Loading...
HomeMy WebLinkAboutX2018-1903 - Soils (2)X701 g_)g03 30q C,,nGido 5 engineering geotechnical applications consultants June 21, 2019 Project No. SB102.2 CITY OF NEWPORT BEACH Building Department 100 Civic Center Drive Newport Beach, CA 92660 Subject: FINAL GRADING CERTIFICATE HARDSCAPE COMPACTION, UTILITY TRENCH BACKFILL AT NEW RESIDENTIAL PROPERTY LOCATED at 309 CORONADO STREET NEWPORT BEACH, CALIFORNIA City of Newport Beach Permit No.: 1486-2018 References: 1. "Geotechnical Investigation for Proposed, Residential Development Located at 309 Coronado Street, Newport Beach, California," by EGA Consultants dated April 3, 2018. 2. "Structural Plans for New 3 Story 3 Bedroom House, 309 Coronado Street, Newport Beach, CA 92661," by Paul Rohrer Structural Engineers and JJAB Design, LLC., dated July 30, 2018. 3. "Grading Plans for Proposed Residence, 309 Coronado St., Newport Beach, CA 92661," by D'ZN Engineering dated June 18, 2018. 4. "Response Memorandum: Stormwater Infiltration and Drain Devices at Proposed Residence Located at 309 Coronado Street, Newport Beach, California," by EGA Consultants, Inc., dated August 1, 2018. 5. "Compaction Report for Placement of Fill within Limits of Residential Building Pad at 309 Coronado Street, Newport Beach, California," by EGA Consultants, dated September 4, 2018. To City Building/Grading Officials In accordance with the City of Newport Beach building requirements, we are submitting this compaction report for the grading of the subject building pad. This report includes the test results performed at the subject lot during the placement of on-site soil material in the area of the proposed residential building pad. The site earthworks operations were performed by the sub -contractor, Tight Quarters, Inc. Excavation and grading of the subject lot commenced on August 24, 2018 and was complete by August 27, 2018. To date, site grading included the removal of the upper 2Yz feet (plus 6" scarification) of the old fill and native material located within the limits of the proposed building pad and exterior improvements. All flatwork subgrade was completed by June 13, 2019. Prior to the placement of fill, the excavation bottoms were inspected and approved by a Certified Engineering Geologist employed by EGA Consultants. The exposed surface was scarified, moisture conditioned and recompacted to a minimum of 90% relative compaction. For cohesion -treatment, 2 (two) pallets (each pallet contains 35 bags each weighing 94 pounds) of Portland Cement were blended into the newly -placed fill. Additionally, a silty sand import material was uniformly placed and compacted to cap the upper approximately 12 inches of the newly graded pad. 375-C Monte Vista Avenue • Costa Mesa, CA 92627 • (949) 642-9309 • FAX (949) 642-1290 One Kubota SVL 90-2 front loader, one jumping -jack wacker, one vibratory plate, and water hoses were utilized for the purposes of compaction and grading control. Field density test results are tabulated on Table 1, Summary of Field Density Tests. All earthwork operations were performed under continuous observations by this firm and were performed in accordance with geotechnical specifications outlined in the soils report dated April 3, 2018. I certify that all grading and compaction work was done in compliance with the soils report for this project and the work complies with City of Newport Beach grading regulations. All soils values and geotechnical specifications outlined in the soils report remain valid. Based on our continuous observations and testing, the subject and adjacent sites are not impacted by the site grading operations to date. This opportunity to be of service is appreciated. If you have any questions, please call. Very truly yours, ECA Consultants, Inc. (;' r,�i DWoDAVID A. WORTHINGTON CEG 2124 Wo.G20Principal Engineering Geologist21 nEG. ENGINEERING cc, (1) Addressee (1) Brent Sepulveda FINAL COMPACTION REPORT: 