HomeMy WebLinkAbout09/23/2003 - Study SessionCITY OF NEWPORT BEACH
City Council Minutes
Study Session
September 23, 2003 - 4:00 p.m.
ROLL CALL
Present: Heffernan, Ridgeway, Adams (arrived at 4:14 p.m.), Webb, Nichols
(arrived at 4:03 p.m.), Mayor Bromberg
Absent: Proctor (excused)
CURRENT BUSINESS
1. CLARIFICATION OF ITEMS ON THE CONSENT CALENDAR.
Council Member Heffernan stated that he would be pulling Item 4 (Big Canyon
Reservoir) tonight because he wants more detail about what is being done and
how the City has placated neighbors on Spyglass, Harbor Ridge, etc. Further,
he asked why the work is being done on the cover and water plant before the
hardscape work.
2. MANAGEMENT OF INCOME PRODUCING AGREEMENTS.
In response to Mayor Pro Tem Ridgeway's question, Administrative Services
Director Danner reported that it has been over a year since Council Member
Heffernan asked that this item come before Council.
Utilizing a PowerPoint presentation, Mr. Danner reported that income
agreement growth outpaces the City's development. He stated that the City has
a large number of property leases and other income producing agreements
which represents the City's third largest revenue source after property and sales
tax. He noted that revenues range from $1 /year for the Girl Scout House to over
$3 million /year for the Balboa Bay Club, and collectively the revenues generate
over $10 million /year.
Mr. Danner reported that, ten years ago, contract and management of these
agreements were decentralized among 12 different departments. He noted that
Administrative Services began consolidating the day -to -day billing and
administrative processing of revenues in the early 1990s. He stated that today
all City billings with the exception of the emergency medical services (EMS) are
conducted by the revenue division. He reported that significant efficiencies have
been realized by consolidating City receivables management; however, actual
management level administration of the leases related to policy and negotiation
of terms was not consolidated. He displayed the receivables that the revenue
division currently bills.
Mr. Danner stated that, within the past couple of years, his department began
compiling a list of revenue generating leases, agreements, contracts, and
franchises to keep track of revenues, noting that only about half was shown in
the receivables slide.
Volume 56 - Page 387
INDEX
Management of
Income Producing
Agreements
(73)
City of Newport Beach
Study Session Minutes
September 23, 2003
INDEX
In response to Council Member Heffernan's questions, Mr. Danner confirmed
that billing has been consolidated and the City tries to include all the items into
one monthly bill. He reiterated that, when he started in the early 1990s,
billings were performed by different departments (i.e. Marine Department,
General Services, Police Department) when it should have been centralized in
Administrative Services. He stated that they are trying to consolidate as many
as possible under a single statement. He added that they do not bill for
everything since some things are paid to the City directly.
Mr. Danner stated that most of the agreements were negotiated and managed
by staff, the City Manager's office, and /or the Marine Department. However,
staff reductions and reorganizations in the 1990s decentralized some of the
negotiations to the department heads and left management responsibilities not
well defined. He reported that, several years ago, the revenue division detected
problems with some of the agreements in which it was asked to conduct revenue
audits. He noted that the problems included agreements that have expired,
some had appraisals or rate adjustments that have not occurred, there were
lapses in insurance and performance bonds, and there were other performance
requirement failings by the City and lessees. He stated that, even though
revenue was recovered in most cases, such problems are an embarrassment to
the City, a hardship to the lessees, and time consuming for staff to resolve.
Mr. Danner stated that the solutions include 'outsourcing the property/
agreement management or using City staff.
Mr. Danner reported that they met with the City Manager more than a year ago
and presented a proposal to consolidate more of the responsibility for
administration of these leases in Administrative Services and to hire an income
property manager to handle the job, preferably with a paralegal or real estate
background. He stated that they were directed to first thoroughly investigate
the potential for accomplishing the function with an outside contract. He
reported that they received proposals from the Bendetti Management Group
and Jefferson Wells International, but both were comprehensive and expensive.
He noted that neither vendor was interested in reducing the scope of their
services in the proposal. He pointed out that Bendetti proposed performing the
service for 5% of the gross revenue (about $500,000 /year), while Jefferson Wells'
proposal was for about $325,000. He displayed a slide that showed what was
included in their proposals.
