Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutTS097 ;' ---`7Co140,'3SSIONERS MINUTES
' A
0 �t�`'P�o Poo CITY OF NEWPORT BEACH
June 23, 1994
ROLL CALL INDEX
17. That this use per expire unless exercised within 24
months from the date of ap specified in Section
20.80.090A of the Newport Beach Mun de.
A. Traffic Study No. 97 Public Hearin item No.
Request to approve a traffic study for a proposed automobile Ts 97
rental facility. UP3530
AND
B. Use Permit No. 3530 Public Hearin
Request to permit the establishment of an automobile rental
facility which includes a car washing and maintenance facility and
underground fuel facilities on property located in the M-1-A
District. The proposal also includes a modification to the Zoning
Code so as to allow a monument sign and an electric guard gate
to encroach into the required 15 foot front yard setback.
LOCATION: Lots 25 and 26, Tract No. 3201, located at
4242-4262 Campus Drive, on the
southeasterly side of Campus Drive,between
Dove Street and MacArthur Boulevard,
across from the John Wayne Airport.
ZONE: M-1-A
APPLICANT: Nogle Onufer Associates Architects,Inc.,San
Diego
OWNER: The Shattuck Family Trust, Newport Beach
James Hewicker, Planning Director, referred to Condition No. 28,
Exhibit "A", requesting a Lot Line Adjustment, whereby he
suggested that a Covenant be required so as to hold the two
-16.
COA MISSIONERS , MINUTES
CITY OF NEWPORT BEACH
June 23, 1994
ROLL CALL L INDEX
parcels as a single building site as long as the properties are being
used together, for the duration of the use on the site.
The public hearing was opened in connection with this item, and
Mr. Jerry King, 979 Sandcastle Drive, appeared before the
Planning Commission on behalf of the applicant. He concurred
that amended Condition No. 28 not require a Lot Line
Adjustment, and that the applicant be allowed to apply for a
waiver of a parcel map. He concurred with the findings and
conditions in Exhibit "A". Mr. Hewicker explained that by
replacing the Lot Line Adjustment with a waiver to a parcel map
would require the applicant to come back to the Planning
Commission. He recommends a Covenant to hold the two lots
together for the duration of the use of the property, and it would
not require the applicant to come back to the Planning
Commission. Mr. King concurred with the recommendation.
There being no others desiring to appear and be heard, the public
hearing was closed at this time.
Motion Motion was made to approve Use Permit No. 3530 subject to the
All ayes findings and conditions in Exhibit "A", and to modify Condition
No. 28 as previously stated.
Commissioner Edwards supported the motion; however, he
supports the CC&R only because the applicant's representative
consented to the amendment.
Motion was voted on, MOTION CARRIED.
A. TRAFFIC STUDY NO 97: Approve the Traffic Study,
making the findings listed below:
FINDINGS:
1. That a Traffic Study has been prepared which analyzes the
impact of the proposed project on the peak-hour traffic and
-17-
I
COMMISSIONERS . • MINUTES
�ioAo 0
G��F�o `t��QoyPog10
CITY OF NEWPORT BEACH
June 23, 1994
ROLL CALL INDEX
circulation system in accordance with Chapter 15.40 of the
Newport Beach Municipal Code and City Policy S-1.
2. That the Traffic Study indicates that the project-generated
traffic will neither cause nor make worse an unsatisfactory
level of traffic on any 'major,' 'primary-modified,' or
'primary' street.
3. That the Traffic Study indicates that the project-generated
traffic will not be greater than one percent of the existing
traffic during the 2.5 hour peak period on seven of the
eight study intersections and that the ICU analysis for the
intersection of Campus Drive/Dove Street, indicates that
the ICU values for the A.M. and P.M. peaks will not be
altered by the addition of the project.
B. USE PERMIT NO. 3530
FINDINGS:
1. That the proposed application is support service in nature
and as such,is consistent with the Land Use Element of the
General Plan and is compatible with surrounding land uses.
2. That adequate parking will exist on-site for the proposed
development.
3. That the proposed project will not have any significant
environmental impact and that the project is categorically
exempt from the requirements of the California
Environmental Quality Act under Class 3 (New
Construction or Conversion of Small Structures).
4. That the design of the proposed improvements will not
conflict with any easements acquired by the public at large
for access through or use of property within the proposed
development.
-18-
,COMMISSIONERS • MINUTES
00
�n��Alcf.�" �.
��q�o � �°Qo�Poo CITY OF NEWPORT BEACH
June 23, 1994
ROLL CALL INDEX
5. That public improvements may be required of a developer
per Section 20.80.060 of the Municipal Code.
6. That the proposed modification to the Newport Beach
Municipal Code so as to allow the proposed monument
sign and electric guard gate to encroach into the required
15 foot front yard setback will not,under the circumstances
of this case be detrimental to the health, safety, peace,
morals, comfort and general welfare of persons residing and
working in the neighborhood or be detrimental or injurious
to property or improvements in the neighborhood or the
general welfare of the City, and further that the proposed
modification is consistent with the legislative intent of Title
20 of the Municipal Code.
7. That the approval of Use Permit No. 3530 will not, under
the circumstances of this case,be detrimental to the health,
safety, peace, morals, comfort and general welfare of
persons residing and working in the neighborhood or be
detrimental or injurious to property and improvements in
the neighborhood or the general welfare of the City.
CONDITIONS:
1. That the proposed development shall be in substantial
conformance with the approved plot plan, floor plan and
elevations, except as noted below.
2. That all mechanical equipment, trash areas and vehicle
storage areas shall be screened from Campus 'Drive and
adjoining properties. The proposed block wall adjacent to
the Campus Drive frontage shall be a minimum 6 feet high
and shall be set back a minimum 15 feet from the front
property line.
3. That all automobile repairs shall be conducted within the
building and no outdoor display of vehicles for sale shall be
permitted.
-19-
COAZUSSIONERs MINUTES
�dcror�l��dd.
��yfo�rr �°�O�Poo CITY OF NEWPORT BEACH
June 3, 1994
2
ROLL CALL INDEX
4. That grease interceptors shall be provided in all drains
within the building where petroleum residues may enter the
sewer system, unless otherwise permitted by the Building
Department or the Utilities Department.
5. That no outdoor sound system shall be utilized on-site.
6. That all employees shall park on-site at all times.
7. That all signs shall be installed in accordance with the
requirements of Newport Beach Sign Code.
8. That the proposed electric guard gate will be solely for
vehicles exiting the property. That any future ent security
gate shall be located to provide a minimum distance of
twenty (20) feet from the front property line, and shall be
subject to further review of the City Traffic Engineer.
9. That all improvements be constructed as required by
Ordinance and the Public Works Department.
10. That arrangements be made with the Public Works
Department in order to guarantee satisfactory completion
of the public improvements, if it is desired to record a
parcel map or obtain a building permit prior to completion
of the public improvements.
11. That the on-site parking, vehicular circulation and
pedestrian circulation systems be subject to further review
by the Traffic Engineer.
12. That all parking spaces shall be striped with approved
traffic markers or painted white lines not less than 4 inches
wide.
13. That the required number of handicapped parking spaces
shall be designated within the on-site parking area and shall
be used solely for handicapped self-parking. One
-20-
COAU41SSIONERS • • MINUTES
.pl�.00 ICI C6c`�O di
o �• � s
CITY OF NEWPORT BEACH
June 23, 1994
ROLL CALL INDEX
handicapped sign on a post and one handicapped sign on
the pavement shall be required for each handicapped space.
That the required handicap parking spaces shall be
relocated to the nearest row of parking adjacent to the
building.
14. That the intersection of the private drives and Campus
Drive be designed to provide sight distance for a speed of
45 miles per hour. Slopes, landscape, walls, signs,
monument signs and other obstruction shall be considered
in the sight distance requirements. Landscaping within the
sight line shall not exceed twenty-four inches in height.
15. That the unused drive approaches be removed and replaced
with curb, gutter and sidewalk; that the proposed new drive
approaches be constructed with the City's flared approach
standard 166-L, and that the settled sections of curb and
gutter be reconstructed along the Campus Drive frontage.
All work shall be completed under an encroachment permit
issued by the Public Works Department.
16. That a hydrology and hydraulic study be prepared by the
applicant and approved by the Public Works Department,
along with a master plan of water, sewer and drainage for
the on-site improvements prior to issuance of any grading
or building permits. Any modifications or extensions to the
existing storm drain, water and sewer systems shown to be
required by the study shall be the responsibility of the
developer.
17. That disruption caused by construction work along
roadways and by movement of construction vehicles shall
be minimized by proper use of traffic control equipment
and flagmen. Traffic control and transportation of
equipment and materials shall be conducted in accordance
with state and local requirements.
-21-
OONOMSSIONERS MINUTES
� s
0 �t��o�o,`Poo CITY OF NEWPORT BEACH
June 23, 1994
ROLL CALL INDEX
18. That overhead utilities serving the site be undergrounded
to the nearest appropriate pole in accordance with Section
19.24.140 of the Municipal Code unless it is determined by
the City Engineer that such undergrounding is unreasonable
or impractical.
19. That this approval of use permit applies only to the facility
as a servicing facility with no customer pick-up or drop-off
of vehicles to the subject property; and any change to the
operational characteristics of the facility to allow for
customers to pick-up or drop-off the vebicles to the site
and/or for the use of a shuttle bus to transport customers
to and from the site shall be subject to approval of an
amendment to this use permit.
0. That the proposed monument sign adjacent to Campus
Drive shall be moved back or designed in such a manner as
to provide sight distance in conformance with the City's
Sight Distance Standard 110-L. The final design and
positioning of the monument sign shall be approved by the
Public Works Department to insure conformance with City
sight distance standards.
1. That the drive entrance shall be widened to provide a
minimum 14 foot wide aisle exiting the facility, unless
otherwise approved by the City Traffic Engineer. The nose
of the island of the entrance shall also be relocated so as
not to encroach into the public right-of-way.
2. That the car wash area shall be protected so as to prevent
drainage from the parking lot from entering the sewer
system. The drain shall be connected to the sewer system
and have a grease trap. The design and installation of the
above facilities shall be approved by the Utilities
Department.
That the outdoor storage of tires and other auto related
parts or merchandise shall be prohibited on-site.
-22-
COAn ISSIONERS MINUTES
°�9F�o �tr��Qoy�oso CITY OF NEWPORT BEACH
June 23, 1994
ROLL CALL INDEX
24. That the entire site shall be maintained in a clean and
orderly manner.
25. That the front of the building facing Campus Drive shall-be
constructed of masonry veneer or similar material as
indicated on the approved elevation.
26. Landscaping along Campus Drive shall be regularly
maintained free of weeds and debris. All vegetation shall
be regularly trimmed and kept in a healthy condition.,
27. That the approval of this application shall permit complete
engine rebuilding (including electrical and transmission
repair), as well as tune-ups, lubrication, smog testing and
brake service and installation. No painting, body work or
other operations of a similar nature shall be permitted on-
site unless an amendment to this use permit is approved by
the Planning Commission.
28. That the recordation of a Covenant shall be required so as
to hold the two lots as a single building site for the
duration of the use of the property.
29. That prior to the issuance of a certificate of use and
occupancy, the applicant shall demonstrate to the Planning
Department that the lighting system shall be designed,
directed, and maintained in such a manner as to conceal
the light source and to minimize light spillage and glare to
the adjacent properties and Campus Drive.
0. That prior to the issuance of a certificate of use and
occupancy, the applicant must demonstrate to the City's
Building Department and Fire Department that the project
is in compliance with the County of Orange Health
Department and the City's Fire Department Regulations.
1. That the Planning Commission may add or modify
conditions of approval to this use permit, or recommend to
-23-
,C,QA=SSIONERS MINUTES
CITY OF NEWPORT BEACH
June 23, 1994
ROLL CALL INDEX
the City Council the revocation of this use permit, or the
City Council may revoke this use permit upon a
determination that the operation which is the subject of this
use permit causes injury, or is detrimental to the health,
safety, peace, morals, comfort, or general welfare of the
community.
32. This use permit shall expire unless exercised within 24
months from the date of approval as specified in Section
20.80.090A of the Newport Beach Municipal Code.
Var ce No. 1196 Continued Public Hearing)
Item No.4
Request t ermit the construction of a single family dwelling on V1196
property loca d in the R-1.5 District which exceeds 1.5 times the
buildable area if the site. The proposal also includes cont'd
modifications to t Zoning Code so as to allow the proposed to 7/7/94
structure to encroach feet into the required 20 foot front yard
setback, and 7 feet into required 10 foot rear yard setback; a
request to construct 6 foot h walls along the side property lines
which encroach 15 feet into a required 20 foot front yard
setback; and two carport spaces ated on the front one-half of
the lot, partially open on both sides ere the Code requires that
said covered parking spaces shall have walls and an operating
garage door). The modification also inclu the following second
floor encroachments into the required 3 foo We yard setbacks:
one bay window; one greenhouse window, a he duct; a portion
of the living room; and a planter box.
LOCATION: Portions of Lots 27 and 28, Block 7, ion
Five, Balboa Island, located at 1508 P
Avenue, on the northerly side of Park
Avenue, between The Grand Canal and
Abalone Avenue, on Little Balboa Island.
-24-
Planning Commission Meeting June 23, 1994
Agenda Item No. 3
CITY OF NEWPORT BEACH
TO. Planning Commission
FROM: Planning Department
SUBJECT: A. Traffic Study No. 97 (Public Hearing)
Request to approve a traffic study for a proposed automobile rental
facility.
AND
B. Use Permit No. 3530 (Public Hearing)
Request to permit the establishment of an automobile rental facility
which includes a car washing and maintenance facility and
underground fuel facilities on property located in the M-1-A District.'
The proposal also includes a modification to the Zoning Code so as to
allow a monument sign and an electric guard gate to encroach into the
required 15 foot front yard setback.
LOCATION: Lots 25 and 26, Tract No. 3201, located at 4242-4262 Campus Drive,
on the southeasterly side of Campus Drive, between Dove Street and
MacArthur Boulevard, across from the John Wayne Airport.
ZONE: M-1-A
APPLICANT: Nogle Onufer Associates Architects, Inc., San Diego
OWNER: The Shattuck Family Trust, Newport Beach
Application
This is a applicant request to permit the establishment of an automobile rental facility which
includes administrative offices,a car washing and maintenance facility and underground fuel
facilities on property located in the M-1-A District. The proposal also includes a
modification to the Zoning Code so as to allow a 5 foot 6 inch high± monument sign and
an electric guard gate to encroach into the required 15 foot front yard setback. In
accordance with Section 20.42.025 of the Newport Beach Municipal Code, automobile
service stations and other uses which in the opinion of the Planning Commission are similar
in character are permitted in the M-1-A District, subject to the securing of a use permit in
each case. Use permit procedures are outlined in Chapter 20.80 of the Municipal Code;
traffic study procedures are set forth in Chapter 15.40 of the Municipal Code; and
modification procedures are set forth in Chapter 20.81.
0
TO: Planning Commission - 2
Y
Environmental Signii"icance
This project has been reviewed, and it has.been determined that-it is categorically exempt
from the requirements of the California Environmental Quality Act under Class 3 (New
Construction or Conversion of Small Structures).
Conformance with the General Plan
The Land Use Element of the General Plan designates the site for "Administrative,
Professional and Financial Commercial" use. The proposed use is allowed under support
retail and service use. The Land Use Element has also established area specific land use
policies throughout the City. These'"area"policies set a site-by-site floor area ratio (F.A..R.)
development limit of 0.5/35 (Base Development Allocation is 29,006 square feet = 0.5
times the site area). Given that the application is for the construction of a structure
containing less than the base development allocation, the proposal is consistent with the
requirements of the Land Use Element of the General Plan policies and guidelines..
Subject Property and Surrounding Land Uses
The subject property measures 200± feet wide and 290± feet deep with land area of
58,000± square feet. The subject property is currently developed with two single story office
buildings (15,000 sq.ft.),which will be demolished, and related on-site parking area. To the
northwest, across Campus Drive, is the John Wayne Airport; to the north, is a two story
office building; to the east, is a veterinary hospital and a single story light industrial building
with related parking areas; and to the south, is an office building.
Combination of Lots
The proposed site is currently comprised of two lots which are to be consolidated into one
parcel of land through a lot line adjustment. The applicant is aware of this requirement and
the lot line adjustment application will be submitted subsequent to this use permit approval.
The following table has been prepared which sets forth the characteristics of the proposed
parcel and proposed project:
Parcel No. Parcel Area Building (s.f.) Floor Area Ratio
1 58,000± sq.ft. 3,150± sq:ft. 0.053
The proposed parcel fully conforms to the design standards as specified for the M-1-A
District. The Lot Line Adjustment for consolidation of the two lots is for financing and
conveyance purposes and for the proposed construction of the automobile rental facility.
AnaV3ia
The applicant is requesting to allow the establishment of an auto rental servicing facility and
related facilities consistent with such operations. The facility will consist of a 3,150± sqft.
TO. Planning Commission - 3
structure which will house two maintenance service bays (only minor automobile repairs will
be performed), one automobile washing bay and related employee offices. There will also
be a canopy with a fuel island and related underground gasoline tank. The proposed hours
of operation will be generally 24 hours since vehicles are constantly being serviced or
prepared for redelivery, as is typical for automobile rental facilities. The maximum number
of employees will be 10 at any one time. The building will be 16 feet 6 inches high and the
freestanding canopy will also be approximately 16 feet 6 inches high.
The applicant has indicated that the facility will be solely a servicing center and customers
will not come to the site to rent vehicles. Therefore, based on this information, staff"has
included a condition of approval which will require that to alter the operational
characteristics of the facility to allow customers to come to the site, an amendment to this
use permit must first be approved by the Planning Commission. The appropriate condition
has been incorporated into the attached Exhibit "A".
Off-Street Parking Requirement for Proposed Business
The Municipal Code does not contain any specific parking requirement for automobile
leasing facilities. However, based on a standard of one parking space per each 225 sq.ft. of
office space in the M-1-A District specified under Section 20.42.045 of the Municipal Code,
the administration and customer service portion of the facility would generate a requirement
for 6 parking spaces (1,218± sq. ft. administration _ 225 = 5.4 or 6 spaces). Based on a
standard of three spaces for each 1,000 sq.ft. of industrial use as specified under Section
20.42.045 of the Municipal Code, the storage, servicing and car wash portion of site
operations would generate a requirement for 6 parking spaces (1,302± sq.ft. maintenance
and storage + 630± sq.ft. car wash/preparation area = 1,932± sq.ft. _ 1,000 x 3 = 5.7 or
6 spaces). Thus, the total parking requirement would be 12 spaces (6 spaces + 6 spaces =
12 spaces). As shown on the attached site plan, 26 parking spaces will be provided for
employees, visitors, and for automobiles to be serviced. In addition, space for storage of
over one hundred fifty vehicles will also be provided on-site. This will be more than
adequate to serve the proposed facility.
Traffic Study No. 97
The proposed development will generate a significantly higher traffic volume than the light
industrial or general office use allowed under the current zoning. Therefore, a traffic study
was required to determine the compatibility of the proposed project under the guidelines
of the City's Traffic Phasing Ordinance. A traffic study has been prepared for the proposed
project in conformance with the City's Traffic Phasing Ordinance and City Council Policy
S-1 to examine the consistency and conformity of the project with the City's Circulation
Element. The City Traffic Engineer identified the following eight (8) intersections for
detailed evaluation in the traffic study.
1. MacArthur Boulevard at Campus Drive
2. MacArthur Boulevard at Birch Street
3. MacArthur Boulevard at Jamboree Road
10 0
TO: Planning Commission - 4
4. Bristol Street North at Campus Drive
5. Bristol Street at Irvine Avenue
6. Bristol Street North at Birch Street
7. Bristol Street at Birch Street
8. Campus Drive at Dove Street
The first step in evaluating an intersection's traffic volume capacity is to conduct a 19b,
traffic volume analysis, taking into consideration existing traffic, regional growth, and
committed projects that the City has granted approvals. If the project's generated traffic is
less than one percent traffic-volume on all approach segments to the selected intersections
during the projected peak.2-1/2 hour volume in either the morning or afternoon, then the
project's traffic impact is considered insignificant and in compliance with the City's Traffic
Phasing Ordinance requirement. In the event that the project's generated traffic exceeds
the one percent traffic volume analysis on any approach leg to any of the selected
intersections,then further analysis would be required which consists of Intersection Capacity
Utilization (ICU) analysis.
The one percent traffic volume test was applied to the selected intersections and one of the
intersections exceeded the maximum one percent volume test. The intersection.of Campus
Drive at Dove Street exceeded 1%of the intersection traffic volume; therefore,further ICU
analysis for that intersection became necessary.
The ICU analysis indicated that the intersection of Campus Drive at Dove Street is
operating at acceptable level of service for both peak periods. The intersection of Campus
Drive/Dove Street, currently maintains a Level of Service "B" with an ICU value of 0.63,
less than required by the City's Traffic Phasing Ordinance. The proposed project would
generate 21 inbound trips and 16 outbound trips in the morning peak hour and 21 inbound
and 20 outbound trips in the evening peak hour. The additional trips on Campus Drive
generated by the project would not•deteriorate the existing ICU value or level of Service at
the intersection of Campus Drive and Dove Street. Therefore, the proposed project would
not have any significant impact on the City's circulation network. The ICU analysis is
contained in Appendix C of the Traffic Study. The Traffic Study for this project indicates
that the proposed automobile rental, storage and maintenance facility would generate 380
trip ends per day.
Vehicular Access and Parking
Access to the site is provided via Campus Drive. Presently, there are two driveways that
provide for ingress and egress to the site. The existing driveways will be demolished,
replaced with curb and gutter and a new driveway,wiil be constructed for vehicular access
from Campus Drive. It is the recommendation of the Traffic Consultant that the width of
the exit portion of the drive be increased to a minimum of 14 feet to accommodate exiting
vehicles.
TO: Planning Commission - 5
Public Improvements
Staff has observed that the existing public improvements on the site, namely sidewalks and
drive approaches, are either damaged,will be unused, or nonconforming to City Standards.
The Public Works Department has indicated that the unused drive aprons be replaced with
curb, gutter and sidewalks and that the parking lot be striped, in conformance with City
Standards. Staff has also recommended that the nose of the island shown at the entrance
to the facility be relocated so as not to encroach into the public right-of-way.
Gasoline Storage Tank
The applicant has requested to add an underground gasoline storage tank and pumps to the
facility. The Building Department and the Fire Department do not object to the gasoline
tanks so long as approval is in compliance with the County of Orange Health Department
and the City's Fire Department Regulations.
Modification to Encroach into Front Yard Setback
The applicant requests the approval of a modification to allow a monument sign and an
electric guard gate to encroach into the required 15 foot front yard setback. The Zoning
Ordinance requires a minimum 15 foot front yard setback on Campus Drive, unless a
modification to the Zoning Code is approved. The proposed single-faced monument sign
measures 5 feet 6 inches high by 7± feet in length,with 32 sq.ft. of copy identifying the site
as a National Car Rental facility. The single-faced monument sign is proposed to be set
back 4.5 feet from the front property line. However, the Public Works Department and the
City Traffic Engineer have determined that the sign location as proposed may not be in
accordance with City Standards for sight distance and the appropriate condition of approval
to assure compliance with those standards has been included in the attached Exhibit "A".
It is staffs opinion that the proposed monument sign is acceptable inasmuch as the site is
quite large with limited access, and clear identification would enhance circulation in the
area. Furthermore, the sign encroachment is consistent with other signs that have been
approved by the Planning Commission and the Modifications Committee in front yard
setbacks in this area.
The proposed electric guard gate for vehicles exiting the facility is similar to those proposed
by other car rental facilities which encroach into the required 15 foot front yard setback.
Staff has no objection to this gate location as much as it is for exiting vehicles only.
However, it is staffs opinion that, in the future, an encroachment of this nature regulating
entry to the site could impair pedestrian circulation by automobiles stopping across the
public sidewalk. In order to assure that pedestrian circulation is not affected, the City
Traffic Engineer has recommended that the location of any future entry security gate be set
back a minimum of 20 feet from the front property line and be subject to further review by
the City Traffic Engineer. The applicant has been made aware of this requirement and the
appropriate conditions of approval have been included in the attached Exhibit "X.
0
TO: Planning Commission - 6
The plans also show the location of a decorative masonry wall, along Campus Drive, to
encroach into the required 15 foot front yard setback. The applicant has indicated that the
proposed height is 6 feet,whereas,the height of such structures within the 15 foot front yard
setback is limited to a maximum of 3 feet. The applicant has indicated that the intent was
for the wall to be located so as not to encroach into the required 15 foot front yard setback,
therefore, the appropriate condition of approval has been incorporated into the attached
Exhibit "A".
Specific Findings
Chapter 15.40 of the Municipal Code requires that the Planning Commission make certain
findings in conjunction with its approval of a traffic study. Section 20.80.060 of the Newport
Beach Municipal Code also provides that in order to grant any use permit, the Planning
Commission shall find that the establishment, maintenance or operation of the use or
building applied for will not,under the circumstances of the particular case, be detrimental
to the health, safety, peace, morals, comfort, and general welfare of persons residing or
working in the neighborhood of such proposed use or be detrimental or injurious.to property
and improvements in the neighborhood or the general welfare of the City. Should the
Planning Commission wish to approve Traffic Study No. 97 and Use Permit No. 3530, the
findings and conditions of approval set forth in the attached Exhibit "A" are suggested. No
exhibit for denial has been provided,inasmuch as staff is of the opinion that no findings may
be reasonably made in support of the denial of these ,applications. However, should
information be presented at the public,hearing which warrants a denial of these applications,
the Planning Commission may wish to ,take such an action.
