Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
N2018-0504
City Newport Beach 11111111111111111111111111111111111111111111111p1111 Permit No:N2018-0504 oivcenter Dach, CA 92660 Permit Phone Project No: 0692-2017 Counter (949)644-3311 . Online Inspection Request - www.newportbeachca.gov / Online n `4 �11 Services 4114 Inspection Requests Phone (949)644-3255 Job Address: 461 MORNING CANYON RD NB Thomas:Guide: 919G3 Description : EA FOR DECORATIVE ENTRY WALK, DAN APPROACH AND STEP. UPDATED 12-5-18: ARTIFICIAL TURF IN THE PUBLIC RIGHT-OF-WAY. Parcel # : 4591-621-9 - Legal Desc : N TR 1237 LOT 43 Owner: RILEY DAVID & GIANNA Contractor : ALTERA LANDSCAPE Phone: 949-233-2113 Phone: 866-872-2611 Address : 461 MORNING CANYON DR �•• Address : 34145 PACIFIC COAST HWY #172 CORONA DEL MAR, CA 92625 DANA POINT CA 92629 Contractor State Lic: 893827 Applicant: NIELSEN PHIL License Expire : 04 30, 2019 Phone: 714-717-1418 [ Address : 6131 ANACAPA DR HUNTINGTON BEACH CA 92647 Business License: BT30056271 Business Expire: 08 31, 2019 Special Cond.: PRE -CONSTRUCTION MEETING REQUIRED Workers' Compensation Insurance - - Carrier : WEST AMERICAN INS Policy No: XWW58005903 W. C. Expire: 07 05, 2019 Permit Processing Fee : $0.00 Sewer Connection : $0.00 Total Fee $1,162.00 Agreement Fee: $871.00 4TT Box Cover: $0.00 Paid : $1,162.00 Traffic control Plan Check : $0.00 Total Water Meters : $0.00 Balance : $0.00 Inspection Fee : $291.00 Water Meter Connection : $0.00 Receipt No: 92gC5 Refundable Deposit: $0.00 Total Water Meter Box: $0.00 Street Tree Fee : $0.00 Adjustment : $0.00 Processed By: Date: _/_/ Other Department: —Date: Utilities Approval : Date : _/_/ Permit Denied Date Traffic Approval : Date: _/_/ Issued Permit: Date: General Services Approval : Date: /// Permit Processing Fee: Q Public Works Only $257.00 Other Department $293.00 Agreement Fee: Preparation of Report/Agreement $871.00 Document Recordation Fee $204.00 Monitoring Wells $535.00 Inspection Fee: Public Works Field Inspection Utilities Field Inspection Water Quality/Artificial Turf Inspection Refundable Deposit: Improvements Qty- $176.00 $129.00 $115.00 1 TBD TBD Street/Alley/Walk Closure: $70.000 Newspaper Rack Inspection $115.00 0 Traffic Control Plan Check 8-1/2" x 11" $70.00 Sewer Connection Fee $250.00 24" x 36" $152.00 4TT Box & Cover $64.00 Additional 1---- ——----1 THE FOLLOWING ITEMS REQUIRE APPROVAL FROM THE Revenue Dlvi—slo—n — — — — — — I REVENUE DIVISION PRIOR TO PAYMENT OF FEES Approval: I I (Water Meter: Installation Charge $563.00 I 34' Meter $50.25 1 1" Meter $121.50 Water Meter Boxes: 1 11 1/2" Meter $285.00 1" DFW Meter Box $96.66 e 11 1/2" Turbine Meter $700.00 2" DFW Meter Box $203.24 12" Meter $425.00 1 12" Turbine Meter $845.00 1 13" Meter $3,310.00 14" Meter $4,730.00 1 16" Meter $7,190.00 Development Services Fee (Plan check hourly) $165.00 5200-5015 Final Tract Map Checking Fee $2,653.00 5200-5026 Final Parcel Map Checking Fee - Moderate $2,653.00 5200-5027 Lot Line Adjustment Fee $1,151.00 5200-5028 Park Dedication Fee Zone TBD 405-470 Street Easement/Vacation Fee (+100% of hrly over 4 hrs) $1,089.00 5200-5031 Street Tree Fee ($700 Planting Fee) TBD 030-2284 Engineering Tech: Total Amount Due: For Finance Use Only SZOA4 t 2,- $ -1.4' Permit Specialist Receipt No. 