Loading...
HomeMy WebLinkAboutX2017-3235 - Misc (2)VOi-7-3 35 3 $0 3 0Marcv5 Ave CITY OF NEWPORT BEACH CONEVIUNITY DEVELOPMENT DEPARTNIENT BUILDISION 100 Civic Center Drive P.O. Box `1 68 1 Newpo Beach, CA 92658-8915 www.newportbe, achc_ aoov (949) 644.3200 PRE -GRADE MEETING AGREEMENT DATE: 5^07- I � ` — _JOB ADDRESS; 3 e o3 m r 0 1. The grading plan check number for this site is and correspondence. Z Z u]_ 5_ and will be referred to in all reports, certifications 2. STOP ORDERS Whenever any work is being done contrary to the provisions of the City Codes, the Chief Building Official or his authorized representative may order the work stopped by notice in writing served on any Persons engaged in the doing or causing such work to be done and any such persons shall forthwith stop such work until authorized by the Chief Building Official to proceed with the work. 3. The stamped set of approved plans shall be on the job site at all times. 4. NOTIFICATION OF NONCOMPLIANCE If, in the course of fulfilling their responsibilities, the civil engineer, surveyor, the soils engineer, the engineering geologist or the testing agent finds that the work is not being done in conformance with the approved grading plans, the discrepancies shall be reported immediately in writing to the person in charge of the grading work and to the Building Division. Recommendationsfor co measures, if necessary, shall be submitted to the Building Division for approval. rrective 5. When import or export of materials is required, haul routes to and from the site shall be approved by the City Traffic Engineer and hauling procedures shall be in accordance with Chapter 15 of the Newport Beach Municipal Code (NBMC). Contractor shall use Best Management Practices are addressed. (BMP's) to insure that all water quality issues 6. Between October 1 and April 30, erosion control BMP measures shall be in place. During the remainder of the year dry season wind erosion BMP's (dust control) shall be implemented. Sediment control BMP's shall be isediment nstalled and maintained at all operational storm drain inlets internal to the project BMP's to control off- site stormwaterf omnconstruction activshall be it es shall be mplemented.ented and maintained. AAP ropriate weather tMP s to Prevent contamination of to deploy BMP's to protect all exposed portions of the site within 48 -hours when the National Weather Service forecasts a 50% or greater chance of rain. triggered" action plan and the ability 7. All fills shall be compacted throughout to a minimum of 90 percent compaction as determined by ASTM test method 1557and report and approved by the soils engineer. Preliminary sCompaction tests shall be performed according to the 8. All trench (including interior and exterior utility trenches) and retaining wall backfill shall be compacted throughout to a minimum of 90 percent relative compaction and approved by the soils engineer. 9. Whenever work on which required inspection/testing is covered by additional work without first being inspected/tested, the Chief Building Official shall require by written notice that the work be exposed for examination. The work of exposing and recovering shall not entail or be subject to expense to the City of Newport Beach and will be the sole expense of the Permittee. 10. Landscaping of all slopes and pads shall be in accordance with 15.10.130 of the NBMC. 11. Approved drainage provisions shall be used to protect adjoining properties during the grading operation. 12. The permittee or his agent shall notify the Building Division when the grading operation is ready for each of the following inspections: a. PRE - GRADE MEETING When the permittee is ready to begin work, but not Tess than two days before any grading or brushing is started. h. DRAINAGE f terrace drains, down drains or after placement of pipe 1n DEVICE INSPECTION After forming o subdrains, but before any concrete or filter material is placed. grading has been completed, the rough grade report shall be provided to d' the (ol .;GInspector e foulndation9nspection or sooner based on the Building Inspector s discretion. onofired reports have been submitted. completed and the as -graded plan, professional approvals and the requ e. FINAL When all work, including installation of all drainage structures and other protective devices, has been roved b the Geotechnical royal shall be submitted to the Building Inspector. Engineer or Engineering Geologist Written app All footing excavations, slab on grade areas and subdrains shall be inspected and app lace. prior, to any on Prior to the start of grading, all permanent property comer monuments shall bwiththe County of Orange shallbe inspections, proof of recordation of the "comer record" or `record of survey' provided.Code of the City of The undersigned acknowledge a copy