Loading...
HomeMy WebLinkAboutX2019-2774 - MiscR.P.I. Deputy Inspections Inc. www.deputyinspector.com (949) 291-3912 x2OR-27714 CITY OF NEWPORT BEACH X50711Qfi%clre4 br COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 1 Newport Beach, CA 92658 ovdnuvdpnri circ _ ov1 (949) 644-3200 SPECIAL INSPECTION REPORT Project Address: 2507 Margaret Drive / Curtis Residence Permit Number: X2019-2774 Inspection Type (s): Epoxy Inspection Date (s):10116/19, 10/18/19 ( ) Periodic Continuous Observed cleaning and embedments for dowels at existing footings & slab. (16) total #4 @ 36" OC bars w/ 6" min. embed. placed as per details 203/SD2 & 204/SD2 on the approved plans. Simpson Set -XP ICC ESR 2508 epoxy was used as per approved plans. All work was found to comply with the approved plans and specifications & applicable building codes. Total Inspection Time Each Day: Date: 10/16/19 j 10/18/19 10/18/19 _ Hours: min. j min. Ryan Paquette Construction To the best of my knowledge, the wor� Inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmans to provisions of the U.B.C. except as noted above. spa ' ns or ' re: Date: 10/18/19 Print full Name: I Newport Beach Registration No.: Ryan Paquette NB -0615 R.P.I. Deputy Inspections Inc. 1903 Via Pimpollo San Clemente, Ca. 92673 R.P.I. Deputy ons Inc. www.deputyinspector.com (949)291-3912 CITY OF NEWPORT BEACH COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 100 Civic Center Drive I P.O. Box 1768 ( Newport Beach, CA 92658 www.newportbeachca.oov ](949)644-3200 SPECIAL INSPECTION REPORT Project Address: Curtis Residence 2507 Margaret Dr. Newport Beach Ca. Permit Number: X2019-2774 Inspection Type (s): Epoxy Inspection Date (s):11/05/19 ( ) Periodic (./)Continuous Observed cleaning and embedments for all thread bolts at existing walls. (7) 5/8" X S' embedment as per 202/SD-2 on approved plans. Simpson Set -XP ICC ESR 2508 epoxy was used as per approved plans. All work was found to comply with the approved plans and specifications & applicable buildinq codes. List Tests Made: Total Inspection Time Each Day: Date: 11/05/19 Hours: Min I List All Items Requiring Correction (Include Previously Listed Unconnected Items): Newave Construction To the best of mV knowledge, the work inspected was in accordance with the Building Division approved design drawings, specifications and applicable workmanship provisions of the U.B.C. except as noted above. Rick Paquette R.P.I. Deputy Inspections Inc. 1903 Via Pimpollo San Clemente, Ca. 92673 11/05/19 NB -0217