HomeMy WebLinkAboutX2015-2624 - Misc (2)X2 -01S - 2-U ZN
t4uov eoxauq �d
Appendix E
LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION
I hereby certify that:
(1) 1 am a professional appropriately licensed in the State of California to provide
professional landscape design services.
ty located at _ �O I -'0X 6*'r f ►ted!
(provide street
by me or under my supervision.
(3) The landscaping for the identified property has been installed in substantial
conformance with the approved Landscape Documentation Package and complies with
the requirements of the City of Newport Beach Water Efficient Landscape Ordinance
(Municipal Code Section 14.17) and the City of Newport Beach Standards for
Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for
the efficient use of water in the landscape.
(4) The following elements are attached hereto:
a. Irrigation scheduling parameters used to set the controller;
b. Landscape and irrigation maintenance schedule;
c. Irrigation audit report; and 1*6WftoAf 1jvj1r6Vj4ZttAoGr4r
d. Soil analysis report, if not submitted with Landscape Documentation Package,
and documentation verifying implementation of the soil report
recommendations.
(5) The site installation complies with the following:
a. The required irrigation system has been installed according to approved plans
and specifications and if applicable, any prior approved irrigation system
alternatives.
Yes _ No
b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler &
Emitter Standard.
Yes _ No
(6) The information I have provided in this Landscape Installation Certificate of
Completion is true and correct and is hereby submitted in compliance with the City of
Newport Beach Design Standards for Implementation of the City of Newport Beach
Water Efficient Landscape Ordinance.
33
19/�-11:2
Date
�
ir.Pnsa NumhArhar
lephone
Landscape Design Professional's Stamp
(If Appropriate
DANIEL D.
STEWART
34
Aq-
E-mail Address
C:\Users\Lisa\Downloads\ilrigation base,dwg, 5/1/2019 9:17:32 AM, LY
o °°. -'TA'
a y
a o .A^*
8�' c
o
poruPr
a °.
N. .^�• O
.y
rte, W
O
'„J
NpOCD
!] O
P
, O ,Ty,
Gi IY N G• On
fD N G.
fD UfD 'a
Pr
�.
Vl c
N ^I qq�gg
i••
0.a
s
a
�
0.0
Via'
0
°o
"�
��NN=
x'
O
C a• O w
a
O G
O
�o
y
od
a
o� �a
m
�'
ago �_ ��ys'
pf 'xry
w EL
ry��`�a�•�'
:# X
00
£fax
2.
a
y w p• y
1R
o. F. y
a � a
a
r
a
C:\Users\Lisa\Downloads\ilrigation base,dwg, 5/1/2019 9:17:32 AM, LY
IRRIGATION SCHEDULING GUIDELINE
4606 Roxbury Road, Corona Dal Mar, CA
TOTAL INCHES PER YEAR 45.4"
MONTH
JAN. FEB. MAR. APRIL MAY JUNE JULY AUG. SEPT.
OCT.
NOV.
DEC.
INCHES PER MONTH (Eto)
1.2 1.4 2.7 4.5 5.3 6.3 7.4 6.4 5
3.1
1.3
0.9
VALVE TIMING PER MONTH IN MINUTES DAILY
TURF MP ROTATOR
3.7 4.8 8.4 14.4 16.3 20.1 23 20.1 15.4
9.6
3.8
2.8
Pr. Rate.41'Mr,
TURF MP ROTATOR
1.9 2.4 4.2 7.2 8.2 10.5 11.5 10.5 7.7
4.8
1.9
1.4
Pr. Rate.82Mr.
TURFSQUARESPRAY
2.6 2.7 3.5 4.4 5.1 5 5.5 5.5 4.7
3.5
2.3
1.8
Pr. Rate 1.74'7Hr.
TURFADJ. ARC.
1.2 1.3 1.6 2 2.3 2.3 2.5 2.5 2.1
1.5
1.2
0.9
Pr. Rate 3.2P7M..
SHRUB MP ROTATOR
8.3 8.8 11.2 14.3 16.3 16.2 17.7 17.7 15.1
10.9
8.3
6.4
Pr. Rate.41 Mr.
SHRUB SQUARE SPRAY
2.1 2.2 2.8 3.5 4.1 4 4.4 4.4 3.8
2.8
1.8
1.4
Pr. Rate t MlHr.
SHRUB 2Q NOZZLE
1.4 1.5 1.9 2.5 2.8 2.8 3.1 3.1 2.6
1.9
1.4
1.1
Pr. Rate 2.61%Hi
DRIPLINE
4.5 4.7 6 7.6 8.7 8.7 9.4 9.4 8.3
5.8
4.4
3.4
Pr. Rate .96Mr.
VALVE TIMING PER MONTH IN MINUTES WEEKLY
SHRUB BUBBLER
4.1 4.4 5.6 7.1 8.1 8.1 8.8 8.8 7.5
5.4
4.1
3.2
Pr. Rate 6.8117Hr.
NOTE. THE ABOVE SCHEDULING GUIDELINE IS A STARTING POINT FOR CONTROL VALVE
TIMING.
ONCE RUN
TIMES ARE PROGRAMED IN THE CURRENT MONTH, THE HUNTER 1 -CORE
CONTROLLER AND THE HUNTER SOLAR -SYNC WEATHER STATION WILL MAKE DAILY VALVE
TIMING ADJUSTMENTS BASED ON THE CURRENT WEATHER CONDITIONS AND Eto.