Structural Observation Report
Project Address: 309 33rd Street
Y Report Date: / l i '
CNB Inspector Name:
CNB Permit #:
Building Owner Name:
Owner's Mailing Address d different from site);
Owners Telephone #:
CNB Plan Check #:
Full Name of Structural Observer (SO):
SO E-mail Address:
SO Telephone #:
SO License / Reg. #:
Paul Rohrer
Paul@PRSEinc.com
714-272-9579
S4340
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNFCTIANS r1RRFRVFII lrharlr annlirehin k..i
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
Floor/Roo
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
❑ Conventional
Footings & Slab
❑ Concrete
❑
Steep
❑ Concrete
5l-{ *11 hQtn) Lj
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑
Concrete
❑ Steel Deck
❑ Caissons, Piles,Wood
Grade Beams
or Manuf.
Shear Panels
❑
Masonry
Wood
❑ Other:
❑ Other:
❑
Other:
❑ Other:
❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
I
❑ REPORT CONTINUED ON ATTACHED PAGES.
❑ FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the approved construction documents. and all observed deficiencies ware cerrwrtarl
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. 1, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division.
')9
No. 4340
EXP: 12/31/2019
STAMP OF STRUCTURAL OBSERVER
DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION RY AUTI MPUFn cNPI nYPPs nP TWX CITY Mc ucwoneT aceru
FotmiV tm=R[ObsmatiotiReponar o ti..
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportbeachca.gov 1(949)644-3200
Structural Observation Report
Project Address: 309 33rd Street
l Z6Report Date: /17
CNB Inspector Name:
CNB Permit #:
Building Owner Name:
Owner's Mailing Address (if different from site);
Owner's Telephone #:
CNB Plan Check #:
Full Name of Structural Observer (SO):
SO E-mail Address:
SO Telephone M
SO License / Reg. #:
Paul Rohrer
Paul@PRSEinc.com
714-272-9579
S4340
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check anolicable boxes)
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division. /til
1/21N/
J IAMY OF 5I KUL; I UKAL UBSEKVLK
nRQFRVATInm nnFQ mnT wAIVC ANv RFOInivCMFNTQ rnP RIIII niur wcocr,TmU ov A, rrUnolTcn eru1R1 nWCC nC TUC nrm nc NCumnoT oeeru
Forms\Strur alObse atiooRepon&lma cdom
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
(Floor/Roof)
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
❑
Conventional
Footings & Slab
❑ Concrete
❑ Steel
❑ Concrete
5r}j�QZ a f (tt
I /
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑ Concrete
❑ Steel Deck
❑
Caissons, Piles,Wood
Grade Beams
or Manuf.
Shear Panels
❑ Masonry
Woad
❑
Other:
❑ Other:
❑ Other:
❑ Other:
❑
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑
OBSERVED DEFICIENCIES AND COMMENTS: K01\316
❑ REPORT CONTINUED ON ATTACHED PAGES.
❑ FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the approved construction documents, and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division. /til
1/21N/
J IAMY OF 5I KUL; I UKAL UBSEKVLK
nRQFRVATInm nnFQ mnT wAIVC ANv RFOInivCMFNTQ rnP RIIII niur wcocr,TmU ov A, rrUnolTcn eru1R1 nWCC nC TUC nrm nc NCumnoT oeeru
Forms\Strur alObse atiooRepon&lma cdom
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportbeachca.gov (949) 644-3200
Structural Observation Report
Project Address: 309 33rd Street
Report Date:
CNB Inspector Name:
CNB Permit #:
Building Owner Name:
Owners Mailing Address (if different from site);
Owner's Telephone #:
CNB Plan Check #:
Full Name of Structural Observer (SO):
SO E-mail Address:
SO Telephone M
SO License / Reg. #:
Paul Rohrer
Paul@PRSEinc.com
714-272-9579
S4340
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED check aniolicable boxes
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
Floor/Roo
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
❑ Conventional
Footings & Slab
❑ Concrete
❑ Steel
❑ Concrete
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑ Concrete
❑ Steel Deck
❑ Caissons, Piles,
Grade Beams
Wood or Manuf.
Shear Panels
❑ Masonry
I
Wood
❑ Other:
❑ Other: =0
Other:
❑ Other:
❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
❑ REPORT CONTINUED ON ATTACHED PAGES.
INAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the approved construction documents and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. 1, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division.
3////11
i�tr��QPJV D RO( 42
1P i
W No. 4340 m
EXP: 12/31/2019 A
s',�rFTOF CA 'rO, P
STAMP OF STRUCTURAL OBSERVER
OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH.
