HomeMy WebLinkAboutTPO035_KOLL CENTER (AETNA LIFE) TP0035 '. COM/WSSONERSI May 19, 1983 MINUTES m , m m y. City of Newport Beach ROLL CALL INDEX Request to consider Amendment No. 2 to the Traffic Item #13 Phasing Plan for the remaining development in the Koll Center Newport Planned Community. LOCATION: The Planned Community of Koll Center, on property bounded by MacArthur Boulevard, TRAFFIC Campus Drive and Jamboree Road. PHASING PLAN ZONE: P-C APPLICANT: The Koll Company, Newport Beach APPROVED OWNER: Aetna Life Insurance Company, CONDI- Newport Beach TIONALLY The discussion opened in connection with this item and Mr. Sid Buck, Vice-President of The Koll Company, appeared before the Commission and requested approval of the Traffic Phasing Plan. Motion X Motion was made for approval of Amendment No. 2 to the All Ayes I X X X X * X Koll/Aetna Traffic Phasing Plan, subject to the following findings and revised Condition No. 38, which MOTION CARRIED: FINDINGS: 1. That subsequent changes in the project will not require revisions to the Certified Final EIR. 2. That no new significant environmental impacts not considered in the Certified Final EIR were found. 3. That no substantial changes have occurred with respect to the circumstances under which the project will be undertaken. 4. That no new information of substantial importance related to the project has become available. 5. That the Phasing Plan is consistent with the Newport Beach General Plan and the Planned Community Development Plan for Koll Center Newport. -31- (� COMMdSSIONERS • MINUTES May 19, 1983 3 x � c m y. City of Newport Beach ROLL CALL INDEX 6. That based on the Phasing Plan and surrounding information submitted therewith, there is a reasonable correlation between projected traffic at time of completion and the capacity of affected intersections. 7. That the applicant has taken into consideration the preparation of his plan characteristics in the design of his development which either reduce traffic generation or guide traffic onto less impacted arterials or through intersections in the least congested direction. REVISED CONDITION NO. 38: 38. That prior to the occupancy of any buildings on the site beyond the existing development completed or under construction, an additional eastbound through lane shall be constructed at the intersection of Coast Highway and MacArthur Boulevard (unless. subsequent project approvals require modification thereto) or the applicant shall contribute $41,000.00 to a fund for the construction of improvements to Coast Highway in conjunction with the Coast Highway widening project. This improvement shall be subject to the approval of the City Traffic Engineer. General Plan Amendment 82-1 (Public Hearing) Item #13 est to amend the Land Use, Residential Growth, Recr tion and Open Space, Circulation and Noise Element of the Newport Beach General Plan for the REMOVED North Ford Diego Creek south site. FROM THE CALENDAR LOCATION: The are ounded by Bison Avenue, Jamboree Ro San Diego Creek, and the easterly City ndary between San Diego Creek and Bison Av e. -32- l Planning Commission Meeting May 19, 1983 Agenda Item No. 13 CITY OF NEWPORT BEACH TO: Planning Commission FROM: Planning Department SUBJECT: Traffic Phasing Plan (Discussion) Request to consider Amendment No. 2 to the Traffic Phasing Plan for the remaining development in the Koll Center Newport Planned Community. LOCATION: ' The Planned Community of Koll Center Newport, on property bounded by MacArthur Boulevard, Campus Drive, and Jamboree Road. ZONE: P-C APPLICANT: The Koll Company, Newport Beach OWNER: Aetna Life Insurance, Co. , Newport Beach Application The applicant has requested the approval of an amendment to the Traffic Phasing Plan (TPP) for the remaining development in the Kbll Center Newport Planned Community under Koll/Aetna ownership. The amendment will amend Condition No. 38 of the Traffic Phasing Plan as indicated below: 38. That prior to the occupancy of any buildings on the site beyond the existing development completed or under construction, an additional eastbound through lane shall be constructed at .the intersection of Coast Highway and MacArthur Boulevard (unless subsequent project approvals require modification thereto) or the applicant shall contribute $41,000.00 to a fund for the construction of improvements to Coast Highway in conjunction with the Coast 'Highway widening project. This improvement shall be subject to the approval of the City Traffic Engineer. Phasing Plans must be developed in accordance with the Planned Community Development Plan, City Council Resolution 9742, Amendment No. 514, Amendment No. 550, and the City's definition of the