Loading...
HomeMy WebLinkAbout14 - Newport Airport Village Planned Community Development Plan (PA2014-225)Q SEW Pp�T CITY OF z NEWPORT BEACH c�<,FORN'P City Council Staff Report September 8, 2020 Agenda Item No. 14 TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: Seimone Jurjis, Community Development Director - 949-644-3232, sjurjis@newportbeachca.gov PREPARED BY: Jim Campbell, Deputy Community Development Director David Blumenthal, AICP, Planning Consultant dblumenthal@newportbeachca.gov PHONE: 949-644-3204 TITLE: Ordinance Nos. 2020-22 and 2020-23: Newport Airport Village Planned Community Development Plan (PA2014-225) ABSTRACT - The applicant is processing a number of applications, including a General Plan Amendment, Planned Community Development Plan (PCDP), and a Development Agreement that would allow for the future redevelopment of the 16.46 -acre property with up to 444 dwelling units (329 base units and 115 density bonus units) and 297,572 square feet of retail, office, and other airport supporting use. In addition, the proposal would include a request to override the Airport Land Use Commission's (ALUC) inconsistency determination with the Airport Environs Land Use Plan (AELUP) for John Wayne Airport. For City Council's consideration is the adoption of the environmental clearance for the project, introduction of two ordinances to rezone the property, adoption of the PCDP, and approval of a Development Agreement. If approved, then a second public hearing would be conducted on September 22, 2020 for the City Council to take final action on the proposed override of the Airport Land Use Commission determination, General Plan Amendment and adoption of the two ordinances. RECOMMENDATION: a) Conduct a public hearing; b) Adopt Resolution No. 2020-78, A Resolution of the City Council of the City of Newport Beach, California, Adopting Environmental Impact Report Addendum No. ER2020- 002 to the 2006 General Plan Update Program Environmental Impact Report and 2014 General Plan Land Use Element Update Supplemental Environmental Impact Report for the Newport Airport Village Planned Community Development Located at 4341, 4361, and 4501 Birch Street; 4320, 4340, 4360, 4400, 4500, 4520, 4540, 4570, 4600, and 4630 Campus Drive; and 4525, 4533, and 4647 Macarthur Boulevard (PA2014-225); 14-1 Ordinance Nos. 2020-22 and 2020-23: Newport Airport Village Planned Community Development Plan (PA2014-225) September 8, 2020 Page 2 c) Waive full reading, direct the City Clerk to read by title only, introduce Ordinance No. 2020-22, An Ordinance of the City Council of the City of Newport Beach, California, Approving Zoning Code Amendment No. CA2014-009 and Planned Community Development Plan No. PC2020-02 Establishing the Newport Airport Village Planned Community Development Plan Located at 4341, 4361, and 4501 Birch Street; 4320, 4340, 4360, 4400, 4500, 4520, 4540, 4570, 4600, and 4630 Campus Drive; and 4525, 4533, and 4647 Macarthur Boulevard (PA2014-225), and pass to second reading on September 22, 2020; and d) Waive full reading, direct the City Clerk to read by title only, introduce Ordinance No. 2020-23, An Ordinance of the City Council of the City of Newport Beach, California, Approving Development Agreement No. DA2014-003 for the Newport Airport Village Planned Community Development for the Property Located at 4341, 4361, and 4501 Birch Street; 4320, 4340, 4360, 4400, 4500, 4520, 4540, 4570, 4600, and 4630 Campus Drive; and 4525, 4533, and 4647 Macarthur Boulevard (PA2014- 225), and pass to second reading on September 22, 2020. FUNDING REQUIREMENTS: As part of the Development Agreement, the applicant has agreed to pay a $6,000,000 public benefit fee, $2,500,000 park in -lieu fee and $1,000,000 public safety fee. This results in a net positive fiscal impact of $9,500,000. INTRODUCTION: Proiect Settin The 16.46 -acre project site is generally located southeast of John Wayne Airport (JWA), a commercial and general aviation airport that is owned and operated by the County of Orange. The site is west of MacArthur Boulevard, south of Campus Drive, north of Birch Street, and about 550 feet north of Dove Street. The project site is currently developed with a variety of commercial uses, including retail, restaurants, rental vehicle facilities and office buildings. The project site is within the Airport Area of the City and currently has a General Plan Land Use Plan Category of Airport Office (AO). Additionally, the project site is zoned OA (Office Airport) that allows uses consistent with the Land Use Plan Category. Surrounding land uses include various multiple -story professional and medical office buildings, a five -story apartment building, multiple hotels, retail businesses, restaurants vehicle sales and repairs, and vehicle rental agencies. In addition to these uses, JWA is located to the west and north of the site. 14-2 Ordinance Nos. 2020-22 and 2020-23: Newport Airport Village Planned Community Development Plan (PA2014-225) September 8, 2020 Page 3 T Figure 1- Project Boundaries Project Description Leu d Saunders Property Company c/o Starpointe Ventures ("Applicant") seeks approval of a General Plan Amendment, Zoning Code Amendment, Planned Community Development Plan, and a Development Agreement. The Applicant's request does not include a specific development project at this time, but rather it is for legislative approvals only. Should the subject applications be approved by the City Council, future development would require the processing of a site development review application and be required to comply with the development and use standards set forth in the PCDP. A complete analysis of the project and related entitlement findings can be found in the attached Planning Commission staff report (Attachment D). DISCUSSION: General Plan Amendment and Policy Waiver The proposal would amend the General Plan Land Use Category of the site from Airport Office (AO) (Figure 2) to Mixed Use Horizontal 2 (MU -H2) (Figure 3). This change would alter the future focus of the property from uses that are solely intended to support or benefit from airport operations (e.g. professional offices, aviation retail, automobile rental and sales, hotels, ancillary retail and restaurant), to a horizontal intermixing of uses that may include regional commercial office, multi -family residential, vertical mixed-use buildings, industrial, hotel rooms, and ancillary neighborhood commercial uses. 14-3 Ordinance Nos. 2020-22 and 2020-23: Newport Airport Village Planned Community Development Plan (PA2014-225) September 8, 2020 Page 4 0 cr r� A,0 G Figure 2 - Existing Land Use Map Figure 3 -Proposed Land Use Map 14-4 Ordinance Nos. 2020-22 and 2020-23: Newport Airport Village Planned Community Development Plan (PA2014-225) September 8, 2020 Page 5 This General Plan Amendment would also provide Anomaly 86 to the General Plan Table LU2 (Anomaly Locations) establishing the following maximum development limits to the site: Table. Residential Development Allocation Base Anomaly Statistical Land Use Development Project Totals With Density Bonus Replacement Units Number Area Designation Limit (so Development Limit Other Additional Information 2,200 Nonresidential Approved Projects 86 L4 MU -1-12 development 329 dwelling units Uptown Newport 1 632 1 290 297,572 322 1,244 The General Plan contains a maximum limit of 2,200 dwelling units within the MU -1-12 designation of the Airport Area. In considering the Newport Airport Village project, in conjunction with the other approved and pending projects within the MU -1-12 land use designation, there would be 430 remaining units available for other properties with the MU -1-12 designation (see Table 1). Table 1 — Airport Area Residential Units Residential Development Allocation Base Units Density Bonus Units Project Totals With Density Bonus Replacement Units Additive Units Total Units General Plan Development Limit (MU -H2) 1650 550 2,200 Approved Projects Uptown Newport 1 632 1 290 922 322 1,244 Newport Crossings 259 0 259 91 350 Projects Under Review The Koll Center Residences 260 260 52 312 Proposed Newport Airport Village 329 0 329 115 444 Remaining Development Allocation 430 0 430 It is important to note that the density bonus units do not count towards the capacity limits of the General Plan since State Housing Law excludes these types of dwelling units from maximum allowable densities under the General Plan. In accordance with City Council Policy A-18, the attached Planning Commission staff report (Attachment D) contains a complete Charter Section 423 analysis. The property is located in Statistical Area L4. The proposed General Plan Amendment does not allocate new dwelling units, nor increase the amount of floor area allowed, and does not increase a.m. or p.m. peak hour traffic trips to the statistical area. As a result, the Amendment is not classified as a major amendment requiring a vote of the electorate. In addition to the amendments to the General Plan, the Applicant is requesting to waive General Plan Policies LU 6.15.7 (Overall Density and Housing Types) and LU 6.15.13 (Neighborhood Parks Standards). 14-5 Ordinance Nos. 2020-22 and 2020-23: Newport Airport Village Planned Community Development Plan (PA2014-225) September 8, 2020 Page 6 Policy LU 6.15.7 (Overall Density and Housing Types) states: Require that residential units be developed at a minimum density of 30 units and maximum of 50 units per net acre averaged over the total area of each residential village. Net acreage shall be exclusive of existing and new rights- of-way, public pedestrian ways, and neighborhood parks. Within these densities, provide for the development of a mix of building types ranging from townhomes to high-rises to accommodate a variety of household types and incomes and to promote a diversity of building masses and scales. The residential component of the project is 329 units (excluding density bonus units) within the 16.46 -acre residential village, which results in a net density of 20 dwelling units per acre. In order to meet the minimum 30 dwelling units per acre, the Applicant would need to provide 493 units. Considering that residential development would be limited to Planning Area 1 of the project site (see Figure 5), it would be appropriate to consider how the overall site density would result in actual development. Planning Area 1 is 7.14 acres, to which the construction of 329 units would have an effective density of 46 units per acre (the 493 units would result in an effective density of 69 units per acre). The PCDP requires that any residential development include an affordable housing component, which shall have a minimum of 5 percent of units for very -low income households, or a minimum of 10 percent of units for low-income households, or a minimum 10 percent of units for moderate -income households. Accordingly, the future developer of any residential project would be eligible for incentives and concessions under Government Code Section 65915. Government Code Section 65915 also prohibits the City from applying a development standard that will have the effect of physically precluding the construction of a development. In Wollmer v. City of Berkeley (193 Cal. App. 4th 1329(2011)), the Court of Appeals of California interpreted the waiver of height standards, number of stories and setbacks to accommodate project amenities such as an interior courtyard, community plaza and high ceilings as physical constraints that would warrant a waiver pursuant to Government Code Section 65915. A waiver of General Plan Policy LU 6.15.7 is consistent with the concessions that could be granted under Government Code Section 65915 and would be consistent with the Appeals Court ruling. Policy LU 6.15.13 (Neighborhood Parks Standards) states: To provide a focus and identity for the entire neighborhood and to serve the daily recreational and commercial needs of the community within easy walking distance of homes, require dedication and improvement of at least 8 percent of the gross land area (exclusive of existing rights-of-way) of the first phase development in each neighborhood, or % acre, whichever is greater, as a neighborhood park. This requirement may be waived by the City where it can be demonstrated that the development parcels are too small to feasibly accommodate the park or inappropriately located to serve the needs of local residents, and when an in -lieu fee is paid to the City for the acquisition and improvement of other properties as parklands to serve the Airport Area. 14-6 Ordinance Nos. 2020-22 and 2020-23: Newport Airport Village Planned Community Development Plan (PA2014-225) September 8, 2020 Page 7 in every case, the neighborhood park shall be at least 8 percent of the total Residential Village Area or one acre in area, whichever is greater, and shall have a minimum dimension of 150 feet. Park acreage shall be exclusive of existing or new rights-of-way, development sites, or setback areas. A neighborhood park shall satisfy some or all of the requirements of the Park Dedication Ordinance, as prescribed by the Recreation Element of the General Plan. The ability to waive the requirements of Policy LU 6.15.13 are self-contained within the policy itself. The Council may waive the dedication of land for a neighborhood park when: 1) the area to be dedicated would be too small or be inappropriately located, and 2) the applicant pays an appropriate in -lieu fee. Due to the proximity to the airport and surrounding land uses, staff is of the opinion that it would not be appropriate to locate a neighborhood park on the development site. Accordingly, the applicant has agreed to pay an in -lieu fee of $2,500,000. Zoning Code Amendment The Zoning Code Amendment would rezone the site from OA (Office Airport) to PC -60 (Planned Community - Newport Airport Village Planned Community) to implement the proposed MU -H2 land use designation. According to the Newport Beach Municipal Code (NBMC) Section 20.56.020, the minimum area requirement for a PCDP is ten acres of improved land, unless the Council waives the requirement. In this case, the PCDP is comprised of 16.46 acres of improved land. CO T U P C P J• i� ' aoG� coR,�TH�q � � s WAY K F OA Z PC -11 m � PC -15 Figure 4 - Proposed Zoning Map 14-7 Ordinance Nos. 2020-22 and 2020-23: Newport Airport Village Planned Community Development Plan (PA2014-225) September 8, 2020 Page 8 This rezone would allow for the adoption of the Planned Community Development Plan (PCDP), which would set the development standards and land use regulations for the project site as required by Chapter 20.56 (Planned Community District Procedures) of the NBMC. Planned Community Development Plan The proposed Newport Airport Village PCDP (Attachment E) is divided into the following sections: Introduction and Purpose — Introduces the project, site, and surrounding area. II. Land Use and Development Regulations — Creates the permitted uses and development standards. III. Architectural Design Considerations — Provides principles and concepts to guide the site layout and architectural design of buildings. IV. Residential Design Guidelines — Establishes specific architectural standards that residential developments will need to comply with. V. Plan Administration and Implementation — Sets the process to review development and amending the PCDP. Site Development Review is required for the development of new buildings. To achieve a mixed-use environment, Newport Airport Village PC District is divided into two planning areas (see Figure 5). Planning Area 1 would accommodate the residential development component of the site, plus up to 94,583 square feet of nonresidential (food service, retail, offices, and personal services) uses. It is important to note that all dwelling units in Planning Area 1 would be required to be located outside of John Wayne Airport's 65-dBA CNEL zone and Safety Zone 3. Planning Area 2 is limited to nonresidential uses with a FAR of 0.5. This would include food services, bars/nightclubs, retail sales, offices, personal services, and most uses permitted or conditionally permitted within the Office Airport (OA) zone. MM Ordinance Nos. 2020-22 and 2020-23: Newport Airport Village Planned Community Development Plan (PA2014-225) September 8, 2020 Page 9 John Wayn�Airport .�■- �r- O' W 4? ■ ae FQJy ar 1 g l Planning Area 1 2 1 wr f \ f � Planning Area 2,1 S -rely Z'n, U w m� l r Figure 5 - Planning Areas The PCDP also establishes the development standards that future development would need to abide by, a summary of which is contained in Table 2. Table 2 - Development Standards Development Standard Planning Area 1 Planning Area 2 Housing Density 30 units/acre minimum N/A 46 units/acre maximum Building Height 85' (residential and mixed-use) 37', an increase to 54' is 37' (nonresidential) allowed with approval of a Site Development Permit Setbacks Buildings under 20' in height 15' from street property line 10' from street property line 5' from internal property line 5' from internal property line Buildings 20' or greater in height 20' from street property line 5' from internal property line Floor Area 94,583 square feet 0.5 Floor Area Ratio (202,989 square feet) Open Space Private - 5% gross floor area/unit N/A Common - 75 square feet/unit 14-9 Ordinance Nos. 2020-22 and 2020-23: Newport Airport Village Planned Community Development Plan (PA2014-225) September 8, 2020 Page 10 When the Planning Commission initially reviewed the project, the allowable building height for Planning Area 2 was 55 feet, with approval of a Site Development Permit. However, the Federal Aviation Administration (FAA) has conducted a more detailed analysis of the allowed heights and has determined the maximum height within this planning area should not exceed 54 feet due to a potential conflict with a microwave transmission antenna. Accordingly, the PCDP has been amended to reflect the FAA's determination. Development Agreement Pursuant to NBMC Section 15.45.020(A)(2)(a), a Development Agreement is required whenever a General Plan Amendment or Zoning Code Amendment is proposed that will result in the development of 50 or more dwelling units. The intent of the Development Agreement is to provide the property owner/developer a vested development right, while providing some public benefit to the community. In this case, the property owner/developer would have a vested right to develop 444 dwelling units (329 base units and up to 115 density bonus units) and 297,572 square feet of commercial floor area, provided the proposed development complies with the development regulations and design guidelines set forth in the PCDP. The vested right to develop is for 15 years for the residential portion of the project and 20 years for the nonresidential portion of the project. In consideration of the vested development right, the property owner/developer will pay the following in addition to standard impact fees: • Public Benefit Fee: $6,000,000 in three installments - ($2,000,000 at entitlement approval, $2,000,000 at building permit issuance, and $2,000,000 at Certificate of Occupancy) • General Pan Policy Waiver In -Lieu Park Fee: $2,500,000 • Public Safety Fee: $1,000,000 for Fire Life Safety staffing, services, or equipment The Development Agreement can be found as Exhibit B of Attachment C of this report. Fiscal Analysis An independent fiscal impact analysis was prepared by Applied Development Economics (Attachment F), which was based on the City's Fiscal Impact Model. The analysis prepared for the Newport Airport Village project concludes that existing permitted land uses on the site could generate $153,364 annually, while the proposed project would result in an annual cost of $466,523 for a total net change of $619,887 annually. It should be noted that the fiscal outcome of the proposed project is in line with earlier analysis of the current General Plan allowances, because the proposed dwelling units for the site are part of the existing dwelling unit allocation under the 2006 General Plan. 14-10 Ordinance Nos. 2020-22 and 2020-23: Newport Airport Village Planned Community Development Plan (PA2014-225) September 8, 2020 Page 11 Plannina Commission Review On June 4, 2020, the Planning Commission conducted a duly noticed public hearing to consider the requested application (Attachment G). Other than the applicant and his representative, only one member of the public addressed the Planning Commission regarding the request. At the conclusion of the public hearing, the Planning Commission adopted Resolution No. PC2020-20 (Attachment H), thereby recommending the City Council approve the project, by a unanimous 6-0 vote. Airport Environs Land Use Plan The project site falls within the airport planning area of the Airport Environs Land Use Plan (AELUP) for the John Wayne Airport. Section 4.3 of the AELUP and Section 21676(b) of the Public Utilities Code (PUC) requires the City submit the project to the Airport Land Use Commission (ALUC) for a consistency determination with the AELUP. ALUC conducted a hearing on the matter on July 16, 2020 (Attachment 1), to which staff and the project proponent attended. ALUC voted (6-0) finding the project is inconsistent with the AELUP based on noise, safety, and height (Attachment J). It is important to note that since the General Plan was found consistent with the AELUP in 2006, the City has submitted 16 projects to ALUC (Attachment K) for consideration, which includes the proposed Newport Airport Village project. ALUC found that 13 of the projects were consistent with the AELUP and three were not (including this project). As a result of this determination, on July 28, 2020 the City Council adopted Resolution No. 2020-73 to notify ALUC and the State Division of Aeronautics of the City's intent to override ALUC's finding, as afforded to the City in PUC Section 21676(b). Notice of Council's action was sent to ALUC and the Division of Aeronautics on July 30, 2020, which initiated a 45 -day comment period on the intent to override. This comment period will expire on September 13, 2020. As a final review authority on legislative acts, the City Council may choose to override ALUC's determination. ALUC submitted a response letter to the City's Notice of Intent on August 27, 2020 (Attachment L). The letter reiterates ALUC's concerns about the project and outlines their response to the City's proposed findings of the potential override. This was followed by a response letter from Caltrans Division of Aeronautics, which was received on August 28, 2020 (Attachment M). The Division of Aeronautics response expresses concerns about the project within the safety zones. A complete analysis of the override option, along with a response to the comments provided by ALUC and the Division of Aeronautics, will be included in the staff report for the September 22, 2020 public hearing if this agenda item is passed. 