HomeMy WebLinkAboutX2016-4299 - SoilsJanuary 19, 2018
VaGeos
Consulting Engineering Geologists
X,2016-42gq
4q Seaward Rd
Juan and Orli Estrada Project No. 161503
c/o Free Creation, Inc. Report No. 18-008
5478 Wilshire Blvd., Suite 214
Los Angeles, CA 90036
Subject: Report of Rough Grading and Retaining Wall Backfill
549 Seaward Road
Corona del Mar, California
COMB Permit: X2016-4299; Project No. 2954-2016
Reference: 1. Rough Grade Compaction Report, Residential Development, 549 Seaward
Road, Corona del Mar, California, by David A. Purkis, PE, dated January 19,
2018, Project No. 16-3728. (See attached report.)
2. Summary of Engineering Geologic Observations, Rough Grading for
Garage and Lower Level Building Pads, 549 Seaward Road, Corona del Mar,
California, by ViaGeos, dated August 3, 2017, Project No. 161503 , Report
No. 17-074.
3. Preliminary Geotechnical Investigation for Proposed Residence, 549
Seaward Road, Corona del Mar, California, by ViaGeos, dated December 12,
2016, Project No. 161503, Report No. 16-121.
Dear Mr. and Mrs. Estrada;
This letter and attached report present a summary of engineering geologic observations and
geotechnical observations and testing performed during rough grading of the upper level
building pads and backfill of garage/lower level retaining walls of the residence under
construction at the subject site. Engineering geologic observations reported herein occurred
during the period from July, 2017 to January, 2018.
Rouah Grading
Prior to rough grading, the former residence and site improvements, other than the site
retaining wall at the northeasterly property margin, were demolished and debris was
removed from the site. Remedial grading performed in conjunction with rough grading of the
upper level building pad and rear yard consisted of overexcavation and recompaction of
near surface soils. The depth of overexcavation was typically 3± feet below original site
grades, 3.5 to 4± feet below upper level building pad grades. The maximum fill thickness
is about 4 feet at locations along the southwesterly side of the upper level building pad. Firm
native soils (terrace deposits) were exposed in removal bottoms at locations of engineered
fill placement. Approximate removal bottom elevations and limits of engineered fill are
depicted on Plate 1 of the attached report by David A. Purkis, PE.
ViaGeos* 305 N. Coast Highway, Suite R TEL (949) 494-2721
P.O. Box 309, Laguna Beach, CA 92652 FAX (949) 376-5766
549 Seaward Road January 19, 2018
Corona del Mar, California Project No. 161503
Report No. 18-008
Rough grading of the garage/lower level building pads included excavation and export of
native soils (terrace deposits) to construct the building pads. The excavation bottom exposed
competent terrace deposits that consist of dense silty sand. A summary of engineering
geologic observations documented during rough grading of the garage/lower level building
pads were presented in Reference 2.
Retainina Wall Subdrain and Backfill
Burrito style subdrains were constructed around the perimeter of the garage/lower level
retaining walls. Subdrains consist of 4 -inch perforated drain pipe surrounded by clean gravel
and all enclosed within a geotextile filter fabric. Miradrain panels were placed against the
retaining walls are in contact with the burrito style subdrain.
Backfill around the garage/lower level retaining walls consists of compacted on-site sandy
soils. On the northwesterly and southwesterly sides of the garage/lower level retaining walls,
the upper 2 feet of backfill that supports adjacent footings of the upper level was compacted
with a minimum compaction standard of 95 percent relative compaction. Geotechnical
observations and testing performed during retaining wall backfill operations are presented
in the attached report by David A. Purkis, PE.
Conclusions
Soil conditions encountered during rough grading of the site, including retaining wall backfill
operations performed to date, are consistent with those described in Reference 3 and no
additional recommendations are provided at this time. The site is considered acceptable,
from an engineering geologic viewpoint, for construction of the upper level foundations and
slabs.
Closure
Our observations have been performed using the degree of care and skill ordinarily
exercised under similar circumstances by reputable engineering geologists and geotechnical
consultants practicing in this or similar locales. No warranty, expressed or implied, is made
as to the conclusions and professional advice provided herein. The conclusions of this report
are based on limited site observations by this office and others during grading.
The opport ' y to be of service is appreciated. Please call this office if you have any
questio , c ments or require any additional information.
/Scerel o
U5\GZrEt.
EP GEI NL ERIRTifil-DG
is el . Childs, President k, pc t
gineering Geologist EG 1664 —
Registration Expires 3/31 /18
Attachement: Rough Grade Compaction Report, Residential Development, 549 Seaward
Road, Corona del Mar, California, by David A. Purkis, PE, dated January 19,
2018, Project No. 16-3728.
ViaGeos
DAVID A. PURKIS, PE
Consulting Civil Engineer
January 19,2018
Project No.: 16-3728
T0: Juan and Orli Estrada
c/o ViaGeos
305 North Coast Highway, Suite R
Laguna Beach, CA 92651
SUBJECT: Rough Grade Compaction Report
Residential Development
549 Seaward Road, Corona del Mar, California
REFERENCE: 1. ViaGeos, December 12, 2106; "Preliminary Geotechnical Investigation
for Proposed Residence, 549 Seaward Road, Corona del Mar, California"
2. Duca-McCoy, Inc., December 14,2016; "Grading Plan of 549 Seaward
Road, Corona del Mar, CA, Lot 105 of Tract No. 1237"
INTRODUCTION
In conjunction with ViaGeos, we have provided geotechnical services during rough
grading of the subject site. The services included observation and testing during grading
and wall backfill activities between July 2017 and January 2018. A copy of Reference 2
was used herein to record pertinent geotechnical data and is attached as Plate 1.