FomuVSrtucwrelObomatiovRepon&Inshacrio,ss
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
y ww.newportbeachca.pa_v 1 (949) 644-3200
Structural Observation Report
Project Address:
Report Date: p
CNB Inspector Name:
CNB Permit #:
30933rd Street
Ml�t�/ off,
DATE
OBSERVED
❑ Conventional
Footincis & Slab
Building Owner Name:
Owner's Mailing Address (if different from site);
Owner's Telephone M
CNB Plan Check #:
Full Name of Structural Observer (SO):
SO E-mail Address:
SO Telephone #:
SO License / Reg. #:
Paul Rohrer
Paul@PRSEinc.com
714-272-9579
S4340
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED check applicable boxes
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
Floor/Roo
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
❑ Conventional
Footincis & Slab
❑ Concrete
❑
Steel
❑ Concrete
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑
Concrete
❑ Steel Deck
❑ Caissons, Piles,Wood
Grade
Grade Beams
or Manuf.
Shear Panels
❑
Masonry
,,Wood
�
1&
❑ Other:
❑ Other:
❑
Other:
❑ Other:
❑ ITEMS CHECKED ABOVE ARE APPROVED AND
WITHOUT DEFICIENCIES.
*OBSERVED DEFICIENCIES AND COMMENTS:
❑ REPORT CONTINUED ON ATTACHED PAGES.
FINAL STRUCTURAL OBSERVATION REPORT:
h structure generally complies with the approved construction documents and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division. i 1
t ///V//
QQY J� D. RO
m QP y�F 2c
P y
CD No. 4340 m
EXP: 12/31/2019UCTU
A
�TgrR OF CALO�a\P
STAMP OF STRUCTURAL OBSERVER
STRUCTURAL OBSERVATION DOES NOT WANE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH.
Forms%"sure Obsewat eaWan&lmt=tiom
O� �gW P
CITY OF NEWPORT BEACH
u`" z COMMUNITY DEVELOPMENT DEPARTMENT
C,q��aN�� BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportbeachea.gov 1 (949) 644-3200
Structural Observation Report
Project Address: 309 33rd Street
Report Date: 1/21/2019
CNB Inspector Name:
CNB Permit #:
Building Owner Name:
Owner's Mailing Address (if different from site);
Owner's Telephone #:
CNB Plan Check #:
Full Name of Structural Observer (SO):
SO E-mail Address:
SO Telephone #:
SO License / Reg. #:
Paul Rohrer
Paul@PRSEinc.com
714-272-9579
S4340
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check aoolicable boxesl
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
(Floor/Roof)
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
X Conventional
Footings & Slab
❑ Concrete
❑
Steel
❑ Concrete
DE g
Delta 3 Footings & HD's
1/21/19
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑
Concrete
❑ Steel Deck
❑ Caissons, Piles,
Grade Beams
❑ Wood or Manuf.
Shear Panels
❑
Masonry
❑ Wood
❑ Other:
❑Other:
❑Other:
❑ Other:
❑ ITEMS CHECKED ABOVE
ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
No deficiencies Noted
❑ REPORT CONTINUED ON ATTACHED PAGES.
❑ FINAL STRUCTURAL OBSERVATION REPORT:
The structure generall complies with the approved construction documents, and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division.
1/21/19
y��<i•QPJ" D. RpC Fy
�P y
Lu No. 4340 m
EXP: 12/31/2019
*
�T9 P OF CALFO��\P
STAMP OF STRUCTURAL OBSERVER
STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH.
Forms\StmctumlObservationRepoit&lnstnmtions
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 17681 Newport Beach, CA 92658-8915
www.newportbeachca.gov 1 (949) 644-3200
Structural Observation Report
Project Address:
309 33rd Street
Report Date:
� /
CNB Inspector Name:
CNB Permit#;
Building Owner Name:
Owner's Mailing Address (N different from site);
Owner's Telephone M
CNB Plan Check #:
Full Name of Structural Observer (SO):
Paul Rohrer
SO E-mail Address:
SO Telephone #:
SO License / Reg. M
ElMat Foundation,
Prestressed Concrete
Paul@PRSEinc.com
714-272-9579
S4340
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED h
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
Floor/Roo
c eck a Iicable
INDICATE LOCATION(-S-)--F-DATE
OBSERVED
oozes
I OBSERVED
❑ Conventional
Footin s& Slab
❑ Concrete
❑ Steel
❑ Concrete
_E
S
r s f0
ElMat Foundation,
Prestressed Concrete
EJMasonry
❑ Concrete
Steel Deck
❑ Caissons, Piles,
Grade Beams
❑ Wood orManuf.
Shear Panels
❑ Masonry
❑ Wood
❑ Other:
❑ Other:
❑ Other:
❑ Other:
❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS: tjW6
❑ REPORT CONTINUED ON ATTACHED PAGES.