PLANNING DEPARTMENT
JA ES)D. HEWIC R, Director
�By L , Oct k"
)JAVIER S:GARCIA
Senior Planner
Attachments: Exhibit "A"
Vicinity Map
Operational Statement from the Applicant
Traffic Study No. 97 date stamped May 26, 1994
Site Plan, Elevations and Sign Plan
F.\WP51\JAY-G\UP\AUr0\UP3530SR
TO. Planning Commission - 7
EXHIBIT "A"
FINDINGS AND CONDITIONS OF APPROVAL
FOR TRAFFIC STUDY NO. 97
AND USE PERMrr NO. 3530
A. TRAFFIC STUDY NO 97: Approve the Traffic Study, making the findings listed
below:
FINDINGS:
1. That a Traffic Study has been prepared which analyzes the impact of the proposed
project on the peak-hour traffic and circulation system in accordance with Chapter
15.40 of the Newport Beach Municipal Code and City Policy S-1.
2. That the Traffic Study indicates that the project-generated traffic will neither cause
nor make worse an unsatisfactory level of traffic on any 'major,' 'primary-modified;
or 'primary' street.
3. That the Traffic Study indicates that the project-generated traffic will not be greater
than one percent of the existing traffic during the 2.5 hour peak period on seven of
the eight study intersections and that the ICU analysis for the intersection of Campus
Drive/Dove Street, indicates that the ICU values for the A.M. and P.M. peaks will
not be altered by the addition of the project.
B. USE PERMIT NO. 3530
FINDINGS:
1. That the proposed application is support service in nature and as such, is consistent
with the Land Use Element of the General Plan and is compatible with surrounding
land uses.
2. That adequate parking will exist on-site for the proposed development.
3. That the proposed project will not have any significant environmental impact and
that the project is categorically exempt from the requirements of the California
Environmental Quality Act under Class 3 (New Construction or Conversion of Small
Structures).
TO: Planning Commission - 8
4. That the design of the proposed improvements will not conflict with any easements
acquired by the public at large for access through or use of property within the
proposed development.
5. That public improvements may be required of a developer per Section 20.80.060 of
the Municipal Code.
6. That the proposed modification to the Newport Beach Municipal Code so as to allow
the proposed monument sign and electric guard gate to encroach into the required
15 foot front yard setback will not, under the circumstances of this case be
detrimental to the health, safety, peace, morals, comfort and general welfare of
persons residing and working in the neighborhood or be detrimental or injurious to
property or improvements in the neighborhood or the general welfare of the City,
and further that the proposed modification is consistent with the legislative intent of
Title 20 of,the Municipal Code.
7. That the approval of Use Permit No. 3530 will not, under the circumstances of this
case,be detrimental to the health,safety,peace,morals,comfort and general welfare
of persons residing and working in the neighborhood or be detrimental or injurious
to property and improvements in the neighborhood or the general welfare of the
City.
CONDMONS:
1. That the proposed development shall be in substantial conformance with the
approved plot.plan, floor plan and elevations, except as noted below.
2. That all mechanical equipment, trash areas and vehicle storage areas shall be
screened from Campus Drive and adjoining properties. The proposed block wall
adjacent to the Campus Drive frontage shall be a minimum 6 feet high and shall be
set back a ra iimum 15 feet from the front property line.
3. That all automobile repairs shall be conducted within the building and no outdoor
display of vehicles for sale shall be permitted.
4. That grease interceptors shall be provided in.all drains within the building where
petroleum residues may enter the sewer system, unless otherwise permitted by the
Building Department or the Utilities Department.
5. That no outdoor sound system shall be utilized on-site.
6. That all employees shall park on-site at all times.
7. That all signs shall be installed in accordance with the requirements of Newport
Beach Sign Code.
0
TO. Planning Commission - 9
8. That the proposed electric guard gate will be solely for vehicles exiting the property.
That any future pat—ry security gate shall be located to provide a minimum distance
of twenty(20)feet from the front property line, and shall be subject to further review
of the City Traffic Engineer.
9. That all improvements be constructed as required by Ordinance and the Public
Works Department.
10. That arrangements be made with the Public Works Department in order to
guarantee satisfactory completion of the public improvements, if it is desired to
record a parcel map or obtain a building permit prior to completion of the public
improvements.
11. That the on-site parking,vehicular circulation and pedestrian circulation systems be
subject to further review by the Traffic Engineer.
12. That all parking spaces shall be striped with approved traffic markers or painted
white lines not less than 4 inches wide.
13. That the required number of handicapped parking spaces shall be designated within
the on-site parking area and shall be used solely for handicapped self-parking. One
handicapped sign on a post and one handicapped sign on the pavement shall be
required for each handicapped space. That the required handicap parking spaces
shall be relocated to the nearest row of parking adjacent to the building.
14. That the intersection of the private drives and Campus Drive be designed to provide
sight distance for a speed of 45 miles per hour. Slopes, landscape, walls, signs,
monument signs and other obstruction shall be considered in the sight distance
requirements. Landscaping within the sight line shall not exceed twenty-four inches
in height.
15. That the unused drive approaches be removed and replaced with curb, gutter and
sidewalk; that the proposed new drive approaches be constructed with the City's
flared approach standard 166-L, and that the settled sections of curb and gutter be
reconstructed along the Campus Drive frontage. All work shall be completed under
an encroachment permit issued by the Public Works Department.
16. That a hydrology and hydraulic study be prepared by the applicant and approved by
the Public Works Department, along with a master plan of water, sewer and
drainage for the on-site improvements prior to issuance of any grading or building
permits. Any modifications or extensions to the existing storm drain, water and
sewer systems shown to be required by the study shall be the responsibility of the
developer.
17. That disruption caused by construction work along roadways and by movement of
construction vehicles shall be minimized by proper use of traffic control equipment
TO: Planning Commission - 10
and flagmen. Traffic control and transportation of equipment and materials shall be
conducted in accordance with state and local requirements.
18. That overhead utilities serving the site be undergrounded to the nearest appropriate
pole in accordance with Section 19.24.140 of the Municipal Code unless it is
determined by the City Engineer that such undergrounding is unreasonable or
impractical.
19. That this approval of use permit applies only to the facility as a servicing facility with
no customer pick-up or drop-off of vehicles to the subject property; and any change
to the operational characteristics of the facility to allow for customers to pick-up or
drop-off the vehicles to the site and/or for the use of a shuttle bus to transport
customers to and from the site shall be subject to approval of an amendment to this
use permit.
20. That the proposed monument sign adjacent to Campus Drive shall be moved back
or designed in such a manner as to provide sight distance in conformance with the
City's Sight Distance Standard 110-L. The final design and positioning of the
monument sign .shall be approved by the Public Works Department to insure
conformance with City sight distance standards.
21. That the drive entrance shall be widened to provide a minimum 14 foot wide aisle
exiting-the facility,unless otherwise approved by the City Traffic Engineer. The nose
of the island at the entrance shall also be relocated so as not to encroach into the
public right-of-way.
22. That the car wash area shall be protected so as to prevent drainage from the parking
lot from entering the sewer system. The drain shall be connected to the sewer
system and have a grease trap. The design and installation of the above facilities
shall be approved by the Utilities Department.
23. That the outdoor storage of tires and other auto related parts or merchandise shall
be prohibited on-site.
24. That the entire site shall be maintained in a clean and orderly manner.
25. That the front of the building facing Campus Drive shall be constructed of'masonry
veneer or similar material as indicated on the approved elevation.
26. Landscaping along Campus Drive shall be regularly maintained free of weeds and
debris. All vegetation shall be regularly trimmed and kept in a healthy condition.
27. That the approval of this application shall permit complete engine rebuilding
(including electrical and transmission repair), as well as tune-ups, lubrication, smog
testing and brake service and installation. No painting, body work or other
operations of a similar nature shall be permitted,on-site unless an amendment to this
0 0 -7
TO: Planning Commission - it
use permit is approved by the Planning Commission.
28. That a Lot Line Adjustment shall be approved and recorded to combine the two lots
into one building site prior to the issuance of building permits, unless otherwise
approved by the Planning Department and the Public Works Department.
29. That prior to the issuance of a certificate of use and occupancy, the applicant shall
demonstrate to the Planning Department that the lighting system shall be designed,
directed, and maintained in such a manner as to conceal the light source and to
minimize light spillage and glare to the adjacent properties and Campus Drive.
30. That prior to the issuance of a certificate of use and occupancy, the applicant must
demonstrate to the City's Building Department and Fire Department that the project
is in compliance with the County of Orange Health Department and the City's Fire
Department Regulations.
31. That the Planning Commission may add or modify conditions of approval to this use
permit, or recommend to the City Council the revocation of this use permit, or the
City Council may revoke this use permit upon a determination that the operation
which is the subject of this use permit causes injury, or is detrimental to the health,
safety, peace, morals, comfort, or general welfare of the community.
32. This use permit shall expire unless exercised within 24 months from the date of
approval as specified in Section 20.80.090A of the Newport Beach Municipal Code.
VICINITY MAP
i 4 ,I.•w.
P-L I P-C P-C
I m
/ BIRCH STREET
1
t
f '.1 1
I � "
yy
n
e. a 4J
P-C
P-C2
Y .
I t Rcs.•a +3U '94F•
P-C
4
u •P-C I rLl. .k y
pf
n: 2 P-r. Yt
i I t4
:.-. ' .. �. �4 C
I
•� P•C LISTWI:1 P
--11--- ----4
1- _ � r-c ^QQtQY
IN
MAP
4 �
D I STR I CT 1 IV G MAP NEWPORT BEACH CALI FOR NI.
N=• .CeICKTwII Ntfm[xT4L �� I
I1�11 11NDlC CWN RESIDENT'" L= ,� LIDNT COYY[IICIII
�R�t � DpM10E R[SW[MTIK C-S� SlMLMI CpuY[P[14 1
---, I LEA'-, R11NKTi0"IKC IA.0 MLDCMUI =,EM m"ur NxINO I I
.S11,40 1 pPp.AD,
YNCL ...
L. ee a- c;I couew y-ixD DISTRICT - J a,[
USE PERMIT NO . 3530
TRAFFIC STUDY NO. 97
National Car Rental System,Inc.
World Headquarters
7700 France Avenue South
Minneapolis, Minnesota 66435
612-830.2121
March 29. 1994
National Car Rental
4242 &4262 Campus Drive
Newport Beach, California
OPERATIONAL STATEMENT
The primary operation of the National Service Facility will be to clean and maintain rental
oars that have bean rented at the Orange County/John Wayne Airport.
National's rental cars will be picked up and dropped off at the John Wayne Airport by the
customers. National employees will shuttle these retumed vehicles to this new facility to
be cleaned and refueled, then driven back to the airport by the employees for customer
use. No customers are anticipated to drop off or pick up rental cars at this facility.
The process for these retumed cars will be as follows;
They will enter the site from the west approach on Campus Drive and be lined up to be
cleaned. The cars will then proceed to the canopy for refueling, vacuuming and topping
off of fluids. The next step is to proceed through the car wash bay where the car Is
washed using an automatic car wash. The cleaned car is then lined up in the storage
area on the east side of the site until it is needed at the airport. The Cars will then exit
the site from the east approach on to Campus Drive.—_
Secondary uses of the facility include housing of National's administration offices.
Employee and visitor parking has been provided for these uses. The building will also
contain two maintenance bays that will be used to maintain the fleet of rental oars. The
maintenance services will consist of oil changes, minor mechanical and alectrical repairs
and pre-delivery inspections.
\ �
1
TRAFFIC STUDY
i FOR
NATIONAL CAR RENTAL .
SERVICE FACILITY
Prepa'redfor
The City of Newport Beach
Prepared by
%imley Horn and Associates, Inc.
REG�tD�4AR
CITY OF NBWPORTTMENT
p1,pNHiNG BEAGB+
MA t1PY 2619s�
b,110,31121 213,41516
o May 1994 visit
TABLE OF CONTENTS
INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
PROJECT DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
TRIP GENERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
TRIP DISTRIBUTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
TRAFFIC IMPACT ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Committedprojects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Intersectionsto be analyzed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
C test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
ICU test . 11'
MITIGATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . it
ON-SITE CIRCULATION AND PARKING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
SITE ACCESS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
LIST OF FIGURES
FIGUREI -Location Map . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . 2
FIGURE2 - Site Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
FIGURE 3 - Current Service Facility Vehicle Routing 5
FIGURE 4 :Proposed Service Facility Vehicle Routing . . . . . . . . . . . . . . . . . . . . . . . . . 6
FIGURE 5 -Project Trip Distribution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
FIGURE 6 -Project Traffic - Morning and Evening Peak Hour . . . . . . . . . . . . . . . . . . . . . . 9
LIST OF TABLES
TABLE 1 - Summary of Project Trip Generation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
TABLE 2 -List of Approved Projects and Occupancy Level as of May, 1994 . . . . . . . . . . . . 10
TABLE 3 - Summary of Intersection Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
INTRODUCTION
Kimley-horn and Associates has been retained to conduct a traffic impact analysis for the proposed
National Car Rental Service'Facility on Campus Drive, south of the John Wayne Airport. City policy
requires that any project consisting of more"than 10,000 square feet of gross floor area, ten or more
dwelling units, or generating more than 130 daily trips must be evaluated in accordance with the
requirements of the City's Traffic Phasing Ordinance(TPO). As this report will-indicate, the project will
generate more than 130 daily trips. Therefore, the following analysis has been conducted in accordance
with the TPO requirements.
PROJECT DESCRIPTION
National Car Rental System, Inc. proposes to relocate an existing National Car Rental Service Facility
to a 1.3-acre site on the south side of Campus Drive, between Dove Street and MacArthur Boulevard.
The existing Service Facility is located on the West side of Bristol Street South,between Birch Street and
Cypress Street.
An area map is provided on Figure 1, and depicts both the existing and,the proposed Service Facility
locations. A copy of the project site plan is provided on Figure 2.
The project site is currently occupied by two single-story multi-tenant industrial office buildings,totalling
approximately 15,000 square feet. These buildings would be demolished to allow for development of the
proposed project.
The proposed Service Facility is to house the facilities for cleaning, maintaining, and fueling the rental
vehicles, after they have been returned by the customer. A small office,building will be provided for
administrative personnel.
The site plan-indicates parking storage for 164 rental vehicles (110 spaces for cars that are ready for
rental, 42 for cars just returned, and 12 for cars being serviced), and 14 spaces for employees and
visitors.
National Car Rental has a leasing agent and a 90-space parking area at the John Wayne Airport. All
customer pick-up and drop-off activity will take place at the airport. The operation at the Service Facility
will primarily involve shuttling the "ready cars" to the airport lot, and picking up the return cars from
the airport lot and taking them back to the Service Facility to be cleaned and fueled.
The vehicles are transferred between the airport and the Service Facility by National Car Rental drivers.
The cars are transferred in groups, With, for example, five ready cars driven from the Service Facility
to the airport, and five returned cars driven back.
The project site is proposed to have one right-in-right-out-only driveway on Campus Drive, located at
approximately the center of the project. The existing use on the site is serviced by two right-in-tight-out
only driveways,located at both edges of the property. The existing raised median on Campus Drive will
preclude any left-turn movements into or out of the site. Traffic approaching the site from the north on
Campus Drive will be required to make a U-turn at Dove Street, and make a northbound right turn into
the site.
4-
I
NOT TO SCALE
/ / e
0
°Q Io� Q�
Sf m
0�
fa
0
E
�a
o�
�o
z
5�
c°
5
0
FIGURE 1
LEGEND
LOCATION MAP
• ANALYSIS INTERSECTIONS
c
Kimley—Horand ss❑oclates, Inc.
2
`n
Ili) illl i[il Ilii Ihi Ilil Ifil ifll Ifii
fill �� � tiiii
i .
ilil IfiJ ■ I �
• Ifli i121 � _ �, � �,
■ n
Ijll Ifil
oil
I[II Ifil
ail Iri lal 111I r,l I Inl
lid
m' y' IIII 1!I
INI
un Ili
till lill Ifil I@I 1lil I(ll 1(II IHI Ifjl r�i r�i rsi :�� �; � � � � r�
�`t� II.1 LI■It r?
A National Car Rental representative has indicated that the new (proposed) location will result in
significant time and cost savings for the company, due to the reduction in time and distance required to
travel back and forth between the airport and the service facility. The driver's route between the airport
and the existing service facility is depicted on Figure 3, and the new route for the proposed site is
depicted on Figure 4. As comparison of these two figures reveals, relocation of the Service Facility to
the proposed location will result in a much shorter round-trip for the rental vehicles, as well as a
reduction in traffic on some movements at a number of intersections. While the reduction in traffic at
some intersections is acknowledged, this analysis will focus on the impact of the addition of project traffic
to any impacted intersections, per the TPO requirements.
TRIP GENERATION
Trip generation estimates for the project are based on the number of parking spaces provided for rental
cars on the site. The site plan indicates parking is provided for 164 rental cars.
Trip generation rates for the project are based on a traffic study conducted by Austin Foust and
Associates for a similar facility in the City of Newport Beach. Daily and peak hour trip generation rates,
and the resulting project trip generation for 164 rental cars are summarized on Table 1.
TABLE 1
SUMMARY OF PROJECT TRIP GENERATION
Daily AM Peak Hour PM Peak Hour
Description In I Out In Out In Out
Car Rental Trip Generation
Rates (trips per car) 1.1 1.22 0.13 0.10 0.13 0.12
® National Car Rental Trip
t� Generation (164 cars) 180 200 21 16 21 20
The project will generate approximately 380 daily trips, with 21 inbound and 16 outbound trips in the
morning peak hour, and 21 inbound and 20 outbound trips in the evening peak hour.
The current uses on the site are still generating some traffic, not quantified by site counts. The TPO
allows for deduction of existing traffic generation in the analysis of proposed project impact. For a
worst-case analysis,the full traffic generation for the proposed Service Facility is assumed in the analysis,
without any deduction taken for existing uses on site.
TRIP DISTRIBUTION
The assumed distribution of project traffic is depicted on Figure S. This distribution assumes that the
majority of project-related traffic (80%) is comprised of the activity between the airport and the service
facility, and will follow the routing depicted on Figure 4; and that the remainder (20%) is comprised of
employees and service and sales traffic.
-4-
lA
NOT TO SCALE
i
/ / Q
c°
6,/S�o�S e�°r •�
� J m
/ O`Oij L
S� -�
a
i u
o`
6�0 •
�o
�o
cy
b
r
J
FIGURE 3
CURRENT SERVICE FACILITY VEHICLE ROUTING
Klmley-Horn�arid Ass aoeiotes, Inc.
N01 TO SCALE
\ / a40
d� Qo5
�o
O� Q
er: QJy �O
s!o!9! GoF ryti 4e S!
r�slo! 0�0 0
`S! m
! 6
0
E
�a
o�
F�O
�o
0
c�
J
n
N
h
Z<
O
F
FIGURE 4
PROPOSED SERVICE FACILITY VEHICLE ROUTING
Kimley—Horne and Assoc ates, Inc.
1,101 10 SCALE
5-7-
f Sx
< /
0 K
O
O
S r/SIOj S G°� y� a`a Sf
Bi•• � 4
S! m
Q
O
�D
°o
o�
P�O
�o
�d l
9�
�4+
a
FIGURE 5 s
�( PROJECT TRIP DISTRIBUTION a
Kimley-Horn�an sales. Inc.
7
•
Based on these trip distribution assumptions, the peak hour project traffic at the area intersections is
depicted on Figure 6.
TRAFFIC IMPACT ANALYSIS
The methodology for the evaluation of the project's traffic-related impacts is defined in the City's Traffic
Phasing Ordinance (Ordinance 86-20) and explained in detail in the Administrative Procedures for
Implementing The Traffic Phasing Ordinance.
Compliance with the City's Traffic Phasing Ordinance requires that detailed impact analysis of the project
traffic be conducted at any intersection to which the project will add one percent or more of the projected
traffic volume during the AM or PM peak 2.5-hour period. Projected volumes include existing traffic
volumes; regional growth, where appropriate; and projected traffic from:committed projects. The
analysis year is one year after completion of the project, and is assumed to be two years from the date
of this report.
Regional traffic growth is applied on selected City roadways which are assumed to carry a component
of regional (non-local) traffic. The growth rates on these roadways have been determined by the City,
of Newport Beach, through regional modelling and historical evaluation procedures. A copy of the City
of Newport Beach Regional Traffic Annual Growth Rate list is provided in Appendix A of this report.
Based on this list, MacArthur Boulevard has a regional growth rate of 3 percent per year within the study
area. No other roadway segments impacted by the project have a regional growth factor.
Committed projects
For purposes of this analysis, committed projects are those projects that have been approved,but are not
fully occupied, and therefore are not yet impacting the area intersections with their full trip generating
potential. The list of committed projects and their respective level of occupancy as of May, 1994, are
shown on Table 2 and were provided by the City of Newport Beach.
EN Traffic to be generated by these projects is added to existing traffic volumes,plus regional growth at area
intersections, to arrive at projected traffic volumes for the analysis year.
Intersections to be analyzed
Based on review of the project operation, and the likely origins and destinations of the project-related
trips, the following intersections were identified for analysis:
• MacArthur Boulevard and Campus Drive
• MacArthur Boulevard and Birch Street
• MacArthur Boulevard and Jamboree Boulevard
• Bristol Street North and Campus Drive
• Bristol Street South and Irvine Boulevard
• Bristol Street North and Birch Street
• Bristol Street South and Birch Street
• Campus Drive and Dove Street
-8-
NOT TO SCALE
� / Q
/ e
/ s/2
/ O 0
/ ry0\ry C10 Q0y
Se 'Stars! G°� r5` a�Sr
ar
r m
y Y
r a
0
�a
o�
F�
�o
�0 1
-c
a
+�9
i
n
FIGURE 6
PROJECT TRAFFIC - MORNING AND EVENING PEAK HOUR
Kirnley—Horn❑anAssociates. Inc.
9
� y
TABLE 2
LIST OF APPROVED PROJECTS AND
OCCUPANCY LEVEL AS OF MAY, 1994
Project Name Occupancy
Civic Plaza 96%
Corporate Plaza 30%
Newport Place 96%
Valdez 40%
Koll Center Newport No. I TPP 0%
1400 Dove Street 80%
Koll Center TPP Amend.4A 0%
Rosan's Development 65%
Fashion Island N2 0%
Ncwporter Resort Expand 0%
28th St. Marina Project 50%
Pacific Bell Site 0%
Newport Village 0%
Castaways Marina 0%
Koll Center Carl's Jr. 52%
Civic Plaza 0%
Corporate Plaza&West 0%
Harbor Pacific Plaza 0%
Hoag Hospital Extension 0%
Corporate Plaza West D 0%
Interpretive Center 0%
Pacific Mutual 1601 Avocado 0%
Newport Diagnostic#85 0%
Alamo Car Rental 0%
Pao Tel Mini Storage 0%
Four Seasons Addition 0%
Family Fitness Center 0%
Amendment No. 1 Ford Aero 0%
® Ciosa-Irvine Project 0%
�l Newport Dunes 0%
® Bayview 0%
9� City of Irvine Dev. 0%
10
K')CZ
0
The location of each of these intersections, in relation to the project site, is indicated on Figure 1
(presented previously).
1% test
For the 1% Test, the project peak hour trip generation is doubled, to reflect the likely peak 2.5-hour
project traffic,generation.
The projected 2.5-hour peak period approach volume for each intersection leg is comprised of the
Existing peak 2.5-hour volume, provided by the City of Newport Beach; plus Regional Growth; where
appropriate, plus Committed Project traffic.
The project will add 1% of the peak 2.5-hour projected volume at only one intersection—Campus Drive
at Dove Street. The morning peak hour project traffic volume represents 2.3% of the peak 2.5-hour
volume on the southbound approach at this intersection. In accordance with the requirements of the
Traffic Phasing Ordinance, an intersection capacity utilization analysis will be conducted at this
intersection.
The 1% Analysis Worksheets for all analysis intersections are contained in Appendix B of this report.
ICU Test
The operation of the intersection of Campus Drive at Dove Street is presented on Table 3 for the
following conditions:
• Existing Conditions
• Existing plus Regional Growth plus Committed Projects
• Existing plus Regional Growth plus Committed Projects plus Project
TABLE 3
SUMMARY OF INTERSECTION OPERATION
Intersection: Campus Drive/Dove Street AM Peak Hour PM Peak Hour
CONDITION ICU LOS ICU LOS
Existing .63' B .65 B
Existing + Growth + Committed Projects .64 B .68 B
Existing + Growth + Committed Projects + Project .65 B ,68 B
The intersection currently operates at Level of Service "B" (LOS "B") in the morning peak hour, with
an ICU of 0.63, and at LOS "B" in the evening peak hour, with an ICU of 0.65. With the addition of
regional traffic growth, and traffic from committed projects, the intersection will continue to operate at
LOS "B" in both peak hours, with ICU's of 0.64 and 0.68. The addition of project traffic to the
intersection will not change the intersection level of service. The intersection will continue to operate
i[ at LOS "B" in both peak hours, with ICU's of 0.65-and 0.68. The ICU worksheet for this intersection
�( is provided in Appendix C of this report.