Accompanying Illustrations and Appendices
Appendix A - Summary of Field Density Tests
Appendix B - Laboratory Tests and Procedures
Plate 1 — Geotechnical Plot Plan
GRADING SUMMARY
The grading of the subject site consisted of over -excavation and recompaction of existing
surficial soils in accordance with the recommendations of Reference 1 and backfill of the
garage retaining walls. The approximate limits and depths of fill placement are depicted
on Plate 1.
32158 Camino Capistrano #212, San Juan Capistrano, CA 92675 • 949.240.7293 • fax 949.454.0927
Estrada - Rough Grading
January 19, 2018
Page 2
Excavation and compaction of fill materials was accomplished with a Caterpillar 268B
skidsteer loader and hand operated mechanical compactors. The contractors were SGE
Excavation and FreeCreation Contracting. The fill was placed in approximately 8 -inch
loose lift thicknesses. Water was added with a hose. Consolidation of fill materials was
accomplished by repeated passes with the aforementioned equipment.
FIELDAND_LABORATORY = TESTING
The compaction standard used for the minimum density requirements was 90 percent of
ASTM D-1557 Test Method. Field densities were obtained in accordance with ASTM D-
1556 (Sand Cone) Test Method. A total of 12 relative compaction tests were taken at the
subject site. These tests are numbered and the approximate locations are shown on the
accompanying Plate 1. The results of the field density and laboratory tests are
summarized in Appendix A and B, respectively. Testing was performed in representative
areas in order to provide a professional opinion as to the compaction of the fill materials.
This is not a warranty that all fill soils have a relative density of at least 90 percent of
maximum.
CONCLUSIONS
1. Removal of Unsuitable Materials
Unsuitable soil materials were removed from the graded areas to the approximate
limits and depths depicted on Plate 1. The project geologist observed the over -
excavation bottoms prior to placement of fill.
2. Compaction
The results of tests and observations indicate that the fill soils placed during rough
grading have been compacted to minimum requirements to the approximate
depths and limits indicated on the attached Plate 1 in accordance with the project
specifications.
3. Rough Grade Conclusion
Rough Grading is appropriate for the intended use and is approved for those
portions of the subject building area as delineated on the accompanying map from
Estrada - Rough Grading
" January 19, 2018
Page 3
a soil engineering viewpoint provided the geotechnical recommendations from
Reference 1 are implemented.
RECOMMENDATIONS
1. Geotechnical Recommendations
The geotechnical recommendations presented in the Reference 1 remain
appropriate for foundation design.
2. Fine Grading
All fine grading should be accomplished so that water is directed away from
footings and slabs. No water should be allowed to pond adjacent to footings and
slabs.
3. Observations and Tests
The Soils Engineer or Engineering Geologist should perform observations and
tests at the following stages:
A. After footing excavations for the structure foundation, but prior to placement
of steel.
B. During any additional retaining wall backfill and any trench backfill operation.
C. During subgrade preparation and base placement for exterior hardscape areas.
4. Maintenance
Throughout the life the of the project, regular site maintenance should be
conducted to ensure that drainage components are clean of obstructions and that
they properly control surface waters in accordance with the recommendations of
the referenced report. Landscaping installations should be maintained in a
manner that does not allow water to pond near sloped areas or in areas adjacent to
structures.
Estrada - Rough Grading
January 19, 2018
Page 4
CLOSURE
This work was conducted in accordance with generally accepted practice in the soils
engineering field. No other warranty is offered or implied. The conclusions and
recommendations presented in this report are based on surface and subsurface conditions
encountered and the present state of geologic knowledge. They are not intended to imply
a control of nature. As site geotechnical conditions may alter with time, the
recommendations presented in this report are considered valid for a period of one year
from_the-report_ date. Changes in the proposed land use or development may require
supplemental investigations or recommendations. Lastly, independent use of this report
in any form cannot be approved unless specific, written verification of the applicability of
the recommendations is obtained from this office.
Thank you for the opportunity to be of service. If you have any questions, please call.
Respectfully Submitted,
David A. Purkis
Civil Engineer
(RCE 42810)
Expires 3/31/18
No. 42810
Exp: 3-31-18
APPENDIX A - SUMMARY OF FIELD DENSITY TESTS
TEST
TEST
TEST
APPROX.
SOIL
DRY DENSITY
MOISTURE
RELATIVE
NO.
DATE
LOCATION
ELEV.
TYPE
FIELD
MAX.
FIELD
OPT.
COMPACT
pcf
pcf
%
%
%
1
7/14/17
Fill
106.8
1.
117.1
123.0
13.1
11.0
95
2
7/17/17
Fill
107.5
1
115.1
123.0
13.3
11.0
94
3
7/18/17
Fill
108.0
1
114.4
123.0
13.6
11.0
93
4
7/18/17
Fill
108.8
1
113.3
123.0
13.6
11.0
92
5
11/10/17
RW
102.0
1
116.4
123.0.
14.1
11.0
95
6
11/15/17
RW
103.0
1
117.6
123.0
14.3
11.0
96
7
11/20/17
RW
104.2
1
113.3
123.0
13.5
11.0
92
8
11/28/17
RW
105.2
1
112.9
123.0
13.3
11.0
92
9
12/1/17
RW
106.5.
