Loading...
HomeMy WebLinkAboutN2018-0496t%P(,4r City of Newport Beach q111 .`a 100 Civic Center Drive, Newport Beach, CA 92660 1111111111111111111111111111111111111111111111111N 2 0 1 8 0 4 9 6 r a �r) Permit Counter Phone (949)644-3311 4: Online Inspection Request - www.newportbeachca.gov / Online Services Permit No: N2018-0496 , Project No : 3028-201SCANNED,- Inspection Requests Phone (949)644-3255 Job Address : 3725 OCEAN BLVD NB Thomas:Guide: 919F3 Description : RETAINING WALL, PLANTER WALLSM WALKWAY, STEPS WITHIN ROW Parcel#: 0521-501-5 - Legal Desc : CORONA DEL MAR LOT BLK A POR OF BLK Owner: FISCHER,DESMOND LAWRENCE Phone: Address : 3725 OCEAN BLVD CORONA DEL MAR, CA 92625 Applicant: PINNACLE CUSTOM HOMES INC Phone: [ Address : Special Cond. : Ott e� ^ • �. Contractor : PINNACLE CUSTOM HOMES INC Phone: 714-327-0225 Address : 151 KALMUS DR STE D-210 COSTA MESA CA 92626 Contractor State Lic: 782202 License Expire : 07 31, 2020 Business License : BT30051358 Business Expire : 06 30, 2019 Workers' Compensation Insurance - - Carrier : STATE COMP INS FUND Policy No : 9030335 W. C. Expire: 12 01, 2018 Permit Processing Fee : $0.00 Sewer Connection : $0.00 Total Fee Agreement Fee : $871.00 4TT Box Cover: $0.00 Paid : Traffic control Plan Check : $0.00 Total Water Meters : $0.00 Balance Inspection Fee : $176.00 Water Meter Connection : $0.00 Receipt No Refundable Deposit: $0.00 Total Water Meter Box: $0.00 Street Tree Fee : $0.00 Adjustment : $0.00 Processed By : Utilities Approval : Traffic Approval : General Services Approval $1,047.00 $1,047.00 $0.00 Date : _/_/ Other Department : Date: Date : _/_/ Permit Denied Date: Date : _/_/ Issued Permit Date: / ! COMPLETE THE BELOW INFORMATION PROJECT ADDRESS: WORK: ILED.DESCRIPTION OF PROPOSE f' l ' Y PPLICA Phone:--� Q lS Email Address: Mailing Addres �- --I /State/Zip: o s G 2 cJ? OWNE : JAIr.Phone:' l G Email Ad ress: Mailing Addre s: i f ct� t '- City/State/Zip: ALL COMACTORMFORMATM ISRE tRE�-P EAM C .: : CONTRACTOR: c�c (Office Phone. Z^i Company (if different): Jobsite Phone: L163 LpSy Other Phone: Email Address: Mailing Adds: 7 — l c� Ci tate/Zip: 0 2 cp2- _ State License Number & Class: c7 Ex ires City Business License Number: C7J Ex Tres: ct WORKERS COMPENSATION INSURANCE - Certificate of Insurance (Section 3800 Labor Code) Com an : Policy No: Expires: Municipal Oerations: 949-644-3055 Utilities: 949-644-3011 Urban Forestry: 949-644-3083 FOR OFFICE USE ONLY Special Conditions of Permit: � \ ✓1 iu ADDITIONAL APPROVAL REQUIRED FROM THE FOLLOWING DEPARTMENTS Utilities: Municipal Operations Traffic: Fire: Other: Engineering Technician: Permi alist 1 D I C( Permit No. IN2018- f /users/pbw/shared/enrroach/masters/epworksheet.xi1 ' Public Works Department 949-W-3311 2D 100 Civic Center Drive, Newport Beach, CA 92660 Permit Processing Fee: Q Public Works Only $257.00 Other Department $293.00 Agreement Fee: Preparation of Report/Agreement $871.00 Document Recordation Fee $204.00 Monitoring Wells $535.00 Inspection Fee: Public Works Field Inspection Utilities Field Inspection Water Quality/Artificial Turf Inspection Refundable Deposit: Improvements Street/Alley/Walk Closure: $70.000 Newspaper Rack Inspection Traffic Control Plan Check 8-1/2" x 11" $70.00 Sewer Connection Fee 24" x 36" $152.00 4TT Box & Cover Additional _ _ _ THE FOELOWING ITEMS REQUIRE APPROVAL FRQM TH'E R REVENUE DIVISION PRIOR TO PAYMENT OF FEES A Water Meter. Installation Charge �3/4" Meter $50.25 F' Meter $121.50 Water Meter Boxes: 11 1/2" Meter $285,00 1" DFW Meter Box 11 1/2" Turbine Meter $700.00 2" DFW Meter Box 12" Meter $425.00 12" Turbine Meter $845.00 13" Meter $3,310.00 14" Meter $4,730.00 16" Meter $7,190.00 $176.00 $129.00 $115.00 TBD TBD $115.00 $$64.0011 64.00 venue Division s i proval $563. $96.66 $203.24 Qty. Budget Number Development Services Fee (Plan check hourly) $165.00 5200-5015 Final Tract Map Checking Fee $2,653.00 5200-5026 Final Parcel Map Checking Fee - Moderate $2,653.00 5200-5027 Lot Line Adjustment Fee $1,151.00 5200-5028 Park Dedication Fee Zone TBD 405-470 Street Easement/Vacation Fee (+100% of My over 4 hrs) $1,089.00 5200-5031 Street Tree Fee ($700 Planting Fee) TBD 030-2284 Engineering Tech: Total Amount Due: For Finance Use Only �k �I��1 Permit Specialygt-----, Receipt No. front and back masters/ 3/20181 lepfeesheet.xlsievised 9/13118 I ALL UNDERGROUND WORK SHALL BE PERFORMED BY A LICENSED CONTRACTOR I Contact "Underground Service Alert" At Least 48-Hours in Advance of Any Excavation at 1-800-227-2600 or 811 TERMS AND CONDITIONS OF ENCROACHMENT PERMIT 1. Encroachment Permits may be taken out by the owner of benefited property or a licensed contractor. A licensed contractor must provide a "Letter of Authorization" to allow another party to pull a permit. An approved copy of the permit and construction plan shall be kept at the job site at all times. Work, which has been done prior to issuance of a permit, is subject to rejection/fine. City reserves the right to void permit if work does not commence within 30 days after date of issuance. 2. The Permittee agrees to defend, indemnify and hold the City, its authorized agent, officers, representatives and employees harmless from any responsibility, liability, suit or action of any description arising out of any accident, loss or damage to persons or property occurring as a result of work undertaken under this permit. 3. All work shall be done in accordance with the approved plans, Standard Special Provisions and Standard Drawings of the City of Newport Beach, and in compliance with all applicable State laws and City ordinances. 4. Permittee guarantees all work performed under this permit to be free of hidden and latent defects. Any failures shall be corrected within two weeks after notification to the satisfaction of the Public Works Director. 5. A valid State licensed contractor must perform all construction within the public right-of-way, unless waived by the Public Works Director. A valid State Contractor License Class A can perform any work in the public right-of-way. For construction or connection to water lines a valid State Contractor License Class C-34 is required. For construction or connection to sewer lines a valid State Contractor License Class C-42 is required. 6. All trenching and/or resurfacing shall conform to City Standard 105-L for parkway/roadway and City Standard 140-L, in the alley, where a minimum half -alley width resurfacing shall be provided, unless otherwise directed by the Public Works Dept. Contractors shall obtain permits to perform excavation or trench work from the California Division of Industrial Safety prior to commencing underground construction as required by State law. Walls and faces of all excavations over 5 feet in depth shall be protected by a shoring system, sloping of the ground, or other equivalent means. Trenches less than 5 feet in depth shall be guarded when hazardous ground movement may be expected. 7. The Public Works Department Inspectors must inspect all work in the Public right-of-way. Forms and subgrade must be inspected and approved before concrete is ordered/poured. Sewer, pipelines, and subgrade construction must be inspected and approved before backfilling, or applicant may be required to excavate site. Separate inspections by the Municipal Operations Department may be required depending on scope of work performed. 8. All trench restoration must be inspected by the Public Works Department. No utility installation(s) shall be allowed over or within 5 feet of any City utilities, unless approved by the Public Works Department. Locate and pothole existing City -owned utilities (ie: water, sewer, or street lighting conduits) to verify locations. Maintain a one -foot clearance over or under existing City -owned utilities. Sewer cleanouts require VCP or PVC SDR35 be used with a 4TT box over the riser. 