Loading...
HomeMy WebLinkAboutX2018-3454 - Misc4018.3Nsy JTS INSPECTION SERVICES 371 Newporf CdenCf OFFICE/CELL: (323) 630-9436 8990 KRISTIN DRIVE. E-mail: daniel.sigala@sbcglobal.net DOWNEY, CA 90240 REGISTERED SPECIAL/DEPUTY INSPECTOR – CERTIFICATE OF COMPLIANCE BUILDING DEPARTMENT ❑ Proj.Date // Project Name ❑ Robar Permit # X ,;— -5 Project Address 3 7/ /Y' DYE' 13 Owner Name Phone # Address Fire roofin ❑ General Contractor �- Phone # Address Fax # Site Contact Cell # Sub -Contractor Phone # Address Fax # Engineering Firm Phone # Address Fax # TYPE OF INSPECTION 7 Reinforced Concrete ❑ Shotcrete ❑ Gunite ❑ Robar ❑ Welding ❑ Structural Masonry ❑ Prestress ❑ Anchors bolts owels Fire roofin ❑ Post - Tension ❑ Framing ❑ Nailing Insp. ❑ Grading ❑ Others Quality Control ❑ Cylinders Samples Core Panels Mortar Grout Masonry prism To the Building Official Building Inspector I hereby certify that the following portions of the work at the above address which required Special/Deputy Inspection and for which I was employed to inspect, were inspected by me and comply with the applicable provisions of the Building Codes and approved drawings. I Inspector (Print): Inspection Sign:_ HOURS: Mon,_ Verified By: (Print & Sign) License #: N R D 6 //o Type: Date: Tues, ed, _Thur, Fri, Sat, Sun,_ EXISTING RIM JOIST OR BLOCKING OR NEW D.F. #2 BLOCKING WITH 8d TOE NAILS AT 6 INCHES O.C. TO TOP PLATE. PROVIDE MSTA36 ALONG RIM AT 40 POST 3/8 INCH MINIMUM EDGE DISTANCE (T 8d COMMON NAILS - AT 4" ON CENTER NEW 15/32" COX STRUCT. I PLYWOOD SHEAR WALL WITH 8d 04-/6- 8d COMMON NAILS AT 4 INCH —� ON CENTER ALL EDGES AND 6 INCH ON CENTER EACH INTERMEDIATE STUD 2X4 D.F NO. 2 016" O.C. WALL 04 D.F. NO. 2 CONTINUOUS FROM SILL PLATE TO TOP OF WALL — FLOORING OVER SUBFLOOR SIMPSON HDU 4 W/ 1/4"X2.5"SDS SCREWS HOLDOWN PER PLAN W/SIMPSON SDS SCREWS (E) CRIPPLE STUD WALL TO BE REPLACED —USE SIMPSON (E) CONCRETE STEM WALL (E) A.B. y 5/8" A.B. VIEDDED117y, UNWI- Lt WALL dNAUHNU WI I H 1- LTWODU ON EXTERIOR FACE OF CRIPPLE STUDS Kd,L 10 . , WATER DAMAGE WALL REPAIR AT 371 NEWPORT GLEN COURT NEWPORT, CA 92660. DATE 11/21/18 0 V�o \1� X2013-3q5q CITY OF NEWPORT BEACH 371 Newport 66en CJ COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 Structural Observation Report Project Address: Report Date: CNB Inspector Name: CNB Permit #: 371 NEWPORT GLEN CT 12/05/2018 DAVID REED X2018.3454 Building Owner Name: Owner's Mailing Address (if different from site); Owner's Telephone #: CNB Plan Check #: PAGANO, MARTHA mpagano92660@yahoo.com 949-278-4885 0886-2018 Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License / Reg. #: JORGE ESTRADA JESTRADA2432@GMAIL.COM 562-552-6660 C87410 PLEASE INDICATE STRUCTURAL ELEMENTS AND OBSERVED check applicable boxes FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS Floor/Roof INDICATE LOCATION(S) OBSERVED DATE OBSERVED ior—Conventional Footin s & Slab ❑ Concrete ❑ Steel ❑ Concrete 12/05/18 ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck ❑ Caissons, Piles, Grade Beams ❑ Wood or Manuf. Shear Panels ❑ Masonry ❑ Wood ❑ Other: ❑ Other: I ❑ Other: ❑ Other: ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: ❑ REPORT CONTINUED ON ATTACHED PAGES. FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. 12/05/18 J I AIVIF OF J 1 KUu I UKAL UCA'CKvtK STRUCTURAL OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. F..\Str W.10b,.afi..Rep ft&h.tru wss STRUCTURAL OBSERVATION REPORT INSTRUCTIONS When structural observation is required for a project, the structural observer shall perform site visits at significant construction stages throughout the progress of the work. Site visit frequency shall allow for correction of observed deficiencies without substantial effort or uncovering of the completed work. Structural observation site visits shall be performed for each construction stage identified on the approved construction documents. The structural observer may utilize the City of Newport Beach "Structural Observation Report' form, or a similarly formatted report, to record the required observation visits. If the City's form is not used the alternate report shall be on the structural observer's letterhead, state the site address, plan check and permit numbers, stages and elements observed, date observed, and complete contact information for the structural observer. All structural observation reports, regardless of form used, shall include the license stamp and wet signature of the structural observer responsible for the project. OBSERVED DEFICIENCIES When a deficiency is noted, the structural observer shall give copies of the completed structural