HomeMy WebLinkAbout05 - Annual Measure M2 - Program Eligibility SubmittalPORT CITY OF
O �
_ i NEWPORT BEACH
City Council Staff Report
<i FO RN
June 11, 2019
Agenda Item No. 5
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
PREPARED BY: Shelby Morgan, Management Assistant
smorgan newportbeachca.gov
PHONE: 949-644-3013
TITLE: Resolution No. 2019-49: Annual Measure M2 — Program Eligibility
Submittal
ABSTRACT:
In order to maintain eligibility to receive Measure M2 Fair Share and Competitive funding
from the Orange County Transportation Authority (OCTA), annual submittals of eligibility
documentation is required. The submittal documentation this year requires approval of
an updated Measure M2 Seven -Year Capital Improvement Program (CIP) and adoption
of a resolution which adopts a Pavement Management Program, affirms that the City's
Circulation Element is in conformance with the Regional Master Plan of Arterial Highways
(MPAH), and reaffirms the City's Mitigation Fee Program.
RECOMMENDATION:
a) Determine this action is exempt from the California Environmental Quality Act (CEQA)
pursuant to Sections 15060(c)(2) and 15060(c)(3) of the CEQA Guidelines because
this action will not result in a physical change to the environment, directly or indirectly;
b) Adopt the Measure M2 Seven -Year CIP;
c) Adopt Resolution No. 2019-49, A Resolution of the City Council of the City of Newport
Beach, California, Concerning the Status and Update of the Circulation Element,
Mitigation Fee Program, and Pavement Management Plan for the Measure M2
Program; and
d) Direct staff to submit all necessary material to OCTA to satisfy the Measure M annual
eligibility requirements.
5-1
Resolution No. 2019-49: Annual Measure M2 — Program Eligibility Submittal
June 11, 2019
Page 2
FUNDING REQUIREMENTS:
Submittal of the eligibility documentation ensures that the City will continue to receive its
Fair Share portion of the one-half cent Countywide transportation sales tax, commonly
known as Measure M2, as well as allow the City to participate in receiving additional funds
through the Measure M2 Competitive grant funding programs. This amounts to several
million dollars in roadway related funding each year and is a key part of our roadway
maintenance program.
DISCUSSION:
On November 7, 2006, Orange County voters approved Ordinance No. 3, the Renewed
Measure M (M2) multi -billion dollar program extension of the original Measure M.
M2 authorized the imposition of a one-half cent retail transaction and use tax for a period
of 30 years starting in 2011.
Current M2 legislation provides local agencies with 18% of the sales tax revenue collected
under a program called "Fair Share." The distribution to each local agency is based on a
formula using population, miles of existing arterial highways located within each
jurisdiction, and taxable sales.
The City of Newport Beach will receive approximately $1.98 million in Fiscal Year 2019-
2020 for local street projects under the Fair Share Program. To maintain eligibility so as
to receive Measure M2 funds, the City must satisfy the following requirements by
June 28, 2019:
1. Adopt a Measure M2 Seven -Year CIP that includes all projects to be funded
partially or fully by Measure M dollars (Attachment A).
2. Adopt a Resolution affirming that the City's Circulation Element is in conformance
with the Regional Master Plan of Arterial Highways (MPAH), reaffirming that
Council concurs with the existing Mitigation Fee Program, and adopting an
updated Pavement Management Plan (Attachment B).
3. Submit all required documents as mentioned in the OCTA Fiscal Year 2019-2020
Measure M2 Eligibility Guidelines (Attachment C and D).
The budgets shown on the Measure M2 Seven -Year CIP for fiscal years 2019/20-2025/26
are estimated based on anticipated spending and historic needs. Actual budgets for
these years have not been established at this time. The Pavement Management Plan
outlines the processes in place for the planning, preventative maintenance and repair of
the City's roadways. An updated Pavement Management Plan report is required to be
submitted to OCTA on a biennial basis. Upon City Council's approval of the
recommended actions, a complete submittal of the City's eligibility packet will be
transmitted to OCTA by June 28, 2019 to ensure continued eligibility under the M2
program.
5-2
Resolution No. 2019-49: Annual Measure M2 — Program Eligibility Submittal
June 11, 2019
Page 3
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this action is not subject to the California
Environmental Quality Act (CEQA) pursuant to Sections 15060(c)(2) (the activity will not
result in a direct or reasonably foreseeable indirect physical change in the environment)
and 15060(c)(3) (the activity is not a project as defined in Section 15378) of the CEQA
Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no
potential for resulting in physical change to the environment, directly or indirectly.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENTS:
Attachment A — Measure M2 Seven -Year Capital Improvement Program
Attachment B —Resolution No. 2019-49
Attachment C — Pavement Management Plan
Attachment D — Mitigation Fee Program — Fair Share Fee Schedule
5-3
ATTACHMENT A
Measure M Seven Year Capital Improvement Program For Fiscal Years 2019-2020 through 2025-2026
City of Newport Beach
Lower Sunset View Park 2,349,600
Year 1
Year 2
Year 3
Year 4
Year 5
Year 6
Year 7
Estimated
95,000
General Fund
Project Name
19/20
20/21
21/22
22/23
23/24
24/25
25/26
Cost
Fund Source
%
Various Pavement
3,316,800
2,038,231
2,087,149
2,135,153
2,214,116
2,295,312
2,377,465
16,464,226.00
M Fair Share
28%
Rehabilitation Projects
2,487,140
2,000,000
2,000,000
2,000,000
2,000,000
2,000,000
2,000,000
14,487,140.00
Gas Tax
25%
2,914,600
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
11,914,600.00
SB1-RMRA
21%
147,100
147,100.00
Contributions (CalRecycle)
0.3%
3,264,750
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
12,264,750.00
General Fund
21%
250,000
250,000.00
Balboa Village Pkg Mgmt District
0%
2,089,000
2,089,000.00
Neighborhood Enhancement
4%
200,000
200,000.00
Wastewater Capital
0%
Subtotal
14,669,390
7,038,231
7,087,149
7,135,153
7,214,116
7,295,312
7,377,465
57,816,816.00
Total
100%
E
1,466,939
703,823
708,715
713,515
721,412
729,531
737,747
C/I
13,202,451
6,334,408
6,378,434
6,421,638
6,492,704
6,565,781
6,639,719
Balboa Peninsula
102,118
102,558
102,998
102,822
410,496
M Comp
88%
Shuttle/Trolley Project
13,925
13,985
14,045
14,021
55,976
Balboa Village Pkg Mgmt District
12%
Subtotal
116,043
116,543
117,043
116,843
466,472
Total
100%
The Balboa Peninsula
51,200
51,200
51,200
51,200
204,800
M Comp
80%
Shuttle Expansion Program
12,800
12,800
12,800
12,800
51,200
Balboa Village Pkg Mgmt District
20%
Subtotal
64,000
64,000
64,000
64,000
256,000
Total
100%
Lower Sunset View Park 2,349,600
2,349,600
M Comp.
41%
Concept / Overcrossings 3,150,400
3,150,400
FFP - Parks & Community Cntrs
54%
95,000
95,000
General Fund
2%
200,000
200,000
Transportation & Circulation Fund
3%
Subtotal 5,795,000
5,795,000
Total
100%
TOTAL PROJECTED BUDGET 20,644,433 7,218,774 7,268,192 7,315,996 7,214,116 7,295,312 7,377,465 64,334,288
C:\Users\smorgan\Desktop\Measure M 7 -yr C1 FY 19-20 SM
5/24/2019
5-4
CAPITAL IMPROVEMENT PROJECTS AS IDENTIFIED IN THE PROPOSED 2019-2020 CIP
Description
Total
Measure M
Fair Share
(12201)
Measure M
Comp.
(1230051,
1230052,
12300531
SB1 - Gas Tax
RMRA (12101)
(12601)
General
Fund
(01201927)
Contributions
(13501, 13801)
Tidelands Facilities
Maintenance Financing
(10001) Plan (56201)
Balboa
Transportation Village
& Circulation Parking Mgmt
(14001) District
(53501)
Neighborhood
Enhancement
(53601)
Wastewater
Capital
(71201)
Various Pavement Rehabilitation Projects
000006-
-
Alleys Reconstruction (15R18)
$225,000
$186,000
$39,000
Balboa Blvd Median Improvements (19R11)
$250,000
$250,000
Bayside Dr, Jamboree Rd, and Marine Ave Rehabilitation (16R12)
$271,250
$271,250
Balboa Peninsula Crosswalks Improvements (19T11)
$155,400
$155,400
Bison Avenue/San Joaquin Hills Rd Pavement Rehabilitation (19R21)
$3,441,000 $1,829,900
$1,414,600 $131,400
$65,100
Bonita Canyon Drive Pavement Rehabilitation (19R22)
$58,570
$58,570
Cameo Highlands Street Rehabilitation (20R21)
$2,900,000
$1,500,000 $1,400,000
Concrete Replacement Program (20R06)
$700,000
$500,000
$200,000
Concrete Street Pavement Reconstruction (18R21)
$1,400,000
$531,500
$568,500
$300,000
Macarthur Boulevard/University Drive Pavement Rehab (18R23)
$380,000
$300,000
$80,000
Marine Avenue Reconstruction (17R13)
$239,500
$237,500
$2,000
Neighborhood Parking and Curb Improvements (20R11)
$450,000
$450,000
Ocean Blvd/Carnation Ave Concrete Reconstruction (18R25)
$1,800,000
$200,000
$1,400,000
$200,000
Old Newport Blvd/West Coast Hwy Modifications (15R19)
$128,670
$128,670
Slurry Seal Program (19R04/20R04)
$1,770,000
$1,770,000
Street Pavement Repair Program (20Ro3)
$500,000
$500,000
Subtotal $14,669,390 $3,316,800
$0 $2,914,600 $2,487,140 $3,264,750
$147,100
$0 $0
$0 $250,000
$2,089,000
$200,000
Pro'ects funded by Measure M Comp. or
Balboa Peninsula Shuttle/Trolley (17T13)
$398,800
1 $334,000
$64,800
Balboa Peninsula Shuttle/Trolley Expansion (19T13)
$295,600
$278,400
$17,200
Lower Sunset View Park Concept/ Overcrossings (15T09)
$5,795,000
1 $2,349,600
$95,000
$3,150,400
$200,000
Subtotal
$6,489,400
$0 $2,962,000
$0 $0
$95,000
$0
$0 $3,150,400
$200,0001 $82,000
$0
$0
Grand Total $21,158,7901 $3,316,8001 $2,962,0001$2,914,6001 $2,487,1401 $3,359,7501
$147,1001
$0 $3,150,4001
$200,0001 $332,0001
$2,089,000
$200,000
5-5
5/24/2019
Agency:
Newport Beach
Project Name:
Balboa Peninsula Trollev
Project Limits:
Balboa Peninsula
Project Number:
16-NBCH-CBT-3832
Type of work (Tow):
Transit
Tow Description:
New Service
Project Description:
Shuttle program for the Balboa Peninsula area.
Measure M
Seven Year Capital Improvement Program (Sorted by Project Name)
Fiscal Years 2019/2020 through 2025/2026
FUND NAME PERCENT ESTIMATED COST PROJECTED COST NOTES
M2 Transit - V 88.00 $410,496 $427,283
Other 12.00 $55,976 $58,265 Balboa Village Parking Managment District
$466,472 $485,548
Project Phase
19/20
20/21
21/22
22/23
23/24
24/25
25/26
Estimated Cost
Projected Cost
E
$0
$0
$0
$0
$0
$0
$0
$0
$0
R
$0
$0
$0
$0
$0
$0
$0
$0
$0
C/I
$102,118
$102,558
$102,998
$102,822
$0
$0
$0
$410,496
$429,572
O&M
$13,925
$13,985
$14,045
$14,021
$0
$0
$0
$55,976
$55,976
$116,043
$116,543
$117,043
$116,843
$0
$0
$0
$466,472
$ 485,548
Agency:
Newport Beach
Project Name:
Balboa Peninsula Trollev Exoansion
Project Limits:
Balboa Peninsula
Project Number:
18-NBCH-CBT-3913
Type of work (Tow):
Transit
Tow Description:
New Service
Project Description:
Provide trolley service for an additional 5 weekends
$0
in August through to Labor Day
FUND NAME PERCENT ESTIMATED COST PROJECTED COST NOTES
General Fund 80.00 $204,800 $212,398 Measure M2 - Transit V
General Fund 20.00 $51,200 $53,100 Balboa Village Parking Management District
$256,000 $265,498
Project Phase
19/20
20/21
21/22
22/23
23/24
24/25
25/26
Estimated Cost
Projected Cost
E
$0
$0
$0
$0
$0
$0
$0
$0
$0
R
$0
$0
$0
$0
$0
$0
$0
$0
$0
C/I
$51,200
$51,200
$51,200
$51,200
$0
$0
$0
$204,800
$214,298
O&M
$12,800
$12,800
$12,800
$12,800
$0
$0
$0
$51,200
$51,200
$64,000
$64,000
$64,000
$64,000
$0
$0
$0
$256,000
$ 265,498
0
5-6
5/24/2019 Measure M 2
Seven Year Capital Improvement Program (Sorted by Project Name)
Fiscal Years 2019/2020 through 2025/2026
Agency:
Newport Beach
Project Name:
Bristol Street Traffic Signal Svnchronization
Project Limits:
Bristol St N from Jamboree to Campus; Bristol St S
24/25
frnm Irvine to .lsmhnree- Rawiew PI/Rawiew Cir
Project Number:
14 -OCTA -TSP -3704
Type of work (TOW):
Traffic Signals
Tow Description:
Replace and upgrade traffic signals and equipment
Project Description:
This project upgrades the traffic signal control
$0
hardware and CCN cameras at eight intersections.
$0
Also updates and implements traffic signal timing and
R
coordination plans for the intersections. OCTA is
$0
lead agency. Carry-over project through FY19/20.
FUND NAME PERCENT ESTIMATED COST PROJECTED C
General Fund 0.00 $0 $0 100 % $71,000 Prior Grant Match from City.
OCTA lead agency.
$0 $0
Project Phase
Newport Beach
Project Name:
Coast Hiahwav Traffic Sianal Svnchronization
22/23
23/24
24/25
25/26
Estimated Cost
Projected Cost
E
$0
$0
$0
$0
$0
$0
$0
$0
$0
R
$0
$0
$0
$0
$0
$0
$0
$0
$0
C/I
$0
$0
$0
$0
$0
$0
$0
$0
$0
O&M
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$ 0
Agency:
Newport Beach
Project Name:
Coast Hiahwav Traffic Sianal Svnchronization
Project Limits:
Coast Highway from westerly limit with Huntington
24/25
Beach to easterly limit with Lacuna Reach_
Project Number:
Projected Cost
Type of Work (TOW):
Traffic Signals
TOW Description:
Interconnect traffic signals to improve coordination
$0
and communication
Project Description:
OCTA led project. Project upgrades intersections
$0
along Coast Highway. Enhancements include CCTV
R
cameras, Fiber Optic communication network
$0
improvements, and updates signal timing and
$0
coordination plans. Carry-over project, no new
$0
funding.
FUND NAME PERCENT ESTIMATED COST PROJECTED COST N
General Fund 100.00 $0 $0 Gas Tax Fund
$0 $0
Project Phase
19/20
22/23
23/24
24/25
25/26
Estimated Cost
Projected Cost
E
$0
$0
$0
$0
$0
$0
$0
$0
$0
R
$0
$0
$0
$0
$0
$0
$0
$0
$0
C/I
$0
$0
$0
$0
$0
$0
$0
$0
$0
O&M
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$ 0
5-7
5/24/2019 Measure M 3
Seven Year Capital Improvement Program (Sorted by Project Name)
Fiscal Years 2019/2020 through 2025/2026
Agency:
Newport Beach
Project Name:
Newport Bay Marina Trash Skimmer Litter Removal
22/23
(Stnrm Drain Intercentnrs Tier 1)
Project Limits:
Newport Bay Marina
Project Number:
12-NBCH-ECP-3637
Type of work (TOW):
Environmental Cleanup
TOW Description:
Runoff Diversion
Project Description:
Install trash skimmers to clean water before it enters
$0
the ocean. This is under the Storm Water Pollution
$0
mitigation Program.
FUND NAME PERCENT ESTIMATED COST PROJECTED C
M2 ECP -1 0.00 $0 $0 Project Completed FY14-15 - construction
phase completed - O & M phase underway
General Fund 100.00 $8,800 $8,800 Operations & Maintenance
$8,800 $8,800
Project Phase
Newport Beach
Project Name:
Newport Beach Bicycle and Pedestrian Bridge
22/23
23/24
24/25
25/26
Estimated Cost
Projected Cost
E
$0
$0
$0
$0
$0
$0
$0
$0
$0
R
$0
$0
$0
$0
$0
$0
$0
$0
$0
C/I
$0
$0
$0
$0
$0
$0
$0
$0
$0
O&M
$2,200
$2,200
$2,200
$2,200
$0
$0
$0
$8,800
$8,800
$2,200
$2,200
$2,200
$2,200
$0
$0
$0
$8,800
$ 8,800
Agency:
Newport Beach
Project Name:
Newport Beach Bicycle and Pedestrian Bridge
22/23
Pmiert
Project Limits:
Bridge will span Superior Ave at the intersection of
$95,000
Pacific Coast Hwv and Balhon Blvd
Project Number:
Planned
Type of Work (TOW):
Bridge
TOW Description:
Construction of new bridge crossing
Project Description:
Construction of a, 240 feet long, bicycle and
$3,150,400
pedestrian bridge over heavily trafficked, 8 lane
BCIP
Superior Avenue. Includes new landings on the
$2,349,600
south-east and north-east corners of the
BCIP Funds
intersections, as well as site improvments.
FUND NAME
PERCENT
ESTIMATED COST
EL
22/23
General Fund
1.64
$95,000
$95,000
City Match
General Fund
3.45
$200,000
$200,000
Transportation and Circulation
General Fund
54.36
$3,150,400
$3,150,400
FFP: Parks/ Community Centers
BCIP
40.55
$2,349,600
$2,349,600
BCIP Funds
$0
$0
$5,795,000
$5,795,000
$0
Project Phase
19/20
22/23
23/24
24/25
25/26
Estimated Cost
Projected Cost
E
$700,000
$0
$0
$0
$0
$0
$0
$700,000
$700,000
R
$0
$0
$0
$0
$0
$0
$0
$0
$0
C/I
$5,095,000
$0
$0
$0
$0
$0
$0
$5,095,000
$5,095,000
O&M
$0
$0
$0
$0
$0
$0
$0
$0
$0
$5,795,000
$0
$0
$0
$0
$0
$0
$5,795,000
$ 5,795,000
5-8
5/24/2019 Measure M 4
Seven Year Capital Improvement Program (Sorted by Project Name)
Fiscal Years 2019/2020 through 2025/2026
Agency:
Newport Beach
Project Name:
Newport Dunes Litter Removal (Storm Drain
22/23
Internentnm Tier Il
Project Limits:
Backbay Drive near the Hyatt Regency hotel
Project Number:
12-NBCH-ECP-3639
Type of work (Tow):
Environmental Cleanup
TOW Description:
Continuous Deflection Separator (CDS)
Project Description:
Install storm interceptors and trash skimmers to clean
$0
water before it enters the ocean. This is under the
$0
Storm Water Pollution Mitigation Program.
FUND NAME PERCENT ESTIMATED COST PROJ
M2 ECP -1 0.00 $0 $0 Project completed FY14-15 - Construction
Phase Completed - O&M Phase underway
General Fund 100.00 $21,075 $21,075 Operations & Maintenance
$21,075 $21,075
Project Phase
19/20
20/21
21/22
22/23
23/24
24/25
25/26
Estimated Cost
Projected Cost
E
$0
$0
$0
$0
$0
$0
$0
$0
$0
R
$0
$0
$0
$0
$0
$0
$0
$0
$0
C/I
$0
$0
$0
$0
$0
$0
$0
$0
$0
O&M
$4,215
$4,215
$4,215
$4,215
$4,215
$0
$0
$21,075
$21,075
$4,215
$4,215
$4,215
$4,215
$4,215
$0
$0
$21,075
$ 21,075
Agency:
Newport Beach
Project Name:
Pelican Point Litter Removal (Storm Drain Interceptors
22/23
Tier 1)
Project Limits:
Pelican Point HOA - by Hampden Rd
Project Number:
12-NBCH-ECP-3636
Type of work (Tow):
Environmental Cleanup
Tow Description:
Continuous Deflection Separator (CDS)
Project Description:
Install storm drain interceptors and trash skimmers to
$0
clean water before it enters the ocean. This is under
$0
the Storm Water Pollution Mitigation Program.
FUND NAME PERCENT ESTIMATED COST PROJECTED COST NOTES
M2 ECP -1 0.00 $0 $0 Project completed FY14-15 - Constrution
Phase completed - O&M Phase underway
General Fund 100.00 $24,200 $24,200 Operations & Maintenance
$24,200 $24,200
Project Phase
19/20
20/21
21/22
22/23
23/24
24/25
25/26
Estimated Cost
Projected Cost
E
$0
$0
$0
$0
$0
$0
$0
$0
$0
R
$0
$0
$0
$0
$0
$0
$0
$0
$0
C/I
$0
$0
$0
$0
$0
$0
$0
$0
$0
O&M
$4,840
$4,840
$4,840
$4,840
$4,840
$0
$0
$24,200
$24,200
$4,840
$4,840
$4,840
$4,840
$4,840
$0
$0
$24,200
$ 24,200
5-9
5/24/2019 Measure M 5
Seven Year Capital Improvement Program (Sorted by Project Name)
Fiscal Years 2019/2020 through 2025/2026
Agency:
Newport Beach
Project Name:
Traffic Sional Rehabilitation Proaram
Project Limits:
Citywide
Project Number:
20T01
Type of Work (TOW):
Traffic Signals
TOW Description:
Replace and upgrade traffic signals and equipment
Project Description:
This annual program rehabilitates and maintains
$0
existing traffic signal equipment throughout the City.
$0
Work may include replacement of hardware including
$80,000
control equipment, signal poles, cabinets, and
R
re -wiring traffic signals.
FUND NAME Liiiiiiiis PERCENT ESTIMATED COST PROJECTED C
Gas Tax 10.50 $98,550 $98,550 Gas Tax Fund - 19T01
General Fund 89.50 $840,000 $840,000 20T01
$938,550 $938,550
Project Phase
Newport Beach
Project Name:
Various Pavement Rehabilitation Proiects
22/23
23/24
24/25
25/26
Estimated Cost
Projected Cost
E
$80,000
$0
$0
$0
$0
$0
$0
$80,000
$80,000
R
$0
$0
$0
$0
$0
$0
$0
$0
$0
C/I
$858,550
$0
$0
$0
$0
$0
$0
$858,550
$858,550
O&M
$0
$0
$0
$0
$0
$0
$0
$0
$0
$938,550
$0
$0
$0
$0
$0
$0
$938,550
$ 938,550
Agency:
Newport Beach
Project Name:
Various Pavement Rehabilitation Proiects
Project Limits:
Citywide
Project Number:
N/A
Type of Work (TOW):
Road Maintenance
TOW Description:
Rehabilitation of roadway
Project Description:
Various pavement rehabilitation projects as
$713,515
determined by the Pavement Management Program
20.61
and field reviews.
FUND NAME
PERCENT
ESTIMATED COST
PROJECTED COST
NOTES
Gas Tax
25.06
$14,487,141
$15,581,752
Projected Cost
General Fund
21.21
$12,264,750
$13,191,443
$713,515
General Fund
20.61
$11,914,600
$12,814,837
SB1 Fund
General Fund
0.25
$147,100
$158,214
CalRecycle Grant Fund
General Fund
0.43
$250,000
$268,889
Balboa Village Parking Mgmt District
General Fund
3.61
$2,089,000
$2,246,839
Neighborhood Enhancement
General Fund
0.35
$200,000
$215,111
Wastewater Capital
M2 LFS
28.48
$16,464,226
$17,708,221
$0
$0
$0
$57,816,817
$62,185,308
$0
Project Phase
19/20
22/23A
23/24A
24/25 A
25/26 M
Estimated Cost
Projected Cost
E
$1,466,939
$703,823
$708,715
$713,515
$721,412
$729,531
$737,747
$5,781,682
$5,781,682
R
$0
$0
$0
$0
$0
$0
$0
$0
$0
C/I
$13,202,451
$6,334,408
$6,378,434
$6,421,638
$6,492,704
$6,565,781
$6,639,719
$52,035,135
$56,403,626
O&M
$0
$0
$0
$0
$0
$0
$0
$0
$0
$14,669,390
$7,038,231
$7,087,149
$7,135,153
$7,214,116
$7,295,312
$7,377,466
$57,816,817
$ 62,185,308
5-10
ATTACHMENT B
RESOLUTION NO. 2019- 49
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF NEWPORT BEACH, CALIFORNIA, CONCERNING
THE STATUS AND UPDATE OF THE CIRCULATION
ELEMENT, MITIGATION FEE PROGRAM, AND
PAVEMENT MANAGEMENT PLAN FOR THE MEASURE
M2 PROGRAM
WHEREAS, the City of Newport Beach ("City") desires to maintain and improve
the streets within its jurisdiction, including those arterials contained in the Master Plan of
Arterial Highways ("MPAH") administered by the Orange County Transportation Authority
("OCTA");
WHEREAS, the City has endorsed a definition of and process for, determining
consistency of the City's Traffic Circulation Element ("Circulation Element") with the
MPAH;
WHEREAS, the City's Circulation Element, which is incorporated into the City's
General Plan, does not preclude implementation of the MPAH within its jurisdiction;
WHEREAS, the City is required to adopt a resolution biennially informing OCTA
that the City's Circulation Element is in conformance with the MPAH and whether any
changes to any arterial highways of said Circulation Element have been adopted by the
City during Fiscal Year (FY) 2017-18 and FY 2018-19;
WHEREAS, the City is required to send biennially to OCTA all recommended
changes to the City's Circulation Element and the MPAH for the purposes of re -qualifying
for participation in the Comprehensive Transportation Funding Programs, which are a
collection of competitive grant programs comprised primarily of Measure M2 funds (an
Orange County transportation sales tax) offered to local agencies to assist in funding
street improvements, transit expansion, and even environmental mitigation projects;
WHEREAS, the City is required to adopt a resolution biennially certifying that the
City has an existing Mitigation Fee Program that assesses traffic impacts of new
development and requires new development to pay a fair share of necessary
transportation improvements attributable to the new development;
WHEREAS, the City is required to meet eligibility requirements and submit
eligibility verification packages to OCTA in order to remain eligible to receive M2 funds;
5-11
Resolution No. 2019 -
Page 2 of 3
WHEREAS, the City is required to adopt and update a Pavement Management
Plan ("PMP"), using the required format, regarding the status of road pavement conditions
and implementation of the PMP on a biennial basis; and
WHEREAS, the City is required to provide a plan that manages the preservation,
rehabilitation, and maintenance of paved roads by analyzing pavement life cycles,
assessing overall system performance costs, and determining alternative strategies and
costs necessary to improve paved roads.
NOW, THEREFORE, the City Council of the City of Newport Beach resolves as
follows:
Section 1: The City Council does hereby inform OCTA that:
a) The arterial highway portion of the City's Circulation Element is in
conformance with the MPAH;
b) The City attests that no unilateral reduction in through lanes has been
made on any MPAH arterials during FY 2017-18 and FY 2018-19;
c) The City reaffirms that City Council concurs with the existing Mitigation
Fee Program;
d) The PMP is in conformance with the PMP Submittal Template provided
in the Countywide Pavement Management Plan Guidelines;
e) The City hereby adopts a PMP and has provided an updated PMP
report, using the required format, to OCTA; and
f) The City's Public Works Director, City Engineer or designee, is
authorized to sign the PMP certification form.
Section 2: The recitals provided in this resolution are true and correct and are
incorporated into the operative part of this resolution.
Section 3: If any section, subsection, sentence, clause or phrase of this
resolution is, for any reason, held to be invalid or unconstitutional, such decision shall not
affect the validity or constitutionality of the remaining portions of this resolution. The City
Council hereby declares that it would have passed this resolution, and each section,
subsection, sentence, clause or phrase hereof, irrespective of the fact that any one or
more sections, subsections, sentences, clauses or phrases be declared invalid or
unconstitutional.
5-12
Resolution No. 2019 -
Page 3 of 3
Section 4: The City Council finds the adoption of this resolution is not subject to
the California Environmental Quality Act ("CEQA") pursuant to Sections 15060(c)(2) (the
activity will not result in a direct or reasonably foreseeable indirect physical change in the
environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378)
of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3,
because it has no potential for resulting in physical change to the environment, directly or
indirectly.
Section 5: This resolution shall take effect immediately upon its adoption by the
City Council, and the City Clerk shall certify the vote adopting the resolution.
ADOPTED this 11th day of June, 2019.
Diane B. Dixon
Mayor
ATTEST:
Leilani I. Brown
City Clerk
APPROVED AS TO FORM:
CITY ATTORNEY'S OFFICE
X ,—
Aaron C. Harp
City Attorney
5-13
ATTACHMENT C
FA
OCTA
City of Newport Beach
Pavement
Management Plan
Prepared by: NCE
Submitted to OCTA:6-28-2019
5-14
m
OCTA
Agency Submittal Table of Contents
Pavement Management Plan Agency Submittal
I. Pavement Management Plan Certification..................................................................................................... 2
II. Executive Summary.........................................................................................................................................
3
III. Background (Optional)....................................................................................................................................
4
IV. Current Pavement Conditions (PCI)................................................................................................................ 5
V. Projected Pavement Conditions (PCI)............................................................................................................. 5
VI. Alternative Funding Levels..............................................................................................................................
6
MaintainExisting Average Network PCI.............................................................................................................. 6
Improve Average Network PCI............................................................................................................................ 6
VII. Current and Projected Backlog by Year of Pavement Maintenance Needs ....................................................
7
VIII. Centerline Mileage..........................................................................................................................................7
IX. Percentage of Network in Each of Five Condition Categories Based on Centerline Miles .............................
8
X. Reduction in M2 Local Match.........................................................................................................................
9
XI. Appendix A — Seven -Year Road Maintenance and Rehabilitation Plan Based on Current or Expected
FundingLevel........................................................................................................................................................
10
XII. Appendix B —Complete Street Listing Current Conditions...........................................................................
11
XIII. Appendix C — Quality Assurance/Quality Control Plan.................................................................................
12
Introduction......................................................................................................................................................
12
XIV. Appendix D — Pavement Management Data Files.........................................................................................
13
XV. Appendix E — GIS Maps —Current Conditions (Optional)..............................................................................
13
Page 11 5-15
MPavement Management Plan Agency Submittal
OCTA
I. Pavement Management Plan Certification
The City of Newport Beach certifies that it has a Pavement Management Plan in conformance with the criteria
stated in the Orange County Transportation Authority Ordinance No. 3. This ordinance requires that a
Pavement Management Plan be in place and maintained to qualify for allocation of revenues generated from
renewed Measure M (M2).
The plan was developed by City of Newport Beach* using PAVER, a pavement management system,
conforming to American Society of Testing and Materials (ASTM) Standard D6433, and contains, at a minimum,
the following elements:
Inventory of MPAH and local routes reviewed and updated biennially. The last update of the inventory
was completed on November, 2018 for Arterial (MPAH) streets and November, 2018 for local streets.
Assessment of pavement condition for all routes in the system, updated biennially. The last field
review of pavement condition was completed on November, 2018.
Percentage of all sections of pavement needing:
o Preventative Maintenance: 28.4%
o Rehabilitation: 5.1%
o Reconstruction: 1.5%
Budget needs for Preventative Maintenance, Rehabilitation, and/or Reconstruction of deficient
sections of pavement for:
{] Current biennial period $25.0 million
n Following biennial period $5.5 million
O Funds budgeted or available for Preventative Maintenance, Rehabilitation, and/or Reconstruction:
Current biennial period $11.4 million
Following biennial period $11.4 million
• Backlog by year of unfunded pavement rehabilitation, restoration, and reconstruction needs.
The Pavement Management Plan is consistent with countywide pavement condition assessment
standards as described in the OCTA Countywide Pavement Management Plan Guidelines adopted by
the OCTA Board of Directors.
*An electronic copy of the Pavement Management Plan (with Micro Paver or StreetSaver compatible files) has
been, or will be, submitted with the certification statement.
A copy of this certification is being provided to the Orange County Transportation Authority.
Submitted by:
Michael J. Sinacori, P.E.
Name (Print) /I
Title
City of Newport Beach
Jurisdiction
Date
— �- "- 1 1
Page I2 5-16
m
OCTA
II. Executive Summary
Pavement Management Plan Agency Submittal
NCE was selected by the City of Newport Beach to perform an update of the City's Pavement Management
Program (PMP). The goal of this project is to update the PMP with current pavement conditions and to
perform funding analyses to help inform and educate policy makers as well as to comply with the Orange
County Transportation Authority's (OCTA) Measure M2 Program.
The 2019 PMP update includes an assessment of the entire MPAH pavement network via walking inspection
method; local pavement network within Council Districts 1, 2, and 3 was also inspected via windshield
inspection method. The assessment was completed in November of 2018 and result shows that the City's
overall weighted PCI for the pavement network is 82, which is in the "Good" category. This is a one -point
decrease from 2017. As a result, the City remains eligible for local agency match reduction of 10% per OCTA's
requirement.
After the database was updated with maintenance activities that had occurred since 2017, pavement
treatment policies were reviewed and unit costs were updated. Two budget scenarios were run and the result
shows that the City's current annual funding level of $5.7 million is efficient to maintain the current PCI at 82
by the end of the seven-year analysis period. Furthermore, it would take approximately $6.0 million per year
to increase the network PCI to 83.
Page 13
5-17
m
OCTA
III. Background (Optional)
Pavement Management Plan Agency Submittal
The City of Newport Beach owns and maintains approximately 205.7 centerline miles of pavements, which
includes 49.0 miles of the Master Plan of Arterial Highways (MPAH) streets and 156.7 miles of local streets,
representing a total replacement cost of $411.5 million.
Page 14
5-18
m
OCTA
Pavement Management Plan Agency Submittal
IV. Current Pavement Conditions (PCI)
V. Projected Pavement Conditions (PCI)
Should be by projected PCI by year under existing or expected funding levels for next seven fiscal years
("Today' is before June 30).
isca ear W
Today
Current Funding
(S million)
$5.7 million
Entire Network
PCI
82
ow MPAH RW
81
A�
82
2019-20
$5.7 million
82
83
82
2020-21
$5.7 million
83
84
82
2021-22
$5.7 million
83
83
82
2022-23
$5.7 million
83
83
83
2023-24
$5.7 million
83
81
83
2024-25
$5.7 million
83
81
83
2025-26
$5.7 million
82
81
83
Page 15
5-19
m
OCTA
VI. Alternative Funding Levels
Maintain Existing Average Network PCI
Pavement Management Plan Agency Submittal
Fiscal Year
Today
Funding Needed
($ million)
$5.7 million
Entire Network
PCI
82
MPAH
81
Local
82
2019-20
$5.7 million
82
83
82
2020-21
$5.7 million
83
84
82
2021-22
$5.7 million
83
83
82
2022-23
$5.7 million
83
83
83
2023-24
$5.7 million
83
81
83
2024-25
$5.7 million
83
81
83
2025-26
$5.7 million
82
81
83
Improve Average Network PCI
Fiscal Year
Today
Funding Needed
($ million)
$6.0 million
Entire Network
PCI
82
MPAH
81
Local
82
2019-20
$6.0 million
83
83
82
2020-21
$6.0 million
83
84
82
2021-22
$6.0 million
83
83
83
2022-23
$6.0 million
83
83
83
2023-24
$6.0 million
83
82
83
2024-25
$6.0 million
83
82
84
2025-26
$6.0 million
83
81
84
Page 16
5-20
mPavement Management Plan Agency Submittal
OCTA
VII. Current and Projected Backlog by Year of Pavement Maintenance Needs
Fiscal Year qJ
Today
'rent FunclinF"
rBaucklog
23.9
Maintain PCI Backlog'
23.9
Increase PCI
23.9
2019-20
17.6
17.6
17.3
2020-21
14.5
14.5
13.9
2021-22
12.9
12.9
12.5
2022-23
11
11
10.6
2023-24
7.4
7.4
7.4
2024-25
6.5
6.5
6.5
2025-26
4.9
4.9
4.9
VIII. Centerline Mileage
Page 17
5-21
mPavement Management Plan Agency Submittal
OCTA
IX. Percentage of Network in Each of Five Condition Categories Based on
Centerline Miles
Condition
Category
Network
M
Percent�jj
Area 0
Total
jMWpave;;jI
Percent
... of Centerline
Pavement Mileage of
(sf) j& Network
Centerline
Mileage of
Network
CIRange
Very Good
86-100
MPAH
17.0%
7,893,541
48.8%
13,492,344
23.0
Local
29.0%
77.4
Good
75-85
MPAH
9.6%
4,479,118
26.9%
8,460,903
9.6
Local
18.2%
45.8
I Fair
60-74
MPAH
10.3%
41800,026
17.00
4,320,157
11.8
Local
9.3%
23.2
IMPAH
I Poor
41-59
2.5%
1,150,878
4.9%
1,094,709
4.1
Local
2.3%
5.9
Very Poor
0-40
MPAH
0.3%
125,980
2.4%
686,559
0.5
Local
1.5%
4.4
Page 18
5-22
m
OCTA
X. Reduction in M2 Local Match
Pavement Management Plan Agency Submittal
A local agency match reduction of 10% of the eligible cost for projects submitted for consideration of funding
through the M2 Comprehensive Transportation Funding Programs (CTFP) call for projects is available if the
local agency either:
a. Shows measurable improvement of paved road conditions during the previous reporting period
defined as an overall weighted (by area) average system improvement of one Pavement Condition
Index (PCI) point with no reduction in the overall weighted (by area) average PCI in the Master Plan of
Arterial Highways (MPAH) or local street categories;
or
b. Have road pavement conditions during the previous reporting period, within the highest 20% of the
scale for road pavement conditions in conformance with OCTA Ordinance No. 3, defined as a PCI of 75
or higher, otherwise defined as in "good condition".
If applicable, please use the space below to justify the local agency's eligibility for a reduction in M2 Local
Match based on the statement above.
The City of Newport Beach has met the criteria above by having an average weighted PCI of 82. This means the
City continues to remain eligible for reduction in M2 local match requirement.
Page 19
5-23
m
OCTA
Pavement Management Plan Agency Submittal
XI. Appendix A — Seven -Year Road Maintenance and Rehabilitation Plan
Based on Current or Expected Funding Level
The seven-year plan for road maintenance and rehabilitation should be based on current and projected
budget. Street sections selected for treatment should be identified here. Specific data to be submitted should
follow the format below:
MPAH
Limits of Work
Street Name
From To
Length of Width of Pavement
Segment Segment Area
Type of
Treatment
Cost of
Treatment
Year of
Treatment
Type of
Treatment
Cost of
Treatment
Year of
Treatment
LOCAL
Limits of Work
Street Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of
Treatment
Cost of
Treatment
Year of
Treatment
Please attach the seven-year road maintenance and rehabilitation plan, following the above template, after
this sheet. The plan should be labeled Appendix A.