❑ FINAL STRUCTURAL OBSERVATION REPORT:
The structuregenerally complies with the approved construction documents and all observed d £ I
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. 1, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which 1 have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division.
FE
e rc enc as were corrected.
91
No. 4340
EXP: 12/31/2019
SIAMP OF STRUCTURAL OBSERVER
DOES NOT WANE ANY REQUIREMENTS FOR BUILDING INSPECTION aY AUTHORIZED EMPLOYEES nF THE rnv nr HCwonOT uoenu
FortMSbu�turelObserva,iovRepon@Im,Ncllo�u
WPO
CITY OF NEWPORT BEACH
a COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newDorYbeachca.00v (949) 644-3200
Structural Observation Report
Project Address: Report Date:
309 33rd Street 41,2 c- i CNB Inspector Name:
Building Owner Name:
Full Name of structural Observer (SO):
Paul Rohrer
FOUNDATIONS
Conventional
Footings a Slab
❑ Mat Foundation,
Prestressed Concre
❑ Caissons, Piles,
Grade Beams
❑ Other:
SHEAR WALLS
❑ Concrete
❑ Masonry
❑ Wood or Manuf.
Shear Panels
❑ Other:
CNB Permit #:
Ga
Owner's Mailing Address (if different from site); Owner's Telephone #: CN8 Plan Check #:
SO E-mail Address: SO Telephone #: SO License / Reg. #:
Paula PRSEinc.com 714-272-9579 S4340
FRAMES DIAPHRAGMS INDICATE LOCATION(S) DATE
Floor/Roo OBSERVED OBSERV
❑ Stael ❑ Concrete
s zs r
❑ Concrete ❑ Steel Deck
❑ Masonry ❑ Wood
❑ Other: ❑ Other.
❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS: l n
❑ FINAL STRUCTURAL OBSERVATION REPORT.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under
MY responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the syWtural systems by the City of N
Division. /
ewport Beach, Building
✓
❑ REPORT CONTINUED ON ATTACHED PAGES.
Am
No. 4340
EXP: 72/31/2019
a iv,mr Ur 6 I RUCTURAL OBSERVER
STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYE
ES OF THE CITY OF NEWPORT BEACH.
Pesms?StrutturNObsrnviaalsPon&Irtswcria�
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www newoortbeachcagov (949) 644-3200
Structural Observation Report
Project Address: 309 33rd Street
Report Date:
CNB Inspector Name:
CNB Permit #:
DIAPHRAGMS
Floor/R000
IS ��
4UA6.1
DATE
OBSERVED
Conventional
Footings & Slab
Building Owner Name:
Owner's Mailing Address (if different from site);
Owner's Telephone #:
CNB Plan Check #:
Full Name of Structural Observer (SO):
SO E-mail Address:
SO Telephone #:
SO License / Reg. #:
Paul Rohrer
Paul@PRSEinc.com
714-272-9579
S4340
PLEASE INDICATE STRUCTURAL FI FMFNTC ANIn cnranuernnue M120CovCn
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
Floor/R000
n4V
INDICATE LOCATION(S)
OBSERVED
4UA6.1
DATE
OBSERVED
Conventional
Footings & Slab
❑ Concrete
❑
Steel
❑ Concrete
i
Lina °L F -T i
401/b j6
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑
Concrete
❑ Steel Deck
❑ Caissons, Piles,
Grade Beams
❑ Wood or Manuf.
Shear Panels
❑
Masonry
❑ Wood
❑ Other:
❑ Other:
❑
Other:
❑ Other:
❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
❑ REPORT CONTINUED ON ATTACHED PAGES.
❑ FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the approved construction documents and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division. . )
16
111
No. 4340
EXP: 12/31/2019
STAMP OF STRUCTURAL OBSERVER
DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH.
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportbeachcagov 1(949)644-3200
Structural Observation Report
Project Address: 309 33rd Street
Report Date'f: ?,,S (�.
CNB Inspector Name:
CNB Permit #:
Building Owner Name:
Owner's Mailing Address (if different from site);
Owners Telephone #:
CNB Plan Check #:
Full Name of Structural Observer (SO):
Paul Rohrer
SO Email Address:
SO Telephone #:
'714-272-9579
SO License / Reg. #:
S.
Paul@PRSEine.corn
❑ Mat Foundation,
Prestressed Concrete
S4340
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED check a licabl b
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
Floor/Roo
e
INDICATE LOCATION(S)
OBSERVED
oxes
DATE
OBSERVED
Conventional
-footincis & Slab
❑ Concrete
❑
Steel
11Concrete
S.
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑
Concrete
❑ Steel Deck
❑ Caissons, Piles,
Grade Beams
❑ Wood or Manuf.
