CITY. OF NEWPORT BEACH November 19, 2018
Building Department Project No. SB132.2
100 Civic Center Drive
Newport Beach, CA 92660
Subject: COMPACTION REPORT FOR PLACEMENT OF FILL
WITHIN LIMITS OF RESIDENTIAL BUILDING PAD
FOR PROPOSED RESIDENTIAL DEVELOPMENT
LOCATED AT 421 HOLMWOOD DRIVE
NEWPORT BEACH, CALIFORNIA
City of Newport Beach Permit No.: 1916-2018
References:
1. "Geotechnical Investigation for Proposed Residential Development Located at 421 Holmwood Drive,
Newport Beach, California," by EGA Consultants dated July 12, 2018.
2. "New 2 Story 4 Bedroom Residence, 421 Holmwood Drive, Newport Beach, CA," by JJAB Design, LLC,
dated November 19, 2018.
3. "Structural Plans, 421 Holmwood Drive, Newport Beach, CA," by Paul Rorher, Structural Engineers, dated
October 4, 2018.
4. "Precise Grading Plan, 421 Holmwood Drive, Newport Beach, CA," by D'ZN Engineering, dated October 3,
2018.
To City Building/Grading Officials:
In accordance with the City of Newport Beach building requirements, we are submitting
this compaction report for the grading of the subject building pad. This report includes
the test results performed at the subject lot during the placement of on-site soil material
in the area of the proposed residential building pad. The site earthworks operations
were performed by the sub -contractor, Tight Quarters, Inc.
Excavation and grading of the subject lot commenced on November 8, 2018 and was
completed on November 15, 2018. To date, site grading included the removal of the
upper 3 feet of the old fill and native material located within the limits of the proposed
building pad.
Prior to the placement of fill, the excavation bottoms were inspected and approved by a
Certified Engineering Geologist employed by EGA Consultants. The exposed surface
was scarified, cement treated with Portland Cement, and recompacted to a minimum of
90% relative compaction. Field density test results are tabulated on Table 1, Summary
of Field Density Tests.
One 953C Caterpillar tractor front loader and one Kubota SVL90-2 were utilized for the
purpose of compaction and grading control. All work was completed in accordance with
Soils Report dated July 12, 2018 and in accordance with the City of Newport Beach
requirements.
375-C Monte Vista Avenue • Costa Mesa, CA 92627 • (949) 642-9309 • FAX (949) 642-1290
All earthwork operations were performed under continuous observations by this firm
and were performed in accordance with geotechnical specifications outlined in the Soils
Report dated July 12, 2018.
The building pad was graded in accordance with the 2016 CBC and the City of Newport
Beach Building standards and are approved for construction. Based on our continuous
observations and testing, the subject and adjacent sites are not impacted by the site
grading operations to date.
This report includes the test results performed at the subject site during the placement
of on-site and imported soil material in the area of the proposed building pad.
Additional observations and testing are required in areas to receive exterior
improvements (driveway approach, patio flatwork, drainage, etc.) and utility
trench backfill.
I certify that all rough grading work was done in compliance with the above -referenced
Soils Report and the work complies with City of Newport Beach grading regulations. All
soils values and geotechnical specifications outlined in the Soils Report remain valid.
This opportunity to be of service is appreciated. If you have any questions, please call.
Very truly yours,
EGA Consultants, Inc.
