Loading...
HomeMy WebLinkAboutX2018-0379 - Soilsconsultants CITY OF NEWPORT BEACH Building Department 100 Civic Center Drive Newport Beach, CA 92660 X,201$-0378 6-0,9 4c0C;A 4 V engineering geotechnical applications October 14, 2019 Project No. WP034.2 Subject: FINAL GRADING CERTIFICATE HARDSCAPE COMPACTION, UTILITY TRENCH BACKFILL AT NEW RESIDENTIAL PROPERTY LOCATED at 602 ACACIA AVENUE CORONA DEL MAR, CALIFORNIA City of Newport Beach Permit No.: 03112018 References: 1. "Geotechnical Investigation for Proposed, Residential Duplex Located at 602 Acacia Avenue, Corona Del Mar, California," by EGA Consultants dated July 28, 2017. 2. "602 Acacia Duplex, Building Plans" by Brandon Architects, Inc., last dated March 22, 2018. 3. 'Precise Grading Plan, 602 Acacia Avenue, Corona Del Mar, CA," by Forkert Engineering & surveying, Inc. dated December 19, 2017. 4. "Compaction Report for Placement of Fill within Limits of Residential Building Pad at 602 Acacia Avenue, Corona Del Mar, California," by EGA Consultants, Inc., dated May 31, 2018, To City Building/Grading Officials: In accordance with the City of Newport Beach building and grading requirements, we are submitting this final compaction report for the grading of the subject building pad, utility trench backfill, and exterior improvements. The site earthworks operations were performed by the sub -contractor, Tight Quarters, Inc. Excavation and grading of the subject lot commenced on May 21, 2018 and was completed on May 24, 2018. All flatwork subgrade was completed by October 10, 2019. Site grading included the removal of the upper 3 of the old fill and native material located within the limits of the new building pad and exterior improvements. A minimum 12 inches of engineered fill was placed below all future footing bottom elevations. Prior to the placement of fill, the excavation bottoms were inspected and approved by a Certified Engineering Geologist employed by EGA Consultants. The exposed surface was scarified and recompacted to a minimum of 90% relative compaction. Field density test results are tabulated on Table 1, Summary of Field Density Tests. One 953-C Caterpillar tractor front loader, one jumping -jack Wacker, one vibratory plate, and water hoses were utilized for the purposes of compaction and grading control. All earthwork operations were performed under continuous observations by this firm and were performed in accordance with geotechnical specifications outlined in the Soils Report dated July 28, 2017 375-C Monte Vista Avenue • Costa Mesa, CA 92627 • (949) 642-9309 • FAX (949) 642-1290 I certify that all grading and compaction work was done in compliance with the soils report for this project and the work complies with City of Newport Beach grading regulations. All soils values and geotechnical specifications outlined in the soils report remain valid. Based on our continuous observations and testing, the subject and adjacent sites are not impacted by the site grading operations to date. This opportunity to be of service is appreciated. If you have any questions, please call. Very truly yours, EGA Consultants, Inc. , DAVID A. WORTHINGTON CEG 2124 Principal Engineering Geologist Copies'. (2) Addressee (1) Walerpointe Custom Home Builders, Inc., Attn: Matt Kincheloe FINAL COMPACTION REPORT: 602 Acacia Avenue, Corona Del Mar, CA Project No. WP034.2 October 14, 2019 OF TABLE 7 SUMMARY OF MOISTURE DENSITY RELATIONSHIPS (ASTM: D1556) Sample Depth Dry Moisture Maximum Optimum Relative Number/ Below Density Content Density Moisture Compaction Location Pad ft PCF °/d' PCF % °/a FD -1 3.0 115.7 10.7 123.0 10.0 94 E Central Pad FD -2 2.0 114.7 10.8 123.0 10.0 93 NE Edge Pad FD -3 1.5 117.1 10.5 123.0 10.0 95 SE Edge Pad FD -4 3.0 118.6 10.9 123.0 10.0 96 W Central Pad FD -5 2.0 116.0 10.4 123.0 10.0 94 SW Edge Pad FD -6 0.5 117.2 10.6 123.0 10.0 95 NW Central Pad FD -7 FG 118.1 10.7 123.0 10.0 96 SW Central Pad FD -8 FG 116.9 10.6 123.0 10.0 95 NE Central Pad FD -9 FG 118.4 10.6 123.0 10.0 96 SW Central Pad FD -10 FG 119.6 10.4 123.0 10.0 97 Central Pad FD -11 FG 117.4 10.7 123.0 10.0 95 Utility Trench Backfill FD -12 FG 118.3 10.3 123.0 10.0 96 Flatwork FINAL COMPACTION REPORT: 602 Acacia Avenue, Corona Del Mar, CA Project No. WP034.2 October 14, 2019 FD -13 Flatwork FG 119.6 10.5 123.0 10.0 97 FD -14 FG 116.9 10.6 123.0 10.0 95 Area Drain Backfill FD -15 FG 116.7 10.2 123.0 10.0 95 Driveway/ Carport Area "FG" = Finish Grade (Ground Level Pad). TABLE 2 SUMMARY OF MAXIMUM DENSITY TEST (ASTM D 1557) Sample Maximum Optimum Location Density Moisture Pcf % FIII (per Soils Report 123.0 10.0 dated July 28, 2017) FINAL COMPACTION REPORT: 602 Acacia Avenue, Corona Del