Shear Panels
❑
Masonry
❑ Wood
❑ Other:
❑ Other:
❑
Other:
❑ Other:
❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
❑ REPORT CONTINUED ON ATTACHED PAGES.
❑ FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the approved construction documents. and all ninserved dafirlanriaa wa,a
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. 1, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division.
'7_31t 6
Ar"��QPJV D. RO��F2
y FP
w No. 4340 m
EXP: 12/31/2019
'P 'y OF CALRO��\P
STAMP OF STRUCTURAL OBSERVER
OBSERVATION DOES NOT WAIVE ANY RFONIR9MFNTS FOR Rum mrin imaccr'nnu av Auruneoen coral nveee ..� r�� ..,'........................ -.
Forms\SmawdObsmationReponal.,.,,io,u
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportbeachca.gov 1(949)644-3200
Structural Observation Report
Project Address:
309 33rd Street
ReportDate: J
/ / j
CNB Inspector Name:
CNB Permit #:
Building Owner Name:
Owner's Mailing AWres (if different from site);
Owner's Telephone #:
CNB Plan Check #:
Full Name of Structural Observer (SO):
SO E-mail Address:
SO Telephone #:
SO License / Reg. #:
Paul Rohrer
Paul@PRSEinc.com
714-272-9579
S4340
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED check annficable boxes
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division. I'll
e01b,
A
No. 4340
EXP: 12/31/2019
STAMP OF STRUCTURAL OBSERVER
STRUCTURAL OBSYRVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH.
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
Floor/Roo
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
❑
Conventional
Footin s & Slab
❑ Concrete
❑ Steel
❑ Concrete
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑ Concrete
❑ Steel Deck
❑
Caissons, Piles,
Grade Beams
❑ Wood or Manuf.
Shear Panels
❑ Masonry
❑ Wood
❑
Other:
❑ Other:
❑ Other:
❑ Other:
❑
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑
OBSERVED DEFICIENCIES AND COMMENTS:
'
❑ REPORT CONTINUED ON ATTACHED PAGES.
❑ FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the approved construction documents, and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division. I'll
e01b,
A
No. 4340
EXP: 12/31/2019
STAMP OF STRUCTURAL OBSERVER
STRUCTURAL OBSYRVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH.
X2017-056
CITY OF NEWPORT BEACH 301 33rj S4
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive i P.D. Box 17681 Newport Beach, CA 92658-8915
www.newportbeachca.gov 1 (949) 644-3200
BUILDING HEIGHT CERTIFICATION
Project Street Address:
Building Permit
As the surveyor of record for the project at the above address, I hereby certify that I have reviewed the
City of Newport Beach approved plan and original topographic survey and based the, elevations listed
below on those plans.
Elevations shall include an allowance for roofing material thickness if not yet installed. Provide
each critical ridge and fiat roof, or roof deck railing elevations indicated on the approved plans.
Use the format below on the back of this form if additional space is necessary or further
explanation is needed. Provide original copy to the inspector before roof framing inspection.
All elevation points are based on: O NAVD88 O NGVD29
Assumed
Please provide the following elevation information for the highest roof ridges, flat roofs, or
parapets/guardrails. Additional elevation Points may be requested by the Building Inspector.
RIDGES (3:12 slope or greater)
y/Tl�
1. Approved elevation point of ridge is 1*L*7LM and actual elevation point is 127 al)
2. Approved elevation point of ridge is and actual elevation point is.
3. Approved elevation point of ridge is and actual elevation point is
FLAT ROOFS, PARAPETS AND GUARDRAILS
1. Approved elevation point of flat roof or parapet is 12l-';�and actual elevation point is ZZ•Z�
2. Approved elevation point of flat roof or parapet is and actual elevatidn point is
3. Approved elevation point of flat roof or parapet is and actual elevation point is
I certify that the above height measurements are correct and the above project:
Ca"IS in compliance with the City -approved plans.
OIS NOT in compliance with the City -approved plans (Provide explanation).
Please describe any deviation from
Surveyor or civil Eng
(Wet stamp and
* License number of 33965 or lower
f rmsffiuitding I[cighl Cetlification 11/02/16
on the back of this form.
7 I
Date
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportbeachea.gov 1 (949) 644-3200
Project Street Address:
Building Permit Number(s):
As the surveyor of record for the project at the above address, I hereby certify that I have review«d the
City of Newport Beach approved plan and original topographic survey and based the elevations listed
below on those plans.
Elevations shall include an allowance for roofing material thickness if not yet installed. Provide
each critical ridge and flat roof, or roof deck railing elevations indicated on the approved plans.
Use the format below on the back of this form if additional space is necessary or further
explanation is needed. Provide original copy to the inspector before roof framing inspection.