'Rotw , - 4 Z,Q O S flusersipbwlshar"encroach/masterslep front and tuck masters) Rev. 9/13/2018 epfeeshestAs-revised 9113(18 Cityo Newport Beach B"1111111111111111111111111111111111111111111111111111110gcach. CA �2660 Permit Counter Phone (949)644-3311 it Online Inspection Request - www.newportbeachca.gov / Online Services Job Address: 461 MORNING CANYON RD NB Description : EA FOR DECORATIVE ENTRY WALK, D/W APPROACH AND STEP. Parcel # : 4591-621-9 - Legal Desc : N TR 1237 LOT 43 Owner: RILEY DAVID & GIANNA Phone: 949-233-2113 Address : 461 MORNING CANYON DR CORONA DEL MAR, CA 92625 ... Applicant: NIELSEN PHIL Phone : 714-717-1418 [ Address : 6131 ANACAPA DR HUNTINGTON BEACH CA 92647 Special Cond.: PRE -CONSTRUCTION MEETING REQUIRED Permit Processing Fee : $0.00 Sewer Connection : $0.00 Agreement Fee: $871.00 4TT Box Cover: $0.00 Traffic control Plan Check: $0.00 Total Water Meters: $0.00 Inspection Fee: $176.00 Water Meter Connection : $0.00 Refundable Deposit: $0.00 Total Water Meter Box: $0.00 Street Tree Fee : $0.00 Adjustment : $0.00 Processed By: Utilities Approval : Traffic Approval : General Services Approval Thomas:Guide: Contractor Phone : Address Permit No: N2018-050,4 Project No : 0692-2017 Inspection Requestc Mora -IkIh"285 ' 919G3 ALTERA LANDSCAPE 866-872-2611 34145 PACIFIC COAST HWY #172 DANA POINT CA 92629 Contractor State Lic: 893827 License Expire : 04 30, 2019 Business License: BT30056271 Business Expire: 08 31, 2019 Workers' Compensation Insurance - - Carrier : WEST AMERICAN INS Policy No: XWW58005903 W. C. Expire: 07 05, 2019 Total Fee $1,047.00 Paid : $1,047.00 Balance : $0.00 Receipt No: Date : _/ / Other Department: Date : Date : /_/ Permit Denied Date .L. e' Date : // Issued Permit: Date : `/S /TR Date : / / COMPLETE THE BELOW INFORMATION PROJECT ADDRESS: 4 (P 1 Morn;n Can on Road - Corono. Oa Mast CA g7&P25- DETAILED DESCRIPTION OF PROPOSED WORK: 1 - 4*t dieg:�t�- 141-adt'. d,1,41 APPLICANT: Q 112hone:gLM.0t$1 . 2007 Email Address: � ol.anclx e.Corn `' w eAl4er..w&c G•cam Mailing Address: 34141F 4e:9c Cori+ kwy stj"ie 2 City/State/Zip: a Pain's CA Q20V OWNER: Dam! d w Phone: q49 --233 - 21 13 Email Address: pave r� �rA. cGrY� Mailing Address: 2---+"2..o E. coms+ 4WY City/State/Zip: Corona De I Ma.r CA a2(o2S -ALL CCO.i ACTOR TKW,ISREQtIWM*W.ASE COMPLETE CONTRACTOR: Avkem LLX Office Phone: C14q. %1 • ZO02 Company (if different): Jobsite Phone: Somf. Other Phone: 56Urie Email Address: Q L-andsc . m CoA Cant( . COM Mailing Address: q IBIS c GrJ4 Pw5vi-k4472 City/Stet ip: oJr-4 C,4 4-VO-L-i State License Number & Class: c13Expires: 1-f 36I4t City Business License Number: �3T0OSlv2-=k-1 Expires: Ir31 1er WORKERS COMPENSATION INSURANCE - Certificate of Insurance (Section 3800 Labor Code) Com an A P =f1C • Policy No: XW Wst00s0f0 3 Expires: 2zS M Municipal O erations: 949-644-3055 Utilities: 949-644-3011 Urban Forestry: 949-644-3083 :-FOROFFICE USE ONLY Special Conditions of Permit: ADDITIONALAPPi4WAL REQUpiED FROM THE FOLLOWING DEPARTMENTS Utilities: Municipal Operations Traffic: Fire: 0 Other: Engineering Technician: cialist Pe Nipo Date: l Permit No. IN2018- f /userstpbw/shared/encroach/masters/epwarksheet.xls t 1 Public Works Department 949444-3311 100 Civic Center Drive, Newport Beach, CA 92660 Permit Processing Fee: Public Works Only $257.00 Other Department $293.00 Agreement Fee: Preparation of Report/Agreement $871. Document Recordation Fee $204.00 Monitoring Wells $535.00 [n Inspection Fee: Public Works Field Inspection Utilities Field Inspection Water Quality/Artificial Turf Inspection Refundable Deposit: Improvements Street/Alley/Walk Closure: $70.00Newspaper Rack Inspection Traffic Control Plan Check 8-1/2" x 11" $70.00 Sewer Connection Fee 24" x 36" $152.00E 4TT Box & Cover Additional THE FOLLOWING ITEMS REQUIRE APPROVAL FROWN THE R REVENUE DIVISION PRIOR TO PAYMENT OF FEES �A Water Meter: 1-� Installation Charge 13/4" Meter $50.25 11" Meter $121.50 Water Meter Boxes: 11 1/2" Meter $285.00 1" DFW Meter Box 11 1 /2" Turbine Meter $700.00 T' DFW Meter Box 12" Meter $425.00 12" Turbine Meter $845.00 13" Meter $3,310.00 14" Meter $4,730.00 16" Meter $7,190.00 $176.0 $129. 