HomeMy WebLinkAboutX2019-1578 - Alternative Material & Methodsi Ill
70(m" x2oi�( - 1s�8; I �,D`� Wghl"d Dr.
RECF,��
O�
CITY ONEWPORT
O]BEACH
oM�M
c2
REQUEST FOR MODIFICATION TO PROVISIONS
OF TITLE 9 (FIRE -CODE) OR TITLE 16 (BUILDING CODE)
EHCOMMUNITYDEVELOPMENT DEPARTMENT
✓U�
(See Reverse for Basis for Approval) (Fee $294)
BUILDING DIVISION
'-R100 Civic Center Drive ) P.O. Box 1798 1 Newport Beach, CA 82558-8915.
n o
9FF�
OR METHOD OF CONSTRUCTION
www.aewoortbeachcalaov 1 (949).644-3200.
, 6�F<OA
ion Type R-rN Iuwpft4
REQUEST FOR EXEMPTION FROM DISABLED
y❑
_7
s - I
Fee due
CONSTRAINT (Fee $1,637)
O
�ryT
(Ratification by the Board of Appeals will be required.)LEI
TRIBUTION
B@AOy,
iv Ina euaUINU UVARD:OF APPEALS (See Reverse)
(Signature; statement of owner or applicant, statement of reasons fort appeal and filing fees are required.)
CASHIER RECEIPT NUMBER: ti� 0 cty (Lz/ I Fommtinodif 09/2v1e
.G M
CASE NO.:.
i y�
❑
FOR STAFF USE ONLY
REQUEST FOR MODIFICATION TO PROVISIONS
OF TITLE 9 (FIRE -CODE) OR TITLE 16 (BUILDING CODE)
ck#//L'ZG7 #Gf Stories Z.
OF THE NEWPORT BEACH MUNICIPAL CODE
(See Reverse for Basis for Approval) (Fee $294)
y Classiflrat(on. �-3 /L1
Q REQUEST FOR ALTERNATE MATERIAL
llding S h�# Gf Units f
FNo.W
OR METHOD OF CONSTRUCTION
atus.(See
Reverse for Basis for Approval) (Fee $294)
ion Type R-rN Iuwpft4
REQUEST FOR EXEMPTION FROM DISABLED
y❑
ACCESS DUE TO PHYSICAL OR LEGAL
s - I
Fee due
CONSTRAINT (Fee $1,637)
(Ratification by the Board of Appeals will be required.)LEI
TRIBUTION
Owner L&plan Check C110
For above requests, complete Sections f, 2 & 3Petitioner
El
below by printing In ink or. typing...
Fire ❑ Other
jiJOBADORESS:
PETITIONER ADDRESS:
SITE ADDRH$Si 1508 HIGHLAND DR. NEWPORT BEACH, CA 82660
Petitioner AQx ENGINEERINOGIANG VAG
Owner KEVIN TaETS.
:lpetgiarrer to be archlfeot or enain"r)
Address 1608HIOHLANDDR.
Address 152081100KNOLLOWDRNE,SUR45
NEWPORTSEACH Zlp 32660
SANTAANA,CA Zip 92706
Daytime Phone ('.we ) 376-7406-
Daytime Phone ( 714 ) 6620610
2 REQUEST: Submit lans If necessary to Illustrate reguest. Additional sheets or data may be attached.
sa
USTIFICATION/FINDINGS OF EQUIVALENCY: CODE SECTIONS:
SIKH MB SOLVENT FREE, EPDXY MOISTURE BARRIER Provides Permeabliltv of
0-06 91m2 24h; FAFaHG keepliqg the SAGIIAg slab and existling Walla an 't wisuld keep
e cos s own an no compromise EXis,Ing o0 Ing s U Ura y
Petitioner' Position
Signatu CA professional Lic. # s. 6280 W 0600120 Data 2dj
FOR STAFF USE ONLY --
DEPARTMENT ACTION In acporilance vnth: ❑ CBC 104.11/CFC 104.9 ❑CBC 104.10/CFC 104.8
(Alternate materials 8 methods) '. (CBG Modification)
❑ Concurrence from Fire Code Official, Is required:. ❑ Approved ❑ Disapproved ❑: Written Comments Attached s
By: Date
❑ Request (DOES) (DOES NOT) lessen any fire protection requirements.
❑ Request (DOES) (DOES NOT) lessen the structural Integrity
The Request Is Granted 171 Denied (Sea reverse for."
❑ Granted (Ratification required) appeal Information)
Conditions of Approval:
Signature - Position SMj�UII MN -OFFI a.
Print Name- -
iv Ina euaUINU UVARD:OF APPEALS (See Reverse)
(Signature; statement of owner or applicant, statement of reasons fort appeal and filing fees are required.)
