Enclosed are the Avon Street Model photos forwarded on January 9 by Pulaski
and Arita Architects. In addition to the photos not being suitable for
reproduction in the Final Initial Study, the Model does not show the re-
lationship between the project site and the adjacent commercial properties
on Coast Highway. This is contrary to explicit instructions given to
Rolly's office repeatedly over a six-week period. In light of the diffi-
culty in obtaining these photos, we respectfully request that the Final
Initial Study be prepared without the Model photos.
Also, we had requested a copy of the Mariners' Mile Specific Area Plan
from Rolly's office, at which we received (with the photos) a copy of the
Mariners' Mile Zoning Ordinance. We request that City staff provide assis-
tance in obtaining a copy of the Mariners ' Mile Specific Area Plan.
As you are aware, we have already exceeded our budget for the Avon Street
project. The reoccurring starts and stops in processing (i .e. , revised
traffic study) and difficulties in obtaining materials from the client
and consultants throughout the history of the project have resulted in ex-
tra costs which we could not have foreseen in preparing our original con-
tract bid. We would greatly appreciate any assistance you could provide
in completing the Final Initial Study in the most expeditious and cost-
effective manner possible.
Respectfully,
PHILLIPS BRANDT REDDICK
Anthony SRidmore
Assistant Project Manager
Enclosure 62-013
PLANNING • ARCHITECTURE • LANDSCAPE ARCHITECTURE • ENVIRONMENTAL RESEARCH
18012 SKY PARK CIRCLE•IRVINE,CA 92714. (714) 261-8820 CALIFORNIA COLORADO HAWAII
CITY OF NEWPORT BEACH
PLANNING DEPARTMENT
v�� 3
DATE: November 22, 1983
TO: Environmental Affairs Committee Ol
Don Webb, Public Works N
Rich Edmonston, Traffic 0Cq��F EACy, S
Ron Whitely, PB&R
Tony Melum, Marine Cb 6
Bob Lenard, Planning v
Chris Gustin, Planning
FROM: Fred Talarico, Environmental Coordinator
SUBJECT: Initial Study "Avon Street"
Draft EIR "Corona del Mar School Site"
The above subject reports are attached for your review and
consideration. The EAC Will be having separate meetings on the two
reports as noted below: tt `
AVON STREET: ` Date: i� November 28, 1985
Time: 10:00 am
Place: Planning Dept. Conference Rm.
CORONA DEL MAR
SCHOOL SITE: Date: November 29, 1983
Time: 1:30 pm
Place: Planning Dept. Conference Rm.
If you have any problems or conflicts, please contact me at ext. 197.
Fred Talarico �`2 /_//
FT:to
CITY OF NEWPORT BEACH
PLANNING DEPARTMENT
October 13, 1983
TO: Fred Talarico, Environmental Coordinator
FROM: Sandy Genis, Associate Planner
SUBJECT: Mariner's Mile/Avon Street Traffic Data
The traffic model land use data for the small sub-zones in the Mariner's Mile/
Avon Street study area was completed this morning (October 13) , at which time
I called Kathy Devine and let her know it was available. We received the map
showing the sub-zones for the area last Thursday (October 6) . Just wanted to
let you know where things stood so you can plan your schedule based on
reasonable progress on this project by our consultants.
SANDY GENIS
SG:nma
PHIWPS BRANDT REDDICK
June 28, 1983
Mr. Fred Talarico
Environmental Coordinator
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92663-3884
Subject: Proposal to Prepare Expanded Initial Study - Avon Street
Properties
Dear Mr. Talarico:
Phillips Brandt Reddick (PBR), in association with Basmaciyan-Darnell ,
Inc. (BDI), is pleased to submit this proposal for preparation of an ini-
tial study for the Avon Street Properties. In developing this proposal ,
we have discussed various aspects of the proposed project with City staff
and visited the subject site. Given the constraints involved with poten-
tial development of this property, the initial study must carefully ad-
dress land use, circulation and design characteristics of the proposal as
well as other topics mandated by the CEQA Guidelines and City Policy K-3.
We believe that the combination of PBR's environmental analysts, landscape
architects and grading engineers and BDI's intimate knowledge of traffic
and circulation issues in this area will provide the City with a thorough
analysis of the potential impacts of the project. Mitigation measures
will be recommended to address these potential impacts. In addition,
members of the study team will be available to provide continued support
to City staff as the project moves to the Coastal Commission for
consideration.
The following proposal outlines a scope of work and budget through com-
pletion of a final draft initial study. Continued consulting services
through City or Coastal Commission hearings could be provided on a time
and materials basis in accordance with the attached fee schedules.
SCOPE OF WORK/SCHEDULE
The following tasks will be completed within thirty (30) days after re-
ceipt of all necessary plans, background studies, and other information
from the applicant and/or City staff. The following minimum information
would be required to begin work:
PLANNING • ARCHITECTURE • LANDSCAPE ARCHITECTURE • ENVIRONMENTAL RESEARCH
18012 SKY PARK CIRCLE • IRVINE, CA 92714 • (714) 641.8820 CALIFORNIA COLORADO HAWAII
e
Mr. Fred Talarico
June 28, 1983
Page Two
• Mariner's Mile Specific Plan and any amendments thereto;
• City Zoning Ordinance for the above plan area;
• Map of all ownerships within the subject site including all easements
and rights-of-way for public streets;
• Plot plans indicating proposed resubdivision of the property including
ownerships, easements, etc. ;
• Conceptual grading plans for lots proposed for eventual residential
use indicating finished grades and standards for structure height and
lot coverage; and
• Preliminary geotechnical evaluation of the property for the proposed
use.
Other information needs may be identified by the consultant team or City
staff prior to initiation of the study.
Task 1: Review Background Information and Proposed Project
PBR and BDI staff will assemble and review all pertinent back-
ground information including the above list of material to be pro-
vided by the applicant or City staff. After an initial review,
the study team will meet with City staff and the applicant to
finalize the details of the project description and scope of the
expanded initial study.
Task 2: Prepare Screencheck Initial Study
PBR/BDI will prepare a complete initial study document including
all sections required by the CEQA Guidelines and City Policy K-3.
The following annotated outline describes the approach, content
and level of detail of the study elements:
1.0 Introduction/Summar of Im acts - A brief introduction of
the proposed project will be followed by a summary of the
project's impacts, applicable city policies/requirements
and/or feasible mitigation measures.
2.0 Project Description - The project's location, objectives and
key characteristics will be described. Particularly impor-
tant in this section will be a discussion of the local and
regional land uses and land use plans related to this area.
Per the RFP, these plans will include the General Plan,
Local Coastal Plan, Mariner's Mile Specific Plan and all
regulations/ordinances related thereto, and existing, plan-
ned or committed land uses and infrastructure improvements
in the site vicinity. As part of this section, PBR will out-
Mr. Fred Talarico
June 28, 1983
Page Three
line all discretionary permits required for project implemen-
tation. The implications of the issuance of these permits
(i .e. , project approval ) will be described in the following
section.
3.0 Existing Environmental Conditions, Im acts, and Mitigation
Measures - For each environmenta factor, the baseline
coon, project impacts, and City policies/requirements
and/or mitigation measures will be noted as follows:
3.1 Landform/Geolo - Review of proposed grading concept
in term—a dform impacts, slope stability, seismi-
city, and groundwater movement based on applicant
provided geotechnical study.
3.2 H d�rologgy/Drainage - Analysis of changes in quantity
and qual-ityt surface runoff.
3.3 Biological Resources - Review of existing literature
and cursory field walkover to identify potential for
presence of sensitive flora/fauna.
3.4 Cultural Resources - Records check of potential pres-
ence of arc aeo ogical , paleontological or historic
resources.
3.5 Land Use Compatibility - The compatibility of the pro-
posed project with surrounding uses will be carefully
addressed. Particular attention will be placed on the
interface between the proposed project and the rear
yards of commercial uses immediately south of the site.
3.6 Traffic/Circulation - BDI will prepare a detailed study
as outlined in the attached scope of work. This report
will be summarized for this section and included in
full as part of the appendix.
3.7 Air Quality - PBR will briefly evaluate air quality
impacts re ated to construction phase and long-term
stationary and mobile source emissions created by the
project.
3.8 Acoustic Environment - Based on projected CNEL contours
for Coast Highway and Newport Boulevard, PBR will iden-
tify potential noise impacts on the proposed residen-
tial areas. The need for more detailed noise studies
will also be addressed.
Mr. Fred Talarico
June 28, 1983
Page Four
3.9 Aesthetics - Based on grading and landscape plans and
propose 7uilding heights, PBR will evaluate line-of-sight
impacts on existing residential units to the north and
west. In support of the land use compatibility section,
the impact of commercial storage and loading areas in
views from the new residences will be analyzed.
Task 3: Revise Screencheck Draft/Prepare Final Initial Study
The screencheck initial study will be reviewed at a meeting with
the City's Environmental Review Committee. Based on comments and
changes conveyed at the ERC meeting, PBR will revise the screen-
check and prepare a final draft initial study. Up to 25 copies of
the final document will be submitted within one week of the ERC
meeting.
ESTIMATED BUDGET
It is estimated that the above scope of work could be completed for the
fallowing not-to-exceed labor and materials budget.
Task 1: Data Collection/Review $ 600
Task 2: Screencheck Initial Study 3,400
Task 3: Final Draft Initial Study 500
PBR Labor $TI-00-
Traffic Consultant $3,500
Materials Expenses (Graphs, Reproduction, etc. ) $ 250
TOTAL NOT TO EXCEED BUDGET $8,250
Attendance at two meetings with staff and/or the applicant is included in
PBR's scope of work. Attendance at additional meetings/hearings would be
provided on a time and materials basis in accordance with the attached
rate scedule.
SCOPE OF WORK MODIFICATIONS
In the event the scope of work should change to a degree that would alter
this estimate, PBR will contact you in writing and a revised fee will be
established. Requests for additional work will be documented and a
completion time and estimated fee will be submitted for your approval .
BILLING
Client billing will be on a monthly basis predicated upon the percentage
of work completed during that billing period in accordance with the at-
1
Mr. Fred Talarico
June 28, 1983
Page Five
tached fee schedule. Invoices are due and payable within 30 days of
mailing and are considered delinquent thereafter. Delinquent invoices are
charged interest at a rate of 1.5 percent per month, or 18 percent per
annum.
STAFFING
Mr. Mitchell Brown will be responsible for the screencheck and final draft
documents and attendance at client meetings. To the extent required, Mr.
Brown will solicit technical input from other PBR staff to review the
proposed project.
We Took forward to working with you on this project and responding to the
needs of the City and applicant in a timely and cost-effective manner.
Should you have any questions regarding this proposal , please contact the
undersigned. Your signature below will indicate approval of this
proposal , which will thus serve as a binding contract.
Respectfully submitted,
PHILLIPSS ,BRRANDT REDDICK
AV�f le
Mitchell K. Brown APPROVED:
Director of Environmental Planning Fred Ta arico
Environmental Coordinator
MKB:cr 62-510 36E City of Newport Beach
Attachments DATE:
0
0 OT
/,
o� PHIWPS BRANDT REDDICK
RATE SCHEDULE
Effective February 1 , 1981I
Office Per Hour
President $95
Principals $70
Associates/Directors $52-$62
Project Managers/Project Planners/Project Designers $38-$46
Assistant Managers/Planners/Designers $30-$36
Graphic Designers/Research Analysts $24-$30
Graphic Production/Administrative Assistants/
Word Processing $20-$24
Clerical $18
Note:
1 . Travel , reproduction, materials and other non-wage costs at cost
plus 12% administrative charge.2
2. Rates for consultants in connection with appearance before courts
and/or commissions and councils or litigation will be $100.00 per
hour (four hour minimum).