3 9 $115.00 TBD TBD $115.00 $.00E----J $64 $64.00 venue Division — — — — _ 1 provai: 1 $96.66 $203.24 Development Services Fee (Plan check hourly) $165.00 5200-5015 Final Tract Map Checking Fee $2,653.00 5200-5026 Final Parcel Map Checking Fee - Moderate $2,653.00 5200-5027 Lot Line Adjustment Fee $1,151.00 5200-5028 Park Dedication Fee Zone TBD 405-470 Street Easement/Vacation Fee (+100% of My over 4 hrs) $1,089.00 5200-5031 Street Tree Fee ($700 Planting Fee) TBD 030-2284 Engineering Tech: Total Amount Due: For Finance Use Only Permit Speck "st Recel o. fluserslpbw/shared/enwach/masters/ep front and back masters/ Rev. 9/13/2018 epfeesheetAs-revised 9113118 ALL UNDERGROUND WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR Contact "Underground Service Alert" At Least 48-Hours in Advance of Any Excavation at 800422-4133 TERMS AND CONDITIONS OF ENCROACHMENT PERMIT WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code) 1 Encroachment Permits may be taken out by the owner of benefited property or a licensed contractor. A licensed I certify that I have a Certificate of consent to selfWftifieate of Worker's contractor must provide a `Letter of Authorization" to allow another party to pull a permit. An approved copy of the Co pensation Insurance, or a Certified Copy her permit andconstruction plan shall be kept at the job site at all times. Work, which has been done prior to issuance of 5 a permit, is subject to rejection/fine. City reserves the right to void permit if work does not commence within 30 days Date: Signature: after date of issuance CERTIFICATE OF EXEMPTION (Section 3800 Labor Code) 2. The Permittee agrees to defend, indemnify and hold the City, its authorized agent, officers, representatives and employees harmless from any responsibility, liability, suit or action of any description arising out of any accident, loss I certify that in the performance of the work under this permit, I shall not employ or damage to persons or property occurring as a result of work undertaken under this permit. any person so as to become subject to California Worker's Compensation Laws. If, 3. All work shall be done in accordance with the approved plans, Standard Special Provisions and Standard Drawings after signing this certificate I become subject to the Worker's Compensation of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances. provprov si provisions of the State Labor Code, I must comply with the provisions of Section 4 Permittee guarantees all work performed under this permit to be free of hidden and latent defects. Any failures shall this shall be deemed revoked. be corrected within two weeks after notification to the satisfaction of the Public Works Director. permit 5 A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by the Date: Signature: Public Works Director. A valid State Contractor License Class A can perform any work in the public right-of-way. For construction or connection to water lines a valid State Contractor License Class C-34 is required. For construction or connection to sewer lines a valid State Contractor License Class C-42 is required. CONTRACTOR LICENSE