of the above and agree to comply with the Grading of the permit special requirements Newport Beach, the recommendations of the project soils report and any y the surveyor of Prior to foundation inspection a Line and Grade Certificate Form must signed and stamped by record and submitted to the building inspector. A Structural Observation Report may be required. All al listed below must be present for the pregrade meeting unless approved by the building inspector. P V��DGE IGS N CIVIL ENGR.: FOQ Kt Ei�61 ( lel OWNERICONTRACTOR: 5���� ' By: OM By: scb ��zCE��i� 7j�I wuhd✓ 9f6��t Address: ✓IEtJI�bzT 9a �OG3 Telephone: ZZ�I Bn00� 3f Telephone: 141 30`6-265`67 GEOTECHNICAL ENGINEER: C(,-aW1NG! I/Vlf GEOLOGIST.: 5, � MBy: By. Cvv iu�e ISD elz(Wo d Address: - Telephone: Telephone: GRADING CONTR.: '� "�'a� ' (C-d2®�P • By:V-A. y iil By: Address: 3 - W �2 Address: Telephone: Telephone: NEWPORT BEACH REPRESENTATIVE: «.. �_ Lan( PHONE#: 9tj__ 5 L�L�� INSPECTION REQUESTS: (949) 644-3255 New ort Beach Construction U ours: o 6:30 p.m. Monday through Friday: Saturdays: 8:00 a.m. to 6:00 P.M. No work on Sundays and Holidays Foms\pregrade meeting agreement 8-12 From: CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov1 (949) 644-3200 CIVIL ENGINEER'S CERTIFICATION FORM Date: Forkert Engineering & Surveying, Inc. July 11, 2019 22311 Brookhurst St, Ste 203 Huntington Beach, CA 92646 ATTENTION: GRADING ENGINEER, BUILDING DIVISION GPC No.: 2245-2017 Tract/Subdivision/Lot No.: Rough: _Final: x Project Names: 3803 Marcus Ave Owner/Developer: The William Scott Upshall Family Trust Type of Project: Notes: _Tract: _ Drainage SFR _ Commercial x Other Industrial Yardage for Project: Notes: 28 Cut: _ Borrow: 32 Fill: _ Export: I hereby approve the grading for this project in accordance with my responsibilities under the City Grading Code. I have inspected the project and hereby certify that all areas exhibit positive surface flow to public ways or City approved drainage devices. The grading has been completed: in conformance with, with the following changes to the approved grading plan. Description of Changes: QppFESS/ — �. a . RG — Company: Forkert Engineering & Surveying Inc N0.58827 Name: _ � r9✓'�j ��-ll�_ � EXP.12-31- (print) q� C10 - License No.: RCE 58627 OF CAS Forms\Civil E ngineer s CertifcaLon Form 9-13 ,gCEIVED ay CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION JUL 25 2018 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 926588915 www.newoortbeachca.00v 1 (949) 644-3200 CITYOF 4,�VpORT 6EP- SETBACKS AND TOP OF SLAB/FLOOR ELEVATION CERTIFICATE The purpose of this certificate is to insure that the structure is located properly on site per the approved drawings. This certificate also verifies the top of slab/floor elevation noted on the approved drawings. After the top of slab/floor elevation is verified to match the elevation specified on the approved drawings, the contractor and inspector can measure the height of the structure to the top of slab/floor to verify that it is equal or less than the dimension shown on building sections and elevations. This form must be filled out by a registered surveyor or civil engineer authorized to perform surveys. The survey must be done after the concrete forms are in place or preferable after the concrete slab is poured or raised floor is built, but prior to starting wall framing. Engineer/Surveyor's Name VRVI7> E. W/bOLLr Y License # 3L S Engineer/Surveyor's Address Zt'32— 1 4&t,307 -40Z,;,, Surrr-,4. %dS?7A)7 C/9' %l7L�O Job Address 38'03 M/tY s 4nE yfi 7 /v Setbacks: Sketch a site plan and specify surveyed setbacks (use back page). * Top of slab/floor elevation: * If slab/floor elevation varies, sketch a plan or section through slab on the back page and specify the elevations. Use same datum used in the survey of record. I certify that the setbacks are 0, are not ❑, per City approved plans. Describe any deviations from plans: I certify that top of slab/floor elevation(s) any dev ations from plans: AV Date Forms/SetbacksapdTopofSlabElevatii isX, is not ❑, per City approved drawings. Describe LZGL-809 (blL) XVd ZM—b£L (blL) 1N3WdOl3A30 213NVNIdS :1N3110 M30 :A8 'OXHO ZbOLI 09LZ6 VO 'Nusni VINHOdI1VO 'HOV38 1NOdM3N :SS3?J00V Nor :A8 NMVaO 'ON 311A V mins '3nN3AV inN1VM Z£9Z 3nN3AV snoHVW £09£ 9l/£Z/LO '31V0 Z 30 S3IVIOOSSV V A31100M I] 8W6WL0 3aVV9 aNV 3NIl 3NON :31VO5 Z 133HS r Z W i?f)fow w0Z7 In D w N V�YOR�[yj W X0 5b4�LEY �'¢0 D 0 v/ w30w� w o 6 aww0M ra _ o V d _w� o (> ; o "' 0" rs ova' �4 ■■ ~ Ow O v7 S Q. G N O W~ J 3 �30xa�cs� Z Z }a LW¢ OD ~ W ¢OW WW oWo _ Z Ow O KO V)" F W j oEPvwiz m� a W, mN)-JM ND It Q 04 >¢ j D_N �Z n O Foy 0 0) W z W En m " 0 z L fLn- l� } N F$ N Vi �} Q a�� I w Z 5 J F wg=) W SW xw 000 0 W� a f-m O"w L }O En JO} W a �� W ~� y �D 0O HU ¢ fY' Z �w Q 0_' w 0 Q �w oM: } �wJp