Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
X2018-1903 - Misc
X2018 1703 CITY OF NEWPORT BEACH 309 Cor-onado s� COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 BUILDING HEIGHT CERTIFICATION Project Street Address: 309 60�'i.G%AZA-DG S`1-724-1-7_ Building Permit Number(s): `9 2-01 —/c/o 3 As the surveyor of record for the project at the above address, I hereby certify that I have reviewed the City of Newport Beach approved plats and original topographic survey and based the elevations listed below on those plans. Elevations shall include an allowance for roofing material thickness if not yet installed. Provide each critical ridge and flat roof, or roof deck railing elevations indicated on the approved plans. Use the format below on the back of this form if additional space is necessary or further explanation is needed. Provide original copy to the inspector before roof framing inspection. All elevation points are based on: Von to NAVD88 O NGVD29 O Assumed Please provide the following elevation information for the highest roof ridges, flat roofs, or parapets/guardrails. Additional elevation points may be requested by the Building Inspector. RIDGES (3:12 slope or greater) r�fiui� , 2 `e /frZ(c. (j� (^^_ 1. Approved elevation point of ridge is 38, CIL) and actual elevation point is 37. [, j 2. Approved elevation point of ridge is and actual elevation point is 1 Approved elevation point of ridge is and actual elevation point is FLAT (/ROOFS, PARAPETS AND GUARDRAILS 1. Approved elevation point of fla f or arapet is3" aei and actual elevation point is 2. Approved elevation point of flat roof or parapet is and actual elevation point is 3. Approved elevation point of flat roof or parapet is and actual elevation point is J+ND SSR I certify that the above height measurements are correct and the above project: ® IS in compliance with the City -approved plans. 4 � Qr OIS NOT in compliance with the City -approved plans (Provide explanation). J x653 Please describe any deviation from the City -approved plans on the back of this form. t9P _ Surveyor or Civil Engineer's* signature aI (Wet stamp and signature required) * License number of 33965 or lower Forms\Building Heigh[ Certification 11/02/16 Date° CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 926588915 www.newportbeachca.gov 1 (949) 644-3200 SETBACKS AND TOP OF SLAB/FLOOR ELEVATION CERTIFICATE The purpose of this certificate is to insure that the structure is located properly on site per the approved drawings. This certificate also verifies the top of slab/floor elevation noted on the approved drawings. After the top of slab/floor elevation is verified to match the elevation specified on the approved drawings, the contractor and inspector can measure the height of the structure to the top of slab/floor to verify that it is equal or less than the dimension shown on building sections and elevations. This form must be filled out by a registered surveyor or civil engineer authorized to perform surveys. The survey must be done after the concrete forms are in place or preferable after the concrete slab is poured or raised floor is built, but prior to starting wall framing. Engineer/Surveyor's NameFOA) MiQ of MA License # C6 y&5'-? Engineer/Surveyor's Address 2.30/& _.1 FE RO&I-T % 0P . PY070%,C/d hW!r, e* Job Address 30 9 OD p aykDO Setbacks: Sketch a site plan and specify surveyed setbacks (use back page). * Top of slab/floor elevation: * If slab/floor elevation varies, sketch a plan or section through slab on the back page and specify the elevations. Use same datum used in the survey of record. I certify that the setbacks are ®, are not ❑, per City approved plans. Describe any deviations from plans: I certify that top of slab/floor elevation(s) is 41, is not ❑, per City approved drawings.., Describe any deviations from plans:` q-17 ar S &4653 Date Engineer/Surveyor's stamp anda qf.