DAVID A. WORTHINGTON CEG 2124
Principal Engineering Geologist
Copies: (2) Addressee
(1) Sepulveda Builders, Inc
790 Newton Way
Costa Mesa, CA 92667
PAD CERTIFICATION REPORT
421 Holmwood Drive, Newport Beach, CA
Project No. 58132.2
November 19, 2018
i udvld A. %
Worthlnin
No. CEG2124
cERnFlEo4
ENGINEERING l �,
TABLE 1
SUMMARY OF MOISTURE DENSITY RELATIONSHIPS
(ASTM: D1556)
Sample
Depth
Dry
Moisture ''
Maximum
Optimum
Relative
Number/
Below
Density
Content
Density
Moisture
Compaction
Location
Grade
(PCF)
(%a)
(PCF)-
(°/a)
N
ft
FD -1
3.0
112.4
10.9
122.0
10.0
92
SWC of
Pad
FD -2
2.0
114.7
11.2
122.0
10.0
94
SEC of Pad
FD -3
1.5
113.8
11.3
122.0
10.0
93
S. Central
Pad
FD -4
1.0
117.3
11.8
122.0
10.0
96
S Edge
Pad
FD -5
0.5
114.9
11.7
122.0
10.0
94
S. Central
Pad
FD -6
3.0
116.1
10.8
122.0
10.0
95
N Central
Pad
FD -7
2.0
112.4
10.5
122.0
10.0
92
NEC of
Pad
FD -8
1.0
112.7
11.0
122.0
10.0
92
Center of
Pad
FD -9
0.5
115.1
11.0
122.0
10.0
94
NWC of
Pad
FD -10
FG
113.6
11.7
122.0
10.0
93
Central of
Pad
FD -11
FG
114.9
11.4
122.0
10.0
94
E Central
of Pad
PAD CERTIFICATION REPORT
421 Holmwood Drive, Newport Beach, CA
Project No. SB132.2
November 19, 2018
FD -12
SWC of
Pad
FG
116.3
11.2
122.0
10.0
95
FD -13
FG
114.7
10.9
122.0
10.0
94
SEC of Pad
FD -14
FG
117.4
11.4
122.0
10.0
96
Garage
Pad
"FG" = Finish Grade
TABLE 2
SUMMARY OF MAXIMUM DENSITY TEST
(ASTM D 1557)
Sample
Maximum
Optimum
Location `'
Density
Moisture
Fill - silty sandy clay per Soils
122.0
10.0
Report dated 7/12/18
PAD CERTIFICATION REPORT
421 Holmwood Drive, Newport Beach, CA
Project No. SB132.2
November 19, 2018
consultants
engineering
geotechnical
applications
November 8, 2019
Project No. SB132.2
CITY OF NEWPORT BEACH
Building Department
100 Civic Center Drive
Newport Beach, CA 92660
Subject: FINAL GRADING CERTIFICATE
HARDSCAPE COMPACTION, UTILITY TRENCH BACKFILL
AT NEW RESIDENTIAL PROPERTY LOCATED at
421 HOLMWOOD DRIVE
NEWPORT BEACH, CALIFORNIA
City of Newport Beach Permit No.: 1916-2018
References:
1. "Geotechnical Investigation for Proposed Residential Development Located at 421 Holmwood Drive,
Newport Beach, California," by EGA Consultants dated July 12, 2018.
2. "New 2 Story 4 Bedroom Residence, 421 Holmwood Drive, Newport Beach, CA," by JJAB Design, LLC,
dated November 19, 2018.
3. "Structural Plans, 421 Holmwood Drive, Newport Beach, CA," by Paul Rorher, Structural Engineers, dated
October 4, 2018.
4. "Precise Grading Plan, 421 Holmwood Drive, Newport Beach, CA," by D'ZN Engineering, dated October 3,
2018.
To City Building/Grading Officials:
In accordance with the City of Newport Beach building and grading requirements, we are
submitting this final compaction report for the grading of the subject building pad, utility trench
backfill, and exterior improvements. The site earthworks operations were performed by the
sub -contractor, Tight Quarters, Inc.
Excavation and grading of the subject lot commenced on November 8, 2018 and was
completed on November 15, 2018. All flatwork subgrade was completed by October 21, 2019.
Site grading included the removal of the upper 3 of the old fill and native material located within
the limits of the new building pad and exterior improvements. A minimum 12 inches of
engineered fill was placed below all future footing bottom elevations.
Prior to the placement of fill, the excavation bottoms were inspected and approved by a
Certified Engineering Geologist employed by EGA Consultants. The exposed surface was
scarified and recompacted to a minimum of 90% relative compaction. Field density test results
are tabulated on Table 1, Summary of Field Density Tests.
One 953C Caterpillar tractor front loader, one Kubota SVL90-2, jumping jack compactors, and
vibratory plates were utilized for the purpose of compaction and grading control.
375-C Monte Vista Avenue • Costa Mesa, CA 92627 • (949) 642-9309 • FAX (949) 642-1290
For all site retaining/subterranean walls, we have observed the installation of the min. 4 -inch
dia. PVC retaining wall back -drain pipes (SDR 35 or equiv) backfilled with %-inch crushed rock
wrapped in filter fabric ("geofabric"). The PVC pipes were placed with perforations -down,
length -wise along the flowlines behind the new retaining walls. The new subterranean
backdrains are tight -lined via solid pipes (min. 4 -inch dia.),which gravity -discharge to the alley
strip drain.
