HomeMy WebLinkAboutSS3 - Superior Avenue and West Coast Highway Intersection Improvements - PowerPointAugust 25, 2020 Item No. SS3 SUPERIOR AVENUE AND WEST COAST HIGHWAY INTERSECTION IMPROVEMENTS City Council Study Session August 25, 2020 5 ha-'-'FOR,tA Background • Located at the intersection of Superior Ave and West Coast Hwy • Two separate projects ➢Superior Ave Pedestrian Bridge and Parking Lot ➢WCH Widening and Pedestrian Bridge • Improve circulation and access and provide additional parking I y V i ) 1 SUNSET RIDGE PARK AF a eq� SUPERIOR AVE CC F ' SUNSET VIEW PARK U� PARKING LOT P� 00 v - a TOA HOAG N"E3 C o a 9 � Superior Ave Ped Bridge and Parking lot • Environmental Documents and Conceptual Design approved on 11/19/2019 • Final design currently in progress • Construction scheduled to start Fall 2021 • Complete construction by Winter 2022 New Ped Bridge ; Sunset View Park Extension ''\\\ rm,%, , - - I i I !1, 11 . i - I, Parking L r °r Approved Conceptual Bridge Design • Conceptual Design -Selected 3 -span concrete bridge • Advantages ➢Common construction method ➢Minimal maintenance ➢Cost effective • Primary Drawback e s r --- A. a:.�s kk j• � �{� NOW ➢Requires two concrete columns (supports) on Superior Ave Alternate Concrete Arch Bridge Design • Same advantages as previously approved 3 -span concrete bridge (similar construction cost) • Single -span bridge with structural and aesthetic concrete arch (in place of two concrete columns) • Eliminate possibility of vehicles running into concrete columns (improve safety) • Similar height as 3 -span bridge (no additional view obstruction) • Support from City Council Working Group • Recommend proceeding with concrete arch bridge Concrete Arch Bridge Rendering — From Sunset Ridge Park Single -span arch bridge without mid -span supports Concrete Arch Bridge Rendering — From WCH • Remove staircase to construct WCH bridge • Save $200,000 (estimated cost of staircase) • Use existing sidewalk on Superior Ave WCH Proposed Improvements WCH Widening and Pedestrian Bridge Superior Ave Pedestrian Bridge and Parking Lot SMSEr PO(E PMK Improve Circulation and Safety! C Remove X -Walks Add 41" EB Thru Lane ,.---- jy. PM` K ` ` �_..-ice "cCCC;\\� 1�-• ' --� New Ped Ramp New Ped Bridge PR0P0.9® suF,� f PAPJQM LOT / (Tao STv1S) ' ® r l - R V I T I ! t WEST COAST FIGHWAY New Ped Ramp Funding — WCH Widening and Ped Bridge • Included in FY 2020-21 CIP (Design only) • Received M2 grant funding in May 2020 (65% up to $780,000) • Recommend PSA Amendments with current design team to complete the environmental review and design efforts totaling $1.2M • $420,000 (35% of $1.2M) available from FFP Parks/Facilities in current CIP • Seek additional grant funding for R/W and Construction phases • Additional City matching funds needed for R/W and Construction (Future CIP) Schedule — WCH Widening and Ped Bridge • Environmental Review/Conceptual Design ➢ Sept 2020 to Sept 2022 (24 months) • Permitting (Caltrans and CCC) and R/W Acquisition ➢ Sept 2022 to June 2023 (9 months) • Final Design ➢ Sept 2022 to Nov 2023 (14 months) • Construction ➢ Jan 2024 to Mar 2025 (14 months) 3 4 5 1 2 3 13 14 $ g 10 1181 a0 22s ILL 23,Zq 30'3- Public Works Department A Well -Engineered Machine Protecting and Providing Quality Public Improvements and Services 7" ^rte _ -_ �:. •� _:�' j � v: .�. 1 _ brP� M