Loading...
HomeMy WebLinkAboutTPO072_CORPORATE CIVIC PLAZA TP0072 1 aEW PO CITY OF NEWPORT BEACH P.O.BOX 1768,NEWPORT BEACH, CA 92659.1768 qC/FO R� PLANNING DEPARTMENT (714) 644-3225 February 7, 1992' Mr. Tom Redwitz Vice President The Irvine Company 550 Newport Center Drive PO Box I Newport Beach, CA 92658 RE: Contract Augmentation Request for Library Exchange Agreement Traffic Analy*is Dear Tom, The City has received a contract augmentation request from LSA to cover out of scope extra work performed for the Library Exchange Agreement during the period July through November 1991 (letter of January 22, 1992 attached). The letter requests a budget increase of $533.60, which would bring the total budget for this project to $18,533.60. A budget augmentation request of$5000 was originally submitted by ISA on November 25, 1991(copy attached). Although the terms of the contract specifically require prior authorization for extra work, the City indicated that it would support a contract augmentation of$533.60 to cover the work performed by LSA from July through November, 1991 (attached letter of January 14, 1992). Since $1466.40 remained in the budget after completion of in-scope tasks, this augmentation would allow $2000 for the extra work completed by LSA. As indicated above, a prior authorization clause is standard in City consultant contracts. Although we understand how project pressures can make it difficult to stay on top of administrative matters, we also expect our consultants to exercize reasonable diligence in monitoring the status of contracts and to notify us promptly whenever problems arise. In this case, we were very surprised to receive an extra work request more than four months after this out-of-scope work was begun. Because the City has had a good working relationship with I.SA in the past, we were willing to partially accomodate their request on this occasion. We wish to assure The Irvine Company that the City views this as an isolated incident, and such requests will not be routinely approved in the future. 3300 Newport Boulevard, Newport Beach Mr. Tom Redwitz February 7, 1992 I apologize for any inconvenience this may cause. If you concur with the City's position, please submit a check for $613.64 to cover LSMs $533.60 extra work request plus 159o' City review fee. If you wish to discuss this matter please do not hesitate to call. Very truly yours, PLANNING DEPARTMENT JAMES D. HEWICKER, hector By: Vµ^ J bn H. Douglas, CP onmental Coordinator cc: Pat Temple Rich Edmonton F.\.»\LWRARY\TIGBDGTXTR r ,K � It�ELtIVc-v PLANNING DEPART EN) LSA Associates,Inc. CITY OF NEWPORT BEACH Environmental Assessment Transportation Engineering ResourceLSA anagement AM FEB 61992 4M Community Plan'ng IJl 1 $ 71 ►911U►ll►121 3 4 5 6 Environmental Restoration �► 12► ► t ► I Prtncipals January22, 1992 RobBalen Les Card John Douglas Jim Culver Environmental Coordinator Georgexnrilko City of Newport Beach CarollynLobell 3300 Newport Boulevard BaMayer Fay Aloe Newport Beach, CA 92663 Rob Schonholtz Malcolm Sproul Subject: Budget Contract Amendment Request - Corporate Plaza and Associates GPA library Transfer Michael Cale Dear John: Lyn Calerdine Connie Calica In response to your letter dated January 14, 1992, LSA Associates, Inc. (LSA) Gary Dow Kevin Fincher has revised the November 24, 1991, Budget Contract Amendment Request Steve Granholm letter and, as recommended In your letter, LSA accepts your budget augment Richard Grassetti of$533.60, bringing the total contract amount to $18,533.60. Roger Harris ArtHomrighausen As indicated in our previous letter, LSA completed the tasks outlined in the RobertHrubes GinaJnrickp scope of work letter dated April 8, 1991, and submitted to the City for their Benson Lee review on June 28, 1991. At the end of June, LSA had expended $16,533.60 Rob McCann towards scope of work tasks, with $1,466.60 remaining in the budget. Sabrina Nicholls BothPadon Between July and November, ISA prepared and submitted to the City for HarrAntho yPetros their review additional out of scope tasks, as follows: AnthonyPztros AmyRndell Dean Williams Jill Wilson Alternatives Analysts On July 18, 1991, LSA was requested to prepare an alternatives analysis for the library exchange agreement. The following three alternatives were Identi- fied: • Alternative 1 - No Project/Development under the existing General Plan. • Alternative 2 - Development of new library on site of existing Civic Plaza facility. 01/22/92(I:\CNE001UNVOICE.LTR) One Park Plaza,Saite5o0 Telephone 714553-0666 Irvine,California 92714 Facsimile 714553-8076 LSA Associates,Inc • Alternative 3 - Transfer of Development Rights between the existing Civic Plaza and the proposed Newport Village library site only. The request was made to conduct a trip generation comparison for Alterna- tives 2 and 3, and to provide a brief description of the traffic and circulation as a result of these alternatives. The traffic and circulation analysis for Alter- native 1 was not required, as this alternative had been analyzed and docu- mented in previous EIRs. New City Traffic Model Database As part of a second round of comments raised by the City in its review of the June 28, 1991, studies, LSA was requested to revise the technical studies based on new traffic data that were not previously available. The studies were revised to include: • Existing and year 2010 daily traffic volumes, approved by Rich Edmonston at the City of Newport Beach, and consistent with the City's most current General Plan Traffic Model. This included daily traffic volumes for Avocado Avenue south of San Miguel. • A Traffic Phasing Ordinance (TPO) analysis for Civic and Corporate Plazas that included the intersection at Avocado and Pacific Coast Highway. • Refined trip distributions that Included Avocado, and were consistent with the TPO and the General Plan level analysis. • An expanded discussion explaining why intersections over 0.90 ICU in the TPO analysis are not considered a significant impact. These studies were then submitted to Don Simpson, Rich Edmonston, and Patty Temple at the City of Newport Beach and to Mike Erikson and Tom Redwitz at The Irvine Company for their review on September 13, 1991. Additional Revisions As a result of additional changes requested by the City of Newport Beach and changes to the project description, the September 13, 1991, studies were revised and submitted to Marie Gilliam and Rich Edmonston on October 23, 1991. Per discussions with Rich Edmonston, the latest round of revisions and clarifications to the technical studies were made to reflect: 01/22/92(1.%CNB001\JNV010E.LIR) 2 I LSA Assadates,Inc. • The transfer of 35,000 square feet office from Newport Village to Civic Plaza, which resulted In the new office added being reduced from 57,150 square feet to 22,150 square feet; and The name change from Pelican Hill Road to Newport Coast Drive. Subsequent to this.submittal, LSA was requested by Rich Edmonston to revise the ICU calculations at three intersections to maintain consistency between these traffic studies and similar studies submitted to the City. Although our ICU analyses were technically correct, they were not consistent with the City's ICU worksheets. As a result, LSA recommended revising two of three ICUs and the ICU summary tables in the reports. LSA submitted the revised ICU worksheets and summary tables to Marie Gilliam on November 4, 1991. Subsequent to successful completion of the additional out of scope tasks as presented above, the City Council approved the Corporate and Civic Plaza projects and the Library Transfer agreement EIR. It should be noted that subsequent to our June 28, 1991, report submittal, and as a result of these additional tasks, LSA incurred time and material costs of approximately $4,500. LSA recognizes the City of Newport Beach as a valued client and would like to maintain the strong working relationship that we currently enjoy. There- fore, LSA will absorb the difference between the $4,500 (actual time and material costs incurred) and the recommended budget augment of$533.60. With authorization of this budget augment as presented in your January 14, 1992, letter, LSA has enclosed an invoice for $1,005.00, which is made up of the $472.55 remaining in our original budget estimate, and a portion of the recently approved budget augment of$533.60. Sincerely, LSA ASSOCIATES, INC. 4 A Ray A. Moe Principal CC: Rich Edmonston Patricia Temple Approved: oh H. Dougl AICP ironmental oordinator City of Newport Beach 01/22/92(1.\CNE001\INVOICE.L7R) 3 I LSD INVOICE LSA Associates,Inc CITY OF NEWPORT BEACH DATE: JANUARY 22, 1992 ATTN: PATTY TEMPLE 3300 NEWPORT BOULEVARD INV 11664F - REVISED NEWPORT BEACH, CA 92660 FOR PERIOD: THRU NOVEMBER PROJECT # CNB 001 PROJECT NAME: CORPORATE PLAZA ;PROJECT MGR: . R AMMP.RI FOR PROFESSIONAL SERVICES RENDERED THROUGH NOVEMBER 30, 1991 R AMMARI 16.75 HRS @ 60. 00 = 1, 005. 00 TOTAL DUE THIS :INVOICE: $ 1,005.00 1 Remit to: 197 Park Place Telephone 415 236-6810 ':. Ricimiona:C.hinim•i 94RCf Facsimile 415 236-3480 t CITY OF NEWPORT BEACP COUNCIL MEMBERS MINUTES REGULAR COUNCIL MUTING PLACE: Council Chambers � TIME: 7:00 P.M. ttt""" DATE: Janua 13, 1992 ROLL CALL INDEX Present x x x x x x x A. ROLL CALL. Motion x B. Reading of Minutes of Meeting of All Ayes December 9, 1991, and Adjourned Meetings of January 6 and 7, 1992 was waived, approved as written, and ordered filed. Motion x C'. Reading in full of all ordinances and resolutions All Ayes waived. and un der was dto read by titles only. D. EEAR314GS: 1. Mayor Sansone opened the public hearing regarding: A. General Plan Amendment No. 91-l(C) GPA 91-1(C) A request to amend the Land Use (45/94) Element of the General Plan so as to increase the allowable development on the new library site for the Newport Village Planned Community from 50,000 sq. ft. to 65,000 sq. ft. ; and the acceptance of Environmental Impact Report No. 149; AND B. Local Coastal Program Amendment LCP Amd74 No. 24 A request to amend the Local Coastal Program Land Use Plan so as to transfer 30,000 square feet of allowable office development from the Newport Village Planned Community to the Corporate Plaza West Planned Community; AND C. Planning Commission Amendment No. PCA 728 728 A request by the Irvine Company to amend the Corporate Plaza Planned Community Development Plan so as to permit 85,000 sq. ft. of additional office development transferred from the Newport Village Planned Community. The proposal also includes a request to amend the Planned Community sign provisions so as to be consistent with the proposed sign provisions of the Corporate Plaza West Planned Community; AND D. Planning Commission Amendment No. CA 729 729 A request by the City of Newport Beach and The Irvine Company to amend the Civic Plaza Planned Community Development Plan so as to add 57,150 sq. ft. of additional office development, 35,000 sq. ft. of which would be transferred from the Newport Village Planned Community and 22,150 sq. ft. of which is new development entitlement, and to delete 14,000 sq. ft. of library entitlement, which would be transferred to the Newport Village Planned Community. The proposal Volume 46 - Page 3 AkITY OF NEWORT BEACH , COUNCIL MEMBERS MINUTES ROLL CRLL January 13, 1992 INDEX also includes: a request to amend the existing Planned Community sign standards; and a change to require the approval of a use permit for restaurants rather than a site plan review; AND E. Proposed ORDINANCE NO. 91-47, Ord.91-47 being.. Corp Plza AN ORDINANCE OF THE CITY West COUNCIL OF THE CITY OF NEWPORT BEACH ADOPTING PLAffi= CONKUNITY DISTRICT REGULATIONS AND DEVELOPMENT PLAN FOR CORPORATE PLAZA WEST AND AMENDING PORTIONS OF DISTRICTING NAP NO., 48 j $0, AS TO RECLASSIFY SAID PROPERTY IRON. THE UNCLASSIFIED (U) AND OPEN SPACE (0-S) DISTRICTS, TO THE PLUM COMKUNITr (P-C) DISTRICT (PLANNING COMKISSION AMENDMENT NO. 730). A request by The Irvine Company to amend a portion of Districting Map No. 48 so as to reclassify property known as Corporate Plaza West Planned Community, located at the northwesterly corner of Newport Center Drive and East Coast Highway, in Newport Center; AND F. Pls� *+Q Commission Amendment No. PCA 746 746 A request by The Irvine Company to amend the Newport Village Planned Community Development Plan so as to: expand the boundary, of the Planned Community so as to include the land bounded by Avocado Avenue, San Niguel Drive, MacArthur Boulevard and San Joaquin Hills Road; revise the land use plan so as to identify five statistical development areas which are distributed between two land use designations of Governmental/ Institutional and Open Space, and delete the multiple family residential and retail designations; add development standards for the development of a 65,000-square-foot library, a 100,000-square-foot museum, and a 4-acre public park; and the addition of a General Notes Section; AND Volume 46 - Page 4 CITY OF NEWPORT' BEACP COUNCIL MEMBERS MINUTES 1 1�� January 13, 1992 INBEX ROLL CRLL G. Proposed ORDINANCE No. 91-46, Ord 91-46 being, Dev Agm AN ORDINANCE OF THE CITY Library COUNCIL OF THE CITY OF Exchng NEWPORT BEACH APPROVING DEVELDPMENT AGREEMENT N0. 4 FOR THE LIBRARY E%CHANGE AGREEMENT BETWEEN THE CITY OF NEWPORT BEACH AND THE IRV311B COMPANY; AND H. Traffic Study No. 72 A request by Trfc Stdy The Irvine Company to approve a 72 Traffic Study so as to demonstrate compliance of the proposed entitlements for Civic Plaza, Corporate Plaza, and Corporate Plaza West with the Traffic Phasing Ordinance; AND I. Resubdivision No. 973 A request Resub 973 by The Irvine Company to resubdivide an existing parcel of land into three parcels; one parcel for a museum, one parcel for a library, and one parcel for open space on property located in the P-C District. Property located at 800-1200 Avocado Avenue, comprising the entire southeasterly side of Avocado Avenue between San Miguel Drive and East Coast Highway, in Newport Center. Report from the Planning Department. The City Manager outlined the above applications (A through I), and the recommended action. He stated that all of the items have been approved by the Council in concept, with the exception of the Development Agreement. Tom Redwitz, representing The Irvine Company and Irvine Pacific, addressed the Council and stated he was excited over the project, and available for questions. Hearing no others wishing to address the Council, the public hearing was closed. Motion x Motion was made to approve the project All Ayes as recommended by the Planning Commission and: 1. Adopt Resolution No. 92-1. Res 92.-1 accepting, approving, , and certifying Final EIR No. 149; and a. Make the findings contained in the Statement of Findings and Facts (Exhibit A of the Resolution); and Volune 46 - Page 5 O I TY OF NWORT BEACH C,OGD ICIL MEMBERS MINUTES January 13, 1992 INDEX ROLL CFlLL b. Find that the facts set forth in the Statement of Overriding Considerations (Exhibit B of the Resolution) are true and are supported by substantial evidence in the record, including Final EIR 149; and c. Find that although the Final EIR identifies certain unavoidable significant environmental effects that will result if the project is approved, the mitigation measures identified shall be incorporated into the project , and all significant environmental affects that can feasibly be mitigated or avoided have been eliminated or reduced to an acceptable level, and that the remaining unavoidable significant effects, when balanced against the facts set forth in the Statement of Overriding Considera- tions, are acceptable; and d. Adopt the Mitigation Monitoring and Reporting Program contained in Exhibit C of the Resolution. 2. Adopt Resolution No. 92-2. Rea 92-2 approving General Plan Amendment No. 91-1(C). 3. Adopt Resolution No. 92-3, Res 92-3 approving Local Coastal Program Amendment No. 24. 4. Adopt Resolution No. 92-4, Res 92-4 approving Planning Commission Amendment No. 728 to the Corporate Plaza Planned Community. 5. Adopt Resolution No. 92-5, Res 92-5 approving Planning Commission Amendment No. 729 to the Civic Plaza Planned Community. 6. Adopt ordinance No. 91-47, Ord 91-47 approving Planning Commission Amendment No. 730 for the Corporate Plaza ifest Planned Community. 7. Adopt Resolution No. 92-6, Res 92-6 approving Plamming Commission Amendment No. 746 to the Newport Village Planned Community. 8. Adopt Ordinance No.91-46. Ord 91-46 approving Development Agreement No. 4. Velvme 46 - Page 6 ` C I TY .OF NEWPORT BEACP COUNCIL MEMBERS MINUTES January 13, 1992 INDEX ROLL CALL 9. Sustain the action of the Planning Commission in approving Resubdivision No. 973 and Traffic Study No. 72. 2. Mayor Sansone opened the public hearing Ord 91.-49 regarding Proposed ORDINANCE NO. 91-49, Zoning/ being, PCA 738 AN ORDINANCE OF THE CITY COUNCIL (94) OF THE CITY OF NEWPORT BEACH AMENDING TITLE 20 OF THE PEWPOR BEACH MUNICIPAL CODE SO AS PERMIT THE SALE OF COPVffiiIEN E ITEMS SUCH AS, BUT NOT Lffi= , SOFT DRINKS, CANDY, CI S, ICE, MAGAZINES AND SNACK FOO , IN CONJUNCTION WITH THE OPSRATI N OF AUTOMOBILE SERVICE STATIONS THE PROPOSED AMEMMEBT ALSO IN ES: THE REQUIREMENT FOR N-SITE PARKING SPACES FOR A BILE SERVICE STATIONS WHICH NOT HAVE SERVICE RAYS BUT DO E THE SALE OF CONVENIENCE ; THE ADDITION OF COVERED ME CAL CAR WASH FACILITIES AS PERMITTED ACTIVITY; THE RE TO PROVIDE BHST R00 WHICH ARE AVAI7dBLE TO THE PUBLIC FOR NEW ADTOx ILE SERVICE STATIONS; AND THE QUIREMENT FOR FUEL PRICE SI S TO BE IN COMPLIANCE WITH BUT NOT EXCEED THE MINI PRICE SIGN REQUIRENHNTS ET FORTH IN THE BUSINESS AND OFESSIONS CODE OF THE STATE OF ORNIA (PLANNING COMMISSION xeaT No. 738). Report from the lanning Department. Discussion ens d, wherein it was noted that the Cali rnia State Business and Professions de provides that cities and counties y not adopt an ordinance or resoluti n after January 1, 1988 which prohi its the concurrent retailing of motor v icle fuel and beer and wine for off- ale consumption in zoning district where the zoning ordinance allows for fuel and off-sale beer and wine to be retailed on separate sites. Inasmu as the City's existing Autom ile Service Station Ordinance, whic prohibits the retail sale of any prod ct unrelated to a service station ope ation (other than those sold in di ensers), was adopted prior to J uary 1, 1988, the City can legally p ohibit the concurrent sale of motor ehicle fuel and the sale of off-sale aer and wine. However, if the City permits the sale of other types of retail convenience items, it is the City Attorney's opinion that the City could not prohibit the sale of beer and wine. A majority of the Planning Commissioners were of the opinion that the sale of beer and wine for off-sale consumption was not compatible with automobile service stations in the City, and so the sale of convenience items (other than the permitted items sold in dispensers) was deleted from the proposed amendment. Volume 46 - Page 7 4t,1 TY OF NWORT BEACH _ COUNCIL MEMBERS MINUTES January 13, 1992 INDEX ROLL CRLL The proposed •amendment recommended by Auto Sery the Planning Commission consists of Stations/ allowing the addition of covered Zoning mechanical car wash facilities as a permitted activity on automobile service station sites; the requirement to provide rest rooms which are available to the general public for new automobile service stations; and the requirement for fuel price signs to be in compliance with, but not exceed the minimum price sign requirements set forth in the Business and Professions Code of the State of California. It was pointed out that the proposed amendment is to the City's basic service station ordinance and does not relate directly to the request of Texaco which is the next public hearing on the agenda. Craig Yamasaki, representing Arco Products, addressed the Council in support of the ordinance .as originally presented to the Planning Commission without the deletion of the language pertaining to convenience items. He indicated that the City's current service station ordinance is functionally obsolete in terms of the types of facilities a modern service station would incorporate into their operation. He stated that the items proposed to be deleted from the ordinance are standard items at the majority of service stations, and by removing that language, the City is disabling oil refining companies such as Arco, Texaco, etc. , from bringing to the City the type of automobile service station facility that is modern and up- to-date. Ted Harris, Texaco Refining Company, Santa Ana, addressed the Council regarding the proposed ordinance as well as the request of Texaco listed as Agenda Item D-3. He stated that the propposed General Plan Amendment No. 91- 3(C), would allow Texaco to enclose an existing breezeway to shelter it from the rain, to expand the rest rooms to handicapped standards, and upgrade the appearance of the service station which is located at the northeasterly corner of Jamboree Road and San Joaquin Hills Road. The request involves enlarging the floor area from 2,000 square feet to 2,300 square feet on a 50,000 square foot lot. With respect to allowing convenient foods in conjunction with service stations, he stated the sale of such items would help retain service stations in the City, as they are closing at a steady rate. He noted that the number of gasoline stations in California has fallen from 19,153 in 1972 to 13,800 in 1991. The 540 square foot snack store Texaco is proposing at the subject location would be stocked by their retailer with all profits going to him. The present vending machines Volume 46 - Page 8 Agenda tm. No. CITY OF NEWPORT BEACH • TO: City Council FROM: Planning Department SUBJECT. A, General Plan Amendmenr Nn_ 91-1(Cl Request to amend the Land Use Element of the General Plan so as to increase the allowable development on the new library site for the Newport Village Planned Community from 50,000 sq. ft. to 65,000 sq. ft.; and the acceptance of Environmental Impact Report No. 149 AND B Local Coastal Program Amendment No, 24 Request to amend the Local Coastal Program Land Use Plan so as to transfer 30,000 square feet of allowablet office o the Corporatedevelopment Plaza from t Newport Village Planned Community • Planned Community. AND C. Amendment No. 728 Request to amend the Corporate Plaza Planned Community Development Plan so as to permit 85,000 sq. ft. of additional office development transferred from the Newport Village Planned Community. The proposal also includes a request to amend the Planned Community sign provisions so as to be consistent with the proposed sign provisions of the Corporate Plaza West Planned Community. AND D Amendment No. 729 • Request to amend the Civic Plaza Planned Community Development Plan so as to add 57,150 sq.ft. of additional office development,35,000 sq.ft.of which would be transferred from the Newport Village Planned Community and'22,150 sq.ft.of which is new development entitlement, r TO: city Council - 2. and to delete 14,000 sq. ft. of library entitlement, which would be transferred to the Newport Village Planned Community. The proposal also includes: a request to amend the existing Planned Community sign • standards; and a change to require the approval of a use permit for restaurants rather than a site plan review. AND E. Amendmant Nn-_730 Request to amend a portion of Districting Map No. 48 so as to reclassify property from the Unclassified (U) and Open Space (O-S) Districts to the Planned Community(P-C)District; and adopt Planned Community District Regulations and Development Plan on property known as Corporate Plaza West. AND F Amendment No.,746 Request to amend the Newport Village Planned Community • Development Plan so as to: expand the boundary of the Planned Community so as to include the land bounded by Avocado Avenue, San Miguel Drive,MacArthur Boulevard and San Joaquin Hills Road; revise the land use plan so as to identify five statistical development areas which are distributed between two land use designations of Governmental/Institutional and Open Space, and delete the multiple family residential and retail designations; add development standards for the development of a 65,000-square-foot library, a 100,000-square- foot museum, and a 4-acre public park; and the addition of a General Notes Section. AND G. Development A,gMment No.4 Request to approve Development Agreement No. 4 for the Library Exchange Agreement between The Irvine Company and the City of Newport Beach. . AND H. Traffic St idy No. 72 Request to approve a Traffic Study so as to demonstrate compliance of the proposed entitlements for Civic Plaza, Corporate Plaza, and Corporate Plaza West with the Traffic Phasing Ordinance. r TO: Ci•council - 3. • ' . AND I Resubdivision No. 973 • Request to resubdivide an existing parcel of land into three parcels; one parcel for a museum, one parcel fora library and one parcel for open space on property located in the P-C District. �nnlic If approved,the proposed actions would implement the Library Exchange Agreement,which was previously approved by the City Council. Rnu¢Pct,�ed Action Hold hearing; close hearing; if desired, approve the project as recommended by the Planning Commission and: 1. Adopt Resolution No. accepting, approving, and certi£yiug Final EIR No. 149, • and a. Make the findings contained in the Statement of Findings and Facts (,Exhibit A of the Resolution); and b. Find that the facts set forth in the Statement of Overriding Considerations (Exhibit B of the Resolution) are true and are supported by substantial i evidence in the record, including Final EIR 149; and C. Find that although the Final EIR identifies certain unavoidable significant environmental effects that will result if the project is approved,the mitigation measures identified shall be incorporated into the project, and all significant environmental effects that can feasibly be mitigated or avoided have been eliminated or reduced to an acceptable level, and that the remaining unavoidable significant effects,when balanced against the facts set forth in the Statement of Overriding Considerations, are acceptable; and d. Adopt the Mitigation Monitoring and Reporting Program contained in Exhibit C of the Resolution. • 2. Adopt Resolution No. approving General Plan Amendment No. 91-1(C). 3. Adopt Resolution No. , approving Local Coastal Program Amendment No. 24. 49 Adopt Resolution No. approving Amendment No. 728 to the Corporate Plaza Planned Community. j r CityCouncil - 4. • Adopt Resolution No._, approving Amendment No.729 to the Civic Plaza.Planned Community. . 6. Adopt Ordinance No.� approving Amendment No. 730 for the Corporate Plaza West Planned Community. �. Adopt Resolution No. approving Amendment No.746 to the Newport Village Planned Community. 8. Adopt Ordinance No. approving Development Agreement No. 4. 91 Sustain the action of the Planning Commission in approving Resubdivision No. 973 and Traffic Study No. 72. At its meeting of November 21, 1991, the Planning Commission voted unanimously to recommend City Council approval of the series of actions listed above,which are necessary tq implement the Library Exchange Agreement. An excerpt of the Planning Commission minutes along with copies of the staff reports are attached for the Council's review. On December, 9, 1991 E and G, and sOeduled a public htearing for e City January 13, 992 to considuncil introduced the er thesesitems for along with the other • requested actions. Respectfully submitted, PLANNING DEPARTMENT JAMES D. HEWICKER, Director J n H. Douglas CP P cipal Planne Attachments: 1. Excerpt of Planning Commission Minutes of November 21, 1991 • 2. Planning Commission Staff Report of November 21, 1991 31 Planning Commission Staff Report Addendum of November 21, 1991 4. Comments and Responses for Final EIR No. 149 5. Draft Resolupon No. certifying Final EIR No. 149 Exhibit A: Statement of Findings and Facts Exhibit B: Statement of Overriding Considerations Exhibit C: Mitigation Monitoring and Reporting Program 1 x TO; city council - 5. • 6, Draft Resolution No. approving General Plan Amendment 91-1(C) 7. Draft Resolution No. approving Local Coastal Program Amendment No. 24 . S. Draft Resolution No. approving Amendment No. 728 for Corporate Plaza PC 9. Draft Resolution No. approving Amendment No. 729 for Civic Plaza PC 10. Draft Ordinance No._approving Amendment No.730 for Corporate Plaza West PC 11. Draft Resolution No. approving Amendment No. 746 for Newport Village PC 12. Draft Ordinance No. approving Development Agreement No. 4 Attached Separately: 13 Draft EIR No. 149 r\_\LMRARY\Cc-R REC 14. Resubdivision No. 973 • • a F ORDINANCE NO. • AN ORDINANCE OF THE CITY OFNNEWPORT BEACH ADOPTING PLANNED COMMUNrrY DISTRICT REGULATIONS AND DEVELOPMENT PLAN FOR CORPORATE PLAZA WEST AND AMENDINC, PORTIONS OF DISTRIC nNO • MAP NO.48 SO AS TO RECLASSIFY SAID PROPERTY FROM THE UNCLASSIFIED(U)AND OPEN SPACE(O-S)DISTRICT'S TO THE PLANNED COMMUNITY(P-C)DISTRICT (PLANNING COMMISSION AMENDMENT NO.730) The City Council of the City of Newport Beach DOES ORDAIN as follows: SECTION 1. The subject property is the following real property in the City of Newport Beach, County of Orange,State of California: Parcel A: That portion of Block 93 of Irvine's Subdivision, as shown on a Map recorded in Book 1, Page 88 of Miscellaneous Record Maps, records of Orange County, California, bounded as follows: Bounded Northwesterly by the Southeasterly line of Parcel 1 of Parcel Map 79-704, as shown on a Map filed in Book 152,pages 17,18,19 and 20 of Parcel Maps,in the office of the County Recorder of Orange County,California; Bounded Northerly by the general Southerly line of the land shown on Parcel Map filed in Book 92,pages 13 and 14 of said Parcel Maps,and'by the Southerly line of Parcel 2 of said Parcel Map No.79-704; • Bounded Southeasterly by the Northwesterly line of Newport Center Drive,as shown on a Map of Tract No. 6015 recorded in Book 239, pages 28 to 41 inclusive, of Miscellaneous Maps,records of said Orange County;and Bounded Southwesterly by the Northeasterly line of East Coast Highway, as shown on said Tract No.6015. Parcel B: Parcel 2 of Parcel Map No.79-704,as shown on a Map filed in Book 152,pages 17, 18, 19 and 20 of Parcel Maps, in the office of the County Recorder of Orange County,California. and hereinafter referred to as"Property." Title 20 of the Newport Beach Municipal Code is hereby amended to rezone all of the above described Property from the Unclassified(U) and Open Space (O-S) Districts to the Planned Community(P-C) District, and designate said Property as the Corporate Plaza West Planned Community. SI C`FION 7.. The planning Director or the City of Newport Beach is hereby Instructed and directed to change Districting Map No.48,referred to in Section 20.01.050 of the Newport Beach Municipal Code, and by such reference is made a part of Title 2p, • to reflect said change as described in Section 1 hereof,and shown in the attached Exhibit "A",and when said Districting Maps have been so amended,the same shall be in full force and effect and be a part of Title 20 of the Newport Beach Municipal Code. 6 SECTION 3. Development of the property,which is rezoned PC pursuant to this Ordinance,shall be as specified in the Planned Community District Regulations and Development Plan which is also approved and adopted pursuant to this Ordinance, and • which specifies the permitted land uses, intensity and density limits and development slandards and rcgul.tlions for the property as set forth in the attached fixhibit"B" SECTION 4. The Planning Director of the City of Newport Beach is also hereby instructed and directed to apply all of the provisions of said Planned Community District Regulations and Development Plan to the Property as described herein;the same sball be in full force and effect and be a part of Title 20 of the Newport Beach Municipal Code. SECTION S.The Mayor shall sign and the City Clerk shall attest to the passage of this Ordinance. This Ordinance shall be published once in the official newspaper of the City within fifteen(15)days of its adoption. The Ordinance shall be effective thirty days after the date of its adoption. This ordinance was introduced at a regular meeting of the City Council of the • City of Newport Beach,held on the—day of 1991,and was adopted on the day of 1992,by the following vote,to wit: AYES,COUNCIL MEMBERS NOES,COUNCIL MEMBERS_ MAYOR ATTEST: dry CLERK Attachments: Exhibit"A": Districting Map No.48 • Exhibit'B": Corporate Plaza West Planned Community District Regulations and Development Plan A\-\LMRARY\CCA7W.ORD 2 7 ell P-C CON s o•s R.aos tiE9y t $•per. Tty bt F C 4 �EyEp fJK�10 Ras xez w ! 