Page 1 10
5-24
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding
MPAH
MPAH
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Balboa Blvd W EB
McFadden PI
16th St
1,880
39
73,320
Grind and Overlay
$ 541,361
2019
Balboa Blvd W WB
12th St
14th St
880
24
21,120
Grind and Overlay
$ 71,813
2019
Campus Or EB
Teller Ave
Jamboree Rd
700
33
26,600
Grind and Overlay
$ 102,682
2019
Coast Highway E NB
Morning Canyon Rd
Poppy Ave
1,615
28
48,220
Grind and Overlay
$ 273,748
2019
Coast Highway E NB
Poppy Ave
Marguerite Ave
1,480
28
46,940
Grind and Overlay
$ 311,174
2019
Coast Highway E NB
Marguerite Ave
Goldenrod Ave
1,790
28
54,370
Grind and Overlay
$ 282,654
2019
Coast Highway E SB
MacArthur Blvd
Goldenrod Ave
1,089
28
35,442
Grind and Overlay
$ 120,512
2019
Coast Highway E SB
Morning Canyon Rd
Cameo Highlands Dr
1,300
30
41,750
Grind and Overlay
$ 141,960
2019
Jamboree Rd NB
Back Bay Dr
Island Lagoon Dr/Hyatt Newporter
675
61
42,175
Grind and Overlay
$ 143,406
2019
Jamboree Rd NB
Santa Barbara Dr
San Joaquin Hills Rd
945
47
46,415
Grind and Overlay
$ 157,823
2019
Jamboree Rd SB
San Joaquin Hills Rd
Santa Barbara Or
920
46
51,920
Grind and Overlay
$ 176,541
2019
Jamboree Rd SB
Back Bay Dr
Coast Highway East
1,030
45
53,350
Grind and Overlay
$ 181,403
2019
MacArthur Blvd SB
Campus Dr
Birch St
860
61
81,960
Grind and Overlay
$ 278,685
2019
MacArthur Blvd SB
Newport Place Dr
Jamboree Rd
1,844
61
104,984
Grind and Overlay
$ 356,9721
2019
Newport Blvd SB
30th St
28th St
648
41
26,568
Grind and Overlay
$ 90,338
2019
Newport Blvd SB
23rd St
21st St/Balboa Blvd West
631
32
20,192
Grind and Overlay
$ 132,464
2019
San Miguel Dr NB
Spyglass Hill Rd/Eastgate Or
Ford Rd
2,286
29
70,294
Grind and Overlay
$ 409,734
2019
San Miguel or SB
Ford Rd
Spyglass Hill Rd/Eastgate Dr
2,230
29
67,170
Grind and Overlay
$ 228,395
2019
San Miguel Dr SB
Spyglass Hill Rd/Eastgate Dr
Yacht Coquette (North Side)
1,494
29
43,326
Grind and Overlay
$ 252,541
2019
San Miguel Dr SB
Yacht Coquette (North Side)
Port Sutton Dr/Yacht Coquette (S)
1,110
29
33,940
Grind and Overlay
$ 115,405
2019
Balboa Blvd NB
36th St
110' N of 39th St
800
34
28,200
Grind and Overlay
$ 98,764
2020
Balboa Blvd W EB
14th St
12th St
880
24
21,120
Grind and Overlay
$ 73,968
2020
Bayside Dr
Jamboree Rd
Coast Highway East
4,130
60
247,800
Grind and Overlay
$ 867,860
2020
Bison Ave EB
Jamboree Rd
MacArthur Blvd
2,310
34
93,040
Grind and Overlay
$ 325,850
2020
Bonita Canyon Dr WB
Chambord
Bridge
400
33
13,200
Grind and Overlay
$ 46,230
2020
Coast Highway E NB
Cameo Highlands Dr
Morning Canyon Rd
1,300
28
38,900
Grind and Overlay
$ 346,689
2020
Coast Highway E NB
Goldenrod Ave
MacArthur Blvd
1,089
28
35,057
Grind and Overlay
$ 312,439
2020
Eastbluff Dr SB
Vista Del Sol
Jamboree Rd
3,975
30
119,250
Grind and Overlay
$ 417,644
2020
Jamboree Rd
Bayside Dr
Coast Highway East
800
60
48,000
Grind and Overlay
$ 168,108
2020
Jamboree Rd SB
Island Lagoon Dr/Hyatt Newporter
Back Bay Or
635
46
31,460
Reconstruction
$ 318,834
2020
Marguerite Ave
Fifth Ave
Coast Hwy East
1,082
36
64,920
Reconstruction
$ 689,997
2020
University or WB
Bonita Creek Bridge
La Vida/Baypointe Dr
675
42
29,600
Reconstruction
$ 347,567
2020
Bristol St North
Spruce St
Birch St
1,486
46
72,856
Grind and Overlay
$ 262,815
2021
Jamboree Rd SB
Ford Rd/Eastbluff Dr
Isan Joaquin Hills Rd
2,625
46
128,450
Grind and Overlay
$ 463,361
2021
MacArthur Blvd NB
Jamboree Rd
Ivon Karman Ave
1,763
39
99,757
Grind and Overlay
$ 359,856
2021
1 of 2
5-25
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding
MPAH
MPAH
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Newport Blvd SB
28th St
26th St
410
41
16,810
Grind and Overlay
$ 60,639
2021
San Miguel Dr
Newport Center Dr East
Avocado Ave
928
72
68,216
Grind and Overlay
$ 246,077
2021
32nd St EB
Balboa Blvd
Newport Blvd
690
32
22,080
Grind and Overlay
$ 82,039
2022
Balboa Blvd NB
27th St
29th St
510
35
17,850
Grind and Overlay
$ 66,323
2022
Balboa Blvd NB
29th St
32nd St
705
35
25,875
Grind and Overlay
$ 96,140
2022
Coast Highway E SB
Cameo Highlands Dr
Newport Coast Dr
3,705
50
176,850
Grind and Overlay
$ 657,094
2022
Eastbluff Dr NB
Vista Del Sol
Jamboree Rd/University Dr
4,000
30
120,000
Grind and Overlay
$ 445,866
2022
San Miguel Dr
Avocado Ave
MacArthur Blvd
310
92
28,520
Grind and Overlay
$ 105,967
2022
Balboa Blvd NB
34th St
36th St
460
34
15,640
Grind and Overlay
$ 59,854
2023
Superior Av NB
Ticonderga St
Placentia Ave
1,493
38
56,734
Grind and Overlay
$ 217,122
2023
16th St
City Limit
Sea Gull Ln
1,465
60
89,380
Grind and Overlay
$ 352,320
2024
Balboa Blvd NB
32nd St
34th St
488
34
16,592
Grind and Overlay
$ 65,403
2024
Bristol St North
Birch St
Campus Dr
617
51
36,967
Grind and Overlay
$ 145,717
2024
Coast Highway E NB
Newport Coast Dr
Cameo Highlands Dr
3,705
50
176,750
Grind and Overlay
$ 696,717
2024
Eastbluff Dr SB
Jamboree Rd/University Dr
Vista Del Sol
4,000
30
120,000
Grind and Overlay
$ 473,019
2024
Hospital Rd
Placentia Ave
Newport Blvd
700
57
39,900
Grind and Overlay
$ 157,279
2024
San Joaquin Hills Rd EB
Santa Cruz Dr
Santa Rosa Dr
2,185
40
88,650
Grind and Overlay
$ 349,443
2024
Superior Av NB
Coast Highway West
Ticonderga St
1,468
38
55,784
Grind and Overlay
$ 219,891
2024
University Dr EB
La Vida/Baypointe Dr
Bonita Creek Bridge
665
32
21,280
Grind and Overlay
$ 83,882
2024
Balboa Blvd NB
25th St
27th St
360
35
12,600
Grind and Overlay
$ 51,157
2025
Balboa Blvd NB
110' N of 39th St
42nd St
540
40
22,100
Grind and Overlay
$ 89,728
2025
Birch St
Von Karman Ave
MacArthur Blvd
1,160
56
74,960
Grind and Overlay
$ 304,343
2025
Coast Highway E SB
Goldenrod Ave
Marguerite Ave
1,790
28
58,170
Grind and Overlay
$ 236,175
2025
Newport Center Dr E SB
Anacapa Dr
Newport Center Dr
754
36
29,144
Grind and Overlay
$ 118,327
2025
University Dr EB
Jamboree Rd
La Vida/Baypointe Dr
640
32
21,730
Grind and Overlay
$ 88,225
2025
Von Karman Ave
Campus Dr
Birch St
777
76
56,952
Grind and Overlay
$ 231,230
2025
Von Karman Ave
Birch St
MacArthur Blvd
2,180
76
163,580
Grind and Overlay
$ 664,148
2025
2 of 2
5-26
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
15th St
Santa Ana Ave
Redlands Ave
670
36
24,120
Slurry Seal
$
6,754
2019
15th St
Redlands Ave
Tustin Ave
670
18
12,060
Slurry Seal
$
3,377
2019
15th St
Tustin Ave
Aliso Ave
660
36
23,760
Slurry Seal
$
6,653
2019
15th St
Aliso Ave
Irvine Ave
660
36
23,760
Slurry Seal
$
6,653
2019
15th St
St Andrew Rd
Kings PI
1,180
35
41,300
Slurry Seal
$
11,564
2019
16th St W
West End
Placentia Ave
2,400
36
86,400
Slurry Seal
$
24,192
2019
19th St
Balboa Blvd
Sundance Dr
930
30
27,900
Slurry Seal
$
7,812
2019
26th St
Newport Blvd
Balboa Blvd
125
22
2,750
Slurry Seal
$
770
2019
28th St
Villa Way
Newport Blvd East NB
225
54
11,750
Slurry Seal
$
3,290
2019
31st St
Lafayette Ave
Villa Way
351
24
8,424
Slurry Seal
$
2,359
2019
35th St
Lake Ave
Balboa Blvd
283
20
5,660
Slurry Seal
$
1,585
2019
38th St
Marcus Ave
East End of Bridge
83
16
1,328
Slurry Seal
$
372
2019
39th St
River Ave
Balboa Blvd
165
17
2,805
Slurry Seal
$
785
2019
39th St
Balboa Blvd
Seashore Or
305
18
5,610
Slurry Seal
$
1,571
2019
44th St
Balboa Blvd
Seashore Dr
370
21
7,770
Slurry Seal
$
2,176
2019
45th St
Balboa Blvd
Seashore Dr
395
21
8,295
Slurry Seal
$
2,323
2019
62nd St
Lancaster St
Newport Shores Dr
405
29
11,745
Slurry Seal
$
3,289
2019
A St
Ocean Front East
South End
535
60
32,100
Slurry Seal
$
8,988
2019
Acacia St
Orchard Dr
Mesa Dr
1,122
50
56,100
Slurry Seal
$
15,708
2019
Aleppo St
Alta Vista Dr
End
385
32
12,320
Slurry Seal
$
3,450
2019
Alta Vista Dr
Carob St
Bison Ave
2,220
36
79,920
Slurry Seal
$
22,378
2019
Alta Vista Dr
Bellis St
Aralia St
1,880
36
67,680
Slurry Seal
$
18,950
2019
Anacapa Dr
Newport Center Dr East
Farallon Dr
758
48
36,384
Slurry Seal
$
10,188
2019
Anniversary Ln
Irvine Ave
End
2,209
28
61,852
Slurry Seal
$
17,319
2019
Back Bay Dr
Shellmaker Rd
Beginning of PCC Section
800
22
17,600
Slurry Seal
$
4,928
2019
Back Bay Dr
Backbay Sewer Pump Station
Access Rd
607
22
13,354
Slurry Seal
$
3,739
2019
Balboa Blvd
19th St
End (North City Limit)
750
30
22,500
Slurry Seal
$
6,300
2019
Balboa Blvd E EB
Main St
B St
695
27
18,765
Slurry Seal
$
5,254
2019
Balboa Blvd E EB
B St
D St
991
22
21,802
Slurry Seal
$
6,105
2019
Balboa Blvd E EB
D St
G St
1,066
22
23,452
Slurry Seal
$
6,567
2019
Bamboo St
Bison Ave
Bellis St
1,805
36
64,980
Slurry Seal
$
18,194
2019
Bay View Ave
Mesa Dr
Orchard Dr
1,200
35
42,000
Slurry Seal
$
11,760
2019
Bayview PI
Bristol St South
Bayview Way
1,355
54
75,170
Slurry Seal
$
21,048
2019
Bayview Way EB
Bayview PI
Jamboree Rd
587
33
21,371
Slurry Seal
$
5,984
2019
Bayview Way WB
Jamboree Rd
Bayview PI
617
32
19,744
Slurry Seal
$
5,528
2019
1 of 34
5-27
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Beacon St
Santa Ana Ave
Cliff Dr
210
34
7,140
Slurry Seal
$
1,999
2019
Beacon St
Tustin Ave
Aliso Ave
600
35
21,000
Slurry Seal
$
5,880
2019
Beacon St
Aliso Ave
Irvine Ave
638
35
22,330
Slurry Seal
$
6,252
2019
Bellis St
Bamboo St
Alta Vista
730
37
27,010
Slurry Seal
$
7,563
2019
Bellis St
Alta Vista Dr
End
475
32
15,200
Slurry Seal
$
4,256
2019
Bison Ave
Bamboo St
Jamboree Rd
1,105
36
41,780
Slurry Seal
$
11,698
2019
Bixia St
Eastbluff Dr
Bamboo St
150
35
5,250
Slurry Seal
$
1,470
2019
Blackthorn St
Bellis St
Bison Ave
1,385
34
47,090
Slurry Seal
$
13,185
2019
Bolsa Ave
Broad St
Clay St
203
38
7,714
Slurry Seal
$
2,160
2019
Broad St
Westminster Ave
Santa Ana Ave
725
35
25,375
Slurry Seal
$
7,105
2019
Buck Gully Dr
Sandcastle Dr
End
126
36
5,786
Slurry Seal
$
1,620
2019
Buckeye St
Bellis St
Bison Ave
1,190
32
38,080
Slurry Seal
$
10,662
2019
Bunya St
Bellis St
Bison Ave
1,555
32
49,760
Slurry Seal
$
13,933
2019
Cacao St
Eastbluff Dr
Catalpa St
150
36
5,400
Slurry Seal
$
1,512
2019
Camelback St
Jamboree Rd
La Felicidad
1,505
40
60,825
Slurry Seal
$
17,031
2019
Camelback St
La Felicidad
Bison Ave
760
78
55,821
Slurry Seal
$
15,630
2019
Camphor St
Catalpa St
Alta Vista Dr
847
37
31,339
Slurry Seal
$
8,775
2019
Carob St
Camphor St
End
2,360
34
80,240
Slurry Seal
$
22,467
2019
Cassia St
Camphor St
Carob St
1,245
32
39,840
Slurry Seal
$
11,155
2019
Catalpa St
Camphor St
Carob St
1,500
35
52,500
Slurry Seal
$
14,700
2019
Ceiba PI
Carob St
End
195
54
11,780
Slurry Seal
$
3,298
2019
Celtis PI
Alta Vista Dr
End
190
54
10,260
Slurry Seal
$
2,873
2019
Cercis PI
Alta Vista Dr
End
220
32
7,040
Slurry Seal
$
1,971
2019
Chestnut PI
Alta Vista Dr
End
220
32
7,040
Slurry Seal
$
1,971
2019
Citrus PI
Alta Vista Dr
End
285
32
9,120
Slurry Seal
$
2,554
2019
Clay St
Westminster Ave
Orange Ave
800
32
25,600
Slurry Seal
$
7,168
2019
Cliff Dr
Kings PI
Signal Rd
426
55
23,430
Slurry Seal
$
6,560
2019
Cliff Dr
Beacon St
Santa Ana Ave
740
34
25,160
Slurry Seal
$
7,0451
2019
Colton St
Sunset Dr
Prospect St
398
29
11,792
Slurry Seal
$
3,302
2019
Colton St
Sunset Dr
Newport Shores Dr
760
29
22,040
Slurry Seal
$
6,171
2019
Dahlia PI
Seaview Ave
End
139
27
3,753
Slurry Seal
$
1,051
2019
Dana Rd
Superior Ave
Flagship Rd
600
36
21,600
Slurry Seal
$
6,048
2019
Dolphin -Striker Way
Dove St
End
335
44
16,740
Slurry Seal
$
4,687
2019
Domingo Dr
Mar Vista Dr
Mar Vista Dr
1,675
36
60,300
Slurry Seal
$
16,8841
2019
Dorchester Rd
I Rockford Rd
ICameo Highland Rd
825
33
27,225
Slurry Seal
$
7,6231
2019
2 of 34
5-28
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Dorchester Rd
Cameo Highland Rd
Garrett Rd
910
33
30,030
Slurry Seal
$
8,408
2019
Dove St
Birch St
Bristol St North
3,930
44
176,670
Slurry Seal
$
49,468
2019
Ebbtide Rd
Crown Dr
Sandpiper Dr
1,317
33
43,461
Slurry Seal
$
12,169
2019
EI Modena Ave
Cliff Dr
Beacon St
410
35
14,350
Slurry Seal
$
4,018
2019
F St
Balboa Blvd East
Ocean Front East
225
26
5,850
Slurry Seal
$
1,638
2019
Farallon Dr
Avocado Ave
Newport Center Dr
1,559
48
74,832
Slurry Seal
$
20,953
2019
Flagship Rd
Dana Rd
Placentia Ave
1,060
37
39,220
Slurry Seal
$
10,982
2019
Fourth Ave
Heliotrope Ave
Iris Ave
268
27
7,236
Slurry Seal
$
2,026
2019
Fourth Ave
Iris Ave
Jasmine Ave
275
27
7,425
Slurry Seal
$
2,079
2019
Fourth Ave
Jasmine Ave
Larkspur Ave
266
27
7,182
Slurry Seal
$
2,011
2019
Fourth Ave
Marigold Ave
Narcissus Ave
267
27
7,209
Slurry Seal
$
2,019
2019
Fourth Ave
Orchid Ave
Poinsettia Ave
270
27
7,290
Slurry Seal
$
2,041
2019
Garrett Dr
Cortland Dr
Cameo Highlands Dr
840
37
31,080
Slurry Seal
$
8,702
2019
Goldenrod Ave
Sea Ln
Harbor View Dr
1,008
33
33,264
Slurry Seal
$
9,314
2019
Grant St
Seashore Dr
Ocean Front Alley West
65
17
1,105
Slurry Seal
$
309
2019
Heron Way
Keel Dr
Outrigger Dr
265
32
8,480
Slurry Seal
$
2,374
2019
Indus St
Kline Dr
West End
800
33
28,400
Slurry Seal
$
7,952
2019
Inlet Dr
Marguerite Ave
Keel Dr
150
36
5,400
Slurry Seal
$
1,512
2019
Isabella Ter
Seaward Rd
End
325
24
8,800
Slurry Seal
$
2,464
2019
Keel Dr
Outrigger Dr
End
1,394
32
46,108
Slurry Seal
$
12,910
2019
Kline Dr
Pegasus St
North End
570
33
21,060
Slurry Seal
$
5,897
2019
La Salud
North End
La Vida
499
44
23,956
Slurry Seal
$
6,708
2019
Lafayette Ave
31st St
Via Lido
385
60
23,100
Slurry Seal
$
6,468
2019
Lafayette Ave
28th St
31st St
860
24
21,140
Slurry Seal
$
5,919
2019
Larkspur Ave
Coast Highway East
Fifth Ave
1,406
27
37,962
Slurry Seal
$
10,629
2019
Lido Park Dr
Lafayette Ave
End
753
54
38,662
Slurry Seal
$
10,825
2019
Lugonia St
Prospect St
Newport Shores Dr
1,025
29
29,725
Slurry Seal
$
8,323
2019
M St
Ocean Blvd
Ocean Front East
90
30
2,700
Slurry Seal
$
756
2019
Mar Vista Dr
Vista Del Oro
Eastbluff Dr
2,268
36
81,648
Slurry Seal
$
22,861
2019
Margaret Dr
Tustin Ave
Irvine Ave
1,284
34
43,306
Slurry Seal
$
12,126
2019
Marguerite Ave
195' S of Coast Highway East
Coast Highway East
195
38
7,410
Slurry Seal
$
2,075
2019
Marigold Ave
Fourth Ave
Fifth Ave
330
27
8,910
Slurry Seal
$
2,495
2019
Martingale Way
Corinthian Way
End
562
44
26,228
Slurry Seal
$
7,344
2019
Muir Beach Cir
Goleta Point Dr
End
570
32
19,740
Grind and Overlay
$
45,408
2019
Narcissus Ave
lCoast Highway East
175' S of Fifth Ave
1,430
27
38,610
Slurry Seal
$
10,811
2019
3 of 34
5-29
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Old Newport BI
475' N of Coast Highway
595' N of Coast Highway
120
30
3,600
Slurry Seal
$
1,008
2019
Old Newport BI
1530' N Hospital Rd
City Limit
300
15
4,500
Slurry Seal
$
1,260
2019
Orchid Ave
Coast Highway East
Third Ave
850
28
23,800
Slurry Seal
$
6,664
2019
Orchid Ave
Third Ave
Fifth Ave
766
28
21,448
Slurry Seal
$
6,005
2019
Orchid St
Zenith Ave
Orchard Dr
957
35
33,495
Slurry Seal
$
9,379
2019
Palm St
Balboa Blvd East
Ocean Front Alley East
75
31
2,325
Slurry Seal
$
651
2019
Paper Ln
Anniversary Ln
End
405
33
13,365
Slurry Seal
$
3,742
2019
Pebble Dr
Goldenrod Ave
Sandpiper Dr
1,247
34
42,398
Slurry Seal
$
11,871
2019
Pegasus St
Santa Ana Ave
Kline Dr
1,177
33
38,841
Slurry Seal
$
10,875
2019
Poinsettia Ave
Coast Highway East
Fourth Ave
1,212
28
33,936
Slurry Seal
$
9,5021
2019
Poppy Ave
Second Ave
Fifth Ave
1,150
27
31,050
Slurry Seal
$
8,694
2019
Quail St
Westerly PI
Spruce St
912
44
40,128
Slurry Seal
$
11,236
2019
Riverside Ave
Coast Highway West
Avon St (West Side)
475
52
24,700
Slurry Seal
$
6,916
2019
Riverside Dr
Indus St
End
210
33
8,430
Slurry Seal
$
2,360
2019
Rockford Rd
Surrey Dr
Cortland Dr
671
37
24,827
Slurry Seal
$
6,952
2019
San Joaquin Hills Rd
Backbay Dr
800' E of Backbay Dr
786
31
29,386
Slurry Seal
$
8,228
2019
San Joaquin Hills Rd EB
800' E of Backbay Dr
Jamboree Rd
832
30
32,960
Grind and Overlay
$
75,817
2019
San Joaquin Hills Rd WB
Jamboree Rd
800' E of Backbay Dr
832
47
44,498
Slurry Seal
$
12,459
2019
Sandcastle Dr
Marguerite Ave
Tiller Way
193
36
6,948
Slurry Seal
$
1,945
2019
Sandcastle Dr
Tiller Way
Inlet Isle Dr
2,588
36
93,168
Slurry Seal
$
26,087
2019
Santa Ana Ave
15th St
City Limit
640
19
12,160
Slurry Seal
$
3,405
2019
Sea Ln
Crown Dr
Harbor View Dr
1,078
38
40,964
Slurry Seal
$
11,470
2019
Second Ave
Poinsettia Ave
Poppy Ave
270
27
7,290
Slurry Seal
$
2,041
2019
Setting Sun Dr
Pebble Dr
Sandpiper Dr
972
33
32,576
Slurry Seal
$
9,121
2019
Short St
Clubhouse Ave
End
315
16
5,040
Slurry Seal
$
1,411
2019
Silver Ln
Anniversary Ln
End
340
33
11,220
Slurry Seal
$
3,142
2019
Surrey Dr
Rockford Rd
Cameo Highland Dr
1,103
33
36,399
Slurry Seal
$
10,192
2019
Surrey Dr
Cameo Highland Dr
Garret Dr
640
33
21,120
Slurry Seal
$
5,914
2019
Third Ave
Iris Ave
Jasmine Ave
270
27
7,290
Slurry Seal
$
2,041
2019
Third Ave
Marguerite Ave
Marigold Ave
272
28
7,616
Slurry Seal
$
2,132
2019
Third Ave
Marigold Ave
Narcissus Ave
265
28
7,420
Slurry Seal
$
2,078
2019
Third Ave
Narcissus Ave
Orchid Ave
264
28
7,392
Slurry Seal
$
2,070
2019
Tustin Ave
Cliff Dr
Clay St
807
35
28,245
Slurry Seal
$
7,909
2019
Via Lido Nord
Via San Remo
Via Palermo
541=
33
17,853
Slurry Seal
$
4,999
2019
Via Lido Nord
Ivia Palermo
Ivia Lorca
646 1
33
1 21,318
Slurry Seal
$
5,9691
2019
4 of 34
5-30
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Via Lido Nord
Via Genoa
Via Dijon
571
33
18,843
Slurry Seal
$
5,276
2019
Via Lido Soud
Via Antibes
Via Dijon
625
33
20,625
Slurry Seal
$
5,775
2019
Via Lido Soud
Via Dijon
Via Genoa
820
33
27,060
Slurry Seal
$
7,577
2019
Via Lido Soud
Via Genoa
Via Koron
850
33
28,050
Slurry Seal
$
7,854
2019
Via Lido Soud
Via Koron
Via Orvieto
660
33
21,780
Slurry Seal
$
6,098
2019
Via Lido Soud
Via Orvieto
Via San Remo
670
33
22,110
Slurry Seal
$
6,191
2019
Via Lido Soud
Via San Remo
Via Venezia
520
33
17,160
Slurry Seal
$
4,805
2019
Via Lido Soud
Via Venezia
Via Zurich
660
33
21,780
Slurry Seal
$
6,098
2019
Via Malaga
Via Oporto
Via Lido
295
22
6,490
Slurry Seal
$
1,817
2019
Villa Way
28th St
29th St
320
25
8,000
Slurry Seal
$
2,240
2019
Vista Del Oro
Eastbluff Dr (South End)
Vista Caudal
2,863
36
103,068
Slurry Seal
$
28,859
2019
Vista Del Oro
Vista Caudal
Vista Entrada
1,040
35
36,400
Slurry Seal
$
10,192
2019
Vista Del Oro
Vista Entrada
Vista Del Sol
2,185
35
76,475
Slurry Seal
$
21,413
2019
Vista Del Oro
Vista Del Sol
Vista Nobleza
2,140
35
74,900
Slurry Seal
$
20,972
2019
Vista Del Oro
Vista Nobleza
Vista Umbrosa
1,880
35
65,800
Slurry Seal
$
18,424
2019
Vista Del Oro
Vista Umbrosa
Eastbluff Dr (North End)
755
35
26,425
Slurry Seal
$
7,399
2019
06th St
Bay Ave West
Balboa Blvd West
165
34
4,896
Reconstruction
$
11,841
2020
09th St
Bay Ave West
Balboa Blvd West
215
27
4,995
Slurry Seal
$
1,441
2020
11th St
Bay Ave West
Balboa Blvd West
215
28
5,208
Slurry Seal
$
1,502
2020
22nd St
Balboa Blvd West
Ocean Front West
315
30
9,450
Slurry Seal
$
2,725
2020
23rd St
Balboa Blvd West
Ocean Front West
360
30
10,800
Slurry Seal
$
3,115
2020
29th St
East End
Lafayette Ave
75
24
1,800
Slurry Seal
$
519
2020
35th St
Marcus Ave
Lake Ave
215
20
4,300
Slurry Seal
$
1,240
2020
36th St
Marcus Ave
Balboa Blvd
500
20
10,000
Slurry Seal
$
2,884
2020
38th St
Balboa Blvd
Seashore Dr
296
18
5,448
Slurry Seal
$
1,5711
2020
40th St
Balboa Blvd
Seashore Dr
318
18
5,844
Slurry Seal
$
1,685
2020
44th St
Channel PI
Balboa Blvd
100
21
2,100
Slurry Seal
$
606
2020
46th St
Balboa Blvd
Seashore Dr
438
21
9,198
Slurry Seal
$
2,653
2020
47th St
River Ave
Neptune Ave
315
21
6,615
Slurry Seal
$
1,908
2020
48th St
River Ave
Neptune Ave
260
20
5,200
Slurry Seal
$
1,500
2020
Alba St
Eastbluff Dr
Aralia St
137
36
4,932
Slurry Seal
$
1,422
2020
Alder PI
Alta Vista Dr
End
305
32
9,760
Slurry Seal
$
2,815
2020
Aleppo St
Aralia St
Alta Vista Dr
675
37
24,975
Slurry Seal
$
7,203
2020
Almond PI
Alta Vista Dr
jEnd
245
32
7,840
Slurry Seal
$
2,261
2020
Amigos Way
Domingo Dr
Domingo Dr
1,055
36
37,980
Slurry Seal
$
10,953
2020
5 of 34
5-31
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Aralia St
Aleppo St
End
1,775
35
62,125
Slurry Seal
$
17,917
2020
Arbutus St
Aleppo St
Alta Vista Dr
1,140
36
41,040
Slurry Seal
$
11,836
2020
Avon St
Riverside Ave
Tustin Ave
458
34
15,572
Slurry Seal
$
4,491
2020
Azure Ave
Orchid St
Bay View Ave
630
35
22,050
Slurry Seal
$
6,359
2020
Back Bay Dr
End of PCC Section
San Joaquin Hills Rd
1,649
22
36,278
Slurry Seal
$
10,463
2020
Back Bay Dr
End of PCC Section
Backbay sewer pump station
3,106
22
68,332
Slurry Seal
$
19,707
2020
Back Bay Dr
Access Rd
Staired Path to Landmark
2,394
22
52,668
Slurry Seal
$
15,189
2020
Back Bay Dr
Staired Path to Landmark
Eastbluff Dr
3,482
22
79,004
Slurry Seal
$
22,785
2020
Balboa Blvd E WB
G St
D St
1,066
22
23,452
Slurry Seal
$
6,764
2020
Balboa Blvd E WB
D St
B St
991
22
21,802
Slurry Seal
$
6,288
2020
Balboa Blvd E WB
B St
Main St
695
27
18,765
Slurry Seal
$
5,412
2020
Bay Ave E
6th St
Island Ave
370
28
10,360
Slurry Seal
$
2,988
2020
Bay Ave E
Palm St
Main St
475
26
10,850
Slurry Seal
$
3,129
2020
Bay View Ave
Orchard Dr
Zenith Ave
1,200
35
42,000
Slurry Seal
$
12,113
2020
Blue Key
Sandcastle Dr
End
750
32
26,700
Slurry Seal
$
7,700
2020
Bowsprit Dr
MacArthur Blvd
Dove St
306
44
13,464
Slurry Seal
$
3,883
2020
Cabrillo Ter
Serra Dr
De Anza Dr
869
23
19,787
Slurry Seal
$
5,707
2020
Catalina Dr
Clay St
15th St
677
34
23,018
Slurry Seal
$
6,638
2020
Catamaran Dr
Keel Dr
End
975
36
37,350
Slurry Seal
$
10,772
2020
Cedar St
Prospect St
Newport Shores Dr
670
29
19,430
Slurry Seal
$
5,604
2020
Clay St
Tustin Ave
Westminster Ave
1,961
34
66,674
Slurry Seal
$
19,229
2020
Cliff Dr
Dover Dr
Kings PI
756
55
41,580
Slurry Seal
$
11,992
2020
Cliff Dr
Signal Rd
St Andrews Rd
1,010
55
55,550
Slurry Seal
$
16,021
2020
Coast Blvd
61st St
End
133
30
3,990
Slurry Seal
$
1,151
2020
Collins Ave
Bay Front North
Balboa Ave
440
28
12,320
Reconstruction
$
35,487
2020
Columbus Cir
Serra Dr
End
112
22
3,464
Slurry Seal
$
999
2020
Court Ave
20th St
McFadden PI
85
28
2,380
Slurry Seal
$
686
2020
Crown Dr
Sea Ln
Crown Dr North
1,152
37
42,624
Slurry Seal
$
12,293 1
2020
Crown Dr North
Crown Dr
San Joaquin Hills Rd
1,370
36
49,320
Slurry Seal
$
14,224
2020
Cutter Rd
Beacon Bay
End
380
24
9,120
Slurry Seal
$
2,630
2020
Dahlia Ave
South End
Way Ln
145
27
3,915
Slurry Seal
$
1,129
2020
De Anza Dr
Seaward Rd
De Sola Ter
750
35
26,250
Slurry Seal
$
7,571
2020
De Sola Ter
Seaward Rd
End
1,005
24
28,015
Slurry Seal
$
8,080
2020
Dove St
Icampus Dr
I Birch St
585
37
21,645
Slurry Seal
$
6,2421
2020
Eastgate Dr
I Newport Hills Dr East
Isan Miguel Dr
1 270
56
11,110
Slurry Seal
$
3,2041
2020
6 of 34
5-32
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Emerson St
Tustin Ave
City Limits
340
30
10,200
Slurry Seal
$
2,942
2020
Fernando Street
Edgewater Ave East
Bay Ave East
367
30
10,680
Slurry Seal
$
3,080
2020
Fourth Ave
Goldenrod Ave
Heliotrope Ave
260
27
7,020
Slurry Seal
$
2,025
2020
Fourth Ave
Larkspur Ave
Marguerite Ave
280
27
7,560
Slurry Seal
$
2,180
2020
Fourth Ave
Marguerite Ave
Marigold Ave
270
27
7,290
Slurry Seal
$
2,102
2020
Fourth Ave
Narcissus Ave
Orchid Ave
273
27
7,371
Slurry Seal
$
2,126
2020
Fourth Ave
Poinsettia Ave
Poppy Ave
269
27
7,263
Slurry Seal
$
2,095
2020
Golden Cir
Anniversary Ln
Anniversary Ln
1,217
33
40,161
Slurry Seal
$
11,582
2020
Goldenrod Ave
Fifth Ave
Sea Ln
282
36
10,152
Slurry Seal
$
2,928
2020
Goldenrod Ave
Harbor View Dr
Crown Dr
1,165
33
38,445
Slurry Seal
$
11,088
2020
Half Moon Bay Dr
Point Loma Dr
Point Arena Way
1,080
32
32,904
Grind and Overlay
$
77,959
2020
Harbor View Dr
MacArthur Blvd
Goldenrod Ave
685
38
26,030
Slurry Seal
$
7,507
2020
Harbor View Dr
Goldenrod Ave
Marguerite Ave
1,945
38
73,910
Slurry Seal
$
21,316
2020
Haven PI
Irvine Ave
St Andrews Rd
543
35
19,005
Slurry Seal
$
5,481
2020
Hazel Dr
577' N of Coast Highway East
Poppy Ave (north side)
393
29
11,397
Slurry Seal
$
3,287
2020
Hilaria Way
Flagship Dr
South End
337
36
14,632
Slurry Seal
$
4,220
2020
Hospital Rd
Newport Blvd
Old Newport Blvd
160
70
11,200
Slurry Seal
$
3,230
2020
Irvine Ave
15th St
16th St
1,267
62
78,554
Slurry Seal
$
22,655
2020
Island View Dr
Salt Air Dr
Lighthouse Ln
815
32
26,080
Slurry Seal
$
7,521
2020
Keel Dr
Catamaran Dr
Outrigger Dr
583
32
21,014
Slurry Seal
$
6,060
2020
La Salud
La Vida
Corsica Dr N
1,335
44
58,740
Slurry Seal
$
16,941
2020
La Salud
Corsica Dr N
La Felicidad
1,005
44
44,220
Slurry Seal
$
12,753
2020
Little River Cir
Carmel Bay Dr
End
115
32
5,180
Grind and Overlay
$
12,273
2020
Marigold Ave
Coast Highway East
Third Ave
825
27
22,275
Slurry Seal
$
6,424
2020
Marine Ave
South Bridge End
North Bridge End
400
20
8,000
Slurry Seal
$
2,307
2020
Mc Fadden PI
Balboa Blvd West
End
600
22
13,200
Slurry Seal
$
3,807
2020
Mendoza Ter
Seaward Rd
End
715
23
17,445
Slurry Seal
$
5,031
2020
Monrovia Ave
City Limit
15th St West
1,655
39
64,545
Slurry Seal
$
18,615 1
2020
Montecito Dr
Dana Point Way
Drakes Bay Dr
1,774
32
57,518
Grind and Overlay
$ 136,277
2020
Newport Place Dr
MacArthur Blvd
Dove St
565
62
36,530
Slurry Seal
$
10,535
2020
Old Newport BI
Coast Highway
270' N of Coast Highway
270
46
12,420
Slurry Seal
$
3,582
2020
Old Newport BI
Hospital Rd
City Limit
1,830
26
39,375
Slurry Seal
$
11,356
2020
Orange Ave
Old Newport Blvd
15th St
436
36
15,696
Slurry Seal
$
4,527
2020
Orchard Dr
Bay View Ave
End
1 148 1
35
1 5,180
Slurry Seal
1 $
1,4941
2020
Orchard Dr
Isanta Ana Ave
jEnd
1 1,374 1
33
1 47,142
Slurry Seal
1 $
13,596
2020
7 of 34
5-33
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Orchid St
Orchard Dr
Azure Ave
500
35
17,500
Slurry Seal
$
5,047
2020
Patrice Rd
Bolero Way
Flagship Rd
500
37
18,500
Slurry Seal
$
5,335
2020
Patrice Rd
Flagship Rd
South End
315
37
11,655
Slurry Seal
$
3,361
2020
Pelican Hill Rd N
Pelican Hill Cir (North Side)
Pelicans Dr
2,684
19
50,996
Slurry Seal
$
14,707
2020
Pelican Hill Rd N
Newport Coast Dr North
Pelicans Dr
1,258
19
23,902
Slurry Seal
$
6,893
2020
Pelican Hill Rd N
Pelicans Dr
Newport Coast Dr
1,258
19
23,902
Slurry Seal
$
6,893
2020
Pelican Hill Rd N
Pelicans Dr
Pelican Hill Cir (North Side)
2,684
19
50,996
Slurry Seal
$
14,707
2020
Pelican Hill Rd S
Newport Coast Dr
Pelican Hill Cir S
5,650
24
142,100
Slurry Seal
$
40,982
2020
Pelican Hill Rd S
Pelican Hill Cir (North Side)
Pelican Hill Cir (South Side)
1,352
24
31,798
Slurry Seal
$
9,1711
2020
Pelican Hill Rd S
Pelican Hill Cir (South Side)
Pelican Hill Cir (North Side)
1,352
24
32,448
Slurry Seal
$
9,358
2020
Pirate Rd
Cliff Dr
Clay St
821
35
28,735
Slurry Seal
$
8,287
2020
Point Arena Way
Point Loma Dr
Point Sur Dr
645
32
22,140
Grind and Overlay
$
52,456
2020
Portside Way
Windover Dr
Wavecrest Dr
576
32
18,432
Slurry Seal
$
5,316
2020
Production PI
Monrovia Ave
Placentia Ave
1,265
38
48,070
Slurry Seal
$
13,863
2020
Quail St
Campus Dr
Birch St
585
36
21,060
Slurry Seal
$
6,074
2020
Quail St
Birch St
Westerly PI
617
60
37,020
Slurry Seal
$
10,677
2020
Redlands Dr
Orchard Dr
Indus St
565
33
18,645
Slurry Seal
$
5,377
2020
Ridge Park Rd
Newport Coast Dr
Tesoro
1,813
37
67,081
Slurry Seal
$
19,346
2020
Ridge Park Rd
Tesoro
Campo Bello
1,283
37
47,471
Slurry Seal
$
13,691
2020
Ridge Park Rd
Campo Bello
Vista Ridge Rd
1,491
37
55,167
Slurry Seal
$
15,9101
2020
Ridge Park Rd
Vista Ridge Rd
West Coast Peak
1,378
37
50,986
Slurry Seal
$
14,704
2020
Ridge Park Rd
Talmont
East End
1,055
37
40,835
Slurry Seal
$
11,777
2020
Ridge Park Rd
San Joaquin Hills Rd
Newport Coast Dr
1,449
37
53,613
Slurry Seal
$
15,462
2020
Riverside Ave
Cliff Dr
15th St
1,400
34
47,600
Slurry Seal
$
13,728
2020
Riverside Dr
Orchard Dr
End
520
33
18,960
Slurry Seal
$
5,468
2020
Salt Air Dr
Salt Air Cir
Lighthouse Ln
560
32
18,420
Slurry Seal
$
5,3121
2020
San Bernardino Ave
15th St
Clay Ave
630
34
21,420
Slurry Seal
$
6,178
2020
San Bernardino Ave
Clay Ave
Cliff Dr
860
14
12,040
Slurry Seal
$
3,472
2020
San Clemente Dr
Santa Barbara Dr
Santa Cruz Dr
1,140
48
54,720
Slurry Seal
$
15,781
2020
Sandcastle Dr
Inlet Isle Dr
Park Green Dr
654
36
23,544
Slurry Seal
$
6,790
2020
Sandcastle Dr
Park Green Dr
Seacrest Dr
975
36
35,100
Slurry Seal
$
10,123
2020
Sandcastle Dr
Seacrest Dr
Catamaran Dr
1,465
36
52,740
Slurry Seal
$
15,210
2020
Santa Barbara Dr
Jamboree Rd
Newport Center Dr West
2,525
73
184,325
Slurry Seal
$
53,159
2020
Seacrest Dr
Icatamaran Dr
Sandcastle Dr
1,475
32
47,200
Slurry Seal
$
13,613
2020
Seashore Dr
I Prospect St
Orange St
1,065
28
29,820
Slurry Seal
$
8,600
2020
8 of 34
5-34
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Seaward Rd
Isabella Ter
De Anza Dr
1,544
35
54,040
Slurry Seal
$
15,585
2020
Second Ave
Jasmine Ave
Marguerite Ave
536
27
14,472
Slurry Seal
$
4,174
2020
Second Ave
Marguerite Ave
Narcissus Ave
574
27
15,498
Slurry Seal
$
4,470
2020
Second Ave
Narcissus Ave
Orchid Ave
269
27
7,263
Slurry Seal
$
2,095
2020
Second Ave
Orchid Ave
Poinsettia Ave
268
27
7,236
Slurry Seal
$
2,087
2020
Second Ave
Poppy Ave
Hazel Ave
125
27
3,375
Slurry Seal
$
973
2020
Short St
Newport Blvd
Clubhouse Ave
135
32
4,320
Slurry Seal
$
1,246
2020
Spruce St
Bristol St North
Quail St
600
60
36,000
Slurry Seal
$
10,382
2020
St Andrews Rd
Kings Rd
Clay St
1,045
34
35,530
Grind and Overlay
$
84,181
2020
Sundance Dr
19th St
End
600
29
17,400
Slurry Seal
$
5,018
2020
Surfline Way
Windover Dr
Wavecrest Dr
658
32
22,556
Slurry Seal
$
6,505
2020
Teller Ave
Campus Dr
Birch St
775
44
39,100
Slurry Seal
$
11,276
2020
Terrace Ridge
Newport Ridge Dr West
End
550
38
23,000
Slurry Seal
$
6,633
2020
Third Ave
Jasmine Ave
Larkspur Ave
270
27
7,290
Slurry Seal
$
2,1021
2020
Third Ave
Larkspur Ave
Marguerite Ave
276
27
7,452
Slurry Seal
$
2,149
2020
Third Ave
Orchid Ave
Poinsettia Ave
265
28
7,420
Slurry Seal
$
2,140
2020
Tiburon Bay Dr
Carmel Bay Dr
Point Arena Way
972
32
31,104
Grind and Overlay
$
73,694
2020
Tiller Way
Sandcastle Dr
Sausalito Dr
1,475
36
53,100
Slurry Seal
$
15,314
2020
Tustin Ave
Clay St
15th St
633
35
22,155
Slurry Seal
$
6,390
2020
Via Havre
Via Lido Soud
Piazza Lido
475
23
10,925
Slurry Seal
$
3,151
2020
Via Lido Nord
Via Lido Soud (East Side)
Via Zurich
459
33
18,647
Slurry Seal
$
5,378
2020
Via Lido Nord
Via Waziers
Via San Remo
661
33
21,813
Slurry Seal
$
6,291
2020
Via Lido Nord
Via Lorca
Via Genoa
769
33
25,377
Slurry Seal
$
7,319
2020
Via Lido Nord
Via Dijon
Via Antibes
530
33
17,490
Slurry Seal
$
5,044
2020
Via Lido Nord
Via Antibes
Via Lido Soud (West Side)
400
20
9,200
Slurry Seal
$
2,653
2020
Via Lido Soud
Via Zurich
Via Lido Nord (East Side)
405
53
24,965
Slurry Seal
$
7,200
2020
Via Ravenna
Via Lido Soud
Via Lido Nord
660
20
13,200
Slurry Seal
$
3,807
2020
Vista Ridge Rd
Newport Coast Dr
Altezza Dr
1,493
37
55,241
Slurry Seal
$
15,932
2020
Wavecrest Dr
Surfline Wy
Sand Point Wy
1,060
36
41,660
Slurry Seal
$
12,015
2020
Westerly PI
Dove St
Quail St
1,406
44
61,864
Slurry Seal
$
17,842
2020
White Sails Way
Crown Dr
Harbor View Dr
1,045
33
34,485
Slurry Seal
$
9,945
2020
Windover Dr
Surfline Way
Sand Point Way
1,023
36
38,328
Slurry Seal
$
11,054
2020
Zenith Ave
Bayview Ave
Spruce Ave
283
35
9,905
Slurry Seal
$
2,857
2020
Zenith Ave
Spruce Ave
Orchid St
284
35
9,940
Slurry Seal
$
2,867
2020
07th St
Bay Ave West
Balboa Blvd West
167
30
5,010
Slurry Seal
$
1,488
2021
9 of 34
5-35
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
10th St
Bay Ave West
Balboa Blvd West
216
28
5,180
Slurry Seal
$
1,539
2021
13th St
Bay Ave West
Balboa Blvd West
216
28
6,048
Slurry Seal
$
1,797
2021
15th St
Old Newport Ave
Bolsa Ave
690
18
12,420
Grind and Overlay
$
41,657
2021
15th St
Irvine Ave
St Andrew Rd
560
62
33,720
Grind and Overlay
$
82,289
2021
15th St W
Monrovia Ave
Placentia Ave
1,284
36
46,224
Grind and Overlay
$ 142,592
2021
18th St
North End
Balboa Blvd West
300
28
8,400
Slurry Seal
$
2,495
2021
20th St
91' S of North End
Balboa Blvd West
325
34
11,050
Reconstruction
$
58,235
2021
21st St
Balboa Blvd West N/s
End
442
24
10,608
Slurry Seal
$
3,151
2021
22nd St
North End
Balboa Blvd West
130
40
5,200
Slurry Seal
$
1,545
2021
28th St
Newport Blvd East NB
Newport Blvd West SB
135
37
4,995
Slurry Seal
$
1,484
2021
30th St
Villa Way
Newport Blvd
450
25
11,250
Slurry Seal
$
3,342
2021
30th St
180' E of Balboa Blvd
Balboa Blvd
180
34
6,120
Reconstruction
$
35,701
2021
32nd St
Seashore Dr
Ocean Front West
190
16
3,040
Slurry Seal
$
903
2021
34th St
Seashore Dr
Ocean Front West
100
17
1,700
Slurry Seal
$
505
2021
35th St
Seashore Dr
Ocean Front West
90
20
1,800
Slurry Seal
$
535
2021
36th St
Finley Ave
End
70
16
1,120
Slurry Seal
$
333
2021
36th St
Balboa Blvd
Seashore Dr
195
20
3,124
Slurry Seal
$
928
2021
37th St
Balboa Blvd
Seashore Dr
284
20
5,340
Slurry Seal
$
1,586
2021
38th St
Finley Ave
Marcus Ave
275
16
4,400
Slurry Seal
$
1,307
2021
41st St
River Ave
Balboa Blvd
154
20
3,080
Reconstruction
$
21,977
2021
42nd St
Balboa Blvd
Seashore Dr
345
18
6,350
Slurry Seal
$
1,886
2021
43rd St
River Ave
Balboa Blvd
155
21
3,255
Slurry Seal
$
967
2021
47th St
Neptune Ave
Seashore Dr
84
20
1,680
Slurry Seal
$
499
2021
61st St
Lancaster St
Coast Highway West
645
20
12,900
Slurry Seal
$
3,832
2021
62nd St
Cedar St
Lancaster St
480
29
13,920
Slurry Seal
$
4,135
2021
Acacia Ave
Second Ave
Pacific Dr
717
27
19,359
Slurry Seal
$
5,751
2021
Aldean PI
15th St
End
260
35
9,100
Slurry Seal
$
2,703
2021
Aliso Ave
Beacon St
Cliff Dr
420
35
14,700
Slurry Seal
$
4,367
2021
Alta Vista Dr
Bison Ave
Bellis St
1,045
36
37,620
Grind and Overlay
$
91,807
2021
Altura Dr
Marapata Dr
Angelita Dr
925
34
31,450
Slurry Seal
$
9,342
2021
Amethyst Ave
Park Ave
Bay Front South
410
27
11,070
Reconstruction
$ 134,142
2021
Angelita Dr
Kewamee Dr
Bayadere Ter
1,060
38
40,280
Slurry Seal
$
11,965
2021
Back Bay Dr
Jamboree Rd
Entrance to Newport Dunes
1,110
61
67,710
Slurry Seal
$
20,113
2021
Back Bay Dr
Entrance to Newport Dunes
Shellmaker Rd
1,225
48
58,800
Slurry Seal
$
17,467
2021
Back Bay Dr
San Jaoquin Hills Rd
Beginning of PCC Section
2,710
22
59,620
Slurry Seal
$
17,710