-11-
2�
MITIGATIONS
No traffic-related mitigation measures will be required of the proposed National Car Rental Service
Facility. By application of the 1% Test, the project will impact one intersection (Campus Drive and
Dove Street), and will not cause the intersection to operate at worse than Level of Service "D".
ON-SITE CIRCULATION AND PARKING
The parking provisions for the site consist of an area for 110 Ready Cars (counting 2 in the drive aisle),
an area for 42 Return Cars (counting 6 in the drive aisles or in the car wash area), and a limited number
of spaces at the back of the site designated for service, employees, and visitors. The parking areas for
the Ready Cars and the Return Cars are designed such that the cars are parked bumper to bumper, side
by side, and do not allow for circulation between the rows of cars. This area is not intended to be used
by the general public. Movement of cars into and out of these parking areas will be accomplished by
National Car Rental drivers, only.
The vehicles depicted on the site plan measure 6 feet wide by 15 feet long. The 15-foot length would
be typical of a compact car; the typical standard passenger vehicle is 18 to 20 feet long. Depending on
the mix of rental vehicle types and sizes on the site, the operator may not be able to fit the number of
vehicles shown on the site plan in the parking areas. The traffic study addresses the full 164 vehicles,
and represents a worse-case analysis.
Circulation through the site consists of a single main drive aisle down the middle of the site, and cross
aisles at the front and the back of the site. There are a number of locations on the site where vehicle
circulation appears to be "tight". When the Ready Car and the Return Car parking areas are full,
circulation around the perimeter of the site will not be possible, and the cross aisles will dead end at three
of the four corners of the site. The cross aisle at the front of the site will only be 20 feet wide, if the
first row of the parking is occupied. This is mitigated by the fact that each aisle is intended to carry,
primarily one-way traffic (one way into the site for the Return Car side, and one way out of the site,for
the Ready Car side), and that only National Car Rental drivers are intended to drive in these areas.
The double-loaded drive aisle at the back (southwest comer) of the site is also only 20 feet wide. This
drive aisle will carry two-way traffic, may be used by drivers other than National Car Rental drivers, and
may involve vehicles driven by or for the handicapped. This drive aisle is recommended for
reconfiguration, to provide a minimum of 24 feet, per City of Newport Beach standards. '
When cars leave the car wash, they will be parked in the area immediately outside the car wash to be
dried. This drying area is,located in the inbound lane of the main drive aisle. Vehicles destined for the
back of the site will need to cross into the outbound lane to-get by any car in the drying area. While this
is not an ideal design feature, it is assumed that, with the low volume of vehicles expected to access the
back of the site, the potential for conflict at this location will be quite low.
While many of these circulation features would not provide adequate internal circulation if the site served
customer traffic or the general public, use of the site is expected to be limited to the employees of the
site, and an occasional visitor.
SITE ACCESS
The existing use on the site is currently accessed by two right-in-right-out only driveways, located at both
edges of the property. The National Car Rental facility site is proposed to have one right-in-right-out-
Orly driveway on Campus Drive, located at approximately the center of the project. As shown on the
site plan, the inbound lane is 24 feet wide, and would be equipped with "Tiger Teeth" to prohibit
-12-
1 �
0 •
outbound movements. The outbound lane is shown to be 10 feet wide, and controlled with an electronic
gate. A 10-foot raised median divides the inbound and outbound lanes,
City of Newport Beach Standard Plan 160E indicates that a commercial driveway should be a minimum
of 24 feet wide (12 feet in each direction assumed), or 14 feet if one-way. The 14400t minimum
requirement allows for movement of emergency vehicles and otherIarge vehicles that may have to service
the site. It is recommended that the outbound lane be widened to a minimum of 14 feet, which could be
accomplished by either moving the raised median over four feet (to the south), which would narrow the
inbound lane; or by narrowing down to the median to six feet. The full 24-foot width on the inbound
lane is not needed, since it is a right-turn-only approach, and will only require one inbound lane.
SUMMARY
• National Car Rental System, Inc. proposes to relocate an existing service facility,to a site on
Campus Drive, south of John Wayne Airport.
• The facility will house 164 rental cars, and facilities for cleaning, maintaining, and fueling rental
vehicles.
• The facility will service the National Car Rental leasing operation at the John Wayne Airport.
All customer pick-up and drop-off activity will take place at the airport. "Ready Cars" will be
exchanged at the airport'by National.Car Rental drivers for returned cars, which will%be brought
back to the service facility to be cleaned and fueled.
• The proposed operation will generate 380 trips per day, with 21 inbound and 16 outbound trips
in the morning peak hour, and 21 inbound and 20 outbound trips in the evening peak hour.
• The majority of project trips will travel only between the service facility and the airport lot.
• The impact of the project was evaluated'by applying the 1% Test, as required by the City's
Traffic Phasing Ordinance. The project would contribute 1'% or more of the morning peak 2.5-
hour period projected volume on.the southbound leg of Campus Drive at Dove Street. The
project does not impact any other intersection by 1%.
• The addition of project traffic would not cause the intersection of Campus Drive and Dove Street
to operate at an unsatisfactory level of service in either the morning or the evening peak hour.
• The project will not be required to make improvements or modifications to the circulation system
to mitigate project impact.
-13-
1 �
I
7.
APPENDIX A
CITY OF NEWPORT BEACH
REGIONAL TRAFFIC
ANNUAL GROWTH RATES
1q
CITY OF NEWPORT BEACH
REGIONAL TRAFFIC ANNUAL GROWTH RATE
COAST HIGHWAY
East city limit to MacArthur Boulevard 2%
MacArthur Boulevard to Jamboree Road 2%-
Jamboree Road to Newport Boulevard 2%
Newport Boulevard to west city limit 4%
IRVINE AVENUE
All 2.5%
JAMBOREE ROAD`
Coast Highway to San Joaquin Hills Road 3%
San Joaquin Hills Road to Bison 2%-
Bison to Bristol 1%
Bristol to Campus 1%
MACARTHUR BOULEVARD
Coast Highway to San Joaquin Hills Road 6%
San Joaquin Hills Road to north city limit 3%
NEWPORT BOULEVARD
Coast Highway to north city limit 1%
Street segments not listed are assumed to have O% regional
growth.
��J
APPENDIX B
1% ANALYSIS WORKSHEETS
y
1% Traffic Volume Analysis
Intersection MACARTHUR BOULEVARD/CAMPUS DRIVE
(Existing Traffic Volumes ase on verage inter' pr Ing 19 92 AM
Peak 2h Hour Approved
■■■ Approach Existing Regional Projects Protected 1% of Protected Protect
Direction Peak 2y Hour Growth Peak 2k Hour Peak 2h Hour Peak 2k Hour Peak 24 Hour
Volume Volume Volume Volume Volume Volume
(3K-4yrs I
Northbound 1525 (q2 31-7 Ao34 AO i O
(�w yw-, &44 3935 39 i �I Southbound 2924 367
Eastbound 2284 p $Z
Westbound 911 O 38 94q 10
Project Traffic is estimated to be less than 1% of Projected
© Peak 22 Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
El Peak 22 Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is required.
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
1% Traffic Volume Analysis
Intersection MACARTHUR BOULEVARD/CAMPUS DRIVE
(Existing Traffic Volumes based on Average Winter/Spring 9 92 )PM
Peak 2k Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Direction Peak 2JI Hour Growth Peak 2h Hour Peak 2h Hour Peak 2� Hour Peak 2h Hour
Volume Volume Volume Volume Volume Volume
Northbound (3'/0• Fyra:)
2365 0111 Jq5 34o 35 0
Southbound (31. •Myra
3581 4 q 373 q`}03 -- `t
Eastbound 1699 O 11 1710 17 i $
Westbound 2817 O G3 1 Abbo 2q I 2
a Project Traffic is estimated to be less than 1% of Projected
Peak 22 Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
Peak 23-2 Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is -required.
i
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
PROJECT:
1% Traffic Volume Analysis
Intersection MACARTHUR BLVD/BIRCH' ST
(Existing Traffic Volumes based on Average Winter/Spring 9 ,_ AM
s
Peak 2k Hour Approved
Approach Existing Regional Projects Projected 1. of Projected Project
Direction Peak 2y Hour Growth Peak 24 Hour Peak 2h Hour Peak 2h Hour Peak 2h Hour
Volume Volume Volume Volume Volume Volume
Northbound 1569 W/ 3Yr5.) I i
I45 a-73 Ig51 '20 I;
Southbound 1967 t83 Tao 47 a'7O 129 (�
Eastbound 991 0 R I I l l A 11 i O
4
Westbound 629 0 50 to—lq 7 ? II
Project Traffic is estimated to be less than 1% of Projected
Peak 2h Hour Traffic Volume
❑ Project Traffic is estimated to be greater than 1% of Projected
Peak 232, Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is .required.
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
PROJECT:. ��
4 1% Traffic Volume Analysis
Intersection MACARTHUR BLVD/BIRCH ST
(Existing Traffic Volumes based on Average Winter/Spring 19 93)PM
Peak 2h Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Direction Peak 2h Hour Growth Peak 2h Hour Peak 2h Hour Peak 2h Hour Peak 21s Hour
Volume Volume Volume Volume Volume Volume
(31.-3yrs. I i
a Northbound 1737 1(,I 111 2(,09
Southbound I ° 3yra R-7 ; ,Z
2121 9 3$5 a7o
Eastbound 1182 O 191 1373 0
--
� Westbound 1746 O 55 )001 1 O
i
i
Q Project Traffic is estimated to be less than 1% of Projected
Peak 22 Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
Peak 22 Hour Traffic Volume: Intersection Capacity Utilization
(I.C.U.) Analysis is required.
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
PROJECT: ��
1% Traffic Volume Analysis
i
Intersection JAMBOREE RD/MACARTHUR BLVD
(Existing Traffic Volumes based on Average inter pring 9 _ AM
Peak 2JI Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Direction Peak 2k Hour Growth Peak 2h Hour Peak 2y Hour Peak 2h Hour Peak 2y Hour
Volume Volume Volume Volume Volume Volume
Northbound
2841 ?63 47R 357l0 3 .Z
Southbound (DY. 3y s•
1166 log 10413 132R a3 i 2 ,
' p'b-3yro.
Eastbound 3257 91 1181 y5g3 )45 C
Westbound
2014 GI AB O
t
a Project Traffic is estimated to be less than 1% of Projected
Peak 23-2 Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
[� Peak 2k Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis i's .required.
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
PROJECT:
1% Traffic Volume Analysis
Intersection JAMBOREE RD/MACARTHUR BLVD
(Existing Traffic Volumes based on Average Winter/Spring 1,9 3_) PM
$ Peak 2h Hour Approved
F
h Existing Regional Projects Projected 1% of Projected Project
on Peak 2+ Hour Growth Peak 2h Hour Peak 2y Hour Peak 2k Hour Peak 2� Hour
Volume Volume Volume Volume Volume Volume
nd 1831 170 l012 cZ(ul3 a4
2876
Southbound AV1 700 3$43 38
1'. •31rs.
Eastbound 2208 0 q8-7 3A4,A 3:Z i o
Westbound 3631 110
Project Traffic is estimated to be less than 1% of Projected
Peak 2Z Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
Peak 22 Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is required.
NATIONAL CAR RENTAL SERVICE FAC11.rrY DUNE, 1994
DATE:
PROJECT: 3n
1% Traffic Volume Analysis
E W NIS
Intersection BRISTOL STREET NORTH/CAMPUS DRIVE
(Existin%g Traffic Volumes based on Average inter pring 9 92)AM
Peak 2h Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Direction Peak 2k Hour Growth Peak 24 Hour Peak 2h,Hour Peak 2h Hour Peak 2$ Hour
Volume Volume Volume Volume Volume Volume
Northbound 5389' 0 107 5�53 . S5 2�
Southbound 1218 O 3o
Eastbound _0_ t7 6 i d
Westbound 2641 0 5 319a 3a- o
Project Traffic is estimated to be less than 1% of Projected
Peak 2Z Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
ElPeak 2z Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U. ) Analysis is required.
NATIONAL CAR RENTAL SERVICE FACILITY TUNE, 1994
DATE:
PROJECT:
1% Traffic Volume Analysis
2 Ao
Intersection BRISTOL STREET NORTH/CAMPUS DRIVE
(Existing Traffic Volumes based on Average Winter/Spring 19 _)PM
�y Peak 2h Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Direction Peak 2h Hour Growth Peak 2y Hour Peak 211 Hour Peak 2k Hour Peak 2k Hour
Volume Volume Volume Volume Volume Volume
Northbound 3436
Southbound 3569 1-20
i
Eastbound p
0_ Q Q
_ Q i fj
Westbound 10 1O(o,1-- -7917 73. � d
6255
Project Traffic is estimated to be less than 1% of Projected
Peak 22 Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
C] Peak 21-2 Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is required.
NATIONAL CAR RENTAL SERVICE FACILrrY JUKE, 1994
DATE:
PROJECT: -a,C�
• � r
1% Traffic Vgqlume�Analysis
W �•�'•
Intersection BRIA OL ST/CAMPUS DR—IRVINE AV
(Existing Traffic Volumes based on Average nter pring 19 LJ
_
Peak 2k Hour Approved
Approach Existing Regional Projects Projected If, of Projected Project
Direction Peak 2k Hour Growth Peak 2h Hour Peak 24 Hour Peak 2h Hour Peak 2h Hour
Volume Volume Volume Volume Volume Volume
Northbound 3952 Q 4y'
Southbound 991 d 11197
rEad6645 �Og 73Mo
_ o a v o 0
Project Traffic is estimated to be less than, 1% of Projected
Peak 2h Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
Peak 2h Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is,required.
,
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
PROJECT:
4()
1% Traffic Volume Analysis
Gf LL) .i": '
Intersection BRIAL ST/CAMPUS DR—IRVINE AV
(Existing Traffic Volumes based on Average Winter/Spring 19 93)PM
Peak 2k Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Direction Peak 2y Hour Growth Peak 2� Hour Peak 2y Hour Peak 2k Hour Peak 2� Hour
Volume Volume Volume Volume Volume Volume
f i
Northbound 3002 p�l� 3`p�7 40
Southbound 2823 O
Eastbound 5600 307 00 59 O
i
i
Westbound —0—
O 0 Q © t
J
Project Traffic is estimated to be less than 1% of Projected
Peak 2k Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
Peak 2Z Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is .required.
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE'
PROJECT: 4 l
1% Traffic Volume Analysis
IF W 1/s
Intersection BRISTOL STREET NORTH/BIRCH STREET
(Existing Traffic Volumes based on Average Winter/Spring 19g� P1q.
Peak 21g Hour ApproYed
Approach Existing Regional Projects Projected 1% of Projected Project
Direction Peak 2k Hour Growth Peak 21s Hour Peak 2y Hour Peak 2y Hour Peak 2k Hour
Volume Volume Volume .Volume Volume Volume
Northbound 2436 O
southbound 711 1 ldD- 1 841.3 1 O
Eastbound _ _
Westbound D ��/_ �g8 odd
Project Traffic is estimated to be less than 1% of Projected
Peak 22 Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
[� Peak 22 Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is required.
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
PRDJ ECF�:
1% Traffic Volume Analysis
57/co L
Intersection 13RISTOL STREET NORTH/BIRCH STREET
(Existing Traffic Volumes ase on Average Winter/Spring 1PLY37M
I
Peak 2)1 Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Direction Peak Volue Peaur Peak Pea Peak lu
Volume
m Volume Vome Y Volume
Northbound 1192 Q
Southbound 2937 O
Eastbound _Q_ O Q
�Westbound 4532 O
Project Traffic is estimated to be less than 1% of Projected
Peak 22 Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
Peak 22 Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is required.
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
PROJECT: _ c I
i
1% Traffic //Volume Analysis s
L/� �J•1�11 I
Intersection BRISTOL ST/BIRCH ST
(Existing Traffic Volumes based on Average Winter/Spring 19 93)AM
Peak 2k Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Direction Peak 2h Hour Growth Peak 2k Hour Peak 2k Hour Peak 2k Hour Peak 2h Hour
Volume Volume Volume Volume Volume Volume
Northbound 473 p 01-0 Yq3 5
Southbound 578 0 11 $
LEastbound 4336 0 �Q eJoZo� 52-stbound
_o_ 0 a o o
Project Traffic is estimated to be less than 1% of Projected
Peak 22 Hour Traffic Volume
❑ Project Traffic is estimated to be greater than 1% of Projected
Peak 212 Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is required.
NATIONAL CAR RENTAL SERVICE FACILITY TUNE, 1994
DATE:
PROJECT: C '
'c
•
1% Traffic Volu4mru Analysis IS
Intersection BRISTOL ST/BIRCH ST
(Existing Traffic Volumes based on Average Winter Spring 19 93)Pm
Peak 23s Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project i
Direction Peak 21s Hour Growth Peak 2h Hour Peak 211 Hour Peak 2k Hour Peak 2k Hour
Volume Volume Volume Volume Volume Volume
Northbound 634 � Q
southbound 1336 5 139,�✓ O
Eastbound 3982 10 5D3OJ I /s i p
Westbound _O_ O O Q d �
Project Traffic is estimated to be less than 1% of Projected
Peak 2z Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
Peak 231 Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is required.
i
NATIONAL CAR RENTAL SERVICE FACILITY DATE JUNE, 1994
PROJECT:
FORM I
1; ECCEIVED
p
MY 19 1994
1% Traffic Volume Analysis trd3iAi91
Intersection, CAMPUS/DOVE
(Existing Traffic Volumes based on Average Winter/Spring 19 91)AM
Peak 2h Hour Approved
Approach Existing Regional Projects Projected 1v of Projected Project
Direction Peak 2h Hour Growth Peak 2k Hour Peak 21 Hour Peak 2y Hour i Peak 2� Hour ,II
Volume Volume Volume Volume Volume VoIwe
i
Northbound 3407 © (y8 3$ 0 4
I
northbound :29
91 O (OQ 75- 16 4-0
i Eastbound 0 1 pZ. 3/ 1 . 3
Westbound22 O /0 152-
Project Traffic is estimated to be less than 1% of Projected
Peak 22 Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
Peak 2Z Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is required.
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
' DATE:
PROJECT:
cnm. -
1% Traffic Volume Analysis
i Intersection CAMPUS/DOVE
(Existing Traffic Volumes ase on verage Inter pring 9 91 PM
Peak 2y Hour Approved
[PApproach Existing Regional Projects Projected 1� of Protected Project
ion Peak 24 Hour Growth Peak 2�S Hour Peak 2k Hour PeaVoluk 2hmeour ' PeaVolumeour
Volume Volume Volume Volume i
und 1942 0 30 �q72 oZV
d
und 3786 Q 13-D- 3908 39 4d
Eastbound 0? 4-1
39
Westbound 337 O aL4- 3loj 4'
2
Project Traffic is estimated to be less than 1% of Projected
❑ Peak 22 Hour Traffic Volume
i
Project Traffic is estimated to be greater than 1% of Projected
Peak 22 Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is required.
II
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
PROJECT: cnMA
4n
• a
t
t
i
APPENDIX C
INTERSECTION CAPACITY
UTILIZATION WORKSHEET
CA4220AM
INTERSECTION CAPACITY UTILIZATION ANALYSIS
INTERSECTION: CAMPUS & DOVE
EXIST TRAFFIC VOLUMES BASED ON AVERAGE DAILY TRAFFIC WINTER/SPRING 1991 AH.
•--'..................•-..___-----__-_•__.- __--___.-________•.-__.-.••._
I IEXISTINGIPROPOSEDIEXISTINGIEXISTINGIREGIONALICOMMITTEOI PROJECTED 1PROJECTIPROJECTI
IMovementl Lanes I Lanes I PK MR I V/C I GROWTH I PROJECT I V/C Ratio IVOlune I V/C I
I ICapacitylCapacityl Volune I Ratio I Volune I VOIUne Iw/o Projectl I Ratio I
I I I I I I I Votune 1 1' 1
-• .....................................I
I NL 1 1600 I 1 39 1 0.02 * O 1 0 1 O.O`L . 1 O 1 0.01- 1
••--------------- I
I NT I 1 1415 O 1 g+ I 1 0 1 I
--- 0.51r`--------------- "I
i-------') 3200 --------•---- ) o:5 a•�c � 1059.•;FI
I NR 1 1 208 .1' O 1 j p I 1 d
__-__•-__.__----f-,•___________________•-_•_-.•___•--.____..__._.I
i 1 .._. 1 ' 121 0.08� I 10.08*1 10 1 0.09.M
SL I ---- I I I 1 0 1
ST ...L.._._-_i._ 608 . ISO 1 a5 I I o l 1
I __ -----------
SR .......I
I 1 10 1 O 1 0 1 1 C) I I
i -•_-___.--I
---EL•--) -------I-----•--I- a ) I O l o I I O I 1'
----------------- -------
ET ) 1600 1 1 1 ) 0.01 * O 1 O 1 0•0 1.1F 1 O 1 0'0 1m
-__-_••-__-_••------------------------------•-1
ER ) 1 1 7 ) 1 O 1 1 1 01
---------•--._._-_--'_.. 1 -----
WL
I
) 1 1 14 ) 1 0 1 A I 1 0 1 I
......*I
I WT ) 1600 1 1 0 ) 0.03 * 0 1 0 1 O,OS4 1 0 1 0.03 1
...............................................
33 ) 1 0- 1 3 1 1 1 I
_-- 1
[EXISTING I 9-a'I
-_.- 1
IEXIST*+ REG GROWTH + COMMITTED W/PRDPOSED IMPROVEMENTS I.C.U. I C),(y•7 1,
_•.-__---- 0 __--I
[EXISTING + COMMITTED + REGIONAL GROWTH + PROJECT I.C.U. .-•._.._. .......
•• ....__I -(py I
.J.......................................................
by Projected + project traffic I.C.U. will be less than or equal to 0.90
Projected + project traffic I.C.U. will be greater than 0.90
1_1 Projected + project traffic I.C.U. w/systems improvement will be
_ less than or equal to 0.90
I_I Projected + project traffic I.C.U. with project improvements will
be less than I.C.U. without project
Description of system iaprovement:
CA4220PN i
INTERSECTION CAPACITY UTILIZATION ANALYSIS
INTERSECTION: CAMPUS 6 DOVE
EXIST TRAFFIC VOLUMES BASED ON AVERAGE DAILY TRAFFIC WINTER/SPRING 1991 PH
• ..................................................•-•.._......._.._....___..--.._..._... .
I IEXISTINGIPROPOSEDIEXISTINGIEXISTINGIREGIONALICONMITTEDI PROJECTED IPROJECTIPROJECTI
IHovementl Lanes I Lanes I PK MR 'I' V/C I GROWTH I PROJECT I V/C Ratio IVolumc I V/C I
I ICapacitylCapacityl. Volume I Ratio I Volume I Volume Iw/o Projectl I Ratio i
I I I I 1 I I I Volume I 1 I
-----------•- •---------- •-••---•-•••••-- •--------••••••--•-...- I
NL 1 1600 1 1 55 1 0.031 (0 1 0 1 0• 03 1 0 10•o3 1
-------- -------•--------- --•--•... .....................
I NT I I 6610 1 12 I 1 0 1 I
I••-•-•--) 3200 -•-----•--- --- ) 0.23 ....................O.A� ...... 1
1 MR 1 1 68 1 0 1 3 1 1 0
___________-------_------__________--------------_______________________
I SL 1 1600 1 1 93 1 0.06 I v l 5 I' o.oLn I ao I o.o-t d
----•-••-•------ --•- ------•-•••-----••---------------•••••••-•------••••-----•-•---•---1
ST I 1 1637 1 O 1, BID I 1 0 1 I
3200 ----------------------__ ...... ___
I-••--------------1 1 t0 I o 'I o l -••-•-•-•-I---- I I
SR
1 EL ) I 1 7 ) o l d I 1 0 1 I
__________________ ................................A.............
-1
I ET ) 1600 1 1 3 ) 0.01 • 1 0 1 O. 01 it 1 O 1 O•01�1
_ ...............................................1
9 ) 1 0 1 1 1 1 O 1 I
I•--•------•-•._...__-----•------•••••..........................•.-----------..-------_---•-I
WL ) I 1 110 ) 1 0 1 10 1 1 0 1 I
I----•--- ..................••---------------- --........----.....---.- .....................
WT ) 1600 1 1 3 ) 0.10 • 40 1 0 1 0. 11* 1 0 I 0- 4
...............................................l
1._.WR ..................I I 45 ) l o l 2 1 I I I I
(EXISTING ------•-•--••-•-----------i-.6 1......................... .....................
I•••--•..................•---••-----•-•----------..---.-.---------••----•---- I
(EXIST + REG GROWTH + COMMITTED W/PROPOSED IMPROVEMENTS I.C.U. I p.(po 1 1
i...........................................................................................
(EXISTING + COMMITTED + REGIONAL GROWTH + PROJECT I.C.U. 1 0.(og I
Projected + project traffic will be less than or equal to 0.90
I_I Projected + project traffic I.C.U. will be greater than 0.90
I_I Projected + project traffic I.C.U. w/systems improvement will be
less than or equal to 0.90
1_1 Projected + project traffic I.C.U. with project improvements will
be less than I.C.U. without project
_.__......__ ....................................................................
Description of system improvement:
i
�C
APR-14—'94 THU 15:51 ID:NOGLE ONUFER TEL NO:619297-6055 #059 P02
National Car Rental System,Inc.
