Loading...
HomeMy WebLinkAbout05_Pickup Residence CDP_PA2019-051 gW PO O�� RTe�, CITY OF NEWPORT BEACH / ZONING ADMINISTRATOR STAFF REPORT November 14, 2019 C'�41,OHN�"- Agenda Item No. 5 SUBJECT: Pickup Residence (PA2019-051) • Coastal Development Permit No. CD2019-011 SITE LOCATION: 23 Harbor Island APPLICANT: Ritner Group, Inc. OWNER: Mr. and Mrs. Todd Pickup PLANNER: Chelsea Crager, Associate Planner 949-644-3227, ccrager@newportbeachca.gov LAND USE AND ZONING • General Plan: RS-D (Single-Unit Residential Detached) • Zoning District : R-1 (Single-Unit Residential) • Coastal Land Use Category: RSD-A (Single Unit Residential Detached) (0.0-5.9 DU/AC) • Coastal Zoning District: R-1 (Single-Unit Residential) PROJECT SUMMARY A coastal development permit (CDP) permit to demolish an existing single-family residence and construct a new two-story, 6,357-square-foot, single-family residence with an 815-square-foot garage. The project includes hardscape, drainage, and landscaping improvements. The project also includes accessory structures and a reinforced bulkhead with cap for coastal hazards protection located in the Harbor Island Tidelands. The proposed residence complies with all applicable development standards including height, setbacks, and floor area limits. No deviations are requested. The project includes improvements within the Harbor Island Tidelands, including accessory structures and the reinforcement and capping of the existing bulkhead, which are within the California Coastal Commission's coastal permit jurisdiction boundary and therefore require their review. This Coastal Development Permit is intended to cover portions of the project within the City's permit authority as designated in the Local Coastal Program (Title 21 of the Newport Beach Municipal Code). 03/13/2018 2 Pickup Residence (PA2019-051) Zoning Administrator, November 14, 2019 Page 2 RECOMMENDATION 1) Conduct a public hearing; 2) Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) because it has no potential to have a significant effect on the environment; and 3) Adopt Draft Zoning Administrator Resolution No. _ approving Coastal Development Permit No. CD2019-011 (Attachment No. ZA 1). DISCUSSION Land Use and Development Standards • The subject property is located in the R-1 Coastal Zoning District, which provides for single-unit residential development and is consistent with the City's Coastal Land Use Plan, General Plan, and Zoning Code. A coastal development permit is required and the property is not eligible for a waiver for de minimis development because the property is located in the Coastal Commission Appeal Area. • The property currently consists of a legal lot developed with a single-family residence. The neighborhood is predominantly developed with two-story single-family residences. The proposed design, bulk, and scale of the development is consistent with the existing neighborhood pattern of development and expected future development consistent with applicable development standards. • The proposed single-family dwelling and accessory structures conform to all applicable development standards, including floor area limit, setbacks, height, and off-street parking as evidenced by the project plans and illustrated in Table 1 below. Table 1 — Development Standards Development Standard Standard E Proposed Setbacks min. Front island interior 15 feet 26 feet Front water 15 feet 15 feet Sides 4 feet 4 feet Allowable Floor Area max. 10,416 square feet 6,357 square feet Allowable V Floor Area max. 781 square feet 0 s uare feet Open Space min. 781 square feet 1,744 square feet Parking (min.) 3-car garage 3-car garage Height(max.) 24-foot flat roof 29-foot sloped roof 29-foot sloped roof Tmplt:03/13/18 Pickup Residence (PA2019-051) Zoning Administrator, November 14, 2019 Page 3 Hazards • The property fronts the Newport Bay and is a private waterfront parcel. The project site is protected by an existing seawall with the top of the bulkhead at elevation 8.55 feet North American Vertical Datum of 1988 (NAVD 88). The existing bulkhead does not have noticeable signs of distress, however based on the bulkhead condition report, it is required to be repaired and raised. The site is also vulnerable to flooding from the adjacent street ends and other low-lying properties that will need to be protected in the future. The project includes a proposal to reinforce the existing wall and add a cap that will bring the height to 10.6 feet (NAVD 88). This portion of the project is located within the California Coastal Commission's permit jurisdiction and therefore required their review. No development is proposed bayward of the existing seawall. • A Coastal Hazards Report and Sea Level Rise Analysis was prepared by William Simpson and Associates, Inc. dated April 17, 2019, for the project. The current maximum bay water elevation is 7.7 feet (NAVD 88). According to the report, the estimated sea level rise at the site appears to be between 1.3 and 5.4 feet over the next 75 years utilizing different probabilistic scenarios, accounting for bay water levels rising in the range of 9 feet to 13.1 feet NAVD 88. The Newport Beach City Council approved the use of the high estimate of the "low risk aversion" scenario, which is 3.2 feet by the year 2100, or 2.9 feet by 2094. Therefore, the sea level is estimated to likely reach approximately 10.6 feet NAVD 88 over the next 75 years (i.e. the life of the structure). Once the existing seawall/bulkhead is raised per the report's recommendations, flooding, wave runup, and erosion will not significantly impact this property over the proposed 75-year economic life of the development. The report also identifies that there is a 0.5 percent chance (medium-high risk aversion scenario) that sea level rise (SLR) would