HomeMy WebLinkAboutX2017-3400 - MiscW11-3100 - 501 E PromonforuJ)r CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658 www.newoortbeachca.aov 1 (949) 644-3200 SPECIAL INSPECTION REPORT Project Address: 801-859 Promontory Point East, Newport Beach, CA. (Stair remodel) Permit Number: X2017-3400 Inspection Type (s): Welding & Epoxy Inspection Date (s): 2/13/18, 2/14/18 Periodic Describe Inspection, Including Location(s): - Observed the field welding at exterior stair remodel between units 100 & 108. 2 WF stringers welded at base plates (Filets) & 2 CJP's at top of stringers to existing WF beams, 2 pipe column landing beam supports at base plates. Details 45 & 6/S-1. Certified Welder Victor Reyes on file. Completed welds were verified for size, length, location and are free from visible defects. Verified the installation of 5/8" all thread anchors at base plates for landing support base plates using simpson set XP epoxy. Verified min embed and proper cleaning of holes using nylon brush and compressed air. Epoxy lot #221 E168E, Exp 8/19. Stair type #1. Total Inspection Time Each Day: Date: i 2/13/1_8___;2/14/18 Hours: i Full ' Full List All Items Requiring Correction (Include Previously Listed Uncorrected Items): Comments: Other than any noted discrepancies all work was done per approved plans, job site specifications, applicable codes, RR's and WPS's to the best of my knowledge and appeared to be in compliance at time of inspection. Special Inspector Signature: Date: 2/14/18 Print Full Name: Newport Beach Registration No.: Peter Gilpin NB -0381 SpeciallnspectionReport 9-24-15 � 16019 Kaplan Ave., City of Insdustry, CA 917.44 Ir FRANKLIN INSPECTION Website: Franklininspection.net 3 E RV ICES Phone: 626.255-2148 SPECIAL & MATERIAL INSPECTION REPORT M T W T F S S Date: Project Name: Promentary Point East 801-859/Units 102-104 Project No.: Project Address: 801 Promontory Dr. E, Newport Beach, CA Jurisdiction Contractor: Permit No: Sub-contractor/Fabricator: Weather: Sunny Start Time: 8:00 AM Reg. Hour: Newport Beach X2017-3400 Stop Time: 12:00 PM OT Hour: Type of Special Inspection: Material Sampling & Testing: Field Welding ElFireprooling Batch Plant DHS -Bolts Mortar/Grout Shop Welding nReinforced Concrete Engineered Fill/Grading ❑ Shear Connectors Masonry Block DHS -Bolts DShotcrete Drilled -Piers -Caissons DSprayed on material 7Reber Masonry Prestressed Concrete Anchors/Epoxy, Expansion DStructural Steel ■other: NDT Approved Documents: Work Inspected: 1)Arrived at job site and calibrated UT machine for Index Point, Angle Beam, Sensitivity, and Horizontal Sweep per AWS Dl.l - 2015 2) Performed Ultrasonic Testing (UT) on CJP 3) See snatched UT report for further details The work ■was Dwas not inspected in accordance with the requirements of approved documents. The work inspected ■met E]did not meet the requirements of the approved documents. Material Sampling was was not ■N/A performed in accordance with approved documents. Inspector Signature: Inspector Name: Brandon Lau Inspector Certification: SNT-TC-1A & CP 2186 All inspections based on a minimum of 4 hours and over 4 hours - 8 hours minimum. If inspector is called to a project and no work is performed, a 2 -hour minimum charge will be applied. Acknowledged by Page 1 of 2 REPORT OF ULTRASONIC TESTING OF WELDS Project Name Promentary Point East 801-859/ Units 102-104 Contract/Project Specificati Ultrasonic Testing Procedu AWS DLI -2015 Section 6 Part F Acceptance/Rejection Cr@eAWS Dl.l -2015 Table 6.2 ULTRASONIC EQUIPMENTS Project Nt Page No. 2 el 2 ULTRASONIC TESTING OF MATERIALS aurtece CoeElllon Thickness JOlpt Typa prim 2916 mhan Fe Vommelft Exem In Leg Reference level Spanning Level Clean .5" Butt FCAW A 1st 66 Table 6.2 comment ulvx INDICATIOWS) FOUND ON RFJFCTF_n WF1 nC I nn wolnilawnt