Mr. Danner reported that most of the leases and agreements are complex
documents with inconsistent formats, contents, and requirements for the City
and the lessee, including periodic adjustments, reviews, and expirations. He
added that these were negotiated many years ago by different individuals. He
listed the aspects of a typical agreement. He reported that Jefferson Wells and
Bendetti included creating an abstract of each agreement as a separate and
required component of the proposal. He stated that this needs to be done by
someone. He indicated that the City Attorney's office, through a contract
attorney, began assisting the City with abstracting the largest revenue -
producing agreements earlier this year and has completed the abstracts on three
agreements at a cost of $751hour. He reported that the total cost for completing
the abstracts in this manner is a one time expense of about $30,000.
Mr. Danner reported that many cities and counties have real property
management positions and some have significantly fewer properties and less
related revenues than the City. He stated that the average base salary for these
Volume 56 - Page 388
City of Newport Beach
Study Session Minutes
September 23, 2003
INDEX
positions range from $74,000 to $96,000 a year, and the responsibilities are
administrative and enforcement oriented. He displayed a list of agencies that
have positions similar to what is being proposed. He reported that most
management aspects are supported by software systems that could cost about
$10,000.
Mr. Danner stated that they believe that the daily administration of these
agreements and leases should be conducted by Administrative Services staff.
However, noting that using staff would be more cost- effective than outsourcing,
he reported that they cannot absorb the extra work with the current personnel
because of existing workloads and the recent annexations. He stated that they
are proposing to place this function in the revenue division, noting that their
staff has not been augmented since the downsizing in the early 1990s. He added
that they believe that establishing a point of contact for other income - generating
opportunities would also improve consistency and continuity. Mr. Danner
pointed out that this function has become too important and needs more
attention than it has received in the past. He believed that in -house
administration is most efficient and the least costly way to administer this
process. He emphasized that the City needs to tighten how it is doing business,
especially since there is a revenue source that is within its control, rather than
being subjugated to the political whims of the State.
Mr. Danner reported that the City Attorney has been consulted on this issue
and concurs with the proposal, the concept has been discussed with the Finance
Committee on at least one occasion and they agree with the recommendation,
and this concept was mentioned during budget deliberations earlier this year.
He stated that it was their intent to incorporate this new position in the 2003-
2004 budget, but the staff work was not completed in time. He added that he
did not want to place this item on the regular agenda without the opportunity to
discuss it with Council at a study session, receive direction, and answer any
questions. He announced that Deputy Administrative Services Director Kurth
and Revenue Manager Everroad are also present to answer any questions.
Mayor Pro Tem Ridgeway stated that he has information for Mr. Danner
regarding the software he is using. He indicated that he read the proposals, but
didn't like them because of the cost. He stated that he is happy with the
recommendation. Mr. Danner confirmed that the proposed employee would be
in the Administrative Services Department. Mr. Everroad confirmed that 70%
of the 130 properties are real property. Mr. Danner reported that abstracts
have been completed for the Balboa Bay Club, the American Legion, and the
Corona del Mar concession. He explained that the concession was done because
the agreement has expired and is up for renewal. He stated that they hoped to
be further along in the process, but the City Attorney's office is keeping the
attorney busy. He confirmed that this could be outsourced, but they feel that
the attorney can do a good job and be less expensive than some of the other
proposals they received. He stated that, as long as she has the time, they
recommend using her. Mayor Pro Tem Ridgeway suggested that, as
Mr. Danner's office collects the agreements, they keep an extra copy so the
property manager has a drawer to go to and everything is centralized.
