Loading...
HomeMy WebLinkAboutX2019-1578 - Alternative Material & Methodsi Ill 70(m" x2oi�( - 1s�8; I �,D`� Wghl"d Dr. RECF,�� O� CITY ONEWPORT O]BEACH oM�M c2 REQUEST FOR MODIFICATION TO PROVISIONS OF TITLE 9 (FIRE -CODE) OR TITLE 16 (BUILDING CODE) EHCOMMUNITYDEVELOPMENT DEPARTMENT ✓U� (See Reverse for Basis for Approval) (Fee $294) BUILDING DIVISION '-R100 Civic Center Drive ) P.O. Box 1798 1 Newport Beach, CA 82558-8915. n o 9FF� OR METHOD OF CONSTRUCTION www.aewoortbeachcalaov 1 (949).644-3200. , 6�F<OA ion Type R-rN Iuwpft4 REQUEST FOR EXEMPTION FROM DISABLED y❑ _7 s - I Fee due CONSTRAINT (Fee $1,637) O �ryT (Ratification by the Board of Appeals will be required.)LEI TRIBUTION B@AOy, iv Ina euaUINU UVARD:OF APPEALS (See Reverse) (Signature; statement of owner or applicant, statement of reasons fort appeal and filing fees are required.) CASHIER RECEIPT NUMBER: ti� 0 cty (Lz/ I Fommtinodif 09/2v1e .G M CASE NO.:. i y� ❑ FOR STAFF USE ONLY REQUEST FOR MODIFICATION TO PROVISIONS OF TITLE 9 (FIRE -CODE) OR TITLE 16 (BUILDING CODE) ck#//L'ZG7 #Gf Stories Z. OF THE NEWPORT BEACH MUNICIPAL CODE (See Reverse for Basis for Approval) (Fee $294) y Classiflrat(on. �-3 /L1 Q REQUEST FOR ALTERNATE MATERIAL llding S h�# Gf Units f FNo.W OR METHOD OF CONSTRUCTION atus.(See Reverse for Basis for Approval) (Fee $294) ion Type R-rN Iuwpft4 REQUEST FOR EXEMPTION FROM DISABLED y❑ ACCESS DUE TO PHYSICAL OR LEGAL s - I Fee due CONSTRAINT (Fee $1,637) (Ratification by the Board of Appeals will be required.)LEI TRIBUTION Owner L&plan Check C110 For above requests, complete Sections f, 2 & 3Petitioner El below by printing In ink or. typing... Fire ❑ Other jiJOBADORESS: PETITIONER ADDRESS: SITE ADDRH$Si 1508 HIGHLAND DR. NEWPORT BEACH, CA 82660 Petitioner AQx ENGINEERINOGIANG VAG Owner KEVIN TaETS. :lpetgiarrer to be archlfeot or enain"r) Address 1608HIOHLANDDR. Address 152081100KNOLLOWDRNE,SUR45 NEWPORTSEACH Zlp 32660 SANTAANA,CA Zip 92706 Daytime Phone ('.we ) 376-7406- Daytime Phone ( 714 ) 6620610 2 REQUEST: Submit lans If necessary to Illustrate reguest. Additional sheets or data may be attached. sa USTIFICATION/FINDINGS OF EQUIVALENCY: CODE SECTIONS: SIKH MB SOLVENT FREE, EPDXY MOISTURE BARRIER Provides Permeabliltv of 0-06 91m2 24h; FAFaHG keepliqg the SAGIIAg slab and existling Walla an 't wisuld keep e cos s own an no compromise EXis,Ing o0 Ing s U Ura y Petitioner' Position Signatu CA professional Lic. # s. 6280 W 0600120 Data 2dj FOR STAFF USE ONLY -- DEPARTMENT ACTION In acporilance vnth: ❑ CBC 104.11/CFC 104.9 ❑CBC 104.10/CFC 104.8 (Alternate materials 8 methods) '. (CBG Modification) ❑ Concurrence from Fire Code Official, Is required:. ❑ Approved ❑ Disapproved ❑: Written Comments Attached s By: Date ❑ Request (DOES) (DOES NOT) lessen any fire protection requirements. ❑ Request (DOES) (DOES NOT) lessen the structural Integrity The Request Is Granted 171 Denied (Sea reverse for." ❑ Granted (Ratification required) appeal Information) Conditions of Approval: Signature - Position SMj�UII MN -OFFI a. Print Name- - iv Ina euaUINU UVARD:OF APPEALS (See Reverse) (Signature; statement of owner or applicant, statement of reasons fort appeal and filing fees are required.) CASHIER RECEIPT NUMBER: ti� 0 cty (Lz/ I Fommtinodif 09/2v1e Guidelines for Approval of Alternate Materials. Design and Methods of Construction Basis For Approval For the Chief Building Official and Fire Code Official or their designated agent to approve a request for modification or a request for alternate material or method of construction,. he/she must determine that special, individual reasons exist that make compliance with the strict letter of the Code impractical and that equivalency is provided. The resulting condition must beinconformance with the spirit and purpose of the Code provisions involved and that such modification: does not lessen: fire protection, structural integrity or occupant safety. The applicantmust provide sufficient Information with this application to allow the above evaluation to be made. Reauirements for Submittals The applicant designprofessionalshall prepare a Written Report that describes the alternate proposal along .with the applicable data listed'below: • State specific code provisions for which alternative is requested and why request is being submitted. • Describe by code section those provisions for which alternative is desired.. • Compare the proposed alternative