All elevation points are based on:. O NAVD88 O NGVD29 Assumed
Please provide the following elevation information for the highest roof ridges, flat roofs, or
%'parapets/guardrails. Additional elevation points may be requested by the Building Inspector.
RIDGES (3:12 slope or greater)
1. Approved elevation point of ridge is 127AR and actual elevation point is 124RU4
2. Approved elevation point of ridge is andactual elevation point is
i 3. Approved elevation point of ridge is and actual elevation point is
FLAT ROOFS, PARAPETS AND GUARDRAILS
1. Approved elevation point of flat roof or parapet is t23'a4nd actual elevationpoint is I 22 � .
2. Approved elevation point of flat roof or parapet is and actual elevation point is
3. Approved elevation point of flat roof or parapet is and actual elevation point is
1 certify that the above height measurements are correct and the above project:
IS in compliance with the City -approved plans.
e 0����""'' ISNOT in compliance with the CityC%)I_INr6
s (Provide explanation).
Please descyibe anydeviation fr1 the C' -ap 3p9` k of this form.
'"LIJARQQAMM) 11/20/1
Surveyor or Civil Engi ers* Qnat d al 3 Date
(Wet stamp and signature requi 89OQ?
* License number of 33965 or lower
FQM%\Brulding Height Certification 11/02/16
PAUL ROHRER
3INEERS
ustin CA 92780
'14) Z72-9579
a
a' WORTSMAN RESIDENCE
309 33rd STREET
NEWPORT BEACH CA
Job No: 17-076
Designed By. PDR
Date: _5/16/2018
PARTIAL S2.0 FOUNDATION PLAN Sheet No:
T 2
0
Ca10ERTS, Inc.
X2017.41056 page 1 of
304 33`A s4
-A (/)Secure
(https://www.calcerts.com/) David Reed logged in [Logout] (login, cfm?process=logout)
CBICERTS Inc. / Secure Home (/index1.cfm
[My User Profile] (myinfo• _edit.cfm)
HERS PROVIDER About (https://www.calcerts. com/about-us/)
• Training
• HERS Certifications (/training certification.php)
• EPA 608 Certification (https://www.calcerts.com/epa-608-certification/)
• Building Department Training (https://www.calcerts.com/hers-registry-training-for-building-departments/)
• Training Schedule (/Training_schedule.cfrn)
• Training Center
Training Center Rooms (/ctc rooms.php)
Earth Room (/ctc earth room.php)
Hybrid Room (/ctc hybrid_room.php)
Sky Room (/ctc_sky_room.php)
Solar Room (/ctc solar room.php)
Efficiency Test House (/ctc_efficiency.php)
Find a Rater (/RaterSearch.php)
Resources
• Registry User Manual (https://www,calcerts.com/forms/2016CaICERTS Registry_User_M• anual_v101816.pdfj
Field Support FAQ (https://www.calcerts.com/faq/index.html)
• QII Handbook (/forms/2016 CaICERTS_QII Booklet_v2018-10-18%20Final.pdf)
• CaICERTS Newsletter (https://www.calcerts.com/newsletters/)
• Registry Help (https://calcerts.zendesk.com)
• New (https://www.calcerts.com/news/)
• Jobs at CaICERTS (https://www.calcerts.com/jobs_at_calcertss
o Career Resources for Raters (https://www.calcerts.com/job-opportunities-placement-resourceso
^ Quality Assurance Reviewers (https://www.calcerts.com/quality-assurance-inspectors/)
• Homeowner Consumer Information (https://www.calcerts.com/homeowner-consumer-information/)
• Builders/HVAC Contractors Information (https://www.calcerts.com/buildershvac-contractors-information/)
• CECAETMa Blueprint Newsletter (http://www.energy.ca.gov/efficiency/blueprints
• Contact Us (https://www.calcerts.com/contact-us/)
Menu
MATCH FOUND
BACK New Search
MODIFY SEARCH
PROJECT STATUS REPORT
GENERAL INFORMATION
Energy Standards Code Year: 2016
Project Name: Wortsman Remodel (Lower)
Project Type: Alterations SFR
Address: 309 33rd Street
City / State / Zip: Newport Beach / CA / 92663
Enforcement Agency: City of Newport Beach
https: //www. calcerts. comlbuildingDeptLookup. cfm?searchBy=2&lot_id=13 00609&step=3... 9/23/2019
Ca10ERTS, Inc.