'U- L M lL } 0 * a 3 S 1 � A yb2 ' ,fAa P-c 0-3 P-t �P F i RC _U_ '� BACK BAY C'e' ?'C [AST COAST HIGHWAY a aLr MAP ra tf AlY L t•1< fl( MI/ JT DISTRICTING--MAP--CITY-OF-NEWPORT-BEACH-CALIFORNIA W R"1124 3-Y55 <m]rox! s<nRR< PENISIONS AMIDRAL•n[YDn1TIAl DISf111CT L q(ry --',�K11TIOwf— ATE WT110OM1 WC•]/M! <ti[ WIwORIT ]aLnO•! JLG L 4LLNl l.�]✓ N NY•UL L•Y-)I CU.T R•1 llw0l[ <LYILY DImlar p61GM]1 Cam• RIWT GOYK<IW ••II�Tt OM 61t.< AR•A-W•AWpOF WW 1-/<-„ (•<IS] , L _ ]!LL LT<�ILRp q M MTII<T p0 i NY MMRO O/1K IMf11<tlT <t 11-IT-1] n_i—oun[x Rtllo[wnu929 olmDer MOW nn .'r'�/,,.^T""I ..]L.]' nll•°a<a•.�+M.n rt �w.i�w.°T.+• �uv w��w�dLw we x<nw/c m.n caurtnaY<. r n•> AtlIIltno AnR.TI•lL R DmnAI ea .n PMRII•�tiYKArt I<II• YVINlt flgi xlsr x<T INAI Y..N /w��Y n/ W/I • �Y�r�I]Wp1«I�N p pbp01< IPWOMTY[IWAF W- MI<.T `R-<�W ?.FL[ R[40[IRIAL DI<TIDCT .31.•! K,CUN/m P•C /f-]LLI 1.lOYptR� wAaVyyl]!!u�- !fy[ IR MT � f—R7 COYRIRIIIA OR •R•gITIIICT !<aY%Owt<.<-F0.<.R11M M.l��WT�i�]Y(W Rl • Exhibit B • CORPORATE PLAZA WEST lot PLANNED COMMUNITY DISTRICT REGULATIONS • c > • -2- • TABLE OF CONTENTS Introduction.................................................................................................... Page SECTION I STATISTICAL ANALYSIS................. Page 4 SECTION II GENERAL NOTES............................. Page 5 SECTION III DEFINITIONS................................... Page SECTION IV BUSINESS, PROFESSIONAL............ Page 7 AND COMMERCIAL Sub-Section A Intent................................................. Page 7 Sub-Section B Permitted Uses................................... Page 7 Sub-Section C Building Location............................... Page 7 Sub-Section D Building Height................................. Page 7 Sub-Section E Parking.............................................. Page 7 Sub-Section F Landscaping..........I......I..................... Page 8 • Sub-Section G Loading Areas.................................... Page 8 Sub-Section H Storage Areas..................................... Page 8 Sub-Section I Refuse Collection Areas...................... Page 8 Sub-Section J Telephone and Electrical Service........ Page 8 Sub-Section K Signs.................................................. Pages 9-10 '�f -3- • INTRODUCTION The Corporate Plaza West Planned Community District for the City of Newport Beach is a part of the Newport Center Development,and has been developed in accordance with the Newport Beach General Plan. The purpose of this PC(Planned Community)District is to provide a method whereby property may be classified and developed for commercial activity,professional and business offices. The specifications of this district are intended to provide land use and development standards supportive of the development proposal contained herein while insuring compliance with the intent of all applicable regulatory codes. I • • C F` D z 0 FARA�LpN rcn 'per ---------------- \•',j'•!�i��+ {:'�i\i\+•y:ter.::+{!.'>{. 'S{:�::i':{:S'{V�:�•%L\}L`:SS'11y(�y�1.:;{}:•j{?}•i;}ny. Vn LV w.`hr�'yY,j{':S�);�;�lti,•yS•:ti•}.,••',YQ:';:Sf�{•:1\y1k•.lk }� 1:•i •'{:;:}{;{:;:ti{1"+.1 'J:yi{�.:y:ti;iiti:�ti}•'\ V,.'.:ly:: ••• �: hvk::':�:+}�:{•)i::1{�:{}�ti:,}�{v{{ii::�ti:.'};1:N.i•.':'li{' !.}7i::•7i^.� • PACIFIC COAST HIGHWAY LEGEND • •i`•}".i}:`: PROFESSIONAL / OFFICE / COMMERCIAL CORPORATE PLAZA WEST � /a ,c x � • I • I YY I �- EAST COAST HIGHWAY • CORPORATE PLAZA WEST NEWPORT Beach,CENTER SETBACKS SITE PLAN fLl rla»porr 13' F F � • 15s ' N • 1 ofw-co cSRE2 ----1 a 5flE 3 ITT 10— [ay U y IOf EAST COAST HIGHWAY • CORPORATE PLAZA WEST � � I NEWPORT CENTER PLAN tL1 Lt i •Y a o 1W 0 a a \ 1 ` \� 11 �\ 1 \ i A 1--I ' S1E 2 O DM s� ( C O 1 IM •IM E A S T C 0 A S T H I G H W A Y CORPORATE PLAZA WEST tfMORT CENTER Newwt Beach,CA GRADING PLAN In �« . -4- • I SECTION I. STATISTICAL ANALYSIS Corporate Plaza West 1. Project Area Net Acreage 12.7 2. Percentage of Site Coverage a. Building Footprint 15-20 b. Parking Area 40-45 C. Landscape 4045 3. Maximum building floor area will not exceed 145,000 square feet. 4. The square footage of individual buildings sites are tentative and subject to adjustment as long as the limitations on total development are not violated. Any adjustment in the • square footages for each building site shall be reviewed and approved by the Planning Director. 5. Preliminary Pad elevations shown are preliminary and subject to revisions which may result from a site survey and preparation,and City review and approval of the final grading plan. • /d x 0 SECTION II. GENERAL NOTES 1. Grading within the Planned Community area will be permitted upon securing of a grading • permit. 2. Water within the Planned Community area will be furnished by the City of Newport Beach. 3. 'Sewage disposal facilities Within the Planned Community will be provided by Orange County Sanitation District No. 5. 4. The subject property is within the City of Newport Beach. The Developer will provide the necessary flood protection facilities under the jurisdiction of the City of Newport Beach. 5. Erosion control provisions shall be carried out on all areas of the Planned Community in a manner meeting the approval of the Planning Department. 6. Except as otherwise stated in this Ordinance, the requirements of the Newport Beach Zoning Code shall apply. The contents of this supplemental text notwithstanding,no construction shall be proposed within the boundaries of this Planned Community District except that which shall comply with all provisions of Newport Beach's Uniform Building Code and the various • mechanical codes related thereto. 7. Parking lot lighting shall be subject to the review and approval of the Director of Planning. Parking lot lighting shall be designed in a manner so as to minimize impacts on adjacent residential areas. &. All mechanical appurtenances on building roof tops and utility vaults shall be screened from street level view in a manner meeting the approval of the Planning Department. 9. Prior to the issuance of grading permits, the site shall be examined to determine the existence and extent of archaeological and paleontological resources in accordance with adopted City polices. 10. The on-site parking, vehicular circulation and pedestrian circulation systems shall be reviewed and approved by the City Traffic,Engineer. 11. The intersections at private streets and drives shall be designed to provide sight distance as specified in drawing No.STD-110-L of the City Public Works design criteria. Slopes landscape,walls and other obstructions shall be considered in the sight distance requirements. Landscaping within the sight line shall not exceed twenty-four inches in height. The sight distance requirement may be modified at non-critical locations,subject • to approval of the City Traffic Engineer. 12. Prior to occupancy of any structures,easements for public emergency and security ingress, egress and public utility purposes shall be dedicated to the City over all private streets. 13. Prior to issuance of a grading permit,the master plans of water,sewer and storm drain facilities shall be reviewed and updated to current standards and any modification or extensions to the existing storm drain,water and sewer systems shown to be required by the review shall be the responsibility of the developer, unless otherwise provided for through an agreement with the property owner. �7 , -6- • SECTION III. DEFINITIONS Advertising Surface of a Sign The total area of the face of the sign structure,excluding supports. Area of Elevation Total height and length of a building as projected to a vertical plane. Setbacks from Street Corners Setbacks from street corners shall be established as that point of intersection of the required • setback lines from access streets,prolonged to point of intersection. y • f t • . i -7- SECTION IV. BUSINESS,PROFESSIONAL AND COMMERCIAL • A. Intent The intent of this district is to permit the location of a combination of business and professional office uses,and light general commercial activities engaged in the sale of products to the general public. B. Permitted Uses The following shall be permitted: 1. Retail sales and service of a convenience nature. 2. Administrative and professional offices (excluding medical offices). 3. Restaurants,including outdoor,drive-in or take-out restaurants,shall be subject to the securing of a use permit in each case. Facilities other than indoor dining establishments or those that qualify as outdoor, drive-in or take-out establishments shall be subject to the City of Newport Beach regulations covering drive-in and outdoor establishments. • 4. Institutional, financial and governmental facilities. 5. Civic, cultural, commercial recreational and recreational facilities. 6. Parking lots, structures and facilities. 7. Drive-up teller units,subject to the review of the on-site parking and circulation plan by the City Traffic Engineer and approved by the Planning Department. C. Building Location All buildings shall be located in substantial conformance with the approved site plan. D. Building Height All buildings and appurtenant structures shall be limited to a maximum height of thirty- two (32) feet provided further that they extend no higher than the extension of the sight plane established by Ordinance No. 1596 for Corporate Plaza. E. Parking • Adequate off-street parking shall be provided to accommodate all parking needs for the site. The intent is to eliminate the need for any on-street parking. Required off-street parking shall be provided on the site of the use served,or on a common parking area in accordance with the off-street parking requirements of City of Newport Beach Planning and Zoning Ordinance. F. Landscaping • Detailed landscaping and irrigation plans, prepared by a licensed landscape architect, licensed landscaping contractor,or architect shall be reviewed by the Director of Parks, Beaches and Recreation. All landscaping shall be installed and maintained so as not to penetrate the extension of the Sight Plane established for the Corporate Plaza Planned Community in Ordinance No.1596. All landscaping referred to in this section shall be maintained in a neat and orderly fashion. 1 Screening Areas used for parking shall be screened from view or have the view interrupted by landscaping,and/or fencing from access streets,and adjacent properties. Plant materials used for screening purposes shall consist of lineal or grouped masses of shrubs and/or trees. 2. Landscal2ing-Vehicle Separation All landscaped areas shall be separated from adjacent vehicular areas by a wall or curb, at least six (6) inches higher than the adjacent vehicular area. • 3. Parking Areas Trees,equal in number to one(1)per each five(5)parking stalls shall be provided in the parking area. G. Loading Areas 1. Street side loading shall be allowed providing the loading dock is screened from view from adjacent streets. H. Storage Areas 1. All outdoor storage shall be visually screened from access streets,and adjacent property. Said screening shall form a complete opaque screen. 2. No storage shall be permitted between a frontage street and the building line. I. Refuse Collection Areas 1. All outdoor refuse collection areas shall be visually screened from access streets, • and adjacent property. Said screening shall form a complete opaque screen. J. Telephone and Electrical Service All "on site" electrical lines (excluding transmission lines) and telephone lines shall be placed underground. Transformer or terminal equipment shall be visually screened from view from streets and adjacent properties. -9- K. ins 1. Building Address Sign • Building address numerals shall be a maximum of two (2)feet in height and shall be consistent with the building identification signing. Building address number shall face the street(and/or pedestrian walkways in the case of necessity),and be located on the building so that they are visible from adjacent frontage roads and designated parking areas. 2. Project/Building Identification Sign Project and/or building identification signs are permitted at major entry access drives from adjacent frontage streets, provided that they comply with the City of Newport Beach site distance requirement 110-L. The identification signage is permitted in the form of a free-standing(single or double faced)monument sign. The sign copy shall be restricted to the project or building name and street address. Individual letter heights shall not exceed eighteen (18) inches. 3. Tenant Identification Signs • Tenant identification signs are permitted and are divided into two (2)categories: Primary Tenant - Secondary Tenant Tenant identification signs are to be wall-mounted graphics,consisting of individually fabricated letters. Box or"can" signs are not permitted. The maximum number of primary tenant signs permitted on any one building elevation is two (2). Each secondary tenant shall be limited to one(1) identification sign. The maximum letter height of a primary tenant sign shall not exceed twenty-four (24)inches. The maximum letter height of a secondary tenant sign shall not exceed sixteen (16) inches. Sign copy shall be restricted to identification of the person, firm,company or corporation operating the use conducted on the site. 4. 'General Sign Standards • a. Signs(to include all those visible from the exterior of any building)may be lighted but no sign or any other contrivance shall be devised or constructed so as to rotate,gyrate,blink or move in any animated fashion. Ca 0 -10- 5. Temporary Signs • The following guidelines are intended to produce a consistent sign design for temporary signs within Newport Center. All temporary signs require the approvals of the City of Newport Beach and The Irvine Company. Temporary signs are to identify the future site,project or facility under development on individual project sites. Information on this sign is limited to: - For Sale,For Lease,Future Home of,Building/Project Name,etc. - Type or Name of Development - Type and Area of Space Available - Major Tenant or Developer - Financial Institution - General Contractor - Architect - Leasing Agent - Occupancy Date - Phone Number - Irvine Company or Irvine Company Project Name and Logo Location: One temporary sign is permitted on site for each frontage street. • These signs may be single or double-faced and parallel or perpendicular to the roadway. Design: All temporary signs are to be built in substantial conformance to The Irvine Company corporate design standards as shown on the following page. Longevity: Signs can exist from the time of lease or sale of the parcel until construction and/or leasing of the facility is complete. • ho� 216/91 • Future Home of f .American Products 31 Technology Dr. • (714) 5514500 SROKEn: Company uxHmEcr. Frank Lloyd Wright CONTPAcroa: Johnson Construction 1 HG IRVING COMPANY • =.P3 . • Attachment 12 � r ORDINANCE NO._ AN ORDINANCE OF THE CITY OF NEWPORT BEACH • APPROVING A DEVELOPMENT AGREEMENT FOR THE LIBRARY EXCHANGE AGREEMENT BETWEEN THE CITY OF NEWPORT BEACH AND THE IRVINE COMPANY (DEVELOPMENT AGREEMENT NO.4) The City Council of the City of Newport Beach DOES ORDAIN as follows: SECTION 1. The City Council finds and declares that: a. The state legislature and the City Council have determined that the lack of certainty in the approval of development projects can result in a waste of resources, escalate the cost of housing and other development to the consumer, and discourage investment in and commitment to comprehensive planning which would make maximum efficient utilization of resources at the least economic cost to the public; and b. Assurance that an applicant may proceed with a project in accordance with • existing policies,rules and regulations,and subject to conditions of approval,will strengthen the public planning process,encourage private participation in comprehensive planning,and reduce the economic costs of development; and c. California Government Code Section 65864 et seq. authorizes cities to enter into development agreements with any person having a legal or equitable interest in real property for the development of the property;and d. Chapter 15.45 of the Newport Beach Municipal Code provides requirements and procedures for the adoption of development agreements;and e. Development Agreement No.4 has been prepared in compliance with state law and the Newport Beach Municipal Code; and f. In compliance with state law and city ordinance, duly noticed public hearings were held by the Planning Commission and the City Council to consider • Development Agreement No.4;and g. The City Council finds that said Development Agreement is in compliance with the CaliforniaEnvironmental Quality Act and Guidelines promulgated thereunder;and h. The City Council finds that said Development Agreement is in conformance with the Newport Beach General Plan. • SECTION 2. Pursuant to Chapter 15A5 of the Newport Beach Municipal Cade establishing procedures and requirements for the consideration of development agreements, Development Agreement No. 4 for the Library Exchange Agreement, attached hereto as Exhibit"A",is hereby approved. SECTION 3. Copies of said Development Agreement are on file in the offices of the City Clerk and Planning Department of the City of Newport Beach and said Development Agreement is made a part hereof by this reference. SECTION 4. This Ordinance shall be published once in the official newspaper of the City,and the same shall be effective thirty(30) days after the date of its adoption. This Ordinance was introduced at a regular meeting of the City Council of the . City of Newport Beach held on the_day of 1991,and was adopted on the _day of .1992,by the following vote,to wit: AYES,COUNCIL MEMBERS NOES,COUNCIL MEMBERS ABSENT COUNCIL MEMBERS MAYOR ATTEST CITY CLERK • Attachment Exhibit"A":Development Agreement No.4 for the Library Exchange Agreement R\_\UBRARY\CGDA.ORD RECORDING REQUESTED BY AND WHEN RECORDED RETURN TO: • City Clerk City of Newport Beach 330 Newport Boulevard Newport Beach, California 92663-3884 AGREEMENT FACILITATING LIBRARY EXCHANGE (Pursuant to Government Code Sections 65864-65869.5) This AGREEMENT FACILITATING LIBRARY EXCHANGE (the "Agreement") is entered into this day of �_I 1991, by and between the City of Newport Beach, lifor municipal corporation and charter city ("City") and The Irvine Company, a Michigan corporation, ("Company") . City and Company are sometimes collectively referred to herein as the "Parties." RECITALS • A. Company and City have entered into an EXCHANGE AGREEMENT AND ESCROW INSTRUCTIONS dated October 10, 1990, (the "Exchange Agreement") , whereby the City has agreed to transfer its old library in the Civic Plaza Planned Community ("Civic Plaza) in Newport Center to Company, in exchange for a site for a new library in the Newport Village area of Newport Center (the "New Library Property") . B. Section 6.2 of the Exchange Agreement provides, among other things, that the Company's obligation to make the exchange is contingent upon its first having obtained all discretionary land use approvals necessary to (i) construct 65,550 square feet of office space in Civic Plaza, and (ii) transfer a total of 115,000 square feet of office development from Newport Village to the Corporate Plaza Planned Community ("Corporate Plaza") or the Corporate Plaza West Planned Community ("Corporate Plaza West") . C. City and Company now wish to satisfy that contingency by entering into an agreement securing for Company the right to (i) • construct 65,550 square feet of office space in Civic Plaza, and (ii) transfer and construct a total of 115,OoO square feet of office ,development from Newport Village to Corporate Plaza or Corporate Plaza West, consistent with the terms specified in the Exchange Agreement. D. This Agreement is consistent with provisions of state law (Government Code Section 65864 et seq. ) and local law (Chapter 1545) which authorize binding agreements that: (i)• encourage 0C.V BUMUCJRVPACQEVAOMT.05A 07AQ91101po a6 investment in and commitment to comprehensive planning and public facilities financing; (ii) strengthen the public planning process and encourage private implementation of the local general plan; • (iii) provide certainty in the approval of projects in order to avoid waste of time and resources; and (vi) reduce the economic costs of development by providing assurance to the property owners that it may proceed with its projects in accordance with existing policies, rules, and regulations. E. The City Council finds that this Agreement: (i) is consistent with City's General Plan and all specific plans as of the date of this Agreement applicable to the Project; (ii) is in the best interest of the health, safety, and general welfare of City, its residents, and the public; (iii) is entered into pursuant to and constitutes a present exercise of City's police power; and (iv) is consistent with, and has been approved in accordance with, provisions of Government Code Section 65867 and Chapter 15.45 of the Newport Beach Municipal Code. AGREEMENT NOW, THEREFORE, City and Company agree as follows: 1. Property. • This Agreement shall apply to the property described in the attached Exhibit "A" (collectively the "Property") . Company either is the fee owner of the Property, or has an equitable interest in the Property by reason of the Exchange Agreement. The attached Exhibit "B" is a map which shows the general location of parcels comprising the Property and indicates the portions of the Property referred to in this Agreement as Civic Plaza, Corporate Plaza, and Corporate Plaza West, respectively. 2. Development of the Property. 2.1 Project. While this Agreement is in effect, development of the Property by Company (the "Project") shall be in accordance with the terms and conditions of this Agreement, and of subsections 6.2(k) and 6.2(1) of the Exchange Agreement. In the event of a conflict between this Agreement and the Exchange Agreement, the provisions of the Exchange Agreement shall prevail. The permitted uses of the Property, the density or intensity of use of the Property, and the maximum height and size of proposed buildings shall be as • shown and identified for each parcel of the Property on Exhibit "C," provided that Company shall have the right to transfer office development square footage between Corporate Plaza and Corporate Plaza West consistent with subsection 6.2(1) of the Exchange Agreement. As provided in Government Code Section 65865.2, City shall not prevent development of the Property for the uses and to the density or intensity of development set forth in Exhibit "C." In addition, Company 0g2RK131T10JRVPA=EVAGMT.0SA 2 0724I91 2O1pe and City will adhere to the extent feasible to the processing schedule provided in Exhibit "D." reement on SO 2.2 Effect of A A icatr ons for II oval which C ty is • AppraVals. In connection with anyapp required, permitted or has the right to give relating to the Project, or otherwise under its ordinances, resolutions and codes, City shall not impose any condition or restriction prevents company from developing the Property with the uses and to the maximum densities and intensities permitted in Exhibit ,c.11 Subject to review for completeness, City shall accept for processing and shall timely review and act on all applications for further land use entitlement approvals with respect to the Project called for or required Agreement and subsections 6.2 (k) and 6.2(1) of the Exchange Agreement. In the event of a conflict between this Agreement and the Exchange Agreement, the provisions of the Exchange Agreement shall prevail. 2.3 compliance with Chapter 15.40. With respect to construction of the 115,000 square feet of office development transferred from Newport Village to corpoh toPlaza or Corporate Plaza West, Company shall complychapter 40 of the Newport Beach Municipal Code (the "TPO") subject to the provisions and 3 of n in subsections . 6.2 (1) (i) (1) -( ) the Exchange Agreement 2.4 Future Discretionary Reviews_. city shall retain its discretionary powers in reviewing applications for project- related development approvals submitted before the effective date of this Agreement, provided that those powers will be applied in a manner that is consistent with this Agreement and the Exchange Agreement and will not prevent Company from development of the Project with the land uses, and to the densities or intensities, permitted by this Agreement and the Exchange Agreement. Except as provided herein, future discretionary' approvals, including but not limited to rezoning, tentative and parcel map approvals, plot plans and plan development approvals, shall be consistent with this Agreement and the plans, ordinances, resolutions and policies regulating the use of land in effect on the effective date of this Agreement. Nothing in this Agreement shall prevent City from imposing measures to mitigate significant effects identified in any environmental document prepared for development of the Project, or any poovided rtion thereof, p • the measure does not render the Project infeasible. City shall retain full discretion to impose standard conditions generally applicable to subdivision or parcel maps or through the site plan review provisions set forth in section 20.01.070 of the Newport Beach Municipal Code. 2.5 No Conflicting Enactments. city shall not apply to the Project any ordinance, policy, rule, regulation or other measure enacted or effective after the Agreement Date which 3 07pA191 UIPs pC2TRIMT7L\IRVPAC1DfiVAaMT.OSA � /i� is in conflict with this Agreement or the Exchange Agreement., This Section shall not restrict city's ability to enact an ordinance, policy, rule, regulation or other measure . applicable to the Project pursuant to California Government Code section 65866 in accordance with the procedures specified in Section 3. No moratorium or other limitation (whether relating to the rate, timing or sequencing of the development or construction of all or any part of the Project and whether enacted by initiative or otherwise) affecting subdivision maps, Building permits, ,occupancy certificates or other entitlements to use approved, issued .or granted within City, or portions of City, shall apply to the Project. 2.6 Benefits to company. Company is entering into this Agreement on the reasonable expectation that this Agreement fulfills and implements the intent of the Exchange Agreement, which is to vest in Company as early as possible the right to (i) construct 65,550 square feet of office space in Civic Plaza, and (ii) transfer and construct a total of 115,000 square feet of office development from Newport Village to Corporate Plaza or Corporate Plaza West, consistent with the terms specified in the Exchange Agreement. The benefit to Company under this Agreement consists of the assurance, hereby acknowledged by City, that this Agreement is preserving Company's right to develop the Property as if Company had • otherwise obtained "all discretionary land use approvals" as described in subsections 6.2 (k) and 6.2 (1) of the Exchange Agreement. 3. Rules Re lations and Official Policies. 3.1 N Rules. This Agreement shall not prevent City from applying to the Project regulations and policies ('collectively "Regulations") adopted or effective after the Agreement Date, provided that the same are adopted and applied City-wide and consist solely of the following: (a) Procedural Regulations relating to hearing bodies, petitions, applications, notices, findings, records, hearings, reports, recommendations, appeals and. any other matter of procedure; (b) Regulations which are not in conflict with this Agreement or the Exchange Agreement; or • (c) Regulations which are in conflict with this Agreement or the Exchange Agreement, if such Regulations have been consented to in writing by Company. 3.2 Taxes Assessments and Fees. City may impose such taxes, assessments and fees adopted or effective after the Agreement Date, including but not limited to business license- taxes or franchise fees, on the Project as are imposed on a City-wide basis. OC2ZRKD\TI=VPACWEVAOMT.05A 4 07124,91 201Pm �9 • 3.3 New Lawa Rules or Recrulations. In the event any state or federal law, rule, regulation or plan is enacted or applied • after the Agreement Date which prevents or precludes compliance with one or more of the provisions of this Agreement, then this Agreement shall be either modified as may be necessary to comply with such state or federal laws or regulations, or terminated, pursuant to the following process: (a) Notice and Conies: In the event that a state or federal law or regulation is enacted or applied in such a way as to preclude or prevent compliance with one or more provisions of this Agreement, the Party believing that such event has occurred shall provide the other Party with: (1) written notice of the existence of such event; (2) a copy of the law or regulation; and (3) a statement of the conflict with the provisions of this Agreement, and of the proposed modification of the Agreement the Party giving the notice believes may be necessary to comply with the state or federal law or regulation; (b) Modification Conference: The Parties shall, within thirty (30) days of the notice required in Section 6.3(a) • above, meet and confer in good faith in' a reasonable attempt to agree on the effect of the rule or regulation on this Agreement and proposed modifications of this Agreement in order to conform it with such federal or state law or regulation; and, (a) Council Hearings: Regardless of whether the Parties reach any tentative agreement on the matters involved in the modification conference required by Section 6.3 (b) above, the matter shall be scheduled for a public hearing before City Council. City shall give at least thirty (30) days' public notice of such hearing, pursuant Government Code Section 65867. City Council, at such hearing, shall determine the exact modification or suspension which it believes shall be necessitated by the law, rule, regulation or plan. Company, at the hearing, shall have the right to offer oral and written testimony. Any proposed modification shall be taken by the affirmative vote of not less than a majority of City Council: Within thirty (30) days thereafter, Company shall either elect, in writing delivered to City, to • accept the modification, or terminate this Agreement. 4. Pro act as a Private Undertaking. The development of the Project is a private development, that neither Party is acting as the agent -of the other in any respect hereunder, and that each Party is an independent contracting entity with respect to the terms, covenants and conditions contained in this Agreement. No partnership, joint venture or other association of any kind is formed by this Agreement. The only relationship between City and OC2ZM CCf=VPAGWEVAGMT.O5A 5 0724191 201pm n I'I ' Company is that of government overnment entity regulating the development of private property by the owner of such property. • 5. Term. The term of this Agreement shall continue until all f the I permect as its required for occupancy and operation provided that in no contemplated by the Project have bee20isse rs a measured from the event shall such term exceed twenty ( ) y of the California Effective Date. Pursuant to Section 66452.6(a) roved for the Subdivision Map Act, any tentative Subdivision City esting to tativepro map" or Property, whether designated v to the date on which this otherwise, may be extended by Agreement terminates. 6, Amendment or Cancellation of Agreement. Other than fications of this Agreement pursuant to Section modi only by Agreement may be amended or cancelled in whole or in part mutual written and executed consent of the Parties in compliance with Government Code Section 65868. 