be greater than 2.9 feet around the year 2070 and could as high as 13.1 feet NAVD 88 by the year 2100. If future SLR is greater than the likely estimate of the "low risk aversion" scenario by 2094 (10.6 feet NAVD 88), then the bulkhead can be raised without further bayward encroachment. • The finished floor elevation of the proposed single-family residence is 13.2 feet (NAVD 88), which complies with the minimum 9.00-foot (NAVD 88) elevation standard. The Coastal Hazard Report concludes that the bay water elevation (currently 7.7 feet NAVD 88) will not exceed the proposed finished floor of the single-family residence at elevation 13.2 feet (NAVD 88) for the anticipated 75- year life of the structure. • Pursuant to Newport Beach Municipal Code (NBMC) Section 21.30.030(C)(3)(i)(iv), the property owner will be required to enter into an agreement with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., TmplC 03/13/19 Pickup Residence (PA2019-051) Zoning Administrator, November 14, 2019 Page 4 waves, erosion, and sea level rise). The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c). Both requirements are included as conditions of approval that will need to be satisfied prior to final building inspection, and prior to the issuance of building permits, respectively. • The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of a building permit. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. Water Quality • The property fronts the Newport Bay. Pursuant to NBMC Section 21.35.030 (Construction Pollution Prevention Plan), a Construction Pollution Prevention Plan (CPPP) is required to implement temporary Best Management Practices (BMPs) during construction to minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived from construction chemicals and materials. A CPPP has been prepared and included in the plan sets for review and approval prior to the issuance of construction permits. Construction plans and activities will be required to adhere to the approved CPPP. • Pursuant to NBMC Section 21.35.050 (Water Quality and Hydrology Plan), because of the site's proximity to the water and because the development contains more than 75 percent of impervious surface area, a Water Quality and Hydrology Plan (WQHP/WQMP) was prepared by Toal Engineering, Inc., dated February 7, 2019. The final WQHP/WQMP will be required to be reviewed and approved by the City's Engineer Geologist prior to building permit issuance. The WQHP/WQMP includes a polluted runoff and hydrologic site characterization, treatment control BMPs, use of a low-impact development approach and bioretention system to retain the design storm runoff volume on-site, and documentation of the expected effectiveness of the proposed BMPs. Construction plans will be required to comply with the approved WQHP/WQMP prior to the issuance of building permits. • The project design addresses water quality with a construction erosion control plan and a post-construction drainage system that includes drainage and percolation features designed to retain dry weather runoff and minor rain event runoff on-site. Any water not retained on-site is directed to the City's storm drain system. Tmpl[:03/13/19 J Pickup Residence (PA2019-051) Zoning Administrator, November 14, 2019 Page 5 Public Access and Views • The project site is located on a privately gated island between the nearest public road and the sea or shoreline. Implementation Plan Section 21.30A.040 requires that the provision of public access bear a reasonable relationship between the requirement and the project's impact, and be proportional to the impact. In this case, the project replaces an existing single-family residence located on an R-1 lot with a new single- family residence. Therefore, the project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. Furthermore, the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. • The project site is not located adjacent to a coastal view road, public access way, or coastal viewpoint as identified in the Coastal Land Use Plan. The nearest coastal viewpoint is located at the end of Harbor Island Drive and is not visible from the site. The proposed single-family residence complies with all applicable Local Coastal Program (LCP)development standards and maintains a building envelope consistent with the existing neighborhood pattern of development. The front setback along the harbor is 15 feet and only allows improvements with a maximum height of 42 inches. Additionally, the project does not contain any unique features that could degrade the visual quality of the coastal zone. • Vertical access to the harbor is available at the Balboa Basin, approximately 2,000 feet east of the property. Vertical and lateral access to the beach and harbor is also available at street ends throughout Balboa Island, approximately 1,300 feet southeast of the property. The project does not include any features that would obstruct access along these routes. ENVIRONMENTAL REVIEW This project is exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. Class 3 exempts the demolition of up to three single-family residences and additions of up to 10,000 square feet to existing structures. The proposed project consists of the demolition of one single-family residence and the construction of a new 6,357-square- foot single-family residence. TmplC 03/13/18 Pickup Residence (PA2019-051) Zoning Administrator, November 14, 2019 Page 6 PUBLIC NOTICE Notice of this public hearing was published in the Daily Pilot, mailed to all owners and residential occupants of property within 300 feet of the boundaries of the site (excluding intervening rights-of-way and waterways), including the applicant, and posted on the subject property at least 10 days before the scheduled hearing, consistent with the