CITY OF
z NEWPORT BEACH
c<,FORN'P City Council Staff Report
February 11, 2020
Agenda Item No. 13
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
PREPARED BY: Tom Sandefur, Assistant City Engineer,
tandefur@newportbeachca.gov
PHONE: 949-644-3321
TITLE: Central Library Chiller Maintenance and Condenser
Replacement/Relocation — Award of Contract No. 7776-1 (20F02)
ABSTRACT -
Staff has received construction bids for the Central Library Chiller Maintenance and
Condenser Relocation project and requests City Council approval to award the
construction contract to Mesa Energy Systems, Inc. This project will replace deteriorated
components of the Central Library HVAC system; and replace and relocate a condenser
that services the library.
RECOMMENDATION:
a) Find this project exempt from the California Environmental Quality Act (CEQA)
pursuant to Section 15301(c), Class 1, (maintenance of existing public facilities
involving negligible or no expansion of use),of the CEQA Guidelines, because this
project has no potential to have a significant effect on the environment;
b) Approve the project plans and specifications;
c) Award Contract No. 7776-1 to Mesa Energy Systems, Inc., for the total bid price of
$302,609, and authorize the Mayor and City Clerk to execute the contract; and
d) Establish $45,000 (approximately 15 percent) contingency to cover the cost of
unforeseen work not included in the original contract.
FUNDING REQUIREMENTS:
Sufficient funding is available in the current Capital Improvement Program budget for the
award of this contract. Funds will be expensed from the Facilities Maintenance Master
Plan Program Account (517101-980000-20F02).
13-1
Central Library Chiller Maintenance and Condenser Replacement/Relocation —
Award of Contract No. 7776-1 (20F02)
February 11, 2020
Page 2
Proposed fund uses are as follows:
Vendor
Purpose
TOTAL BID AMOUNT
Amount
Mesa Energy Systems, Inc.
Construction Contract
$
302,609.00
Mesa Energy Systems, Inc.
Construction Contingency
$
45,000.00
Various
Printing & Incidentals
$
1,500.00
RAN Enterprises, Inc.
Total:
$
349,109.00
Staff recommends establishing a $45,000 (approximately 15 percent of total bid) for
contingency purposes and unforeseen conditions associated with construction.
DISCUSSION:
At 10 a.m. on January 21, 2020, the City Clerk opened and read the bids for this project:
The City received five bids for this project. Upon review of the bid documents from the
apparent low -bidder, Western Allied Corporation, it was determined the contractor was
non-responsive because they did not submit a bid bond or other bid security at bid
opening as required by the project specifications.
The low bidder, Mesa Energy Systems, Inc., possesses a California State Contractor's
License Classification "C-20", as required by the project specifications. A review of
references for Mesa Energy Systems, Inc., shows satisfactory completion of similar
contracts for other public agencies.
The proposed project includes replacement of the chiller unit condenser fins, piping
throughout the chiller yard, replacing the chiller pumps, constructing a concrete pad for a
new condensing unit, furnishing, delivering, and installing a new condensing unit, and
various piping and electrical modifications at the Central Library.
Pursuant to the Contract Specifications, the Contractor will have 20 consecutive working
days to complete the work.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this project exempt from the California
Environmental Quality Act (CEQA) pursuant to Section 15301(c), Class 1, (maintenance
of existing public facilities involving negligible or no expansion of use) of the CEQA
Guidelines, because this project has no potential to have a significant effect on the
environment;
13-2
BIDDER
TOTAL BID AMOUNT
Low
Western Allied Corporation
$
281,700.00
2nd
Mesa Energy Systems, Inc.
$
302,609.00
3rd
Allison Mechanical, Inc.
$
344,400.00
4th
RAN Enterprises, Inc.
$
417,000.00
5th
F.M. Thomas Air Conditioning
$
422,162.00
The City received five bids for this project. Upon review of the bid documents from the
apparent low -bidder, Western Allied Corporation, it was determined the contractor was
non-responsive because they did not submit a bid bond or other bid security at bid
opening as required by the project specifications.
The low bidder, Mesa Energy Systems, Inc., possesses a California State Contractor's
License Classification "C-20", as required by the project specifications. A review of
references for Mesa Energy Systems, Inc., shows satisfactory completion of similar
contracts for other public agencies.
The proposed project includes replacement of the chiller unit condenser fins, piping
throughout the chiller yard, replacing the chiller pumps, constructing a concrete pad for a
new condensing unit, furnishing, delivering, and installing a new condensing unit, and
various piping and electrical modifications at the Central Library.
Pursuant to the Contract Specifications, the Contractor will have 20 consecutive working
days to complete the work.
ENVIRONMENTAL REVIEW:
Staff recommends the City Council find this project exempt from the California
Environmental Quality Act (CEQA) pursuant to Section 15301(c), Class 1, (maintenance
of existing public facilities involving negligible or no expansion of use) of the CEQA
Guidelines, because this project has no potential to have a significant effect on the
environment;
13-2
Central Library Chiller Maintenance and Condenser Replacement/Relocation —
Award of Contract No. 7776-1 (20F02)
February 11, 2020
Page 3
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENT:
Attachment A — Location Map
13-3
ATTACHMENT A
2 iNEW CONDENSER LOCATION CIVIC CENTER
PARKING STRUCTURE
CENTRAL LIBRARY •
(1000 AVOCADO AVE)
q .�y NleAwC
CONSTRUCTION NOTES:
10 CHILLER YARD MAINTENANCE
20 CONDENSER RELOCATION AND REPLACEMENT
30 PROTECT EXISTING RETAINING WALL IN PEACE
40 PROTECT EXISTING EQUIPMENT IN PLACE
50 EXISTING 10 -FT HIGH METAL FENCING, PROTECT IN PLACE
CITY OF NEWPORT BEACH APPROVED
PUBLIC WORKS DEPARTMENT
4gOFESSION
CHAEL S J
No. 64465
THOMAS M. SANDEFUR, P.E.
ASSISTANT CITY ENGINEER
CENTRAL LIBRARY HVAC DATE 12/11/19 SCALE N.T.S.
DRAWN KC C-7776-1
OF
z
VIL 0¢ �
CALIF o
}
U
DATE
3
EET
1 OF 1
B -5279-S
13-4