Mayor Bromberg noted that Council Member Heffernan is the chair of the
Finance Committee. Council Member Heffernan indicated that they have not
addressed this specific issue because they have not seen the proposal to add staff
Volume 56 - Page 389
City of Newport Beach
Study Session Minutes
September 23, 2003
in- house. He stated that when he was first on Council he asked how a specific
lease was administered. He indicated that it was alarming to hear that
different departments handled it. He stated that it was appropriate to have this
under the finance department and there be a uniform abstract form or grid to
summarize all the documents and to have the documents looked at on a monthly
basis. Council Member Heffernan believed that the work is not complete
because the abstracts have not been performed, so the City does not have all the
data in one spot. Plus, the City does not have the program to indicate whether a
payment has been received, list the contact person, show insurance information,
etc. He reported that, once they know the data, it is in one spot, and can be
monitored, then it can be reflected in a uniform bill. He emphasized that this
accounts for about $10 million a year and is a reoccurring problem of
management. He added that collection will also be better once it is on one
monthly bill. He stated that the question for Council is whether this is best
handled in -house or with an outside source. He indicated that he is not ready to
answer this today. He believed that getting this within one department is a
good start.
Mr. Danner noted that the two proposals were costly and they proposed doing
things that the City does not want them to do (i.e. billing and collecting
revenue). He stated that, after weighing the cost and services Bendetti and
Jefferson Wells would provide, they believe they could do this function in -house
as good as Bendetti and Jefferson Wells for less money. Mayor Pro Tern
Ridgeway stated that he has property managers and he is not paying anywhere
near 3.55% to 5 %.
Mayor Pro Tem Ridgeway noted that every lessee has to provide a yearly
insurance certificate that names the City as the additional insured. He believed
that the City does not receive 1/3 of those and this is why the City needs an in-
house manager. He stated that making sure the City has the certificate is
equally as important as the collection because of unlimited liability to the City.
In response to Council Member Heffernan's questions, Mr. Danner stated that a
lot of cities have property managers or property agents. He indicated that they
have enough information to move forward. City Manager Bludau stated that
they are hoping to receive authorization to put this on a future agenda and
develop a job description. Mayor Bromberg suggested that staff develop what it
needs and bring it before the Finance Committee, have them fine tune it, and
then bring it before Council.
3. BACK BAY SCIENCE CENTER.
Utilizing a PowerPoint presentation, City Attorney Burnham noted that the
Back Bay Science Center project, formally known as the Marine Study Center,
has been around for 3'/2 to 4 years and came about during discussions relative to
projects that could be funded with American Trader Oil Spill proceeds. He
stated that, to date, this is the funding source for the City's contribution. He
reported that the Center has always included the concept of a water quality
testing lab and water quality research and education facility. He indicated that
they have more recently looked into the possibility of restoring the wetlands at
the south side of Shellmaker Island and creating an area that would serve as a
wetland restoration and research arena. Further, there will be a set of
interpretive trails, storage and office space, and a meeting area. He reported
Volume 56 - Page 390
1101IM1i
Back Bay
Science Center
(51)
City of Newport Beach
Study Session Minutes
September 23, 2003
INDEX
that tton Yee has been the architect and principal designer for the project since
its inception and devoted a lot of time, some of which was voluntary, to bringing
the project to where it is right now. He pointed out that the model that Mr. Yee
prepared displays the 13,000 sq. foot building, restored wetlands, interpretive
trail, and the other onsite amenities.
Mr. Burnham reported that the functions of the facility are still being discussed
by the principal parties (Department of Fish and Game, the County, and the
City). He noted that the process also involves UCI because their crew facility is
scheduled to be replaced with a larger building behind the Center. He stated
that the Coastal Commission has been involved in developing the curricula and
interpretive plan, as well as maintaining the greenhouse that propagates native
vegetation. He noted that there is a voluntary program that plants the
vegetation in the Upper Bay and removes the exotic plants.
Mr. Burnham reported that the City has prepared a negative declaration for the
Department of Fish and Game. He indicated that, this morning, the
Department of Fish and Wildlife told them they needed a finding of no
significant impacts. He stated that they have hastily prepared an
environmental assessment. He added that Jon Douglas is making good progress
on a coastal development permit application which will hopefully be filed in time
to get this on the January agenda. He reported that they hope to go out to bid
some time in February. He stated that the two primary funding sources are
$1 million from a Department of Fish and Game grant and $1.23 million from
the County for the water quality lab. He indicated that the estimated cost for
the project is about $3.7 million to $4 million. He noted that the City has
contributed about $550,000 and there is not much money left in this account.
