Loading...
HomeMy WebLinkAbout06 - Peninsula Point NOC C-4627�EWPORr == CITY OF z NEWPO TE EACH City Co uncH Staff Report Agenda Item No. 6 January 8, 2013 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department David A. Webb, Public Works Director 949 - 644 -3311, dawebb @newportbeachca.gov PREPARED BY: Frank Tran, Associate Civil Engineer APPROVED: D. �✓� TITLE: Peninsula Point Alley Replacement — Completion and Acceptance of Contract No. 4627 ABSTRACT: On March 13, 2012, City Council awarded Contract No. 4627 (Peninsula Point Alley Replacement) to Hillcrest Contracting, Inc., for a total contract cost of $1,617,335 plus a 15% allowance for contingencies. The required work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATIONS: 1. Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project. 2. Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of the Civil Code. 3. Release the Faithful Performance Bond one year after this Council acceptance. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following accounts: Account Description AD -103 Street Rehabilitation AD -103 Construction Contingency Water Enterprise Fund Wastewater Enterprise Fund General Fund Account Number 74103 -9804 74103 -9805 7511- C2002040 7541- C2002040 7013- C2002040 Amount $961,991.55 42,608.00 464,497.66 50,717.07 326,687.67 Total: $1,846,501.94 I of 4 Peninsula Point Alley Replacement — Completion and Acceptance of Contract No. 4627 January 08, 2013 Page 2 DISCUSSION: Overall Contract Cost/Time Summary Awarded Contract Final Cost at Contingency Actual Contract Time Amount Completion Target Contract Time Under ( -) or Change (days) Over ( +) $1,617,335.00 $1,846,501.94 15% or less +14.2% 142 0 The work necessary for the completion of this contract consisted of removing existing alley and street pavements and replacing with new concrete pavement, construction of new curb access ramps, adjusting utilities to grade and performing other appurtenant and incidental items of work as required. The alley and street pavement replacement included in this contract was the final work effort for the Utility Underground Assessment District 103. In addition to the above work, an 8 -inch storm drainage system was constructed as part of the project to remedy historic flooding at the sump in the middle of Alley No. 205 (between "M" Street and Channel Road, Seville Avenue and Miramar Drive, as well as a landscaped island was constructed at Balboa Boulevard and "I" Street intersection as part of Peninsula Point HOA Beautification effort. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $1,617,335.00 Actual cost of bid items constructed: $1,676,023.40 Total change orders: Final contract cost: $170,478.54 $1,846,501.94 The final cost of bid items constructed was more than the original bid amount due to an increase in the final quantities constructed. The final construction contract cost was approximately 14.2 percent above the original bid amount. A portion of this cost increase resulted when the Contractor encountered thicker existing pavement sections during removals that in turn resulted in the installation of slightly thicker replacement pavement sections. Staff also took advantage of the low unit bid prices to include replacement of additional deteriorated sidewalks and street pavement within the project limits. A summary of the project schedule is as follows: Estimated Completion Date per 2011 Baseline Schedule September 2012 Project Awarded for Construction March 13, 2012 Contract Completion Date with Approved Extensions October 4, 2012 Actual Substantial Construction Completion Date October 4, 2012 2 of Peninsula Point Alley Replacement — Completion and Acceptance of Contract No. 4627 January 08, 2013 Page 3 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301(c). This exemption covers the minor alteration of existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. NOTICING: This agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). In addition, the City Clerk will be filing a Notice of Completion for the project as a result of this action. The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Submitted by: David A. Webb Public Works Director Attachment: A. Project Location Map 3 of ATTACI-IEMENT A LOCATION MAP PENINSULA POINT ALLEYS REPLACEMENT, C -4627 ® PROJECT AREA CHANNEL ID. / � NR f S _ — J Q /sr \ \ 6 AF SCALZ. /V cs r ❑\Usen\P91T\5hcred\ConlmctsVY 11 -12\C -4627 — Pnninsulo NIM Alley Raplottmen1�0C616N PHeS �L Ion —Atop. 4 of