1
115.7
123.0
13.8
11.0
94
10
12/8/17
RW
108.4
1
116.8
123.0
14.1
11.0
95
11
12/8/17
RW
108.4
1
120.0
123.0
13.9
11.0
98
12
1/18/18
RW
109.0
1
114.5
123.0
13.2
11.0
93
Tests taken by sand cone method ASTM D-1556.
APPENDIX B - LABORATORY DATA
PROJECT: Estrada Project No. 16-3728
549 Seaward Road
Corona Del Mar, Ca
A. Maximum Density -Optimum Moisture Determination
Maximum density and optimum moisture content were determined in accordance with
Test Designation ASTM D 1557-07. The test results are summarized below.
Sample Location Material Type Optimum Moisture. Max. Dry Density
PCF
As provided Brown silty sand/sandy silt 11.0 123.0
N_
O
C
O
a�nC-
�J
f
August 3, 2017
Juan and Orli Estrada
c/o Free Creation, Inc.
5478 Wilshire Blvd., Suite 214
Los Angeles, CA 90036
V aGeos
Consulting Engineering Geologists
Project No. 161503
Report No. 17-074
Subject: Summary of Engineering Geologic Observations
Rough Grading for Garage and Lower Level Building Pads
200 Poppy Avenue
Corona del Mar, California
COMB Permit: X2016-4299; Project No. 2954-2016
Reference: 1. Preliminary Geotechnical Investigation for Proposed Residence, 549
Seaward Road, Corona del Mar, California, by ViaGeos, dated December 12,
2016, Project No. 161503, Report No. 16-121.
2. Grading Plan of 549 Seaward Road, Corona del Mar, CA, Lot 105 of Tract
1237, by Duca-McCoy, Inc.
Dear Mr. and Mrs. Estrada ;
This letter presents a summary of engineering geologic observations during rough grading of
the garage and lower level building pad for the proposed residence at the subject site.
Engineering geologic observations reported herein occurred during the period from July 20,
2016 to July 26, 2017.
Rough Grading
Rough grading of the basement level building pad was performed by.... Rough grading
included excavation and export of native soils to construct the building pad. The excavation
bottom exposes competent native soils (terrace deposit) that consist of dense to slightly silty
sand. Temporary construction excavations (retaining wall back cuts) around the perimeter of
the lower level excavation expose competent terrace deposits and geotechnically approved
compacted fill, and have been laid back in general accordance with the recommendations
provided in Reference 1.
Remedial grading of the upper building pads has been partially completed and additional
rough grading of the upper pad and rear yard hardscape areas will be performed following
construction and backfill of the foundation retaining walls that will separate lower and upper
building pads.
Conclusions
Soil/geologic conditions encountered during shoring construction and grading/excavation for
the basement level are generally consistent with those described in Reference 1. The site is
considered acceptable, from an engineering geologic viewpoint, for construction of the
garage and lower level foundation.
ViaGeos* 305 N. Coast Highway, Suite R TEL (949) 494-2721
P.O. Box 309, Laguna Beach, CA 92652 FAX (949) 376-5766
549 Seaward Road
Corona del Mar, California
August 3, 2017
Project No. 161503
Report No. 17-074
A geotechnical compaction report summarizing geotechnical observations, field density testing
and laboratory testing performed during rough grading will be provided at the completion
of retaining wall backfill operations and construction of the upper level building pads/site
grades.
Closure
Our observations have been performed using the degree of care and skill ordinarily
exercised under similar circumstances by reputable engineering geologists and geotechnical
consultants practicing in This or similar locales. No warranty, expressed or implied, is made
as -to the conclusions -and-prof essional advice provided herein. =The conclusions of this report
are based on limited site observations by this office and others during grading.
The op ortumty to be of service is appreciated. Please call this office if you have any
qu7eff, hs, comments or require any additional information.
Zrely,
'_pED �Fo
�5 1,EL B.
cy
U \v� G�
No. 1664 �O (n
CERTIFIED N
ichael B. Childs, President
-i
ENGINLLEE9CRING
N E P, ;Sg
Engineering Geologist EG 1664
Registration Expires 3/31 /18
9T P
40 W R�
V aGeos
ViaGeos
Consulting Engineering Geologists
FIELD MEMORANDUM
Client: Estrada c/o Free Creation, Inc. Date: December 14, 2017
Job Address: 549 Seaward Rd., CdM
Subject: Footing excavations- Light well and upper level foundations adjacent to retaining walls
Reference: Geotechnical Investigation for Proposed Residence, 549 Seaward Road, Corona del Mar,
California, by VIaGeos, dated December 12, 2016, Project No. 161503 , Report No. 16-
121.
Observations
Footing excavations for the light well and upper level foundations located immediately adjacent to the
foundation retaining walls of the lower level (on the sides of the residence) have been formed onto firm,
unyielding soils (engineered fill) that consist of densely compacted slightly silty to silty sand. Density test
results documented by field representative for David A. Purkis, PE indicate at least 90 percent relative
compaction of (ower backfill soils and at least 95 percent relative compaction of upper backfill soils
within 2 feet of bottom of footings for upper level foundations located immediately adjacent to
retaining walls. The approximate locations of observed footing excavations pertinent to this field
memorandum are shown on the attached portion of the Basement Framing Plan Foundation Plan, Sheet
S-2, by FMH Engineering. (See reverse side.)
Conclusions
The footing excavations are acceptable, from an engineering geologic viewpoint, for placement of steel
and concrete.
Recommendations
Dimensions and details to be verified by others.
Note: This memorandum is not intended to verify footing geometry, steel reinforcing,
or that the bottom of the excavations are clean at the time concrete is poured.
