Loading...
HomeMy WebLinkAboutX2019-2139 - MiscControl Air Conditioning Corporation 5200 E La Palma Avenue, Anaheim, CA 92807 Phone (714)777-8600 Fax (714) 777-3293 License Number 369439: C-20, C-36, C-38 CACC Job #: 102-19-0084 1(2019 -2139 660 Newpor6 Cenkf Dr- Control r Test and Balance Report Project Name: MOBILTE #200 Address: 660 NEWPORT CENTER DRIVE Suite/Floor: 200 City: NEWPORT BEACH Date: 12/13/2019 Technician: CARTER SNOWDEN Control Conditioning Corporation AIR BALANCE REPORT 5200 E . Palma Avenue, Anaheim, CA 92807 ,Phone (714) :.,1 Fax (714) 777-3293 ., ..• ,. STATE OF CALIFORNIA MECHANICAL CEG-NRCI-MCH-01-E (Revised 01116) f k CALIFORNIA ENERGY COMMISSION CERTIFICATE OF INSTALLATION NRCI-MCH-01-E Mechanical (Page 2 of 2) Project Name: Mobilitie #200 @ 660 NCD Enforcement Agency: Permit Number: Address: 660 Newport Center Drive 200 City Newport Beach Zip Code: 92660 Document Title or Description Applicable Sheets or Pages, Tables, Schedules, etc. Date Approved By the Enforcement Agency Doc�entation Author Signature: l/J`i'yrf'IrSrnl �J Documentation Author Company Name: - Date Signed: Control Air Conditioning Corporation 8/16/19 Address: CEA/ HERS Certification Identification (If applicable): DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Installation documentation is accurate and complete. DocyOnentation Au or Nme' Doc�entation Author Signature: l/J`i'yrf'IrSrnl �J Documentation Author Company Name: - Date Signed: Control Air Conditioning Corporation 8/16/19 Address: CEA/ HERS Certification Identification (If applicable): 5200 E. La Palma Avenue Not Applicable City/State/Zip: Phone: Anaheim, CA 92807 (714) 777-8600 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify that this Certificate of Installation documentation is accurate and complete. 1. The information provided on this Certificate of Installation is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility forthe system design, construction, or installation of features, materials, components, or manufactured devices forthe scope of work identified on this Certificate of Installation and attest to the declarations in this statement (responsible builder/installer), otherwise I am an authorized representative of the responsible builder/installer. 3. The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations, and the installation conforms to the requirements given on the plans and specifications approved by the enforcement agency. 4. 1 reviewed a copy of the Certificate of Compliance approved by the enforcement agency that identifies the specific requirements for the scope of construction or installation identified on this Certificate of Installation, and I have ensured that the requirements that apply to the construction or installation have been met. S. 1 will ensure that a completed signed copy of this Certificate Of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Responsible Builde staller Signature: Company Name: (Installing Subcontractor or General Contractor or Position With Company I e : Builder/Owner) Control Air ConditioningCorporation Foreman Address: CSLB License: 5200 E. La Palma Avenue 369439 City/State/Zip: Phone: Date Signed: Anaheim, CA 92807 (714)777-8600 8/16/19 CA Building Energy Efficiency Standards- 2016 Nonresidential Compliance June January 2016 STATE OF CALIFORNIA MECHANICAL CEC-NRCI-MCH-W-E (Revised 01116) �y CALIFORNIA ENERGY COMMISSION CERTIFICATE OF INSTALLATION NRCI-MCH-01-E Mechanical (Page 1 of 2) Project Name: Mobilitie #200 @ 660 NCD Enforcement Agency: Permit Number: Address: 660 Newport Center Drive 200 City Newport Beach Zip Code: 92660 A. GENERAL INFORMATION DATE OF BUILDING PERMIT In the table below identify all applicable construction documents that specify the features, materials, components, manufactured devices, or system performance diagn ostic results required for the scope of responsibility for this Installation Certificate. BUILDING TYPE Applicable Sheets or Pages, Tables, Schedules, etc. PHASE OF CONSTRUCTION If more than one person has responsibility for building construction, each person shall prepare and sign an Installation Certificate document applicable to the portion of construction for which they are responsible; alternatively, the person with chief responsibility for construction shall prepare and sign the Installation Certificate documents) for the entire construction. B. SCOPE OF RESPONSIBILITY Date of approval by the enforcement agency of the Certificate of Compliance that provides the specifications for this Installation Certificate. In the table below identify all applicable construction documents that specify the features, materials, components, manufactured devices, or system performance diagn ostic results required for the scope of responsibility for this Installation Certificate. Document Title or Description Applicable Sheets or Pages, Tables, Schedules, etc. Date Approved By the Enforcement Agency No Mechanical Acceptance Forms Required CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance June January 2016