Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
X2019-3888 - Alternative Material & Methods (2)
X2Dlq�3M M-1 wlvwI h 1A;yJED Gy Cv�WPO_ RT CITY OF NEWPORT BEACH-"`" O� , € m Ct"7MYJ1U1d11Y r ,� , �' COMMUNITY DEVELOPMENT DEPARTMENT p rl cp( N`,F U S BUILDING DIVISION c vP 100 Civic Center Drive P.O. Box 1768 1 Newport Beach, CA 92658-8915 42rF00.N www.newportbeachca.gov 1 (949) 644-3200 CASE NO.: ❑ REQUEST FOR MODIFICATION TO PROVISIONS OF TITLE 9 (FIRE CODE) OR TITLE 15 (BUILDING CODE) OF THE NEWPORT BEACH MUNICIPAL CODE ee Reverse for Basis for Approval) (Fee $304) REQUEST FOR ALTERNATE MATERIAL OR METHOD OF CONSTRUCTION (See Reverse for Basis for Approval) (Fee $304) ❑ REQUEST FOR EXEMPTION FROM DISABLED ACCESS DUE TO PHYSICAL OR LEGAL CONSTRAINT (Fee $1,692) (Ratification by the Board of Appeals will be required.) For above requests, complete Sections 1, 2 & 3 below by printing in ink or typing. JOB ADDRESS: SITE ADDRESS: 1437 Dolphin Terrace, Newport Beach Owner Randy Long Address 1437 Dolphin Terrace, Newport Beach Zip 92625 Daytime Phone ( ) Submit 0 Cf(Y Or Petitioner Roy Reed, PE (Petitioner to be architect or engineer) Address 7727 Caminito Liliana San Diego CA Zip 92129 Daytime Phone (760 ) 586-8121 3 USTIFICATION(FINDINGS OF EQUIVALENCY: _ CODE SECTIONS: i6.G � CBC � Petitioner's Position Principle Engineer Signature CA Professional Lic. # C80503 Data 1/30/20 DEPARTMENT ACTION: In accordance with: ❑ Concurrence from Fire Code Official is required. FOR STAFF USE ONLY ❑ CBC 104.11/CFC 104.9 ❑ CBC 104.10/CFC 104.8 (Alternate materials & methods) (CBC Modification) ❑ Approved ❑ Disapproved ❑ Written Comments Attached By: ❑ Request (DOES) (DOES NOT) lessen any fire protection requirements. Date ❑ Request (DOES) (DOES NOT) lessen the structural integrity The Request is Granted ❑ Denied (See reverse for ❑ Granted (Ratification required) appeal information) Position Print Name APPEAL OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse) (Signature, statement of owner or pplicant, stat" nt of reasons for appejl nd filing fees are required.) CASHIER RECEIPT NUMBER: 1101 � S q ` I )-s Liz Forms\modif 12/17/19 M `x. VP0 FOR STAFF USE ONLY Plan Check # ?— — # of Stories J' Occupancy Classification Use of Building �. 2 ._ # of Units Project Status 9 Ml �(.Ar.t "1511!F- — Construction Type — Verified by No. of Items Fee due DISTRIBUTION: caner an Check �"'•f` Petitioner Inspector Fire ❑ Other Petitioner Roy Reed, PE (Petitioner to be architect or engineer) Address 7727 Caminito Liliana San Diego CA Zip 92129 Daytime Phone (760 ) 586-8121 3 USTIFICATION(FINDINGS OF EQUIVALENCY: _ CODE SECTIONS: i6.G � CBC � Petitioner's Position Principle Engineer Signature CA Professional Lic. # C80503 Data 1/30/20 DEPARTMENT ACTION: In accordance with: ❑ Concurrence from Fire Code Official is required. FOR STAFF USE ONLY ❑ CBC 104.11/CFC 104.9 ❑ CBC 104.10/CFC 104.8 (Alternate materials & methods) (CBC Modification) ❑ Approved ❑ Disapproved ❑ Written Comments Attached By: ❑ Request (DOES) (DOES NOT) lessen any fire protection requirements. Date ❑ Request (DOES) (DOES NOT) lessen the structural integrity The Request is Granted ❑ Denied (See reverse for ❑ Granted (Ratification required) appeal information) Position Print Name APPEAL OF DIVISION ACTION TO THE BUILDING BOARD OF APPEALS (See Reverse) (Signature, statement of owner or pplicant, stat" nt of reasons for appejl nd filing fees are required.) CASHIER