305 N. Coast Highway, Suite R
Laguna Beach, CA 92651
TEL (949) 494-2721
FAX(949) 376-5766
R-
c�j ..€a
IJ hin$ �
locations of observed footing excavations pertinent to ViaGeos
ndum dated Dec. 14, 2017 are shown above as, highlighted areas.
6��2:$
'', SSSSS
R-
c�j ..€a
IJ hin$ �
locations of observed footing excavations pertinent to ViaGeos
ndum dated Dec. 14, 2017 are shown above as, highlighted areas.
ViaGeos
Consulting Engineering Geologists
FIELD MEMORANDUM
Client: Estrada c/o Free Creation, Inc. Date: November 2. 2017
Job Address: 549 Seaward Rd., CdM
Subject: Observation of subdrain at basement/garage foundation retaining walls
Reference: Geotechnical Investigation for Proposed Residence, 549 Seaward Road, Corona del Mar,
California, by ViaGeos, dated December 12, 2016, Project No. 161503 , Report No. 16-
121.
Observations
A retaining wall subdrain has been constructed at the base of the perimeter foundation retaining walls
of the basement and garage level. The subdrain consists of perforated 4 -inch drain pipe surrounded by
gravel and all enclosed within a geotextile filter fabric.
Approximate locations of observed retaining wall subdrain pertinent to this field memorandum are
shown on the attached portion of the Basement Foundation Plan, Sheet S-1, by FMH Engineering. (See
reverse side.)
Conclusions
The retaining wall subdrain is suitable for the intended use.
Recommendations
Waterproofing to be verified by others.
Retaining wall backfill may consist of compacted clean gravel, native or imported sandy soils.
Where used as backfill, gavel should be mechanically compacted in 2± ft. thick lifts using Whackers or
other compaction equipment to consolidate gravel backfill materials, as verified by ViaGeos. A layer of
geotextile filter fabric should be placed between the gravel and overlying soil backfill.
Soil backfill should be moisture conditioned prior to placement and should be mechanically compacted in
lifts to more than 12 inches thick (uncompacted thickness). Compaction testing of soil backfill by the Soil
Engineer's re s/entative is required, and testing shall occur at vertical intervals not greater than 2 feet.
W / No. 1664 '
CERTIFIED
ENGINEERING
-Note; Observations presented on this field 1i ,
subdrain outlet pipes, or waterproofing of relptl
taiQir
retaining walls and does not constitute an element
305 N. Coast Highway, Suite R
Laguna Beach, CA 92651
t intended to verify plumbing and routing of subdrains,
subdrain is intended to limit hydrostatic forces behind
TEL (949) 494-2721
FAX(949) 376-5766
aeos
V aGeos
Consulting Engineering Geologists
FIELD MEMORANDUM
Client: Estrada c/o Free Creation, Inc. Date: October 11, 2017
Job Address: 549 Seaward Rd., CdM
Subject: Garage and basement level slab sub , ry ade
Reference: Geotechnical Investigation for Proposed Residence, 549 Seaward Road, Corona del Mar,
California, by ViaGeos, dated December 12, 2016, Project No. 161503 , Report No. 16-
121.
Observations
Slab subgrade at the garage and basement levels expose firm, unyielding soils (marine terrace
deposits) that consist of dense slightly silty to silty sand. A very shallow plumbing trench in the lower
level building pad has been backfill with moisture conditioned native sandy soils and tamped to a firm,
unyielding condition. Other plumbing pipes that are expose will be surrounded by clean gravel backfill
needed to raise the pad grade 6+ inches. Approximate locations of observed slab subgrade pertinent
to this field memorandum are shown on the attached portion of the Basement Foundation Plan, Sheet S-
1, by FMH Engineering. (See reverse side.)
Conclusions
The slab subgrade areas are acceptable, from an engineering geologic viewpoint, for placement of
gravel, vapor retarder, sand steel and concrete.
Recommendations
Subsiab section, vapor retarder, steel reinforcement and slab thickness to be verified by others.
.C,`���L BuJ
. c\
� 6 No 1664
CER�IEJED
ENGINEERING
By: is a B. Childs EG 1664 GEoko4! "
Note: This memorandum is not intended to verify gravel section, vapor retarder, steel reinforcing,
or thickness of concrete floor slabs.
305 N. Coast Highway, Suite R TEL (949) 494-2721
Laguna Beach, CA 92651 FAX(949) 376-5766
Approximate locations of observed slab subgrade pertinent to ViaGeos
Field Memorandum dated Oct. 11, 2017 are shown above as highlighted areas.
2
ViaGeos
Consulting Engineering Geologists
FIELD MEMORANDUM
Client: Estrada c/o Free Creation, Inc. Date: August 10, 2017
Job Address: 549 Seaward Rd., CdM
Subject: Footing excavations- Garage and basement level foundations
Reference: Geotechnical Investigation for Proposed Residence, 549 Seaward Road, Corona del Mar,
California, by ViaGeos, dated December 12, 2016, Project No. 161503 , Report No. 16-
121.
Observations
Footing excavations for the garage and basement level foundations have been constructed into firm,
unyielding soils (marine terrace deposits) that consist of dense slightly silty to silty sand. Approximate
locations of observed footing excavations pertinent to this field memorandum are shown on the attached
portion of the Basement Foundation Plan, Sheet S-1, by FMH Engineering. (See reverse side.)
Conclusions
The footing excavations are acceptable, from an engineering geologic viewpoint, for placement of steel
and concrete.
