Loading...
HomeMy WebLinkAboutX2016-3832 - Misc (2),2669-z016 xzot6-�g3z j7Oq 14r5hland ®r Appendix E LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION I hereby certify that: (1) 1 am a professional appropriately licensed in the State of California to provide professional landscape design services. , (2) The landscapq proj ct for the property located at f QCZ6 %J, c 1��D 2kea. _/c� 4 (pr 'vide street address 4 parcel number(s)) was installed by me or under my supervision. (3) The landscaping for the identified property has been installed in substantial conformance with the approved Landscape Documentation Package and complies with the requirements of the City of Newport Beach Water Efficient Landscape Ordinance (Municipal Code Section 14.17) and the City of Newport Beach Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for the efficient use of water in the landscape. (4) The following elements are attached hereto: a. Irrigation scheduling parameters used to set the controller; b. Landscape and irrigation maintenance schedule; c. Irrigation audit report; and d. Soil analysis report, if not submitted with Landscape Documentation Package, and documentation verifying implementation of the soil report recommendations. (5) The site installation complies with the following: a. The required irrigation system has been installed according to approved plans and specifications and if applicable, any prior approved irrigation system alternatives. Yes No b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler & EmitterStandard. I Yes No (6) The information I have provided in this Landscape Installation Certificate of Completion is true and correct and is hereby submitted in compliance with the City of Newport Beach Design Standards for Implementation of the City of Newport Beach Water Efficient Landscape Ordinance. 33 Caoall Print Name Signature Address Telephone Landscape Design Professional's Stamp (If Appropriate) 9M Date � M1,71 License Number mail Address CERTIFICATION OF LANDSCAPE DESIGN I hereby certify that: Appendix B (1) I am a professional appropriately licensed in the State of California to provide professional landscape design services. (2)A�The landscape design and water use calculationAfor the property located at _ (provide street address or parcel numlber(s)) were prepared by me or under my supervision. n (3) The landscape design and water use calculations for he identified property comply with the requirements of the City of WI Water Efficient Landscape Ordinance (Municipal Code Secti ns 1 ,12 ) and the City of O�tyGuidelines for Implementation of the City of 9 l- Water Efficient Landscape Ordinance. (4) The information I have provided in this Certificate of Landscape Design is true and correct and is hereby submitted in compliance with the City of 1 Guidelines for Implementation of the City of lc Water Fff*c*L&nt Landscape Ordinance. Print Name Dale T /Signature Telephone Landscape Design Professional's Stamp R CC --d9- 71&:7/ License Number c 40grUkr�•cv�Y -mail Address V WATER USE CALCULATIONS Regular Landscape Areas Tota I ETAF x Area 2081 Total Area 3936 Average ETAF 0.53 All Landscape Areas Total ETAF x Area 3078 otalArea 4933 Average ETAF 0.62 Average ETAF for Regular landscape Areas must be 0.55 or below for residential areas, and 0.45 or below for non-residential areas. California Water Efficient Landscape Worksheet Reference Evapotranspiratlon(IT.) 1 43.21 Project Type , Residential, 0.55 Hydroaone # / Planting Descri tions Plant Factor (PF) lirrigation Method" Irrigation Efficient (IE)` JEW (PF/IE) ILandscape Area 5 . Ft. JETAF x Area lEstimated Total Water Use (ETWU)° Regular Landscape Areas Al Shrub Bubbler MED OA Overhead 0.75 0.53 . 24 13 343 A2 Shrub Drip MED OA Drip 0.81 0.49 31, 155 4153 A3 Raised Pit. Drip MED DA Drip',0.81 0.49;i, 356 176 4709 A4TurfSprayHlGH, 0.7 Overhead" 0.75 0.93 590 551 14749 A5 Shirub Drip LOW, 0.2 Drip 0.81 0.25 833 205 5502 A6 Shrub Drip MED OA Drip 0.81 0.49 '; 256 126 3386 A7 Veggie Drip -MED 0,4 Drip 0.81 0.49 " 30 15 397 A8 Tree Bubbler LOW 0.2 Overhead. 0.75 0.27 ; .48 13 343 A9 Shrub Bubbler MED 0.4 Overhead'' 0.75 0.53 152 81 2171 A10 Turf Spray HIGH O.l Overhead i 0.75 0.93 202 189 5050 Al i Tree Bubbler LOW 0.2 Overhead 0.75 0.27 48 13 343 Pool&Spa 0.7 Overhead: 0.75 0.93 584 545 14599 Mulch Only 0 0.75 0.00 500 0 0 0.75 0.00 0 0 0.75 0.00 0 0 0.75 0.00 0 0 0.75 0.00 ,' 0 0 0.75 0.00 01 0 0.75 0.00 0 0 0.751 0.00 1 01 0 otals 3936 1 2081 1 55745 Special Landscape Areas FrontTurf -Existing MMMM"[Totals 1 1 1 1 997 997 0 00 0 26704 0 0 997 997 26704 ETWU Total 82448 Maximum Allowed Water Allowance (MAWA)-i 84686 Regular Landscape Areas Tota I ETAF x Area 2081 Total Area 3936 Average ETAF 0.53 All Landscape Areas Total ETAF x Area 3078 otalArea 4933 Average ETAF 0.62 Average ETAF for Regular landscape Areas must be 0.55 or below for residential areas, and 0.45 or below for non-residential areas. IRRIGATION CONTROLLER SCHEDULE ET, DATA JAN FEB. MAR. APR MAY JUN. JUL AUG. SEP. OCT. NOV. DEC. MONTHLY 2.2 1 2.7 1 3.4 1 3.8 1 4.6 1 4.6 1 4.9 1 4.9 1 4.4 1 3.4 1 2.4 1 2.0 1 = 43.2 WATERING SCHEDULE NOTES: • THIS SCHEDULE IS INTENDED AS A STARTING POINT ONLY. • THE IRRIGATION CONTRACTOR SHALL ADJUST RUN TIMES FOR ACTUAL SITE CONDITIONS and MICRO -CLIMATES. • SPLIT RUN TIMES MAY BE REQUIRED for SLOPE CONDITIONS and VARYING SOIL INFILTRATION RATES • APPLICATION RATE SHALL NOT EXCEED THE INFILTRATION RATE of THE SOIL • IRRIGATION RUN-TIMES SHALL be BETWEEN THE HOURS of 10:00 P.M. AND 5:00 A.M. NOZZLESwkh mAVEMGE PRECIPITA770N RATEof0.45