provisions of the Municipal Code. Additionally, the item appeared on the agenda for this meeting, which was posted at City Hall and on the City website. APPEAL PERIOD: This action shall become final and effective 14 days following the date the Resolution is adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 (Local Coastal Implementation Plan) of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the City's certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. For additional information on filing an appeal, contact the Planning Division at 949-644-3200. Prepared by: Chelsea Cra9 er Associate Planner GBR/cc Attachments: ZA 1 Draft Resolution ZA 2 Vicinity Map ZA 3 Project Plans Tinpl[:03/13/19 Attachment No. ZA 1 Draft Resolution 03/13/2018 RESOLUTION NO. ZA2019-### A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2019-011 TO DEMOLISH AN EXISTING SINGLE-FAMILY RESIDENCE AND CONSTRUCT A NEW TWO-STORY, SINGLE-FAMILY RESIDENCE INCLUDING AN ATTACHED GARAGE LOCATED AT 23 HARBOR ISLAND (PA2019-051) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by Ritner Group, Inc., with respect to property located at 23 Harbor Island, requesting approval of a coastal development permit. 2. The lot at 23 Harbor Island is legally described as Lot 23 of Tract 802. 3. The applicant requests a coastal development permit to demolish an existing single- family residence and construct a new two-story, 6,357-square-foot, single-family residence with an 815-square-foot garage. The project includes hardscape, drainage, landscaping improvements, and accessory structures. The project also includes accessory structures and a reinforced bulkhead with cap for coastal hazards protection located in the Harbor Island Tidelands. The proposed residence complies with all applicable development standards including height, setbacks, and floor area limits. No deviations are requested. The portions of the project within the Harbor Island Tidelands are within the California Coastal Commission's coastal permit jurisdiction boundary and therefore require their review. 4. The project includes imrprovements with the Harbor Island Tidelands, which are within the California Coastal Commission's permit jurisdiction. This Coastal Development Permit is intended to cover portions of the project within the City's permit authority as designated in the certified Local Coastal Program (LCP) (Title 21 of the Newport Beach Municpal Code). 5. The subject property is designated RS-D (Single-Unit Residential Detached) by the General Plan Land Use Element and is located within the R-1 (Single-Unit Residential) Zoning District. 6. The subject property is located within the coastal zone. The Coastal Land Use Plan category is RSD-A (Single Unit Residential Detached) (0.0-5.9 DU/AC) and it is located within the R-1 (Single-Unit Residential) Coastal Zone District. 7. A public hearing was held on November 14, 2019, in the Corona del Mar Conference Room (Bay E-1 st Floor) at 100 Civic Center Drive, Newport Beach. A notice of time, place and purpose of the hearing was given in accordance with the Newport Beach Municipal 05-15-2018 2 Zoning Administrator Resolution No. ZA2019-### Page 2 of 10 Code. Evidence, both written and oral, was presented to, and considered by, the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations Section 15303, Article 19 of Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small Structures), because it has no potential to have a significant effect on the environment. 2. Class 3 exempts the demolition of up to three single-family residences and additions of up to 10,000 square feet to existing structures. The proposed project consists of the demolition of one single-family residence and the construction of a new 6,357-square- foot single-family residence. 3. The exceptions to this categorical exemption under Section 15300.2 are not applicable. The project location does not impact an environmental resource of hazardous or critical concern, does not result in cumulative impacts, does not have a significant effect on the environment due to unusual circumstances, does not damage scenic resources within a state scenic highway, is not a hazardous waste site, and is not identified as a historical resource. SECTION 3. REQUIRED FINDINGS. In accordance with Section 21.52.015 (Coastal Development Permits, Findings and Decision) of the Newport Beach Municipal Code (NBMC), the following findings and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum floor area limitation is 10,416 square feet and the proposed floor area is 6,357 square feet. b. The proposed development provides the minimum required setbacks, which are 15 feet along the front property line abutting the interior of Harbor Island, 4 feet along each side property line and 15 feet along the front property line on the waterfront, adjacent to the Harbor Island Tidelands. c. The highest guardrail is less than 24 feet from established grade (12.63 feet North American Vertical Datum of 1988 [NAVD 88])and the highest ridge is no more than 05-15-2018 9 Zoning Administrator Resolution No. ZA2019-### Page 3 of 10 29 feet from established grade, which comply with the maximum height requirements. d. The project includes garage parking for a total of three vehicles, complying with the minimum three-car garage parking requirement for single-family residences with more than 4,000 square feet of habitable floor area. 2. The neighborhood is predominantly developed with two-story, single-family residences. The proposed design, bulk, and scale of the development is consistent with the existing neighborhood pattern of development. 