IL OF W m� c ~ D=Q= x WN m O LL Z N �I W \ Z0 ND \ w 0zo v% �m 00 QN m¢\ U Om" Z F- "}\ aW oo z W i =Wo Z y oa. o U Z N a J 0 g¢M ao LLI � 0LLJ LZ W ¢ m LJ y � V) ,00'b ,90'b mp 4 95'L=dd N N as o0�a=3d 4 m 0 Ni W o p, �00 U p4� m4 Z a m�� a4oQ 0 S � m Q� OM1' 0 0 a ri o N N y V h €m . I � I 30N3Atl (znnsnr 9ei9ra xzaawaoa) �� Sn9atlW I � I� �LL w �1 I (Ztl ,40'9[{'Itl AO'O[S),86'BZf Q 59HItltldB 30 Q 818tl8 M.966L9iN 1 N c� ly =� (za .ao'9{z •laaw) .9o'ocz _�_ _ — �w LL i (ztl ,z9'sn) (laarv) se'za ,crez d I (Ixxw) as'cv (9 ooa°r 6a ,00su7r(za ,z9'su'm.) AoS 6� a a'9t1 �V ait s goo o w � II n d6 a k g z kT O s W wJ � S Z ca J T m Zoz 88 N o N n d J ffi d d B= � S O�¢ao mZug FY a$ m VL/ Z �ms Z �w w w mm aNr oz; ; W <w < map Uc)s m 10'. �m� &� Y ��� Eo amo_< vmi�3 wE w m (laerv),zs'ez M,sl.fixecN y gs e O H mw a o z m m »mY 6F 7112 allo d <3 $ Man W O s or u � WEE aaa Id Edd .'ddb3&'n�n �oz n� �" 4� `�" F o"$d W9 nova 6 -ze a€d- g€z€ n €�" `e W �£N El ar E� € � s � INt o " ��a o �€ y n mrya Yzi n p a �0�Z um �i CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 BUILDING HEIGHT CERTIFICATION Project street Address: 3803 Marcus Avenue, Newport Beach, CA 92663 Building Permit Number(s): As the surveyor of record for the project at the above address, I hereby certify that I have reviewed the City of Newport Beach approved plan and original topographic survey and based the elevations listed below on those plans. Elevations shall include an allowance for roofing material thickness if not yet installed. Provide each critical ridge and flat roof, or roof deck railing elevations indicated on the approved plans. Use the format below on the back of this form if additional space is necessary or further explanation is needed. Provide original copy to the inspector before roof framing inspection. All elevation points are based on: O NAVD88 O NGVD29 O Assumed Please provide the following elevation information for the highest roof ridges, flat roofs, or parapets/guardrails. Additional elevation points may be requested by the Building Inspector. RIDGES (3:12 slope or greater) OA 1. Approved elevation point of ridge is 37.91 and actual elevation point is 37.74 © 2. Approved elevation point of ridge is 37.91 and actual elevation point is 37.71 © 3. Approved elevation point of ridge is 37.91 and actual elevation point is 37.78 FLAT ROOFS, PARAPETS AND GUARDRAILS OD 1. Approved elevation point of flat roof or parapet is 32.67 and actual elevation point is 32.39 . O2. Approved elevation point of flat roof or parapet is 32.67 and actual elevation point is 32.42 . © 3. Approved elevation point of flat roof or parapet is 32.88 and actual elevation point is 32.42 . I certify that the above height measurements are correct and the above project: OIS in compliance with the City -approved plans. OIS NOT in compliance with the City -approved plans (Provide explanation). Please describe any deviation from the City -approved plans on the back of this form. urveyor or Civil Engineer's* signature and seal (Wet stamp and signature required) * License number of 33965 or lower Foms\Building Height Certification 11/02/16 11/28/18 Date r C990 tl0'HOtl3SR .......•... a.o..a I �tl SflotlVWE �= slaaiixOev NOONVUO 3WOH MIS f1O if i ° � $ $ €� [F`s� IH�p��i� g'•$='�;:i 9p €= sP;{€s'��9�6fg@o�$'�€6 Ilp� ° fixa s;°€f�a SP!.ab; r€ 4€ii$fi#i i 8 p9$fi a Pa;,€$ $'9e Sa €E p$E$ €P f3€s@a�a€$s$$ $2ilg$9 q� �8$FPg1 91;apg € it 1 a $4 zp°p�s@ei4' 88g8 �a m 8..86€ B 111119 ..f .f9Y .8�€.��f9 .�$$§ea°ea8 I 46 4 pi 6 I yy'' ss5 I 31 pp3; 9 614 0. 0 4 Eel p ° 64Sgk��a�32.1 e i$ l i Hill E3�i�€ i i 1 p�$gf g��e....$a �a if if fi ¢ 896898fi[p[�2�iapppff 3 �p 9e3ayelo C$6 E ! sii8si€ a I p g v \ g�� 88g8 a5 � $8a Iu Hill, Ilk ;Ila 5 $ a $e9@ g11 I @ CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.00v 1 (949) 644-3200 TEMPORARY POWER RELEASE APPLICATION (Inspection/Administrative Fee) COMMERCIAL: $188.00 RESIDENTIAL: NO FEE PROJECT: 3803 Marcus Ave., Newport Beach, CA 92663 OWNER'S NAME: William Upshall PHONE NO: 916-932-6976 JOB ADDRESS: 3803 Marcus Ave., Newport Beach, CA 92663 BUILDING PERMIT NO.(s): X2017-3235 Request is hereby made for the release of electrical on subject project only for the purpose of testing equipment and/or mechanical systems prior to building permit final approval. I agree that no building or structure shall be used or occupied until the Building inspector has issued a building permit final approval or Certificate of Occupancy. Moving in furniture, staging, showing for sale, or any use other than construction, shall be considered use or occupancy and a violation of this agreement (CBC 111.1). Furthermore, it is not our intent to use or occupy this building until all City regulations and conditions concerning this building have been complied with, and it is understood and agreed that the City of Newport Beach is hereby authorized to order disconnect of service without notification for any violation of the above conditions prior t9, 1nal pCoval or Certificate of Occupancy. OWNER or TENANT SIGNATURE( F �� DATE: 7 PRINT name of owner or tenant: PHONE #: Li'fgO —71 7 -/11 i 11 CONTRACTOR SIGNATURE: _Y� _ DATE: PRINT name of contractor:.' lle6- ALL PHONE #: ly�- 30�••�3 Forms\TEMPORARY POWER RELEASE APPLICATION. 