Loading...
HomeMy WebLinkAbout08 - Water Well Rehabilitation (Tamura Deep Well) — NOCQ �EwPpRT CITY OF O � z NEWPORT BEACH <,FORN'P City Council Staff Report August 25, 2020 Agenda Item No. 8 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: David A. Webb, Public Works Director - 949-644-3311, dawebb@newportbeachca.gov PREPARED BY: Andy Tran, Senior Civil Engineer, atran@newportbeachca.gov PHONE: 949-644-3315 TITLE: Water Well Rehabilitation (Tamura Deep Well) — Notice of Completion for Contract No. 7427-2 (19W04) ABSTRACT: On July 9, 2019, City Council awarded Contract No. 7427-2 for the Water Well Rehabilitation (Tamura Deep Well) project to General Pump Company, Inc. The work is now complete and staff requests City Council acceptance and close out of the contract. RECOMMENDATION: a) Accept the completed work and authorize the City Clerk to file a Notice of Completion for the project; b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the Notice of Completion has been recorded in accordance with applicable portions of Civil Code; and c) Release Faithful Performance Bond one year after acceptance by the City Council. FUNDING REQUIREMENTS: The adopted budget included sufficient funding for this contract. The construction contract was expensed from the following account within the budget: Account Description Water Capital Pumping and Ops Account Number e/T2rew M 70201933-980000-19W04 $ 366,799.80 Total: $ 366,799.80 8-1 Water Well Rehabilitation (Tamura Deep Well) — Notice of Completion for Contract No. 7427-2 (19W04) August 25, 2020 Page 2 DISCUSSION: Overall Contract Cost/Time Summary Awarded Final Cost at Contingency Actual % Due to % Due to Contract Amount Completion Allowance Contract Directed Unforeseen Change Change Change $473,660.00 $366,799.80 10% or less -22.6% -27.3% +4.7% Allowed Contract Time + 170 Actual Time +1 Approved Extensions (days) = Under (-) or Over (+) This project included removal and reinstallation of a water well pump and motor, chemical treatment and brushing, video surveys, caliper and gyroscopic surveys, replacement of the existing pump, replacement of an exhaust fan at the Dolphin Deep well site, and installation of a new ventilation system at both Dolphin and Tamura well sites. The contracted work has now been completed to the satisfaction of the Public Works and Utility Departments. A summary of the construction cost is as follows: Original Bid Amount: $ 473,660.00 Actual Cost of Bid Items Constructed: $ 242,694.00 Total Change Orders: $ 124,105.80 Final Contract Cost: $ 366,799.80 The final contract cost was $366,799.80, which was approximately 22.6 percent lower than the original bid amount. This cost decrease was primarily due to not needing the optional well casing liner, which was included in the bid. Upon removal of the existing pump and motor, the well was inspected and determined to be in good condition. As a result, some of the well rehabilitation procedures were not necessary, which lead to additional cost savings. The contract change orders for the project involved installing a new ventilation system at both well sites and replacing an exhaust fan at the Dolphin well site that failed during construction. This change order was necessary to lower the temperature in the pump control room produced by the variable frequency drives (VFDs) that run the vertical turbine motors at each well site. The VFDs produce a constant level of high heat and require a ventilation system to maintain cooler temperatures in order to properly function. The exhaust fan at the Dolphin Deep well site coincidentally failed during the construction phase. Since we had a professional design and construction team working on this project, the replacement of the exhaust fan was added to this contract to expedite replacement of this critical component. 8-2 Water Well Rehabilitation (Tamura Deep Well) — Notice of Completion for Contract No. 7427-2 (19W04) August 25, 2020 Page 3 A summary of the project schedule milestones is as follows: Estimated Start of Construction per Annual Baseline Schedule 10/28/2019 Actual Start of Construction Per Notice to Proceed 11/4/2019 Extended Contract Completion Date Inclusive of Extra Work 7/16/2020 Actual Substantial Construction Completion Date 7/17/2020 The ventilation upgrades at Dolphin and Tamura well sites consisted of mechanical fans and motors with long lead times of eight weeks from the factory. Once the parts were delivered, construction was completed in a timely and expeditious manner. ENVIRONMENTAL REVIEW: On July 9, 2019, the City Council found this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15302(c) Class 2, (reconstruction of existing facility involving negligible or no expansion of capacity) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. NOTICING: The agenda item has been noticed according to the Brown Act (72 hours in advance of the meeting at which the City Council considers the item). ATTACHMENT: Attachment A — Location Map 8-3 uz Conner Dr M tropical avan Plaza6 el goome+s Tong's r° ■Sendero Apartments I ouniam Valley ■ Jarrett Cir Skating Center Dr SQ�wd Cir CZ Recteation Starbucks w Ave Warner Ave z � o O i 9 — c to T I�' G (v�Yer cto 01 G] 2 r Paul's Coffee Shop -_ `■ ��JP�y C - a Warner Ave Sizzler 'I nce Bicycle a '9 tropical avan Plaza6 el la nada Ave Gta Tong's r° CO. + ng Center Fish & Pets r q ke d p C O La Egperanz La Paloma Ave y Lombardi Ave 0 .o m La Paluina Ave = o ^' N °Andalusia 00, La Casita Ave Ave 0 `ri La Capklla Ave w ;r 12 ° �_ La Estrella Ave Ave EI Portal Cir a i .i ELiiella cn d -• kr - TAMURA PROJECT LOCATION Q - 17415 MAGNOLIA ST w tclla A FOUNTAIN VALLEY CA 92708 BeatowuChurcha. - La Lune Ave DOLPHIN PROJECT LOCATION 9649 DOLPHIN AVE psi FOUNTAIN VALLEY CA 92708 La Zana Cl La Dona Ci Ye Slater Ave Slater Ave Slater A:!- Slater Dolphin Ave EI Colorado Ave EI Valle Ave a ra n EI Blanco Ave - Fountain Valley Perk EI Capitan Ave N r y E! Pueblo Ave rn nm ca ,. 3a fl Camino Ave w a o N x aI ountmn valley High Scholl d La Roca Ave N 3 ,.. k— N La Amapala Pv m n WATER WELL REHABILITATION CITY OF NEWPORT BEACH TAMURA DEEP PUBLIC WORKS DEPARTMENT LOCATION MAP C-7427-2 8/25/2020 8-4