HomeMy WebLinkAboutX2016-1101 - Misc (2)X? DIV -IM
� � 01 CAmd� fir.
Appendix E
LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION
I hereby certify that:
(1) 1 am a professional appropriately licensed in the State of California to provide
professional landscape design services.
(( The landscape project for the proppy located at 4GO4 C psfl
a� r� �� �� C o�T (provide street
address or parcel number(s)) was installed by me or under my supervision.
(3) The landscaping for the identified property has been installed in substantial
conformance with the approved Landscape Documentation Package and complies with
the requirements of the City of Newport Beach Water Efficient Landscape Ordinance
(Municipal Code Section 14.17) and the City of Newport Beach Standards for
Implementation of the City of Newport Beach Water Efficient Landscape Ordinance for
the efficient use of water in the landscape.
(4) The following elements are attached hereto:
a. Irrigation scheduling parameters used to set the controller;
b. Landscape and irrigation maintenance schedule;
c. Irrigation audit report; and
Soil analysis report, if not submitted with Landscape Documentation Package,
and documentation verifying implementation of the soil report
recommendations.
(5) The site installation complies with the following:
a. The required irrigation system has been installed according to approved plans
and specifications and if applicable, any prior approved irrigation system
alternatives.
Yes _ No
b. Sprinklers comply with ASABE/ICC 802-2014 Landscape Irrigation Sprinkler &
Emitter Standard.
_ZYes _ No
(6) The information I have provided in this Landscape Installation Certificate of
Completion is true and correct and is hereby submitted in compliance with the City of
Newport Beach Design Standards for Implementation of the City of Newport Beach
Water Efficient Landscape Ordinance.
33
2495 Laguna Canyon Road
Laguna Beach CA92651
949.715.7557
RE : Landscape irrigation scheduling parameters 4607 CAMDEN DRIVE
CORONA DEL MAR per city of Newport Beach —11.18.19
Irrigation control settings comply with city of Newport Beach Water Conservation "Permanent
Restrictions"
LANDSCAPE IRRIGATION/MAINTENANGE�SCHEDULING AND PERAMTERS
HYDROZONE
IRRIGATION SYSTEM TYPE
PLANT WATER USE TYPES
LANDSCAPE MAINTENANCE AND
IRRIGATION CHECK
1
DRIP
LOW
BI WEEKLY
2
DRIP
MODERATE
BI WEEKLY
3
DRIP
MODERATE
BI WEEKLY
4
DRIP
LOW
BI WEEKLY
5
DRIP
LOW
BI WEEKLY
7
DRIP
MODERATE
BI WEEKLY
8
DRIP
LOW
BI WEEKLY
9
DRIP
MODERATE
BI WEEKLY
10
POP UP
HIGH
BI WEEKLY
11
DRIP
LOW
BI WEEKLY
12
DRIP
MODERATE
BI WEEKLY
13
DRIP
MODERATE
BI WEEKLY
14
POP UP
HIGH
BI WEEKLY
MEIJbok",nICo
2495 Laguna Canyon Road
Laguna Beach CA92651
949.715.7557
RE: Landscape Irrigation scheduling parameters 4607 CAMDEN DRIVE
CORONA DEL MAR per city of Newport Beach —11.18.19
Irrigation control settings comply with city of Newport Beach Water Conservation "Permanent
Restrictions"
LANDSCAPE IRRIGATION/MAINTENANCE SCHEDULING AND PERAMTERS.
HYDROZONE
IRRIGATION SYSTEM TYPE
PLANT WATER USE TYPES
LANDSCAPE MAINTENANCE AND
IRRIGATION CHECK
1
DRIP
LOW
BI WEEKLY
2
DRIP
MODERATE
BI WEEKLY
3
DRIP
MODERATE
BI WEEKLY
4
DRIP
LOW
BI WEEKLY
5
DRIP
LOW
BI WEEKLY
7
DRIP
MODERATE
BI WEEKLY
8
DRIP
LOW
BI WEEKLY
9
DRIP
MODERATE
BI WEEKLY
10
POP UP
HIGH
BI WEEKLY
11
DRIP
LOW
BI WEEKLY
12
DRIP
MODERATE
BI WEEKLY
13
DRIP
MODERATE
BI WEEKLY
14
POP UP
HIGH
BI WEEKLY