3. Invoices are payable within thirty days of receipt. Payments not
received within thirty days will be charged interest at the rate
of 1 .5 percent per month for an effective annual rate of 18 percent.
IThese rates apply to all contracts signed after this date.
PLAN NINGhM6IqCW1R0VAg6A6% ARCNf? 4i& EAI7d MT0 ESEARCH
18012 SKY PARK CIRCLE - IRVINE, CA 92714 - (714) 641.8820 CALIFORNIA COLORADO HAWAII
8\D1 EAMACIYAWDARNELL, INC.
_ ENGINEERING AND PLANNING
Transportation, Traffic, Municipal, Transit
4262 Campus Drive, Suite B•1 Newport Beach,California 92660 (714)549.9940
June 28 , 1983
Mr. Mitch Brown
PBR
18012 Sky Park Circle
Irvine, CA 92714
Subject: Proposal to provide Traffic Engineering Services -
Avon Street Properties
Dear Mr. Brown:
Basmaciyan-Darnell, Inc. is pleased to present this proposal
to assist PBR in preparing the Expanded Initial Study for
Avon Street Properties. We have contacted the City Traffic
Engineer and discussed the project requirements. Based on
these discussions and our understanding of the area, we have
prepared the following Scope of Work? Project Budget and
Project Schedule.
Scope of Work
1. Project Initiation - Meet with City staff to discuss the
project objectives and study parameters.
2. Assemble previous studies and reports for the area.
3. Establish with City staff the land use parameters to
be analyzed for the area bounded by Coast Highway,
Avon Street? Riverside Avenue and Newport Boulevard.
For this work task, existing land use conditions and
future land use conditions will be summarized for
analysis purposes.
4. Utilizinct the land use data generated in Task 3
estimates of traffic generation to/from the area will
be estimated and distributed to the adjacent street
system. The traffic assignments will be made for the
following conditions with and without Avon Street ex-
tended to Santa Ana Avenue.
a. Raised Median constructed on Coast Highway
restricting access to right in/out.
Mr. Mitch Brown
PBR
June 28, 1983
Page Two
b. Parking on Coast Highway removed and 6-lanes
marked.
c. Future development restricted to access via
Avon Street with no access- to Coast Highway.
d. One other condition as deemed appropriate.
5. The previous studies and Specific Plan for the area will
be reviewed to estimate traffic that would use Avon Street
to access the Newport Heights area.
6. Traffic generation to/from the proposed residential develop-
ment will be estimated and added to the surrounding street
system.
7 . The data generated in Tasks 1-6 will be assembled and
analyzed to provide a discussion on the implications of
the proposed Avon Street cul de sac as well as the various
access alternatives identified in Task 4 .
B. A report will be prepared in appropriate format to provide
a summary of the analyses performed and their implications.
The report will generally include:
Existing Conditions
Land Use
Traffic
Future Conditions
Land Use
Traffic
Specific Plan Characteristics
Traffic Impact Analyses
Comparison and Changes in Traffic
Conditions resulting from the access•
scenarios identified in Task 4.
Impacts
Traffic Volumes
Commercial Uses on Coast Highway:
�I
Mr. Mitch Brown
PBR
June 28, 1983
Page Three
Access Via -Avon Street
Access Drives on Coast Highway
Coast Highway Widening Project
Adequacy of Avon Street
Emergency Access
Pedestrian Access
Local Circulation (ie connection to
Newport Heights)
Implications on Residential Uses
Project Budget
Basmaciyan-Darnell, Inc. proposes to perform the services out-
lined on a time and materials basis with a not-to-exceed maximum
of $3,500.
Project Schedule
The completion of the work will take five weeks from notice to
proceed. Assuming authorization to proceed is given the week of
July 4, the draft report can be completed and submitted on or
before August 8, 1983.
Please call me if you have any questions or need additional infor-
mation.
Sincerely,
BAASSMA`C, y
IeYAN-DARN L, INC.
O
Bill E. Darnell, P.E.
BE/ss
\ M
44
..A
lm � J
1
t.
_--.
�r..�.�-
��--1 PROPOSAL TO PREPARE.
EXPANDED INITIAL STUDY --
A VON STREET PROPERTIES
NEWPORT BEACH, CA
•
• PREPARED FOR :
PLANNING DEPARTMENT --
CITY OF
NEWPORT BEACH
e
PREPARED BY:
e
TDC PLANNING
770 SO. BREA BLVD,
e SUITE 204
BREA, CA 92621
•
JUNE 1983
PLANNING
27 June 1983
Mr. Fred Talarico,
Environmental Coordinator
Planning Department
CITY OF NEWPORT BEACH
3300 West Newport Boulevard
P.O. Box 1768
Newport Beach, California 92663-3884
RE: EXPANDED INITIAL STUDY -- AVON STREET PROPERTIES
Dear Mr. Talarico:
Enclosed is our proposal to complete the above referenced Expanded
Initial Study. We welcome this opportunity to submit a proposal for
your consideration. Briefly, our proposal is presented in the follow-
ing terms:
! • Introduction
• Areas of Analysis (Scope-of-Work)
• Estimated Fee
• Schedule of Submittals
• Participating Staff
We appreciate your comments on the proposal and any questions you
may have on the Scope-of-Work. Please feel free to call me at your
convenience.
Very truly yours,
Ralph Castaneda, Jr.
Principal
TDC PLANNING
RC:kh
Enclosure
r
II, 770 SOUTH BREA BOULEVARD • SUITE 204 BREA. CALIFORNIA 92621 • 714 / 990.2175
PROPOSAL TO PREPARE
t EXPANDED INITIAL STUDY
AVON STREET PROPERTIES
CITY OF NEWPORT BEACH
PREPARED FOR:
PLANNING DEPARTMENT
CITY OF EACH
300 WEST NNEWPORT EWPORT BBLVD.
P.O. BOX 1768
NEWPORT BEACH, CA 92663-3884
1
PREPARED BY :
TDC PLANNING
770 SOUTH BREA BLVD. , SUITE 204
BREA, CA 92621
•
CONTACT PERSON :
RALPH CASTANEDA, JR.
(714) 990-2175
27 JUNE 1983
f
INTRODUCTION
Several discretionary approvals are being requested from the City for
purposes of abandoning Avon Street and thereby facilitating the con-
struction of single-family homes. The nature of these discretionary
approvals encompass the following:
• Amendment of the Mariners Mile Specific Plan.
• Amendment of the City Zoning Ordinance.
• Abandonment/road vacation of a public street
. (Avon Street) .
• Resubdivision of property to establish lots for
single-family residences and public streets.
• Buiding permits and grading permits.
Located near Pacific Coast Highway and Newport Boulevard, the pro-
ject area is bounded by Avon Street on the south, Santa Ana Avenue
on the west, Cliff Drive on the north, and the edge of pavement of
existing Avon Street on the east. The project site is vacant and
undeveloped.
•
0
•
s
a AREAS OF ANALYSIS
Based on the RFP, general background information, a site visit, and
interviews with City staff, the following areas of analysis will be in-
cluded in the Expanded Initial Study:
• Land Use and Plans
• Traffic and Circulation
• Aesthetics
* • Noise
• Other Environmental Factors
The Scope-of-Work for each of these areas is described in the follow-
ing pages.
LAND USE AND PLANS
If Avon Street is abandoned, the project applicant (Mr. Pulaski) in-
tends to eventually construct single-family homes. Avon Street runs
parallel to Pacific Coast Highway. The Mariners Mile Specific Plan
indicates rear-loading for businesses that front on Pacific Coast High-
way in order to eliminate driveways on PCH. The project proposal
will impact this plan as the applicant proposes residences with a cul-
de-sac street for access. As a result, implementation of the Specific
. Plan (i.e. , extension of Avon Street) will be impacted.
We will evaluate the proposed project, as described in the foregoing
paragraphs, in relationship to its impact on implementation of the
following land use policy and development guidelines.
0 • General Plan
• Local Coastal Plan
• Specific Area Plan
• Specific Plan District
From a review of the documents, the following will be prepared:
• Inventory of present policies, guidelines, standards
affecting the future use or development of the Avon
Street properties.
• Summary matrix describing the above.
• Relationship of the proposed project to the inventory.,
r
Field surveys will be performed to identify the nature, location, and
intensity of existing land uses surrounding or impacted by the pro-
posed project. A map of existing land uses will be prepared. Re-
connaissance surveys indicate a variety of uses along Pacific Coast
Highway, such as a bank, auto dealership, and motel, and single-
family homes along Santa Ana Avenue.
The proposal will be thoroughly evaluated with respect to compati-
bility with existing land uses and uses proposed in the various
planning documents. The evaluation and impact analysis will be
considered in light of the research findings of the traffic and
noise consultants.
g
TRAFFIC AND CIRCULATION
This area of analysis, to be completed by Weston Pringle and Asso-
ciates, would consist of examining traffic factors related to the
proposed closure of Avon Street between Santa Ana Avenue and
Riverside Avenue in the Mariners Mile area of Newport Beach.
The study would consider the impacts upon traffic circulation in
the area that could result from closure of Avon Street, Proposed
plans for the improvement of Pacific Coast Highway also would be
included in the study. A report would be prepared summarizing
findings and recommendations related to traffic and circulation.
Three tasks are included in the Scope-of-Work, as follows:
Data Collection
Weston Pringle and Associates would assemble all available data per-
tinent to the study. This would include closure plans, related de-
velopment plans, Coast Highway plans, existing traffic volumes and
similar data. A meeting would be held with City staff to review the
project and obtain data and specific concerns. A field review would
be conducted to gain familiarity with existing conditions. (The
field data necessary for the entire study will be collected as part of
the Land Use Analysis.)
Analysis
The analysis would be directed toward identifying potential impacts
upon the circulation system due to the proposed closure. Specific
concerns include impact on delivery service to commercial facilities
on Pacific Coast Highway and the length of the proposed cul-de-sac.
Potential diversion of existing traffic to other streets would also be
considered along with other potential impacts upon the circulation
system of the area. Problems would be identified and mitigation
measures recommended, as may be required.
•
•
e Report and Meeting
A report would be prepared summarizing findings and recommendations.
The report would contain the required supportive data and be suitable
for Incluslon in the overall Initial Study report. A meeting would be
held with the City staff and othres as may be required during the
course of the study. (Attendance at public hearings is not included
t as a part of this proposal.)
AESTHETICS
This area of analysis includes, pursuant to the RFP, the following:
• Impacts on adjacent views.
• Compatibility of future residences with adjacent com-
mercial storage and loading areas.
! • Alteration of natural land forms.
• Landscape plans review.
During the land use surveys, photographs will be taken (for inclu-
sion in the study) of existing conditions. These photographs will
40 include the project site from different locations; adjacent commercial
storage/loading areas; existing residences along Santa Ana Avenue
and Cliff Drive; existing views from the areas affected by the pro-
posed project; and others as appropriate.