09/13/2018 CITY OF NEWPORT BEACH 4 4 Community Development Department I Building Division 100 Civic Center Dr.] P.O. Box 1768 1 Newport Beach, CA 92658 www.newoortbeachca oov 1 (949) 644-3200 CALGREEN DOCUMENTATION COMPLIANCE CERTIFICATION ADDRESS:_IS03 Z t 5 A /� PERM IT NO.: 3a3S Y16r lTzT kkGt{ e—h 1a-663 THIS FORM ',SHALL BE COMPLETED AND SIGNED PRIOR TO REQUEST FOR FINAL BUILDING INSPECTION.; ONE COPY OF THIS FORM SHALL BE SUBMITTED TO THE BUILDING INSPECTOR AT FINAL INSPECTION AND ONE SHALL BE PROVIDED TO THE BUILDING OWNER AS PART OF THE CAL GREEN CERTIFICATION PACKAGE. The following] section shall be completed by a person with overall responsibility for the planning and design portion of the project. REQUIRED DOCUMENTATIONS PROVIDED TO THE PROPERTY OWNER(S) ®- Franchise Hauler for Construction/Demolition Waste (65% min. reuse of nonhazardous waste) 9 VOC Contents Limitation 9 Formaldehyde Emissions Limitation 51 T-24 Energy Certificate of Installations (Env., QII, Lighting, Photovoltaic, Mach., Plumb.) li� T-24 Energy Certificate of Verifications or Acceptance ( Env., QII, Lighting, Photovoltaic, Mach., Plumb., HERS) Operations and Maintenance Manual MOISTURE CONTENT OF BUILDING MATERIAL (RESIDENTIAL CONSTRUCTION ONLY) (� 1 certifyithat the moisture content of the wall and floor framing is less than 19 percent as determined in accordance with Section 4.505.3 of CAL Green prior to being enclosed. DECLARATION STATEMENT • 1 certify under penalty of perjury, under the laws of the State of California, the information provided is true and correct. • I certify that the installed measures, materials, components, or manufactured devices identified on this certificate conform to all applicable codes and regulations, and the installation is consistent with the plans and specifications approved by the enforcing agency. Responsible Person's Name: I Responsible Date Signed: Position/Titl . 4:::9"/a-19 1 5 C4 If1-1 Forms\CALGreen Documentation Compliance Cert Form 1-2017 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www,newportbeachca.gov 1 (949) 644-3200 CONTRACTOR/PROPERTY OWNER SELF -CERTIFICATION DECLARATION FOR PLUMBING FIXTURE REPLACEMENT Project Address: p Q, rAA 1Z4(e(S A //g- Date: Permit#: The following is to be completed by the California licensed contractor or owner, participating in the City of Newport Beach Self-Cer ificaattion Program. Please type or print. Installer's Name: ems License No (if applicable) Installer's Mailing Address: y7/a - 'Z' A7�5 /��¢ p > Phone # (required): '741;,0- 7,39-�(07� Installer's Email: '�' G� 93D10 FAX* -76 6 — 7 ,,L� — / `a' y Installers 1�L�vs7t3 1 hG [� ��lfOD, c6vh I certify that the installation is in compliance with applicable code requirements. I further affirm that I have reviewed and understand the requirements of the applicable 2013 California Green Code and Newport Beach Municipal Code (NBMC) Section 301.1.1 and that all self -certification reports submitted will be based on the code requirements contained therein. I declare that all plumbing fixtures subject to the NBMC 301.1.1 has been replaced meeting the low flow requirements: Kitchen faucets: 1.5 gal/minute at 60 psi Shower heads: 2.0 gal/minute at 80 psi Water closet: 1.28 gal/flush Faucets: maximum flow rate of 1.5 gal/minute at 60 psi, and minimum 0.8 gal/minute at 20 psi -«- r9 Installer's Signature Date Prooertv Owner (Required) As the property, owner of the project address noted above, I have read, understand and agree to participate in the Plumbing Fixture Replacement Self -Certification Program. I further understand that by participating in this program, the plumbing system will not be inspected by a City of Newport Beach Building Inspector during construction or after installation unless requested. The Building Division may request and reserves the right to verify code compliance after the ins allation is complete Pioperfy Owners signature Date iJrLL[,4Mt SCVZr L"11f 111 L� Sl.