7. Enfor_ oement• Unless amended or cancelled as provided in Section 9, or modified or suspended i s enforceablersuant by by Government Party Section 65869.5, this Agreementapplicable general or specific notwithstanding any change in any nation or other plan, zoning, subdivision or building by Cityincluding by • applicable ordinance or regulation adoptei by any or all of the the voters of City) which purports to apply Property. iew S. Periodic Review of COmpliance. twelve ty d(12) pmonths any shall mvthe this Agreement at least once every65865.1 Of the Effective Date in accordance with Sections 65865 and Company shall California Government Code. At such reviews,e�ent. Company demonstrate its good faith compliance ofcgood f ith compliance as City, agrees to furnish such evidence of g, in the reasonable exercise of its discrion ad etshallnbea deemed etoobebin notice to Company, may require. Company pursuantood faith tocSectionc with 9.1to terminate this Agreement e s not entitled this Agreement. 90 Events of Default. 9.1 Defau �ompanY. Pursuant to California Government Code Section 65865.1, if City determines following a noticed public hearing and on the basis of substantial evidence that Company has not complied in good faith with Company's • obligations under Section specify ois Agreementr City shall, by the mannerin which Company written notice Company, has failed to so comply and state the steps Company must t days ke to bring itself into compliance. If, within thirty (30) after receipt of the written notice from City specifying does the manner in which Company has failed to so comp tl bring itself not commence all steps reasonably necessary itself into compliance as required and thereafter diligdeemeently d to be pursue such steps to completion, ,then Company shall be6 07(14191 2O1pm oCn=MT1CMVPAC0EVAGMT.05A 2/ .' in default under the terms of this Agreement and city terminate yth) o seek a modir (c seek an on this Agreement, ) Agreement, or (c) Y other availableremedies, as • provided in Section 9.3. 9.2 Default by City. If City has not complied with any of its obligations and limitations under this Agreement, Company shall, by written notice to City, specify the manner in which City has failed to so comply and state the steps necessary for City to bring itself into compliance. If, within thirty (30) days after receipt of the written notice from Company specifying the manner in which City has failed to so comply, City does not bring itself into compliance, then City shall be deemed to be in default under the terms of this Agreement ion of ths and Company may (a) seek a modificatl other available terminate this Agreement, or (c) seek any remedy as provided in Section 9.3. Except as de tact grow, if City adopts or enforces any moratorium, Jure, or other similar limitation (whether relating to the rate, timing or sequencing of the development or construction of all or any part of the Project and whether enacted by initiative or otherwise) affecting the processing or approval of subdivision maps, building permits, occupancy certificates or other entitlements to use which is applied to the Project, then Company may immediately (a) seek a modification of this • Agreement, (b) terminate this Agreement, or (c) seek any other available remedy as provided in Section 9.3. City shall not be in default if it adopts a temporary citywide moratorium on development due to its inability to supply sufficient water to then current customers as necessary to maintain minimum levels of health, safety and sanitation and, provided further, the City shall not be considered in default if it is required to enforce a moratorium because of a law, rule, regulation or plan identified in Section 3.3. In the event that it becomes necessary in the future for the City or other responsible agency to declare a water or sewer moratorium, however, the Project shall have and enjoy priority over all other future development for water and sewer service when and as the same thereafter becomes available. 9.3 Specific Performance ReMft4y. Due to the size, nature and scope of the Project, and due to the fact that it may not be practical or possible to restore the Property to its natural condition once implementation of this Agreement has begun, the Parties acknowledge that, except as provided in section 9.4, money damages and remedies at law generally are inadequate and • that specific performance is appropriate for the enforcement of this Agreement. Except as provided in section 9.4, the remedy of specific performance or, in the alternative, a writ of mandate, shall be the sole and exclusive legal remedy available to either party in the event of the default, or alleged default, by the other. 707/24191 2'01Pm M+�:•' OCYIat 11MRVPAC1MVAOMT.05A {• 307 s 0 9.4 Payment of Appraised value Oxon Termination. If Company elects to terminate this Agreement as provided under Paragraph 9.2, then Company shall be entitled to payment from City of . the appraised net fair market value of the New Library Property, to be determined as follows: (a) Within thirty (30) days written notice from Company to City expressing Company's election to terminate, Company and City shall each select an appraiser to appraise the value of both the New Library Property and the old library property in Civic Plaza (the "Old Library Property") transferred to Company in exchange for the New Library Property, and advise the other of the selection. Time being of the 'essence, if either party should fail to select an appraiser within the time provided, that party shall conclusively be deemed to have selected the appraiser selected by the other party. (b) Each appraiser will be instructed to determine the value both of the New Library Property and the Old Library Property, and to meet with the other appraiser in an effort to come to an agreement as to that value, within sixty (60) days of his or her selection. If there is only one appraiser selected by City and Company, or • if the appraisers selected by them agree upon the value of the New Library Property and/or the Old Library Property, the appraised value shall be as so determined or agreed upon. (c) If the appraisers are unable to agree on a determination of the value of the New Library Property and/or the Old Library Property, then within the sixty (60) days following their selection, the two appraisers shall agree upon and appoint a third appraiser who shall independently prepare an appraisal of the value of the property on which agreement has not already been reached. The appraised value will then be the average of the two closest values as determined by the three appraisers, and the appraised net fair market value of the New Library Property shall be the appraised value of the New Library Property less the value of the Old Library Property. (d) All appraisers appointed hereunder shall be competent, qualified by training and experience in Orange County, California, disinterested, and independent, and • shall be members in good standing of the American Institute of Real Estate Appraisers or its successor, or such other 'recognized association of professional real estate appraisers as my be mutually agreed upon by Company and City, and all determinations of value shall be rendered in writing and signed by the appraiser or appraisers making the report. 0CZTRRBnMRVPAQDEVAOMT.05A H 07401 7.01pm 33 (e) For purposes of all appraisals, the New Library Property shall be appraised assuming (i) that the New Library Property were unimproved but fully graded and • with all required utilities in place for development, (ii) that the highest and best use of the New Library Property was for office development, (iii) that the New Library Property were fully entitled for development of 180,500 square feet of net leasable office space (less the amount of that square footage of net leasable office space actually transferred to Corporate Plaza and/or Corporate Plaza West and for which building permits have been issued or similar vested rights otherwise secured as of the valuation date) , (iv) that development of the New Library Property to that level of entitlement were not constrained by any height restrictions or similar constraint, and (v) that all permit and other governmental fees have been paid and necessary public infrastructure installed. For purposes of all appraisals, the old Library Property shall be appraised in its then current condition, taking into account the then status and application of applicable regulations, zoning laws, moratoria, and other land use entitlements than might apply against the old Library Property and its development. • (f) Within thirty (30) days after the value of the New Library Property has been determined pursuant to the foregoing, City shall pay to Company the appraised value of the New Library Property. 10. Cooperation. Each Party covenants to take such reasonable actions and execute all documents that may be necessary to achieve the purposes and objectives of this Agreement. 11. Force Majeure. Neither Party shall be deemed to be in default where failure or delay in performance of any of its obligations under this Agreement is caused, through no fault �of the Party whose performance is prevented or delayed, by floods, earthquakes, other Acts of God, fires, wars, riots or similar hostilities, strikes or other labor difficulties, State or Federal regulations, or court actions. Except as specified above, nonperformance shall not be excused because of the act or omission of a third person. 12. Notices. Any notice or demand which shall be required or permitted by law or any provision of this Agreement shall be in • writing and if the same is to be served upon a Party, may be personally delivered to the Party, or shall be deposited in the United States mail, certified, return receipt requested, postage prepaid, dr shall be delivered by overnight courier, overnight courier charges prepaid, and shall be addressed as follows: OC2ZRRB\nCVRVPA=EVAOMT.OSA 9 0UMI 101po TO CITY: City of Newport Beach 3300 Newport Boulevard Post Office Box 1768 • • Newport Beach, California 92663-3884 Attn: City Manager With a copy to: City Attorney City of Newport Beach 3300 Newport Boulevard Post Office Box 1768 Newport Beach, California 92663-3884 TO COMPANY: The Irvine Company 550 Newport Center Drive Newport Beach, California 92660-0015 Attn: General Counsel With copies to: Latham & Watkins 650 Town Center Drive Costa Mesa, California 92626-1918 Attn: Robert K. Break Irvine Pacific 550 Newport Center Drive • Newport Beach, California 92660-0015 Attn: President Either Party may change the address. stated herein by notice to the other Party in the manner provided in this Section, and thereafter notices shall be addressed and submitted to the new address. Notice shall be deemed to be delivered upon the earlier of (a) the date received or (b) three (3) business days after deposit in the mail as provided above. 13. Transfers and Assignments. Company shall have the right to sell, lease, transfer or assign the Property in whole or in part (provided that no such partial transfer shall cause a violation of the Subdivision Map Act, Government Code Section 66410, et seg.) to any person, partnership, joint venture, firm or corporation at any time during the term of this Agreement without prior written consent of City. The burdens and benefits of this Agreement inure to all successors in interest of the parties to this Agreement. In order to provide continued notice thereof, this Agreement and all amendments thereto will be recorded by the Parties. I. 6r., 0=01 Wpm •t OC121FJMn=VPA0J)EVAGM1:0SA 10 4k 14. Exhibits. The following documents are attached hereto and incorporated herein by this reference: • Exhibit Designation Description "All Legal Description of the Property "BOO Depiction of the Property "C" Development Plan (Including Density and Intensity of Development) "D" Processing Schedule 15. Rules of Construction and Miscellaneous Terms. 15.1 Gender. The singular includes the plural; the masculine and neuter include the feminine; "shall" is mandatory, "may" is permissive. 15.2 Time of Essence. Time is of the essence regarding each provision of this Agreement in which time is an element. • 15.3 Waiver. Failure by a Party to insist upon the strict performance of any of the provisions of this Agreement by the other Party, and failure by a Party to exercise its rights upon a default by the other Party hereto, shall not constitute a waiver of that Party's right to demand strict compliance by such other Party in the future. 15.4 Counterparts. This Agreement may be executed in two or more counterparts, each of which shall be identical and may be introduced in evidence or used for any other purpose without any other counterpart, but all of which shall together constitute one and the same Agreement. 15.5 Entire Agreement. This Agreement constitutes the entire agreement and supersedes all prior agreements and understandings, both written and oral, between City and Company with respect to the subject matter hereof. 15.6 Severabiiity. If any provision of this Agreement or the application thereof to any party or _ circumstances shall be held invalid or unenforceable to • any •extent, the remainder of this Agreement or the application of such provision to persons or circumstances other than those as to whom or which it is held invalid or unenforceable, shall not be affected thereby, and each provision of this Agreement shall be valid and enforceable to the fullest extent permitted by law. ; , - 15.7 Construction. This Agreement has been drafted after ';"• extensive negotiation and revision. Both Company and City �ads� • 11 07[Ml 201pm OC2ZRKBNTICVRVFACJ)L iMI:OSA • • are sophisticated parties represented by independent counsel throughout the negotiations. City and Company each agree and acknowledge that the terms of this Agreement are fair and • reasonable, taking into account their respective purposes, terms and conditions. In accordance with the foregoing, this Agreement shall be construed as a whole in accordance with its fair meaning and no principle or presumption of contract construction or interpretation shall be used to construe the whole or any part of this Agreement in favor of or against either City and Company. 15.s No Third Party Beneficiaries. The only parties to nt are City and Company. There are no third party this AgreeZe beneficiaries and this Agreement is not intended and shall not be construed to benefit or be enforceable by any other person whatsoever. 15.9 Governing Law. This Agreement and any dispute arising hereunder shall be governed by and interpreted in accordance with the laws of the State of California. 15.10 section Headings. All Section headings and subheadings are inserted for convenience only and shall not affect any construction or interpretation of this Agreement. • 15.11 Incorporation of Recitals and Exhibits. Recitals A through E and attached Exhibits "A" through "E" are hereby incorporated herein by this reference as though fully set forth in full. 16. Authority to Execute. The persons executing this Agreement warrant and represent that they have the authority to execute this Agreement on behalf of the entity for which they are executing this Agreement, and further warrant and represent that they have the authority to bind their respective Party to the performance of its obligations hereunder. 17. Recordation. This Agreement and any amendment or modification hereto or cancellation hereof shall be recorded in the Office of the County Recorder of the County of Orange, by the City Clerk within the period required by Section 65868.5 of the Government Code. • THE IRVINE COMPANY A Michigan corporation By: 0C2U=UC MVPAC0EVAGMT.0SA 12 071MI 2-01pm Its: By: Its: CITY OF NEWPORT BEACHp A Municipal Corporation By: Its: Mayor ATTEST: City Clerk APPROVED AS TO FORM: Robert H. Burnham City Attorney 0C22R! %UC9RVPAQDEVAGMT.OSA 13 OVUM i0lpm J G JO 01/06/92 1s:29 FAX 714 7#b 2421 • HXMIT "A" CIVIC PLAZA Legal Description Parcels 1, 2 and 3, as shown on a Map filed in Book 81, pages 8 and 9 of Parcel Maps, in the office of the County Recorder of Orange County, California. • 01/06/92 15:50 FAX 714 2421 inn lxvttiu W. • �ppd" EXHIBIT A CORPORATE PLAZA Legal Description parcels 1 to 20 inclusive, and Parcels A and B, as shown on a Map filed in Book 93, pages 45 and 46 of Parcel Maps, in the office of the County Recorder of Orange County, California. • • .kln O1/08/92 15:30 FAX 714 2421 THE 1RV1NR W. • Wluuviuuo t+Sa'Qii'rr "At' 11 CORPORATE PLAZA WEST Legal Description Parcel A: That portion of Block 93 of Irvine's Subdivision, as shown on a Map recorded in Book 1, page 88 of Miscellaneous Record Maps, records of Orange County, California, bounded as follows: Bounded Northwesterly by the Southeasterly line of Parcel 1 of Parcel Map No. • 79-704, as shown on a Map filed in Book 152, pages 179 189 19 and 20 of Parcel Maps, in the office of the County Recorder of Orange County, California; Bounded Northerly by the general Southerly line of the land shown on Parcel Map filed in Book 92, pages 13 and 14 of said Parcel Maps, and by the Southerly line of Parcel 2 of said Parcel Map No. 79 704; Bounded Southeasterly by the Northwesterly line of Newport Center Drive, as shower on a Map of Tract No. 6015 recorded in Book 239, pages 28 to 41 inclusive, of Miscellaneous Maps, records of said Orange County; and Bounded Southwesterly by the Northeasterly line of East Coast High, as shown on said Tract No. 6015. Parcel B: Parcel 2 of Parcel Map No. 79704, as shown on a Map filed in Book 152, pages 17, 18,-19 and 20 of Parcel Maps, in the office of the County Recorded of Orange County, California. . 0i/aa/aL 18:sU rna 114 V L4'1 ++.++ .,.,,..., ..... • z...... ..... EYMIT "A" • NEWPORT VrLLAGE Legal Description That portion of Block 93 of Irvine's Subdivision, as shown on a Map recorded in Book 1, page 88 of Miscellaneous Record Maps, records of Orange County, California, bounded as follows: Bounded Northeasterly by the Southwesterly line of San Joaquin ]:sills .Road, as shown on a Map of Tract No. 6015 recorded in Book 239, pages 28 to 41 inclusive, of Miscellaneous Maps, records of said Orange County; • Bounded Northwesterly by the centerline of Avocado Avenue, as shown on Parcel Map No. 84-706 filed in Book 192, pages 1 and 2 of Parcel Maps, in,the office of the County Recorder of said Orange County, Parcel Map No. 83-729 filed in Book 193, pages 17 and 18 of said Parcel Maps, Parcel Map filed in Book 259 page 1 of said Parcel Maps and Parcel Map filed in Book 56, page 46 of said Parcel Maps, and Northwesterly by the Southeasterly line of Avocado Avenue as shown on Parcel Map filed in Bood 93, pages 45 and. 46 of said Parcel Maps; Bounded Southeasterly by the Northwesterly line of MacArthur Boulevard; and Bounded Southwesterly by the Northeasterly line of East Coast Highway. Excepting therefrom that portion included within San Miguel Drive. • EXHIBIT "B" Civic Plaza Old Library Site 49 Center 41, • Corporate Plaza West Sand • P Newport Village y Now Library Site Corporate Plaza ii • Library Land Exchange Agreement Parcels January6,1992 - Parcels 500 ���' 70 EXHIBIT "C" • • CIVIC PLAZA PLANNED COMMUNITY DISTRICT REGULATIONS • • Y-Al EXHIBIT "C" • -2- TABLE OF CONTENTS Introduction.................................................................................................... Page SECTION I STATISTICAL ANALYSIS................. Page 5 SECTION 11 GENERAL NOTES............................. Page 6 SECTION III CIVIC, CULTURAL............................ Page BUSINESS AND PROFESSIONAL OFFICES Sub-Section A Intent................................................. Page 7 Sub-Section B Permitted Uses................................... Page 7 Sub-Section C Building Location............................... Page 7 Sub-Section D Buildi.-ig Height................................. Page 7 Sub-Section E Parking.............................................. Page 7 Sub-Section F Landscaping....................................... Page 8 Sub-Section G Loading Areas.................................... Page 8 . Sub-Section H Refuse Collection Areas...................... Page 8 Sub-Section I Telephone and Electrical Service........ Page 8 Sub-Section J Signs.................................................. Pages 9-10 760S S EXHIBIT "C" -3- • PLANNED COMMUNITY DISTRICT REGULATIONS For Civic Plaza Ordinance No. 1649,adopted by the City of Newport Beach on December 22,1975 (Amendment No.455) Amendment No.1 March 12,1979 P.C.Amendment No 527;Resolution No.9517 Amendment No.2 November 23,1987 P.C. Amendment No.653;Resolution No.87-164 • EXHIBIT "C" -4- INTRODUCTION • The Civic Plaza Planned Community District for the City of Newport Beach is a part of the Newport Center Development in conformance with the Newport Beach General Plan which was adopted in December 1973. The subject property is located in the northwestern area of Newport Center. It is adjacent to San Joaquin Hills Road on the north,Santa Cruz and San Clemente Drives on the east,Santa Barbara Drive on the south, and an existing police station, fire station,automobile agency and. service station on the west. The purpose of this PC(Planned Community)district is to provide a method whereby property may be classified and developed for civic and cultural activity and commercial,professional and business offices. The specifications of this district are intended to provide flexibility in both the land use and development standards for the planned building groups. • • i 417 • EXHIBIT "C" • SAN JOAQUIN HILLS ROAD ServiceStation >:.::•;.:c •;:;rs.t•:2:;:;:..;;::c :•.:;. ::c.;:.;.;,•.;.:•:cr•.:...... .' Auto gency y;. Po/ice oept ••>.:r, r .;,.... 4•.�:.;:.::::::�::.:.::.. Fire � Q p qT cc LU m cc Q � ~ 7 � LEGEND O��G • CIVIC / CULTURAL / PROFESSIONAL / OFFICE CIVIC PLAZA 70 • EXHIBIT "C" • 1 ` JA`f,&o ROAD - � �Fw--wTE der 1 /a 90 , CIVIC PLAZA rrrr'777 NEWPORT CENTER sE78ACrc sirE ww i Newport Beech. EXHIBIT "C" • r _ • � ��READ �� � r� � i � S•r�o \\- N ° r � a �♦ I ' ` •` see \ ° /, r i _SANTA—CR DRIVE�_ •3Q/sjl�. • /� '' --�1101•T1 I CIVIC PLAZA NEWPORT C94TER Newport eeach,CA GRADM PLAN A EXHIBIT "C" • -5- • SECTION I. STATISTICAL ANALYSIS Civic Plaza 1. Project Area Net Acreagel 26.12 2. Percentage of Site Coverage (Site Plan) a. Building Footprint I5-20%a b. Parking Area 45-50% C. Landscape 35-40% 3. ware Footages of Uses Office Park2 315,661 Sq. Ft. Art Museum 30,000 Sq. Ft. I ' • l Net Acreage Site area within the existing property lines. 2 February 1, 1991 existing square footage allowable is 250,111 (Land Use Element of the City of Newport Beach,Resolution No.88-100,October 24, 1988). • EXHIBIT "C" -6- SECTION II. GENERAL NOTES • 1. 1Vatcr within the Planned Community area will be furnished by the City of Newport Beach. 2. Sewage disposal facilities within the Planned Community will be provided by Orange County Sanitation District No. 5. 3. The subject property is within the City of Newport Beach. The Developer will provide the necessary flood protection facilities under the jurisdiction of the City of Newport Beach. d. Grading and erosion control provisions shall be carried out on all areas of the Planned Community in a manner meeting the approval of the Director of Planning. 5. Except as otherwise stated in this Ordinance, the requirements of the Newport Beach Zoning Code shall apply. The contents of this supplemental text notwithstanding,no construction shall be proposed within the boundaries of this Planned Community District except that which shall comply with all provisions of Newport Beach's Uniform Building Code and the various mechanical codes related thereto. • 6. Parking lot lighting shall be subject to the review and approval of the Director of Planning. Parking lot lighting shall be designed in a manner so as to minimize impacts on adjacent residential areas. 7. All mechanical appurtenances on building roof tops and utility vaults shall be screened from street level view in a manner meeting the approval of the Director of Planning. S. Prior to the issuance of grading permits, the site shall be examined to determine the existence and extent of archaeological and paleontological resources in accordance with adopted City polices. 9. In the event that any non-office facility were to be eliminated from the project, the eliminated facility would be replaced with the equivalent amount of office space. 10. That a pedestrian and bicycle trail system be reviewed and approved by the Director of Planning. I • EXHIBIT "C" -7- SECTION III. CIVIC,CULTURAL,BUSINESS AND PROFESSIONAL OFFICES • A. Intent The intent of this district is to permit the location of a combination of civic,cultural, business and professional office uses,and support commercial activities.engaged in the sale of products to the general public. B. Permitted Uses The following shall be permitted: 1. Retail sales and service of a convenience nature. 2. Administrative and professional offices. 3. Restaurants. Subject to Use Permit. 4. Institutional, financial and ,governmental facilities. 5. Civic, cultural, commercial recreational and recreational facilities. • 6. Parking lots, structures and,facilities. C. Building Location All buildings shall be located in substantial conformance with the approved site plan. p. Building Height All buildings and appurtenant structures shall be limited to a maximum height of sixty- five (65) feet. E. Parking Adequate off-street parking shall be provided to accommodate all parking needs for the site. The intent is to eliminate the need for any on-street parking. Required off-street parking shall be provided on the site of the use served,or on a common parking area in accordance with the off-street parking requirements of City of Newport Beach Planning and'Zoning Ordinance. • Parking for the museum shall be based on 3.5 spaces/1,000 square feet of gross Floor area. S3 EXHIBIT "C" • -8- F. Landscaping Detailed landscaping and irrigation plans, prepared by a licensed landscape architect, • licensed landscaping contractor, or architect shall be reviewed by the Director of Parks, Beaches and Recreation. All landscaping referred to in this section shall be maintained in a neat and orderly fashion. 1. Screening Areas used for parking shall be screened from view or have the view interrupted by landscaping,and/or fencing from access streets,and adjacent properties. Plant materials used for screening purposes shall consist of lineal or grouped masses of shrubs and/or trees. 2. Landscaping-Vehicle Separation All landscaped areas shall be separated from adjacent vehicular areas by a wall or curb, at least six (6) inches higher than the adjacent vehicular area. 3. Parking Areas • Trees,equal in number to one(1) per each five(5)parking stalls shall be provided in the parking area. C. Loading Areas 1. Street side loading shall be allowed providing the loading dock is screened from view from adjacent streets. H. Refuse Collection Areas 1. All outdoor refuse collection areas shall be visually screened from access streets, and adjacent property. Said screening shall form a complete opaque screen. 1. Telephone and Electrical Service All "on site electrical lines (excluding transmission lines) and telephone lines shall be placed underground. Transformer or terminal equipment shall be visually screened,from view from streets and adjacent properties. 2. No refuse collection area shall be permitted between a frontage street and the building line. • • EXHIBIT "C" • -9- J, signs 1. Building Address Sign • Building address numerals shall be a maximum of two (2) feet in height and shall be consistent with the building identification signing. Building address number shall face the street (and/or pedestrian walkways in the case of necessity),and be located on the building so that they are visible from adjacent frontage roads and designated parking areas. 2. Project/Building Identification Sign Project and/or building identification signs are permitted at major entry access drives from adjacent frontage streets, provided that they comply with the City of Newport Beach site distance requirement 110-L. The identification signage is permitted in the form of a free-standing (single or double faced)monument sign. The sign copy shall be restricted to the project or- building name and street address. Individual letter heights shall not exceed eighteen (18) inches. 3. Tenant Identification Signs • Tenant identification signs are permitted and are divided into two (2) categories: Primary Tenant Secondary Tenant Tenant identification signs are to be wall-mounted graphics,consisting of individually fabricated letters. Box or "can" signs are not permitted. The maximum number of primary tenant signs permitted on any one building elevation is two (2). Each secondary tenant shall be limited to one (1) identification sign. The maximum letter height of a primary tenant sign shall not exceed twenty-four (24)inches. The maximum letter height of a secondary tenant sign shall not exceed sixteen (16) inches. Sign copy shall be restricted to identification of the person, firm,company or corporation operating the use conducted on the site. 4. General Sign Standards • a. Signs (to include all those visible from the exterior of any building)may be lighted but no sign or any other contrivance shall be devised or constructed so as to rotate,gyrate,blink or move in any animated fashion. . ss' EXHIBIT "C" i -10- 5. Temporary Signs The following guidelines are intended to produce a consistent sign design for • temporary signs within Newport Center. All temporary signs require the approvals of the City of Newport Beach and The Irvine Company. Temporary signs are to identify the future site, project or facility under development on individual project sites. Information on this sign is limited to: - For Sale, For Lease,Future Home of, Building/Project Name,etc. - Type or Name of Development - Type and Area of Space Available - Major Tenant or Developer - Financial Institution - General Contractor - Architect - Leasing Agent Occupancy Date - Phone Number - Irvine Company or Irvine Company Project Name and Logo Location: One temporary sign is permitted on site for each frontage street. • These signs may be single or double-faced and parallel or perpendicular to the roadway. Design: All temporary signs are to be built in substantial conformance to The Irvine Company corporate design standards as shown on the following page. Longevity: Signs can exist from the time of lease or sale of the parcel until construction and/dr leasing of the facility is complete. • a s6 EXHIBIT "C" .,1r•,r .;M1 • Page 2/6/91 Future Home,of .Amenican Products 31 ":ethnology Dr. (714) 551,1500 MKS: Company mcwrrcr: Frank Lloyd Wright caMLACMR: Johnson Construction THE WIN=COMPANY { • EXHIBIT "C" CORPORATE PLAZA PLANNED COMMUNITY DISTRICT REGULATIONS • , EXHIBIT "C" . -2- • I TABLE OF CONTENTS Introduction.................................................................................................... Page SECTION I STATISTICAL ANALYSIS................. Page 4 SECTION II GENERAL NOTES............................. Pages 5-6 SECTION III DEFINITIONS................................... Page 7 SECTION IV BUSINESS, PROFESSIONAL............ Page AND COMMERCIAL Sub-Section A Intent................................................. Page Sub-Section B Permitted Uses................................... Page 8 Sub-Section C Building Location............................... Page 8 Sub-Section D Building Height................................. Page 8 Sub-Section E Parkir g.............................................. Page 9 Sub-Section F Landscaping....................................... Page 9 Sub-Section G Loading Areas.................................... Page 9 • Sub-Section H Storage Areas..................................... Page 9 Sub-Section I Refuse Collection Areas...................... Page 10 Sub-Section J Telephone and Electrical Service........ Page 10 Sub-Section K Signs.................................................. Pages 10-11 • EXHIBIT "C" • -3- • INTRODUCTION The Corporate Plaza Planned Community District for the City of Newport Beach is a part of the Newport Center Development in conjunction with the South Irvine Ranch General Land'Use Plan and the Newport Beach General Plan which was adopted in December 1973. The purpose of this PC(Planned Community) District is to provide a method whereby property may be classified and developed for commercial activity, professional and business offices. The specifications of this district are intended to provide flexibility in both the land use and development standards for the planned building groups. • • EXHIBIT "C" • • D O C) lz �9 :.:.