Analysis of aesthetic impacts will be accomplished in light of the
following:
• Design/visual/aesthetic policies and guidelines
found in the various planning documents.
• Existing conditions as defined through land use
surveys, photography, and supporting research
materials.
• Review and evbluation of the •project site, plan,
zoning standards, and landscape plans to ade-
quately pinpoint potential impacts.
NOISE
This area of analysis, in summary, includes:
• Determination of probable noise impacts to the
proposed residential development of the property
located at the previously planned intersection of
Avon Street and Santa Ana Boulevard.
• Prescription of generic noise control measures which
would be typically required for development in the
level of impacts determined.
Mr. Otto Bixier will be in charge of the noise analysis.
• To complete this assignment, the property of concern will be visited
and noise measurements will be made for both first and second floor
elevations. Second floor measurements will be made by extension of
the monitoring device to second floor heights abovegrade so that
second floor shielding may be examined (since frequently second
floors have views over walls and buildings to receive higher impacts
than first floors).
Simultaneously, traffic counts of Pacific Coast Highway will be made
to provide a traffic flow noise calibration. Based on existing ADT's
and future ADT's and traffic percentage classifications obtained from
the traffic consultant and/or CALTRANS, both existing and future
• years' 24-hour noise impacts will be calculated and corrected as
necessary by the on-site measurements performed.
Using these data, based on typical residential construction techniques
indiginous to the area, the type of noise mitigation measures that
would be required to obtain both indoor and outdoor noise/use com-
patibility will be described. Although specific building plans are
not going to be reviewed or mitigated by engineering design, the
City will be provided with sufficient information to assist the considera-
tion and guidance of development of this parcel.
OTHER ENVIRONMENTAL FACTORS
This area of analysis will include all other environmental factors re-
lated to Initial Studies as identified in CEQA guidelines. The analy-
sis will be incorporated and documented in the Expanded Initial
Study docyment.
�I •
•
ESTIMATED FEE FOR SCOPE-OF-WORK
DESCRIPTION ESTIMATED FEE
Project Management $ 840.00
t
Land Use s Plans 960.00
Traffic E Circulation 1,850.00
Aesthetics 700.00
Noise 525.00
Other Environmental Factors 150.00
Typing 150.00
A
Graphics 100.00
Reproduction/Binding* 150.00
Miscellaneous Expenses 125.00
TOTAL $5,550.00
•
•
f
L •
*Seven (7) Draft; 15 Final copies.
FEE SCHEDULE
This Expanded Initial Study is to be completed on a time and materials
basis with a not-to-exceed figure. The amount of $5,550.00 is the
not-to-exceed figure for the proposed project. The fee schedule for
the personnel to be involved in the project is as follows:
TDC PLANNING
• Ralph Castaneda, Jr. $45/hr.
• Linda Brown Brayton $25/hr.
WESTON PRINGLE E ASSOCIATES
•
• Firm Principal $65/hr.
9 Senior Engineer $50/hr.
Associate Engineer $30/hr.
• • Assistant Engineer $25/hr.
• Engineering Draftsman $25/hr.
• Field Supervisor $15/hr.
• Secretary $10/hr.
• • Clerical, field enumerator $10/hr.
OTTO BIXLER $60/hr.
•
1
•
•
SCHEDULE OF SUBMITTALS
TDC Planning will submit to the City of Newport Beach seven (7)
copies of the Draft Expanded Initial Study no later than 30 days
from the project go-ahead authorization. Upon staff review and
approval of the Planning Director, 15 copies of the Final Report
will be delivered to the City.
PARTICIPATING STAFF
• Ralph Castaneda, Jr.
TDC Planning, Project Management and Initial Study
Preparation
. • Linda Brown Brayton .
TDC Planning, Project Analysis and Initial Study
Preparation
• Weston Pringle and Associates
Traffic and Circulation Analysis
* • Otto Bixier
Noise Impact Analysis
Resumes of these individuals are included in the following pages.
•
•
•
•
•
•
TDC PLANNING
HOUSING AND URBAN PLANNERS
770 SO. BREA BLVD. SUITE 204
• BREA, CA 92621
(714) 990-2175
3�
RALPH CASTANEDA, JR. SPECIALIZATIONS
PRINCIPAL Housing Planning Environmental Analysis
Housing and City Planner General Plan Preparation ocal Coastal Planning unity Participation
•
r
EDUCATION
Master of City Planning • University of Research Assistant
University of California, Berkeley California, Berkeley New Towns
1970 Department of Project
Bachelor of Arts City Planning 1969
Political Science a County of Ventura Planner II
California State University, Fullerton Planning Planning Department
1967 Department Liaison to Local
Agency Formation
Agency
1967-1968
PROFESSIONAL EXPERIENCE
Planning Consultant
• TOO Planning Principal Teaching Experience
1980-1982 , University of Guest Lecturer,
. Castaneda-Berg Principal California Extension, "Social Elements
& Associates 1978-1980 Irvine, 1976 of the General Plan"
• Haworth & Principal Planner • University of Instructor,
Anderson, Ina 1976-1978 California Extension "Planning the
• Owen Menard Project Planner Irvine, 1972 Physical Environment"
& Associates 1975
• University of Assistant Coordinator,
• Haworth/Anderson/ Project Planner California Extension, "Urban Hous-
Lafer 1972-1974 Irvine, 1972 ing Workshops"
• Eugene Wheeler Project Planner • American Planning Moderator.
& Associates 1970 Association, Cal- "Housing Element
Chapter, 1982 Revisited"
MEMBERSHIPS
Public Planning National Association of Housing
• County of Orange Senior Program and Redevelopment Officials
County Administrative Planning Social Programs Advisory Committee
Office Analyst County of Orange
Forecast & Analysis 1975-1976 1978-1980
Center
• County of Orange Planner Ill Orange County Fair Housing Council
Planning Housing Element (former member)
(� Department Project Director Housing Coalition of Orange County
1970-1972 (former member)
•
RALPH CASTANEDA, JR. SPECIALIZATIONS
PRINCIPAL Housing Planning Environmental Analysts
Housing and City Planner General Plan Preparation Community Participation
Local Coastal Planning
• HOUSING PLANNING
HOUSING ELEMENTS HOUSING PROGRAM DEVELOPMENT
• City of Alhambra — 1981 • Hermosa Beach, California—Senior Citizens
• City of Anaheim — 1980 Housing Program, City of Hermosa Beach
• City of Barstow — 1977 • La Mirada, California—Senior Citizens Hous-
• • City of Brea— 1979 and 1982 ing Program, City of La Mirada
• City of Burbank— 1979 • Orange County, California— Housing Alloca-
lion Model Strategy Plan,Orange County Plan-
e City of Fullerton — 1973 ning Department
• City of Hermosa Beach — 1982 • Orange County,California—Housing Authority
• City of La Habra— 1981 Administrative and Implementation Proce-
• City of Lakewood — 1976 dures, Orange County Planning Department
• City of La Mesa— 1981 • Orange County, California — Housing Cost
• City of Montclair— 1972 Reduction Study and Program,Orange County
Environmental Management Agency
• City of National City— 1980 • Orange County, California — Housing Cost
• • City of Orange— 1974 Reduction Zone,Orange County Environmen-
• City of San Juan Capistrano—1977 and 1981 tal Management Agency
• City of Santee— 1982 • Orange County,California—Housing Program
• City of Whittier— 1982 Development Strategy for the Southeast
• City of Orange 1 1971 Orange County Housing Task Force, Orange
County 9 County Environmental Management Agency
• Orange County, California — Evaluation of
HOUSING ASSISTANCE PLANS State/Federal Programs and Formulation of a
• Colton Housing Program Plan,Mission Viejo Company
• Fontana • San Juan Capistrano, California — Housing
• Lakewood Opportunities Program:Alternative Strategies,
Programs, and Schedule, City of San Juan
• Santa Fe Springs Capistrano
• Westminster
HOUSING MARKET STUDIES
HOUSING NEEDS ASSESSMENTS • Brea,California—Apartment and Mobile Home
• City of Hermosa Beach (senior citizens) Markets, City of Brea
• City of La Mirada (senior citizens) • Orange County,California—Assisted Housing
• City of Montebello Feasibility Analysis, Cortez Development
• City of Simi Valley Company
• Southeast Orange County Housing Task Force • Orange County, California — South Coast
• Mission Viejo Company Housing and Commercial Market Study, Or-
pan y ange County Environmental Management
Agency
HOUSING CONDITION SURVEYS • San Diego, California — Regional Housing
• City of Alhambra Market Analysis: 1980 Short Term Projections,
• City of Anaheim Comprehensive Planning Organization of the
• City of Brea San Diego Region
• City of La Habra
• City of Santee
•
•
COMMUNITY PARTICIPATION
ADDITIONAL STUDIES/RESEARCH ADVISORY COMMITTEES
• Alhambra, California — Community Urban • City of Anaheim — Housing Element
Blight Analysis, City of Alhambra • City of Brea— Housing Element
• Laguna Beach,California—Housing Element • City of Brea— Open Space Element
Review, Rutlin &Tucker • City of La Mesa — Housing Element
• Montclair, California — Impact of Subsidized • City of Lakewood— Housing Element
Housing on Property Values,City of Montclair • City of Orange — Housing Element
• Orange County, California— Impact Analysis of Section 236 Housing Developments, Or-
• City of National City— Housing Element
•
ange County Planning Department • County of Orange— Dana Point Specific Plan
• Ventura County, California — Mobile Home • County of Orange—Southeast Orange County
Park Development: Issues and Opportunities, Housing Task Force
Ventura County Planning Department • County of Ventura — Ventura Avenue Land
Use Study/Neighborhood Plan
WORKSHOPS
GENERAL PLAN PREPARATION • City of La Habra— Housing Element
GENERAL PLAN ELEMENTS • City of Hermosa Beach—Senior Citizen Hous-
ing Program
• Brea,California—Open Space Element of the • City of Hermosa Beach — Local Coastal Pro-
General Plan, City of Brea gram/Phase III
• Orange County,California—Dana PointSpeci- • City of a Mirada — Senior Citizen Housing
fic Plan, Orange County Environmental Man- Program
agement Agency
• Stanton,California—Land Use Element of the PARTICIPATING MEMBER
General Plan, City of Stanton
• Upland, California — Consolidated General • City of Yorba Linda — Capital Improvements
Plan, City of Upland Committee
• County of Orange—Social Programs Advisory
ADDITIONAL STUDIES/RESEARCH Committee
• Fort Yuma,California— Fort Yuma West Land • Housing Coalition of Greater San Diego
Use Plan, Ouechan Tribal Council • Orange County Fair Housing Council
• Orange County,California—Capistrano Beach • Orange County Housing Coalition
Reconnaisance Study,Orange County Environ- • Orange County Housing Opportunity, Inc.