Uwas nortnspemea to accoraance wap me requirements of the approved documents. The work inspectedn met ❑did hot meet the requirements of the approved documents. Inspecto Brandon Lau Leve 11 Date February 14, 2018 DE*OA DISCONTINUITY (h) QDISTANCEREMARKS From X From Y 6 H $' ;< IS 8 (Discontinuity Evaluation) I nn wolnilawnt Uwas nortnspemea to accoraance wap me requirements of the approved documents. The work inspectedn met ❑did hot meet the requirements of the approved documents. Inspecto Brandon Lau Leve 11 Date February 14, 2018 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive i P.O. Box 1768 1 Newport Beach, CA 92658 www.newoortbeachca.gov 1 (949) 644-3200 SPECIAL INSPECTION REPORT Project Address: 801-859 Promontory Point East, Newport Beach, CA. (Stair remodel) Permit Number: X2017-3400 Inspection Type (s): Welding & Epo) Inspection Date (s): 2/28/18, 3/1/18 Describe Inspection, Including Location(s): Observed the field welding at exterior stair remodel between units 122 & 124. 2 WF stringers welded at base plates (Filets) & 2 CJP's at top of stringers to existing WF beams, 2 pipe column landing beam supports at base plates. Details 45 & 6/S-1. Certified Welder Victor Reyes on file. Completed welds were verified for size, length, location and are free from visible defects. Verified the installation of 5/8" all thread anchors at base plates for landing support base plates using simpson set XP epoxy. Verified min embed and proper cleaning of holes using nylon brush and compressed air. Epoxy lot #231 E172E, Exp 8/19. Stair type #1. Total Inspection Time Each Day: Date: 2/28/18 _..__T3/1./18___ --' — Hours: iFull Full List All Items Requiring Correction (Include Previously Listed Uncorrected Items): Comments: Other than any noted discrepancies all work was done per approved plans, job site specifications, applicable codes, RFPs and WPS's to the best of my knowledge and appeared to be in compliance at lime of inspection. Special Inspector Signature: Date: 3/1/18 Print Full Name: Newport Beach Registration No.: Peter Gilpin NB -0381 SpeciahnspectionReport 8-24-15 000 rFRANKLIN INSPECTION srr:vrc[::; 16019 Kaplan Ave., City of Insdustry, CA 91744 Website: Franklininspection.net Phone: 626-255-2148 SPECIAL & MATERIAL INSPECTION REPORT M T w T F S S Date: 3/1/2018 X Project Name: Stair Remodel Project Address: 801-859 Promontory Point East, Newport Beach, CA Contractor: Prommontory management Sub-contractor/Fabricator: RPS Weather: hot Project No.: Jurisdiction Newport Beach Permit No: X2017-3400 Start Time: 12:00pm Stop Time: 4:00pm Reg. Hour: 4 OT Hour: Type of Special Inspection: Material Sampling & Testing: Field Welding EFireproofing Batch Plant EHS-Bolts Mortar/Grout I—IShopWelding EIReinforced Concrete Engineered Fill/GradingShear Connectors Masonry Block 1:1 HS -Bolts ElShotcrete Drilled -Piers -Caissons Sprayed on material Rebar Masonry Prestressed Concrete EAnchorslEpoxy, Expansion Structural Steel Other: NDT Approved Documents: Work Inspected: arrived at field location: 801-859 Promontory Point East, Newport Beach, CA 1)Performed Ultrasonic Examination on Stair stringer CJP splices between units 122 and 124 2) Calibrated index point, angle beam, horizontal sweep and sensitivity per AWS D1.1-2015 3) See attached UT report for details The work ❑x was Uwas not inspected in accordance with the requirements of approved documents. The work inspected ❑x met Edid not meet the requirements of the approved documents. Material Sampling Dwas was not x N/A Inspector Signature: Inspector Name: Kong Vuong performed in accordance with approved documents. Inspector Certification: UT Level IUSNT-TC-IA/CP-189 All inspections based on a minimum of 4 hours and over 4 hours - 8 hours minimum. If inspector is called to a project and no work is performed, a 