(`�.SE+A� di 4n6[/h/f/� GOatl Print-r Email This form must be completed and returned to the City of Newport Beach, Building Division, for a final approval of the combination permit. Please return this form to the Building Division by mail or fax. Please mail to: City of Newport Beach Phone: (949) 718-1888 Community Development Department Fax #: (949) 644-3250 Building Division P. O. Box 1768 Newport Beach, CA 92658 Forms\Contractor-ovmerself-certDeclamton-Plumbing Fixture Replacement 08/11/16 xgol l- 32 35 F roject Status Report 3'903 9Nc> gals Ave CaICERTS, Inc Effective: 08/08/2019 07:31 1 of 3 GENERALiNFORMATION Energy Standards Code Year: 2016 Project Name: 17153 Upshall % Project Type: New Construction SFR Address: 3803 MARCUS AVE r City / State / Zip: Newport Beach / CA / 92663 ~ I Enforcement Agency: City of Newport Beach ❑ Permit Number: X2019-1452 Easy to Verify @ calcerts.com HERS VERIFIABLE ICOMPLETE MEASURES: OVERALL STATUS: COMPLETE GF1R INFORMATIO e'rtriicate of�ompl�ance (Liss Requ�r`"ed EnergxAFeaures�, ; Certificate Type: Compliance Registered Form: CF1R-PRF-01 Registered Date: 10/05/2017 03:26 Registration Number. 217-P010343697A-000-000-0000000-0000 R►bOTTIf3'NAL Cis " g1d 5 Rm,0;," stemY Registrarm io umber CF1R-SRA-01 08/03/2019 217-P010343697A-R01001A (Solar Ready Area) 14:20 Travis Bond (SPINNAKER DEVELOPMENT LLC) �CF2R�INORMAT©N GAtt��ioates�:of Inst�llat�on-(Doeumenttiefiproµer mstallit�on of rqu�red ener9Y, features) M.,, i 5 stem Y Form ered NumberCF2R-ENV-Ol-E eRe�stratron� 019 217-P010343697A-000}001-EO1001A-0000 (Fenestration Installation) Travis Bond(SPINNAKER DEVELOPMENT LLC)CF2R-ENV-03-E 19 217-P010343697A-000-001-E03001A-0000 (Insulation Installation) Travis Bond r,4.36 (SPINNAKER DEVELOPMENT LLC) CF2R-ENV-21-H 19 217-P010343697A-000-001-E21001B-0000 (QII-AIS-Batt, Loose Fill, Travis Bond and SPF) (SPINNAKER DEVELOPMENT LLC)CF2R-ENV-22-H 19 217-P010343697A-000-001-E22001A-0000 (QII-Air Infiltration Sealing) Travis Bond (SPINNAKER DEVELOPMENT LLC) CF2R-ENV-23-H08/03/2019 217-P010343697A-000-001-E23001B-0000 (QII-Installation) 14:36 Travis Bond (SPINNAKER DEVELOPMENT LLC) CF2R-LTG-01-E 08/03/2019 217-P010343697A-000-001-LO1001A-0000 (Lighting) 14:36 Travis Bond (SPINNAKER DEVELOPMENT LLC) CF2R-MCH-01-E 08/03/2019 217-P010343697A-000-001-MO1001A-0000 (Space Conditioning 14.36 Travis Bond C Systems, Ducts and Fans) (SPINNAKER DEVELOPMENT LLC) HERS Provider: CaICERTS Inc. Project Status Report CaICERTS, Inc Effective: 08/08/2019 07:31 2 of 3 HERS Provider: CaICERTS Inc. CF2R-MCH-20-H 08/03/2019 3697A-000-001-M20002A-0000 System 1 (Dud Leakage) 14:36 TraysOBond (01 (SPINNAKER DEVELOPMENT LLC) CF2R-MCH-21-H 217-PO10343697A-000-001-M21002A-0000 System 1 (Ducts Located In 14/36/2019 Travis Bond Conditioned Space) (SPINNAKER DEVELOPMENT LLC) CF2R-MCH-23-H 08/03/2019 3697A-000-001-M23002A-0000 System 1 (Airflow) 14:36 Travis Bond (SPINNAKER DEVELOPMENT LLC) CF2R-MCH-22-H 08/03/2019 217-PO10343697A-000-001-M22002A-0000 System 1 (Fan Efficacy) 14:36 Travis Bond (SPINNAKER DEVELOPMENT LLC) CF2R-MCH-25-H 08/03/2019 217-POBond 3697A-000-001-M25002A-0000 System 1 (Refrigerant Charge) 14:36 Travis (SPINNAKER DEVELOPMENT LLC) CF2R-MCH-25-H 08/03/2019 3697A-000-001-M25003A-0000 System 2 (Refrigerant Charge) 14:36 Trav217-Pis s 4 (SPINNAKER DEVELOPMENT LLC) CF2R-MCH-26-H 08/03/2019 OB1o0r3d43697A-000-001-M26002A-0000 System 1 (Rated Equipment) 14:36 Travis (SPINNAKER DEVELOPMENT LLC) CF2R-MCH-26-H 08/03/2019 3697A-000-001-M26003A-0000 System 2 (Rated Equipment) 14:36 Travis Bond (SPINNAKER DEVELOPMENT LLC) CF2R-MCH-27-H 08/03/2019 217-PO10343697A-000-001-M27001A-0000 (IAQ and MV) 14:36 Travis Bond (SPINNAKER DEVELOPMENT LLC) CF2R-PLB-02-E 08/03/2019 217-P010343697A-000-001-BO2004A-0000 (SD HWS Distribution) 14:36 Travis Bond (SPINNAKER DEVELOPMENT LLC) CF3R INFORMAer icate rtNerr i qqu eri atr f HERS es . ill System m t �grs�Fetrd'®'�' rrh Rgistia �oriNuin�ek, MN CF3R-ENV-21-H 08/03/2019 217-PO10343697A-000-001-E21001B-E21A (QII-AIS-Batt, Loose Fill, 14:42 Rex Hoefer Dang and SPF) (REX QUE HOEFERDANG) CF3R-ENV-22-H 08/03/2019 217-PO10343697A-000-001-E22001A-E22A (QII-Air Infiltration Sealing) 14:42 Rex Hoefer Dang (REX QUE HOEFERDANG) CF3R-ENV-23-H 08/03/2019 217-PO10343697A-000-001-E23001B-E23A (QII-Installation) 14:42 Rex Hoefer Dang (REX QUE HOEFERDANG) CF3R-MCH-20-H08/03/2019 217-P010343697A-000-001-M20002A-M20A System 1 (Duct Leakage) 14:42 Rex Hoefer Dang (REX QUE HOEFERDANG) CF3R-MCH-21-H 08/03/2019 A-000-001-M21002A-M21A System 1 (Ducts In Cond Space) 14:42 Rex Hoefer Dang (REX QUE HOEFERDANG) CF3R-MCH-23-H 08/03/2019 217-PO10343697A-000-001-M23002A-M23A System 1 (Airflow) 14:42 Rex Hoefer Dang 0 (REX QUE HOEFERDANG) System 1 CF3R-MCH-22-H 08/03/2019 Rex Hoefer Dang A 000-001-M22002A-M22A (Fan Efficacy) 14:42 (REX QUE HOEFERDANG) System 1 CF3R-MCH-25-H 08/03/2019 Rex Hoefer Dang A-000-001-M25002A-M25A (Refrigerant Charge) 14:42 (REX QUE HOEFERDANG) CF3R-MCH-25-H 08/03/2019 3697A 000-001-M25003A-M25A System 2 (Refrigerant Charge) 14:42 Rex Hoefer Dang (REX QUE HOEFERDANG) CF3R-MCH-26-H 08/03/2019 217-PO10343697A-000-001-M26002A-M26A System 1 (Rated Equipment) 14:42 Rex Hoefer Dang (REX QUE HOEFERDANG) HERS Provider: CaICERTS Inc. I