14-11 Ordinance Nos. 2020-22 and 2020-23: Newport Airport Village Planned Community Development Plan (PA2014-225) September 8, 2020 Page 12 Importance of Project towards Housing Needs As an alternative to overriding the ALUC findings, the Council can direct the applicant to redesign the project in a manner that the ALUC would find consistent with the AELUP. In this case, staff believes the applicant would need to eliminate the residential component of their request. Given the extremely high Regional Housing Needs Allocation (RHNA) of 4,832 new dwelling units the City is expected to plan for in the upcoming 6t" Cycle Housing Element Planning Period (2021-2029), staff believes this is not the most prudent option. If the project were approved, PCDP Planning Area No. 1 would be added to the City's Housing Sites Inventory as part of the Housing Element Update process. Credit could be given for the project towards meeting a significant portion of the City's upcoming RHNA due to the fact that project meets all criteria as a viable housing opportunity site pursuant to State Housing Element Law. ENVIRONMENTAL REVIEW: On July 25, 2006, the City Council certified a Program Environmental Impact Report (PEIR) for the General Plan 2006 Update (SCH No. 2006011119), a copy of which can be found at http://www.newportbeachca.gov/cepa. The PEIR analyzed the potential impacts of a citywide land use plan, and goals and policies for 10 General Plan elements. The PEIR designated the project area as Airport Office and Supporting Uses (AO). The designation would allow up to 358,498 square feet of office based on the allowable 0.5 floor area ratio (FAR). The AO land use designation is intended to allow uses that support or benefit from operations of the adjoining John Wayne Airport. These may include professional offices; aviation; retail; automobile rental, sales, and service; hotels and ancillary retail, restaurant, and service uses. This designation specifies a FAR of 0.5, except for warehousing, which may be developed at a FAR of 0.75. Two previous addendums to the PEIR, which are unrelated to the project area, have been previously approved. On July 22, 2014, the City Council certified a Supplemental EIR (SEIR) for the 2014 update to the Land Use Element of the General Plan (SCH No. 2013101064), a copy of which can be found at http://www.newportbeachca.gov/cepa. The SEIR focused on a General Plan Land Use Element Amendment proposing both reduced and increased development capacities in various areas of the City. The SEIR evaluated the designation of the project site as Mixed Use -Horizontal 2 (MU -H2). The SEIR assessed the potential development of 238,077 square feet of office space and 329 additional dwelling units for the project site as an increase to what the General Plan would allow. As a result of failing to obtain voter approval, as required by Charter Section 423, the General Plan Land Use Element Amendment was not implemented. The result of the vote did not nullify the certification of the SEIR and the City Council has not rescinded its certification of the SEIR. 14-12 Ordinance Nos. 2020-22 and 2020-23: Newport Airport Village Planned Community Development Plan (PA2014-225) September 8, 2020 Page 13 As a result of the proposed project changes from the analysis that was conducted in 2014, an Addendum to the PEIR and SEIR was prepared (Exhibit B of Attachment A). The Addendum analyzed the following environmental topics: Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Energy, Geology and Soils, Greenhouse Gas Emissions, Hazards and Hazardous Materials, Hydrology, Land Use and Planning, Mineral Resources, Noise, Population and Housing, Public Services, Recreation, Transportation, Tribal Cultural Resources and Utilities and Service Systems. This Addendum also includes analysis of new topical sections that were not included in the previous EIRs; specifically, it includes a new energy section and a new wildfire section. These topics were included in the Addendum because the State CEQA checklist was updated to include them subsequent to both the PEIR and SEIR certifications. This proposed Newport Airport Village PCDP would result in the same or reduced development scope than what was analyzed in the PEIR and SEIR. Based on the environmental analysis conducted, any potential impact has already been appropriately addressed through the PEIR and SEIR. Pursuant to Section 15162(a) of the CEQA Guidelines, when an EIR has been certified for a project, no subsequent EIR shall be required unless the City determines, on the basis of substantial evidence in the light of the whole record, one or more of the following: 1. Substantial changes are proposed in the project which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; 2. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or 3. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete, shows any of the following: a. The project will have one or more significant effects not discussed in the previous EIR; b. Significant effects previously examined will be substantially more severe than shown in the previous EIR; c. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or d. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative. 14-13 Ordinance Nos. 2020-22 and 2020-23: Newport Airport Village Planned Community Development Plan (PA2014-225) September 8, 2020 Page 14 Based on the entire environmental review record, the project will not result in any new significant impacts that were not previously analyzed in the PEIR or the SEIR. All potential impacts would be either the same or less than those described in the PEIR or SEIR and have been appropriately mitigated. In addition, there are no substantial changes to the circumstances under which the project would be undertaken that would result in new or more severe environmental impacts than previously addressed in either the PEIR or SEIR, nor has any new information regarding the potential for new or more severe significant environmental impacts been identified. In accordance with Section 15164 of the CEQA Guidelines, an addendum to the previously adopted PEIR and SEIR is the appropriate environmental documentation for the project. NOTICING: Notice of this hearing was published in the Daily Pilot, mailed to all owners of property within 300 feet of the boundaries of the site (excluding intervening rights-of-way and waterways), posted along the boundaries of the site, and an email select alert was sent to email subscribers of the Planning Division's notification list. The item also appears on the agenda for this meeting, which was posted at City Hall and on the City Website. ATTACHMENTS: Attachment A —Resolution No. 2020-78 Attachment B — Ordinance No. 2020-23 Attachment C — Ordinance No. 2020-23 Attachment D — Planning Commission Staff Report, Dated June 4, 2020 Attachment E — PC -60 (Newport Airport Village Planned Community Development Plan) Attachment F — Fiscal Impact Analysis Attachment G — Planning Commission Minute Excerpts, Dated June 4, 2020 Attachment H —Planning Commission Resolution No. PC2020-20, Excluding Attachments Attachment I —ALUC Staff Report, Dated July 16, 2020 Attachment J —ALUC Letter of Determination Attachment K — Previous ALUC Consistent Findings Attachment L — ALUC Response to City's Notice of Intent Attachment M — Division of Aeronautics Response to City's Notice of Intent 14-14 Attachment A Resolution No. 2020-78 14-15 RESOLUTION NO. 2020-28 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH, CALIFORNIA, ADOPTING ENVIRONMENTAL IMPACT REPORT ADDENDUM NO. ER2020-002 TO THE 2006 GENERAL PLAN UPDATE PROGRAM ENVIRONMENTAL IMPACT REPORT AND 2014 GENERAL PLAN LAND USE ELEMENT UPDATE SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT FOR THE NEWPORT AIRPORT VILLAGE PLANNED COMMUNITY DEVELOPMENT LOCATED AT 4341, 4361, AND 4501 BIRCH STREET; 4320, 4340, 4360, 4400, 4500, 4520, 4540, 4570, 4600, AND 4630 CAMPUS DRIVE; AND 4525, 4533, AND 4647 MACARTHUR BOULEVARD (PA2014-225) WHEREAS, an application was filed by Saunders Property Company ("Applicant") with respect to property located at 4341, 4361, and 4501 Birch Street; 4320, 4340, 4360, 4400, 4500, 4520, 4540, 4570, 4600, and 4630 Campus Drive; and 4525, 4533, and 4647 MacArthur Boulevard within the northerly portion of the Campus Tract, generally bounded by Birch Street, Campus Drive, MacArthur Boulevard and the extension of Corinthian Way, legally described on Exhibit A, which is attached hereto and incorporated herein by reference ("Property"); WHEREAS, the Property is designated AO (Airport Office and Supporting Uses) by the City of Newport Beach General Plan ("General Plan") Land Use Element and is located within the OA (Office -Airport) Zoning District; WHEREAS, the Applicant proposes a Planned Community Development Plan that would allow redevelopment of the 16.46 -acre Property with up to 329 residential dwelling units, exclusive of any density bonus as allowed pursuant to California Government Code Section 65915, and up to 297,572 square feet of office, retail, and commercial uses ("Project") which require the following approvals from the City of Newport Beach ("City"): • General Plan Amendment (GP2014-004) ("GPA") — A request to amend the General Plan Land Use Designation of the Property from AO (Airport Office and Supporting Uses) to MU -H2 (Mixed -Use Horizontal 2) and to amend Table LU2 (Anomaly Locations) to add Anomaly No. 86 to allow for the development of 329 dwelling units, exclusive of any permitted density bonus, and 297,572 square feet of commercial uses; 14-16 Resolution No. 2020 - Page 2 of 7 • Zoning Code Amendment (CA2014-009) — A request to change the zoning designation of the Property from OA (Office -Airport) to PC -60 (Newport Airport Village Planned Community); • Planned Community Development Plan (PC2020-002) — A request to adopt the Newport Airport Village Planned Community Development Plan ("PCDP") which sets the development design and use standards for the Property; • Development Agreement (DA2014-003) ("DA") — A request for a development agreement between the Applicant and the City, which would provide vested rights to develop the Property, while also providing negotiated public benefits; and • Addendum to the 2006 General Plan Update and 2014 General Plan Land Use Element Amendment Environmental Impact Reports (ER2020-002) — Pursuant to the California Environmental Quality Act ("CEQA"), the Addendum to the 2006 General Plan Update Program Environmental Impact Report ("PEIR") and 2014 General Plan Land Use Element Supplemental Environmental Impact Report ("SEI R") will address reasonably foreseeable environmental impacts resulting from the Project; WHEREAS, the Project is not located in the coastal zone; therefore, amending the Local Coastal Program or a coastal development permit is not required; WHEREAS, a telephonic study session was held on April 23, 2020, in the Council Chambers located at 100 Civic Center Drive, Newport Beach, California, due to the Declaration of a State Emergency and Proclamation of Local Emergency related to COVID-19 to introduce the Project to the Planning Commission; WHEREAS, a telephonic public hearing was held by the Planning Commission on June 4, 2020, in the Council Chambers located at 100 Civic Center Drive, Newport Beach, California, due to the Declaration of a State Emergency and Proclamation of Local Emergency related to COVID-19. A notice of time, place and purpose of the public hearing was given in accordance with California Government Code Section 54950 et seq. ("Ralph M. Brown Act") and Chapter 20.62 (Public Hearings) of the Newport Beach Municipal Code ("NBMC"). Evidence, both written and oral, was presented to, and considered by, the Planning Commission at this public hearing; WHEREAS, at the hearing, the Planning Commission adopted Resolution No. PC2020-020 by a unanimous vote (6 ayes, 0 nays) recommending the City Council approve the Project; and 14-17 Resolution No. 2020 - Page 3 of 7 WHEREAS, telephonic public hearings were held by the City Council on September 8, 2020 and September 22, 2020, in the Council Chambers located at 100 Civic Center Drive, Newport Beach, California, due to the Declaration of a State Emergency and Proclamation of Local Emergency related to COVID-19. A notice of time, place and purpose of the public hearings were given in accordance with Public Utilities Code Section 21676(b), the Ralph M. Brown Act, and Chapters 15.45 (Development Agreements), 20.56 (Planning Community District Procedures) and 20.62 (Public Hearings) of the NBMC. Evidence, both written and oral, was presented to, and considered by, the City Council at these public hearings. NOW, THEREFORE, the City Council of the City of Newport Beach resolves as follows: Section 1: On July 25, 2006, the City Council adopted Resolution No. 2006-75, thereby certifying the adequacy and completeness of the Environmental Impact Report ("EIR") for the 2006 General Plan Update (SCH No. 2006011119). The EIR was prepared in compliance with California Public Resources Code Section 21000 of seq. ("CEQA"), its implementing regulations set forth in the California Code of Regulations Title 14, Division 6, Chapter 3 ("CEQA Guidelines") and City Council Policy K-3. Additionally, in accordance with Section 15168(a) of the CEQA Guidelines, the City prepared the EIR as a PEIR that analyzed the potential impacts of a citywide land use plan, and the goals and policies of 10 general plan elements. The General Plan designates the Property as AO (Airport Office and Supporting Uses). The designation would allow up to 358,498 square feet of office based on the allowable 0.5 floor area ratio ("FAR"). The AO (Airport Office and Supporting Uses) land use designation is intended to allow uses that support or benefit from operations of the adjoining John Wayne Airport. These may include professional offices, aviation, retail, automobile rental, sales, and service, hotels and ancillary retail, restaurant, and service uses. This designation specifies a FAR of 0.5, except for warehousing, which may be developed at a FAR of 0.75. Section 2: The City Council adopted Resolution Nos. 2007-79 and 2012-62 on December 11, 2007 and July 24, 2012, respectively. These resolutions approved CEQA Addendum Nos. 1 and 2 to the PEIR for the 2006 General Plan Update to analyze changes to the development intensities within the North Newport Center Planned Community ("NNCPC") Development Plan. No analysis of the Property was included in these addendums. 14-18 Resolution No. 2020 - Page 4 of 7 Section 3: On July 22, 2014, the City Council adopted Resolution 2014-65, thereby certifying the adequacy and completeness of SEIR No. ER2014-002 as part of an update to the 2014 General Plan Land Use Element Update (SCH No. 2013101064). The SEIR was prepared in compliance with CEQA, CEQA Guidelines and City Council Policy K-3. The SEIR focused on an amendment to the General Plan Land Use Element proposing both reduced and increased development capacities in various areas of the City. The 2014 General Plan Land Use Element Update that was the focus of the SEIR designated the Property as MU -H2 (Mixed -Use Horizontal 2), among other changes to the General Plan Land Use Element. The SEIR analyzed the impacts of potential development of an additional 238,077 square feet of office space and 329 dwelling units at the Property in addition to the 358,498 commercial floor area allowed by the General Plan prior to the 2014 General Plan Land Use Element Update. The MU -H2 (Mixed -Use Horizontal 2) designation, which applies to properties in the Airport Area, provides for a horizontal intermixing of uses that may include regional commercial office, multifamily residential, vertical mixed-use building, industrial, hotel rooms, and ancillary neighborhood commercial uses. As a result of failing to obtain voter approval in the November 2014 general election as required by Section 423 of the City Charter, the 2014 General Plan Land Use Element Update was not approved or implemented; however, City Council Resolution No. 2014-65 certifying the SEIR remains valid and effective because it was not rescinded by the outcome of the vote or by action of the City Council. Section 4: Pursuant to Section 21166 of the California Public Resources Code and Section 15162 of the CEQA Guidelines, when an EIR has been certified for a project, no subsequent EIR is required unless the lead agency determines, on the basis of substantial evidence in the light of the whole record, one or more of the following: a. Substantial changes are proposed in the project which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; b. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or 14-19 Resolution No. 2020 - Page 5 of 7 c. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete, shows any of the following: i. The project will have one or more significant effects not discussed in the previous EIR; ii. Significant effects previously examined will be substantially more severe than shown in the previous EIR; iii. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or iv. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative. Section 5: The Applicant is proposing to amend the General Plan Land Use Designation from AO (Airport Office and Supporting Uses) to MU -H2 (Mixed Use Horizontal 2) and to amend Table LU2 (Anomaly Locations) to add the Property as Anomaly No. 86; and rezone the Property from OA (Office -Airport) to PC (Newport Airport Village Planned Community). This change will allow the construction of 444 dwelling units (329 base units and 115 density bonus units), and 297,572 square feet of commercial uses. The commercial floor area is a reduction from what the General Plan currently would allow for the Property. General Plan Policy LU 6.15.5 (Residential and Supporting Uses) and the MU -H2 (Mixed Use Horizontal 2) allows a maximum of 2,200 residential units. The Project's residential component is allocated from the remaining portion of the 2,200 units and would not increase planned residential development in the area. Further, the SEIR analyzed the construction of 444 dwelling units in the same Traffic Analysis Zone ("TAZ") and concluded there would be no impact. Due to the similarity between the Project and the prior projects that considered in the PER and SEIR, an Addendum was prepared pursuant to Section 15162 (Subsequent EIRs and Negative Declarations) and 15164 (Addendum to an EIR or Negative Declaration) of the CEQA Guidelines. 