2021
10 of 34
5-36
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Basswood St
Alta Vista Dr
Alta Vista Dr
1,090
33
35,425
Grind and Overlay
$
86,653
2021
Bay Farm PI
Upper Bay Dr
End
425
34
14,450
Slurry Seal
$
4,292
2021
Bayside Dr
Carnation Ave
EI Paseo Dr
3,600
37
126,200
Slurry Seal
$
37,488
2021
Bayside Dr
EI Paseo Dr
Jamboree Rd
2,160
37
85,420
Slurry Seal
$
25,374
2021
Bayside Dr
Coast Highway East
End
1,187
38
45,106
Slurry Seal
$
13,399
2021
Bayview Way
Shearwater PI
Bayview PI
575
37
32,838
Slurry Seal
$
9,755
2021
Beacon Bay
Harbor Island Rd
End
1,170
24
28,080
Slurry Seal
$
8,341
2021
Begonia Ave
Pacific Dr
Coast Highway East
1,885
28
52,780
Slurry Seal
$
15,678
2021
Birch St
Mesa Dr
End
232
36
9,552
Slurry Seal
$
2,837
2021
Blue Water Dr
Salt Air Dr
Crown Dr North
1,100
32
35,028
Slurry Seal
$
10,405
2021
Bonnie Doon Ter
Patolita Dr
Ramona Dr
1,481
37
54,797
Slurry Seal
$
16,278
2021
Breakers Dr
Ocean Blvd
Breakers Dr
770
20
18,000
Slurry Seal
$
5,347
2021
Broad St
Santa Ana Ave
San Bernardino Ave
280
16
4,480
Slurry Seal
$
1,331
2021
Canal St
Canal Cir (West End)
Sunset Dr
420
30
12,600
Slurry Seal
$
3,7431
2021
Carmel Bay Dr
Point Loma Dr
Spyglass Hill Rd
1,635
36
58,860
Grind and Overlay
$ 143,640
2021
Catalina Dr
Old Newport Blvd
Broad St
1,700
34
57,800
Slurry Seal
$
17,170
2021
Catalina or
Broad St
Clay St
323
34
10,982
Slurry Seal
$
3,262
2021
Channel PI
Balboa Blvd
Rivo Alto (River)
295
21
6,195
Slurry Seal
$
1,840
2021
Chubasco Dr
Evita Dr
Zahma Dr
690
37
25,530
Slurry Seal
$
7,584
2021
Clay St
Irvine Ave
Tustin Ave
1,339
34
46,126
Slurry Seal
$
13,702
2021
Cliff Dr
Riverside Ave
Beacon St
1,062
33
35,046
Slurry Seal
$
10,411
2021
Colton St
Newport Shores Dr
End
170
18
3,060
Slurry Seal
$
909
2021
Coral Ave
Bay Front South
Park Ave
410
27
11,070
Reconstruction
$ 119,869
2021
Corinthian Way
MacArthur Blvd
Birch St
876
44
38,544
Slurry Seal
$
11,450
2021
Cortes Cir
Serra or
End
90
22
2,980
Slurry Seal
$
885
2021
Cortland Dr
Rockford PI
Cameo Highlands Dr
702
37
25,974
Grind and Overlay
$
91,061
2021
Cortland Dr
Cameo Highlands Dr
Garrett Dr
989
37
36,593
Grind and Overlay
$ 119,695
2021
Dolphin Ter
Bonnie Doone Ter
Patolita Dr
1,266
33
41,778
Slurry Seal
$
12,410
2021
Dolphin Ter
Patolita Dr
Ramona Dr
1,306
33
43,098
Slurry Seal
$
12,802
2021
Driftwood Rd
Shorecliff Rd
Morning Canyon Rd
1,100
27
29,700
Slurry Seal
$
8,822
2021
EI Paseo Dr
Bayside or
Malabar Dr
550
34
18,700
Slurry Seal
$
5,555
2021
Evening Canyon Rd
Shorecliff Rd
Morning Canyon Rd
1,995
28
63,360
Slurry Seal
$
18,821
2021
Evita Dr
Seadrift Dr
Chubasco Dr
220
58
12,760
Slurry Seal
$
3,790
2021
Fern St
Canal St
Coast Highway West
273
30
8,190
Slurry Seal
$
2,433
2021
Fernleaf Ave
Coast Highway East
Fifth Ave
370
27
9,990
Slurry Seal
$
2,968
2021
11 of 34
5-37
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Fifth Avenue
Dahlia Ave
Heliotrope Ave
895
33
29,535
Slurry Seal
$
8,773
2021
Fifth Avenue
Heliotrope Ave
Iris Ave
290
32
9,280
Slurry Seal
$
2,757
2021
Fifth Avenue
Jasmine Ave
Marguerite Ave
630
28
18,390
Slurry Seal
$
5,463
2021
Fifth Avenue
Marigold Ave
Poppy Ave
1,175
36
42,300
Slurry Seal
$
12,565
2021
First Ave
Begonia Ave
Carnation Ave
270
27
7,290
Slurry Seal
$
2,166
2021
First Ave
Fernleaf Ave
Goldenrod Ave
270
27
7,290
Slurry Seal
$
2,166
2021
First Ave
Goldenrod Ave
Heliotrope Ave
270
27
7,290
Slurry Seal
$
2,166
2021
First Ave
Heliotrope Ave
Iris Ave
270
27
7,290
Slurry Seal
$
2,166
2021
First Ave
Iris Ave
Jasmine Ave
270
27
7,290
Slurry Seal
$
2,166
2021
Fourth Ave
Avocado Ave
Acacia Ave
265
27
7,155
Slurry Seal
$
2,125
2021
Galatea Ter
Bayadere Ter
Angelita Dr
1,750
33
57,750
Slurry Seal
$
17,155
2021
Gary PI
15th St
End
260
33
8,580
Slurry Seal
$
2,549
2021
Goldenrod Ave
Coast Highway East
Fourth Ave
190
27
5,130
Slurry Seal
$
1,524
2021
Goldenrod Ave
Fourth Ave
Fifth Ave
350
27
9,450
Slurry Seal
$
2,807
2021
Goldenrod Ave
Crown Dr
Wavecrest Dr
635
35
22,225
Slurry Seal
$
6,602
2021
Granville Dr
Newport Center Dr
Gate
388
26
10,088
Slurry Seal
$
2,997
2021
Hazel Dr
Poppy Ave (south side)
Coast Highway East
1,375
21
29,875
Slurry Seal
$
8,874
2021
Hazel Dr
Coast Highway East
577' N of Coast Highway East
577
30
17,310
Slurry Seal
$
5,142
2021
Heliotrope Ave
Ocean Blvd
Bayview Dr
400
27
10,800
Slurry Seal
$
3,208
2021
Heliotrope Ave
Bayside or
Coast Highway East
1,015
28
28,420
Slurry Seal
$
8,442
2021
Heliotrope Ave
Coast Highway East
Fifth Ave
785
27
21,195
Slurry Seal
$
6,296
2021
Highland St
North End
Coast Highway West
260
30
7,800
Slurry Seal
$
2,317
2021
Iris Ave
Coast Highway East
Fifth Ave
945
27
25,515
Slurry Seal
$
7,579
2021
Irvine Ter
Coast Highway East
Bonnie Doone Ter
115
64
7,360
Slurry Seal
$
2,186
2021
Island Ave
Bay Ave East
Balboa Blvd West
164
33
5,412
Slurry Seal
$
1,608
2021
Jasmine Ave
Coast Highway East
Third Ave
508
27
13,716
Slurry Seal
$
4,074
2021
Jasmine Ave
Third Ave
Fifth Ave
760
27
20,520
Slurry Seal
$
6,096
2021
Kewamee Dr
Seadrift Dr
Avocado Ave
1,150
37
42,550
Slurry Seal
$
12,640
2021
K-Thanga Dr
Dolphin Ter
Bonnie Doone Ter
275
33
9,075
Slurry Seal
$
2,696
2021
La Felicidad
Camelback St
La Salud
300
44
13,200
Slurry Seal
$
3,921
2021
La Jolla Dr
Santa Ana Ave
End
175
16
2,800
Slurry Seal
$
832
2021
La Salud
La Felicidad
South End
431
44
20,964
Slurry Seal
$
6,227
2021
Lancaster St
Canal St
30' S of End
60
29
1,740
Slurry Seal
$
517
2021
Lindo Ave
Bay Ave West
Alley N of Bay Ave West
553
23
12,719
Slurry Seal
$
3,778
2021
Lugonia St
Seashore Dr
Ocean Front Alley West
59
19
1,121
Slurry Seal
$
333
2021
12 of 34
5-38
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Malabar Dr
Seadrift Dr/EI Paseo Dr
Bonnie Doone Ter
688
37
25,456
Slurry Seal
$
7,562
2021
Marapata Dr
Sabrina Ter
Kewamee Dr
690
37
25,530
Slurry Seal
$
7,584
2021
Marcus Ave
Rialto
Channel PI
735
16
11,760
Slurry Seal
$
3,493
2021
Marigold Ave
Third Ave
Fourth Ave
345
27
9,315
Slurry Seal
$
2,767
2021
Marine Ave
North Bridge End
Bayside Dr
300
20
10,800
Slurry Seal
$
3,208
2021
Michael PI
15th St
End
260
34
8,840
Slurry Seal
$
2,626
2021
Mission Bay Dr
Point Loma Dr
Spyglass Hill Rd
1,818
36
65,448
Grind and Overlay
$ 159,717
2021
Monterey Cir
Carmel Bay Dr
End
528
32
18,696
Grind and Overlay
$
45,625
2021
Morning Canyon Rd
Serra Dr
Seaward Rd
920
35
32,200
Slurry Seal
$
9,565
2021
Morning Canyon Rd
Seaward Rd
Coast Highway East
350
35
12,250
Slurry Seal
$
3,639
2021
Morning Canyon Rd
Coast Highway East
Shorecliff Rd
1,462
27
41,964
Slurry Seal
$
12,466
2021
Narcissus Ave
Fifth Ave
Geranium
344
36
12,384
Slurry Seal
$
3,679
2021
Neptune Ave
46th St
51st St
1,075
24
25,800
Slurry Seal
$
7,664
2021
Neptune Ave
51st St
End
750
25
18,750
Slurry Seal
$
5,570
2021
Newport Ridge Dr East
San Joaquin Hills Rd
Park Crest
1,520
40
59,300
Slurry Seal
$
17,615
2021
Newport Ridge Dr East
Park Crest
St Michael
2,215
40
88,600
Slurry Seal
$
26,319
2021
Newport Ridge Dr West
St Michael
Whitesands
1,420
40
56,800
Slurry Seal
$
16,873
2021
Newport Ridge Dr West
Whitesands
San Joaquin Hills Rd
1,220
40
47,700
Slurry Seal
$
14,169
2021
Newport Shores Dr
Walnut St
61st St
827
20
16,540
Slurry Seal
$
4,913
2021
Orange St
Canal St
Coast Highway West
468
35
16,380
Slurry Seal
$
4,866
2021
Orange St
Coast Highway West
Ocean Front Alley West
166
32
5,312
Slurry Seal
$
1,578
2021
Orchid Hill PI
Upper Bay Dr
End
425
34
14,450
Slurry Seal
$
4,292
2021
Palm St
Ocean Front Alley East
Ocean Front East
135
31
4,185
Slurry Seal
$
1,243
2021
Pelican Hill Rd S
Pelican Hill Cir (South Side)
Newport Coast Dr
5,650
24
142,600
Slurry Seal
$
42,360
2021
Piazza Lido
Via Florence
Via Havre
510
58
29,580
Slurry Seal
$
8,787
2021
Point Loma Dr
Mission Bay Dr
Point Arena Way
1,350
32
43,950
Grind and Overlay
$ 107,254
2021
Powell PI
15th St
End
220
34
7,480
Slurry Seal
$
2,222
2021
Prospect St
Cedar St
Newport Shores Dr
785
29
22,765
Slurry Seal
$
6,762
2021
Prospect St
Newport Shores Dr
Coast Highway West
180
24
4,320
Slurry Seal
$
1,283
2021
Prospect St
Coast Highway West
Seashore Dr
75
46
3,450
Slurry Seal
$
1,0251
2021
Prospect St
Seashore Dr
Ocean Front Alley West
54
18
972
Slurry Seal
$
289
2021
Quail St
Spruce St
Dove St
1,276
44
56,144
Slurry Seal
$
16,678
2021
Ramona Dr
Dolphin Ter
Santanella Ter
511
33
16,863
Slurry Seal
$
5,009
2021
Ridge Park Rd
lWest Coast Peak
Talmont
1,216
37
44,992
Slurry Seal
$
13,365
2021
River Ave
142nd St
Channel PI
340
28
9,520
Slurry Seal
$
2,828
2021
13 of 34
5-39
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
River Ave
Alley #325
Balboa Blvd
330
25
8,250
Slurry Seal
$ 2,451
2021
River Ave
Balboa Blvd
51st St
1,100
38
41,800
Slurry Seal
$ 12,417
2021
River Ave
51st St
End
1,250
38
47,500
Slurry Seal
$ 14,110
2021
Rivera Ter
Seaward Rd
End
328
23
8,544
Slurry Seal
$ 2,538
2021
Riverside Ave
Avon St
Cliff Dr
943
52
49,036
Slurry Seal
$ 14,566
2021
Rockford PI
Rockford Rd
End
250
37
11,050
Grind and Overlay
$ 26,966
2021
Rocky Point Rd
Goleta Point Dr
End
465
32
16,380
Grind and Overlay
$ 47,057
2021
Ruby Ave
Bay Front North
Balboa Ave
456
28
12,768
Reconstruction
$ 159,833
2021
Ruby Ave
Balboa Ave
Park Ave
435
28
12,180
Reconstruction
$ 152,472
2021
Ruby Ave
Park Ave
Bay Front South
418
27
11,286
Reconstruction
$ 141,281
2021
Sabrina Ter
Seadrift Dr
Angelita Dr
1,722
33
56,826
Slurry Seal
$ 16,880
2021
Salt Air Cir
Salt Air Dr
End
335
32
13,520
Slurry Seal
$ 4,016
2021
Sand Point Way
Windover Dr
Wavecrest Dr
280
36
11,580
Slurry Seal
$ 3,440
2021
Sandpiper Dr
Ebbtide Rd
Setting Sun Dr
435
33
14,855
Slurry Seal
$ 4,4131
2021
Santanella Ter
Patolita Dr
Malabar Dr
1,605
33
52,965
Slurry Seal
$ 15,733
2021
Santiago Dr
Pescador Dr
Polaris Dr
394
37
15,178
Grind and Overlay
$ 37,040
2021
Schooner Rd
Beacon Bay
End
290
24
6,960
Slurry Seal
$ 2,067
2021
Scott Dr
Corinthian Way
Dove St
513
44
22,572
Slurry Seal
$ 6,705
2021
Sea Ln
Harbor View Dr
Goldenrod Ave
1,340
37
49,580
Slurry Seal
$ 14,728
2021
Seabreeze Ln
Tiller Way
Surfview Ln
1,110
32
36,520
Slurry Seal
$ 10,848
2021
Seadrift Dr
Malabar Dr
Zahma Dr
1,660
37
61,420
Slurry Seal
$ 18,245
2021
Seashore Dr
Orange St
End
1,475
27
41,625
Slurry Seal
$ 12,365
2021
Seaview Ave
Goldenrod Ave
Jasmine Ave
909
30
27,270
Reconstruction
$ 341,372
2021
Seaview Ave
Marguerite Ave
Narcissus Ave
615
30
18,450
Reconstruction
$ 230,961
2021
Seaview Ave
Poinsettia Ave
Poppy Ave
270
28
7,560
Slurry Seal
$ 2,246
2021
Seaward Rd
De Anza Dr
Serra Dr
914
35
31,990
Slurry Seal
$ 9,503
2021
Seaward Rd
Serra Dr
Coast Highway East
349
35
12,215
Slurry Seal
$ 3,628
2021
Seaward Rd
Coast Highway East
Evening Canyon Rd
235
37
9,195
Slurry Seal
$ 2,731
2021
Seaward Rd
Evening Canyon Rd
Driftwood Rd
287
27
7,749
Slurry Seal
$ 2,302
2021
Serra Dr
Seaward Rd
De Anza Dr
1,305
35
45,675
Slurry Seal
$ 13,568
2021
Shorecliff Rd
Evening Canyon Rd
End
817
27
26,559
Slurry Seal
$ 7,889
2021
Spruce Ave
Bristol St South
Azure Ave
1,824
35
63,840
Slurry Seal
$ 18,964
2021
St Andrews Rd
Clay St
15th St
600
34
20,400
Grind and Overlay
$ 49,783
2021
Starboard Way
Windover Dr
Wavecrest Dr
357
32
11,424
Slurry Seal
$ 3,394
2021
Surfview Ln
Tiller Wy
Seabreeze Lane
720
32
24,040
Slurry Seal
$ 7,141
2021
14 of 34
5-40
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Tahuna Ter
Marapata Dr
Angelita Dr
1,235
33
40,755
Slurry Seal
$
12,106
2021
Third Ave
Acacia Ave
Begonia Ave
265
27
7,155
Slurry Seal
$
2,125
2021
Third Ave
Heliotrope Ave
Iris Ave
263
27
7,101
Slurry Seal
$
2,109
2021
Third Ave
Poinsettia Ave
Poppy Ave
270
28
7,560
Slurry Seal
$
2,246
2021
Twin Lakes Cir
Carmel Bay Dr
End
162
32
6,684
Grind and Overlay
$
20,887
2021
Upper Bay Dr
Mesa Dr
Orchid Hill PI
527
36
18,972
Slurry Seal
$
5,636
2021
Via Dijon
Via Lido Soud
Via Lido Nord
570
20
11,400
Slurry Seal
$
3,386
2021
Via Graziana
Piazza Lido
Via Lido Nord
470
16
7,520
Slurry Seal
$
2,234
2021
Via Ithaca
Via Lido Soud
Via Lido Nord
970
20
19,400
Slurry Seal
$
5,763
2021
Via Lido Nord
Via Zurich
Via Waziers
540
33
17,820
Slurry Seal
$
5,293
2021
Via Mentone
Vai Lido Soud
Via Lido Nord
850
20
17,000
Slurry Seal
$
5,050
2021
Via Palermo
Via Lido Soud
Via Lido Nord
762
22
16,764
Slurry Seal
$
4,980
2021
Via Undine
Via Lido Soud
Via Lido Nord
570
20
11,400
Slurry Seal
$
3,386
2021
Via Yella
Via Lido Soud
Via Lido Nord
465
20
9,300
Slurry Seal
$
2,763
2021
Vista Ridge Rd
Altezza Dr
Ocean Heights Dr
1,857
37
68,709
Slurry Seal
$
20,410
2021
Vista Ridge Rd
Ocean Heights Dr
Coastal Canyon Dr
2,067
37
76,479
Slurry Seal
$
22,718
2021
Vista Ridge Rd
Coastal Canyon Dr
Ocean Heights Dr
1,695
37
62,715
Slurry Seal
$
18,630
2021
Vista Ridge Rd
Ocean Heights Dr
Ridge Park Rd
619
37
22,903
Slurry Seal
$
6,803
2021
Walnut St
Prospect St
Newport Shores Dr
886
29
25,694
Grind and Overlay
$
62,703
2021
Walnut St
Newport Shores Dr
Coast Highway West
165
19
3,135
Slurry Seal
$
931
2021
Washington St
Bay Ave East
Balboa Blvd East
140
20
2,800
Slurry Seal
$
832
2021
Wayne Rd
Rockford Rd
Cameo Highlands Dr
695
33
22,935
Grind and Overlay
$
55,970
2021
Yawl Rd
Beacon Bay
End
250
24
6,000
Slurry Seal
$
1,782
2021
Zahma Dr
Kewamee Dr
Chubasco Dr
530
37
19,610
Slurry Seal
$
5,825
2021
10th St
North End
Bay Ave West
36
26
936
Slurry Seal
$
286
2022
12th St
Bay Ave West
Balboa Blvd West
215
28
5,180
Slurry Seal
$
1,585
2022
15th St
Bolsa Ave
Santa Ana Ave
960
18
17,280
Slurry Seal
$
5,287
2022
21st St
North End
Balboa Blvd West
442
24
10,608
Slurry Seal
$
3,246
2022
23rd St
City Limits
Tustin Ave
943
35
33,005
Slurry Seal
$
10,098
2022
23rd St
Tustin Ave
Irvine Ave
778
35
27,230
Slurry Seal
$
8,331
2022
28th St
East End
Villa Way
75
14
1,050
Slurry Seal
$
321
2022
33rd St
Seashore Dr
Ocean Front West
135
16
2,160
Slurry Seal
$
661
2022
36th St
Finley Ave
Short St
305
16
4,880
Slurry Seal
$
1,493
2022
40th St
jChanneIPI
Marcus Ave
130
16
2,080
Slurry Seal
$
636
2022
41st St
I Balboa Blvd
Seashore Dr
330
18
6,060
Slurry Seal
$
1,854
2022
15 of 34
5-41
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
51st St
River Ave
Seashore Dr
330
20
6,600
Slurry Seal
$
2,019
2022
61st St
Seashore Dr
Ocean Front West
85
19
1,615
Slurry Seal
$
494
2022
62nd St
Canal St
Cedar St
860
29
24,940
Slurry Seal
$
7,631
2022
62nd St
Newport Shores Dr
Coast Highway West
165
18
2,970
Slurry Seal
$
909
2022
62nd St
Seashore Dr
Ocean Front Alley West
55
18
990
Slurry Seal
$
303
2022
Apolena Ave
Bay Front North
Balboa Ave
573
27
15,471
Reconstruction
$ 199,479
2022
Apolena Ave
Park Ave
Bay Ave South
414
27
11,178
Reconstruction
$ 144,126
2022
Arbutus St
Alta Vista Dr
End
225
32
7,200
Slurry Seal
$
2,203
2022
Avocado Ave
Pacific Dr
160' N of Pacific Dr
160
16
2,560
Slurry Seal
$
7831
2022
Avocado Ave
Waterfront Dr
Coast Highway East
1,460
86
99,420
Slurry Seal
$
30,419
2022
Babcock St SB
City Limit
16th St West
306
33
10,098
Slurry Seal
$
3,090
2022
Back Bay Dr
Beginning of PCC Section
End of PCC Section
90
22
1,980
Reconstruction
$
25,530
2022
Bay Ave W
10th St
9th St
470
33
15,510
Slurry Seal
$
4,746
2022
Bay Ave W
7th St
6th St
450
28
12,600
Slurry Seal
$
3,855
2022
Bayadere Ter
Sabrina Ter
Angelita Dr
2,310
33
76,230
Slurry Seal
$
23,324
2022
Beacon St
Westminster Ave
Holmwood Dr
240
34
8,160
Slurry Seal
$
2,497
2022
Beryl Ln
Priscilla Ln
Vivian Ln
1,196
34
41,864
Slurry Seal
$
12,809
2022
Blue Gum Ln
Westcliff Dr
End
700
32
25,500
Slurry Seal
$
7,802
2022
Bonnie Doon Ter
Dolphin Ter
Patolita Dr
1,067
37
39,479
Slurry Seal
$
12,079
2022
Bonnie Doon Ter
Ramona Dr
Malabar Dr
350
37
12,950
Slurry Seal
$
3,962
2022
Brighton Rd
Cameo Shores Rd
Camden Dr
1,390
33
48,370
Slurry Seal
$
14,799
2022
Camden Dr
Cameo Shores Rd
Milford Dr
1,345
33
44,385
Slurry Seal
$
13,580
2022
Cameo Highlands Dr
Coast Highway East
Garrett Dr
1,420
37
49,321
Grind and Overlay
$ 215,057
2022
Cameo Shores Rd
Coast Highway East
Orrington Rd
1,088
37
37,777
Slurry Seal
$
11,558
2022
Cameo Shores Rd
Orrington Rd
Brighton Rd
956
37
35,372
Slurry Seal
$
10,823
2022
Canal Cir
Canal St
Canal St
265
29
7,685
Slurry Seal
$
2,351
2022
Canal St
62nd St
Canal Cir (West End)
270
30
8,100
Slurry Seal
$
2,478
2022
Canal St
Sunset Dr
Grant St
969
30
29,070
Slurry Seal
$
8,894
2022
Carnation Ave
Bayside Dr
First Ave
458
27
12,366
Slurry Seal
$
3,784
2022
Cedar St
East End
Prospect St
300
29
8,700
Slurry Seal
$
2,662
2022
Cedar St
Seashore Dr
Ocean Front Alley West
57
19
1,083
Slurry Seal
$
331
2022
Channel PI
Rivo Alto
39th St
743
16
11,888
Slurry Seal
$
3,637
2022
Channel PI
39th St
Rialto
440
16
7,040
Slurry Seal
$
2,154
2022
Cherry Tree Ln
Redland Dr
End
200
34
6,800
Slurry Seal
$
2,081
2022
Cliff Dr
Irvine Ave
Riverside Ave
1,684
56
92,820
Slurry Seal
$
28,400
2022
16 of 34
5-42
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Colton St
Seashore Dr
Ocean Front Alley West
60
18
1,080
Slurry Seal
$
330
2022
Coral Ave
Balboa Ave
Park Ave
417
27
11,259
Reconstruction
$ 145,171
2022
Cove St
Fernleaf Ave
End
165
24
3,960
Slurry Seal
$
1,212
2022
Cumberland Ln
Sussex Ln
Dover Dr
435
34
15,390
Slurry Seal
$
4,709
2022
Cypress St (S/A Heights)
Mesa Dr
Orchard Dr
1,320
36
47,520
Slurry Seal
$
14,539
2022
Cypress St (S/A Heights)
Cul De Sac
Bristol St South
260
36
9,360
Slurry Seal
$
2,864
2022
Dahlia Ave
200' S of First St
Coast Highway East
1,490
27
40,230
Slurry Seal
$
12,309
2022
Dahlia Ave
Coast Highway East
Fifth Ave
165
27
4,455
Slurry Seal
$
1,363
2022
Dawnview Ln
Redland Dr
Redland Dr
160
33
5,280
Slurry Seal
$
1,615
2022
Deborah Ln
Vivian Ln
Sylvia Ln
633
34
22,122
Slurry Seal
$
6,769
2022
Doris Ln
Dover Dr
Ruth Ln
241
36
8,676
Slurry Seal
$
2,655
2022
Dorothy Ln
Estelle Ln
Marian Ln
920
34
31,280
Slurry Seal
$
9,571
2022
Dover or
Westcliff Dr
Dover Dr (Arterial)
170
36
5,460
Slurry Seal
$
1,671
2022
Evening Star Ln
Polaris Dr
End
980
33
34,840
Slurry Seal
$
10,660
2022
Fairfield Dr
Cameo Shores Rd
Milford Dr
1,355
33
44,715
Slurry Seal
$
13,681
2022
Fairhill Dr
23rd St
End
543
34
18,462
Slurry Seal
$
5,649
2022
Fern St
Seashore Dr
Ocean Front Alley West
62
17
1,054
Slurry Seal
$
322
2022
Fernleaf Ave
250' S of First St
Coast Highway East
1,260
27
34,020
Slurry Seal
$
10,409
2022
Finley Ave
Rialto
38th St
35
16
560
Slurry Seal
$
171
2022
First Ave
Carnation Ave
Dahlia Ave
271
27
7,317
Slurry Seal
$
2,2391
2022
First Ave
Dahlia Ave
Fernleaf Ave
270
27
7,290
Slurry Seal
$
2,230
2022
Fourth Ave
Acacia Ave
Begonia Ave
267
27
7,209
Slurry Seal
$
2,206
2022
Fourth Ave
Begonia Ave
Carnation Ave
265
27
7,155
Slurry Seal
$
2,189
2022
Fourth Ave
Carnation Ave
Dahlia Ave
265
27
7,155
Slurry Seal
$
2,189
2022
Fullerton Ave
Cliff Dr
Beacon St
423
35
14,805
Slurry Seal
$
4,530
2022
G St
Balboa Blvd East
Ocean Blvd
204
36
6,344
Slurry Seal
$
1,9411
2022
Galaxy Dr
Santiago Dr (South End)
Rigel Cir
1,459
37
53,983
Grind and Overlay
$ 219,300
2022
Galaxy Dr
Rigel Cir
Mariners Dr
1,956
37
72,372
Slurry Seal
$
22,143
2022
Galaxy Dr
Mariners Dr
Holiday Dr
1,452
34
49,368
Grind and Overlay
$ 200,552
2022
Galaxy Dr
Hoilday Dr
Santiago Dr (North End)
2,202
34
74,868
Slurry Seal
$
22,907
2022
Goldenrod Ave
End
Coast Highway East
1,124
28
31,472
Slurry Seal
$
9,629
2022
Gorham Dr
Cameo Shores Rd
Milford Dr
1,400
33
46,200
Slurry Seal
$
14,136 1
2022
Grant St
North End
Coast Highway West
325
29
9,425
Slurry Seal
$
2,884
2022
Hampden Rd
Milford Dr
Cameo Shores Rd
930
37
34,410
Slurry Seal
$
10,528
2022
Hampden Rd
Icameo Shores Rd
End
213
37
8,131
Slurry Seal
$
2,488
2022
17 of 34
5-43
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Hampshire Cir
Antigua Way
Antigua Way
751
34
25,534
Slurry Seal
$
7,812
2022
Harrow PI
Dover Dr
End
155
33
7,615
Slurry Seal
$
2,330
2022
Highland Dr
Mariners Dr
Irvine Ave
1,945
37
71,965
Slurry Seal
$
22,019
2022
Highland St
Seashore Dr
Ocean Front Alley West
72
17
1,224
Slurry Seal
$
375
2022
Hilaria Way
North End
Flagship Dr
230
38
8,740
Slurry Seal
$
2,674
2022
Holly Ln
Tustin Ave
Irvine Ave
1,286
34
43,724
Slurry Seal
$
13,378
2022
Holmwood Dr
Catalina Dr
Broad St
1,380
34
46,920
Slurry Seal
$
14,356
2022
Inlet Isle Dr
Topside Ln
Sandcastle Dr
1,088
32
37,066
Slurry Seal
$
11,341
2022
Iris Ave
Ocean Blvd
Seaview Ave
625
28
17,500
Slurry Seal
$
5,354
2022
Iris Ave
Bayside Dr
Coast Highway East
722
27
19,494
Slurry Seal
$
5,964
2022
Jasmine Ave
Ocean Blvd
88' N of Ocean Blvd
88
28
2,464
Reconstruction
$
31,770
2022
Jasmine Ave
Bayside Dr
Coast Highway East
480
28
13,440
Slurry Seal
$
4,112
2022
Kent Ln
Sussex Ln
Dover Dr
415
34
14,110
Slurry Seal
$
4,317
2022
Ketch Rd
Beacon Bay
End
310
24
7,440
Slurry Seal
$
2,276
2022
Key Bay
Park Green Dr
End
80
64
5,120
Slurry Seal
$
1,567
2022
Key View
Sandcastle Dr
End
115
34
5,410
Slurry Seal
$
1,655
2022
Kline Dr
South End
Orchard Dr
625
28
19,000
Slurry Seal
$
5,813
2022
La Linda Ct
23rd St
End
199
32
6,368
Slurry Seal
$
1,948
2022
La Linda PI
23rd St
End
548
37
22,076
Slurry Seal
$
6,754
2022
Lake Park Ln
23rd St
Tustin Ave
430
25
10,750
Slurry Seal
$
3,2891
2022
Lancaster St
62nd St
61st St
79
30
2,370
Slurry Seal
$
725
2022
Leeward Ln
Tradewinds Ln
Holiday Rd
1,865
33
61,545
Slurry Seal
$
18,831
2022
Lighthouse Ln
Salt Air Dr
Blue Water Dr
1,065
32
35,580
Slurry Seal
$
10,886
2022
Lugonia St
Newport Shores Dr
Coast Highway West
167
19
3,173
Slurry Seal
$
971
2022
Marcus Ave
33rd St
34th St
229
26
5,954
Slurry Seal
$
1,822
2022
Marcus Ave
35th St
36th St
220
26
5,720
Slurry Seal
$
1,7501
2022
Marcus Ave
36th St
Rialto
164
26
4,264
Slurry Seal
$
1,305
2022
Marian Ln
Highland Dr
Ruth Ln
1,048
38
39,824
Slurry Seal
$
12,185
2022
Marigold Ave
Seaview Ave
Coast Highway East
585
28
16,380
Slurry Seal
$
5,012
2022
Mariners Dr
Irvine Ave
Dover Dr
1,450
38
55,100
Slurry Seal
$
16,859
2022
Mariners Dr
Dover Dr
Santiago Dr
2,212
38
84,056
Slurry Seal
$
25,718
2022
Marlin Way
Shipway Ln
Terrapin Way
725
33
25,725
Slurry Seal
$
7,8711
2022
Meadow Ln
Tustin Ave
End
195
35
9,325
Slurry Seal
$
2,853
2022
Mesa Dr
Cypress St
End
1,345
37
49,765
Slurry Seal
$
15,226
2022
Milford Dr
Hampden Rd
Orrington Rd
875
37
32,375
Slurry Seal
$
9,906
2022
18 of 34
5-44
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Milford Dr
Orrington Rd
Camden Dr
801
37
32,137
Slurry Seal
$
9,833
2022
Monrovia Ave
15th St West
End
535
39
20,865
Slurry Seal
$
6,384
2022
Narcissus Ave
175'S of Fifth Ave
Fifth Ave
163
30
4,890
Reconstruction
$
63,050
2022
Newport Coast Dr SB
73 Freeway Bridge
Sage Hill
2,235
44
98,340
Slurry Seal
$
30,089
2022
Newport Shores Dr
Orange St
Walnut St
632
20
12,640
Slurry Seal
$
3,867
2022
Nordina St
Seashore Dr
Ocean Front Alley West
85
17
1,445
Slurry Seal
$
442
2022
North Star Ln
White Cliffs Dr
End
850
33
30,550
Slurry Seal
$
9,347
2022
Nottingham Rd
Dover Dr
Santiago Dr
1,758
38
66,804
Slurry Seal
$
20,440
2022
Ocean View Ave
Tustin Ave
Cliff Dr
922
24
22,128
Slurry Seal
$
6,770
2022
Olive St
Seashore Dr
Ocean Front West
172
17
2,924
Slurry Seal
$
895
2022
Onyx Ave
Bay Front North
Balboa Ave
575
27
15,525
Reconstruction
$ 200,176
2022
Onyx Ave
Balboa Blvd
Park Ave
420
27
11,340
Reconstruction
$ 146,215
2022
Orrington Rd
Cameo Shores Rd
Milford Dr
1,425
33
47,025
Slurry Seal
$
14,388
2022
Outrigger Dr
Keel Dr
Sandcastle Dr
1,454
33
47,255
Slurry Seal
$
14,458
2022
Patolita Dr
Dolphin Ter
Bonnie Doone Ter
490
33
16,170
Slurry Seal
$
4,947
2022
Peach Tree Ln
Redland Dr
End
202
34
6,868
Slurry Seal
$
2,101
2022
Pembroke Ln
Mariners Dr
Cornwall Ln
930
34
32,220
Slurry Seal
$
9,858
2022
Perham Rd
Cameo Shores Rd
Milford Dr
1,380
33
45,540
Slurry Seal
$
13,934
2022
Piazza Genoa
Via Lido Soud
Via Genoa
192
45
8,640
Slurry Seal
$
2,644
2022
Poinsettia Ave
Ocean Blvd
Seaview Ave
547
28
15,316
Slurry Seal
$
4,686
2022
Poinsettia Ave
Seaview Ave
Coast Highway East
638
28
17,864
Slurry Seal
$
5,466
2022
Polaris Dr
Galaxy Dr
Evening Star Ln
1,232
36
44,352
Slurry Seal
$
13,570
2022
Polaris Dr
Evening Star Ln
Santiago Dr
1,718
36
62,148
Slurry Seal
$
19,015
2022
Pork Barrel Way (35th 1/2 St)
Finley Ave
End
80
16
1,280
Slurry Seal
$
392
2022
Quiet Cove
Tiller Way
End
470
32
16,540
Slurry Seal
$
5,061
2022
Redlands Ave
Clay St
Cliff Dr
730
34
24,820
Slurry Seal
$
7,594
2022
Redlands Dr
South End
23rd St
203
33
6,699
Slurry Seal
$
2,050
2022
Redlands Dr
23rd St
Dawnview Ln
550
33
18,150
Slurry Seal
$
5,553
2022
Redlands Dr
Dawnview Ln
Santa Isabel Ave
768
33
25,344
Slurry Seal
$
7,754
2022
Rigel Cir
Galaxy Dr
End
170
56
12,020
Slurry Seal
$
3,678
2022
Roxbury Rd
Cameo Shores Rd
Milford Dr
1,197
33
39,501
Slurry Seal
$
12,086
2022
Ruth Ln
Estelle Ln
Marian Ln
631
34
22,654
Slurry Seal
$
6,931
2022
San Nicolas Dr
Newport Center Dr East
Avocado Ave
1,080
78
84,240
Grind and Overlay
$ 552,199
2022
Santa Ana Ave
Clay St
15th St
627
36
22,572
Slurry Seal
1 $
6,9061
2022
Santana Dr
Dolphin Ter
Bonnie Doone Ter
375
33
12,375
Slurry Seal
1 $
3,7861
2022
19 of 34
5-45
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Santiago Dr
Irvine Ave
Galaxy Dr
874
36
31,464
Slurry Seal
$
9,627
2022
Santiago Dr
Mariners Dr
Nottingham Rd
2,360
36
84,960
Slurry Seal
$
25,995
2022
Santiago Dr
Nottingham Rd
Pescador Dr
1,445
36
52,020
Slurry Seal
$
15,916
2022
Sausalito Dr
Marguerite Ave
End
600
36
23,100
Slurry Seal
$
7,068
2022
Sea Gull Ln
Sherington PI
16th St
900
37
33,300
Grind and Overlay
$ 200,272
2022
Seashore Dr
42nd St
45th St
630
28
17,640
Slurry Seal
$
5,397
2022
Seashore Dr
46tth St
45th St
205
28
5,740
Slurry Seal
$
1,756
2022
Seaview Ave
Carnation Ave
Goldenrod Ave
857
30
25,710
Reconstruction
$ 331,499
2022
Seaview Ave
Narcissus Ave
Orchid Ave
256
28
7,040
Slurry Seal
$
2,154
2022
Seaview Ave
Orchid Ave
Poinsettia Ave
270
28
7,425
Slurry Seal
$
2,272
2022
Second Ave
Carnation Ave
Heliotrope Ave
1,200
28
33,600
Slurry Seal
$
10,280
2022
Serenade Ter
Dolphin Ter
Ramona Dr
1,000
33
33,000
Slurry Seal
$
10,097
2022
Shell St
Way Ln
End
145
32
3,770
Slurry Seal
$
1,153
2022
Sherington PI
Irvine Ave
Sea Gull Ln
1,432
37
52,984
Grind and Overlay
$ 290,379
2022
Sunset Dr
Lugonia St
End
363
29
10,527
Slurry Seal
$
3,221
2022
Sussex Ln
Dover Dr
Cumberland Ln
1,205
34
41,570
Slurry Seal
$
12,719
2022
Teresita Ln
Kathleen Ln
Vivian Ln
530
35
19,150
Slurry Seal
$
5,859
2022
Terrapin Way
Shipway Ln
Marlin Way
450
33
15,450
Slurry Seal
$
4,727
2022
Third Ave
Dahlia Ave
Fernleaf Ave
265
27
7,155
Slurry Seal
$
2,189
2022
Topaz Ave
Collins Ave
Park Ave
238
23
5,474
Reconstruction
$
70,5801
2022
Topside Ln
Sandcastle Dr
Inlet Isle Dr
626
32
20,782
Slurry Seal
$
6,359
2022
Tremont Ln
Cameo Shores Rd
Milford Dr
1,420
33
46,860
Slurry Seal
$
14,337
2022
Tustin Ave
Santiago Dr
23rd St
1,305
34
44,370
Slurry Seal
$
13,576
2022
Tustin Ave
South End
Santa Isabel Ave
330
37
12,700
Slurry Seal
$
3,886
2022
Tustin Ave
Santa Isabel Ave
North End
580
37
25,400
Slurry Seal
$
7,771
2022
Via Eboli
Via Lido Soud
Via Lido Nord
702
20
14,040
Slurry Seal
$
4,296
2022
Via Genoa
Via Lido Soud
Piazza Lido
440
43
18,920
Slurry Seal
$
5,789
2022
Via Graziana
Via Havre
Piazza Lido
490
18
8,820
Slurry Seal
$
2,699
2022
Via Jucar
Via Lido Soud
Via Lido Nord
925
23
21,275
Slurry Seal
$
6,509
2022
Via Lido Soud
Via Lido Nord (West Side)
Via Antibes
280
20
6,800
Slurry Seal
$
2,081
2022
Via Nice
Via Lido Soud
Via Lido Nord
810
20
16,200
Slurry Seal
$
4,957
2022
Via Orvieto
Via Lido Soud
Via Lido Nord
785
23
18,055
Slurry Seal
$
5,524
2022
Via Quito
Vai Lido Soud
Via Lido Nord
710
20
14,200
Slurry Seal
$
4,345
2022
Vista Baya
West End
Tustin Ave
527
33
19,891
Slurry Seal
$
6,086
2022
Vista Baya
Tustin Ave
East End
430
24
13,305
Slurry Seal
$
4,071
2022
20 of 34
5-46
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Vista Del Sol
Vista Del Oro
Eastbluff Dr
470
60
28,200
Slurry Seal
$ 8,628
2022
Vivian Ln
Beryl Ln
Diana Ln
794
34
28,196
Slurry Seal
$ 8,627
2022
Walnut St
Seashore Dr
Ocean Front Alley West
55
18
990
Slurry Seal
$ 303
2022
Warwick Ln
Marian Ln
Nottingham Rd
244
33
8,052
Slurry Seal
$ 2,464
2022
15th St
Kings PI
St James PI
210
35
7,350
Slurry Seal
$ 2,316
2023
26th St
East End
Newport Blvd
140
29
4,060
Slurry Seal
$ 1,279
2023
33rd St
Lake Ave
Balboa Blvd
275
18
4,950
Slurry Seal
$ 1,560
2023
34th St
Clubhouse Ave
Rivo Alto
165
16
2,640
Slurry Seal
$ 832
2023
35th St
Finley Ave
Rivo Alto
70
16
1,120
Slurry Seal
$ 353
2023
36th St
Short St
Clubhouse Ave
340
16
5,440
Slurry Seal
$ 1,714
2023
38th St
North End
Channel PI
34
16
544
Slurry Seal
$ 171
2023
39th St
Channel PI
Marcus Ave
275
16
4,400
Slurry Seal
$ 1,387
2023
40th St
Marcus Ave
Rivo Alto
35
16
560
Slurry Seal
$ 176
2023
A St
Ocean Front East
South End
535
60
32,100
Grind and Overlay
$ 83,1061
2023
Abalone Ave
Park Ave
Bay Front South
415
28
11,620
Reconstruction
$ 154,320
2023
Acacia Ave
Coast Highway East
Second Ave
1,075
27
29,025
Slurry Seal
$ 9,147
2023
Agate Ave
Park Ave
Bay Front South
505
30
15,150
Reconstruction
$ 201,201
2023
Amethyst Ave
Bay Front North
Balboa Ave
575
27
15,525
Reconstruction
$ 206,181
2023
Amethyst Ave
Balboa Ave
Park Ave
425
27
11,475
Reconstruction
$ 152,395
2023
Anacapa Dr
Newport Center Dr East
Farallon Dr
758
48
36,384
Grind and Overlay
$ 94,198
2023
Avon St
West End
Riverside Ave
835
21
18,747
Slurry Seal
$ 5,908
2023
Bamboo St
Bison Ave
Bellis St
1,805
36
64,980
Grind and Overlay
$ 168,232
2023
Bayview Way EB
Bayview PI
Jamboree Rd
587
33
21,371
Grind and Overlay
$ 55,329
2023
Bodega Bay Dr
San Mateo Way
End
1,355
36
48,780
Slurry Seal
$ 15,373
2023
Cambria Dr
EI Capitan Dr
Drakes Bay Dr
2,510
32
80,320
Slurry Seal
$ 25,312
2023
Cliff Dr
St Andrews Place
Irvine Ave
1,210
55
64,519
Slurry Seal
$ 20,333
2023
Clubhouse Ave
Newport Island Channel
Rivo Alto
1,057
17
17,441
Slurry Seal
$ 5,496
2023
Collins Ave
Balboa Ave
Park Ave
429
28
12,012
Reconstruction
$ 159,526
2023
Coral Ave
Bay Front North
Balboa Ave
575
27
15,525
Reconstruction
$ 206,181
2023
Cypress St (S/A Heights)
Orchard Dr
Cul De Sac
980
36
35,280
Slurry Seal
$ 11,118
2023
Dahlia Ave
Ocean Blvd
Seaview Ave
275
27
7,425
Slurry Seal
$ 2,340
2023
Dahlia PI
Seaview Ave
End
139
27
3,753
Grind and Overlay
$ 9,716
2023
Dana Point Way
San Martin Way
Montecito Dr
169
36
6,084
Slurry Seal
$ 1,917
2023
Diamond Ave
Bay Front North
Balboa Ave
496
28
13,888
Reconstruction
$ 184,441
2023
Diamond Ave
Balboa Ave
Park Ave
430
28
1 12,040
Reconstruction
$ 159,898
2023
21 of 34
5-47
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Drakes Bay Dr
Goleta Point Dr
Point Aguello Way
269
32
9,358
Slurry Seal
$ 2,949
2023
Drakes Bay Dr
Point Aguello Way
Point Conception Way
1,381
32
44,192
Slurry Seal
$ 13,927
2023
Drakes Bay Dr
Point Conception Way
Montecito Dr
471
32
15,822
Slurry Seal
$ 4,986
2023
EI Capitan Dr
Spyglass Hill Rd
Point Arguello Way
1,236
44
54,384
Slurry Seal
$ 17,139
2023
EI Capitan Dr
Point Arguella Way
Point Conception Way
1,603
44
71,282
Slurry Seal
$ 22,464
2023
EI Modena Ave
Beacon St
Clay St
667
35
23,345
Slurry Seal
$ 7,357
2023
Fernleaf Ave
Ocean Blvd
Seaview Ave
295
30
8,850
Reconstruction
$ 117,533
2023
Fifth Avenue
Marguerite Ave
Marigold Ave
320
36
11,520
Slurry Seal
$ 3,630
2023
Finley Ave
38th St
Channel PI
220
16
3,520
Slurry Seal
$ 1,109
2023
First Ave
Acacia Ave
Begonia Ave
272
27
7,344
Slurry Seal
$ 2,314
2023
Flagship Rd
Dana Rd
Placentia Ave
1,060
37
39,220
Grind and Overlay
$ 101,540
2023
Ford Rd
Hillside Dr
East End
590
32
22,320
Slurry Seal
$ 7,034
2023
Ford Rd EB
West End
San Miguel Dr
840
30
26,900
Slurry Seal
$ 8,477
2023
Ford Rd WB
Newport Hills Dr
West End
877
29
25,433
Slurry Seal
$ 8,015
2023
Fullerton Ave
Beacon St
Clay St
667
35
23,345
Slurry Seal
$ 7,357
2023
Fullerton Ave
Clay St
15th St
643
35
22,505
Slurry Seal
$ 7,092
2023
Garrett Dr
Cortland Dr
Cameo Highlands Dr
840
37
31,080
Grind and Overlay
$ 80,466
2023
Goldenrod Ave
Ocean Blvd
150'S of Seaview Ave
375
27
10,125
Reconstruction
$ 134,466
2023
Goleta Point Dr
Drakes Bay Dr
Morro Bay Dr
1,635
32
53,820
Slurry Seal
$ 16,961
2023
Holiday Rd
Santiago Dr
Tradewinds Ln
1,485
38
56,430
Slurry Seal
$ 17,784
2023
Jade Cove
San Martin Way
End
275
32
10,300
Slurry Seal
$ 3,246
2023
Kent Ln
Pembroke Ln
Sussex Ln
250
34
8,500
Slurry Seal
$ 2,679
2023
Key West
Park Green Dr
End
230
32
8,860
Slurry Seal
$ 2,792
2023
Kings Rd
Cliff Rd
St Andrews Rd
1,510
35
52,850
Slurry Seal
$ 16,655
2023
Kings Rd
St Andrews Rd
Kings PI
1,915
35
67,025
Slurry Seal
$ 21,122
2023
Lake Ave
34th St
33rd St
205
26
5,330
Slurry Seal
$ 1,680
2023
Larkspur Ave
Bayside Dr
Coast Highway East
247
28
6,916
Slurry Seal
$ 2,180
2023
Laurel PI
Irvine Ave
End
510
36
18,360
Slurry Seal
$ 5,786
2023
Lincoln Ln
Estelle Ln
Marian Ln
1,563
34
53,742
Slurry Seal
$ 16,936
2023
Malibu Cir
Mission Bay Dr
End
205
32
7,560
Slurry Seal
$ 2,382
2023
Marguerite Ave
San Joaquin Hills Rd
Pacific View Dr
721
36
26,406
Slurry Seal
$ 8,322
2023
Marine Ave
Balboa Ave
South Bridge End
591
37
21,867
Reconstruction
$ 290,406
2023
Montecito Dr
Cambria Dr
Dana Point Way
1,052
32
33,664
Slurry Seal
$ 10,609
2023
Morro Bay Dr
Goleta Point Dr (South End)
Goleta Point Dr (North End)
1,317
32
42,894
Slurry Seal
$ 13,518
2023
Newport Hills Dr E
Ford Rd
Port Ramsgate PI
1,280
36
51,100
Slurry Seal
$ 16,104
2023
22 of 34
5-48
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Newport Hills Dr E
Port Ramsgate PI
Port Seabourne Way
1,550
37
57,350
Slurry Seal
$
18,073
2023
Newport Hills Dr E
Port Seaborne Way
Port Sutton Dr
1,809
36
65,124
Slurry Seal
$
20,523
2023
Newport Hills Dr E
Port Sutton Dr
Newport Hills Dr West
1,985
38
75,430
Slurry Seal
$
23,771
2023
Newport Hills Dr W
Newport Hills Dr East
Port Carlow PI
1,550
36
55,800
Slurry Seal
$
17,585
2023
Newport Hills Dr W
Port Carlow PI