< •: m �p,�t O I T /\ :� tp;>}S��}Y{`?:•::C:;4'�vi:;i:4;};;;;::::;:• :•:v:::::{ti ti}i::: r;•f.l::'.}:�;•':J:.:'•'::�ytiy{.'t:•'tL:;:•;:;:��•:�::1'•;•1'.'•;:ir;r;.:...jii.M1l'�.:::,.., r •4•';.�•.;{::7:•iS};Y{{ `•'1•"'t{•'•L1'::yi{r;::�t<:y::;:yti}jS.::.;. .. ......;.;;; •:: PACIFIC COAST HIGHWAY LEGEND • <'' '< PROFESSIONAL / OFFICE / COMMERCIAL CORPORATE PLAZA �� EXHIBIT "C" 12 ri la 'V y b 14 A �`. � /' i r`f1T�1TR 15 It • A O 11 .�..i�. A p 9 I•� �G_.. I a F 9 p, O f y G w < • b •A , 2 r j { ® � �' � tea• • A • S A p- CORPORATE PLAZAAIEW n t PORT CENTER SETBACKS SITE `I a �eeeen,ca IIJJ .0 _,.,,, G �w • EXHIBIT "C" • f 12 . 9 19 _ d r� Y 14JTTMTLI Is Is i 23 tp loll 22 , a 1 CORPORATE PLAZA NEWPORT CENTER , � 3 h,CA 3fGHTPLMEPLAN EXHIBIT "C" -4- • SECTION I. STATISTICAL ANALYSIS Corporate Plaza 1. Project Area Gross Acreage 47.8 Net Acreage 40A 2, Percentage of Site Coverage a. Building Footprint 15-20 b. Parking Area 40-45 C. Landscape 40-45 3. Maximum building floor area will not exceed 432,320 square feet. 4. The square footage of individual building sites are tentative and subject to adjustment as long as the limitations on total development are not violated. Any adjustment in the • square footages for each building site shall be reviewed and approved by the Planning Director. • EXHIBIT "C" -5- SECTION H. GENERAL NOTES • j. Grading outside an area submitted under the Planned Development Ordinance but within the Planned Community area will be permitted upon securing of a grading permit. 2. Water within the Planned Community area will be furnished by the City of Newport Beach. 3. Sewage disposal facilities within the Planned Community will be provided by Orange County Sanitation District No. 5. 4, The subject property is within the City of Newport Beach. The Developer will provide the necessary flood protection facilities under the jurisdiction of the City of Newport Beach. 5. Erosion control provisions shall be carried out on all areas of the Planned Community, in a manner meeting the approval of the Director of Planning. 6. Except as otherwise stated in this Ordinance, the requirements of the Newport Beach Zoning Code shall apply. • The contents of this supplemental text notwithstanding,no construction shall be proposed within the boundaries of this Planned Community District except that which shall comply with all provisions of Newport Beach's Uniform Building Code and the various mechanical codes related thereto. 7, Parking lot lighting shall be subject to the review and approval of the Director of Planning. Parking lot lighting shall be designed in a manner so as to minimize impacts on adjacent residential areas. 8. All mechanical appurtenances on building roof tops and utility vaults shall be screened from street level view in a manner meeting the approval of the Director of Planning, 9. Prior to the issuance of grading permits, the site shall be examined to determine the existence and extent of archaeological and paleontological resources in accordance with adopted City polices. 10. Any future signal light on East Pacific Coast Highway at the private street intersection will be the responsibility of The Irvine Company. 11. The on-site parking, vehicular circulation and pedestrian circulation systems shall be reviewed and approved by the Traffic Engineer. • 12. The intersections at private streets and drives shall be designed to provide sight distance for a speed of 30 miles per hour. Slopes landscape,walls and other obstructions shall be considered in the sight distance requirements. Landscaping within the sight line shall not exceed twenty-four inches in height. The sight distance requirement may be modified at non-critical locations,subject to approval of the Traffic Engineer. �t/ EXHIBIT "Cl' . -6- . 73. Prior to occupancy of any structures,easements for public emergency and security ingress, egress and public utility purposes should be dedicated to the City over all private streets. 14. Prior to issuance of a grading permit,the master plans of water,sewer and storm drain facilities shall be reviewed and updated to current standards and any modifications or extensions to the existing storm drain,water and sewer systems shown to be required by the review shall be the responsibility of the developer unless otherwise provided for through an agreement with the property owner. The review of the storm drain master plan will require the submittal of hydrology and hydraulic studies to the Public Works Department for review and approval. The hydrology study shall include both on-site and off-site drainage to determine the measures necessary to protect the subject development from flooding during a 100 year storm frequency. The developer may be required to install retention basins upstream from the proposed development or enlarge the existing downstream storm drain system to satisfy the requirement. 15. The northerly entrance/exit on Avocado Avenue shall be designed for a right turn in and out,ONLY. The design shall provide for an island that restricts left turns. This requirement may be waived if the driveway lines up with the access to the parcel easterly of Avocado Avenue and the City incurs no additional costs to relocate their proposed access to the library site. • • • EXHIBIT "C" • _7_ • $ECTION III. DEFINITIONS ,6dvertising Surface of a Sign The total area of the face of the sign structure,excluding supports. Area of Elevation Total height and length of a building as projected to a vertical plane. $gtbacks from Street Corners • Setbacks from street corners shall be established as that point of intersection of the required tefback lines from access streets,prolonged to point of intersection. �r� • EXHIBIT "C" • -8- SECTION IV. BUSINESS,PROFESSIONAL AND COMMERCIAL • A. In n The intent of this district is to permit the location of a combination of business and professional office uses, and light general commercial activities engaged in the sale of products to the general public. B. Permitted Uses The following shall be permitted: 1. Retail sales and service of a convenience nature. 2. Administrative and professional offices (excluding medical offices). 3. Restaurants,including outdoor,drive-in or take-out restaurants,shall be subject to the securing of a use permit in each case. Facilities other than indoor dining establishments or those that qualify as outdoor,drive-in or take-out establishments shall be subject to the City of Newport Beach regulations covering drive-in and outdoor establishments. • Restaurant uses shall not be permitted on Building Site Numbers 3,4,or 5. 4. Institutional, financial and governmental facilities. 5. Civic, cultural, commercial recreational and recreational facilities. 6. Parking lots, structures and facilities. 7. Drive-up teller units,subject to the review of the on-site parking and circulation plan by the City Traffic Engineer and approved by the Director of Planning. C. Building Location All buildings shall be located in substantial conformance with the approved site plan. D. Building Height All buildings and appurtenant structures shall be limited to a maximum height of thirty- two (32) feet, with the exception of Building"22 " which shall be permitted up to the limit established by the sight plane and the extension of the sight plane northerly to • Farallon Drive and southerly to Pacific Coast Highway. d� EXHIBIT "C" -9- E. Parkin all be provided to accommodate all parking needs for the Adequate off-street parking sh . site. The intent is to eliminate the need for any on-street parking. Required off-street parking shall be provided on the site of the use served,or on a common parking area in accordance with the off-street parking requirements of City of Newport Beach Planning and Zoning Ordinance. F. Landscaping Detailed landscaping and irrigation plans, prepared by a licensed landscape architect, licensed landscaping contractor, or architect shall be reviewed by the Director of Parks, Beaches and Recreation. In no case shall any landscaping penetrate the sight plane ordinance established by the sight plane for Harbor View Hills. All landscaping referred to in this section shall be maintained in a neat and orderly fashion. 1 Screening Areas used for parking shall be screened from view or have the view interrupted by landscaping,and/or fencing from access streets,and adjacent properties. • Plant materials used for screening purposes shall consist of lineal or grouped masses of shrubs and/or trees. 2. Landscaping-Vehicle Separation All landscaped areas shall be separated from adjacent vehicular areas by a wall or curb, at least six (6) inches higher than the adjacent vehicular area. 3. Parking Areas Trees,equal in number to one(1) per each five(5) parking stalls shall be provided in the parking area. G. Loading Areas 1. Street side loading shall be allowed providing the loading dock is screened from view from adjacent streets. H. - toragg Areas • 1. All outdoor storage shall be visually screened from access streets,and adjacent property. Said screening shall form a complete opaque screen. 2. No storage shall be permitted between a frontage street and the building line. 7p EXHIBIT "C" • -10- 1. Refuse Collection Areas 1. All outdoor refuse collection areas shall be visually screened from access streets, • and adjacent property. Said screening shall form a complete opaque screen. 2. No refuse collection area shall be permitted between a frontage street and the building line. J. Telephone and Electrical Service All "on site" electrical lines (excluding transmission lines) and telephone lines shall be placed underground. Transformer or terminal equipment shall be visually screened from view from streets and adjacent properties. K. i n 1. Building Address Sign Building address numerals shall be a maximum of two(2)feet in height and shall be consistent with the building identification signing. Building address number shall face the street (and/or pedestrian walkways in the case of necessity),and be located on the building so that they are visible from adjacent frontage roads and designated parking areas. • 2. Project/Building Identification Sign Project and/or building identification signs are permitted at major entry access drives from adjacent frontage streets, provided that they comply with the City of Newport Beach site distance requirement 110-L. The identification signage is permitted in the form of a free-standing(single or double faced)monument sign. The sign copy shall be restricted to the project or g building name and street address. Individual letter heights shall not exceed eighteen (18) inches. 3. Tenant Identification Signs Tenant identification signs are permitted and are divided into two (2)categories: - Primary Tenant - Secondary Tenant Tenant identification signs are to be wall-mounted graphics,consisting of • individually fabricated letters. Box or "can" signs are not permitted. The maximum number of primary tenant signs permitted on any one building elevation is two (2). Each secondary tenant shall be limited to one (1) identification sign. The maximum letter height of a primary tenant sign shall not exceed twenty-four (24)inches. The maximum letter height of a secondary tenant sign shall not exceed sixteen(16) inches. EXHIBIT "C" . -11- Sign copy shall be restricted to identification of the person, firm,company or corporation operating the use conducted on the site. . 4. General Sign Standards a. Signs (to include all those visible from the exterior of any building) may be lighted but no sign or any other contrivance shall be devised or constructed so as to rotate,gyrate,blink or move in any animated fashion. 5. Temporary Signs The following guidelines are intended to produce a consistent sign design for temporary signs within Newport Center. All temporary signs require the approvals of the City of Newport Beach and The Irvine Company. Temporary signs are to identify the future site, project or facility under development on individual project sites. Information on this sign is limited to: - For Sale,For Lease,Future Home of,Building/Project Name,etc. - Type or Name of Development - Type and Area of Space Available - Major Tenant or Developer • Financial institution General Contractor - Architect - Leasing Agent - Occupancy Date - Phone Number - Irvine Company or Irvine Company Project Name and Logo Location: One temporary sign is permitted on site for each frontage street. These signs may be single or double-faced and parallel or perpendicular to the roadway. Design: All temporary signs are to be built in substantial conformance to The Irvine Company corporate design standards as shown on the following page. Longevity: Signs can exist from the time of lease or sale of the parcel until construction and/or leasing of the facility is complete. • • EXHIBIT "C" • 7; ^j Page 2/6/94 • Future Home of .Amen*can Products 31 Technology Dr. (71.4) 551,1500 ORaceA: Company .wcwmcr: Frank Lloyd Wright COM Acwa: Johnson Construction v�THE IRVINE COMR NY • �3 • EXHIBIT "C" • CORPORATE PLAZA WEST • PLANNED COMMUNITY DISTRICT REGULATIONS I• • EXHIBIT "C" -2- • TABLE OF CONTENTS Introduction.................................................................................................... Page SECTION I STATISTICAL ANALYSIS................. Page SECTION 1I GENERAL NOTES............................. Page 5 SECTION III DEFINITIONS................................... Page 6 SECTION IV BUSINESS, PROFESSIONAL............ Page 7 AND COMMERCIAL Sub-Section A Intent................................................. Page 7 Sub-SectionB Permitted Uses................................... Page Sub-Section C Building Location............................... Page 7 Sub-Section D Building Height................................. Page 7 Sub-Section E Parking.............................................. Page 7 Sub-Section F Landscaping....................................... Page 8 • Sub-Section G Loading Areas.................................... Page 8 Sub-Section H Storage Areas..................................... Page 8 Sub-Section I Refuse Collection Areas...................... Page 8 Sub-Section J Telephone and Electrical Service........ Page 8 Sub-Section K Signs.................................................. Pages 9-10 • • EXHIBIT "C" • _3_ • INTRODUCTION The Corporate Plaza West Planned Community District for the City of Newport Beach is a part of the Newport Center Development,and has been developed in accordance with the Newport Beach General Plan. The purpose of this PC(Planned Community) District is to provide a method whereby property may be classified and developed for commercial activity,professional and business offices. The specifications of this district are intended to provide land use and development standards supportive of the development proposal contained herein while insuring compliance with the intent of all applicable regulatory codes. • �6 • EXHIBIT "C" • C 9Q�iG C !Z � C 0 FARALLpN m �F2 ,�}ti}:{: '•:.<,i•:1ti r••.tit}:{i{•}4ei 1�1::i�$�i`,:\x�Y� ��•: Yf r.tiY:f. L hS::.LY.. �•�Y. • .'1•:'}{•}4�,1�::�^tf��'\it\�.'S\:{:;iy.�T,�•ft•k•\yi. L{y:¢'. tr•• �� iii':: ti::tih\fA••'•i:{{i' h :i.::ti t.:{::::{$tiL::ti}•5 • PACIFIC COAST HIGHWAY LEGEND • ''}''''''`'' PROFESSIONAL / OFFICE ] COMMERCIAL CORPORATE PLAZA WEST 7� • EXHIBIT "C" . ` O e DLNDMSnEf 0 IICz ' EAST COAST HIGHWAY • CORPORATE PLAZA WEST NEWPORT CENTER SETBACKS SUE PLAN I Newpm Soo,CA �", ",•"" P y ?0 e EXHIBIT "C" • •F o eu.wao s,rE, ' us I C A r • I � y eun a MADV O SUE 2 SUE 7 • - ,� EAST COAST HIGHWAY CORPORATE PLAZA WEST NEWPORT CENTER S&ff PLOW PLAN aw q N&*p r Beath CA / • EXHIBIT "C" • • � I `lost �w V • li � 4- E awe s E7 g : SITE EAST COAST HIGHWAY i CORPORATE PLAZA WEST NEWPORT CENTER NewpWBeach.G1 GRADWGPLAN i _ N EXHIBIT "C" • -4- • SECTION I. STATISTICAL ANALYSIS Corporate Plaza West 1. Project Area Net Acreage 12.7 2. Percentage of Site Coverage a. Building Footprint 15-20 b. Parking Area 40-45 c. . Landscape 4045 3. Maximum building floor area will not exceed 145,000 square feet. 4. The square footage of individual buildings sites are tentative and subject to adjustment as long as the limitations on total development,are not violated. Any adjustment in the • square footages for each building site shall be reviewed and approved by the Planning Director. 5. Preliminary Pad elevations shown are preliminary and subject to revisions which may result from a site survey and preparation,and City review and approval of the final grading plan. • • EXHIBIT "C" • -5- SECTION H. GENERAL NOTES 1. Grading within the Planned Community area will be permitted upon securing of a grading • permit. 2. Water within the Planned Community area will be furnished by the City of Newport Beach. ' 3. Sewage disposal facilities within the Planned Community will be provided by Orange County Sanitation District No. 5. 4. The subject property is within the City of Newport Beach. The Developer will provide the necessary flood protection facilities under the jurisdiction of the City of Newport Beach. 5. Erosion control provisions shall be carried out on all areas of the Planned Community in a manner meeting the approval of the Planning Department. 6. Except as otherwise stated in this Ordinance, the requirements of the Newport Beach Zoning Code shall apply. The contents of this supplemental text notwithstanding,no construction shall be proposed within the boundaries of this Planned Community District except that which shall comply with all provisions of Newport Beach's Uniform Building Code and the various • mechanical codes related thereto. 7. Parking lot lighting shall be subject to the review and approval of the Director of Planning. Parking lot lighting shall be designed in a manner so as to minimize impacts on adjacent residential areas. S. All mechanical appurtenances on building roof tops and utility vaults shall be screened from street level view in a manner meeting the approval of the Planning,Department. 9. Prior to the issuance of grading permits, the site shall be examined to determine the existence and extent of archaeological and paleontological resources in accordance with adopted City polices. 10. The on-site parking,vehicular circulation and pedestrian circulation systems shall be reviewed and approved by the City Traffic Engineer. 11. The intersections at private streets and drives shall be designed to provide sight distance as specified in drawing No.STD-110-L of the City Public Works design criteria. Slopes landscape,walls and other obstructions shall be considered in the sight distance requirements. Landscaping within the sight4ine shall not exceed twenty-four inches in • height. The sight distance requirement may be modified at non-critical locations,subject to approval of the City Traffic Engineer. 12. Prior to occupancy of any structures,easements for public emergency and security ingress, egress and public utility purposes shall be dedicated to the City over all private streets. 13. Prior to issuance of a grading permit,the master plans of water,sewer and storm drain facilities shall be reviewed and updated to current standards and any modification or extensions to the existing storm drain,water and sewer systems shown to be required by the review shall be the responsibility of the developer,unless otherwise provided for through'an agreement with the property owner. • EXHIBIT "C" • -6- • SECTION III. DEFINMONS Advertising Surface of a Sign The total area of the face of the sign structure,excluding supports. Area of Elevation Total height and length of a building as projected to a vertical plane. Setbacks from Street Corners • Setbacks from street corners shall be established as that point of intersection of the required setback lines from access streets,prolonged to point of intersection. O � • EXHIBIT "C" • -7- SECTION IV. BUSINESS,PROFESSIONAL AND COMMERCIAL • A. Intent The intent of this district is to permit the location of a combination of business and professional office uses, and light general commercial activities engaged in the sale of products to the general public. B. Permitted Uses The following shall be permitted: 1. Retail sales and service of a convenience nature. 2. Administrative and professional offices (excluding medical offices). 3. Restaurants,including outdoor,drive-in or take-out restaurants,shall be subject to the securing of a use permit in each case. Facilities other than indoor dining establishments or those that qualify as outdoor', drive-in or take-out establishments shall be subject to the City of Newport Beach regulations covering drive-in and outdoor establishments. • 4. Institutional, financial and governmental facilities. 5. Civic, cultural, commercial recreational and recreational facilities. 6. Parking lots, structures and facilities. 7. Drive-up teller units,subject to the review of the on-site parking and circulation plan by the City Traffic Engineer and approved'by the Planning Department. C. Building Location All buildings shall be located in substantial conformance with the approved site plan. D. Building Height All buildings and appurtenant structures shall be limited to a maximum height of thirty- two (32) feet provided further that they extend no higher than the extension of the sight plane established by Ordinance No. 1596 for Corporate Plaza. • E. Parking Adequate off-street parking shall be provided to accommodate all parking needs for the site. The intent is to eliminate the need for any on-street parking. Required off-street parking shall be provided on the site of the use served,or on a common parking area in accordance with the off-street parking requirements of City of Newport Beach Planning and Zoning Ordinance. d � • EXHIBIT "C" . F. Lands_ caving • Detailed landscaping and irrigation plans, prepared by .a licensed landscape architect, licensed landscaping contractor, or architect shall be reviewed by the Director of Parks, Beaches and Recreation. All landscaping shall be installed and maintained so as not to penetrate the extension of the Sight Plane established for the Corporate Plaza Planned Community in Ordinance No.1596. All landscaping referred to in this section shall be maintained in a neat and orderly fashion. 1. nin Areas used for parking shall be screened from view or have the view interrupted by landscaping,and/or fencing from access streets,and adjacent properties. Plant materials used for screening purposes shall consist of lineal or grouped masses of shrubs and/or trees. 2. Landscaping-Vehicle Separation All landscaped areas shall be separated from adjacent vehicular areas by a wall or curb, at least six (6) inches higher than the adjacent vehicular area. • 3. Parking Areas i Trees,equal in number to one(1) per each five(5)parking stalls shall be provided in the parking area. G. Loading Areas 1. Street side loading shall be allowed providing the loading dock is screened from view from adjacent streets. H. Storage Areas 1. All outdoor storage shall be visually screened from access streets,and adjacent property. Said screening shall form a complete opaque screen. 2. No storage shall be permitted between a frontage street and the building line. I. Refuse Collection Areas 1. All outdoor refuse collection areas shall be visually screened from access streets, • and adjacent property. Said screening shall form a complete opaque screen. J. Telephone and Electrical Service All "on site electrical lines (excluding transmission lines) and telephone lines shall be placed underground. Transformer or terminal equipment shall be visually screened from view from streets and adjacent properties. O . EXHIBIT "C" • -9- K. i n • 1. Building Address Sign Building address numerals shall be a maximum of two (2) feet in height and shall be consistent with the building identification signing. Building address number shalt face the street (and/or pedestrian walkways in the case of necessity),and be located on the building so that they are visible from adjacent frontage roads and designated parking areas. 2. Project/Building Identification Sign Project and/or building identification signs are permitted at major entry access drives from adjacent frontage streets, provided that they comply with the City of Newport Beach site distance requirement 110-L. The identification signage is permitted in the form of a free-standing (single or double faced)monument sign. The sign copy shall be restricted to the project or building name and street address. Individual letter heights shall not exceed eighteen (18) inches. 3. Tenant Identification Signs • Tenant identification signs are permitted and are divided into two (2)categories: - Primary Tenant - Secondary Tenant Tenant identification signs are to be wall-mounted graphics,consisting of individually fabricated letters. Box or "can" signs are not permitted. The maximum number of primary tenant signs permitted on any one building elevation is two (2). Each secondary tenant shall be limited to one (1) identification sign. The maximum letter height of a primary tenant sign shall not exceed twenty-four (24)inches. The maximum letter height of a secondary tenant sign shall not exceed sixteen (16) inches. Sign copy shall be restricted to identification of the person, firm,company or corporation operating the use conducted on the site. • 4. General Sign Standards a. Signs(to include all those visible from the exterior of any building)may be lighted but no sign or any other contrivance shall be devised or constructed so as to rotate,gyrate,blink or move in any animated fashion. 0 � ' EXHIBIT "C" • -10- 5. Temporary Signs • The following guidelines are intended to produce a consistent sign design for temporary signs within Newport Center. All temporary signs require the approvals of the Citv of Newport Beach and The Irvine Company. Temporary signs are to identify the future site,project or facility under development on individual project sites. Information on this sign is limited to: - For Sale,For Lease,Future Home of,Building/Project Name,etc. - Type or Name of Development - Type and Area of Space Available - Major Tenant or Developer - Financial institution - General Contractor - Architect - Leasing Agent - Occupancy Date - Phone Number Irvine Company or Irvine Company Project Name and Logo Location: One temporary sign is permitted on site for each frontage street. • These signs may be single or double-faced and parallel or perpendicular to the roadway. Design: All temporary signs are to be built in substantial conformance to The Irvine Company corporate design standards as shown on the following page. Longevity: Signs can exist from the time of lease or sale of the parcel until construction and/or leasing of the facility is complete. • 0 J • • •• • •• �• � •�• • v�\✓INI 19.:J.JI�N1 I'.Uti EXHIBIT "C" :may Page 2/6/9 '1 • Future Home of .American Products 31 Technology Dr. • (714) 5514500 GAOKER: Company AFCWTECT; Frank Lloyd Wright CONrwcro": Johnson Construction 0 THE IRVINE COMPANY • �0 • LIBRARY LAND EXCHANGE AGREEMENT • PROJECT SCHEDULE 07/31/91 1992 DESCRIPTION JUL AUG SEP OCT NOV DEC JAN FEB MAR EIR Notice of Preparation Com fete Prepare Screencheck EIR �,� , Screen Check Review 45-day Public Review P.C.TEXT • Draft P.C.Text Complete w, �rn(9 Yn YM N...• w..i H•"wix�. City Review PARCEL MAPS FOR NEW LIBRARY Prepare Parcel Map Complete w.r " Screen Check m s X File Map M :•a . >•- ; _ Record Map -i DEVELOPMENT AGREEMENT _ Draft Agreement lete M >w: City Review Z: PUBLIC HEARINGS Planning Commission �M •nn . •• City Council NEW LIBRARY IMPLEMENTATION Preliminary Design Complete Design Development y' & Constriction Does Plan Check Sell Certificates of Participation Start Construction TRANSACTION ITEMS Open Escrow Complete Property Insections Complete a Close Escrow �O Authorized to Publish Advertisements of all 1d uding public notices by Decme of the Superior court of Orange Coun�omia,NumberA-6214, September 29, 1961,and A-24831 June 11,1963 PLANNING DEPARTw2h,I-i ,.ITY OF NEVIPORT BEAr 1 STATE OF CALIFORNIA AM riov 15 1991 Fk1 County of Orange 7180001111I21112014151F A I am a Citizen of the United States and a resident of the County aforesaid; I am over the age of eighteen years, and not a parry to or interested in the below entitled matter. I am a principal clerk of the NEWPORT BEACH—COSTA MESA PILOT, a newspaper of general circulation, printed and published in the City of Costa Mesa, County of Orange, State of California, and PUBLIC NOTICE PUBLIC NOTICES THERI GIv NHhat Environ• that attached Notice is a true and complete NOTICE OF cilitles In the Newport Vil- mental Impact Report No. PUBLIC HEARING cage -area from $0,000 149 has been prepared in Notice is-hereby given square feel to 65,000 connection with the ap- copy as was printed and published on the that he Planning Cemmis-'square. feet The project plicalion noted above. It Is slon of the City of Newport also--consists of a.serles of the pfesent intention of the followingdates. Beach will hold a public actions necessary to com. City 10 accept the Environ. hearing on the application plate a land exchange be. mental Impact Report andl of The Irvine Comport and tween the City of Newport supporting documents.The, the City of Newport,,yeach Beach and The Irvine Com• City oncouragas members for General Plan.Amend= Party which would ex• of the general public to re- November 9, 1991 ment 91-(C); Local Costal change approximately 2 view and comment,on this Program Amendment.No. acres of Cl owned prop- documentation. Copies of 24; Amendment Nos. 728. only in the Civic Plaza area the Environmental• Impact 729, 730 and 746; Traffic of Newport Center (the ex- Report and supporting doc- Phasing Ordinance Study isting library site)to The Ir- uments are available for No.72: and Resubdivison vine Company for yap• public review and Inspec- No. 973 on property lo• proximately 4 acres In the lion at the Planning Depart- Bated in various sites with(- Newport V Ilago area (the ment, City of Newport Newport Center. proposed It nary site). Beach,3300 Newport Bou- •Tho•uprcposed project Planned Community (P ) lovard,:Newport Beach, consists of a request to district regulations would California, 92669.1768 amend the Land Use Ele• be adopted or amended to (714)644.3225. ment of the,Newport Beach effect,a transfer of allowed Notice Is hefeby further General'Plan to Increase, development from the New- given that said public hear- the,allocation for library fa- port Village PC to the Cor• ng will be held on,the21st porate Plaza and.Corporale day of November, 1991, at Plaza West PCs, attd the the hour of 7:30 p.m.in the allowed development in-the Council Chambers of the Civic Plaza PC would bii in• Newport Beach ,Cffy, Hall, creased by 22,150 a uaro 3300'Newport Boulevard, feet. •The Newport Village Newport Beach, California, + PC would receive entitle., at which time and place ment to allow construction any and all persons inter- 01 a now 65,000-square- ested may appear and be •loot ilbraq' The PC text heard thereon. If y60 chat- amendments would Include longs this project in court,- detailed development �ou may be limited to refs• standards for the affected ng only those Issues you properties. An amendment or someone else raised at to the Local Coastal Pro • the- public hearing de- gram Land Use Plan is also scribed in this notice or in requested to transfer written correspondence de- 30,000 square feet of allow. livered to the City at, or I declare, under penalty of perjury, that the able Ace• development Prior to,the public hearing. from Newport Village PC to For information call (714) foregoing is true and correct. Corporate Plaza West PC. 6443200. g 9 Additionally, a resubdivi- Norma Glover,Socre+ slon to create a parcel for tary, Planning Controls. • the new library in Newport slon, City of Newport Villa'rgge PC,and approval of Beach. Executed on November 9; ,199 1 nancesle chasingre �Ordi. ' Published Newport Beach/Costa Mesa Pilot at Costa Mes alif Ja November 9,1991. � sa9B6 Signature PROOF OF PUBLICATION LIBRARY TRANSFER AGREEMENT TRAFFIC AND CIRCULATION ANALYSIS September 13, 1991 Prepared for: City of Newport Beach 3300 Newport Boulevard Newport Beach, CA 92660 Prepared by: ISAAssociates, Inc. 1 Park Plaza, Suite 500 Irvine, California 92714 (714) 553-0666 M Project #CNB001 • • rs,,n .A,na TABLE OF CONTENTS PAGE INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 PROJECT DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 EXISTING DAILY TRAFFIC VOLUME ANALYSIS . . . . . . . . . . . . . . . . . . . . 