observation report to the owner or owner's representative, project contractor, and the Chief Building Official or designee. The contractor shall resolve all deficiencies prior to final inspection or acceptance of the structural work by the Chief Building Official, or designee. FINAL STRUCTURAL OBSERVATION REPORT The structural observer shall submit a final structural observation report to the Chief Building Official, or designee, upon completion of the structural system. The final structural observation report shall state that the structural system conforms to the approved construction documents and that all previously observed deficiencies have been corrected. Final inspection or other acceptance of the structural system by the Chief Building Official, or designee, will not occur until the final structural observation report is received. CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newr)ortbeachca.gov 1 (949) 644-3200 Structural Observation Report Project Address: 371 NEWPORT GLEN CT Report Date: 12/05/2018 CNB Inspector Name: DAVID REED CNB Permit #: X2018-3454 Building Owner Name: Owner's Mailing Address (if different from site); Owner's Telephone #: CNB Plan Check #: PAGANO, MARTHA mpagano92660@yahoo.com 949-278-4885 0886-2018 Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License / Reg. A JORGE ESTRADA JESTRADA2432@GMAIL.COM 562-552-6660 C-087410 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes) FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floo oof) INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete ❑ Steel ❑­CMGFet€�! ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck [ICaissons, Piles, Grade Beams ❑ Wood or Manuf. Shear Panels ❑Masonry Wocd 1 ' C) ❑ Other: ❑ Other: ❑ Other: ❑ Other: ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: ❑ REPORT CONTINUED ON ATTACHED PAGES. FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. <_ P ✓vi✓L1 > I (s k/ - 7lsL Innnnnnn 12/19/18 NO. C87410 EXP. s 2019 STAMP OF STRUCTURAL OBSERVER STRUCTURAL OBSERVATION DOES NOT WANE ANY REQUIREMENTS FOR BUILDING INSPECTION BYAU'rHORIZED EMPLOYEES OF THE CITYOF NEWPORT BEACH. Forms\SlmcluralObservationRepott&Instructions When structural observation is required for a project, the structural observer shall perform site visits at significant construction stages throughout the progress of the work. Site visit frequency shall allow for correction of observed deficiencies without substantial effort or uncovering of the completed work. Structural observation site visits shall be performed for each construction stage identified on the approved construction documents. The structural observer may utilize the City of Newport Beach "Structural Observation Report" form, or a similarly formatted report, to record the required observation visits. If the City's form is not used the alternate report shall be on the structural observer's letterhead, state the site address, plan check and permit numbers, stages and elements observed, date observed, and complete contact information for the structural observer. All structural observation reports, regardless of form used, shall include the license stamp and wet signature of the structural observer responsible for the project. OBSERVED DEFICIENCIES When a deficiency is noted, the structural observer shall give copies of the completed structural observation report to the owner or owner's representative, project contractor, and the Chief Building Official or designee. The contractor shall resolve all deficiencies prior to final inspection or acceptance of the structural work by the Chief Building Official, or designee. FINAL STRUCTURAL OBSERVATION REPORT The structural observer shall submit a final structural observation report to the Chief Building Official, or designee, upon completion of the structural system. The final structural observation report shall state that the structural system conforms to the approved construction documents and that all previously observed deficiencies have been corrected. Final inspection or other acceptance of the structural system by the Chief Building Official, or designee, will not occur until the final structural observation report is received. sioaioeiso d1 OW80 'ON .1.d `upeusg 02.1of ,V�,gqA'x `,Cjataouis •aapeay gxb of aapeay Zlxq;o 8suey0 'Z •aaluaa uo „9I o; ,,Zti woa3 saa,}ej ouiloap fo 2uioed5 'I :anoge uolluaw joafoid o; suoisinaa 2uirAoIJo} agx anoadde `epeJls3 a8iof `I ,ieiay}O Suippne of 099Z6 V0'yoeaU :wodmaN l.ino0 ua,9 :WOdMeN ILE :aa m,7aAwoH,Y,w Wu11.coauts 0019 tjOJm,?N ILE wi5• IV jej:)tDo2utpjinu yueau 3podMaN jo Al!7 610Z `9Z ,4snu'of