309 Coronado Street, Newport Beach, CA Project No. SB102.2 June 21, 2019 TABLE 1 SUMMARY OF MOISTURE DENSITY RELATIONSHIPS (ASTM: D1556) Sample Depth Dry Moisture Maximum Optimum Relative Number/ Below Density Content Density Moisture Compaction Location Grade (PCF) (e/d) (PCF) N (°/a) (ft) FD -1 2.5 98.8 10.6 106.0 10.5 93 N. Central Bldg. Pad FD -2 2.0 97.6 10.8 106.0 10.5 92 N. West Bldg. Pad FD -3 1.5 99.9 10.7 106.0 10.5 94 N. East Bldg. Pad FD -4 1.0 101.0 10.5 106.0 10.5 95 N. Central Bldg. Pad FD -5 2.5 97.6 11.0 106.0 10.5 92 N. Edge Bldg, Pad FD -6 2.0 99.7 10.8 106.0 10.5 94 S. West Bldg. Pad FD -7 1.5 98.8 10.7 106.0 10.5 93 S. East Bldg. Pad FD -8 1.0 101.2 10.6 106.0 10.5 95 S Central Bldg. Pad FD -9 0.5 101.8 11.2 108.0 11.0 94 W. Central Bldg. Pad FD -10 0.5 104.2 11.8 108.0 11.0 96 E. Central Bldg. Pad FD -11 FG 103.0 11.4 108.0 11.0 95 N. Central Bldg. Pad FD -12 FG 101.8 11.6 108.0 11.0 94 S. Central Bldg. Pad FINAL COMPACTION REPORT: 309 Coronado Street, Newport Beach, CA Project No. SB102.2 June 21, 2019 FD -13 FG 102.7 11.2 108.0 11.0 95 SEC Bldg. %n Fill/Native - Beach Sands 106.0 10.5 Per Soils Report dated April 3, 2018 Pad Import - 108.0 11.0 Silty Sand with trace gravel FD -14 FG 102.8 11.5 108.0 11.0 95 SWC Bldg. Pad FD -15 FG 104.0 11.2 108.0 11.0 96 Central Bldg. Pad FD -16 FG 102.9 11.1 108.0 11.0 95 Garage Pad FD -17 FG 97.6 12.8 108.0 11.0 90 Util Trench Backfill FD -18 FG 101.5 11.7 108.0 11.0 94 Hardscape FD -19 FG 101.2 11.3 108.0 11.0 94 Hardscape FD -20 FG 105.6 11.4 108.0 11.0 98 Approach FD" = Field Density Test FG' = Finish Grade (Ground Level Pad) TABLE 2 SUMMARY OF MAXIMUM DENSITY TEST (ASTM D 1557) Sample Maximum Optimum Location Density Moisture Pc %n Fill/Native - Beach Sands 106.0 10.5 Per Soils Report dated April 3, 2018 Import - 108.0 11.0 Silty Sand with trace gravel FINAL COMPACTION REPORT: 309 Coronado Street, Newport Beach, CA Project No. SB102.2 June 21, 2019 consultants engineering geotechnical applications CITY OF NEWPORT BEACH Building Department 100 Civic Center Drive Newport Beach, CA 92660 September 4, 2018 Project No. SB102.2 Subject: COMPACTION REPORT FOR PLACEMENT OF FILL WITHIN LIMITS OF RESIDENTIAL BUILDING PAD AT 309 CORONADO STREET NEWPORT BEACH, CALIFORNIA City of Newport Beach Permit No.: 1486-2018 References: 1. "Geotechnical Investigation for Proposed, Residential Development Located at 309 Coronado Street, Newport Beach, California," by EGA Consultants dated April 3, 2018. 2. "Structural Plans for New 3 Story 3 Bedroom House, 309 Coronado Street, Newport Beach, CA 92661," by Paul Rohrer Structural Engineers and JJAB Design, LLC., dated July 30, 2018. 3. "Grading Plans for Proposed Residence, 309 Coronado St., Newport Beach, CA 92661," by D'ZN Engineering dated June 18, 2018. 4. "Response Memorandum: Stormwater Infiltration and Drain Devices at Proposed Residence Located at 309 Coronado Street, Newport Beach, California," by EGA Consultants, Inc., dated August 1, 2018. To City Building/Grading Officials: In accordance with the City of Newport Beach building requirements, we are submitting this compaction report for the grading of the subject building pad. This report includes the test results performed at the subject lot during the placement of on-site soil material in the area of the proposed residential building pad. The site earthworks operations were performed by the sub -contractor, Tight Quarters, Inc. Excavation and grading of the subject lot commenced on August 24, 2018 and was complete by August 27, 2018. To date, site grading included the removal of the upper 2'/ feet of the old fill and native material located within the limits of the proposed building pad. The lot was roughly divided into halves, excavated and recompacted to bring the entire lot to finished subgrade. One Kubota SVL 90-2 was utilized for the purpose of compaction and grading control. On site soils were moisture treated