mental Management Agency
• Orange County, California — Tustin Islands • State of California, Attorney General's Office
Neighborhood Strategy Area Study, Orange — Subcommittee on Housing of the Environ-
County Environmental Agency mental Task Force
• San Juan Capistrano,California—Initial Plan-
ning Data System, City of San Juan Capis-
trano
• Santa Ana, California — Logan Barrio Land
Use Plan, City of Santa Ana
• Seal Beach, California — Population, Demo-
graphic and Housing Analyses for Land Use
Plan, City of Seal Beach
• Ventura County, California—Ventura Avenue
Land Use Study/Neighborhood Plan,Ventura
County Planning Department
•
•
ENVIRONMENTAL
IMPACT REPORTS
GENERAL PLAN ELEMENTS INITIAL STUDIES
• Brea, California — Housing Element of the • Brea, California — Carden Day Care Facility,
General Plan, City of Brea City of Brea
• Brea,California—Open Space Element of the • Brea, California — Church of the Nazarene
General Plan, City of Brea Day Care Center, City of Brea
• Dana Point,California—SpecificPlan,Orange • Brea, California — Christ Lutheran School
County Environmental Management Agency Expansion, City of Brea
• Anaheim,California—Housing Element of the • Brea, California— Circulation Element of the
General Plan, City of Anaheim General Plan, City of Brea
• La Habra,California—Housing Element of the • Brea,California—SurplusPropertiesDisposi-
General Plan, City of La Habra tion, City of Brea
• La Mesa,California—Housing Element of the • Upland, California — General Plan Elements,
General Plan, City of La Mesa City of Upland
• National City,California—Housing Elementof
/ the General Plan, City of National City
RESIDENTIAL PROJECTS LOCAL COASTAL PLANNING
• Baldwin Park California — Section 8 Apart-
ment Housing, City of Baldwin Park • Hermosa Beach, California — LCP Phase III:
• Brea,California—Brea Hollow Condominiums, Implementing Actions,City of Hermosa Beach
City of Brea • Imperial Beach,California—LCP Issue Identi-
• Brea, California — Hong Enterprises Condo- fication, City of Imperial Beach
miniums, City of Brea • Orange County,California—Dana Point Speci-
• Brea,California— Laurel Townhouses,City of fic Plan:Issue Identification,Land Use Policies,
• Brea Implementing Actions, Orange County Envi-
• Montclair, California — Montclair Gardens ronmental Management Agency
Section 236 Apartment Development, City of
Montclair OTHER PLANNING PROJECTS
• Simi Valley,California—Tentative Tract3177,
City of Simi Valley • Orange Cuonty,California—Land Use Regula-
ADDITIONAL PROJECTS tions:Dana Point Specific Plan,Orange County
• Brea, California — Apollo/Tamarack Office- Environmental Management Agency
Industrial Condominiums, City of Brea • Orange County, California— Paratransit Ser-
• Brea,California— Brea Business Park,City of vice&Financial Study,Orange County Transit
Brea District
• Brea,California—Brea-OlindaFriends Church,
City of Brea
• Brea, California— Econ-O-Lube'N Tune, City
of Brea
• Brea, California — Founders National Bank,
City of Brea
• Brea,California—Off ice Condominium,Lot17
of Tract 10129, City of Brea
• Brea, California — Palm Commerce Centre,
City of Brea
• Brea, California — Redevelopment Agency
Area A-2, City of Brea
• Brea,California—Union'76 Research Center,
City of Brea
LINDA BROWN BRAYTON SPECIALIZATIONS
ASSOCIATE Environmental Analysis Site Plan Review
Environmental Planner General Plan Preparation Ordinance Preparation
EDUCATION PROFESSIONAL EXPERIENCE
Master of Arts Planning Consultant
Social Sciences
California State University, Fullerton a TOO Planning Associate
1977 1982-present
Secondary Teaching Credential a Chambers Consultants Environmental
California State University, Fullerton 8 Planners Planner
1974 1978-1980
Bachelor of Arts Public Planning
Sociology a City of Brea Junior Planner
California State University, Fullerton 1977.1978
1973 — -
MEMBERSHIPS
American Planning Association
Association of Environmental Professionals
>1
D
-
LINDA BROWN BRAYTON SPECIALIZATIONS
ASSOCIATE Environmental Analysts Site Plan Aeview
Environmental Planner General Plan Preparation ordinance Preparation
ENVIRONMENTAL
IMPACT REPORTS
GENERAL PLANS/SPECIFIC PLANS SPECIALIZED PROJECTS
• Orange County, California — San Clemente/ • Huntington Beach, California — Focused EIR
San Juan Capistrano Circulation Study, for Warner Avenue Relief Sewer,City of Hunt-
Orange County Environmental Management ington Beach
Agency • Brea, California — Residential Care Facility,
• Pismo Beach, California — Seascape Village City of Brea
Specific Plan, City of Pismo Beach • Santa Barbara California—LasPositasRegion-
• San Juan Capistrano, California — Master al Park City of Santa Barbara
Plan of Historic Downtown, City of San Juan
Capistrano
RESIDENTIAL PROJECTS ADDITIONAL PROJECTS
• Brea, California — Cardinal Point Condomin- • Los Angeles,California—Co-author of Scope
iums, City of Brea of Work Document for EIR/EIS for the 1984
• El Monte,California—Twin Lakes Condomin- Olympic Games, City of Los Angeles, Depart-
turns,iums, City of El Monte ment of Parks and Recreation and U.S. Army
• La Canada Flintridge, California — Focused Corps of Engineers
EIR for a 17-Unit Residential Subdivision,City • San Clemente, California — Technical Spe-
of La Canada Flintridge cialist for Feral Animal Removal Program:San
• San Juan Capistrano, California — 77-Unit Clemente Island, U.S. Department of the Navy
Planned Residential Development,City of San • Santa Barbara, California — Technical Spec-
Juan Capistrano ialist for Environmental Assessment/Environ-
• Santa Barbara, California— Focused EIR for mental Impact Report for Natural Gas Platform:
Holmcrest Road Residential Subdivision, City Santa Barbara Channel,County of Santa Bar-
of Santa Barbara bara
COMMERCIAL PROJECTS ENVIRONMENTAL
• Brea; California — Brea Imperial Shopping ASSESSMENTS
* Center, City of Brea
• Brea,California—Imperial Business Park,City • Downey,California— Bus Maintenance Facil-
of Brea ity, Southern California Rapid Transit District
• Brea, California—Old West Office Plaza, City • Oceanside,California— Expansion of Ocean-
of Brea side Harbor, U.S. Corps of Engineers
• • Brea, California—Tentative Tract No. 10798, • San Clemente, California — Technical Spe-
City of Brea cialist for Environmental Assessment of Con-
• San Juan Capistrano, California — Focused tinuing Naval Operations at San Clemente
EIR for Ganado Office Complex, City of San Island, U.S. Department of the Navy
Juan Capistrano • Technical Specialist for Marine Mammal Sur-
INDUSTRIAL PROJECTS vey, Naval Ocean Systems Center
• • Brea,California—BreaTowerslndustrialCom- • Technical Specialist for EIR/EIS for Explora-
plex, City of Brea tory Drilling Operations, Lease PRC3314.1
(Pierpont)
• Brea, California — Industrial Subdivision at
Tamarck Avenue and Lambert Road, City of
Brea
• • Brea, California — Palm Commerce Center,
City of Brea
•
URBAN PLANNING
• Brea, California — Summary of Residential
Development Standards: Housing Element Re-
vision Program, City of area
• Hermosa Beach,California—Apartment Suit-
ability Evaluation and Design Standards Re-
view: Senior Citizen Housing Study, City of
Hermosa Beach
• Buena Park, California — Permit Processing
for a 28•Unit Condominium Project, Group
Realty Services
• • Hanford, California— Permit Processing for a
Concrete Batch Plant,Hanford,Charles Oliver
• la Mirada,California— Permit Processing for
a Commercial Development, Shapell Indus-
tries
• • Stanton,California—Justification of Proposed
Documents for Annexation 8o,City of Stanton
•
•
•
0
WESTON STEWART PRINGLE
Registered Professional Engineer:
State of California
•
Fellow, Institute of Transportation Engineers; Member, American Society of
Civil Engineers; President, Southern California Section, Institute of Trans-
portation Engineers; Secretary-Treasurer, Western District,- Institute of
Transportation Engineers; Delegate, Program Development Conference, Institute
of Transportation Engineers; Member, Special Publications Committee, Institute
of Transportation Engineers; Senior Editor, "Technical Notes", Institute of
Transportation Engineers.
•• Institute of Transportation Engineers Technical Committee Activities: Parking F
Facilities for Industrial Plants; Traffic Improvement Data Collection Guidelines; z and Traffic Characteristics and Considerations for Tomorrow's•Airports.
Mr. Pringle has had a varied experience in both the planning and operational
fields of traffic engineering. Some of the projects with which he has been
involved include:
• Transportation Planning - circulation and transportation elements of general
plans for cities; freeway location and impact studies; access, circulation and
parking systems for industrial plants, airports, central business districts,
colleges, shopping centers and other developments; traffic impact analysis for
environmental impact reports.
Traffic Operations - TOPICS areawide plan studies for eleven cities; traffic a
signal and traffic signal system design; parking studies; street and parking
lot lighting designs; school safety programs; access, circulation and parking
studies for commercial, residential, and public developments.
• In 1971 Mr. Pringle participated i,n the Institute of Transportation Engineer's
Study Mission to Europe and Moscow. This included an opportunity to study t
traffic and transportation in Munich, Berlin, Paris, Moscow and London, and
provides a valuable addition to his experience.
Educational Qualifications: California State University - Fresno, Bachelor of
Science in Civil Engineering, 11960; Certificate, Municipal Public Works Admin-
istration; Lecturer in Transportation and Traffic Engineering, California State
Polytechnic University, Pomona.
From 1960, Mr. Pringle has been Civil Engineering Assistant, City of West Covina;
I� Assistant Traffic Engineer, Traffic Engineer and Associate Civil Engineer, City
of Downey; Principal Engineer, Wilbur Smith and Associates, Consulting Engineers,
Los Angeles; Vice President of Lampman and Associates, Consulting Engineers
Pomona; and Vice President, Cromelin-Pringle and Associates, Inc., Placentia. {
. 1
j
,
TRAFFIC STUDY
FOR
1 '
1 AVON STREET PROPERTIES
1
1
1
1
�1
iPrepared by :
' BASMACIYAN-DARNELL, INC.
II �
1
1
I
' TRAFFIC STUDY
FOR
AVON STREET PROPERTIES
Prepared for:
PHILLIPS BRANDT REODICK, INC.
' 18012 Sky Park Circle
Irvine, CA 92714
Prepared by:
' BASMACIYAN-DARNELL, INC.
4262 Campus Drive, Suite B-1
t Newport Beach, CA 92660
(714)549-9940
' November 17 , 1983
' TABLE OF CONTENTS
PAGE
' INTRODUCTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
Project Description: : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . 1
EXISTING CONDITIONS . . . . .1
' Roadway Characteristics. . . . . . • • • . . . . . . . . . . . . . . . . . • • . • 4
Intersection Capacity Analysis. . . . . . 6
' PROJECT-RELATED TRAFFIC. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Trip Generation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
' Trip Distribution. . . . . . . . . . . . . . . .
TRAFFIC PHASING ORDINANCE. . , . . . . . . •7
' FUTURE TRAFFIC CONDITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Future Traffic •Volumes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
' Analysis of Avon Street Alternatives. . . . . . . . . . . . . . . . . 9
Summary of Evaluation of Avon Street Alternatives. . . 17
Capacity Analysis. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
' AVON STREET DESIGN CONSIDERATIONS. . . . . .-. . . . . . . . . . . . . . . . . 21
Avon Street Properties Cul-de-Sac of Avon Street. . . .22
' Avon Street Extension to Santa Ana Avenue. . . . . . . . . . . 22
SUMMARY OF FINDINGS AND CONCLUSIONS. . . . . . . . . . . . . . . . . . . . . .23
APPENDIX A
APPENDIX B
LIST OF TABLES
' Table No. Description Page No.