Port Seabourne Wy
1,295
38
49,210
Slurry Seal
$
15,508
2023
Newport Hills Dr W
Port Seabourne Wy
Ford Rd
2,346
38
89,148
Slurry Seal
$
28,094
2023
Onyx Ave
Park Ave
Bay Front South
410
27
11,070
Reconstruction
$ 147,016
2023
Opal Ave
Collins Ave
Park Ave
549
23
12,627
Reconstruction
$ 167,694
2023
Opal Ave
Park Ave
Bay Front South
550
24
13,200
Reconstruction
$ 175,304
2023
Pacific View Dr
San Miguel Dr
End
2,675
36
97,800
Slurry Seal
$
30,821
2023
Palm St
Bay AveEast
Balboa Blvd East
193
34
6,562
Slurry Seal
$
2,068
2023
Park Green Dr
Sausalito Dr
Sandcastle Dr
1,110
40
44,400
Slurry Seal
$
13,992
2023
Pearl Ave
Bay Front North
Park Ave
582
23
13,386
Reconstruction
$ 177,774
2023
Piazza Lido
Via Havre
Via Koron
428
24
10,272
Slurry Seal
$
3,2371
2023
Point Arguello Way
EI Capitan Dr
Drakes Bay Dr
170
36
6,120
Slurry Seal
$
1,929
2023
Point Conception Way
EI Capitan Dr
Drakes Bay Dr
168
36
6,798
Slurry Seal
$
2,142
2023
Point Mendocino Way
Spyglass Hill Rd
Bodega Bay Dr
170
36
6,120
Slurry Seal
$
1,929
2023
Point Sur Dr
Carmel Bay Dr
Point Arena Wy
645
32
21,390
Slurry Seal
$
6,741
2023
Poppy Ave
Coast Highway East
Second Ave
300
30
9,000
Reconstruction
$ 119,525
2023
Port Abbey PI
Port Sheffield PI (West End)
Newport Hills Drive West
772
32
24,704
Slurry Seal
$
7,7851
2023
Port Abbey PI
Newport Hills Drive West
Port Sheffield PI (East End)
940
32
30,080
Slurry Seal
$
9,480
2023
Port Aberdeen PI
Port Whitby PI
Port Durness PI
1,379
32
44,628
Slurry Seal
$
14,064
2023
Port Albans Cir
Newport Hills Dr East
End
175
54
9,450
Slurry Seal
$
2,978
2023
Port Albans PI
Newport Hills Dr East
Port Cardigon PI
695
32
22,240
Slurry Seal
$
7,009
2023
Port Ashley PI
Port Stirling PI (West End)
Newport Hills Drive West
350
32
11,200
Slurry Seal
$
3,530
2023
Port Ashley PI
Newport Hills Drive West
Port Stirling PI (East End)
620
32
19,840
Slurry Seal
$
6,252
2023
Port Barmouth PI
Port Westbourne PI (West End)
Newport Hills Drive West
600
32
19,200
Slurry Seal
$
6,051
2023
Port Barmouth PI
Newport Hills Drive West
Port Westbourne PI (East End)
850
32
27,200
Slurry Seal
$
8,572
2023
Port Bishop PI
Newport Hills Dr East
Port Carney PI
998
33
32,435
Slurry Seal
$
10,222
2023
Port Bristol Cir
Port Cardiff PI (West Side)
Newport Hills Drive East
1,160
32
37,120
Slurry Seal
$
11,698
2023
Port Bristol Cir
Newport Hills Drive East
End
1,095
32
35,040
Slurry Seal
$
11,043
2023
Port Cardiff PI
Port Bristol Cir (West End)
Newport Hills Drive East
958
32
30,656
Slurry Seal
$
9,661
2023
Port Cardiff PI
Newport Hills Drive East
Port Bristol Cir (East End)
525
32
16,800
Slurry Seal
$
5,294
2023
Port Cardigan PI
Newport Hills Dr East
Port Albans PI
840
32
26,880
Slurry Seal
$
8,471
2023
Port Carlisle PI
Port Whitby PI
Port Lerwick PI
1,461
32
47,252
Slurry Seal
$
14,891
2023
23 of 34
5-49
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Port Carlow Cir
Newport Hills Dr West
End
115
54
6,210
Slurry Seal
$
1,957
2023
Port Carlow PI
Newport Hills Dr West
Port Renwick PI
959
32
30,688
Slurry Seal
$
9,671
2023
Port Carney PI
Newport Hills Dr East
Port Bishop PI
523
33
16,998
Slurry Seal
$
5,357
2023
Port Charles PI
Port Margate PI (West End)
Newport Hills Drive West
665
32
21,280
Slurry Seal
$
6,706
2023
Port Charles PI
Newport Hills Drive West
Port Margate PI (East End)
1,000
36
36,000
Slurry Seal
$
11,345
2023
Port Chelsea PI
Port Ramsgate PI (West End)
Newport Hills Drive East
987
32
31,584
Slurry Seal
$
9,953
2023
Port Chelsea PI
Newport Hills Drive East
Port Ramsgate PI (East End)
549
32
17,568
Slurry Seal
$
5,536
2023
Port Claridge PI
Newport Hills Dr East
Port Nelson PI
906
33
29,445
Slurry Seal
$
9,279
2023
Port Dunbar Dr
Spyglass Hill Rd
Port Harwick PI
172
36
6,942
Slurry Seal
$
2,188
2023
Port Dunleigh Cir
Newport Hills Dr East
End
678
32
21,696
Slurry Seal
$
6,837
2023
Port Durness PI
Port Harwick PI
Port Whitby PI
708
36
26,238
Slurry Seal
$
8,269
2023
Port Durness PI
Port Whitby PI
Port Aberdeen PI
1,274
36
46,364
Slurry Seal
$
14,611
2023
Port Edward Cir
Newport Hills Dr East
End
325
32
10,400
Slurry Seal
$
3,277
2023
Port Edward PI
Newport Hills Dr East
Port Locksleigh PI
888
33
28,860
Slurry Seal
$
9,0951
2023
Port Harwick PI
Port Dunbar Dr
Port Durness PI
353
36
14,208
Slurry Seal
$
4,478
2023
Port Hemley Cir
Newport Hills Dr West
End
110
54
5,940
Slurry Seal
$
1,872
2023
Port Kimberly PI
Newport Hills Dr West
Port Manleigh PI
858
32
27,456
Slurry Seal
$
8,653
2023
Port Laurent PI
Newport Hills Dr East
Port Trinity PI
878
33
28,535
Slurry Seal
$
8,993
2023
Port Lerwick PI
Port Whitby PI
Port Carlisle PI
992
32
31,744
Slurry Seal
$
10,004
2023
Port Locksleigh PI
Newport Hills Dr East
Port Edward PI
1,000
33
32,500
Slurry Seal
$
10,242
2023
Port Manleigh Cir
Newport Hills Dr West
Newport Hills Dr West
750
32
24,000
Slurry Seal
$
7,563
2023
Port Manleigh PI
Newport Hills Dr West
Port Kimberly PI
782
32
25,024
Slurry Seal
$
7,886
2023
Port Margate PI
Port Charles PI (West Side)
Newport Hills Drive West
378
32
12,096
Slurry Seal
$
3,812
2023
Port Margate PI
Port Charles PI (East Side)
Newport Hills Drive West
840
32
26,880
Slurry Seal
$
8,471
2023
Port Nelson PI
Newport Hills Dr West
Port Charles PI (East Side)
945
33
30,713
Slurry Seal
$
9,679
2023
Port Provence PI
Port Weybridge PI (West End)
Newport Hills Dr East
1,160
32
37,120
Slurry Seal
$
11,698
2023
Port Provence PI
Newport Hills Dr East
Port Weybridge PI (East Side)
812
32
27,784
Slurry Seal
$
8,756
2023
Port Ramsey PI
San Miguel Dr
Port Whitby PI
153
36
6,008
Slurry Seal
$
1,893
2023
Port Ramsgate PI
Port Chelsea PI (West End)
Newport Hills Drive East
633
32
20,256
Slurry Seal
$
6,384
2023
Port Ramsgate PI
Newport Hills Drive East
Port Chelsea PI (East End)
430
32
13,760
Slurry Seal
$
4,336
2023
Port Renwick PI
Newport Hills Dr West
Port Carlow PI
852
32
27,264
Slurry Seal
$
8,592
2023
Port Seabourne Way
Newport Hills Dr West
Newport Hills Dr East
1,600
40
63,760
Slurry Seal
$
20,094
2023
Port Sheffield PI
Port Abbey PI (West Side)
Newport Hills Drive West
507
32
16,224
Slurry Seal
$
5,113
2023
Port Sheffield PI
Newport Hills Drive West
Port Abbey PI (East Side)
650
32
20,800
Slurry Seal
$
6,5551
2023
Port Stanhope Cir
Newport Hills Dr West
End
115
38
5,330
Slurry Seal
$
1,680
2023
24 of 34
5-50
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Port Stanhope PI
Newport Hills Dr West
Port Tiffin PI
725
32
23,200
Slurry Seal
$ 7,311
2023
Port Stirling PI
Port Ashley PI (West Side)
Newport Hills Drive West
615
32
19,680
Slurry Seal
$ 6,202
2023
Port Stirling PI
Newport Hills Drive West
Port Ashley PI (East Side)
780
32
24,960
Slurry Seal
$ 7,866
2023
Port Sutton Dr
San Miguel Dr
Newport Hills Dr East
384
49
15,756
Slurry Seal
$ 4,965
2023
Port Taggart PI
Newport Hills Dr West
Port Wheeler PI
995
32
31,840
Slurry Seal
$ 10,034
2023
Port Tiffin Cir
Newport Hills Dr West
End
115
54
6,210
Slurry Seal
$ 1,957
2023
Port Tiffin PI
Newport Hills Dr West
Port Stanhope PI
730
32
23,360
Slurry Seal
$ 7,362
2023
Port Townsend Cir
Port Bishop PI
End
295
33
9,735
Slurry Seal
$ 3,068
2023
Port Trinity Cir
Newport Hills Dr East
End
345
33
11,213
Slurry Seal
$ 3,534
2023
Port Trinity PI
Newport Hills Dr East
Port Laurent PI
758
33
24,635
Slurry Seal
$ 7,764
2023
Port Westbourne PI
Port Barmouth PI (West Side)
Newport Hills Drive West
390
32
12,480
Slurry Seal
$ 3,933
2023
Port Westbourne PI
Newport Hills Drive West
Port Barmouth PI (East Side)
680
32
21,760
Slurry Seal
$ 6,858
2023
Port Weybridge PI
Port Provence PI (West End)
Newport Hills Drive East
830
32
26,560
Slurry Seal
$ 8,370
2023
Port Weybridge PI
Newport Hills Drive East
Port Provence PI (East Side)
618
33
20,394
Slurry Seal
$ 6,427
2023
Port Wheeler PI
Newport Hills Dr West
Port Taggart PI
1,057
32
33,824
Slurry Seal
$ 10,659
2023
Port Whitby PI
Port Ramsey PI
Port Durness PI
1,020
36
37,220
Slurry Seal
$ 11,730
2023
Prospect St
Canal St
Cedar St
856
29
24,824
Slurry Seal
$ 7,823
2023
Ramona Dr
Santanella Ter
Bonnie Doone Ter
280
33
9,240
Slurry Seal
$ 2,912
2023
San Martin Way
Bodega Bay Dr
San Mateo Way
825
36
30,450
Slurry Seal
$ 9,596
2023
San Mateo Way
Bodega Bay Dr
San Martin Way
640
32
21,980
Slurry Seal
$ 6,927
2023
Sand Key
Park Green Dr
End
501
33
17,783
Slurry Seal
$ 5,604
2023
Sandune Ln
Inlet Isle Dr
End
670
32
23,240
Slurry Seal
$ 7,324
2023
Santa Ana Ave
Cliff Dr
Clay St
1,655
34
56,270
Slurry Seal
$ 17,733
2023
Sapphire Ave
Bay Front North
Balboa Ave
540
27
14,580
Reconstruction
$ 193,631
2023
Sapphire Ave
Balboa Ave
Park Ave
419
27
11,313
Reconstruction
$ 150,243
2023
Sapphire Ave
Park Ave
Bay Front South
435
28
12,180
Reconstruction
$ 161,757
2023
Seashore Dr
36th St
33rd St
690
28
19,320
Slurry Seal
$ 6,089
2023
Seashore Dr
42nd St
39th St
650
28
18,200
Slurry Seal
$ 5,736
2023
Somerset Ln
Highland Dr
Highland Dr
1,445
34
50,330
Slurry Seal
$ 15,861
2023
Summit St
Seashore Dr
End
175
18
3,150
Slurry Seal
$ 993
2023
Third Ave
Avocado Ave
Acacia Ave
270
27
7,290
Slurry Seal
$ 2,297
2023
Third Ave
Begonia Ave
Carnation Ave
265
27
7,155
Slurry Seal
$ 2,2551
2023
Topaz Ave
Park Ave
Bay Front South
580
24
13,920
Reconstruction
$ 184,866
2023
Tradewinds Ln
Santiago Dr
Commodore Rd
2,275
38
86,450
Slurry Seal
$ 27,244
2023
Turquoise Ave
Bay Front South
Park Ave
500
28
14,000
Reconstruction
$ 185,928
2023
25 of 34
5-51
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Via Firenze
Via Lido Nord
Piazza Lido
447
16
7,152
Slurry Seal
$
2,254
2023
Warwick Ln
Estelle Ln
Marian Ln
742
33
24,486
Slurry Seal
$
7,717
2023
15th St
Santa Ana Ave
Redlands Ave
670
36
24,120
Grind and Overlay
$
64,320
2024
15th St
Redlands Ave
Tustin Ave
670
18
12,060
Slurry Seal
$
3,915
2024
15th St
Tustin Ave
Aliso Ave
660
36
23,760
Slurry Seal
$
7,712
2024
15th St
Aliso Ave
Irvine Ave
660
36
23,760
Slurry Seal
$
7,712
2024
15th St
St Andrew Rd
Kings PI
1,180
35
41,300
Slurry Seal
$
13,406
2024
16th St W
West End
Placentia Ave
2,400
36
86,400
Slurry Seal
$
28,045
2024
19th St
Balboa Blvd
Sundance Dr
930
30
27,900
Slurry Seal
$
9,056
2024
26th St
Newport Blvd
Balboa Blvd
125
22
2,750
Slurry Seal
$
893
2024
28th St
Villa Way
Newport Blvd East NB
225
54
11,750
Grind and Overlay
$
31,333
2024
31st St
Lafayette Ave
Villa Way
351
24
8,424
Slurry Seal
$
2,734
2024
35th St
Lake Ave
Balboa Blvd
283
20
5,660
Slurry Seal
$
1,837
2024
38th St
Marcus Ave
East End of Bridge
83
16
1,328
Slurry Seal
$
431
2024
39th St
North End
Channel PI
35
16
560
Slurry Seal
$
182
2024
39th St
River Ave
Balboa Blvd
165
17
2,805
Slurry Seal
$
910
2024
39th St
Balboa Blvd
Seashore Dr
305
18
5,610
Slurry Seal
$
1,821
2024
44th St
Balboa Blvd
Seashore Dr
370
21
7,770
Slurry Seal
$
2,522
2024
45th St
Balboa Blvd
Seashore Dr
395
21
8,295
Slurry Seal
$
2,6931
2024
62nd St
Lancaster St
Newport Shores Or
405
29
11,745
Slurry Seal
$
3,812
2024
Acacia St
Orchard Dr
Mesa Or
1,122
50
56,100
Slurry Seal
$
18,210
2024
Agate Ave
Bay Front North
Park Ave
666
23
15,318
Reconstruction
$ 209,535
2024
Aleppo St
Alta Vista Or
End
385
32
12,320
Slurry Seal
$
3,999
2024
Alta Vista Dr
Carob St
Bison Ave
2,220
36
79,920
Slurry Seal
$
25,942
2024
Alta Vista Dr
Bellis St
Aralia St
1,880
36
67,680
Slurry Seal
$
21,969
2024
Anniversary Ln
Irvine Ave
End
2,209
28
61,852
Slurry Seal
$
20,077
2024
Apolena Ave
Balboa Ave
Park Ave
426
27
11,502
Reconstruction
$ 157,336
2024
Back Bay Or
Shellmaker Rd
Beginning of PCC Section
800
22
17,600
Slurry Seal
$
5,713
2024
Back Bay Or
Backbay Sewer Pump Station
Access Rd
607
22
13,354
Slurry Seal
$
4,335
2024
Balboa Blvd E EB
Main St
B St
695
27
18,765
Slurry Seal
$
6,091
2024
Balboa Blvd E EB
B St
D St
991
22
21,802
Slurry Seal
$
7,077
2024
Balboa Blvd E EB
D St
G St
1,066
22
23,452
Slurry Seal
$
7,612
2024
Bay View Ave
Mesa Dr
Orchard Or
1,200
35
42,000
Slurry Seal
$
13,633
2024
Bayview PI
Bristol St South
Bayview Way
1,355
54
75,170
Slurry Seal
$
24,400
2024
Bayview Way WB
liamboree Rd
Bayview PI
617
32
19,744
Slurry Seal
$
6,409
2024
26 of 34
5-52
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Beacon St
Tustin Ave
Aliso Ave
600
35
21,000
Slurry Seal
$
6,817
2024
Beacon St
Aliso Ave
Irvine Ave
638
35
22,330
Slurry Seal
$
7,248
2024
Bellis St
Bamboo St
Alta Vista
730
37
27,010
Slurry Seal
$
8,767
2024
Bellis St
Alta Vista Dr
End
475
32
15,200
Slurry Seal
$
4,934
2024
Bison Ave
Bamboo St
Jamboree Rd
1,105
36
41,780
Slurry Seal
$
13,562
2024
Blackthorn St
Bellis St
Bison Ave
1,385
34
47,090
Slurry Seal
$
15,285
2024
Bolsa Ave
Broad St
Clay St
203
38
7,714
Slurry Seal
$
2,504
2024
Broad St
Westminster Ave
Santa Ana Ave
725
35
25,375
Slurry Seal
$
8,237
2024
Buck Gully Dr
Sandcastle Dr
End
126
36
5,786
Slurry Seal
$
1,878
2024
Buckeye St
Bellis St
Bison Ave
1,190
32
38,080
Slurry Seal
$
12,361
2024
Bunya St
Bellis St
Bison Ave
1,555
32
49,760
Slurry Seal
$
16,152
2024
Cacao St
Eastbluff Dr
Catalpa St
150
36
5,400
Slurry Seal
$
1,753
2024
Camelback St
Jamboree Rd
La Felicidad
1,505
40
60,825
Slurry Seal
$
19,744
2024
Camelback St
La Felicidad
Bison Ave
760
78
55,821
Slurry Seal
$
18,119
2024
Camphor St
Catalpa St
Alta Vista Dr
847
37
31,339
Slurry Seal
$
10,173
2024
Carob St
Camphor St
End
2,360
34
80,240
Slurry Seal
$
26,046
2024
Cassia St
Camphor St
Carob St
1,245
32
39,840
Slurry Seal
$
12,932
2024
Catalpa St
Camphor St
Carob St
1,500
35
52,500
Slurry Seal
$
17,041
2024
Ceiba PI
Carob St
End
195
54
11,780
Grind and Overlay
$
31,413
2024
Celtis PI
Alta Vista Dr
End
190
54
10,260
Slurry Seal
$
3,330
2024
Cercis PI
Alta Vista Dr
End
220
32
7,040
Slurry Seal
$
2,285
2024
Chestnut PI
Alta Vista Dr
End
220
32
7,040
Slurry Seal
$
2,285
2024
Citrus PI
Alta Vista Dr
End
285
32
9,120
Slurry Seal
$
2,960
2024
Clay St
Westminster Ave
Orange Ave
800
32
25,600
Slurry Seal
$
8,310
2024
Cliff Dr
Kings PI
Signal Rd
426
55
23,430
Slurry Seal
$
7,605
2024
Cliff Dr
Beacon St
Santa Ana Ave
740
34
25,160
Slurry Seal
$
8,167
2024
Collins Ave
Park Ave
Bay Front South
419
27
11,313
Reconstruction
$ 154,750
2024
Colton St
Sunset Dr
Prospect St
398
29
11,792
Slurry Seal
$
3,828
2024
Colton St
Sunset Dr
Newport Shores Dr
760
29
22,040
Slurry Seal
$
7,154
2024
Crystal Ave
Park Ave
Bay Front South
410
28
11,480
Reconstruction
$ 157,035
2024
Dana Rd
Superior Ave
Flagship Rd
600
36
21,600
Slurry Seal
$
7,011
2024
Diamond Ave
Park Ave
Bay Front South
418
27
11,286
Reconstruction
$ 154,381
2024
Dolphin -Striker Way
Dove St
End
335
44
16,740
Slurry Seal
$
5,434
2024
Domingo Dr
Mar Vista Dr
Mar Vista Dr
1,675
36
60,300
Slurry Seal
$
19,573
2024
Dorchester Rd
Rockford Rd
Cameo Highland Rd
825
33
27,225
Slurry Seal
$
8,837
2024
27 of 34
5-53
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Dorchester Rd
Cameo Highland Rd
Garrett Rd
910
33
30,030
Slurry Seal
$
9,748
2024
Dove St
Birch St
Bristol St North
3,930
44
176,670
Slurry Seal
$
57,347
2024
Ebbtide Rd
Crown Dr
Sandpiper Dr
1,317
33
43,461
Slurry Seal
$
14,107
2024
EI Modena Ave
Cliff Dr
Beacon St
410
35
14,350
Slurry Seal
$
4,658
2024
F St
Balboa Blvd East
Ocean Front East
225
26
5,850
Grind and Overlay
$
15,600
2024
Farallon Dr
Avocado Ave
Newport Center Dr
1,559
48
74,832
Grind and Overlay
$ 199,551
2024
Fourth Ave
Heliotrope Ave
Iris Ave
268
27
7,236
Slurry Seal
$
2,349
2024
Fourth Ave
Iris Ave
Jasmine Ave
275
27
7,425
Slurry Seal
$
2,410
2024
Fourth Ave
Jasmine Ave
Larkspur Ave
266
27
7,182
Slurry Seal
$
2,331
2024
Fourth Ave
Marigold Ave
Narcissus Ave
267
27
7,209
Slurry Seal
$
2,340
2024
Goldenrod Ave
Sea Ln
Harbor View Dr
1,008
33
33,264
Slurry Seal
$
10,797
2024
Heron Way
Keel Dr
Outrigger Dr
265
32
8,480
Slurry Seal
$
2,753
2024
Indus St
Kline Dr
West End
800
33
28,400
Slurry Seal
$
9,219
2024
Inlet Dr
Marguerite Ave
Keel Dr
150
36
5,400
Slurry Seal
$
1,753
2024
Isabella Ter
Seaward Rd
End
325
24
8,800
Slurry Seal
$
2,856
2024
Keel Dr
Outrigger Dr
End
1,394
32
46,108
Slurry Seal
$
14,967
2024
Kline Dr
Pegasus St
North End
570
33
21,060
Slurry Seal
$
6,836
2024
La Salud
North End
La Vida
499
44
23,956
Slurry Seal
$
7,7761
2024
Lafayette Ave
31st St
Via Lido
385
60
23,100
Slurry Seal
$
7,498
2024
Lafayette Ave
28th St
31st St
860
24
21,140
Slurry Seal
$
6,862
2024
Larkspur Ave
Coast Highway East
Fifth Ave
1,406
27
37,962
Slurry Seal
$
12,322
2024
Lugonia St
Prospect St
Newport Shores Dr
1,025
29
29,725
Slurry Seal
$
9,649
2024
M St
Ocean Blvd
Ocean Front East
90
30
2,700
Slurry Seal
$
876
2024
Mar Vista Dr
Vista Del Oro
Eastbluff Dr
2,268
36
81,648
Slurry Seal
$
26,503
2024
Margaret Dr
Tustin Ave
Irvine Ave
1,284
34
43,306
Slurry Seal
$
14,057
2024
Marguerite Ave
195' S of Coast Highway East
Coast Highway East
195
38
7,410
Slurry Seal
$
2,405
2024
Marigold Ave
Fourth Ave
Fifth Ave
330
27
8,910
Slurry Seal
$
2,892
2024
Martingale Way
Corinthian Way
End
562
44
26,228
Slurry Seal
$
8,514
2024
Narcissus Ave
Coast Highway East
175'S of Fifth Ave
1,430
27
38,610
Slurry Seal
$
12,533
2024
Old Newport BI
475' N of Coast Highway
595' N of Coast Highway
120
30
3,600
Slurry Seal
$
1,169
2024
Old Newport BI
1530' N Hospital Rd
City Limit
300
15
4,500
Slurry Seal
$
1,461
2024
Orchid Ave
Coast Highway East
Third Ave
850
28
23,800
Slurry Seal
$
7,725
2024
Orchid Ave
Third Ave
Fifth Ave
766
28
21,448
Slurry Seal
$
6,962
2024
Orchid St
IZenith Ave
Orchard Dr
957
35
33,495
Slurry Seal
$
10,872
2024
Palm St
jBalboa Blvd East
Ocean Front Alley East
75
31
2,325
Slurry Seal
$
755
2024
28 of 34
5-54
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Paper Ln
Anniversary Ln
End
405
33
13,365
Slurry Seal
$
4,338
2024
Park Ave
Pearl Ave
Collins Ave
880
48
35,460
Reconstruction
$ 485,057
2024
Pebble Dr
Goldenrod Ave
Sandpiper Dr
1,247
34
42,398
Slurry Seal
$
13,762
2024
Pegasus St
Santa Ana Ave
Kline Dr
1,177
33
38,841
Slurry Seal
$
12,608 1
2024
Poinsettia Ave
Coast Highway East
Fourth Ave
1,212
28
33,936
Slurry Seal
$
11,016
2024
Poppy Ave
Second Ave
Fifth Ave
1,150
27
31,050
Slurry Seal
$
10,079
2024
Riverside Ave
Coast Highway West
Avon St (West Side)
475
52
24,700
Slurry Seal
$
8,018
2024
Riverside Dr
Indus St
End
210
33
8,430
Slurry Seal
$
2,736
2024
Rockford Rd
Surrey Dr
Cortland Dr
671
37
24,827
Slurry Seal
$
8,059
2024
San Joaquin Hills Rd
Backbay Dr
800' E of Backbay Dr
786
31
29,386
Slurry Seal
$
9,539
2024
San Joaquin Hills Rd WB
Jamboree Rd
800' E of Backbay Dr
832
47
44,498
Slurry Seal
$
14,444
2024
Sandcastle Dr
Marguerite Ave
Tiller Way
193
36
6,948
Slurry Seal
$
2,255
2024
Sandcastle Dr
Tiller Way
Inlet Isle Dr
2,588
36
93,168
Slurry Seal
$
30,242
2024
Santa Ana Ave
15th St
City Limit
640
19
12,160
Slurry Seal
$
3,947
2024
Sea Ln
Crown Dr
Harbor View Dr
1,078
38
40,964
Slurry Seal
$
13,297
2024
Setting Sun Dr
Pebble Dr
Sandpiper Dr
972
33
32,576
Slurry Seal
$
10,574
2024
Short St
Clubhouse Ave
End
315
16
5,040
Slurry Seal
$
1,636
2024
Silver Ln
Anniversary Ln
End
340
33
11,220
Slurry Seal
$
3,642
2024
Surrey Dr
Rockford Rd
Cameo Highland Dr
1,103
33
36,399
Slurry Seal
$
11,815
2024
Surrey Dr
Cameo Highland Dr
Garret Dr
640
33
21,120
Slurry Seal
$
6,855
2024
Third Ave
Iris Ave
Jasmine Ave
270
27
7,290
Slurry Seal
$
2,366
2024
Third Ave
Marguerite Ave
Marigold Ave
272
28
7,616
Slurry Seal
$
2,472
2024
Third Ave
Marigold Ave
Narcissus Ave
265
28
7,420
Slurry Seal
$
2,409
2024
Third Ave
Narcissus Ave
Orchid Ave
264
28
7,392
Slurry Seal
$
2,399
2024
Tustin Ave
Cliff Dr
Clay St
807
35
28,245
Slurry Seal
$
9,168
2024
Via Lido Nord
Via San Remo
Via Palermo
541
33
17,853
Slurry Seal
$
5,795
2024
Via Lido Nord
Via Palermo
Via Lorca
646
33
21,318
Slurry Seal
$
6,920
2024
Via Lido Nord
Via Genoa
Via Dijon
571
33
18,843
Slurry Seal
$
6,116
2024
Via Lido Soud
Via Antibes
Via Dijon
625
33
20,625
Slurry Seal
$
6,695
2024
Via Lido Soud
Via Dijon
Via Genoa
820
33
27,060
Slurry Seal
$
8,7841
2024
Via Lido Soud
Via Genoa
Via Koron
850
33
28,050
Slurry Seal
$
9,105
2024
Via Lido Soud
Via Koron
Via Orvieto
660
33
21,780
Slurry Seal
$
7,070
2024
Via Lido Soud
Via Orvieto
Via San Remo
670
33
22,110
Slurry Seal
$
7,177
2024
Via Lido Soud
Ivia San Remo
Ivia Venezia
520
33
17,160
Slurry Seal
$
5,570
2024
Via Lido Soud
Ivia Venezia
IVia Zurich
660 1
33
1 21,780
Slurry Seal
$
7,070
2024
29 of 34
5-55
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Via Malaga
Via Oporto
Via Lido
295
22
6,490
Slurry Seal
$
2,107
2024
Villa Way
28th St
29th St
320
25
8,000
Slurry Seal
$
2,597
2024
Vista Del Oro
Eastbluff Dr (South End)
Vista Caudal
2,863
36
103,068
Grind and Overlay
$ 274,847
2024
Vista Del Oro
Vista Caudal
Vista Entrada
1,040
35
36,400
Slurry Seal
$
11,815
2024
Vista Del Oro
Vista Entrada
Vista Del Sol
2,185
35
76,475
Slurry Seal
$
24,824
2024
Vista Del Oro
Vista Del Sol
Vista Nobleza
2,140
35
74,900
Slurry Seal
$
24,312
2024
Vista Del Oro
Vista Nobleza
Vista Umbrosa
1,880
35
65,800
Slurry Seal
$
21,359
2024
Vista Del Oro
Vista Umbrosa
Eastbluff Dr (North End)
755
35
26,425
Slurry Seal
$
8,577
2024
09th St
Bay Ave West
Balboa Blvd West
215
27
4,995
Slurry Seal
$
1,670
2025
11th St
Bay Ave West
Balboa Blvd West
215
28
5,208
Slurry Seal
$
1,741
2025
22nd St
Balboa Blvd West
Ocean Front West
315
30
9,450
Slurry Seal
$
3,159
2025
29th St
East End
Lafayette Ave
75
24
1,800
Slurry Seal
$
602
2025
35th St
Rivo Alto
Marcus Ave
85
16
1,360
Slurry Seal
$
455
2025
36th St
Marcus Ave
Balboa Blvd
500
20
10,000
Slurry Seal
$
3,343
2025
44th St
Channel PI
Balboa Blvd
100
21
2,100
Slurry Seal
$
702
2025
46th St
Balboa Blvd
Seashore Dr
438
21
9,198
Slurry Seal
$
3,075
2025
47th St
River Ave
Neptune Ave
315
21
6,615
Slurry Seal
$
2,212
2025
48th St
River Ave
Neptune Ave
260
20
5,200
Slurry Seal
$
1,739
2025
Alder PI
Alta Vista Dr
End
305
32
9,760
Slurry Seal
$
3,263
2025
Aleppo St
Aralia St
Alta Vista Dr
675
37
24,975
Slurry Seal
$
8,350
2025
Amigos Way
Domingo Dr
Domingo Dr
1,055
36
37,980
Slurry Seal
$
12,698
2025
Aralia St
Aleppo St
End
1,775
35
62,125
Slurry Seal
$
20,771
2025
Arbutus St
Aleppo St
Alta Vista Dr
1,140
36
41,040
Slurry Seal
$
13,721
2025
Avon St
Riverside Ave
Tustin Ave
458
34
15,572
Slurry Seal
$
5,206
2025
Back Bay Dr
End of PCC Section
San Joaquin Hills Rd
1,649
22
36,278
Slurry Seal
$
12,129
2025
Back Bay Dr
End of PCC Section
Backbay sewer pump station
3,106
22
68,332
Slurry Seal
$
22,846
2025
Balboa Blvd
19th St
End (North City Limit)
750
30
22,500
Slurry Seal
$
7,523
2025
Balboa Blvd E WB
G St
D St
1,066
22
23,452
Slurry Seal
$
7,841
2025
Balboa Blvd E WB
D St
B St
991
22
21,802
Slurry Seal
$
7,289
2025
Balboa Blvd E WB
B St
Main St
695
27
18,765
Slurry Seal
$
6,274
2025
Bay Ave E
6th St
Island Ave
370
28
10,360
Slurry Seal
$
3,464
2025
Bay Ave E
Palm St
Main St
475
26
10,850
Slurry Seal
$
3,628
2025
Bay View Ave
Orchard Dr
Zenith Ave
1,200
35
42,000
Slurry Seal
$
14,042
2025
Beacon St
Santa Ana Ave
jCliff Dr
210
34
7,140
Slurry Seal
$
2,387
2025
Bixia St
Eastbluff Dr
I Bamboo St
150
35
5,250
Slurry Seal
1 $
1,7551
2025
30 of 34
5-56
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Blue Key
Sandcastle Dr
End
750
32
26,700
Slurry Seal
$ 8,927
2025
Bowsprit Dr
MacArthur Blvd
Dove St
306
44
13,464
Slurry Seal
$ 4,501
2025
Cabrillo Ter
Serra Dr
De Anza Dr
869
23
19,787
Slurry Seal
$ 6,615
2025
Carnation Ave
Ocean Blvd
Seaview Ave
297
30
8,910
Reconstruction
$ 125,536
2025
Catalina Dr
Clay St
15th St
677
34
23,018
Slurry Seal
$ 7,696
2025
Catamaran Dr
Keel Dr
End
975
36
37,350
Slurry Seal
$ 12,487
2025
Cedar St
Prospect St
Newport Shores Dr
670
29
19,430
Slurry Seal
$ 6,496
2025
China Cove Ramp
Ocean Blvd
Fernleaf Ave
280
19
5,320
Reconstruction
$ 74,955
2025
Cliff Dr
Signal Rd
St Andrews Rd
1,010
55
55,550
Slurry Seal
$ 18,572
2025
Coast Blvd
61st St
End
133
30
3,990
Slurry Seal
$ 1,334
2025
Columbus Cir
Serra Dr
End
112
22
3,464
Slurry Seal
$ 1,158
2025
Court Ave
20th St
McFadden PI
85
28
2,380
Slurry Seal
$ 796
2025
Crown Dr
Sea Ln
Crown Dr North
1,152
37
42,624
Slurry Seal
$ 14,251
2025
Crown Dr North
Crown Dr
San Joaquin Hills Rd
1,370
36
49,320
Slurry Seal
$ 16,489
2025
Dahlia Ave
South End
Way Ln
145
27
3,915
Slurry Seal
$ 1,309
2025
De Anza Dr
Seaward Rd
De Sola Ter
750
35
26,250
Slurry Seal
$ 8,776
2025
De Sola Ter
Seaward Rd
End
1,005
24
28,015
Slurry Seal
$ 9,366
2025
Dove St
Campus Dr
Birch St
585
37
21,645
Slurry Seal
$ 7,237
2025
Eastgate Dr
Newport Hills Dr East
San Miguel Dr
270
56
11,110
Slurry Seal
$ 3,714
2025
Emerald Ave
Bay Front North
Park Ave
320
27
8,640
Reconstruction
$ 121,732
2025
Emerald Ave
Park Ave
Bay Front South
339
27
9,153
Reconstruction
$ 128,960
2025
Emerson St
Tustin Ave
City Limits
340
30
10,200
Slurry Seal
$ 3,410
2025
Fernando Street
Edgewater Ave East
Bay Ave East
367
30
10,680
Slurry Seal
$ 3,571
2025
Fourth Ave
Goldenrod Ave
Heliotrope Ave
260
27
7,020
Slurry Seal
$ 2,3471
2025
Fourth Ave
Larkspur Ave
Marguerite Ave
280
27
7,560
Slurry Seal
$ 2,528
2025
Fourth Ave
Marguerite Ave
Marigold Ave
270
27
7,290
Slurry Seal
$ 2,437
2025
Fourth Ave
Narcissus Ave
Orchid Ave
273
27
7,371
Slurry Seal
$ 2,464
2025
Fourth Ave
Orchid Ave
Poinsettia Ave
270
27
7,290
Slurry Seal
$ 2,437
2025
Fourth Ave
Poinsettia Ave
Poppy Ave
269
27
7,263
Slurry Seal
$ 2,428
2025
Garnet Ave
Bay Front North
Park Ave
481
27
12,987
Reconstruction
$ 182,978
2025
Garnet Ave
Park Ave
Bay Front South
392
25
9,800
Reconstruction
$ 138,076
2025
Golden Cir
Anniversary Ln
Anniversary Ln
1,217
33
40,161
Slurry Seal
$ 13,427
2025
Goldenrod Ave
Seaview Ave
End
230
30
6,900
Reconstruction
$ 97,217
2025
Goldenrod Ave
Fifth Ave
Sea Ln
282
36
10,152
Slurry Seal
$ 3,394
2025
Goldenrod Ave
Harbor View Dr
I Crown Dr
1,165
33
38,445
Slurry Seal
1 $ 12,8541
2025
31 of 34
5-57
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Grant St
Seashore Dr
Ocean Front Alley West
65
17
1,105
Slurry Seal
$ 369
2025
Harbor View Dr
MacArthur Blvd
Goldenrod Ave
685
38
26,030
Slurry Seal
$ 8,703
2025
Harbor View Dr
Goldenrod Ave
Marguerite Ave
1,945
38
73,910
Slurry Seal
$ 24,711
2025
Haven PI
Irvine Ave
St Andrews Rd
543
35
19,005
Slurry Seal
$ 6,354
2025
Hazel Dr
577' N of Coast Highway East
Poppy Ave (north side)
393
29
11,397
Slurry Seal
$ 3,810
2025
Hilaria Way
Flagship Dr
South End
337
36
14,632
Slurry Seal
$ 4,892
2025
Hospital Rd
Newport Blvd
Old Newport Blvd
160
70
11,200
Slurry Seal
$ 3,745
2025
Irvine Ave
15th St
16th St
1,267
62
78,554
Slurry Seal
$ 26,263
2025
Island View Dr
Salt Air Dr
Lighthouse Ln
815
32
26,080
Slurry Seal
$ 8,7191
2025
Keel Dr
Catamaran Dr
Outrigger Dr
583
32
21,014
Slurry Seal
$ 7,026
2025
La Salud
La Vida
Corsica Dr N
1,335
44
58,740
Slurry Seal
$ 19,639
2025
La Salud
Corsica Dr N
La Felicidad
1,005
44
44,220
Slurry Seal
$ 14,784
2025
Lido Park Dr
Lafayette Ave
End
753
54
38,662
Slurry Seal
$ 12,926
2025
Marigold Ave
Ocean Blvd
Seaview Ave
370
27
9,990
Reconstruction
$ 140,753
2025
Marine Ave
Bay Front South
Park Ave
440
27
12,880
Reconstruction
$ 181,471
2025
Marine Ave
Park Ave
Balboa Ave
470
37
17,390
Reconstruction
$ 245,014
2025
Marine Ave
South Bridge End
North Bridge End
400
20
8,000
Slurry Seal
$ 2,675
2025
Mc Fadden PI
Balboa Blvd West
End
600
22
13,200
Slurry Seal
$ 4,413
2025
Mendoza Ter
Seaward Rd
End
715
23
17,445
Slurry Seal
$ 5,832
2025
Monrovia Ave
City Limit
15th St West
1,655
39
64,545
Slurry Seal
$ 21,580
2025
Newport Place Dr
MacArthur Blvd
Dove St
565
62
36,530
Slurry Seal
$ 12,213
2025
Old Newport BI
Coast Highway
270' N of Coast Highway
270
46
12,420
Slurry Seal
$ 4,152
2025
Orange Ave
Old Newport Blvd
15th St
436
36
15,696
Slurry Seal
$ 5,248
2025
Orchard Dr
Bay View Ave
End
148
35
5,180
Slurry Seal
$ 1,732
2025
Orchid St
Orchard Dr
Azure Ave
500
35
17,500
Slurry Seal
$ 5,851
2025
Park Ave
West End
Pearl Ave
710
48
28,560
Reconstruction
$ 402,392
2025
Park Ave
Collins Ave
Sapphire Ave
660
48
25,920
Reconstruction
$ 365,196
2025
Park Ave
Sapphire Ave
Amethyst Ave
668
48
26,304
Reconstruction
$ 370,606
2025
Patrice Rd
Bolero Way
Flagship Rd
500
37
18,500
Slurry Seal
$ 6,185
2025
Patrice Rd
Flagship Rd
South End
315
37
11,655
Slurry Seal
$ 3,897
2025
Pelican Hill Rd N
Pelican Hill Cir (North Side)
Pelicans Dr
2,684
19
50,996
Slurry Seal
$ 17,050
2025
Pelican Hill Rd N
Newport Coast Dr North
Pelicans Dr
1,258
19
23,902
Slurry Seal
$ 7,9911
2025
Pelican Hill Rd N
Pelicans Dr
Newport Coast Dr
1,258
19
23,902
Slurry Seal
$ 7,991
2025
Pelican Hill Rd N
Pelicans Dr
Pelican Hill Cir (North Side)
2,684
19
50,996
Slurry Seal
$ 17,050
2025
Pelican Hill Rd S
Newport Coast Dr
Pelican Hill Cir S
5,650
24
142,100
Slurry Seal
$ 47,509
2025
32 of 34
5-58
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Pelican Hill Rd S
Pelican Hill Cir (North Side)
Pelican Hill Cir (South Side)
1,352
24
31,798
Slurry Seal
$
10,631
2025
Pelican Hill Rd S
Pelican Hill Cir (South Side)
Pelican Hill Cir (North Side)
1,352
24
32,448
Slurry Seal
$
10,849
2025
Poinsettia Ave
Fourth Ave
Fifth Ave
318
30
9,540
Reconstruction
$ 134,412
2025
Quail St
Campus Dr
Birch St
585
36
21,060
Slurry Seal
$
7,0411
2025
Quail St
Birch St
Westerly PI
617
60
37,020
Slurry Seal
$
12,377
2025
Quail St
Westerly PI
Spruce St
912
44
40,128
Slurry Seal
$
13,416
2025
Redlands Dr
Orchard Dr
Indus St
565
33
18,645
Slurry Seal
$
6,234
2025
Ridge Park Rd
Newport Coast Dr
Tesoro
1,813
37
67,081
Slurry Seal
$
22,428
2025
Ridge Park Rd
Tesoro
Campo Bello
1,283
37
47,471
Slurry Seal
$
15,871
2025
Ridge Park Rd
Campo Bello
Vista Ridge Rd
1,491
37
55,167
Slurry Seal
$
18,444
2025
Ridge Park Rd
San Joaquin Hills Rd
Newport Coast Dr
1,449
37
53,613
Slurry Seal
$
17,925
2025
Riverside Ave
Cliff Dr
15th St
1,400
34
47,600
Slurry Seal
$
15,914
2025
Riverside Dr
Orchard Dr
End
520
33
18,960
Slurry Seal
$
6,339
2025
Salt Air Dr
Salt Air Cir
Lighthouse Ln
560
32
18,420
Slurry Seal
$
6,158
2025
San Bernardino Ave
15th St
Clay Ave
630
34
21,420
Slurry Seal
$
7,161
2025
San Bernardino Ave
Clay Ave
Cliff Dr
860
14
12,040
Slurry Seal
$
4,025
2025
San Clemente Dr
Santa Barbara Dr
Santa Cruz Dr
1,140
48
54,720
Slurry Seal
$
18,295
2025
Sandcastle Or
Inlet Isle Dr
Park Green Dr
654
36
23,544
Slurry Seal
$
7,872
2025
Sandcastle Dr
Park Green Dr
Seacrest Dr
975
36
35,100
Slurry Seal
$
11,735
2025
Sandcastle Dr
Seacrest Dr
Catamaran Dr
1,465
36
52,740
Slurry Seal
$
17,633
2025
Santa Barbara Dr
Jamboree Rd
Newport Center Dr West
2,525
73
184,325
Slurry Seal
$
61,626
2025
Seashore Dr
Prospect St
Orange St
1,065
28
29,820
Slurry Seal
$
9,970
2025
Seaward Rd
Isabella Ter
De Anza Dr
1,544
35
54,040
Slurry Seal
$
18,067
2025
Second Ave
Jasmine Ave
Marguerite Ave
536
27
14,472
Slurry Seal
$
4,838
2025
Second Ave
Marguerite Ave
Narcissus Ave
574
27
15,498
Slurry Seal
$
5,182
2025
Second Ave
Narcissus Ave
Orchid Ave
269
27
7,263
Slurry Seal
$
2,4281
2025
Second Ave
Orchid Ave
Poinsettia Ave
268
27
7,236
Slurry Seal
$
2,419
2025
Second Ave
Poinsettia Ave
Poppy Ave
270
27
7,290
Slurry Seal
$
2,437
2025
Second Ave
Poppy Ave
Hazel Ave
125
27
3,375
Slurry Seal
$
1,128
2025
Short St
Newport Blvd
Clubhouse Ave
135
32
4,320
Slurry Seal
$
1,444
2025
Spruce St
Bristol St North
Quail St
600
60
36,000
Slurry Seal
$
12,036
2025
Sundance Dr
19th St
End
600
29
17,400
Slurry Seal
$
5,817
2025
Surfline Way
Windover Dr
Wavecrest Dr
658
32
22,556
Slurry Seal
$
7,541
2025
Terrace Ridge
Newport Ridge Dr West
End
550
38
23,000
Slurry Seal
$
7,690
2025
Third Ave
liasmine Ave
Larkspur Ave
270
27
7,290
Slurry Seal
$
2,437
2025
33 of 34
5-59
Appendix A Sorted by Year of Treatment
Seven -Year Road Maintenance and Rehabilitation Plan Based on City's Current Budget
Local
Local
Limits of Work
Branch Name
From
To
Length of
Segment
Width of
Segment
Pavement
Area
Type of Treatment
Cost of
Treatment
Year of
Treatment
Third Ave
Larkspur Ave
Marguerite Ave
276
27
7,452
Slurry Seal
$
2,491
2025
Third Ave
Orchid Ave
Poinsettia Ave
265
28
7,420
Slurry Seal
$
2,481
2025
Tiller Way
Sandcastle Dr
Sausalito Dr
1,475
36
53,100
Slurry Seal
$
17,753
2025
Tustin Ave
Clay St
15th St
633
35
22,155
Slurry Seal
$
7,407
2025
Via Havre
Via Lido Soud
Piazza Lido
475
23
10,925
Slurry Seal
$
3,653
2025
Via Lido Nord
Via Lido Soud (East Side)
Via Zurich
459
33
18,647
Slurry Seal
$
6,234
2025
Via Lido Nord
Via Waziers
Via San Remo
661
33
21,813
Slurry Seal
$
7,293
2025
Via Lido Nord
Via Lorca
Via Genoa
769
33
25,377
Slurry Seal
$
8,484
2025
Via Lido Nord
Via Dijon
Via Antibes
530
33
17,490
Slurry Seal
$
5,848
2025
Via Lido Nord
Via Antibes
Via Lido Soud (West Side)
400
20
9,200
Slurry Seal
$
3,076
2025
Via Lido Soud
Via Zurich
Via Lido Nord (East Side)
405
53
24,965
Slurry Seal
$
8,347
2025
Via Ravenna
Via Lido Soud
Via Lido Nord
660
20
13,200
Slurry Seal
$
4,413
2025
Vista Ridge Rd
Newport Coast Dr
Altezza Dr
1,493
37
55,241
Slurry Seal
$
18,469
2025
Wavecrest Dr
Surfline Wy
Sand Point Wy
1,060
36
41,660
Slurry Seal
$
13,928
2025
Westerly PI
Dove St
Quail St
1,406
44
61,864
Slurry Seal
$
20,683
2025
White Sails Way
Crown Dr
Harbor View Dr
1,045
33
34,485
Slurry Seal
$
11,530
2025
Windover Dr
Surfline Way
Sand Point Way
1,023
36
38,328
Slurry Seal
$
12,814
2025
Zenith Ave
Spruce Ave
Orchid St
284
35
9,940
Slurry Seal
$
3,323
2025
34 of 34
5-60
mPavement Management Plan Agency Submittal
OCTA
XII. Appendix B — Complete Street Listing Current Conditions
A complete street listing of current pavement conditions should be included in this report. Specific data to be
submitted should follow the format below:
M PAH
Street Name
From
To
Width of Segment Area
Current PCI
Most Recent
Inspection Date
LOCAL
Street Name
From
To
Width of Segment
Area
Current PCI Most Recent
Inspection Date
Please attach the complete street listing, following the above template, after this sheet. The pages should be
labeled Appendix B.