versus the code requirements in terms of structural strength, suitability,. effectiveness, fire resistance, safety and health impacts affecting the building or user of the building. • Demonstrate that the proposed alternative iscompatible with balance of code requirements,. • When applicable, specify how authoritative consensus document(s) are used to substantiate proposal. (Reference draft ]CC Building Performance:. Code Commentary Section 1.4.2.3 for background information).. • Provide assumptions, references, and documentation of evaluation: methods utilized. This: includes intended use, input data, anticipated outputs, and limitations of computer models and other analytical tools or methods. • Specify when and where special inspection and testing are required and the standards of acceptance for demonstrating compliance. Show how the proposed alternate, if accepted, will be identified on. the ;job site. • Where land use restrictions and building setbacks are required, deed restrictions may be an appropriate method to ensure continued compliance. • State how and: where alternate proposal is incorporated within construction plans. and prepare .plan amendments asnecessary. _.The design professional has the responsibilityto coordinate all construction documents and ensure compatibility between documents.. • The. report and design documents shall be dated, signed and stamped by the design professional according to the: plan submittal procedure: • For ademate .methods of design requests, the applicant shall' set performance criteria forhis design.. Performance criteria shall be reviewed, amended and approved by the Building. or Fire Code Official prior to start of design. Alternative DesfanReview/Verification: the adopted codes and procedures. If the Building or Fire Code Official does nothave the expertise on staff: to make a thorough and: competent review, the Building or Fire Code Official shall select consultant that possesses the necessary qualifications to perform a third -party or peer review. Cost: of peer review shall be: paid. by. applicant - to the Building Division prior to commencing the: review. • Verify that all applicable Information and justifications listed above as requirements for submittals Is received and verify that evaluation and design methods used by designer are appropriate to the ialternative :proposed. • Verify products are being used in accordance with their listing conditions as required by recognized listing agencies. If not available, require documentation and/or testing to demonstrate compliance with intent of code and intended use. • Evaluate performance of material and: possible flaws :that could affect performance of material in its installed state. • They reviewer shall documentthat the submittal has been reviewed: and accepted as meeting the alternative materials, design and methods of construction provisions of the code. if the Building or Fire Code Official Is not satisfied that the applicant has: met the conditions, the request should be denied In writing with the applicable reason(s). Inspection/Field Vei;iffcation. The alternate proposal as approved in the construction documents must be verified by Inspection, and; where: necessary, testing as: follows • To verify that alternate materials, systems and fabricated, products comply with accepted design criteria and the manufacturer's and engineer's installation procedures, inspectors should check product labeling, certification,. quality assurance, processes,: and testing,-es:applicable. - • When appropriate, an approved third party quality assurance inspection and testing: service may required for. continuous and complex Inspection and testing activities. This is Intended to verify that construction complies` with the code and the approved plans. Appealsmust be submitted on the Appeal Form available at Permit Counter accompanied by the proper fee. You will be notified in writing of the appeal hearing's time and date. a woo'Bu4aeuMum6ecfiJWul 09926 'S 1b0dM2N Z s 6550- (O LL'xo HJtl3B 1tlOdM3N 0 Cw g otw-Z98 (64L)80 3AINO ONVIH9IH 209L I SO#emns'Mmowp cmi Z 27 N a 30N3GS3M S1331 'ONI ONIN33NISN3 XOV m a M'N lJIDffi ' 3 Il B c 9 �kE y°0j a8 �TspF��ag$N�2b 33 p.�p}'yg ggS �yg 3 pp 8Ep§§ �ey �p3$tld R$2 i IRE � a€ w� 9911 .81. @9 i e g`a g "€ G.1 6 n§ 1111 p' A•' $ � "d [SM k g 3� pb � l ��E -1® �seaasPp a§ s s a n ♦' n I E w I PM a id s N _C6 s _ @ s ------- L i d W ;I =I