HomeMy WebLinkAboutX2018-2546 - MiscX11 t G xA1701? -as�ls VECTOR E f1 G I n E E R S Project Number: C0054-001-171 April 15, 2019 Renato Trotta, Architect 6 Winged Foot Lane Newport Beach, CA 92660 949-719-0915 REFERENCE: O'Toole Residence, Corona Del Mar, CA 92625 Grouting and Inspection of non -Retaining CMU Site Walls Dear Mr. Trotta, Per your request, we have reviewed the calculations and drawings for the above referenced project. Please be advised as follows: Where the CMU site walls were not grouted in accordance with the plan specifications, the contractor may mover forward with a high 'lift grouting condition, assuming the following procedures are performed: • Grout shall be a high -slump workable mix, placed with a mechanical vibrator such that the grout fills all voids. • Grout shall attain a min compressive strength of 2000 psi at 28 days. • Grout shall contain an admixture of the type that reduced early water loss. • Provide cleanout openings for all walls at the bottom of every reinforced cell. Clean out openings shall be sufficient in size to allow thorough removal of all motor droppings and debris. • Special inspection shall be required for the grout as specified in the attached table. The recommendations above are provided based upon our review of calculations and drawings generated from information the client provided. No observation was made of the structural integrity, materials used or quality of work of any portions of the structure. We hope this meets your needs. If you have any further questions regarding this matter, please call this office at your convenience. Very truly yours, VECTOR STRUCTURAL ENGINEERING OF SOUTHERN CALIFORNIA, LLP 4-15-2019 Kalen A. Wilson, P.E. Project Engineer 23152 Verdugo Dr. Suite 102 / Laguna Hills, CA 92653/ T (714) 576-6524 / F (801) 990-1776 / www.vectorse.com Page 1 of 1 YECTOR Required Verification and Inspection of Masonry Construction (LEVEL B) Frequency Referenced Standard Verification and Inspection530/ASCE Continuous Periodic TMS4021ACI 5 TMS 602/ACI 530.1/ASCE 6 1. Verify compliance with approved submittals. - X - Art. 1.5 2. Prior to grouting, verify that the following are in compliance: a. Grout space. - X - Art. 3.2D, 3.2F b. Grade, type, and size of reinforcement and anchor bolts, and prestressing tendons X Sec. 1.16 Art. 2.4, 3.4 and anchorages. c. Placement of reinforcement, connectors, and prestressing tendons and anchorages. - X Sec. 1.16 Art. , 3.2E 3.4, 3.6AE, d. Proportions of site -prepared grout and Art. 2.613, prestressing grout for bonded tendons. X 2.4G.1.b e. Construction of mortarjoints.X Art. US 3. Verify during construction: a. Size and location of structural elements. X Art. 3.3F b. Type, size, and location of anchors, including other details of anchorage of _ X Sec. 1.16.4.3, _ masonry to structural members, frames, or 1.17.1 other construction. 4. Observe preparation of grout specimens, Art. 1.413.2.a.3, mortar speciments, and/or prisms. X 1.4b.2.b.3, 1.4b.2.c.3, 1.4b.3,1Ab.4 23152 Verdugo Dr. Suite 1021 Laguna Hills, CA 926531 T (714) 576-65241 F (801) 990-1776 1 www.vectorse.com