4 TRIP GENERATION COMPARISON . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 DAILY TRIP DISTRIBUTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 EXISTING PLUS PROJECT DAILY TRAFFIC VOLUMES . . . . . . . . . . . . . . 10 YEAR 2010 PLUS PROJECT DAILY TRAFFIC VOLUMES . . . . . . . . . . . . . 12 MITIGATION MEASURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 NEWPORT CENTRAL LIBRARY ACCESS ANALYSIS . . . . . . . . . . . . . . . . . 12 09/t3/91(CNDOOI,.UDRARY.RM 1I LIST OF FIGURES AND TABLES LIST OF FIGURES PAGE 1 - Library Exchange and Development Transfers . . . . . . . . . . . . . . . . . . 3 2 - Existing Daily'rraffic Volumes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 3 - Transfer Developments Trip Distribution and Assignment . . . . . . . . . 8 4 - Existing Plus Projects Daily traffic Volumes . . . . . . . . . . . . . . . . . . . 11 5 - Forecast 2010 Daily Traffic Volumes . . . . . . . . . . . . . . . . . . . . . . . . 13 6- Forecast 2010 Plus Projects Daily Traffic Volumes . . . . . . . . . . . . . . 14 7 - Newport Central library Site Plan . . . . . . . . . . . . . . . . . . . . . . . . . . 16 LIST OF TABLES PAGE A- Library Exchange and Development Transfers Summary Table . . . . . . 2 B -Trip Generation Summary . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . 6 C - General Plan Analysis Daily Traffic Volumes . . . . . . . . . . . . . . . . . . . 9 ' • • L%ASAX WM bA INTRODUCTION The following report documents the traffic and circulation analysis for the proposed library Exchange Agreement in Newport Center in the City of New. port Beach. This report provides a General Plan level traffic circulation analysis to examine the effects of changes in the traffic on the arterial streets around Newport Center. A project description is provided first, documenting the land use changes proposed in the transfer agreement and examined In the analysis. This is followed by a daily and peak hour trip generation analysis for the proposed development transfers. For purposes of this analysis, three distinct devel- opment areas were identified and examined: Civic Plaza, Corporate Plaza, and Newport Village. An analysis of the overall change in traffic volumes is also identified. Forecast changes in daily trips generated for each of the areas are assigned to the arterial street system in and around Newport,Center based on modeled and estimated distribution patterns. To document the impacts associated with the change in daily trips assigned to the street system, the City's 1991 daily flow map was used to represent the existing baseline condition. The forecast year 2010 condition is based on the City of Newport Beach Traffic Analysis Model (NBTAM) forecast 2010 daily traffic volumes. Any impacts to the arterial circulation network In the exist- ing and future conditions are identified and, where necessary, mitigation measures are proposed. Finally, an internal circulation evaluation of the proposed site plan for the Newport Central library is included to document vehicular access locations and their interface with the local circulation network. PROJECT DESCRIPTION In order to illustrate the proposed development actions of the library ex- change and Newport Center development transfers, Table A and Figure 1 have been prepared. As the Figure and Table indicate, three development transfers within Newport Center are proposed. 'The library Exchange Agreement proposes to relocate the City's Public li- brary from Civic Plaza to Newport Village. As part of the relocation process, the proposed Newport Central library will Increase in size from 14,000 square feet to 65,000 square feet. Based on discussions with CIty staff, the proposed library development in Newport Village is exempt from the City's Traffic Phasing Ordinance (TPO) analysis, as the peak hour Impacts would not be significant. The City's current General Plan provides entitlement to develop 150,000 square feet of office in Newport Village. Although this land 09/13/91(CNB001,.UBWY.1U T1 Development Development Ranainitq Existing Rawioing Proposed After Actions Ell IS A= Development Under Gp Chang g xE chance to be Taken Civic Plan S.0 14.000 of 9,400 of I)library 65,550 of 1)TPO (library and library office deleted office 2)Amend PC office site) 2)57,150 sf 3)Adopt Development office added Agreement Corporate Planr 9.0 328,770 of 19.555 sf 85,000 sf 103,555 sf 1)TPO office office offim tans- office 2)Amend PC ferred in 3)Adopt Development Agreement Corporate Plan 9.0 21,000 of 94,00d sf 30,000 of 124,000 sf 1)TPO Nest offim office office trans- office 2)Adopt PC (erred in 3)Coastal Permit 4)Adopt Development Agreement Newport Village 33.0 Temporary 150,t100 of 1)35,000 of 65.000 of 1)Adopt PC uses office office deleted library+ 2)GPAs (+100,000 of 2)115,000 of 100,000 sf 3)Parcel Map museum) office trance- museum fened out 3)65,000 of library added TOTAL: 349,700 of 270,955 of 293,105 sf office offim offim 14,000 of 100,000 of 65,000 of library museum library +temporary 100,000 sf uses museum I-Three sites involved,totalling 9 Ae. 2-No crostractim on the mmenm site is part of this analysis. 3-GPA for bbraq use only. Table A Lch Library Exchange and ►J Newport Village Office Transfer i `N 1Y SAN JOAQUIN HILLS RD S 1✓ S 1 0 �4�` 4 d > tm- 3 __ ___ O O O I LIBRARY i N WPORT ' 14,000at __ --, < r d r 1% Ei E�OFFIC__...-1 ` o T. • D g5,lllll)sf ` OFFICE'-" 10 1 3011110sf 0 loml OFF1 E p •'g5 0llllsf @ r 36 t1110sf gY OFFICE '103F6 6s1 $p ••••••N•F•�15�81 (•••••••..• p00d RELOCATE 0 COpg'C LEGEND ppCIFIC -- Actions as per Library Exchange Proposed Entitlement ----•-•• Actions as per Newport Village i P g Existing Entitlement Development Transfer •••••••• Potential Additional 15,000sf of Library 4/5/91(CNB001) - - Figure 1 LShNot Scale. Library Exchange and Newport Village Office Transfer • LTA Anodaay Ma use entitlement will be transferred out of Newport Village, a trip credit for Newport Village equivalent to the 150,000 square feet of office is assumed In the analysis. Sixty-five thousand square feet of general office development entitlement are proposed In Civic Plaza. A TPO analysis has been conducted for this pro- posed development and is documented in the CIvic Plaza Traffic Phasing Ordinance Study prepared by ISA Associates, Inc. (ISA). Currently, the City's General Plan provides a land use entitlement of 8,400 square feet of office in Civic Plaza. As a result, the change in office development examined in this analysis is for the "remaining office development of 57,150 square feet. The final development transfer will be the transfer of 115,000 square feet of the existing 150,000 square foot general office entitlement in Newport Village to Corporate Plaza and Corporate Plaza West. Of the 115,000 square feet of the proposed office development, 85,000 will be transferred to Corporate Plaza, while the remaining 30,000 square feet of the 115,000 square feet will be transferred to Corporate Plaza West. The City of Newport Beach General Plan currently permits an additional 94,000 square feet of office development in Corporate Plaza West and 18,555 square feet of office in Corporate Plaza. As a result, the total office development in both Corporate Plaza and Corpo. rate Plaza West is approximately 227,600 square feet. As with the proposed CIvic Plaza development transfer, a TPO analysis has been conducted for the proposed development action and is documented In the Corporate Plaza Traffic Phasing Ordinance Study prepared by ISA. The differential between the 150,000 square feet of General Plan office enti- tlement for Newport Village and the 115,000 square feet proposed to be transferred to Corporate Plaza and Corporate Plaza West is 35,000. This will be deleted from Newport Center. EXISTING DAILY TRAFFIC VOLUME ANALYSIS Figure 2 presents the daily traffic volume flow map for the existing condition. As indicated previously, the Average Daily Traffic (ADT) volumes are taken from the City of Newport Beach traffic volume counts conducted in 1991. TRIP GENERATION COMPARISON Table B presents a summary of the trip generation for each of the develop- ment areas involved in the transfer agreement. As the Table indicates, trip credits for existing and entitled developments have been included In the analysis. All the trip generation rates are based on the NBTAM Trip Rate Summary. The following discussion provides a textual summary of Table B. 09/13/91(CND001,.LIBR&RY.ltM 4 I pqW C � SAN JOAQUIN "4q HILLS lSAv " 20,000 a QA � a RU to 0 12,(100 b O b x m FORT x o c O� 4T � 140 b b D tP tWi> M CQ O O O a0 'OO O L d 42,000 H Wy 4$0(Nj AA� 4 Goys 5111W PACtEtC 6/13/91(CNBOI)I I Figure 2 LEGEND: C /�� 40,000 .AvetaRe Dally.Trafftc Volumes LIJl 1 Not To Scale Existing 1991 Daily Traffic Volumes LSA Associates,Inc. Table B-Library Exchange Trip Generation Table Trip Generation Rates Trip Generation land Use Size Units ADT AM IN AM OUT PM IN PM OUT ADT AM IN AM OUT PM IN PM OUT Civic Plaza Existing Library(To Be Removed) (14.0) TSF 41.80 1.40 1.30 3.60 3.20 (585) (20) (18) (50) (45) Total Future Office 65.55 TSF 13.00 1.90 0.30 0.60 1.70 852 125 20 39 ill Current Office(Entitled) (8.4) TSF 13.00 1.90 0.30 0.60 1.70 (109) (16) (3) (5) (14) Change in Office Development 57.15 TSF 743 109 17 34 97 Civic Plaza Trip Generation Differential L158 89 1 16) 52 Corporate Plaza/Corporate Plaza West Total Future Office 227.6 TSF 13.00 1.90 0.30 0.60 1.70 2,958 432 68 137 387 Current Office(Entitled) (112.6) TSF 13.00 1.90 0.30 0.60 1.70 (1,463) (214) (34) (68) (191) Change in Office Development 115 TSF 1,495 218 34 69 196 Corporate Plaza/Corporate Plaza West Trip Generation Differential F 1,495 218 34 69 196 Newport Village Future library(To Be Relocated) 65.0 TSF 41.80 1.40 1.30 3.60 3.20 2,717 91 85 234 208 • Current Office(Entitled) (150.0) TSF 13.00 1.90 0.30 0.60 1.70 (1,950) (285) (45) (90) (255) Newport Village Trip Generation Differential r 767 194 40 144 4 Total library Exchange Projects Trip Generation Differential 2,420 113 73 197 201 13Sep91(CNB001/LIBTGEN.WQI) I • LSA Auadater,61C The proposed 65,550 square feet of office in Civic Plaza will generate approx- imately 850 daily trips, 140 AM and 150 PM peak hour trips. Trip credits for the library and currently entitled office will generate approximately 700 daily trips, 60 AM and 110 PM peak hour trips. The resulting change in trips generated for Civic Plaza with the proposed development transfers is the addition of approximately 150 daily trips, 80 AM and 40 PM peak hour trips to the arterial streets. A similar trip generation analysis was conducted for Corporate Plaza/ Corporate Plaza West, in which 115,000 square feet of office is transferred out of Newport Village and into Corporate Plaza and Corporate Plaza West. This results in the addition of approximately 1,500 daily trips, 240 AM and 270 PM peak hour trips. The proposed 65,000 square foot library in Newport Village will generate approximately 2,700 daily trips, 180 AM and 440 PM peak hour trips. The currently entitled 150,000 square feet of office will provide a trip credit of approximately 2,000 daily trips, 330 AM and 350 PM peak hour trips. The resultant trip generation differential for Newport Village is an additional 700 daily trips and 90 PM peak hour trips. During the AM peak hour, however, the proposed Library Transfer agreement will generate 150 fewer peak hour trips than the currently General Plan entitlement. The overall differential in trips generated for the three transfer developments in Newport Center will result in the addition of approximately 2,400 daily trips, 200 AM and 400 PM peak hour trips to the arterial circulation system. Based on the NBTAM 2010 forecast trip generation, Newport Center is fore- cast to generate approximately 124,000 daily trips. The proposed transfer developments examined in this analysis will generate less than two percent of the total forecast 2010 daily trips generated by Newport Center. DAILY TRIP DISTRIBUTION/ASSIGNMENT Figure 3 provides the trip distribution and daily traffic volume assignment for Civic Plaza, Corporate Plaza, and Newport Village in and around Newport Center. The Figure also provides the net change in daily traffic volumes along the arterial network for the total development transfers. Trip distribution patterns for Corporate and Civic Plaza are based on select zone assignments prepared by Austin-Foust Associates, Inc. (AFA) from the City's traffic analysis model. Trip distribution for Newport Village is based on estimates of travel patterns that would be expected for a library develop- ment. Daily trip assignment is the product of the trip distribution percentages along the arterial link and the daily trip differentials identified in Table B. Table C 09/13/91(CNB001,.L1BRARY.IU'Y) 7 N OSAN IOAOWIN tV O SAN RIAQUIN Q c 9%(10) y31401 lln is(4p) N ; culls /p% �4 x T m ? 't O pVF (ISO) O m -P..? 0 \ O y �: 20 NEWIORT 00 20% Fyn ,�oj0 ) �`�'/.. 26% o �0 % (30) 9% IJ tk N � A D CIVIC PLAZA a CORPORATE PLAZA w w m m C O m i U H O O uwY 25%(310) 20% S�30) c (I 22/0 o (330) cast NRy p) 1ACIFIC IACIFIC �0OOI o A H SAN C IOAOIIIN W C SAN t 3010(20) Ni3-(/0 ; 1OAouIN mw �vE tts 0) luLrs 300 cF t R lf�r'2 �� NEWIO p N o ,.Q Sr20 NEW to O j i o a c 208 250 p - p zuo tun O O O O NEWPORT VILLAGE ?� TOTAL PROJECTS m a y 0 16%(120) 500 15% 120 cor.� HRy 9� 500 co/ MCIFIC gyp) IACIFIC 9l13/91(cN0001) Figure 3 LEGEND: 10% -Percent Distribution (200) -Average Daily Traffic Volumes LSDTotal Projecta Volumes amrounded Project Trip Distribution NoI To Scale to the nearest hundred. and Assignments LSA An dalvs,Ism Table C-Library Exchange General Plan Analysis Daily Traffic Volume Summary Civic Corporate Newport Total Existing Year 2010 Link Existing 1991 Year 2010• Plaza Plaza Village Projects(1) Pius Projects Plus Projects PCH (elo MacArthur) 48,000 42,000 10 100 70 200 48,200 42,200 PCH(at Newport Center) 42,000 45,000 10 370 120 500 42,500 45,500 PCH (w/o Jamboree) 57,000 78,000 30 330 120 500 57,500 78,500 Avocado(s/o San Miguel) 4,00 00 0 7,0 0 540 770 1,300 5,300 8,30o • MacArthur(n/o SJ Hills) 53,000 59,000 20 390 250 700 53,700 59,700 MacArthur(s/o SJ Hills) 38,000 39,000 0 220 150 400 38,400 39,400 San Miguel (elo MacArthur) 7,000 11,000 0 160 100 300 7,300 11,300 San Miguel (w/o MacArthur) 14,000 13,000 0 390 250 600 14,600 13,600 San Miguel (w/o Avocado) 14,000 13,000 0 0 200 200 14,200 13,200 Jamboree(n/o SJ Hills) 53,000 68,000 50 310 150 500 53,500 68,500 Jamboree(s/o SJ Hills) 40,000 55,000 40 10 0 100 40,100 55,100 Newport Center Drive 20,000 14,000 10 370 140 500 20,500 14,500 Santa Barbara(at San Clemente) 12,000 15,000 90 330 120 500 12,500 15,500 San Joaquin Hills(e%o Jamboree) 20,000 20,000 10 0 20 0 20,000 20,000 San Joaquin Hills(w/o MacArthur) 15,000 14,000 40 150 100 300 15,300 14,300 n/a-volumes not available. (s) Year 2010 Daily Traffic Volumes assume construction of the San Joaquin Hills Transportation Corridor. (1)Total Projects Daily Traffic Volumes rounded to nearest hundred. • 13Sep91(CN60011vOLSUALWQj) LM Anodat"Ina provides a summary of the daily traffic volumes for existing and future condi- tions with and without the proposed development projects. Although daily traffic volumes are commonly cited to the nearest thousand daily trips, It should be noted that, due to the low number of daily project trips forecast, the total projects traffic volumes assigned are rounded to the nearest hun- dred daily trips. As Figure 3 indicates, trip distribution for Civic Plaza assumes 35 percent of the traffic along jamboree Road, 24 percent along Pacific Coast Highway, and 12 percent along MacArthur Boulevard. Internal trip capture within Newport Center accounts for nine percent of the total trips generated. Similarly, Corporate Plaza trip distributions, presented in Figure 3, assume approximately 30 percent of the traffic along Pacific Coast Highway, 30 per- cent along MacArthur Boulevard, 22 percent along Jamboree Road, and 10 percent along San Miguel. As with Civic Plaza, trips remaining within New- port Center account for eight percent of the total trips generated. The third frame in Figure 3 presents the trip distribution for Newport Village and assumes 20 percent of the traffic along Pacific Coast Highway, 35 percent along MacArthur Boulevard, 20 percent along jamboree Road,and 15 percent along San Miguel. Trips within Newport Center account for ten percent of the total trips generated. The final frame in Figure 3 presents the overall change in daily traffic vol- umes along the arterial links as a result of the development transfers. As the Figure Indicates, the arterial link at Avocado Drive north of San Joaquin Hills is forecast to average approximately 1,300 trips per day with the proposed development transfers. This arterial street was recently completed and serves to provide access to Newport Village and Corporate Plaza. Avocado Drive is a four lane street between Pacific Coast Highway and San Joaquin Hills Road. Exclusive left turn pockets are provided at the interchange with the Corpo- rate Plaza and Newport Village access driveways. Due to the low daily traffic volumes generated, other arterial links in the vicinity of Newport Center are not forecast to be impacted by the proposed developments. EXISTING PLUS PROJECT DAILY TRAFFIC VOLUMES In order to examine the effects of the daily traffic volume assignment on the existing arterial network, the net change in trips assigned, as presented In the final frame of Figure 3, was added to the City's existing 1991 baseline daily traffic volumes, presented in Figure 2. Figure 4 presents the existing plus projects daily traffic volumes in and around Newport Center. As indicated previously, the existing baseline vol- umes are based on a 1991 traffic flow map prepared by the City of Newport Beach. As Figure 4 indicates, the addition of the dally traffic volumes to the 09/13/91(CNB001%1]BRAItY.RM 10 W U SAN JOAOUIN w HILLS 20,(NN) 153O() > < 3 @p z > > x w M O j 'A FORT c IZS z ,�cP 14,2(Nl 14, A ' [n w t•O O d � t C 42,500 Hwy Cp1,5 57,500 ypCiFIC 9/13/91(CNB1)01) Figure 4 LEGEND: LS.t 40,000 -Average Dally Traffic Volumes Existing Plus Projects "��' To s�:�1� Daily Traffic Volumes • • LSA Awada/ai/na existing circulation network does not result In any significant impacts to the arterial system. The project volume differentials added to the arterial cIrcula• lion network account for less than two percent of the.existing daily traffic volumes on Pacific Coast Highway, MacArthur Boulevard, Jamboree Road, and San Joaquin Hills. The projects daily traffic volumes on San Miguel and Santa Barbara, which service the development sites, account for approximate- ly four percent of the existing daily trips. YEAR 2010 PLUS PROJECT DAILY TRAFFIC VOLUMES Figure 5 presents the daily traffic volume flow map for the future condition. As indicated previously, the ADT volumes are from the City of Newport Beach Traffic Analysis Model (NBTAM) for the forecast year 2010. The fore- cast daily traffic volumes assume construction of the San Joaquin Hills Trans- portation Corridor and Pelican Hill Road. As the Figure indicates, the daily traffic volume along Pacific Coast Highway east of MacArthur Is lower than the existing 1991 volume, reflecting the effect of diverted traffic utilizing the proposed San Joaquin Hills Road and Pelican Hill Road connections. Figure 6 presents the forecast year 2010 plus projects daily traffic volumes. As the Figure indicates, daily traffic volumes are not forecast to increase significantly with the proposed development transfers. Project daily traffic volumes on Pacific Coast Highway, MacArthur Boulevard, Jamboree Road, and San Joaquin Hills account for less than two percent of the forecast 2010 daily volumes, while on San Miguel and Santa Barbara, the project daily traffic volumes account for between three and five percent of the future traffic volumes. MITIGATION MEASURES As presented in the analysis above, the net change in trips generated by the proposed development transfers and the current General Plan entitlement is considered insignificant from a General Plan level analysis. With the addition of the net change in daily trips generated, no impacts are forecast in the existing or future conditions. As a result, no mitigation measures are recom- mended. NEWPORT CENTRAL LIBRARY ACCESS ANALYSIS In addition to examining the basic daily assignment of traffic generated by the proposed Newport Central Library, this report analyzes the proposed library site plan to determine whether access from the proposed library con- forms with the proposed arterial circulation network. 09/13/91(CNB001wUBRARY.RM 12 a SAN • JOAQUIN HILLS 14 211,fN10 WHl v r D A100 25 In O Z NSW PORT T 13, J 8 A � O r� o cn o O o 0 n r t O 45,000 Ilwy 5��,1 92 QUO OPS C PACIFIC 9/13/911 CNBU(II) Figure 5 LEGEND: TC /�� 40,000 -Average DaIty Traffic Volumes . LIJl 1 Nnl To Scale Year 2010 Daily Traffic Volumes 00 EA SAN JOAQUIN HILLS /S,3� c 211,(HH) D G > RD 3 m a a � A b b UI O '! ? �@IPORT x G 1%200 13600 o_ d x rL Rt wS, d �O O r d ' 45,500 Hwy 422/Jl� C0 78,500 If IC 9/13/9l(CNBOOI) Figure 6 LEGEND: 40,wo -Average Daily,Traffic Volumes LShYear 2010 Plus Projects Not To Scaic Daily Traffic Volumes • • LSA Awodaw;Ina Figure 7 presents a reduced site plan for the proposed Newport Central library showing the existing striping along Avocado Drive north of Padfic Coast Highway. As the Figure illustrates, no access is proposed on the major arterials of MacArthur Boulevard and Pacific Coast Highway. Access along these arterials could interfere with the flow of through traffic along the arterials. Instead access is proposed to be provided along Avocado Drive. This roadway is designated as a Secondary in the County of Orange Master Plan of Arterial Highways (MPAH). As the striping plan in Figure 7 illustrates, Avocado Drive is a four lane undi- vided roadway with left turn pockets at the intersecting driveway locations. Access to the proposed library site is provided via two driveway locations along Avocado Drive. The main entrance is located north of Pacific Coast Highway, and is strategically aligned with the existing Corporate Plaza access. The Intersection aligns the southbound left turn lane with the northbound left turn lane into the Corporate Plaza headquarters. The second driveway, north of the main entrance, provides access to the service area behind the library. This access is located just south of a right-in/right-out driveway to Corporate Plaza. A single southbound left turn lane provides access to the library at this location. Based on this analysis, the proposed site plan provides adequate circulatory access to the Newport Central library along Avocado Drive: 09/13/91(CN0001%U0RARY.RP1) 15 P a I �� °fib ��, /•� fi .+ LEGtHII - �—r—T V O` er.. .:x. .�•.��.. _ '� J i �' MI PALUWMAXr Ac lip _ xwor nnv r 6/13/91( Na00%) Figure 7 LS /� Newport Central Library 1 1 Site Plan CIVIC PLAZA TRAFFIC PHASING ORDINANCE STUDY September 13, 1991 Prepared for: City of Newport Beacb 3300 Newport Boulevard Newport Beacb, CA 92660 Prepared by: LSA Associates, Ina 1 Park Plaza, Suite 500 Irvine, California 92714 (714) 553.0666 LSA Project #CNB001 • 0 ,se Amad eg IM TABLE OF CONTENTS PAGE INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 PROJECT DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 TRIP GENERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2. TRIP DISTRIBUTION AND ASSIGNMENT . . . . . . . . . . . . . . . . . . . 2 TPO ONE PERCENT ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 INTERSECTION CAPACITY UTILIZATION ANALYSIS . . . . . . . . . . . . . . . . 9 MITIGATION MEASURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 APPENDIX A- ONE PERCENT TRAFFIC VOLUME ANALYSIS WORKSHEETS B - INTERSECTION CAPACITY UTILIZATION ANALYSIS WORKSHEETS W/13/91(CNBWl'+CWC 0.U'n I • • LM A&WANAK/MG LIST OF FIGURES PAGE 1 - Project Site Location Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 2 - Trip Distribution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 3 - Intersection Location Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 09/13Nl(CNU00t,.CVIC7P0.RPT) iI • ,s. AsmcfamAina LIST OF TABLES PAGE A- Trip Generation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 B - 1% TPO Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 C - Intersection Capacity Utilization . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 09/1391(CNB001,,CVIC1P0.RP1) Iii • . LU AnMWW Ina INTRODUCTION The City of Newport Beach Traffic Phasing Ordinance (TPO) requires an analysis of potential project related traffic impacts on critical intersections for any office, commercial, or industrial projects which have a gloss floor area greater than 10,000 square feet, and all residential developments of more than ten dwelling units. This report documents the results of the TPO analysis for the proposed Irvine Company office development project located at Civic Plaza in the City of Newport Beach. Currently, the City of Newport Beach Museum and Li- brary are located in Civic Plaza. However, the Museum and Library are pro- posed to be relocated. This analysis focuses on the development of 65,500 square feet of office in Civic Plaza. Consistent with the City of Newport Beach Administrative Procedures for Implementing the TPO analysis, trips are generated, distributed and assigned for the proposed office project. Trip generation for the general office land use and project distribution and assignment percentages are based on the City of Newport Beach Traffic Analysis Model (NBTAM). Existing traffic conditions are based on winter/spring, 1990, peak hour traffic counts, and committed project traffic volumes at select intersections are taken from the City's cumulative projects list prepared in November, 1990. For purposes of this analysis, the proposed 227,555 square feet of general office developments in Corporate Plaza and Corporate Plaza West are as- sumed to be committed projects when evaluating the TPO analysis for the Civic Plaza project. Cumulative growth volumes, also included in this analy- sis, are based on the City of Newport Beach Regional Traffic Annual Growth Rates for street segments within the City of Newport Beach boundary. The results of the analysis will identify those Intersections within the City of Newport Beach boundary where project generated traffic exceeds one per- cent of the forecast traffic volumes and will Identify intersections exhibiting unacceptable levels of service (LOS E or worse). Based on discussions with the City and the applicant, development of the proposed office project is scheduled following completion of Pelican Hill Road. Construction of Peli- can Hill Road will result in the diversion of traffic from the MacArthur Boule- vard/Pacific Coast Highway corridors to the parallel Pelican Hill Road fhWlty. To this end, and at the direction of the City's Traffic Engineer, the intersec tion capacity utilization (ICU) analysis for those intersections which operate at LOS E or worse, will consider Pelican Hill Road as a mitigation measure and will be evaluated by subtracting the diverted-Pelican Hill Road peak hour traffic volumes from the through volumes at the critical intersections. The Pelican Hill Road peak hour traffic volume diversion is based on the City's traffic model. 09/13/91(CN B001•,CV1C7TO.RP7) • • LSA Amoda"Ina PROJECT DESCRIPTION Figure 1 presents the project location map for the proposed Civic Plaza office development. Civic Plaza is located at the northeast corner of Santa Barbam and San Clemente in Newport Center, and proposes development of 65,500 square feet of general office land use. Project access to Civic Plaza is current- ly not identified, as no site specific plans are available. However for purpos- es of the TPO analysis, traffic is assumed to access the arterial circulation net- work at San Clemente. TRIP GENERATION As indicated previously, trip generation rates for the proposed office land use are taken from the City of Newport Beach Traffic Analysis Model (NBTAM) trip rate summary. Table A presents the peak period and peak hour trip generation for the proposed Civic Plaza project. As can be seen in Table A, approximately 850 daily trips, 145 AM peak hour and 150 PM peak hour trips are forecast. TRIP DISTRIBUTION AND ASSIGNMENT The trip distribution patterns used in this analysis are based on select zone assignments prepared by Austin-Foust Associates, Inc. (AFA) from the City's traffic analysis model. The distribution patterns for Civic Plaza are based on a select zone assignment for Zone 85 of the NBTAM. Figure 2 presents the Civic Plaza trip distribution percentages for inbound and outbound project traffic at the intersections within the City of Newport Beach. As the Figure indicates, approximately 35%of the traffic Is distributed along Jamboree Road, 20% along San Joaquin Hills Road, 12% along MacArthur Boulevard, and 24% along Pacific Coast Highway. Internal trip capture within Newport Center accounts for 9% of the total trips generated. Peak period and peak hour trips generated by the proposed project are assigned to the local roadway network based on the distribution percentages illustrated in Figure 2. The peak period trip assignments are used in the TPO one percent analysis, while the peak hour trip assignments are used in the peak hour ICU analysis. 09/13/91(CNBOOI'CVICTPO.Itln) 2 BRISTOL J BRISTOL J �9 9 9� tie 9 BISON m N C m Z T Q 9 m pORO m SAN JOAQUIN HLLS Civic Plaza S � eq'9A�rA ,1� 9,q TIJ''0O 00 cFl� 9p z Fq a rz J W w � p p COAST o 7Y 9 y 8AYSIDS 0 � 1/28/91(CNH001) FIGURE 1 F� LSDSchematic - PROJECT SITE LOCATION MAP 1- Not To Scale BRISTOL tit �9T 0Qh\ BRISTOL BRISTOL a BRISTOL i ri 3 s r G9 m 1 2 BISON y 3 r m t r I o m DNm �� 7 \ 2 n 4 lm FO¢O 1 � 2 5 to 1 'o low SAN JOAOUIN HILLS a N 4 1Z -`10 N A Pa 6 L 9% INTERNAL B IR AR �CAPTUREta o A w Uj PROJECT c�T O9T 7L � ~ F o c SITE 9 7- ° n r c� cc w /A , ��18 21 2 ~ 4— CC 7 . 