%o% q, Forms/SetbacksandTopofSlabElevationCerl. v M 5fI's 771. gJ S CORNER RECORD Agencylndex - Document Number City ofCounty of California -- Brief Legal Description CORNER TYPE COORDINATES (Optional) N. E. Government Corner ❑ Control ❑ Elevation Meander ❑ Property units Metric ❑ U.S. Survey Fact ❑ Rancho ❑ Other ❑ Horizon!al Datum i Zone Epoch Date Date of Survey _ Lr4 �/� Vertical Datum ❑ Complies with Public Resourcos Code §§Se01-SS t 9 ❑ Complies with Public Resources Code §§8890 8901 PLS Act Ref.: ❑ 8765(d) ® 8771 ❑ 8773 ❑ Other: Corner/ !SJ Left as found ❑ Established ❑ Rebuilt ❑ Pre-Construc!ion Monument: ❑Found and tagged Reestablished Referenced Post-Ccnsfructien Narrative of Cerner identified and monument as found. set, reset, replaced, or removed. See sheet #2 for descdption(s): RcV APR 0 3 2018 p Sufi p curve �Q ���EDEy�9 %Q� SURVEYOR'S STATEMENT Z O W V 1k6�� Q Tris Corner Record eco; frr..pared by me or under my du action in conformance with the Profass,onal Land Surveyors Ac! on Signed ---.__I�-'{-- P.L. S. or R.C.E No, X653 COUNTY SURVEYOR'S STATEMENT Thio --------------------- Thi; Corner Re•;ord was n:cei•ved and examined arse fled P:ignad PJ -S. or R.C.F. No. 'lfie County Surveyor's Cemnretit Mage 1 N Document Number_ I 3 BASIS OF BEARINGS: E2)Ge"'1T ST. BEING BEARINGS NORTH ISARE BASED 00 EON AST PER C.R.CENTERLINE 0OF CORONADO 82,63 S 21E�jE (21"W g P9 'o 1222 BAY AVENUE ---ti-------------- N71°42'3.3)." 205.22'-(20-5:05'}- — 205.22'} MONUMENT NOTES: • INDICATES FOUND MONUMENT AS NOTED. ❑ INDICATES SET LEAD, TACK & TAG, LS 4653, 1'0/S P.L. PROD., FLUSH. 26, O INDICATES SET LEAD, TACK DISTANCE - & TAG, LS 4653, FLUSH. I 30.00'(30.00') F2 N15°42'00"E 25.00'(25.00') ❑3 o� �a ,moi ONi e W O Z CD ¢ o fl �I wa I SURVEYOR'S NOTES: ® ESTABLISHED INTERSECTION PER [ ], FROM POINTS(1) & MONUMENT DESCRIPTIONS: 01 FD. L,T&T, FLUSH. (g) FD. L, T & T, FLUSH. "LS 5411", PER [[ ]], "LS 5411", PER {{ }}, 03 FD. CHIS.'X', PER { } & [ ], FLUSH. ® FD. L, T & T, "RCE 11066", PER [ ], FLUSH. 50 FD. L, T & T, UNREADABLE, NO REFERENCE,FLUSH,ACCEPTED AS BEING ON THE RIGHT OF WAY LINE ALLEY AS SHOWN. REFERENCE MAPS: O NEWPORT BAY TRACT SUB. OF BLOCK C, M.M. 4/29 [] C.R. 2009-3432 { } C.R. 0630 [[ ]] C.R. 2015-1905 {{}} C.R. 2015-1904 2 oft [OIL t SG. d. _ LINE DATA: BEARING DISTANCE ❑1 N15°42'00"E 30.00'(30.00') F2 N15°42'00"E 25.00'(25.00') ❑3 N15°42'43"E 25.00'(25.00') ® N15°42'43"E 30.00'(30.00') 3].N71°42'35"W---70-04''— 7-0.00''}---- © N71°42'36"W 70.05'(70.00') From: CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.gov 1 (949) 644-3200 CIVIL ENGINEER'S CERTIFICATION FORM DZN ENGINEERING 166 MATISSE CIRCLE ALISO VIEJO, CA 92656 ATTENTION: GRADING ENGINEER, BUILDING DIVISION Date: 14 OCTOBER 201q pts GPC No.: Rough:_Finaf X Project Names: NEW SINGLE FAMILY RE5IDENGE - 309 GORONADO Owner/Developer: Type of Project: Notes: x Tract: x Drainage PRECISE GRADING PLAN _Commercial _Other Industrial Yardage for Project: Notes: { , Cut: _Borrow: Fill: _Export: No Change to Permitted Yardage _ 1 hereby approve the grading for this project in accordance with my responsibilities under the City Grading Code. I have inspected the project and hereby certify that all areas exhibit' positive surface flow to public ways or City approved drainage devices. The grading has been completed SUBSTANTIALLY - in conformance with, ehatges-tethe approved grading plan. Description of Changes: NO CHANGES TO THE APPROVED GRADING PLANS. 