Project Status Report Ca10ERTS, Incl Effective: 08/08/2019 07:31 3 of 3 System 2 CF3R-MCH-26-H 08/03/2019 Rex HO10343697A 000-001-M26003A-M26A (Rated Equipment) 14:42 Dang(REX QUE HOEFERDANG) CF3R-MCH-27-H 08/03/2019 (IAQ and MV) 14:42 1217-PO10343697A-000-001-M27001A-M27A Rex Hoefer Dang (REX QUE HOEFERDANG) HERS Provider: CaICERTS Inc. 3 903 Marcus Ave mcyjnlelj ELEVATOR CORPORATION August 6, 2019 Dear Mr. Dellegatte: The residential elevator installed at 3803 Marcus, Newport Beach, CA 92662, was built according to ASME A17.1 codes by the manufacturer and installed by McKinley Elevator Corporation, a State -licensed conveyance company, in accordance with ASME 5.3 2004. Attached are copies of both our state contractor's license and our certificate as a State -licensed installer of conveyances. If you have any questions regarding this elevator, I may be contacted at (949) 261-9244 or mark 2 ,mckinleyelevator.com. Sincerely, J Mark McKinley., McKinley Elevato Corporation 1761 1 Armstrong Avenue 555 Fulton Street. Suite 202 Irvine, California 92614F&I San Francisco, California 94102 549/261-9244 415/526-5951 FAX 949!955-3675 www.mckinleyelevator.com FAX 415/626-9954 99011-3235 3$03 moscus 4me �gW PpRT p� @� CITY OF NEWPORT BEACH u rt s COMMUNITY DEVELOPMENT DEPARTMENT �a BUILDING DIVISION o9<rFoa� 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newoortbeachca.gov 1(949)644-3200 Structural Observation Report Project Address: 3803 rte+ -r-" Avg Report Date: 02./13/26)19 CNB Inspector Name: CNB Permit #: Building O er : S�,TT J S4i-,, L tAiLLJrP Own Mallin Address (if different from site); 10 460 CAYa't�a T N��STEd/ Owner's Telephone #. CNB Plan Check #: TWub 0 Concrete Full Name of Structural Observer (SO): SO E -mall Address: SO Telephone #: SO License / Reg. #: t4,-SWAi-1 @, w P,s%.Com (949)zer.-994 53812 MRS u Ar-pwn .e ❑ Wood EXT •400 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes) FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED • Conventional Footings & Slab ❑ Concrete ❑ Steel 0 Concrete ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck ❑ Caissons, Piles, - Grade Beams ❑ Wood or Manuf Shear Panels ❑ Masonry ❑ Wood ❑ Other. ❑ Other: ❑ Other: ❑ Other. ❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: ❑ REPORT CONTINUED ON ATTACHED PAGES. jK FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. -.1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY FomulSvucmrelObservnionftepondrnswdwm STAMP OF STRUCTURAL OBSERVER OF THE CITY OF NEWPORT BEACH. CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 Structural Observation Report Project Address: 3,503 MAP -C US AVF- . Report Date: O7 2 5116 CNB Inspector Name: CNB Permit #: Building Owner Name: AMILY Rd$ SCOTT up.5 u_ TOmers Mailing Address (if different from site); iw4 5ulvcAs LN4 SUITE Z Owner's Telephone #: CNB Plan Check*: THE WILI_lRM iu-s 9C742- 6P_APr� �ANJS , �7 Full Name of Structural Observer (SO): $°DNA MIF'ZJaHOSS&INKP+SNANL SO E-mail Address: S. KASHAN/LVVSA&F-• SO Telephone #: (949)2oG-992y SO License / Reg. #: �2 . , _'. EXT 9.01 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes) FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATIONS) OBSERVED DATE OBSERVED XI Conventional Footin s & Slab El Concrete ❑ Steel ❑ Concrete 6P_APr� �ANJS , �7 ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck H,=)( 5,q&Az TI &S ❑ Caissons, Piles, Grade Beams ❑ Wood or Man uf. Shear Panels ❑ Masonry ❑ Wood NT OTu lerls ❑ Other: ❑ Other: ❑ Other: ❑ Other:�)rS� /�OLpC7WN ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. 1, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. 971 SIGNATURE OF STRUCTURAL OBSERVER OF RECORD DATE C 82840 STAMP OF STRUCTURAL OBSERVER STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. Forms\Struuum Observatma Vort&instructions CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca:aov 1 (949) 644-3200 Structural Observation Report Project Address: 3803 /7A COS AVE. Report D te: 057016 CNB Inspector Name: CNB Permit #: Building Owner Name: HMiL TV -L;& 1 Owner' M llin Addressif diff rent from site); Owner's Telephone #: CNB Plan Check #: ?'Ha VJ14 _1AH SCOTT UpSM�� t� o viv eASr( S�'5uiT-a 62 ❑ Concrete ❑ Steel ❑ Concrete Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License / Reg. #: fdflA rtIIZZ�NdSS�N�SN��c°�.