He indicated that the City also maintains an account that is derived from
Beacon Bay lease revenue ($300,000) that must be used for Upper Bay projects.
He stated that the State Lands Commission has indicated that the City could
use those funds for this project since it complies with the restrictions for the use
of the funds.
Ron Yeo displayed the site plan and stated that the intent is to get rid of all the
temporary facilities and build one complex. He reported that, if they do not
have all the funds to pay for everything, they will build the water quality and
teaching labs and as much of the complex as possible, and utilize the existing
temporary facilities for office space. He emphasized that it is their goal to work
hard and raise money to do as much as they can. He indicated that it is a long
range project to get all of the teaching tools needed. He noted that everyone is
in favor of this project.
Assistant City Manager Kiff stated that the concept behind the center is to have
an active, hands -on place to learn about water quality and environmental
protection. He indicated that there would be touch tanks, the County's lab, a
tidepool demonstration area, an education curriculum approved by the Coastal
Commission, and green buildings that reflect environmental protection. He
showed an aerial of Shellmaker a couple of years ago and what it will look like
after the center is built. Council Member Heffernan noted that Shellmaker is at
the corner of the Dunes marina. Assistant City Manager Kiff also displayed the
proposed improvements and the floor plan. He stated that all of the testing for
ocean and bay water across the County would be done at this lab. He noted that
everyone could see the testing occur. Mayor Pro Tem Ridgeway clarified that
Volume 56 - Page 391
City of Newport Beach
Study Session Minutes
September 23, 2003
INDEX
most of the ocean testing will actually ne clone ny the urange Vounty banitation
District. Assistant City Manager Kiff indicated that the County will be doing
this from Corona del Mar to the south.
Assistant City Manager Kiff reported that they need to look for additional
funding to finish the job. He indicated that there are some State bond revenues
available for water quality education - oriented facilities, but he will need to
investigate whether they are still available. He stated that there is also some
moneys that the City is required to dedicate towards Upper Newport Bay
programs through SB573. He indicated that another option would be to phase
or downscale the project. Assistant City Manager Kiff reported that more
information can be found on the City's website (www.citv.newport- beach.ca.us)
and there is also an opinion email address that people can send their comments
to ( opinimis(Lbcity .newport- beach.ca.us).
Mr. Burnham stated that there has been a lengthy process for developing an
interpretive plan that describes the functions of the center. He indicated that
they are not sure they did a great job in revealing the draft plan to the local
environmental community. He reported that they recently met with
environmental organizations and he will be meeting with Jean Watt in the near
future. He emphasized that the idea is not to duplicate what is done at the
Muth Center or interfere with any other water quality education program. He
stated that there is enough need for as much water quality education as possible
and he believed that this will be the kind of center that gives the City the
presence in the Upper Bay that Council indicated it wants. Mayor Bromberg
added that this is fitting for Newport Beach since it is a coastal city.
In response to Council Member Heffernan's questions, Mr. Burnham reported
that the nest action that needs to be taken is the cooperative agreement that
talks about the phasing of construction, financing /construction management if
the funds are short, and takes the first step toward an operating agreement once
the facility is running. He indicated that this should come to Council within
30 days. He stated that, following this, Council will be presented with a use and
occupancy agreement and a full operating agreement that describes what the
County, City, and Department of Fish and Game will be doing after the facility
is constructed to maintain the site, ensure that programs are being offered on a
regular basis, and ensure that the curricula is appropriate. Mr. Burnham
reported that the City is not obligated to make up the $2 million shortfall. He
explained that, when the cooperative agreement is brought before Council, he
believed they will list potential funding options. He clarified that they will
phase construction if they do not have the money when they go out to bid.
In response to Council Member Webb's questions, Mr. Burnham confirmed that
they will be looking for benefactors in the community to help fund the shortfall.
He reported that they met this morning with an individual who has raised
money in this community before and provided them with good ideas they will
probably be implementing or pursuing in the nest couple of weeks. He stated
that this will also come back to Council.