9. Properly lighted barricades must be provided and maintained around all trenches, excavations and obstructions. All signs, flags, lights and other warning and safety devices shall conform to the requirements of the current "Manual of Warning Signs, Sights and Other Devices for the Use in Performance of Work Upon Highways", issued by the California Department of Transportation. If needed, barricades can be obtained from the City at a charge of $10.00 per barricade per day, with a minimum charge of $35.00. It is the responsibility of the applicant to place barricades to protect the general public. Access to fire hydrants must be maintained at all times. 10. Work within or near beach sensitive areas will not be allowed during, City holidays, spring break, Memorial Day weekend, summer between June 15 and September 15, and during the holiday season from December 19 to January 1, unless approved by the Public Works Department. 11. Any work that extends into traffic or parking lanes and impedes the normal flow of traffic requires the applicant to acquire a Temporary Street Closure Permit from the Public Works Department. Access for fire, police and emergency vehicles must be maintained at all times. Traffic Control must be per Work Area Traffic Control Handbook (WATCH). No nighttime traffic lane closures, unless prior approval has been granted. Any lane(s) closure on a major street will only be allowed between 9:00 a.m. and 3:00 p.m. (Monday thru Friday), unless approved by the Public Works Department. Any work affecting the State Highway's traffic or within the State Highway right-of-way will require a Caltrans Permit. All vehicles shall be lawfully parked. 12. This permit does not authorize the closure of sidewalks, streets, or alleys for construction access, storage of materials, or parking of construction vehicles unless detailed on an attached Temporary Street Closure. 13. Applicant must notify USA at 1-800-227-2600 2 days before starting any underground construction. Applicant must notify all affected residents 24 hours in advance of restricted access and any inconveniences. All USA marks shall be removed prior to Final Public Works Inspection. 14. Refuse or unused materials shall be removed within 24 hours after completion of the work. If not removed, the City may remove and bill the applicant. Coordinate alley closures with City's refuse pick-up days by calling 949-644-3066 for the collection schedule so service is not interrupted. To place a dumpster or materials in the public right-of-way, a Temporary Street Closure Permit must be obtained from the Public Works Department. WORKER'S COMPENSATION INSURANCE (Section 3800 Labor Code) , I certify that I have a Certificate of consent to self -insure, Certificate^of Worker's Compensati n bsurance, or a Certified Co y t r f. /�/� Date: Signature / O� 4J6I CERTIFICATE OF EXEMPTION (Section 3800 Labor Code) I certify that in the performance of the work under this permit, I shall not employ any person so as to become subject to California Worker's Compensation Laws. If, after signing this certificate I become subject to the Worker's Compensation provisions of the State Labor Code, I must comply with the provisions of Section 3700 or this permit shall be deemed revoked. Date: Signature: CONTRACTOR LICENSE EXEMPTION As the Owner of the benefiting property, I certify I am personally performing all work in the Public Right -of -Way. Date: Signature: HOLD HARMLESS STATEMENT I understand that I am locating minor encroachments within the City Right-of- Way/Easement. As property owner it is my responsibility to maintain the encroachments. I will be responsible for replacing the improvements if the City removes them for maintenance of utilities or other public need. I shall indemnify and hold the City harmless for any liability associated with the minor encroachments. Date: Signature: Inspections should be requested by callin t Publ' or s Inspection Request Line at: 949-644-3255. INITIALS: 15. All above ground facilities shall comply with the Municipal Code, including but not limited to Chapter 13.20. 