HomeMy WebLinkAboutX2018-3454 - Misc4018.3Nsy
JTS INSPECTION SERVICES 371 Newporf CdenCf
OFFICE/CELL: (323) 630-9436 8990 KRISTIN DRIVE.
E-mail: daniel.sigala@sbcglobal.net DOWNEY, CA 90240
REGISTERED SPECIAL/DEPUTY INSPECTOR – CERTIFICATE OF COMPLIANCE
BUILDING DEPARTMENT
❑
Proj.Date //
Project Name
❑ Robar
Permit # X ,;— -5
Project Address 3 7/ /Y'
DYE' 13
Owner Name
Phone #
Address
Fire roofin ❑
General Contractor �-
Phone #
Address
Fax #
Site Contact
Cell #
Sub -Contractor
Phone #
Address
Fax #
Engineering Firm
Phone #
Address
Fax #
TYPE OF INSPECTION
7
Reinforced Concrete
❑
Shotcrete
❑ Gunite
❑ Robar
❑ Welding ❑
Structural Masonry
❑
Prestress
❑ Anchors bolts
owels
Fire roofin ❑
Post - Tension
❑
Framing
❑ Nailing Insp.
❑ Grading
❑ Others
Quality Control
❑
Cylinders Samples
Core Panels
Mortar
Grout
Masonry prism
To the Building Official Building Inspector
I hereby certify that the following portions of the work at the above address which required
Special/Deputy Inspection and for which I was employed to inspect, were inspected by me and
comply with the applicable provisions of the Building Codes and approved drawings.
I
Inspector (Print):
Inspection Sign:_
HOURS: Mon,_
Verified By: (Print & Sign)
License #: N R D 6 //o Type:
Date:
Tues, ed, _Thur, Fri, Sat, Sun,_
EXISTING RIM JOIST OR
BLOCKING OR NEW D.F. #2
BLOCKING WITH 8d TOE
NAILS AT 6 INCHES O.C.
TO TOP PLATE. PROVIDE
MSTA36 ALONG RIM AT 40 POST
3/8 INCH MINIMUM
EDGE DISTANCE (T
8d COMMON NAILS -
AT 4" ON CENTER
NEW 15/32" COX STRUCT. I PLYWOOD
SHEAR WALL WITH 8d 04-/6-
8d COMMON NAILS AT 4 INCH —�
ON CENTER ALL EDGES AND 6 INCH
ON CENTER EACH INTERMEDIATE STUD
2X4 D.F NO. 2 016" O.C. WALL
04 D.F. NO. 2 CONTINUOUS
FROM SILL PLATE TO TOP OF WALL
— FLOORING OVER SUBFLOOR
SIMPSON HDU 4 W/ 1/4"X2.5"SDS SCREWS
HOLDOWN PER PLAN
W/SIMPSON SDS SCREWS
(E) CRIPPLE STUD WALL TO BE REPLACED
—USE SIMPSON
(E) CONCRETE STEM WALL
(E) A.B. y
5/8" A.B. VIEDDED117y,
UNWI- Lt WALL dNAUHNU WI I H 1- LTWODU
ON EXTERIOR FACE OF CRIPPLE STUDS
Kd,L
10 . ,
WATER DAMAGE WALL REPAIR AT 371 NEWPORT GLEN COURT
NEWPORT, CA 92660. DATE 11/21/18
0
V�o
\1�
X2013-3q5q
CITY OF NEWPORT BEACH 371 Newport 66en CJ
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newportbeachca.gov 1 (949) 644-3200
Structural Observation Report
Project Address:
Report Date:
CNB Inspector Name:
CNB Permit #:
371 NEWPORT GLEN CT
12/05/2018
DAVID REED
X2018.3454
Building Owner Name:
Owner's Mailing Address (if different from site);
Owner's Telephone #:
CNB Plan Check #:
PAGANO, MARTHA
mpagano92660@yahoo.com
949-278-4885
0886-2018
Full Name of Structural Observer (SO):
SO E-mail Address:
SO Telephone #:
SO License / Reg. #:
JORGE ESTRADA
JESTRADA2432@GMAIL.COM
562-552-6660
C87410
PLEASE INDICATE STRUCTURAL ELEMENTS AND
OBSERVED check applicable boxes
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
Floor/Roof
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
ior—Conventional
Footin s & Slab
❑ Concrete
❑ Steel
❑ Concrete
12/05/18
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑ Concrete
❑ Steel Deck
❑ Caissons, Piles,
Grade Beams
❑ Wood or Manuf.
Shear Panels
❑ Masonry
❑ Wood
❑ Other:
❑ Other: I
❑ Other:
❑ Other:
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES AND COMMENTS:
❑ REPORT CONTINUED ON ATTACHED PAGES.
FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the approved construction documents, and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division.
12/05/18
J I AIVIF OF J 1 KUu I UKAL UCA'CKvtK
STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH.
F..\Str W.10b,.afi..Rep ft&h.tru wss
STRUCTURAL OBSERVATION REPORT INSTRUCTIONS
When structural observation is required for a project, the structural observer shall perform site visits at
significant construction stages throughout the progress of the work. Site visit frequency shall allow for
correction of observed deficiencies without substantial effort or uncovering of the completed work.
Structural observation site visits shall be performed for each construction stage identified on the
approved construction documents.
The structural observer may utilize the City of Newport Beach "Structural Observation Report' form, or a
similarly formatted report, to record the required observation visits. If the City's form is not used the
alternate report shall be on the structural observer's letterhead, state the site address, plan check and
permit numbers, stages and elements observed, date observed, and complete contact information for the
structural observer. All structural observation reports, regardless of form used, shall include the license
stamp and wet signature of the structural observer responsible for the project.