RECEIPT NUMBER: 1101 � S q ` I )-s Liz Forms\modif 12/17/19 M R 9 00000000111111h. - Generic Type Cycloaliphatic Amine Epoxy General Description Highly chemical resistant epoxy mastic coating require multiple coats for hiding. Note: The low with exceptionally versatile uses in all industrial Steel markets. Self -priming and suitable for application yellow or discolor more than normal in a short period over most existing coatings, and tightly adherent of time. to rust. Serves as stand-alone system for a variety Gloss of chemical environments and is also designed for Galvanized Steel various immersion conditions. 4.0 - 6.0 mils (102 - 152 microns) per coat Features • Excellent chemical resistance No effect on plane, • Surface tolerant characteristics 6.0-8.0 mils (150200 microns) over light rust and for uniform gloss over • Conventional and low-temperature versions Concrete or CMU • Self -priming and primer/finish capabilities Excessive film thickness over inorganic zines may increase damage • Very good abrasion resistance during shipping or erection. • VOC compliant to current AIM regulations By Volume 75% +/- 2 • Suitable for use in USDA inspected facilities z 1203 tt at 1.0 mils (29.5 m /I at 25 microns) Color Refer to Carboline Color Guide. Certain colors may Results require multiple coats for hiding. Note: The low Blasted Steel 2 cts. 890 temperature formulation will cause most colors to Dry Temp. yellow or discolor more than normal in a short period Resistance of time. Finish Gloss Primer Self -priming. Dry Film 4.0 - 6.0 mils (102 - 152 microns) per coat Thickness No effect on plane, 6.0-8.0 mils (150200 microns) over light rust and for uniform gloss over no rust in scribe inorganic sines. Don't exceed 10 mils (250 microns) in a single coat. Limitations Excessive film thickness over inorganic zines may increase damage during shipping or erection. Solids Content By Volume 75% +/- 2 Theoreticalz z 1203 tt at 1.0 mils (29.5 m /I at 25 microns) Coverage Rate 301 ft2 at 4.0 mils (7.4 m2/1 at 100 microns) 1000 cycles, CS17 200 ft at 6.0 mils (4.9 m2/1 at 150 microns) Allow for loss in mixing and application. VOC Values) Thinner 2 13oz/gal=2.30 lbs/gal (2769/1) No blistering, rusting Thinner 2 7oz/gal=2.08lbs/gal (250g/I) Epoxy Pr. 1 ct. 890 Thinner 33 16oz/gal=2.43lbs/gal (291g/1) Thinner 33 7oz/gal=2.08lbs/gal (250g/1) after 2800 hours As Supplied 1.81 lbs/gal (217 g/I) Surfaces must be clean and dry. Remove all dirt, dust, oil and all other contaminant. Immersion: SSPC-SP10 Non -immersion: SSPC-SP6 1.5-3.0 mils (38-75 microns) SSPC-SP2 or SP3 are suitable cleaning methods for mild environments. Prime with specific Carboline primers as recommended by your Carboline Sales Representative. Refer to the specific primer's Product Data Sheet for requirements. Concrete must be cured 28 days at 75'F (24"C) and 50% relative humidity or equivalent. Prepare surfaces in accordance with ASTM D4258 Surface Cleaning of Concrete and ASTM D4259 Abrading Concrete. Voids in concrete may require surfacing.. Mortar joints should be cured a min of 15 days. Drywall & Plaster Joint compound and plaster should be fully cured prior to coating application. Previously Painted Lightly sand or abrade to roughen surface and degloss Surfaces the surface. Existing paint must attain a minimum 3A rating in accordance with ASTM D3359 "X -Cut" adhesion test. Test Method 'Use Thinner #76 up to 8 ozlgal for 890 and 16 ci /gal for 890 LT