CASHIER RECEIPT NUMBER: ti� 0 cty (Lz/ I Fommtinodif 09/2v1e
Guidelines for Approval of Alternate Materials. Design and Methods of Construction
Basis For Approval
For the Chief Building Official and Fire Code Official or their designated agent to approve a request for modification
or a request for alternate material or method of construction,. he/she must determine that special, individual reasons
exist that make compliance with the strict letter of the Code impractical and that equivalency is provided. The
resulting condition must beinconformance with the spirit and purpose of the Code provisions involved and that
such modification: does not lessen: fire protection, structural integrity or occupant safety. The applicantmust provide
sufficient Information with this application to allow the above evaluation to be made.
Reauirements for Submittals
The applicant designprofessionalshall prepare a Written Report that describes the alternate proposal along .with the
applicable data listed'below:
• State specific code provisions for which alternative is requested and why request is being submitted.
• Describe by code section those provisions for which alternative is desired..
• Compare the proposed alternative versus the code requirements in terms of structural strength, suitability,.
effectiveness, fire resistance, safety and health impacts affecting the building or user of the building.
• Demonstrate that the proposed alternative iscompatible with balance of code requirements,.
• When applicable, specify how authoritative consensus document(s) are used to substantiate proposal.
(Reference draft ]CC Building Performance:. Code Commentary Section 1.4.2.3 for background information)..
• Provide assumptions, references, and documentation of evaluation: methods utilized. This: includes intended
use, input data, anticipated outputs, and limitations of computer models and other analytical tools or methods.
• Specify when and where special inspection and testing are required and the standards of acceptance for
demonstrating compliance. Show how the proposed alternate, if accepted, will be identified on. the ;job site.
• Where land use restrictions and building setbacks are required, deed restrictions may be an appropriate
method to ensure continued compliance.
• State how and: where alternate proposal is incorporated within construction plans. and prepare .plan
amendments asnecessary. _.The design professional has the responsibilityto coordinate all construction
documents and ensure compatibility between documents..
• The. report and design documents shall be dated, signed and stamped by the design professional according to
the: plan submittal procedure:
• For ademate .methods of design requests, the applicant shall' set performance criteria forhis design..
Performance criteria shall be reviewed, amended and approved by the Building. or Fire Code Official prior to
start of design.
Alternative DesfanReview/Verification:
the adopted codes and procedures. If the Building or Fire Code Official does nothave the expertise on staff: to
make a thorough and: competent review, the Building or Fire Code Official shall select consultant that possesses
the necessary qualifications to perform a third -party or peer review. Cost: of peer review shall be: paid. by. applicant - to the Building Division prior to commencing the: review.
• Verify that all applicable Information and justifications listed above as requirements for submittals Is received and
verify that evaluation and design methods used by designer are appropriate to the ialternative :proposed.
• Verify products are being used in accordance with their listing conditions as required by recognized listing
agencies. If not available, require documentation and/or testing to demonstrate compliance with intent of code
and intended use.
• Evaluate performance of material and: possible flaws :that could affect performance of material in its installed
state.
• They reviewer shall documentthat the submittal has been reviewed: and accepted as meeting the alternative
materials, design and methods of construction provisions of the code. if the Building or Fire Code Official Is not
satisfied that the applicant has: met the conditions, the request should be denied In writing with the applicable
reason(s).
Inspection/Field Vei;iffcation.
The alternate proposal as approved in the construction documents must be verified by Inspection, and; where:
necessary, testing as: follows
• To verify that alternate materials, systems and fabricated, products comply with accepted design criteria and the
manufacturer's and engineer's installation procedures, inspectors should check product labeling, certification,.
quality assurance, processes,: and testing,-es:applicable. -
• When appropriate, an approved third party quality assurance inspection and testing: service may required for.
continuous and complex Inspection and testing activities. This is Intended to verify that construction complies`
with the code and the approved plans.
Appealsmust be submitted on the Appeal Form available at Permit Counter accompanied by the proper fee. You
will be notified in writing of the appeal hearing's time and date.
a woo'Bu4aeuMum6ecfiJWul 09926 'S 1b0dM2N Z s
6550- (O LL'xo HJtl3B 1tlOdM3N 0 Cw
g otw-Z98 (64L)80 3AINO ONVIH9IH 209L I
SO#emns'Mmowp cmi Z 27 N
a 30N3GS3M S1331
'ONI ONIN33NISN3 XOV
m a M'N lJIDffi ' 3 Il B
c 9
�kE
y°0j a8 �TspF��ag$N�2b 33 p.�p}'yg ggS �yg 3 pp
8Ep§§ �ey �p3$tld R$2
i IRE �
a€ w� 9911
.81. @9 i e g`a g "€ G.1 6 n§ 1111
p'
A•' $ � "d [SM k g 3� pb � l ��E
-1® �seaasPp a§
s s
a n ♦' n I
E
w
I PM
a
id
s N _C6 s _
@ s
------- L
i
d W ;I =I