Loading...
HomeMy WebLinkAbout07 - 15th Street Rehab C-5077 NOC�gWP0�r CITY OF E;11V'P ; �T E C, oaN'P City Council Staff Report Agenda Item No. 7 November 27, 2012 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department David A. Webb, Public Works Director 949 - 644 -3311, dawebb @newportbeachca.gov PREPARED BY: Patrick Arciniega, Senior Civil Engineer APPROVED: A Z� TITLE: 15th Street Road Rehabilitation Project — Old Newport Boulevard to Redlands Avenue - Notice of Completion and Acceptance of Contract No. 5077 ABSTRACT: On July 10, 2012, the City Council awarded Contract No. 5077 for the 15th Street Road Rehabilitation project to All American Asphalt for a total contract cost of $303,303.00 plus a 15% allowance for contingencies. The required work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATIONS: 1. Accept the completed work and authorize the City Clerk to file a Notice of Completion. 2. Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with the applicable portions of the Civil Code. 3. Release the Faithful Performance Bond one year after Council acceptance. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following accounts: Account Description Account Number Amount Gas Tax 7181- C2002042 $157,897.35 Water Enterprise Fund 7511- C2002042 $8,910.00 Measure M Turnback 7281- C2002042 $34,371.45 Contributions Costa Mesa 7251- C2002042 $108,375.51 Total Construction Cost: $ 309,554.31 15th Street Road Rehabilitation Project — Old Newport Boulevard to Redlands Avenue - Notice of Completion and Acceptance of Contract No. 5077 November 27, 2012 Page 2 DISCUSSION: Overall Contract Cost/Time Summary Contract Award Final Cost at Benchmark Actual Contract Time Amount Completion Target Contract Time Under ( -) (days) or Over ( +) $303,303.00 $309,554.31 15% or less 2.1% 30 -6 The work necessary to complete this contract consisted of cold milling and paving 15th Street and installing a median in front of Newport Heights Elementary School. The median island corrected a severe cross -grade problem at the entrance to the school parking lot. Prior to the improvement, cars had a difficult time negotiating the driveway without bottoming out on the pavement. Now the ingress and egress of the parking lot is much safer. The contract also provided for concrete repairs to sidewalks, drive approaches and ADA ramps. Repairs Costa Mesa's side of 15th Street were funded by the City of Costa Mesa. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $ 303,303.00 Actual cost of bid items constructed: $295,252.72 Contract change orders: $ 14,301.59 Final contract cost: $ 309,554.31 The final overall construction cost, including one change order, was approximately 2.1 % above the original bid amount. The change order was for additional unclassified excavation for the road reconstruction portion of the job and some additional concrete work. The notice to proceed allowed for 30 working days based on the scope of the work. The project was substantially completed August 30, 2012, which was 6 days ahead of schedule. A summary of the project schedule is as follows: Estimated Completion Date per July 2011 Baseline Schedule: September 7, 2012 Project Awarded for Construction: May 8, 2012 Completion Date from Award with Approved Extensions: September 10, 2012 Actual Substantial Construction Completion Date: August 30, 2012 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301(c). This exemption covers the minor alteration of 2 15th Street Road Rehabilitation Project — Old Newport Boulevard to Redlands Avenue - Notice of Completion and Acceptance of Contract No. 5C 77 November 27, 2C 12 Page 3 existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. NOTICING: This agenda item has been noticed according to the Brown Act. In addition, the City Clerk will be filing a Notice of Completion for the project as a result of this action. The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Submitted by: David VTdbb I Public Works Director /City Engineer Attachment: A. Location Map 3 SEC BELOW LEFT -OLD NEWT - -- - --1 L SANTA ANA AVE , n - -- JILL ORANGE AVE BOLSA AVE - - WESTMINSTER AVE II � II L__JL WA -J SEE ABOVE RIGHT SAN BER;110MNO AVE REDLANDS AVE 15th Street NOT TO SCALE 15th Street Pavement Rehabilitation Project Limits Attachment A CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT !AWN: JT SHT. 1 OF 1 ATE: 6/22/12 C -5077 404 4