Loading...
HomeMy WebLinkAboutF2018-0150 - Permits0 c 0 _T v C N N E u c v v N m a d m N « « N O J C N NO TC N ,F t C O � 0 o U N O N a.m yra N ❑ N i F2018•0150 SCo11;n5- Isle CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION CHECKLIST YES NO 1. Riser Construction and Location Approval a. Drain valve ❑ b. Backflow device (single check) ❑ c. Bell activation device ❑ d. Inspector's test valve ❑ e. Riser sized per approved plans 2. Pressure Test a. System tested at operating pressure for 2 hours ❑ b. Pressure gauge installed ❑ 3. Sprinkler Heads shall not be installed in the fittings prior to the fittings being cemented in place (temporary test plugs) a. Installation and spacing of temporary test plugs ❑ 4. Piping a. Material installed per plan ❑ b. Hangers per codes/prevent upward movement ❑ c. All CPVC piping shall be installed by persons who have been ❑ certified by the manufacturer for installation of CPVC piping d. Piping protected from damage I ❑ 5. Bell a. Wiring installed per code ❑ b. Boxes installed at proper locations ❑ NOTE: CPVC plastic pipe in the garage shall not be exposed. Sprinklers that are listed as "Quick Response" or "Residential" must be used. CORRECTIONS AND FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION APPROVED: PERMIT#: ���10 �t�d BY: � DATE: Forms\Fire Sprinkler NFPA 13D System- Rough Inspection Checklist 05/12/2015 wpo CITY OF NEWPORT BEACH O� dca COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION c44rro: 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 FIRE SPRINKLER NFPA 13D SYSTEM FINAL CHECKLIST (RESIDENTIAL) YES NO 1. Water meter proper size ❑ ❑ 2. Fire sprinkler system installed per the approved plans ❑ ❑ 3. All construction covers removed from sprinkler heads ❑ ❑ 4. Cover plates are NOT to be installed, but shall be available on the jobsite ❑ ❑ 5. All tape and paint removed from sprinkler heads ❑ ❑ 6. Finish trim installed around sprinkler heads ❑ ❑ 7. Proper signage posted at all required locations ❑ ❑ 8. Flow test conducted and bell tested ❑ ❑ 9. Location of inspectors testing valve in approved location ❑ ❑ SYSTEMS: 10. Clearances around sprinkler heads and riser - no obstructions 11. Operating pressure gauge installed at riser showing proper water pressure 12. Back flow preventer installed 13. System installed per manufacturers specifications NOTES: ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ FIRE SPRINKLER NFPA 13D SYSTEM FINAL APPROVED: PERMIT #: BY: DATE: Forms\ Fire Sprinkler NFPA 13D System -FINAL Checklist RESIDENTIAL 05/12/2015 F.20/8-0/50 SColl;ns Ave t�Wp°fir CITY OF NEWPORT BEACH 0 COMMUNM DEVELOPMENT DEPARTMENT BUn DING DIVISION +cQaRA° 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92558-8915 www.newportheachca.gov 1(949) 6443200 FIRE SPRINKLER NFPA 13D SYSTEM FINAL CHECKLIST (RESIDENTIAL) YES NO 1. Water meter proper size ❑ 2. Fire sprinkler system installed per the approved plans ❑ 3. All construction covers removed from sprinkler heads ❑ 4. Cover plates are NOT to be installed, but shall be available on the Jobsite ❑ 5. All tape and paint removed from sprinkler heads / ❑ 6. Finish trim Installed around sprinkler heads ❑ 7. Proper signage posted at all required locations ❑ B. Flow test conducted and bell tested y ❑ 9. Location of inspector's testing valve in approved location 1. ❑ SYSTEMS: 10. Clearances around sprinkler heads and riser - no obstructions -0 ❑ 11. Operating pressure gauge installed at riser showing proper water pressure j� 11 12. Back flow preventer installed %0 ❑ 13. System installed per manufacturers specifications U 11NOTES: FIRE SPRINKLER NFPA 13D SYSTEM FINAL APPROVED: PERMIT # X Zoll 05-37— BY: 1 L • DATE: _✓� --- Furors\ Fre Sprinkler NFPA 13D System- FINAL ChwWM SUIDENTIAL 05/12/2015 CO1MIl1 [TN DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 [Newport Beach, CA 92658-8915 www-newportheachca.gov 1 (949) 644-3200 FIRE SPREWMER NFPA 13D SYSTEM ROUGH INSPECTION CHECKLIST FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION APPROVED: PERMIT M BY. DATE: Fomes\Fire Sprmkier NFPA 130 Sy.Rem -Rough Inspection ChrrWist 05/]2/2015 YES NO 1. Riser Construction and Location Approval a. Drain valve ❑ ❑ b. Backflow device (single check) ❑ ❑ c. Bell activation device ❑ ❑ d. Inspector's test valve ❑ ❑ e. Riser sized per approved plans 2. Pressure Test a. System tested at operating pressure for 2 hours ❑ ❑ b. Pressure gauge installed ❑ ❑ 3. Sprinkler Heads shall not be installed in the fittincs prior to the fittings being cemented in Place (temporary test plugs) a. Installation and spacing of temporary last plugs ❑ ❑ 4. Piping a. Material installed per plan ❑ ❑ b. Hangers per codes/prevent upward movement ❑ ❑ c. All CPVC piping shall be installed by persons who have been ❑ ❑ certified by the manufacturer for installation of CPVC piping d. Piping protected from damage ❑ ❑ 5. Bell a. Wiring installed per code ❑ ❑ b. Boxes installed at proper locations ❑ ❑ NOTE: CPVC plastic pipe in the garage shall not be exposed. Sprinklers that are listed as "Quick Response' or °Residentiar must be used. CORRECTIONS AND NOTES: FIRE SPRINKLER NFPA 13D SYSTEM ROUGH INSPECTION APPROVED: PERMIT M BY. DATE: Fomes\Fire Sprmkier NFPA 130 Sy.Rem -Rough Inspection ChrrWist 05/]2/2015