Additionally, prior to the placement of %-inch gravel backfill in the lower H/3 of the wall backfill,
the excavation bottoms were inspected and approved by a representative of the Certified
Engineering Geologist employed by EGA Consultants.
All garage/retaining wall backfill was inspected/tested/documented and approved by a qualified
representative of EGA Consultants. Spoils used as backfill above the filter fabric were
compacted to a minimum of 90% relative compaction. The backdrains and backfill were
approved and are suitable for the intended use from a geotechnical standpoint.
All earthwork operations were performed under continuous observations by this firm and were
performed in accordance with geotechnical specifications outlined in the above -referenced Soils
Report dated July 12, 2018 and with the Precise Grading Plan by D7N Engineering, dated
October 3, 2018.
I certify that all grading and compaction work was done in compliance with the soils report for
this project and the work complies with City of Newport Beach grading regulations. All soils
values and geotechnical specifications outlined in the soils report remain valid.
Based on our continuous observations and testing, the subject and adjacent sites are not
impacted by the site grading operations to date.
This opportunity to be of service is appreciated. If you have any questions, please call.
Very truly yours,
EGA Consultants, Inc. �g`� "tp
�,d DavldA <
Q
Worthin910d
DAVID A. WORTHINGTON CEG 2124 *
Nu' CfG2124
Principal Engineering Geologist Nj
CEppgED
OlftrrRINoII I
p
Copies. (2) Addressee
(1) Sepulveda Builders, Inc.
790 Newton Way
Costa Mesa, CA 92667
FINAL COMPACTION REPORT:
421 Holmwood Drive, Newport Beach, CA
Project No. 58132.2
November 8, 2019
TABLE 1
SUMMARY OF MOISTURE DENSITY RELATIONSHIPS
(ASTM: D1556)
Sample
Depth
Dry
Moisture
Maximum
Optimum
Relative
Number/
Below
Density
Content
Density
Moisture
Compaction
Location
Grade
(PCF)
N
(PCF)
N
N
ft
FD -1
3.0
112.4
10.9
122.0
10.0
92
SWC of
Pad
FD -2
2.0
114.7
11.2
122.0
10.0
94
SEC of Pad
FD -3
1.5
113.8
11.3
122.0
10.0
93
S. Central
Pad
FD -4
1.0
117.3
11.8
122.0
10.0
96
S Edge
Pad
FD -5
0.5
114.9
11.7
122.0
10.0
94
S. Central
Pad
FD -6
3.0
116.1
10.8
122.0
10.0
95
N Central
Pad
FD -7
2.0
112.4
10.5
122.0
10.0
92
NEC of
Pad
FD -8
1.0
112.7
11.0
122.0
10.0
92
Center of
Pad
FD -9
0.5
115.1
11.0
122.0
10.0
94
NWC of
Pad
FD -10
FG
113.6
11.7
122.0
10.0
93
Central of
Pad
FD -11
FG
114.9
11.4
122.0
10.0
94
E Central
of Pad
FD -12
FG
116.3
11.2
122.0
10.0
95
SWC of
Pad
FINAL COMPACTION REPORT:
421 Holmwood Drive, Newport Beach, CA
Project No. SB132.2
November 8, 2019
FD -13
FG
114.7
10.9
122.0
10.0
94
SEC of Pad
Fill - silty sandy clay per
122.0
10.0
Soils Report dated July 12, 2018
FD -14
FG
117.4
11.4
122.0
10.0
96
Garage
Pad
FD -15
1.0
109.9
11.9
122.0
10.0
90
Util Trench
Backfill
FD -16
0.5
110.2
11.1
122.0
10.0
90
Util Trench
Backfill
FD -17
FG
112.2
10.8
122.0
10.0
92
Hardscape
FD -18
FG
110.7
10.5
122.0
10.0
91
Hardscape
FD -19
FG
116.6
11.0
122.0
10.0
96
Driveway
Ach
pproa
"FG" = Finish Grade
TABLE 2
SUMMARY OF MAXIMUM DENSITY TEST
(ASTM D 1557)
Sample
Maximum
Optimum
Location
Density
Moisture
Pof
Fill - silty sandy clay per
122.0
10.0
Soils Report dated July 12, 2018
FINAL COMPACTION REPORT:
421 Holmwood Drive, Newport Beach, CA
Project No. SB132.2