1 Existing ICU and Level of Service (Los) . . . . . 6
' 2 Summary of Trip Generation Characteristics. . 6
3 Estimated Tripmaking to/from the Proposed
Project. . . . . . . . . . . . . 7
. . . . . . . . . . . . . . . . . . . . .
4 Avon Street Alternatives Traffic Volume
Summary. . . . . . . . . . . . . . . . . . . . 16
5 Summary of Daily Raodway CapacityAnalysis. . 18
6 Comparison of Coast Highway Traffic Volumes.21
LIST OF FIGURES
Page No.
Figure No. Description
1 Project Location. . . . . . . . . . . . . . . . . . . . . . . . . . 2
2 Project Vicinity. . . . . . . . . . . . . . . . . . . . . . . . . . 3
3 Existing Average Daily Traffic Volumes. . .5
4 Project-Related Traffic. . . . . . . . . . . . . . . . . . . 8
5 Base Condition. . . . . . . . . . . . . . . . . . . . . . . . . . . 10
6 Alternative A-1. . . . . . . . . . . . . . . . . . . . . . . . . . . 11
7 Alternative A-2. . . . . . . . . . . . . . . . . . . . . . . . . . .
12
8 Alternative B-1. . . . . . . . . . . . . . . . 13
9 Alternative B-2. . . . . . . . . . . . . . . . . . . . . . . . . . . 14
10 Proposed Avon Street Cul-de-Sac. . . . . . . . . . .
19
11 Location of Avon Street Exnteded Through
Avon Street Properties Parcels. . . . . . . . . .20
TRAFFIC STUDY
FOR
AVON STREET PROPERTIES
INTRODUCTION
' The purpose of this study is to examine the traffic related
impacts associated with the development of seven (7) residential
properties on Avon Street, Santa Ana Avenue and Cliff Drive. In
' conjunction with the project, it is proposed that Avon Street be
extended west from Riverside Avenue to terminate in a cul-de-sac
just east of Santa Ana Avenue. Because in earlier planning by
' the City Mariners' Mile Specific Plan) the connection of Avon
Street to Santa Ana Avenue has been considered, the implications
of the cul-de-sac on Avon Street must be addressed.
' In this report, the existing conditions for the area are
discussed, including traffic volumes, roadway configurations and
intersection capacity utilization ( ICU' s) . Also included is an
' analysis of future traffic conditions based on several scenarios
involving the extension of Avon Street and improvements to Coast
Highway.
' PROJECT DESCRIPTION
The project site lies north of Coast Highway and is bounded by
Newport Boulevard on the west, Cliff Drive to the north, Avon
Street on the south side of the properties, and Riverside Avenue
on the east. The project applicant proposes that Avon Street be
extended west from Riverside Avenue as a cul-de-sac to provide
access for five of seven residential dwelling units that are
' planned for the area. Two parcels would have access via Cliff
Drive.
' Figure 1 is a map depicting the proposed project location from a
regional perspective. Figure 2 is a vicinity map showing the
project site, with the seven proposed single family residential
sites identified, and the immediately surrounding area.
' EXISTING CONDITIONS
The existing land uses in the area are commercial (various types,
primarily marine-related commercial enterprises, restaurants, and
other retail/commercial) along Coast Highway and single-family
' residential to the north of Avon Street and Cliff Drive in the
Newport Heights area. Ths U.S. Post Office, at the corner of
Riverside Avenue and Avon Street constitutes another major land
use category.
Access to the area is provided primarily by Coast Highway,
Newport Boulevard, Riverside Avenue and Avon Street. Additional
' access will be provided via Cliff Drive and Santa Ana Avenue. The
1982 average daily traffic (ADT) volumes for the roadways in the
' 1
p0 ; 6 Ca us Drive
O
9 0 of
61rch Street ;
��i OFF a pG C w
A Q m °
`ep
K �
P
Bristol Street
� a
•
Del Mar Avenue universit
0
O99 9O°° F e Drive 6onits Can
a
�4t`y y ° Upper
19O New p
COSTA MESA 22nd Street ort
Bay Drive
r•
•
N c Drive �
• rd Roa
NEW FIT
loth Street. AC °
O o
PROJECT : 0 Ban JoapuinHills Road
s SITE 171111 street °00
r' m Street
c < D trs c m 1ph 1 a CORONA n
9 e = �9`�• c u ° o o DEL MAR
• tP ° ' .'• ° Bays s
Avon• °
o > A
° COAST ` h��hiY i CL �
PACIFIC Ay ac 0
? •
° or
Balboa Boulevlyd
Pacific Ocean
Avocado Avenue
FIGURE 1
BASMACIYAN•bARNELI,INC. PROJECT LOCATION
43 1,
H..r.l.F4J Yliw
pl41q H9"yf"JY
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
N
not to scale
STREE7
w
z
w
4
2J� m
9
w PV ON w
�2P �
III
5�
HIGHWAY
,GOPS�
® LOCATION OF PROPOSED DEVELOPMENT
(Avon Street Properties)
FIGURE 2
BASMAC4YAN DARNELL,INC. PROJECT VICINITY
1261 U.P.Om.,B ft B 1
Ne.pon Bean.W dwMa 92M
17111 549 040 I,
vicinity of the project are presented in Figure 3. These traffic
volumes represent average winter weekday volumes. Also presented
on Figure 3 are the 1980 average summer weekday traffic volumes
' on Coast Highway and Newport Boulevard. It should be noted that
the major roadways in the area experience a higher daily volume
during the summer months.
' Roadway Characteristics
' The following is a description of existing roadway
characteristics.
Coast Highway (SR-1 ) is classified as a major arterial in the
Master Plan Circulation Element for the City of Newport Beach.
Between Newport Boulevard and Tustin Avenue there are three
westbound and two eastbound travel lanes along Coast Highway.
There is a two-way left-turn lane between Newport Boulevard and
Riverside Avenue and a raised median between Riverside and Tustin
Avenues. Left turn pockets are provided in the eastbound
' direction at Riverside and Tustin Avenues. Curbside parking is
allowed except on the southside of Coast Highway between Newport
Boulevard and Riverside Avenue.
' Newport Boulevard ( SR-55) northerly of Pacific Coast Highway is
a six-lane divided facility with turning lanes at Hospital Road.
It is grade separated at Coast Highway.
' Riverside Avenue is constructed as a 56-foot roadway from curb to
curb and is striped to provide two through lanes plus a bike lane
' in each direction. Northerly of Avon Street the roadway is
channelized to provide one through lane plus a bike lane in each
direction.
' Tustin Avenue is constructed to provide one through lane in each
direction with curbside parking allowed.
' Avon Street at the present time has a right-of-way of 40 feet and
provides one travel lane in each direction. Presently the
roadway is improved for a distance of about 400 west of Riverside
' Avenue. The remainder of the roadway is graded but unimproved.
Avon Street between Riverside Avenue and Tustin Avenue provides
one travel lane in each direction and parking on both sides of
the roadway.
Old Newport Boulevard is a north-south facility and provides one
travel lane in each direction with curbside parking allowed on
' the easterly side.
Santa Ana Avenue near Old Newport Boulevard is constructed at a
' 10% grade and provides one through lane in each direction.
Cliff Drive is a residential street constructed to provide one
' travel lane in each direction and curbside parking.
4
0
a0c, a
�r �o
• o � a
c e
m e a a C
e e
w o
s�
m
D
m I�VOWN
u
� Street
a
m
Z Pacific Coast ff/96W
53/39 47/45
no scale 47/45
N 52/48 LEGEND: 61/59'
33/28 XX/YY-DAILY TRAFFIC VOLUMES
XX-VOLUMES REPRESENT AVERAGE SUMMER
WEEKDAY VOLUMES (CITY OF NEWPORT BEACH
TRAFFIC FLOW MAP 1986)(IN THOUSANDS)
2/51 YY-VOLUMES REPRESENT AVERAGE
44/37 WINTER WEEKDAY VOLUMES
(CITY OF NEWPORT BEACH TRAFFIC FLOW MAP
1982)(IN THOUSANDS)
FIGURE 3
"'"'""Y""°^""k" '"` EXISTING AVERAGE DAILY TRAFFIC VOLUMES
114t U WpN YI1•[.]uil[O 1
N[wpJll O[I\II•WMNN['J16f0 ',
' Intersection Capacity Analysis
' The intersections of Coast Highway at Riverside and Tustin
Avenues are considered critical to traffic flow in the project
area. Accordingly, the capacity for each was evaluated using the
Intersection Capacity Utilization (ICU) method.
' Using the existing peak hourly turning movement counts and the
existing geometrics for these two signalized intersections, the
' ICU for each intersection was calculated for the afternoon peak
hour condition. The results of these calculations are summarized
in Table 1 . Based on the ICU computation, both intersections
' operate at satisfactory levels of service under present
conditions.
The ICU value for an intersection is a measure of the portion of
' an intersection' s total capacity that is being, utilized by the
traffic volumes. The resultant ICU can then be related to the
level of service (LOS) to determine the quality of traffic flow
' through the intersection. The ICU calculations and a description
of levels of service are in Appendix A.
' TABLE 1
EXISTING ICU AND LEVEL OF SERVICE (LOS )
Intersection PM Peak Hour
' ICU LOS
Coast Highway at:
' Riverside Avenue 0.7731 C
Tustin Avenue 0.6764 B
PROJECT-RELATED TRAFFIC
Trip Generation
' Trip generation to/from the project site is based on studies
conducted for similar developments, tripmaking rates published by
' the Institute of Transportation Engineers and studies conducted
by the City of Newport Beach. The trip generation- rates used in
this study for the project site are presented in Table 2.
t TABLE 2
SUMMARY OF TRIP GENERATION CHARACTERISTICS
' Trip Generation Rates per Dwelling Unit
Land Use Daily AM Peak Hour PM Peak Hour
' IN OUT IN OUT
Residential (Single
' Family detached
Dwelling Units ) 12. 0 0 . 3 0. 6 0. 6 0. 4
6
' Applying the trip generation rates presented in Table 2 to the
residential land use proposed for the project site, tripmaking
' for the proposed project has been estimated. Table 3 is a
summary of the total estimated tripmaking for the proposed
project.
' TABLE 3
ESTIMATED TRIPMAKING TO/FROM THE PROPOSED PROJECT
' Estimated Trip Ends (a)
Land Use Daily AM Peak Hour PM Peak Hour
IN OUT IN OUT
' Seven ( 7) Single Family
Detached Dwelling Units 84 2 4 4 3
' (a) A trip end is a one way movement to/from a land use.
' Trip Distribution
The trip distribution characteristics of the site have been
developed taking into consideration the spatial orientation of
' possible attractors of tripmaking in the surrounding vicinity and
the adjacent street system. Based on the trip distribution
assumptions, trips estimated to be generated by the proposed
project were then distributed to the roadway system for daily,
morning peak hour and afternoon peak hour conditions. Figure 4
presents the project-generated traffic volumes on the surrounding
' streets.