World Headquarters
7700 France Avenue South
Minneapolis, Minnesota 66435
612-830.2121
March 29, 1994
National Car Rental
4242&4262 Campus Drive
Newport Beach, California
OPERATIONAL STATEMENT
The primary operation of the National Service Facility will be to clean and maintain rental
oars that have boon rented at the Orange County/John Wayne Airport.
National's rental cars will be picked up and dropped off at the John Wayne Airport by the
customers. National employees will shuttle these returned vehicles to this new facility to
be cleaned and refueled, then driven back to the airport by the employees for customer
use. No customers are anticipated to drop off or pick up rental cars at this facility.
The process for these returned cars will be as follows:
They will enter the site from the west approach on Campus Drive and be lined up to be
cleaned. The cars will then proceed to the canopy for refueling, vacuuming and topping
off of fluids, The next step is to proceed through the car wash bay where the car Is
washed using an automatic car wash. The cleaned car is then lined up in the storage
area on the east side of the site until it is needed at the airport. The cars will then exit
the site from the east approach on to Campus Drive.--
Secondary uses of the facility include housing of National's administration offices,
Employee and visitor parking has been provided for these uses. The building will also
contain two maintenance bays that will be used to maintain the fleet of rental cars, The
maintenance services will consist of oil changes, minor mechanical and electrical repairs
and pre-delivery inspections.
CITY OF NEWPORT BEACH
PLANNING DEPARTMENT
FAX(714) 644-3250
(charge code#2718)
Mailing Address: Street Address:
P.O.BOX 1768 3300 Newport Boulevard
Newport Beach, CA 92659-1768 Newport Beach,CA 92663
Advance Planning Division Current Planning Division
(714) 644-3225 (714) 644-3200
--------------------------- ---------------------------------------------------------------------
Fax Cover Sheet
FROM: DATE: 4 / 29 / 99
Aziz M. Aslami ;
Aasociate P1annPr
Title
TO:
Russ Ownfer Business Phone( r,,19 )297_Rng
FAXNo. 6( 19 ) 297-8055
Subject:
Traffic Study for National Car Rental
No. of Pages (excluding cover sheet): 1 ;
Special Instructions:
I � ,
L - J
a�W Pp�,r
KIT CITY OF NEWPORT BEACH
U P.O.BOX 1768,NEWPORT BEACH, CA 92658.8915
C'9ClFO R��P
PLANNING DEPARTMENT (714) 644-3225
April 29. 1994
Serine Ciandella
Kimley-Horn and Associates Inc.
2100 W. Orangewood Avenue, Suite 140
Orange, CA 92668
Subject: Traffic Phasing Ordinance Study for the
proposed National Car Rental Facility at 4242-
4262 Campus Drive, Newport Beach (TPO # 97)
Dear Ms. Serine:
Enclosed please find the 'Proposal Acceptance" for the proposed National Car Rental
Facility that would be constructed in the City of Newport Beach.
For traffic data or technical questions please contact Rich Edmonston, the City's Traffic
Engineer, at (714) 644-3344.
The applicant has expressed his concerns for the urgency of the proposed project and
demanded a "fast Tracking" process, therefore, please commence the subject traffic study
task immediately and complete the study as soon as possible.
Should you have any other questions regarding this project, or need additional information,
please contact me.
Very truly yours,
PLANNING DIRECTOR
JAMES D. HEWICKER, DIRECTOR
By Vl -
Aziz Nf Aslarhi
Associate Planner
F.\WP51\...\A=-A\Traffic\1P0MLet1
3300 Newport Boulevard, Newport Beach
I,_. i_�� —I'tURIV UI�HIVUG IG 1- 1 i4-9Jv—J-.i;•� nh,l ci D+ i� •.+-1 I,u .Qiv r .vx
" ` H16'KlkoyHom and Assaclates,
Ina-,. "% y,mi q"pLAW MDG ROHM MrAICOMLTAMO
w�.
2100 Wen Ot,nge++•oDdAV<^u•,auAe ND,Orango,CAldemiu DJ6Ra 714•030•1030 F,tt 71493D•D,88
April 27, 1994
Post•It'•brand tax tranemlttal memo 78T1 No►paa„►
To Z ro,n� A4VW4c,`
John H. Douglas, AICP
:, ..
Planning Depar(mont U.PI•
City of Newport Beach
3300 Newport'Boulevard `0
F"lr / 6K�lr Z� •
Newport Beach, CA 92658
Re: proposal to Prepare a Traffic Analysis for Proposed National Car Rental Service Facility on
Campus Drive in the City Of Iilewport
Dear Mr. Douglas;
Thank you for inviting ICimley-ftorn!and Associates, Inc, to submit this proposal to prepare a traffic
analysis for the proposed National.Car Rental Service Facility on Campus Drive in the City of Newport
circulation is ues Hand wetlook 1 a d to his o has pensive portunity ty totence in wo k with thes ty of Newport Beacic h act
QUALMCkTIONS AND STAFFING
ICimley-Horn;is a national transportation engineering firm founded in 1961 and ranked among Engineering
News Record's top 20 'trampoitatiosi fimts, We have a staff of approximately 350 in 21 offices
throughout the Southwest and Southeast,including the western metropolitan areas of Orange County, San
Diego, Los Angeles, Las Vegas;Phopnix, Dallas, and Denver.
�@lated Exuerlen� ; i —
1.
Established by transportation planners and traffic operations speclallsts, our firm afters s national
reputation for services-to cities; counties, and other public agencies as well as private-sector clients
working with local agencies. Ili Southern California we have provided transportation services for both
large, and small-scale studies. _mve particularly relevant efforts,include:
■ Rossmoor Busj4i propertles, County of Orange—Provided traffio impact analysis,
parking circuladonrecommendations,TDM program recommendation,and other project
- specific analyses fPr 193-acre property located on the corner of one of the busiest
intersections in the County: Moulton Parkway and El Toro Road.
■ nolsa Chlca Land ttse Plan„City of IIuntington BeacitlCounty of Orange—Worked
closely,wlth City SO County officials and community interest groups to evaluate over
20 alternative development and roadway plans on the controversial Bolsa Chica site.
■ Christ,College Master Plan, City of Irvine Prepared traffic impact analysis for
update of th6,c -hrf t College Irvitle Master Plan, .'.Update included General Plan
qY . .r•rit4 i . . • .
:I y,
eh,tlOUe . Si Forl L,udordole • Fort MY•rc • 'ASV,Op '• OMnO, • Od,ndO
PhOMl1t.fld,1D�♦8,( COr,•Aleut•TAmp•.V•rn Doath•VInpnI.s•,oh.W,•t Pahn a•wh
•I• ''• t re 1 , t 1 a 67
p,utld
'
• r, n . . . , r t a .r.. ..aq s y, s:" t .. . '•a n.wt H4 µ...'' _ L1r✓,ra�
..at. ... _.. .... ...,..r. .Mail
�iMLLY—riUKN UKtikut ItL ' t— 4—JJ0-9 OG Npl a1 Z)v IVU .Uiu r .U_
j 2 April27, 1994
Mr. John Douglas
ning and development of excess campus property for
Amendment atttl,pjtoppsed rezo
residential use.. :::;
AM/PM'Mint-1V1art,I City of LaHabra — Prepared a detailed traffic. analysis for
�ig retail conversion of anti o7lstiil corner into an AMIPM Minl-Mart Gas Station. Analysis
included a gap study, .study of neighborhood cut-through traffic, and review of on-site
and off-site clrc4lettor�constraints.
1 :.
■ Yorba Linda Family�ntulafmnent Center, City of Yorba Linda —Conducted traffic
impact snalysis.atid extensive parking study for a proposal to open a family-oriented
pizza and biltiarda.faeuity in an existing shopping center.
a 1
• 1
1
We have selected the following personnel from our Orange County office with the appropriate related
experience in transportation services for planning efforts that may to necessary for this project;
• Serine Ciandellgtt,(Pr�Jeet Manager)
•8 yes'cs exp ce
Traffic modoT(l�ig
Trat�c imps analysis
?rnvlconmettta docpmentation
- Transportatigl►Dr'nund Management
• Susan Rosner(Arialyils'and Support)
. 4 Yom expetlance;
.. - Trat>9portati4ri�la{uring
Traffic impao}.6 ysis
lCimley-Horn has,a detailed QA/QC program that is ingrained into our day-to-day practice. We operate
with a philosophy that our clients deserve the very best service we can provide. Our QA/QC efforts are
guided by a.speclfic Kiruley-horn (}A/QC in
which is issued to each Writley-Horn professional,
utilized in each project undo'n, d regularly revised/updated.
For this project, the key component of our QA/QC effort will be an in-house review by a senior
professional,not involved in conducting the project. For this project, Kimley-Horn is assigning Herman
Basmaciyan, P.E. to provide in-house QA/QC. Mr. Basmaciyan is a senior transportation engineer with
over 20 years of local experience in'all aspects of transportation planning.
+' a•
i.3:. A
vM •{
1 .r )vC ,. ..rrnr.�w+ww,wr,MNlW in MIMI111M.111i1NFf9d19�.•18111i I{pu111
;r1Lt'f-riUklV UKnNut c ri4'9 0-J �O hfJ1 4(ti L JJ ivu . uiu r .u ,
•'w.i. i
F 3 April 29, 1994
Mr. John Douglas
BACKGROIJ 'D & AI'Y'ROA, T
National Car Rental System, Inc••prop9ses to develop the site Asa Service Pao"'ryI serving primarily t e
Orange County Alrport.•t: •t
The project site is off-silo from.tile Airport, and is proposed to serve as the cleaning and maintenance
center for the•National vehicles, ;f ar:rental b° ill typically
not come to the site; the cars will
be delivered to and picked up froth the airportY National
The traffic impact study will need to..Address the amount of traffic to be generated
eratted will not the Proposed
operation; and Its impact on the,ggxrounding street system. Since the proposed t3'
in the same manner as a.typical cat re4tal facility,trip generation estimates will need to be based, input,
On practical jXperienco and jud dontt
J.•i i
The traffic analysis wily be conducted in accordance with the City's Traffic Phasing Ordinance (TPO)
Guidelines. For purposes of this.,pro'posai; it is assumed dte following seven intersections will require
analysia:
• MacArthur Boulevard ®,Cultpus Drive
MacArthur Boulevard(�, itSd►Street
• MacArthur Boulevard(� bores Road
Campus Drive?,'ii Bristol'�tr North
• us Drive . Brlstol'•Stwt South
Camp
• Birch Street(�$ristol Stteet•North
• Birch Street* ristolSttoot�South
i
SCOPE OF SERVICES
The foilowitlg tasks arQ envlsi0nd for this project:
1. Conduct a sitcNisit of?the proposed site.
•�•
2r Meet with City,staff to d�acuss the relevant issues surrounding the proposal, and to obtain traffic
counts and any other materials or documentation available. Reach concurrence on final list of
.analysis locatiQlts, =4j'pprQa�to analysis.
3, Review traffic counts apd et aluate for reasonableness and accuracy.
4. Observe traffic,flow and tragic patterns on the affected streets:
5. Estimate the amount of traffic to be generatcd by the proposed project, and distribution of the
project traffic on the area street system.
g, Determine if project Wits 1% criteria at any intersection, and if further analysis-is necessary.
v i,,• )! ,• , .., i�! ' ;? :lf��: 1 Y.'• +• .. ..u,.u."' •M•q. _ tlMtl1lMlllllrfNR41n11tM
niVILLT'nUiIN U-XM110G IC i t14-7Au-9v00 ni l 4f '.V v 1J •JO IVU .Ulu t' .U4
,;�y• t
• :ii e. 1
Mr. John Douglas
4 April 27, 1994
7. Identify the project IMPK't to;esult from the proposed project.
g, If necessary, ldentify the}pidgation measures necessary tb address the Impacts-
If
present the findings of tha'anoysis in a report.
yN
The Scope of•Services does not ytelude attendance at any public meetings. If attendance at meettnga is
required, they will be billed on.a tittte•and-materials basis, In accordance with the K1m1aY-Iiorn and
Associates Hourly Billlt}g Rate Schedule in effect at the time.
SCHEDULE
We are prepared to begin work.ig3mediately upon receipt of authorlMdOn to proceed. Following receipt
of all necessary, data, we wi11,c�lpte our analysis within a two. to.three-weak titneframe. A draft
report will be,submitted to you.for your review and comment.
.: ..� TEE
This estimate assume$that the City of Newport Beach will provide all necessary traffic data and further
data collection by Kimley-Hord'Will not be required for analysis of the previously identified seven
locations. A breakdown of thig cost,estimate is provided for your information.
Estimated
�TasJf_ Cos
project Start-VP MGM—
Existing Conditions ADAYsi8 550.00
project Trip Estimates 850.00
1%Analysis . 550.00
piojeot Impact and h1il;1$ation 1,200.00•
Report preparation 1 5
$5,250.00
KHA proposes to cott)plete the tasks outlined above for a lump sum fee of$ 5,250.00.
The proposed fee includes labor fees, plus an amount to cover certain direct expenses for the project
which would included in-house duplicating, facsimile, local mileage, telephone, postage, in-house
blueprinting, and word procesiw'�omputer. As necessary, additional services will be provided for an
additional fee basal on curret t;hodrly rates plus direct expenses at a 1.10 multiplier. Billings will be
issued on the basis of;percent;uompleteY and will he due and payable within 30 days of invoicing.
IM
Y i• sf.'.
�_•Y~__ —_ ...[b,�,::ttat�FlttA+TlttllSlili.gt
1... •.
.n.
t\i11Lt1`r1UKH UKrthot IC ( 14-:1dG-J400 hlJt 4( V4 1J •Ji CIU .uiu r .UJ
f April 27, 1994
Mr. John Douglas
CLOSURE
In addition to the matters,set forth,herein,our agreement shaft include and shall be subject to the attached
Standard Provisions. The term".the client" as used in the attached'Standard provisions shall refer to The
City of Newport Beach:
If you concur in the foregoing Arid WiPh to direct us to proceed Wlth the scope outlined, please execute
our offices. Fees and
the enclosed copy of this letter agreement in the space provided, and return to
times stated in this agreement are valid for thirty (30) days after the date of this letter.
We appreciate this opportunity to;work'with the City of Newport Beach, and look forward to a successful
project. Please call If you havo py 1ue8tions.
Sincerely,
KIMLF.Y-HORN.AND ASSOCIATES, Inc.
. .;.:: GAdt.«s��•'' Cam_
Serino Ciandella
,
project Manager
SAC.MMI
NaBcar pro/0494pro
cc: Rich FAnonston, Traffic JQ$.InePrlag —
.,F , 1
Attachment Stattdard;provist"i
I%LI i. . 1994
Agreed to this_. day of,
' City of NeWp rt Beach
By: K•.
�.56'OG/Az-Er PZA"'J g7r--
printed Namaland TU }'
• 1•
,
.1 � wlTll .x1w
1 s dq
{ .. ryMr ' 1 '•
,....,�,t s q .+, .b.•�
?. . _.:+? ....�_. .. •., , ., , , •,,,...,•�. , , ,•..,»r dlrF�iHeKNia:tit+iHidl#•iiiiii�
APR-26-'94 TUE 12:55 ID:N06LE ONUFER TEL N0:619/297-8055 #110 P01
If you have any questions or problems regarding fax transmission p n 93
please call 619/297-8066. coo
coo
FAX TRANSMITTAL NOCLE
PAGE 1 OF 1 ONJFER
ASSOCIATES
DATE : n 46144 ARCHITECTS
PROTECT' NAME : o 'rb L
239E SA-Diego Ave.
PRO FCT a �~ San CA 92110
Tel :
(619pwne129?-1 3 9 7-0066
FAX:
TO n NeWPOAT `AM , 16141397•HU55
1•714. 6-44• a2rPO - FA%4
FOR YO R :
WE TRANSMIT
THE FOLLOWING : o 85 ioc Date Description
4G c t.hIr 'a lase pe���►�arcl� 3�,g4. l Was
�yh,(W.A a* +W �tm� �Hs� 1 would )U nv'r�fleal
in 2 was relar('41&011 uj�o4 1-(f
Can K,v plttasQ vtotvtse ...ru ash fig si�►� aMof
REMARKS Imps" op Our vt.4j C+e06
�ur�e PlMOA1 t4 mm*S10A )VA rt�? As you
ve awi:re, �hMM is 04124 to 'Ke swee s of" pie" tit,
BY: n
�U�l. � Q�ruF-fie
C.C.
CITY OF NEWPORT BEACH
PLANNING DEPARTMENT
FAX(714) 644-3250
(charge code#2718)
Mailing Address: 1, Street Address:
P.O.BOX 1768 3300 Newport Boulevard
Newport Beach,CA 92659-1768 Newport Beach,CA 92663
Advance Planning Division Current Planning Division
(714) 644-322.5 (714) 644-3200
-----------------------------------------------------------------------------------------------------------;
Fax Cover Sheet
FROM: DATE: 4 / 27 / 94
Aziz M. Aslami
Associate Planner
Title
' TO: 1
Russ Ownfer Business Phone ( 619 )297-8066
FAXNo. 619 ) 297-8055
Subject:
j Traffic Study for National Car Rental
No. of Pages (excluding cover sheet): 5
Special Instructions:
-----------------------------------------------------------------------------------------------------------
• wm/ey-Horn 0 RECEIVED BY
Kimley-Horn and Associates, Inc. PIAANNIINGDEPARTMEN/�T
ENGINEERING,PLANNING,AND ENVIRONMENTAL CONSULTANTS QII I Of NF,.WPORIT BEACH
West Orangewood Avenue,Suite 140,Orange,California 92668 714-939-1030 Fax 714-938-9488
AY APR 2 4 9994 PIN
7�8i91ID1Ui12i112t314i516
April 20, 1994
John H. Douglas, AICP
Planning Department
City of Newport Beach
3300 Newport Boulevard
Newport Beach, CA 92658
SUBJECT: Proposal to Prepare a Traffic Analysis for Proposed National Car Rental Service
Facility on Campus Drive in the City of Newport
Dear Mr. Douglas:
Thank you for inviting Kimley-Horn and Associates, Inc. to submit this proposal to prepare a traffic
analysis for the proposed National Car Rental Service Facility on Campus Drive in the City of Newport
Beach. Kimley-Horn and Associates has extensive experience in addressing local traffic impact
circulation issues, and we look forward to this opportunity to work with the City of Newport Beach.
QUALIFICATIONS AND STAFFING
Introduction
Kimley-Horn is a national transportation engineering firm founded in 1967 and ranked among Engineering
News-Records top 20 transportation firms. We have a staff of approximately 350 in 21 offices
throughout the Southwest and Southeast,including the western metropolitan areas of Orange County,San
Diego, Los Angeles, Las Vegas, Phoenix, Dallas, and Denver.
Related Experience
Established by transportation planners and traffic operations specialists, our firm offers a national
reputation for services to cities, counties, and other public agencies as well as private-sector clients
working with local agencies. In Southern California we have provided transportation services for both
large- and small-scale studies. Five particularly relevant efforts include:
■ Rossmoor Business Properties, County of Orange —Provided traffic impact analysis,
parking circulation recommendations,TDM program recommendations,and other project
- specific nalyses for 193-acre property located on the corner of one of the busiest
intersections in the County: Moulton Parkway and El Toro Road.
Charlotte . Dallas . Fort Lauderdale . Fort Myers . Las Vegas . Orange . Orlando
Phoenix.Raleigh.Sarasota.Stuart.Tampa.Vero Beach.Virginia Beach.West Palm Beach
B ul l di ng cl l and re l a t l o n s h l ps a n c e 1967
Mr. Herb Vargas 2 November 1, 1993
■ Bolsa Chica Land Use Plan, City of Huntington Beach/County of Orange—Worked
closely with City and County officials and community interest groups to evaluate over
20 alternative development and roadway plans on the controversial Bolsa Chica site.
■ Christ College Master Plan, City of Irvine — Prepared traffic impact analysis for
update of the Christ Coliee Irvine Master Plan. Update included General Plan
Amendment and proposed rezoning and development of excess campus property for
residential use.
■ AM/PM Mini-Mart, City of Lahabra — Prepared a detailed traffic analysis for
conversion of an existing retail corner into an AM/PM Mini-Mart Gas Station. Analysis
included a gap study, a study of neighborhood cut-through traffic, and review of on-site
and off-site circulation constraints.
Yorba Linda Family Entertainment Center, City of Yorba Linda — Conducted
traffic impact analysis and extensive parking study for a proposal to open a family-
oriented pizza and billiards facility in an existing shopping center.
taff;n
We have selected the following personnel from our Orange County office with the appropriate related
experience in transportation services for planning efforts that may be necessary for this project:
• Serine Ciandella (Project Manager)
- 8 years experience
- Traffic modelling
- Traffic impact analysis
- Environmental documentation
- Transportation Demand Management
• Susan Rosner (Analysis and Support)
- 4 years experience
- Transportation planning
- Traffic impact analysis
Ouality Assurance/Quality Control
Kimley-Horn has a detailed QA/QC program that is ingrained into our day-to-day practice. We operate
with a philosophy that our clients deserve the very best service we can provide. Our QA/QC efforts are
guided by a specific Kimley-Hom QA/QC manual which is issued to each Kimley-Horn professional,
utilized in each project undertaken, and regularly revised/updated.
For this project, the key component of our QA/QC effort will be an in-house review by a senior
professional not involved in conducting the project. For this project, Kimley-Hom is assigning Herman
Basmaciyan, P.E. to provide in-house QA/QC. Mr. Basmaciyan is a senior transportation engineer with
Mr. Herb Vargas 3 November 1, 1993
over 20 years of local experience in all aspects of transportation planning.
BACKGROUND & APPROACH
National Car Rental System, Inc. proposes to develop the site as a Service Facility, serving primarily the
Orange County Airport.
The project site is off-site from the Airport, and is proposed to serve as the cleaning and maintenance
center for the National vehicles. Car rental customers will typically not come to the site; the cars will
be delivered to and picked up from the airport by National personnel.
The traffic impact study will need to address the amount of traffic to be generated by to proposed
operation, and its impact on the surrounding street system. Since the proposed facility will not function
in the same manner as a typical car rental faclity, trip generation estimates will need to be based, in part,
on practical experience and judgment.
The traffic analysis will be donducted in accordance with the City's Traffic Phasing Ordinance (ITO)
Guidelines. For purposes of this proposal, it is assumed that four to six intersections will be analyzed.
The final list of analysis locations will be finalized through discussions with City staff.
SCOPE OF SERVICES
The following tasks are envisioned for this project:
1. Conduct a site visit of the proposed site.
2. Meet with City staff to discuss the relevant issues surrounding the proposal, and to obtain traffic
counts and any other materials or documentation available. Reach concurrence on final list of
analusis locations, and approach to analysis.
3. Review traffic counts and evaluate for reasonableness and accuracy.
4. Observe traffic flow and traffic patterns on the affected streets.
5. Estimate the amount of traffic to be generated by the proposed project, and distribution of the
project traffic on the area street system.
6. Determine if project meets 1% criteria at any intersection, and if further analysis is necessary.
7. Identify the project impact to result from the proposed project.
8. If necessary, identify the mitigation measures necessary to address the impacts.
9. Present the findings of the analysis in a report.
The Scope of Services does not include attendance at any public meetings. If attendance at meetings is
required, they will be billed on a time-and-materials basis, in accordance with the Kimley-Horn and
Associates Hourly Billing Rate Schedule in effect at the time.
Mr. Herb Vargas 4 November 1, 1993
SCBEDULE
We are prepared to begin work immediately upon receipt of authorization to proceed. Following receipt
of all necessary data, we will complete our analysis within a two- to three-week timeframe. A draft
report will be submitted to you for your review and comment.
FEE
This estimate assumes traffic data collection and analysis of six locations. A breakdown of this cost
estimate is provided for your information.
Estimated
Task Cost
Project Start-Up $600.00
Traffic Counts 1,000.00
Existing Conditions Analysis 450.00
Project Trip Generation/Distribution Estimates 850.00
1% Analysis 450.00
Project Impact and Mitigation 1,000.00
Report Preparation 1,500.00
$5,5850.00
YHA proposes to complete the tasks outlined above for a lump sum fee of$ 5,850.00.
The proposed fee includes labor fees, plus an amount to cover certain direct expenses for the project
which would included in-house duplicating, facsimile, local mileage, telephone, postage, in-house
blueprinting, and word processing computer. As necessary, additional services will be provided for an
additional fee based on current hourly rates plus direct expenses at a 1.10 multiplier. Billings will be
issued on the basis of percent complete, and will be due and payable within 30 days of invoicing.
CLOSURE
In addition to the matters set forth herein, our agreement shall include and shall be subject to the attached
Standard Provisions. The term"the client' as used in the attached Standard Provisions shall refer to The
City of Newport Beach.
If you concur in the foregoing and wish to direct us to proceed with the scope outlined, please execuite
the enclosed copy of this letter agreement in the space provided, and return to our offices. Fees and
times stated in this agreement are valid for thirty (30) days after the date of this letter.
Mr. Herb Vargas S November 1, 1993
We appreciate this opportunity to work with the City of Newport Beach, and look forward to a successful
project. Please call if you have any questions.
Sincerely,
KMMEY HORN AND ASSOCIATES, Inc.