Recommendations
Dimensions and details to be verified by others.
GE
No. 1664
CERDOE0
ENGINEERING
Note: This memorandum is not intended to verify footing geometry, steel reinforcing,
or that the bottom of the excavations are clean at the time concrete is poured.
305 N. Coast Highway, Suite R TEL (949) 494-2721
Laguna Beach, CA 92651 FAX(9A9) 376-5766
ons of observed footing excavations pertinent to Vi*Geos
dated Aug. 10, 2017 are shown above as,'highlighte areas.
September 4, 2019
Juan and Orli Estrada
c/o Free Creation, Inc.
5478 Wilshire Blvd., Suite 214
Los Angeles, CA 90036
Subject: Final Report of Geotechnical
549 Seaward Road
Corona del Mar, California
COMB Permit: X2016-4299
V aGeos
Consulting Engineering Geologists
Project No. 161503
Report No. 19-066
Observation and Testing for New Residence
Reference: 1. Report of Rough Grading and Retaining Wall Backfill, 549 Seaward Road,
Corona del Mar, California, by ViaGeos, dated January 19, 2018, Project No.
161503, Report No. 18-008.
2. Rough Grade Compaction Report, Residential Development, 549 Seaward
Road, Corona del Mar, California, by David A. Purkis, PE, dated January 19,
2018, Project No. 16-3728.
3. Summary of Engineering Geologic Observations, Rough Grading for
Garage and Lower Level Building Pads, 549 Seaward Road, Corona del Mar,
California, by ViaGeos, dated August 3, 2017, Project No. 161503, Report
No. 17-074.
4. Preliminary Geotechnical Investigation for Proposed Residence, 549
Seaward Road, Corona del Mar, California, by ViaGeos, dated December 12,
2016, Project No. 161503, Report No. 16-121.
Dear Mr. and Mrs. Estrada,
This letter presents a summary of engineering geologic/geotechnical observations performed
by ViaGeos, subsequent to rough grading of building pads and backfill of foundation
retaining walls, during construction of the residence at the subject site, as required for
submittal to the City of Newport Beach. The project builder, at their discretion, made requests
for geotechnical observations during course of construction. Rough grading of the garage/
lower level building pad and upper level building pads was completed in January, 2018 and
geologic/geotechnical observations and testing are reported in References 1, 2 and 3.
Engineering geologic/geotechnical observations reported herein occurred at various stages
of construction during the period from January, 2018 to February, 2019, and these included
observation of footing excavations for the upper level foundation of the residence,
observation of subslab preparation at the upper level, observation of footing excavations for
site walls and observation of the swimming pool excavation. A review of current site
conditions was performed on September 3, 2019.
ViaGeos* 305 N. Coast Highway, Suite R TEL (949) 494-2721
P.O. Box 309, Laguna Beach, CA 92652 FAX (949) 376-5766
549 Seaward Road
Corona del Mar, California
Foundation Excavations
September 4, 2019
Project No. 161503
Report No. 19-066
Footing excavations reviewed during construction included foundations for the residence and
site walls in the front and rear yard. Footing excavations for the lower level foundation of
the residence were constructed into competent terrace deposits, and footing excavations for
the upper level foundation were constructed into engineered fill placed during rough grading
and retaining wall backfill operations. (See References 1, 2 and 3.) The footing excavations
for site walls located in the front yard were constructed into competent terrace deposits and
footing excavation for the low site wall at the perimeter of the rear patio slab was
constructed into engineered fill placed during rough grading. Footing excavations reviewed
by ViaGeos were documented in field memoranda that were provided to the project builder
and City of Newport Beach at the time of construction.
Interior Plumbing Trench Backfill and Subslab Preparation
Shallow interior pluming trenches were backfilled with compacted on-site soils, and disturbed
near surface soils were compacted in preparation for construction of floor slabs.
Swimmina Pool Excavation
The swimming pool excavation was constructed into competent terrace deposits and
engineered fill placed during rough grading.
Exclusions
Certain earthwork construction at the site was not observed by ViaGeos, and this specifically
includes, but is not limited to: retaining wall subdrains for site walls in the front and rear yards
(where applicable), backfill of site walls in the front and rear yards. Additional earthwork
construction at the site that was not observed by ViaGeos specifically includes sewer and
utility trench backfills and compaction of soils placed during preparation of final hardscape
subgrades (where applicable). This and other earthwork construction not specifically
identified in the preceding paragraphs and prior reports (References 1, 2 and3) were not
observed by ViaGeos or David A. Purkis, PE are not a part of this report.
Waterproofing of retaining walls, as well as, routing and plumbing of subdrains and subdrain
outlet pipes, are not/were not within the purview of engineering geologic and geotechnical
observations.
Conclusions
Engineering geologic and geotechnical observations and testing reported herein indicate the
reviewed earthwork construction summarized above and described in our prior reports
(References 1, 2 and 3) was performed in general accordance with the recommendations of
ViaGeos and is considered adequate for the intended use.
Closure
Review and approval of the site surface drainage system for compliance with approved
plans and verification of proper and effective function is referred to others. Drainage
patterns approved by the Civil Engineer and/or Building/Grading Official must be
maintained throughout the life of the project. Regular site maintenance must be conducted
by the homeowners or their agents to verify that drainage components are clean of
obstructions and that they properly and effectively collect and control surface waters.
