Loading...
HomeMy WebLinkAbout05 - Corona del Mar Fire Station No.5/Library Replacement — Notice of Completion for Contract No. 8136-2 (15F12)PORT CITY OF O � _ i NEWPORT BEACH City Council Staff Report <i FO RN December 10, 2019 Agenda Item No. 5 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Peter Tauscher, Senior Civil Engineer, ptauscher@newportbeachca.gov PHONE: 949-644-3316 TITLE: Corona del Mar Fire Station No.5/1-ibrary Replacement — Notice of Completion for Contract No. 8136-2 (15F12) ABSTRACT: On February 27, 2018, the City Council awarded Contract No. 8136-2, Corona del Mar Fire Station No.5/1-ibrary Replacement project, to TELACU Construction Management, Inc. (TELACU) of Orange, California. The work has now been completed and staff requests City Council acceptance and closeout of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after Notice of Completion has been recorded in accordance with applicable portions of the Civil Code; and c) Release the Faithful Performance Bond one year after acceptance by the City Council. FUNDING REQUIREMENTS: The adopted budget included sufficient funding for this project. The construction contract was expensed from the following account within the budget: Account Description Account Number Amount FFP: Fire Stations 53201-980000-15F12 $ 6,732,398.71 $ 6,732,398.71 5-1 Corona del Mar Fire Station No.5/Library Replacement — Notice of Completion for Contract No. 8136-2 (15F12) December 10, 2019 Page 2 DISCUSSION: Award Final Cost at Contingency Actual % Due to % Due to Contract Completion Allowance Contract Directed Unforeseen Amount $ 6,732,398.71 Chane Chane Change $ 6,724,186.00 $6,732,398.71 8% or less 0.1% 0.0% 0.5% Allowed Contract Time 16 Actual Time (days) months Under - or Over(+)+39 The work necessary for the completion of this contract consisted of demolishing two existing buildings; surveying; grading the site; pouring foundations; constructing a combination fire station and branch library; landscaping the site; and installing/coordinating with utilities. The Corona del Mar Fire Station No-5/Library Replacement construction contract was awarded to TELACU on February 27, 2018 with a Notice to Proceed date of April 16, 2018. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the construction contract cost is as follows: Original Bid Amount: $ 6,724,186.00 Actual Cost of Bid Items Constructed: $ 6,724,186.00 Total Change Orders: $ 33,212.71 Liquidated Damages: $ -25,000.00 Final Contract Cost: $ 6,732,398.71 The final construction contract cost was less than one percent over the original bid contract amount. Staff issued five change orders that amounted to $8,212.71. The change orders stemmed from unforeseen issues affecting various trades. The most significant change order was a credit for unused FF&E allowance for library furniture. A summary of the project schedule is as follows: Estimated Completion Date per 2019 Baseline Schedule: August 23, 2019 Project Award for Construction: February 27, 2018 Contract Completion Date with Approved Extensions: August 19, 2019 Actual Substantial Construction Completion Date: October 11, 2019 Completion of this project was delayed beyond the original scheduled completion date for a number of reasons. Some of these delays are accounted for due to events such as weather or manufacture material delays (last winter was a very wet year with above normal rain days), while others were due to sub -contractor underperformance and non -excused schedule slippage. 5-2 Corona del Mar Fire Station No.5/Library Replacement — Notice of Completion for Contract No. 8136-2 (15F12) December 10, 2019 Page 3 Understanding there is currently a very tight labor market, and corresponding very high level of work and product demand, and after generally a very smooth performing project, TELACU struggled near the end to get a few of their sub -contractors to perform (particularly in the millwork and finish carpentry areas). As such, even with the good faith effort by TELACU to finish contracted work, staff determined it was appropriate to assess $25,000 in liquidated damages for project delays (liquidated damages for this construction contract are defined at $2,500 per day). The primary intent of the liquidated damages was not to punish TELACU, but rather compensate the City for damages related to not completing the construction on time. Damages for this project involved covering all the costs related to maintaining a temporary fire station, extending consultant construction services and staff time required to manage the project. The project was deemed substantially complete as of October 11, 2019, with all building and site improvements completed and operational. Some miscellaneous close-out items, operation and maintenance turnover, and financial paperwork post -substantial completion still remained and have since been finalized prior to this Notice of Completion action. ENVIRONMENTAL REVIEW: On February 27, 2018, City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15302 (Replacement or Reconstruction) of the CEQA Guidelines. This exemption covers the replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structures replaced and will have substantially the same purpose and capacity of the structure replaced. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). In addition, the City Clerk will be filing a Notice of Completion for the project as a result of this action. ATTACHMENT: Attachment A — Project Location Map 5-3 Attachment A Not To Scale Project Limits FIRE STATION N0.5 /LIBRARY REPLACEMENT CITY OF NEWPORT BEACH LOCATION MAP PUBLIC WORKS DEPARTMENT C-8136-2 � 12/10/19 5-4