term reasonableness. The Traffic Phasing Plan was originally approved by the City Council on November 10, 1980 and by the Planning Commission on September 4, 1980. Amendment No. 1 to the Traffic Phasing Plan was approved by the Planning Commission on April 9, 1981. TO: Ping Commission -2. Environmental Significance An Environmental Impact Report was certified in conjunction with the adoption of the Traffic Phasing Plan for the Koll/Aetna Properties in Koll Center Newport. Staff has reviewed the proposed amendment and determined that there are no new significant environmental impacts not previously considered, nor has there been substantial changes with respect to the circumstances under which the project will be undertaken. Phasing Plan The approved Phasing Plan for the Koll/Aetna properties allows for the following .phasing schedule: 1981 - Occupancy of a 7,650 sq.ft. addition to Koll Co. Corporate Headquarters 1983 - Occupancy of Phase I (,440' room Hotel and 225,198 sq.ft. of office/restaurant/retail use.) 1984 - Occupancy of Phase II (100,736 sq.ft. of office/restaurant use.) Staff Analysis The City Council is presently considering the Coast Highway Widening project and Draft EIR/EIS. Subsequent to the Council's review and recommendations, the reports will go to the State and then to the Federal Highway Administration. The proposed amendment to Condition No. 38 of the approved Traffic Phasing Plan will allow the Koll Company to occupy the buildings now under construction in the Koll Center Newport and contribute a sum equal to that required to make the intersection improvements. Staff feels that any action taken by the Planning Commission related to the changes to the Coast Highway/MacArthur Boulevard intersection would be premature, and therefore, recommends approval of this amendment. Suggested Action Staff recommends approval of Amendment No. 2 to the Koll/Aetna Traffic Phasing Plan with the findings and subject to the revised Condition No. 38 as indicated in Exhibit "A". PLANNING DEPARTMENT Attachment: Exhibit "A" JAMES D. HEWICKER, Director Pre Ta arico, Environmental Coordinator FT:tn TO: Ploing Commission -3. • EXHIBIT "A" RECOMMENDED FINDINGS FOR APPROVAL OF AMENDMENT NO. 2 TO THE KOLL/AETNA TRAFFIC PHASING PLAN FINDINGS: 1. That subsequent changes in the project will not require revisions to the Certified Final EIR. 2. That no new significant environmental impacts not considered in the Certified Final EIR were found. 3. That no substantial changes have occurred with respect to the circumstances under which the project will be undertaken. 4. That no new information of substantial importance related to the project has become available. 5. That the Phasing Plan is consistent with the Newport Beach General Plan and the Planned Community Development Plan for Koll Center Newport. 6. That based on the Phasing Plan and surrounding information submitted therewith, there is a reasonably correlation between projected traffic at time of completion and the capacity of affected intersections. . 7. That the applicant has taken into consideration the preparation of his plan characteristics in the design of his development which either reduce traffic generation or guide traffic onto less impacted arterials or through intersections in the least congested direction. REVISED CONDITION NO. 38 38. That prior to the occupancy of any buildings on the site beyond the existing development completed or under construction, an additional eastbound through lane shall be constructed at the intersection of Coast Highway and MacArthur Boulevard (unless subsequent project approvals require modification thereto) or the applicant shall contribute $41,000.00 to a fund for the construction of improvements to Coast Highway in conjunction with the Coast Highway widening project. This improvement shall be subject to the approval of the City Traffic Engineer. Planning Commission Meeting May 19, 1983 Agenda Item No. 13 CITY OF NEWPORT BEACH TO: Planning Commission FROM: Planning Department SUBJECT: Traffic Phasing Plan (Discussion) Request to consider Amendment No. 2 to the Traffic Phasing Plan for the remaining development in the Koll Center Newport Planned Community. LOCATION: ' The Planned Community of Koll Center Newport, on property bounded by MacArthur Boulevard, Campus Drive, and Jamboree Road. ZONE: P-C APPLICANT: The Koll company, Newport Beach OWNER: Aetna Life Insurance, Co. , Newport Beach Application The applicant has requested the approval of an amendment to the Traffic Phasing Plan (TPP) for the remaining development in the Kbll Center Newport Planned Community under Koll/Aetna ownership. The amendment will amend Condition No. 38 