HERS VERIFIABLE COMPLETE
MEASURES:
OVERALL COMPLETE
STATUS:
CF1 R INFORMATION - Certificate of Compliance (Lists Required Energy
Features)
Certificate Type: Compliance
Registered Form: CFIR-PRF-01
Registered Date: 12/14/2017 15:30
Registration
Number: 217-P016566466A-000-000-0000000-0000
PDF: yj (cert_Sessionprint.cfm?source=1)
CF2R INFORMATION - Certificates of Installation (Documents the proper
Installation of required energy features)
91
Page 2 of 4
Easy to Verify @ calcerts. com
System Form RegisteredDate Registration Number
217-P016566466A-000-
CF2R-ENV-01-E 001-E01001 A-0000
(Fenestration 09/12/2019
20:17 Robert Mattox
Installation) (R K M HEATING & AIR
CONDITIONING INC)
CF2R-ENV-03-E 09/12/2019
(Insulation Installation) 20:17
CF2R-MCH-01-E
(Space Conditioning 09/12/2019
Systems, Ducts and 20:17
Fans)
217-P016566466A-000-
001-E03001A-0000
Robert Mattox
(R K M HEATING & AIR
CONDITIONING INC)
217-P016566466A-000-
001-M01001A-0000
Robert Mattox
(R K M HEATING & AIR
CONDITIONING INC)
M)
>I (cert_ Sessionprint.cfm?
source=2)
> (cert_Sessionprint.cfm?
source=3)
>'' (cert_Sessionprint.cfm?
source=4)
https://www.calcerts. com/buildingDeptLookup.cfm?searchBy=2&lot_id=1300609&step=3... 9/23/2019
CalCERTS, Inc.
System 1
I rLK-MUH-20-1-
of HERS Measures)
(Duct Leakage)
System 1
CF2R-MCH-23-H
System Form
(Airflow)
System 1
CF2R-MCH-22-H
Date
(Fan Efficacy)
System 1
CF2R-MCH-26-H
(Rated Equipment)
2/2019 I.V
'-""`uuulq-0000
7Robert Mattox
(R K M HEATING & AIR
CONDITIONING INC)
09/12/2019
20:17
09/12/2019
20:17
09/12/2019
20:17
System 1 CF2R-PLB-02-E 09/12/2019
(SO HWS Distribution) 20:17
217-P016566466A-000-
001-M23001A-0000
Robert Mattox
(R K M HEATING & AIR
CONDITIONING INC)
217-P016566466A-000-
001-M22001A-0000
Robert Mattox
(R K M HEATING & AIR
CONDITIONING INC)
217-P016566466A-000-
001-M26001A-0000
Robert Mattox
(R K M HEATING & AIR
CONDITIONING INC)
217-P016566466A-000-
001-B02001A-0000
Robert Mattox
(R K M HEATING & AIR
CONDITION
Page 3 of 4
j>! (cert—Sessionprint.cfm?
source=5)
>1 (cert_Sessionprint.cfm?
source=6) ('
> (cert—Sessionprint.cfm?
source=7) 4
> (cert Sessionprint.cfm?
source=8)
>� (cert Sessionprint.cfm?
source=9)
INU INC)
CF3R INFORMATION - Certificates of Verification
of HERS Measures)
(Documents
the verification
System Form
Registered
Date
Registration Number
217-P016566466A-000-
System 1 CF3R-MCH-20-H
09/12/2019
001-M20001A-M20A
(Duct Leakage)
20:50
Rex Hoefer Dang
so (certSessionprint.cfm?
(REX QUE
urce=10)
HOEFERDANG)
217-P016566466A-000-
System 1 CF3R-MCH-23-H
09/12/2019
001-M23001A-M23A
(Airflow)
20:50
Rex Hoefer Deng
; ' (cert—Sessionprint.cfm?
(REX QUE
source=11)
HOEFERDANG)
217-P016566466A-000-
System 1 CF3R-MCH-22-H
09/12/2019
001-M22001A-M22A
(Fan Efficacy)
20:50
Rex Hoefer Dang
I>, (cert—Sessionprint.cfm?
(REX QUE
source=12)
HOEFERDANG)
https://www.calcerts.com/buildingDeptLookup.cfm?searchBy=2&lot id=1300609&step=3... 9/23/2019
Ca10ERTS, Inc.