10 15 15� 9/13/91(CNBO81) Figure 2 LEGEND 1;r� X—) . X% Distribution LS- Schematic . Not To Scale Civic Plaza Trip Distribution LSA Associates, Ina Table A-Civic Plaza Trip Generation Trip Generation Rates Trip Generation Land Use Size Units ADT AM IN AM OUT PM IN PM OUT ADT AM IN AM OUT PM IN PM OUT General Office Peak Period Trip Generation 65.5 TSF 13.00 3.80 0.60 1.20 3:!0 852 249 39 79 223 General Office Peak Hour Trip Generation 65.5 TSF 13.00 1.90 0.30 0.60 1.70 852 124 20 39 111 • 13,Sep91 i • • IM A=WWO4 Ina TPO ONE PERCENT ANALYSIS The one percent traffic volume analysis was conducted at 21 intersections within the CIty of Newport Beach. These Intersections were selected because they are anticipated to be influenced by traffic generated by the proposed project. The list of 21 intersections was reviewed and verified by the City's Traffic Engineer. Figure 3 presents an intersection location map for the following twenty-one intersections: 1. Riverside Av./Coast Highway 2. Tustin Av./Coast Highway 3. Dover Dr./Coast Highway 4. Bayside Dr./Coast Highway 5. Jamboree Rd./BrIstol St. N. 6. Jamboree Rd./Bristol St. 7. Jamboree Rd./University Dr. 8. Jamboree Rd./Bison Av, 9. Jamboree Rd./Ford Dr. 10.Jamboree Rd./SJ Hills Rd. 11. Jamboree Rd./Santa Barbara 12.Jamboree Rd./Coast Highway 13. MacArthur Dr./Bison Av. 14. MacArthur Dr./Ford Dr. 15. MacArthur Dr./SJ Hills Rd. 16. MacArthur Av./San Miguel 17. MacArthur Dr./Coast Highway 18. Goldenrod Av./Coast Highway 19. Marguerite Av./Coast Highway 20. Poppy Av./Coast Highway 21.Avocado Av./Coast Highway The peak period trips generated are assigned at each intersection approach based on the trip distributions presented previously. The one percent test volumes are based on the existing winter/spring 1990 counts conducted by the City and Include projected regional growth volumes as Identified in the Traffic Annual Growth Rates for street segments within the City of Newport Beach boundary, and committed projects as identified In the City's cumula- tive projects list of November 1990. This list has been updated to include the proposed office developments in Corporate Plaza as committed projects in determining the one percent test volumes. In essence the "One Percent Traffic Volume Analysis" tests, as defined in the Traffic Phasing Ordinance No. 86-20, consist of a series of comparisons between the One Percent Test volumes and the proposed project's peak period trip assignment for the 21 selected Intersections in the City of New- port Beach. The test year for the analysis is 1993, one year after occupancy of the proposed project. The results of the "One Percent Traffic Volume Analysis" are summarized in Table B. This table identifies 21 Intersections in the City of Newport Beach, along with their respective peak period comparison volumes. For each ap- proach leg of an intersection, the 1993 AM and PM peak period one percent test volumes, the proposed projects' peak period trip assignment,and a com- parison of the peak period volumes are presented. Under the "Project Vol- 09/t3/91(CNBW1%CV1C7T0.RPr) 6 I BRISTOL 5 BRISTOL J 6 yy C9 7 9, yG 9 BISON 13 m m ca D m 14 Z m c, m FOPO 9 SAN JOAQUIN MILLS 15 10 11 e�9eA9q �a c 16 °FyT 09l n LU w O 21 < a o COAST i7 18 a C1 12 Q �Ck �C �Y 20 4 19 s N 3 SAYgoe to W ~ S 2 1 u/13/91(CNB001) Figure 3 h' LS- Schematic - Not To Scale Intersection Location Map 1SA Associates,Ina TABLE B-Civic Plaza 1%TPO Analysis 1993 PEAK PERIOD I%TEST VOLUMES PROJECT PEAK PERIOD TRIP ASSIGNMENT PROJECT VOLUMES EXCEED I%TEST VOLUMES • AM PM AM PM AM PM INTERSECTION NB SB EB WB NB SB EB WB NB SB EB WB NB SB EB WB NB SB EB WB NB SB EB WB 1.Riverside Ave/PCH 0 9 58 35 1 13 53 58 0 0 37 4 0 0 12 22 2.Tustin Ave/PCH 0 1 52 38 0 3 51 59 0 0 37 4 0 0 12 24 3.Dover Dr/PCH 3 26 50 53 3 30 48 78 0 12 37 7 0 4 12 40 4,Bayside Dr/PCH 13 3 76 39 15 4 73 81 0 0 50 7 0 0 16 40 5.Jamboree Rd/Bristol St N 92 25 O O 83 49 0 1 4 17 O O 24 6 0 0 6.Jamboree Rd/Bdstol St 65 18 77 0 68 30 72 0 6 17 25 0 33 6 8 0 7.Jamboree Rd/Universlty Dr 52 50 13 14 59 67 9 11 9 42 0 20 49 13 O 6 YES 8.Jamboree Rd/Bison Ave 48 50 4 6 56 56 3 7 11 62 2 5 60 20 1 2 YES YES 9.Jamboree Rd/Ford Rd 49 43 12 10 59 53 12 5 13 67 5 12 76 21 2 4 YES YES YES to.Jamboree Rd/SJ Hills Rd 45 53 7 13 43 65 4 23 14 85 0 0 78 27 0 O YES YES It.Jamboree/Sartta Barbara 48 41 0 6 37 53 0 25 62 62 0 22 20 20 0 127 YES YES YES YES 12.Jamboree Rd/PCH 16 28 67 32 11 54 58 53 5 8 52 2 2 47 17 1 13.MacArthur Blvd/Bison Ave 81 62 6 O 67 86 11 0 5 32 1 0 29 10 7 0 14.MacArthur Blvd/Ford Rd 68 60 3 21 60 85 6 12 5 32 0 0 27 10 2 0 15.MarArthur/SJ Hills Rd 50 52 6 23 41 68 22 10 0 25 9 25 0 8 51 8 YES YES YES 16.MacArthur/San Miguel 55 33 5 8 29 48 24 7 0 0 0 0 O 0 2 0 17.MacArthur Blvd/PCH O 20 29 73 0 39 43 34 0 O 3 17 0 0 16 6 • 18.Goldenrod Ave/PCH 4 2 30 72 3 3 69 45 0 0 3 15 0 0 16 5 19.Marguerite Ave/?CH 6 5 29 65 7 10 64 41 0 0 2 15 0 0 13 5 20.Poppy Ave/PCH 1 1 24 73 2 5 58 37 0 0 2 12 0 0 11 4 21.Avocado ave/PCH 4 0 23 34 6 1 37 29 O o 3 17 0 0 16 6 t3Sep9t • • rs,,.1 ,,a umes Exceed 1% Test Volumes", those approach legs to an intersection where the project volumes exceed the one percent test volumes are identified. As outlined in the Administrative Procedure for Implementing the TPO, critical intersections are defined as those locations in which project generat ed traffic adds one percent or more to the peak 2.5 hour period traffic vol- ume, to any leg of the intersections in the committed plus project condition. As mentioned previously, the committed condition includes the existing traffic plus regional growth plus approved project generated traffic. As seen in Table C, 6 of the 21 'intersections will exceed one percent of the intersection approach volumes. For those critical Intersections where, on any approach leg, project traffic is anticipated to be greater than one percent of the projected peak 2.5 hour committed traffic volume, intersection capacity utilization (ICU) analysis Is required. INTERSECTION CAPACITY UTILIZATION ANALYSIS The ICU methodology examines the rum volumes for each intersection to determine the volume/capacity (v/c) ratio for each movement. Conflicting turn movement volumes and their v/c ratios are then examined to determine the overall capacity utilization for each intersection in the form of a v/c ratio, termed ICU. In effect, an ICU is the percentage of an Intersection's capacity needed to adequately accommodate all vehicles travelling through the inter- section. Hence, the higher the ICU, the higher the percentage of capacity utilization, where an ICU of 1.00 would equal the utilization of 100% of the Intersection's capacity. With lower capacity utilization, residual capacity will prevail. The ICU calculations presented In this analysis are consistent with the City of Newport Beach TPO implementation guidelines. As required by the TPO Implementation guidelines, critical intersections, where project volumes exceed the one percent test volumes, will need mid- gation if exiting plus cumulative plus project conditions exceed 0.90 ICU dur- ing the AM or PM peak hour. The ICU analysis worksheets for the twenty- one intersections examined in the City of Newport Beach are presented in Appendix A of this report. Table C presents a summary of the ICU analysis for the existing, cumulative, and cumulative plus, project conditions. For those intersections which ex- ceed the 0.90 ICU threshold, the ICU was evaluated assuming peak hour traffic diversions to Pelican Hill Road as a mitigation measure. Table C indicates that, of the six intersections forecast to exceed the one percent test volumes, only one intersection will exceed the 0.90 ICU thresh- old value for the cumulative and project condition. The critical intersection is located at MacArthur Boulevard and San Joaquin Hills Road. 09/13/91(CNB001%CVIC7P0.RP1) 9 1SA Acsodates,lac - TABLE C-Civic Plaza Intersection Capacity Utilization Summary CUMULATIVE+ CUMULATIVE + PROJECT • EXISTING CUMULATIVE PROJECT W/PELICAN HILL RD INTERSECTION AM PM AM PM AM PM AM PM 7.Jamboree Rd/University Dr 0.68 0.66 0.81 0.86 0.81 0.86 - _ 8.Jamboree Rd/Bison Ave 0.56 0.54 0.68 0.67 0.69 0.68 - _ 9.Jamboree Rd/Ford Rd 0.62 0.61 0.71 0.75 0.72 0.75 - - 10.Jamboree Rd/SJ Hills Rd 0.56 0.50 0.68 0.61 0.68 0.62 - 11.Jamboree/Santa Barbara 0.45 0.56 0.59 0.69 0.61 0.70 _ _ 15. Mar-Ardmr/SJ Hills Rd 0.84 0.77 0.98 0.95 0.99 0.95 0.96 0.84 • 13Bep91 LSA AUDCWM 1W. MITIGATION MEASURES As indicated in the TPO analysis presented in this report, the intersection at MacArthur Boulevard and San Joaquin Hills Road will exceed the One Per- cent Test and will operate at an ICU value greater than 0.90 with develop- ment of the proposed Civic Plaza project. As indicated previously, completion of the Pelican Hill Road facility is sched- uled prior to development and occupancy of the proposed Civic Plaza. Therefore, construction of Pelican Hill Road will result in the diversion of traffic from the MacArthur Boulevard/jamboree Road/Pacific Coast Highway corridors to the parallel Pelican Hill Road facility and will mitigate some of the future impacts. At the direction of the City's Traffic Engineer, it was recommended that Pelican Hill Road be considered as a mitigation measure for the proposed project. An ICU analysis was conducted for the intersection of MacArthur Boulevard/San Joaquin Hills Road by subtracting the diverted Pelican HIll Road peak hour traffic volumes, as determined by the City's baseline 1987 traffic model, from the through volumes along MacArthur Boulevard. The results of the ICU analysis with Pelican Hill Road are presented in Table C. As the Table indicates, with the construction of Pelican Hill Road, the intersection at MacArthur Boulevard/San Joaquin Hills Road will operate below the existing plus cumulative ICU values during the AM and PM peak hours. It should be noted that, although the Intersection exceeds 0.90 ICU and the .construction of Pelican Hill Road will mitigate the intersection by a margin equal to or greater than the impact of the project, the requirements of the TPO analysis indicate that a mitigation would not be required even though the resulting ICU continues to exceed 0:90. Therefore, no further mitigation measures are proposed. 09/1"1(CNB00L%CVIC7P0.RP7) ]1 CORPORATE PLAZA TRAFFIC PHASING ORDINANCE STUDY September 13, 1991 Prepared for. City of Newport Beach 3300 Newport Boulevard Newport Beacb, CA 92660 Prepared by: LSAAssociates, Inc. I Park Plaza, Suite 500 Irvine, California 92714 (714) 553-0666 ISA Project #00001. .. • • LU AiadatK Ina TABLE OF CONTENTS PAGE INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 PROJECT DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 TRIP GENERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 TRIP DISTRIBUTION AND ASSIGNMENT . . . . . . . . . . . . . . . . . . . 2 TPO ONE PERCENT ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 INTERSECTION CAPACITY UTILIZATION ANALYSIS . . . . . . . . . . . . . . . . 9 MITIGATION MEASURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 APPENDIX A- ONE PERCENT TRAFFIC VOLUME ANALYSIS WORKSHEETS B - INTERSECTION CAPACITY UTILIZATION ANALYSIS WORKSHEETS 09/1391(CNB00l%C0(UTP0.RPT) i 0 • LM Ama aks,Ina LIST OF FIGURES PAGE 1 - Project Site Location Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 2 - Trip Distribution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 3 - Intersection Location Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 09/13/91(CNB001•+C0RD PO.RP1) ii 0 • Loa AMWAW84!MC LIST OF TABLES PAGE A- Trip Generation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S B - 1% ITO Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 C - Intersection Capacity Utilization Summary . . . . . . . . . . . . . . . . . . . 10 09n3i91(cNBWt%C0aPrn0.RM iii 0 • `t't""°dasm Ina INTRODUCTION The City of Newport Beach, Traffic Phasing Ordinance .(TPO) requires an analysis of potential project related traffic impacts on critical intersections for any office, commercial, or industrial projects which have a gross floor area greater than 10,000 square Feet, and all residential developments of more than ten dwelling units. This report documents the results of the TPO analysis for two proposed Irvine Company development projects in Newport Center in the CIty of Newport Beach. The proposed projects are located In Corporate Plaza and Corporate Plaza West. Both development projects propose general office uses. Corporate Plaza proposes 85,000 square feet of office use, while Cor- porate Plaza West proposes 30,000 square feet. Currently, the City's General Plan provides office entitlement for 18,555 square feet in Corporate Plaza and 94,000 square feet in Corporate Plaza West. From a traffic perspective, and for purposes of the TPO analysis, Corporate Plaza and Corporate Plaza West have been combined as a single project with a proposed potential development of 227,555 square feet. The combined project will be referred to as Corporate Plaza in this report. Consistent with the City of Newport Beach Administrative Procedures for Implementing the TPO analysis, trips are generated, distributed and assigned for the proposed office projects. Trip generation for general office land rises and project distribution and assignment percentages are based on the City of Newport Beach Traffic Analysis Model (NBTAM). Existing traffic conditions are based on winter/spring 1990 peak hour traffic counts, while committed project traffic volumes at select intersections,are taken from the City's cumulative projects list prepared in November, 1990. For purposes of this analysis, the proposed Civic Plaza general office develop- ment located at Santa Barbara and San Clemente, is assumed to be a commit- ted project in evaluating the TPO analysis for the Corporate Plaza projects. Cumulative growth volumes, also included in this analysis, are based on the City of Newport Beach Regional Traffic Annual Growth Rates for street seg- ments within the City of Newport Beach boundary. The results of the analysis will identify those intersections within the City of Newport Beach boundary where project generated traffic exceeds one per- cent of the forecast traffic volumes and will Identify intersections exhibiting unacceptable levels of service (LOS E or worse). Based on discussions with the City and the applicant, development of the proposed office projects are scheduled following completion of Pelican Hill Road. Construction of Peli- can Hill Road will result in the diversion of traffic from the MacArthur Boule- vard/Pacific Coast Highway corridors to the parallel Pelican Hill Road Wlity. To this end, and at the direction of the City's Traffic Engineer, the intersec- tion capacity utilization (ICU) analysis for those Intersections which operate at LOS E or worse, will consider Pelican Hill Road as a mitigation measure 09/13/91(CNa001•.00RM 0.RP7) • LU AnochW4!na and will be evaluated by subtracting the diverted Pelican Hill Road peak hour traffic volumes from the through volumes at the critical intersections. The Pelican Hill Road peak hour traffic volume diversion Is based on the City's traffic model. PROJECT DESCRIPTION Figure 1 presents the project location map for the proposed Corporate Plaza office developments. Corporate Plaza is located along Pacific Coast Highway west of MacArthur Boulevard in the City of Newport Beach. Corporate Plaza West is located adjacent to Corporate Plaza, west of Newport Center Drive. Corporate Plaza proposes 103,555 square feet of general office land use east of Newport Center Drive and 124,000 square feet west of Newport Center Drive, for a total office development of 227,555 square feet. Two project driveways along Avocado Drive, one on Pacific Coast Highway, one on Newport Center Drive and one on Farallon Drive are proposed to provide access to Corporate Plaza. Project access to Corporate Plaza West is proposed along Pacific Coast Highway and Newport Center Drive at the terminus of Farallon Drive. TRIP GENERATION As indicated previously, trip generation rates for the proposed office land uses are taken front the City of Newport Beach Traffic Analysis Model (NBTAM) trip rate summary. Table A presents the peak period and peak hour trip generation for the proposed Corporate Plaza project. As can be seen in Table A, approximately 3,000 daily, 500 AM peak hour and 520-PM peak hour trips are forecast. TRIP DISTRIBUTION AND ASSIGNMENT The trip distribution patterns used In this analysis are based on select zone assignments prepared by Austin-Foust Associates, Inc. (AFA) from the Clty's traffic analysis model. The distribution patterns for Corporate Plaza are based on a select zone assignment for Zone 91 of the NBTAM. Figure 2 presents the Corporate Plaza trip distribution percentages for in- bound and outbound project tmffic at the intersections within the City of Newport Beach. As the Figure indicates, approximately 30% of the traffic Is distributed along Pacific Coast Highway, 30% along MacArthur Boulevard, 22% along Jamboree Road, and 10% along San Miguel. Internal trip capture within Newport Center accounts for 8% of the total trips generated. Peak period and peak hour trips generated by the proposed project are assigned to the local roadway network based on the distribution percentages 09/13/91(CNB001%C0RPTP0.RPT) 2 BRISTOL J � BRISTOL �9 O 9,St� yG 9 BISON m N D C W 2 T 9 m m FOPO SAN JOAQUIN HILLS eA�eg9q �h'a o w Corporate Plaza Fq o w West c9 s CL cc o o COAST c pt�\FG Corporate Plazagy 9 w BAYSIOS N � W ~ /L 1/28/91(CN0001) FIGURE I W�, L—S k Schematic . PROJECT SITE LOCATION MAP L 1 Not To Scale BRISTOL Q9 BRISTOL �i BRISTOL 14�1—' a BRISTOL i 1f rya Fc` 1 yG9 '01 a a 1 \ BISON \ N 2�1 Z T J 9 ?a3 1ii1 10 m lm FOPO `� r 2� _ 1 N 1 o SAN JOAOUIN NILLS j 1 ro+ t f r e L L E2 yP .�.� ro � 8% J 3 INTERNAL 25 J 4S.' CAPTURE 18 9eg9q ,rho ��+ Ul e �9T U Fq a O c� L < a 2 1 � O C PC F1 7 o. 21 L s ..—a r o� a_... U CC s / f sAvs�E > �9 PROJECT o A/ SITES 1 1 . 10 13 9113191(CNB001) LEGEND Figure 2 gr, X----1 - X% Distribution LSA Nat T.11�• Nat To Sale Corporate Plaza Trip Distribution LSA Associates,Inc Table A-Corporate Plaza Trip Generation Trip Generation Rates Trip Generation Land Use Size Units ADT AM IN AM OUT PM IN PM OUT ADT AM IN AM OUT PM IN PM OUT General Office Peak Period Trip Generation 227.555 TSF 13.00 3.80 0.60 1.20 3.40 2,958 865 137 273 774 General Office Peak Hour Trip Generation 227.555 TSF 13.00 1.90 0.30 0.60 1.70 2,958 432 68 137 387 • 13sep•91 AWW191M Inc illustrated in Figure 2. The peak period trips assignments are used in the ITO one percent analysis, while the peak hour trip assignments are used in the peak hour ICU analysis. TPO ONE PERCENT ANALYSIS The one percent traffic volume analysis was conducted at 21 intersections within the City of Newport Beach. These intersections were selected because they are anticipated to be influenced by traffic generated by the proposed projects. The list of Intersections was reviewed and verified by the City's Traffic Engineer. Figure 3 presents an intersection location map for the following 21 intersections: 1. Riverside Av./Coast Highway 2. Tustin Av./Coast Highway 3. Dover Dr./Coast Highway 4. Bayside Dr./Coast Highway 5. Jamboree Rd./Bristol St. N. 6. Jamboree Rd./Bristol St. 7. Jamboree Rd./University Dr. 8. Jamboree Rd./Bison Av. 9. Jamboree Rd./Ford Dr. 10.Jamboree Rd./5J Hills Rd. 11. Jamboree Rd./Santa Barbara 12.Jamboree Rd./Coast Highway 13• MacArthur Dr./Bison Av. 14. MacArthur Dr./Ford Dr. 15. MacArthur Dr./SJ Hills Rd. 16. MacArthur Av./San Miguel 17. MacArthur Dr./Coast Highway 18. Goldenrod Av./Coast Highway 19. Marguerite Av./Coast Highway 20. Poppy Av./Coast Highway 21.Avocado Av./Coast Highway The peak period trips generated are assigned at each intersection approach based on the trip distributions presented previously. The one percent test volumes are based on the existing winter/spring 1990 counts conducted by the City and include projected regional growth volumes as identified in the Traffic Annual Growth Rates for street segments within the CIty of Newport Beach boundary, and committed projects as Identified in the Citys cumula- tive projects list of November, 1990. This list has been updated to Include the proposed Civic Plaza general office development as a committed project in determining the one percent test volumes. In essence the "One Percent Traffic Volume Analysis" tests, as defined in the Traffic Phasing Ordinance No. 86-20, consist of a series of comparisons between the One Percent Test volumes and the proposed projects' peak period trip assignment for the 21 selected Intersections in the City of New port Beach. . The test year for the analysis is 1993, one year after occupancy of the proposed projects. The "One Percent Traffic Volume Analysis" worksheets are presented in Appendix A. 09/L3/91(CNB0013C0RPrP0.RM 6 BRISTOL 5 J BRISTOL 6 �90 '9 7 �y G,p 3 BISON 13 m N D 14 i T 0 m m FAO + 9 SAN JOAOUIN HILLS 15 10 11 e�9e�9q < 16 0 O9TT O 9 0 0 0 0 21 � a Ul COAST 17 18 i _ °a 12 Q��F�o � �r 20 4 19 V) 3 B4 U3f ¢ H W ¢ 2 1 9/13/91(CNB001) Figure 3 w LStA Not To lc _ Not To Scale Intersection Location Map !SA Associates,/rta TABLE B-Corporate Plaza 1%TPO Analysis 1993 PEAK PERIOD 1%TEST VOLUMES PROJECT PEAK PERIOD TRIP ASSIGNMENT PROJECT VOLUMES EXCEED 1%TEST VOLUMES • AM PM AM PM AM PM INTERSECTION NB SB EB WB NB SB EB WB NB SB EB .WB NB SB EB WB NB SB EB WB NB SB EB WB I.Riverside Ave/PCH 0 9 58 35 1 13 53 58 0 1 112 14 0 8 35 77 YES YES 2.Tustin Ave/PCH 0 1 51 38 0 3 50 58 O 0 112 15 0 O 35 85 YES YES 3.Dover Dr/PCH 3 26 49 52 3 30 48 77 0 43 121 29 0 14 38 162 YES YES YES 4.Bayslde Dr/PCH 13 3 75 39 15 4 73 79 0 0 164 29 0 0 52 162 YES YES 5.Jamboree Rd/Brbtol St N 92 25 O O 83 49 0 1 15 35 O O 85 11 0 O YES YES 6.Jamboree Rd/Bristol St 65 17 76 O 67 30 72 0 25 35 130 0 139 11 41 o YES YES YES 7.Jamboree Rd/University Dr 52 48 13 14 58 67 9 It 25 156 0 9 139 49 0 3 YES YES S.Jamboree Rd/Bison Ave 47 49 4 6 56 55 3 7 25 164 0 0 139 52 0 0 YES YES 9.Jamboree Rd/Ford Rd 49 42 12 10 58 53 12 5 29 164 17 0 162 52 5 O YES YES YES 10.Jamboree Rd/SJ Hills Rd 45 52 7 13 42 65 4 23 26 182 9 0 147 57 3 0 YES YES YES 11.Jamboree/Santa Barbara 48 40 0 6 37 53 0 25 0 138 0 30 0 44 0 170 YES YES YES 12.Jamboree Rd/PCH 16 29 65 32 11 54 58 51 9 0 173 34 3 0 55 193 YES YES YES 13.MacArthur Blvd/Bison Ave 81 60 6 O 65 85 1t 0 31 190 17 0 178 60 5 O YES YES YES 14.Macanhur Blvd/Ford Rd 68 58 3 21 38 84 6 12 34 208 17 0 193 66 5 0 YES YES YES 15.MacArthur/SJ Hills Rd 50 50 6 23 40 68 22 10 20 225 14 0 t16 71 77 O YES YES YES YES YES 16.MaeAnhur/San Miguel 55 31 4 7 29 48 22 7 0 225 35 93 0 71 201 30 YES YES YES YES YES YES 17.MacArthur Bhrd/PCH 0 20 29 72 0 39 43 34 0 0 t0 61 0 0 54 19 YES • 18.Goldenrod Ave/PCH 4 2 30 71 3 3 69 45 0 0 10 52 0 0 54 16 19.Marguerite Ave/PCH 6 5 29 65 7 10 64 41 0 0 8 52 0 O 46 16 20.Poppy Ave/PCH 1 1 24 72 2 .5 58 37 0 0 7 35 0 0 39 it 21.Avocado Ave/PCH 4 0 23 34 6 0 37 29 0 t0 0 61 0 54 0 19 YES YES YES 13sep9t . . LSA Asodafi;Ina The results of the "One Percent Traffic Volume Analysis" are summarized In Table B. This table identifies 21 Intersections in the City of Newport Brach, along with their respective peak period comparison volumes. For each ap. proach leg of an intersection, the 1993 AM and PM peak period one,pement test volumes, the proposed projects' peak period trip assignment, and a com- parison of the peak period volumes are presented. Under the "Project Vol- umes Exceed 1%Test Volumes", those approach legs to an intersection where the project volumes exceed the one percent test volumes are identified. As outlined in the Administrative Procedure for Implementing the TPO, critical Intersections are defined as those locations in which project generat- ed traffic adds one percent or more to the peak 2.5 hour period traffic vol- ume, to any leg of the intersections in the committed plus project condition. As mentioned previously, the committed condition Includes the existing traffic plus regional growth plus approved project generated traffic. As seen in Table B for the proposed Corporate Plaza Development, 18 of the• 21 intersections will exceed one percent of the intersection approach vol- umes. For those critical intersections where, on any approach leg, project traffic is anticipated to be greater than one percent of the projected peak 2.5 hour committed traffic volume, intersection rapacity utilization (ICU)analysis is required. INTERSECTION CAPACITY UTILIZATION ANALYSIS The ICU methodology examines the turn volumes for each intersection to determine the volume/capacity (v/c) ratio for each movement. Conflicting turn movement volumes and their v/c ratios are then examined to determine the overall capacity utilization for each intersection in the form of a v/c ratio, . termed ICU. In effect, an ICU is the percentage of an intersection's capacity needed to adequately accommodate all vehicles travelling through the inter- section. Hence, the higher the ICU, the higher the percentage of capacity utilization, where an ICU of 1.00 would equal the utilization of 100% of the intersection's capacity. With lower capacity utilization, residual capacity will prevail. The ICU calculations presented in,this analysis are consistent with the City of Newport Beach TPO Implementation guidelines. As required by the TPO implementation guidelines, critical intersections, where project volumes exceed the one percent test volumes, will need miti- gation if exiting plus cumulative plus project conditions exceed 0.90 ICU dur- ing the AM or PM peak hour. The ICU analysis worksheets for the twenty- one intersections examined in the City of Newport Beach are presented in Appendix B of this report. Table C presents a summary of the ICU analysis for the existing, cumulative, and cumulative plus project conditions. For those intersections which ex- ceed the 0.90 ICU threshold, the ICU was evaluated assuming peak hour traffic diversions to Pelican Hill Road as a mitigation measure. 09/13i91(CNB001••.00RM0.RPI) 9 ISA Assodates,Ina TABLE C-Corporate Plaza Intersection Capacity Utilization Summary CUMULATIVE + CUMULATIVE + PROJECT a EXISTING CUMULATIVE PROJECT W/PELICAN HILL RD INTERSECTION AM PM AM PM AM PM AM PM 1.Riverside Ave/PCH 0.67 0.80 0.80 0.89 0.80 0.89 - - 2.Tustin Ave/PCH 0.66 0.58 0.78 0.70 0.80 0.70 .- _ 3•Dover Dr/PCH 0.63 0.65 0.71 0.73 0.73 0.75 - - 4.Bayside Dr/PCH 0.76 0.69 0.85 0.81 0.87 0.82 - _ 5.Jamboree Rd/Bristol St N. 0.65 0.72 0.76 0.87 0.76 0.88 - _ 6.Jamboree Rd/Bristol St S. 0.78 0.76 1.02 0.90 1.02 0.91 0.97 0.89 7.Jamboree Rd/University Ave 0.68 0.66 0.81 0.85 0.81 0.86 - _ 8.Jamboree Rd/Bison Ave 0.56 0.54 0.68 0.66 0.69 0.68 - - 9.Jamboree Rd/Ford Rd 0.62 0.61 0.70 0.74 0.72 0.75 - - 10.Jamboree Rd/SJ Hills Rd 0.56 0.50 0.67 0.61 0.68 0.62 - _ 11.Jamboree/Santa Barbara 0.45 0.56 0.59 0.70 0.61 0.70 - _ 12.Jamboree Rd/PCH 0.72 0.63 0.82 0.73 0.83 0.76 - _ 13•MacArthur Blvd/Bison Ave 0.97 0.74 1.17 0.91 1.18 0.93 0.86 0.89 14.MacArthur Blvd/Ford Rd 0.78 0.74 0.92 0.86 0.92 0.88 0.80 0.86 15.MacArthur/SJ Hills Rd 0.84 0.77 0.97 0.92 0.99 0.95 0.96 0.84 16.MacArthur/San Miguel 0.66 0.86 0.78 0.97 0.80 1.00 0.68 0.92 17.MacArthur/PCH 0.53 0.68 0.62 0.84 0.62 0.84 - - 21.Avocado Avenue/PCH 0.49 0.50 0.56 0.57 0.56 0.58 - - 1J&P-91 ' 0 . LSA Atodabq Iaa Table C indicates that, of the 18 Intersections forecast to exceed the one percent test volumes, only 5 intersections will exceed the 0.90 ICU threshold value for the cumulative and project condition. Four of these critical Inter. sections are located along the MacArthur Boulevard Corridor north of Pacific Coast Highway at San Miguel, San Joaquin Hills Road, Ford Drive, and Bison Avenue. The other intersection is located at Jamboree and Bristol Street South. MITIGATION MEASURES As indicated in the TPO analysis presented in this report, five intersections will exceed the One Percent Test and will'operate at an ICU value greater than 0.90 with development of the proposed Corporate Plaza projects. As indicated previously, completion of the Pelican Hill Road facility is sched- uled prior to development and occupancy of the proposed Corporate Plaza. As a result, construction of Pelican Hill Road will divert traffic from the MacArthur Boulevard/jamboree Road/Pacific Coast Highway corridors to the parallel Pelican Hill Road facility and will mitigate future Impacts. At the direction of the City's Traffic Engineer, it was recommended that Pelican Hill Road be considered as a mitigation measure for the ,proposed project. An intersection rapacity utilization (ICU) analysis was conducted for the five critical intersections by subtracting the diverted Pelican Hill Raid peak hour traffic volumes, as determined by the CIty's baseline 1987 traffic model, from the through volumes along MacArthur Boulevard at the critical intersections. The results of the ICU analysis at the five critical intersections with Pelican Hill Road are presented in Table C. As indicated in Table C, with the con- struction of Pelican Hill Road, the intersections along MacArthur at Ford Drive and Bison Avenue are mitigated and are forecast to'operate at LOS D In the AM and PM peak hours. The intersections along MacArthur at San Miguel and San Joaquin Hills Road, and Jamboree at Bristol Street South, however, are not mitigated below the threshold 0.90 ICU value, but with completion of Pelican Hill Road, these intersections will operate below the existing plus cumulative ICU values during the AM and PM peak hours. It should be noted that, although the intersections exceed 0.90 ICU and the construction of Pelican Hill Road will mitigate the intersections by a margin equal to or greater than the impact of the project, the requirements of the TPO analysis indicate that mitigations would not be required even though the resulting ICUs continue to exceed 0.90. Therefore, no further mitigation measures are proposed. 09/13/91(CN11001,-00RM0.1 M it PoR @ CITY OF NEWPORT BEACH V ' T P.O.BOX 1768,NEWPORT BEACH,CA 92659-1768 a. C'9</FO RN�P FAX COVER SHEET DATE: TO: (day OAo-P-� BUSINESS PHONE: FAX NUMBER: J S3 J g�r7'o RE: THE FOLLOWING DOCUMENT IS FROM: :�-oc'—De'v"cas CITY OF NEWPORT--BEACH 3300 NEWPORT BOULEVARD NEWPORT BEACH, CA. 92663 PHONE NO. : (714) ' 3?��5 FAX NO. : (714)644-3 50 NO. OF PAGES: SPECIAL INSTRUCTIONS: 3300 Newport Boulevard, Newport Beach PORr CITY OF NEWPORT BEACH V \ ? P.O.BOX 1768,NEWPORT BEACH,CA 92659-1768 law PLANNING DEPARTMENT (714) 644-3225 January 14, 1992 Mr. Ray Moe I.SA Associates, Inc. One Park Plaza, Suite 500 Irvine, CA 92714 RE: Library Exchange TPO Study Dear Mr. Moe, This letter is in response to your budget amendment request dated November 25, 1991. Unfortunately, we are unable to authorize this request for the reasons set forth below. The Schedule of Standard Contract Provisions and Billing Rates attached to your original proposal for this project states '"The total estimated amount of time and expenses noted in the Compensation and Terms section of this proposal will serve as a control on the services to be provided. The specified amount will not be exceeded without prior approval of the client" In your letter of November 25, 1991 you stated that final revisions to the studies described in the scope of work were submitted on June 28, 1991. You went on to describe additional out of scope tasks that were undertaken beginning on July 18, 1991. You identified out of scope work products that were submitted on September 13, October 23, and November 4, 1991. Although we understand how schedule pressures can make it difficult to keep up with routine administrative matters,we believe extra work budget requests submitted more than four months after such work is initiated are unacceptable and in direct violation of contract provisions. In our telephone discussions regarding this matter, it was noted that our invoice records show that a balance of$1466.40 remained in the budget through the end of June, 1991, the date you indicated that in-scope tasks had been completed. Your letter of November 25 made no mention of this remaining budget, and stated that your costs for out of scope work amounted to $2500. However, in our telephone conversation you stated that the remaining budget authorization had been factored into your budget augmentation request, and that the extra work performed by your firm actually amounted to approximately $4000. We believe your request should have made note of this accounting procedure prior to being questioned about it in our telephone conversation. 3300 Newport Boulevard, Newport Beach Mr. Ray Moe January 14, 1992 Page 2 Although our agreement clearly provides that the City is not required to authorize extra work budget augmentations "after the fact", I indicated to you that the City would agree to authorize payment of$2000 for the out of scope work described in your November 25 letter. Since a budget authorization of$1466.40 remained in this account at the conclusion of the in-scope tasks, we are prepared to authorize a budget augmentation of $533.60. If you concur, please submit a revised budget augmentation request and invoice for the City s approval. In conclusion, I would like to emphasize the importance of processing extra work requests, when necessary, in a timely fashion. We believe we have had a good working relationship with your firm in the, past, and wish to maintain this relationship on future projects. Adherance to the terms of our agreements will help to prevent misunderstandings and maintain good professional relations. Thank you for your cooperation in this matter. Very truly yours, PLANNING DEPARTME JAMES D. CKER, ' ector By: J . Douglas, AMP E ' nmental CooUnator cc: Jim Hewicker, Planning Director Patricia Temple, Advance Planning Manager Rich Edmonston, City Traffic Engineer F:\-.\L1BRARY\LSA-13GT.LTR Teo q - __ l�l/��'P� � 1 •`-V' �7.G1�'J'v�- _- __-_- �1'1VDI�i�. - �UG[Q'�i� �IN INq _ -, Wqo f 3. 7s� (�d S/ar/Rr� 1rr`79 - - -3 _ 0 1/3/9i� 5931 , ys 419f - -- 1700. 0 &416I3/q�) - - 1777. 71- OP- ---- ���if 113 . 89-Kp.� 8ti(gt`` 47a. 5s x r • • REC�pti INVOICE ppR�(Mi�PCN LSh PwTNN�N�WP�R� LSA Associates,Inc C\1 OF g 1g92 Q� pk` To: CITY OF NEWPORT BEACH Date. DECEMBER 30, 1991 ATTN: PATTY TEMPLE Invoice No: 3300 NEWPORT BOULEVARD 0011664F NEWPORT BEACH CA 92660 For Period: NOVEMBER Project No: CNB001 Project Name: CORPORATE PLAZA Project Manager R AMMARI FOR PROFESSIONAL SERVICES RENDERED NOV 01 , 1991 THRU NOV 30, 1991 R MOE 2.00 HRS @ 110.00 = 220.00 R SLOUGH 2. 