TRAFFIC PHASING ORDINANCE (TPO)
' The City of Newport Beach . Traffic Phasing Ordinance (TPO)
requires the review of potential external traffic impacts on
' critical intersections for any office, industrial or. commercial
development of 10 , 000 square feet or more and any residential
development of 10 dwelling units or more. The proposed project
' consists of a total of seven (7) dwelling units, therefore is
exempt from the Traffic Phasing Ordinance regulations.
' FUTURE TRAFFIC CONDITIONS
A recent upate of the City of Newport Beach traffic circulation
' model, based on the City' s "Trend-Growth" scenario and the City' s
Master Plan Circulation Element, was used as the data base for
the future traffic conditions analysis. in order to examine the
Mariners` Mile area in detail, a section of the City' s Model
(Traffic Analysis Zone 43 ) was "windowed out" for analysis, and a
subarea model was developed. The Mariners ' Mile area was
subdivided into 20 analysis zones, based on access and land use
' considerations. Detailed land use estimates (based on "Trend
7
•
� s c
yCb C b �
N C i
y
C
PQO� [0
0�Q\�Q "o 12
`
T
m
7
0 pvon _
03 o �. ylb v Street
\�•\ eol
Z a Paclflc Coast ylDhway
no scale 931313 2�/7/
7
N
LEGEND
XX/YY/ZZ DAILY/AM/PM
NOTE: Traffic to/from lots served by Cliff Drive not shown.
NNK FIGURE 4
aa5"'"C'IYA"°a"""`•INC. PROJECT RELATED TRAFFIC
Ne..Ym.wa.n,umwnl.'l:060 '.
Itlq N9 Y9W
Growth" ) for each zone was provided by the City of Newport Beach
Planning Department. Cordon Stations around the Mariners' Mile
area were designated to simulate the traffic flow through
' Mariners' Mile and the traffic that travels to/from Mariners" Mile
and the remainder of the modelling area. Different circulation
scenarios were then examined to assess the implications of such
' matters as constructing Avon Street and placing median barriers
on Coast Highway.
' The subarea model was processed on a micro-computer to allow for
the analysis of many different alternatives. The MINUTP computer
software package was used. MINUTP is similar in nature and
function to software packages used for large main-frame
computers, such as UTPS, PLANPAC and TRANPLAN.
Future Traffic Volumes
' Presented in Figure 5 are the future traffic volumes for the
project area if Avon Street were extended to Santa Ana Avenue to
' form a "T" intersection, in accordance with the Mariners' Mile
Specific Plan. Outside the Mariners' Mile area, the arterial
streets included in the City' s Master Plan Circulation Element
are assumed to be in place. Traffic estimates reflect the "Trend
' Growth" scenario. The future traffic volumes and street system
depicted in Figure 5 are referred to as the base condition. )
Under this base condition, Avon Street would have traffic volumes
' of approximately 2500 vehicles per day.
Analysis of Avon Street Alternatives
' Since the project applicant has proposed that Avon Street
terminate at a cul-de-sac, a change to the Mariners' Mile
Specific Plan would be required. To assess the implications of
' such a change, a series of four alternatives , with various
assumptions for Avon Street and access to/from Coast Highway,
were analyzed. These alternatives are described below and are
' presented graphically in Figures 6 through 9.
Alternative A-1 : (Figure 6 ) Avon Street extended west from
' Riverside Avenue with a cul-de-sac just east of Santa Ana Avenue.
Alternative A-2: (Figure 7) Same as Alternative A-1 except with
a median on Coast Highway between Old Newport Boulevard and just
' east of Tustin Avenue.
Alternative B-1 : (Figure 8) Avon Street extended from Riverside
' Avenue to Santa Ana Avenue (Base Condition) plus a median on
Pacific Coast Highway between Old Newport Boulevard and just east
of Tustin Avenue.
Alternative B-2: (Figure 9 ) Same as Alternative B-1 plus Avon
Street extended east from Tustin Avenue to approximately 900 to
1000 ft. , then to curve southerly and form a "T" intersection
with Coast Highway. With this alternative it would be possible
to travel on Avon Street between Coast Highway (from a point
' 9
•
83.8 0i
n • � >o
J
"ram 6.1 O a0 6.4
C
� � a 3.1 j
13.5 't Q 8.4
`a`QC a ( � 4.1 h 3.1 10.6
16.0
0
9.5
�0 O
2.0
mM V0p 2.6 9.4 1.0
15.9 1.3
1-' O / 'J 6 Street
o G
3 1 17.5 •6 4.3
0 38.9
Z w ^r --30.2 —30.2
e a - p1 3 98.6 29.0 � 29.6 _ Coast H18hway ` 27.1
18.4
no SCflle 6 r .Ir
N3.1
12.5 17
03 LEGEND
/fig 0 ' '� XX.X DAILY. TRAFFIC IN THOUSANDS
`L6'3 r J
m W
� h
i co
ti
FIGURE 5
BASMACIY.1„1„NNEL ,INC. BASE CONDITION
AVON STREET EXTENDED TO SANTA ANA AVENUE
Ne.pun fiOJI•IaNIW N.Y16G° i
pNl N9 y9JU ",.
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
a
a c
83.8
a , �
.c 5.1 m D 5.4
F a 3.1 a
2.8
3.1 e
m
C
to 10.6
a
2,8 a a
0 a t4
0 a
is Q. � .o
m ai 2,0
mN
M V oi\ 1.3 9.4 1.0
� a
.4
14.3 1.23ff@@t.6
3a 17,8 4,4
Z a 39.6 — 30.2 —30.2 oast m 3.1 Ffj
m
al N 17.4 f AA 6 38.4 28.7 29.8 9hw 27.1
no scale , 9 A-0
5.0 3.8 .y1 28.0 —
N
1y 6
929 14.8 13.1 LEGEND
DAILY TRAFFIC IN THOUSANDS
�0 6
v 3 7.1
m a
t r•
co
`D\ FIGURE 6
BASMAI'IYAN U4NNk1 L,INC. ALTERNATIVE A-1
Rolumyut U.u.,5wN81 AVON STREET AS A CUL DE SAC
Nenpon Y.wM1,u4twm.•J:EEO ,
OHI H9 Y9iY
0
aoc, a
c o
83.6 a C
`c6 6.1 C a 5.4 V
F a q � 3.1 m
op Q a C
12.6 ' 3.1 Q
19 m 8,4
..
oaa a a W 10.6 a
2.6 y 16.0 9.5
m 2.0
G Op 1.7 9.4 1.0
Cm16.0 .8 15.6
'L O Street-5
n� C , 3.1
N
18.1
M 44.1 30.2 4 31.2
i 16.B�A31 46.4 29.7130.7 Coast f!/gnK,By ` 27.1
6.0 6.6
no So81e �
.y9 6 A2 6 2
N 6.
136 LEGEND
DAILY TRAFFIC IN THOUSANDS
17.1 iy
,$6
7,1
26-
CO
t
�a CO
I
\�\ FIGURE 7
ALTERNATIVE A-2
BA5A1ACYA"°A""°" INC.
AVON STREET AS A CUL DE SAC
134$l•mym Ouw,Swu°1 li
WITH A MEDIAN ON COAST HIGHWAY
plq H9 f9N ��.
0
� a c
F w` 5.4 ti
3.1 a
3.5 V 8.4
C
0�a 6 < 4.1 10.5
Q` a 18.0 9.6 '
C�Q``a�
.0
C ,. p 3.1 9.4 1.0
to 1 �V0 1.3
0 16.7 3.3 Street
'e
a It
m p 2 9 17.8 4.3
4.3
Z co 42.8 —30.2
3Y.2
0 Coast
30.7
00 8C8I8 6.0
N 15. 2$6 39 9 26.6—
.��6 LEGEND
14.6 12.3 DAILY TRAFFIC IN THOUSANDS
1a 6
7.1
26 3 f
to
i
FIGURE 8
ALTERNATIVE B-1
BA'"'"""A""°"""`''"` AVON STREET EXTENDED TO SANTA ANA .AVENUE
WITH A MEDIAN ON COAST HIGHWAY
pNI HY YW°
c o
83.6 a c
�c0 C b 8.4
3.1
F 6,1 a q w o
3.6 e Q
� w •
a o, 3.1 16.0 10.5 a
ro
Q°Oa a j 4.1 .: 8.4
i
2.0
O
m . 16.7 -9.4 1.0
Ly 1.8
F 6 3.3 /�yOfi 3.1 StfAAt.B 2.4
2,9
17.6 3.1 3.1
m
Z a 4.3 r 42.8 -30.2 -30.4 COAat
0 0
�a 18.7 R26 39.9- 29.4 - 29.9 28 8 N19hWaY- 27.1
no Scale g 25.4 y
286 gg.N 6.0 6.1 26.6-
-,3 3
14.8 cy
1$6
a
\D\ FIGURE 9
Y ALTERNATIVE B-2
OASMACII DARNELL•INC AVON STREET EXTENDED WEST TO SANTA ANA AVENUE AND EXTENDED
1143 umpm Ulue.Su.i.B 1
EAST TO COAST HIGHWAY WITH A MEDIAN ON COAST HIGHWAY
UHI p+v vsm
i
' about 900 to 1000 ft. east of Tustin Avenue) and Santa Ana
Avenue, but the discontinuity (jog) on the alignment of Avon
Street at Riverside Avenue would remain.
' Collectively, the five alternatives present the information to
assess the range of traffic implications associated with actions
' pertaining to Avon Street and Coast Highway. Presented in Table
4 is a comparison of the daily traffic volumes at several key
locations for the five alternatives.
' As would be expected, Alternative A-1 (Avon Street as a cul-de-
sac) would have the lowest traffic volumes on Avon Street.
Installing a median barrier on Coast Highway (Alternative A-2 )
' would increase the traffic volumes on Avon Street by
approximately 400 vehicles per day. The reason for this is that
without the median vehicles travelling easterly on Coast Highway
' wishing to access the development on the north side of the street
would have to either make a U-Turn at Riverside Avenue or make a
left turn and access the area from the Avon Street cul-de-sac.
' In addition, the installation of a median on Coast Highway would
increase volumes on Coast Highway by about 1500 to 3000 vehicles
between Newport Boulevard and Riverside Avenue. This is because
vehicles are no longer given the option to make left or U-Turns
' at any point before Riverside Avenue.
The two alternatives with Avon Street extended through to Santa
' Ana Avenue (the base condition and Alternative B-1 ) would have
the largest volumes on Avon Street. Traffic volumes on Coast
Highway would decrease slightly but not enough to have any
significant effect on overall traffic conditions. Again,
installing a median barrier on Coast Highway would increase
traffic volumes by approximately 1000 to 3000 vehicles per day on
Coast Highway between Newport Boulevard and Riverside Avenue.
Likewise, the traffic volumes on Avon Street would increase
slightly.
' The last Alternative (B-2 ) is illustrative of what would happen
if, in addition to extending Avon Street from Riverside Avenue to
Santa Ana Avenue, and installing a median on Coast Higway, Avon
t Street were also extended east from Tustin Avenue to tie in with
Coast Highway. (See Figure 9. ) The traffic volumes on Avon
Street west of Riverside Avenue would not differ much from those
in Alternative B-1 , nor would the 'volumes decrease substantially
' on Coast Highway. On the extended portion of Avon Street
between Coast Highway and Tustin Avenue the traffic volumes would
be in the range of 1300 to 3000 vehicles per day. It is con-
cluded that, even if Avon Street were extended from Coast Highway
(east of Tustin Avenue) to Santa Ana Avenue, Avon Street would
not be sufficiently attractive to divert through traffic from
' Coast Highway.