of the Traffic Phasing Plan as indicated below: 38. That prior to the occupancy of any buildings on the site beyond the existing development completed or under construction, an additional eastbound through lane shall be constructed at .the intersection of Coast Highway and MacArthur Boulevard (unless subsequent project approvals require modification thereto) or the applicant shall contribute $41,000.00 to a fund for the construction of improvements to Coast Highway in conjunction with the Coast Highway widening project. This improvement shall be subject to the approval of the City Traffic Engineer. Phasing Plans must be developed in accordance with the Planned Community Development Plan, City Council Resolution 9742, Amendment No. 514, Amendment No. 550, and the City's definition• of the term reasonableness. The Traffic Phasing Plan was originally approved by the City Council on November 10, 1980 and by the Planning Commission on September 4, 1980. Amendment No. 1 to the Traffic Phasing Plan was approved by the Planning Commission on April 9, 1981. TO: PlAng Commission -2. • Environmental Significance An Environmental Impact Report was certified in conjunction with the adoption of the Traffic Phasing Plan for the Koll/Aetna Properties in Koll Center Newport. Staff has reviewed the proposed amendment and determined that there are no new significant environmental impacts not previously considered, nor has there been substantial changes with respect, to the circumstances under which the project will be undertaken. Phasing Plan The approved Phasing Plan for the Koll/Aetna properties allows for the following phasing schedule: 1981 - Occupancy of a 7,650 sq.ft. addition to Koll Co. Corporate Headquarters 1983 - Occupancy of Phase I (440 room Hotel and 225,198 sq.ft. of office/restaurant/retail use.) 1984 - Occupancy of Phase II (100,736 sq.ft. of office/restaurant use.) Staff Analysis The City Council is presently considering the Coast Highway Widening project and Draft EIR/EIS. Subsequent to the Council's review and recommendations, the reports will go to the State and then to the Federal Highway Administration. The proposed amendment to Condition No. 38 of the approved Traffic Phasing Plan will allow the Koll Company to occupy the buildings now under construction in the Koll Center Newport and contribute a sum equal to that required to make the intersection improvements. Staff feels that any action taken by the Planning Commission related to the changes to the Coast Highway/MacArthur Boulevard intersection would be premature, and therefore, recommends approval of this amendment. Suggested Action Staff recommends approval of Amendment No. 2 to the Koll/Aetna Traffic Phasing Plan with the findings and subject to the revised Condition No. 38 -as indicated in Exhibit "A". PLANNING DEPARTMENT Attachment: Exhibit "A" JAMES D. HEWICKER, Director BY Fre Ta arico, Environmental Coordinator FT:tn TO: *ning Commission -3. EXHIBIT "A" RECOMMENDED FINDINGS FOR APPROVAL OF AMENDMENT NO. 2 TO THE KOLL/AETNA TRAFFIC PHASING PLAN FINDINGS: 1. That subsequent changes in the project will not require revisions to the Certified Final EIR. 2. That no new significant environmental impacts not considered in the Certified Final EIR were found. 3. That no substantial changes have occurred with respect to the circumstances under which the project will be undertaken. 4. That no new information of substantial importance related to the project has become available. 5. That the Phasing Plan is consistent with the Newport Beach General Plan and the Planned Community Development Plan for Koll Center Newport. 6. That based on the Phasing Plan and surrounding information submitted therewith, there is a reasonably correlation between projected traffic at time of completion and the capacity of affected intersections. . 7. That the applicant has taken into consideration the preparation of his plan characteristics in the design of his development which either reduce traffic generation or guide traffic onto less impacted arterials or through intersections in the least congested direction. REVISED CONDITION NO. 38 38. That prior to the occupancy of any buildings on the site beyond the existing development completed or under construction, an additional eastbound through lane shall be constructed at the intersection of Coast Highway and MacArthur Boulevard (unless subsequent project approvals require modification thereto) or the applicant shall contribute $41,000.00 to a fund for the construction of improvements to Coast Highway in conjunction with the Coast Highway widening project. This improvement shall be subject to the approval of the City Traffic Engineer.