50 HRS @ 55.•00 = 137. 50 K BENEDICT .25 HRS @ 20.00 = 5. 00 G DOW 2.00 HRS @ 60. 00 = 120.00 S NICHOLLS .75 HRS @ 65. 00 4875 R AMMARI 33.00 HRS @ 60.00 = 1 , 980:00 GRAPHIC TECHNICIAN 4.25 HRS @ 50. 00 = 212. 50 OFFICE ASSISTANT 2.00 HRS @ 35.00 = 70.00 WORD PROCESSOR . 50 HRS @ 45.00 = 22. 50 TOTAL FEES DUE THIS INVOICE: $2,816. 25 FOR •'i BY — -- — Planning DirectOf XCCOUNT NO..' DISCOUNT OF 1% ( 28. 16) ON CURRENT CHARGES ALLOWED IF PAID IN FULL BY JANUARY 30, 1992, A SERVICE CHARGE WILL BE ASSESSED ON ALL PAST DUE ACCOUNTS. Remit to: 157 Park Place Telephone 415 236-6810 Pt.Richmond,California 94801 Facsimile 415 236-3480 9Rs .as n ¢73.SS u(al ag94.� x L �S INVOICE , LSA Associates,Inc ' TO. CITY OF NEWPORT BEACH Date: DECEMBER 30, 1991 ATTN: PATTY TEMPLE Invoice No: 3300 NEWPORT BOULEVARD 0011664F NEWPORT BEACH CA 92660 For Period: NOVEMBER Project No: CNBOOI Project Name: CORPORATE PLAZA Project Manager! R AMMARI FOR PROFESSIONAL SERVICES RENDERED NOV O1 , 1991 THRU NOV 30, 1991 R MOE 2. 00 HRS @ 110. 00 — 220. 00 R SLOUGH 2. 50 HRS @ 55.00 — 137. 50 K BENEDICT .25 HRS @ 20. 00 — 5.00 G DOW 2.00 HRS @ 60. 00 = 120.00 S NICHOLLS .75 HRS @ 65. 00 = 48.75 R AMMARI 33, 00 HRS @ 60.00 — 1 ,980. 00 GRAPHIC TECHNICIAN 4.25 HRS @ 50.00 — 212. 50 OFFICE ASSISTANT 2. 00 HRS @ 35. 00 — 70.00 WORD PROCESSOR . 50 HRS @ 45. 00 = 22. 50 TOTAL FEES DUE THIS INVOICE: $2,816. 25 DISCOUNT OF 1;5 t 28. 16) ON CURRENT CHARGES ALLOWED IF PAID IN FULL BY JANUARY 30, 1992 A SERVICE CHARGE WILL BE ASSESSED ON ALL PAST DUE ACCOUNTS. Remit to: 157 Park Place Telephone 415 236-6810 A Richmond,Californla 94801 Facsimile 415 236-3480 X _ INVOICE LSA LSA Associates,Inc To: CITY OF NEWPORT BEACH Date., DECEMBER 30, 1991 ATTN: PATTY TEMPLE Invoice No: 3300 NEWPORT BOULEVARD 0011664F NEWPORT BEACH CA 92660 For Period: NOVEMBER Project No: CNBOOI Project Name: CORPORATE PLAZA - Project Manager: R AMMARI FOR PROFESSIONAL SERVICES RENDERED NOV 01 , 1991 THRU NOV 30, 1991 R MOE 2. 00 HRS @ 110.00 - 220. 00 R SLOUGH 2. 50 HRS @ 55.00 - 137. 50 K BENEDICT .25 HRS 0 20. 00 ' 5.00 G DOW 2.00 HRS @ 60. 00 = 120.00 3 NICHOLLS . 75 HRS @ 65.00 48.75 R AMMARI 33. 00 HRS @ 60.00 - I,980.00 GRAPHIC TECHNICIAN 4.25 HRS 0 50.00 212.50 OFFICE ASSISTANT 2.00 HRS 0 35. 00 = 70.00 WORD PROCESSOR . 50 HRS @ 45. 00 = 22. 50 TOTAL FEES DUE THIS INVOICE: $20816. 25 DISCOUNT OF 1% t 2S, 163 ON CURRENT CHARGES ALLOWED IF PAID IN FULL BY JANUARY 30, 1992 A SERVICE CHARGE WILL BE ASSESSED ON ALL' PAST DUE ACCOUNTS. Remit to: 157 Park Place Telephone 415 236-6810 Pt.Richmond,California 94801 Facsimile 415 236-3480 X RECEIVED uY INVOICE LSDPLANNING DEPARTMENT IJ CITY OF NEWPORT BEACH LSAAssociatet,Inc AM JAN 31992 PM 718I9,0jHI12i1I2I3I4I5I6 To: CITY OF NEWPORT BEACH Date. DECEMBER 30, 1991 ATTN: PATTY TEMPLE Invoice No: 3300 NEWPORT BOULEVARD 001166411 NEWPORT BEACH CA 92660 For Period: NOVEMBER Project No. CN6001 Project Name: CORPORATE PLAZA Project Manager.- R AMMARI REIMBURSABLE EXPENSES- NOV 01 , 1991 THRU NOV 30, 1991 FREIGHT POSTMASTER SEP POSTAGE UNITED PARCEL SERVIC WK END 1119 AIR & SURFACE COURIE NOV COURIER 35. 41 XEROX XEROX CORPORATION SEP COPIES OCT COPIES 142.40 TOTAL DUE THIS INVOICE: $177.81 / . L,h_ji•ie 7 J•? ' j.1w. am t `A9i4 Vt5N T Plahning Director ACCOUNT NO.: DISCOUNT OF 1% < 1 . 78) ON CURRENT CHARGES ALLOWED IF PAID IN FULL BY JANUARY 30, 1992 A SERVICE CHARGE WILL BE ASSESSED ON ALL PAST DUE ACCOUNTS. Remit to: 157 Park Place Telephone 415 236-6810 Pt.Richmond,Califorma 94801 Facsimile 415 236-3480 T SA INVOICE LSA Associates,Inc To.- CITY OF NEWPORT BEACH Date. DECEMBER 30, 1991 ATTN: PATTY TEMPLE I1voice No: 3300 NEWPORT BOULEVARD 0011664R NEWPORT BEACH CA 92660 For Period: NOVEMBER Project No.- CNBOOI Project Name: ' Project Manager: " CORPORATE PLAZA R AMMARI REIMBURSABLE EXPENSES- NOV 01 , 1991 THRU NOV 30, 1991 FREIGHT POSTMASTER SEP POSTAGE UNITED PARCEL SERVIC WK END 11/9 AIR £e SURFACE COURIE NOV COURIER 35. 41 XEROX XEROX CORPORATION SEP COPIES OCT COPIES 142. 40 TOTAL DUE THIS INVOICE: $177.81 DISCOUNT OF 1% t 1, 76) ON CURRENT CHARGES ALLOWED IF PAID IN FULL BY JANUARY 30, 1992 A SERVICE CHARGE WILL BE ASSESSED ON ALL PAST DUE ACCOUNTS. Remit to: 157Park Place Telephone 415 236-6810 Pt.Richmond,California 94801 Facsimile 415 236-3480 r LSh INVOICE LSA Associates,Inc To: CITY OF NEWPORT BEACH Date. DECEMBER 30, 1991 ATTN: PATTY TEMPLE Invoice No: 3300 NEWPORT BOULEVARD 0011664R NEWPORT BEACH CA 92660 For Period: NOVEMBER Project No: CNB001 Project Name. CORE}ORATE PLAZA Project Manager. 'R+ AMMARI REIMBURSABLE EXPENSES- NOV 01 , 1991 THRU NOV 30, 1991 FREIGHT POSTMASTER SEP POSTAGE UNITED PARCEL SERVIO WK END 11/9 AIR a SURFACE COURIE NOV COURIER 35.41 XEROX CORPORATION SEP COPIES OCT COPIES 142.40 TOTAL DUE THIS INVOICE: $177.E1 DISCOUNT OF 1% C 1 . 78) ON CURRENT CHARGES ALLOWED IF PAID IN FULL BY JANUARY 30, 1992 A SERVICE CHARGE WILL BE ASSESSED ON ALL PAST DUE ACCOUNTS. Remit to: 157 Park Place Telephone 415 236-6810 Pt.Richmond,California 94801 Facsimile 415 236-3480 •w' • LSAAssociates,lnc. Environmental Assessment Transportation Engineering L i y� ceManagement Comm ,1►�\J� CommuniryPlanning Environmental Restoration Principals November 25, 1991 RobBaten Les Card Jim Culver Patty Temple GeorgeKurilko City of Newport Beach CarollynLobell 3300 Newport Boulevard Bill Mayer Newport Beach, CA 92663 Ray Moe Rob Schonholtz Malcolm Sproul Subject: Budget Contract Amendment Request- Associates Corporate Plaza and GPA Library Transfer Michael Cate Dear Patty: Lyn Calerdine Connie Calica Gary Dow Per our modified scope of work letter dated April 8, 1991, LSA Associates, Kevin Finch" Inc. (LSA) was to revise the Traffic Phasing Ordinance (TPO) analysis studies Steer Granholm for Corporate and Civic Plazas in Newport Center, and prepare a General Richard Grmsetti Plan level traffic and circulation analysis for the library exchange agreement Roger Harris in Newport Center. LSA has completed the scope of work tasks and has Art Homrighausen undertaken additional out of scope tasks in an effort to provide the City with Robert Hrubes a timely response. Gina Jnrick Benson Lee The following budget contract amendment request is for the additional out Sabina Ni n of scope tasks completed and an potential additional tasks to be completed Sabrina Nicholls p p Y1� p Beth Paden on an as needed basis. A budget augment for $5,000 is requested, to bring Harrigene Perry our total budget estimate to $23,000. This budget contract amendment Anthony Petros includes $2,500 for the out of scope work effort and $2,500 estimated to be AmyRudell the additional transportation services needed to bring this project and LSA's Dean Williams involvement to a successful completion. Jill Wilson The following provides a summary of project tasks completed; additional out of scope tasks undertaken and completed; and potential future tasks that may need to be undertaken to bring this project to a successful conclusion. PROJECT TASKS COMPLETED The TPO analysis studies for Corporate and Civic Plazas, previously prepared on February 14, 1991, were revised based on comments from Rich Edmonston, City Traffic Engineer, and submitted to the City for their review on June 13, 1991. Copies of the study were also sent to Mane Gilliam at ?LAIMING DEPARTMENT 'iTY OF NEWPORT QEAC4l145p91p;\CNBO01\evDGl:r.LTxl NOV 27 1991 ce AM 8)iBPark Plaza,Suite 500 Telephone 714553.0666 7181911011112111213141519,California 92714 Faaimile714553.8076 A v • LSA Associates,Inc. MEG Associates. Also on June 13, 1991, LSA completed the traffic and circu- lation analysis for the library exchange agreement, and submitted copies of this study to the City for their review. Subsequent to the June 13, 1991, submittal, the request was made to revise the library exchange analysis assuming a total future office development of 65,550 square feet in Civic Plaza as compared with the 65,500 square feet assumed previously. Although not a significant work effort, LSA made the necessary revisions to the June 13, 1991, traffic and circulation analysis, and submitted revised cop- ies of the study to the City and Marie Gilliam for their review on June 28, 1991. OUT OF SCOPE TASKS UNDERTAKEN LSA has completed additional out of scope tasks as outlined below. Three tasks were undertaken, including an alternatives analysis; a revised analysis based on the City's most recent traffic analysis model; and additional revi- sions. 1. Alternatives Analysis On July 18, 1991, LSA was requested to prepare an alternatives analysis for the library exchange agreement. The following three alternatives were identi- fied: •Alternative 1 - No Project/Development under the existing General Plan. •Alternative 2 - Development of new library on site of existing Civic Plaza facility. •Alternative 3 - Transfer of Development Rights between the existing Civic Plaza and the proposed Newport Village library site only. The request was made to conduct a trip generation comparison for alterna- fives 2 and 3, and provide a brief description of the traffic and circulation as a result of these alternatives. The traffic and circulation analysis for Alterna- tive 1 was not required, as this alternative had been analyzed and document- ed in previous EIRs. 2. New City Traffic Model Database As part of a second round of comments raised by the City in its review of the June 28, 1991, studies, LSA was requested to revise the technical studies 11/15/91(1:\CNB001\BUDGEr.LTR) 2 LSA Associates,Inc. based on new traffic data that was not previously available. The studies were revised to include: • Existing and year 2010 daily traffic volumes, approved by Rich Edmonston at the City of Newport Beach, and consistent with the City's most current General Plan Traffic Model. This included daily traffic volumes for Avocado Avenue south of San Miguel. • A Traffic Phasing Ordinance (TPO) analysis for Civic and Corporate Plazas that included the intersection at Avocado and Pacific Coast Highway. • Refined trip distributions that included Avocado, and were consistent with the TPO and the General Plan level analysis. • An expanded discussion explaining why intersections over 0.90 ICU in the TPO analysis are not considered a significant impact. These studies were then submitted to Don Simpson, Rich Edmonston, and Patty Temple at the City of Newport Beach and to Mike Erikson and Tom Redwitz at The Irvine Company for their review on September 13, 1991. 3. Additional Revisions As a result of additional changes requested by the City of Newport Beach and changes to the project description, the September 13, 1991, studies were revised and submitted to Marie Gilliam and Rich Edmonston on October 23, 1991. Per discussions with Rich Edmonston, the latest round of revisions and clarifications to the technical studies were made to reflect: • The transfer of 35,000 square feet office from Newport Village to Civic Plaza resulting in the new office added being reduced from 57,150 square feet to 22,150 square feet; and • The name change from Pelican Hill Road to Newport Coast Drive. Subsequent to this submittal, ISA was requested by Rich Edmonton to revise the ICU calculations at three intersections to maintain consistency between these traffic studies and similar studies submitted to the City. Although our ICU analyses were technically correct, they were not consistent with the City's ICU worksheets. As a result, LSA recommended revising two of three ICUs and the ICU summary tables in the reports. LSA submitted the revised ICU worksheets and summary tables to Marie Gilliam on November 4, 1991. Future Tasks nth the most recent submittal on October 23, 1991, and the updated ICU worksheets and summary tables on November 4, 1991, LSA has completed all 11/25/91(1:\CNBG01\BUDGEr.LTR) 3 e • LSA Associates,Inc. tasks indicated per our Modified Scope of Work for the three Newport Cen- ter developments, and has conducted and completed additional out of scope tasks as outlined above. It is our understanding, however, that additional tasks may be required on an as needed basis to provide supplementary technical analysis. As a result, LSA requests that additional budget be provided to account for the out of scope tasks presented above and additional tasks to be completed on an as needed basis.. A budget augment for $5,000 is requested, to bring our total budget to $23,000. This budget contract amendment includes the $2,500 out of scope work effort described above, and $2,500 estimated for the additional transportation services needed to bring this project to a suc- cessful completion. Preparation and attendance at public hearings is not included in this budget contract amendment request, and we suggest that this be invoiced on a time and material basis, should LSA be required to participate in hearings. LSA requests you authorize the $5,000 budget augment by signing below and returning the signed letter to LSA at your earliest opportunity. We look forward to continuing to work for the City of Newport Beach, to meet your transportation services needs. Sincerely, LSA ASSOCIATES, INC. Ray A. Moe Principal ACCEPTED AND AUTHORIZED BY: Signature Print Name and Title Company Date 11/25/91(1.\CNB001\13UDGET.LTR) 4 ,,.•r LSA Associates,Inc. Env,romnental Assessment Transportation Engineering ResourceManaLSD CommunityPgement CornmunityPlanning Environmental Restoration Principals November 25, 1991 Rob Balen Les Card fin Culver Patty Temple GeorgeKurilko City of Newport Beach Carollyn Labels 3300 Newport Boulevard Bill Mayer Newport Beach, CA 92663 Ray Aloe Rob Schonboltz Malcolm Sproul Subject: Budget Contract Amendment Request- Associates Corporate Plaza and GPA Library Transfer M,cbael Cale Dear Patty: Lyn Calerdme Connie Calica - ov Per our modified scope of work letter dated April 8, 1991, LSA Associates, Kevin eom Fmche, Inc. (LSA) was to revise the Traffic Phasing Ordinance (TPO) analysis studies Steve Granhobn for Corporate and Civic Plazas in Newport Center, and prepare a General Richard Gm:settt Plan level traffic and circulation analysis for the library exchange agreement Roger Harris in Newport Center. LSA has completed the scope of work tasks and has Art Hornrighausen undertaken additional out of scope tasks in an effort to provide the City with Robert Hrubes a timely response. Gina Jurick Benson Lee The following budget contract amendment request is for the additional out Sabina Nict of scope tasks completed and any potential additional tasks to be completed Sabrina NiclmBs Betl;Padon on an as needed basis. A budget augment for $5,000 is requested, to bring Harrigene Perry our total budget estimate to $23,000. This budget contract amendment Anthonrpetros includes $2,500 for the out of scope work effort and $2,500 estimated to be ArnyRudell the additional transportation services needed to bring this project and LSA's Dean Wilhams involvement to a successful completion. Jill Wilson The following provides a summary of project tasks completed; additional out of scope tasks undertaken and completed;and potential future tasks that may need to be undertaken to bring this project to a successful conclusion. PROJECT TASKS COMPLETED The TPO analysis studies for Corporate and Civic Plazas, previously prepared on February 14, 1991, were revised based on comments from Rich Edmonton, City Traffic Engineer, and submitted to the City for their review on June 13, 1991. Copies of the study were also sent to Marie Gilliam at -i At*4 40 J-P ARTf4EN, 1:Y OF NrEY OU 5GAf45ro1(I:\CNB001\BUOGcr.LTR) HOV 2 '. 1991 AM p y t; 1q �t p ,t 8 °l;trk Plaza,Suue 500 Tilcpbnnc lH 5530666 618Ic7110111121•L121J1` iDIPtne,California 92714 Facsimile 714 553-8076 t • LSA AuociateS Inc. MEG Associates. Also on June 13, 1991, ISA completed the traffic and circu- lation analysis for the library exchange agreement, and submitted copies of this study to the City for their review. Subsequent to the June 13, 1991, submittal, the request was made to revise L65e,5,50 'lib exchange analysis assuming a total future o�ee-d elopment of are feet in Civic Plaza as compared with �e 65,5 square feet pr o yam-- r( Although not a significant work effort, ISA made the necessary revisions to W4 the June 13, 1991, traffic and circulation analysis, and submitted revised cop- ies of the study to the City and Marie Gilliam for their review on June 28, • , �(g j 1991. OUT OF SCOPE TASKS UNDERTAKEN ISA has completed additional out of scope tasks as outlined below. Three tasks were undertaken, including an alternatives analysis; a revised analysis based on the City's most recent traffic analysis model; and additional revi- sions. 1. Alternatives Analysis � f A&Q, AI On July 18, 1991, ISA was requested to prepare an alternatives analysis for the library exchange agreement. The following three alternatives were identi- fied: J •Alternative 1 - No Project/Development under the existing General Plan. •Alternative 2 - Development of new library on site of existing Civic Plaza facility. •Alternative 3 - Transfer of Development Rights between the existing Civic Plaza and the proposed Newport Village library site only. The request was made to conduct a trip generation comparison for alterna- tives 2 and 3, and provide a brief description of the traffic and circulation as a result of these alternatives. The traffic and circulation analysis for Alterna- tive 1 was not required, as this alternative had been analyzed and document- ed in previous EIRs. 2. New City Traffic Model Database As part of a second round of comments raised by the City in its review of the June 28, 1991, studies, ISA was requested to revise the technical studies 11/25/91(1.\CNB00I%BUDGEr.LTR) 2 :a.. l • LSA Aswzate4 I= based on new traffic data that was not previously available. The studies were revised to include: Existing and year 2010 daily traffic volumes, approved by Rich Edmonton at the City of Newport Beath, and consistent with the City's most current General Plan Traffic Model. This included daily traffic volumes fim Avocado Avenue south of San Miguel. • A Traffic Phasing Ordinance (I'PO) analysis for Civic and Corporate Plazas that included the intersection at Avocado and Pacific Coast Highway. • Refined trip distributions that included Avocado, and were consistent O IL with the TPO and the General Plan level analysis. • An expanded discussion explaining why intersections over 0.90 ICU in a jug the TPO analysis are not considered a significant impact. Tt 1ti S These studies were then submitted to Don Simpson, Rich Edmonston, and Patty Temple at the City of Newport Beach and to Mike Erikson and Tom Redwitz at The Irvine Company for their review on September 13, 1991. 3. Adddtioxal Retoisiam As a result of additional changes requested by the City of Newport Beach and changes to the project description, the September 13, 1991, studies were revised and submitted to Marie Gilliam and Rich Edmonton on October 23, 1991. Per discussion with Rich Edmonton, the latest round of revision and clarification to the technical studies were made to reflect: • The transfer of 35,000 square feet office from Newport Village to Civic Nol r Plaza resulting in the new office added being reduced from 57,150 f`� square feet to 22,150 square feet; and • The name change from Pelican Hill Road to Newport Coast Drive. Subsequent to this submittal,LSA was requested by Rich Edmonton to revise the ICU calculation at three intersections to maintain consistency between , these traffic studies and similar studies submitted to the City. Although our ' ICU analyses were technically correct, they were not consistent with the City's ICU worksheets. As a result, LSA recommended revising two of three ICUs and the ICU summary tables in the reports. LSA submitted the revised ICU worksheets and summary tables to Marie Gilliam on November 4, 1991. Puture Tasks With the most recent submittal on October 23, 1991, and the updated ICU worksheets and summary tables on November 4, 1991, LSA has completed all 112siv1(1:\CNa001\noocar.tTR) 3 s LSA Associates,Inc. tasks indicated per our Modified Scope of Work for the three Newport Cen- ter developments, and has conducted and completed additional out of scope tasks as outlined above. It is our understanding, however, that additional tasks may be required on an as needed basis to provide supplementary technical analysis. As a result, LSA requests that additional budget be provided to account for the out of scope tasks presented above and additional tasks to be completed on an as needed basis. A budget augment for $5,000 is requested, to bring our total budget to $23,000. This budget contract amendment includes the $2,500 out of scope work effort described above, and $2,500 estimated for the additional transportation services needed to bring this project to a suc- cessful completion. Preparation and attendance at public hearings is not included in this budget contract amendment request, and we suggest that this be invoiced on a time and material basis, should LSA be required to participate in hearings. LSA requests you authorize the $5,000 budget augment by signing below and returning the signed letter to LSA at your earliest opportunity. We look forward to continuing to work for the City of Newport Beach, to meet your transportation services needs. Sincerely, LSA ASSOCIATES, INC. Ray A. Moe Principal ACCEPTED AND AUTHORIZED BY: Signature Print Name and Title Company Date 1125/'91(I:\CN6001\BUDGErXTR) 4 LSA Associates,Inc. EnvironmentalAssessment Transportation Engineering L�y� Resource Management A`\J' Community Planning Environmental Restoration RECEIUru y, PLANcdiNG OEpyflT CITY OF NIEWPORT t3EN T RCl1 Principals September 13, 1991 AN SEP 19 1991 Rob Balen Les Card I�I�l1011�I�t2131415 6 Jim Cidver Marie Gilliam George6urdko MEG Associates Carollyn Lobell 2043 Westcliff Drive BtllAlayer Suite 108/123 RavMoe RobSchonholtz Newport Beach, CA 92660 Malcolm Sproul Associates Subject: Library Exchange and Transfer Traffic Studies .Michael Cale Lvn Calerdme Dear Marie: Connie Calica Gary Dow Please find attached copies of the revised traffic studies for the proposed Kevin Ftncher P� P P�City Steve Granholm of Newport Beach Central Library exchange and,development transfers. As Richard Grasseut per discussions with you, Don Webb, and Rich Edmonston, we have respond- RogerHarris ed to the comments raised by the City and have made the following revisions Art Homrighauten to the technical studies. Robert Hrubes Gma Jsmck Benson Lee Rob McCann 0 Existing and Year 2010 daily traffic volumes, approved by Rich Sabrina Nicholls Edmonston at the City of Newport Beach, have been revised to reflect Beth Radon the City's most current General Plan Traffic Model. This includes Harrtgene Perry daily traffic volumes for Avocado Avenue south of San Miguel. Amhony Pettus AmyRudell Dean Williams 0The intersection at Avocado and Pacific Coast Highway has been Jill Wilson Included in the Traffic Phasing Ordinance(TPO) analysis for Civic and Corporate Plazas. • The trip distributions for the TPO analysis and the General Plan level analysis have been refined to be more consistent with each other. • The discussion regarding why intersections over 0.90 ICU are not considered a significant impact has been expanded. 09/13/91(1ACN11001\COVER,LTR) One Park Plaza,Suite 500 Telephone 714553.0666 Irvine,California 92714 Facsimile 714553.8076 LSA Associates,Inc. Apart from revisions to the technical studies, additional revisions are needed in the body of the EIR to respond to such comments-as the Pelican Hill Road opening in November 1991. I trust that you will review the revisions and please feel free to call me if you have any questions. Sincerely, LSA ASSOCIATES, INC. g >k Ray Mce Principal Attachment: Library Transfer Agreement Traffic and Circulation Analysis Corporate Plaza Traffic Phasing Ordinance Study Civic Plaza Traffic Phasing Ordinance Study CC: Don Simpson, City of Newport Beach Rich Edmonston, City of Newport Beach Patty Temple, City of Newport Beach Mike Erikson, The Irvine Company Tom Redwitz, The Irvine Company 09/13/91(1:\CNB001\C0VER.LIR) 2 f JUN 14 '91 12:24 LSa IRVINE 698 POI fly • FAX TRANSMIAL LSA Associites,Inc. one Park Plaza,Suite 500 .Irvine, california 92714 Telephone 714 553-0 566 Facsimile 714 553-8076 Fly»7: Date: Attention: •i' A41 S C- + (ZM WX Project A71jmber: Fac Number. ( .7 k 4 b S L — $ U k 2_ Project Name: <<.,,Wv icy _ — 1 O Urgent Frnm: kA M a n t k p' ❑ ftt yorar ra9ucst .Sent by: ❑For your approval For your information Number of Pages(including this one): 1% ❑Hard copy to follow CC: ?03�-L, 1�t('J�yyp�C.f„ _ ❑,�'or your review iY{, 91 '!� ❑ Other .._ r _�a cr t3 Comments'. La', �"LIL, G., _ L�\ ' • y 'a 4 a.XG 4tC OOL �p� E �t�llS ( � QA� dfp ` 'atu I WtnGS M `yY�C��% 6-L,O(-_tS( �.,vu LA- o S u:6ls q3 �cpc�v ttc.Ct C(pw 7, o OG_ vZ. a oo as I ISu'T A 4& �• q vK \GW G u_26 Ei w. 1SA AM-dates,!nc iy Table C-LEbrary Exchange General Plan Analysis Daily Traffic Volume Summary Civic Corporate Newport Total Existing Year 2010 µ Link Existing 1991 Year 2010 Plaza Plaza village Projects(1) Plus Projects Plus Pro a as rs PCH(c/o MacArthur) 501400 3700 10 130 76 200 50,200 37,200 ui PCH(at Newport Ctr/Avocado) 36,000 44,000 0 370 120 500 36*500 44,500 PCH(w/o Jamboree) 57,000 79,000 30 340 120 500 57,500 79,500 Avocado(n/a San Miguel) n/a n/a 0 60 120 200 n/a a/a •D Avocado(slo San Miguel) n/a n/a 0 6'.,0 770 1,400 n/a n/a MacArthur(a/o SJ Hills) 43,000 51,000 20 390 250 700 48,700 51,700 o MacArthur(slo SJ Hills) 36,000 42.000 10 330 150 500 36,500 42,500 ` San Miguel(eMacArthur) ll,000 27,000 0 160 100 300 11,300 27,300 % m San Miguel (w/o MacArthur) 11,000 27,000 10 410 250 300 11,800 27,800 San Miguel(w/o Avocado) 11,000 27,0W 10 0 200 200 11,200 27,200 Jamboree(n/o SJ Hills) 51,000 57,000 60 310 150 500 51,500 57,500 Jamboree(slo SJ Hills) 35,00D 48,000 30 10 0 0 35,000 48,000 Newport Center Drive tt/a 22,000 0 370 140 500 n/a 22,500 Santa Barbara(e%San Clemente) 14,4)()0 13,000 90 330 120 500 14,500 13,500 Santa Barbara(w/o San Clemente) 14,000 13,000 30 330 120 500 14,500 13,500 San Clemente n/a n/a 40 0 0 0 n/a n/a San Joaquin Hills(e%Jamboree) 18,000 14,000 10 0 20 0 18,000 14,000 San Joaquin Hills(w/o Jamboree) 14,000 20,000 20 60 100 200 14,200 20,200 n/a•volumes not available. • (*) Year 2010 Daily Traffic Volumes assume construction of the San Joaquin Hills Transportation Corridor. (1) Total Projects Daily Traffic Volumes rounded to nearest hundred. m CO CO -n 0 -- ro 2•€]wv91(CN800r1V0lSF7M.lY�Y) LSh • TRANSMITTAL • LSA Associates,Inc. To: City of Newport Beach Transmitted: 3300 Newport Blvd. LIXFor your review ❑ Foryourfiles Newport Beach, CA 92660 ❑Atyour request ❑ Foryourinformation ❑ Foryourapproval ❑ Distribution Attu: Sandy Genis Date, February 14. 1991 Subject; Traffic Phasing Ordinance Analysis Project: Corporate & Civic Plaza Project$. CNBOOI Date Copies Description 2/14/91 1 Corporate Plaza TPO Study 2/14/91 1 Civic Plaza TPO Study The above are transmitted: EX Herewith ❑ Underseparatecover ❑ via: Fed. Expr. General remarks: Sandy, please review the following TPO studies for Corporate and Civic Plazas in Newport Center. Please do not hesitate to call Ray Moe or myself at (714) 553-0666 if you have any questions. Copies to: Rich Edmonston, P.E. & Don Simpson By: Ramzi Ammari , Assistant Project Manager One Park Plaza,Suite 500 Telephone 714 553-0666 Irvine,California 92714 Facsimile 714553-8076 RECEIVLu ev LSAAssociates,Inc. PLANNING DEPARMENT EnvironmentalAssessment CITY OF NEWPORT BEACH Transportation Enginceing yPlanning LSD ResoCommunitanagement �M MAR 1 4, 1991 PH Envionm nta[Restoration 71819110i1 i12i1i2131415I6 Principals March 6, 1991 RobBaln Les Card Jim Culver Sandy Genis GeorgeKitrilko Planning Department Carollyntobell City of Newport Beach Bill Mayer Ray Moe 3300 Newport Boulevard RobSchonboltz Newport Beach, CA 92660 Malcolm Sproul ' Associates Subject: Corporate and Civic Plaza TPO Analysis Billing Aficbael Cale Lp Calerdine Connie Calica Gary Dow Dear Sandy: Kevin Fincher Steve Granbolm At the request of the City of Newport Beach, LSA Associates, Inc. (LSA) is Richard Grassetu currently preparing two Traffic Phasing Ordinance (TPO) analyses for Corpo- Roger Harris rate Plaza and Civic Plaza In the Newport Center. Our work effort is defined Art rubes battsen Robertert Hru in a proposal prepared and submitted In September, 1990, and approved by GinaJurick Patty Temple at the City. Per your request, a copy of our proposal was re- Benson Lee submitted to you in February, as your records did not indicate that we had a RobAkCann signed contract. D Sabrina Nicholls Beth Padon It has come to my attention from our Accounting Department that ISA has Harrigene Perry AntbonyPetos received payment on the December invoice for $3,225.00, but our previous AmyRudell November invoice for $843.75 remains outstanding. It has also come to my Dean Williams attention that we still do not have a signed contract with the City to conduct Jill Wilson the TPO analysis. Attached is a copy of our proposal, as well as copies of our November in- voices as n which hot been paid, and our December invoice, which has been paid. To provide you with a complete billing package for this project, copies of our January and February invoices are also Included in this transmittal. J ry t'S' May I request a status report on our contract, and if the contract is signed, could I receive a copy for our flies. Would you also determine the current status of the outstanding November Invoice. One Park Plaza,Suite 500 Telepbone 714553.0666 Irvine,California 92714 Facsimile 714553.8076 L LSAAzodates Inc. We look forward to continuing our relationship with the City of Newport Beach and providing you with our transportation services. If you have any questions regarding this letter, please feel free to call me at (714) 553-0666. Sincerely, Fog Ray A. Moe Principal Attachments: Proposal Invoices 2 FORM 160.3495 I 01 0399752 CITY OF NEWPORT BEACH 417191 417191 VOUCHERNO. INVOICE NO. PURCHASE ORDER NO. INVOICE DATE AMOUNT DISCOUNT NETAMOUNT_ I I 1045280 CORP/CIVIC 9/13/90 11*000600 .00 119000.00 LSA ASSOC A ALYSES i i I li I. TOTAL � p/�p pp l aEW Pp�T a CITY OF NEWPORT BEACH • U r} � , P.O.BOX 1768,NEWPORT BEACH,CA 92659-1768 Cq<i FO AN�P I PLANNING DEPARTMENT (714) 644-3225 September 13, 1990 David Dmohowski Vice President Entitlement Irvine Pacific Co_ . P.O. Box I Newport Beach, CA 92658-8904 Subject: Corporate Plaza and Civic Plaza TPO Analysis Dear Dave: The City of Newport Beach has received a proposal from LSA Associates Inc. to conduct two Traffic Phasing Ordinance analyses for three Irvine Pacific office developments. The proposal contains an outline of the scope of work required, estimated time schedule for completion, and estimated budget required for the preparation of the studies. • The fee requested has been reviewed by the City, and the amount requested for the tasks required is considered appropriate and warranted. To proceed with the study, it is requested that you remit the following fees: Consultant Fees $ 10,000 City Fees (10%) 1,000 Total Request: $ 11,000 Please make the check payable to the City of Newport Beach. Your prompt attention in this matter is appreciated. Very truly yours, PLANNING DEPARTMENT JAMES D. HEWICKER, Director By ' •��'�b Patricia L. Temple Advance Planning Manager Attachment 1\JM\EIR-D0CS\C0RP-C1V.TP0 3300 Newport Boulevard, Newport Beach LSA 10 , 1990 eR v ,1 %, PXAZ a ( , O $ 9'll r�Ok$ 1 tQ���• (XO C) f.ftP'�Zi Se �rirtaQi LSA Associates,Inc. One Park Plaza,Suite 500 Telepbone 714553.0666 [vine,Cak/brnia 92714 Faceimde 714553.8076 Environmental Assessment Transportation Engineering Resource Management Lsa Community Planning Environmental Restoration September 11, 1990 RECEIVED BY Patty Temple PLANNING DEPARTMENT Advanced Planning Manager CITY OF NEWPORT BEACH City of Newport Beach DEC 121990 3300 Newport Boulevard Newport Beach, CA 92660 AM PM M191I0111112111213141516 SUBJECT: PROPOSAL TO CONDUCT CORPORATE PLAZA AND CIVIC PLAZA TRAFFIC PHASING ORDINANCE ANALYSIS Dear Patty: LSA Associates Inc. (LSA) is pleased to submit this proposal for profes- sional services to conduct two Traffic Phasing Ordinance (TPO) analyses for three Irvine Pacific office developments within the City of Newport Beach. Based on our understanding, three Newport Center undeveloped parcels are proposed for development. These projects are in Corporate Plaza, Corporate Plaza West, and Civic Plaza in the City of Newport Beach. From a traffic perspective, however, Corporate Plaza and Corporate Plaza West are not signifi- cantly different and may be treated as a single project. Therefore, for purpos- es of this analysis, the proposed 144,000 square feet of office use in Corpo- rate Plaza West and the 65,000 square feet in Corporate Plaza will be analyzed as one project, while the 65,500 square feet in Civic Plaza will be analyzed as a separate project. Consistent with the City of Newport Beach TPO analysis guidelines, LSA will generate, distribute and assign trips for each of the proposed Irvine Pacific office projects. Trip generation for General Office land uses and project distribution and assignment percentages will be based on the City of Newport Beach Traffic Analysis Model (NBTAM) . Existing Winter/Spring 1990 peak hour traffic counts and committed pro- ject traffic volumes at select intersections will be required prior to conduct- ing the TPO analysis. In addition, cumulative growth turn volumes will be based on the City of Newport Beach Regional Traffic Annual Growth Rates for street segments within the City of Newport Beach boundary. 