OBSERVED DEFICIENCIES
When a deficiency is noted, the structural observer shall give copies of the completed structural
observation report to the owner or owner's representative, project contractor, and the Chief Building
Official or designee.
The contractor shall resolve all deficiencies prior to final inspection or acceptance of the structural work
by the Chief Building Official, or designee.
FINAL STRUCTURAL OBSERVATION REPORT
The structural observer shall submit a final structural observation report to the Chief Building Official, or
designee, upon completion of the structural system. The final structural observation report shall state
that the structural system conforms to the approved construction documents and that all previously
observed deficiencies have been corrected. Final inspection or other acceptance of the structural system
by the Chief Building Official, or designee, will not occur until the final structural observation report is
received.
CITY OF NEWPORT BEACH
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915
www.newr)ortbeachca.gov 1 (949) 644-3200
Structural Observation Report
Project Address:
371 NEWPORT GLEN CT
Report Date:
12/05/2018
CNB Inspector Name:
DAVID REED
CNB Permit #:
X2018-3454
Building Owner Name:
Owner's Mailing Address (if different from site);
Owner's Telephone #:
CNB Plan Check #:
PAGANO, MARTHA
mpagano92660@yahoo.com
949-278-4885
0886-2018
Full Name of Structural Observer (SO):
SO E-mail Address:
SO Telephone #:
SO License / Reg. A
JORGE ESTRADA
JESTRADA2432@GMAIL.COM
562-552-6660
C-087410
PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes)
FOUNDATIONS
SHEAR WALLS
FRAMES
DIAPHRAGMS
(Floo oof)
INDICATE LOCATION(S)
OBSERVED
DATE
OBSERVED
❑ Conventional
Footings & Slab
❑ Concrete
❑ Steel
❑CMGFet€�!
❑ Mat Foundation,
Prestressed Concrete
❑ Masonry
❑ Concrete
❑ Steel Deck
[ICaissons, Piles,
Grade Beams
❑ Wood or Manuf.
Shear Panels
❑Masonry
Wocd
1 ' C)
❑ Other:
❑ Other:
❑ Other:
❑ Other:
ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES.
❑ OBSERVED DEFICIENCIES
AND COMMENTS:
❑ REPORT CONTINUED ON ATTACHED PAGES.
FINAL STRUCTURAL OBSERVATION REPORT:
The structure generally complies with the approved construction documents and all observed deficiencies were corrected.
I declare that the following statements are true to the best of my knowledge:
1. I am the licensed design professional retained by the owner to be in responsible
charge of the structural observation;
2. I, or another licensed design professional whom I have designated above and is under
my responsible charge, have performed the required site visits at each significant
construction stage to verify that the structure is in general conformance with the
approved construction documents;
3. 1 understand that all deficiencies which I have documented must be corrected, prior to
final acceptance of the structural systems by the City of Newport Beach, Building
Division. <_ P
✓vi✓L1 > I (s k/ - 7lsL
Innnnnnn 12/19/18
NO. C87410
EXP. s 2019
STAMP OF STRUCTURAL OBSERVER
STRUCTURAL OBSERVATION DOES NOT WANE ANY REQUIREMENTS FOR BUILDING INSPECTION BYAU'rHORIZED EMPLOYEES OF THE CITYOF NEWPORT BEACH.
Forms\SlmcluralObservationRepott&Instructions
When structural observation is required for a project, the structural observer shall perform site visits at
significant construction stages throughout the progress of the work. Site visit frequency shall allow for
correction of observed deficiencies without substantial effort or uncovering of the completed work.
Structural observation site visits shall be performed for each construction stage identified on the
approved construction documents.
The structural observer may utilize the City of Newport Beach "Structural Observation Report" form, or a
similarly formatted report, to record the required observation visits. If the City's form is not used the
alternate report shall be on the structural observer's letterhead, state the site address, plan check and
permit numbers, stages and elements observed, date observed, and complete contact information for the
structural observer. All structural observation reports, regardless of form used, shall include the license
stamp and wet signature of the structural observer responsible for the project.
OBSERVED DEFICIENCIES
When a deficiency is noted, the structural observer shall give copies of the completed structural
observation report to the owner or owner's representative, project contractor, and the Chief Building
Official or designee.
The contractor shall resolve all deficiencies prior to final inspection or acceptance of the structural work
by the Chief Building Official, or designee.
FINAL STRUCTURAL OBSERVATION REPORT
The structural observer shall submit a final structural observation report to the Chief Building Official, or
designee, upon completion of the structural system. The final structural observation report shall state
that the structural system conforms to the approved construction documents and that all previously
observed deficiencies have been corrected. Final inspection or other acceptance of the structural system
by the Chief Building Official, or designee, will not occur until the final structural observation report is
received.
sioaioeiso d1
OW80 'ON
.1.d `upeusg 02.1of
,V�,gqA'x
`,Cjataouis
•aapeay gxb of aapeay Zlxq;o 8suey0 'Z
•aaluaa uo „9I o; ,,Zti woa3 saa,}ej ouiloap fo 2uioed5 'I
:anoge uolluaw joafoid o; suoisinaa 2uirAoIJo} agx anoadde `epeJls3 a8iof `I
,ieiay}O Suippne of
099Z6 V0'yoeaU :wodmaN
l.ino0 ua,9 :WOdMeN ILE :aa
m,7aAwoH,Y,w Wu11.coauts
0019 tjOJm,?N ILE
wi5• IV
jej:)tDo2utpjinu
yueau 3podMaN jo Al!7
610Z `9Z ,4snu'of