Council Member Nichols asked if they have looked at alternate projects or uses
for Shellmaker Island. Mr. Burnham reported that Shellmaker Island is owned
in -fee by the Department of Fish and Game. He stated that the County, City,
and Department of Fish and Game are advocating this project because it serves
Volume 56 - Page 392
City of Newport Beach
Study Session Minutes
September 23, 2003
the interest of each of the entities. He confirmed that the Center would be
supplying a need that is not being supplied or not adequately being supplied.
Council Member Nichols noted that the City has a lot of other things that also
need funding. Mr. Burnham stated that they have been careful so far to make
sure that the funding for this project has only come from funds that are
earmarked for this purpose, rather than from General Fund money. Council
Member Nichols noted that the Corona del Mar beach sand is unfunded. He
asked if the Muth Center is an appropriate place for the center and if the Back
Bay can be used for some eelgrass mitigation. Mr. Burnham reported that this
area is not appropriate for eelgrass restoration, although the program at Upper
Bay has identified sites that are fairly close to the Dunes as possible restoration
sites. He explained that the Muth Center is not the type of facility that would
serve the functions previously discussed, is far from parking, is not immediately
adjacent to the water, and is not owned by the Department of Fish and Game.
4. BIG CANYON RESERVOIR COVERING AND DISINFECTION
FACILITIES; STATUS REPORT PRIOR TO BIDDING PROJECT.
City Manager Bludau noted that moving forward with the cover was one of
staffs top 12 priorities for the last fiscal year.
Principal Civil Engineer Sinacori announced that Utilities Director Davidson
and Utilities Operations Manager Antista are in the audience and stated that
they, along with their staff, have spent a lot of time on this project over the last
few years. He also noted that Harry Kobzeff, the landscape architect, and Steve
Tedesco, TetraTech, Inc. Vice President, are also in the audience.
Utilizing a PowerPoint presentation, Mr. Sinacori reported that the floating
cover would be for the 23 acre surface water reservoir and includes a structural
curb around the entire reservoir, a stainless steel anchoring system, new
security fencing along the top, and four circulation mixing pumps along the
bottom of the reservoir. He stated that another benefit to the project is the new
liquid chloramination disinfection facility to replace the gas system with a safer
liquid system. He noted that this will be placed before the dam. He added that
there will also be some landscape and site improvements.
Mr. Sinacori reported that the State Department inspects and permits the City's
water system; in 1989, they mandated the elimination of the open body
reservoir; in 2005, the Trihalomethanes Limit (THMs) will change; and it will be
difficult to meet the new limits with the open body reservoir. He emphasized
that today and in the past, the City has always met all current Federal and
State health standards for water quality. He reported that the cover will
eliminate the gas chlorination facility, there will be a new state of the art
chloramination facility, there will be a safer liquid system that is endorsed by
the Newport Beach Fire Department, it reduces chemical treatment expenses by
about $40,000 /year, it eliminates midge fly and algae, and they will be able to
maintain some emergency storage for the City.
Regarding the California Environmental Quality Act (CEQA) process,
Mr. Sinacori stated that the City contracted with Helix Environmental in
December 1993, the first public scoping meeting was held in January 1994, the
second meeting was held in February 1994 at the Minkoff residence on Yacht
Enchantress since not many people attended the first meeting, and the County
Volume 56 - Page 393
INDEX
Big Canyon
Reservoir Covering &
Disinfection
Facilities
(89)
City of Newport Beach
Study Session Minutes
September 23, 2003
INDEX
approved the mitigated negative declaration in June 1994. He noted that the
negative declaration had seven mitigation measures: 1) compliance with the
excavation and grading codes; 2) dust suppression; 3) construction emission
reductions; 4) Regional Water Quality Control Board approval; 5) construction
notification; 6) traffic control; and 7) a landscape plan. He noted that the
landscape plan is to be prepared by a licensed landscape architect in
consultation with the affected neighborhoods. He reported that they went back
to the Minkoff residence (SeaView Community Association) in October 2002 and
the association sent an approval letter in July; and they met with the Pacific
View Cemetery in fall 2002 to try to develop a plan that utilizes the cemetery
slope to better screen the cover. He indicated that the residents and the Pacific
View Cemetery management liked the idea; however, their corporate office
rejected it. He stated that they have not had any formal meetings with
residents from the Spy Class community. He indicated that several residents
have contacted them over the years since the CEQA report was published and
reported that these residents can adjust the landscaping to reach their desired
view.