14-20 Resolution No. 2020 - Page 6 of 7 Section 6: The following environmental topics were analyzed for the proposed Project: Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Energy, Geology and Soils, Greenhouse Gas Emissions, Hazards and Hazardous Materials, Hydrology, Land Use and Planning, Mineral Resources, Noise, Population and Housing, Public Services, recreation, Transportation, Tribal Cultural Resources and Utilities and Service Systems. The Addendum includes analysis of new topics that were not included in the PEIR and SEIR. Specifically, the Addendum includes a new energy section and a new wildfire section. These additional analyses are appropriate for inclusion in the Addendum, but none result in new or increased significant impacts that would require preparation of a subsequent EIR pursuant to Section 15162 of the CEQA Guidelines. Section 7: On the basis of the entire administrative record, the Project will not result in any new significant impacts that were not previously analyzed in the PEIR for the 2006 General Plan Update (SCH No. 2006011119) or the SEIR for the 2014 General Plan Land Use Element Update (SCH No. 2013101064). The potential impacts associated with this Project would either be the same or less than those described in either the PEIR or SEIR that have been appropriately mitigated. In addition, there are no substantial changes to the circumstances under which the Project would be undertaken that would result in new or more severe environmental impacts than previously addressed in either the PEIR or SEIR, nor has any new information regarding the potential for new or more severe significant environmental impacts been identified. Therefore, in accordance with Section 15164 of the CEQA Guidelines, the Addendum to the previously adopted PEIR and SEIR is the appropriate environmental document for the Project. In taking action to approve any of the requested applications for the proposed Project, the data presented in the PEIR and SEIR, as augmented by the Addendum for this Project, are considered as part of the record. Section 8: The Addendum to the PEIR and SEIR, is hereby adopted by the City Council. The Addendum to the PEIR and SEIR and all materials, which constitute the record upon which this decision was based, are on file with the Planning Division, City Hall, 100 Civic Center Drive, Newport Beach, California. Section 9: The City Council finds that judicial challenges to the City's CEQA determinations and approvals of land use projects are costly and time consuming. In addition, project opponents often seek an award of attorneys' fees in such challenges. As project applicants are the primary beneficiaries of such approvals, it is appropriate that such applicants should bear the expense of defending against any such judicial challenge, and bear the responsibility for any costs, attorneys' fees, and damages which may be awarded to a successful challenger. 14-21 Resolution No. 2020 - Page 7 of 7 Section 10: The recitals provided in this resolution are true and correct and are incorporated into the operative part of this resolution. Section 11: If any section, subsection, sentence, clause or phrase of this resolution is for any reason held to be invalid or unconstitutional, such decision shall not affect the validity or constitutionality of the remaining portions of this resolution. The City Council hereby declares that it would have passed this resolution, and each section, subsection, sentence, clause or phrase hereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses or phrases be declared invalid or unconstitutional. Section 12: This resolution shall take effect immediately upon its adoption by the City Council, and the City Clerk shall certify the vote adopting the resolution. ADOPTED this 8t" day of September, 2020 Will O'Neill Mayor ATTEST: Leilani I. Brown City Clerk APPROVED AS TO FORM: CITY TTORNEY'S OFFICE Aaron C. Harp City Attorney Attachment: Exhibit A — Legal Description Exhibit B —Addendum to the 2006 General Plan Update (SCH No. 2006011119) and 2014 General Plan Land Use Element Update (SCH No. 2013101064) Environmental Impact Reports 14-22 EXHIBIT "A" Legal Description 14-23 ADDRESS APN LEGAL DESCRIPTION 4361 Birch Street, 427-121-23 THE LAND REFERRED TO HEREIN BELOW IS SITUATED NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF Newport Beach CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA LOTS 7, 8, 9 AND 10 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190, PAGES 11, 12 AND 13 OF MISCELLANEOUS MAPS, RECORDS OF ORANGE COUNTY, CALIFORNIA. SAID LAND IS ALSO SHOWN AS PARCEL 1 ON LOT LINE ADJUSTMENT 93-5, RECORDED DECEMBER 8, 1993 AS INSTRUMENT NO. 93-0854901, OFFICIAL RECORDS. EXCEPTING THEREFROM ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE GRANT DEED RECORDED APRIL 9, 1993 AS INSTRUMENT NO. 93-0237996 OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE GRANT DEED 14-24 ADDRESS APN LEGAL DESCRIPTION RECORDED APRIL 9, 1993 AS INSTRUMENT NO. 93-0237996, OFFICIAL RECORDS. 4540 Campus 427-111-03 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: Newport Beach, CA PARCEL 1: LOT 18 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 11 THROUGH 13, INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPT ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED JUNE 30, 1992 AS INSTRUMENT NO. 92-440215 OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANYAND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE, AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, 14-25 ADDRESS APN LEGAL DESCRIPTION ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED JUNE 30, 1992 AS INSTRUMENT NO. 92-440215 OF OFFICIAL RECORDS. PARCEL 2: AN EASEMENT FOR DRIVEWAY PURPOSES OVER THE WESTERLY 12 FEET OF THE NORTHERLY 60 FEET OF LOT 17 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190, PAGES 11 THROUGH 13, INCLUSIVE OF MISCELLANEOUS MAPS, RECORDS OF ORANGE COUNTY, CALIFORNIA, AS SET FORTH IN THAT CERTAIN DECLARATION OF ACCESS EASEMENT, RECORDED JUNE 30, 1992 AS INSTRUMENT NO. 92-440213 OF OFFICIAL RECORDS, UPON THE TERMS AND CONDITIONS AS THEREIN PROVIDED 4340 Campus 427-121-07 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: Newport Beach, CA LOT 29 OF TRACT NO. 3201, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 130, PAGES 25 TO 30 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, ANY OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED BY THE IRVINE COMPANY IN DEED RECORDED 14-26 ADDRESS APN LEGAL DESCRIPTION FEBRUARY 4, 1994 AS INSTRUMENT NO. 94-0085581 OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS AS RESERVED IN THE DEED RECORDED FEBRUARY 4, 1994 AS INSTRUMENT NO. 94- 0085581 OF OFFICIAL RECORDS 4400 Campus 427-121-09 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: Newport Beach, CA LOT 31 OF TRACT NO. 3201, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 130, PAGE(S) 25 THROUGH 30, INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, ANY OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED BY THE IRVINE COMPANY IN DEED RECORDED 14-27 ADDRESS APN LEGAL DESCRIPTION DECEMBER 20, 1991 AS INSTRUMENT NO. 91-702340, OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS AS RESERVED IN THE DEED RECORDED DECEMBER 20, 1991 AS INSTRUMENT NO. 91- 702340, OF OFFICIAL RECORDS 4570 Campus 427-111-04 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: Newport Beach, CA PARCEL 1: LOT 17 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 11 THROUGH 13, INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAND COUNTY. EXCEPTING THEREFROM ALL MINERALS, OIL, GAS, PETROLEUM, OTHER HYDROCARBON SUBSTANCES AND ALL UNDERGROUND WATER IN OR UNDER OR WHICH MAY BE PRODUCED FROM SAID LAND WHICH UNDERLIES A PLANE PARALLEL TO AND 500 FEET FROM THE PRESENT SURFACE OF SAID LAND FOR THE PURPOSE OF PROSPECTING FOR, THE EXPLORATION, DEVELOPMENT, PRODUCTION, EXTRACTION AND TAKING OF SAID MINERALS, OIL, GAS, PETROLEUM, OTHER HYDROCARBON SUBSTANCES AND WATER FROM SAID LAND BY MEANS OF MINES, WELLS, DERRICKS, OTHER EQUIPMENT FROM SURFACE LOCATIONS ON ADJOINING OR NEIGHBORING LAND OR LYING OUTSIDE OF THE ABOVE DESCRIBED LAND, IT BEING UNDERSTOOD THAT THE OWNER OF SUCH MINERALS, OIL GAS, PETROLEUM, OTHER HYDROCARBON SUBSTANCES AND WATER AS SET FORTH ABOVE, SHALL HAVE NO RIGHT TO ENTER UPON THE SAID LAND OR ANY PORTION THEREOF ABOVE SAID PLANE PARALLEL TO AND 500 FEET BELOW THE 14-28 ADDRESS APN LEGAL DESCRIPTION PRESENT SURFACE OF TI EE SAID LAND FOR ANY PURPOSE WHATSOEVER. AS RESERVED BY THE IRVINE COMPANY, A MICHIGAN CORPORATION IN THE DEED RECORDED FEBRUARY 19, 1993 AS INSTRUMENT NO. 93-107963 OF OFFICIAL RECORDS. PARCEL 2: NON-EXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "DECLARATION OF ACCESS EASEMENTS (MACARTHUR/CAMPUS)" DATED JANUARY 30, 1992 AND RECORDED FEBRUARY 20, 1992 AS INSTRUMENT NO. 92-101692 AS AMENDED AND RESTATED IN AN INSTRUMENT RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247260, BOTH OF OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. PARCEL 3: NON-EXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "DECLARATION OF ACCESS EASEMENT. DATED JUNE 17, 1992, AND RECORDED JUNE 30, 1992 AS INSTRUMENT NO. 92- 440213 OF OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. 4341 Birch Street 427-121-14 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA LOT 6 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190, PAGES 11, 12 AND 13 OF MISCELLANEOUS MAPS, RECORDS OF SAID ORANGE COUNTY. EXCEPT ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, 14-29 ADDRESS APN LEGAL DESCRIPTION RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED DECEMBER 31, 1991 AS INSTRUMENT NO. 91- 720058 OF OFFICIAL RECORDS. ALSO EXCEPT ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED DECEMBER 31, 1991 AS INSTRUMENT NO. 91-720058 OF OFFICIAL RECORDS. APN: 427-121-14 4500 and 4520 427-111-01, THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Campus Drive 427-111-02 CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, and 427- STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: Newport Beach, 121-10 CA PARCEL 1 IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP FILED IN BOOK 60, PAGE 22 OF PARCEL MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. 4600 Campus 427-111-05 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: Newport Beach, CA PARCEL 1: LOT 16 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 11 TO 13 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM, ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM AND OTHER MATERIAL RESOURCES 14-30 ADDRESS APN LEGAL DESCRIPTION AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE ON THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED BY THE IRVINE COMPANY, RECORDED FEBRUARY 19, 1993 AS INSTRUMENT NO. 93- 107971, OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED BY THE IRVINE COMPANY, RECORDED FEBRUARY 19, 1993 AS INSTRUMENT NO. 93-107971, OFFICIAL RECORDS. PARCEL 2: NONEXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "AMENDED AND RESTATED OR ACCESS EASEMENTS (MACARTHUR/CAMPUS)", DATED MARCH 25, 1992, RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247260, IN THE OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. 4360 Campus 427-121-08 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: 14-31 ADDRESS APN LEGAL DESCRIPTION Newport Beach, LOT 30 OF TRACT NO. 3201, IN THE CITY OF NEWPORT BEACH, CA COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 130, PAGES 25, 26, 27, 28,29 AND 30 OF MISCELLANEOUS MAPS, RECORDS OF ORANGE COUNTY CALIFORNIA. EXCEPT ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED MARCH 15, 1994 AS INSTRUMENT NO. 94-0179376, OFFICIAL RECORDS. ALSO EXCEPT ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED MARCH 15, 1994 AS INSTRUMENT NO. 94-0179376, OFFICIAL RECORDS. 14-32 ADDRESS APN LEGAL DESCRIPTION 4501 Birch Street 427-111-10 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA PARCEL 1: LOT 12 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190. PAGES 11 TO 13 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPT ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR. ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED JANUARY 10, 1992 AS INSTRUMENT NO. 92- 015047, OFFICIAL RECORDS. ALSO EXCEPT ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED 14-33 ADDRESS APN LEGAL DESCRIPTION JANUARY 10, 1992 AS INSTRUMENT NO. 92-015047, OFFICIAL RECORDS. PARCEL 2: A NON-EXCLUSIVE EASEMENT FOR INGRESS AND EGRESS OVER THAT PORTION OF LOT 13 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 11 TO 13 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY, DESCRIBED AS FOLLOWS: BEGINNING AT THE MOST SOUTHERLY CORNER OF SAID LOT; THENCE NORTH 290 52'01" WEST 327.33 FEET TO THE MOST WESTERLY CORNER OF SAID LOT; THENCE NORTH 520 01'58" EAST 24.24 FEET ALONG THE NORTHWESTERLY LINE OF SAID LOT TO THE NORTHWESTERLY PROLONGATION OF A LINE PARALLEL WITH AND NORTHEASTERLY 24.00 FEET FROM THE SOUTHWESTERLY LINE OF SAID LOT; THENCE SOUTH 290 52' 10" EAST 331.81 FEET ALONG SAID PROLONGATION, SAID PARALLEL LINE AND THE SOUTHERLY PROLONGATION THEREOF TO A POINT ON A CURVE IN THE SOUTHERLY LINE OF SAID LOT, SAID CURVE BEING CONCAVE SOUTHERLY, HAVING A RADIUS OF 272.00 FEET, A RADIAL TO SAID POINT BEARS NORTH 240 48' 17" WEST; THENCE WESTERLY 24.03 FEET ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 50 03'44" OF THE POINT OF BEGINNING. 4630 Campus 427-111-06 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: Newport Beach, CA PARCEL 1: LOT 15 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 11 TO 13 OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM, ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN GEOTHERMAL STEAM, ANY OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN 14-34 ADDRESS APN LEGAL DESCRIPTION THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT HOWEVER, THE RIGHT TO DRILL MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OF THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED BY THE IRVINE COMPANY RECORDED FEBRUARY 19, 1993 AS INSTRUMENT NO. 93- 107967, OFFICIAL RECORDS. PARCEL 2: NONEXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "AM ENDED AND RESTATED DECLARATION OF ACCESS EASEMENTS (MACARTHUR/CAMPUS) DATED MARCH 25, 1992 RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247260, IN THE OFFICE RECORDS OF ORANGE COUNTY, CALIFORNIA. PARCEL 3: NONEXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED " RECIPROCAL EASEMENT AGREEMENT AND CONSENT" DATED OCTOBER 14, 1999 RECORDED NOVEMBER 19, 1999 AS INSTRUMENT NO. 19990805278, AND AMENDED BY THE CERTAIN DOCUMENT ENTITLED "WAIVER AND AMENDMENT TO RECIPROCAL EASEMENT AGREEMENT" DATED AUGUST 24, 2015 RECORDED AUGUST 28, 2015 AS INSTRUMENT NO. 2015000446662 IN THE OFFICE RECORDS OF ORANGE COUNTY, CALIFORNIA. 4525, 4533 and 427-111-09 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE 4647 MacArthur CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Boulevard STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: Newport Beach, PARCEL 1: CA LOT 13 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190, PAGE(S) 11 TO 13 INCLUSIVE, OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM 14-35 ADDRESS APIN LEGAL DESCRIPTION ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFORE AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION RECORDED APRIL 16, 1992. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL, BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION RECORDED APRIL 16, 1992. PARCEL 2: NON-EXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "DECLARATION OF ACCESS EASEMENTS (MACARTHUR/CAMPUS)" DATED JANUARY 30, 1992 AND RECORDED FEBRUARY 20, 1992 AS INSTRUMENT NO. 92-101692, OFFICIAL RECORDS AND AMENDED BY DOCUMENT RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247260, OFFICIAL RECORDS, IN THE OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. PARCEL 3: NON-EXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "DECLARATION OF ACCESS 14-36 ADDRESS APN LEGAL DESCRIPTION EASEMENTS (BIRCH/MACARTHUR)" DATED JANUARY 30, 1992 AND RECORDED FEBRUARY 20, 1992 AS INSTRUMENT NO. 92- 101691 OFFICIAL RECORDS AND AMENDED BY DOCUMENT RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247259 OFFICIAL RECORDS IN THE OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. 4320 Campus 427-121-06 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: Newport Beach, CA LOT 28 OF TRACT NO. 3201, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 130, PAGES 25 THROUGH 30, INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, ANY OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED BY THE IRVINE COMPANY, A MICHIGAN CORPORATION, BY DEED RECORDED MAY 6, 1994 AS INSTRUMENT NO. 94-317183 OF OFFICIAL RECORDS. 14-37 May 2020 Addendum No. 3 to the City of Newport Beach General Plan 2006 Update EIR, April 2006 (SCH No. 2006011119) and Addendum No. 1 to the General Plan Land Use Element Amendment Final Supplemental EIR, May 2014 (SCH No. 2013101064) Newport Airport Village City of Newport Beach Prepared for: City of Newport Beach Contact: James W. Campbell, Deputy Director Community Development Community Development Department 100 Civic Center Drive Newport Beach, California 92660 949.644.3210 Prepared by: PlaceWorks Contact: JoAnn C. Hadfield, Principal 3 MacArthur Place, Suite 1100 Santa Ana, California 92707 714.966.9220 info@placeworks.com www.placeworks.com ED PLACEWORKS NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Table of Contents Section Page 1. INTRODUCTION..............................................................................................................................1 1.1 BACKGROUND, PURPOSE, AND SCOPE..................................................................................................1 AGRICULTURE AND FORESTRY RESOURCES................................................................................... 1.2 ENVIRONMENTAL PROCEDURES............................................................................................................ 2 1.3 CONTENT AND ORGANIZATION OF THIS ADDENDUM............................................................. 4 2. ENVIRONMENTAL SETTING......................................................................................................... 7 2.1 PROJECT LOCATION....................................................................................................................................... 7 2.2 ENVIRONMENTAL SETTING....................................................................................................................... 7 3. PROJECT DESCRIPTION.............................................................................................................17 5.8 3.1 PROJECT BACKGROUND.............................................................................................................................17 5.9 3.2 PROPOSED LAND USE..................................................................................................................................21 5.10 3.3 PROPOSED ENTITLEMENTS......................................................................................................................27 5.11 4. ENVIRONMENTAL CHECKLIST.................................................................................................. 39 4.1 BACKGROUND..................................................................................................................................................39 4.2 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED...........................................................41 4.3 DETERMINATION (TO BE COMPLETED BY THE LEAD AGENCY).........................................41 4.4 COMPARING CHANGES AND/OR NEW INFORMATION TO PREVIOUS EIRs ................... 42 5. ENVIRONMENTAL ANALYSIS..................................................................................................... 45 5.1 AESTHETICS...................................................................................................................................................... 