ViaGeos 2
549 Seaward Road September 4, 2019
Corona del Mar, California Project No. 161503
Report No. 19-066
The homeowners should recognize that alteration of drainage patterns, the addition of
hardscape elements, changes in landscaping, excessive irrigation and/or seasonal climatic
variations may all have an affect on subsurface moisture conditions which in turn may affect
structural performance. Slope and site maintenance guidelines are attached in Appendix A.
Our observations and testing have been performed using the degree of care and skill
ordinarily exercised under similar circumstances by reputable geotechnical consultants
practicing in this or similar locales. No warranty, expressed or implied, is made as to the
conclusions and professional advice provided herein.
The conclusions of this report are based on limited site observations by this office during
construction. They are not intended to imply a control of construction practices or of nature.
As geotechnical conditions may alter with time, the conclusions of this report are valid as of
this date only. Lastly, this report has been prepared to satisfy City of Newport Beach
building requirements.
The opportunity to be of service is genuinely appreciated. If you have any questions or
comments, please contact this office.
Sincerely,
ViaGeos
Michael B. Childs, President
Engineering Geologist EG 1664
License Expires 03/31/20
Attachment: Appendix A -Guidelines for General Site and Slope Maintenance
ViaGeos
549 Seaward Road
Corona del Mar, California
Appendix A
September 4, 2019
Project No. 161503
Report No. 19-066
GUIDELINES FOR GENERAL SITE AND SLOPE MAINTENANCE
Proper maintenance of a property including building pads and slopes is crucial to its long-
term structural performance, upon which residences depend. The following guidelines are
presented to aid the homeowner in properly caring for building pads and slopes, and
thereby help maintain the structural integrity of their homes:
I. Most earth materials are moisture -sensitive and uncontrolled water is often a major cause
of deterioration of a property. Sources of water may include irrigation, rainfall, leaking
pipes, and natural groundwater.
Ideally, moisture conditions beneath all structural elements such as foundations and slabs and
beneath slopes should be carefully controlled to provide a constant and uniform soil moisture
throughout the year. Variations in moisture content in subsurface soils may be minimized
through proper landscape and hardscape design and maintenance. Subsurface moisture
conditions are affected by variations in irrigation water volumes, seasonal rainfall,
landscaping or placement of impermeable coverings such as slabs, steps, walkways and
sealed planters. Homeowners should try to integrate and balance these elements in
conjunction with drainage devices to maintain a constant uniform subsurface moisture condition
beneath all foundations and slopes throughout the year.
a) All water derived from surface runoff should be directed away from foundations and
slopes. Finish grades should be properly constructed and maintained across the property so
that surface sheetflow runoff from irrigation or rainfall is drained in a non-erosive manner
away from foundations and slopes, and water should not be allowed to erode, pond and
percolate into the ground adjacent to structures or into slopes. The drainage patterns
approved at the time of fine grading, including earth berms, should be maintained throughout
the life of the project.
b) Roof drain runoff should be diverted by sidewalks, driveways, aprons or ground gutters
away from earthen areas and collected by surface drain inlets and solid pipes and flow
offsite to a proper outlet.
c) All gutters, drains, catch basins and drainage courses should be kept clean and unclogged
to allow proper drainage and collection. Drainage systems should be periodically inspected
prior to and during periods of heavy rains.
d) Homeowners should be attentive to records of water usage. Unusually high usage may
indicate leaking water lines. Persistent damp ground, slabs or walls, or musty odors may be
another indication of leaking pipes. Any indication of leaking water, sewer or drain pipes
should be investigated immediately by a competent plumber experienced in detecting leaks.
e) Subdrains behind retaining walls and beneath fill slopes, which help to control the flow of
groundwater, should be checked periodically to assure they are clean and perform properly.
VlaGeos 4
549 Seaward Road September 4, 2019
Corona del Mar, California Project No. 161503
Report No. 19-066
II. Proper landscaping and proper design and construction of hardscape elements is a very
important aspect of maintaining site stability.
a) Slopes should be properly planted and irrigated. Drought resistant plants are
recommended to help prevent the possibility of over -watering. A landscape expert should
be consulted when designing or changing the landscaping and irrigation of a residence.
b) A combination of shallow -rooted groundcover and deep-rooted shrubs and trees planted
in moderation may help to reduce erosion during rainy periods or due to irrigation and help
maintain surficial stability of slopes. Heavy groundcover requiring extensive irrigation should
be avoided.
c) Fill placement for landscaping elements, terraces or slopes, or construction of hardscape
devices such as planters, walkways, patios and steps should avoid altering flow patterns
designed for proper drainage of the site. The property owners should recognize that
alteration of drainage and landscaping patterns, or the addition of hardscape elements may
create water problems that could affect structural performance.
III. Rodent activity should be controlled, and animal burrows that may act as a conduit for
water and soften or erode the slope should be filled.
IV. Slopes and grades approved during fine grading of the property should not be altered
without expert consultation.
ViaGeos
VaGeos
Consulting Engineering Geologists
September 20, 2019
Juan and Orli Estrada
c/o Free Creation, Inc.
5478 Wilshire Blvd., Suite 214
Los Angeles, CA 90036
Subject: Addendum to Final Report of Geotechnical Observation
and Testing for New Residence
549 Seaward Road
Corona del Mar, California
COMB Permit: X2016-4299
Project No. 161503
Report No. 19-075
Reference: 1. Final Report of Geotechnical Observation and Testing for New Residence,
549 Seaward Road, Corona del Mar, California, by ViaGeos, dated
September 4, 2019, Project No. 161503, Report No. 18-066.
2. Supplemental Compaction Report, Residential Development, 549 Seaward
Road, Corona del Mar, California, by David A. Purkis, PE, dated September 20,
2019, Project No. 16-3728.