Mr. Sinacori explained that this has taken so long because the groundwater
development project came online in October 1997 and was the highest priority.
He stated that it was directed by Council to have this program be a pay- as -you-
go program, but they still had a $16 million bond for the groundwater project
that ended up being $25 million in 1995. He reported that they began seeking
Federal funding in 1998, which was approved in fiscal year 2002 -2003 for
$867,000. He noted that the earliest opportunity to have the funds to cover the
reservoir was in 2000. Mr. Sinacori reported that staff is in the process of
draining and cleaning the reservoir and assessing the needed repairs to the
bottom, landscape and site improvements have been bid, the cover and
disinfection improvements are being finalized, the federal funding process is
ongoing, and there will be coordination with the Metropolitan Water District
(MWD). He displayed photos of the reservoir, the bottom of the reservoir, and
the sign that warns of a chlorine leak. He noted that they will no longer have
this risk starting next week because the facility will be out of chlorine gas.
Mr. Sinacori reported that, during the next 15 months, MWD will be the source
of water. He noted that there has been quite a bit of coordination with MWD on
this, stating that they have also reviewed any planned shutdowns with them.
He stated that the groundwater development project will be the backup supply
to MWD and there will also be emergency interconnects with other agencies. He
displayed the water facilities in Orange County.
Mr. Sinacori stated that the landscape and site improvements include tree
replacement, tree additions, and decorative block wall and landscape
improvements. He reported that bids were received in August 2003, Council
will consider awarding the contract tonight, and the completion is scheduled for
January 2004. He noted that this will be inspected in- house. He stated that the
trees that will be added are mostly eucalyptus trees. Mayor Pro Tern Ridgeway
expressed concern that the trees will grow very tall and residents will later say
the City is blocking their view. Further, the trees drop leaves and are messy.
Mr. Sinacori reported that the SeaView community talked about all the different
specimens and what could be done with views. He noted that the SeaView
Landscape Committee and board reviewed the project. He stated that Pacific
View manages their slope and there are shorter specimen of eucalyptus trees on
Volume 56 - Page 394
City of Newport Beach
Study Session Minutes
September 23, 2003
INDEX
the hills. He confirmed for Mayor Pro '1'em Ridgeway that the Urty's arborist
and General Services Director have also been involved in this project. He
indicated that the best thing the City can do is to get as tall a eucalyptus tree as
possible since they cannot get trees higher than 60 feet to benefit everyone's
views all the way up the hill. Mayor Pro Tem Ridgeway stated that the houses
in the lower levels do not need 60 foot trees, but the higher people will. lie
asked if using 60 foot trees will be creating a future problem for the City. Public
Works Director Badum reported that Mr. Sinacori has simulations that will
show what they are proposing. He assured everyone that the issue of views has
been carefully considered by the landscape architect. Mr. Sinacori displayed the
landscape simulations that have been presented to the community. He reported
that that the residents have lost vegetation due to El Nino and putting back the
vegetation has been an issue with their landscape committee because doing this
would block somebody else's view. He stated that the predominant views are
well past the ocean, noting that the trees just help screen the reservoir and does
not impact views. He displayed the views from the Minkoff property that looks
at the reservoir horizontally. He stated that the plant material is in their yard,
but they can adjust it to any level they want to mitigate their view. He noted
that the eucalyptus tree in their view is City property. He added that the
Minkof£s love the tree, would like it back, and have asked for more trees. He
noted that, as you look at the views from the properties as you move up the hill,
they still have their ocean view but the reservoir is screened. He indicated that
the trees will be in a 24 -inch box, but the seedlings will shoot past this box in a
couple of years. It was stated from the audience by staff that the trees will
reach 60 feet in about five years. Mr. Sinacori reported that every resident has
some sort of landscape hedge in their backyard and it depends on how high they
want the hedge and how they want to mitigate the view of the reservoir and the
cemetery site. He emphasized that they cannot put trees high enough to help
Spy Glass because it would hurt the people lower on the hill. He showed a
60 foot tree along the buffer that does not impede views. Mayor Pro Tem
Ridgeway clarified that he just wanted to make sure the issue is being reviewed.