via a 2 -inch diameter water hose during the grading process to bring the moisture content to near -optimum. For cohesion -treatment, 2 (two) pallets (each pallet contains 35 bags each weighing 94 pounds) of Portland Cement were blended into the newly -placed fill. Additionally, a silty sand import material was uniformly placed and compacted to cap the upper approximately 12 inches of the newly graded pad. Prior to the placement of fill, the excavation bottoms were inspected and approved by a Certified Engineering Geologist employed by EGA Consultants. The exposed surface was scarified, moisture conditioned and recompacted to a minimum of 90% relative compaction. Field density test results are tabulated on Table 1, Summary of Field Density Tests. 375-C Monte Vista Avenue • Costa Mesa, CA 92627 • (949) 642-9309 • FAX (949) 642-1290 All earthwork operations were performed under continuous observations by this firm and were performed in accordance with geotechnical specifications outlined in the soils report dated April 3, 2018. The building pad was graded in accordance with the 2016 CBC and the City of Newport Beach Building standards and are approved for construction. Based on our continuous observations and testing, the subject and adjacent sites are not impacted by the site grading operations to date. This report includes the test results performed at the subject site during the placement of on- site soil material in the area of the proposed building pad. Additional observations and testing are required in areas to receive exterior improvements (driveway approach, patio flatwork, etc.) and utility trench backfill. I certify that all rough grading work was done in compliance with the above -referenced Soils Report and the work complies with City of Newport Beach grading regulations. All soils values and geotechnical specifications outlined in the above -referenced soils report remain valid. This opportunity to be of service is appreciated. If you have any questions, please call Very truly yours, EGA Consultants, Inc. DAVID A. WORTHINGTON CEG 2124 Principal Engineering Geologist Copies: (1) Addressee (1) Brent Sepulveda PAD CERTIFICATION REPORT; 309 Coronado Street, Newport Beach, CA Project No. SB102.2 September 4, 2018 TABLE 1 SUMMARY OF MOISTURE DENSITY RELATIONSHIPS (ASTM: D1556) Sample Depth Dry Moisture : Maximum Optimum Relative Number/ Below Density Content Density Moisture Compaction Location Grade (PCF) N (PCF) N N ft FD -1 2.5 98.8 10.6 106.0 10.5 93 N. Central Bldg. Pad FD -2 2.0 97.6 10.8 106.0 10.5 92 N. West Bldg. Pad FD -3 1.5 99.9 10.7 106.0 10.5 94 N. East Bldg. Pad FD -4 1.0 101.0 10.5 106.0 10.5 95 N. Central Bldg. Pad FD -5 2.5 97.6 11.0 106.0 10.5 92 N. Edge Bldg, Pad FD -6 2.0 99.7 10.8 106.0 10.5 94 S. West Bldg. Pad FD -7 1.5 98.8 10.7 106.0 10.5 93 S. East Bldg. Pad FD -8 1.0 101.2 10.6 106.0 10.5 95 S Central Bldg. Pad FD -9 0.5 101.8 11.2 108.0 11.0 94 W. Central Bldg. Pad FD -10 0.5 104.2 11.8 108.0 11.0 96 E. Central Bldg. Pad FD -11 FG 103.0 11.4 108.0 11.0 95 N. Central Bldg. Pad FD -12 FG 101.8 11.6 108.0 11.0 94 S. Central 11 Bldg. Pad PAD CERTIFICATION REPORT: 309 Coronado Street, Newport Beach, CA Project No. SB102.2 September 4, 2018 FD -13 FG 102.7 11.2 108.0 11.0 95 SEC Bldg. P/o, Fill/Native - Beach Sands 106.0 10.5 Per Soils Report dated 4/3/18 Pad Import - Silty Sand with trace 108.0 11.0 gravel FD -14 FG 102.8 11.5 108.0 11.0 95 SWC Bldg. Pad FD -15 FG 104.0 11.2 108.0 11.0 96 Central Bldg. Pad FD -16 FG 102.9 11.1 108.0 11.0 95 Garage Pad "FD" = Field Density Test "FG" = Finish Grade (Ground Level Pad) TABLE 2 SUMMARY OF MAXIMUM DENSITY TEST (ASTM D 1557) Sampler Maximum Optimum Location Density Moisture Po P/o, Fill/Native - Beach Sands 106.0 10.5 Per Soils Report dated 4/3/18 Import - Silty Sand with trace 108.0 11.0 gravel PAD CERTIFICATION REPORT: 308 Coronado Street, Newport Beach, CA Project No. SB102.2 September 4, 2018