Dear Mr. and Mrs. Estrada,
This addendum to our Final Report of Geotechnical Observation and Testing for New
Residence (Reference 1) presents a summary of additional engineering geologic/geotechnical
observations and testing performed by ViaGeos and David A. Purkis, PE to address retaining
wall subdrains and retaining wall backfill conditions that were excluded from our prior final
report, as such additional information was requested by the City of Newport Beach.
Additional observations and testing pertain to retaining wall subdrains and backfill conditions
at the front of the site that were not observed and tested during the course of construction
because this office was not notified of the earthwork construction activities at the time such
work was performed. In order to verify retaining wall subdrains and retaining wall backfill
conditions, excavations were provided by the project builder to allow observation of
subgrade conditions.
At the location of the retaining wall along the southwesterly side of the front patio, the
exposed subdrain was observed to be inadequate. The retaining wall backfill was removed
from this location and a subdrain was installed near the base of the retaining wall. The burrito
style subdrain consists of a perforated 4 -inch drain pipe surrounded by gravel and all
enclosed in a geotextile filter fabric. The wall was subsequently backfilled with compacted
sandy native soils. Geotechnical observations and testing during retaining wall backfill
operations are presented in the attached report by David A. Puriks, PE. The approximate
location of the retaining wall subdrain and limits of geotechnically reviewed retaining wail
backfill are shown on Plate 1 of that report.
ViaGeos* 305 N. Coast Highway, Suite R TEL (949) 494-2721
P.O. Box 309, Laguna Beach, CA 92652 FAX (949) 376-5766
549 Seaward Road Septmber 20, 2019
Corona del Mu, California Project No. 161503
Report No. 19-075
At the front, northeasterly side of the property, retaining wall subdrain components were
observed at the front of the house foundation retaining wall, but no subdrain could be exposed
for the adjacent site wall that supports grade for the walkway along the property margin
because this area is paved with concrete. To provide measures to relieve potential hydrostatic
loading on this retaining wall, weep holes were drilled into the base of the retaining wall and
a retaining wall subdrain was provided in contact with the weep holes within the bottom of the
adjacent raised planter. A previously constructed subdrain at this location was considered
inadequate. The new burrito style subdrain consists of a perforated 4 -inch drain pipe
surrounded by gravel and all enclosed in a geotextile filter fabric. The approximate location
of the retaining wall subdrain is shown on Plate 1 of the attached report.
The retaining wall backfill exposed in an exploratory excavation was observed to be firm and
unyielding, and the retaining wall backfill that occurs beneath concrete walkway on the front,
northeasterly side of the property is considered to be adequately compacted. (See attached
report by David A. Purkis, PE.)
Based upon further observation of site conditions and review of prior construction documentation,
there is no need for a subdrain at the perimeter edge of the concrete patio in the rear yard,
and the patio subgrade is considered adequate for the intended use.
Conclusions
Based on additional engineering geologic and geotechnical observations and testing reported
herein, the reviewed earthwork construction at the front of the property that is summarized
above was performed in general accordance with the recommendations of ViaGeos and is
considered adequate for the intended use.
Closure
Our observations and testing have been performed using the degree of care and skill ordinarily
exercised under similar circumstances by reputable geotechnical consultants practicing in this or
similar locales. No warranty, expressed or implied, is made as to the conclusions and
professional advice provided herein. The conclusions of this report are based on limited site
observations by this office during construction. They are not intended to imply a control of
construction practices or of nature. As geotechnical conditions may alter with time, the
conclusions of this report are valid as of this date only. Lastly, this report has been prepared
to satisfy City of Newport Beach building requirements.
The oppattunity to be of service is genuinely appreciated. If you have any questions or
comments, please contact this office.
i
Sincerely, %a o
��m S Mo. 7uo4 O �1f
CCR
�--'� EMGI�IEEP.If`1G
Migg el B. Childs, President �T E PES ice// J
CEngineering Geologist EG 1664 Vn oR��
License Expires 03/31 /20 ` y �CA�
Attachment: Supplemental Compaction Report, Residential Development, 549 Seaward Road,
Corona del Mar, California, by David A. Purkis, PE, dated September 20, 2019, Project No.
16-3728.
DAVID A. PURKIS, PE
Consulting Civil Engineer
September 20, 2019
Project No.: 16-3728
TO: Juan and Orli Estrada
c/o ViaGeos
305 North Coast Highway, Suite R
Laguna Beach, CA 92651
SUBJECT: Supplemental Compaction Report
Residential Development
549 Seaward Road, Corona del Mar, California
REFERENCE: 1. ViaGeos, September 4, 2019; "Final Report of Geotechnical
Observation and Testing for New Residence, 549 Seaward Road,
Corona del Mar, California, COMB Permit:X2016-4299"
2. David A. Purkis, PE, January 19, 2018; "Rough Grade Compaction
Report, Residential Development, 549 Seaward Road, Corona del Mar,
California
3. ViaGeos, December 12, 2106; "Preliminary Geotechnical
Investigation for Proposed Residence, 549 Seaward Road, Corona del
Mar. California"
INTRODUCTION
Based on requirements from City Building Inspection, we have conducted a review of the
as -built conditions at the subject site. The review included observations of subgrade
conditions, where exposed in exploratory excavations; observation and testing of backfill
placed behind the southeasterly retaining wall near to the southerly property margin and
consultation with the project geologist.