I)erine Ciandella
Project Manager
SAC.numn
Natkarpro/o494pro
cc: Rich Edmonston, Traffic Engineering
Attachment: Standard Provisions
Agreed to this day of , 1994
City of Newport Beach
By:
Printed Name and Title
' v KIMLEY-HORN AND ASSOCIATES,INC. •
STANDARD PROVISIONS
(1) Scope of Services The undertaking of the Engineer to perform professional services under this Agreement extends only to those services specifically described herein. However,if
requested bythe Client and agreed to bythe Engineer,the Engineer will perform additional services('Additional Services')hereunder and shall be compensated therefore as set forth below.
In addition,the Engineer is authorized to perform Additional Services for which the Engineer will be similarly compensated for those services arising due to emergencies,errors or other
unanticipated actions by the Client's cenlrador(s),revised regulations governing the Engineers services,and when,in the Engineers opinion,Additional Services are advisable as a result
of other factors required by other authorities and such Additional Services are clearly in the Chenl's interest and advance authorization cannot be obtained. In the event of the performance
of such Additional Services,the Engineer will notify the Client as soon as practical of the necessity and inception of the services.
(2)Client's Responsibilities In addition to my responsihilities specifically described herein,the Client shall have the fallowing responsibilities to the Engineer.
(a) OceIgnale in writing a person to ad as his representative with respect to this Agreement,such person having complete authority to transmit instructions,resolve information,and
make or interpret the Client's decisions.
(b) Provide all information and criteria as to the Climes requirements,objectives,and expectations for the project.These data shall include all numerical criteria that are to be met
and ell standards of development,design,or construction that ere to be followed.
(c) Provide to the Engineer all previous studies,plans,or other documents pertaining to the prolecl and all new data reasonably necessary,in the Engineers opinion,such as site
survey and engineering data,environmental impact assessments or statements,zoning or other Ind use regulations,etc„upon on all of which the Engineer may rely.
(d) Arrange for access to the she and other private or public property as required for the Engineer to provide the services under this Agreement.
(a) Review all documents or verbal reports presented by the Engineer and render In wining decisions pertaining thereto within a reasonable time so as not to daisy the services of
the Engineer.
(p Furnish approvals and permits from govemmenlal authorities havinglurisdiclion overthe project and approvals nd consents from other parties as may be necessary for compel on
of the Engineers services.
(g)Provide such idepademaccount(ng,legal,insurance,codestlmafng,and overall feasiblfityservices beyond the scopeefthisAgre iment as the Client maymquireorthe Engineer
may reasonably request with regard to the professional fields listed above.
(h) Give prompt written notice to the Engineer whenever the Client becomes aware of my development that affects the scope and timing of the Engineers services or my defector
noncompliance in my aspect of the ProjecL
(q Bear all costs incident to the responsibildies of the Client.
(3) Period of Services Unless otherwise provided herein,the Engineer volt begin work promptly after receipt of a fully executed copy of this Agreement and,union specified otherwise
herein,shall complete the services within a reasonable length of time. The provisions of this section and the compensation to the Engineer Included in this Agreement have been agreed
to In anticipation of a continuous and orderly progress through the completion of the Engineers services.
(a) Times forpetformance agreed to herein shall be extended to the extent necessary for delays due to natural disasters,strikes,orotherdreumstnces over which the Engineer has
no control.
(b) If the Engineers services am delayed or suspended In whole or in pad,the times of performance shall be extended to the extent of such delay or suspension;such suspension
shall nottemlmda this Agreement unless the Engineer elects to terminate bywriten notice in accordance with dharprovislons of this Agreement Ifsuchdelaybrsuspensionextends
- for more than six months(cumulatively)for reasons beyond the Engineers control,the various miss of compensation provided for elsewhere in this Agreement shall be subject to
renegotiation.
(4) Compensation for Services Unless specifically agreed to herein,the following standard provsions as to compensation amounts shall be applicable.
(a) The Engineer shall be compensated in U.S.dollars for the services specifically described herein In accordance herewith.
(b) If the Engineer performs Additional Services,the Client shall pay the Engineer ferthe pedornnse of those Services an amount(in addition to all other amounts payable under
this Agreement)based upon the Engineers current hourly rates for the actual time spent by the Engineer in providing such Adddlonal Services plus an amount to cover certain direct
expenses for the project which would indudo In-house duplicating,facsimile,legal mileage,telephone,postage,in-home blueprinting and word processing. In addition,other tired
expenses will be billed at 1.15 times costs.Technical use of computers for analysis,design graphics,sto.,will be billed at$25.00 per hour.
Ifc) In wineporon to mounts
pa ablelerb the Client ttore the
to such
mounts.
the Client shall be invoiced for and shall Pay to the Engineer in accordance with Paragraph(5)all taxes,
lev
ed with
(6) Payments for Services Compensation shall be paid to the Engineer in accordance with the following Provisions:
(a) Invoices will be submitted bythe Engkeerto the Client monthly for services performed and expenses incurred pursuant to this Agreement during the priormonth. Paymntofeach
such invoice will be due within twenty-five(25)days of the receipt thereof. Aservice charge will be added to delinquent accounts at the maximum rate allowed bylaw for each month
of delinquency.
(b) If the Client fails to make any payment due the Engineer for services and expenses within thirty(30)days afterthe Engineers transmittal of its invoice therefor,the Engineer may,
afar giving seven(7)days'written notice to the Client,suspend services under this Agreement until all amounts due hereunder are paid In full.
(c) In the event any invoice or any portion thereof remains unpaid for more than sixty(60)days fallowing the invoice dale,the Engineer may initiate collection proceedings to collect
the same and recover,in addition to all amounts due and payable Including accrued interest,its reasonable collectlonfeesnd otherexpenses mlatedto the proceeding.Such expenses
shall Include,but shall not be limited to,the cost,determined at the Engineers normal hourly billing rates,of the time devoted to such proceeding by he employees.
(d) The Client acknowledges and agrees that the payment forservices rendered and expenses incurred bythe Engineer pursuant to this Agreement is not subject to any contingency
or conditions unless expressly set forth in this Agreement.
(6)Reuseof Documents AM documents,Inclding but not limited to drawings,specifications and data or programs stored electronically,prepared bythe Engineer pursuanito this Agreement
are related exclusively to the services described herein. They are not Intended or represented to be suitable for reuse by the Client or others on extensions of this proled or on any other
project.Arty muse without written verification oradaptation bythe Engineerto spedfepurposes Intended will beat the Client's sole risk and without lability or legal exposure to the Engineer,
and the Client shall kxlemnlfyad hold the Errgieerharmless tram all claims,damages,losses and expenses,Including but not limited to attomeya'fees,arising out of or resufing therefrom.
Any such verification or adaptation will entitle the Engineer to further compensation at rates to be agreed upon by the Client and the Engineer.
(7) Opinions of Cost
(a) Since the Englneer has no control overthe cost of tabor,materials,equipment or services famished by others,or over methods of delenining prices,or over competitive bidding
or market conditions,any and all opinions as to costs rendered hereunder,including bud not limited to opinions as to the casts of construction and materials,shall be made an the basis
of its experience and qualifications and represent its best judgment as an experienced and qualified professlonal engineer,familiar with the wnsta loon Industry;but the Engineer cannot
and does et guarantee that proposals,bids or actual costs will not vary from opinions of cost prepared by IL if at any time the Client wishes greater assurance as to the amount of
any cest,he shall employ an independent cost estlmstur to make such delerminallon. Engineering services required to bring costa within any limitation established by the Client will
be paid for as Additional Services hereunder by the Client.
(b) If a limit with respect to condnwiln or other costs is established by written Agreement between the Client and the Engineer,the following will apply.
C11 The acceptance by the Client at any time during the performance,of services hereunder of a revised opinion of probable cod in excess of the then established cost Iimf
will constitute a corresponding revision in the previously agreed cost lima to the extent indicated in such revised opinion.
(IQ Any cod limit so established shall be Increased by a bidding contngency,of ten percent unless mother amount is established in writing.
(iii) The Engineerwill be permitted to determine what materials,equipment,componentsyslems ndtypes of construction are to be Included in the drawings and specifications
prepared by it pursuant hereto and to make reasonable adjustments In the extent of the project to bring it within the cod limit.
(iv) if the bidding or negotiating phase of the project ties not commenced within six(6)months after the completion of the Engineers design hereunder,the established cost
Iimf will not be biding on the Engineer,and the Client shall consent to an adjustment in such cost lima commensurate with my applicable change in the general level
of prices in the construction industry between the date of completion of the Engineers design hereunder and the date on which proposals or2bids�riz une toflalin or
(v) If the lowest bona fide propose]or bid exceeds the established cod Iimf,the client shall(1)give written approval to increase such cost limit,( ) negotiating
rebidding the project within a reasonable time,or(3)cooperate in revising the projects extent or quality. In the case of(3),the Enguoer shall,without additional charge,
to bring the
cast
n the
st firrift. The
service will be the limit of
tmodify the he Engineers responsib dys and specifications
ntthis regard and,having done so,txeEngineer prepared by it hereunder as shall be enitledtoto paymntlforits services inin accordnding of ce with this AgreementAgreementand shall have
no further liability hereunder.
(8) Termination The obligation to provide fudher see under this Agreement maybe laminated by either party upon*,(7)days'written notice in the event of substantial failure
by the ooerparty to perform in accordance with the tonns hereof through no fault of the terminating party. In the event of any termination,the Engmeorwill be paid for all services rendered
to the data of lamination.all expenses subject to reimbursement herdunder,and other reasonable expenses Incurred by the Engineer as a result of such termination. In the event the
Engineer's compensation under this Agreement Is a fixed tee,upon such lamination the amount payable to the Engineer for services rendered will be a proportional amount of the
total too based on the rare of the amount of the wady done,as reasenably dolannined by the Engineer,to the total amount of work which was to have been performed,less pnor partial
payments,if any,which have been made.
(9) Liability The Engineer is protected byWodmrs'Compensation lnsuranco(androromployer's liabileyinsumnce).professional babildy insurance,and by pubticilability insurance for bodily
injury and property damage and will furnish cedificates of insurance upon request. The Enginceragress to hold the Client harmless from loss,damage,Injury,or liability arising directly and
to the extent from the negligent ads or amissons of the Engineer,its employees,agents,subcontractors and Ihalrempbyees and agents but only to the extent that the same is equally
covered and paid under the foregoing policies of insurance. If the Cuero specifically directs the Engineer to obtain increased Insurance cave,mge,or it the nalum of the Engineer's actNkos
requires additional Workers'Compensation or similar insurance coverage,the Engineer will lake out such additional Insurance,It obtainable,at the Cllenrs expense
(10) Slandard of Coro In perforating ris protosslonal services heeunder,the Engtnoor will am that dagem of com and skllt odiaadly exercised,underskmllarclax malances;by mputabto
members of its profession practicing in the same or similar locality. No other womanly.express or implied,is made or Intended by the Engineer's undotakfng hereln or its performance of
services hereunder. It is agreed that M accordance with and subject to the provisions of the foregoing paragraph(9),the Client will beak any and all liability,claim for damages,cost of
defense,oraxponsea to be levied against the Enginearon account of any and WI design defects,oams,emissions,or professional negrgence,to the mount actually pail in compensation
for,or with rasped to,such liability,claim,cost,or expense under any polity or policies of professional liability Insurance maintained by the Engineer. Further,the Client agrees to notify
any centractororsubcenlradorwho may portion work In connection with any design,report,or study prepared by the Engineer of such limitation fordelocis,orrera,omissions,or professional
negligence,and require as a condition precedent to his(orris)performance of such work an Identical limitation of liability on his(or its)part ns against the EngInter.ln the event the Clam
falls to obtain an oamical limitation of liabilitypmvlsion as to defects or negligence,the Client shall Mentally and hold the Engineer harmless for any liability related to offer,omissions,or
ad of pofessonal negligence In such a memerand to such"am that the aggregate liability of the Engineer,indudirig awards and costs assossed by my medietomadaitmtorforsuch dated
or neggganrs to or parties Including the Client,shall not exceed the aforementioned amount Undorno cicomstanoss shall the Engkwer bo liable for extra Costs or other conseghronCos
due to changed cenddons or for costs related to the failure of the contractor or mate riaMren to install work In accordance with the plans and specifications.
(11) Means B Methods of Contractors The Engineer shall have no authority coverer rosponsblydyfortho mome,methods,tachniques,sequences orprowdurea of construction selected
byconYmdor(s),forsaletyprocamons and programs incidentto the work of contractor(s)orformy'failure of Contoclor(s)to complywah laws,rules,regulations,ordinances,codmoronors
applicable to contractor(s)furnishing and performing their work
(12) Expanses of Litigation In the event litigation in anyway related to the services parforrod hereunder is Initiated against the Engincerby the Cllan4 its contractors,orsubcontmdom,
and such fdigalon concludes with the entry of a final judgment favorable to the Engineer the Client shall mimbume the Engineer forall of its roaeongblo altomeys'fens and otherexpensos
related losald Idigation. Sudi expenses shall Include,but shall net be ranked to,the cost,dotornined at the Engineer's normal houdy billing miss,of the time devoted to such litigation by
the Engineer's employees.
(13) Arbitration AN claims,counieclaMhs,disputes,and other matters In question between the Client and the Enginserarising out ofthis Agreementarths broach thereof shag be decided
by biding arbitration In accordance with the Construction Industry flutes of lho American Arbitration Association then obtaining,at the solo dodolon of Iho Engineer. Notice of demand
for arbitration mud be riled in writing with the other party to this Agreement and with the American Arbitration Assodaton no Wier it=that dale when Institution of legal or equitable
proceedings based on such claim,dispule,or other mmor M question would be barred by the applicable statute of IMltatons.In addition,no arbitration proceedings shag Include by
consolidation,joinder,orin anyot hermamer,myparly of erthan the Clionlandthe Engineer,and arbitration M nupectof aspodgcallydesoibod claim,counterclaim,disputaorothermater
In question shag net be expanded to Include any other Issue.The restrictions of the pravous scale=as to parties to and Issues of the arbitration proceedings may be amandod by spectra
written approval of the Client and the Engineer for each exception.
(14) Hazardous Substances It Is understood and agreed that In seeking the professional sonkes of the Engineer under this Agreement,the Client does not request the Engineer to
undertake to perform any services,studies,or into,or to make any tlaleffmatons Involving hazardous substances,as dented by federal law.Therefore,the Engineer undertakes no such
obligation hereunder,and the Client agrees to hold harmless,Indemnity,and defend the Engineer from and against any and all claim,asses,damages,lWugky,and costa adskg out of
orM anywaycoenected with the presence,disdarge,mime,orescapo of contaminants orhazallous substances of anykind,aronvimrcnemal liabifityof anyratues,in any mannermlatod
to serAm parfoffmod by Iho Engineer undmthla Agroement if any condition regarding ahazardous substance,Including but not Untried masbostos,Is observed bytes Engfrhearoroegoged
during the course of the performance of the saviors hereunder,the Engineer slag have the tight to Coosa all sorvkss until the hazardous substance condition has boon eliminated. That
Engineer shall have the responsibility to notify the Client of any such condition of which tha Engineer becomes aware,and the Client shall be solely responsible far the elimination of the
hazardous substance condition.Iftheservkes to be performed bytho Engineerhomundarcgnnat be performed becausooflhaexistenw of the hawdoussubslenco condition,the existence
of the condition shall be deemed to be a substantial failure on the pin of the Client to perform in accordance with the terms of this Agreement,though no fault of the Engineer,for the
purposes of termination under paragraph(8):
(15) Beneficiaries,Assignment and Subcontracting Nothing under this Agreement shall be construed to give any rights or benefits M this Agreement to anyone other than the Client
and the Engineer,and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of the Client and the Engtneerand not for the benefit
.of any otherpaty.Nekherthe Clientnorthe Engineershallassign,sublal,orlmnslerany rights underor interests InthIsAgreemem without the written consent of the other.However,nothing
contained hereinshall prevent ermstrict gat Engineer from employing Independent professional associates orconsultants asthe Engineer mayck m appropriate toassist In the performance
of services hereunder.
(16) Confidentiality The Client hereby cons"to the use and dissemination by the Engineer of photographs of the Project and to to use by the Engineer of facts,data and Information
obtained by the Engineer In the mutkho performance of the services hereunder. Notwithstanding Ile fomgoing,with rasped to any facts,data oroformation specifically Identified In writing
by the Client,the Engineer shall use reasonable cam to maintain the confidentiality of such idonllfcd malarial.
(17) Controlling Law This Agreement is to be govamed by the law of the Slato of California.
(18) Binding Efiost This Agreement shag bind,and the benefits thereof shall Inum to to respective parties hereto,their legal mprasonWlives,mocutors,adminisualom,succossom and
assigns.
(19) Limit of Liability In recognition of the reform risks and benefits oftha project to both to Client and the Design Professional,the risks have been allowed such that the Client agrees.
to the fulled extend permitted by law,to fimk the liability of the Design Professional to the Client on the pmjod for any and all claims,losses,costs,damages of any nature whatsoever or
claims expenses from any cause or causes,so that the total aggregate liability of the Design Professiopal shall net exceed the Design Professionsfs fee for sonkes received on this projeot
Such claims and causes Include,but are not hauled to negligence,professional orrora or omissions,sidd liability,breach of contract or warranty.
(20) Mergar,Amendment This Agreement constitutes the entire Agreement between the Engineerand the Client,and negollalions,wmlm,and oral understandings between the parties
am merged herein. This Agreement can be supplemented andrer amended only by a written dochmient executed by both the Engineer and the Client.
(21) Soverability,and Waiver of Provisions Any provision in this Agreement that is prohibited or unenforceable In anyjurisdicton shall,as to such judsdkllm,be ineffective to the edam
of such prohgbkon or un rnorceabtky without kwafdating the remainkg provisions hereof or affici the validity or enforceability of such prevision In any olherjutsdicllo. Also,the non,
enforcement of arty prevision by either party shall not constitute a waiver of that provision nor shall it affect the enforceability of that provision or of the remainder of this Agreement.
DATE TIME
Fo
WHILE OU WERE OUT
OF /
PHONE NO`�/(/�(/f7�fZ EXT.
TELEPHONED lel<l PLEASE CALL
RETURNED YOUR CALL
WILL CALL AGAIN
CAMEINTO9EEYOU ENT MESSAGE d=�is��
7T
<.S's
BY
CITY OF NEWORT BEACH CASH RECEIPT
NEWPORT BEACH,CA 92663
39191
RECEIVED BY:CM CUSTOMER:NATIONAL CAR RENTAL SYS I
MISCELLANEOUS RECEIPTS 0102243 CO FILING FEES 010-2243 $50. 00
MISCELLANEOUS RECEIPTS 0102300 MISC TRAFFIC STD 010-2300 $67385. 00
TOTAL DUE t sEY435.00
CASH PAID CHECK PAID CHECK NO TENDERED CHANGE
$. 00 $6,433.QO 618,1181- $6, 435. 00 $. 00
DATE - 04/2'8'/'q-j---Tl-ME- �i4,20:57
DATE TIME
FOR-
WHILE YOU WERE OUT
1
M
I
OF
PHONE NO. ,6�Fr EXT.
TELEPHONED PLEASE CALL
RETURNED YOUR CALL WILL CALL AGAIN
CAME IN TO SEE YOU O�URGENT
MESSAGE
(\ /
/By
�G��- SlW-C�cl� (-�n��..w�(�
� � � ,
9
� � W � f
i
� �
NATIONAL CAR RENTAL SYSTEM, INC. 7700 FRANCE AVENUE SOUTH MINNEAPOLIS, MN 55435
INVOICE NUMBER INVOICE DATE I HER NO. GROSS AMOUNT -OUNIT NET AMOUNT
TRAFFIC 04 27 94 6435.00
�Z %:Natidn l National Car Rental System,Inc
Cdqurters
arRentalopD France Wrd Avenue South
Minneapolis,Minnesota 55435
(612)893-6433
Timothy W.Johnson
Director
Facility Planning
CHECK NO CHECK DATE VENDOR NUMBER I VENDOR NAME cHECKAMOUNT
6181181 04 27194 1 T0471 I CITY OF NEWPORT BEACH $***%r***6,435.00
EfA H iE (10SITING CH K
r , ONVIRONHF:NT.AL INFORHARION FORS( 0
City of Newport Beach Planning Department
3300 Newport Boulevard, Newport Beach, CA 92663
(714) 644-3225
A. General Information
1. Applic ant/Agent:_NOGLE ONUFER ASSOCIATES ARCHITECTS, INC. phone: (619) 297-8066
Address; 2398 SAN DIEGO AVENUE, SAN DIEGO; CA 92110
2. Property Owners SHATTUCK FAMILY TRUST WILLIAM N. SHATTUCK,Phones (714)756,-150
—c/o TRUSTEE
Jip
Address: 4242 CAMPUS DRIVE. NEWPQgT BEACH, CA 92660
B. proiect Descr ption
Please attach the following materials for the project:
• Vicinity map • Plans drawn to scale
• Proposed revisions to zoning map • At least 3 different site photos mount d
and text using underlie and on 8 1/2 X 11 cardboard with a key map
g l eeout notation, if applicable showing the photo locations and
direction of view
1. Project name: NATIONAL CAR RENTAL
2. Project locations 4242 & 4262 CAMPUS DRIVE, NEWPORT BEACH, CA 92660
N217-111 - 06
3. Assessor's parcel €: JT"1-17-1 ^o,_ 4. Permit application ifs
5a. Proposed use; CAR RENTAL SERVICE FACILITY
5b. Project size (dwelling units, gross floor area, etc. ) 2,982SF
5o. site size: 58,000SF 5d. Building heights 17!0"
6. Existing land use designations:
General Plan: Zonings M I•A
Specific Plan: LCP
7. Previous governmental approvals: _ ^
B. other governmental approvals required:
Federal: State: _
Regional: Locals
1 JULY 1, 1994 Estimated occu anc s NOVEMBER 1, 1994
9. Begin conatructic:f: F Y
(date) (date)
C. potential Environmental Effects
On a separate page, please provide the' following information. if the question is not
applicable, indicate "Not applicable" or "None".
1. Earth
Please describe the earthwork that will be required for the project. Include grading
quantities, and the location of borrow or stockpile sites, and haul routes, if
applicable. Describe any geotechnical or soils investigations that have be n
conducted. include exhibits showing existing and proposed topography, retaining walls,
and erosion control devices.
2. Air
Describe any air emissions or odors that could result from the project, including
emissions during construction, and any measures that are proposed to reduce these
emissions.
3. Water
Describe existing and proposed site drainage, and measures that will be employed to
reduce erosion and prevent contaminated runoff from entering the storin drain system,
groundwater or surface water.. Describe any changes that could occur in groundwater
levels or bodies of surface water. Is the project located in a flood hazard zone?
4. Biological Resources ••
Describe 'the existing vegetation on the site, and any trees or large shrubs that are
to be removed. Identify any fish or wildlife that inhabit the cite.
d
ool �U "J4 1:.:ib •.I lb - !+F U•, i c,ri F.4/4
Describe any sources of noise that impact the site, and any Oise-generating equipmen
that will be utilized on the property, either during construction or after occupancy,
What means to reduce noise impacts on surrounding proportion or building occupants ar
proposed?
6. Light and Glare
Describe exterior lighting that is proposed for the project and means that will b
utilized to reduce light and glare impacts o:: surrounding properties.
7. Land Use
Describe: a) the existing land uses and structures on the project site and on adjacent
parcels; b) the projects conformance with existing land use plane and regulations fe
the property; and c) its compatibility with surrounding land uses.
8. Public_Health and afet
Identify any aspects of the project that could present a risk to public health due t
normal operations, or due to an explosion or the release of hazardous substance
(including, but not limited to: oil, pesticides, chemicals or radiation) in the even
of an accident or spill. is there any possibility that the site could be contaminate
due to previous uses or dumping? If so, what measures are proposed to eliminate the
hazard or contamination?
9. populationLHoueing/Emplovment
a. If the project is residential, please explain how the project will comply wit
the affordable housing policies contained in the Housing Element of the Genera
Plan, and the average household size expected.
b. If the project is commercial, industrial, or institutional, please identify the
tenants and/or uses and the estimated number of employees.
10. Transportation/Circulation/Parking
Please describe how the project will comply with parking regulations, and identify an
changes or improvements to the circulation system that are proposed as part of the
project.
11. Public Sery cea til t es
Please identify whether adequate capacity currently exists for the following public
services and utilities. If expansion is needed, explain how it will be accomplished
Please attach any written confirmation of capacity you have received from service
providers.
• Communications Systems • Electrical power
• Fire protection • Natural gas
• Parka/recreational facilities • police protection
• schools • sewer systems or septic tanks
• Solid waste and disposal • Storm water drainage systems
1
12. bestheticp
Describe whether the project could potentially obstruct any scenic vista or view Opel
to the public, or create an aesthetically offensive site open to public view. Coul
the project block any private views?,
13. Cultural and Historic Aesoyrcea
Please indicate whether any archaeological or paleontological surveys have been don
on the site. Could the project result in any adverse physical or aesthetic effects t
any building, structure, or object having historical, cultural, or religious
significance? ,
CortificatL6
I certify that the statements furnished above and in the attached• exhibits are correct an
complete to the beet of my knowledge and belief. I am the legal owner of the property that
is the subject of this application or have been authorized by the owner to act on his behal
regarding this application. I further acknowledge that y false etatements or informatio
presented herein may result in the revocation of any a oval or permit granted on the bass
of this information.