Page 4 of 4
Compliance and Registry Support
Hours and Contact Information
Mon -Fri: 7am-5pm
916-985-3400 ext. `
support@calcerts.com (mailto:support@calcerts.com)
Contact
31 Natoma St Suite 120 Folsom, CA 95630
Sign up for our Newsletter (/newslettersubscribe.cfm)
Have a Complaint? (/complaint/)
Office: 916-985-3400
Toll Free: 877-437-7787
Fax: 916-985-3402
0, wsc VISA � i! ' j (https://twitteccom/intent/follow?original_referer=http%3A%2F%
fts
0 '
2Fwww.clientstaging14.com%2F®ion=follow link&screen_name=calcerts&tw_p=followbutton&variant=2.0)
(http://www.facebook. com/plugins/like.php?href=https%3A%2F%2Fwww.facebook.com%
2FCaICE RTS&width&layout=standard&action=like&show_faces=false&share=false&height=35&appld=229201930429557)
• Terms & Conditions (/terms -conditions/)
• Privacy Statement (/privacy-statemento
• Class Cancellation Policy (/class -cancellation -policy/)
• SiteMap (/sitemapo
Copyright @ 2014 1 CaICERTS, Inc. (0 I All Rights Reserved
https://www.calcerts.com/buildingDeptLookup.cfm?searchBy=2&lot id=1300609&step=3... 9/23/2019
217-P016566466A-000-
System 1
CF3R-MCH-26-H
09/12/2019
001-M26001A-M26A
Rex Hoefer Deng
Sou (cert_Sessionprint.cfm?
(Rated Equipment)
20:50
Source= 13)
(REX QUE
HOEFERDANG)
Compliance and Registry Support
Hours and Contact Information
Mon -Fri: 7am-5pm
916-985-3400 ext. `
support@calcerts.com (mailto:support@calcerts.com)
Contact
31 Natoma St Suite 120 Folsom, CA 95630
Sign up for our Newsletter (/newslettersubscribe.cfm)
Have a Complaint? (/complaint/)
Office: 916-985-3400
Toll Free: 877-437-7787
Fax: 916-985-3402
0, wsc VISA � i! ' j (https://twitteccom/intent/follow?original_referer=http%3A%2F%
fts
0 '
2Fwww.clientstaging14.com%2F®ion=follow link&screen_name=calcerts&tw_p=followbutton&variant=2.0)
(http://www.facebook. com/plugins/like.php?href=https%3A%2F%2Fwww.facebook.com%
2FCaICE RTS&width&layout=standard&action=like&show_faces=false&share=false&height=35&appld=229201930429557)
• Terms & Conditions (/terms -conditions/)
• Privacy Statement (/privacy-statemento
• Class Cancellation Policy (/class -cancellation -policy/)
• SiteMap (/sitemapo
Copyright @ 2014 1 CaICERTS, Inc. (0 I All Rights Reserved
https://www.calcerts.com/buildingDeptLookup.cfm?searchBy=2&lot id=1300609&step=3... 9/23/2019
XZ17-LI056
wPwngT
305 33rd 34
CITY OF NEWPORT BEACH REPORT OF SPECIAL INSPECTION
TYPE OF INSPECTION: Epoxy set horizontal rebar dowels/retro-fit all thread rod AB's DATE: 8/29/2018
OWNER: Wortzman REGISTRATION No.: NB0569
PROJECT ADDRESS: 309 331a st, Newport Beach CA
ARCHITECT: PaceENGINEER: Paul Rohrer
PROJECT TYPE: Residential remodel/addition I BUILDING PERMIT: X2017-4056
Observation and verification of the following work:
Installation of epoxy set horizontal rebar dowels at plumbing trench patch back areas
(4) retro -fit all thread rod anchor bolts
#4 horizontal rebar dowels installed at 16"oc each side of trench tied together w/ min 8"
embedment into existing to new foundation slab on grade connection at (2) utility/plumbing
trench patch back areas. See detail 1/S4.3
(4) 5/8"0 retro -fit all thread rods installed w/ min 8" embedment into existing exterior footing
at bathroom wall new retro -fit anchor bolt locations. See detail 5/S4.3
All work done in accordance with City of Newport Beach Building Department approved
construction plans, ICC Evaluation Service Report 2508, ASTM C172/C31,
ACI 318-5.6, 5.8, 5.9, 5. 10, and CBC sections1903/1704.4.
Holes were drilled to the required diameter and embedment depth, holes were blown out at
97 psi, brushed out, and then blown out again at 97 psi prior to epoxy application.
All horizontal rebar dowels and retro -fit all thread rods were inserted into epoxy filled holes
and rotated Y turn at time of installation. Simpson eox SET -XP was used.
No problems noted at time of inspection.
Steve Skeffington Deputy Inspector
ICBO CERTIFICATIONS: 1030205-10,20,30, 40, 49, 50, 51, 55, 60,89
ICC CERTIFICATIONS: 1030205-83, 135, B6, C5, C8, E5, M5, P5, R5, CB
ACI FIELD TECHNICIAN GRADE 1: 0023995
19386 Highridge Way • Trabuco Canyon • CA 92679 • (949) 228-1261 • steve@coastdevelopment.net
OF
CITY OF NEWPORT BEACH REPORT OF SPECIAL INSPECTION
.. .,,,,,,vucupuumon --
Observation and verification of the following work: BUILDING PERMIT: X2017-4056
lnsse vl lon of epoxy set horizontal rebar dowels/retro-fit all thread rod
(2) #4 horizontal rebar dowels installed T&B w/ min 8" embedment into existing exterior
footings to new footing connection, (2 locations, 8 dowels total) See detail 1/S4.3
(16) #4 horizontal rebar dowels installed at 16"oc w/ min 8" embedment into existing exterior
footing at new foundation slab on grade connection. See detail 1/S4.3
(14) 5/8"0 retro -fit all thread rods installed w/ min 8" embedment into existing exterior
footing at new retro -fit anchor bolt locations. See detail 5/S4,3
All work done in accordance with City of Newport Beach Building Department approved
construction plans; ICC Evaluation Service Report 2508, ASTM C172/C31,
--- 318-5.6, 5.8, 5:9, 5. 101 and CBC sections 19b311704.4.