Page 1 11
5-61
Appendix B
Complete Street Listing Current Conditions
MPAH
Sorted by Street Name
M PAH
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Most Recent
Inspection Date
15th St W
Monrovia Ave
Placentia Ave
36
46,224
55
11/19/2018
16th St
City Limit
Sea Gull Ln
60
89,380
69
10/4/2018
16th St
Sea Gull Ln
Dover Dr
38
17,100
93
10/4/2018
32nd St
Lafayette Ave
Villa Way
48
24,564
100
10/22/2018
32nd St
Villa Way
Newport Blvd
62
29,150
98
10/22/2018
32nd St EB
Balboa Blvd
Newport Blvd
32
22,080
66
10/22/2018
32nd St WB
Newport Blvd
Balboa Blvd
32
22,080
77
10/22/2018
Avocado Ave
Coast Highway East
Farralon Dr
64
120,360
97
10/15/2018
Avocado Ave
Farralon Dr
San Miguel Dr
66
57,552
98
10/15/2018
Balboa Blvd E EB
Island Ave
Medina Way
44
21,910
91
10/8/2018
Balboa Blvd E EB
Medina Way
Adams St
28
26,696
84
10/8/2018
Balboa Blvd E EB
Adams St
Main St
22
17,006
87
10/8/2018
Balboa Blvd E WB
Main St
Washington St
22
5,610
84
10/8/2018
Balboa Blvd E WB
Washington St
Palm St
30
7,920
96
10/8/2018
Balboa Blvd E WB
Palm St
Adams St
22
5,500
80
10/8/2018
Balboa Blvd E WB
Adams St
Coronado Ave
28
17,640
73
10/8/2018
Balboa Blvd E WB
Coronado St
Medina Way
28
9,240
74
10/8/2018
Balboa Blvd E WB
Medina Way
Island Ave
40
20,800
78
10/8/2018
Balboa Blvd NB
23rd St
25th St
35
11,600
80
10/8/2018
Balboa Blvd NB
25th St
27th St
35
12,600
76
10/8/2018
Balboa Blvd NB
27th St
29th St
35
17,850
71
10/8/2018
Balboa Blvd NB
29th St
32nd St
35
25,875
69
10/8/2018
Balboa Blvd NB
32nd St
34th St
34
16,592
74
10/8/2018
Balboa Blvd NB
34th St
36th St
34
15,640
72
10/8/2018
Balboa Blvd NB
36th St
110' N of 39th St
34
28,200
64
10/8/2018
Balboa Blvd NB
110' N of 39th St
42nd St
40
22,100
75
10/8/2018
Balboa Blvd NB
42nd St
44th St
40
16,800
87
10/8/2018
Balboa Blvd NB
44th St
Coast Highway
35
28,700
80
10/8/2018
Balboa Blvd SB
Coast Highway
46th St
35
14,595
88
10/8/2018
Balboa Blvd SB
46th St
44th St
35
16,205
92
10/8/2018
Balboa Blvd SB
44th St
41st St
24
15,870
78
10/8/2018
Balboa Blvd SB
41st St
38th St
24
17,330
79
10/8/2018
Balboa Blvd SB
38th St
36th St
24
11,040
78
10/8/2018
Balboa Blvd SB
36th St
34th St
24
11,982
83
10/8/2018
Balboa Blvd SB
134th St
132nd St
1 24
1 12,712 1
80
1 10/8/2018
1 of 9 5-62
Appendix B
Complete Street Listing Current Conditions
MPAH
Sorted by Street Name
MPAH
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Most Recent
Inspection Date
Balboa Blvd SB
32nd St
29th St
35
24,675
80
10/8/2018
Balboa Blvd SB
29th St
27th St
35
17,850
80
10/8/2018
Balboa Blvd SB
27th St
25th St
35
12,600
80
10/8/2018
Balboa Blvd SB
25th St
23rd St
35
14,000
86
10/8/2018
Balboa Blvd W EB
23rd St
22nd St
29
8,700
90
10/8/2018
Balboa Blvd W EB
22nd St
McFadden PI
48
21,360
79
10/8/2018
Balboa Blvd W EB
McFadden PI
16th St
39
73,320
44
10/8/2018
Balboa Blvd W EB
16th St
14th St
24
22,824
94
10/8/2018
Balboa Blvd W EB
16th St
14th St
18
17,100
92
10/8/2018
Balboa Blvd W EB
14th St
12th St
24
21,120
62
10/8/2018
Balboa Blvd W EB
14th St
12th St
18
15,840
92
10/8/2018
Balboa Blvd W EB
12th St
8th St
50
89,000
89
10/8/2018
Balboa Blvd W EB
8th St
6th St
42
36,506
93
10/8/2018
Balboa Blvd W EB
6th St
Island Ave
42
18,400
86
10/8/2018
Balboa Blvd W WB
Island Ave
6th St
40
15,100
74
10/8/2018
Balboa Blvd W WB
6th St
8th St
40
34,800
78
10/8/2018
Balboa Blvd W WB
8th St
12th St
40
70,600
87
10/8/2018
Balboa Blvd W WB
12th St
14th St
24
21,120
56
10/8/2018
Balboa Blvd W WB
12th St
14th St
18
15,840
92
10/17/2018
Balboa Blvd W WB
14th St
16th St
24
22,824
92
10/8/2018
Balboa Blvd W WB
14th St
16th St
18
17,100
92
10/8/2018
Balboa Blvd W WB
16th St
21st St
38
69,940
79
10/8/2018
Balboa Blvd W WB
21st St
23rd St
42
21,000
84
10/17/2018
Bayside Dr
Jamboree Rd
Coast Highway East
60
247,800
59
10/15/2018
Birch St
Jamboree Rd
Von Karman Ave
60
114,000
68
10/4/2018
Birch St
Von Karman Ave
MacArthur Blvd
56
74,960
67
10/4/2018
Birch St
MacArthur Blvd
Dove St
61
91,195
88
10/4/2018
Birch St
Dove St
Quail St
61
81,130
95
10/4/2018
Birch St
Quail St
Bristol St North
61
67,885
89
10/4/2018
Birch St
Bristol St South
Orchard St
64
90,130
76
10/4/2018
Birch St
Orchard St
Mesa Dr
64
79,744
77
10/4/2018
Bison Ave EB
Jamboree Rd
MacArthur Blvd
34
93,040
62
10/4/2018
Bison Ave EB
MacArthur Blvd
City limit
42
46,940
80
10/25/2018
Bison Ave WB
City Limit
MacArthur Blvd
42
48,340
80
10/15/2018
Bison Ave WB
MacArthur Blvd
1.1amboree Rd
41
1 104,210 1
70
1 10/19/2018
2 of 9 5-63
Appendix B
Complete Street Listing Current Conditions
MPAH
Sorted by Street Name
MPAH
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Most Recent
Inspection Date
Bonita Canyon Dr EB
MacArthur Blvd
Bridge
41
32,431
70
10/9/2018
Bonita Canyon Dr EB
Bridge
Mesa View Dr
30
35,000
65
10/9/2018
Bonita Canyon Dr EB
Mesa View Dr
Prarie Rd
30
49,950
65
10/9/2018
Bonita Canyon Dr EB
Prarie Rd
Bridge
42
34,440
70
10/9/2018
Bonita Canyon Dr EB
Bridge
Chambord
42
19,140
70
10/9/2018
Bonita Canyon Dr EB
Chambord
SR -73
42
44,310
72
10/9/2018
Bonita Canyon Dr WB
SR -73
Chambord
44
46,420
72
10/9/2018
Bonita Canyon Dr WB
Chambord
Bridge
33
13,200
61
10/9/2018
Bonita Canyon Dr WB
Bridge
Prarie Rd
33
32,555
65
10/9/2018
Bonita Canyon Dr WB
Prarie Rd
Mesa View Dr
30
52,950
66
10/9/2018
Bonita Canyon Dr WB
Mesa View Dr
Bridge
30
30,000
71
10/9/2018
Bonita Canyon Dr WB
Bridge
MacArthur Blvd
38
39,758
71
10/9/2018
Bristol St North
Jamboree Rd
Dove St
46
26,036
79
10/4/2018
Bristol St North
Dove St
Spruce St
46
58,006
75
10/4/2018
Bristol St North
Spruce St
Birch St
46
72,856
67
10/4/2018
Bristol St North
Birch St
Campus Dr
51
36,967
73
10/4/2018
Bristol St South
Irvine Ave
Birch St
58
33,900
68
10/4/2018
Bristol St South
Birch St
Cypress St
50
31,550
72
10/4/2018
Bristol St South
Cypress St
Spruce Ave
34
31,350
70
10/4/2018
Bristol St South
Spruce Ave
Bayview PI
50
42,750
91
10/4/2018
Bristol St South
Bayview PI
Jamboree Rd
50
52,000
91
10/4/2018
Campus Dr EB
Bristol St North
Quail St
41
40,450
98
10/4/2018
Campus Dr EB
Quail St
Dove St
42
58,150
100
10/4/2018
Campus Dr EB
Dove St
Airport
42
81,300
100
10/3/2018
Campus Dr EB
Airport
MacArthur Blvd
62
26,040
100
10/4/2018
Campus Dr EB
MacArthur Blvd
MacArthur Ct
40
20,400
87
10/4/2018
Campus Dr EB
MacArthur Ct
Von Karman Ave
36
37,044
79
10/19/2018
Campus Dr EB
Von Karman Ave
Teller Ave
36
47,340
72
10/3/2018
Campus Dr EB
Teller Ave
Jamboree Rd
33
26,600
50
10/15/2018
Coast Highway E NB
Newport Coast Dr
Cameo Highlands Dr
50
176,750
68
10/2/2018
Coast Highway E NB
Cameo Highlands Dr
Morning Canyon Rd
28
38,900
43
10/2/2018
Coast Highway E NB
Morning Canyon Rd
Poppy Ave
28
48,220
47
10/2/2018
Coast Highway E NB
Poppy Ave
Marguerite Ave
28
46,940
45
10/2/2018
Coast Highway E NB
Marguerite Ave
Goldenrod Ave
28
54,370
48
10/2/2018
Coast Highway E NB
Goldenrod Ave
MacArthur Blvd
28
35,057
43
10/2/2018
3 of 9 5-64
Appendix B
Complete Street Listing Current Conditions
MPAH
Sorted by Street Name
MPAH
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Most Recent
Inspection Date
Coast Highway E NB
MacArthur Blvd
Avocado Ave
50
39,500
82
10/2/2018
Coast Highway E NB
Avocado Ave
Newport Center Dr
50
54,500
83
10/2/2018
Coast Highway E NB
Newport Center Dr
Irvine Ter
50
56,250
76
10/2/2018
Coast Highway E NB
Irvine Ter
Jamboree Rd
46
154,350
86
10/2/2018
Coast Highway E SB
Jamboree Rd
Irvine Ter
46
139,150
86
10/2/2018
Coast Highway E SB
Irvine Ter
Newport Center Dr
46
55,600
71
10/2/2018
Coast Highway E SB
Newport Center Dr
Avocado Ave
44
55,830
81
10/2/2018
Coast Highway E SB
Avocado Ave
MacArthur Blvd
50
41,250
75
10/2/2018
Coast Highway E SB
MacArthur Blvd
Goldenrod Ave
28
35,442
60
10/2/2018
Coast Highway E SB
Goldenrod Ave
Marguerite Ave
28
58,170
69
10/2/2018
Coast Highway E SB
Marguerite Ave
Poppy Ave
28
47,190
73
10/2/2018
Coast Highway E SB
Poppy Ave
Morning Canyon Rd
28
49,220
76
10/2/2018
Coast Highway E SB
Morning Canyon Rd
Cameo Highlands Dr
30
41,750
61
10/2/2018
Coast Highway E SB
Cameo Highlands Dr
Newport Coast Dr
50
176,850
65
10/2/2018
Dover Dr NB
Coast Highway
Cliff Dr
39
40,823
96
10/4/2018
Dover Dr NB
Cliff Dr
Castaways Ln
30
39,080
100
10/4/2018
Dover Dr NB
Castaways Ln
Westcliff Dr
30
44,100
100
10/4/2018
Dover Dr NB
Westcliff Dr
Mariners Dr
37
96,795
99
10/11/2018
Dover Dr NB
Mariners Dr
Irvine Ave
37
34,854
98
10/11/2018
Dover Dr SB
Westcliff Dr
16th St
33
44,070
100
10/11/2018
Dover Dr SB
16th St
Cliff Dr
30
37,500
100
10/11/2018
Dover Dr SB
Cliff Dr
Coast Highway
41
52,549
99
10/11/2018
Eastbluff Dr NB
Jamboree Rd
Vista Del Sol
30
119,250
82
10/3/2018
Eastbluff Dr NB
Vista Del Sol
Jamboree Rd/University Dr
30
120,000
70
10/11/2018
Eastbluff Dr SB
Jamboree Rd/University Dr
Vista Del Sol
30
120,000
74
10/11/2018
Eastbluff Dr SB
Vista Del Sol
Jamboree Rd
30
119,250
63
10/11/2018
Ford Rd EB
Jamboree Rd
MacArthur Blvd
34
129,320
74
10/5/2018
Ford Rd EB
San Miguel Dr
Hillside Dr
36
14,760
99
10/11/2018
Ford Rd EB
Newport Hills Dr
San Miguel Dr
29
79,047
98
10/11/2018
Ford Rd WB
MacArthur Blvd
Jamboree Rd
34
127,840
82
10/5/2018
Ford Rd WB
San Miguel Dr
Newport Hills Dr
30
72,600
99
10/5/2018
Ford Rd WB
Hillside Dr
San Miguel Dr
32
12,960
99
10/5/2018
Hospital Rd
Placentia Ave
Newport Blvd
57
39,900
72
10/15/2018
Irvine Ave
Baycrest Rd
Santiago Dr
38
82,460
100
10/11/2018
Irvine Ave
16th St
Mariners Dr
34
88,400
100
10/11/2018
4 of 9 5-65
Appendix B
Complete Street Listing Current Conditions
MPAH
Sorted by Street Name
MPAH
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Most Recent
Inspection Date
Irvine Ave
Mariners Dr
Dover Dr
32
38,816
100
10/11/2018
Irvine Ave
Dover Dr
Linda Ln
34
21,930
100
10/11/2018
Irvine Ave
Linda Ln
Baycrest Rd
34
36,890
100
10/11/2018
Irvine Ave
Santiago Dr
23rd St
77
103,606
100
10/11/2018
Irvine Ave
23rd St
Santa Isabel Ave
76
114,000
100
10/11/2018
Irvine Ave
Santa Isabel Ave
University Dr
28
96,800
100
10/11/2018
Irvine Ave
Mesa Dr
Bristol St South
42
129,900
82
10/11/2018
Irvine Ave
Baycrest Rd
Francisco Dr
38
46,626
100
10/11/2018
Irvine Ave
Francisco Dr
Santiago Dr
38
37,658
100
10/11/2018
Irvine Ave
Santiago Dr
Francisco Dr
38
37,848
100
10/11/2018
Irvine Ave
Francisco Dr
Baycrest Rd
38
46,474
100
10/11/2018
Irvine Ave
300'S of Monte Vista Ave
Santa Isabel Ave
28
29,372
100
10/11/2018
Irvine Ave
BRISTOL ST
MESA DR
42
131,880
94
10/11/2018
Jamboree Rd
Bayside Dr
Coast Highway East
60
48,000
57
10/15/2018
Jamboree Rd NB
Coast Highway East
Back Bay Dr
53
37,014
79
10/5/2018
Jamboree Rd NB
Back Bay Dr
Island Lagoon Dr/Hyatt Newporter
61
42,175
56
10/10/2018
Jamboree Rd NB
Island Lagoon Dr/Hyatt Newporter
Santa Barbara Dr
46
155,600
79
10/10/2018
Jamboree Rd NB
Santa Barbara Dr
San Joaquin Hills Rd
47
46,415
60
10/10/2018
Jamboree Rd NB
San Joaquin Hills Rd
Ford Rd
46
127,968
78
10/10/2018
Jamboree Rd NB
Ford Rd
Bison Ave
46
152,424
94
10/10/2018
Jamboree Rd NB
Bison Ave
University Dr/Eastbluff Dr
46
144,680
98
10/10/2018
Jamboree Rd NB
University Dr/Eastbluff Dr
Bayview Way
57
83,439
90
10/10/2018
Jamboree Rd NB
Bayview Way
Bristol St South
57
58,935
91
10/10/2018
Jamboree Rd NB
Bristol St North
MacArthur Blvd
46
39,380
77
10/10/2018
Jamboree Rd SB
Campus Dr
Birch St
49
43,740
94
10/10/2018
Jamboree Rd SB
Birch St
Fairchild Rd
48
106,560
81
10/10/2018
Jamboree Rd SB
Fairchild Rd
Koll Center
58
42,542
94
10/10/2018
Jamboree Rd SB
Koll Center
MacArthur Blvd
58
35,450
97
10/10/2018
Jamboree Rd SB
MacArthur Blvd
Bristol St North
46
38,824
89
10/10/2018
Jamboree Rd SB
Bristol St South
Bayview Way
53
51,214
81
10/10/2018
Jamboree Rd SB
Bayview Way
University Dr/Eastbluff Dr
46
87,498
81
10/10/2018
Jamboree Rd SB
University Dr/Eastbluff Dr
Bison Ave
46
151,880
97
10/10/2018
Jamboree Rd SB
Bison Ave
Ford Rd/Eastbluff Dr
46
154,430
98
10/10/2018
Jamboree Rd SB
Ford Rd/Eastbluff Dr
San Joaquin Hills Rd
46
128,450
67
10/10/2018
Jamboree Rd SB
ISan Joaquin Hills Rd
ISanta Barbara Dr
46
51,920
53
10/15/2018
5 of 9 5-66
Appendix B
Complete Street Listing Current Conditions
MPAH
Sorted by Street Name
MPAH
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Most Recent
Inspection Date
Jamboree Rd SB
Santa Barbara Dr
Island Lagoon Dr/Hyatt Newporter
46
146,710
72
10/10/2018
Jamboree Rd SB
Island Lagoon Dr/Hyatt Newporter
Back Bay Dr
46
31,460
40
10/15/2018
Jamboree Rd SB
Back Bay Dr
Coast Highway East
45
53,350
59
10/10/2018
MacArthur Blvd NB
Coast Highway East
San Miguel Dr
34
105,712
100
10/15/2018
MacArthur Blvd NB
San Miguel Dr
San Joaquin Hills Rd
46
74,798
100
10/15/2018
MacArthur Blvd NB
San Joaqin Hills Rd
3400' N of San Joaqin Hills Rd
44
151,350
100
10/15/2018
MacArthur Blvd NB
3400' N of San Joaqin Hills Rd
Bonita Canyon Dr/Ford Rd
44
140,900
100
10/15/2018
MacArthur Blvd NB
Bonita Canyon Dr/Ford Rd
Villaggio
59
97,144
72
10/10/2018
MacArthur Blvd NB
Villaggio
Bison Ave
55
84,560
86
10/10/2018
MacArthur Blvd NB
Bison Ave
City Limit
46
54,470
74
10/3/2018
MacArthur Blvd NB
Jamboree Rd
Von Karman Ave
39
99,757
65
10/3/2018
MacArthur Blvd NB
Von Karman Ave
Birch St
60
146,940
71
10/3/2018
MacArthur Blvd NB
Birch St
Campus Dr
60
55,080
73
10/3/2018
MacArthur Blvd SB
Campus Dr
Birch St
61
81,960
52
10/3/2018
MacArthur Blvd SB
Birch St
Newport Place Dr
60
147,240
71
10/3/2018
MacArthur Blvd SB
Newport Place Dr
Jamboree Rd
61
104,984
61
10/3/2018
MacArthur Blvd SB
City Limit
Bison Ave
60
75,450
81
10/3/2018
MacArthur Blvd SB
Bison Ave
Vilaggio
55
74,060
72
10/15/2018
MacArthur Blvd SB
Villaggio
Bonita Canyon Dr
55
101,380
71
10/15/2018
MacArthur Blvd SB
Bonita Canyon Dr
2600'S Bonita Canyon Dr
46
125,600
100
10/15/2018
MacArthur Blvd SB
2600'S Bonita Canyon Dr
San Joaqin Hills Rd
46
171,400
100
6/27/2017
MacArthur Blvd SB
San Joaquin Hills Rd
San Miguel Dr
44
74,952
100
10/15/2018
MacArthur Blvd SB
San Miguel Dr
Coast Highway East
34
125,006
100
10/15/2018
Marguerite Ave
Harbor View Dr
Fifth Ave
55
84,810
100
10/2/2018
Marguerite Ave
Fifth Ave
Coast Hwy East
36
64,920
36
10/15/2018
Marguerite Ave
Harbor View Dr
Sausalito Dr
60
62,820
100
10/15/2018
Marguerite Ave
Sausalito Dr
San Joaquin Hills Rd
60
110,700
100
10/15/2018
Mesa Dr
Irvine Ave
Acacia St
66
90,090
86
10/22/2018
Mesa Dr
Acacia St
Mesa Dr/ Birch St
66
13,200
89
10/22/2018
Newport Blvd NB
21st St/Balboa Blvd West
23rd St
36
20,844
81
10/22/2018
Newport Blvd NB
23rd St
26th St
32
17,120
81
10/8/2018
Newport Blvd NB
26th St
28th St
38
15,770
80
10/22/2018
Newport Blvd NB
28th St
30th St
38
25,460
75
10/22/2018
Newport Blvd NB
30th St
32nd St
35
17,780
99
10/22/2018
Newport Blvd NB
32nd St
Finley Ave
52
20,880
99
10/22/2018
6 of 9 5-67
Appendix B
Complete Street Listing Current Conditions
MPAH
Sorted by Street Name
MPAH
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Most Recent
Inspection Date
Newport Blvd NB
Finley Ave
Via Lido
42
21,084
99
10/22/2018
Newport Blvd NB
Via Lido
Newport Channel Bridge
42
25,956
83
10/22/2018
Newport Blvd SB
Finley Ave
32nd St
42
21,820
99
10/22/2018
Newport Blvd SB
32nd St
30th St
35
17,640
99
10/22/2018
Newport Blvd SB
30th St
28th St
41
26,568
61
10/22/2018
Newport Blvd SB
28th St
26th St
41
16,810
72
10/22/2018
Newport Blvd SB
26th St
23rd St
32
17,280
87
10/22/2018
Newport Blvd SB
23rd St
21st St/Balboa Blvd West
32
20,192
44
10/22/2018
Newport Blvd SB
Newport Channel Bridge
Via Lido
42
22,932
71
10/22/2018
Newport Blvd SB
Via Lido
Finley Ave
42
21,546
99
10/22/2018
Newport Center Dr E NB
Newport Center Dr
Anacapa Dr
36
28,644
85
10/3/2018
Newport Center Dr E NB
Anacapa Dr
San Miguel Dr
36
31,630
91
10/3/2018
Newport Center Dr E NB
San Miguel Dr
Santa Rosa Dr
36
44,664
97
10/3/2018
Newport Center Dr E NB
Santa Rosa Dr
Santa Cruz Dr
36
57,296
90
10/3/2018
Newport Center Dr E SB
Santa Cruz Dr
Santa Rosa Dr
36
53,008
97
10/3/2018
Newport Center Dr E SB
Santa Rosa Dr
San Miguel Dr
36
43,360
82
10/3/2018
Newport Center Dr E SB
San Miguel Dr
Anacapa Dr
36
31,380
98
10/3/2018
Newport Center Dr E SB
Anacapa Dr
Newport Center Dr
36
29,144
72
10/3/2018
Newport Center Dr NB
Coast Highway East
Farallon Dr/Granville Dr
36
46,304
83
10/3/2018
Newport Center Dr NB
Farallon Dr/Granville Dr
Newport Center Dr West
36
32,748
98
10/3/2018
Newport Center Dr SB
Newport Center Dr West
Farallon Dr/Granville Dr
36
37,020
77
10/3/2018
Newport Center Dr SB
Farallon Dr/Granville Dr
Coast Highway East
36
40,816
98
10/3/2018
Newport Center Dr W NB
Newport Center Dr
Santa Barbara Dr
36
53,548
79
10/3/2018
Newport Center Dr W NB
Santa Barbara Dr
Santa Cruz Dr
36
41,632
98
10/3/2018
Newport Center Dr W SB
Santa Cruz Dr
Santa Barbara Dr
36
40,018
81
10/3/2018
Newport Center Dr W SB
Santa Barbara Dr
Newport Center Dr
36
55,924
98
10/3/2018
Newport Coast Dr NB
Coast Highway East
Pelican Hill Rd South
41
80,809
71
10/9/2018
Newport Coast Dr NB
Pelican Hill Rd South
Provence
41
66,321
77
10/9/2018
Newport Coast Dr NB
Provence
Pelican Hill Rd N/Ocean Ridge Dr
41
200,473
78
10/9/2018
Newport Coast Dr NB
Pelican Hill Rd N/Ocean Ridge Dr
Vista Ridge Rd/Pacific Pine Dr
41
140,908
80
10/9/2018
Newport Coast Dr NB
Vista Ridge Rd/Pacific Pine Dr
Ridge Park Rd
41
46,932
78
10/9/2018
Newport Coast Dr NB
Ridge Park Rd
San Joaquins Hills Rd
41
59,965
91
10/9/2018
Newport Coast Dr NB
San Joaquin Hills Rd
Sage Hill
41
124,804
92
10/9/2018
Newport Coast Dr NB
Sage Hill
73 Freeway Bridge
42
93,870
92
10/9/2018
Newport Coast Dr SB
73 Freeway Bridge
ISage Hill
44
1 98,340 1
89
1 3/31/2017
7 of 9 5-68
Appendix B
Complete Street Listing Current Conditions
MPAH
Sorted by Street Name
MPAH
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Most Recent
Inspection Date
Newport Coast Dr SB
Sage Hill
San Joaquin Hills Rd
41
129,054
84
10/9/2018
Newport Coast Dr SB
Ridge Park Rd
Vista Ridge Rd/Pacific Pine Dr
41
47,182
89
10/9/2018
Newport Coast Dr SB
Vista Ridge Rd/Pacific Pine Dr
Pelican Hill Rd N/Ocean Ridge Dr
41
143,408
72
10/29/2018
Newport Coast Dr SB
Pelican Hill Rd N/Ocean Ridge Dr
Provence
41
200,973
82
10/9/2018
Newport Coast Dr SB
Provence
Pelican Hill Rd South
41
70,821
88
10/9/2018
Newport Coast Dr SB
Pelican Hill Rd South
Coast Highway East
41
83,809
89
10/9/2018
Newport Coast Dr SB
San Joaquin Hills Rd
Ridge Park Road
41
45,715
78
10/9/2018
Placentia Ave
Hospital Rd
Superior Ave
40
32,400
93
10/3/2018
Placentia Ave
Superior Ave
City Limits
62
79,050
93
10/3/2018
San Joaquin Hills Rd EB
Jamboree Rd
Santa Cruz Dr
40
61,900
82
10/5/2018
San Joaquin Hills Rd EB
Santa Cruz Dr
Santa Rosa Dr
40
88,650
69
10/5/2018
San Joaquin Hills Rd EB
Santa Rosa Dr
MacArthur Blvd
40
68,200
82
10/5/2018
San Joaquin Hills Rd EB
MacArthur Blvd
San Miguel Dr
40
44,320
85
10/5/2018
San Joaquin Hills Rd EB
San Miguel Dr
Crown Dr
41
39,212
71
10/5/2018
San Joaquin Hills Rd EB
Crown Dr
Marguerite Ave
41
65,993
84
10/5/2018
San Joaquin Hills Rd EB
Marguerite Ave
Spyglass Hill Rd
41
116,841
98
10/5/2018
San Joaquin Hills Rd EB
Spyglass Hill Rd
Newport Ridge Dr West
33
152,385
88
10/3/2018
San Joaquin Hills Rd EB
Newport Ridge Dr West
Newport Ridge Dr East
33
77,670
86
10/5/2018
San Joaquin Hills Rd EB
Newport Ridge Dr East
Newport Coast Dr
33
41,125
88
10/5/2018
San Joaquin Hills Rd WB
Newport Coast Dr
Newport Ridge Dr East
33
42,890
71
10/5/2018
San Joaquin Hills Rd WB
Newport Ridge Dr East
Newport Ridge Dr West
33
77,920
80
10/5/2018
San Joaquin Hills Rd WB
Newport Ridge Rd West
Spyglass Hill Rd
33
144,885
81
10/5/2018
San Joaquin Hills Rd WB
Spyglass Hill Rd
Marguerite Ave
41
115,619
100
10/5/2018
San Joaquin Hills Rd WB
Marguerite Ave
Crown Dr
41
65,993
85
10/5/2018
San Joaquin Hills Rd WB
Crown Dr
San Miguel Dr
41
40,212
79
10/5/2018
San Joaquin Hills Rd WB
San Miguel Dr
MacArthur Blvd
41
41,565
88
10/5/2018
San Joaquin Hills Rd WB
MacArthur Blvd
Santa Rosa Dr
40
70,360
80
10/5/2018
San Joaquin Hills Rd WB
Santa Rosa Dr
Santa Cruz Dr
40
92,200
85
10/5/2018
San Joaquin Hills Rd WB
Santa Cruz Dr
Jamboree Rd
40
63,240
73
10/5/2018
San Miguel Dr
Avocado Ave
MacArthur Blvd
92
28,520
71
10/5/2018
San Miguel Dr
Newport Center Dr East
Avocado Ave
72
68,216
71
10/15/2018
San Miguel Dr NB
MacArthur Blvd
San Joaquin Hills Rd
31
45,335
98
10/4/2018
San Miguel Dr NB
San Joaquin Hills Rd
Pacific View Dr
29
19,665
74
10/4/2018
San Miguel Dr NB
Pacific View Dr
Harbor Woods PI
29
14,645
95
10/4/2018
San Miguel Dr NB
Harbor Woods PI
Port Sutton Dr
29
53,319
90
10/4/2018
8 of 9 5-69
Appendix B
Complete Street Listing Current Conditions
MPAH
Sorted by Street Name
MPAH
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Most Recent
Inspection Date
San Miguel Dr NB
Port Sutton Dr
Yacht Coquette (North End)
29
32,190
97
10/4/2018
San Miguel Dr NB
Yacht Coquette (North End)
Spyglass Hill Rd/Eastgate Dr
29
45,326
70
10/10/2018
San Miguel Dr NB
Spyglass Hill Rd/Eastgate Dr
Ford Rd
29
70,294
46
10/4/2018
San Miguel Dr SB
Ford Rd
Spyglass Hill Rd/Eastgate Dr
29
67,170
58
10/4/2018
San Miguel Dr SB
Spyglass Hill Rd/Eastgate Dr
Yacht Coquette (North Side)
29
43,326
46
10/4/2018
San Miguel Dr SB
Yacht Coquette (North Side)
Port Sutton Dr/Yacht Coquette (S)
29
33,940
52
10/4/2018
San Miguel Dr SB
Port Sutton Dr
Harbor Woods PI
29
51,069
89
10/4/2018
San Miguel Dr SB
Harbor Woods PI
Pacific View Dr
29
15,645
93
10/4/2018
San Miguel Dr SB
Pacific View Dr
San Joaquin Hills Rd
29
22,915
95
10/4/2018
San Miguel Dr SB
San Joaquin Hills Rd
MacArthur Blvd
30
41,200
98
10/4/2018
Santa Cruz Dr
San Joaquin Hills Rd
Newport Center Dr West
72
82,656
90
10/15/2018
Santa Rosa Dr
Newport Center Dr East
San Joaquin Hills Rd
72
39,600
76
10/15/2018
Santiago Dr
Tustin Ave
Irvine Ave
37
48,375
96
11/20/2018
Spyglass Hill Rd
San Miguel Dr
Harbor Ridge Dr
44
54,340
76
10/4/2018
Spyglass Hill Rd
Harbor Ridge Dr
Ridgeline Dr
44
56,452
76
10/4/2018
Spyglass Hill Rd
Ridgeline Dr
EI Capitan Dr
44
56,144
74
10/4/2018
Spyglass Hill Rd
EI Capitan Dr
San Joaquin Hills Rd
44
84,480
77
10/4/2018
Superior Av NB
Coast Highway West
Ticonderga St
38
55,784
75
10/2/2018
Superior Av NB
Ticonderga St
Placentia Ave
38
56,734
72
10/2/2018
Superior Av NB
Placentia Ave
City Limit
38
66,500
96
10/2/2018
Superior Av SB
City Limit
Placentia Av
38
63,080
93
10/2/2018
Superior Av SB
Placentia Av
Ticonderga St
38
58,976
88
10/2/2018
Superior Av SB
Ticonderga St
Coast Highway West
38
58,976
94
10/2/2018
University Dr EB
Jamboree Rd
La Vida/Baypointe Dr
32
21,730
66
10/15/2018
University Dr EB
La Vida/Baypointe Dr
Bonita Creek Bridge
32
21,280
65
10/15/2018
University Dr EB
Bonita Creek Bridge
City Limit
44
34,320
85
10/15/2018
University Dr WB
City Limit
Bonita Creek Bridge
44
36,320
70
10/15/2018
University Dr WB
Bonita Creek Bridge
La Vida/Baypointe Dr
42
29,600
29
10/15/2018
University Dr WB
La Vida/Baypointe Dr
Jamboree Rd
42
30,130
75
10/15/2018
Via Lido
Newport Blvd
Bridge (West End)
26
40,300
93
10/15/2018
Via Lido
Bridge (West End)
Newport Blvd
26
40,300
85
10/15/2018
Von Karman Ave
Campus Dr
Birch St
76
56,952
67
10/11/2018
Von Karman Ave
Birch St
MacArthur Blvd
76
163,580
67
10/11/2018
Westcliff Dr EB
Irvine Ave
Dover Dr
25
42,575
97
10/11/2018
Westcliff Dr WB
Dover Dr
Irvine Ave
25
42,375
98
10/11/2018
9 of 9 5-70
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
06th St
Bay Ave West
Balboa Blvd West
34
4,896
59
11/1/2018
06th St
Balboa Blvd West
Ocean Front West
34
5,168
98
10/23/2018
07th St
Bay Ave West
Balboa Blvd West
30
1 5,010
86
11/6/2018
07th St
Balboa Blvd West
Ocean Front West
34
5,100
98
10/23/2018
08th St
Bay Ave West
Balboa Blvd West
33
5,280
78
11/21/2018
08th St
Balboa Blvd West
Ocean Front West
33
5,280
98
10/23/2018
09th St
North End
Bay Ave West
30
3,300
96
11/1/2018
09th St
Bay Ave West
Balboa Blvd West
27
4,995
79
11/6/2018
09th St
Balboa Blvd West
Ocean Front West
28
5,740
96
10/23/2018
10th St
North End
Bay Ave West
26
936
93
11/6/2018
10th St
Bay Ave West
Balboa Blvd West
28
5,180
88
11/6/2018
10th St
Balboa Blvd West
Ocean Front West
27
6,129
96
10/23/2018
11th St
North End
Bay Ave West
30
900
96
11/21/2018
11th St
Bay Ave West
Balboa Blvd West
28
5,208
79
11/6/2018
11th St
Balboa Blvd West
Ocean Front West
28
6,440
96
10/23/2018
12th St
North End
Bay Ave West
29
870
96
11/21/2018
12th St
Bay Ave West
Balboa Blvd West
28
5,180
91
11/6/2018
12th St
Balboa Blvd West
Ocean Front West
28
6,440
96
10/23/2018
13th St
North End
Bay Ave West
30
900
96
11/21/2018
13th St
Bay Ave West
Balboa Blvd West
28
6,048
85
11/6/2018
13th St
Balboa Blvd West
Ocean Front West
28
6,720
96
11/1/2018
14th St
North End
Bay Ave West
30
900
96
11/21/2018
14th St
Bay Ave West
Balboa Blvd West
30
6,450
96
11/1/2018
14th St
Balboa Blvd West
Ocean Front West
27
6,210
89
10/23/2018
15th St
North End
Balboa Blvd West
73
21,900
96
11/1/2018
15th St
Balboa Blvd West
Ocean Front West
77
17,941
95
10/23/2018
15th St
Old Newport Ave
Bolsa Ave
18
12,420
63
11/19/2018
15th St
Bolsa Ave
Santa Ana Ave
18
17,280
94
11/19/2018
15th St
Santa Ana Ave
Redlands Ave
36
24,120
69
11/19/2018
15th St
Redlands Ave
Tustin Ave
18
12,060
73
11/19/2018
15th St
Tustin Ave
Aliso Ave
36
23,760
70
11/19/2018
15th St
Aliso Ave
Irvine Ave
36
23,760
75
11/19/2018
15th St
Irvine Ave
St Andrew Rd
62
33,720
52
11/19/2018
15th St
St Andrew Rd
Kings PI
35
41,300
70
11/19/2018
15th St
Kings PI
St James PI
35
7,350
92
11/19/2018
1 of 38 5-71
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
15th St W
Placentia Ave
Superior Ave
60
12,900
51
11/19/2018
16th St
Balboa Blvd West
Ocean Front West
27
6,075
87
10/23/2018
16th St W
West End
Placentia Ave
36
86,400
73
11/19/2018
17th St
Balboa Blvd West
Ocean Front West
28
6,300
91
2/1/2017
18th St
North End
Balboa Blvd West
28
8,400
85
11/6/2018
18th St
Balboa Blvd West
Ocean Front West
28
6,356
92
10/23/2018
19th St
North End
Balboa Blvd West
28
12,040
97
11/6/2018
19th St
Balboa Blvd West
Ocean Front West
30
8,100
92
11/1/2018
19th St
Balboa Blvd
Sundance Dr
30
27,900
73
11/19/2018
20th St
North End
91' S of North End
34
3,094
94
11/6/2018
20th St
91' S of North End
Balboa Blvd West
34
11,050
57
11/21/2018
20th St
Balboa Blvd West
Ocean Front West
33
11,418
96
2/1/2017
21st St
North End
Balboa Blvd West
24
10,608
91
11/6/2018
21st St
Balboa Blvd West N/s
End
24
10,608
85
1/12/2017
22nd St
North End
Balboa Blvd West
40
5,200
84
11/6/2018
22nd St
Balboa Blvd West
Ocean Front West
30
9,450
81
11/6/2018
23rd St
Balboa Blvd West
Ocean Front West
30
10,800
83
11/6/2018
23rd St
City Limits
Tustin Ave
35
33,005
85
11/19/2018
23rd St
Tustin Ave
Irvine Ave
35
27,230
75
11/19/2018
24th St
Balboa Blvd
Ocean Front West
16
6,240
65
10/23/2018
25th St
Balboa Blvd
Ocean Front West
16
6,320
92
10/23/2018
26th St
East End
Newport Blvd
29
4,060
92
11/6/2018
26th St
Newport Blvd
Balboa Blvd
22
2,750
71
11/6/2018
26th St
Balboa Blvd
Ocean Front West
21
8,295
67
10/23/2018
27th St
Balboa Blvd
Ocean Front West
20
7,800
65
10/23/2018
28th St
East End
Villa Way
14
1,050
89
11/6/2018
28th St
Villa Way
Newport Blvd East NB
54
11,750
61
11/6/2018
28th St
Newport Blvd East NB
Newport Blvd West SB
37
4,995
87
11/6/2018
28th St
Newport Blvd West SB
Balboa Blvd
60
13,200
93
11/6/2018
28th St
Balboa Blvd West
Ocean Front West
34
13,090
70
10/23/2018
29th St
East End
Lafayette Ave
24
1,800
81
11/6/2018
29th St
Lafayette Ave
Newport Blvd NB
24
12,840
93
11/6/2018
29th St
Newport Blvd SB
Balboa Blvd
33
10,725
69
11/1/2018
29th St
Balboa Blvd
Ocean Front West
33
12,705
75
10/23/2018
30th St
Lafayette Ave
Villa Way
29
7,965
92
11/1/2018
2 of 38 5-72
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
30th St
Villa Way
Newport Blvd
25
11,250
87
11/6/2018
30th St
Newport Blvd
180' E of Balboa Blvd
34
7,480
94
11/6/2018
30th St
180' E of Balboa Blvd
Balboa Blvd
34
6,120
57
11/1/2018
30th St
Balboa Blvd
Ocean Front West
32
12,000
67
11/1/2018
31st St
Lafayette Ave
Villa Way
24
8,424
66
11/6/2018
31st St
Villa Way
Newport Blvd
24
11,832
95
11/6/2018
31st St
Balboa Blvd
Ocean Front West
32
12,032
92
11/6/2018
32nd St
Balboa Blvd
Seashore Dr
36
6,264
81
10/23/2018
32nd St
Seashore Dr
Ocean Front West
16
3,040
86
11/6/2018
33rd St
East End
Marcus Ave
18
1,350
96
11/6/2018
33rd St
Marcus Ave
Lake Ave
18
3,960
96
11/5/2018
33rd St
Lake Ave
Balboa Blvd
18
4,950
92
11/5/2018
33rd St
Balboa Blvd
Seashore Dr
20
4,960
93
11/5/2018
33rd St
Seashore Dr
Ocean Front West
16
2,160
88
11/5/2018
34th St
Clubhouse Ave
Rivo Alto
16
2,640
91
11/5/2018
34th St
Rivo Alto
Marcus Ave
16
1,056
96
11/5/2018
34th St
Marcus Ave
Lake Ave
18
3,888
92
11/5/2018
34th St
Lake Ave
Balboa Blvd
18
5,040
94
11/5/2018
34th St
Balboa Blvd
Seashore Dr
18
4,756
93
11/5/2018
34th St
Seashore Dr
Ocean Front West
17
1,700
86
11/5/2018
35th St
Short St
Finley Ave
16
4,880
93
11/5/2018
35th St
Finley Ave
Rivo Alto
16
1,120
91
11/5/2018
35th St
Rivo Alto
Marcus Ave
16
1,360
93
11/6/2018
35th St
Marcus Ave
Lake Ave
20
4,300
83
11/6/2018
35th St
Lake Ave
Balboa Blvd
20
5,660
75
11/6/2018
35th St
Balboa Blvd
Seashore Dr
20
5,264
93
11/6/2018
35th St
Seashore Dr
Ocean Front West
20
1,800
86
11/6/2018
36th St
Short St
Clubhouse Ave
16
5,440
91
11/6/2018
36th St
Finley Ave
Short St
16
4,880
90
11/6/2018
36th St
Finley Ave
End
16
1,120
86
11/6/2018
36th St
Rivo Alto
Marcus Ave
20
2,000
78
11/21/2018
36th St
Marcus Ave
Balboa Blvd
20
10,000
81
11/6/2018
36th St
Balboa Blvd
Seashore Dr
20
3,124
86
11/5/2018
36th St
Balboa Blvd
Seashore Dr
20
540
90
11/21/2018
36th St
Seashore Dr
Ocean Front West
20
1,780
96
10/23/2018
3 of 38 5-73
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
37th St
Lake Ave
48' E of Park Ln
20
2,300
79
11/1/2018
37th St
48' E of Park Ln
Park Ln
20
960
96
11/5/2018
37th St
Balboa Blvd
Seashore Dr
20
5,340
86
11/5/2018
37th St
Seashore Dr
Ocean Front West
20
1,400
92
10/23/2018
38th St
North End
Channel PI
16
544
91
11/5/2018
38th St
Channel PI
Finley Ave
16
3,616
93
11/5/2018
38th St
Finley Ave
Marcus Ave
16
4,400
84
11/5/2018
38th St
Marcus Ave
East End of Bridge
16
1,328
71
11/5/2018
38th St
East End of Bridge
Lake Ave
19
2,147
76
11/21/2018
38th St
Lake Ave
Balboa Blvd
22
5,984
91
11/1/2018
38th St
Balboa Blvd
Seashore Dr
18
5,448
84
11/5/2018
38th St
Seashore Dr
Ocean Front West
20
1,440
92
10/23/2018
39th St
North End
Channel PI
16
560
93
11/5/2018
39th St
Channel PI
Marcus Ave
16
4,400
92
11/5/2018
39th St
Marcus Ave
Rivo Alto
19
703
70
11/21/2018
39th St
Rivo Alto
River Ave
20
720
92
11/21/2018
39th St
River Ave
Balboa Blvd
17
2,805
74
11/5/2018
39th St
Balboa Blvd
Seashore Dr
18
5,610
71
11/5/2018
39th St
Seashore Dr
Ocean Front West
20
1,500
90
10/23/2018
40th St
North End
Channel PI
16
560
93
11/5/2018
40th St
Channel PI
Marcus Ave
16
2,080
91
11/5/2018
40th St
Marcus Ave
Rivo Alto
16
560
91
11/5/2018
40th St
Rivo Alto
River Ave
20
700
92
11/21/2018
40th St
River Ave
Balboa Blvd
20
3,140
63
11/1/2018
40th St
Balboa Blvd
Seashore Dr
18
5,844
83
11/5/2018
40th St
Seashore Dr
Ocean Front West
20
1,320
92
11/1/2018
41st St
Rivo Alto
River Ave
20
720
86
11/21/2018
41st St
River Ave
Balboa Blvd
20
3,080
56
11/1/2018
41st St
Balboa Blvd
Seashore Dr
18
6,060
89
11/5/2018
41st St
Seashore Dr
Ocean Front West
20
1,480
92
10/23/2018
42nd St
Rivo Alto
River Ave
20
700
77
11/21/2018
42nd St
River Ave
Balboa Blvd
20
3,160
60
11/1/2018
42nd St
Balboa Blvd
Seashore Dr
18
6,350
86
11/5/2018
42nd St
Seashore Dr
Ocean Front West
19
1,406
92
10/23/2018
43rd St
Rivo Alto
River Ave
21
1,806
72
11/21/2018
4 of 38 5-74
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
43rd St
River Ave
Balboa Blvd
21
3,255
89
11/5/2018
43rd St
Balboa Blvd
Seashore Dr
18
6,210
74
11/5/2018
43rd St
Seashore Dr
Ocean Front West
20
1,540
90
10/23/2018
44th St
Channel PI
Balboa Blvd
21
2,100
83
11/5/2018
44th St
Balboa Blvd
Seashore Dr
21
7,770
70
11/5/2018
44th St
Seashore Dr
Ocean Front West
20
1,560
92
10/23/2018
45th St
Balboa Blvd
Seashore Dr
21
8,295
72
11/5/2018
45th St
Seashore Dr
Ocean Front West
20
1,500
92
10/23/2018
46th St
Balboa Blvd
Seashore Dr
21
9,198
80
11/12/2018
46th St
Seashore Dr
Ocean Front West
20
1,500
92
10/23/2018
47th St
River Ave
Neptune Ave
21
6,615
85
11/5/2018
47th St
Neptune Ave
Seashore Dr
20
1,680
89
11/5/2018
47th St
Seashore Dr
Ocean Front West
20
1,460
92
10/23/2018
48th St
River Ave
Neptune Ave
20
5,200
84
11/5/2018
48th St
Seashore Dr
Ocean Front West
20
1,440
92
10/23/2018
49th St
River Dr
Neptune Ave
20
4,900
96
11/19/2018
49th St
Seashore Dr
Ocean Front West
20
1,260
92
11/24/2018
50th St
River Ave
Neptune Ave
20
4,600
97
11/19/2018
50th St
Seashore Dr
Ocean Front West
20
1,240
92
11/24/2018
51st St
River Ave
Seashore Dr
20
6,600
91
11/19/2018
51st St
Seashore Dr
Ocean Front West
20
1,060
90
11/24/2018
52nd St
River Ave
Neptune Ave
20
4,300
96
11/19/2018
52nd St