49 5.2 AGRICULTURE AND FORESTRY RESOURCES................................................................................... 61 5.3 AIR QUALITY..................................................................................................................................................... 65 5.4 BIOLOGICAL RESOURCES.......................................................................................................................... 77 5.5 CULTURAL, RESOURCES............................................................................................................................... 88 5.6 ENERGY...............................................................................................................................................................94 5.7 GEOLOGY AND SOILS................................................................................................................................100 5.8 GREENHOUSE GAS EMISSIONS.............................................................................................................110 5.9 HAZARDS AND HAZARDOUS MATERIALS.......................................................................................116 5.10 HYDROLOGY..................................................................................................................................................132 5.11 LAND USE AND PLANNING....................................................................................................................140 5.12 MINERAL RESOURCES................................................................................................................................155 5.13 NOISE..................................................................................................................................................................158 5.14 POPULATION AND HOUSING................................................................................................................171 5.15 PUBLIC SERVICES..........................................................................................................................................176 5.16 RECREATION..................................................................................................................................................184 5.17 TRANSPORTATION.......................................................................................................................................188 5.18 TRIBAL CULTURAL RESOURCES............................................................................................................201 5.19 UTILITIES AND SERVICE SYSTEMS...................................................................................................... 206 5.20 WILDFIRE..........................................................................................................................................................221 6. SUMMARY...................................................................................................................................225 7. REFERENCES.............................................................................................................................227 APPENDICES Appendix A Newport Village Planned Community Development Plan Appendix B Newport Village Trip Making Assessment May 2020 Page i NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Table of Contents List of Figures Figure1 Regional Location................................................................................................................................. 9 Figure2 Local Vicinity.......................................................................................................................................11 Figure 3 Aerial Photograph, Project Site........................................................................................................13 Figure 4 Aerial Photograph, Airport Area......................................................................................................15 Figure5 LU22 Airport Area.............................................................................................................................19 Figure 6 Airport Area Proposed Changes, 2014 LUE Amendment..........................................................23 Figure7 Concept Plan....................................................................................................................................... 25 Figure8 PC District Boundary......................................................................................................................... 33 Figure9 Planning Areas 1 & 2.......................................................................................................................... 35 Figure 10 Conceptual Architecture....................................................................................................................37 Figure 11 Height Restrictions per Federal Air Regulations, Part 77............................................................ 53 Figure 12 Airport Area Safety Zones................................................................................................................ 55 Figure 13 2006 General Plan Biological Resources......................................................................................... 79 Figure 14 Environmental Study Areas(ESAs)................................................................................................. 81 Figure 15 FAA Part 77 Height Restrictions — 2014 LUE Amendment Airport Area ChangeAreas.....................................................................................................................................121 Figure 16 2008 AELUP JWA Noise Exposure at the Project Site.............................................................165 Page ii PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Table of Contents List of Tables Table 1 Proposed Area 4A Land Use Changes, LUE Amendment (2014) ............................................. 21 Table 2 Permitted Uses By Planning Area.................................................................................................... 28 Table 3 Allowable Land Use Comparison: Proposed Project, 2006 General Plan and Uses(dBA CNEL)............................................................................................................................160 2014 LUE Amendment for the Project Site...................................................................................47 Projected Jobs -Housing Ratio........................................................................................................172 Table 4 Land Use Compatibility: John Wayne Airport Safety Zones ....................................................... 57 Table 5 Existing Maximum Permitted Building Heights..........................................................................119 Project Trip Generation — LUE Amendment Airport Area Change Areas ............................189 Table 6 GeoTracker and RCRA Info Sites.................................................................................................126 2006 General Plan Update Traffic Analysis — Land Use Comparison to Table 7 Newport Beach General Plan Consistency Analysis...................................................................142 Table 8 City of Newport Beach Incremental Noise Impact Criteria for Noise -Sensitive Uses(dBA CNEL)............................................................................................................................160 Table 9 Projected Jobs -Housing Ratio........................................................................................................172 Table 10 Projected Student Population in SAUSD.....................................................................................181 Table 11 Project Trip Generation — LUE Amendment Airport Area Change Areas ............................189 Table 12 2006 General Plan Update Traffic Analysis — Land Use Comparison to ProposedProject...............................................................................................................................191 Table 13 Project Site Trip Generation — 2006 GPA vs Proposed Project...............................................192 Table 14 Intersection Level of Service — 2006 GPU vs Proposed Project..............................................193 Table 15 2014 LUE Amendment Traffic Analysis — Land Use Comparison to Proposed Project.................................................................................................................................................194 Table 16 Project Site Trip Generation — 2014 LUE Amendment vs Proposed Project ........................194 Table 17 Intersection Level of Service — 2014 LUE Amendment vs Proposed Project .......................195 Table 18 Net Increase in Wastewater Generation.......................................................................................212 Table 19 Net Increase in Water Demand......................................................................................................214 Table 20 Net Increase in Solid Waste Generation.......................................................................................216 Table 21 Annual Net Increase in Electricity Use — Project Site................................................................218 Table 22 Annual Net Increase in Natural Gas Use......................................................................................219 May 2020 Page iii NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Table of Contents Tbis page intentionally left blank. Page iv PlaceWorks 1. Introduction 1.1 BACKGROUND, PURPOSE, AND SCOPE This document is an Addendum to the following previously certified City of Newport Beach Environmental Impact Reports (EIRs): ■ General Plan 2006 Update Final Environmental Impact Report, April 2006 (State Clearinghouse No. 2006011119), as amended by two subsequent GPEIR Addendums: • Addendum to the City of Newport Beach General Plan 2006 Update Final Environmental Impact Report, November 2007. • Addendum No. 2 to the City of Newport Beach General Plan 2006 Update Final Environmental Impact Report, June 12, 2015. ■ General Plan Land Use Element (LUE) Amendment, Final Supplemental Environmental Impact Report, March 2014 (State Clearinghouse No. 201310164). The comprehensive 2006 General Plan Update EIR analyzed the potential impacts of a citywide comprehensive update to the land use plan, and goals and policies for 10 general plan elements. The Supplemental DEIR in 2014 focused on a General Plan Land Use Element Amendment proposing reduced or increased development capacities in various areas of the City. Both EIRs encompass proposed land uses for the Airport Area community and include the project site that is the subject of this Addendum. The subject property is an approximately 16.46 -acre site located west of MacArthur Boulevard, south of Campus Drive, north of Birch Street, and about 550 north of Dove Street. The site currently allows 358,498 square feet of commercial uses and is developed with a mix of office, retail, restaurant, and car rental facilities. The 2006 GPU EIR and 2014 LUE Amendment Supplemental EIR (SEIR) designated the site for the following uses: ■ 2006 GPU EIR: Airport Office and Supporting Uses (AO). The designation would allow up to 358,498 square feet of commercial uses based on the allowable 0.5 floor area ratio (FAR). The AO land use designation is intended to allows uses that support or benefit from operations of the adjoining John Wayne Airport. These may include professional offices; aviation; retail; automobile rental, sales, and service; hotels and ancillary retail, restaurant, and service uses. This designation specifies an FAR of 0.5, except for warehousing, which may be developed at an FAR of 0.75. ■ 2014 LUE Amendment SEIR: Mixed Use -Horizontal 2 (MU -142). The SEIR assesses the potential development of an additional 238,077 additional square feet of office space and 329 new dwelling units (plus 115 density bonus units) for the site identified as "Saunders Properties." In the 2014 LUE May 2020 Page 1 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 1. Introduction Amendment SEIR, the Saunders Properties site encompassed approximately 26.24 acres. (The proposed project occupies 16.46 acres of that area.) The MU -H2 designation applies to properties located in the Airport Area. It provides for a horizontal intermixing of uses that may include regional commercial office, multifamily residential, vertical mixed-use building, industrial, hotel rooms, and ancillary neighborhood commercial uses. A maximum of 2,200 residential units are allowed within this designation (exclusive of density bonus units) as replacement of existing office, retail, and/or industrial uses, at a maximum density of 50 units per adjusted gross acre, of which a maximum of 550 units may be developed as infill. The proposed conceptual plan and Newport Airport Village Planned Community Development Plan (PCDP)—referred to as the proposed project in this Addendum—is based on the development of 329 residential units, additional density bonus units, and a mix of 297,572 square feet of commercial uses. Consistent with chapter 20.32 of the Newport Beach Municipal Code (NBMC), a density bonus will be permitted if the project includes affordable housing units. The NBMC would allow a maximum density bonus of 35 percent of residential units (115 additional units), resulting in up to 444 dwelling units for the project. The actual number of density bonus units will be determined at the time that a development project is proposed. At this time, only a conceptual development plan has been prepared as part of the modified project (the PCDP). This Addendum, therefore, addresses the potential environmental impacts of a maximum impact scenario assuming 444 dwelling units and a mix of 297,572 square feet of commercial. The incremental impacts of the project are evaluated relative to the two certified EIRs described above. This Addendum substantiates that no supplemental or subsequent EIR is required pursuant to Section 21166 of the California Environmental Quality Act (CEQA) and Sections 15162 and 15164 of the CEQA Guidelines for the entitlements proposed (zone change, general plan amendment, planned community development plan, and development agreement). In comparison to the 2006 and 2014 EIRs, the project would not result in new or substantially more severe environmental impacts. Further, since the 2006 and 2014 EIRs were certified, there has been no substantial change with respect to the circumstances under which the project is being undertaken that would require major revisions to the EIRs. Any future discretionary entitlements required to develop the project site (for example, a tentative tract map and site development review) would be subject to further environmental review under CEQA. 1.2 ENVIRONMENTAL PROCEDURES 1.2.1 CEQA Requirements According to Section 21166 of CEQA and Section 15162 of the State CEQA Guidelines, when an EIR has been certified or a negative declaration adopted for a project, no subsequent EIR or negative declaration shall be prepared for the project unless the lead agency determines that one or more of the following conditions are met: 1. Substantial project changes are proposed that will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects. Page 2 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 1. Introduction 2. Substantial changes would occur with respect to the circumstances under which the project is undertaken that require major revisions to the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects. 3. New information of substantial importance that was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified or the negative declaration was adopted shows any of the following: a. The project will have one or more significant effects not discussed in the previous EIR or negative declaration. b. Significant effects previously examined will be substantially more severe than identified in the previous EIR. c. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponent declines to adopt the mitigation measures or alternatives. d. Mitigation measures or alternatives that are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponent declines to adopt the mitigation measures or alternatives. Preparation of an Addendum to an EIR is appropriate when none of the conditions specified in Section 15162 (above) are present and some minor technical changes to the previously certified EIR are necessary. After careful consideration of the potential environmental impacts of the proposed project, the City of Newport Beach, as lead agency, has determined that none of the conditions requiring preparation of a subsequent or supplemental EIR have occurred. The City, therefore, has determined that the circumstances described in CEQA Guidelines Section 15164 apply to the proposed project, and an Addendum to the 2006 and 2014 certified EIRs is appropriate. This Addendum compares the proposed project to the designated land uses for the project site as approved in the 2006 General Plan Update (GPU) and the associated environmental impacts assessed in the GPU EIR. It further details impacts of the project compared to impacts identified for the site in the 2014 LUE Amendment SEIR. This Addendum includes analysis of new topical sections that were not included in the previous EIRs; specifically, it includes a new energy section and a new wildfire section (see discussion in Section 1.2.3, CEQA Checklist Update). These additional analyses are appropriate for inclusion in the Addendum, but none result in new or increased significant impacts that would require preparation of a subsequent EIR pursuant to Section 15162 of the CEQA Guidelines. 1.2.2 Scope of Subsequent Analysis The discretionary approvals subject to CEQA for the proposed project include the following: May 2020 Page 3 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 1. Introduction ■ Zone Change from OA (Office Airport) to PC (Newport Airport Village Planned Community) ■ General Plan Amendment from AO (Airport Office and Supporting uses) to MU -H2 (Mixed Use Horizontal) ■ Adoption of Newport Airport Village Planned Community Development Plan ■ Approval of Development Agreement between the applicant and the City of Newport Beach As lead agency under CEQA for this action, the City of Newport Beach is required to evaluate the environmental impacts associated with these discretionary approvals. The scope of the review for project - related impacts for this Addendum is limited to changes between the land uses as evaluated in the 2006 and 2014 EIRs in comparison to the currently proposed project. The approved, designated land uses in the 2006 General Plan and the GPU policies identified in the 2006 GPU EIR that mitigate potential environmental impacts for the site serve as the baseline for the environmental impact analysis of the proposed project. Relative impacts to the site land use as evaluated in the 2014 LUE Amendment SEIR are also evaluated to substantiate that new impacts associated with the proposed project would not be significant. Note that neither the 2006 GPU EIR nor the 2014 LUE Amendment SEIR included mitigation measures. Both relied on detailed General Plan policies adopted in the 2006 General Plan to mitigate potential environmental impacts. As applicable, in addition to 2006 General Plan policies, this Addendum documents required regulatory requirements and City conditions of approval that reduce potential environmental impacts. As described further below, existing enforcement and monitoring mechanisms are in place to ensure that all measures will be implemented. A CEQA Mitigation Monitoring Program, therefore, is not required. This document is intended to provide sufficient information to allow the City of Newport Beach and any other permitting agencies to evaluate the potential impacts from construction and operation of the proposed project. 