15
TAME 4
AWl SfM AI.7FRRATIM
YRAMC Wlt•E StINRY
LWATIiJB
Altermt9ve Avon Street Coast Hii¢ney Riverside Avenue 74stin Avenue
e%Santa Am w/o Riverside e o Riverside e o HL Wrt Blvd. w/o Riverside Ave. e%o Tustin Ave, n/o Avm St. s/o Avon St, n/o Avon St. s/o Avm St.
t-�
rr Bise 2,600 2,508 1,300 BD,WD 75,4W 59,500 16,OW 17,500 2,000 4,3W
A-1 - 1.300 1,200 82,600 78,000 59,800 16.000 17,800 2,OW 4,400
A-2 800 1,700 1,300 85,600 86,600 61,9W 16,WD 18,100 2,OW 4,400
B-1 2,9W 3,10D 1,30D 82,7W 82,700 61,900 16,000 17,800 2,OW 4,300
11-2 2,900 3,100 1,6W 82.701) 82,700 59,700 16,000 17,6W 2,000 3,100
' Summary of Evaluation of Avon Street Alternatives
Following is a summary of the major conclusions based on the
' evaluation of the alternatives for Avon Street.
1 . Avon Street west of Riverside Avenue would serve primarily as
' a street to serve abutting land uses whether or not it is
connected to 'Santa Ana Avenue or is terminated in a cul-de-
sac just east of Santa Ana Avenue. The amount of traffic on
this portion of Avon Street, other than to/from adjacent
properties, would be less than 1 ,000 vehicles per day (vpd) .
2 . Avon Street would not be sufficiently attractive to divert
any through traffic off Coast Highway even if Avon Street
were extended east of Tustin Avenue ( to tie in with Coast
Highway) . Traffic on Avon Street would consist primarily of
' vehicles travelling to/from abutting properties. (The
subarea model was run with the assumption that the
discontinuity in alignment at Riverside Avenue would remain.
' But checks of travel time indicate that this conclusion would
still be valid even if the discontinuity were eliminated. )
3 . The extension of Avon Street east of Tustin Avenue would not
' have a significant effect on traffic volumes on Avon Street
west of Riverside Avenue.
4. Depending on the alternative, traffic volumes on Coast
Highway east of Newport Boulevard would be in the range of
- - 80—,000 to 85,600 vpd. West of Riverside Avenue the range
would be 75,400 to 86, 600 .
Capacity Analysis
The implementation of Avon Street extended to Santa Ana Avenue or
cul-de-sac will impact future traffic conditions on Coast
Highway. The effects of these changes were previously presented
in Table 4. To identify the specific impacts on Coast Highway
daily volume to capacity ratios were calculated for Coast Highway
between Newport Boulevard and Riverside Avenue and for Avon
' Street. The results of these analyses are presented in Table 5.
Review of Table 5 shows that the projected traffic volumes on
' Avon Street can be adequately accommodated for any of the alter-
natives . This conclusion is based on the assumption that Avon
Street would be fully improved to provide 32 feet between curbs
and that parking would be prohibited to provide unobstructed
traffic flow. This roadway width would be needed with or without
the extension of Avon Street to Santa Ana Avenue because a 32-
foot width is considered a minimum design criterion for this type
' of street. Further review of Table 5 shows that future traffic
forecasts for the area would exceed the existing and future
capacity of Coast Highway. Although the daily capacity would be
' exceeded in any event, a comparison of traffic volumes on Coast
17
TABLE 5
SUMMARY OF
' DAILY ROADWAY CAPACITY
ANALYSIS
' Future
Daily Capacity Daily Existing Future
Exist. Future Volume Conditions Conditions
V C LOS V C LOS
Coast Highway
West of Riverside
Avenue
' Base Condition 41 , 100 54, 000 751400 • 1 .83 F 1 .39 F
Alternative A-1 41 , 100 54,000 78,000 1 .90 F 1 .44 F
' Alternative A-2 41 , 100 - 54,000 86, 600 2 .11 F 1 . 60 F
Alternative B-1 41 , 100 54,000 82,700 2.01 F 1 .53 F
Alternative B-2 41 , 100 54, 000 82,800 2. 01 V 1 .53 F
Avon Street
West of Riverside
Avenue
Base Condition NA *8, 000 21500 - - 0. 31 A
Alternative A-1 NA 81000 11300 - - 0.16 A
1 Alternative A-2 NA *8, 000 11700 _ _ 0.21 A
Alternative B-1 NA *81000 31100 0.38 A
Alternative B-2 NA *81000 3,100 - - 0. 39 A
' * Estimated by BDI based on 40 foot Avon Street right-of-way,
improved to 32 foot between curbs and no parking.
1
' 18
'SIIpTA AMA AVDff
:�-
a,r mar �,.�_.� _r�utrf� x:� •.
712
MM
4y
` 'L
PARLE \ rARLEi \ \ s �✓'�
lK e
{... �`.�?}� \ � Mum
O
CITY OF NEWPORT BEACH
AVON STREET 40' RADIUS CAL-DE-SAC
PROPERTIES PROPOSED - CURB STANDARD
32' RADIUS CUL-DE-SAC
CURB
\D\ FIGURE 10
BASMAc)YNi NARNELL.INC. PROPOSED AVON STREET CUL-DE-SAC
J242 umW.Ux...Sw,.6•)
xe.yort i4q B•..h W$ 0 YSeGO
Illq iiY Y i
tip
mom
s1; SIIYfA
�—� A.IMP W 1LZW ♦• {��
V �
nlw
`t\ \` mac. -•tr .,,.T ..�-r'_- Q r/� ' '•
90� ;AM 2
AVON STREET EXTENSION
N
\�\ FIGURE 11
BASMACIYAN-DANNtLI,INC. LOCATION OF AVON STREET EXTENDED
„.:pow nGetwnb Yt66o THROUGH AVON STREET PROPERTIES PARCELS
I7145 5499940
' Highway and the resulting increase or decrease when compared to
base conditions can be made.
Table 6 presents these comparisons and the respective increase or
' decrease.
TABLE 6
' COMPARISON OF
COAST HIGHWAY TRAFFIC VOLUMES
' Daily Decrease in Traffic
Traffic when compared to Sase
' Alternative Forecast Condition
Base Conditions 75, 400 NA
' A-1 (Avon Cul-de-Sac) 78, 000 2,600
A-2 (Avon Cul-de-Sac 86 , 600 11 ,200
Median on Coast Highway)
B-1 (Avon Extended) 82, 700 7, 300
' B-2 (Avon Extended-Santa Ana 82, 800 7, 400
to e/o Tustin/Coast and
' Median on Coast Highway)
Review of Table 6 shows that each alternative, when compared to
Base Conditions traffic forecasts, ,will result in increased traf-
fic on Coast Highway west of Riverside Avenue. Review of the
data shows that the proposed cul-de-sac alternative proposed by
Avon Properties results in the least increase approximately 2, 600
' daily vehicles. The greatest impact occurs with Alternative A-2
when a median is installed on Coast Highway and Avon is Cul-de-
saced. This Alternative (A-1 ) represents a 11 ,200 vehicle
increase above the base condition forecast.
In summary it can be concluded that the Avon Street can ( if
constructed as discussed in this report) accommodate the future
' traffic volumes presented for each alternative. Coast Highway on
the other hand is expected to exceed its daily capacity in any
event.
' AVON STREET DESIGN CONSIDERATIONS
' Construction of Avon Street will be restricted to the available
40 foot right-of-way due to the location of existing development
and the steep terrain located to the north of Avon Street. This
' reduced right-of-way will permit the construction of a 32 foot
wide roadway (providing 4 foot parkways on either side) . This
roadway width is the maximum that could be constructed the entire
' length of Avon Street except for the improved section of Avon
21
' Street immediately west of Riverside Avenue which is improved to
provide two travel lanes and curbside parking.
' Implementation of Avon Street to serve the Avon Street Properties
project or to extend to Santa Ana Avenue has the same design
constraints of the 40 foot right-of-way and 32 foot curb to curb
roadway width. The primary differences will be in the physical
construction in the vicinity of Santa Ana Avenue. A discussion
of these differences follows.
' Avon Street Properties Cul-de-Sac of Avon Street
The Avon Street Properties project entails' the termination of
' Avon Street east of Santa Ana Avenue with a cul-de-sac serving
three residential properties. The plans presented with the
project show a cul-de-sac constructed with a 32-foot-radius curb
' for the cul-de-sac. Figure 10 presents the cul-de-sac. This
cul-de-sac design does not conform to the City of Newport Beach
adopted cul-de-sac design standards. The City' s adopted
standards require a 40 foot curb radius. This design standard
has been established by the City to provide adequate turnaround
for large trucks and to specifically accommodate fire trucks.
The required 40 foot radius is also depicted on Figure 10.
' An adequate cul-de-sac will be needed to assure that truck
traffic entering and leaving the commercial properties along
' Coast Highway from Avon Street can turn around in the event they
reach the cul-de-sac. Also an adequate turn around for fire
vehicles is another important consideration. This is extremely
' important from the aspect of having Avon Street provide rear
access to the Coast Highway commercial properties.
A major difference between the Avon Street Properties cul-de-sac
alternative and the future extension of Avon Street to Santa Ana
is that the roadway can be constructed on approximately existing
grades. This will permit access to be taken to Newport Imports.
' Access to the TNT restaurant parcel would require a change in
grade or construction of a parking structure to gain access to
the TNT parcel.
' Avon Street Extension to Santa Ana Avenue
The extension of Avon Street to Santa Ana Avenue will require the
raising of Avon Street at a 10% grade to reach Santa Ana Avenue.
Also the roadway will have to be curved northerly to intersect
Santa Ana Avenue. Figure 11 depicts the location of the proposed
' roadway through the Avon Street properties.
This roadway extension will necessitate some retaining walls and
restriction of access to the TNT Restaurant parcel. Also access
to/from Newport Imports may not be feasible. In general, it
should be pointed out that access to these parcels via Avon
Street would necessitate modification of the existing parcels.
' Access to/from the TNT Restaurant parcel may be possible by
constructing a parking structure. The desirability and safety
22
' aspects of introducting an access on a 10% roadway grade is not
recommended.
' The continuation of Avon Street through to Santa Ana Avenue will
result in improved local circulation within the Mariners' Mile
area. The improvement in local circulation will be a function of
' providing additional access to/from the Newport Heights area and
the ability of vehicles leaving development between Coast Highway
and Avon Street with a destination to the north on Newport
Boulevard to use Avon Street, Santa Ana Avenue and Old Newport
t Boulevard. Overall this access alternative is expected to reduce
future traffic on Pacific Coast Highway by approximately 2500
daily vehicles.
' Additional benefits of the Avon Street extension would be the
ability of truck traffic and delivery vehicles to use Avon Street
' rather than Coast Highway for access. This is especially
significant when large trucks have to use Coast Highway for their
loading and unloading operations (which results in potential
blockage of through traffic) .
SUMMARY OF FINDINGS AND CONCLUSIONS
' o The proposed seven (7) dwelling units are expected to generate
approximately 84 daily vehicle trip ends.