where Results non-photochemically reactive solvents are required. Blasted Steel 2 cts. 890 These are nominal values and may vary with color. Dry Temp. Continuous: 300 °F (149 °C) Resistance Non -Continuous: 350 °F If 77 °C) Discoloration and loss of gloss occurs above 200 F (93 C) but does not affect Performance. Under Insulation Continuous: 300 °F (149 °C) Resistance No effect on plane, Discoloration and loss of gloss occurs above 200 F (93 C) but does not no rust in scribe affect performance. Limitations Do not apply over latex coatings. For immersion projects use only factory made material in special after 4000 hours colors. Consult Technical Service for specifics. Topcoats 85 mg. loss after Surfaces must be clean and dry. Remove all dirt, dust, oil and all other contaminant. Immersion: SSPC-SP10 Non -immersion: SSPC-SP6 1.5-3.0 mils (38-75 microns) SSPC-SP2 or SP3 are suitable cleaning methods for mild environments. Prime with specific Carboline primers as recommended by your Carboline Sales Representative. Refer to the specific primer's Product Data Sheet for requirements. Concrete must be cured 28 days at 75'F (24"C) and 50% relative humidity or equivalent. Prepare surfaces in accordance with ASTM D4258 Surface Cleaning of Concrete and ASTM D4259 Abrading Concrete. Voids in concrete may require surfacing.. Mortar joints should be cured a min of 15 days. Drywall & Plaster Joint compound and plaster should be fully cured prior to coating application. Previously Painted Lightly sand or abrade to roughen surface and degloss Surfaces the surface. Existing paint must attain a minimum 3A rating in accordance with ASTM D3359 "X -Cut" adhesion test. Test Method System Results ASTM B 117 Salt Fog Blasted Steel 2 cts. 890 No effect on plane, rust in scribe. 1/16" undercutting at scribe after 2000 hours ASTM B117 Salt Fog Blasted Steel 1 No effect on plane, Ct. IOZ 1 ct 890 no rust in scribe and no undercutting after 4000 hours ASTM D 4060 Abrasion Blasted Steel 1 ct 85 mg. loss after Epoxy Pr. 1 ct 890 1000 cycles, CS17 wheel 1000 gm. load ASTM D1735 Water Fog Blasted Steel 1 ct. No blistering, rusting Epoxy Pr. 1 ct. 890 or delamination after 2800 hours ASTM D2486 Blasted Steel 1 ct. 890 93% gloss retained Scrub Resistance after 10,000 cycles w/ liquid scrub medium ASTM D3359 Adhesion Blasted Steel 1 ct 890 5A ASTM D3363 Blasted Steel 2 cis 890 Greater than 8H Pencil Hardness ASTM E84 Flame 2 ct 890 5 Flame 5 and Smoke Smoke Class A Test reports and additional data available upon written request. Mixing & Thinning Mixing Power mix separately, then combine and power mix. DO NOT MIX PARTIAL KITS. June 2016 0986 To the best of our knowledge the technical data contained herein is true and accurate on the date of publication and is subject to change without prior notice. User must contact Carboline Company to verify correctness before specifying or ordering. No guarantee of accuracy is given or implied. We guarantee our products to conform to Carboline quality control. We assume no responsibility for coverage, performance or injuries resulting from use. Liability, if any, is limited to replacement of products. NO OTHER WARRANTY OR GUARANTEE OF ANY KIND IS MADE BY CARSOLINE, EXPRESS OR IMPLIED, STATUTORY, BY OPERATION OF LAW, OR OTHERWISE, INCLUDING MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. Carboline©and Carboguard@ are registered trademarks of Carboline Company. Page 1 of 2 Carboguard° 890 Thinning Spray: Up to 13 oz/gal (10%) w/ #2 Brush: Up to 16 oz/gal (12%) w/#33 Roller: Up to 16 oz/gal (12%) w/ #33 Thinner #33 can be used for spray in hot/windy conditions. Use of thinners other than those supplied or recommended by Carboline may adversely affect product performance and void product warranty, whether expressed or implied. 