0 q F Company: DZN ENGINEERING Not 406-? Name: ROME L. DEMA-ALA, P.E.. (Print) License No.: C54067 (RCE/LS) rormswrvn cnynrorn a..cn,���a„����..,�� - X9018-1903 30GCoronodo 44 PR PAUL ROHRER STRUCTURAL ENGINEERS S17291r Irvine Blvd. Suite #152 Tustin CA C Office: (714) 486-2537 - Cell: (714) 272-9579 e-mail: Paul@PRSEinc.com CITY INSPECTOR CLARIFICATION November 13, 2018 PSL USED INSTEAD OF VSL Sepulveda Builders. Project Name: 309 Coronado Brent Sepulveda Location: 309 Coronado 790 Newton Way Newport Beach CA Costa Mesa CA 92627 PRSE Job #: 18-035 The use of ParaLam Beams (PSL) in lieu of VersaLam Beams (VSL) is acceptable. Both PSL and VSL have nearly identical design values. Sincerely, PRSE Inc. Page 1 of 1 PAUL ROHRER R STRUCTURAL ENGINEERS S17291 17291 Irvine Blvd. Suite #152 Tustin CA 92780 COffice: (714) 486-2537 Cell: (714) 272-9579 Paul@PRSElnc.com SEE PIAN FOR COL OR POST CONDUIT OR PIPE AS OCCURS. OF POFTC A5 RET00. GC COORD TYR ONO ON PLAN I.'� VERIFY FTG EMBEDMENT REQYS W/ GEOTECHNICAL REPORT. 2. PAD FOOTINGS HAVE NOT BEEN DESIGNED TO RESIST TEMPORARY ERECTION FORCES PROVIDE BRACING DURING ERECTION AS REQUIRED. 3. SEE OTHER DETAILS FOR EMBEDDED ITEMS IN FOOTING. 4. AT STEEL COLUMN, PROVIDE 4' MIN CONCRETE COVER AROUND COLUMN, BASE PLATE, AND ANCHOR BOLTS. 309 CORONADO ST Job No: 18-035 NEWPORT BEACH Designed By: PR Date: 9/21/2018 Sheet No: PAD FOOTING SCHEDULE 171 PAD FOOTING SCHEDULE MARK A B ROOF P2 2' 0"x2' O" L-0 3-#4 EW P2.5 2' 6"x2 6" 1'-0" 3-#4 EW P3 3'-0"x3'-0" 1'-0" 4-#4 EW P3.5 3'-6"x3'-6 1'-0" 4-#4 EW 4.0 4' 0"x4' 0" 1'-0 5-#4 EW ER i PAD FOOTING SCHEDULE 171 X2019-1903 3OR Corona�o SF CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 17681 Newport Beach, CA 92658-8915 www.newportbeachca.aov 1 (949) 644-3200 Structural Observation Report Project Address: 309 Coronado Report Date: oJ CNB Inspector Name: CNB Permit#: Building Owner Name: Ownere Mailing Address (if different from site); Owner's Telephone #: CNB Plan Check #: Full Name of Structural Observer (SO): Paul Rohrer SO E-mail Address: SO Telephone M SO License / Rag. # ❑ Steel Paul@PRSEinc,com 714-272-9579 S4340 r6MAQc mu196A1 r a I KUU I UKAL tLtMrN r5 AND CONNECTIONS OBSERVED check applicable boxes FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roof) INDICATE LOCATION($) OBSERVED DATE OBSERVED FConventional ootings & Slab ❑ Concrete ❑ Steel ❑ Concrete ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck ❑ Caissons, Piles,Wood Grade Beams orManuf. hear Panels ❑ Masonry Waod (�qt A7 1 (u l ❑ Other. ❑Other: ❑ Other: ❑ Other. ❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: _ ❑ REPORT CONTINUED ON ATTACHED PAGES. FINAL STRUCTURAL OBSERVATION REPORT: structure aner illy complies with the approved construction documents_ and all ebservad dafirinnria. afore rnr�ar_1nd I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of thesW l systems by the City of Newport Beach, Building Division. No. 4340 EXP: 12/31/2019 STAMP OF STRUCTURAL OBSERVER STRUCTURAL DJI&RVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.aov 1 (949) 644-3200 Structural Observation Report Project Address: 309 Coronado I Report Date: ?