Council Member Heffernan indicated that he may have a conflict because he
lives about 200 feet away. He noted that he lives downstream of the reservoir
and asked if seismic issues have been looked at. Utilities Director Davidson
reported that they went out for proposals a year ago for seismic consultants and
conducted a complete seismic analysis of the dam. He stated that it passed with
no problems and meets today's seismic standards. He reported that they had to
do the seismic study prior to the cover project because, after the Northridge
earthquakes, all the dam seismic standards changed.
In response to Council Member Webb's question, Mr. Davidson reported that the
City has to submit information to the Bureau of Dam Safety yearly. Council
Member Heffernan stated that now is the time to deal with any conceptual
problems because once the reservoir is full, they will not be able to do this. He
noted that the City is not changing the reservoir and will be using the existing
topographical configuration of the dam. Mr. Davidson reported that the City
will be repairing cracks, has already done work on the slopes, and will be
patching or putting an asphalt overlay over the entire bottom, as well as making
needed repairs.
Regarding the reservoir bottom, Council Member Webb stated that it is very soft
because there is a clay lining underneath. He noted that it is an extremely
Volume 56 - Page 395
City of Newport Beach
Study Session Minutes
September 23, 2003
INDEX
complicated and complex process to do paving operations. He indicated that
they tried this about 10 or 15 years ago, but the truck gradually sank to the
bottom. He noted that the asphalt is not really a part of the structural
membrane that protects and keeps the water in the reservoir, but the clay layer
underneath does this.
Council Member Heffernan stated that one of the issues that he has repeatedly
heard from engineering firms that have done this, is that the key objection is
that people will be looking down onto a black -gray cover when they once had a
blue water view. Mr. Sinacori indicated that, depending on where they are at,
they will still look at asphalt sides, a rusted fence, and an asphalt road. He
stated that the cover may end up looking more attractive to them.
Mr. Sinacori reported that the cover material is approved by the State Health
Department and can be either tan, white, or black. He noted that they first
thought the tan color would be acceptable to the community; however, it may
end up looking very dirty, will need cleaning more often, and stand out more as
a non - natural feature rather than a black cover that may blend away like an
asphalt street. He reported that the black cover is actually more durable than
the tan cover.
Mr. Sinacori reported that TetraTech, Inc. started this project as ASL
Consultants in 1995, but it was put on hold in 1997 because of funding issues.
He stated that an amendment was approved in July 2002 to add the disinfection
system to their contract. He indicated that they are expecting plans shortly. He
stated that the contract can probably be awarded in December if they can figure
out what to do with the bottom quickly and make any necessary repairs or add
the repairs to the project. Mr. Sinacori reported that the funds were requested
in the 2002 -2003 federal fiscal year which normally starts in October. He stated
that the appropriations were delayed until January 2003 and it took until May
2003 before the federal government in «'ashington got the paperwork from San
Francisco's federal offices. He noted that part of the process involves following
the guidelines of the National Environmental Protection Act (NEPA) which
includes preparing an environmental assessment (EA) utilizing City CEQA
documents. He stated that Bucknam & Associates has been hired to prepare a
draft document for the EPA and hopefully they will release it for review in late
October. He believed that the whole process should be done by December 2003
or January 2004. He emphasized that, if they start spending any money now,
they will not be eligible for any reimbursement. Mr. Sinacori stated that the
plan is to award the contract on December 9, 2003. He noted that the El Toro
Water District (ETWD) installed a new cover last year, but they have operated
with a cover for 20 years. He stated that they have tapped into their experience
and will be recommending to Council that the City use the same inspector they
used. Mr. Sinacori reported that it takes three months to make the material,
the concrete curb and site work will take about three months, and they hope to
install the cover in April 2004. He indicated that the disinfectant facility will be
in construction the entire nine months. He noted that the working hours are
Monday through Friday from 7:00 a.m. to 5:00 p.m. City Manager Bludau asked
how noisy construction will be. Mr. Sinacori reported that there will probably be
a few backup bells and residents may be able to see the work being done. He
added that they are also considering including a bonus /penalty clause in the
contract to help speed things along.