�, �-/C.t•}5'Hiyl�/@)�t�iA.SE. z�-9929 C�2134� 4V7 -foy PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check aw3licable boxes) I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. C 82840 STAMP OF STRUCTURAL OBSERVER STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BYAUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. Forms\StmcWmIObse,nti.Sd port&lnstmetions FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete ❑ Mat Foundation, ete ❑ Masonry ❑ Concrete ❑ Steel Deck f" 1 -T SLAS ❑ Caissons, Piles, Grade Beams ❑ Wood or Manuf. Shear Panels ❑ Masonry ❑ Wood ❑ Other: ❑ Other: ❑ Other: ❑ Other: XITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. C 82840 STAMP OF STRUCTURAL OBSERVER STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BYAUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. Forms\StmcWmIObse,nti.Sd port&lnstmetions COMMUNITY DEVELOPMENT _DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.aov 1 (949) 644-3200 Project Address: 3903 MR�GuS AVS. Report Date: Name: CNB Permit#: r—R!`9rL Building Owner Name: S rHC IIJ/L-IAH 560TT U�'�ffA'a— Owner' M lin Address if diff rent from site);ephone#: lam+ v CAsrt ���surr s6Full Ltor CNB Plan Check#: ❑ Steel ❑ Concrete Name of Structural Observer (SO): SO E-mail Address: ne #: SO License /Reg. #� El Caissons. Piles, Grade Beams El Wood orManuf. Shear Panels 0 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED !r. hprk nnnlirahle hnYPSt FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete ElMat Foundation, Prestressed Concrete ❑ Masonry ❑Concrete ❑Steel Deck El Caissons. Piles, Grade Beams El Wood orManuf. Shear Panels ❑ MasonryWood ❑ Other: ❑ Other: ❑ Other: ❑ Other: ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. SIGNATURE OF STRUCTURAL OBSERVER OF RECORD DATE STAMP OF STRUCTURAL OBSERVER STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. Forms\SwcwrelObservstiardtepart&ianmcEons CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 Structural Observation Report Pro ecl Address: 4808 MARCUS Avg Report Date: (0 03116 CNB Inspector Name: CNB Permit #: BrWuil ng O� ANaroeS.0.r.7, VpSNAt-L- W M Ovion s Mailing Address (if different from site); SWVZHST U#N�� STE Z Owner's Telephone*., CNB Plan Check #: FAr.H l t -Y 7?-"TfoZA al— b4p2a0>'5 957" ❑ Mat Foundation, Prestressed Concrete ❑ Masonry Full Name of Structural Observer (SO : 'rorff3 NsNvl SO E-mail Address: S _�tiL}Nl SO Telephone #: (99J2o6-9929 SO License / Reg. #: 21�F© PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check aoDlicable boxes) FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS Floor/Roof) INDICATE LOCATION(S) DATE OBSERVED OBSERVED • Conventional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck ❑ Caissons, Piles, Grade Beams ❑ Wood or Manuf. Shear Panels ❑ Masonry QQ Wood" 3 F:LP— !vA)L NCn INGWV1 ❑ Other: 1 0 Other: ❑ Other: ❑ Other. STRAps/ II aL_0CVIMCf 19 ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in- general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. C 82840 STAMP OF STRUCTURAL OBSERVER STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. FomLMtmcturdlObsematio0 ep A&LMmctiom CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newoortbeachca.aov 1 (949) 644-3200 Structural Observation Report Project Address: 3803 Marcus Ave Newport Beach Report Date: 10/24/2018 CNB Inspector Name: CNB Permit#: Building Owner Name: Owner's Mailing Address (if different from site); Owners Telephone #: CNB Plan Check #: Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License / Reg. M Masoud Jefari M.jafari@wsase.com 9492069929 EXT400 S3812 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED check applicable boxes FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck ❑ Caissons, Plies, Grade Beams ❑ Wood or Manuf. Shear Panels ❑ Masonry fd Wood Roof Sheathing and Nailing ❑ Other: ❑ Other: ❑ Other: ❑ Other: ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. 0 OBSERVED DEFICIENCIES AND COMMENTS: There is no deficiency identified at the time of observation. ❑ REPORT CONTINUED ON ATTACHED PAGES. 0 FINAL STRUCTURAL OBSERVATION REPORT: The structure generall complies with the approved construction documents and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3, 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. 10/24/2018 DATE STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. fo=%Stm<ture O0 amfionRepong.11 radio. __COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.pov 1 (949) 644-3200 Structural Observation Report Project Address: 3903 i7Pge-US AVE. Report Date: CNB Inspector Name: CNB Permit#: Building Owner Name: RI`foL TAGS Owner' M lin Address if diff rent from site ; ) 12D V r ' Owner's Tele hone #: p CNB.Plan Check #: 7Ha WIWWAH SGaiT 0P5HA1U- -A& Y5LJrrc 62 B Full Name of Structural Observer (SO): SO E-mail Address: w�raSF. SO Telephone #: SO License / Reg. #: C<5264-tl fF1FFA t4II�SSrn�KK`15Hs?r��e �j;, g.l}SHR/�/C, z®�-99zs Wood or Manuf. Shear Panels EXT deg Pi FAcr wnICATE :gTR[IrTlIRAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes) FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck ❑ Caissons, Piles, Grade Beams Wood or Manuf. Shear Panels ❑ Masonry ❑ Wood �iT�e1o/' W�17 WPrLL5 )//p2 11 ❑ Other: ❑ Other: ❑ Other: ❑ Other: 1X ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. S I AMH Ur b I KUU 1 UKAL UbbtC VCK STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CRY OF NEWPORT BEACH. FocrosVSnucwrelObservatioeReporc&instructions 1) We checked GLB 3 1/2 x 117/8, 12" O.C. that has been used instead of PSL 3 '/2 x 117/8 as the floor joist at 2nd floor between grid 4 & 6. It works. 