EXEMPTION 6. All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L, As the Owner of the benefiting property, I certify I am personally performing all in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public work in the Public Right -of -Way. Works Dept. Contractors shall obtain permits to perform excavation or trench work from the California Division of Date: Signature: Industrial Safety prior to commencing underground construction as required by State law. Walls and faces of all excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent means. Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected. HOLD HARMLESS STATEMENT 7. The Public Works Department Inspectors must inspect all work in the Public right-of-way. Forms and subgrade must I understand that I am locating minor encroachments within the City Right -of - be inspected and approved before concrete is ordered/poured. Sewer, pipelines, and subgrade construction must be Way/Easement. As property owner it is my responsibility to maintain the inspected and approved before backfilling, or applicant may be required to excavate site. Separate Utilities encroachments. I will be responsible for replacing the improvements if the City Department or General Services Department inspections may be required depending on scope of work performed. removes them for maintenance of utilities or other public need. 1 shall indemnify 8. All trench restoration must be inspected by the Public Works Department. No utility installation(s) shall be allowed and hold the City harmless for any liability associate with the minor over or within 5 feet of any City utilities, unless approved by the Public Works Department. Locate and pothole encroachments. existing City -owned utilities tie, water, sewer, or street lighting conduits) to verify locations. Maintain a one -foot clearance over or under existing City -owned utilities. Sewer cleanouts require VCP or PVC SDR35 be used with a Date: Signature: 4TT box over the riser. 24-hour notice for Encroac en Permit Inspection is required by calling 9 Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions. All "Manual signs, flags, lights and other warning and safety devices shall conform to the requirements of the current of Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways', issued by the Public Works at 949-644-33 1. California Department of Transportation. If needed, barricades can be obtained from the City at a charge of $10.00 15. Any above ground utility facilili will require documented approval from the adjacent per barricade per day, with a minimum charge of $35.00. It is the responsibility of the applicant to place barricades to protect the general public. Access to fire hydrants must be maintained at all times affected property owner(s). 10. Work within or near beach sensitive areas will not be allowed during, City holidays, spring break, Memorial Day 16. Homeowner, contractors, and subcontracotrs may each be liable for violations of Water weekend, summer between June 15 and September 15. and during the holiday season from December 19 to Quality Laws. Best Management Practices will be enforced. It is against the law to 11. January 1, unless approved by the Public Works Department. Any work that extends into traffic or parking lanes and impedes the normal flow of traffic requires the applicant to discharge construction debris into the gutter and storm drain. Felony violations of Wafer acquire a Temporary Street Closure Permit from the Public Works Department. Access for fire, police and Quality Laws are punishable by fines up to $25,000 and/or up to three years in State emergency vehicles must be maintained at all times Traffic Control must be per Work Area Traffic Control prison plus the full cost to clean up an illegal discharge or spill. 