Loading...
HomeMy WebLinkAboutH2018-0240 - MiscSTATE OF CALIFORNIA ALTERATIONS - HVAC CERTIFICATE OF COMPLIANCE HVAC CZ 1, 3 to 7 and 16 9 4;1018.0m 50z PoinSe44s'a Ave AMISSION CF1R-ALT-03-E < (Page 1 of 1) Site Address: Enforcement Agency: Date Prepared: Permitil: 502 Poinsettia Ave. Newport Beach Equipment Type Equipment Efficiency New: Ducting or Lineset Required R -value Conditioned z Floor Area (ft) Thermostat ❑ Packaged System ❑ Evaporator Coil _AFUE COP X R-6 (CZ 1-10,12&13) Ducts Served by system .Setback XSPlit System ❑ Condensing Unit ❑ R-8' (CZ 11,14-15) Ducts ft (If not already _SEER HSPF El >_ R-2.8 Lineseta p resent must L3Furnace ❑ Lineset _EER be installed) HERS VERIFICATION SUMMARY Installer determines work to be completed and matches to one of the options below, At permit application this form is allowed to be filled out by hand. For final inspection all forms are to be registered (no hand filled forms allowed) and a copy left on site. 5(1. HVAC Changeout/Repair Required Compliance Documents to be left on site for Final: (Can include new ducting) All Equipment, CF1R-ALT-02-E Condenser Unit, Evaporator Coil, CF2R: MCH -01, MCH -20-H Air Handler/Furnace CF3R: MCH -20-H Installer Requirement: Duct leakage (515%or, s10% to outside, or seal all accessible leaks) Exempted from duct leakage testing if: D 1. Duct system registered with HERS provider as previously sealed, or O 2. There is less than 40 linear feet of duct in unconditioned space, or ❑ 3. Existing duct systems are constructed, insulated or sealed with asbestos (list manufacture date of building . New HVAC System Required Compliance Documents to be left on site for Final: All new equipment and All New Ducts' CFIR-ALT-02-E CF2R-MCH-01-E, MCH -20-H, MCH -22-11, MCH -(23 or 24)-H CF3R-MCH-20-H, MCH -22-H, MCH -(23 or 24)-H' Installer Requirement: Duct leakage <5%, Fan Efficacy (0.58W/CFM), Air Flow 2 350 CFM/ton (or Standards Table 150.0-13 / C alternative) ❑ 3. All New Ducts with Replacement Required Compliance Documents to be left on site for Final: Includes replacing or installing All New CF1R-ALT-02-E Ducts' and one or more of the following: CF213-MCH-01-E, MCH -20-11, MCH -(23 or 24)-H Condenser Unit, Evaporator Coil, Furnace CF3R-MCH-20-H, MCH -(23 or 24)-H Installer Requirement: Duct leakage < 591, Air Flow_ 350 CFM/ton (or Standards Table 150.0-B / C alternative) ❑ Exempted from duct leakage testing if existing duct systems are constructed, insulated or sealed with asbestos. ❑ 4. New Ducting over 40 feet Required Compliance Documents to be left on site for Final: Adding or replacing ducts in unconditioned CF1R-ALT-02-E space but less than All New Ducts' CF211-MCH-20-11 CF3R-MCH-20-H Installer Required to: Duct leakage (:5.15% or, < 10% to outside, or seal all accessible leaks) ❑ Exempted from duct leakage testing if existing duct systems are constructed, insulated or sealed with asbestos. 'All new ducting requires R-8 insulationwhen more than 40 It installed in CZs 11 & 14-16 and R-6 in CZs 1-10, 12 & 13, and R-6 insulation when less than 40 It installed. This includes in walls, between floors etc. ' A New Duct system is when the duct system is constructed of at least 75 %new duct material, and up to 25%may consist of reused parts from the dwelling unit's existing duct system (e.g., registers, grilles, boots, air handler, plenums, duct material. I R-2.8 W' thick insulation) for linesets 1" and less. Contractor (Documentation Author's /Responsible Designer's Declaration Statement) I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. —2-1 am`eligible under Division 3 ofthe Califomia Business and -Professions Co-dee toaccept responsi l ity orthe: 'information ont is ocument 3. That the energy features and performance specifications for the design identified on this Certificate of Compliance conform to the requirements of Title 24, Parts 1 and 6 of the California Code of Regulations (CCR). 4. That the energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the CCR. 5. The building design features or system design features identified on this Certificate of Compliance are consistent with the Information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Responsible De! IS ame: b"Iti Responsible Designer Signature: Date Sign d: License: 754456 Company: Address: City/State/Zip: hone: Klondike Air Inc. 1308 Lo an Ave Ste -E I Costa Mesa 92626 1 714 979-2070 For assistance or questions regarding the Energy Standards, contact the Energy Hotline at: 1-800-772-3300 w018-0240 Project Status Report 502 PoinSeRic. Ave CaICERTS, Effective: 10/09/2018 07:39 19 Energy Standards Code Year: 2016 Project Name: NB 502 POINSETTIA Project Type: Alterations SFR Address: 502 POINSETTIA City / State / Zip: Corona del Mar/ CA/ 92625 Enforcement Agency: City of Newport Beach Permit Number/ Date: H2O18-0240 / 4/18/2018 HERS VERIFIABLE COMPLETE - No HERS Measures Required MPA" " 9 1`y1Z" """' 1218-A020129687A-000-000-0000000-0000 Number: 0 to @ calcerts.com CrZK-MLN-U1-t llb-HUZUlZ9t)tf/�H-UUU-/,A-MUlUUlA-000U (Space Conditioning 10/08/2018 Andrew Beeker Systems, Ducts and Fans) 17:11 (KLONDIKE AIR INC) HERS Provider: CaICERTS Inc.