Mar, CA Project No. WP034.2 October 14, 2019 consultants CITY OF NEWPORT BEACH Building Department 100 Civic Center Drive Newport Beach, CA 92660 engineering geotechnical application r May 31, 2018 Project No. WP034.2 Subject: COMPACTION REPORT FOR PLACEMENT OF FILL WITHIN LIMITS OF RESIDENTIAL BUILDING PAD AT 602 ACACIA AVENUE CORONA DEL MAR, CALIFORNIA City of Newport Beach Permit No.: 0311-2018 References: "Geotechnical Investigation for Proposed, Residential Duplex Located at 602 Acacia Avenue, Corona Del Mar, California," by EGA Consultants dated July 28, 2017. "602 Acacia Duplex, Building Plans" by Brandon Architects, Inc., last dated March 22, 2018. "Precise Grading Plan, 602 Acacia Avenue, Corona Del Mar, CA," by Forkert Engineering & Surveying, Inc. dated December 19, 2017. To City Building/Grading Officials: In accordance with the City of Newport Beach building requirements, we are submitting this compaction report for the grading of the subject building pad. This report includes the test results performed at the subject lot during the placement of on-site soil material in the area of the proposed residential building pad. The site earthworks (excavation) operations were performed by the sub -contractor, Tim Greenleaf Engineering. Excavation and grading of the subject lot commenced on May 21, 2018 and was complete by May 24, 2018. The building and garage pad consists of a 3 foot over -excavation, with native spoils used for backfill Prior to the placement of fill, the excavation bottoms were inspected and approved by a Certified Engineering Geologist employed by EGA Consultants. The exposed surface was scarified, moisture conditioned and recompacted to a minimum of 90% relative compaction. The upper two feet of backfill was treated with Portland Cement, using approximately 8 bags per 8 inch lift. Field density test results are tabulated on Table 1, Summary of Field Density Tests. One CAT 953-C front loader was utilized for the purpose of compaction and grading control. Water was added via a 2 -inch fire hose and moisture contents were at near -optimum moisture levels. All earthwork operations were performed under continuous observations by this firm and were performed in accordance with geotechnical specifications outlined in the referenced soils report dated July 28, 2017. The building pad was graded in accordance with the 2016 CBC and the City of Newport Beach Building standards and are approved for construction. Based on our continuous observations and testing, the subject and adjacent sites are not impacted by the site grading operations to date. 375-C Monte Vista Avenue • Costa Mesa, CA 92627 • (949) 642-9309 • FAX (949) 642-1290 This report includes the test results performed at the subject site during the placement of on- site and imported soil material in the area of the proposed building pad. Additional observations and testing are required in areas to receive exterior improvements (driveway approach, patio flatwork, drainage, etc.) and utility trench backfill. I certify that all rough grading work was done in compliance with the above -referenced soils report and the work complies with City of Newport Beach grading regulations. All soils values and geotechnical specifications outlined in the Soils Report remain valid. This opportunity to be of service is appreciated. If you have any questions, please call. Very truly yours, EGA Consultants, Inc. �EFtED Davidq,, � Worthington DAVID A. WORTHINGTON CEG 2124 * N0• CEG2124 Principal Engineering Geologist N� CER77RED 9a ENGINEER NG it) I Copies: (2) Addressee (1) Waterpoinle Custom Home Builders, Inc. PAD CERTIFICATION REPORT: 602 Acacia Avenue, Corona Del Mar, CA Project No. WP034.2 May 31, 2018 TABLET SUMMARY OF MOISTURE DENSITY RELATIONSHIPS (ASTM: D1556) Sample Depth Dry Moisture Maximum Optimum Relative Number/ Below Density Content Density Moisture Compaction Location Pad ft PCF % PCF % FD -1 3.0 115.7 10.7 123.0 10.0 94 E Central Pad FD -2 2.0 114.7 10.8 123.0 10.0 93 NE Edge Pad FD -3 1.5 117.1 10.5 123.0 10.0 95 SE Edge Pad FD -4 3.0 118.6 10.9 123.0 10.0 96 W Central Pad FD -5 2.0 116.0 10.4 123.0 10.0 94 SW Edge Pad FD -6 0.5 117.2 10.6 123.0 10.0 95 NW Central Pad FD -7 FG 118.1 10.7 123.0 10.0 96 SW Central Pad FD -8 FG 116.9 10.6 123.0 10.0 95 NE Central Pad FD -9 FG 118.4 10.6 123.0 10.0 96 SW Central Pad FD -10 FG 119.6 10.4 123.0 10.0 97 Central Pad "FG" = Finish Grade (Ground Level Pad). TABLE 2 SUMMARY OF MAXIMUM DENSITY TEST (ASTM D 1557) Sample Maximum Optimum Location Density Moisture Pc Fill (per Soils Report dated 7/28/17) 123.0 10.0 PAD CERTIFICATION REPORT: 602 Acacia Avenue, Corona Del Mar, CA Project No. WP034.2 May 31, 2018