17 If a refundable deposit was paid, applicant must submit a Soils Compaction applicant Handbook (WATCH). No nighttime traffic lane closures, unless prior approval has been granted. Any lane(s) closure on a major street will only be allowed between 9:00 a.m. and 3:00 p.m. (Monday thru Friday), unless approved by Certificate or Evidence of a Slurried and requesttsa final inspectionisCo from the the Public Works Department. Any work affecting the State Highway's traffic or within the State Highway right-of-way Public Works Department. Monies may be held for six months after final inspection will require a Caltrans Permit. All vehicles shall be lawfully parked. before a refund will be processed. 12 This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of 18. No trees in the public right-of-way shall be planted, removed, trimmed, er relocated materials, or parking of construction vehicles unless detailed on an attached Temporary Street Closure without approval from the General Services Department. 13. Applicant must notify USA at 1-800-227-2600 2 days before starting any underground construction. Applicant 19. All work in the public right-of-way must meet the approval of the Public Work must notify all affected residents 24 hours in advance of restricted access and any inconveniences. Department or corrections will be required (i.e. removals, exposing connections, 14. Refuse or unused materials shall be removed within 24 hours after completion of the work. If not removed, the City etc.). Additional inspection fees may be required, may remove and bill the applicant. Coordinate alley closures with City's refuse pick-up days by calling 949-644-3066 20. Permit is for standard materials in the public right-of-way only, unless previously for the collection schedule so service is not interrupted To place a dumpster or materials in the public right-of-way, a approved by Public Works and an Encroachment Agreement has been processed. Temporary Street Closure Permit must be obtained from the Public Works Department. 21. Permit is valid for "description" of work noted on front only. Additional work performed may require issuance of a separate permit and/or additional fees. No work related to this encroachment permit shall be performed until the Public Works Department has Issued this permit. Applicant hereby peknowledges he/she has read<'/'and under rids the ter s and conditions of this permit and he/she agrees to abide by them. Permit is void if work is not commenced within 30 days after Issuance./ Permit fees are nonrefundable. Dat /J J /15(Sianature: 1% mw =w X= w� 098* �U- do Advo =ir d0�0� SIAVG L aeog NO�Nb) 9MN210W 1%, •r� t ap ��'2 s�i �- ._ . _ . _ _ - ems. �i,_ .s'.•'�..'.�....:,:u .iLs ._rt�e._ 7._r..';`1+�� ��3 (Jd LUG':-) d UU !' _i J PailpI;(n aq of 61111or)iJ all! �j 9Nn M(11A aN11 When Recorded Return To: DAVID A RILEY Recorded In Official Records, Orange County 2720 EAST COAST HIGHWAY Hu Nguyen, Clerk -Recorder CORONA DEL MAR, CA 826211 21.00 11111� IFF[qjqRjjjPjjkj Recording Requested By:* s R 0 6 201700MBW51:43 pm IM7117 FIRST REPUBLIC BANK PAYOFF DEPARTMENT -Phone R: 800-331-3282 _ 62 8ec2 81LI R01 F14 2 . 9.gQ-0_.00 0.00 0.00 3.00 0.00 0.00 O.QQ..,.