1.2.3 CEQA Checklist Update On December 28, 2018, the Office of Administrative Law approved updated CEQA Guidelines that were implemented on January 1, 2019. The updated guidelines include an update to the Appendix G Checklist, which is used as the basis for topical environmental review by the City of Newport Beach. This Addendum has been prepared to fully address the requirements of the updated guidelines.. The updated Appendix G checklist includes some impact areas that were not included in the 2006 and 2014 certified EIRs. However, as discussed in this Addendum, the proposed project would not have any significant impacts or require mitigation in those impact areas. The addition of impact areas added to the Appendix G Checklist do not necessitate a new EIR. 1.3 CONTENT AND ORGANIZATION OF THIS ADDENDUM The following components comprise the EIR Addendum in its totality: 1. The Introduction (Section 1), the Environmental Setting (Section 2) and Project Description (Section 3) Page 4 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 1. Introduction 2. The completed Environmental Checklist Form and its associated analyses (Sections 4 and 5), which conclude that the proposed project would not result in any new significant environmental impacts or substantially increase the severity of environmental impacts beyond the level disclosed in the 2006 General Plan Update EIR as Addended with Addendums 1 and 2. This Addendum relies on the most current CEQA environmental checklist (Appendix G, 2019 CEQA Guidelines), which addresses environmental issues section by section. The completed checklist and conclusions in the checklist are included and substantiated in Section 5, Environmental Analysis, which includes the following subheadings for each environmental topic: ■ Summary of Impacts Identified in the 2006 and 2014 Certified EIRs ■ Impacts Associated with the Proposed Project ■ Adopted Mitigation Measures/General Plan Policies Applicable to the Proposed Project ■ Level of Significance After Mitigation/Policies Implementation Where applicable, specific regulatory requirements identified in the 2006 and 2014 certified EIRs to reduce environmental impacts are reproduced in this Addendum as applicable for the proposed project. 3. The following Appendices to this Addendum: ■ Appendix A: Airport Village Planned Community Development Plan (PCDP) ■ Appendix B: Newport Village Trip Making Assessment 4. The 2006 General Plan Update EIR, accompanying Mitigation Monitoring and Reporting Program (MMRP), Technical Appendices to the GPU EIR, Findings and Statement of Facts, Statement of Overriding Considerations, and City Council Resolution No. 2006-75, which are all herein incorporated by reference pursuant to CEQA Guidelines Section 15150 and are available for review at City of Newport Beach Community Development Department, 100 Civic Center Drive, Newport Beach, CA 92660 and online at www.newportbeachca.gov. 5. Addendum No. 1 to the General Plan Update EIR, which is herein incorporated by reference pursuant to CEQA Guidelines Section 15150 and is available for review at City of Newport Beach Community Development Department, 100 Civic Center Drive, Newport Beach, CA 92660. 6. Addendum No. 2 to the General Plan Update EIR, which is herein incorporated by reference pursuant to CEQA Guidelines Section 15150 and is available for review at City of Newport Beach Community Development Department, 100 Civic Center Drive, Newport Beach, CA 92660. 7. General Plan Land Use Element Amendment Final Supplemental EIR, March 2014 (SCH No. 201310164) accompanying Mitigation Monitoring and Reporting Program (MMRP), Technical Appendices to the GPU EIR, findings and Statement of Facts, Statement of Overriding Considerations, and City Council Resolution No. 2014-65, which are all herein incorporated by reference pursuant to CEQA Guidelines Section 15150 and are available for review at City of Newport Beach Community Development Department, 100 Civic Center Drive, Newport Beach, CA 92660 and online at www.newportbeachca.gov May 2020 Page 5 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 1. Introduction Tbis page intentionally left blank. Page 6 PlaceWorks 2. Environmental Settin 2.1 PROJECT LOCATION The 16.46 -acre project site is generally located southeast of John Wayne Airport and within the Airport Area as defined by the Newport Beach General Plan. The Airport Area includes approximately 360 acres in the northernmost portion of Newport Beach, bounded by Campus Drive to the west and north, Jamboree Road to the east, and Bristol Street to the south. The City of Irvine is located north and east of the Airport Area. The Airport Area is proximate to Interstate 405 and State Routes 55 and 73, and is within a commercial area of Newport Beach that is gradually redeveloping into a mixed-use community integrating residential development with commercial office, retail, and other uses. The Regional Location and Local Vicinity for the project site are depicted in Figures 1 and 2, respectively. An aerial photograph of the project site, which is located west of MacArthur Boulevard, south of Campus Drive, north of Birch Street, and about 550 feet north of Dove Street, is provided as Figure 3, Aerial Photograph, Project Site. 2.2 ENVIRONMENTAL SETTING 2.2.1 Existing Land Use The 2013 traffic study prepared for the LUE Amendment SEIR identified traffic area zones (TAZs). TAZs 1378 and 1379 include the project site and some adjacent properties (they encompass the area bounded by MacArthur Boulevard, Birch Street, Dove Street, and Campus Drive). The traffic study identified existing uses in TAZs 1378 and 1379 as 171,191 square feet of commercial uses and 352,300 square feet of office uses. These uses, as shown on Figure 3, Aerial Photograph, Project Site, are accommodated within several buildings fronting Campus Avenue and Birch Street, and include miscellaneous commercial uses, including retail, office, a bank, service uses, medical offices, a restaurant, and car rental facilities. 2.2.2 Surrounding Land Use Surrounding land uses, including office, hotels, auto rental facilities and retail uses, are depicted on Figure 4, Aerial Photograph, Airport Area. The John Wayne Airport abuts Campus Drive to the north. The 7- to 10 -story Radisson Hotel and Benihana Restaurant are located across Birch Street to the south of the project site. South of the hotel and restaurant, the site of the existing MacArthur Square shopping center, bounded by Scott Drive, Corinthian Way, and Dove Street, was recently approved (2018) for development of a 5 -story, 350 -unit residential project (Newport Crossings). Office and hotel uses are located across MacArthur Boulevard to the east. May 2020 Page 7 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 2. Environmental Setting This page intentionally left blank. Page 8 PlaceWorks Pacific Oce n NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 2. Environmental Setting Tbis page intentionally left blank. Page 10 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Figure 2 - Local Vicinity Note: Unincorporated county areas are shown in white. 0 2,000 — — — — Project Boundary Source: ESRI, 2019 Scale (Feet) PlaceWorks S�- A a shasa v Dr Fx;tg Ma; n Gillettegve ca Q�e c Stu r eon Dr eo St u a Pier ant Dr c otel Manistee Dr ay m Mores N PaularinoAve �� �aaor'tB 4a A/ U) LU Sat Baker St �m caps a o. gas 9fl Rand Iph v a w aae st Mohc et a a F� a nOr O rq va P spm Costa esa = John Wayne Tate o kaimus 1 Airport a� v ar;n oa Or Lir Ave a as cP �a � des ThE . L waY a St p� m 3m sx`i � � o Haus aSt� °. Sq uyac e a St �`a� � Baa t N R, PI ce Of a �9e IrvineAve�a `� gow rit F� 0 as M�aO _ Irvine a 5 yti a a�y4n 5 0� as `?X%eW m ya / Newport Beach aq Way erg University Or m ZZ Upper Newport Bay S @ m m baa v 170 a vis �ckB v rnnovatkOn e m o Ornada g YOr m Ote` o7a o d� a atn nd ri Ova a y c Note: Unincorporated county areas are shown in white. 0 2,000 — — — — Project Boundary Source: ESRI, 2019 Scale (Feet) PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 2. Environmental Setting Tbis page intentionally left blank. Page 12 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Figure 3 - Aerial Photograph, Project Site rnthfan � ' Y ted, �G k Office — — — Project Boundary Traffic Analysis Zone (TAZ) 1377 and 1378 0 350 Source: ESRI, 2019 Scale (Feet) k. PLaceWl'orks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 2. Environmental Setting Tbis page intentionally left blank. Page 14 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 2. Environmental Setting Tbis page intentionally left blank. Page 16 PlaceWorks I Proiect Description 3.1 PROJECT BACKGROUND 3.1.1 2006 General Plan Since Newport Beach is almost fully developed, the 2006 General Plan (existing General Plan) focused on "new development that would result as re -use of economically underperforming properties and obsolete development, conversion of uses in response to market demand (e.g., office and industrial to residential) and more intense use of land in defined areas" (DEIR, General Plan 2006 Update). The General Plan identified several subareas as special study areas, including the John Wayne Airport Area. The plan for the Airport Area is shown in Figure 5, LU22Air�iortArea, and allows for the maintenance and/or limited expansions of currently developed mix of uses, including office, airport -supporting commercial, hotel, and public uses. The 2006 General Plan also introduced the opportunity to develop new residential neighborhoods as replacements for existing and allowed future uses, and in some cases, for underutilized surface parking lots. Policies establish criteria for the development of cohesive residential neighborhoods oriented around neighborhood parks and local -serving convenience commercial facilities and interconnected by a network of pedestrian -oriented streets. Buildout of the Airport Area in accordance with the approved General Plan would allow up to 2,200 residential units (1,650 replacement and 550 additional units), although the addition of 4,300 residential units was studied in the 2006 GPU EIR. As shown in Figure 5, the project site is designated for Airport and Office Supporting (AO) businesses. Residential uses per the 2006 General Plan are not a permitted use within the 16.46 -acre project site, but were identified as allowable uses in the Mixed -Use -Horizontal (MU -H2) areas throughout much of the Airport Area. 3.1.1.1 ADDENDUMS TO THE 2006 GENERAL PLAN UPDATE EIR Subsequent to approval of the General Plan Update approval and certification of the GPU EIR in 2006, two GPU EIR Addendums were approved. Both Addendums were limited to changes in the Newport Center Statistical Area (General Plan Statistical Area L1 (Newport Center/Fashion Island) of the City and did not change land uses or environmental findings related to the Airport Area or to the Airport Village project site. No mitigation measures were required for the changes approved as addressed in these Addendums. Following is a brief summary of actions covered: ■ Addendum to the City of Newport Beach General Plan 2006 Update Final Environmental Impact Report, November 2007. The approval established a "Planned Community District" and adopted the North Newport Center Planned Community (PC) Text. The action incorporated Fashion Island, Block 600 and Block 500, and San Joaquin Plaza owned by The Irvine Company (applicant) into a single Planned Community District. Respective areas and PC Text within the San Joaquin Planned Community District were removed. May 2020 Page 17 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 3. Project Description The PC District is intended to provide the classification and development of land use parcels as a coordinated, comprehensive project to take advantage of large-scale community planning. The North Newport Center PC Text was developed to be consistent with the 2006 adopted General Plan and reflects the uses and land designations permitted under the plan. As detailed in Addendum No. 1, Table 1, "Development Area Summary," land uses would not allow for any increase beyond the development intensities allowed in the General Plan for those subareas. ■ Addendum No. 2 to the City of Newport Beach General Plan 2006 Update Final Environmental Impact Report, June 12, 2015. This Addendum addressed proposed transfers of unbuilt development intensity within the Newport North Center PC (NNCPC). Specifically, the Addendum analyzed: • Conversion of unbuilt, nonresidential development intensity (79 hotel rooms) to multifamily residential development intensity and transfer into the NNCPC. • Assignment of 15 residential units within the MU -H3 portions of Newport Center to San Joaquin Plaza. • Amendment of NNCPC Development Plan to increase allowable residential development by a total of 94 units and to allocate the 94 units plus the 430 residential units currently allocated to the MU -H3 portions of the NNCPC solely to San Joaquin Plaza. • Amendment of the Public Benefit Agreement between the City of Newport Beach and the Irvine Company concerning North Newport Center to vest the revised development intensities and allocations. • Approval of a traffic study for 94 units pursuant to the City's Traffic Phasing Ordinance and Amendment to the Affordable Housing Implementation Plan (AHIP). Based on the facts and analysis in Addendum No. 2, the City's Planning Commission found that the project, when compared to the 2006 GPU EIR, would not result in any new or more severe adverse environmental impacts. The Planning Commission also specifically concluded that, based on the Traffic Phasing Ordinance (TPO) traffic analysis prepared for Addendum No 2, the project would not have any new or more significant adverse traffic or circulation impacts. The General Plan Update EIR and both Addendum Nos. 1 and 2 are incorporated by reference pursuant to CEQA Guidelines Section 15150 and are available for review at the City of Newport Beach Community Development Department, 100 Civic Center Drive, Newport Beach, CA 92660. None of the approvals addressed in the GPU EIR Addendums affect the Airport Area or proposed Airport Village project site. Therefore, they are not addressed further in this Addendum. Page 18 PlaceWorks YY� AO j� CO -G A /\ C cPy B / MU -H2 v AO s 5 w PF CO -G / MU- A MU -H2 CO- 0 �I � AD- m ® \\ MU -H2 Co -G U -H2 \ j' opv, NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Figure 5 - LU22 Airport Area Q Sub -Area Conceptual Development Plan Area Land Use Delineator Line ^i Highway 65 CNEL Noise Contour •Refer to anomaly table 1with nderlying Uses: Office, Hotel, Supporting Retail, esidential Village: Housing and Mixed -Ise Guidelines for Design and Development) aAirport -Supporting Businesses 19 Commercial and Office 0 1,200 Scale (Feet) Source: City of Newport Beach, 2006, General Plan Update, fig. LU22 Placeti forks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 3. Project Description Tbis page intentionally left blank. Page 20 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 3. Project Description 3.1.2 General Plan Land Use Element Amendment In 2014, an amendment to the General Plan Land Use Element was prepared to reflect changes in the economy and market, recent legislation, and emerging best practices. The LUE Amendment included increases/decreases in development capacity in specific areas of the city. Some areas within the Airport Area were proposed for increases in density, as shown in Figure 6, Airport Area Proposed Changer, 2014 LUE Amendment. The proposed land use modifications included redesignating the subject property (and adjacent properties collectively called the "Saunders Properties") as Mixed Use Horizontal (MU -142) and increasing the allowable capacity by 238,077 square feet of office space, 329 units, and 115 density bonus units. Those 444 units and 238,077 square feet were in addition to nonresidential development pursuant to the site's allowed 0.5 FAR. These changes are compared to existing uses (as of 2014) and uses allowed pursuant to the 2006 General Plan in Table 1, Proposed Area 4A Land Use Changes, LUE Amendment (2014). On July 22, 2014, the LUE Amendment was approved by the City Council, and the Supplemental EIR was certified. The City also posted a Notice of Determination (NOD) on July 23, 2014, with the County Clerk as well as the State Clearinghouse for the Office of Planning and Research (OPR). The project approval, however, was subject to City Charter Section 423, which requires that voters approve major amendments (known as the Greenlight Initiative). A "major amendment" is one that significantly increases the maximum amount of traffic that allowed uses could generate or significantly increases allowed density or intensity. The voters declined to approve the LUE Amendment in the November 2014 election. The certification of the Supplemental EIR, however, was not subject to Charter Section 423; therefore, the SEIR remains valid and certified. Table 1 Proposed Area 4A Land Use Changes, LUE Amendment (2014) Map Planning 2006 General Plan Proposed Changes 2014 LUE Amendment Resulting Capacity Reference Location Sub -Area Desi nation Allowable Designation Increased Capacity w/Amendment 4A Saunders Airport Airport 571,507 SF Mixed -Use 238,077 SF 809,584 SF (TAZs Properties Area Office and Office and Auto Horizontal 329 DU 444 DU (329 DU plus 1377 & 26.24* Supporting Rental Facilities (MU -H2) 115 density bonus 1378) acres Uses (AO) I units)** * The Airport Village project site is 16.46 acres within this total 26.24 acre area. **The traffic study for the proposed LUE Amendment evaluated 804,366 SF and 444 DU. 3.2 PROPOSED LAND USE The project applicant (Saunders Property Company) proposes redesignation of the approximately 16.46 -acre project site to allow a maximum of 329 residential dwelling units, additional density bonus units, and a maximum of 297,572 square feet of office, retail, service, and auto rental facilities. The potential configuration of the land uses is shown in Figure 7, Concept Plan. The proposed project site encompasses 16.46 acres of the 26.24 acres studied in the 2014 LUE Amendment. 3.2.1 Residential The base 329 units would be developed at a maximum density of 50 units per acre (du/acre) in the residentially designated portion of the PCDP and in accordance with Land Use Element Policy LU 6.15.7. The applicant May 2020 Page 21 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 3. Project Description has requested a waiver of the Land Use Element Policy LU 6.15.7 minimum density requirement (30 dwelling unit per acre) as allowed by California Government Code Section 65915(e)(1). The MU -H2 land use designation allows a variety of residential development configurations, including single - unit dwellings -attached, single -unit dwelling -detached, multiunit dwellings, two -unit dwellings, and/or live -work units. However, the proposed PCDP assumes multiunit development. The project would be entitled to a density bonus that corresponds with its affordable units, pursuant to state density bonus law and consistent with Chapter 20.32 of the NBMC. The percentage of the project's base 329 residential units will be set aside for affordable housing as follows: ■ At least 5 percent for very low income households, OR ■ At least 10 percent for low income households, OR ■ At least 10 percent for moderate income households. The proposed Newport Airport Village PCDP details the potential entitlement for density bonus units based on the provision of affordable units. The project could be eligible for up to 35 percent of the base units (an additional 115 dwelling units), depending on the affordable housing set-aside. The proposed project is adjacent to John Wayne Airport, and residential uses would be prohibited within the 65 DBA CNEL contour of the airport and within John Wayne Airport Safety Zone 3 (see Figures 12 and 16, respectively, for Safety Compatibility Zone and CNEL boundaries) to ensure consistency with the Airport Environs Land Use Plan for John Wayne Airport and Newport Beach General Plan Policy N 3.2. 