X OoWA 0A wT 5; , 46e;.F- k
Print name of owner or representative gnature bisee
�O.YC C C '1 Y3 .- .. .- 3 C Oii A F •- • L ••
For Office Use
Date filed:. Fee: Receipt No: Sy:_
f:\...\JO\FORMS\ENY•INF0. Rev. 2194
1. Earth
Existing topography will basically remain the same. Existing AC paving/and
construction will be removed in its entirety with new AC paving and service building
being installed. Finish grading only will be performed.
2. Air
No adverse air emissions are expected other than those caused during construction by
normal construction vehicles, and during occupancy by new cars being shuttled off and
on the site.
3. Water
Existing site drainage sheet flows thru (2) curb cut openings onto Campus Drive. Said
overall site drainage pattern will remain except for minor modifications to direct sheet
flow to new central curb cut opening verses existing (2) curb cut openings. If required
by City, site water will be collected into catch basins and discharged directly into storm
sewer system. The new facility will have a self-contained recycling car wash, and will
also have an oil interceptor for all interior drains, etc.
4. Biological Resources
Site has no major vegetation or wildlife.
5. Noise
No adverse noise is expected other than that caused during construction by normal
construction vehicles, equipment, etc.; and during occupancy by new cars being shuttled
off and on the site. Minor servicing of new vehicles during occupancy will occur
within the service building. A masonry fence will be installed along Campus which
will diminish the incoming traffic noise as well as any site generated noise.
6. Light and Glare
Site lighting will be accommodated by approximately (4) 30' tall standards with metal
halide cut-off fixtures, and under-canopy lights. Metal halide is requested due to color
rendition of rental cars. Said light layout will be engineered at time of working
drawings complete with photometric layout. Light throws will be directed downward
only, and will be engineered to cut off at properly lines/fences.
7. Land Use
Existing land contains (2) 1 story office buildings and AC parking lots. New
construction will be similar with (1) 1 story service building and the remainder of the
site being utilized for parking of rental vehicles. New facility will include:
administration office, automobile maintenance, car washing, and refueling operations.
The proposed project is compatible with the surrounding light industrial and general
office use as allowed by the existing M1A zoning.
8. Public Health and Safety
No adverse effects to the public health and safety is expected. The new car wash
facility is a closed system utilizing recycled water, the interior floor drains discharge
into an oil interceptor, and the new fueling pumps, etc. are triple lined, etc. per EPA
standards. No existing contaminated soils are anticipated due to present use of
property; however, should any contaminated soils, materials, etc. be discovered, they
will be removed/disposed as required by all local, state, and federal laws/codes.
9. Population/Housing/Employment
The project will maintain a small administrative staff of 2-3 people, a small service
staff of 2-3 people, and a small staff of drivers. Maximum staff at any one time is
expected to be in the range of 10 employees.
10. Transportation/Circulation/Parking
The project contains on-site parking for approximately 180 vehicles. The
administrative area of 1,230SF requires approximately 5 spaces (1/250SF). The
remaining service area of 1,750SF requires approximately 5 spaces (3/1000SF). As
shown on the attached site plan, 10 spaces will be provided for employees and 4 spaces
for visitors. The internal circulation is shown on the attached site plan.
11. Public Services/Utilities
Existing utilities are adequate for intended use.
12. Aesthetics
No adverse aesthetics are anticipated. A new decorative masonry wall with security
gate and landscape strip will be installed alongside Campus/ and a new 6'0" tall chain
link fence with vinyl slats will be installed on the interior property lines. The proposed
service building will be setback from the street to minimize sight lines.
13. Cultural and Historic Resources
No cultural or historic resources are evident/effected.
ILA!J -IS-Aid b fSS t�LL 6,c;gT y6, 2kf41
7s75 - s
a..i DMCRIP'TION
Lots 25 and 26 of Tradt no. 3201, in the pity of Newport Seaoh, County of Granger
state of Calitornia, as PeY iiaP Recorded in Hack 1301 pages 25 to 30 inclusive of
Xiscellaneoae Napa, in the office of the county Recorder of said county.
=C n any and all oil, oil rights, minerals, mineral righte, natural gas rights, and
other hydrocarbons by whaL•aoever name known, geothermal steam, and all Products
derived from any of the foragoin9, that may ba within or under the land, together
with the perpetual right Of drilling. mining, exploring and operating therefor and
etorinff in and removing the game from the Sand er any other land, including the right
to whipstock or dire sub
ctionally drill and mitre from latrda other than those s
hereby, oil or gas wells, tunnels and shafts into, through or across the subsuurfarfa
ce
of the land, and to bottom such whipatocked or directionally drilled wells, tunnels
sad ahafta under and beneath or beyond the exterior limits thereof, and to radrill,
yytunr»1, equip. maintain, rapair, da4open and operate any such wells ar mines; i.
ore
without, however, the right to drill, mina, store, ex fan and operate through the
aurfacn or the upper 500 A t33ohigsn of e subougfftafi corperaf th
tinn,ore-ordld 70bruaryn78 e1992 as
d in • paw
frca The Irvine Companyr
instrument No. 92-122266, official Records.
ALrip E&CgpT say and all water, rights or interests therein, no matter how acquired by
Oragtor in connection with or with respect to the land,
Amster, and owned or used er,
together with the right and power to erplore, drill, redrill, zameve and store the
ts
Same from the land or to divert or otherwise utilize such water, riShtO hts or ehallLbe
on any other property owned of leased by Grantor, whether suchwaterrig
adjudicated,
riwisni overlying, appropriative, littoral, Percolating, prescriptive,
statutory or contractual► but without, however, any tight to enter upon the surface
of the land in the exercise of ouch righte, as reaervad1in the Do"inst fromtThe Irvine
Codpany, A Michigan corporation, recorded iabruarl
28,92-122266, OfticLKI Records.
To '�'
Company
FAX •—
Phone
From
Companv.—.—
Fax
Phon-
.CoL� �33.
Nun,"of R19-5, -
'
'.,y p ,g xaYSf�tla Oa DVki,k rJdEC 80 166 '6'z '00
TOO'Bbdd SS09L636T9T6 01 UH--lU037 93I183dO'Jd WOJd £h:LT *1 6E dUW
ITPAMO, S u my,
/
��'''`•' J ' ; � - ;. - '�% 1" '�' ;� 'y -� 'FUR,- „ r'-' �" _ i. ' 'ry ' � r .
-NATIONAL..CAR RENTAL
./'. � - ' ,' '! . f;�' t �.- � " -••t ,.fit - _ -_, � 1/ - � . .i �..
J r 5ERVICE FAI�MI,TYtV
I, '
IPreparedfoT'i '•_ ?
;City of Newpdrt Beach'. t'
Prepared
Kimjey,Horn'and'.Associate' Inc.
I ' i y - ' . - • . - I NN��G' �' 7BEpC -
.f• . .-` _ . ' t, ;� . � ��!�, III ' . , 'r
/ � (•1 /.: , '• ice'. I
1
1
' TRAFFIC STUDY
' FOR
' NATIONAL CAR RENTAL
SERVICE FACILITY
' Prepared for
' The City of Newport Beach
Prepared by
' Kimley-Horn and Associates, Inc.
1
' m May 1994
r
TABLE OF CONTENTS
' INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
PROJECT DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
TRIP GENERATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
' TRIP DISTRIBUTION ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
' TRAFFIC IMPACT ANALYSIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
i
Committed projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Intersections to be analyzed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
' ICU . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
ICU test . 11
' MITIGATIONS . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
ON-SITE CIRCULATION AND PARKING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
' SITE ACCESS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
' SUMMARY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
' LIST OF FIGURES
FIGURE 1 -Location Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
' FIGURE 2 - Site Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
FIGURE 3 - Current Service Facility Vehicle Routing . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
' FIGURE 4 -Proposed Service Facility Vehicle Routing . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
' FIGURE 5 -Project Trip Distribution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
FIGURE 6-Project Traffic-Morning and Evening Peak Hour . . . . . . . . . . . . . . . . . . . . . . 9
LIST OF TABLES
TABLE 1 -Summary of Project Trip Generation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
TABLE 2 -List of Approved Projects and Occupancy Level as of May, 1994 . . . . . . . . . . . . 10
TABLE 3 - Summary of Intersection Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
I
INTRODUCTION
' Kimley-Horn and Associates has been retained to conduct a traffic impact analysis for the proposed
National Car Rental Service Facility on Campus Drive, south of the John Wayne Airport. City policy
requires that any project consisting of more than 10,000 square feet of gross floor area, ten or more
' dwelling units, or generating more than 130 daily trips must be evaluated in accordance with the
requirements of the City's Traffic Phasing Ordinance(TPO). As this report will indicate,the project will
generate more than 130 daily trips. Therefore, the following analysis has been conducted in accordance
' with the TPO requirements.
' PROJECT DESCRIPTION
National Car Rental System, Inc. proposes to relocate an existing National Car Rental Service Facility
to a 1.3-acre site on the south side of Campus Drive, between Dove Street and MacArthur Boulevard.
The existing Service Facility is located on the west side of Bristol Street South,between Birch Street and
Cypress Street.
t An area map is,provided on Figure 1, and depicts both the existing and the proposed Service Facility
locations. A copy of the project site plan is provided on Figure 2.
' The project site is currently occupied by two single-story multi-tenant industrial office buildings,totalling
approximately 15,000 square feet. These buildings would be demolished to allow for development of the
proposed project.
' The proposed Service Facility is to house the facilities for cleaning, maintaining, and fueling the rental
vehicles, after they have been returned by the customer. A small office building will be provided for
tadministrative personnel.
The site plan indicates parking storage for 164 rental vehicles (110 spaces for cars that are ready for
' rental, 42 for cars just returned, and 12 for cars being serviced), and 14 spaces for employees and
visitors.
National Car Rental has a leasing agent and a 90-space parking area at the John Wayne Airport. All
customer pickup and drop-off activity will take place at the airport. The operation at the Service Facility
will primarily involve shuttling the "ready cars" to the airport lot, and picking up the return cars from
' the airport lot and taking them back to the Service Facility to be cleaned and fueled. -
The vehicles are transferred between the airport and the Service Facility by National Car Rental drivers.
' The cars are transferred in groups, with, for example, five ready cars driven from the Service Facility
to the airport, and five returned cars driven back.
The project site is proposed to have one right-in-right-out-only driveway on Campus Drive, located at
approximately the center of the project. The existing use on the site is serviced by two right-in-right-out
only driveways, located at both edges of the property. The existing raised median on Campus Drive will
preclude any left-turn movements into or out of the site. Traffic approaching the site from the north on
' Campus Drive will be required to make a U-turn at Dove Street, and make a northbound right turn into
the site.
' -1
1
1 / /
1 NOT TO SCALE
/ e
1 �
1 w�
Qo
1 �o
p� Q
Ner, ay O
sf m
1 /S
u
1 �a
o�
�o
1
1 w2
5`
1 m
n
1
F<
a
1 FIGURE 1LEGEND
s
1 LOCATION MAP
• ANALYSIS INTERSECTIONS
G
1 Kimley—Horn❑cn ss❑,tee, Inc.
2
RE oe
IfilIfii 'Ifp 'Ifil �Ifil 9fi1 Ifil IfiF IfiF SERVICE -,)
I� 2 ---� . .
'liil 11111 _
IMJ
Ifil
Ifil Ifll IQr+ �L��
fid
Ifll 61:1
'Ifil I1
1111' ll
1111 .�I i�� ter i�i i�I ill ill f�l lal
lid ice' I191 I!U
ram, ��J ��i ��J ICJ ram+ ice: ice! i� 1i91 Ilil Ilfl. Ilil III III6 J li 1 Ii1P
dill Ifil �IfiF Ifil Qiil Ifil 'Ifil liil �ifil r_1 i�i �_i rst i�i r_t i {�i t�1
FIGURE 2
44 SITE PLAN
i
1
I
' A National Car Rental representative has indicated that the new (proposed) location will result in
significant time and cost savings for the company, due to the reduction in time and distance required to
' travel back and forth between the airport and the service facility. The driver's route between the airport
and the existing service facility is depicted on Figure 3, and the new route for the proposed site is
depicted on Figure 4. As comparison of these two figures reveals, relocation of the Service Facility to
the proposed location will result in a much shorter round-trip for the rental vehicles, as well as a
reduction in traffic on some movements at a number of intersections. While the reduction in traffic at
some intersections is acknowledged,this analysis will focus on the impact of the addition of project traffic
' to any impacted intersections, per the TPO requirements.
' TRIP GENERATION
Trip generation estimates for the project are based on the number of parking spaces provided for rental
cars on the site. The site plan indicates parking is provided for 164 rental cars.
Trip generation rates for the project are based on a traffic study conducted by Austin Foust and
Associates for a similar facility in the City of Newport Beach. Daily and peak hour trip generation rates,
' and the resulting project trip generation for 164 rental cars are summarized on Table 1.
' TABLE 1
SUMMARY OF PROJECT TRIP GENERATION
' Daily AM Peak Hour PM Peak Hour
Description In Out In Out In Out
' Car Rental Trip Generation
Rates (trips per car) 1.1 1.22 0.13 0.10 0.13 0.12
' National Car Rental Trip
Generation(164 cars) 180 200 21 16 21 20
' The project will generate approximately 380 daily trips, with 21 inbound and 16 outbound trips in the
morning peak hour, and 21 inbound and 20 outbound trips in the evening peak hour.
' The current uses on the site are still generating some traffic, not quantified by site counts. The TPO
allows for deduction of existing traffic generation in the analysis of proposed project impact. For a
worst-case analysis,the full traffic generation for the proposed Service Facility is assumed in the analysis,
' without any deduction taken for existing uses on site.
TRIP DISTRIBUTION
' The assumed distribution of project traffic is depicted on Figure S. This distribution assumes that the
majority of project-related traffic(80%) is comprised of the activity between the airport and the service
' facility, and will follow the routing depicted on Figure 4; and that the remainder (20%) is comprised of
employees and service and sales traffic.
1
1 NOT TO SCALE /
01>
1 / � f
1 �
1 5
Oy
o` e`
1 S B �SfO/Sf GOF r�� OLO Sf
sf m
f 4
0
o�
F�
�O
1
1 „v
ch
5�
1
i3
rn
1 3
J
F
1 FIGURE 3 x
1 CURRENT SERVICE FACILITY VEHICLE ROUTING
1 Kimley—Hor�n sates, Inc.
5
1
1 NOT TO SCALE
1 / /
1 � /
�a
1 oQ
O� Q�
N eri QJy �o
sfo `rf OoF r `e Sf
r�sf0
Sf [D
f 1
0
o�
Fn
�o
1
1
h�
c°'
5
4+
1 a
h
1
F
a
1 FIGURE 4 s
1 PROPOSED SERVICE FACILITY VEHICLE ROUTING
1 Klmley-Horn❑an sates, Inc.
6
1
1 / �
NOT TO SCALE
0
/ to%�
1 / S.-
,p I5
glp1.
0
0"? IoQO
O
1 S �Jsfa/9t GoF 5w oDe 3t
Jsfot
Si m
1 Q`oJ/S
fa
0
1 �a
a�
o�
�o
xe
1 i3
N
1
F
a
1 FIGURE 5 s
PROJECT TRIP DISTRIBUTION
1 b
1 Kimley--Horn end Associates, Inc.
7
Based on these trip distribution assumptions, the peak hour project traffic at the area intersections is
depicted on Fgure 6.
TRAFFIC IMPACT ANALYSIS
' The methodology for the evaluation of the project's traffic-related impacts is defined in the City's Traffic
Phasing Ordinance (Ordinance 86-20) and explained in detail in the Administrative Procedures for
Implementing The Traffic Phasing Ordinance.
' Compliance with the City's Traffic Phasing Ordinance requires that detailed impact analysis of the project
traffic be conducted at any intersection to which the project will add one percent or more of the projected
traffic volume during the AM or PM peak 2.5-hour period. Projected volumes include existing traffic
' volumes; regional growth, where appropriate; and projected traffic from:committed projects. The
analysis year is one year after completion of the project, and is assumed to be two years from the date
of this report.
1 Regional traffic growth is applied on selected City roadways which are assumed to carry a component
of regional (non-local) traffic. The growth rates on these roadways have been determined by the City
' of Newport Beach, through regional modelling and historical evaluation procedures. A copy of the City
of Newport Beach Regional Traffic Annual Growth Rate list is provided in Appendix A of this report.
Based on this list,MacArthur Boulevard has a regional growth rate of 3 percent per year within the study
area. No other roadway segments impacted by the project have a regional growth factor.
Committed projects
' For purposes of this analysis, committed projects are those projects that have been approved, but are not
fully occupied, and therefore are not yet impacting the area intersections with their fiill trip generating
' potential. The list of committed projects and their respective level of occupancy as of May, 1994, are
shown on Table 2 and were provided by the City of Newport Beach.
' Traffic to be generated by these projects is added to existing traffic volumes,plus regional growth at area
intersections, to arrive at projected traffic volumes for the analysis year.
t Intersections to be analyzed
Based on review of the project operation, and the likely origins and destinations of the project-related
trips, the following intersections were identified for analysis:
t • MacArthur Boulevard and Campus Drive
• MacArthur Boulevard and Birch Street
' • MacArthur Boulevard and Jamboree Boulevard
• Bristol Street North and Campus Drive
• Bristol Street South and Irvine Boulevard
t • Bristol Street North and Birch Street
• Bristol Street South and Birch Street
• Campus Drive and Dove Street
-8-
1
NOT TO SCALE /
1 /
/ °r
/ e
2/2-
0
O
Sf m
O`O/f S M
1 r
�a
1 ee
o�
P�0
S
1 5
1 a
N
3
1 J
F
Q
' FIGURE 6
PROJECT TRAFFIC - MORNING AND EVENING PEAK HOUR
1
1 =Klmlll�—Ho5rPand Associates. Inc.
9
' TABLE 2
LIST OF APPROVED PROJECTS AND
' OCCUPANCY LEVEL AS OF MAY, 1994
Project Name Occupancy
Civic Plaza 96%
Corporate Plaza 30%
' Newport Place 96%
Valdez 40%
Koll Center Newport No. 1 TPP 0%
' 1400 Dove Street 80%
Koll Center TPP Amend.4A 0%
1 Rosso's Development 65%
Fashion Island#2 0%
' Newporter Resort Expand 0%
28th St. Marina Project 50%
' Pacific Bell Site 0%
Newport Village 0%
' Castaways Marina 0%
Koll Center Carl's Jr. 52%
' Civic Plaza 0%
Corporate Plaza&West 0%
' Harbor Pacific Plaza 0%
Hoag Hospital Extension 0%
' Corporate Plaza West B 0%
Interpretive Center 0%
Pacific Mutual 1601 Avocado 0%
' Newport Diagnostic#85 0%
Alamo Car Rental 0%
' Pao Tel Mini Storage 0%
Four Seasons Addition 0%
' Family Fitness Center 0%
Amendment No. 1 Ford Aero 0%
' Ciosa-Irvine Project 0%
Newport Dunes 0%
' Bayview 0%
City of Irvine Dev. 0%
' 10
' The location of each of these intersections, in relation to the project site, is indicated on Figure 1
(presented previously).
' 1% test
For the 1% Test, the project peak hour trip generation is doubled, to reflect the likely peak 2.5-hour
project traffic generation.
The projected 2.5-hour peak period approach volume for each intersection leg is comprised of the
Existing peak 2.5-hour volume, provided by the City of Newport Beach; plus Regional Growth, where
' appropriate; plus Committed Project traffic.
The project will add 1% of the peak 2.5 hour projected volume at only one intersection— Campus Drive
at Dove Street. The morning peak hour project traffic volume represents 2.3% of the peak 2.5-hour
volume on the southbound approach at this intersection. In accordance with the requirements of the
Traffic Phasing Ordinance, an intersection capacity utilization analysis will be conducted at this
' intersection.
The I% Analysis Worksheets for all analysis intersections are contained in Appendix B of this report.
' ICU Test
' The operation of the intersection of Campus Drive at Dove Street is presented on Table 3 for the
following conditions:
' • Existing Conditions
• Existing plus Regional Growth plus Committed Projects
• Existing plus Regional Growth plus Committed Projects plus Project
TABLE 3
' SUMMARY OF WMRSECTION OPERATION
Intersection: Campus Drive/Dove Street AM Peak Hour PM Peak Hour
' CONDITION ICU LOS ICU LOS
Existing .63 B .65 B
' Existing + Growth + Committed Projects .64 B .68 B
Existing + Growth + Committed Projects + Project .65 B .68 B
' The intersection currently operates at Level of Service "B" (LOS "B") in the morning peak hour, with
an ICU of 0.63, and at LOS "B" in the evening peak hour, with an ICU of 0.65. With the addition of
' regional traffic growth, and traffic from committed projects, the intersection will continue to operate at
LOS "B" in both peak hours, with ICU's of 0.64 and 0.68. The addition of project traffic to the
intersection will not change the intersection level of service. The intersection will continue to operate
' at LOS "B" in both peak hours, with ICU's of 0.65 and 0.68. The ICU worksheet for this intersection
is provided in Appendix C of this report.
' MITIGATIONS
No traffic-related mitigation measures will be required of the proposed National Car Rental Service
' Facility. By application of the 1% Test, the project will impact one intersection (Campus Drive and
Dove Street), and will not cause the intersection to operate at worse than Level of Service "D".
ON-SITE CIRCULATION AND PARHING
' The parking provisions for the site consist of an area for 110 Ready Cars (counting 2 in the drive aisle),
an area for 42 Return Cars (counting 6 in the drive aisles or in the car wash area), and a limited number
' of spaces at the back of the site designated for service, employees, and visitors. The parking areas for
the Ready Cars and the Return Cars are designed such that the cars are parked bumper to bumper, side
by side, and do not allow for circulation between the rows of cars. This area is not intended to be used
' by the general public. Movement of cars into and out of these parking areas will be accomplished by
National Car Rental drivers, only.
' The vehicles depicted on the site plan measure 6 feet wide by 15 feet long. The 15-foot length would
be typical of a compact car; the typical standard passenger vehicle is 18 to 20 feet long. Depending on
the mix of rental vehicle types and sizes on the site, the operator may not be able to fit the number of
' vehicles shown on the site plan in the parking areas. The traffic study addresses the full 164 vehicles,
and represents a worse-case analysis.
' Circulation through the site consists of a single main drive aisle down the middle of the site, and cross
aisles at the front and the back of the site. There are a number of locations on the site where vehicle
circulation appears to be "tight". When the Ready Car and the Return Car parking areas are full,
' circulation around the perimeter of the site will not be possible,and the cross aisles will dead end at three
of the four corners of the site. The cross aisle at the front of the site will only be 20 feet wide, if the
first row of the parking is occupied. This is mitigated by the fact that each aisle is intended to carry
primarily one-way traffic (one way into the site for the Return Car side, and one way out of the site for
the Ready Car side), and that only National Car Rental drivers are intended to drive in these areas.
The double-loaded drive aisle at the back (southwest corner) of the site is also only 20 feet wide. This
' drive aisle will carry two-way traffic, may be used by drivers other than National Car Rental drivers, and
may involve vehicles driven by or for the handicapped. This drive aisle is recommended for
reconfiguration, to provide a minimum of 24 feet, per City of Newport Beach standards. '
tWhen cars leave the car wash, they will be parked in the area immediately outside the car wash to be
dried. This drying area is located in the inbound lane of the main drive aisle. Vehicles destined for the
back of the site will need to cross into the outbound lane to-get by any car in the drying area. While this
is not an ideal design feature, it is assumed that, with the low volume of vehicles expected to access the
back of the site, the potential for conflict at this location will be quite low.
' While many of these circulation features would not provide adequate internal circulation if the site served
customer traffic or the general public, use of the site is expected to be limited to the employees of the
' site, and an occasional visitor.
SITE ACCESS
' The existing use on the site is currently accessed by two right-in-right-out only driveways,located at both
edges of the property. The National Car Rental facility site is proposed to have one right-in-right-out-
only driveway on Campus Drive, located at approximately the center of the project. As shown on the
site plan, the inbound lane is 24 feet wide, and would be equipped with "Tiger Teeth" to prohibit
' -12
' outbound movements. The outbound lane is shown to be 10 feet wide, and controlled with an electronic
gate. A 10-foot raised median divides the inbound and outbound lanes.
' City of Newport Beach Standard Plan 160L indicates that a commercial driveway should be a minimum
of 24 feet wide (12 feet in each direction assumed), or 14 feet if one-way. The 14-foot minimum
requirement allows for movement of emergency vehicles and other large vehicles that may have to service
the site. It is recommended that the outbound lane be widened to a minimum of 14 feet, which could be
accomplished by either moving the raised median over four feet (to the south), which would narrow the
inbound lane, or by narrowing down to the median to six feet. The full 24-foot width on the inbound
lane is not needed, since it is a right-turn-only approach, and will only require one inbound lane.
SUMMARY
' • National Car Rental System, Inc. proposes to relocate an existing service facility to a site on
Campus Drive, south of John Wayne Airport.
' • The facility will house 164 rental cars, and facilities for cleaning,maintaining, and fueling rental
vehicles.
' • The facility will service the National Car Rental leasing operation at the John Wayne Airport.
All customer pick-up and drop-off activity will take place at the airport. "Ready Cars" will be
' exchanged at the airport by National Car Rental drivers for returned cars, which will be brought
back to the service facility to be cleaned and fueled.
• The proposed operation will generate 380 trips per day, with 21 inbound and 16 outbound trips
' in the morning peak hour, and 21 inbound and 20 outbound trips in the evening peak hour.