— PIN: 488462-18 SUBSTITUTION OF TRUSTEE AND FULL RECONVEYANCE , liiiiiiiiiiiiiiiiiiiiilloillilliulI WHEREAS, David A. Riley and Glenna 0. Riley, husband and wife was the Original Trustor, FIDELITY NATIONAL F Trn4 INSURANCE COMPANY, the Original Trustee, and, FIRST REPUBLIC BANK, the Original BenefidW, under that certain Deed of Trust dated 11102/2016 and recorded 11/180016 as Instrument No: 2016MOSS232 , Ofitcial Records of Orange County, State of California and Property Address: 461 MORNING CANYON ROAD, NEWPORT BEACH, CA, 82625 Loan Amount: $975,000.00 WHEREAS, the undersigned present benefidary desires m substitute a new Trustee under said Deed of Trust in place and instead of FIDELITY NATIONAL TITLE INSURANCE COMPANY. Now therefore, the undersigned hereby substilutes himee "N"Nselfithemselves as Trustee under said Deed of Trust and does hereby reconvey, without warranty, to the person or persons legally entilled hereto, the Estate now held by him thereunder. Whenever the conteod hereof so requires, the masculine gender Indudes the feminine and/or neuter, and the singular numbers includes the plural. . The undersigned hereby accepts said appointment as trustee under the above deed of trust, and as successor trustee, and. pursuant to the request of said owner and holder and to accordance with the provisions of said deed of trust, does hereby RECONVEY WITHOUT WARRANT, TO THE PERSONS LEGALLY ENTITLED THERETO, all the estate now held by it under said deed of trust. Dated:10/AM17 . BENEFICIARY / NEW TRUSTEE FIRST REPUBLIC BANK By: Kelly Walter Its: Assistant Vice President page 41 61164e32 RPY Rene 1022340 2M3 CAM 0MV6 Corot Z=42M is A notary public or other after completing this certificate verifies only the Identity of the Individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of CALIFORNIA County of LOS ANGELES COUNTY On October 26, 2017, before me, Joseph Vincent Clcone, a Notary Public, personalty appeamd Kelly Watter, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) Were subscribed to the within instrument and acknowledged to me that halahelthey executed the same in hWherAheir authorized cepacky(les). and that by hbA wAheir signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed One Instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is fire and correct. WITNESS m}r I seal �JOW YINCENT ca'ANE COMM. 82142244 Signature (S�) _ Lames : ncent Cicone nfeb 2Q10 Commission Expires: 02l0812020 Page 0 2 61164M RPY Red 1822349 20253 CA059 Orenge Cain 22664= MEwNr��,a v � Cads+�nK'' Permit Number CITY OF NEWPORT BEACH Artificial Turf - Maintenance Standards and Installation Guidelines Council Policy L-6 Private Encroachments in Public Rights -Of -Way N2018-0504 Date : 12/05/2018 The use of artificial turf shall be governed by the following standards: (1) Materials Minimum Specifications. a. Artificial turf shall be of a type known as cut pile infill and shall be manufactured from polypropylene, polyethylene, or a blend of polypropylene and polyethylene fibers stitched onto a polypropylene or polyurethane meshed or hole -punched backing. b. Hole -punched backings shall have holes spaced in a uniform grid pattern with spacing not to exceed four inches by six inches on center. c. Soil stabilizing filter fabrics shall be rated to perform for a minimum of 15 years. d. See detailed specifications at www.asgi.us (2) Installation. Site preparation is extensive for artificial grass and should be done by a professional installer. Pursuant to the Contractor's State License Board, synthetic grass installers must have a classification "A" (General Engineering), "B" (General Contractor), C-27 (Landscaping), or C-61/0-12 (Synthetic Products) Contractor's License. Artificial turf shall be installed in accordance with the manufacturer's specifications and in accordance with the Association of Synthetic Grass Installers (ASGI) guidelines. Artificial turf shall be maintained in a manner to mimic healthy living turf, including the following: a. Sod or existing groundcover shall be removed prior to installation of any artificial turf. b. Artificial turf shall be installed over a compacted and porous road base material that is a minimum of two inches deep. c. Underlayment fabric shall be no less than 4 ounces per sq. ft. d. Artificial turf shall be anchored at all edges and seams. e. All artificial turf seams shall be glued and not sewn. • Artificial turf shall be maintained by the property owner in a fashion so as to mimic the appearance of a flourishing, maintained lawn without any of the following: fading • visible seams • gashes, dents or ruts 0 damaged areas or stains • worn-out unnatural appearance • odors or a matted appearance f. All parkway trees, new and existing, shall have the artificial turf cut and anchored a distance no less than 24 inches around the tree base. A layer of mulch shall be placed and maintained to cover the base of all parkway tree(s). All parkway tree(s) shall be provided irrigation or hand watered during the tree(s) establishment period and/or if the tree(s) are in need of watering. It is the homeowner's responsibility to maintain a sufficient watering schedule to maintain the health of the tree(s). (3) Maintenance. Do: Clean, sanitize, brush, and remove debris. a. Cleaning shall be done with non -toxic, biodegradable products. Any discharge of wash/waste water or cleaning materials shall be prevented from entering the gutter and storm drain system. b. Hand rake worn turf areas. c. Repair depressions to maintain an even visual surface. d. Brush back any loose infill that has been washed or moved off the turf. e. Eliminate any odors, flat or matted areas, weeds, loosened edges at seams or elsewhere. f. Replace artificial turf when maintenance or repair is unable to simulate a healthy living turf. Do Not: Install indoor/outdoor carpet or allow runoff or weeds a. Wash down artificial turf area so as to allow runoff. b. Install artificial turf up to the base of the parkway tree(s) less than 24 inch diameter around tree base. c. Allow weeds to grow along perimeter or through any seem. d. Install "indoor/outdoor' carpeting type material in lieu of artificial turf as set forth in the Association of Synthetic Grass Installers (ASGI) guidelines. References: Landscape architects and installers: www.cica.org Artificial turf installation guidelines: unouv.asgi.us Landscape rebates: www.eoatersmartnewport.orQ I understand the information provided me and my responsibility as a homeowner to install and maintain the parkway and tree(s) if any existing or future plantings in a manner as written above and abides by council Policy L-6. Property Address: 461 MORNING CANYON RD NB Date: Homeowner Signature:RILEY DAVID & GIANNA Print Name: / / CITY OF NEWPORT BEACH PUBUC WORKS DATE 11/06/2018 PRE -JOB CHECKLSIT PERMIT N2018 0504 �.y�Q�N•' ADDRE55 461 MORNING CANYON RD PW INSPECTORJulio VelaHO EMAIL. `claytiG n�•y_vpur yr ��h�pv PHONE 714 315 4960 INSPECTION REQUESTS PHONE OR ON-LINE. 949 6" 3255 STANDARD DRAWING (STD) OR ITEM REVIEWED REVIEWED Affilluff (Rf,R) LIMITS: These areas may Include sidewalk (S/", curb and apnoadl, AC of PCt: Street, AC or PCC Alley. Parkways. or wo&ways. STD 105-L-A UNDERGROUND CONSTRUCTION REQUIREMENT NOTES x STO 105-L-6 TRENCH RESURFACING - TYPES OF PAVEMENT RESTORATION STD 105-L-C ROADWAY UTILITY TRENCH DETAIL STD 105-L-D PARKWAY UTILITY TRENCH DETAIL STD, 305-L-E ROADWAY UTILITY POTHOLE AND BORE DETAIL STD 105-L-F MORATORIUM ROAOWAV TRENCH OETAII Follow Imk of all Cov Mo.aTo• w St.ee(51r. w STD 105-L-G MONITORING WELL CAPPING DETAIL STD 140-L TYPICAL ALLEY SECTION STO 160-L-A COMMERICAL DRIVEWAY DETAIL APPROACH TYPE I STO 162-L RESIDENTIAL DRIVEWAY APPROACH TYPE I. TYPICAL O/W APPROACH STD 163-L RESIDENTIAL DRIVEWAY APPROACH TYPE IT OII MAY APPROACH TYPE III: ROLLED CURB x crn Taal GI uu sasannr4cn nalvcwev 11/6/2018 City of Newport Beach Page 12 of 15 6:30:21AM INSP150 - Daily Inspection Request Report Requested Inspection Date : 11/06/2018 Inspection Type: ENCROACH inspection Area : PW Site Address: 461 MORNING CANYON RD AMID Information: Activity : N2018-0504 SubType : NEW Status : APPROVED OWNER: RILEY DAVID & GIANNA Phone : 949-233-2113 APPLICANT: NIELSEN PHIL Phone : 714-717-1418 PHILNIELSEN00@YAHOO.( Description : EA FOR DECORATIVE ENTRY WALK, D/W APPROACH AND STEP. Requested inspections) Item: 10200 PRE JOB - PW Requested Time: 11/6/2018 12:00:OOAM Requestor: WEBUSER Entered By: WEBUSER � F �54 9499812002 Comments: AM - Assigned to :777zz»7»7* i� ' �y-pi'7,)%7' i fi l i S C) !�', j"' 4, Dx_5-ItTL L Zji AJ L�L � / tAl) A-LL" tiVc I- LA 7 Lc F3 L '411114/2018 City of Newport Beach Page 3 of 16 4:30:15PM INSP150 - Daily Inspection Request Report Requested Inspection Date: 11/15/2018 Inspection Type: ENCROACH Inspection Area: PW Site Address : 461 MORNING CANYON RD Activity : N2018-0504 SubType : NEW Status : APPROVED OWNER: RILEY DAVID & GIANNA Phone : 949-233-2113 APPLICANT: NIELSEN PHIL Phone : 714-717-1418 PHILNIELSEN00@YAH00.( Description : EA FOR DECORATIVE ENTRY WALK, D/W APPROACH AND STEP. Requested nspectio(s) Item: �b Requested Time: 11/15/2018 12:00:OOAM Requestor: %1VR 9494334449 iJ N✓1 Entered By: NBIVR Commentg: AM Assigned to: V p -) "e, '1 e0 s L-L,, e,4,07 /f of= ,gal � ! �- v s . a�� 71) P <E7;�o - C"-3 �11119/2018 City of Newport Beach Page 2 of 15 4:30:34PM INSP150 - Daily Inspection Request Report Requested Inspection Date: 11/20/2018 Inspection Type: ENCROACH Inspection Area: PW Site Address : 461 MORNING CANYON RD Y Activity : N2018-0504 SubType : NEW Status : APPROVED OWNER: RILEY DAVID & GIANNA Phone : 949-233-2113 APPLICANT: NIELSEN PHIL Phone : 714-717-1418 PHILNIELSEN00@YAH00.( Description : EA FOR DECORATIVE ENTRY WALK, D/W APPROACH AND STEP. Item: 10110 C-9NGWT&PUffECV90RKS�� Requested Time: 11/20/2018 12:00:OOAM Requestor: Entered By: NBIVR Comments: AM Assigned to: \ % $ -f3© A- P1 I> - twe e ^00'. AC -so 15 "" A'l f110 NBIVR 9494334449 �J ` 4 d,C Logged Refile l r .. 7 z5 fro cam3 f 11/27/2018 City of Newport Beach Page 2 of 12 4:30:21PM INSP150 - Daily Inspection Request Report Requested Inspection Date: 11/28/2018 Inspection Type : ENCROACH Inspection Area: PW .y, Site Address: 461 MORNING CANYON RDA .. i .. i ��L2, ��s vryys ` Y-., ' ��+F .. ... `�it. x . � .. • °:,:i7S Activity : N2018-0504 SubType : NEW Status : APPROVED OWNER: RILEY DAVID & GIANNA APPLICANT: NIELSEN PHIL Phone : 949-233-2113 Phone : 714-717-1418 PHILNIEU Description: EA FOR DECORATIVE ENTRY WALK, D/W APPROACH Item: 10250 FINAL - PW Requested Time: 11/28/2018 12:00:OOAM Entered By: NBIVR Comments: Assigned to: PM '� V 9494334449 COMPLETED