/ /� / � CNB Inspector Name: CNB Permit#: Building Owner Name: Owner's Mailing Address (if different from site); Owner's Telephone M CNB Plan Check M Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License / Reg. #: Paul Rohrer Paul@PRSEinc.com 714-272-9579 S4340 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS ORSFRVFn 1rhark nnnlirnhln hnvnet I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of th stru rel systems by the City of Newport Beach, Building Division. / STAMP OF STRUCTURAL OBSERVER DOES NOT WAIVE ANY REOWREMENTS FOR BUILDING INAPFrTInN RV euTunPrrPn Pmol nvcPs nP TUC riTv nc ucwonoT ocnru Form mcture Obsmatioa eponlrinsnacsious FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS Floor/Roof INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck ❑ Caissons, Piles, Grade Beams ❑ Wood or Manuf. Shear Panels ❑ Masonry ❑ Wood ❑ Other: ❑ Other: ❑ Other: ❑ Other: ❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: ❑ REPORT CONTINUED ON ATTACHED PAGES. NAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of th stru rel systems by the City of Newport Beach, Building Division. / STAMP OF STRUCTURAL OBSERVER DOES NOT WAIVE ANY REOWREMENTS FOR BUILDING INAPFrTInN RV euTunPrrPn Pmol nvcPs nP TUC riTv nc ucwonoT ocnru Form mcture Obsmatioa eponlrinsnacsious CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.aov 1 (949) 644-3200 Structural Observation Report Project Address: 309 Coronado Report Date: 9/20118 CNB Inspector Name: CNB Permit #: Building Owner Name: Owner's Mailing Address (if different from site); Owner's Telephone #: CNB Plan Check #: Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License / Reg. #: Paul Rohrer Paul@PRSEinc.com 714-272-9579 S4340 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes) FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS (Floor/Roo INDICATE LOCATION(S) OBSERVED DATE OBSERVED N Conventional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete Foundations 9/20/18 ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck ❑ Caissons, Piles, Grade Beams ❑ Wood or Manuf. Shear Panels ❑ Masonry ❑ Wood ❑ Other: ❑ Other. ❑ Other: ❑ Other: ❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: No deficiencies noted ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. 9/20/18 51 No. 4340 EXP: 12/31/2019 STAMP OF STRUCTURAL OBSERVER STRUCTURAL OBSERVATION DOES NOT WANE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. F.\St.UnlObsave =Pn p &b.�tl CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca.agv_ 1 (949) 644-3200 Structural Observation Report Project Address: 309 Coronado Report Date: J911 i V CNB Inspector Name: CNB Permit* DIAPHRAGMS Floor/Roo INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Building Owner Name: Owner's Mailing Address (V different from site); Owner's Telephone #: CNB Plan Check #: Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License / Reg. A Paul Rohrer Paul@PRSEinc.com 714-272-9579 S4340 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check applicable boxes) I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. v D. ROy,�,� F2� 'p 2 w No. 4340 m EXP: 12/31/2019 n t{')I FOF Ci'o����\p STAMP OF STRUCTURAL OBSERVER OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. fosms6 ctm Observetioo epos&Innsoctiojn FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS Floor/Roo INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck ❑ Caissons, Piles, Grade Beams X- Vood or Manuf. Shear Panels ❑ Masonry Wood 2 �3v2 cJ t t q i ❑ Other: ❑Other: ❑ Other: ❑ Other; ❑ ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: I\JotjG ❑ REPORT CONTINUED ON ATTACHED PAGES. p FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents, and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. v D. ROy,�,� F2� 'p 2 w No. 4340 m EXP: 12/31/2019 n t{')I FOF Ci'o����\p STAMP OF STRUCTURAL OBSERVER OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. fosms6 ctm Observetioo epos&Innsoctiojn CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658-8915 www.newportbeachca�o_v 1 (949) 644-3200 Structural Observation Report Project Address: 309 Coronado j U � y � ?,Report Date: CNB Inspector Name: CNB Permit #: Building Owner Name: Owner's Mailing Address (if different from site); Owner's Telephone #: CNB Plan Check #: Full Name of Structural Observer (SO): SO E-mail Address: SO Telephone #: SO License / Reg. #: Paul Rohrer Paul@PRSEinc.com 714-272-9579 S4340 PLEASE INDICATE STRUCTURAL ELEMENTS AND CONNECTIONS OBSERVED (check aoolicable boxes) I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. 161 No. 4340 EXP: 12/31/2019 STAMP OF STRUCTURAL OBSERVER STRUCTUM OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. Forrzu6 "mra[ObsmatiovRepott&lnslwu om FOUNDATIONS SHEAR WALLS FRAMES DIAPHRAGMS Floor/Roo INDICATE LOCATION(S) OBSERVED DATE OBSERVED ❑ Conventional Footings & Slab ❑ Concrete ❑ Steel ❑ Concrete ❑ Mat Foundation, Prestressed Concrete ❑ Masonry ❑ Concrete ❑ Steel Deck ❑ Caissons, Piles,ood Grade Beams or Manuf. hear Panels EJMasonry I PKIWood 12_'-* %'Lt M W64A - " e- (4X);?r,> cq ❑ Other: ❑ Other: ❑ Other: ❑ Other: ITEMS CHECKED ABOVE ARE APPROVED AND WITHOUT DEFICIENCIES. ❑ OBSERVED DEFICIENCIES AND COMMENTS: ❑ REPORT CONTINUED ON ATTACHED PAGES. ❑ FINAL STRUCTURAL OBSERVATION REPORT: The structure generally complies with the approved construction documents and all observed deficiencies were corrected. I declare that the following statements are true to the best of my knowledge: 1. I am the licensed design professional retained by the owner to be in responsible charge of the structural observation; 2. I, or another licensed design professional whom I have designated above and is under my responsible charge, have performed the required site visits at each significant construction stage to verify that the structure is in general conformance with the approved construction documents; 3. 1 understand that all deficiencies which I have documented must be corrected, prior to final acceptance of the structural systems by the City of Newport Beach, Building Division. 161 No. 4340 EXP: 12/31/2019 STAMP OF STRUCTURAL OBSERVER STRUCTUM OBSERVATION DOES NOT WAIVE ANY REQUIREMENTS FOR BUILDING INSPECTION BY AUTHORIZED EMPLOYEES OF THE CITY OF NEWPORT BEACH. Forrzu6 "mra[ObsmatiovRepott&lnslwu om Site Name: A38 -2206R Building Department: Address: 309 CORONADO STREET Permit Number: City: NEWPORT BEACH Code Year Standards: Zip: 92661 Scan to Validate Newport Beach, City of X2018-1903 2016 Dwelling / System ' Document'. Title Registration # ;. Date Registered CFSR-PRF-01-E Performance Compliance 418-PO10055168A-000-000-0000000 7/30/2018 _I -0000 B B Dwelling / System Document Title Registration # '. Date Registered ,I CF2R-ENV-01-E Fenestration 418-P01005516BA-000-001- 9/13/2019 EGIOOIA-0000 CF2R-ENV-03-E Insulation Installation 418-P010055168A-000-001- 9/13/2019 I E03002A-0000 - -418-P010055168A-000-001- - CF2R ENV 04-E Roofing Radiaantnt Bawler 9/13(2019 E04013A-0000 CF2R-LTG-01-E Lighting 418-P030055168A 000 001- 0 I 9/13/2019 1.01003A-0000 CF2R-MCH-01a-E