'See VOC values for thinning limits. Ratio 1:1 Ratio (A to B) Pot Life 3 Hours at 75°F (24°C) Pot life ends when coating loses body and begins to sag. Pat life times will be less at higher temperatures. Curina Schedule Higher film thickness, insufficient ventilation or cooler temperatures will require longer cure Mmes and could result in solvent entrapment and premature failure. Excessive humidity or condensation on the surface during curing can interfere with the cure, can cause discoloration and may result in asurface haze. Any haze or blush must be removed by water washing before recasting. During high humidity conditions, it is recommended that the application be done while temperatures are increasing. Maximum recoaMopcoat times are 30 days for epoxies and 90 days for polyurethanes at 75-F (24°C). It the maximum recast times have been exceeded, the surface must be abraded by sweep blasting or sanding prior to the application of additional coats. Listed below are general equipment guidelines for the application of this product. Job site conditions Cleanup p may require modifications to these guidelines to achieve the desired results. Spray Application This is a high solids coating and may require Surface Temp.' Dry to Recoat Dry to Recroat & Topcoat w/ other finishes Final Cure General Final Cure Immersion 50 'F (10 °C) 12 Hours 24 Hours 3 Days NR 60 °F (16 'C) 8 Hours 16 Hours 2 Days 10 Days 75 °F (24 °C) 4 Hours 8 Hours 1 Days 5 Days 90 °F (32 °C) 2 Hours 4 Hours 16 Hours 3 Days Higher film thickness, insufficient ventilation or cooler temperatures will require longer cure Mmes and could result in solvent entrapment and premature failure. Excessive humidity or condensation on the surface during curing can interfere with the cure, can cause discoloration and may result in asurface haze. Any haze or blush must be removed by water washing before recasting. During high humidity conditions, it is recommended that the application be done while temperatures are increasing. Maximum recoaMopcoat times are 30 days for epoxies and 90 days for polyurethanes at 75-F (24°C). It the maximum recast times have been exceeded, the surface must be abraded by sweep blasting or sanding prior to the application of additional coats. Listed below are general equipment guidelines for the application of this product. Job site conditions Cleanup p may require modifications to these guidelines to achieve the desired results. Spray Application This is a high solids coating and may require (General) adjustments in spray techniques. Wet film thickness Safety is easily and quickly achieved. The following spray equipment has been found suitable and is available from manufacturers such as Binks, DeVilbiss and Greco. Conventional Pressure pot equipped with dual regulators, 3/8" Ventilation Spray I.D. minimum material hose, .070" I.D. fluid tip and appropriate air cap. Airless Spray Brush & Roller (General) Brush Roller Pump Ratio: 30:1 (min.)