HomeMy WebLinkAbout09 - Concrete Street Pavement Reconstruction — Award of Contract No. 7184-2 (18R21)Q SEW Pp�T
CITY OF
z NEWPORT BEACH
c�<,FORN'P City Council Staff Report
January 14, 2020
Agenda Item No. 9
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
PREPARED BY: Patricia Kharazmi, Assistant Civil Engineer,
pkharazmi@newportbeachca.gov
PHONE: 949-644-3344
TITLE: Concrete Street Pavement Reconstruction (Anade Avenue, Montero
Avenue, Alvarado Place, and 6t" Street) — Award of Contract
No. 7184-2 (18R21)
ABSTRACT:
Staff has received construction bids for the Concrete Street Pavement Reconstruction
project and requests City Council's approval to award the construction contract to
Aramexx Group, Inc. dba Aramexx Construction (Aramexx Construction). This project
will reconstruct the deteriorated concrete pavement on Anade Avenue, Montero Avenue,
and Alvarado Place from Bay Avenue to Edgewater Avenue and 6t" Street from Balboa
Boulevard to Bay Avenue; construct new storm drain systems on Anade Avenue, Montero
Avenue, and Alvarado Place; and construct new landscaped parkways on Anade Avenue
and Montero Avenue.
RECOMMENDATIONS:
a) Find this project exempt from the California Environmental Quality Act (CEQA)
pursuant to Section 15301(b)(c) Class 1, (maintenance of existing public facilities
involving negligible or no expansion of use), of the CEQA Guidelines, because this
project has no potential to have a significant effect on the environment;
b) Approve the project plans and specifications;
c) Award Contract No. 7184-2 to Aramexx Construction, for the total bid price of
$1,369,708.00, and authorize the Mayor and City Clerk to execute the contract;
d) Establish a contingency of $137,000.00 (approximately 10 percent of total bid) to
cover the cost of unforeseen work not included in the original contract; and
e) Approve Budget Amendment No. 20BA-025 transferring appropriations of
$185,776.70 from the Bison Avenue Pavement Rehabilitation Project (No. 12201-
980000-19R21) to the Concrete Street Repair Project (Account No. 12201-980000-
18R21) within the Measure M fund.
9-1
Concrete Street Pavement Reconstruction (Anade Avenue, Montero Avenue,
Alvarado Place, and 6th Street) — Award of Contract No. 7184-2 (18R21)
January 14, 2020
Page 2
FUNDING REQUIREMENTS:
Upon approval of the proposed budget amendment, sufficient funding is available from
the current project Capital Improvement Program budget for the award of this contract.
The recommended Budget Amendment transfers $185,776.70 of appropriations from the
current Bison/San Joaquin Hills Rd pavement rehabilitation project (Account No. 12201-
980000-19R21) to the Concrete Street Reconstruction project (Account No. 12201-
980000-18R21) within the Measure M Fair Share fund.
Per staff report dated November 19, 2019 awarding contract C-7433-2 for the Bison
Avenue Pavement Rehabilitation Project (19R21), the low bid was approximately
$300,000 or 10.6 percent below the engineer's estimate. Additionally, as described in
further detail in the staff report for Notice of Completion on contract C-7183-2 for the
McArthur Boulevard Pavement Rehabilitation Project (18R23) on the Consent Agenda for
this January 14, 2020 meeting, a short segment of roadway on Bison Avenue was added
to the MacArthur project. Staff moved this small portion of work to avoid impacting the
busy intersection of MacArthur Boulevard and Bison Avenue twice and to streamline
Caltrans permitting. As a result of these two items, the City recognized significant cost
savings on the Bison project while still completing all planned work.
The project sources are as follows:
Account Description
General Fund
Gas Tax
Measure M Fair Share
Proposed fund uses are as follows:
\/Pnrinr
Aramexx Construction
Aramexx Construction
American Geotechnical, Inc.
Various
Account Number
Amount
01201927-980000-18R21
$
299,445.40
12101-980000-18R21
$
533,277.90
12201-980000-18R21
$
717,276.70
Total:
$
1,550,000.00
Purpose
Amount
Construction Contract
$
1,369,708.00
Construction Contingency
$
137,000.00
Materials Testing
$
38,240.00
Printing & Incidentals
$
5,052.00
Total:
$
1,550,000.00
Staff recommends establishing $137,000.00 (approximately 10 percent of total bid) for
contingency purposes and unforeseen conditions associated with construction.
9-2
Concrete Street Pavement Reconstruction (Anade Avenue, Montero Avenue,
Alvarado Place, and 6th Street) — Award of Contract No. 7184-2 (18R21)
January 14, 2020
Page 3
DISCUSSION:
At 10 a.m. on December 17, 2019, the City Clerk opened and read the bids for this project:
The City received 10 bids for this project. The low bid was 8.7 percent below the
Engineer's Estimate of $1,500,000.00. The low bidder, Aramexx Construction,
possesses a California State Contractor's License Classification "A", as required by the
project specifications. A review of references for Aramexx Construction shows
satisfactory completion of similar contracts for other municipalities.
The proposed project includes removing and reconstructing the deteriorated concrete
pavement, driveway and alley approaches, sidewalks, curbs, cross gutters, and curb
ramps; constructing three new storm drain systems, including new catch basins, junction
structures, and storm drain cleanouts; performing parkway improvements; adjusting utility
boxes to grade; and restriping the concrete pavement.
