Loading...
HomeMy WebLinkAbout07 - Misc Paving NOC C-4882Agenda Item No. 7 January 8, 2013 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Public Works Department David A. Webb, Public Works Director 949 -644 -3311, dawebb @newportbeachca.gov PREPARED BY: Patrick Arciniega, Senior Civil Engineer APPROVED: TITLE: Miscellaneous Paving Repair — Bristol Street South, Newport Coast Drive and Jamboree Road @ Coast Highway South - Notice of Completion and Acceptance of Contract No. 4882 ABSTRACT: On July 10, 2012, City Council awarded Contract No. 4882 for the Miscellaneous Paving Repair project to PALP, Inc., DBA Excel Paving for a total contract cost of $657,265.50 plus a 10% allowance for contingencies. The required work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATIONS: 1. Accept the completed work and authorize the City Clerk to file a Notice of Completion. 2. Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with the applicable portions of the Civil Code. 3. Release the Faithful Performance Bond one year after Council acceptance. FUNDING REQUIREMENTS: Funds for the construction contract were expended from the following account: Account Description Account Number Amount Measure M Turnback 7281- C2002047 $278,920.09 Bristol St. Relinquishment 7253- C2002047 $352,280.00 Total Construction Cost: $631,200.09 I of 5 Miscellaneous Paving Repair — Bristol Street South, Newport Coast Drive and Jamboree Road @ Coast Highway South - Notice of Completion and Acceptance of Contract No. 4882 January 08, 2013 Page 2 DISCUSSION: Overall Contract Cost/Time Summary Contract Award Final Cost at Benchmark Actual Contract Time Time Under ( ) Amount Completion Target Contract (days) or Over ( +) $657,265.50 $631,200.09 10% or less -4,0% 60 -31 The work necessary to complete this contract consisted of cold milling and overlaying new asphalt pavement on Bristol Street South, multiple locations on Newport Coast Drive and the left turn lanes on Jamboree Road at Coast Highway. The contract has now been completed to the satisfaction of the Public Works Department. A summary of the contract cost is as follows: Original bid amount: $ 657,265.50 Actual cost of bid items constructed: $590,518.40 Contract change orders: $40,681.69 Final contract cost: $631,200.09 The final overall construction cost, including 3 change orders, was approximately 4.0% under the original bid amount. This is generally due to the fact that the final bid quantities came in below estimated values as some paving thickness modification were made in the field. As a result of this reduction, and in an effort to take advantage of the low contract bid prices, some additional deteriorated pavement areas were added to the project. These additional areas however were in high traffic areas and resulted in additional traffic control pavement striping efforts and thus produced additive change orders to the base contract. The notice to proceed allowed for 60 consecutive working days to complete the scope of the work. The project was substantially completed November 5, 2012, which was 31 days ahead of the allotted contract time. A summary of the project schedule is as follows: Estimated Completion Date per July 2012 Baseline Schedule: November 9, 2012 Project Awarded for Construction: September 24, 2012 Completion Date per Contract and Approved Extensions December 19, 2012 Actual Substantial Construction Completion Date: November 5, 2012 ENVIRONMENTAL REVIEW: City Council found this project exempt from the California Environmental Quality Act ( "CEQA ") pursuant to Section 15301(c). This exemption covers the minor alteration of 2 of Miscellaneous Paving Repair — Bristol Street South, Newport Coast Drive and Jamboree Road @ Coast Highway South - Notice of Completion and Acceptance of Contract No. 4882 January 08, 2013 Page 3 existing public facilities with negligible expansion of the facilities in areas that are not environmentally sensitive. NOTICING: This agenda item has been noticed according to the Brown Act. In addition, the City Clerk will be filing a Notice of Completion for the project as a result of this action. The Notice Inviting Bids was advertised in the City's official publication and in construction industry publications. Advance construction notices were also distributed to impacted residents and businesses prior to work being compelted. Submitted by: Public Works Director Attachment: A. Location Map 3 of JAMBOREE ROAD DOVE STREET x rr z z Li Li w of SPRUCE STREET J Q (Y m BIRCH STREET`° CAMPUS DRIVE ATTACHMENT A H 0 V) N Ld w w rr F- J O F- m K �?11� BAYVIEW PLACE CSPRUCE AVENUE C CYPRESS 'STREET IRVINE AVENUE BRISTOL STREET SOUTH NOT TO SCALE MISCELLANEOUS PAVING CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT REPAIR PROJECT LIMITS (DRAWN: PA I I SHT. 1 OF 2 DATE: 10/6/11 C -4882 1 4 of 5 �I iii to �r P1 1� ATTACHMENT A �o JAMBOREE R®. AT EAST COAST HWY. �I NOR -N RO PO ovv - V�\cw NOT TO SCALE O�Fq �Ri E F a w NEWPORT COAST DRIVE NOT TO SCALE MISCELLANEOUS PAVING REPAIR PROJECT LIMITS CITY OF NEWPORT BEACH PUBLIC WORKS DEPARTMENT IURMYriv.. PA I SHT. 2 OF 2 8 10/6/111 C -4882