' o Since the proposed project consists of less than 10 dwelling
units, it is exempt from the Traffic Phasing Ordinance
' regulations.
o Under the base condition (Avon Street extended to Santa Ana
Avenue to form a "T" intersection) , Avon Street would have
' traffic volumes of approximately 2500 vehicles per day (Vpd) .
Traffic volumes on Coast Highway between Old Newport Boulevard
and Riverside Avenue would be approximately 75, 000 to 80, 000
' vpd.
o With Avon Street extended to form a cul-de-sac, the daily
traffic would be approximately 1300 vehicles. Coast Highway
(between Old Newport Boulevard and Riverside Avenue) would
experience volumes of 78 , 000 to 82, 000 vehicles daily.
' o Avon Street west of Riverside Avenue would serve primarily the
adjacent land uses only (•and not through traffic from Coast
Highway) whether or not it• is connected to Santa Ana Avenue or
' is terminated in a cul-de-sac just east of Santa Ana Avenue.
o Avon Street would not be sufficiently attractive to divert any
' through traffic off Coast Highway even if Avon Street were
extended east of Tustin Avenue (to tie in with Coast Highway) .
Traffic on Avon Street would consist primarily of vehicles
travelling to/from abutting properties .
23
o One of the primary benefits of the Avon extension would be
improvement of local circulation by providing an alternate
route to gain access to the rear of the . Coast Highway
' properties.
o Depending on the alternative, traffic volumes on Coast Highway
east of Newport Boulevard would range from 80 ,000 to 85, 600
' vehicles per. day. West of Riverside Avenue the range would be
75, 400 to 86 ,000 .
' o Projected traffic volumes on Avon Street can be adequately
accommodated for any of the alternatives based on the
assumption that Avon Street would be fully improved to provide
' 32 feet between curbs and parking would be prohibited.
o Whether or not any changes to Avon Street are implemented, the
daily capacity on Coast Highway will be exceeded.
o Approval of the cul-de-sac alternative and development of the
Avon Street residential parcels will require that Avon Street
be fully improved along its unimproved section to the cul-de-
sac.
' o The selection of the cul-de-sac alternative will also require
a decision on the size of the cul-de-sac to be constructed.
The project proponent proposes a 32 foot radius cul-de-sac
whereas the City' s standard is a 40 foot radius..
1
1
' 24
' Appendix A
' INTERSECTION CAPACITY UTILIZATION ANALYSIS
Intersection Coast Hwy. / Riverside Av.
( Existing Traffic Volumes Bases on Average Daily Traffic Winter/Spring 1983)
EXISTING PROPOSED EXIST. EXIST. REGIONAL COHHITTEO PROJECTED
Movement PK.HR. V/C GRO'.RH PROJECT V/C Ratio PROJECT PPOJECT
Lanes Cap. Lanes Cap. Vol. Ratio Volume Volume Wo Project Volume V/C Ratio
Volume
NL 13
tNT 1600 1 .0113
NR 4
SL 103
ST 1600 2 .0656*
' SR 1600 418 .2613
EL 1600 1 337 .2106*
' ET 3200 1541 .4838
ER 7
' WL 1600 52 .0325
WT • 4800 1905 .3969*
' WR 1600 75 .0469
YELLOWTIME ,1000*
1 i
' EXISTING INTERSECTION CAPACITY UTILIZATION .7731
EXISTING PLUS COMMITTED PLUS REGIONAL GROWTH W/PROPOSED INPROVEMENTS I.C.U. i
. . .. . — .. .
EXISTING PLUS COMMITTED ..PLUS REGIONAL GROWTH PLUS PROJECT I.C.U.
' ❑ Projected plus project traffic I.C.U. will be less than or equal to 0.90
' ❑ Projected plus project traffic I.C.U. w4ll be greater than 0.90
' ❑ Projected plus project traffic I.C.U. with systems improvement will be
' less_than or_equal_to0.90_
' Description of system improvement:
1
tDATE:
PROJECT FORM II
INTERSECTION CAPACITY UTILIZATION ANALYSIS
Intersection Coast Hwy. / Tustin Ave.
1 ( Existing Traffic Volumes Bases on Average Daily Traffic Winter/Spring 19 83)
1 EXISTING PROPOSED EXIST. EXIST. REGIONAL COMIITTEO PROJECTED
Mordnent PK.NR. V/C GROWTH PROJECT V/C Ratio PROJECT PPOJECT
Lanes Cap. lanes Cap. Vol. Ratio Volwe Volume w/o Project Volume V/C Ratio
Volume
NL 1
' NT 1600 3 .0038
NR 2
' SL 60
ST 1600 5 .0644*
1 SR 38
EL 1600 81 .0506*
ET 3200 1566 .4922
ER 9
1 WL
WT 4800 2215 .4614
1 WR 1600 90 .0563
YELLOWTIME .1000*
TER
E i
1 EXISTING INSECTION CAPACITY UTILIZATION .67fi4
EXISTING PLUS C"ITTED PLUS REGIONAL GROWTH W/PROPOSED IMPROVEMENTS I.C.U. i
EXISTING PLUS COl iTTED PLUS REGIONAL GROWTH PLUS PROJECT I.C.U.
1 .
1 ❑ Projected plus project traffic I.C.U. will be less than or equal to 0.90
1 ❑ Projected plus project traffic I.C.U. will be greater than 0.90
1 ❑ Projected plus project traffic I.C.U. with systems improvement will be
' less_than or_equal_to0.90
' Description of system improvement:
1
1
1 DATE:
PROJECT FORM II
LEVEL OF SERVICE DESCRIPTIONS
Nominal Range
Level of' Service Traffic Quality of ICU (a)
A Low volumes; high speeds; speed not restricted 0.00 - 0.60
by other vehicles; all signal cycles clear with
no vehicles waiting through more than one signal
cycle.
' B Operating speeds beginning to be affected by
other traffic; between one and ten percent of 0.61 - 0.70
' the signal cycles have one or more vehicles
which wait through more than one signal cycle
during peak traffic periods.
C operating speeds and maneuverability closely
controlled by other traffic; between 11 and 30
percent of the signal cycles have one or more 0.71 - 0.80
' vehicles which wait through more than one signal
cycle during peak traffic periods; recommended
ideal design standard. _ •
' D Tolerable operating speeds; 31 to 70 percent of —
the signal cycles have one or more vehicles
which wait through more than one signal cycle 0.81 - 0.90
' during peak traffic periods; often used as
design standard in urban areas.
' E Capacity; the maximum traffic volume an inter-
section can accommodate; restricted speeds; 71
to 100 percent of the signal cycles have one or 0.91 - 1.00
more vehicles which wait through more than one
' signal cycle during peak traffic periods.
F Long queues of traffic] unstable flow; stoppages
' of long duration; traffic volume and traffic
speed can drop to zero; traffic volume will be Not Meaningful
less than the volume which occurs at Level of
Service E.
' (a) Although the Highway Capacity Manual recommends the above relationship
' between level of service and volume/capacity ratios, field observation
shows that a more appropriate relationship would be as follows:
' A, 0.00 to 0.80; B, 0.81 to 0.85; C, 0.86 to 0.90; D, 0.91 to 0.95;
and E, 0.96 to 1.00.
Source: Hiahway Capacity Manual._ Highway Research Board Special Report 87,
' National Academy of Sciences, Washington D.C., 1965, page 320.
1
1
. 1
1
1
1
1
1
1
1 I'i
i
1
1
1
1 Appendix B
1
1
1
1
1
' MARINERS' MILE
TREND GROWTH LAND USE FORECASTS
' Traffic
Analysis
' Zone Sand Use Description
11 Restaurant 22 , 340 SF*
Office 44, 680 SF
Commercial 22 ,340 SF
12 Restaurant 18, 330 SF
Office 36, 660 SF
' Commercial 18 ,330 SF
13 Restaurant 33 , 870 SF
Office 67,740 SF
Commercial 33, 870 SF
' 14 Restaurant 2, 120 SF
Office 4 ,240 SF
Commercial 2 , 120 SF
' 15 Single Family Attached 23 dwelling units
16 Restaurant 10 , 370 SF
Office 20,750 SF
' Commercial 10 , 370 SF
17 Restaurant 22,610 SF
Office 45 ,220 SF
Commercial 22, 610 SF
' l8 Restaurant 19,570 SF
Office 39, 130 SF
Commercial 19,570 SF
' 19 Restaurant 12,410 SF
Office 24 ,820 SF
Commercial 12 , 410 SF
' 20 Restaurant 18 , 830 SF
Office 37, 660 SF
Commercial 18, 830 SF
' 21 Restaurant 36,600 SF
Office 73, 200 SF
Commercial 36 , 600 SF
22 Single Family Attached 17 dwelling units
' 23 Restaurant 11,260 SF
Office 22,510 SF
Commercial 11,260 SF
' 24 -
25 Single Family Attached 9 dwelling units
26 Restaurant 25,570 SF
' Office 51, 140 SF
Commercial 51, 140 SF
Boat Slips 35 slips
27 Restaurant 24, 330 SF
' Office 48 , 660 SF
Commercial 24, 330 SF
Boat Slips 35 slips
' Traffic
Analysis
Zone Land Use Description
' 28 Restaurant 20 , 930 SF
Office 41, 850 SF
' Commercial 20, 930 SF
Boat Slips 35 slips
Office 15 , 830 SF
Boat Slips 35 slips
29 Restaurant 21,550 SF
Office 43,100 SF
Commercial 21,550 SF
' Boat Slips 35 slips
Restaurant 10, 800 SF
Office 61990 SF
Commercial 6, 270 SF
Boat Slips 35 slips
30 Restaurant 5 , 150 SF
' Office 10,290 SF
Commercial 5,150 SF
Boat Slips 35 slips
Commercial 1,420 SF
' Restaurant 71400 SF
Boat Slips 35 slips
31 Restaurant 34 ,380 SF
' Office 68,760 SF
Commercial 34, 380 SF
Boat Slips 39 slips
t Restaurant 10, 390 SF
Office 4, 320 SF
Boat Slips 39 slips
' TOTALS BY LAND USE:
' RESTAURANT 368 ,810 SF
OFFICE 707,550 SF
COMMERCIAL 373,480 SF
' SINGLE FAMILY ATTACHED 49 Dwelling Units
BOAT SLIPS 358 Slips
' Source; City of Newport Beach
Planning Department
' * Square Feet
1
0 0
o
o � m
o
O
C O O
58 0 o
Hospital Road 59 r` 84
co 83 85 0
8
57 60 1\ 86 87
QI4 —Q 25 101
61 102 Cllll Drive
0 7 77 16 24 112 22
8P III
'C 6 yea to 13d_ 79 �2 113 21
64 Avon . 2 I ��, 89 8 19 Q2
Z0 /104 7 5 3 7 g0 0 92103 95 197 100
56 ,/i1 69 7 98 10 Pacific Coast ii1s; a
L1 91 93 1 8 III 99
6 72 `74 81 /
55 6 69 70 Q27 �28 29 A30 A/
52 0 66 )26
31
5 5
51 LEGEND:
• NODE
1❑ 54 TRAFFIC ANALYSIS ZONES
110
a
\D- ' E
9ASMACIYAN DARNEL.INC. MARINERS MILE NETWORK AND TRAFFIC ANALYSIS ZONES
u6: all
oma wn 9ei
Ne.yau Br41 "40 Y266o
11161 ii999i�u