• The majority of project trips will travel only between the service facility and the airport lot.
• The impact of the project was evaluated by applying the 1% Test, as required by the City's
Traffic Phasing Ordinance. The project would contribute 1% or more of the morning peak 2.5-
' hour period projected volume on the southbound leg of Campus Drive at Dove Street. The
project does not impact any other intersection by 1%.
' • The addition of project traffic would not cause the intersection of Campus Drive and Dove Street
to operate at an unsatisfactory level of service in either the morning or the evening peak hour.
' • The project will not be required to make improvements or modifications to the circulation system
to mitigate project impact.
1
1
' -13-
1
t
1
' APPENDIX A
' CITY OF NEWPORT BEACH
REGIONAL TRAFFIC
ANNUAL GROWTH RATES
1
' CITY OF NEWPORT BEACH
' REGIONAL TRAFFIC ANNUAL GROWTH RATE
I
COAST HIGHWAY
' East city limit to MacArthur Boulevard 2%
MacArthur Boulevard to Jamboree Road 2%
1 Jamboree Road to Newport Boulevard 2%
Newport Boulevard to west city limit 4%
' IRVINE AVENUE
All 2.5%
' JAMBOREE ROAD
Coast Highway to San Joaquin Hills Road 39.
' San Joaquin Hills Road to Bison 2%
Bison to Bristol 15.
' Bristol to Campus 1%
' MACARTHUR BOULEVARD
' Coast Highway to San Joaquin Hills Road 6%
San Joaquin Hills Road to north city limit 3%
NEWPORT BOULEVARD
' Coast Highway to north city limit 100
Street segments not listed are assumed to have O% regional
' growth.
1
1
1
1
1
1
1
1
i
1
1
1
1
i
i APPENDIX B
1% ANALYSIS WORKSHEETS
1
1
i
V
1% Traffic Volume Analysis
Intersection MACARTHUR BOULEVARD/CAMPUS DRIVE
(Existing Traffic Volumes based on Average Winter/Spring 19 92 )AM
' Peak 2h Hour Approved
Approach Existing Regional Projects Projected iX of Projected Protect
Direction Peak 2h Hour Growth Peak 24 Hour Peak 211 Hour Peak 2h Hour Peak 2h Hour
' Volume Volume Volume Volume Volume Volume
Northbound (3y 4yn. I
1525 I92 31"I Ao34 AO O
' Southbound 2924 (�-4N�.1
31,7 G'�� 3935 39
Eastbound 2284 O 8z 23L10 .7`E
' Westbound 911 O 38 949 10
Project Traffic is estimated to be less than 1% of Projected
© Peak 22 Hour Traffic Volume
' ❑ Project Traffic is estimated to be greater than 1% of Projected
Peak 22 Hour Traffic Volume. Intersection Capacity Utilization
' (I.C.U.) Analysis is required.
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
' DATE:
PROJECT:
i
1 .
1% Traffic Volume Analysis
' Intersection MACARTHUR BOULEVARD/CAMPUS DRIVE
(Existing Traffic Volumes based on Average Winter/Spring 9 92 )PM
' .Peak 2h Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Direction Peak 211 Hour Growth Peak 2h Hour Peak 2h Hour Peak 211 Hour Peak 2y Hour
Volume Volume Volume Volume Volume Volume
' Northbound
2365 9R7 'jq8 340 35 i O
South bound (3'°•gyr.-
3581 q49 373 �1�403
Eastbound 1699 O 1 It 171D 17 S
Westbound 2817 O (03 ,1880
' Q Project Traffic is estimated to be less than 1% of Projected
Peak 22 Hour Traffic Volume
' Q Project Traffic is estimated to be greater than 1% of Projected
Peak 2z Hour Traffic Volume.' Intersection Capacity Utilization
(I.C.U.) Analysis is -required.
1
NATIONAL CAR RENTAL SERVICE FACILITY TUNE, 1994
DATE:
' PROJECT:
1% Traffic Volume Analysis
Intersection MACARTHUR BLVD/BIRCH ST
' (Existing Traffic Volumes based on Average Winter/Spring 19 _) AM
' Peak 2h Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Girection Peak 211 Hour. Growth Peak 21. Hour Peak 2k Hour Peak 2k Hour Peak 2h Hour
I I
Volume Volume Volume Volume Volume Volume
Northbound 1569 14,5 IR73 1981 oZD i .Z !�
(37—.a
Southbound 1967 I$3 -20 570 a9 .�
Eastbound 991 0 1121 1119 I I i 0
' Westbound 629 O 50 fn7q y 1
Project Traffic is estimated to be less than 1% of Projected
Peak 2z Hour Traffic Volume
a Project Traffic is estimated to be greater than 1% of Projected
Peak 22 Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U. ) Analysis is .required.
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
' PROJECT:
1% Traffic Volume Analysis
' Intersection MACARTHUR BLVD/BIRCH ST
(Existing Traffic Volumes based on Average Winter/Spring 19 93)PM
' Peak 2h Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Direction Peak 2 Hour Growth Peak 22 Hour Peak 2y Hour Peak 2h Hour Peak 21 Hour
' Volume Volume Volume Volume Volume Volume
(31.-3yrs• 1 �
Northbound 1737 1(0l '111 aC009
Southbound 10 3yra a?7
2121 q 3$5 a704
Eastbound 1182 O 191 13'13 14 i 0
Westbound 1746 o 55 1001 18 1 O
i
' Project Traffic is estimated to be less than 1% of Projected
Q Peak 22 Hour Traffic Volume
' Project Traffic is estimated to be greater than 1% of Projected
Peak 22 Hour Traffic Volume: Intersection Capacity Utilization
' (I.C.U.) Analysis is� required.
1 •
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
PROJECT:
1% Traffic Volume Analysis
Intersection JAMBOREE RD/MACARTHUR BLVD
(Existing Traffic Volumes based on Average Winter/Spring 9 _ AM
Peak 2h Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Direction Peak 211 Hour Growth Peak 2h Hour Peak 2h Hour Peak 2k Hour Peak 2� Hour
Volume Volume Volume Volume Volume Volume
Northbound 2841 472 357(0 3(e 2
South bound (3Y.•3y�• '
' 1166 l08 Io4Y, 132A a3 i 2
Eastbound
3257 qq 1187 145 b
Westbound (116.3yrs•) O
2014 GI `15`E RB�q A8
' a Project Traffic is estimated to be less than 1% of Projected
Peak 22 Hour Traffic Volume
Q Project Traffic is estimated to be greater than 1% of Projected
Peak 22. Hour Traffic Volume. - Intersection Capacity Utilization
(I.C.U.) Analysis is ,required.
1
NATIONAL CAR RENTAL SERVICE FACILITY NNE, 1994
DATE:
I'i ' PROJECT:
1% Traffic Volume Analysis
Intersection JAMBOREE RD/MACARTHUR BLVD
(Existing Traffic Volumes ase on verage Inter pring 9 _ PM
Peak 2k Hour Approved
Approach Existing Regional Projects Projected 1X of Projected Protect
Direction Peak 2k Hour Growth Peak 2k Hour Peak 2k Hour Peak 2k Hour Peak 2k Hour
Volume Volume Volume Volume Volume Volume
' t3V.- rs: a G Northbound 183.1 170 612 o'llul3
' southbound 2876 700 3$43 38 I
I•. -31r6• i O
Eastbound 2208 b7 Q$'T 37,107, 3R
' und �fo O
Westbo
3631 IIO $9l� �637
Project Traffic is estimated to be less than 1% of Projected
Mi Peak 22 Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
Peak 23-2 Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is required.
1
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
' PROJECT: _
1% Traffic Volume Analysis NI5
Intersection BRISTOL STREETJ NORTH/CAMPUS DRIVE
(Existing Traffic Volumes based on Average Winter/Spring 19 92)AM
' Peak 2k Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Direction Peak 2y Hour Growth Peak 2h Hour Peak 21g Hour Peak 2h Hour Peak 2k Hour
Volume Volume Volume Volume Volume Volume
' Northbound 5389 jp7 5�53 55 2�
Southbound 1218 O
' Eastbound _D_
Westbound 2641 0 5 3�90 3a-
Project Traffic is estimated to be less than 1% of Projected
Peak 22 Hour Traffic Volume
a Project Traffic is estimated to be greater than 1% of Projected
Peak 22 Hour Traffic Volume. Intersection Capacity Utilization
('I.C.U. ) Analysis is required.
1
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
' PROJECT:
' 1% Traffic Volume Analysis
2/W
Intersection BRISTOL STREET NORTH/CAMPUS DRIVE
(Existing Traffic Volumes based on Average Winter/Spring 19 _)PM
' Peak 2y Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Direction Peak 211 Hour Growth Peak 211 Hour Peak 2k Hour Peak 2h Hour Peak 2� Hour
Volume Volume Volume Volume Volume Volume
' Northbound 3436 0 30 a44ptp 05 �
Southbound 3569 O 1-20 Z�38 d
Eastbound Q Q O O b
Westbound' 6255 Do`7 191-7
' Project Traffic is estimated to be less than 1% of Projected
Peak 22 Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
Peak 22 Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is required.
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
' PROJECT:
1% Traffic V/gqlume Analysis 5
' Intersection
BRIATOL ST/CAMPUS DR/IRVINE AV
(Existing Traffic Volumes based on Average Winter/Spring 19 L-' )
' Peak 231 Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Direction Peak 2h Hour Growth Peak 22 Hour Peak 2h Hour Peak 22 Hour Peak 2h Hour
Volume Volume VVo`lume �(VVoolgumme Volume Volume
Northbound 3952
' Southbound 991,
Eastbound 6645 10 & 0 7J 10 -73
' Westbound _ _ O
' Project Traffic is estimated to be less than 1% of Projected
Peak 2,- Hour Traffic Volume
' Project Traffic is estimated to be greater than 1% of Projected
Peak 22 Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is. required.
NATIONAL CAR RENTAL SERVICE FACILITY TUNE, 1994
DATE:
PROJECT:
1
1
1 1% Traffic Volume Analysis �Ih
1 Intersection BRISTOL ST/CAMPUS DR-IRVINE AV
(Existing Traffic Volumes based on Average Winter/Spring 19 93)PM
1 Peak 2k Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project I
Direction Peak 2 Hour Growth Peak 2� Hour Peak 2h Hour Peak 2y Hour Peak 2� Hour
Volume Volume Volume Volume Volume i Volume
' I
Northbound 3002 l7 p�/`oL 3`�+'740
1 r
n02823 � at SOIL O
nd 5600 O 590 nd —0— Q © p Q I
1 Project Traffic is estimated to be less than 1% of Projected
Peak 2h Hour Traffic- Volume
1Q Project Traffic is estimated to be greater than 1% of Projected
Peak 2z Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is .required.
1
1
1
1
i
i
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
1 PROJECT:
1% Traffic Volume alysis l�s
Intersection BRISTOL STREET NORTH/BIRCH STREET
(Existing Traffic Volumes ase on verage Inter pring 92 p,1K
' Peak 2$ Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Direction -Peak 2y Hour Growth Peak 2h Hour Peak 211 Hour Peak 2h Hour Peak 2h Hour
Volume Volume Volume Volume Volume Volume
.�
' Northbound 2436 O 5 0�3 ( 0
Southbound 711 O .O
Eastbound O O 0
Westbound
' Project Traffic is estimated to be less than 1% of Projected
Peak 22 Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
Peak 21-,.•Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is required.
' NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
' PROJECF:
' 1% Traffic Volume Analysis
s/W
' Intersection BRISTOL STREET NORTH/BIRCH STREET
(Existing Traffic Vol Uum—e-s--Fa-siT on Average Winter pring 19 _ PM
' Peak 2.11 Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Direction Peak 2 Hour Growth Peak 2h Hour Peak 2k Hour Peak 211 Hour Peak 2h Hour
Volume Volume Volume Volume Volume Volume
Northbound 1192 0
Southbound 2937 �� I
Eastbound _0_ O 0
' Westbound 4532 0 S101 5� D
Project Traffic is estimated to be less than 1% of Projected
Peak 22 Hour Traffic Volume
' Project Traffic is estimated to be greater than 1% of Projected
Peak 2z Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is required.
NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
PROJECT:
1% Traffic Volume Analysis/s
' Intersection BRISTOL ST/BIRCH ST
(Existing Traffic Volumes ase on Average Winter/Spring 19 93)Art
Peak 211 Hour Approved
Approach Existing Regional Projects Projected 1% of Projected Project
Direction Peak 2h Hour Growth Peak 2h Hour Peak 2h Hour Peak 231 Hour Peak 2J, Hour
Volume Volume Volume /Volume Volume Volume
' Northbound 473 D 010 5
South Dun 578 0 at (p� j O
' Eastbound 4336 0 0 $ 04- ' S�
' Westbound - 0 Q O d p
—0—
t Project Traffic is estimated to be less than 1% of Projected
Peak 22 Hour Traffic Volume
' ❑ Project Traffic is estimated to be greater than 1% of Projected
Peak 2z Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is required.
' NATIONAL CAR RENTAL SERVICE FACILITY TUNE, 1994
DATE:
PROJECT:
' 1% Traffic Volume Analysis N�s
Intersection BRISTOL ST/BIRCH ST
(Existing Traffic Volumes based on Average inter Spring 19 93)PM
Peak 2J1 Hour Approved
' Approach Existing Regional Projects Projected 1% of Projected Project I
Direction Peak 2-, Hour Growth Peak 211 Hour Peak 2�i Hour Peak 2+ Hour Peak 2� Hour
Volume Volume Volume Volume Volume Volume
' Northbound 634 40 O
South bound 1336 5 1/39,� n
Eastbound 3982 0 5D3 7 -10J✓ `TS i 0 �
Westbound _0_ 0 0 b O
1
Project Traffic is estimated to be less than 1% of Projected
Peak 22 Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
Peak 22 Hour Traffic Volume. Intersection Capacity Utilization
' (I.C.U.) Analysis is required.
NATIONAL CAR RENTAL SERVICE FACILITY DATE• JUNE, 1994
PROJECT:
FORM I
' 1VED
MY 19 1994
1% Traffic Volume Analysis
Intersection CAMPUS/DOVE
(Existing Traffic Volumes ase on verage Inter pring 19 91 AM
' Peak 211 Hour Approved I
Approach Existing Regional Projects Projected 1% of ProjectedFftak2�
Direction Peak 2k Hour Growth Peak 2h Hour Peak 2�, Hour Peak 2k Hour our
Volume Volume Volume Volume Volume Volu•e
1 i
35 o ji
Northbound 3407 © (DS s �
southbound 1691 O (� 1'55 lB 4 t
I t
Eastbound 29 j O o2 - �
' ' 3
Westbound 122 O 10 ) 59- °�' 1
' Project Traffic is estimated to be less than 1% of Projected
Peak 2z Hour Traffic Volume
Project Traffic is estimated to be greater than 1% of Projected
Peak 22 Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is required.
' NATIONAL CAR RENTAL SERVICE FACILITY JUKE, 1994
DATE:
' PROJECT: c n„ .
' 1% Traffic Volume Analysis
Intersection CAMPUS/DOVE
(Existing Traffic Volumes ase on verage Inter pring 9 91 PM
Peak our Approved
Approach Existing Regional Projects Projected 1� of Projected Project
Direction Peak 24 Hour Growth Peak 2�, Hour Peak 2�S Hour PeaYolumeour ' Peay.Iumeour
Volume Volume Volume Volume
I
' Northbound 1942 n 30 �q 72 oZU
Southbound 3786 O lad 39OS �✓R 4�
' Eastbound 39 i Q pZ 41 1
' ( Westbound 337 _ O
Project Traffic is estimated to be less than 1% of Projected
❑ Peak 22 Hour Traffic Volume
' Project Traffic is estimated to be greater than 1% of Projected
Peak 22 Hour Traffic Volume. Intersection Capacity Utilization
(I.C.U.) Analysis is required.
i
1
1 I
' NATIONAL CAR RENTAL SERVICE FACILITY JUNE, 1994
DATE:
PROJECT: [Horn T
' APPENDIX C
INTERSECTION CAPACITY
' UTILIZATION WORKSHEET
t
• ' CA4220AM
' INTERSECTION CAPACITY UTILIZATION ANALYSIS
INTERSECTION: CAMPUS & DOVE
' EXIST TRAFFIC VOLUMES BASED ON AVERAGE DAILY TRAFFIC WINTER/SPRING
---- --------------1991 AM-
I IEXISTINGIPROPOSEDIEXISTINGIEXISTINGIREGIONALICOMMITTEDI PROJECTED 1PROJECTIPROJECTI
' IMovementl Lanes I Lanes I PK MR I V/C I GROWTH I PROJECT I V/C Ratio IVOLume I V/C I
ICapacitylCapacityl Volume I Ratio I Volume I Volume lw/o Projectl I Ratio I
I I
Volume I I
I I I I I I
I NL 1 1600 1 1 39 1 • 0.026 O---------------------------------------------- -I
I HT 1 1 1415 0 1 a4 I I O 1 1
*`_-__-• • ____•
I--------) 3200 -----------'---'--) 0.51 -- --- 0, 5 a•�---------C•59..i�
I MR 1 1 208 ,I• O 1 10 1 I d l I
--------------------------------------- -------'•-__---•-----I
' 1 SL 1 1600 1 1 121 1 0.081 - 0 1 '7 1 b.0$*1 'go 10.09.X1
--•----- -----------•----------------------------I
1_.sR--------.._I_..-----I-.--6DB I o i 25 1 l p l I
1 -- -- --
3200 --) 0.19 * O:a.0 O•Ab
' 1 sR I 1 10 1 0 1 O 1 l C) l I
1 -------I
I EL ) 1 1 4 ) 1 © 1 O 1 1 0 1 1
' ---------------------------------•----- -------I
1 ET ) 1600 1 1 1 ) 0.01 * 0 1 0 1 O.O I* 1 0 1 0.01*1.
------------•---------------------------------I
' I ER ) 1 1 7 ) l o l l 1 1 p 1 1
------------------I
I WL ) 1 1 14 ) I o I a I I -°- I I
I-------- ------- ------._ --- ---- I
' I WT ) 1600 I I 0 ) 0.03 * 0 1 a I 0.0341 0 1 0.03 1
----------I
I. WR ) 1 1 33 ) 1 O 1 3 1 1 1 I
' --- -------------------------------•---•--- ---• --
1
EXISTING I �1
-'--------------------•-- ---•------------•--- I
' (EXIST'+ REG GROWTH + COMMITTED W/PROPOSED IMPROVEMENTS I.C.U. I o.(p4 1
_-_•-------------------------------I
(EXISTING + COMMITTED + REGIONAL GROWTH + PROJECT I.C.U-----------------------------I ld I
-------------------------------- -----. --------
' Projected + project traffic I.C.U. will be Less than or equal to 0.90
Projected + project traffic I.C.U. will be greater than 0.90
1_I Projected + project traffic I.C.U. w/systems improvement will be
— less than or equal to 0.90
1_1 Projected + project traffic I.C.U. with project improvements will
be less than I.C.U. without project
1 -----------------------------_---_
Description of system improvement:
i
' CA4220PM
' INTERSECTION CAPACITY UTILIZATION ANALYSIS
INTERSECTION: CAMPUS & DOVE
' EXIST TRAFFIC VOLUMES BASED ON AVERAGE DAILY TRAFFIC WINTER/SPRING1991PH
. - _ _ •_-_ •---__- --- -_ - _
I IEXISTINGIPROPOSEDIEXISTINGIEXISTINGIREGIONALICOMMITTEDI PROJECTED 1PROJECTIPROJECTI
' IHovementl Lanes I Lanes I PK HR I V/C I GROWTH I PROJECT I V/C Ratio IVolume I V/C I
I ICapacitylCapacityl Volume I Ratio I Volume I Volume 1w/o Projectl I Ratio I
I I I I I I I I volume I I I
I-------------"---"------"-._.-------------------"-------""---- _-••--_____"_._-I
1600 55
I NT 1 -------------------�I- --Oj� o3 O o3
------------IZ--i-— - I -I
I
3200 "----"--- ) 0.23 ------ -
MR 1 I 68 1 o I 3 I I o 1
-___--_•-------------------------------------I
' I SL 1 1600 1 1 93 1 0.06 1 C9 1 5 1 O.OLo I AO 10.0.7 1
--------------------------------------------------------------I
I ST 1 1 1637 1 O 1 So I 1 0 1 1
l----- --) 3200 ---------i----_-- ) 0.51*---—--I---—---I--os3� I -----I o----
--. ----""•----•"-----"-"-----I
I EL ) 1 1 7 ) 1 0 1 a I 1 0 1 I
-----------------•---------------------------"I
..---... 3 ) 0.01 * I d 1 0. O I k I O I O.OII
ET ) 1600 I I p
' 9 ) I I I I l o l I
WL ) I 1 110 ) 1 6 I to I l o l 1
I-------- ------------------ "-'---' I
' I WT ) 1600 1 1 3 ) 0.10 *-_. O--1 0 1 0 ( 1 of 1 O 1 o. I 1
-------------------------------- I
I 'WR ) 1 1 45 )
' - '--"-'--"'---I
L______•__'__________._'•_•__.___..'._(5.1z _ I
1EXISTING I !1zlr I
I----------------------------------------------------------------------------
' 1EXIST + REG GROWTH + COMMITTED W/PROPOSED IMPROVEMENTS I.C.U. I C)AP j I I
--------------------•_----__-.___-I
1EXISTING + COMMITTED + REGIONAL GROWTH + PROJECT I.C.U. 10.(PE, I
---------------------------------------------------------------------------------------------
' I+ Projected + project traffic will be less then or equal to 0.90
' 1_1 Projected + project traffic I.C.U. will be greater than 0.90
1_1 Projected + project traffic I.C.U. w/systems improvement Will be
' — less than or equal to 0.90
1_1 Projected + project traffic I.C.U. with project improvements will
be less than I.C.U. without project
Description of system improvement:
`- o t6-.:a
TRAFFIC STUDIES cJ
APPLICANT: CONSULTANTS:
NAME: '
I
i
i
PHONE:
PROJECT NAME: DESCRIPTION:
DATE DEPOSIT FEES PAYMENT REMAINING BALANCE
SZ,moo
aEdvrpRr CITY OF NEWPORT B*
Building Department
' S 3300 Newport Blvd.
e. P.O. Box 1768
c�4FoRN`� Newport Beach, CA 92659-1768
(714) 644-3288/3289
PLAN CHECK NO. .
FEE RECEIPTS
Received From lob Address
Building Plan Check - Valuation $ 010-5002 $
Grading Plan Check - Cu. Yds. 010-5004 $
Overtime Plan Check - B G...... ....... .............010-5002/5004 $
Special Inspection............... .......................010-5008 $
Reinspection B E H P.................................010-5008 $
Temporary Electric................ ....... ...............010-4612 $
Temporary Gas...........................................010-4616 $
Grease Interceptor......................................010-4620 $
Planning Department Fees................................010-5000 $
Sale of Maps & Publications.............................010-5812 $
Determination of Unreasonable Hardship..................010-5018 $
Microfilm Copies/Photocopies............................010-5019 $
Hazardous Material Disclosure...........................010-5021 $
X Other /D--VV.3$ Sd, f
4 38.5'1 DO
RECEIVED BY: TOTAL FEES $6
AF 2 81994
NOTICE: Plan Check expires 180 dag aREXANKIMACH I
FEE RECEIPT NO.
Mfeerept9.93>
RC
�250 • +
AS 525 • +
02 '
e.",A775 ° *
5.975 • +
o
00
rzctit;l';r� c%
❑S❑ Kimley-Horn PLANNING DEPARTMENT
® and Associates,Inc. 'TY OF NNIPORT g£A(lk'
JUL 2'/ 199
and ilsassodafeddmsians: AN PM
HufcheonEngineers 7181911001121112r3r IM
Robeds Eagrneering
Urban Resource Group
TIN 56-0885615
CITY OF NEWPORT BEACH PI 7 07� INV . DATE : 06/30/94
INVOICE 0 : 093523
3300 NEWPORT BLVD. PROTECT N : 940801
NEWPORT BEACH, CA 92658-8915
CLIENT REF:
NATIONAL RENT-A-GAR TRAFFIC STUDY PROS . MGR . : SAC
PLEASE REPLY TO \ ! O 36 qa
2100 W. ORANGEWOOD AVENUE
SUITE 140 _
ORANGE, CA 92668
FOR PROFESSIONAL SERVICES
RENDERED THROUGH 06/30/94
TOTAL FEE AUTHORIZED 5, 250 . 00
SPERCENT COMPLETE AS OF 06/30/94 100 . 0OY.