3. The property fronts the Newport Bay and is a private waterfront parcel. The project site is protected by an existing seawall with the top of the bulkhead at elevation 8.55 feet (NAVD 88). The existing bulkhead does not have noticeable signs of distress, however it is recommended to be reinforced and raised. The site is also vulnerable to flooding from the adjacent street ends and other low-lying properties that will need to be protected in the future. The project proposes to reinforce the existing wall and add a cap that will bring the height to 10.6 feet (NAVD 88). No development is proposed bayward of the existing seawall. 4. A Coastal Hazards Report and Sea Level Rise Analysis was prepared by William Simpson and Associates, Inc. dated April 17, 2019, for the project. The current maximum bay water elevation is 7.7 feet NAVD 88. According to the report, the estimated sea level rise at the site appears to be between 1.3 and 5.4 feet over the next 75 years utilizing different probabilistic scenarios, accounting for bay water levels rising in the range of 9 feet to 13.1 feet NAVD88. The Newport Beach City Council approved the use of the high estimate of the "low risk aversion" scenario, which is 3.2 feet by the year 2100, or 2.9 feet by 2094. Therefore, the sea level is estimated to likely reach approximately 10.6 feet NAVD 88 over the next 75 years (i.e. the life of the structure). Once the existing seawall/bulkhead is raised per the report's recommendations, flooding, wave runup, and erosion will not significantly impact this property over the proposed 75-year economic life of the development. The report also identifies that there is a 0.5 percent chance (medium-high risk aversion scenario)that sea level rise (SLR)would be greater than 2.9 feet around the year 2070 and could as high as 13.1 feet NAVD 88 by the year 2100. If future SLR is greater than the likely estimate of the "low risk aversion" scenario by 2094 (10.6 feet NAVD 88), then the bulkhead can be raised without further bayward encroachment. 5. The finished floor elevation of the proposed single-family residence is 13.2 feet (NAVD 88), which complies with the minimum 9.00-foot (NAVD 88) elevation standard. The Coastal Hazard Report concludes that the bay water elevation (currently 7.7 feet NAVD 88)will not exceed the proposed finished floor of the single-family residence at elevation 13.2 feet (NAVD 88) for the anticipated 75-year life of the structure. 6. Pursuant to NBMC Section 21.30.030(C)(3)(i)(iv), the property owner will be required to enter into an agreement with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also 05-15-2018 1O Zoning Administrator Resolution No. ZA2019-### Page 4 of 10 be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c). Both requirements are included as conditions of approval that will need to be satisfied prior to final building inspection, and prior to the issuance of building permits, respectively. 7. The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and CBC prior to building permit issuance. 8. The project design addresses water quality with a construction erosion control plan that outlines temporary Best Management Practices (BMPs) to be implemented during construction to minimize erosion and sedimentation, and to minimize pollution of runoff derived by construction chemicals and materials. 9. The project design includes a post-construction drainage system that includes drainage and percolation features designed to retain dry weather and minor rain event runoff on- site. Any water not retained on-site is directed to the City's storm drain system. 10. The property fronts the Newport Bay. Pursuant to NBMC Section 21.35.030 (Construction Pollution Prevention Plan), a Construction Pollution Prevention Plan (CPPP) is required to implement temporary Best Management Practices (BMPs)during construction to minimize erosion and sedimentation and to minimize pollution of runoff and coastal waters derived from construction chemicals and materials. A CPPP has been prepared and included in the plan sets for review and approval prior to the issuance of construction permits. Construction plans and activities will be required to adhere to the approved CPPP. 11. Pursuant to NBMC Section 21.35.050 (Water Quality and Hydrology Plan), because of the site's proximity to the water and because the development contains more than 75 percent of impervious surface area, a Water Quality and Hydrology Plan (WQHP/WQMP) was prepared by Toal Engineering, Inc., dated February 7, 2019. The final WQHP/WQMP will be required to be reviewed and approved by the City's Engineer Geologist prior to building permit issuance. The WQHP/WQMP includes a polluted runoff and hydrologic site characterization, treatment control BMPs, use of a low-impact development approach and bioretention system to retain the design storm runoff volume on-site, and documentation of the expected effectiveness of the proposed BMPs. Construction plans will be required to comply with the approved WQHP/WQMP prior to the issuance of building permits. 12. Proposed landscaping complies with Implementation Plan Section 21.30.075. A condition of approval is included that requires drought-tolerant species. Prior to issuance of building permits, the final landscape plans will be reviewed to verify invasive species are not planted. 05-15-2018 11 Zoning Administrator Resolution No. ZA2019-### Page 5 of 10 13. The project site is not located adjacent to a coastal view road, public access way, or coastal viewpoint as identified in the Coastal Land Use Plan. The nearest coastal viewpoint is located at the end of Harbor Island Drive and is not visible from the site. The proposed single-family residence complies with all applicable Local Coastal Program (LCP) development standards and maintains a building envelope consistent with the existing neighborhood pattern of development. The front setback along the harbor is 15 feet and only allows improvements with a maximum height of 42 inches. Additionally, the project does not contain any unique features that could degrade the visual quality of the coastal zone. Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. Facts in Support of Finding: 1. The project site is located on a privately gated island between the nearest public road and the sea or shoreline. Implementation Plan Section 21.30A.040 requires that the provision of public access bear a reasonable relationship between the requirement and the project's impact, and be proportional to the impact. In this case, the project replaces an existing single-family residence located on an R-1 lot with a new single-family residence. Therefore, the project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. Furthermore, the project is designed and sited (appropriate height, setbacks, etc.) so as not to block or impede existing public access opportunities. 2. Vertical access to the harbor is available at the Balboa Basin, approximately 2,000 feet east of the property. Vertical and lateral access to the beach and harbor is also available at street ends throughout Balboa Island, approximately 1,300 feet southeast of the property. The project does not include any features that would obstruct access along these routes. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby finds this Project is categorically exempt from the California Environmental Quality Act ("CEQA") pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment. 2. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit No. CD2019-011, subject to the conditions set forth in Exhibit "A," which is attached hereto and incorporated by reference. 05-15-2018 12 Zoning Administrator Resolution No. ZA2019-### Page 6 of 10 3. This coastal development permit is intended to cover portions of the project within the City's permit authority under the certified Local Coastal Program. The portions of the project within the Harbor Island Tidelands are within the California Coastal Commission's coastal permit jurisdiction boundary and therefore require their review. 4. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 Local Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the City's certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. PASSED, APPROVED, AND ADOPTED THIS 14" DAY OF NOVEMBER, 2019. Jim Campbell, Zoning Administrator 05-15-2018 '�,�j Zoning Administrator Resolution No. ZA2019-### Page 7 of 10 EXHIBIT "A" CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. Prior to finalization of building permits for the new residence, the existing bulkhead or similar flood protection improvement shall be raised or replaced to provide a minimum elevation of 10.6 feet (NAVD 88). All improvements shall occur landward of the existing bulkhead. The plans shall also demonstrate that the wall can be augmented to a greater height if the future sea level rise is greater than the likely estimate of the "low risk aversion" scenario by 2094 (10.6 feet NAVD88). 3. Prior to the issuance of a Certificate of Occupancy, an agreement in a form approved by the City Attorney between the property owner and the City shall be executed and recorded waiving rights to the construction of future shoreline protection devices including the repair and maintenance, enhancement, reinforcement, or any other activity affecting the bulkhead, that results in any encroachment seaward of the authorized footprint of the bulkhead or other shoreline protective device. The agreement shall be binding against the property owners and successors and assigns. 4. Prior to the issuance of a building permit, the property owner shall submit a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney's fees, disbursements and court costs)of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City's approval of development.This letter shall be scanned into the plan set prior to building permit issuance. 5. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter sensitive habitat, receiving waters, or a storm drain or result in impacts to environmentally sensitive habitat areas, streams, the beach, wetlands or their buffers. No demolition or construction materials shall be stored on public property. 6. This approval does not authorize any new or existing improvements (including landscaping) on State tidelands, public beaches, or the public right-of-way. 7. This Coastal Development Permit does not authorize any development bayward of the private property. 8. The applicant is responsible for compliance with the Migratory Bird Treaty Act. In compliance with the (MBTA), grading, brush removal, building demolition, tree trimming, 05-15-2018 1.4 Zoning Administrator Resolution No. ZA2019-### Page 8 of 10 and similar construction activities shall occur between August 16 and January 31, outside of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of Native Birds pursuant to MBTA: A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one or two short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. 9. Best Management Practices (BMPs) and Good Housekeeping Practices (GHPs) shall be implemented prior to and throughout the duration of construction activity as designated in the Construction Erosion Control Plan. 10. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 11. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stock piles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 12. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 13. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new coastal development permit. 14. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 15. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this Coastal Development Permit. 05-15-2018 15 Zoning Administrator Resolution No. ZA2019-### Page 9 of 10 16. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 17. Prior to the issuance of building permits, the applicant shall submit a final construction erosion control plan. The plan shall be subject to the review and approval by the Building Division. 18. Prior to the issuance of building permits, the applicant shall submit a final drainage and grading plan. The plan shall be subject to the review and approval by the Building Division. 19. Prior to the issuance of building permits, a copy of the Resolution, including conditions of approval Exhibit "A" shall be incorporated into the Building Division and field sets of plans. 20. Prior to issuance of building permits, the applicant shall submit to the Planning Division an additional copy of the approved architectural plans for inclusion in the Coastal Development file. The plans shall be identical to those approved by all City departments for building permit issuance. The approved copy shall include architectural sheets only and shall be reduced in size to 11 inches by 17 inches. The plans shall accurately depict the elements approved by this Coastal Development Permit. 21. Prior to the issuance of building permits, the final WQHPNVQMP shall be reviewed and approved by the Building Division. Implementation shall be in compliance with the approved CPPP and WQHPNVQMP and any changes could require separate review and approval by the Building Division. 22. Prior to the issuance of building permits, the applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive plant species and water efficient irrigation design. The plans shall be approved by the Planning Division. 23. All landscape materials and irrigation systems shall be maintained in accordance with the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 24. Prior to the issuance of building permit, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 25. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by the current property owner or agent. 05-15-2018 1�jj Zoning Administrator Resolution No. ZA2019-### Page 10 of 10 26. This Coastal Development Permit No. CD2019-011 shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 27. Prior to the issuance of building permits, the applicant shall obtain a coastal development permit or other authorization of improvement for areas within the California Coastal Commission's permit jurisdiction, as determined by the California Coastal Commission. 28. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney's fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City's approval of Pickup Residence including, but not limited to, Coastal Development Permit No. CD2019-011 (PA2019-051). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and/orthe parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages, which City incurs in enforcing the indemnification provisions set forth in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition. 05-15-2018 17 Attachment No. ZA 2 Vicinity Map 03/13/2018 12 VICINITY MAP 1• d' =5; Subject Property � W ,tom, a UL ACUNjBPV T: [ 4 Coastal Development Permit No. CD2019-011 PA2019-051 23 Harbor Island 03/13/2018 29 Attachment No. ZA 3 Project Plans 03/13/2018 20 O INDEX OF DRAWINGS : o ALL �i ECG w. ,e .� — :a y 1'. The Pickup Residence { ngB,GRUIP 23 Harbor Island Newport Beach, CA AHAYPROJECT DIRECTORY VICINITY MAP PROJECT DATA .M.�,.�� GMENNI rm.xMMY, EN. m.�o,a w�TNRERim,.„E.,v�...®a...m.rr.. ,o.uNESPEE.R.Rom: .AFR.a,R 1 CTICARAHAS a�w�ReW�remen6 „s.m.� IGNALMON—ACHAPPREPLEATILYT.S.- GENERAL SALES ON. NY ® Rx. pxm c ,TARMTNE.EE,x�.RmRREo x Emm ,. PICKUP EIRAGRANT N E-SPONG ENE., . �GGGOA """ x.T.,aTax a m mR RESIDENCE �.r_aa.w �EE...r T NEo « 9En1M ABBREVIATIONS `REAL^`°"NE R^INSPRING nS UAL.ma� �.w��,RCora,w ARESSYORrNNG= wST =s ^�^^^^ AGEM, .11HANNERNAM SAG ASCNA. AN �. I OF GF.Rafv iR.—PRoALAILL Ecm' ie�:�o:,o-,.�.m m.,sr PRO T�xo: .. .N. ROTHILLA v..R� ,. RAYFMCNES mNxa a, ANIENCRONVOLMEN=NREiowoRmoEaTIORM eEonux[oErou rvE IN 2r— HIS ANNORDINA .,.,.. ros aEPom�Ru000mo,TEn �om�a �N RE �ALEOEvaxTr.ROE x TW.� .� wx.,. aRwECTvun.. cwER I— MANSYMN. A. .m w.�..�o. ., IN ... .. 1 inm ecmx NooRnu .,,A.. .EaE��wEn FOR MAMM NOTresu[owm TEAL Tvunmmmd.vq.H 11SAP I TNEcmro IECTORR.EE.REQ Dm.EREm.,EREATER LEGREEUEo TNanm �ENEESSAGG .em EpE, COVER SHEET IOR TOREMPRENT ..m ..,w w wv.n.w.w V. n` E ou,.1 eoxaYNIMmc owuwerersorwenN OIRErRou ERGEARENALINI vrmuo.w m. CAP .1EO RiG wm.eervxo Tom RcsmEr,e,.oawnEnxo Q LEGEND — — ff— 21 ;mde CAL GREEN-Residential Minimum Requirements rl t n 9 r GRO UP PICKUP RESIDENCE tuldat NeMABockCAW -- , CAL GREEN RESIDENTIAL MINIMUM gq REQUIREMENTS 4 $ E GN-1 S �s�ae.a.• 22 ;E,e Residential Construction Minimum Requirements Notes .. .�..u�...-.... ,....�..r.-.r—...wr.,. '" -_ -_._.....,.m-.-�or.0 ftflB fIGROUP . ..�...emu•.-...a.um_..a.., PICKUP RESIDENCE NaaWlBeI ,T.— moo, 'RESIDENTIAL CONSTRUCTION MINIMUM REQUIREMENTS GN-2 -- -- A. j ----------" ---------- ---------- —ti�p L—r e r l t me rIGRGIIP nr',°_, _— ___ _ _= le Pd� r _ — rr rurrn„ PICKUP RESIDENCE a ftr td *Bea cAmm Amhilectural Site Plan General Notes: mnlm Rmuuemmis neae TaWktiwm. Grade Establishment '. I.N..w.mn. 6 �Iywua...o1 nm r.rww.A. w t. nrN M t�gvm, mmen a brwrr F .r esnemn ,eTye re. arem.w m..nw...rpem. r use'u nsemu° .nne. rab.m owm.prnv w..mner�aes a �,:dllh'�Nfl­ xo.u.«m Nxa—) IM PA—T cen nrs. — i easlar .w..mPs---me' x wsm.rne oro si Teae ewwn xennrre nrerc.m..w.r.r.iim..m Ixwnl,ini,neuae e.snV�A,lyy ox�e.iW ."u°`ei®. �e 0 i knee.�v m.no.n. a .i ox+i. ownxme m I.s °Arn+.�.•. w^ •1O •••. II...r@ ..aos.�� HRGHITEG IJRAL < uv.nyna°i«.r.� umme.1 m.cvnsw.1 vwc wmmi.pivgem�. a�mwNmeminm.mdauwv c.er...•mr��.ma"�rn�.nw... — a.1x ......n .m .. SITE PLAN I s. eArrrrrewimi.g ir.r.ewe�. mw.av a NMmM+r.µvMmieepwmea�dx� .u+raN.e AAA .