` GPM Output: 3.0 (min.) Material Hose: 3/8" I.D. (min.) Tip Size: .017"-.021" Output PSI: 2100-2300 Filter Size: 60 mesh `Teflon packings are recommended and available from the pump manufacturer. Multiple coats may be required to obtain desired appearance, recommended dry film thickness and adequate hiding. Avoid excessive re -brushing or rerolling. For best results, tie-in within 10 minutes at 75°F (24-C). Use a medium bristle brush. Shelf Life Use Thinner #2 or Acetone. In case of spillage, absorb and dispose of in accordance with local applicable regulations. Read and follow all caution statements on this product data sheet and on the MSDS for this product. Wear protective clothing, gloves and use protective cream on face, hands and all exposed areas. When used as a tank lining or in enclosed areas, thorough air circulation must be used during and after application until the coating is cured. User should test and monitor exposure levels to insure all personnel are below guidelines. Part A: 36 months at 75'F (24°C) Part B: 15 months at 75°F (24°C) 'When kept at recommended storage conditions and in original unopened containers. Shipping Weight 2 Gallon Kit - 29 IDS (13 kg) (Approximate) 10 Gallon Kit- 145lbs (66 kg) Storage Temperature & Humidity Use a short -nap synthetic roller cover with phenolic Flash Point core. (Setaflash) Storage Condition Material Surface Ambient Humidity Minimum 50 °F (10 °C) 50 °F (10 'C) 1i 50 "F (10 'C) 0 Maximum190'F(32-0) 125 -F (52 °C) 110 °F (43 °C) 90 This product simply requires the substrate temperature to be above the dew point. Condensation due to substrate temperatures below the dew point can cause flash rusting on prepared steel and interfere with proper adhesion to the substrate. Special application techniques may be required above or below normal application conditions. 40° -110°F (4°43°C) 0-100% Relative Humidity 89°F (32°C) for Part A 73°F (23°C) for Part B Store Indoors. This product is solvent based and not affected by excursions below these published storage temperatures, down to 1i for a duration of no more than 14 days. Always inspect the product prior to use to make sure it is smooth and homogeneous when properly mixed. • carboltne Caa6nSs -Linings - FirzP�noJing June 2016 0986 To the best of our knowledge the technical data contained herein is true and accurate on the date of publication and is subject to change without prior notice. User must contact Carboline Company to verify correctness before specifying or ordering. No guarantee of accuracy is given or implied. We guarantee our products to conform to Carboline quality control. We assume no responsibility for coverage, performance or injuries resulting from use. Liability, if any, is limited to replacement of products. NO OTHER WARRANTY OR GUARANTEE OF ANY KIND IS MADE BY CARIBOU N E, EXPRESS OR IMPLIED, STATUTORY, BY OPERATION OF LAW, OR OTHERWISE, INCLUDING MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. Carboline® and Camaguard0 are registered trademarks of Carboline Company. Page 2 of 2 �;�_ / t— v °A TEMPORARYf tSLOPE Y .� IBY OTHERS NP CALL �' 0.0PERN LINE C l �. IXISTMG CURB I 1 @SIDEWALK _ _ I I I 77 I� J: TEAPORARYI ISL IF, Dy OlX(E-RS',-TYPR: SSL) EEO eaoeoseQ edsEMENr LEVEL I I I f �I iL _ PRC i EXISTING 2 STORY RESIBENCE kl II � II R ;TCS,. ARY BE SHEET$ ]I�� `, y(\ ry9T11'S0'E'�� SS J1 .ILII `PROPERTY LINE a 1 REQUEST FOR ALTERNATE MATER/AL (CBC 1,8,7.2) CITY OE NENPORT HEACH a�cmm Tnm°r ,° o.m ❑m., ae m CBTb��lile Carboguare$00 rr.� �Y d .