09/11/90(RAMZ1\N13TP0.PR0) ❑ 1 Park Plaza, Suite 500 • Irvine, California 92714 • (714) 553-0666 ❑ 157 Park Place • Pt. Richmond, California 94801 • (415) 236-6810 L lsa The TPO analysis will compare the total projects' peak period volumes with the projected 1993 volumes (including growth and committed project vol- umes) for all approaches at select intersections in the City of Newport Beach. For purposes of this analysis, the proposed Civic Plaza development will be assumed to be a committed project when evaluating the TPO analysis for the Corporate Plaza projects. Similarly, the proposed Corporate Plaza projects will be assumed to be committed projects when evaluating the TPO analysis for the Civic Plaza project. For purposes of this proposal , the following intersections are recom- mended for analysis: • Riverside Ave./Coast Highway 0 Tustin Ave./Coast Highway • Dover Dr./Coast Highway 0 Bayside Dr./Coast Highway • Jamboree Rd./Bristol St. N 0 Jamboree Rd./Bristol St. • Jamboree Rd./University Dr. 0 Jamboree Rd./Bison Ave. • Jamboree Rd./Ford Dr. 0 Jamboree Rd./SJ Hills Rd. • Jamboree Rd./Santa Barbara Ave. 0 Jamboree Rd./Coast Highway • MacArthur Ave./Bonita Canyon 0 MacArthur Dr./Bison Ave. • MacArthur Dr./Ford Dr. MacArthur Dr./SJ Hills Rd. • MacArthur Dr./San Miguel MacArthur Dr./Coast Highway • Goldenrod Ave./Coast Highway Marguerite Ave./Coast Highway • Poppy Ave./Coast Highway It is recommended that this list be reviewed and intersections be added or subtracted per your recommendations. Based on discussions with the City and the applicant, development of the proposed office projects are scheduled following completion of Pelican Hill Road. Therefore, the TPO analysis for each project will be conducted assuming diversion of traffic from the MacArthur Boulevard/Pacific Coast Highway corri- dors to the parallel Pelican Hill Road facility. To this end, meetings between LSA and the City of Newport Beach Traffic Engineer will be requested to deter- mine the extent of the traffic diversion. Preliminary methods to determine this diversion may be through the use of the City's traffic model , specifical- ly, the relationship of a 1995 model run with and without Pelican Hill Road. This determination is very important as subsequent TPO analyses in the City would utilize this data. Based on the results of our discussions, the diverted peak hour traffic volumes will be added or subtracted from the turn volumes at the select inter- sections. In addition, trip generation credits for the existing museum and li- 09/11/900AHMNSTPO.PRO) 2 LSa brary will be included in the TPO analysis for the 65,500 square feet office development in Civic Plaza. The results of the analysis will identify the total office development potential based on the 1% test results and any intersections exhibiting unac- ceptable levels of service (LOS E or worse) . Mitigation measures will be recommended based on the City of Newport Beach General Plan proposed improve- ments package, and a sketch of the proposed intersection improvements will be prepared. LSA is aware that the TPO analysis is critical to the overall development application. To this end, LSA proposes to complete both TPO analysis tasks within three weeks from the date of authorization to proceed and receipt of the existing peak hour turn volumes and committed projects list. LSA estimates a budget of $10,000 will be required to accomplish the proposed work effort. These tasks will be accomplished on an hourly basis, consistent with the attached rates and contract provisions. This amount will not be exceeded without prior authorization. In conclusion, we thank you for the opportunity to prepare this proposal to assist you in your planning efforts in the City of Newport Beach. Sincerely, � a. Wta- Ray A. Moe Principal cc: Rich Edmonston City Traffic Engineer 09/11/90(RAMZI\NBTPO.PRO) 3 Lsa SCHEDULE OF STANDARD CONTRACT PROVISIONS BILLING RATES FEES FOR PROFESSIONAL SERVICES Fixed-Fee Contracts. If a fixed-fee proposal , the professional services described in the Scope of Services section of the attached proposal shall be provided for the fixed fee noted in the Compensation and Terms section of the proposal . All other professional services are considered extra services. Extra services shall be provided on a time and expenses basis at the same rates specified for hourly contracts unless other arrangements are made in advance. Hourly Contracts. If an hourly plus expenses proposal , the professional services described in the Scope of Services section of the attached proposal shall be provided on a time basis at current hourly rates. These rates are as shown on a Rate Schedule that is attached or can be made available. Hourly rates are subject to review at least annually on or about July 1 each year, and may be adjusted to reflect changing labor costs at our discretion at that time. Out of pocket expenses shall be reimbursed at cost plus 10%, unless other arrangements are made in advance, and are not included in the hourly fee for professional services. Out of pocket expenses include, but are not limited to, costs of: 1) reproduction of reports and graphics furnished or prepared in connection with the work of the contract, 2) long distance telephone and telegraph charges, 3) laboratory services, 4) automobile travel at 26 cents/mile, 5) truck travel at 43 cents/mile, 6) other travel , subsistence, vehicle rental , and lodging in connection with the work of the contract, 7) fees of specialized consultants retained with the approval of the client and 8) facsimile transmittals at one dollar per page. The total estimated amount of time and expenses noted in the Compensation and Terms section of this proposal will serve as a control on the services to be provided. The specified amount will not be exceeded without prior approval of the client. 09/25/90(ADMIN\CONTRACT.PRO) LSa FREQUENCY OF BILLING Monthly invoices shall be submitted for progress payment based on work completed to date. Out of pocket expenses shall be billed on the same monthly invoice and shall be identified as a separate item. PAYMENT OF ACCOUNTS Accounts are due and payable upon receipt of invoice. A service charge of H% of the invoice amount (18% annual rate) may be applied to all accounts not paid within 30 days of invoice date. Any attorney's fees or other costs incurred in collecting any delinquent amount shall be paid by the Client. TERMINATION OF SERVICES These services may be terminated upon ten days written notice for good reason by either party. In this event, payment for all services and expenses incurred prior to the date of termination shall be due and payable upon receipt of final invoice in accordance with the provisions of the foregoing section. REVOCATION If this Schedule of Standard Contract Provisions is attached to a proposal , said proposal shall be considered revoked if acceptance is not received within 90 days of the date thereof, unless otherwise specified in the proposal . 09/25/90(ADMINWONTRAMPRO) Csa HOURLY BILLING RATES JULY 1. 1990 Job Classification Hourly Rate PRINCIPAL $100-150 ASSOCIATE/PROJECT MANAGER $ 65-100 ASSISTANT PROJECT MANAGER $ 50-70 PRINCIPAL INVESTIGATOR/PROJECT SCIENTIST $ 45-60 ENVIRONMENTAL ANALYST/ASSISTANT PLANNER/ ASSISTANT ENGINEER $ 40-55 FIELD DIRECTOR (ARCHAEOLOGY/PALEONTOLOGY/BIOLOGY) $ 35-50 RESEARCH ASSISTANT/TECHNICIAN $ 25-50 WORD PROCESSING $ 35-45 FIELD CREW/OFFICE ASSISTANT $ 15-35 'The hourly rate for work involving actual expenses in court, giving depositions or similar expert testimony, will be billed at $175 per hour regardless of job classification. 09/25/90(ADMINWONTRAMPRO) • 02-219- 01 • TRAFFIC STUDIES APPLIICC�ANT: .,/ C/O�NSULTANTS: NAME: ' J�'//n`X,7-Jl.QJ 7✓1��./�L/�!/ ��H PHONE: PROJECT NAME: DESCRIPTION: i DATE DEPOSIT FEES PAYMENT REMAINING BALANCE ID Id 9d /l, -zz- Zz8 , 3.5 � S�l�• o2S CAW D, _� Sal• � �y3, �.5 a,�5 RECEIPT CITY OF NEWPORT BEACH NEWPORT BEACH. CALIFORNIA 926 No. 60019 �4tOPN�' T DATE RECEIVED FROM -+-►NI �� ��y�`� `� /� ����� ���I�� --- `///\,111:� ' FOR: j! ACCOUNT NO. AMOUNT f e{ p -I�d�-C70 4-1 q C91C) I D DEPARTMENT BY l D, 7,-) 4 2 - 12/N"/ �02-219- niZ TRAFFIC STUDIES APPLICANT: CONSULTANTS: NAME: PHONE: PROJECT NAME:: DESCRIPTION: DATE DEPOSIT FEES PAYMENT REMAINING BALANCE 3"•2 �C�, - �'DD•UD + DDD Ff DIJaZ, ,Z d��%'°eti2 •i/ .Z, zS6.�J 3 q26 , Ob l/ 8a 3 �? C/, z0 q I�. 5l) / 5'o b • -3b elo, 7 / , V46 , j{0 9jl e, .�5 � �. 5,5 RECEIPT ___ ._._._.._ EIPT �,_,_D���W��m ._ CITY OF NEWPORT BEACH ! NEWPORT EACH CALIFORNIA 92663Q No. 71600 ATE Ov RECEIVED FROM ! FOR: - '•t •!. .ACCOUNT NO.- 'AM T• _• 4 =-- ! DEPARTMENT ��� eY Dio z3oa • 3 02-219— D/ • NAME PHONE APPLICANT: CONSULTANTS: DATE DEPOSIT FEES PAYMENT REMAINING BALANCE • �dsJ� "t/ S �f / ODD, d0 /, /✓` ��EwraoRr CITY OF NEWPORT BEACH CASH RECEIPT e.f i NEWPORT BEACH,CA 92663 �<fFORN`' 3556 RECEIVED BY:CM CUSTOMER:THE IRVINE CO MISCELLANEOUS RECEIPTS TRAFFIC STUDIES 0102300 $533.60 ENVIRONMENTAL FEES CITY FEE $80.04 I 'li TOTAL DUE $613.64 CASH PAID CHECK PAID CHECK NO TENDERED CHANGE $.00 $613.64 455828_ $613.64 $. 00 DATE — 02/18/92 TIME — 15:43:52 CITY CF �EWPORr • DEMAND FOR NEWPORT � e� PAYMENT BEACH c9r�p0.N`P S Demandof: LSA Associates, Inc. Date: February 18, 1992 Address: 157 Park Place Pt Rirhmand, rA 94R01 In the amount of: $1,005.00 Item of Expenditure Budget # Amount CORPORATE PLAZA TRAFFIC ANALYSIS For professional. services rendered Invoice No. 11664F - Revised Total $1,005.00 Approved For Payment: PAJ"-t�L Department ea Audited and Approved: Finance Director T SA INVOICE LSA Associates,Inc CITY OF NEWPORT BEACH DATE: JANUARY 22, 1992 ATTN: PATTY TEMPLE 3300 NEWPORT BOULEVARD INV 11664F — REVISED NEWPORT BEACH, CA 92660 FOR PERIOD: THRU NOVEMBER PROJECT # CNB 001 PROJECT NAME:. CORPORATE PLAZA PROJECT MGR: R ILXKARI FOR PROFESSIONAL SERVICES RENDERED THROUGH NOVEMBER 30, 1991 R AMMARI 16.75 HRS r? 60.00 = 1,005.00 • TOTAL DOE THIS INVOICE: $ 1,005.00 !,sx•�Y—> �- y r"z spa '...5,2;�'MENT By P nnin Du".:r � Q 30 1 Remit :o: :s-p.:rk pl.ne Telep�one 415 236-6810 ': .i:.:^•:uu.i.(:.o:nn•rn.:94-9:1 F.r.srnulc-15136-J480 • • it ¢aEwPORT x � CITY OF NEWPORT BEACH 3 � P.O. BOX 1768,NEWPORT BEACH,CA 92659-1768 cqC/FO R�`P PLANNING DEPARTMENT (714) 644-3225 February 7, 1992 Mr. Tom Redwitz Vice President The Irvine Company 550 Newport Center Drive PO Box I Newport Beach, CA 92658 RE: Contract Augmentation Request for Library Exchange Agreement Traffic Analysis Dear Tom, The City has received a contract augmentation request from LSA to cover out of scope extra • work performed for the Library Exchange Agreement during the period July through 22 1992 attached i November 1991 (letter of January . The letter requests a budget increase) of $533.60, which would bringthe total budget for this project to $18,533.60. A budget augmentation request of$5000 was originally submitted by LSA on November 25, 1991(copy attached). Although the terms of the contract specifically require prior authorization for extra work, the City indicated that it would support a contract augmentation of$533.60 to cover the work performed by LSA from July through November, 1991 (attached letter of January 14, 1992). Since $1466.40 remained in the budget after completion of in-scope tasks, this augmentation would allow $2000 for the extra work completed by LSA. As indicated above, a prior authorization clause is standard in City consultant contracts. Although we understand how project pressures can make it difficult to stay on top of administrative matters, we also expect our consultants to exercize reasonable diligence in and to notify us promptly whenever pr oblems arise. In monitoring the status of contractsfy P P Y this case, we were very surprised to receive an extra work request more than four months after this out-of-scope work was begun. Because the City has had a good working relationship with LSA in the past, we were willing to partially accomodate their request on this occasion. We wish to assure The Irvine Company that the City views this as an isolated incident, and suc h requests will not be routinely approved in the future. • 3300 Newport Boulevard, Newport Beach Mr. Tom Redwitz • February 7, 1992 I apologize for any inconvenience this may cause. If you concur with the City's position, please submit a check for$613.64 to cover LSMs $533.60 extra work request plus 159o' City review fee. If you wish to discuss this matter please do not hesitate to call. Very truly yours, PLANNING DEPARTMENT JAMES D. HEWICKER, irector By: v J hn H. Douglas,61CP onmental Coordinator cc: Pat Temple Rich Edmonton R\..\U BRARY\TY0.BDGT.LTR • • PLANNING DEPARTMEN t LSA Associates,Inc. CITY OF NEWPORT BEACH EnvitonmentalAsmsvnent Transportation Engineering • T FEB 61°92 pM CoResmmunrce ity Planning LSA agement AM 12 3 4 5 8 Environmental Restoration 71819i101113121 I l 1 1 I P r i it o p a l s January 22, 1992 Rob Balen Les card John Douglas Jim Crdvrr Environmental Coordinator George xtrrilko City of Newport Beach Carollyt Lobell 3300 Newport Boulevard Bill Mayer Newport Beach, CA 92663 Ray Moe Rob Scbonboltz Malcolm Sproul Subject: Budget Contract Amendment Request - Corporate Plaza and GPA Library Transfer Associates Mtcbael Cale Dear John: Lyn Calcrdine Connie Calica In response to your letter dated January 14, 1992, LSA Associates, Inc. (LSA) GaryDov Xevin Fincber has revised the November 24, 1991, Budget Contract Amendment Request SteveGranbolm letter and, as recommended in your letter, LSA accepts your budget augment • RicbardGrassetti of$533.60, bringing the total contract amount to $18,533.60. Roger-Harris Art Hourrigbausen As indicated in our previous letter, LSA completed the tasks outlined in the t^ Robert s Gina Jnricick, scope of work letter dated April 8, 1991, and submitted to the City for their , k Benson Lee review on June 28, 1991. At the end of June, LSA had expended $16,533.60 RobMcCamr towards scope of work tasks, with $1,466.60 remaining in the budget. Sabrina Nicbolls Beth,Padon Between July and November, LSA prepared and submitted to the City for Harrigene Perry their review additional out of scope tasks, as follows: Anthony Pevos AnsyRudell Dean Williams Jill Wilson Alternatives Analysis On July 18, 1991, LSA was requested to prepare an alternatives analysis for the library exchange agreement. The following three alternatives were identi- fied: • Alternative 1 - No Project/Development under the existing General Plan. • Alternative 2 - Development of new library on site of existing Civic Plaza facility. 0122/92(1:\CNE001\INV0ICE.LTR) One Park Plaza,Suite 500 Telepbone 714 533 0666 Imine,California 92714 Facsimile 714353.8076 LSA Amdates,Inc. Alternative 3 - Transfer of Development Rights between the existing • Civic Plaza and the proposed Newport Village library site only. The request was made to conduct a trip generation comparison for Alterna- tives 2 and 3, and to provide a brief description of the traffic and circulation as a result of these alternatives. The traffic and circulation,analysis for Alter- native 1 was not required, as this alternative had been analyzed and docu- mented in previous EIRs. New City Traffic Model Database As part of a second round of comments raised by the City in its review of the June 28, 1991, studies, ISA was requested to revise the technical studies based on new traffic data that were not previously available. The studies were revised to Include: • Existing and year 2010 daily traffic volumes, approved by Rich Edmonston at the City of Newport Beach, and consistent with the City's most current General Plan Traffic Model. This included daily traffic volumes for Avocado Avenue south of San Miguel. • A Traffic Phasing Ordinance (TPO) analysis for Civic and Corporate Plazas that included the intersection at Avocado and Pacific Coast . Highway. • Refined trip distributions that included Avocado, and were consistent with the TPO and the General Plan level analysis. V • An expanded discussion explaining why intersections over 0.90 ICU in the TPO analysis are not considered a significant impact. These studies were then submitted to Don Simpson, Rich Edmonton, and Patty Temple at the City of Newport Beach and to Mike Erikson and Tom Redwitz at The Irvine Company for their review on September 13, 1991. Additional Revisions As a result of additional changes requested by the City of Newport Beach and changes to the project description, the September 13, 1991, studies were revised and submitted to Marie Gilliam and Rich Edmonston on October 23, 1991. Per discussions with Rich Edmonston, the latest round of revisions and clarifications to the technical studies were made to reflect: • 01/22/92(I:\CNEOOI\INVOICE.LTR) 2 LSA Azodateg Inc. • The transfer of 35,000 square feet office from Newport Village to Civic Plaza, which resulted in the new office added being reduced from 57,150 square feet to 22,150 square feet; and • The name change from Pelican Hill Road to Newport Coast Drive. Subsequent to this submittal, LSA was requested by Rich Edmonston to revise the ICU calculations at three intersections to maintain consistency between these traffic studies and similar studies submitted to the City. Although our ICU analyses were technically correct, they were not consistent with the City's ICU worksheets. As a result, LSA recommended revising two of three ICUs and the ICU summary tables in the reports. LSA submitted the revised ICU worksheets and summary tables to Marie Gilliam on November 4, 1991. Subsequent to successful completion of the additional out of scope tasks as presented above, the City Council approved the Corporate and Civic Plaza projects and the Library Transfer agreement EIR. It should be noted that subsequent to our June 28, 1991, report submittal, and as a result of these additional tasks, LSA Incurred time and material costs of approximately $4,500. LSA recognizes the City of Newport Beach as a valued client and would like to maintain the strong working relationship that we currently enjoy. There- fore, LSA will absorb the difference between the $4,500 (actual time and material costs incurred) and the recommended budget augment of$533.60. With authorization of this budget augment as presented in your January 14, 1992, letter, LSA has enclosed an invoice for $1,005.00, which is made up of 4. 2. remaining in our original budget estimate, and a portion of the the $ 7 SS g recently approved budget augment of$533,60. Sincerely, LSA ASSOCIATES, INC. I� Q. � Ray A. Moe Principal CC: Rich Edmonton Patricia Temple Approved: John H. Douglas,AICP Environmental Coordinator City of Newport Beach • 01(22192(1:\CNBOOI\INVOICE.LTB) 3 LSh INVOICE LSA Associates,Inc CITY OF NEWPORT BEACH DATE: JANUARY 22, 1992 ATTN: PATTY TEMPLE 3300 NEWPORT BOULEVARD INV 11664F - REVISED NEWPORT BEACH, CA 92660 FOR PERIOD: THRU NOVEMBER PROJECT # CNB 001 PROJECT NAME: CORPORATE PLAZA . :PROJECT MGR: . R AMMARI FOR PROFESSIONAL SERVICES RENDERED THROUGH NOVEMBER 30, 1991 R AMMARI 16.75 HRS 1.2 60.00 = 1,005.00 • TOTAL DUE THIS :INVOICE: $ 1,005.00 • Remit to: 1 15?Park Place Telephone 115 236-6810 ': R:ci"'7mld Cli:tur•m.v 918'1 1•:usnmle 115 136-3480 SEW PO CITY OF NEWPORT BEACH VT P.O.BOX 1768,NEWPORT BEACH,CA 92659-1768 e.� C7<!FORN`' PLANNING DEPARTMENT (714) 644-3225 January 14, 1992 Mr. Ray Moe LSA Associates, Inc. One Park Plaza, Suite 500 Irvine, CA 92714 RE: Library Exchange TPO Study Dear Mr. Moe, This letter is in response to your budget amendment request dated November 25, 1991. Unfortunately, we are unable to authorize this request for the reasons set forth below. The Schedule of Standard Contract Provisions and Billing Rates attached to your original • proposal for this project states '"The total estimated amount of time and expenses noted in the Compensation and Terms section of this proposal will serve as a control on the services to be provided. The specified amount will not be exceeded without prior approval of the client." In your letter of November 25, 1991 you stated that final revisions to the studies described in the scope of work were submitted on June 28, 1991. You went on to describe additional out of scope tasks that were undertaken beginning on July 18, 1991. You identified out of scope work products that were submitted on September 13, October 23, and November 4, 1991. Although we understand how schedule pressures can make it difficult to keep up with routine administrative matters,we believe extra work budget requests submitted more than four months after such work is initiated are unacceptable and in direct violation of contract provisions. In our telephone discussions regarding this matter, it was noted that our invoice records show that a balance of$1466.40 remained in the budget through the end of June, 1991, the date you indicated that in-scope tasks had been completed. Your letter of November 25 made no mention of this remaining budget, and stated that your costs for out of scope work amounted to $2500. However, in our telephone conversation you stated that the remaining budget authorization had been factored into your budget augmentation request,and that the extra work performed by your firm actually amounted to approximately$4000. We believe your request should have made note of this accounting procedure prior to being questioned . about it in our telephone conversation. 3300 Newport Boulevard, Newport Beach . _. ... ... ... _.. .ram. .--------._.�.._..•- Mr. Ray Moe • January 14, 1992 Page 2 Although our agreement clearly provides that the City is not required to authorize extra work budget augmentations after the fact", I indicated to you that the City would agree to authorize payment of$2000 for the out of scope work described in your November 25 letter. Since a budget authorization of$1466.40 remained in this account at the conclusion of the in-scope tasks, we are prepared to authorize a budget augmentation of $533.60. If you concur, please submit a revised budget augmentation request and invoice for the City's approval. In conclusion, I would like to emphasize the importance of processing extra work requests, when necessary, in a timely fashion We believe we have had a good working relationship with your firm in the, past, and wish to maintain this relationship on future projects. Adherance to the terms of our agreements will help to prevent misunderstandings and maintain good professional relations. Thank you for your cooperation in this matter. Very truly yours, PLANNING DEPARTME JAMES D. CJector ! By. J Douglas E . mnental Cor cc: Jim Hewicker, Planning Director Patricia Temple, Advance Planning Manager Rich Edmonton, City Traffic Engineer F:\_.\UBRARY\LSA-BGTXTR r LSA Associates,Inc. Environmental Assess,nent Transportation Engineering . �� Resource Management Community Planning Eninronn,ental Restoration Principals November 25, 1991 Rob Balen Les Card flm Culmr Patty Temple George X+rrilko City of Newport Beach Carollyn Lobelt 3300 Newport Boulevard Bill Mayer Newport Beach, CA 92663 Ray Moe RobSchonholtz Malcolm Sproul Subject: Budget Contract Amendment Request- Associates Corporate Plaza and GPA Library Transfer Michael Cale Deal, Patty: Lyn Calerdine Connie Calico Gnmn Fbn Per our modified scope of work letter dated April 8, 1991, LSA Associates, Kevin Inc. (LSA) was to revise the Traffic Phasing Ordinance (TPO) analysis studies Storm Granhohn for Corporate and Civic Plazas in Newport Center, and prepare a General •RichardGrassetti Plan level traffic and circulation analysis for the library exchange agreement Roger Harris in Newport Center. LSA has completed the scope of work tasks and has Art Hon,rrgha+nen undertaken additional out of scope tasks in an effort to provide the City with Robert Hrrrbet a timely response. Gina farick Benson Lee The following budget contract amendment request is for the additional out Rob McCann Sabrina Nicholls of scope tasks completed and any potential additional tasks to be completed , Beth Padon on an as needed basis. A budget augment for $5,000 is requested, to bring Harrigene Per•,), our total budget estimate to $23,000. This budget contract amendment Antho»yPetros includes $2,500 for the out of scope work effort and $2,500 estimated to be AmyR,rdell the additional transportation services needed to bring this project and LSA's Dean Williams involvement to a successful completion. Jill Wilson The following provides a summary of project tasks completed; additional out of scope tasks undertaken and completed; and potential future tasks that may need to be undertaken to bring this project to a successful conclusion. PROJECT TASKS COMPLETED The TPO analysis studies for Corporate and Civic Plazas, previously prepared on February 14, 1991, were revised based on comments from Rich Edmonston, City Traffic Engineer, and submitted to the City for their review yl L Y on June 13, 1991. Copies of the study were also sent to Marie Gilliam at �LANNIP:G UEPARWIENi 'PY OF NEViIPORT BEAC4l 15/91(1:WNBoolwoncsr.r.TR) NOV 2':' 1991 AM Blk Park Plaza,Suite 500 Telephone 714553.0666 71819110111112111213A4 Yfp-,e,California 91714 Facsimile 714553-8076 k x LSA A mtet,Inc. . MEG Associates. Also on June 13, 1991, LSA completed the traffic and circu- lation analysis for the library exchange agreement, and submitted copies of this study to the City for their review. Subsequent to the June 13, 1991, submittal, the request was made to revise the library exchange analysis assuming a total future office development of 65,550 square feet in Civic Plaza as compared with the 65,500 square feet assumed previously. Although not a significant work effort, LSA made the necessary revisions to the June 13, 1991, traffic and circulation analysis, and submitted revised cop- ies of the study to the City and Marie Gilliam for their review on June 28, 1991. OUT OF SCOPE TASKS UNDERTAKEN LSA has completed additional out of scope tasks as outlined below. Three tasks were undertaken, including an alternatives analysis; a revised analysis based on the City's most recent traffic analysis model; and additional revi- sions. 1. Alternatives Analysis On July 18, 1991, LSA was requested to prepare an alternatives analysis for • the library exchange agreement. The following three alternatives were identi- fied: •Alternative 1 - No Project/Development under the existing General Plan. •Alternative 2.- Development of new library on site of existing Civic Plaza facility. •Alternative 3 - Transfer of Development Rights between the existing Civic Plaza and the proposed Newport Village library site only. The request was made to conduct a trip generation comparison for alterna- tives 2 and 3, and provide a brief description of the traffic and circulation as a result of these alternatives. The traffic and circulation analysis for Alterna- tive 1 was not required, as this alternative had been analyzed and document- ed in previous EIRs. 2. New City Traffic Model Database As part of a second round of comments raised by the City in its review of the June 28, 1991, studies, LSA was requested to revise the technical studies • 11/25/91(1.\CNB00I\BUDGEr.LTR) 2 LSA Azoctates,Inc. based on new traffic data that was not previously available. The studies were . revised to include: • Existing and year 2010 daily traffic volumes, approved by Rich Edmonston at the City of Newport Beach, and consistent with the City's most current General Plan Traffic Model. This included daily traffic volumes for Avocado Avenue south of San Miguel. • A Traffic Phasing Ordinance (TPO) analysis for Civic and Corporate Plazas that included the intersection at Avocado and Pacific Coast Highway. • Refined trip distributions that included Avocado, and were consistent with the TPO and the General Plan level analysis. An expanded discussion explaining why intersections over 0.90 ICU in the TPO analysis are not considered a significant impact. These studies were then submitted to Don Simpson, Rich Edmonston, and Patty Temple at the City of Newport Beach and to Mike Erikson and Tom Redwitz at The Irvine Company for their review on September 13, 1991. 3. Additional Revisions As a result of additional changes requested by the City of Newport Beach and • changes to the project description, the September 13, 1991, studies were revised and submitted to Marie Gilliam and Rich Edmonston on October 23, 1991. Per discussions with Rich Edmonston, the latest round of revisions and clarifications to the technical studies were made to reflect: • The transfer of 35,000 square feet office from Newport Village to Civic Plaza resulting in the new office added being reduced from 57,150 square feet to 22,150 square feet; and • The name change from Pelican Hill Road to Newport Coast Drive. Subsequent to this submittal, LSA was requested by Rich Edmonston to revise the ICU calculations at three intersections to maintain consistency between these traffic studies and similar studies submitted to the City. Although our ICU analyses were technically correct, they were not consistent with the City's ICU worksheets. As a result, LSA recommended revising two of three ICUs and the ICU summary tables in the reports. LSA submitted the revised ICU worksheets and summary tables to Marie Gilliam on November 4, 1991. Future Tasks nth the most recent submittal on October 23, 1991, and the updated ICU worksheets and summary tables on November 4, 1991, LSA has completed all • 11/25/91(1.\CNBOO1WUDGEr.L7R) 3 LSA Associates,Inc. tasks indicated per our Modified Scope of Work for the three Newport Cen- ter developments, and has conducted and completed additional out of scope tasks as outlined above. It is our understanding, however, that additional tasks may be required on an as needed basis to provide supplementary technical analysis. As a result, LSA requests that additional budget be provided to account for the out of scope tasks presented above and additional tasks to be completed on an as needed basis. A budget augment for $5,000 is requested, to bring our total budget to $23,000. This budget contract amendment includes the $2,500 out of scope work effort described above, and $2,500 estimated for the additional transportation services needed to bring this project to a suc- cessful completion. Preparation and attendance at public hearings is not included in this budget contract amendment request, and we suggest that this be invoiced on a time and material basis, should LSA be required to participate in hearings. LSA requests you authorize the $5,000 budget augment by signing below and returning the signed letter to LSA at your earliest opportunity. We look forward to continuing to work for the City of Newport Beach, to meet your transportation services needs. Sincerely, LSA ASSOCIATES, INC. Ray A. Moe Principal ACCEPTED AND AUTHORIZED BY: Signature Print Name and Title Company Date 11/25/91(IACNB001\BUDGEr.LTR) 4