16. Homeowner, contractors, and subcontractors may each be liable for violations of Water Quality Laws. Best Management Practices will be enforced. It is against the law to discharge construction debris into the gutter and storm drain. Felony violations of Water Quality Laws are punishable by fines up to $25,000 and/or up to three years in State prison plus the full cost to clean up an illegal discharge or spill. 17. If a refundable deposit was paid, applicant must submit a Soils Compaction Certificate or Evidence of a Slurried Backfill and request a final inspection from the Public Works Department. Monies may be held for six months after final inspection before a refund will be processed. 18. No trees in the public right-of-way shall be planted, removed, trimmed, or relocated without approval from the Municipal Operations Department, Parks and Street Trees Division. 19. All work in the public right-of-way must meet the approval of the Public Works Department or corrections will be required (i.e. removals, exposing connections, etc.). Additional inspection fees may be required. 20. Permit is for standard materials in the public right-of-way only, unless previously approved by Public Works and an Encroachment Agreement has been processed. 21. Permit is valid for "description" of work noted on front only. Additional work performed may require issuance of a separate permit and/or additional fees. No work related to this encroachment permit shall be performed until the Public Works Department has Issued this permit. Ap Ilcant hereby acknowledges he/she has read and un stands the terms and conditions of this permit and he/she agrees to abide by them. Permit Is void If work Is not commenced within 30 days a er I . unless otherwise p r d b�r t�hep�4� Works e a ment. Permit fees are nonrefundable. Please note: Preparation of Encroachment Agreement fee Is non-refundable. Da __. Signature:��i;js_ � br 21 � � t I� : - - - 1 - �: - - ► �O \� oc Z iy t I BTU Pr, DI, Tp ?? F5 I 69.57 J _ E800TFC •r{ _ _ —. T5 I. / Iii I 2 TS _ J TS —. P. .I I I PA B2.75' 66.d .� 65.001' \ E-'E of - \_ 9 — _ LU10 I ;ttb y..,» 4 1 a y f5 1 i j T�lh. ',)( BOA /I 6753'PL . 9O0 Yf T9 , I T.O. CAS •4.i`o G PRG_ I I I ea.o' ID f bT5' ED.67 i ea.ot \ I /atao' Q FG TY� Id 1 l J■\ 615 TiY PA 830' 87.55•_ 1 �I' Btab' t d Sr 9 c fs t :b� :. t;; ,. ,.TS 1.1 I T i\ \ 6 � F t 01 : Ph .�_r, .0 _ Ru...,_tS'.iL:L.: \ r.CI�.ri r 1 L _ �P/, A iP 07.65 NI i i Bf.6'_ TM \ . r5' / IE97i6 Q.. , , rr �84 C :. TP d i es s5• 0639' eG.aB 57.09' .51.49 ,r E/Y 81 $ s > ; 8 ADAYWX r T.O. IRiU,-H G.2r..'.1 - \ B5.1a b�.59 B5.E� E5.7V / EEO' \ RL bl.<q B6.5� 552 PA I.1 ��'�' � T.O. Yv.LL r AAA 1't'LK T.O. YVILL J 20 a 22 FACE 8/5/2019 City of Newport Beach Page 3 of 15 6:30:49AM INSP150 - Daily Inspection Request Report Requested Inspection Date : 08/05/2019 Inspection Type: ENCROACH Inspection Area : PW Site Address : 3725 OCEAN BLVD A/PtD Information: Activity : N2018-0496 SubType : Status : APPROVED APPLICANT: DARREN BRADBURY Phone : 714-403-8636 DBRADBURY@PINNACLEC OWNER: FISCHER,DESMOND LAWRENCE Phone: Description : RETAINING WALL, PLANTER WALLS, WALKWAY, STEPS WITHIN ROW P s) Item: 10250 FINAL - PW Requested Time: 8/5/2019 12:00:OOAM Requestor: NBIVR 9515291729 Entered By: NBIVR Comments: AM Assigned to: tlollhl ' - -:� --F n Z:�/7 SFD -* PER►,n tr %AWD COPY ►Jvr FounJD