3.2.2 Nonresidential The project proposes a maximum of 297,572 square feet of office, commercial, and auto -rental facilities. The current land use designation of AO allows up to 358,498 square feet of commercial use based on the allowable 0.5 FAR. With a few exceptions, uses permitted or conditionally permitted within the OA zoning district, as listed in Chapter 20.20 of the Municipal Code, would remain permitted or conditionally permitted pursuant to the PCDP. Per the code, the OA zoning district is intended to provide for uses that support or benefit from airport operations. These may include corporate and professional offices; automobiles sales, rental and service; aviation sales and service; hotels; and accessory retail, restaurant, and service uses. Uses determined by the Community Development Director to be accessory or ancillary to permitted uses would also be allowed. Page 22 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Figure 6 -Airport Area Proposed Changes, 2014 LUE Amendment a,P ,.. -11-11 City Boundary 4A -Saunders Properties ��' m U+arHu � , Retail: +238,077 SF = F 4C - Lyon Companies Q Areas of Change Residential: +329 DUs i oQ Retail: +85,000 SF Residential Neighborhoods Residential: +850 Replacement DUs Hotel: +150 Rooms RS -D - Single -Unit Residential Detached RS -A - Single -Unit Residential Attached RT -Two -Unit Residential �. RM - Multiple Unit Residential i 46- The Hanpars RM -D -Multiple -Unit Residential Detached Commercial Districts and Corridors Retail: +11,800 SF ♦� doe a o OO � CN - Neighborhood Commercial 5° O – ♦ CC -Corridor Commercial z � a CG - General Commercial � z CV -Visitor Serving Commercial O CM -Recreational and Marine Commercial i ♦ � CR - Regional Commercial o Commercial Office Districts CO -G - General Commercial Office 3 a ♦ a O ♦� CO -M - Medical Commercial Office ♦�� CO -R- Regional Commercial Office Industrial Districts ♦' o M1111 IG -Industrial c � 4D - UAP Companies Airport Supporting Districts 4699 Jamboree Road, 5190 Campus Drive AO Airport Office and Supporting Uses q Revise Anomaly #6 to allow '�o�s Qat ♦ 2.0 FAR if trip neutral congregate care Mixed -Use Districts r MU -V -Mixed Use Vertical MU -H- Mixed Use Horizontal o g � MU -W -Mixed Use Water Related i Public, Semi -Public and Institutional PI -Private Institutions PF -Public Facilities e5 cr �a PR - Parks and Recreation mP OS - Open Space Source: City of Newport Beach, March 2014, Supplemental EIR, fig. 3.4 0 1,200 1 FF Scale (Feet) Placeti forks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 3. Project Description Tbis page intentionally left blank. Page 24 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Figure 7 - Concept Plan 16 Existing Office/Retail Land Use Summary %.�, m Retail/Commercial- O��-- Story Office m 2 & 3 � 4 Story Residential over Parking ©(Existing) Enterprise Office/Facility— (Future) Retail/Commercial, ��� ��7 Out ParcelEl ��<'� ���` \• /�� ,� aa�,r —--------- { 0 300 1 FF Scale (Feet) Source: Airport Village Planned Community Development Plan, May 2020 Placeti forks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 3. Project Description Tbis page intentionally left blank. Page 26 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 3. Project Description 3.3 PROPOSED ENTITLEMENTS The following entitlements/discretionary approvals from the City are required for the proposed project: ■ Zone Change from OA (Office Airport) to PC (Newport Airport Village Planned Community) ■ General Plan Amendment from AO (Airport Office and Supporting Uses) to MU -H2 (Mixed Use Horizontal) ■ Adoption of the Newport Airport Village Planned Community Development Plan (PCDP) ■ Approval of Development Agreement between the applicant and the City of Newport Beach Approvals of these entitlements would provide the land use authorization for development of the site with a maximum of 329 residential dwelling units, additional density bonus units, and a maximum of 297,572 square feet of office, retail, service, and auto rental facilities. This Addendum analyzes the potential impacts associated with the requested entitlements. Future development of the project site in accordance with these approvals, however, would require site development review and supporting applications/information, including refined site plan(s), infrastructure detail, and focused technical studies. The subsequent review would also be subject to applicable environmental review under CEQA. 3.3.1 Newport Airport Village Planned Community Development Plan Upon approval, the Newport Airport Village PCDP would become the zoning for the project area and would provide development standards and guidelines for buildout of property. The proposed PCDP is provided as Appendix A to this Addendum. The PCDP includes: ■ Introduction and Purpose ■ The PC District Boundary, Parcel Numbers, and Addresses ■ Land Use and Development Regulations ■ Site Development Standards ■ Architectural Design Considerations ■ Plan Administration Information 3.3.1.1 LAND USES, DEVELOPMENT REGULATIONS, AND SITE DEVELOPMENT STANDARDS Land Uses The proposed PCDP district boundary encompasses 16.46 acres and is shown in Figure 8, PC District Boundary. The project area is delineated into two planning areas, as depicted in Figure 9, PC Land Use — Planning Areas 1 and 2. Planning Area 1 comprises 7.14 acres and is designated as Mixed -Use Residential. Planning Area 2 is designated Commercial and encompasses 9.32 acres. The boundary of Planning Area 1 coincides with the 65 dBA CNEL contour from the John Wayne Airport Environs Land Use Plan (OCALUC 2008). Per the PCDP, a maximum of 329 residential units plus density units would be allowed within the residential -designated area, May 2020 Page 27 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 3. Project Description outside of the 65 dB CNEL noise contour. The AELUP categorizes safety zones from 1 to 6, with 1 being the most restrictive (prohibits all new structures and residential uses). Zone 3 limits residential uses to very low residential densities and recommends avoidance of moderate to higher usage intensities. Planning Area 1 is within Safety Zone 6, which does not restrict any residential uses. The future residential project would comply with Chapter 19.52 of the City's municipal code requiring dedication of parks and/or payment of in -lieu fees. The major land use categories for each planning area are listed in Table 2, Permitted Uses by Planning Area. The PCDP notes that the Community Development Director may determine other uses not specifically listed may be allowed or allowed pursuant to a Minor Use Permit (MUP) of Conditional Use Permit (CUP), provided the use is consistent with the purposed of the planning area, compatible with surrounding uses, and not listed as a prohibited use. Table 2 Permitted Uses By Planning Area Uses I Planning Area 1 I Planning Area 2 I Notes Residential Multi -unit dwellings P Live/work units P Mixed-use development P Accessory dwelling units P Per NBMC 20.48.200 Home Occupations P Per NBMC 20.48.110 Residential accessory uses and amenities P P Food, Alcohol, Entertainment Alcohol sales (off-site) MUP MUP Alcohol Sales (on-site) CUP CUP Bars, lounge, nightclub CUP Food service, no late hours MUP MUP Food service, late hours CUP CUP Office, Retail, Service Financial Institutions P P Offices, business & professional P P Offices, medical and dental P P Personal services, general P P Personal services, restricted MUP- MUP Retail sales (less than 10,000 sq. ft.) P P Retail sales (greater than 10,000 sq. ft.) P Other Uses Uses not listed herein, but allowed in the OA zone _ A P = Permitted Use CUP = Conditional Use Permit MUP = Minor Use Permit A = Allowed subject to permit requirements provided in Table 2-4 of NBMC Section 20.20.020(C) = Not Permitted Page 28 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 3. Project Description Development Standards PCDP site development standards include: height limitations; minimum building area square footage; floor area ratios; setbacks; parking standards by use; landscaping, lighting, and sign standards; energy requirements, walls/hedges height limitations; and screening/buffering standards (for storage, mechanical equipment, and waste, etc.). The proposed PCDP development standards specify residential density, open space requirements, affordability requirements, noise standards and notification requirements, and park dedication/fees requirements (please see PCDP in Appendix A for complete list of standards). Planning Area 1 Development Standards (Mixed -Use Residential) ■ Maximum height of residential or mixed-use structure: 85 feet, including any architectural features of mechanical equipment. Maximum height of non-residential structure: 37 feet including any architectural feature, elevator penthouse, or mechanical equipment, unless a Site Development Review is approved pursuant to NBMC Section 20.52.080, in which case the maximum shall be 55 feet. ■ Minimum setbacks: Buildings, or portion thereof, that are under 20 feet in height shall be set back a minimum of 10 feet from any street property line and a minimum of 5 feet from any internal property line. • Buildings, or portion thereof, that are 20 feet or greater in height shall be set back a minimum of 20 feet from any street and a minimum of 5 feet from any internal property line. Residential Density: Densities shall be a minimum of 30 dwelling units per acre and a maximum of 50 dwelling units per acre, not including density bonus units. Floor Area Limit: Floor area for nonresidential uses shall not exceed 94,583 square feet. This floor area limit is based on the conversion commercial development allowed by the general plan to residential dwelling units pursuant to General Plan Policy LU6.15.5. ■ Affordability Requirements: Residential development shall include affordable housing as follows: a minimum of 17 units for very -low income households (5 percent of 329 units), or a minimum of 33 units for low-income households (10 percent of 329 units), or a minimum 33 units for moderate -income households within a common -interest development. Planning Area 2 Development Standards Permitted Height of Structures: No structure, nor any portion of any structure, architectural feature, elevator penthouse, or mechanical equipment shall exceed a height of 37 feet, unless a Site Development Review is approved pursuant to NBMC Section 20.52.080, in which the review authority may allow buildings or structures to exceed 37 feet to a maximum of 55 feet. May 2020 Page 29 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 3. Project Description ■ Setbacks: Minimum setbacks shall be 15 feet from any street property line and 5 feet from any internal property line. ■ Floor Area Ratio: Floor area ratio shall not exceed 0.5, except for warehouse uses, which are allowed a maximum floor area ratio of 0.75. ■ Lot Size and Dimensions: Newly created shall meet the minimum standards for lots provided in NBMC Section 20.20.030 for the OA (Office—Airport) Zoning District. Additional Development Standards In addition to the planning area specific development standards, the proposed PCDP includes standards applicable to all development within the Newport Airport Village Planned Community that address: ■ Maximum intensity ■ Parking and Circulation ■ Landscaping ■ Pedestrian and Bicycle Connection ■ Lighting ■ Utilities ■ Air Conditioning Units ■ Signs ■ Fences, Hedges, and Walls ■ Buffering and Screening ■ Ground -Mounted Mechanical Equipment ■ Outdoor Storage ■ Solid Waste Storage Areas ■ Native American Monitoring 3.3.1.2 ARCHITECTURAL DESIGN The PCDP includes general principles for architectural design and additional principles by land use: mixed use, residential, and office/commercial. Pursuant to the PCDP, development will be designed to convey a unified and high-quality character with use -consistent architectural design, materials, and color palette. Abundant use of landscape within interior courtyards, open spaces, and parking areas is encouraged. Figure 10, Conceptual Architecture, shows images by land use type as included in the PCDP to guide development with respect to architectural massing, detail, building material variety, and pedestrian -orientation integration. These images are not intended to portray precise design of future development. 3.3.1.3 PLAN ADMINISTRATION AND IMPLEMENTATION The Plan Administration section summarizes the ongoing procedures to implement the PCDP. The Site Development Review process, including an application with all materials to determine consistency with the Page 30 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 3. Project Description PCDP and applicable requirements of the Newport Beach Municipal Code, would be required prior to the issuance of a grading or building permit. No parcel or tract map shall be recorded prior to the approval of the Site Development Review for the entire project or significance phase, and until responsibility for the performance of and payment for maintenance are clear. CC&Rs shall be subject to the approval of the City Attorney. Applications for PCDP amendment shall follow the process identified in the NBMC (Section 20.56.050(E), and administrative responsibilities and authority shall be subject to NBMC Chapter 20.60. Compliance with the CDP and the Zoning Code shall be subject to NBMC Chapter 20.68. May 2020 Page 31 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 3. Project Description Tbis page intentionally left blank. Page 32 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Figure 8 - PC District Boundary ,•,� i JOHN WAYNE J AIRPORT 0. o` J� Unincorporated Orange County � � v Cs Newport Beach 07 OoGeS Co�infha� Project Boundary — • • — City Boundary Source: Newport Airport Village PCDP, May 2019 0 300 Scale (Feet) ru Placeti forks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 3. Project Description Tbis page intentionally left blank. Page 34 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Figure 9 - PC Land Use - Planning Areas 1 and 2 � Q John WayneAirport M 4676 Q_ 2 ) �I Q4 4f J5 �T ♦ g 64 I Planning Area 1 �J�j • a`� 6 i '°° ► • Planning Area 2,1 I 63 �p0 D4° ► ��A43 g� ► of °° z ► o°Fz6°� SafetyZono iimn II, ---------�-`�'z -_ 5� w �'O ► w 4� r �cs3 r qhs `► c�RiNrHrgN � m AY Project Boundary Planning Area 1 Mixed -Use Residential (7.14 acres) Planning Area 2 Commercial (9.32 acres) 0 250 Source: Newport Airport Village Planned Community Development Plan, 2020 Scale (Feet) PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 3. Project Description Tbis page intentionally left blank. Page 36 PlaceWorks .ilk 1�Ell� F - a1 11 rP.I E — fir- I ,� � T i :as f i �"� ` _ _• b✓� ��._ �� „, y . r - � � �` c N. ,__��+ __ ���� iii®��r�■i���:� ��� I� .11}�jd ' _— � rs1 pl big y�l F,It dd r T w s r R / r � �► 6; Km h m r r Wig r I1�mR 8 .— ]oil r s=ue + rl i y 5 , §:ail fE 191191 :.fid f 7tr! i R v _.J _• ._. - .�.. _ – _ NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 3. Project Description Tbis page intentionally left blank. Page 38 PlaceWorks 4. Environmental Checklist 4.1 BACKGROUND 1. Project Title: Newport Airport Village 2. Lead Agency Name and Address: City of Newport Beach Community Development Department 100 Civic Center Drive Newport Beach, CA 92660 3. Contact Person and Phone Number: James W. Campbell, Deputy Director Community Development 949-644-3210 4. Project Location: The 16.46 -acre project site is generally located southeast of John Wayne Airport and within the approximate 360 -acre Airport Area as defined by the Newport Beach General Plan. The site is located west of MacArthur Boulevard, south of Campus Drive, north of Birch Street, and about 550 feet north of Dove Street. 5. Project Sponsor's Name and Address: Saunders Property Company c/o Starpointe Ventures 19700 Fairchild, Suite 240 Irvine, CA 92612 6. General Plan Designation: Airport Office and Supporting Uses (AO) 7. Zoning: Office -Airport (OA) 8. Description of Project: Proposed redesignation of the approximately 16.46 -acre project site to allow mixed uses, including a maximum of 329 residential dwelling units, additional density bonus units (up to 115 units), and a maximum of 297,572 square feet of office, retail, service, and auto rental facilities. 9. Surrounding Land Uses and Setting: The John Wayne Airport abuts Campus Drive to the north. The 7- to 10 -story Radisson Hotel and Benihana Restaurant are located across Birch Street to the south of the project site. South of the hotel and restaurant, the site of the existing MacArthur Square shopping center, bounded by Scott Drive, Corinthian Way, and Dove Street, was recently approved (2018) for development of a 5 -story, 350 -unit residential project (Newport Crossings). Office and hotel uses are located across MacArthur Boulevard to the east. May 2020 Page 39 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 4. Environmental Checklist 10. Other Public Agencies Whose Approval or Consideration Is Required: (e.g., permits, financing approval, or participation agreement): ■ Airport Land Use Commission (ALUC): John Wayne Airport ■ Santa Ana Regional Water Quality Control Board Agency ■ South Coast Air Quality Management District Page 40 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDOM CITY OF NEWPORT BEACH 4. Environmental Checklist 4.2 ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED This Addendum evaluates the potential incremental impacts of the proposed project in comparison to the 2006 GPU EIR and the 2014 LUE Amendment Supplemental EIR to determine if there are potentially new project - related significant impacts , an increase in the severity of previously determined significant impacts, or changes in circumstances that could result in new significant impacts. ❑ Aesthetics ❑ Agricultural and Forest Resources ❑ Air Quality ❑ Biological Resources ❑ Cultural Resources ❑ Energy ❑ Geology / Soils ❑ Greenhouse Gas Emissions ❑ Hazards & Hazardous Materials ❑ Hydrology / Water Quality ❑ Land Use / Planning 0 Mineral Resources ❑ Noise ❑ Population / Housing ❑ Public Services ❑ Recreation ❑ Transportation / Traffic ❑ Tribal Cultural Resources ❑ Utilities / Service Systems ❑ Wildfire ❑ Mandatory Findings of Significance 4.3 DETERMINATION (TO BE COMPLETED BY THE LEAD AGENCY) On the basis of this initial evaluation: 1-1 I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. F] I find that the proposed project MAY have a "potentially significant impact" or "potentially significant unless mitigated" impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed. I find that although the proposed project could, as originally proposed, have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier EIR pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR, including revisions or mitigation measures or conditions or approval that are imposed upon the proposed project, nothing further is required prior to consideration and adoption of this modified IS/Checklist and Addendum. ._ Printed Name -V"t+ .Ow+� 2,78 "ZO Date tYlay 2020 Page 41 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 4. Environmental Checklist 4.4 COMPARING CHANGES AND/OR NEW INFORMATION TO PREVIOUS EIRs The purpose of the checklist is to evaluate the categories in terms of any "changes" or "new information" that may result in a changed environmental impact evaluation pursuant to Public Resources Code section 21166 and CEQA Guidelines sections 15162-15164. A "no" answer does not necessarily mean that there are no potential impacts relative to the environmental category, but that there is no substantial change in the project or circumstances surrounding the project that would result in new significant adverse environmental impacts from those identified in the previously adopted negative declaration. 4.4.1 Explanation of Checklist Evaluation Categories Where Impact Was Analyzed in Prior Environmental Documents This analysis provides a crosswalk to the pages of the other environmental documents where information and analysis may be found relative to the environmental issue listed under each topic. Are Substantial Changes Proposed to the Project Which Require Major Revisions to the Prior EIR or Negative Declaration Involving New Significant Impacts or a Substantial Increase in the Severity of Previously Identified Significant Impacts? Pursuant to Section 15162(a)(1) of the CEQA Guidelines, this column indicates whether any changes to the project would require major revisions to the prior EIR or negative declaration due to the involvement of new significant adverse environmental effects. If a "yes" answer is given, additional mitigation measures, or revised measures, will be specified in the discussion section including a statement of impact after mitigation. Any Substantial Change in Circumstances Involving New Significant Impacts or Substantial Increase in the Severity of Previously Identified Significant Impacts? Pursuant to Section 15162(a)(2) of the CEQA Guidelines, this column indicates whether there have been substantial changes to the project site or the vicinity (environmental setting) that have occurred after certification of the EIR or adoption of the prior negative declaration and which would result in the project having new significant impacts that were not considered or mitigated by the prior environmental document. Any New Information of Substantial Importance Requiring Additional Analysis? Pursuant to Section 15162(a)(3)(A)-(D) of the CEQA Guidelines, this column asks whether new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR or negative declaration, shows any of the following criteria listed above (A) -(D). Prior Environmental Document Mitigation Measures Adopted to Address Impacts? Pursuant to Section 15162(a)(3) of the CEQA Guidelines, this column indicates whether other environmental documents provide mitigations to address effects in the related impact category. If NA is indicated, a previous Page 42 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 4. Environmental Checklist environmental document and this initial study conclude that the impact does not occur with this project, and therefore no mitigation is needed. 