Loading...
HomeMy WebLinkAbout06 - Spyglass Hill Reservoir Water Mixing System — Notice of Completion for Contract No. 7428-1PORT CITY OF O � _ i NEWPORT BEACH City Council Staff Report <i FO RN September 24, 2019 Agenda Item No. 6 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Ben Davis, Associate Civil Engineer, bdavis@newportbeachca.gov PHONE: 949-644-3317 TITLE: Spyglass Hill Reservoir Water Mixing System — Notice of Completion for Contract No. 7428-1 (19W15) ABSTRACT: On March 26, 2019, City Council awarded Contract No. 7428-1 for the Spyglass Hill Reservoir Water Mixing System project to Humphrey Constructors. The work is now complete and staff requests City Council acceptance of the project and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of Civil Code; and c) Release Faithful Performance Bond one year after acceptance by the City Council. FUNDING REQUIREMENTS: The current adopted budget included sufficient funding for this project. The construction contract was expensed from the following accounts within the budget: Account Description Water Capital NMP Account Number A :T.WIMS 70201932-980000-19W15 $ 185,331.32 Total: $ 185,331.32 6-1 DISCUSSION: Spyglass Hill Reservoir Water Mixing System — Notice of Completion for Contract No. 7428-1 (19W15) September 24, 2019 Page 2 Overall Contract Cost/Time Summary Awarded Final Cost at Contingency Actual % Due to % Due to Contract Amount Completion Allowance Contract Directed Unforeseen Change Change Change $165,400.00 $185,331.32 15% or less +12.1% 0% +12.1% Allowed Contract Time + 36 Actual Time -6 Approved Extensions (days) = Under (-) or Over (+)in This potable water quality improvement project included installing underground power and communication lines from the reservoir to the control building, installing a new water mixer control panel, and installing a submersible water mixer in the reservoir. The contracted work has now been completed to the satisfaction of the Public Works Department. A summary of the construction cost is as follows: Original Bid Amount: $ 165,400.00 Actual Cost of Bid Items Constructed: $ 165,400.00 Total Change Orders: $ 19,931.32 Final Contract Cost: $ 185,331.32 The final contract cost was $185,331.32, which was approximately 12.1 percent higher than the original bid amount. This cost increase was primarily due to the discovery that both of the existing conduit runs were blocked and thus required their full replacement. The unforeseen change order work consisted of trenching and installing a new pull box and two new conduits. A summary of the project schedule milestones are as follows: Estimated Start of Construction per Annual Baseline Schedule 6/24/2019 Actual Start of Construction Per Notice to Proceed 7/8/2019 Extended Contract Completion Date Inclusive of Extra Work 8/27/2019 Actual Substantial Construction Completion Date 8/19/2019 ENVIRONMENTAL REVIEW: On March 26, 2019, the City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15302(c) Class 2, (reconstruction of existing facility involving negligible or no expansion of capacity) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. 6-2 Spyglass Hill Reservoir Water Mixing System — Notice of Completion for Contract No. 7428-1 (19W15) September 24, 2019 Page 3 NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 6-3 ATTACHMENT A SPYGLASS HILL RESERVOIR CITY OF NEWPORT BEACH MIXING SYSTEM PUBLIC WORKS DEPARTMENT LOCATION MAP C-7428-1 19W15 9/24/19