2) We updated detail AA/SD-4 per your request that you can pass the air conditioning duct through it. 3) For CMST 14 strap at grid A.1 , please use 14-'/a" dia. SDS, min 6" LG to connect filler to beam below, the top of SDS Screw must be flushed with filler. Then nail CMST 14 on top of the filler (See attached pdf file). 4) For the connection at top of FtF'Xs per your request we provided an alternate. You can use screw or weld to connect top of hardyframes to bent plate (See attached pdf file). Please do not hesitate to contact us if you have any further questions. Have a great day. Regards, Soha Kashani, P.E. Project Manager WSA LOGO EMAIL SIGNATURE 23 Orchard Rd.. Suite 250 Lake Forest, CA 92630 c� Z 0 >7 r N c� Z 0 >7 � o CY �ozw �zv)� N v 00 �l 2 a— z co � 2 3 cn 2 w n n a ry r 0 � o CY �ozw �zv)� IXT WILLIAM SIWSON& ASSOCIATES, INC. UPSHALL CUSTOM HOME JOB. 7181 SHT. SK -1 CONSULTING STRUCTURAL ENGINEERS 3803 MARCUS AVENUE NEWPORT BEACH, CA 92663 23 ORCHARD, SUITE 250 P (949) 206-9929 DES. MJ LAKE FOREST, CA 92630 F (949) 206-9955 www.wsase.com mail@wsase.com BOT STRAP DETAIL. DATE 9/26/18 2xFILLER x12" LG FLR SHTG W/10 -10d NAILS 2xFILLER 10d NAILS @ TYP MAX 4" O.C. mill F. J. TYP 4-16d NAILS (E) BLKG CONT STRAP PER PLAN 13/4" PSL FULL DEPTH BLKG W/"A35" EA END (2 TOTAL PER BLKG) AT FULL LENGTH OF STRAP 10d NAILS @ MAX 4" O.C. F.J. TYP (E) BLKG 4-16d NAILS /� p /� �+ SHEAR TRANSFER N.T.S. A Q�(FESS/pv S 3812 U F of C o 9/26/18 Vol �I\ @ q EL z� w E- co Q w u a xvn ,z 0 0 o>� Li oz w (n Q xQS0 w � xP0w3: �a-wz LLI J�oCLcn cn xJw(n Q zo Q L -J -Om~ m F ---w w mz �¢ 0 Q� �w 0 IL a- J Q w w w Z = Q N m S U I Li O w cl� LLJQ Z J J Df Q-iEo S a_ o S I = x < LLJ o = a <�cn U) I C/) (Y w >- >- (n C) Z I— i -Q- owQ ��S' �� J_ I-�o X w N C- U) �I\ @ q EL z� w E- co Q w u a xvn ,z 0 0 o>� Li oz w (n Q xQS0 w � xP0w3: �a-wz LLI J�oCLcn cn xJw(n Q zo Q L -J -Om~ m F ---w w mz �¢ 0 Q� �w 0 IL a- J Q w w w Z = Q N m S U I Li O w cl� LLJQ Z J J Df Q-iEo S a_ o S I U4 WILLIAM SIMPSON & ASSOCIATES, INC. CONSULTING STRUCTURAL ENGINEERS 23 Orchard, Suite 250 P (949) 206-9929 Lake Forest, CA 92630 F (949) 206-9955 www.wsase.wrn mai mailOwsase.comase.com October 3, 2018 Building Division City of Newport Beach 100 Civic Center Dr. Newport Beach, CA 92660 RE: Substitution of PSL beams to GLB of the 2"a floor framing, located at: 3803 Marcus Ave. Newport Beach, CA 92663 WSA Job #7181 To Whom It May Concern, We have reviewed the substitution of the floor beams from PSL to GLB, with the same size as PSL, of the 2"d floor framing of the referenced property, and have found this substitution to be structurally acceptable. Respectfully submitted, Masoud Jafari, S.E. Principal CITE' OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DMSI®N 900 Civic Center Drive I P.O. Box 17681 Newport Beach, CA 92658 yun u.nev/� ILr-e,clica._Qq (949) 644-3200 Project Address: �A©-3 9&e(Ilefl< Permit Number: x Inspection Type (s):Xl75 ae. inspection Date (s): k �iA { )Periodic (j:') Continuous To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above. speckmlinspector signatifte: Describeinspection,includingLacatlon(s): F a -A4 -z-5 vk& g7 Led '513 S d "A z r—re"s';n r i� ListUM Made: Total Ins coon Time Each Day: Date: 1 7 Q. Hour F F List Ali items Re0bing correctionQnctudePreviously Listedllncorre;mdhems): Comments: To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above. speckmlinspector signatifte: Date: F Prim Phil Mame: Newport Beach Re "ion No.: i� Special InSpecnonRepOrt 8-2415 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658 www. newoortbeachca.aov 1 (949) 644-3200 SPECIAL INSPECTION REPORT r, . Project Address: :2 -, � (% __.� i ' ti ; . %c Permit Number:_ Inspection Type (s): Inspection Date (s): .' ` I'K ( ) Periodic (k.) Continuous List Tests Made: t °tLri �I t� .R t. J, (-7 F , i, ..1 7 ,! To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above. Special Inspector Signature: - Date: Print Full Name: Newport Beach Regi tratlon No.: r r�. Speciallnspection Report 8-24-15 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658 www.newoortbeachca.aov 1(949)644-3200 SPECIAL INSPECTION REPORT Project Address:_ 3503 I, 1 A 2 C U e Al 22 Permit Num Inspection T Inspection Date (s): K- I °L1; - I'd ( ) Periodic (y Continuous To the best of my knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above. M Special Inspector Signature: Dater Print Full Name: Newport Beach Registration No.: 641AOIny Jvn.es GS�!fS Special Inspection Report 8-2415