As part of the City's Pavement Management Program, several concrete streets (Anade
Avenue, Montero Avenue, Alvarado Place, and 61" Street) in the Central Balboa Peninsula
area were scheduled for reconstruction in Fiscal Year 2019-20. These concrete streets,
originally constructed around 1916, have reached the end of their useful life and are in
need of replacement. Unlike typical streets, portions of the existing sidewalk on Anade
Avenue and Montero Avenue are below the top of curb, which creates drainage issues.
The proposed improvements will raise the sidewalks to eliminate this condition and
improve the street drainage. In addition to street reconstruction, this project involves
parkway beautification on Anade Avenue and Montero Avenue. City staff hosted two
community meetings in May 2019 and September 2019, as well as individual meetings
with residents of Anade Avenue, Montero Avenue, and Alvarado Place, to discuss and
plan for the parkway improvements including the inclusion of additional street trees on
some streets.
Pursuant to the Contract Specifications, the Contractor will have 100 consecutive working
days to complete the work. Work is scheduled to start in February 2020. No work will be
permitted between Memorial Day 2020 and Labor Day 2020.
9-3
BIDDER
TOTAL BID AMOUNT
Low
Aramexx Construction
$
1,369,708.00
2nd
S&H Civilworks
$
1,519,829.00
3rd
Beador Construction Company, Inc.
$
1,630,600.00
4th
Nobest Inc.
$
1,673,857.00
5th
All American Asphalt
$
1,675,225.00
6th
Excel Paving
$
1,698,575.00
7th
Hardy & Harper, Inc.
$
1,760,000.00
8th
Los Angeles Engineering, Inc.
$
1,945,680.00
9th
HYM Engineering, Inc.
$
2,095,010.00
10th
Alfaro Communications Construction, Inc.
$
2,317,805.21
The City received 10 bids for this project. The low bid was 8.7 percent below the
Engineer's Estimate of $1,500,000.00. The low bidder, Aramexx Construction,
possesses a California State Contractor's License Classification "A", as required by the
project specifications. A review of references for Aramexx Construction shows
satisfactory completion of similar contracts for other municipalities.
The proposed project includes removing and reconstructing the deteriorated concrete
pavement, driveway and alley approaches, sidewalks, curbs, cross gutters, and curb
ramps; constructing three new storm drain systems, including new catch basins, junction
structures, and storm drain cleanouts; performing parkway improvements; adjusting utility
boxes to grade; and restriping the concrete pavement.
As part of the City's Pavement Management Program, several concrete streets (Anade
Avenue, Montero Avenue, Alvarado Place, and 61" Street) in the Central Balboa Peninsula
area were scheduled for reconstruction in Fiscal Year 2019-20. These concrete streets,
originally constructed around 1916, have reached the end of their useful life and are in
need of replacement. Unlike typical streets, portions of the existing sidewalk on Anade
Avenue and Montero Avenue are below the top of curb, which creates drainage issues.
The proposed improvements will raise the sidewalks to eliminate this condition and
improve the street drainage. In addition to street reconstruction, this project involves
parkway beautification on Anade Avenue and Montero Avenue. City staff hosted two
community meetings in May 2019 and September 2019, as well as individual meetings
with residents of Anade Avenue, Montero Avenue, and Alvarado Place, to discuss and
plan for the parkway improvements including the inclusion of additional street trees on
some streets.
Pursuant to the Contract Specifications, the Contractor will have 100 consecutive working
days to complete the work. Work is scheduled to start in February 2020. No work will be
permitted between Memorial Day 2020 and Labor Day 2020.
9-3
Concrete Street Pavement Reconstruction (Anade Avenue, Montero Avenue,
Alvarado Place, and 6th Street) — Award of Contract No. 7184-2 (18R21)
January 14, 2020
Page 4
If the Contractor is unable to complete all of the work prior to Memorial Day 2020, the
Contractor will resume and complete the work immediately following Labor Day 2020.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this project exempt from the California
Environmental Quality Act (CEQA) pursuant to Section 15301(b)(c) Class 1,
(maintenance of existing public facilities involving negligible or no expansion of use), of
the CEQA Guidelines, because this project has no potential to have a significant effect
on the environment.
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENTS:
Attachment A — Location Map
Attachment B — Budget Amendment
PACIFIC OCEAN
® LIMITS OF WORK
BALBOA PENINSULA CONCRETE
PAVEMENT RECONSTRUCTION
LOCATION MAP
BALBOA PENINSULA
ATTACHMENT P
SCALE: NTS
NEWPORT CHANNEL
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
C-7184-2 1 01/14/20
9-5
�wWPaRr ATTACHMENT B
City of Newport Beach
> BUDGET AMENDMENT
c10FORN`r 2019-20 BA#: 20-025
Department: Public Works
ONE TIME: ❑� Yes [--]No
Requestor: Angela Crespi
Approvals
Prepared by: Walid Harding
❑ CITY MANAGER'S APPROVAL ONLY I -,-n -,,
Date IA ' 1.3 -
❑ COUNCIL APPROVAL REQUIRED lCity Clerk: V�, Date
EXPLANATION FOR REQUEST:
ro transfer expenditure appropriations from the Bison Avenue Pavement Rehab Project (19R21) to the Concrete Drom existing budget appropriations
Areet Pavement Repair Project (18R21). ❑from additional estimated revenues
❑From unappropriated fund balance
Fund # Org Object Prat Description - Increase or (Decrease)
$
-- -----
1
i -
i ff
Subtotal i
No Change In Fund Balance
• o