2 -hour minimum charge will be applied. Page I of 2 REPORT OF ULTRASONIC TESTING OF WELDS Project Name 801-859 Promontory Point East, Newport Beach, CA Project No. X2017-3400 Contract/Project Specification Specification Section 051200 Ultrasonic Testing Procedure AWS D1.1-2015 Section 6 Part F Acceptance/Rejection Criteria AWS D1.1-2015 Table 6.2 Page No. 2 of 2 ULTRASONIC EQUIPMENTS aurface CandNon Glean DT System m Type of Bb IIW B Pq roper FCAW fte g. Sonatest tae r Items Examined /Tested: _ CJP welds per AWS DIA, Section 6, Table 6.2 m a r¢ane eemy, canto Description Interpretation Mweld(s) Accepted Rejected Repaired Remarks Type = 0 2nd stringert PSLM1025 2.25 l0 444101 r 9/1/2017 g Q N N a� y N d N Y' W 9 ¢ v_ 5 rc z eae ena o. Intem Re 7' est Won 3 Avenger o 1018 Steel c 70° Harisonic AB -021212 2-25 0.75x0.75 51141 `u 8/9/2017 m n n p a ena o (Discontinuity Evaluation) algac e. 2019833 B09173 600 Sonatest PSS75752 2.25 0.75x0.75 1.1E+07 ° Prior to testingemm aurface CandNon Glean ThicXneys 0.375" JCIM Type ButtlT-loin[ Pq roper FCAW Evm hom a A/B Ce aume cExam In LeB 1st & 2nd Rekrence a 55 dBW ecenNng Level Table 63 Items Examined /Tested: _ CJP welds per AWS DIA, Section 6, Table 6.2 = Weld ID, pc mark LvL gridlines, location Description Interpretation Mweld(s) Accepted Rejected Repaired Remarks between units 122 & 124 = o 2nd stringert WF stringer CJP to existing stringer 2 2 0 0 2 CJP welds UTOK r g N N v y N d N Y' W 9 ¢ v_ 5 rc A c 9 c'o L L m DISTANCE $ o, ii 2nd stringer 2 WF stringer CJP to existing stringer 2 2 0 0 2 CJP welds UTOK REMARKS a b c d From X from Y -Sti ¢` u ¢` 'p .-, p a o (Discontinuity Evaluation) Tented Accepted I Rejectetl I Repatretl Final Acceptance Final Rejection Total Welds 4 4 1 0 1 0 4 0 Comments: INDICATION(S) FOUND ON REJECTED WELDS I he work was Uwas not inspected in accordance with the requirements of the approved documents. The work inspected [0met did not neet the requirements of the approved documents. Inspecto on Vuo eve] UT Level II/SNT-TC-lA/CP-189 Date March 1, 2018 DECIBALS(dB) DISCONTINUITY (in.) V$'� = Euq `v = o V V m r g N N v y N d N Y' W 9 ¢ v_ 5 rc A c 9 c'o L L m DISTANCE $ o, ii a m REMARKS a b c d From X from Y -Sti ¢` u ¢` 'p .-, p a o (Discontinuity Evaluation) I he work was Uwas not inspected in accordance with the requirements of the approved documents. The work inspected [0met did not neet the requirements of the approved documents. Inspecto on Vuo eve] UT Level II/SNT-TC-lA/CP-189 Date March 1, 2018 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 Newport Beach, CA 92658 www.newoortbeachca.gov (949) 644-3200 SPECIAL INSPECTION REPORT Project address: 801-859 Promontory Point E & W, Newport Beach, CA. (Stair remodel) Permit Number: X2017-3399, 34004, 3084 Inspection Type Inspection Date 3/16/18 Continuous Describe Inspection, Including Location(s): Observed the installation of #4 rebar dowels at exterior stair footing/landing using simpson set XP epoxy. Verified min embed and proper cleaning of holes using nylon brush and compressed air. Epoxy lot #231 E172E, Exp 8/19. Detail 6/S1 (4" embed) 3 locations as follows - East buildings between units_;11:4 & 146, 210 & 212, West building between units 102 & 104. Total Inspection Time Each Day: Date_+- —3/1.6/18------------ -------- --' __._:- —4—.—.....__.._.__._. "ours' Min List All Items Requiring Correction (Include Previously Listed Uncorrected Items): Comments: Other than any noted discrepancies all work was done per approved plans, job site specifications, applicable codes, RFI's and WPS's to the best of my knowledge and appeared to be in compliance at time of inspection. Special Inspector Signature: Date: 3/16/18 Print Pull Name: Newport Beach Registration No.: Peter Gilpin NB -0381 Special Inspection Report 8-24-15