HomeMy WebLinkAboutH2018-0240 - MiscSTATE OF CALIFORNIA
ALTERATIONS - HVAC
CERTIFICATE OF COMPLIANCE
HVAC CZ 1, 3 to 7 and 16
9 4;1018.0m
50z PoinSe44s'a Ave
AMISSION
CF1R-ALT-03-E <
(Page 1 of 1)
Site Address:
Enforcement Agency:
Date Prepared:
Permitil:
502 Poinsettia Ave.
Newport Beach
Equipment Type
Equipment Efficiency
New: Ducting or Lineset
Required R -value
Conditioned z
Floor Area (ft)
Thermostat
❑ Packaged System
❑ Evaporator Coil
_AFUE
COP
X R-6 (CZ 1-10,12&13) Ducts
Served by system
.Setback
XSPlit System
❑ Condensing Unit
❑ R-8' (CZ 11,14-15) Ducts
ft
(If not already
_SEER
HSPF
El >_ R-2.8 Lineseta
p resent must
L3Furnace
❑ Lineset
_EER
be installed)
HERS VERIFICATION SUMMARY Installer determines work to be completed and matches to one of the options below, At permit application this
form is allowed to be filled out by hand. For final inspection all forms are to be registered (no hand filled forms allowed) and a copy left on site.
5(1. HVAC Changeout/Repair
Required Compliance Documents to be left on site for Final:
(Can include new ducting)
All Equipment,
CF1R-ALT-02-E
Condenser Unit, Evaporator Coil,
CF2R: MCH -01, MCH -20-H
Air Handler/Furnace
CF3R: MCH -20-H
Installer Requirement: Duct leakage (515%or, s10% to outside, or seal all accessible leaks)
Exempted from duct leakage testing if:
D 1. Duct system registered with HERS provider as previously sealed, or O 2. There is less than 40 linear feet of duct in unconditioned
space, or ❑ 3. Existing duct systems are constructed, insulated or sealed with asbestos (list manufacture date of building
. New HVAC System
Required Compliance Documents to be left on site for Final:
All new equipment and All New Ducts'
CFIR-ALT-02-E
CF2R-MCH-01-E, MCH -20-H, MCH -22-11, MCH -(23 or 24)-H
CF3R-MCH-20-H, MCH -22-H, MCH -(23 or 24)-H'
Installer Requirement: Duct leakage <5%, Fan Efficacy (0.58W/CFM), Air Flow 2 350 CFM/ton (or Standards Table 150.0-13 / C alternative)
❑ 3. All New Ducts with Replacement Required Compliance Documents to be left on site for Final:
Includes replacing or installing All New CF1R-ALT-02-E
Ducts' and one or more of the following: CF213-MCH-01-E, MCH -20-11, MCH -(23 or 24)-H
Condenser Unit, Evaporator Coil, Furnace CF3R-MCH-20-H, MCH -(23 or 24)-H
Installer Requirement: Duct leakage < 591, Air Flow_ 350 CFM/ton (or Standards Table 150.0-B / C alternative)
❑ Exempted from duct leakage testing if existing duct systems are constructed, insulated or sealed with asbestos.
❑ 4. New Ducting over 40 feet
Required Compliance Documents to be left on site for Final:
Adding or replacing ducts in unconditioned
CF1R-ALT-02-E
space but less than All New Ducts'
CF211-MCH-20-11
CF3R-MCH-20-H
Installer Required to: Duct leakage (:5.15% or, < 10% to outside, or seal all accessible leaks)
❑ Exempted from duct leakage testing if existing duct systems are constructed, insulated or sealed with asbestos.
'All new ducting requires R-8 insulationwhen more than 40 It installed in CZs 11 & 14-16 and R-6 in CZs 1-10, 12 & 13, and R-6 insulation when less
than 40 It installed. This includes in walls, between floors etc.
' A New Duct system is when the duct system is constructed of at least 75 %new duct material, and up to 25%may consist of reused parts from the
dwelling unit's existing duct system (e.g., registers, grilles, boots, air handler, plenums, duct material.
I R-2.8 W' thick insulation) for linesets 1" and less.
Contractor (Documentation Author's /Responsible Designer's Declaration Statement)
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
—2-1 am`eligible under Division 3 ofthe Califomia Business and -Professions Co-dee toaccept responsi l ity orthe: 'information ont is ocument
3. That the energy features and performance specifications for the design identified on this Certificate of Compliance conform to the
requirements of Title 24, Parts 1 and 6 of the California Code of Regulations (CCR).
4. That the energy features and performance specifications, materials, components, and manufactured devices for the building design or
system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the CCR.
5. The building design features or system design features identified on this Certificate of Compliance are consistent with the Information
provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement
agency for approval with this building permit application.
Responsible De! IS ame: b"Iti
Responsible Designer Signature:
Date Sign d:
License: 754456
Company:
Address:
City/State/Zip:
hone:
Klondike Air Inc.
1308 Lo an Ave Ste -E
I Costa Mesa 92626
1 714 979-2070
For assistance or questions regarding the Energy Standards, contact the Energy Hotline at: 1-800-772-3300
w018-0240
Project Status Report 502 PoinSeRic. Ave CaICERTS,
Effective: 10/09/2018 07:39 19
Energy Standards Code Year: 2016
Project Name: NB 502 POINSETTIA
Project Type: Alterations SFR
Address: 502 POINSETTIA
City / State / Zip: Corona del Mar/ CA/ 92625
Enforcement Agency: City of Newport Beach
Permit Number/ Date: H2O18-0240 / 4/18/2018
HERS VERIFIABLE COMPLETE - No HERS Measures Required
MPA" " 9
1`y1Z" """' 1218-A020129687A-000-000-0000000-0000
Number:
0
to
@ calcerts.com
CrZK-MLN-U1-t llb-HUZUlZ9t)tf/�H-UUU-/,A-MUlUUlA-000U
(Space Conditioning 10/08/2018 Andrew Beeker
Systems, Ducts and Fans) 17:11 (KLONDIKE AIR INC)
HERS Provider: CaICERTS Inc.