FEE EARNED TO DATE 5,250 . 00
LESS PREVIOUS BILLINGS 3, 675 . 00
---------------
TOTAL THIS INVOICE 1 , 575 . 00
---------------
CURRENT BILLABLE AMOUNT 1 , 575 . 00
---------------
AMOUNT DUE THIS INVOICE 1 ,575 . 00
By
iannh g �i-:,_r r - -
RECGiVED BY
PLANNING DEPARTMENT
Kimley-Horn ::ITY OF NEWPORT BEACH
Kimley-Horn and Associates, Inc. AM J W 21 199.1PM
and its associated divisions: 718191101HI12111213141516
Hutcheon Engineers Q
Urban Resource Group
TIN 56-088561S
CITY OF NEWPORT BEACH (STUD
PIGLAN"" J NV . DATE : 05/31 /94
1J/ NVOICE # : 09328G
3300 NEWPORT BLVD . a� PROJECT # : 940801
NEWPORT BEACH, CA 92658-896� CLIENT REF :
NATIONAL RENT-A-CAR TRAFFIC MGR . : SAC
PLEASE REPLY TO �t
2100 W . ORANGEWOOD AVENUE
SUITE 140
ORANGE, CA 92468
FOR PROFESSIONAL SERVICES
RENDERED THROUGH 05/31 /94
TOTAL FEE AUTHORIZED 5, 250 . 00
PERCENT COMPLETE AS OF 05/31 /94 70 . 00%
FEE EARNED TO DATE 3, 675. 00
LESS PREVIOUS BILLINGS . 00
---------------
TOTAL THIS INVOICE 3, 675 . 00
----------------
CURRENT BILLABLE AMOUNT 3, 675 . 00
---------------
AMOUNT DUE THIS INVOICE 3, 675 . 00
Mij:.Pi KW FOR PA'`i°�3'�'E T
IT
By ( l
• Qn' TUC).:
7
KIMLEY-HORN ORANGE TOL :16714-938-9488 Apr 27i4 15 :54 No .010 P .01
�It�'eir;Y 0 ,t.-t'r'A
Kidgey-Horn and Associates,Inc.
' •' ' N10YY�1Y10,gA,•I•LA.AND i,MPONMFMALCONWITAIM
Zilxl Weft OrenpeAroodAverw».9ulle 1aa,Oranpo,t:nldamio kassa 714D9D-1030 Fex 714938•DeBS
April 27, 1994
" Post-it"brand tax transmittal memo 7671 walpeDee► S
John H. Douglas, AICP ' !. 2-I rom� fAwH4c-y
Planning Department r ` ;; Co.
City of Ne"Qrt Beach Dept'
3300 Newpor(Boulevard l.xk 6h'�lr x►
Newport Beach, CA 92658
Re: proposal to Prepare a Traffic Analysis for Proposed National Car Rental Service Facility on
Campus Drive in the City Of dtlewport
Dear Mr. Douglas:
Thank you for inviting kimley=Morn!and Associates, Inc. to submit this proposal to prepare a traffic
analysis for the proposed National;Car Rental Service Facility on Campus Drive in the City of Newport
Beach. Kimsey-Horn .and Asol@tp has extensive experience in addressing local traffic impact
circulation issues, and we look�foiwkd to this opportunity to woik with the City of Newport Beach.
41T�CATIoNs AND STAFFING
rtiductlon ':.. ;
Kimley-Horn is a national transportation engineering firin founded'in 1967 and ranked among Engineering
NewsRecordis top 20 :transportation firms, We have a staff of approxnnnety 350 in 21 offices
throughout the Southwest and SW4ieik,including the western metropolitan areas of Orange County, San
Diego, Los Angeles, Las Vegas,'.J?h*lx, Dallas, and Denver.
fig,atp Exoertens� ;• ;
Established by transportation planners and traffic operations spe:lallsts, our firm offers a national
reputation for services•to edties;:counties, and other public agencies as well as private-sector clients
working with local agencies. Tti Southern California we have provided transportation services for both
large- and small-scale studies. ;eve - articularly relevant efforts,include.
tt . Rossmoor Bttii(pgss JrepaWes, County of Orange—Provided traffic impact analysis,
parking circulation t'ecommendations,TDM program recommendations,and other project
- specific analysis for 193-acre property located on the Corner of one of the busiest
intersections in;t#e County: Moulton Parkway and El Toro Road.
1r Bolsa Cirica I.Apd 6e.Plan, City of IIuntington'DO WCounty of Orange—Worked
closely.-with City alms County officials and community interest groups to evaluate over
20 alternative development and roadway plans on the controversial Bolsa Chica site,
■ Christ,College Master Plan, City of Irvine — Prepared traffic impact analysis for
• update of the, hrl t College Irvine Master Plan, :'•Update included General Plan
ghefloue • qe er . bn t.euderd•le . Fort MyRc . rate Vopte•'• or.n9e • odeAdo
. • PkaM{x•at4tlp R se you•fluml. Tampa••Vern Dasen.ylronlA Steak•Met Palm Dean
I ,i� '1'i lt,flt re l atia nehl'D} f �a�lyy'T1•aa • 19a7
I'a r .l' •1 '1 �•' - .A x..,.J: { �I�..a�WYPtY ft1 4
KIMLEY—HORN ORANGE TELO714-938-9488 Apr 27,J4 15 :55 No .010 P .02
Mr. John Doll"
2 Aprli'27, 1994
Amendment and,p.Fop4sed rezoning and development Of excess campus property for
residential use..;
AM/PM;; mint-mort,I City of LaIiabra • Prepared a detailed traffic analysis for
conversion Of'at1 Ot.istijig retail corner into an AM/PM Minl-Mart Gas Station. Analysis
included.a gap study, *.study of neighborhood cut-through traffic, and review of on-site
and off-site 0ircttt4tiot constraints,
� Yorba Ydttda Ii',aWllY>Ltttertaittrnent Center, City of Yorba Linda —Conducted traffic
Impact analysis.atul Oxtensivo parking study for a proposal to open a family-oriented
pizza and billiarde'facility in an existing shopping center.
.4N>fftna
J�
We have selected the followingpersonnel from our Orange Countyoffice with the appropriate related
experience in transportation servjces for planning efforts that may ae necessary for this project:
• Serino CiandeV#i.. Ject Manager)
- 8 yes`ts cxpet ca�'
- Traffic raode7�itt8
. Tr ysis
- Env fro o;imentation
- Transportatiori.?De Management
• --V 1
• Susan Rosner (Analy;ls'and Support)
- 4 years experlSgnoe;
- Tr ortatigttlatning
Traffic htiptiostia�ysis
.. pu�atlt Upp„na/M,pltfy [`-n11tfM1, .
Kimloy-Horn has,a detailed QA7QC program that is ingrained into our day-to-day practice. We operate
with a philosophy that our olients deserve the very best service we can provide. Our QA/QC efforts are
t�'
' guided by a•specific ICimley-Horn A/QC manual which is issued to each Kiniley-Horn professional,
utilized in each projeet.undert*n, fad regularly revised/updated.
For this project, the key component of our QA/QC effort will be an in-house review by a senior
professional,not involved in conducting the project. For this project, Kimley-Horn is assigning Herman
Basmaciyan, P.S. to provide ins.louse QA/QC. Mr. liasmaciyan is a senior transportation engineer with
in all aspects of transportation planning.
over 20 years of local experience
ir.
A.
Awl
.'+1'.1.'.1 1!. ., i.. •'!� .1 q.'R����'i... I rXlfw;MM y •
� t
a'' i ...—..—.ter-....-..-...—,r.,-.•.wm—..w l.nr-.u....o,n' .N ln.n
KIMLEY-HORN ORANGE TEL : 11--714-938-9488 Apr 27�4 15 :55 No .010 P .03
3 April 27, 1994
Mr. John Douglas
BACKGROUND & AP,PROA r e
evelop the site as a Service Facility,serving primarily the
National Car Rental System,Inc-proppses to d
Orange County AiMort..i: ? t
•• .:qS 1
The project site Is off-site from.tiie Airport, and is proposed to serve as the cleaning and maintenance
center for the-National vehicles:-'!Car rental customers will typically not come to the site; the cars will
be delivered to and pickcd up froth the airport by National personnel.
The traffic impact study.will 04 to.•address the amount of traffic to be generated by the proposed
on the street system. Since the proposed facility will not function
operation; and its impact
in the same manner as a.typioal cat r facility,trip generation estimator will need to be based, in part,
on practical iWrlence and jutlgttient,
The traffic analysis will be conducted in accordance with the City's Traffic Phasing Ordinance (TPO)
Guidelines. For purposes of this.,proposal; it is assumed the following seven intersections will require
analysis:
MacArthur Boulevard 6 taiiipus Drive
• MacArthur Boulevard. trot
• MacArthur BoulevardIs ore* Road
• Campus Driva jD Bristgl5t North
• Can Drive . Bri6tol'S South
• Birch Street @.P Istoi 5traet�North
Birch Street*�ristol lSt[oo Isouth
SCOPE OF SERVICES
The fallowltlg tasks ar4 envisl0;ri�d for this project:
1. Conduct a site Visit ofl.the proposed site.
a i
2. Meet with Cl
tystaff to d�cass the relevant issues surrounding the proposal, and to obtain traffic
,
counts and any other materials or documentation available. Reach concurrence on final list of
analysis locatigPs, Snit-tprjach to analysis.
3. Review traffic`Counts and cQuate for reasonableness and accuracy,
4. Observe traffic.flow acid traffic patterns on the affected streets.
5, Bsti;matc the amount oftraftAc to be generated by the proposed prq{ect, and distribution of the
project traffic on the AM street system.
;A.. {
6. Determine if project tµgpts !% criteria at any intersection, and if further analysis is necessary.
A! ,I •K• A
Vq
.•:oi. :a•:, •. .• tA�•. . ..i• ^Y .1 ' 'i- . .f !j!s. 40iYw,t, v •sy ,
KIMLEY—HORN ORRNGE TEL 714-938-9488 Rpr 27•'94 15 :56 No .010 P .04
v
4 April 27, 1994
Mr. John Douglas
7. Identify the projgot ImpA •fto tcsult from the proposed project.
1� 1
8, If necessary, identify the!{litigation measures necessary tb address the impacts.
9. Present the fmdiilgs of do;anlilysis in a report,
The scope of•services does not i'J CIude attendance at any public meetings. If attendance at meetings is
required, they will be blilcd on,a titlle-and-materials basis, in accordance with the Khnley-Horn and
Associates hourly Billirw Rate Schedule in effect at the time.
sCHEAIJLE
We are prepared to bcgln workiitlt pl le our on analysis rwith wipt Of ithin two-ttoothree-we to ek tlmetTFollowing
receipt
A draft
of all necessary. data, we will Fo{nplpte
report will be submitted to you.for ypur review and comtnent.
1
TEE
This estimate assumes that the City of Newport Beach will provide all necessary traffic data and further
data collection by Kimley-Horh.'wit l not be required for analysis of the previously identified seven
locations. A breakdown of IN cost,estimate is provided for your information,
Estimated
Projeet Start-Tip • $600 00
Existing Conditions Ab AYS10 550.00
Project Trip Generat1q. ls�rlbutlon Estimates 850.00
9b Analysis . 550.00
1
l,200.00'
Project Impact and Mitigation
Report Preparation• —LIMA
$5,250.00
KHA proposes to con)plete the�tasks outlined above for a lump sum fee of$ 5,250,00.
The proposed fee includes labor fees, plus an amount to cover certain direct expenses for the project
which would included in-house duplicating, facsimile, local mileage, telephone, postage, in-house
blueprinting, and word procesi.W 4gmputer. As necessary, additional services will be,provided for an
additional fee based on curre4 hourly rates plus direct expenses at a 1.10 multiplier, Billings will be
issued on the basis of,percent pmOWO, and will be due and payable within 30 days of invoicing.
•f:i• 1':,aY• . 1 .j :} 1411
..ate , •. .+ yob„�+x.�w..:�!ec'.MIn,C}!4L'Ywd�l2t11Sl;f:d11
KIMLEY—HORN ORRNuE H1 714-938-9488 Rpr 27'94 15 :57 No .010 P .05
i 5 April 27, 1994
Mr. John Douglas
CLOSURE
In addition to the matters,set forth,herefn, our agreement shall include and shall be subject to the attached
Standard provisions. Tho term"'the client" as used in the attached-Standard Provisions shall refer to The
City of Newpprt Beach.' °"' '
If you concur in the foregoing Add wish to direct us to proceed with the Scope outlined, please execute
the enclosed copy of this letter agreement in the space provided, and roturn to our offices. Fees and
times stated in this agreement are valid for thirty (30) days after the date of this letter.
We appreciate this opportunity toyorktwith the City of Newport Beach, and look forward to a successful
project, Please call if you hava:�tty
sincerely,
KIMLEY•HORN AND ASSOCIATES, Inc.
Serino Ciandella
Project Manager
SAC.Pm i
Natkar pro10404pro
cc: Rich Edmonton, Traffic AQ$.ln0P ng —
Attachment: standard Provisipiui
I 1994
Agreed to this day ol',.,
City'ofNow rtBeach `s
ssoCWrc 4A'K)lj
printed Namo',and Titlb:i V
Iq YS.
... .. . :.f T. .t •v.i ..
' e ��i , ><. . .:,.. ... Hai nsrny' _. _ Mt+,.:_4��j,S�dllilkt�iii•t�l•I�I IEi•Itiuill�
PURE E ORDER / PAGE 1
o�a�WPoRm CITY OF NE�PORT BEACH PURCHASE ORDER
3300 NEWPORT BOULEVARD
u P.O. BOX1768 w•tl,.,,a„rt. 11., 1; .
'°" NEWPORT BEACH, CALIFORNIA 92659-8915 =i
1FOa�`� PHONE: (714) 644-3118
pURCH.ORDER DATE I PATE REQUIRED REQUISITION NO. VENDOR N0. DESCRIPTION
(15/02/94 0974 1TTT; : SI:RINE CI.ANDELLA
VENDOR I:IMLEY-ITOIIN and ,ASSOCIATES. INC. rHQIPCITY OF uEwPORT BEACH
2100 W. ORANGEIVOOD AVENUEPLANNIING DEPARTMENT
SUITE 140 3300 NiEQPOPT RLVD.
ORANGE, CA 92698 NMa IPORT BEACH. CALIF, 9266:1
CONFIRM. 113LANKET I FINAL PAYMENTTERMS FREIGHT
NI NI NET 30 DAYS 1 1I/11
QUANTITY UNIT OF MEASURE COMMODITY CODE UNIT PRICE EXTENSION
PROVIDE. TRAFFIC IMPACT STUDY FOR THE PROPOSED
NATIONAL CAR RENTAL SERVICE FACILITY TO BE LOCATED
ON CAMPUS DRIVE ITI NrIVPORT BEACH, PER YOUR PROPOSAL
DATED 4/27/94. (T9897)
CONTACT: JOHN OxITt*t,AS - -PLANNING DfPART1,1ENT
(-714) �44-3725
1 .00 STUDS' 4:1 Q r,.kl; tiut , Ytt0056.110
ITEM NO,001 TRAFFIC STttIT}Y 8.1, DV;1:fIITBVTf kPOVE 14,`
I
TOTAL PURCHASE ORDER 5. 250.00
ORGANIZATION ACCOUNT PROJECT r PROJECT ACCOUNT AMOUNT
010 2300 5125000
TOTAL PURCHASE ORDER 5,250:00
AC'SCE Muplanmulthisordorbys"IleCvendornlI baby uctnpladgnmvntorbydalivewinwholnnrin pan olfho du"'
called lorhernundm / 1y�7�`J�/ /1" 1 �•,r
n:dcwphn�Ihluardeglh+:nllarrventlor nctnowindn•'Slhgt hn hw n�ad and,gmes to All brats and cond,hOnS including thastpnnmdonihnnenann J"Jy 1-I'l.i '! i - •
♦dnnlrhaCodretTur,.hvoOlder Thaool y mrmx and eonddlamthat wdl at ppp11m411 to thnavr,r,14.ra oft his Contr11t.1 tho'u>sued by fin
City olNwpgn BndcM1 BY
IMPORTANT CITY OF NEWPORT BEACH
GENERAL TERMS AND CONDITIONS ON THE REVERSE SIDE ARE INCORPORATED HEREIN.
The Adlcica covcred by this Purcha^o Ordcr or Contract must conform to applicable CA-OSHA Standards,andror other appropriate laws,regulations,rulec,and code of Federal Govemmcnl and the StAo of California Show
.9q A copemtc Itom any MIDI solos lax,use tax or Federal lux applicable to this parahISO This order subject to California sales tax All OUT-OF-STATE VENDORS:the CITY will pay any snlesavao tax on all purchases
l shipped from out-ofotalo.All purchoses and transpodall n charges are exempt from Federal exeNo lax NOTE:All purchases are F O B doctinabon uniuss athomil aathonzod Charges for ah pmorAS are to be height
prrpnld and added to ihoml(shown as a-,pando arm)whore so outheezcd Da not include Federal tramportauon ta<A Newport Beach business license may be required to conduct business in the City.
ORIGINATOR'S/DEPARTMENTAL COPY I
PURCHASE ;ter CITY OF awwaogr
REQUISITION NEWPORT BEACH
�! Gueoa``r
P.O.No.: Date: April 29. 1994
(if Reserved) Dept:
S, ggested Vendor: Ship To:
IC MLEY-HORN and Associates; Inc,
A'00 W. OranOwood.Ave-, , Suite 140_.- _
Orange CA 92668 -
Attention: Phone No:
Quantity Description of Articles or Services Required Unit Price Amount Budget#�
1 Tyaffic Study a for 5250.00 5250A0 010-2300
National Car Rental Service, Cam us Dr.
TS 97 .
r ,
Comments: Sub Total
Tax
Total
Date Required: F.O.B. Terms
Code Amount
PRO (Department Head or person aWhorlztd to execute requisitions
PURCHASING MANAGER
FINANCE DIRECTOR(Approval required for purchases exoceding$4000)
U
z
W
a
a
J
200.00,
�S
_ - ---- ° -- ° --O -
_ Z
_ � Q
F_
1EMPTEES, - 10 I 'VISITORS 4 S VIC - 5 (1)
• cc
REFUSE _ V
o z
U O
F z
° u q J
I c
SERVICE - 7 F >
uj
10:)'-O" 20'-0" L 42'-0" L 38'-O" U V
a p
I'� I W a
�! SERVICE
I EQ. HZZ o
PARKING GAL:GIJLATIONS
op
s 06
( 0A O ffm
EMPLOYEE PARKING 10 SPACES E GAR WASH U. (n
VISITOR PARKING 4 SPACES + i r
T ;c' O W ym
SERVICE CARS 12 SPACES I ,� j` ( u w
N CARS 42 SPACES i, T I �1 0 U In H z
RETUR ( �, I I -� ° � N q a
READY CARS 110 SPACES _
i ' I ADMIN I r ^ rx u V d W
TOTAL CAPACITY 100 SPACES - J
° o z UU
I II L — —
I � I Lu
� p
0.
� a zz
�1/G FUEL TAN U
I '
z
�D�.ISI� eXISTG �1� ( ° Q O w
IN EN11RE`CY (TYP CA ( f I Q Q m
ARE DIA&RAMkTIG O►�1L`� Y C S I E� N C 5 0 0
110 AGE 42 AG V � d w
I U
T(PaL SI DE AND REAR
PPOPERTM UPE F:aw-A v.
(ol•dI TALL-GRAIN UNr, I
WITH VINYL. SLATS 1
z Q
SH 6- ED M NAI.DE FfXpNReS I - - - > ❑
TO �•Ol`TA 6 GA 5. W Oo
FFOPEP-lyUNE, FINAL DESIGN
- J ELEG. GAME MA> T4M -
ro cannR,E wl� wd s Q
TEETH �•,
(�I,p��OF� � �6 G(1�GllVf•5.. 0. . . -DECCRATiVE NDSG>�PED AREA Q
• LANDSCAPED AREA " 11 MASONRY WALL ' I,
REWlZKsIPEMAtAj AV,►.FAVIWoo RoW, I , I
I)T1U11E5,ETC AG FIFa0. PRa><iDE - -0 10-0 24-0 _—__-�b-o — E--
WW GF-N11�AL GUf�6 CVT�pRNE- _
AISLE- 200.00 I
1 NI=W NVDfA IIM,�1T SIGN 1
1CL
{ 1 ISSUE DATES 6 REVISIONS
PRELIM. 3/9/94
PRELIM. 3/24/94
PRELIM 3/28/94
`W
PROPU�Et7 51N6 FLEX 566E /+ cOffia IT CAMPUS DRIVE - 601 R/W
S koN ATOP 21-o 'TALI. RASE CMAIA) z
(SELF 1LL.0.AVrrr.A,IM' LAY) W
gin
U
z
NC94107SD1
W DRAWN 9r
_ a a
CALLED SITE PLAN O CHECKED
NORTH SCALE 1":20' J
.► '' • m ti Y
_�„-,'� � SITE` PLAN
.� r _ DATr63L
Z0
..
roe No 94107
HMO ==19
Ai sm. O
r
I�
w
2 4'-O" 42'-0" 34'-0" a
. a
_ o
4'-O" 0'-O" 12'-O" - J
-- Y
_ - 4 = Q
rq
LIGHT FIXTURE
' — - SEE ELECT'L DWG5.
-- r?� o 0
---- "----- --_-- - - - — WALL LOWER cc
-_�._--- ---- + SEE MECHANICAL DWG5.
---Y ( --1o'X1o' F15 ERG LA55 OHD ' _ 4 •
_ I
1H. FL. EL. 100'-0" �; o. SERVICE o O
p
n I
(�l z
fIREFIN. IN5IJL. METAL _ _ x — - - Q Q
J
41-
SECTIONAL DOOR Q Q 4 PARTS / �� ,II1i, il_,,
W
(, EQUIPM. Q W
SOUTH ELEVATION, I � r - V / \ - /� �'W
''�, _SCALE 1/0 .1-O (am Q
_O
1'-O' 0 13'-4° oiI 16'-0" b' If _0�� o '-O" f-
Lu
;1
' U c
0"X16" SCORED STANDARD Q WASH BA7 �
— (--- FACE C.M.U. c.U. Q
----_- - — -- _ b"XI b" SPLIT FACED 4 _ A
-- 4 WATER-REPELLENT C.M.U. v 4 4
--- — 0"X1b" SCORED GROUND FACED 'OATS = v
Ua� ° CONN AS G�COLOCRM� OF v ELEG. GENERAL r �I�IOMEN C
_ 0"X16" SPLIT FACED OFFICE
� l W
_ -- — WATER-REPELLENT CMJJ. - I Lo
w U
0"X16" SCORED STANDARD / I I Z
_ FACE C.M.U. r T. COPY
-- 4 z
Y Q /MEN - W
rL Ion I
—i- — -, -- ►- -1 -,- -r-- 1— — J \ ,
4 - (j Q
i~7 _ BREAK RM. I CANOPY LINE ABOVE z O❑
NORTH ELEVATION 4 � � MANAGER q = � �' �
w o
XC ALE 1/0":1'-0" G � a LL
IO[ID r_1 <
4 4 Y. 1J
LIGHT FIXTURE_ SEE ELEC'IL Z Q CIO
PLANS _ fiullL O ��
1_ 1_ II 1_ 1_ 1i 1_ II 1_ 11 1_ II 1_ 11 1_ 10. _ 11 1_ 11 �_ V/ h a-
PREFIN. METAL GRAVEL STOP 0 4 0 0 3 4 3 0 4 0 3 0 3 4 0 411 O" 4 0 0 Q
_ w
I L Z
4'-0 11 I 42'-011 1 4'-O" 15'-0" 11-911 1'-9" 12'-0 11 .0
IF III
0"X16" SCORED GROUND FACED = d
WATER-REPELLENT CMJ.J. OF Q O
CONTRASTING COLOR n (�
---- 0"X1b" SPLIT FACED I
-- — WATER-REPELLENT C.M.U.
CLEAR ANODIZEDALLMINLM L - - - - - - - - - - - - _J Q
WINDOWS WITH INSLL. GRAY z
SOLAR GLAZING (MEDIUM) Q d
W
— _ — — — — — — --- — — — -� — STONE SILL. TYPL J ❑
ALLMINLM ENTRANCE U
r�
CALLED FLOOR PLAN
NEST ELEVATION NOTE: 4 NORTH SCALE 1/0":1'-O" I I Un
ALL EXTERIOR C.M.U. TO BE 'L 20.000 GALLON ~ Q
SCALE 1/0".1'-O" FACTORY TREATED WITH
WATER-REPELLANT. U/G FUEL STORAGE TANK U
w
2
QISSUE DATES&REVISIONS
od PRELIM. 3/9/94
PRELIM. 3124/94
LIGHT Fl XTLRE51, SEE ELECL
PLANS 7'-O" 10'-O" 7'-O" 14'-O" PRELIM. 3/28/94
14'-O" W
PREFIN. METAL GRAVEL STOP PREFIN15HED METAL PREFIN15HED METAL w
GRAVEL STOP GRAVEL STOP z
0"X16" SCORED STANDARD LIGHT 12IXTLRF-5 LIGHT FIXTLRES
z
_— - FACED CM.U• SEE ELECL PLANS SEE ELECL PLANS "v w
_—`-- 0"X16" SCORED GROUND PACED
WATER-REPELLANT CMJJ. OF PREFINISHED METAL PREFINISHED METAL
CONTRASTING COLOR FASCIA PANEL FASCIA PANEL
U
z
STEEL COLLMNS 4 STEEL COLLMNS Q db. NC94107A1
_ 0"X1 b" SPLIT FACED FIELD PAINT 2 COATS FIELD PAINT 2 COATS cc
WATER-REPELLENT CM1J. W DRAWN BY
FL. EL. 100'-O"
a CHECKED
CONCRETE FUEL ISLAND CONCRETE FUEL 15LAND Y
ADM IN/SERVICE AN
0
°d FUEL ISLAND PLAN
Q AND ELEVATIONS
FAST ELEVATION + SOUTH ELEVATION CANOPY WEST ELEVATION CANOPY
SCALE 1/0":1'-O" SCALE 1/0":1'-O" SCALE 1/5":1'-0" �.- 94107
ti � JOB NO
m
z �
o U
SH. OF
t