%mAN } AT e��imfrs�v mew cwmrra=wnw r�menn Teanw+=wnwm .Hawn �+ urgrebe umne o.Yas+.+eren npua f xmtsuEre.lni�.pssm Ns.� a nm.ewer r$ ply.mmw.w,a.-ua ay.av ��� a Sp-1 2� WINDOW SCHEDULE WINDOW NOTES mxmw 5b CBC rrcnwna+ ,..e® xmmxune gEk F 55� s 9 uuan `Ey we,, a,•..� �.,» N - uiw5^ Plunumemmi - ® V • • • • •..—...•.o+a+.. f I f1 B fIGROUP w.ai.xw ® .ro s» ® m.m PM ®®. . - ,. ® m.•.�. m.o-.s.. mry - .........»,».,.. �.*. '» _ � PICKUP ® M RESIDENCE .�..� ins N © ma .21 IT- WINDOW SCHEDULE gk B SCH1 .1 2 ..... ., mW� }� WINDOWNOTES 8 8 b a: 8 f tN9 fIG ROUP X 8 M G t Pi W21 11' V �, e,e:. T s, w, e, N H m. ¢.. C ' PICKUP RESIDENCE N Hffkr*M B 4EF6 _ r%WB"cumm s Z U P x J 0 ram. E v r— ,1 WINDOW TYPES B .2 �mI V I O iK a, m, 6. E 5 SCH1 .2 20 DOOR SCHEDULE DOOR NOTES xoou xue rr x oescwrmon rev rw e , ruxix� Hans mxurnrnms �m swi. ewrx wr..P.arp imc� - ,r wnnlLw.iw®P aaadV eamrv.III m4tlPonr)wueraicma ="— +W m40Pnw1 am1-1 —1 —El —I— - - Ej Msa eamalu4lPoSP�eum ia?M _ ^+mY Ywn°� Ina er4,ggrnswmarva muW Paine iampam � mmrr ewaen FIR "" P P� wind m� „ win, L' ..d —1-I E— 1 --1 --1 MI—Ell- ®, r.E— _ - - fit no rIGROUP p all iM'Gm FI .,a.w...aa,..ra,.,...... ® w - - - —' - - C•�/ wind Fsa^m _ - - -. - III In ® PICKUP III jllr� IW . I —d — w- —1 1% .� RESIDENCE wma .� 23 Ha rllllnd �6056d CA93fi63 I _ - - - - - �mssime W: El EWE— 1.31— g DOOR SCHEDULE i 9 SCH2.1 27 ,III I i� - 1 III III IIIIIIIILL _ i IIII III � IIIIIII 0 III IIII�I III ��III A 111 II IIII A III 91III DI III IIII ..j oal IV- I y I e rune rIcxove Hi t7 PICKUP RESIDENCE NHffkrltM NWBexKCAM Slab Edge Plan E SLAB NOTES SLAB LEGEND a m.r..mwmrxvmn vm r dux aw TMD nw PlwlEnu+n ni.c �mowwcLaw SLAB EDGE g PLAN 2 Qxcwvo P A1.1 29 xR's.Wf IY.H xzmu� --- — ® L -- --- nI r r - - R k I --------------------- t g O fiflO fIGROIIP � Ell riles- i s 14 , IM Ea, LIEr PICKUP RESIDENCE JHal % nB�n" cnsm First Floor Plan FLOOR PLAN NOTES FLOOR PUW KEY NOTES WM-LLEGENO Plea TeEUNticna ° PRMECT— eeTWI— rta0x FIRST FLOOR1w�o+ a Am sa PLAN a .y...°. S" �,&:. y A2.1 30 ------- - - = I f - - Jni ® Tit" CEl p® • rlinerIGRovP t o ® - a FC>•� ®a V wo 3 F Poe! - Feml f$I � I � 6 Bedmm � � n. ® m i Hasler ne �Be4 I ® ;_ e men v L vvw. l PICKUP ------ - --� -- :� - ------- i- -- ----i--- -----�- �11 - i I RESIDENCE L J J J rna�ncnsxs� Sewnd Floor Plan FLOOR PLAN NOTES FLOOR PI-AN KEY NOTES WILLLLEGENO pmaT bulallum ` 10 d._ ro...e. ..• .�wd. PaaEa�Fl ao EM.ry m ,- x.rn_ SECOND FLOOR vMv. .y...°,. T` —eev':'E k y PLAN A2.2 31 T ,; i o I ' a rl2nelleRovr ------------ V., •• ati r / axe ! I � i J ..SS GJ1 � i rman. i s X � ♦ � } 5 e 5 :; t'I PICKUP — — — — — — — — — — — RESIDENCE L J J J B" Hatn % Ne.cesxm Roof Plan ATTIC AREA TABULATIONS ROOF PLAN NOTES ROOF KEY NQTES ROOFLEGPNO ❑ nne�� m arnroeu-EM eN re+�mT nu. rta0x .......,...m.... —...wx— ROOF ........,,..w...m.,o, ..,e.� ..e..x w..�oe�.,e PLAN mwxer.eexxew � nmmxu gg � E A3.1 32 SECTION NOTES SECTION KEY NOTES . :0 _ I ' f I f10 f GROISP Section"A" ., ELEVATION KEYNOTES `•� El o�m" o....Wa.,..W" o �� °°° PICKUP �n o Rp,«.,,�...,,,.,m ,,;" o m.,. RESIDENCE —�- -------- _ -----�- — p,,...m,..,. 73 Hffmr1 M El %*B"CAamm M" o o o �e o o.. oaaE'..� i •�. E".o .Kr� e,. m sulLoiNG sEcnons s Section"B" w+E,w—,a "•""",•• 6 � A4.1 33 SECTION NOTES SECTION KEY NOTES ue mw' I fItnefIGROUP Section T" ELEVATION KEYNOTES `•� El o�.v o....Wa.,...s El PICKUP El,�,....._..,.,__ o-m�..°°-A RESIDENCE p,"••""•,•,• 73 Ha arIft H El _., v 2v 2 u x-W w o s HI 0 it : xsu�nTlory svr+svuie _ BUILDING pill irn wuw ...mu. wd m SECTIONS L. 4 " SeIXian"D" - 6 $ A4.2 3-¢ SECTION NOTES m nxsui niox�s m. .... .. .mmr SECTION KEY NOTES Qn ma f InafIGROUP Section"E" ELEVATIONKEY NOTES n... �...v.a...m, wen. E �a ° ... PICKUP o.,w...�.__.,...., o . ,.r°w°w RESIDENCE CE 23 Hatar ft �. 'Ltitr� o�w.�..o� nriaemn.cnsxs� o -1— .... L�J o.eu..r�..r..�..... r:._ sew T. 'm` te, BUILDING SECTIONS i Section T" ""'"""" 9 $ t A4.3 35 IUIEIII ��C -.- ----- =I� fmcs4 M-� N - 9... _I I �I I o��ll_II11 II o�� a C7C7 a ae ___ - mmmm.mmmam�m�msmtma n 0 - o m .� 1.1���1��INN Y�.�1.�.0•�,N..I.a � � I�� p II O � z-ram umn_ ._o '..�.tl� .smev�..v.m mnaw.munvmrs�a m m m m m m mm m ELEVATION NOTES I r rIt na rIGROOP Front Elevation) w•:a ��• - ...�...... .�. ,.......,,Y___ ELEVATION I(EY NOTES nwun E] ` PICKUP _.., . ———— —— — — ----------------------------- — —----- kmt ------- o :m�. ' °_h RESIDENCE — o _, r p..:...®... a, • EI ❑ ....m. ,moonE. IIII` k ' a ❑ r I • p.....,.�,..,,.m..�. i 1 ❑ .....,... �T� 1m w ��I 1 • c 6 vniorm.® II - 'N • Q n.uw II BUILDING ELEVATIONS BULLDI z Lek Side Elevation A5.1 3� ELEVATION NOTES —— ❑ °` 1p— el I =M �� 1 1 1till I ®.. rl tnerIGROUP Rear Elevation .-...w.,o ��• ���- ».. ,,..,..,..e ..M ELEVATION KEY NOTES .wx+ p _ El.R. PICKUP - -- -- -- F --- - ---- - -- LJ RESIDENCE ��. ❑ Z3 HatorlAaM a ❑ �.W^ Neupgl9ar-0.CA9eE3 h + o c e V Paw.�.na. tit .� _ � .-,,,,y ❑ pow a.`." BUILDING ELEVATIONS F z Right Side Elevation A5.2 38 ❑ "a- _� � � x-� � I IIT I � —L _ r _I 3 IWl 0—� - "'�II�T J/ I\I f } f10 fIGRO1SP \I i - _ I I I' WHOLE BUILDING VENTILATION SYSTEM SUMMARY }V — �` O G•e v v ILA �. _F ;row - - L PICKUP RESIDENCE _ N..,a..._... ... ..�.a I B"cgmm First Floor Electrical PlanMT. ma ELECTRICAL PLAN NOTES ELECTRICALLEGEND wi e2' 2 o ® .n Vrty.Yumc. q. .>..:.a......°. �....m..b':. - 6 �......�.......a.mv. • .m..,Mm cuagoxE T .M 'eµgERM 4i&mn.eennw>..... w er ,P "=.rim ,.N. _ m....m... ......,.. ® PR­­� eomn»rta0x i'.4'n.ara ».....e,x..x.....a.e _•:_- :wG'.i'.e'�..e '". q .>..x..v.,�A„� .om.......-m..e.S..•. -_'•: } ..u...m,.- ®.i....., xenrmc� "'min n'," �.....me.. ♦ .... %Zb .... a,.. :. g �- ., FIRST FG R OEM a -. - '.u"'" ELEGIRICAL PLAN 5 A6,1 39� ,P �ar e z � �aeorooms u \ 'Mazer Bem -'� gib.! AiI• F MCNNOe rY ill _ � �� Wlc _—_him Hn rI } nerIGROU; 1 Eil _ Y W 1 q WHOLE BUILDING VENTILATION SYSTEM SUMMARY me e p a �41 - '^:':xa�.....E..