Holes were drilled to the required diameter and embedment depth; holes were blown ouf at
97 si, brushed out, and then blown out a all
at 97 si rior to e ox licatbn.
All horizontal rebar dowels and retro -fit all thread rods were inserted into epoxy filled holes
and rotated'/ turn at time of installation. Simpson epoxy SET xp w
Vo pr_ _ obiems noted at time-nf �n�„o, +; as used.
w3u[u5-10, 20, 30, 40, 49; 50, 51, 55, 60, 89
030205-83, B5, B6, C5, C8, E5, M5, P5, R5, CB
GRADE 1: 0023998
rr
s
CITY OF NEWPORT BEACH REPORT OF SPECIAL INSPECTION
I Observation and verification of the following work: BUILDING PERMIT: X2017-4056
Installation of epoxy set horizontal rebardowels/retro-fit all thread rod
(2) #4 horizontal rebar dowels installed T&B w/ min 8° embedment into existing exterior
footings to new footing connection. (2 locations, 8 dowels total) See detail 1/S4,3
(16) #4 horizontal rebar dowels installed at 16'bc w/ min 8" embedment into existing exterior
footing at new foundation slab on grade connection. See detail 1/S4,3
(14) 5/8"0 retro -fit all thread rods installed w/ min 8" embedment into existing exterior
footing at new retro -fit anchor bolt locations. See detail 5/S4,3
All work done in accordance with City of Newport Beach Building Department approved
construction plans, ICG Evaluation Service Report 2508, ASTM C172/C31,
ACI 318-5.6, 5.8, 5.9, 5,10, and CBC sections 1903/1704.4.
Holes were drilled to the required diameter and embedment depth, hales were blown out at
97 si, brushed out, and then blown out a ain;at 97 si rior to e ox a lication.
AH harizantal rebar dowels: and retro -fit all thread rods were inserted into epoxy filled holes
and rotated '/ turn at time of installation. Sim sone ox SET -XP was used:
No problems noted at time.:: of insnecti�n
Steve
icso c
FIELD
s-10, 20, 30, 40, 49, 50, 51, 55, 60, 89
33, B5, B6, C5, C8, E5, M5, P5, R5, CB
1:0023995
k„
iI $ "
CITY OF NEWPORT BEACH REPORT OF SPECIAL INSPECTION
CA
-........ Il1/11
aggltlon -.-..- I Uut lNuilieu
Observation and verification of the following work: BUILDING PERMIT: -X2017-4056
Installation of epoxy set horizontal rebar dowels/retro-fit all thread rod
(10) #4 horizontal rebar dowels installed at 32"oc w/ min 8° embedment into existing : exterior
footings turned down 90° into new interior footing. See detail 1/54.3
(8) #4 horizontal rebar dowels installed at 18"oc w/ min 81" embedment into existin
footing turned down 90° into new footing. See detail 5/54.3 9 exterior
(4) 5/1 retro -fit all thread rods installed w/ min 12" embedment into existin exterior
footing at new HDU4 hold down locations, See detail 9/54.2 g for
All work done in accordance with City of Newport Beach Building Department approved.
construction plans, ICC Evaluation Service Report 2508, ASTM C172/C31,
ACI 318-5.6, 5.8; 5.9, 5,10 and_CBC sections 3/1704 44
Hales were drilled to the required dl m rand embedment depth, holes were blown out at
101 si, brushed out, and then blown out a ain at 101 si rior to e ox a lication.
Ali horizontal rebar dowels and retro -fit all thread rods were inserted into epoxy filled holes
end rotated "% turn at time of installation. Simpson epox . SET XP was used.
Vo rablems�qT�{ at time of insoPrti�l,
Steve Skeffingto�
ICBO CERTIFICATIONS: 1030205
ICC CERTIFICATION& 1030205-B,'
ACI FIELD TECHNICIAN GRADE 1:
30; 40,,49, 50, 51, 55, 60, &8
16; C5, C8, E5, M5, P5, R5, CB
as