4.4.2 Discussion and Mitigation Sections 4.4.2.1 DISCUSSION A discussion of the elements of the checklist is provided under each environmental category in order to clarify the answers. The discussion provides information about the particular environmental issue, how the project relates to the issue and the status of any mitigation that may be required or that has already been implemented. 4.4.2.2 MITIGATION MEASURES Applicable Mitigation Measures are listed under each environmental category and may be revised to reflect the project revisions. If changes to the project, changes in circumstances, or new information involves new impacts, revised mitigation measures address those impacts and ensure no new significant impacts would result. May 2020 Page 43 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 4. Environmental Checklist Tbis page intentionally left blank. Page 44 PlaceWorks 5. Environmental Analvsis This section provides evidence to substantiate the conclusions in the environmental checklist. The section will briefly summarize the conclusions of both the 2006 GPU EIR and the 2014 General Plan Land Use Element Amendment Supplemental EIR, then discuss whether or not the proposed project is consistent with the findings contained in the respective EIR. Applicable 2006 General Plan policies are reproduced for each topical area, and upon approval, the project would be required to comply with these policies. The 2006 GPU EIR did not include any mitigation measures. As described under Section 3.12, General Plan Land Use Amendment, of this Addendum, after City Council approval of the LUE Amendment and the statute of limitations ran on the certified EIR, the voters declined to approve the project in the November 2014 election. The EIR as certified was not challenged and remains valid for environmental analysis, but since project approval was rescinded, any revised or supplemental General Plan policies in the General Plan LUE Supplement EIR are not applicable. Various topical analyses throughout this Addendum will refer to Table 3, below. This table provides a summary of proposed project site land uses in comparison to the maximum allowed uses for the project site under the approved 2006 General Plan and the 2014 General Plan Land Use Amendment (LUE Amendment). The table also quantifies the net difference (increase or decrease in allowable residential units and nonresidential building square footages) of the project in comparison to the 2006 General Plan and 2014 LUE Amendment. May 2020 Page 45 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Tbis page intentionally left blank. Page 46 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 3 Allowable Land Use Comparison: Proposed Project, 2006 General Plan and 2014 LUE Amendment for the Project Site Permitted/Proposed Land Use May 2020 Page 47 SF Conversion to Remaining Density Land Use Allowable Replacement SF Replacement Bonus Project/Plan Designation* SF Description Units Pro'ect Site Units Units New Units Total Units Explanation Airport Village - MU -H2=16.46 358,498 Land use re -designation 60,926 SF 297,572 329 115 0 444 — 60,926 SF commercial area within Airport Village Proposed acres SF to mixed use horizontal SF converted to replacement units. Project — 329 units are part of 2,200 replacement units allocated under GP. 115 density bonus units (up to 35% base units) are based on maximum bonus for affordable units. 2006 GP AO =16.46 358,498 Includes professional 0 358,498 0 0 0 0 AO applies under 2006 GP to entire project site. acres SF offices, aviation, retail, SF automobile rental, sales, and service, hotels, and ancillary retail, restaurant and service uses Net Change Between Proposed Project and 2006 GP —60,926 329 115 0 444 In comparison to the GP, Airport Village adds units to the project site but does NOT result in a net increase in units for the Airport Area, where 2,200 residential units (1,650 replacement and 550 additional units) are allowed under the 2006 GP. 2014 LUE MU -1-12 = 16.46 507,772 include professional 0 507,772 0 0 444 444 — Non-residential SF 358,498 SF allowable per 2006 GP Amend acres SF offices, aviation, retail, SF The 2014 LUE Amend would have added 288,077 SF to automobile rental, sales, the 26.25 -acre Campus Tract and 62.7% of this amount, and service, hotels, and 149.274 SF, would have been allocated to the 16.46 - ancillary retail, acre site. restaurant and service Residential includes 329 additional DU (not replacement uses units), plus up to 35% density bonus for 444 new DU. May 2020 Page 47 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 3 Allowable Land Use Comparison: Proposed Project, 2006 General Plan and 2014 LUE Amendment for the Project Site Permitted/Proposed Land Use A0= Airport Office MU -H2 = Mixed Use/Horizontal Page 48 PlaceVorks SF Conversion to Remaining Density Land Use Allowable Replacement SF Replacement Bonus Project/Plan Designation* SF Description Units Project Site Units Units New Units Total Units Explanation Net Change Between Proposed Project and LUE Amendment —210,200 329 115 444 0 In comparison to the LUE Amendment, the proposed project would result in a reduction of 210,200 SF (507,772-297,572) commercial floor area. The LU amendment also added 444 DU above the 2006 GP. The proposed project adds DU to the site, but those DUs are in the approved 2006 GP A0= Airport Office MU -H2 = Mixed Use/Horizontal Page 48 PlaceVorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.1 AESTHETICS 5.1.1 Summary of Impacts Identified in the Program EIRs 5.1.1.1 2006 GENERAL PLAN EIR After implementation of 2006 General Plan policies, impacts related to aesthetics and scenic vistas were deemed less than significant and no mitigation measures were required. The GPU EIR acknowledged that new uses, including the introduction of mixed-use development and higher density residential development in the Newport Center/Fashion Island area, the Airport Area, and West Newport Mesa would change the visual character of these areas of the City. The GPU EIR noted that both City-wide and area -specific policies would reinforce design standards, protect visual character and views, and enhance the City's existing aesthetic qualities while simultaneously accommodating projected growth. The GPU EIR also stipulated that new development would undergo a subsequent environmental review consisting of a case-by-case analysis of visual impacts, and that these developments would be required to conform to general plan update standards, the City's municipal code, and as applicable, the local coastal plan. Visual impacts were concluded to be less than significant. 5.1.1.2 2014 LUE AMENDMENT SEIR There are no designated public viewpoints or coastal view roads within or in proximity of the Airport Area. The closest designated coastal view road is Jamboree Road south of SR -73, approximately 0.7 mile southwest. Due to the distance and highly urbanized nature of the Airport Area, the 2014 LUE SEIR determined that public views along this coastal view road would not be impacted by the 2014 LUE Amendment. The General Plan LUE Amendment proposed the following changes to parcels within the Airport Area, all of which would increase development capacity relative to the 2006 General Plan: ■ #4A, Saunders Property:' +238,077 SF retail; +329 DU ■ #4B, The Hangars: +11,800 SF retail ■ #4C: +85,000 SF retail; +850 replacement DU; +150 hotel rooms ■ #4D, UAP Companies: +148,000 SF congregate care (increase FAR to 2.0 if trip neutral) The 2014 LUE SEIR concluded that future development and/or redevelopment in accordance with the LUE Amendment would change the visual character and appearance of the Airport Area. New development intensity would require an increase in building massing and/or heights. Additionally, the introduction of residential and congregate care uses would change the general character of the Airport Area. The 2014 LUE SEIR noted that all of the airport area properties are subject to height restrictions governed by the John Wayne Airport Environs Land Use Plan (AELUP) and Federal Aviation Administration (FAA) regulations. ' The proposed project is located on the Saunders Property. May 2020 Page 49 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis The 2014 LUE SEIR noted that development within the Airport Area would be subject to case-by-case review, including site-specific environmental review with respect to aesthetic impacts. Projects within the Airport Area also must comply with specific policies identified in the 2006 General Plan as applicable to this area (as shown in Section 5.1.4). Among other categories, these policies include detailed urban form and structure, regulatory plans, and design and development standards. Design and development standards detail neighborhood park, streets and pedestrian ways, and building massing requirements. Implementation of the LUE Amendment was therefore found not to degrade the existing visual character or quality of the Airport Area. 5.1.2 Impacts Associated with the Proposed Project NX'ould the proposed project: Comments: a) Have a substantial adverse effect on a scenic vista? No Impact. Project Comparison to 2006 General Plan EIR Vistas provide visual access or panoramic views to a large geographic area and are generally located at a point where surrounding views are greater than one mile away. Panoramic views are usually associated with vantage Page 50 PlaceWorks Less Than Significant Substantial ImpactslNo Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact a) Have a substantial adverse effect on a scenic vista? X b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a X state scenic highway? c) In non -urbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings (Public views are those that are experienced from publicly accessible X vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality? d) Create a new source of substantial light or glare which would adversely affect day or X nighttime views in the area? Comments: a) Have a substantial adverse effect on a scenic vista? No Impact. Project Comparison to 2006 General Plan EIR Vistas provide visual access or panoramic views to a large geographic area and are generally located at a point where surrounding views are greater than one mile away. Panoramic views are usually associated with vantage Page 50 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis points over a section of urban or natural areas that provide a geographic orientation not commonly available. Examples of panoramic views might include an urban skyline, valley, mountain range, a large open space area, the ocean, or other water bodies. The Airport Area does not have public viewpoints or coastal view roads. The closest designated coastal view road is Jamboree Road south of SR -73. Since the coastal view portion of Jamboree road is 0.7 mile from the Airport Area, the project would not impact public views along this coastal road. Therefore, there are no impacts to scenic vistas and no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The 2014 LUE SEIR stated that there were no designated public viewpoints or coastal view roads within or in proximity of the Airport Area. The closest designated coastal view road is Jamboree Road south of SR -73, approximately 0.7 mile southwest. The project site would be too far from the coastal view portion of Jamboree Road to cause any impacts. Therefore, there are no impacts to scenic vistas and no changes or new significant information that would require preparation of an EIR. b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? No Impact. Project Comparison to 2006 General Plan EIR State Route 1, also known as Pacific Coast Highway, is identified as eligible for State Scenic Highway designation, but the City of Newport Beach would need to adopt a scenic corridor protection program and apply for scenic approval from Caltrans to officially designate the highway. Therefore, there are currently no officially designated state scenic highways in the City of Newport Beach. Thus, the proposed project would have no impact on scenic resources within a state scenic highway, and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR As mentioned above, the City of Newport Beach has no officially designated state scenic highways. Therefore, no impacts to scenic highways would arise. c) In non -urbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings (Public views are those that are experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR May 2020 Page 51 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Project Comparison to 2006 General Plan EIR The proposed project would result in a change in land use designation and development capacity for the project site, as shown in Table 3. The proposed land use changes would allow residential development and alter the visual character of the site in comparison to the office, retail, and service uses permitted under the 2006 General Plan EIR. The City's zoning code (Title 20 of the municipal code) identifies land use categories, development standards, and other general provisions that ensure consistency between the City's General Plan and proposed development projects. Property development standards, including height limits and floor area ratio (FAR), are established in Chapter 20.20.030 for the Commercial Zoning Districts. For the project site, the height limit for nonresidential and mixed-use structures with flat roofs is 300 feet (pursuant to the High Rise and Shoreline Height Limit Areas Map (Map H-1) of the NBMC). The FAR is 0.5 for office uses and 0.75 for warehouse uses. Upon approval, the Newport Airport Village PCDP would become the zoning for the project area and would provide development standards and guidelines for buildout of property. As described in Section 3.3.1.1, Land Uses, Development Regulations and Development Standards, different development standards would apply to the respective planning areas (see Figure 9, PC Land Use Planning Areas 1 and 2). The boundaries for the Planning Areas are comparable with the FAA height restriction zones shown in Figure 11. The AELUP also designates safety zones for the airport area, as depicted in Figure 12, AirportArea Safety Zones, and summarized in Table 4. The PCDP height and land use limitations correspond with FAA height limits and compatible land uses defined for the airport safety zones. In comparison to the maximum 300 -foot height limit under existing site zoning, PCDP Planning Area 1 would allow a maximum height of 85 feet for residential and mixed use structures, including architectural features, and mechanical equipment. Non-residential structures within Planning Area 1 would be limited to a maximum of 55 feet (with Site Development Review). Up to six -story buildings (consistent with the 85 -foot -high maximum PCDP standard) are proposed within the residential portion of the project site. The increase in allowable maximum building heights for Planning Area 1 (up to 85 feet) in comparison to the maximum building height currently allowed by the site's zoning (55 feet) would alter the future character of the project site. This increased height, however, is consistent with several surrounding area buildings in the Airport Area within Newport Beach and surrounding City of Irvine. Across Birch Street, there are several multistory buildings that range from 3 to 14 stories (office, hotel and retail/restaurant uses). Across MacArthur Boulevard is a nine -story office building. Page 52 PlaceWorks Newport Beach Source: Orange County Airport Land Use Commission Airport Environs Land Use Plan for John Wayne Airport, 2008 Ail - Irvine eet AMS NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Figure 11 - Height Restrictions per Federal Air Regulations Part 77 Project Boundary City Boundary Elevation Contours in feet above mean sea level (AMSL) Airport Surfaces 0 Horizontal Surface - Elevation 206 Feet AMSL 0 Departure Surface - Slope 50:1 (Horizontal:Vertical) 0 Transitional Surface - Slope 7:1 (Horizontal:Vertical) 0 Conical Surface - Slope 20:1 (Horizontal:Vertical) 0 Runway - Elevation 54 Feet AMSL 0 2,400 Scale (Feet) PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Tbis page intentionally left blank. Page 54 PlaceWorks Costa Mesa • 5 5 X41 2 4 6 4JF �♦ O _ ��% r Newport Beach S - s Irvine NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Figure 12 - Safety Zones Airport Area 0 1,300 Scale (Feet) Source: Orange County Airport Land Use Commission Airport Environs Land Use Plan for John Wayne Airport, 2008 T PlaceForks — — — — Project Boundary —-- City Boundary Long Runway Safety Zones Q1 - Runway Protection Zone Q2 - Inner Approach/Departure Zone Q3 - Inner Turning Zone 4 - Outer Approach/Departure Zone 5 - Sideline Zone 6 - Traffic Pattern Zone Short Runway Safety Zones 1 - Runway Protection Zone Q2 - Inner Approach/Departure Zone Q3 - Inner Turning Zone 4 - Outer Approach/Departure Zone 5 - Sideline Zone Q6 - Traffic Pattern Zone 0 1,300 Scale (Feet) Source: Orange County Airport Land Use Commission Airport Environs Land Use Plan for John Wayne Airport, 2008 T PlaceForks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Tbis page intentionally left blank. Page 56 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis The maximum building height in Planning Area 2 would be 37 feet unless a Site Development Review is approved in which the review authority may allow buildings to a maximum of 55 feet. The 55 -foot height limit would be the same as for the site's existing zoning for commercial uses. The proposed project's nonresidential buildings would be within Airport Safety Zone 3, in which buildings with more than three habitable floors are generally unacceptable. Three-story buildings, therefore, are proposed in the nonresidential portion of the proposed project. Figure 10, Conceptual Architecture, shows concepts consistent with the PCDP's height limitations. Table 4 Land Use Compatibility: John Wayne Airport Safety Zones Safety Zone Land Use Compatibility 1 . Airport ownership of property encouraged Prohibit all new structures • Prohibit residential land uses • Avoid nonresidential uses except if very low intensity in character and confined to the sides and outer end of the area 2 . Prohibit residential uses except on large, agricultural parcels Limit nonresidential uses to activities which attract few people (uses such as shopping centers, most eating establishments, theaters, meeting halls, multi -story office buildings, and labor-intensive manufacturing plants unacceptable) • Prohibit children's schools, day care centers, hospitals, nursing homes Prohibit hazardous uses (e.g. aboveground bulk fuel storage) 3 . Limit residential uses to very low densities (if not deemed unacceptable because of noise) • Avoid nonresidential uses having moderate or higher usage intensities (e.g., major shopping centers, fast food restaurants, theaters, meeting halls, buildings with more than three aboveground habitable floors are generally unacceptable) Prohibit children's schools, large day care centers, hospitals, nursing homes 4 . In undeveloped areas, limit residential uses to very low densities (if not deemed unacceptable because of noise); if alter- native uses are impractical, allow higher densities as infill in urban areas • Limit nonresidential uses as in Zone 3 Prohibit children's schools, large day care centers, hospitals, nursing homes 5 . Avoid residential uses unless airport related (noise usually also a factor) Allow all common aviation -related activities provided that height -limit criteria are met • Limit other nonresidential uses similarly to Zone 3, but with slightly higher usage intensities • Prohibit children's schools, large