HVAC, Ducts and Fans 418 P010055168A 000 001 9/13/2019 M01004A-0000 WHOLE HOUSEI CF2R-MCH-20a-H Duct Leakage 418-P010055168A 000 001 ' 9/13/2019 M20006A 0000 WHOLE HOUSEI CF2R-MCH-22a-H Fan Efficacy 418-P010055168A-000-001- 9/13/2019 I M22008A 0000 WHOLE HOUSES CF2R-MCH-23a-H Airflow Rate 418-P01005516BA-000-001- 9/13/2019 I M23007A 0000 WHOLE HOUSEI 5 CF2R-MCH-25h-H r Refrigerant Charge 418-PO10055168A-000-001- 9/13/2019 I M25009A 0000 0 WHOLE HOUSEI CF2R-MCH 26-H High SEER &EER 418-P01005516BA-000-001- 9/13/2019 I M26010A-0000 CF2R-MCH-27a H Mechanical Ventilation 418-P0i00S5168A-000-001- 9/13/2019 M27005A 0000 WHOLE HOUSES MR -MCH -29-11 Duct Area Reduction 418-P030055168A 000 001 9/13/2019 M29013A 0000 CF2R PLB 02a -E Single Famlly Hot Water 418 PO10055168A 000 001 9/13/2019 I B02012A 0000 - ® e Dwelling / System Document Title Registration # Date Registered WHOLE HOUSEI CF3R-MCH-20a-H Duct Leakage 418-P010055168A-000-001- 9/13/2019 t ,... ...... M20006A-M20A - WHOLE HOUSEI ...2 CFSR MCH -2a -H Fan Efficacy ...., 418-PO10055168A-000-001- .,.. 9J33/2019 M22006A M22A _I WHOLE HOUSEI CF3R-MCH-23a-H Airflow Rate 418-P010055168A-000-001- 9/13/2019 t M23007A-M23A WHOLE HOUSEI CF3R-MCH-25b-H Refrigerant Charge 418 P010055168A-000-001- 9/13/2019 I M25009A-M25A WHOLE HOUSEI CF3R-MCH-26-H High SEER &EER 418-P010055168A 000 001- 9/13/2019 M26010A-1,126A CF3R-MCH-27a-H Mechanical Ventilation 418-P010055168A-000-001- 9/13/2019 I M27005A-M27A WHOLE HOUSEI CF3R-MCH-29-H Duct Area Reduction 418-P010055168A-000-001- 9/13/2019 I M29011A-M29A CITY OF NEWPORT BEACH Community Development Department I Building Division 100 Civic Center Dr.1 P.O. Box 1768 1 Newport Beach, CA 92658 www.newoortbeachca.aov 1(949) 6443200 uALGREEN DOCUMENTATION COMPLIANCE CERTIFICATION ADDRESS: & q WYM(i Ab PERMIT NO.: \1C bV18 — THIS FORM SHALL BE COMPLETED AND SIGNED PRIOR TO REQUEST FOR FINAL BUILDING INSPECTION. ONE COPY OF THIS FORM SHALL BE SUBMITTED TO THE BUILDING INSPECTOR AT FINAL INSPECTION AND ONE SHALL BE PROVIDED TO THE BUILDING OWNER AS PART OF THE CAL GREEN CERTIFICATION PACKAGE. The following section shall be completed by a person with overall responsibility for the planning and design portion of the project. REQUIRED DOCUMENTATIONS PROVIDED TO THE PROPERTY OWNER(S) Vell ranchise Hauler for Construction/Demolition Waste (65% min. reuse of nonhazardous waste) I VOC Contents Limitation 9 Formaldehyde Emissions Limitation L/ T-24 Energy Certificate of Installations (Env., QII, Lighting, Photovoltaic, Mach., Plumb.) ER' T-24 Energy Certificate of Verifications or Acceptance ( Env., QII, Lighting, Photovoltaic, Mach., Plumb., HERS) Ld Operations and Maintenance Manual MOISTURE CONTENT OF BUILDING MATERIAL (RESIDENTIAL CONSTRUCTION ONLY) L3/1 certify that the moisture content of the wall and floor framing is less than 19 percent as determined in accordance with Section 4.505.3 of CAL Green prior to being enclosed. DECLARATION STATEMENT • 1 certify under penalty of perjury, under the laws of the State of California, the information provided is true and correct. • I certify that the installed measures, materials, components, or manufactured devices identified on this certificate conform to all applicable codes and regulations, and the installation is consistent with the plans and specifications approved by the enforcing agency. Responsible Person's Name: Resp nsible Person's Signature: Date Signed: Position/Title: lb(►b�l°l ��. Notes: Forms\CALGreen Documentation Compliance Cert Form 1-2017