Seashore Dr
Ocean Front West
20
1,060
92
11/24/2018
53rd St
River Ave
Neptune Ave
20
3,620
96
11/19/2018
53rd St
Seashore Dr
Ocean Front West
20
1,300
92
11/24/2018
54th St
River Ave
Neptune Ave
38
5,320
95
11/19/2018
54th St
Neptune Ave
Seashore Dr
27
2,025
95
11/19/2018
54th St
Seashore Dr
Ocean Front West
20
1,400
91
11/24/2018
55th St
Seashore Dr
Ocean Front West
18
1,260
90
11/24/2018
56th St
Seashore Dr
Ocean Front West
20
1,640
92
11/24/2018
57th St
Seashore Dr
Ocean Front West
19
1,615
90
11/24/2018
58th St
Seashore Dr
Ocean Front West
19
1,691
92
11/24/2018
59th St
Seashore Dr
Ocean Front West
20
1,720
92
11/24/2018
60th St
North End
Coast Highway West
28
4,340
93
11/19/2018
60th St
Seashore Dr
Ocean Front West
19
1,691
90
11/24/2018
5 of 38 5-75
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
61st St
Lancaster St
Coast Highway West
20
12,900
87
11/19/2018
61st St
Seashore Dr
Ocean Front West
19
1,615
89
11/19/2018
62nd St
Canal St
Cedar St
29
24,940
92
11/19/2018
62nd St
Cedar St
Lancaster St
29
13,920
89
11/19/2018
62nd St
Lancaster St
Newport Shores Dr
29
11,745
63
11/19/2018
62nd St
Newport Shores Dr
Coast Highway West
18
2,970
90
11/19/2018
62nd St
Seashore Dr
Ocean Front Alley West
18
990
89
11/19/2018
62nd St
Ocean Front Alley West
Ocean Front West
18
1,260
92
11/24/2018
A St
Bay Ave East
Balboa Blvd East
20
2,700
89
10/19/2018
A St
Balboa Blvd East
Ocean Front East
20
4,200
90
10/19/2018
A St
Ocean Front East
South End
60
32,100
65
11/7/2018
Abalone Ave
Abalone PI
Balboa Ave
28
3,920
82
3/20/2018
Abalone Ave
Balboa Ave
Park Ave
28
11,760
90
3/20/2018
Abalone Ave
Park Ave
Bay Front South
28
11,620
32
3/20/2018
Abalone Dr
Crystal Ave
Abalone PI
28
6,160
93
3/20/2018
Abalone PI
Abalone Dr
Crystal Ave
24
4,440
91
3/20/2018
Acacia Ave
Coast Highway East
Second Ave
27
29,025
94
3/7/2018
Acacia Ave
Second Ave
Pacific Dr
27
19,359
90
3/7/2018
Acacia St
Orchard Dr
Mesa Dr
50
56,100
76
3/12/2018
Adams St
North End
Bay Ave East
21
3,255
84
10/19/2018
Adams St
Bay Ave East
Balboa Blvd East
19
4,750
67
10/19/2018
Adams St
Balboa Blvd East
Ocean Front Alley East
19
2,185
89
11/21/2018
Adams St
Ocean Front Alley East
Ocean Front East
15
1,395
92
11/7/2018
Agate Ave
Bay Front North
Park Ave
23
15,318
23
3/28/2018
Agate Ave
Park Ave
Bay Front South
30
15,150
25
3/14/2018
Alba St
Eastbluff Dr
Aralia St
36
4,932
83
3/8/2018
Aldean PI
15th St
End
35
9,100
88
11/19/2018
Aldebaran Cir
Galaxy Dr
End
55
9,925
94
11/19/2018
Alder PI
Alta Vista Dr
End
32
9,760
83
3/8/2018
Aleppo St
Aralia St
Alta Vista Dr
37
24,975
78
3/8/2018
Aleppo St
Alta Vista Dr
End
32
12,320
76
3/8/2018
Aliso Ave
15th St
Clay St
35
22,505
94
11/19/2018
Aliso Ave
Clay St
Beacon St
35
23,345
96
11/19/2018
Aliso Ave
Beacon St
Cliff Dr
35
14,700
87
11/19/2018
Almond PI
Alta Vista Dr
End
32
7,840
84
3/29/2018
6 of 38 5-76
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Alta Vista Dr
Carob St
Bison Ave
36
79,920
65
3/7/2018
Alta Vista Dr
Bison Ave
Bellis St
36
37,620
56
3/7/2018
Alta Vista Dr
Bellis St
Aralia St
36
67,680
77
3/7/2018
Altura Dr
Marapata Dr
Angelita Dr
34
31,450
87
3/6/2018
Alvarado PI
Bay Front North
Bay Ave East
34
17,000
67
11/23/2018
Amethyst Ave
Bay Front North
Balboa Ave
27
15,525
25
3/27/2018
Amethyst Ave
Balboa Ave
Park Ave
27
11,475
29
3/27/2018
Amethyst Ave
Park Ave
Bay Front South
27
11,070
52
3/27/2018
Amigos Way
Domingo Dr
Domingo Dr
36
37,980
83
3/8/2018
Anacapa Dr
Newport Center Dr East
Farallon Dr
48
36,384
71
3/28/2018
Anade Ave
Bay Ave East
Edgewater Ave East
34
17,340
69
11/23/2018
Angelita Dr
Kewamee Dr
Bayadere Ter
38
40,280
88
3/5/2018
Anita Ln
Estelle Ln
Marian Ln
33
36,366
94
11/20/2018
Anniversary Ln
Irvine Ave
End
28
61,852
76
11/20/2018
Antigua Cir
Santiago Dr
End
33
7,945
96
11/20/2018
Antigua Way
Santiago Dr (North End)
Mariners Dr
37
74,460
96
11/20/2018
Antigua Way
Mariners Dr
Santiago Dr (South End)
35
35,210
95
11/20/2018
Apolena Ave
Bay Front North
Balboa Ave
27
15,471
48
3/27/2018
Apolena Ave
Balboa Ave
Park Ave
27
11,502
25
3/27/2018
Apolena Ave
Park Ave
Bay Ave South
27
11,178
42
3/27/2018
Aralia St
Aleppo St
End
35
62,125
79
3/7/2018
Arbutus St
Aleppo St
Alta Vista Dr
36
41,040
82
3/8/2018
Arbutus St
Alta Vista Dr
End
32
7,200
89
3/29/2018
Ashford Ln
Glenwood Ln
Santiago Dr
33
10,995
94
11/20/2018
Avocado Ave
Pacific Dr
160' N of Pacific Dr
16
2,560
91
3/7/2018
Avocado Ave
160' N of Pacific Dr
Waterfront Dr
16
1,472
74
3/7/2018
Avocado Ave
Waterfront Dr
Coast Highway East
86
99,420
92
3/5/2018
Avocado Ave
San Miguel Dr
Bus Station
36
56,210
95
3/13/2018
Avocado Ave NB
Bus Station
San Joaquin Hills Rd
23
2,093
81
3/13/2018
Avocado Ave SB
San Joaquin Hills Rd
Bus Station
22
3,674
84
3/13/2018
Avon St
West End
Riverside Ave
21
18,747
92
11/20/2018
Avon St
Riverside Ave
Tustin Ave
34
15,572
85
11/20/2018
Azure Ave
Orchid St
Bay View Ave
35
22,050
84
3/12/2018
B St
North End
Balboa Blvd East
20
1,800
75
11/23/2018
B St
Balboa Blvd East
Ocean Front East
20
2,700
98
11/23/2018
7 of 38 5-77
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
B St
Ocean Front East
South End
60
19,200
93
11/7/2018
Babcock St SB
City Limit
16th St West
33
10,098
91
11/19/2018
Back Bay Dr
Jamboree Rd
Entrance to Newport Dunes
61
67,710
87
3/6/2018
Back Bay Dr
Entrance to Newport Dunes
Shellmaker Rd
48
58,800
88
3/21/2018
Back Bay Dr
Shellmaker Rd
Beginning of PCC Section
22
17,600
78
3/21/2018
Back Bay Dr
Beginning of PCC Section
End of PCC Section
22
6,600
74
3/21/2018
Back Bay Dr
End of PCC Section
San Joaquin Hills Rd
22
36,278
84
3/6/2018
Back Bay Dr
San Jaoquin Hills Rd
Beginning of PCC Section
22
59,620
86
3/6/2018
Back Bay Dr
Beginning of PCC Section
End of PCC Section
22
1,980
19
3/6/2018
Back Bay Dr
End of PCC Section
Backbay sewer pump station
22
68,332
83
3/6/2018
Back Bay Dr
Backbay Sewer Pump Station
Access Rd
22
13,354
75
3/6/2018
Back Bay Dr
Access Rd
Staired Path to Landmark
22
52,668
84
3/6/2018
Back Bay Dr
Staired Path to Landmark
Eastbluff Dr
22
79,004
84
3/8/2018
Balboa Ave
Collins Ave
Marine Ave
28
48,300
17
3/14/2018
Balboa Ave
Marine Ave
Grand Canal
28
5,040
65
3/27/2018
Balboa Ave
Grand Canal
Bay Front East
28
13,440
90
3/20/2018
Balboa Blvd
19th St
End (North City Limit)
30
22,500
76
11/19/2018
Balboa Blvd E EB
Main St
B St
27
18,765
76
11/7/2018
Balboa Blvd E EB
B St
D St
22
21,802
76
11/7/2018
Balboa Blvd E EB
D St
G St
22
23,452
74
11/7/2018
Balboa Blvd E EB
G St
J St
22
21,670
92
11/23/2018
Balboa Blvd E EB
J St
L St
22
8,470
92
11/23/2018
Balboa Blvd E EB
L St
M St
22
15,092
92
11/23/2018
Balboa Blvd E EB
M St
Channel Dr
18
7,074
92
11/23/2018
Balboa Blvd E WB
Channel Rd
M St
22
8,646
92
11/23/2018
Balboa Blvd E WB
M St
L St
22
15,092
92
11/23/2018
Balboa Blvd E WB
L St
J St
22
8,470
98
1/16/2017
Balboa Blvd E WB
J St
G St
22
21,670
98
1/16/2017
Balboa Blvd E WB
G St
D St
22
23,452
78
11/7/2018
Balboa Blvd E WB
D St
B St
22
21,802
78
11/7/2018
Balboa Blvd E WB
B St
Main St
27
18,765
80
11/7/2018
Bamboo St
Bison Ave
Bellis St
36
64,980
62
3/7/2018
Basswood St
Alta Vista Dr
Alta Vista Dr
33
35,425
55
3/8/2018
Bay Ave E
6th St
Island Ave
28
10,360
85
11/7/2018
Bay Ave E
Island Ave
Medina Way
28
15,008
98
2/16/2017
8 of 38 5-78
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Bay Ave E
Medina Way
Fernando St
28
14,420
92
11/23/2018
Bay Ave E
Fernando St
Adams St
30
17,250
91
11/23/2018
Bay Ave E
Adams St
Palm St
29
7,975
92
11/23/2018
Bay Ave E
Palm St
Main St
26
10,850
82
11/7/2018
Bay Ave E
Main St
A St
21
5,670
92
11/23/2018
Bay Ave W
19th St
18th St
42
24,350
97
11/7/2018
Bay Ave W
15th St
13th St
34
31,280
92
11/23/2018
Bay Ave W
13th St
10th St
34
44,880
92
11/23/2018
Bay Ave W
10th St
9th St
33
15,510
93
11/7/2018
Bay Ave W
9th St
7th St
30
26,100
92
11/23/2018
Bay Ave W
7th St
6th St
28
12,600
91
11/7/2018
Bay Farm PI
Upper Bay Dr
End
34
14,450
86
3/12/2018
Bay View Ave
Mesa Dr
Orchard Dr
35
42,000
76
3/12/2018
Bay View Ave
Orchard Dr
Zenith Ave
35
42,000
80
3/12/2018
Bayadere Ter
Sabrina Ter
Angelita Dr
33
76,230
90
3/6/2018
Baycrest Rd
Irvine Ave
Tradewinds Ln
38
9,044
96
11/20/2018
Bayport Way
Holiday Rd
South End
33
7,656
94
11/20/2018
Bayport Way
Francisco Dr
North End
34
9,742
95
11/20/2018
Bayside Dr
Marguerite Ave
Carnation Ave
37
74,855
94
3/6/2018
Bayside Dr
Carnation Ave
EI Paseo Dr
37
126,200
89
3/6/2018
Bayside Dr
EI Paseo Or
Jamboree Rd
37
85,420
74
3/28/2018
Bayside Dr
Coast Highway East
End
38
45,106
88
3/15/2018
Bayview Dr
Ocean Blvd
Goldenrod Ave
28
4,396
95
3/26/2018
Bayview Dr
Goldenrod Ave
Heliotrope Ave
28
7,028
96
3/26/2018
Bayview Dr
Heliotrope Ave
Iris Ave
28
7,280
96
3/26/2018
Bayview PI
Bristol St South
Bayview Way
54
75,170
66
3/12/2018
Bayview Way
Shearwater PI
Bayview PI
37
32,838
86
3/12/2018
Bayview Way
Jamboree Rd
End
72
14,544
93
3/12/2018
Bayview Way EB
Bayview PI
Jamboree Rd
33
21,371
62
3/12/2018
Bayview Way WB
Jamboree Rd
Bayview PI
32
19,744
66
3/12/2018
Beacon Bay
Harbor Island Rd
End
24
28,080
88
3/15/2018
Beacon St
Westminster Ave
Holmwood Dr
34
8,160
90
11/19/2018
Beacon St
La Jolla Dr
Santa Ana Ave
33
3,465
94
11/19/2018
Beacon St
Santa Ana Ave
Cliff Dr
34
7,140
79
11/19/2018
Beacon St
Tustin Ave
Aliso Ave
35
21,000
72
11/19/2018
9 of 38 5-79
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Beacon St
Aliso Ave
Irvine Ave
35
22,330
75
11/19/2018
Bedford Ln
Rutland Rd
Buckingham Ln
36
23,076
95
11/20/2018
Begonia Ave
Pacific Dr
Coast Highway East
28
52,780
90
3/26/2018
Bellis St
Bamboo St
Alta Vista
37
27,010
69
3/8/2018
Bellis St
Alta Vista Dr
End
32
15,200
65
3/8/2018
Berkshire Ln
Oxford Ln
Cambridge Ln
34
32,198
95
11/20/2018
Beryl Ln
Priscilla Ln
Vivian Ln
34
41,864
91
11/20/2018
Birch St
Mesa Dr
End
36
9,552
86
3/12/2018
Bison Ave
Bamboo St
Jamboree Rd
36
41,780
68
3/7/2018
Bixia St
Eastbluff Dr
Bamboo St
35
5,250
77
4/12/2017
Blackthorn St
Bellis St
Bison Ave
34
47,090
72
3/7/2018
Blue Gum Ln
Westcliff Dr
End
32
25,500
70
11/20/2018
Blue Key
Sandcastle Dr
End
32
26,700
82
3/28/2018
Blue Water Dr
Salt Air Dr
Crown Dr North
32
35,028
87
3/28/2018
Bodega Bay Dr
San Mateo Way
End
36
48,780
73
2/26/2018
Bolsa Ave
Broad St
Clay St
38
7,714
73
11/19/2018
Bolsa Ave
Clay St
15th St
36
14,616
94
11/19/2018
Bonaire Way
Holiday Rd
South End
33
10,255
96
11/20/2018
Bonaire Way
Francisco Dr
North End
33
7,425
94
11/20/2018
Bonnie Doon Ter
Dolphin Ter
Patolita Dr
37
39,479
89
3/6/2018
Bonnie Doon Ter
Patolita Dr
Ramona Dr
37
54,797
87
3/6/2018
Bonnie Doon Ter
Ramona Dr
Malabar Dr
37
12,950
90
3/6/2018
Bowsprit Dr
MacArthur Blvd
Dove St
44
13,464
80
3/12/2018
Braemar Way
Francisco Dr
End
34
9,810
94
11/20/2018
Breakers Dr
Ocean Blvd
Breakers Dr
20
18,000
88
3/13/2018
Breakers Dr
Breakers Dr
End
25
25,875
95
3/13/2018
Brighton Rd
Cameo Shores Rd
Camden Dr
33
48,370
99
2/28/2018
Broad St
Bolsa Ave
Westminster Ave
36
22,608
95
11/19/2018
Broad St
Westminster Ave
Santa Ana Ave
35
25,375
75
11/19/2018
Broad St
Santa Ana Ave
San Bernardino Ave
20
5,600
69
11/24/2018
Broad St
Santa Ana Ave
San Bernardino Ave
16
4,480
86
11/19/2018
Broad St
San Bernardino Ave
Redlands Ave
35
9,975
94
11/19/2018
Buck Gully Dr
Sandcastle Dr
End
36
5,786
66
3/28/2018
Buckeye St
Bellis St
Bison Ave
32
38,080
71
3/7/2018
Buckingham Ln
Westcliff Dr
Cornwall Ln
36
22,320
93
11/20/2018
10 of 38 5-80
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
7`6-
Bunya St
Bellis St
Bison Ave
32
49,760
71
3/7/2018
Buttonshell Ln
Holiday Rd
Nautilus Ln
33
14,130
96
11/20/2018
C St
North End
Balboa Blvd East
15
1,170
67
11/23/2018
C St
Balboa Blvd East
Ocean Front East
20
1,600
73
11/23/2018
Cabrillo Ter
Serra Dr
De Anza Dr
23
19,787
81
2/28/2018
Cacao St
Eastbluff Dr
Catalpa St
36
5,400
64
3/8/2018
Cambria Dr
EI Capitan Dr
Drakes Bay Dr
32
80,320
79
2/26/2018
Cambridge Ln
Devon Ln
Highland Dr
34
27,902
94
11/20/2018
Camden Dr
Cameo Shores Rd
Milford Dr
33
44,385
99
2/28/2018
Camelback St
Jamboree Rd
La Felicidad
40
60,825
71
3/8/2018
Camelback St
La Felicidad
Bison Ave
78
55,821
69
3/8/2018
Cameo Highlands Dr
Coast Highway East
Garrett Dr
37
49,321
50
2/27/2018
Cameo Shores Rd
Coast Highway East
Orrington Rd
37
37,777
99
2/28/2018
Cameo Shores Rd
Orrington Rd
Brighton Rd
37
35,372
99
2/28/2018
Camphor St
Catalpa St
Alta Vista Dr
37
31,339
66
3/7/2018
Canal Cir
Canal St
Canal St
29
7,685
92
11/19/2018
Canal St
62nd St
Canal Cir (West End)
30
8,100
91
11/19/2018
Canal St
Canal Cir (West End)
Sunset Dr
30
12,600
89
11/19/2018
Canal St
Sunset Dr
Grant St
30
29,070
91
11/19/2018
Candlestick Ln
Glenwood Ln
Sandalwood Ln
35
23,250
94
11/20/2018
Carmel Bay Dr
Point Loma Dr
Spyglass Hill Rd
36
58,860
60
3/29/2018
Carnation Ave
Ocean Blvd
Seaview Ave
30
8,910
9
3/13/2018
Carnation Ave
Bayside Dr
First Ave
27
12,366
94
3/5/2018
Carnation Ave
First Ave
Coast Highway East
27
38,475
97
3/26/2018
Carob St
Camphor St
End
34
80,240
74
3/29/2018
Cassia St
Camphor St
Carob St
32
39,840
73
3/7/2018
Castaways Ln
Dover Dr
Castaways (private) North
54
24,948
95
11/20/2018
Catalina Dr
Old Newport Blvd
Broad St
34
57,800
88
11/19/2018
Catalina Dr
Broad St
Clay St
34
10,982
87
11/19/2018
Catalina Dr
Clay St
15th St
34
23,018
84
11/19/2018
Catalpa St
Camphor St
Carob St
35
52,500
66
3/7/2018
Catamaran Dr
Keel Dr
End
36
37,350
83
3/1/2018
Cedar St
East End
Prospect St
29
8,700
91
11/19/2018
Cedar St
Prospect St
Newport Shores Dr
29
19,430
82
11/19/2018
Cedar St
Newport Shores Dr
Coast Highway West
19
3,515
93
11/19/2018
11 of 38 5-81
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Cedar St
Seashore Dr
Ocean Front Alley West
19
1,083
88
11/19/2018
Cedar St
Ocean Front Alley West
Ocean Front West
19
1,349
85
11/24/2018
Ceiba PI
Carob St
End
54
11,780
63
3/7/2018
Celtis PI
Alta Vista Dr
End
54
10,260
74
3/7/2018
Centella PI
Holiday Rd
South End
33
12,177
95
11/20/2018
Centella PI
Santiago Dr
North End
37
12,305
96
11/20/2018
Central Ave
Via Lido
End
40
12,600
92
11/23/2018
Cercis PI
Alta Vista Dr
End
32
7,040
65
3/7/2018
Channel PI
Balboa Blvd
Rivo Alto (River)
21
6,195
88
11/7/2018
Channel PI
Rivo Alto
39th St
16
11,888
92
11/5/2018
Channel PI
39th St
Rialto
16
7,040
92
11/5/2018
Channel Rd
Balboa Blvd
Granada Dr
36
5,976
92
11/23/2018
Channel Rd
Granada Dr
End
38
55,670
92
11/23/2018
Cherry Tree Ln
Redland Dr
End
34
6,800
88
11/20/2018
Chestnut PI
Alta Vista Dr
End
32
7,040
68
3/7/2018
China Cove Ramp
Ocean Blvd
Fernleaf Ave
19
5,320
13
3/13/2018
Chubasco Dr
Evita Dr
Zahma Dr
37
25,530
83
3/5/2018
Churchill Ct
Emerson St
End
20
2,700
90
11/23/2018
Citrus PI
Alta Vista Dr
End
32
9,120
68
3/7/2018
Clay St
15th St
St Andrews Rd
34
25,840
95
11/20/2018
Clay St
St Andrews Rd
Irvine Ave
34
22,372
94
11/20/2018
Clay St
Irvine Ave
Tustin Ave
34
46,126
89
11/19/2018
Clay St
Tustin Ave
Westminster Ave
34
66,674
84
11/19/2018
Clay St
Westminster Ave
Orange Ave
32
25,600
63
11/19/2018
Cliff Dr
Dover Dr
Kings PI
55
41,580
83
11/20/2018
Cliff Dr
Kings PI
Signal Rd
55
23,430
69
11/20/2018
Cliff Dr
Signal Rd
St Andrews Rd
55
55,550
78
11/20/2018
Cliff Dr
St Andrews Place
Irvine Ave
55
64,519
92
11/20/2018
Cliff Dr
Irvine Ave
Riverside Ave
56
92,820
89
11/19/2018
Cliff Dr
Riverside Ave
Beacon St
33
35,046
88
11/19/2018
Cliff Dr
Beacon St
Santa Ana Ave
34
25,160
77
11/19/2018
Cliff Dr
Santa Ana Ave
La Jolla Dr
52
15,600
94
11/19/2018
Clubhouse Ave
Newport Island Channel
Rivo Alto
17
17,441
92
11/7/2018
Coast Blvd
61st St
End
30
3,990
85
11/19/2018
Collins Ave
Bay Front North
Balboa Ave
28
12,320
60
3/27/2018
12 of 38 5-82
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Collins Ave
Balboa Ave
Park Ave
28
12,012
25
3/27/2018
Collins Ave
Park Ave
Bay Front South
27
11,313
23
3/27/2018
Colton St
Sunset Dr
Prospect St
29
11,792
74
11/19/2018
Colton St
Sunset Dr
Newport Shores Dr
29
22,040
63
11/19/2018
Colton St
Newport Shores Dr
End
18
3,060
88
11/19/2018
Colton St
Seashore Dr
Ocean Front Alley West
18
1,080
89
11/19/2018
Colton St
Ocean Front Alley West
Ocean Front West
21
924
74
11/24/2018
Columbus Cir
Serra Dr
End
22
3,464
84
2/28/2018
Commodore Rd
Tradewinds Ln
Mariners Dr
38
75,300
95
11/20/2018
Constellation Dr
Santiago Dr
End
38
5,130
96
11/20/2018
Coral Ave
Bay Front North
Balboa Ave
27
15,525
32
3/27/2018
Coral Ave
Balboa Ave
Park Ave
27
11,259
47
3/27/2018
Coral Ave
Bay Front South
Park Ave
27
11,070
53
3/27/2018
Coral PI
Irvine Ave
St Andrews Ave
35
28,070
96
11/19/2018
Corinthian Way
MacArthur Blvd
Birch St
44
38,544
85
3/12/2018
Cornwall Ln
Pembroke Ln
Dover Dr
34
24,808
93
11/20/2018
Coronado St
Edgewater Ave East
Bay Ave East
34
14,960
78
11/23/2018
Coronado St
Bay Ave East
Balboa Blvd East
28
5,180
71
11/23/2018
Coronado St
Balboa Blvd East
Ocean Front East
27
4,752
92
11/23/2018
Cortes Cir
Serra Dr
End
22
2,980
86
2/28/2018
Cortland Dr
Rockford PI
Cameo Highlands Dr
37
25,974
51
2/27/2018
Cortland Dr
Cameo Highlands Dr
Garrett Dr
37
36,593
50
2/27/2018
Court Ave
19th St
20th St
28
8,540
92
11/23/2018
Court Ave
20th St
McFadden PI
28
5,600
92
11/23/2018
Court Ave
20th St
McFadden PI
28
2,380
82
11/7/2018
Cove St
Way Ln
End
24
2,200
94
3/26/2018
Cove St
Fernleaf Ave
End
24
3,960
91
3/26/2018
Crown Dr
Sea Ln
Crown Dr North
37
42,624
79
3/1/2018
Crown Dr North
Crown Dr
San Joaquin Hills Rd
36
49,320
82
3/1/2018
Crystal Ave
Abalone Dr
Balboa Ave
24
11,520
86
3/20/2018
Crystal Ave
Balboa Ave
Park Ave
28
12,040
85
3/20/2018
Crystal Ave
Park Ave
Bay Front South
28
11,480
23
3/20/2018
Cumberland Ln
Sussex Ln
Dover Dr
34
15,390
90
11/20/2018
Cutter Rd
Beacon Bay
End
24
9,120
84
3/15/2018
Cypress St
Edgewater PI
Bay Ave East
20
5,460
92
11/23/2018
13 of 38 5-83
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Cypress St
Bay Ave East
Balboa Blvd East
20
5,800
90
11/23/2018
Cypress St (S/A Heights)
Mesa Dr
Orchard Dr
36
47,520
94
3/12/2018
Cypress St (S/A Heights)
Orchard Dr
Cul De Sac
36
35,280
96
3/12/2018
Cypress St (S/A Heights)
Cul De Sac
Bristol St South
36
9,360
95
3/12/2018
D St
Balboa Blvd East
Ocean Front East
19
1,520
67
11/23/2018
D St
North End
Balboa Blvd East
20
1,500
68
11/23/2018
Dahlia Ave
South End
Way Ln
27
3,915
84
3/13/2018
Dahlia Ave
Ocean Blvd
Seaview Ave
27
7,425
93
3/13/2018
Dahlia Ave
200' S of First St
Coast Highway East
27
40,230
94
3/7/2018
Dahlia Ave
Coast Highway East
Fifth Ave
27
4,455
91
3/7/2018
Dahlia PI
Seaview Ave
End
27
3,753
62
3/26/2018
Dana Point Way
San Martin Way
Montecito Dr
36
6,084
87
2/26/2018
Dana Rd
Superior Ave
Flagship Rd
36
21,600
75
11/19/2018
Dawnview Ln
Redland Dr
Redland Dr
33
5,280
83
11/20/2018
De Anza Dr
Seaward Rd
De Sola Ter
35
26,250
83
2/28/2018
De Sola Ter
Seaward Rd
End
24
28,015
79
2/28/2018
Deborah Ln
Mariners Dr
Vivian Ln
34
8,262
96
11/20/2018
Deborah Ln
Vivian Ln
Sylvia Ln
34
22,122
89
12/21/2016
Devon Ln
Oxford Ln
Cambridge Ln
33
25,290
94
11/20/2018
Diamond Ave
Bay Front North
Balboa Ave
28
13,888
27
3/27/2018
Diamond Ave
Balboa Ave
Park Ave
28
12,040
25
3/27/2018
Diamond Ave
Park Ave
Bay Front South
27
11,286
25
3/27/2018
Diana Ln
Priscilla Ln
Vivian Ln
34
27,108
96
11/20/2018
Dolphin Ter
Bonnie Doone Ter
Patolita Dr
33
41,778
86
3/6/2018
Dolphin Ter
Patolita Dr
Ramona Dr
33
43,098
80
3/6/2018
Dolphin -Striker Way
Dove St
End
44
16,740
76
3/12/2018
Domingo Dr
Mar Vista Dr
Mar Vista Dr
36
60,300
76
3/29/2018
Donnie Rd
22nd St
End
33
20,320
96
11/20/2018
Dorchester Rd
Rockford Rd
Cameo Highland Rd
33
27,225
71
2/27/2018
Dorchester Rd
Cameo Highland Rd
Garrett Rd
33
30,030
68
2/27/2018
Doris Ln
Dover Dr
Ruth Ln
36
8,676
87
11/20/2018
Dorothy Ln
Mariners Dr
Estelle Ln
33
7,854
93
11/20/2018
Dorothy Ln
Estelle Ln
Marian Ln
34
31,280
88
11/20/2018
Dove St
Campus Dr
Birch St
37
21,645
85
3/12/2018
Dove St
Birch St
Bristol St North
44
176,670
71
3/12/2018
14 of 38 5-84
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Dover Dr
End
Leila Ln
29
15,768
96
11/20/2018
Dover Dr
Leila Ln
Mariners Dr
29
14,500
96
11/20/2018
Dover Dr
Mariners Dr
Doris Ln
29
14,790
96
11/20/2018
Dover Dr
Doris Ln
Nottingham Rd
29
17,110
96
11/20/2018
Dover Dr
Nottingham Rd
Norfolk Ln
29
19,285
96
11/20/2018
Dover Dr
Norfolk Ln
Westcliff Dr
29
14,210
96
11/20/2018
Dover Dr
Westcliff Dr
Dover Dr (Arterial)
36
5,460
86
11/30/2016
Drakes Bay Dr
Goleta Point Dr
Point Aguello Way
32
9,358
70
2/26/2018
Drakes Bay Dr
Point Aguello Way
Point Conception Way
32
44,192
69
2/26/2018
Drakes Bay Dr
Point Conception Way
Montecito Dr
32
15,822
86
2/26/2018
Driftwood Rd
Shorecliff Rd
Morning Canyon Rd
27
29,700
84
3/1/2018
E St
Balboa Blvd East
North End
20
1,560
72
11/23/2018
E St
Balboa Blvd East
Ocean Front East
20
1,660
70
11/23/2018
East Coastal Peak
Ridge Park Rd
1195' S of Ridge Park Rd
37
44,215
94
2/27/2018
Eastgate Dr
Newport Hills Dr East
San Miguel Dr
56
11,110
81
3/29/2018
Ebbtide Rd
Crown Dr
Sandpiper Dr
33
43,461
70
3/5/2018
EI Capitan Dr
Spyglass Hill Rd
Point Arguello Way
44
54,384
67
2/26/2018
EI Capitan Dr
Point Arguella Way
Point Conception Way
44
71,282
69
2/26/2018
EI Modena Ave
Cliff Dr
Beacon St
35
14,350
64
11/19/2018
EI Modena Ave
Beacon St
Clay St
35
23,345
92
11/19/2018
EI Modena Ave
Clay St
15th St
35
22,925
94
11/19/2018
EI Paseo Dr
Bayside Dr
Malabar Dr
34
18,700
74
3/6/2018
Emerald Ave
Bay Front North
Park Ave
27
8,640
19
3/28/2018
Emerald Ave
Park Ave
Bay Front South
27
9,153
23
3/28/2018
Emerson St
Tustin Ave
City Limits
30
10,200
80
11/20/2018
Essex Ln
Cambridge Ln
Oxford Ln
34
28,424
93
11/20/2018
Estelle Ln
Ruth Ln
Highland Dr
33
45,744
94
11/20/2018
Estelle Ln
Highland Or
Santiago Or
33
11,946
93
11/20/2018
Eton PI
Dover Dr
End
33
7,879
94
11/20/2018
Evening Canyon Rd
Shorecliff Rd
Morning Canyon Rd
28
63,360
83
3/1/2018
Evening Star Ln
Polaris Dr
End
33
34,840
90
11/20/2018
Evita Dr
Seadrift Dr
Chubasco Dr
58
12,760
86
3/5/2018
F St
North End
Balboa Blvd East
20
2,900
70
11/23/2018
F St
Balboa Blvd East
Ocean Front East
26
5,850
61
11/13/2018
Fairfield Dr
Cameo Shores Rd
Milford Dr
33
44,715
99
2/28/2018
15 of 38 5-85
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Fairhill Dr
23rd St
End
34
18,462
85
11/20/2018
Farallon Dr
Avocado Ave
Newport Center Dr
48
74,832
74
3/28/2018
Fern St
Canal St
Coast Highway West
30
8,190
87
11/19/2018
Fern St
Seashore Dr
Ocean Front Alley West
17
1,054
89
11/19/2018
Fern St
Ocean Front Alley West
Ocean Front West
20
1,400
83
11/24/2018
Fernando Street
Edgewater Ave East
Bay Ave East
30
10,680
81
11/7/2018
Fernleaf Ave
Cove St
China Cove Ramp
21
6,510
87
3/13/2018
Fernleaf Ave
Ocean Blvd
Seaview Ave
30
8,850
27
3/13/2018
Fernleaf Ave
Seaview Ave
150' N Seaview Ave
27
4,050
94
3/26/2018
Fernleaf Ave
150' N Seaview Ave
Bayside Dr
28
9,520
96
3/26/2018
Fernleaf Ave
250' S of First St
Coast Highway East
27
34,020
91
3/6/2018
Fernleaf Ave
Coast Highway East
Fifth Ave
27
9,990
86
3/5/2018
Fifth Avenue
Dahlia Ave
Heliotrope Ave
33
29,535
87
3/5/2018
Fifth Avenue
Heliotrope Ave
Iris Ave
32
9,280
88
3/5/2018
Fifth Avenue
Jasmine Ave
Marguerite Ave
28
18,390
88
2/27/2018
Fifth Avenue
Marguerite Ave
Marigold Ave
36
11,520
92
2/27/2018
Fifth Avenue
Marigold Ave
Poppy Ave
36
42,300
89
2/27/2018
Finley Ave
Newport Blvd
Clubhouse Ave
16
3,040
95
11/6/2018
Finley Ave
Clubhouse Ave
End
16
10,640
95
11/6/2018
Finley Ave
Rialto
38th St
16
560
89
11/5/2018
Finley Ave
38th St
Channel PI
16
3,520
91
11/5/2018
First Ave
Acacia Ave
Begonia Ave
27
7,344
94
3/7/2018
First Ave
Begonia Ave
Carnation Ave
27
7,290
87
3/7/2018
First Ave
Carnation Ave
Dahlia Ave
27
7,317
91
3/7/2018
First Ave
Dahlia Ave
Fernleaf Ave
27
7,290
91
3/7/2018
First Ave
Fernleaf Ave
Goldenrod Ave
27
7,290
89
3/7/2018
First Ave
Goldenrod Ave
Heliotrope Ave
27
7,290
87
3/7/2018
First Ave
Heliotrope Ave
Iris Ave
27
7,290
90
3/7/2018
First Ave
Iris Ave
Jasmine Ave
27
7,290
90
3/7/2018
Flagship Rd
Dana Rd
Placentia Ave
37
39,220
63
11/19/2018
Ford Rd
Hillside Dr
East End
32
22,320
87
3/21/2017
Ford Rd EB
West End
San Miguel Dr
30
26,900
87
2/26/2018
Ford Rd WB
Newport Hills Dr
West End
29
25,433
84
2/26/2018
Fourth Ave
Avocado Ave
Acacia Ave
27
7,155
89
3/7/2018
Fourth Ave
Acacia Ave
Begonia Ave
27
7,209
93
3/7/2018
16 of 38 5-86
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Fourth Ave
Begonia Ave
Carnation Ave
27
7,155
91
3/7/2018
Fourth Ave
Carnation Ave
Dahlia Ave
27
7,155
92
3/7/2018
Fourth Ave
Goldenrod Ave
Heliotrope Ave
27
7,020
83
3/26/2018
Fourth Ave
Heliotrope Ave
Iris Ave
27
7,236
77
3/19/2018
Fourth Ave
Iris Ave
Jasmine Ave
27
7,425
66
3/19/2018
Fourth Ave
Jasmine Ave
Larkspur Ave
27
7,182
71
3/19/2018
Fourth Ave
Larkspur Ave
Marguerite Ave
27
7,560
80
3/19/2018
Fourth Ave
Marguerite Ave
Marigold Ave
27
7,290
80
3/19/2018
Fourth Ave
Marigold Ave
Narcissus Ave
27
7,209
69
3/19/2018
Fourth Ave
Narcissus Ave
Orchid Ave
27
7,371
80
3/19/2018
Fourth Ave
Orchid Ave
Poinsettia Ave
27
7,290
77
3/19/2018
Fourth Ave
Poinsettia Ave
Poppy Ave
27
7,263
81
3/19/2018
Francisco Dr
Tustin Ave
Irvine Ave
37
47,730
95
11/20/2018
Francisco Dr
Irvine Ave
Tradewinds Ln
36
8,496
94
11/20/2018
Fullerton Ave
Cliff Dr
Beacon St
35
14,805
89
11/19/2018
Fullerton Ave
Beacon St
Clay St
35
23,345
92
11/19/2018
Fullerton Ave
Clay St
15th St
35
22,505
92
11/19/2018
G St
North End
Balboa Blvd East
20
3,620
63
11/23/2018
G St
Balboa Blvd East
Ocean Blvd
36
6,344
89
11/7/2018
G St
Ocean Blvd
Ocean Front East
30
6,000
62
11/23/2018
Galatea Ter
Bayadere Ter
Angelita Dr
33
57,750
88
3/6/2018
Galaxy Dr
Santiago Or (South End)
Rigel Cir
37
53,983
49
11/20/2018
Galaxy Dr
Rigel Cir
Mariners Dr
37
72,372
71
11/20/2018
Galaxy Dr
Mariners Dr
Holiday Or
34
49,368
49
11/20/2018
Galaxy Dr
Hoilday Or
Santiago Or (North End)
34
74,868
73
11/20/2018
Garnet Ave
Bay Front North
Park Ave
27
12,987
19
3/14/2018
Garnet Ave
Park Ave
Bay Front South
25
9,800
13
3/14/2018
Garrett Dr
Cortland Dr
Cameo Highlands Dr
37
31,080
62
2/27/2018
Gary PI
15th St
End
33
8,580
84
11/19/2018
Glenwood Ln
Candlestick Ln
Ashford Ln
33
22,320
93
11/20/2018
Golden Cir
Anniversary Ln
Anniversary Ln
33
40,161
82
11/20/2018
Goldenrod Ave
Ocean Blvd
150'S of Seaview Ave
27
10,125
27
3/13/2018
Goldenrod Ave
150'S of Seaview Ave
Seaview Ave
28
4,200
93
3/13/2018
Goldenrod Ave
Seaview Ave
End
30
6,900
20
3/13/2018
Goldenrod Ave
End
Coast Highway East
28
31,472
94
3/7/2018
17 of 38 5-87
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Goldenrod Ave
Coast Highway East
Fourth Ave
27
5,130
82
3/5/2018
Goldenrod Ave
Fourth Ave
Fifth Ave
27
9,450
89
3/5/2018
Goldenrod Ave
Fifth Ave
Sea Ln
36
10,152
84
3/5/2018
Goldenrod Ave
Sea Ln
Harbor View Dr
33
33,264
75
3/5/2018
Goldenrod Ave
Harbor View Dr
Crown Dr
33
38,445
79
3/5/2018
Goldenrod Ave
Crown Dr
Wavecrest Dr
35
22,225
86
3/5/2018
Goleta Point Dr
Drakes Bay Dr
Morro Bay Dr
32
53,820
88
2/26/2018
Gorham Dr
Cameo Shores Rd
Milford Dr
33
46,200
99
2/28/2018
Granada Ave
M St
Channel Rd
30
10,800
92
11/23/2018
Grant St
North End
Coast Highway West
29
9,425
91
11/19/2018
Grant St
Seashore Dr
Ocean Front Alley West
17
1,105
87
11/19/2018
Grant St
Ocean Front Alley West
Ocean Front West
21
1,470
90
11/24/2018
Granville Dr
Newport Center Dr
Gate
26
10,088
89
3/28/2018
Grove Ln
Westcliff Dr
End
32
23,004
92
11/20/2018
H St
North End
Balboa Blvd East
20
3,640
92
11/23/2018
Half Moon Bay Dr
Point Loma Dr
Point Arena Way
32
32,904
59
2/26/2018
Hampden Rd
Milford Dr
Cameo Shores Rd
37
34,410
99
2/28/2018
Hampden Rd
Cameo Shores Rd
End
37
8,131
99
2/28/2018
Hampshire Cir
Antigua Way
Antigua Way
34
25,534
89
11/20/2018
Hampshire Ct
Hampshire Cir
End
50
9,200
95
11/20/2018
Hampshire Ln
Lincoln Ln
Santiago Dr
34
8,500
94
11/20/2018
Hampshire Ln
Santiago Dr
Antigua Way
34
8,500
93
11/20/2018
Harbor Island Dr
Bayside Dr
Harbor Island Rd
43
1 34,250
94
3/15/2018
Harbor Island Dr
Harbor Island Rd
E End
37
68,894
96
3/28/2018
Harbor Island Dr
Harbor Island Dr
N End
36
6,840
97
3/15/2018
Harbor Island Rd
Harbor Island Dr
S End
30
17,550
94
3/15/2018
Harbor View Dr
MacArthur Blvd
Goldenrod Ave
38
26,030
84
3/1/2018
Harbor View Dr
Goldenrod Ave
Marguerite Ave
38
73,910
79
3/1/2018
Harding St
Adams St
Cypress St
20
4,800
92
11/23/2018
Harrow PI
Dover Dr
End
33
7,615
90
11/20/2018
Haven PI
Irvine Ave
St Andrews Rd
35
19,005
80
11/19/2018
Hazel Dr
Poppy Ave (south side)
Coast Highway East
21
29,875
86
3/5/2018
Hazel Dr
Coast Highway East
577' N of Coast Highway East
30
17,310
87
3/5/2018
Hazel Dr
577' N of Coast Highway East
Poppy Ave (north side)
29
11,397
82
3/5/2018
Heather Ln
Irvine Ave
End
34
36,390
97
11/20/2018
18 of 38 5-88
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Heliotrope Ave
Ocean Blvd
Bayview Dr
27
10,800
85
3/13/2018
Heliotrope Ave
Bayview Dr
Seaview Ave
27
9,450
96
3/13/2018
Heliotrope Ave
Seaview Ave
End
27
8,478
93
3/13/2018
Heliotrope Ave
Bayside Dr
Coast Highway East
28
28,420
90
3/7/2018
Heliotrope Ave
Coast Highway East
Fifth Ave
27
21,195
89
3/5/2018
Heron Way
Keel Dr
Outrigger Dr
32
8,480
73
3/28/2018
Highland Dr
Westcliff Dr
Nottingham Rd
38
60,496
95
11/20/2018
Highland Dr
Nottingham Rd
Mariners Dr
38
70,604
95
11/20/2018
Highland Dr
Mariners Dr
Irvine Ave
37
71,965
87
11/20/2018
Highland St
North End
Coast Highway West
30
7,800
88
11/19/2018
Highland St
Seashore Dr
Ocean Front Alley West
17
1,224
91
11/19/2018
Highland St
Ocean Front Alley West
Ocean Front West
19
1,330
92
11/24/2018
Hilaria Way
North End
Flagship Dr
38
8,740
91
11/19/2018
Hilaria Way
Flagship Dr
South End
36
14,632
78
11/19/2018
Holiday Rd
Galaxy Dr
Santiago Dr
38
6,270
94
11/20/2018
Holiday Rd
Santiago Dr
Tradewinds Ln
38
56,430
93
11/20/2018
Holiday Rd
Irvine Ave
Tustin Ave
38
49,020
96
11/20/2018
Holly Ln
Tustin Ave
Irvine Ave
34
43,724
93
11/19/2018
Holmwood Dr
Catalina Dr
Broad St
34
46,920
91
11/19/2018
Hospital Rd
Superior Ave
Placentia Ave
44
42,944
100
11/19/2018
Hospital Rd
Newport Blvd
Old Newport Blvd
70
11,200
78
11/19/2018
1 St
North End
Balboa Blvd East
20
4,560
92
11/24/2018
1 St
Balboa Blvd East
Miramar Dr
37
14,060
91
11/24/2018
1 St
Miramar Dr
Ocean Blvd
36
6,120
92
11/24/2018
1 St
Ocean Blvd
Ocean Front East
30
3,540
85
11/24/2018
Indian Spring Ln
Irvine Ave
End
52
6,556
93
11/20/2018
Indus St
Kline Dr
West End
33
28,400
75
3/13/2018
Inlet Dr
Marguerite Ave
Keel Dr
36
5,400
80
3/1/2018
Inlet Isle Dr
Topside Ln
Sandcastle Dr
32
37,066
94
3/1/2018
Iris Ave
Ocean Blvd
Seaview Ave
28
17,500
93
3/13/2018
Iris Ave
Seaview Ave
North End
28
8,960
96
3/13/2018
Iris Ave
Bayside Dr
Coast Highway East
27
19,494
93
3/7/2018
Iris Ave
Coast Highway East
Fifth Ave
27
25,515
77
3/5/2018
Irvine Ave
Clay St
15th St
38
23,940
96
10/4/2018
Irvine Ave
15th St
16th St
62
78,554
82
10/11/2018
19 of 38 5-89
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Irvine Ter
Coast Highway East
Bonnie Doone Ter
64
7,360
86
3/28/2018
Isabella Ter
Seaward Rd
End
24
8,800
78
2/28/2018
Island Ave
Edgewater Ave East
Bay Ave East
34
18,258
92
11/24/2018
Island Ave
Bay Ave East
Balboa Blvd West
33
5,412
89
11/7/2018
Island Ave
Balboa Blvd West
Ocean Front West
34
5,270
92
11/24/2018
Island View Dr
Salt Air Dr
Lighthouse Ln
32
26,080
84
3/1/2018
J St
North End
Balboa Blvd East
20
4,800
92
11/24/2018
Jade Ave
Park Ave
Bay Front South
28
11,620
89
3/20/2018
Jade Cove
San Martin Way
End
32
10,300
82
3/29/2018
Jasmine Ave
Ocean Blvd
88' N of Ocean Blvd
28
2,464
8
3/15/2018
Jasmine Ave
88' N of Ocean Blvd
Seaview Ave
28
12,096
94
3/13/2018
Jasmine Ave
Seaview Ave
North End
27
7,641
94
3/13/2018
Jasmine Ave
Bayside Dr
Coast Highway East
28
13,440
91
3/7/2018
Jasmine Ave
Coast Highway East
Third Ave
27
13,716
89
2/27/2018
Jasmine Ave
Third Ave
Fifth Ave
27
20,520
89
2/27/2018
K St
Balboa Blvd East
North End
19
4,085
79
11/24/2018
Kathleen Ln
Teresita Ln
Beryl Ln
34
9,270
94
11/20/2018
Kathleen Ln
Beryl Ln
Highland Dr
34
8,840
94
11/20/2018
Keel Dr
Catamaran Dr
Outrigger Dr
32
21,014
83
3/1/2018
Keel Dr
Outrigger Dr
End
32
46,108
74
3/1/2018
Kent Ln
Pembroke Ln
Sussex Ln
34
8,500
92
11/20/2018
Kent Ln
Sussex Ln
Dover Dr
34
14,110
91
11/20/2018
Ketch Rd
Beacon Bay
End
24
7,440
90
3/15/2018
Kewamee Dr
Seadrift Dr
Avocado Ave
37
42,550
84
3/5/2018
Key Bay
Park Green Dr
End
64
5,120
94
3/1/2018
Key View
Sandcastle Dr
End
34
5,410
94
3/1/2018
Key West
Park Green Dr
End
32
8,860
95
3/1/2018
Kings PI
St James Rd
Kings Rd
35
66,080
95
11/20/2018
Kings Rd
Cliff Rd
St Andrews Rd
35
52,850
94
11/20/2018
Kings Rd
St Andrews Rd
Kings PI
35
67,025
94
11/20/2018
Kline Dr
South End
Orchard Dr
28
19,000
90
3/13/2018
Kline Dr
Pegasus St
North End
33
21,060
75
3/13/2018
K-Thanga Dr
Dolphin Ter
Bonnie Doone Ter
33
9,075
86
3/6/2018
L St
Balboa Blvd East
Plaza Del Norte
44
9,504
80
11/24/2018
L St
Plaza Del Norte