Accom going Illustrations and Appendices
Appendix A - Summary of Field Density Tests
Appendix B Laboratory Tests and Procedures
Plate 1 — Geotechnical Plot Plan
GRADING SUMMARY
Testing of fill placement during rough grading is reported in Reference 2 and included
backfill of the garage retaining walls and preparation of the upper building pad. Fill
placement subsequent to rough grading was limited in scope. Limited exposure of fill
placed for the stairs on the northeasterly portion of the lot was observed during removal
of dirt from the planter box in front of this area. The exposed soil appeared to be dense
32158 Camino Capistrano #212, San Juan Capistrano, CA 92675 - 949.240.7293 • fax 949.454.0927
Estrada - Supplemental
September 20, 2019
Page 2
and well compacted. Approximately 2 feet of fill was placed behind the retaining wall
on the southeasterly portion of the lot following the installation of an additional subdrain.
The fill was compacted with a hand operated mechanical compactor (Wacker). Water
was added with a hose.
FIELD AND LABORATORY TESTING
The compaction standard used for the minimum density requirements was 90 percent of
ASTM D-1557 Test Method. Field densities were obtained in accordance with ASTM
D-1556 (Sand Cone) Test Method. A total of 1 relative compaction test was taken for
this supplemental evaluation. The test is included in a summary of all the tests taken for
the project in Appendix A and its approximate location is depicted on the accompanying
Plate 1. The results of laboratory tests are summarized in B. Testing was performed in
representative areas in order to provide a professional opinion as to the compaction of the
fill materials. This is not a warranty that all fill soils have a relative density of at least 90
percent of maximum.
EXCLUSIONS
The project principles/contractors, at their discretion, made requests for geotechnical
observations and tests. This report is limited to the items specifically described herein as
having been observed or tested. Items not observed by the geotechnical consultants are
excluded from this report.
CONCLUSIONS
1. Building Foundation Soils and Garage Wall Backfill
The results of tests and observations indicate that the fill soils placed during
rough grading were compacted to minimum requirements to the approximate
depths and limits indicated on the attached Plate 1 in accordance with the project
specifications.
2. Subgrade Fills
Based on limited observation and descriptions of work performed, the small
amounts of subgrade fills appear to be suitable for their intended use.
3. Compaction
The results of tests and observations indicate that observed fill soils placed during
project development have been compacted to minimum requirements to the
Estrada - Supplemental
September 20, 2019
Page 3
approximate depths and limits indicated on the attached Plate 1 in accordance
with the project specifications.
4. Conclusion
Observations and testing conducted during project development indicate that the
fill placement observed is in general accordance with the geotechnical
recommendations and are adequate for their intended use from a geotechnical
viewpoint.
CLOSURE
This work was conducted in accordance with generally accepted practice in the soils
engineering field. No other warranty is offered or implied. The conclusions and
recommendations presented in this report are based on surface and subsurface conditions
encountered and the present state of geologic knowledge. They are not intended to imply
a control of nature. As site geotechnical conditions may alter with time, the
recommendations presented in this report are considered valid for a period of one year
from the report date. Changes in the proposed land use or development may require
supplemental investigations or recommendations. Lastly, independent use of this report
in any form cannot be approved unless specific, written verification of the applicability
of the recommendations is obtained from this office.
Thank you for the opportunity to be of service, if you have any questions, please call.
Respectfully Submitted,
✓ �
C'`
David A. Purkis
Civil Engineer
(RCE 42810)
Expires 3/31/20
No. 42810
Exp: 3.31.20
Appendix A - Summary of Field Density Tests
Projecc
Estrada
359 Seaward
Proj #i
372'8
TEST
TEST
TEST
APPROX..
SOIL
DRY DENSITY -
MOISTURE
RELATIVE
NO.
DATE
LOCATION
ELEV.
TYPE
FIELD
MAX.
FIELD
OPT.
COMPACT
pcf
Pcf
%
%
%
1
7/14/17
Flt
106.8
1
117.1
123.0
13.1
11.0
95
2
7/17/17
Fill
107.5
1
115.1
123.0
13.3
11.0
94
3
7/18/17
Fill
108.0
1
114.4
123.0
13.6
11.0
93
4
7/18/17
Fill
108.8
1
113.3
123.0
'13.6
11.0
92
5
11/10/17
RW
102.0
1
116.4
123.0
14.1
11.0
95
6
11/15/17
RW
103.0
1
117.6
123.0
14.3
11.0
96
7
11/20/17
RW
104.2
1
113.3
123.0
13.5
11.0
92
8
11/28/17
RW
105.2
1
112.9
123.0
13.3
11.0
92
9
12/1/17
RW
106.5
1
115.7
123.0
13.8
11.0
94
10
12/8/17
RW
108.4
1
116.8
123.0
14.1
11.0
95
11
12/8/17
RW
108.4
1
120.0
123.0
13.9
11.0
98
12
1/18/18
RW
109.0
1
114.5
123.0
13.2
11.0
93
13
9/18/19
RW
105.0
1
122.3
123.0
9.4
11.0
99
Tests taken by sand cone method ASTM D-1556.
APPENDIX B - LABORATORY DATA
PROJECT: Estrada Project No. 16-3728
549 Seaward Road
Corona Del Mar, Ca
A. Maximum Density -Optimum, Moisture Determination
Maximum density and optimum moisture content were determined in accordance with
Test Designation ASTM D 1557-07. The test results are summarized below.
Sample Location Material Type Optimum Moisture Max. Dry Density
% PCF
As provided Brown silty sand/sandy silt 11.0 123.0
L
y
o
o
I
=
8�
I
t;
g