�.az...a.........w,m.�..,..,a.a.a I l PICKUP —-—-—-—-—-—-—-—-—-—-—-—-—-—-— Er, — _ w. a.: RESIDENCE _ N..,a..._... ... ..�.a B"cgmm Second Floor Electrical Plan ELECTRICAL PLAN NOTES ELECTRICAL LEGEND wi e2—2 "� ® .n•rtyYumu. q. RM PFOJEcirelrmt ,amr Pvaecrren nu. 1eomn»rta0x «°me..µ"'i'.4'n.ara ».....e,x..x.....a.e -•:_- :wG'..'.e'�..e '". q .>..x..v.,�A„� .om.......-m..mS..�. -_'•: } ..u...m,.- ®.i....., xenrmc� SECOND FLOOR Y 5 �.....me,. ♦ .... %Zb ..... _ `. Q �• OEM ^r..' x'q"^""^ ELECTRICAL PLAN A6.2 1f-D O o00 1 d �1I r� � ^°.• 'i I I ftftO fIGRO1SP III I 'ii '�i II N r N.W. .ice _r 011lm ® H® --- —_ ______: PICKUP RESIDENCE HsbsIfM %*B"CAMM First FlI Mechanical Plan Nate EQUIPMENTLIST MECHANICAL FILM NOTES WHOLE BUILDING VENTILATION SYSTEM SUMMARY mivo'Tmm¢ aF'fE-E �..�.m....�W....o.a»:...... mrz..emrnuvu.ea., ••awnw 0 w.w .unaw.o-uuwuwr a..b er"u�. .u. E PaaEa rIt .,„„w,.,.m....,.,.,w e.e•.� 0 a ® FIRST FLOOR ....w.....m .^e..w ....................n.s,....e..,..m..._...�... ....®,.,....,. e,,.�::ae... MECHANICAL CD MECHANICAL LEGENDuY- © .rrwunea..maue.wu.wroeemen..a B '"'••• ew.+v..m ----- --��_ AT 1 41 -, ------------------------ fiflO fIGROIIP e 3331 I ,r w I ''i eaan,4 a — Mesler� PICKUP ----------------- ---------------- RESIDENCE llaoonlvM Second Floor Mechanical Plan Nate EQUIPMENTLIST MECHANICAL PUW NOTES WHOLE BUILDING VENTILATION SYSTEM SUMMARY mi2-2 mrz..emrnuvu.ea., ••awnw 0 w.w .unaw.o-uuwuwr a..b er"u�. au. E mq=e.a.su.wnm .,.,N....ve.. ".m" .,,..o...,....e£... PR—T— r.eu 0 a ® ....w.....m .^ea.w ....................n.s.m..e..,..mA._...�.., ....®,.,....,. SECOND FLOOR MECHANICAL _ PLAN �� MECHANICAL LEGEND�u mmra. Xm ...a.�w. L M -".Y- © .rrwunea..maue.wu.wroeemen..a B '"'••• nn.v..m ----- -- A7.2 u u u u u O o� o HII III a 4e F o-a r the rIG R0 VP a — o I I PICKUP RESIDENCE Haba*M B CAmm First Floor Reflected Ceiling Plan —'-2 REFLECTED CEILING PLAN KEY NOTES IT— Q . PFNET nu. na0„ r • FIRST FLOOR W REFLECTED 5@ CEILING PLAN i ,e marexmma.c n .w..,cvau.xn TV A8.1 ® o0 0 m0 o o o o 0 � wK Bea O awoomz O av ae O BeCmwn3 o@ o @� wm �p f i f10 fIG RUIIP � le ELI 0 wm B ®an �mpma tB" ©� o ED m m 0 PICKUP RESIDENCE Nl B CAmm Second Floor Reflected Ceiling Plan —'T-2 REFLECTED CEILING PLAN KEY NOTES IT RIJ P—TC- aIN r • SECOND FLOOR W ( e RERECTED 5@ CEILING PLAN in marexmma.c n .w..cvau.xn TV A8.2 14 r rl l n a rIGPOUP Second Level-Oveday Plane aaa oreneret"ieao" EEE ., PICKUP �- - ---T RESIDENCE 77 Hnaki rd NWBeaDW I z wd e I V � OVERLAY PLANS g First Level-Overlay Plan A9.1 � � 8 mw� PARTIAL ELEVATION j SECTION fI { nefIGROUP FIAT ROOF AT WINDOW BAY 3 22 EAVE R 12 EAVE a 2° .�,.f..wb PARTIAL mny ELEVATION 4 n,rmew.ren m.emm�.e �•° 4 R mnm ,ate. PICKUP RESIDENCE saBns�na nR Hanarl*M xa3 SECTION - - ROOF AT HALL WINDOW BAY 24 FLAT ROOF ATWINDOWBAY R14 EAVE Y4P rn.. rav d wUxue.,ea� aecc -L. ARCHITECTURAL ....,..o-x«. __ ...x.�xa... DETAILS 140 H cm s.. D-1.1 - 25 RAKE 18 RAKE 5 4wee.awn o-m• u PARTIAL ELEVATION m e1 t �1e xnxnxwnw •� w.ti c�^remom. �.w�. ���//�(�_ .} maen ea.rzn vmuwwn. eu.unew�" mewwnem �. awi.w 1 SECTION 1 f } f1a fIGROU; FIAT ROOF AT WINDOW BAY 22 EAVE TRIM AT ROOF WELL WALL R12 EAVE ate u.. ------ --, _w �.� PICKUP m RESIDENCE 23HBMrI*M a... ve� I&AcAqmm 22 s.no, tXexxY.Sx> E RAKE AT FLAT ROOF 24 EAVE TRIM AT ROOF WELL WALL w14 PARAPET Y4w . .x w e. wm..eumaw sm.mrun®wmww.rewr. PRa¢T— DerMis xrm T ARCHITECTURAL DETAILS 1 _n D-1.2 ROOF iO WALL 30 ROOF TO WALL 25 VALLEY w[20 RIDGEI HIP 15 ROOF DRAIN-PRIMARY AND OVERFLOW 5 v ��ereeeawn nm• u - ------ --------------- ------- - , il I , --------T------'` ------------- PIAN VIEW '^"^ea '°"^•`" Wes"¢ f ln9 fIG ROUP n ia�.0•,w FAOM/REPR ELEVPTON SECTION wxvuivzxm SIOEELEVATdi m•w^uwun m a PICKUP IS CHIMNEY CAP 3 RESIDENCE I a ARCHITECTURAL T6 TV wm D-1.3 SKYLIGHT SILL Yv SKYLIGHTJAMB a 1S SKYLIGHT HEAD 5 v -T�eree,awn nm• u 26 21 1s H 6 f I n9 fIGROIIP 22 117 112 $ 2e as 16 13 e 5 PICKUP RESIDENCE a Ilaoor 91O B"cAmm 2 2 —,.—E, 1 � 1 S1EP1 MP2 STEP 9 9 4 �•� n�mc LT ARCHITECTURAL DETAILS C2 , S1 4 51 5 D-2.1 VAPOR BARRIER AT WINDOWS 25 20 15 10 5 4�erseawn nm• u Ll 21 tE 11 6 STEP 1 2 f f10 fIG RUIIP 22 117 112 2 STEP 2 2 _ PICKUP 18 113 5 3 RESIDENCE n Haoor 9 M wpo�B"cumm FEP3 — VAPOR BARRIER AT DOORS 29 24 19 14 9 d w--E aeccren na oerMis ARCHITECTURAL . ... .n��wA.e. DETALLS _ "Lmwers rx+w.m. w.n D-3.1 30 25 20 DOORTHRESHOLD s15 DOORTHRESHOLD 10 STEEL DOOR THRESHOLD . 5 v ��erseawn nm• u mw. ^� § 11 WALL HANDRAIL �fi STAIR AT SWB x 1 �_ aweuh �"A lea fS vva f tna fIGROV; SCREED AT SIAB 2i SCREED ATGARAGE CURB 22 SCREEDATGARAGECURB 1i 12 7 STAIR AT LNDING u2 eemnwu lu<. iriuQe9�w PICKUP $ggg .` 1B G fi BTAIRAT LADING RESIDENCE �gg ... `g�gMg_ .e. � .a ryywpM9eNA.CA9�fi63 1 7 SCREED AT SLAB 29 SCREED ATSLAB 24 19 14 9 STAIR HANDPAIL x4 By = PRa¢T— DeeMis ARCHITECTURAL DE MLS - ���' cd5u1[rrc�u[cnpo[ D-4.1 UFFh'BAR 25 20 15 10 STAIR GUARDRAILS v a ^wnerse.awn nm. u Zoning Administrator-November 14,2019 Item No.5a Additional Materials Received �,J//• Pickup Residence CDP(PA2019-051) YVGGLGtl//7� �OfI,Pi X& 0ea% 6aA&y,,44,y2660 r,sOlVED ay, November 4, 2019 COMMUNITY DEVEI-OPMENT NOV 0 8 2019 City of Newport Beach Community Development Department rrry of Planning Division �`�ipoRT a�Prlx\ 100 Civic Center Drive PO Box 1768 Newport Beach,CA 92658-8915 Re: 23 Harbor Island, Newport Beach, CA File Number: PA2019-051 To Whom It May Concern: I am in receipt of the Notice of Public Hearing regarding a new home to be constructed at 23 Harbor Island, Newport Beach, CA. I reside at 9 Harbor Island and support the application to build the new home. Very truly yours, William Bone, Trustee William G. Bone Trust of 1992 WB:cd