10cean Blvd
1 36
1 21,132 1
90
11/24/2018
20 of 38 5-90
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
L St
Ocean Blvd
Ocean Front East
30
2,760
92
11/24/2018
La Felicidad
Camelback St
La Salud
44
13,200
88
3/8/2018
La Jolla Dr
Santa Ana Ave
End
16
2,800
86
11/19/2018
La Jolla Dr
End
Cliff Dr
20
4,540
96
11/19/2018
La Jolla Dr
Cliff Dr
Beacon St
20
14,300
96
11/19/2018
La Linda Ct
23rd St
End
32
6,368
84
11/20/2018
La Linda PI
23rd St
End
37
22,076
75
11/20/2018
La Salud
North End
La Vida
44
23,956
75
3/8/2018
La Salud
La Vida
Corsica Dr N
44
58,740
83
3/8/2018
La Salud
Corsica Dr N
La Felicidad
44
44,220
80
3/8/2018
La Salud
La Felicidad
South End
44
20,964
85
3/8/2018
La Vida
University Dr
La Salud
44
40,092
96
3/8/2018
Lafayette Ave
31st St
Via Lido
60
23,100
73
11/6/2018
Lafayette Ave
28th St
31st St
24
21,140
65
11/6/2018
Lake Ave
38th St
50' S of 38th St
25
1,250
88
11/24/2018
Lake Ave
50' S of 38th St
36th St
25
8,000
92
11/6/2018
Lake Ave
36th St
35th St
26
5,330
93
11/6/2018
Lake Ave
35th St
34th St
26
5,330
93
11/6/2018
Lake Ave
34th St
33rd St
26
5,330
91
11/6/2018
Lake Ave
33rd St
32nd St
26
5,330
92
11/6/2018
Lake Park Ln
23rd St
Tustin Ave
25
10,750
70
11/20/2018
Lancaster St
62nd St
61st St
30
2,370
91
11/19/2018
Lancaster St
Canal St
30' S of End
29
1,740
88
11/19/2018
Lancaster St
30' S of End
End
30
900
88
11/24/2018
Larkspur Ave
Ocean Blvd
Seaview Ave
28
13,160
94
3/13/2018
Larkspur Ave
Seaview Ave
North End
28
10,080
96
3/13/2018
Larkspur Ave
Bayside Dr
Coast Highway East
28
6,916
94
3/7/2018
Larkspur Ave
Coast Highway East
Fifth Ave
27
37,962
68
3/5/2018
Laurel PI
Irvine Ave
End
36
18,360
94
11/19/2018
Leeward Ln
Tradewinds Ln
Holiday Rd
33
61,545
92
11/20/2018
Leila Lane
Dover Dr (Cul -de -Sac)
Diana Ln
33
7,920
94
11/20/2018
Lido Park Dr
Lafayette Ave
End
54
38,662
76
11/7/2018
Lighthouse Ln
Salt Air Dr
Blue Water Dr
32
35,580
89
3/1/2018
Lincoln Ln
Estelle Ln
Marian Ln
34
53,742
93
11/20/2018
Linda Ln
Irvine Ave
Priscilla Ave
34
7,956
96
11/20/2018
21 of 38 5-91
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Lindo Ave
Bay Ave West
Alley N of Bay Ave West
23
12,719
89
11/7/2018
Lindo Ave
Alley N of Bay Ave West
North End
23
1,587
65
11/24/2018
Little River Cir
Carmel Bay Dr
End
32
5,180
53
2/26/2018
Lugonia St
Prospect St
Newport Shores Dr
29
29,725
69
11/19/2018
Lugonia St
Newport Shores Dr
Coast Highway West
19
3,173
89
11/19/2018
Lugonia St
Seashore Dr
Ocean Front Alley West
19
1,121
88
11/19/2018
Lugonia St
Ocean Front Alley West
Ocean Front West
19
1,349
90
11/24/2018
M St
Balboa Blvd East
Seville Ave
30
16,500
93
1/16/2017
M St
Seville Ave
Ocean Blvd
30
13,200
92
11/24/2018
M St
Ocean Blvd
Ocean Front East
30
2,700
78
4/13/2015
M St
Ocean Blvd
Ocean Front East
30
2,700
92
11/26/2018
Main St
Bay Ave East
Balboa Blvd East
20
3,700
92
11/24/2018
Main St
Balboa Blvd East
Ocean Front East
26
5,460
92
11/24/2018
Malabar Dr
Seadrift Dr/EI Paseo Dr
Bonnie Doone Ter
37
25,456
88
3/6/2018
Malibu Cir
Mission Bay Dr
End
32
7,560
63
2/26/2018
Mar Vista Dr
Vista Del Oro
Eastbluff Dr
36
81,648
70
3/8/2018
Marapata Dr
Sabrina Ter
Kewamee Dr
37
25,530
83
3/6/2018
Marcus Ave
32nd St
33rd St
26
5,538
94
11/7/2018
Marcus Ave
33rd St
34th St
26
5,954
89
11/6/2018
Marcus Ave
34th St
35th St
26
5,434
94
11/6/2018
Marcus Ave
35th St
36th St
26
5,720
90
11/6/2018
Marcus Ave
36th St
Rialto
26
4,264
88
11/6/2018
Marcus Ave
Rialto
Channel PI
16
11,760
84
11/6/2018
Margaret Dr
Tustin Ave
Irvine Ave
34
43,306
74
11/19/2018
Marguerite Ave
Ocean Blvd
Seaview Ave
40
17,120
100
3/5/2018
Marguerite Ave
Seaview Ave
195' S of Coast Highway East
40
16,200
100
3/5/2018
Marguerite Ave
195' S of Coast Highway East
Coast Highway East
38
7,410
75
3/26/2018
Marguerite Ave
San Joaquin Hills Rd
Pacific View Dr
36
26,406
87
3/1/2018
Marian Ln
Lincoln Ln
Highland Dr
38
11,202
95
11/20/2018
Marian Ln
Highland Dr
Ruth Ln
38
39,824
86
11/20/2018
Marigold Ave
Ocean Blvd
Seaview Ave
27
9,990
25
3/26/2018
Marigold Ave
Seaview Ave
Coast Highway East
28
16,380
89
3/13/2018
Marigold Ave
Coast Highway East
Third Ave
27
22,275
86
3/5/2018
Marigold Ave
Third Ave
Fourth Ave
27
9,315
86
3/5/2018
Marigold Ave
I Fourth Ave
Fifth Ave
27
8,910
68
3/26/2018
22 of 38 5-92
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Marine Ave
Bay Front South
Park Ave
27
12,880
22
3/20/2018
Marine Ave
Park Ave
Balboa Ave
37
17,390
22
3/20/2018
Marine Ave
Balboa Ave
South Bridge End
37
1 21,867
28
3/27/2018
Marine Ave
South Bridge End
North Bridge End
20
8,000
78
3/14/2018
Marine Ave
North Bridge End
Bayside Dr
20
10,800
73
3/20/2018
Mariners Dr
Irvine Ave
Dover Dr
38
55,100
91
11/20/2018
Mariners Dr
Dover Dr
Santiago Dr
38
84,056
92
11/20/2018
Mariners Dr
Santiago Dr
East End
37
48,084
96
11/20/2018
Marlin Way
Shipway Ln
Terrapin Way
33
25,725
90
11/20/2018
Martingale Way
Corinthian Way
End
44
26,228
69
3/12/2018
Mc Fadden PI
Balboa Blvd West
End
22
13,200
85
11/6/2018
Meadow Ln
Tustin Ave
End
35
9,325
85
11/20/2018
Medina Way
Edgewater Ave East
Bay Ave East
20
10,400
91
11/24/2018
Medina Way
Bay Ave East
Balboa Blvd East
20
3,600
90
11/24/2018
Medina Way
Balboa Blvd East
End
19
3,040
92
11/24/2018
Mendoza Ter
Seaward Rd
End
23
17,445
82
2/28/2018
Mesa Dr
Mesa Dr/Birch St
Cypress St
37
42,180
98
3/12/2018
Mesa Dr
Cypress St
End
37
49,765
95
3/12/2018
Mesa View North
Ford Rd
Bonita Canyon Dr
43
17,200
93
3/22/2017
Mesa View South
Bonita Canyon Dr
Ford Rd
43
17,200
95
3/22/2017
Michael PI
15th St
End
34
8,840
85
11/19/2018
Milford Dr
Hampden Rd
Orrington Rd
37
32,375
100
2/28/2018
Milford Dr
Orrington Rd
Camden Dr
37
32,137
99
2/28/2018
Miramar Dr
Balboa Blvd East
L St
30
41,610
82
11/24/2018
Miramar Dr
L St
M St
29
16,965
73
11/24/2018
Miramar Dr
M St
Channel Rd
30
17,700
81
11/24/2018
Mission Bay Dr
Point Loma Dr
Spyglass Hill Rd
36
65,448
60
2/26/2018
Monrovia Ave
City Limit
15th St West
39
64,545
79
11/19/2018
Monrovia Ave
15th St West
End
39
20,865
89
11/19/2018
Montecito Dr
Cambria Dr
Dana Point Way
32
33,664
75
2/26/2018
Montecito Dr
Dana Point Way
Drakes Bay Dr
32
57,518
58
2/26/2018
Monterey Cir
Carmel Bay Dr
End
32
18,696
54
2/26/2018
Montero Ave
Bay Ave East
Edgewater Ave East
33
16,500
62
11/24/2018
Morning Canyon Rd
Serra Dr
Seaward Rd
35
32,200
86
2/28/2018
Morning Canyon Rd
Seaward Rd
Coast Highway East
35
12,250
87
2/28/2018
23 of 38 5-93
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Morning Canyon Rd
Coast Highway East
Shorecliff Rd
27
41,964
85
3/26/2018
Morning Star Ln
Polaris Dr
End
33
24,775
96
11/20/2018
Morro Bay Dr
Goleta Point Dr (South End)
Goleta Point Dr (North End)
32
42,894
69
2/26/2018
Muir Beach Cir
Goleta Point Dr
End
32
19,740
57
3/29/2018
Narcissus Ave
Ocean Blvd
Seaview Ave
27
9,882
92
3/5/2018
Narcissus Ave
Seaview Ave
Coast Highway East
27
14,931
92
3/5/2018
Narcissus Ave
Coast Highway East
175' S of Fifth Ave
27
1 38,610
73
2/28/2018
Narcissus Ave
175' S of Fifth Ave
Fifth Ave
30
4,890
36
3/26/2018
Narcissus Ave
Fifth Ave
Geranium
36
12,384
88
2/28/2018
Nautilus Lane
Toyon Ln
Buttonshell Ln
33
11,760
96
11/20/2018
Neptune Ave
46th St
51st St
24
25,800
88
11/19/2018
Neptune Ave
51st St
End
25
18,750
86
11/19/2018
Newport Hills Dr E
Ford Rd
Port Ramsgate PI
36
51,100
83
2/22/2018
Newport Hills Dr E
Port Ramsgate PI
Port Seabourne Way
37
57,350
81
2/22/2018
Newport Hills Dr E
Port Seaborne Way
Port Sutton Dr
36
65,124
85
2/22/2018
Newport Hills Dr E
Port Sutton Dr
Newport Hills Dr West
38
75,430
82
3/29/2018
Newport Hills Dr W
Newport Hills Dr East
Port Carlow PI
36
55,800
81
3/29/2018
Newport Hills Dr W
Port Carlow PI
Port Seabourne Wy
38
49,210
77
2/22/2018
Newport Hills Dr W
Port Seabourne Wy
Ford Rd
38
89,148
82
2/26/2018
Newport Place Dr
MacArthur Blvd
Dove St
62
36,530
80
3/12/2018
Newport Ridge Dr East
San Joaquin Hills Rd
Park Crest
40
59,300
87
2/27/2018
Newport Ridge Dr East
Park Crest
St Michael
40
88,600
89
2/27/2018
Newport Ridge Dr West
St Michael
Whitesands
40
56,800
88
3/29/2018
Newport Ridge Dr West
Whitesands
San Joaquin Hills Rd
40
47,700
86
3/29/2018
Newport Shores Dr
Orange St
Walnut St
20
12,640
91
11/19/2018
Newport Shores Dr
Walnut St
61st St
20
16,540
87
11/19/2018
Nordina St
Seashore Dr
Ocean Front Alley West
17
1,445
89
11/19/2018
Nordina St
Ocean Front Alley West
Ocean Front West
19
1,235
88
11/24/2018
Norfolk Ln
Dover Dr
Devon Ln
33
7,260
94
11/20/2018
North Star Ln
White Cliffs Dr
End
33
30,550
92
11/20/2018
Nottingham Rd
Dover Dr
Santiago Dr
38
66,804
92
11/20/2018
Ocean Blvd
G St
L St
36
54,900
76
11/24/2018
Ocean Blvd
L St
Channel Rd
36
48,060
72
11/24/2018
Ocean Blvd
Goldenrod Ave
Iris Ave
41
32,062
100
3/13/2018
Ocean Blvd
Iris Ave
Marguerite Ave
48
44,640
100
3/13/2018
24 of 38 5-94
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Ocean Blvd
Marguerite Ave
Poppy Ave
41
64,985
100
3/13/2018
Ocean Blvd
Carnation Ave
Goldenrod Ave
41
45,920
6
3/13/2018
Ocean View Ave
Tustin Ave
Cliff Dr
24
22,128
92
11/19/2018
Old Newport BI
Coast Highway
270' N of Coast Highway
46
12,420
78
11/19/2018
Old Newport BI
270' N of Coast Highway
475' N of Cosast Highway
32
6,560
74
11/24/2018
Old Newport BI
475' N of Coast Highway
595' N of Coast Highway
30
3,600
72
11/19/2018
Old Newport BI
595' N of Coast Highway
Hospital Rd
30
28,500
74
11/24/2018
Old Newport BI
Hospital Rd
City Limit
26
39,375
83
11/19/2018
Old Newport BI
Hospital Rd
City Limit
32
58,560
74
11/24/2018
Old Newport BI
1530' N Hospital Rd
City Limit
15
4,500
69
11/19/2018
Olive St
Seashore Dr
Ocean Front West
17
2,924
89
11/19/2018
Onyx Ave
Bay Front North
Balboa Ave
27
15,525
39
3/27/2018
Onyx Ave
Balboa Blvd
Park Ave
27
11,340
42
3/27/2018
Onyx Ave
Park Ave
Bay Front South
27
11,070
35
3/27/2018
Opal Ave
Collins Ave
Park Ave
23
12,627
25
3/28/2018
Opal Ave
Park Ave
Bay Front South
24
13,200
25
3/27/2018
Orange Ave
Old Newport Blvd
15th St
36
15,696
79
11/19/2018
Orange St
Canal St
Coast Highway West
35
16,380
89
11/19/2018
Orange St
Coast Highway West
Ocean Front Alley West
32
5,312
89
11/19/2018
Orange St
Ocean Front Alley West
Ocean Front West
33
1,716
89
11/24/2018
Orchard Dr
Irvine Ave
Birch St
40
32,000
97
3/12/2018
Orchard Dr
Birch St
Cypress St
36
22,680
97
3/12/2018
Orchard Dr
Cypress St
Orchid St
35
16,275
97
3/12/2018
Orchard Dr
Bay View Ave
End
35
5,180
79
3/12/2018
Orchard Dr
Santa Ana Ave
End
33
47,142
84
3/13/2018
Orchid Ave
Ocean Blvd
Coast Highway East
27
29,862
95
3/5/2018
Orchid Ave
Coast Highway East
Third Ave
28
23,800
76
2/27/2018
Orchid Ave
Third Ave
Fifth Ave
28
21,448
76
2/27/2018
Orchid Hill PI
Upper Bay Dr
End
34
14,450
85
3/12/2018
Orchid St
Zenith Ave
Orchard Dr
35
33,495
75
3/12/2018
Orchid St
Orchard Dr
Azure Ave
35
17,500
80
3/12/2018
Orrington Rd
Cameo Shores Rd
Milford Dr
33
47,025
99
2/28/2018
Outrigger Dr
Keel Dr
Sandcastle Dr
33
47,255
93
3/1/2018
Oxford Ln
Devon Ln
Highland Dr
34
26,440
95
11/20/2018
Pacific Dr
Begonia Ave
Acacia Ave
27
8,910
96
3/26/2018
25 of 38 5-95
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Pacific Dr
Acacia Ave
Avocado Ave
27
8,235
98
3/7/2018
Pacific View Dr
San Miguel Dr
End
36
97,800
74
3/1/2018
Palm St
Ferry Entrance
Bay Ave East
34
4,080
88
11/24/2018
Palm St
Bay AveEast
Balboa Blvd East
34
6,562
93
11/7/2018
Palm St
Balboa Blvd East
Ocean Front Alley East
31
2,325
63
11/7/2018
Palm St
Ocean Front Alley East
Ocean Front East
31
4,185
87
11/7/2018
Paloma Dr
Holiday Rd
City Limit
35
22,750
94
11/20/2018
Paper Ln
Anniversary Ln
End
33
13,365
75
11/20/2018
Park Ave
West End
Pearl Ave
48
28,560
26
3/14/2018
Park Ave
Pearl Ave
Collins Ave
48
35,460
23
3/14/2018
Park Ave
Collins Ave
Sapphire Ave
48
25,920
27
3/27/2018
Park Ave
Sapphire Ave
Amethyst Ave
48
26,304
27
3/28/2018
Park Ave
Amethyst Ave
West Side of Bridge
46
23,060
75
3/28/2018
Park Ave
East Side of Bridge
Bay Front East
40
22,820
85
3/20/2018
Park Ave
West Side of Bridge
East Side of Bridge
20
5,600
100
3/21/2018
Park Green Dr
Sausalito Dr
Sandcastle Dr
40
44,400
95
3/1/2018
Park Ln
38th St
36th St
24
10,608
95
11/5/2018
Patolita Dr
Dolphin Ter
Bonnie Doone Ter
33
16,170
90
3/6/2018
Patrice Rd
Bolero Way
Flagship Rd
37
18,500
78
11/19/2018
Patrice Rd
Flagship Rd
South End
37
11,655
81
11/19/2018
Peach Tree Ln
Redland Dr
End
34
6,868
88
11/20/2018
Pearl Ave
Bay Front North
Park Ave
23
13,386
27
3/28/2018
Pearl Ave
Park Ave
Bay Front South
23
10,695
88
3/14/2018
Pebble Dr
Goldenrod Ave
Sandpiper Dr
34
42,398
68
3/28/2018
Pegasus St
Santa Ana Ave
Kline Dr
33
38,841
76
3/13/2018
Pelican Hill Rd N
Pelican Hill Cir (North Side)
Pelicans Dr
19
50,996
81
2/28/2018
Pelican Hill Rd N
Newport Coast Dr North
Pelicans Dr
19
23,902
81
2/28/2018
Pelican Hill Rd N
Pelicans Dr
Newport Coast Dr
19
23,902
79
2/28/2018
Pelican Hill Rd N
Pelicans Dr
Pelican Hill Cir (North Side)
19
50,996
82
2/28/2018
Pelican Hill Rd S
Newport Coast Dr
Pelican Hill Cir S
24
142,100
81
2/28/2018
Pelican Hill Rd S
Pelican Hill Cir (North Side)
Pelican Hill Cir (South Side)
24
31,798
83
2/28/2018
Pelican Hill Rd S
Pelican Hill Cir (South Side)
Pelican Hill Cir (North Side)
24
32,448
83
2/28/2018
Pelican Hill Rd S
Pelican Hill Cir (South Side)
Newport Coast Dr
24
142,600
86
2/28/2018
Pembroke Ln
Mariners Dr
Cornwall Ln
34
32,220
92
11/20/2018
Perham Rd
Cameo Shores Rd
Milford Dr
33
45,540
99
2/28/2018
26 of 38 5-96
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Pescador Dr
Nottingham Rd
Santiago Dr
33
50,271
95
11/20/2018
Piazza Genoa
Via Lido Soud
Via Genoa
45
8,640
91
11/7/2018
Piazza Lido
Via Florence
Via Havre
58
29,580
89
11/30/2018
Piazza Lido
Via Havre
Via Koron
24
10,272
94
11/7/2018
Pirate Rd
Cliff Dr
Clay St
35
28,735
84
11/20/2018
Plaza Del Norte
L St
I St
30
11,250
74
11/24/2018
Plaza Del Sur
I St
L St
30
16,050
72
11/24/2018
Poinsettia Ave
Ocean Blvd
Seaview Ave
28
15,316
89
3/5/2018
Poinsettia Ave
Seaview Ave
Coast Highway East
28
17,864
89
3/5/2018
Poinsettia Ave
Coast Highway East
Fourth Ave
28
33,936
75
3/26/2018
Poinsettia Ave
Fourth Ave
Fifth Ave
30
9,540
27
2/27/2018
Point Arena Way
Point Loma Dr
Point Sur Dr
32
22,140
56
2/26/2018
Point Arguello Way
EI Capitan Dr
Drakes Bay Dr
36
6,120
84
2/26/2018
Point Conception Way
EI Capitan Dr
Drakes Bay Dr
36
6,798
90
2/26/2018
Point Loma Dr
Mission Bay Dr
Point Arena Way
32
43,950
56
2/26/2018
Point Mendocino Way
Spyglass Hill Rd
Bodega Bay Dr
36
6,120
76
2/26/2018
Point Sur Dr
Carmel Bay Dr
Point Arena Wy
32
21,390
70
2/26/2018
Polaris Dr
Galaxy Dr
Evening Star Ln
36
44,352
85
11/20/2018
Polaris Dr
Evening Star Ln
Santiago Dr
36
62,148
83
11/20/2018
Poppy Ave
Coast Highway East
Second Ave
30
9,000
32
2/27/2018
Poppy Ave
Second Ave
Fifth Ave
27
31,050
71
2/27/2018
Poppy Ave
Ocean Blvd
190' S Coast Highway East
24
27,840
100
3/5/2018
Poppy Ave
190'S Coast Highway East
Coast Highway East
21
3,990
89
3/5/2018
Pork Barrel Way (35th 1/2 St)
Finley Ave
End
16
1,280
91
1/18/2017
Port Abbey PI
Port Sheffield PI (West End)
Newport Hills Drive West
32
24,704
85
2/26/2018
Port Abbey PI
Newport Hills Drive West
Port Sheffield PI (East End)
32
30,080
81
2/26/2018
Port Aberdeen PI
Port Whitby PI
Port Durness PI
32
44,628
83
2/22/2018
Port Albans Cir
Newport Hills Dr East
End
54
9,450
84
2/22/2018
Port Albans PI
Newport Hills Dr East
Port Cardigon PI
32
22,240
78
2/22/2018
Port Ashley PI
Port Stirling PI (West End)
Newport Hills Drive West
32
11,200
88
2/26/2018
Port Ashley PI
Newport Hills Drive West
Port Stirling PI (East End)
32
19,840
88
2/26/2018
Port Barmouth PI
Port Westbourne PI (West End)
Newport Hills Drive West
32
19,200
81
2/26/2018
Port Barmouth PI
Newport Hills Drive West
Port Westbourne PI (East End)
32
27,200
81
2/26/2018
Port Bishop PI
Newport Hills Dr East
Port Carney PI
33
32,435
76
2/22/2018
Port Bristol Cir
Port Cardiff PI (West Side)
Newport Hills Drive East
32
37,120
88
2/26/2018
27 of 38 5-97
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Port Bristol Cir
Newport Hills Drive East
End
32
35,040
84
2/26/2018
Port Cardiff PI
Port Bristol Cir (West End)
Newport Hills Drive East
32
30,656
85
2/26/2018
Port Cardiff PI
Newport Hills Drive East
Port Bristol Cir (East End)
32
16,800
87
2/26/2018
Port Cardigan PI
Newport Hills Dr East
Port Albans PI
32
26,880
73
2/22/2018
Port Carlisle PI
Port Whitby PI
Port Lerwick PI
32
47,252
86
2/22/2018
Port Carlow Cir
Newport Hills Dr West
End
54
6,210
88
2/22/2018
Port Carlow PI
Newport Hills Dr West
Port Renwick PI
32
30,688
77
2/22/2018
Port Carney PI
Newport Hills Dr East
Port Bishop PI
33
16,998
86
3/29/2018
Port Charles PI
Port Margate PI (West End)
Newport Hills Drive West
32
21,280
84
2/26/2018
Port Charles PI
Newport Hills Drive West
Port Margate PI (East End)
36
36,000
80
2/26/2018
Port Chelsea PI
Port Ramsgate PI (West End)
Newport Hills Drive East
32
31,584
77
2/22/2018
Port Chelsea PI
Newport Hills Drive East
Port Ramsgate PI (East End)
32
17,568
83
2/22/2018
Port Claridge PI
Newport Hills Dr East
Port Nelson PI
33
29,445
77
2/22/2018
Port Dunbar Dr
Spyglass Hill Rd
Port Harwick PI
36
6,942
86
2/22/2018
Port Dunleigh Cir
Newport Hills Dr East
End
32
21,696
83
2/22/2018
Port Durness PI
Port Harwick PI
Port Whitby PI
36
26,238
80
2/22/2018
Port Durness PI
Port Whitby PI
Port Aberdeen PI
36
46,364
84
2/22/2018
Port Edward Cir
Newport Hills Dr East
End
32
10,400
72
3/29/2018
Port Edward PI
Newport Hills Dr East
Port Locksleigh PI
33
28,860
82
2/22/2018
Port Harwick PI
Port Dunbar Dr
Port Durness PI
36
14,208
84
2/22/2018
Port Hemley Cir
Newport Hills Dr West
End
54
5,940
88
2/22/2018
Port Kimberly PI
Newport Hills Dr West
Port Manleigh PI
32
27,456
83
2/22/2018
Port Laurent PI
Newport Hills Dr East
Port Trinity PI
33
28,535
89
2/22/2018
Port Lerwick PI
Port Whitby PI
Port Carlisle PI
32
31,744
81
2/22/2018
Port Locksleigh PI
Newport Hills Dr East
Port Edward PI
33
32,500
78
2/22/2018
Port Manleigh Cir
Newport Hills Dr West
Newport Hills Dr West
32
24,000
91
2/22/2018
Port Manleigh PI
Newport Hills Dr West
Port Kimberly PI
32
25,024
82
2/22/2018
Port Margate PI
Port Charles PI (West Side)
Newport Hills Drive West
32
12,096
84
2/26/2018
Port Margate PI
Port Charles PI (East Side)
Newport Hills Drive West
32
26,880
82
2/26/2018
Port Nelson PI
Newport Hills Dr West
Port Charles PI (East Side)
33
30,713
72
2/22/2018
Port Provence PI
Port Weybridge PI (West End)
Newport Hills Dr East
32
37,120
82
2/26/2018
Port Provence PI
Newport Hills Dr East
Port Weybridge PI (East Side)
32
27,784
82
2/26/2018
Port Ramsey PI
San Miguel Dr
Port Whitby PI
36
6,008
84
2/22/2018
Port Ramsgate PI
Port Chelsea PI (West End)
Newport Hills Drive East
32
20,256
81
2/22/2018
Port Ramsgate PI
Newport Hills Drive East
Port Chelsea PI (East End)
32
13,760
84
2/22/2018
28 of 38 5-98
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Port Renwick PI
Newport Hills Dr West
Port Carlow PI
32
27,264
79
2/22/2018
Port Seabourne Way
Newport Hills Dr West
Newport Hills Dr East
40
63,760
88
3/29/2018
Port Sheffield PI
Port Abbey PI (West Side)
Newport Hills Drive West
32
16,224
80
2/26/2018
Port Sheffield PI
Newport Hills Drive West
Port Abbey PI (East Side)
32
20,800
83
2/26/2018
Port Stanhope Cir
Newport Hills Dr West
End
38
5,330
92
2/22/2018
Port Stanhope PI
Newport Hills Dr West
Port Tiffin PI
32
23,200
88
2/22/2018
Port Stirling PI
Port Ashley PI (West Side)
Newport Hills Drive West
32
19,680
82
2/26/2018
Port Stirling PI
Newport Hills Drive West
Port Ashley PI (East Side)
32
24,960
87
2/26/2018
Port Sutton Dr
San Miguel Dr
Newport Hills Dr East
49
15,756
81
2/22/2018
Port Taggart PI
Newport Hills Dr West
Port Wheeler PI
32
31,840
81
2/22/2018
Port Tiffin Cir
Newport Hills Dr West
End
54
6,210
92
3/29/2018
Port Tiffin PI
Newport Hills Dr West
Port Stanhope PI
32
23,360
85
2/22/2018
Port Townsend Cir
Port Bishop PI
End
33
9,735
83
2/22/2018
Port Trinity Cir
Newport Hills Dr East
End
33
11,213
81
2/22/2018
Port Trinity PI
Newport Hills Dr East
Port Laurent PI
33
24,635
75
2/22/2018
Port Westbourne PI
Port Barmouth PI (West Side)
Newport Hills Drive West
32
12,480
84
3/29/2018
Port Westbourne PI
Newport Hills Drive West
Port Barmouth PI (East Side)
32
21,760
84
2/26/2018
Port Weybridge PI
Port Provence PI (West End)
Newport Hills Drive East
32
26,560
84
2/26/2018
Port Weybridge PI
Newport Hills Drive East
Port Provence PI (East Side)
33
20,394
78
2/26/2018
Port Wheeler PI
Newport Hills Dr West
Port Taggart PI
32
33,824
81
2/22/2018
Port Whitby PI
Port Ramsey PI
Port Durness PI
36
37,220
83
2/22/2018
Portside Way
Windover Dr
Wavecrest Dr
32
18,432
83
3/5/2018
Powell PI
15th St
End
34
7,480
85
11/19/2018
Prairie Road SB
Bonita Canyon Dr
Ford Rd
35
12,250
95
3/22/2017
Prairie Road NB
Ford Rd
Bonita Canyon Dr
46
16,100
95
3/22/2017
Priscilla Ln
Beryl Ln
Diana Ln
34
23,572
95
11/20/2018
Private Rd
Irvine Ave
Irvine Ave
33
31,110
94
11/20/2018
Production PI
Monrovia Ave
Placentia Ave
38
48,070
83
11/19/2018
Prospect St
Canal St
Cedar St
29
24,824
93
11/19/2018
Prospect St
Cedar St
Newport Shores Dr
29
22,765
89
11/19/2018
Prospect St
Newport Shores Dr
Coast Highway West
24
4,320
89
11/19/2018
Prospect St
Coast Highway West
Seashore Dr
46
3,450
88
11/19/2018
Prospect St
Seashore Dr
Ocean Front Alley West
18
972
87
11/19/2018
Prospect St
Ocean Front Alley West
Ocean Front West
18
576
86
11/24/2018
Quail St
Campus Dr
Birch St
36
21,060
78
3/12/2018
29 of 38 5-99
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Quail St
Birch St
Westerly PI
60
37,020
79
3/12/2018
Quail St
Westerly PI
Spruce St
44
40,128
78
3/12/2018
Quail St
Spruce St
Dove St
44
56,144
86
3/12/2018
Quiet Cove
Tiller Way
End
32
16,540
92
3/1/2018
Ramona Dr
Dolphin Ter
Santanella Ter
33
16,863
86
3/6/2018
Ramona Dr
Santanella Ter
Bonnie Doone Ter
33
9,240
92
3/6/2018
Redlands Ave
15th St
Clay St
34
23,120
94
11/19/2018
Redlands Ave
Clay St
Cliff Dr
34
24,820
91
11/19/2018
Redlands Dr
South End
23rd St
33
6,699
86
11/20/2018
Redlands Dr
23rd St
Dawnview Ln
33
18,150
87
11/20/2018
Redlands Dr
Dawnview Ln
Santa Isabel Ave
33
25,344
86
11/20/2018
Redlands Dr
Orchard Dr
Indus St
33
18,645
78
3/13/2018
Ridge Park Rd
Newport Coast Dr
Tesoro
37
67,081
79
2/27/2018
Ridge Park Rd
Tesoro
Campo Bello
37
47,471
82
2/27/2018
Ridge Park Rd
Campo Bello
Vista Ridge Rd
37
55,167
81
2/27/2018
Ridge Park Rd
Vista Ridge Rd
West Coast Peak
37
50,986
83
2/27/2018
Ridge Park Rd
West Coast Peak
Talmont
37
44,992
87
2/27/2018
Ridge Park Rd
Talmont
East End
37
40,835
83
2/27/2018
Ridge Park Rd
San Joaquin Hills Rd
Newport Coast Dr
37
53,613
83
2/27/2018
Rigel Cir
Galaxy Dr
End
56
12,020
76
11/20/2018
River Ave
38th St
40th St
28
12,040
87
11/24/2018
River Ave
40th St
42nd St
28
12,600
90
11/24/2018
River Ave
42nd St
Channel PI
28
9,520
89
11/5/2018
River Ave
Alley #325
Balboa Blvd
25
8,250
85
11/5/2018
River Ave
Balboa Blvd
51st St
38
41,800
89
11/19/2018
River Ave
51st St
End
38
47,500
90
11/19/2018
Rivera Ter
Seaward Rd
End
23
8,544
87
3/26/2018
Riverside Ave
Coast Highway West
Avon St (West Side)
52
24,700
73
11/20/2018
Riverside Ave
Avon St
Cliff Dr
52
49,036
87
11/19/2018
Riverside Ave
Cliff Dr
15th St
34
47,600
80
11/19/2018
Riverside Dr
Indus St
End
33
8,430
77
3/13/2018
Riverside Dr
Orchard Dr
End
33
18,960
79
3/13/2018
Rockford PI
Rockford Rd
End
37
11,050
58
2/27/2018
Rockford Rd
Surrey Dr
Cortland Dr
37
24,827
66
2/27/2018
Rocky Point Rd
Goleta Point Dr
End
32
16,380
49
2/26/2018
30 of 38 5-100
Local
Street Name
Roxbury Rd
Ruby Ave
Ruby Ave
Ruby Ave
Ruth Ln
Rutland Rd
Sabrina Ter
Salt Air Cir
Salt Air Dr
San Bernardino Ave
San Bernardino Ave
San Bernardino Ave
San Clemente Dr
San Joaquin Hills Rd
San Joaquin Hills Rd EB
San Joaquin Hills Rd WB
San Martin Way
San Mateo Way
San Nicolas Dr
Sand Key
Sand Point Way
Sandalwood Ln
Sandcastle Dr
Sandcastle Dr
Sandcastle Dr
Sandcastle Dr
Sandcastle Dr
Sandpiper Dr
SanduneLn
Santa Ana Ave
Santa Ana Ave
Santa Ana Ave
Santa Ana Ave
Santa Ana Ave
Santa Ana Ave
From
Cameo Shores Rd
Bay Front North
Balboa Ave
Park Ave
Estelle Ln
Mariners Dr
Seadrift Dr
Salt Air Dr
Salt Air Cir
15th St
Clay Ave
Clay Ave
Santa Barbara Dr
Backbay Dr
800' E of Backbay Dr
Jamboree Rd
Bodega Bay Dr
Bodega Bay Dr
Newport Center Dr East
Park Green Dr
Windover Dr
Santiago Dr
Marguerite Ave
Tiller Way
Inlet Isle Dr
Park Green Dr
Seacrest Dr
Ebbtide Rd
Inlet Isle Dr
Old Newport Blvd
Cliff Dr
Cliff Dr
Clay St
Clay St
15th St
Appendix B
Complete Street Listing Current Conditions
Local
To
Milford Dr
Balboa Ave
Park Ave
Bay Front South
Marian Ln
Westcliff Dr
Angelita Dr
End
Lighthouse Ln
Clay Ave
Cliff Dr
Cliff Dr
Santa Cruz Dr
800' E of Backbay Dr
Jamboree Rd
800' E of Backbay Dr
San Mateo Way
San Martin Way
Avocado Ave
End
Wavecrest Dr
Candlestick Ln
Tiller Way
Inlet Isle Dr
Park Green Dr
Seacrest Dr
Catamaran Dr
Setting Sun Dr
End
Cliff Dr
Clay St
Clay St
15th St
15th St
City Limit
Width of
Segment
33
28
28
27
34
36
33
32
32
34
20
14
48
31
30
47
36
32
78
33
36
35
36
36
36
36
36
33
32
24
34
20
36
20
19
Pavement
Area
39,501
12,768
12,180
11,286
22,654
48,600_
56,826
13,520
18,420
21,420
17,200
12,040_
54,720
29,386
32,960
44,498
30,450
21,980
84,240
17,783
11,580
14,670
6,948
93,168
23,544
35,100
52,740
14,855
23,240
18,000
56,270
33,100
22,572
12,540
12,160
Current
PCI
99
50
50
50
89
95
83
87
84
79
75
78
86
66
61
76
67
64
50
95
85
96
73
79
83
81
80
87
95
94
94
86
89
76
74
Sorted by Street Name
Inspection
2/28/2018
3/27/2018
3/27/2018
3/27/2018
11/20/2018
11/20/2018
3/6/2018
3/1/2018
3/1/2018
11/19/2018
11/24/2018
11/19/2018
3/14/2018
3/8/2018
3/8/2018
3/29/2018
2/26/2018
2/26/2018
3/28/2018
3/1/2018
3/5/2018
11/20/2018
3/1/2018
3/1/2018
3/1/2018
3/1/2018
3/1/2018
3/5/2018
3/1/2018
11/19/2018
11/19/2018
11/24/2018
11/19/2018
11/24/2018
11/19/2018
31 of 38 5-101
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Santa Barbara Dr
Jamboree Rd
Newport Center Dr West
73
184,325
82
3/14/2018
Santa Isabel Ave
Irvine Ave
Tustin Ave
56
16,240
95
11/20/2018
Santana Dr
Dolphin Ter
Bonnie Doone Ter
33
1 12,375
91
3/6/2018
Santanella Ter
Patolita Dr
Malabar Dr
33
52,965
88
3/6/2018
Santiago Dr
Irvine Ave
Galaxy Dr
36
31,464
72
11/20/2018
Santiago Dr
Galaxy Dr
Antigua Way
36
84,492
94
11/20/2018
Santiago Dr
Antigua Way
Mariners Dr
36
34,308
95
11/20/2018
Santiago Dr
Mariners Dr
Nottingham Rd
36
84,960
81
11/20/2018
Santiago Dr
Nottingham Rd
Pescador Dr
36
52,020
92
11/20/2018
Santiago Dr
Pescador Dr
Polaris Dr
37
15,178
54
11/20/2018
Sapphire Ave
Bay Front North
Balboa Ave
27
14,580
29
3/27/2018
Sapphire Ave
Balboa Ave
Park Ave
27
11,313
27
3/27/2018
Sapphire Ave
Park Ave
Bay Front South
28
12,180
33
3/14/2018
Sausalito Dr
Marguerite Ave
End
36
23,100
93
3/1/2018
Schooner Rd
Beacon Bay
End
24
6,960
86
3/15/2018
Scott Dr
Corinthian Way
Dove St
44
22,572
88
3/12/2018
Sea Gull Ln
Sherington PI
16th St
37
33,300
49
11/20/2018
Sea Ln
Crown Dr
Harbor View Dr
38
40,964
69
3/1/2018
Sea Ln
Harbor View Dr
Goldenrod Ave
37
49,580
87
3/1/2018
Seabreeze Ln
Tiller Way
Surfview Ln
32
36,520
88
3/1/2018
Seacrest Dr
Catamaran Dr
Sandcastle Dr
32
47,200
85
3/28/2018
Seadrift Dr
Malabar Dr
Zahma Dr
37
61,420
88
3/6/2018
Seashore Dr
32nd St
33rd St
33
7,425
79
11/24/2018
Seashore Dr
36th St
33rd St
28
19,320
91
11/5/2018
Seashore Dr
39th St
36th St
28
19,320
93
11/5/2018
Seashore Dr
42nd St
39th St
28
18,200
91
11/5/2018
Seashore Dr
42nd St
45th St
28
17,640
89
11/5/2018
Seashore Dr
46tth St
45th St
28
5,740
89
11/5/2018
Seashore Dr
46th St
53rd St
28
42,000
94
11/19/2018
Seashore Dr
53rd St
60th St
28
42,000
93
11/19/2018
Seashore Dr
60th St
Prospect St
28
17,640
95
11/19/2018
Seashore Dr
Prospect St
Orange St
28
29,820
79
11/19/2018
Seashore Dr
Orange St
End
27
41,625
89
11/19/2018
Seaview Ave
Carnation Ave
Goldenrod Ave
30
25,710
46
3/13/2018
Seaview Ave
Goldenrod Ave
Jasmine Ave
30
27,270
52
3/13/2018
32 of 38 5-102
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Seaview Ave
Jasmine Ave
Marguerite Ave
30
16,890
64
3/13/2018
Seaview Ave
Marguerite Ave
Narcissus Ave
30
18,450
50
3/13/2018
Seaview Ave
Narcissus Ave
Orchid Ave
28
7,040
90
3/13/2018
Seaview Ave
Orchid Ave
Poinsettia Ave
28
7,425
90
3/13/2018
Seaview Ave
Poinsettia Ave
Poppy Ave
28
7,560
87
3/13/2018
Seaward Rd
Isabella Ter
De Anza Dr
35
54,040
86
2/28/2018
Seaward Rd
De Anza Dr
Serra Dr
35
31,990
86
2/28/2018
Seaward Rd
Serra Dr
Coast Highway East
35
12,215
89
2/28/2018
Seaward Rd
Coast Highway East
Evening Canyon Rd
37
9,195
88
3/1/2018
Seaward Rd
Evening Canyon Rd
Driftwood Rd
27
7,749
82
3/1/2018
Second Ave
Avocado Ave
Carnation Ave
28
25,144
97
3/7/2018
Second Ave
Carnation Ave
Heliotrope Ave
28
33,600
93
3/7/2018
Second Ave
Jasmine Ave
Marguerite Ave
27
14,472
79
3/19/2018
Second Ave
Marguerite Ave
Narcissus Ave
27
15,498
82
3/19/2018
Second Ave
Narcissus Ave
Orchid Ave
27
7,263
83
3/19/2018
Second Ave
Orchid Ave
Poinsettia Ave
27
7,236
81
3/19/2018
Second Ave
Poinsettia Ave
Poppy Ave
27
7,290
76
3/19/2018
Second Ave
Poppy Ave
Hazel Ave
27
3,375
79
3/19/2018
Serenade Ter
Dolphin Ter
Ramona Dr
33
33,000
89
3/6/2018
Serra Dr
Seaward Rd
De Anza Dr
35
45,675
89
2/28/2018
Serrano Ave
M St
Granada Ave
30
5,550
92
11/24/2018
Setting Sun Dr
Pebble Dr
Sandpiper Dr
33
32,576
65
3/5/2018
Seville Ave
Balboa Blvd East
M St
30
20,250
84
11/24/2018
Seville Ave
M St
Channel Rd
30
14,550
79
11/24/2018
Shell St
Way Ln
End
32
3,770
91
3/26/2018
Sherington PI
Irvine Ave
Sea Gull Ln
37
52,984
51
11/20/2018
Shipway Ln
Tradewinds Ln
Skylark Ln
38
29,716
96
11/20/2018
Shorecliff Rd
Evening Canyon Rd
End
27
26,559
73
3/1/2018
Short St
Newport Blvd
Clubhouse Ave
32
4,320
78
11/6/2018
Short St
Clubhouse Ave
End
16
5,040
74
11/6/2018
Sierra Vista
Tustin Ave
End
32
20,132
96
11/20/2018
Signal Rd
Kings Rd
15th St
35
41,650
94
11/20/2018
Silver Ln
Anniversary Ln
End
33
11,220
65
11/20/2018
Skylark Ln
Highland Dr
Commodore Rd
37
9,065
96
11/20/2018
Skylark Ln
Commodore Rd
Holiday Rd
38
41,344
94
11/20/2018
33 of 38 5-103
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Snug Harbor Rd
Cliff Dr
Clay St
35
32,760
93
11/20/2018
Somerset Ln
Highland Dr
Highland Dr
34
50,330
93
11/20/2018
Sonora St
Seashore Dr
Ocean Front Alley West
16
1,520
94
11/19/2018
Sonora St
Ocean Front Alley West
Ocean Front West
19
1,330
88
11/24/2018
Spruce Ave
Bristol St South
Azure Ave
35
63,840
86
3/12/2018
Spruce St
Bristol St North
Quail St
60
36,000
81
3/12/2018
St Andrews Rd
Kings Rd
Clay St
34
35,530
58
11/20/2018
St Andrews Rd
Clay St
15th St
34
20,400
53
11/20/2018
St James PI
15th St
St James Rd
35
24,635
94
11/20/2018
St James Rd
15th St
St James PI
35
35,275
93
11/20/2018
Starboard Way
Windover Dr
Wavecrest Dr
32
11,424
86
3/5/2018
Starlight Cir
Commodore Rd
Glenwood Ln
35
8,155
96
11/20/2018
Starlight Cir
Glenwood Ln
End
33
8,935
96
11/20/2018
Summit St
Seashore Dr
End
18
3,150
91
11/19/2018
Sundance Dr
19th St
End
29
17,400
81
11/19/2018
Sunset Dr
Lugonia St
End
29
10,527
91
11/19/2018
Surfline Way
Windover Dr
Wavecrest Dr
32
22,556
82
3/5/2018
Surfview Ln
Tiller Wy
Seabreeze Lane
32
24,040
90
3/1/2018
Surrey Dr
Rockford Rd
Cameo Highland Dr
33
36,399
70
2/27/2018
Surrey Dr
Cameo Highland Dr
Garret Dr
33
21,120
69
2/27/2018
Sussex Ln
Dover Dr
Cumberland Ln
34
41,570
91
11/20/2018
Sylvia Ln
Beryl Ln
Deborah Ln
34
16,308
93
11/20/2018
Tahuna Ter
Marapata Dr
Angelita Dr
33
40,755
89
3/6/2018
Teller Ave
Campus Dr
Birch St
44
39,100
84
3/29/2018
Teresita Ln
Kathleen Ln
Vivian Ln
35
19,150
89
11/20/2018
Terrace Ridge
Newport Ridge Dr West
End
38
23,000
87
2/27/2018
Terrapin Way
Shipway Ln
Marlin Way
33
15,450
90
11/20/2018
Third Ave
Avocado Ave
Acacia Ave
27
7,290
94
3/7/2018
Third Ave
Acacia Ave
Begonia Ave
27
7,155
90
3/7/2018
Third Ave
Begonia Ave
Carnation Ave
27
7,155
94
3/7/2018
Third Ave
Dahlia Ave
Fernleaf Ave
27
7,155
93
3/21/2018
Third Ave
Heliotrope Ave
Iris Ave
27
7,101
87
3/19/2018
Third Ave
Iris Ave
Jasmine Ave
27
7,290
73
3/26/2018
Third Ave
Jasmine Ave
Larkspur Ave
27
7,290
82
3/19/2018
Third Ave
Larkspur Ave
Marguerite Ave
27
7,452
85
3/19/2018
34 of 38 5-104
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Third Ave
Marguerite Ave
Marigold Ave
28
7,616
66
3/19/2018
Third Ave
Marigold Ave
Narcissus Ave
28
7,420
70
3/19/2018
Third Ave
Narcissus Ave
Orchid Ave
28
7,392
72
3/19/2018
Third Ave
Orchid Ave
Poinsettia Ave
28
7,420
80
3/19/2018
Third Ave
Poinsettia Ave
Poppy Ave
28
7,560
86
3/19/2018
Tiburon Bay Dr
Carmel Bay Dr
Point Arena Way
32
31,104
57
3/29/2018
Tiller Way
Sandcastle Dr
Sausalito Dr
36
53,100
85
3/1/2018
Topaz Ave
Collins Ave
Park Ave
23
5,474
36
3/28/2018
Topaz Ave
Park Ave
Bay Front South
24
13,920
30
3/28/2018
Topside Ln