Volume 56 - Page 396
City of Newport Beach
Study Session Minutes
September 23, 2003
INDEX
Utilities Operations Manager Antista stated that there will be certain
maintenance and operation requirements when the project is complete. He
reported that the State Health Department has adopted American Water Works
Association (AWWA) rules and regulations for maintenance and inspection of
floating covers and the disinfectant facility. He stated that the inspection of the
cover and overall facility will be done daily; maintenance and repairs to the
cover will be done weekly; hatch and vent inspections will be done weekly; they
are required to inspect and maintain the rain water removal system; they are
required to wash down the cover a minimum of four times a year; and required
to keep records and submit reports to the Department of Health Services. He
indicated that the water from washing down the cover will be pumped into the
settling basin. He reported that they conducted a study and will he installing
mixing pumps and circulation pumps in the reservoir to improve turnover and
eliminate potential nitrification problems that are associated with covered
reservoirs. Mr. Antista reported that the new disinfection system will eliminate
the gas chlorine system with a more complex sodium hypochlorite and aqueous
ammonia disinfection system. He added that the disinfection system will be
expanded at 161h Street to mirror the operation at Big Canyon. He stated that,
in fiscal 2004 -2005, they will be requesting two additional water plant operators
to offset the additional maintenance requirements for the new facilities. He
displayed slides of the aqueous ammonia chemical feed pumps that are not
currently in use at 161h Street and also showed ETWD's treatment plant which
is similar to what Big Canyon will have. He added that the disinfectant facility
is highly technical and will require expert manpower to operate. He reported
that the outside of the cover is not treated, but it will be disinfected once it is
built and being installed. He stated that they expect to be cleaning bird
droppings and eucalyptus leaves off of the cover. He confirmed that ETWD has
the same type of cover on their reservoir and it is also black, but their previous
cover was brown. He stated that the intermediate fabric material is nylon.
Mayor Bromberg expressed concern that the City will be telling people they
cannot hose their sidewalks but the City will be able to put the water from the
washing down of the cover into the bay. He believed that the City would be
violating the law if it does this. Mr. Sinacori reported that the Regional Water
Quality Control Board permits and has discharges related to this operation. He
reported that the person who designed the original reservoir built a treatment
system with settling basins. He indicated that the City has to monitor the
discharge, measure for all the different constituents, and dechlorinate. He
noted that it goes into an earthen channel first. He reported that he also will be
talking with Assistant City Manager Kiff about possibly using the water for
another use. He indicated that this water will not hurt the bay.
Mr. Sinacori stated that they have spent a lot of time with ETWD and displayed
photos of their covered reservoir. He indicated that it takes a dozen people to
move the material in and get in place, and it uses a thermo -weld. He stated that
their cover lasted 20 years. He also displayed the rainwater troughs, the floats
that keep them in place, someone walking on the cover, and how they clean and
wash down the reservoir. He noted that ETWD's wash downs go straight to the
drainage system. ?Mayor Pro Tern Ridgeway believed that the City could do a
diversion to the OCSD. Mr. Sinacori indicated that they looked into this;
however, it is a lot of water and would inundate the sewer system.
Volume 56 - Page 397
City of Newport Beach
Study Session Minutes
September 23, 2003
Mr. Sinacori reported that they invited a lot of people to the meeting from the
SeaView community, unfortunately, people were on vacation and unable to
attend. Further, the property manager of SeaView has just resigned.
City Manager Bludau indicated that, since the contract award is on tonight's
agenda, he thought it would be a good idea to walk through the whole process.
Mayor Bromberg commended staff on the presentation.
Council Member Heffernan reported that the City Attorney has informed him
that he would have a conflict with tonight's item. City Attorney Burnham
clarified that he is evaluating whether Council Member Heffernan has a conflict
or not.
PUBLIC COMMENTS - None.
ADJOURNMENT - 5:43 p.m
The agenda for the Study Session was posted on September 17, 2003, at
2:40 p.m. on the City Hall Bulletin Board located outside of the City of
Newport Beach Administration Building.
City Clerk
Recording Secretary
Volume 56 - Page 398
INDEX