—w r. n:e•n.. me.....memn. Carboguardo 690 PROPERTY LINE SEE ELEVATION FOR SPACING LPOES I.V1 [X UL IALN ELANGL e I OFWEB ALONG THE POLL BEAM 3 FILL VOIDS BEHIND LAGGING LENGTH MEI T TIMBER LAGGING WITH CAN CONCRETE V (SEE ELEVATONI S' L] W n � \ PROPOSED ROP SE SfE SHEE`TR5H11 -MIN . —p WATEP PROOFING I I 1 $ FFSj ( CdLEFO$HAITBE T0ECHNICdELO ECQg� DAATINNVATH ° PROPOSED SUBTERRANEAN DBY OTHERS BOARDS (BY OTHERS ^ ° BUILDING WALL BY OTHERS ( 1 LLI ® BUILDING VNLL LONGITUDINAL BERIFORCEAENT PROPERTY LINE: / I TFAPORARYTINBER BURN HOLES THROUGH SOLDIER (REFER TO STRUCTURAL DRAWINGS) BLOCK-OUTS PLACED AT IXISTINGBLUM m� l I DEBAR (1- DIA. MA%,) [ViB gEMOVEpAOTRUOING WEOflfLANGEUPON / � II III COMPLETION OF THE PROMISED STRUCTURE AND/OR AS DIRECTED OF ad� SOLOIEPBEAAS MI -LS THAT NOTE: EPDXYPAINT DAYSEDWINI BE THE PROPFOROSED ARE NOT ENCA5E0 WITNINTXE PR0P03E0 PLANTER WALLS FILOYTHESSWITRALEHGIOVED RECDRO.FlLLROUTACSWITHANAPPROJEO NONCSHRIXI(GROUTACCOROING TO PROJECT F.g e.g �;�_ / t— v °A TEMPORARYf tSLOPE Y .� IBY OTHERS NP CALL �' 0.0PERN LINE C l �. IXISTMG CURB I 1 @SIDEWALK _ _ I I I 77 I� J: TEAPORARYI ISL IF, Dy OlX(E-RS',-TYPR: SSL) EEO eaoeoseQ edsEMENr LEVEL I I I f �I iL _ PRC i EXISTING 2 STORY RESIBENCE kl II � II R ;TCS,. ARY BE SHEET$ ]I�� `, y(\ ry9T11'S0'E'�� SS J1 .ILII `PROPERTY LINE a 1 REQUEST FOR ALTERNATE MATER/AL (CBC 1,8,7.2) CITY OE NENPORT HEACH a�cmm Tnm°r ,° o.m ❑m., ae m CBTb��lile Carboguare$00 rr.� �Y d .—w r. n:e•n.. me.....memn. Carboguardo 690 PROPERTY LINE SEE ELEVATION FOR SPACING LPOES I.V1 [X UL IALN ELANGL e I OFWEB ALONG THE POLL BEAM 3 FILL VOIDS BEHIND LAGGING LENGTH MEI T TIMBER LAGGING WITH CAN CONCRETE V (SEE ELEVATONI S' L] W n � -MIN CBTb��lile Carboguare$00 rr.� �Y d .—w r. n:e•n.. me.....memn. Carboguardo 690 PROPERTY LINE SEE ELEVATION FOR SPACING LPOES I.V1 [X UL IALN ELANGL e I OFWEB ALONG THE POLL BEAM 3 FILL VOIDS BEHIND LAGGING LENGTH MEI T TIMBER LAGGING WITH CAN CONCRETE V (SEE ELEVATONI S' L] W n � -MIN . —p WATEP PROOFING S ° PROPOSED SUBTERRANEAN DBY OTHERS BOARDS (BY OTHERS ^ ° BUILDING WALL BY OTHERS ( 1 LLI ® BUILDING VNLL LONGITUDINAL BERIFORCEAENT TFAPORARYTINBER BURN HOLES THROUGH SOLDIER (REFER TO STRUCTURAL DRAWINGS) BLOCK-OUTS PLACED AT BEAM WEBS FOR LONGITUDINAL m� INTERIOR FACE OF WALL FOR DEBAR (1- DIA. MA%,) [ViB gEMOVEpAOTRUOING WEOflfLANGEUPON SOIDIEfl BFN.1 flEMOVAL COMPLETION OF THE PROMISED STRUCTURE AND/OR AS DIRECTED OF ad� SOLOIEPBEAAS MI -LS THAT NOTE: EPDXYPAINT DAYSEDWINI BE THE PROPFOROSED ARE NOT ENCA5E0 WITNINTXE PR0P03E0 PLANTER WALLS FILOYTHESSWITRALEHGIOVED RECDRO.FlLLROUTACSWITHANAPPROJEO NONCSHRIXI(GROUTACCOROING TO PROJECT F.g e.g SPECIFlCATIONS. Q.Oi / v \ PERMANENTLY ENCASED SOLDIER BEAM PLAN DETAIL - SM 16-17 1� SH4 N.Ts. A SMALL PORTION OF SOLDIER BEAMS #16-17 BEAM/FLANGE SECTION DOES NOT HAVE CONCRETE COVER BECAUSE OF THE NEED TO INSTALL LAGGING. CORROSION PROTECTION IS PROVIDED THROUGH THE USE OF CARBOLINE EPDXY PAINT, AS SHOWN IN DETAIL 4/SH4. _.� ��... c..w......o...:m...e..�:.......W.O^� oxo 34k z m III New Cm.. Hallie II SHORING DESIGN GROUP lao-x020 SHEET SH -1 TRT CCA 9212 , (760)A . E»P..11IIQL . SAN DIEGO, CA 9H19, OBBIEBBB1j1 f/101i0i0 CM. R0V P, 0.ff0 0..CE ABSRI EXP. ]0I SBE) DALE X2.01q • 3189 07 . —p ENNBUA �• o��x.aq _.� ��... c..w......o...:m...e..�:.......W.O^� oxo 34k z m III New Cm.. Hallie II SHORING DESIGN GROUP lao-x020 SHEET SH -1 TRT CCA 9212 , (760)A . E»P..11IIQL . SAN DIEGO, CA 9H19, OBBIEBBB1j1 f/101i0i0 CM. R0V P, 0.ff0 0..CE ABSRI EXP. ]0I SBE) DALE X2.01q • 3189