Sandcastle Dr
Inlet Isle Dr
32
20,782
94
3/1/2018
Toyon Ln
Holiday Rd
Nautilus Ln
33
15,285
94
11/20/2018
Tradewinds Ln
Santiago Dr
Commodore Rd
38
86,450
93
11/20/2018
Tremont Ln
Cameo Shores Rd
Milford Dr
33
46,860
99
2/28/2018
Turquoise Ave
Bay Front South
Park Ave
28
14,000
25
3/28/2018
Tustin Ave
Coast Highway West
Ocean View Ave (S))
34
13,600
95
11/20/2018
Tustin Ave
Ocean View Ave
Cliff Dr
26
12,480
93
11/19/2018
Tustin Ave
Cliff Dr
Clay St
35
28,245
71
11/19/2018
Tustin Ave
Clay St
15th St
35
22,155
81
11/19/2018
Tustin Ave
Emerson St
Francisco Dr
37
31,503
94
11/20/2018
Tustin Ave
150' South of Windward Ln
Santiago Dr
18
11,900
93
11/20/2018
Tustin Ave
Santiago Dr
23rd St
34
44,370
89
12/16/2016
Tustin Ave
South End
Santa Isabel Ave
37
12,700
85
11/20/2018
Tustin Ave
Santa Isabel Ave
North End
37
25,400
88
11/20/2018
Twin Lakes Cir
Carmel Bay Dr
End
32
6,684
48
2/26/2018
University Dr
Irvine Ave
South End
40
50,400
95
11/20/2018
Upper Bay Dr
Mesa Dr
Orchid Hill PI
36
18,972
85
3/12/2018
Via Antibes
Via Lido Soud
Via Lido Nord
36
8,928
97
11/6/2018
Via Antibes
Via Lido Nord
Via Lido Soud
36
8,928
95
11/8/2018
Via Barcelona
Via Lido Soud
Via Lido Nord
20
6,540
97
11/8/2018
Via Cordova
Via Lido Soud
Via Lido Nord
20
9,000
95
11/8/2018
Via Dijon
Via Lido Soud
Via Lido Nord
20
11,400
90
11/8/2018
Via Eboli
Via Lido Soud
Via Lido Nord
20
14,040
91
11/8/2018
Via Fermo
Via Lido Soud
Via Firenze
16
4,096
97
11/8/2018
Via Firenze
Via Lido Nord
Piazza Lido
16
7,152
94
11/13/2018
Via Firenze
Piazza Lido
Via Lido Soud
16
5,696
95
11/8/2018
35 of 38 5-105
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Via Florence
Via Lido Soud
Piazza Lido
24
6,480
97
11/8/2018
Via Genoa
Via Lido Soud
Piazza Lido
43
18,920
93
11/8/2018
Via Genoa
Piazza Lido
Via Lido Nord
43
19,178
96
11/8/2018
Via Graziana
Via Havre
Piazza Lido
18
8,820
91
11/8/2018
Via Graziana
Piazza Lido
Via Lido Nord
16
7,520
89
11/8/2018
Via Havre
Via Lido Soud
Piazza Lido
23
10,925
81
11/8/2018
Via Ithaca
Via Lido Soud
Via Lido Nord
20
19,400
88
11/8/2018
Via Jucar
Via Lido Soud
Via Lido Nord
23
21,275
92
11/8/2018
Via Koron
Via Lido Soud
Via Lido Nord
23
20,930
95
11/8/2018
Via Lido
Bridge (West End)
Via Lido Soud
22
28,420
98
11/8/2018
Via Lido Nord
Via Lido Soud (East Side)
Via Zurich
33
1 18,647
80
11/8/2018
Via Lido Nord
Via Zurich
Via Waziers
33
17,820
87
11/8/2018
Via Lido Nord
Via Waziers
Via San Remo
33
21,813
78
11/8/2018
Via Lido Nord
Via San Remo
Via Palermo
33
17,853
74
11/8/2018
Via Lido Nord
Via Palermo
Via Lorca
33
21,318
75
11/8/2018
Via Lido Nord
Via Lorca
Via Genoa
33
25,377
81
11/8/2018
Via Lido Nord
Via Genoa
Via Dijon
33
18,843
77
11/8/2018
Via Lido Nord
Via Dijon
Via Antibes
33
17,490
78
11/8/2018
Via Lido Nord
Via Antibes
Via Lido Soud (West Side)
20
9,200
84
11/8/2018
Via Lido Soud
Via Lido Nord (West Side)
Via Antibes
20
6,800
92
1/17/2017
Via Lido Soud
Via Antibes
Via Dijon
33
20,625
71
11/8/2018
Via Lido Soud
Via Dijon
Via Genoa
33
27,060
75
11/8/2018
Via Lido Soud
Via Genoa
Via Koron
33
28,050
73
11/8/2018
Via Lido Soud
Via Koron
Via Orvieto
33
21,780
76
11/8/2018
Via Lido Soud
Via Orvieto
Via San Remo
33
22,110
71
11/8/2018
Via Lido Soud
Via San Remo
Via Venezia
33
17,160
77
11/8/2018
Via Lido Soud
Via Venezia
Via Zurich
33
21,780
77
11/8/2018
Via Lido Soud
Via Zurich
Via Lido Nord (East Side)
53
24,965
81
11/8/2018
Via Lorca
Via Lido Soud
Via Lido Nord
20
17,500
95
11/8/2018
Via Malaga
Via Oporto
Via Lido
22
6,490
73
11/8/2018
Via Marina
Tustin Ave
End
33
18,538
95
11/20/2018
Via Mentone
Vai Lido Soud
Via Lido Nord
20
17,000
88
11/8/2018
Via Nice
Via Lido Soud
Via Lido Nord
20
16,200
93
11/8/2018
Via Oporto
32nd St
Via Lido
23
13,225
98
11/8/2018
Via Oporto
Via Lido
Central Ave
29
17,400
100
12/8/2014
36 of 38 5-106
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Via Orvieto
Via Lido Soud
Via Lido Nord
23
18,055
93
11/8/2018
Via Palermo
Via Lido Soud
Via Lido Nord
22
16,764
87
11/8/2018
Via Quito
Vai Lido Soud
Via Lido Nord
20
14,200
92
11/8/2018
Via Ravenna
Via Lido Soud
Via Lido Nord
20
13,200
86
11/8/2018
Via San Remo
Via Lido Soud
Via Lido Nord
23
15,240
98
11/8/2018
Via Trieste
Via Lido Soud
Via Lido Nord
20
12,000
95
11/8/2018
Via Undine
Via Lido Soud
Via Lido Nord
20
11,400
90
11/8/2018
Via Venezia
Via Lido Soud
Via Lido Nord
20
10,700
95
11/8/2018
Via Waziers
Via Lido Soud
Via Lido Nord
23
11,845
98
11/8/2018
Via Xanthe
Via Lido Soud
Via Lido Nord
20
9,800
96
11/8/2018
Via Yella
Via Lido Soud
Via Lido Nord
20
9,300
89
11/8/2018
Via Zurich
Via Lido Soud
Via Lido Nord
21
9,030
96
11/8/2018
Villa Way
28th St
29th St
25
8,000
76
11/8/2018
Villa Way
29th St
32nd St
22
17,160
94
11/6/2018
Vista Baya
West End
Tustin Ave
33
19,891
85
11/20/2018
Vista Baya
Tustin Ave
East End
24
13,305
88
11/20/2018
Vista Del Oro
Eastbluff Dr (South End)
Vista Caudal
36
103,068
63
3/29/2018
Vista Del Oro
Vista Caudal
Vista Entrada
35
36,400
74
3/29/2018
Vista Del Oro
Vista Entrada
Vista Del Sol
35
76,475
78
3/29/2018
Vista Del Oro
Vista Del Sol
Vista Nobleza
35
74,900
78
3/8/2018
Vista Del Oro
Vista Nobleza
Vista Umbrosa
35
65,800
74
3/8/2018
Vista Del Oro
Vista Umbrosa
Eastbluff Dr (North End)
35
26,425
74
3/8/2018
Vista Del Sol
Vista Del Oro
Eastbluff Dr
60
28,200
91
3/8/2018
Vista Ridge Rd
Newport Coast Dr
Altezza Dr
37
55,241
79
2/27/2018
Vista Ridge Rd
Altezza Dr
Ocean Heights Dr
37
68,709
86
2/27/2018
Vista Ridge Rd
Ocean Heights Dr
Coastal Canyon Dr
37
76,479
88
2/27/2018
Vista Ridge Rd
Coastal Canyon Dr
Ocean Heights Dr
37
62,715
88
2/27/2018
Vista Ridge Rd
Ocean Heights Dr
Ridge Park Rd
37
22,903
86
2/27/2018
Vivian Ln
Beryl Ln
Diana Ln
34
28,196
84
12/21/2016
Walnut St
Prospect St
Newport Shores Dr
29
25,694
59
11/19/2018
Walnut St
Newport Shores Dr
Coast Highway West
19
3,135
87
11/19/2018
Walnut St
Seashore Dr
Ocean Front Alley West
18
990
89
11/19/2018
Walnut St
Ocean Front Alley West
Ocean Front West
19
1,330
88
11/24/2018
Warwick Ln
Estelle Ln
Marian Ln
33
24,486
91
12/21/2016
Warwick Ln
Marian Ln
Nottingham Rd
33
8,052
88
11/20/2018
37 of 38 5-107
Appendix B
Complete Street Listing Current Conditions
Local
Sorted by Street Name
Local
Street Name
From
To
Width of
Segment
Pavement
Area
Current
PCI
Inspection
Washington St
Edgewater PI
Bay Ave East
18
1,800
90
11/24/2018
Washington St
Bay Ave East
Balboa Blvd East
20
2,800
87
11/8/2018
Washington St
Balboa Blvd East
Ocean Front Alley East
14
1 1,190
97
11/8/2018
Washington St
Ocean Front East
Ocean Front Alley East
14
1,890
97
11/8/2018
Waterfront Dr
Avocado Ave
Acacia Ave
30
8,430
94
3/7/2018
Wavecrest Dr
Surfline Wy
Sand Point Wy
36
41,660
81
3/5/2018
Way Ln
Dahlia Ave
Fernleaf Ave
15
4,710
93
3/26/2018
Way Ln
Fernleaf Ave
Shell St
15
6,285
93
3/26/2018
Wayne Rd
Rockford Rd
Cameo Highlands Dr
33
22,935
59
2/27/2018
West Wind Way
Polaris Dr
End
34
29,448
96
11/20/2018
Westcliff Dr
Dover Dr
Santiago Dr
32
48,992
96
11/20/2018
Westerly PI
Dove St
Quail St
44
61,864
80
3/12/2018
Westminster Ave
Old Newport Blvd
15th St
36
61,920
94
11/19/2018
White Cliffs Dr
Polaris Dr
North Star Ln
38
8,400
96
11/20/2018
White Sails Way
Crown Or
Harbor View Or
33
34,485
84
3/5/2018
Windover Dr
Surfline Way
Sand Point Way
36
38,328
81
3/5/2018
Windward Ln
Tustin Ave
Irvine Ave
33
42,570
94
11/20/2018
Windward Ln
Tradewinds Ln
Leeward Ln
33
48,060
95
11/20/2018
Yawl Rd
Beacon Bay
End
24
6,000
87
3/15/2018
Zahma Dr
Kewamee Dr
Chubasco Dr
37
19,610
85
3/5/2018
Zenith Ave
Bayview Ave
Spruce Ave
35
9,905
84
3/12/2018
Zenith Ave
Spruce Ave
Orchid St
35
9,940
81
3/12/2018
Zurich Cir
Via Zurich
Via Zurich
16
7,200
96
11/8/2018
38 of 38 5-108
m
OCTA
Pavement Management Plan Agency Submittal
XIII. Appendix C — Quality Assurance/Quality Control Plan
Introduction
When performing data collection in any field, the need for quality control is paramount as it is essential for
accurate planning, analysis and design. This is particularly true for collecting pavement distress data for a
pavement management system.
The Quality Assurance/Quality Control (QA/QC) Plan establishes minimum quality standards for performance
and procedures for updates of the pavement management system.
If applicable, utilize the space below to include information on the agency's QA/QC policies:
Page 1 12
5-109
Pavement Management Plan
Quality Control Plan
February 2019
4ft,
SJO
NCE
Fountain Valley, CA
17050 Bushard St. Suite 200
Fountain Valley, CA 92708
The contents of this report is the confidential property of
NCE and should not be copied, modified, retransmitted, or
used for any purpose except with NCE's written
authorization.
Engineering & Environmental Services
5-111
4 WPO
O
L"1 AV
GeLIFO
TABLE OF CONTENTS
City of Newport Beach
Pavement Management Plan 2019
Quality Control Plan
1. Introduction........................................................................ 1
1.1. Objectives..................................................................................... 1
1.2. Structure...................................................................................... 1
2. Quality Control Plan............................................................ 2
2.1. Condition Inspection Procedures....................................................... 2
2.2. Accuracy Required For Data Collection .............................................. 3
2.3. Inspectors' Qualifications and Experience .......................................... 4
3. Safety Procedures............................................................... 5
Appendix A - Resumes of Field Inspectors
Engineering & Environmental Services
5-112
4 WPO
O
L"1 AV
Gecrruseo-s
1. Introduction
City of Newport Beach
Pavement Management Plan 2019
Quality Control Plan
When performing data collection in any field, the need for quality control is paramount. This
need for quality data is essential for accurate planning, analysis and design. NCE's "Quality
Assurance Management Plan" (QAMP) affirms that:
"NCE is dedicated to achieving technical and management excellence and to
delivering professional engineering and environmental services that meet or
exceed our clients' needs. NCE's Quality Assurance/Quality Control (QA/QC)
Program is designed to achieve these goals. This QA Management Plan
(QAMP) describes NCE's QA Program, which is based on four principles: client
satisfaction, employee participation, problem prevention, and continuous
quality improvements. "
NCE's QAMP establishes minimum quality standards for performance and procedures for
assuring that our clients receive quality service. It requires the participation of employees at
every level. It encourages Project Managers and technical staff to take pride in their work
and responsibility for ensuring that the work is done correctly the first time. The program is
designed to reduce the incidence of problems related to quality and results in
implementation, where necessary, of corrective actions and modification of work procedures
to minimize the incidence of future problems.
NCE has also prepared detailed and specific Quality Control Plans for projects, and the most
notable example is for the Long Term Pavement Performance (LTPP) — Western
Regional Support Contract for the Federal Highway Administration. This is a 150 page
document that covers data collection on highways, including deflection, profile, pavement
distresses, traffic, maintenance and rehabilitation history, materials testing and sampling as
well as a document control.
1.1. Objectives
This document constitutes a formal Quality Control Plan (QCP) for the City of Newport
Beach. The focus is on data collection issues as part of the pavement management update.
Specifically, it is intended for the 2019 Pavement Management Plan Update. The focus is
on the collection of network -level pavement distress data (defined by NCHRP Synthesis 401
Quality Management of Pavement Data Collection, as "Network -level data collection
involves collection of large quantities of pavement condition data, which is often
converted to individual condition indices or aggregated into composite condition indices.")
1.2. Structure
The following components are addressed in this QCP:
• Condition inspection procedures used
• Accuracy required for data collection
• Inspector qualifications and experience
• Safety
1
Engineering & Environmental Services
5-113
4WPO�T
O
AV City of Newport Beach
'.F4 Pavement Management Plan 2019
Gr4ru
Quality Control Plan
2. Quality Control Plan
2.1. Condition Inspection Procedures
The governing document in performing condition inspections for the City of Newport Beach
is ASTM D6433-16 "Standard Practice for Roads and Parking Lots Pavement Condition Index
(PCI) Surveys." Both asphalt concrete (AC) and Portland cement concrete (PCC) pavements
are included in this protocol. The following distresses are collected for each pavement type.
Asphalt Concrete (AC) Pavements
1. Alligator (fatigue) cracking
2. Bleeding
3. Block cracking
4. Bumps and sags
5. Corrugation
6. Depression
7. Edge cracking
8. Joint reflection cracking
9.Lane/Shoulder drop off
10. Longitudinal and transverse cracking
11. Patching and utility cut patching
12. Polished aggregate
13. Potholes
14. Railroad crossing
15. Rutting
16. Shoving
17. Slippage cracking
18. Swell
19. Weathering
20. Raveling
Portland Cement Concrete (Jointed)
1. Blowup/Buckling
2. Corner breaks
3. Divided slab
4. Durability ("D") cracking
5. Faulting
6. Joint seal damage
7. Lane/shoulder drop off
8. Linear cracking
9. Patching (large) and utility cuts
10. Patching (small)
11. Polished aggregate
12. Popouts
13. Pumping
14.Punchout
15. Railroad crossing
16. Scaling, map cracking and crazing
17. Shrinkage cracks
18. Spalling (corner)
19. Spalling (joint)
Any exceptions to the above procedures will be discussed with the City before any
inspections are performed. These are usually related to distresses or situations that are not
covered in the manuals. Examples include slippage cracks, roller check marks or edge
cracking on streets with no curbs and gutters. Others include the use of seals or open -
graded asphalt concrete mixes. Any modifications will be documented and submitted to the
City for approval.
All distress or condition inspections are performed as walking inspections, and a minimum
10% sampling rate is utilized. Field crews are typically composed of a one-person crew
teaming up when required for higher volume facilities such as arterials. The sample units for
this project will be based upon the length and width of the street sections. This data will be
collected to match the existing management sections of PAVER°.
2
Engineering & Environmental Services
5-114
44gvvro,�T
o
+. IV
Gfc+fosx
2.2. Accuracy Required For Data Collection
City of Newport Beach
Pavement Management Plan 2019
Quality Control Plan
The accuracy required for data collection has two components, both of which are further
described in the following paragraphs.
• Re -inspections
• PCI comparisons with past inspections
2.2.1 Re -Inspection "Check"
At least five percent of all inspections are randomly re -inspected by other team members.
A different inspector will review these sites and determine the revised pavement distress
measurements. If the initial inspection is determined to be inaccurate, the original inspector
is given refresher training before being allowed to continue with any further inspections.
Should the data be inaccurate for a certain day, all the data for that day will be re -inspected
following refresher training to ensure accuracy.
Acceptability Criteria
At the time of re -inspection, the actual distresses will be re -inspected and verified, and any
corrections made, if necessary. Distress types and severities must be the same and re-
measured quantities within ±10% of the original measured quantity.
If corrections are required on more than 10% of the re -inspected sample units, then an
additional 5% will be re -inspected. This will continue until more than 95% of the re-
inspected sections meet the acceptability criteria.
2.2.2 PCI Comparison with Past Inspections
As another level of quality control, the new PCIs are compared with the previous PCIS. If
they differ by more than ±10 PCI points, these sections are automatically flagged for further
investigation.
If PCI Increases 10 points:
The section is investigated to see if a maintenance and rehabilitation event has occurred
since the last inspection, but which has not been recorded. This can only be resolved with
feedback from the City. Typically, it may include activities such as:
• Crack sealing activities - changes medium or high severity cracking to low severity
• Patching activities - alligator cracking that has been removed and patched, so that
the resultant PCI is increased.
• Surface seals
• Overlay
3
Engineering & Environmental Services
5-115
44gvvro,�T
o
+. IV
Gfc+fosx
City of Newport Beach
Pavement Management Plan 2019
Quality Control Plan
Therefore, an up-to-date maintenance and rehabilitation history file in the PAVER° database
is desirable, both for historical accuracy as well as to provide additional quality control.
If PCI Decreases 10 points:
The section is checked to see if the average deterioration rate (usually 3 to 4 points per
year) is exceeded. If the drop in PCI is within the range of what is acceptable, no further
action is required. If the drop is more than the acceptable range, a re -inspection will be
performed. The default performance curves in the pavement management software form
the basis for what is acceptable.
2.3. Inspectors' Qualifications and Experience
All NCE's inspectors are required to attend formal training on condition distress inspections.
For example, any of the NCE inspectors working on the LTPP project are required to attend
a week-long training workshop every year to maintain their certifications.
The Orange County Transportation Agency (OCTA) prequalifies pavement inspectors for
work within the County of Orange. This prequalification covers the distresses associated
with the ASTM D6433 test method by assessing each inspector's knowledge of the
distresses, severity levels and how to quantify each distress. Each inspector must renew
their prequalification every two years.
The Metropolitan Transportation Commission (MTC), requires all inspectors working on
pavement management projects funding by MTC to be certified every two years. Each
inspector must attend the distress training class provided by MTC. Then they are required to
undergo field testing on their knowledge and complete an online test.
Finally, NCE conducts a one -day training and calibration workshop for all NCE staff involved
with data collections. This is conducted once a year. The following table lists the inspectors
to be assigned to this project, when their last training was and who conducted it.
Franc Escobedo November 1, 2018 Lisa K. Senn
Meiling Cai November 1, 2018 Lisa K. Senn
Resumes of technicians utilized on this project are included in Appendix A.
Is
Engineering & Environmental Services
5-116
44gvvro,�T
o
+. IV
Gfc+fosx
3. Safety Procedures
City of Newport Beach
Pavement Management Plan 2019
Quality Control Plan
NCE administers a health and safety program in compliance with the Nevada Occupational
Safety and Health Act (Section 618.383) and Cal OSHA Title VIII, Section 3203. The
program is documented in NCE's Workplace Safety Program Manual.
Generally, the safety procedures include:
• Inspectors to wear a Class 2 safety vest at all times;
• Flashing beacon on all vehicles utilized for inspections; and
• Stopped vehicles to be parked at locations away from moving traffic (e.g. nearby
parking, shoulders etc.).
On streets where there is a high volume of traffic or high speeds, additional measures may
be necessary, such as:
• Inspections to occur during off-peak periods or on weekends;
• Additional inspector to watch out for traffic; and
• Traffic flaggers in extreme cases.
In extreme cases where it is not possible to walk on the pavement surface, inspections will
be performed from sidewalks or raised medians. However, this is extremely rare for city or
county roads/streets; this is most often encountered on state highways, and lane closures
are the most likely option at this point.
All NCE inspectors are required to annually update their online safety programs as
administered by "Click Safety". Class Taken are:
• C2 Cal PPE
• C2 Workzone Traffic Control
• C2 Workzone Traffic Safety Tips
• G2 Cal/OSHA Heat Illness
5
Engineering & Environmental Services
5-117
Appendix A
Resumes of Field Inspectors
Engineering & Environmental Services
5-118
Franc Escobedo
Engineering Field Technician
Franc has over 15 years of experience as a pavement management technician
for NCE. He has performed numerous pavement condition inspections
throughout California, Idaho and Washington. His experience includes distress
collection across various Pavement Management Systems, including the
Metropolitan Transportation Commission StreetSaver, PAVER, Cartegraph, and
Hansen systems.
Additionally, Franc has completed both the OCTA PAVER and MTC "Distress
Identification" courses for both Asphalt Concrete and Portland Cement
Pavements and now assists with the training of agency staff on both courses.
Franc performs all activities relating to pavement data collection using hardcopy
forms or tablets. As part of the quality control process, he performs cross-checks
of data in the PMS database. He regularly performs quality control checks of field
collected data and pavement maintenance history to ensure that PMS databases
are accurate and up-to-date. During this process, he generates detailed reports
that are necessary to perform his cross-checks of the collected data.
His field experience and expertise are added benefits to agencies during field
training. Listed below are a collection of agencies for which Mr. Escobedo has
performed condition inspections—they total over 6,000 centerline miles of roads
and streets.
Representative Projects
Pavement Management
Pavement Management Inspections
Engineering Field Technician
41 Ada County, Idaho 41 Hayward 41 San Diego County
:1 Agoura Hills 41 Hillsborough 41 San Ramon
1 Anaheim 41 Humboldt County 41 Santa Cruz County
41 Bakersfield 41 Inyo County 41 Seal Beach
=41 Bell 4: La Habra 41 Siskiyou County
41 Buena Park 41 Lake Forest 41 South Lake Tahoe
41 Camarillo 41 Lemon Grove 41 Stanislaus County
41 Chula Vista 41 Marin County 41 Stanton
41 Commerce 41 Martinez 41 Thousand Oaks
41 Corona 41 Mendocino County 41 Torrance
41 Cudahy 4: Milpitas 41 Tulare
41 Dana Point 41 Mission Viejo 41 Tuolumne County
41 EI Centro 41 Mono County 41 Tustin
41 EI Cerrito 41 Mountain View 41 Vallejo
41 Elk Grove 41 Orange County 41 Vernon
41 Encinitas 41 Palm Springs 41 Walnut Creek
41 Fremont 4: Redwood City 41 West Covina
41 Fullerton 41 San Clemente 41 West Sacramento
Projects included various forms of inspections for pavement distress data collection, such as walking, windshield, and/or semi -
automated.
5-119
;';NCS
Meiling Cali, EIT
Staff Engineer
Meiling joined NCE upon graduation and has since performed pavement condition
inspections throughout California and Idaho, as well as sidewalk and curb ramp
assessments. Her experience includes distress collection across various pavement
management systems.
Representative Projects
Citywide Sidewalk Assessment
City of Carson, CA
Field Technician. NCE inspected sidewalks and curb and gutter distresses on
approximately 203 centerline miles of streets using distress criteria developed in
consultation with the City. The primary emphasis of the assessment was to identify
tripping hazards resulting from damage to sidewalks, curbs and gutters, as well as
to identify locations with previous repairs. Locations where the sidewalk stopped
or was discontinuous were noted. This assessment included reviewing ADA
compliance for the curb ramps.
Sidewalk & Curb Ramp Assessment
City of Corona, CA
Field Technician. NCE performed condition assessments of approximately 350
centerline miles of sidewalks and 9,000 curb ramps. In addition, NCE provided
prioritization criteria as well as repair recommendations.
Pavement Management System and Update
City of Whittier, CA
Field Technician. NCE provided the PMP implementation of 195 centerline miles.
NCE converted old pavement inventory into the StreetSaver° database; reviewed
the inventory data; performed condition inspections; PCI calculation; imported
M&R history records; reviewed M&R strategies and costs; determined the funding
needs of the road network; calculated of multiple funding scenarios, linked the
database to GIS, performed City staff training and provided technical support.
Pavement Management Plan Updates
City of La Habra, CA
Field Technician. NCE provided a comprehensive pavement condition inspection of
the City's streets and alleys to prepare the 2015 update report to the Orange
County Transportation Authority. Updates included the Pavement Condition Index,
treatment, unit costs and cost of all segments of the City's streets.
Pavement Management Plan Updates
City of Manhattan Beach, CA
Field Technician. NCE updated the City's Pavement Management Program,
including inspection/evaluation of approximately 120 centerline miles of paved
streets, review and recommendation of revisions to the current pavement
management strategies and costs, as well as the preparation of a final Pavement
Management Program report.
Pavement Management Plan Updates
City of EI Centro, CA
Field Technician. NCE developed the City's Pavement Management System,
including detailed inspection and evaluation of the City's streets and
Education
BS, Civil Engineering, University of
California, Irvine,. 2014
Registrations and Certifications
Engineer Intern — Civil, CA
Joined NCE
2015
Total Years of Experience
3 years
5-120
recommendations for maintenance methodologies and pavement treatment options
Pavement Condition Inspection and Maintenance
City of Davis, CA
Field Technician. NCE is providing inventory verification, pavement condition inspections, sidewalk assessments, review and
evaluation of maintenance and rehabilitation decision strategies, budgetary analyses, GIS integration and staff training for
the University' pavement management program update.
Pavement Condition Inspection and Maintenance
Ada County Highway District, ID
Field Technician. NCE performed field pavement condition inspections on all the arterial and collectors (approximately 600
miles), as well as approximately 1,000 miles of residential streets. These were walking inspections as per the StreetSaver°
protocols. NCE updated the StreetSaver® database with the distress data collected, calculated the pavement condition
index and provided training on the StreetSaver® program, as well as a discussion of maintenance and rehabilitation
treatments for County staff.
FY 2015-2016 Annual Overlay and Slurry Seal Project
City of Santa Clarita, CA
Field Technician. The project involved pavement reconstruction and resurfacing of 67 City arterial, collector and residential
streets and two bike trails. The scope of work included site evaluation, FWD and coring (rehabilitation and close call
preventative streets only), field surveys for design, detailed street design, utility coordination, design development
meetings, PS&E and bidding and construction support services.
5-121
m
OCTA
Pavement Management Plan Agency Submittal
XIV. Appendix D — Pavement Management Data Files
The Pavement Management data files shall be submitted to OCTA in spreadsheet format. This must include the
following information:
• Street name and limits for all public streets
• Street identifiers (Branch ID, Section ID)
• Direction (if applicable)
• Beginning and ending of each section
• Length, widths, and true areas
• Functional Classification (MPAH, Local)
• Number of travel lanes
• PCI and date of inspection
• Type of recommended treatment
• Cost of recommended treatment
The Pavement Management data files are attached here as a CD, or included as Appendix D
XV. Appendix E — GIS Maps — Current Conditions (Optional)
If included, attach and label Appendix E.
Page 1 13
5-122
apDlls Ave LeBa'd Costa a Santa Anq,.
Park Fairy ��,�. Mesa .� Costa Mesa Countn },
M Park Country = Club XV
Club I
�z
.- ,�c W Wilson It P a
'-- Gisler Par - S a -
�Y� a Victoria St 55
kn` Fla miIto nAve
Lipper IVe•.vport
r' Talbert Q Pa ? Bay Regional Park
'g Regionald 2
_ n ` Perr W 19th St o p�• P
a Lions,
Par
0 a
Big
- Fie/ aark _.
wCoastH Y Big
[jewpolit . j ashio
��V!! Island
j Vlll�l��
O`cQO v C:
i
ti
c, lh'dliam Sand Canyon tYa� sl!nly'
Mason
o_ Regional
` l\ •`l,K.vi 9 Park
D\ Frerch Hip
J
O\11ta C P
73 SlloaY
San Jills
oaqui c,
%rllls
UPBuck
Gu --
H r
Buck Gully
J r
0. Pelican Hilly I J J -
2 [�\ Golf Course SQN JOAQUIN HILLS
r Pelican H� .
Canyon
Emerald
S�ti �SY� ' " F Canyon
�
PCI Ranges
Country
rr
`
N
Club
a Baker St
o =
City of Newport Beach, /1 C
to
,
ri
John Wayne
- (Good)
Airport -
Adams Ave
Pavement Condition 2019
v Orange Tewinkle
C oa sl 73
Memorial
Orange
Cou
N
m College
Park
Ail. NCE
�o
apDlls Ave LeBa'd Costa a Santa Anq,.
Park Fairy ��,�. Mesa .� Costa Mesa Countn },
M Park Country = Club XV
Club I
�z
.- ,�c W Wilson It P a
'-- Gisler Par - S a -
�Y� a Victoria St 55
kn` Fla miIto nAve
Lipper IVe•.vport
r' Talbert Q Pa ? Bay Regional Park
'g Regionald 2
_ n ` Perr W 19th St o p�• P
a Lions,
Par
0 a
Big
- Fie/ aark _.
wCoastH Y Big
[jewpolit . j ashio
��V!! Island
j Vlll�l��
O`cQO v C:
i
ti
c, lh'dliam Sand Canyon tYa� sl!nly'
Mason
o_ Regional
` l\ •`l,K.vi 9 Park
D\ Frerch Hip
J
O\11ta C P
73 SlloaY
San Jills
oaqui c,
%rllls
UPBuck
Gu --
H r
Buck Gully
J r
0. Pelican Hilly I J J -
2 [�\ Golf Course SQN JOAQUIN HILLS
r Pelican H� .
Canyon
Emerald
S�ti �SY� ' " F Canyon
�
PCI Ranges
EW PO
o� Rm
N
—86 - 100 (Very Good)
o =
City of Newport Beach, /1 C
FIGURE
—75 85
- (Good)
a„,P
Pavement Condition 2019
1 In. = 7,000 ft.
1
= 60 - 74 (Fair)
Ail. NCE
o 3,600 7,200
—41 - 59 (Poor)
—0 - 40 (Very Poor)
SOURCE
JOB NUMBER DRAWN
DATE REVISED APPROVED
3
City of Newport Beach GIS Centerline
1003.01.30 Narutl-
1/10/2019
5-123
ATTACHMENT D
PpRT
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
u - Z 1 CIVIC CENTER DRIVE
° h P P.O. BOX 1768, NEWPORT BEACH, CA 92659-1768
(949) 644-3311
MEMORANDUM
TO: PLANNING DEPARTMENT
FROM: TRAFFIC ENGINEER
DATE: June 13, 2018
SUBJECT: REVISED FAIR SHARE FEES — UPDATE 2018
Per City Ordinance 94-19, the Fair Share Fees are to be adjusted effective July 1 of each year
based on the Consumer Price Index (the Los Angeles — Orange County — Riverside All Urban
Consumer Index). For 2018, the fee will be revised 4.1%, from $208.37/trip to $216.91/trip.
A revised Fair Share Fee Summary Table of various land uses as defined by the 1996 NBTAM
is attached for your use.
If you have any questions regarding the new fee or help with fee calculations, please contact
me at ext. 3329.
Antony Brine
City Traffic Engineer
Attachment
F:\Users\PB\MShared\TRAFFIC\Fair Share FeeVairsharememo2018.doc
5-124
FAIR SHARE FEE SUMMARY TABLE 06.13.18
FAIR SHARE FEE SUMMARY TABLE
Fair Share Fee Per Trip
$216.91
USE
GEN RATE
UNIT
FEE/UNIT
1 Res-Low(SFD)
11.00
DU
$2,386
2 Res -Medium (SFA)
8.60
DU
$1,865
3 Apartment
6.50
DU
$1,410
4 Elderly Residential
4.00
DU
$868
5 Mobile Home
6.00
DU
$1,301
6 Motel
10.10
ROOM
$2,191
7 Hotel
10.50
ROOM
$2,278
8 Resort Hotel
6.00
ROOM
$1,301
9 Regional Commercial
22.00
TSF
$4,772
10 General Commercial
40.00
TSF
$8,677
11 Comm./Recreation
40.00
ACRE
$8,677
12 Resort Commercial
35.00
TSF
$7,592
13 Restaurant
66.90
TSF
$14,511
14 Family Restaurant
177.87
TSF
$38,582
15 Fast Food Restaurant
142.00
TSF
$30,802
16 Auto Dealer/Sales
47.91
TSF
$10,392
17 Yacht Club
50.00
TSF
$10,846
18 Health Club
40.00
TSF
$8,677
19 Tennis Club
44.30
CRT
$9,609
20 Marina
0.50
SLIP
$108
21 Theater
1.50
SEAT
$325
22 Newport Dunes
5.70
ACRE
$1,236
23 General Office
13.00
TSF
$2,820
24 Medical Office
45.00
TSF
$9,761
251R & D
9.50
TSF
$2,061
26 Industrial
5.00
TSF
$1,085
27 Mini-StorageMarehouse
2.61
TSF
$566
28 Pre-School/Day Care
67.00
TSF
$14,533
29 Elementary/Private School
1.00
STU
$217
30 Junior/High School
1.40
STU
$304
31 Civic Center/Museum
32.00
TSF
$6,941
32 Library
41.80
TSF
$9,067
33 Post Office
86.80
TSF
$18,828
34 Hospital
11.40
BED
$2,473
35 Nursing/Conv. Home
2.70
PAT
$586
36 Church
7.70
TSF
$1,670
37 Youth Ctr/Service
4.00
TSF
$868
38 Park
6.00
ACRE
$1,301
39 Regional Park