day care centers, hospitals, nursing homes 6 . Allow residential uses • Allow most nonresidential uses; prohibit outdoor stadiums and similar uses with very high intensities Avoid children's schools, large day care centers, hospitals, nursing homes Source: OCALUC 2008. The FARs specified in the PCDP are 0.5 for office uses, 0.75 for warehouse uses, and no restrictions for residential or mixed uses. The PCDP would allow for the same massing for nonresidential land uses when compared to the 2006 GPU. The PCDP also includes general principles for architectural design and additional principles by land use: mixed use, residential, and nonresidential. Development would be designed to convey a unified character with abundant use of landscape. Figure 10, ConceptualArchitecture, shows PCDP renderings by land use type to guide development with respect to architectural massing, detail, building material variety, and pedestrian -orientation integration. The project's conceptual architecture is typical for multifamily and mixed - May 2020 Page 57 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis use projects in the city and nearby jurisdictions and would not unusually impact the design character or quality of the area. Therefore, the proposed project would have a less than significant impact on the visual character of the site, and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Compared to the 2014 LUE Amendment, the proposed project would reduce the maximum allowed nonresidential use by 210,200 square feet and permit the same number of residential dwelling units (maximum 444 units with density bonus) (see Table 3). The proposed PCDP land use designation (MU -H2) would be the same as proposed under the 2014 LUE Amendment. The proposed project, therefore, would reduce site development intensity compared to the 2014 proposed land use. In addition, the project would improve the visual quality of the site through implementation of the PCDP principles for architectural design. Overall, development of the proposed project would be similar to development pursuant to the 2014 LUE proposal and would have a less than significant impact on the visual character of the site. d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? No Impact. Project Comparison to the 2006 General Plan EIR The Airport Area is nearly built out, and a significant amount of ambient light already exists due to urban uses. General Plan policies and regulatory requirements per the City's municipal code Title 20, Chapter 20.60, Section 20.30.070 "Outdoor Lighting," includes general outdoor lighting standards, parking lot lighting standards, and outdoor lighting (spotlighting and floodlighting). The PCDP provides standards beyond existing regulatory requirements. The PCDP would require that the lighting system be designed and maintained to conceal the light source and minimize light spillage and glare outside of the boundary of the PC District. Walkways accessing buildings and parking areas would be illuminated with a minimum maintained 0.5 foot-candle average on the driving or walking surface during the hours of operation and one hour thereafter. The project site is in a highly urban area with existing sources of light and glare. The replacement of existing uses with new sources of light and glare would not substantially alter the amount of lighting or glare on the site. Municipal code and PCDP requirements would ensure that lighting impacts associated with the proposed project, similar to development pursuant to the 2006 GPU, would be less than significant. Thus, the proposed project would not adversely affect day or nighttime views, and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to the 2014 LUE Amendment SEIR The proposed project, similar to development pursuant to the 2014 LUE Amendment, would comply with General Plan policies and regulatory requirements. Light and glare impacts for the proposed project would be Page 58 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis similar to the development intensity contemplated in the LUE Amendment and would therefore be less than significant. 5.1.3 Adopted Mitigation Measures Applicable to the Proposed Project There were no mitigation measures in the 2006 GPU EIR or the 2014 LUE Amendment SEIR. 5.1.4 Relevant General Plan Policies The 2006 General Plan includes the following goals and policies that relate specifically to potential aesthetics and visual character impacts of the proposed Airport Village project. Goal LU 6.15: A mixed-use community that provides jobs, residential, and supporting services in close proximity, with pedestrian -oriented amenities that facilitate walking and enhance livability. ■ LU 6.15.1 - Land Use Districts and Neighborhoods: Provide for the development of distinct business park, commercial, and airport serving districts and residential neighborhoods that are integrated to ensure a quality environment and compatible land uses. ■ LU 6.15.3 - Airport Compatibility: Require that all development be constructed in conformance with the height restrictions set forth by Federal Aviation Administration (FAA), Federal Aviation Regulations (FAR) Part 77, and Caltrans Division of Aeronautics, and that residential development be located outside of the 65 dBA CNEL noise contour specified by the 1985 JWA Master Plan. LU 6.15.7 - Overall Density and Housing Types: Require that residential units be developed at a minimum density of 30 units and maximum of 50 units per net acre averaged over the total area of each residential village. Net acreage shall be exclusive of existing and new rights-of-way, public pedestrian ways, and neighborhood parks. Within these densities, provide for the development of a mix of building types ranging from townhomes to high-rises to accommodate a variety of household types and incomes and to promote diversity of building masses and scales. ■ LU 6.15.8 - First Phase Development Density: Require a residential density of 45 to 50 units per net acre, averaged over the first phase for each residential village. This shall be applied to 100 percent of properties in the first phase development area whether developed exclusively for residential or integrating service commercial horizontally on the site or vertically within a mixed-use building. On individual sites, housing development may exceed or be below this density to encourage a mix of housing types, provided that the average density for the area encompassed by the first phase is achieved. ■ LU 6.15.9 - Subsequent Phase Development Location and Density: Subsequent phases of residential development shall abut the first phase or shall face the first phase across a street. The minimum density of residential development (including residential mixed-use development) shall be 30 units per net acre and shall not exceed the maximum of 50 units per net acre averaged over the development phase. May 2020 Page 59 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis ■ LU 6.15.22 - Building Massing: Require that high-rise structures be surrounded with low- and mid -rise structures fronting public streets and pedestrian ways or other means to promote a more pedestrian scale. Page 60 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.2 AGRICULTURE AND FORESTRY RESOURCES 5.2.1 Summary of Impacts Identified in the Program EIRs 5.2.1.1 2006 GENERAL PLAN EIR The 2006 General Plan Initial Study (IS) indicated that the City of Newport Beach does not contain any significant agricultural resources as the city is almost entirely built out. The IS concluded that there would be no impacts to agricultural and forestry resources and did not discuss the topic in the EIR. 5.2.1.2 2014 LUE AMENDMENT SEIR The 2014 LUE Amendment IS referenced the California Resource Agency's Department of Conservation "Orange County Important Farmland 2010" map, substantiating that the city does not have any significant agricultural resources. Therefore, the IS concluded that no impacts to farmland were found due to development pursuant to the 2014 LUE Amendment, and the topic was not discussed in the EIR. 5.2.2 Impacts Associated with the Proposed Project Would the proposed project: May 2020 Page 61 Less Than Significant Substantial Impacts/No Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping X and Monitoring Program of the California Resources Agency, to non-agricultural use? b) Conflict with existing zoning for agricultural use, with a designated Agricultural Opportunity Area, or with a Williamson Act X contract? c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)), timberland (as defined by Public Resources X Code Section 4526), or timberland zoned Timberland Production (as defined by Government Code Section 51104(g))? d) Result in the loss of forest land or conversion of forest land to non -forest use? X May 2020 Page 61 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Comments: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? No Impact. Project Comparison to the 2006 General Plan EIR The proposed project, similar to development pursuant to the 2006 General Plan, would have no impact on Prime Farmland, Unique Farmland, or Farmland of Statewide Importance because it is not on a site that is designated as Prime Farmland, Unique Farmland, or Farmland of Statewide Importance. Thus, there are no changes or new significant information that would require preparation of an EIR. Project Comparison to the 2014 LUE Amendment SEIR Since the City does not have any significant agricultural resources, the proposed project, similar to development pursuant to the 2014 LUE Amendment, would have no impact on Prime Farmland, Unique Farmland, or Farmland of Statewide Importance. b) Conflict with existing zoning for agricultural use, with a designated Agricultural Opportunity Area, or with a Williamson Act contract? No Impact. Project Comparison to the 2006 General Plan EIR The City of Newport Beach does not have any land designated or zoned for agricultural use, used for agriculture, or subject to a Williamson Act contract. Thus, the proposed project, similar to all development pursuant to the 2006 GPU, would have no impacts to agricultural zoning or a Williamson Act contract. No impacts would occur, and there are no changes or new significant information that would require preparation of an EIR. Page 62 PlaceWorks Less Than Significant Substantial Impacts/No Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact e) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of X Farmland to non-agricultural use or conversion of forest land to non -forest use? Comments: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? No Impact. Project Comparison to the 2006 General Plan EIR The proposed project, similar to development pursuant to the 2006 General Plan, would have no impact on Prime Farmland, Unique Farmland, or Farmland of Statewide Importance because it is not on a site that is designated as Prime Farmland, Unique Farmland, or Farmland of Statewide Importance. Thus, there are no changes or new significant information that would require preparation of an EIR. Project Comparison to the 2014 LUE Amendment SEIR Since the City does not have any significant agricultural resources, the proposed project, similar to development pursuant to the 2014 LUE Amendment, would have no impact on Prime Farmland, Unique Farmland, or Farmland of Statewide Importance. b) Conflict with existing zoning for agricultural use, with a designated Agricultural Opportunity Area, or with a Williamson Act contract? No Impact. Project Comparison to the 2006 General Plan EIR The City of Newport Beach does not have any land designated or zoned for agricultural use, used for agriculture, or subject to a Williamson Act contract. Thus, the proposed project, similar to all development pursuant to the 2006 GPU, would have no impacts to agricultural zoning or a Williamson Act contract. No impacts would occur, and there are no changes or new significant information that would require preparation of an EIR. Page 62 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Project Comparison to the 2014 LUE Amendment SEIR The conclusions regarding agricultural zoning, opportunity areas and/or a Williamson Act contract in the 2014 LUE Amendment were consistent with the 2006 GPU EIR, and no impacts would occur. c) Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g))? No Impact. Project Comparison to the 2006 General Plan EIR The City of Newport Beach does not have any land designated or zoned for forestland, timberland, or timberland zoned Timberland Production. Thus, the proposed project, similar to all development pursuant to the 2006 GPU, would have no impacts, and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to the 2014 LUE Amendment SEIR Since the City of Newport Beach does not have any land designated or zoned for forestland, timberland, or timberland zoned Timberland Production, the proposed project, similar to all development pursuant to the 2014 LUE Amendment, would have no impacts. d) Result in the loss of forest land or conversion of forest land to non -forest use? No Impact. Project Comparison to the 2006 General Plan EIR See response to Section 5.2.2(c), above. Project Comparison to the 2014 LUE Amendment SEIR See response to Section 5.2.2(c), above. e) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non -forest use? No Impact. Project Comparison to the 2006 General Plan EIR See responses to Sections 5.2.2(a), (b), and (c), above. May 2020 Page 63 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Project Comparison to the 2014 LUE Amendment SEIR See responses to Sections 5.2.2(a), (b), and (c), above. 5.2.3 Mitigation Measures Identified in the Program EIR and Applicable to the Proposed Project There were no mitigation measures specified in the 2006 GPU EIR and the 2014 LUE Amendment SEIR, and no mitigation measures are required for the proposed project. 5.2.4 Relevant General Plan Policies There were no relevant General Plan policies in the 2006 GPU EIR or the 2014 LUE Amendment SEIR. Page 64 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.3 AIR QUALITY 5.3.1 Summary of Impacts Identified in the Previous EIRs 5.3.1.1 2006 GENERAL PLAN EIR Air Quality Management Plan Consistency The 2006 GPU EIR concluded that the project (General Plan Update) would potentially conflict with implementation of South Coast Air Quality Management District's (South Coast AQMD) 2003 Air Quality Management Plan (AQMP). The 2006 GPU EIR identified that the land plan would increase residential growth projections slightly over what was projected by Southern California Association of Governments (SCAG) for Orange County in 2030. Since preparation of the 2006 GPU EIR, South Coast AQMD has adopted the 2016 AQMP, which is the current AQMP for the South Coast Air Basin (SoCAB). Regional Construction Impacts The 2006 GPU EIR concluded that, even after mitigation, construction air emissions could exceed South Coast AQMD's significance thresholds as a result of the amount of development activity that is anticipated in the City. Regional Operational Impacts The 2006 GPU EIR concluded that the operational emissions would cumulatively contribute to the nonattainment designations of the SoCAB. At the time of the 2006 GPU EIR, the SoCAB was designated as nonattainment for ozone (03), carbon monoxide (CO) Jos Angeles County only), and coarse particulate matter (PM10). Localized Impacts The 2006 GPU EIR demonstrated that there would be no CO exceedances caused by vehicular emissions idling at intersections, and therefore localized CO hot spot impacts would be less than significant. Odors The 2006 GPU EIR identified that odors generated within the City would not affect a substantial number of people, and impacts would be less than significant. 5.3.1.2 2014 LUE AMENDMENT SEIR Air Quality Management Plan Consistency The 2014 LUE Amendment SEIR determined that air quality impacts would be less than significant because the incremental increase in emissions associated with the LUE Amendment compared to the project as analyzed under the 2006 GPU EIR would not exceed the South Coast AQMD's regional significance threshold. May 2020 Page 65 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Regional Construction Impacts The 2014 LUE Amendment SEIR concluded that the construction emissions and resulting impacts would be similar to the those analyzed in the 2006 GPU EIR and impacts would be less than significant. Regional Operational Impacts The 2014 LUE Amendment SEIR concluded that the incremental increase in operational emissions from the 2006 GPU EIR would not exceed the South Coast AQMD regional significance thresholds. Therefore, operation -related regional air quality impacts were determined to be less than significant. Localized Impacts The Initial Study prepared for the 2014 LUE Amendment SEIR determined that it would result in similar CO hotspot impacts as the 2006 General Plan, and impacts would be less than significant. In addition, the 2014 SEIR determined that with implementation of mitigation, which would require installation of maximum efficiency rating value filters, localized impacts on new sensitive receptors would be less than significant. Odors The Initial Study prepared for the 2014 SEIR concluded that odor impacts would be similar to those analyzed in the 2006 EIR, and impacts would be less than significant. 5.3.2 Impacts Associated with the Proposed Project Where available, the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations. Would the proposed project: Page 66 PlaceWorks Less Than Significant Substantial ImpactslNo Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact a) Conflict with or obstruct implementation of the applicable air quality plan? X b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non -attainment under X an applicable federal or state ambient air quality standard? c) Expose sensitive receptors to substantial pollutant concentrations? X Page 66 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Comments: a) Conflict with or obstruct implementation of the applicable air quality plan? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. A consistency determination with an AQMP plays an important role in local agency project review by linking local planning and individual projects to the AQMP. It fulfills the CEQA goal of informing decision makers of the environmental efforts of the project under consideration early enough to ensure that air quality concerns are fully addressed. It also provides the local agency with ongoing information as to whether they are contributing to the clean air goals in an AQMP. The South Coast AQMD is the responsible in developing AQMPs for the SoCAB region. The current air quality plan for the SoCAB region is the 2016 AQMP, which was adopted March 2017 (SCAQMD 2017). Regional growth projections are used by South Coast AQMD to forecast future emission levels in the SoCAB. For southern California, these regional growth projections are provided by SCAG and are partially based on land use designations included in city/county general plans. Projects that are consistent with the local general plan are considered consistent with the air quality -related regional plan. Project Comparison to 2006 General Plan EIR As stated, AQMPs utilize regional growth projections that are based on the land use designations in the local general plans. Thus, the land uses assumed and the growth anticipated in the 2006 GPU EIR have been incorporated into the current 2016 AQMP. The proposed project would redesignate the project site from AO to MU -H2, which would expand the overall geographic area designated as MU -H2 in the Airport Area. Although the overall geographic area designated MU -H2 would be expanded in the Airport Area, the proposed project would not increase the overall development capacity in the MU -1-12 -designated areas as analyzed in the 2006 GPU EIR. Additionally,, the proposed project would reduce the amount of allowable nonresidential land uses both within the project site and Airport Area. Because the land uses allowed under the proposed project would be within the development capacity assumed in the 2006 GPU EIR, its implementation would not result in increasing growth and would be within the growth assumptions of the 2016 AQMP. Additionally, and as discussed in Section 5.3(b), below, the proposed project is not anticipated to result in a substantial increase in operation -phase emissions compared to what was previously analyzed in the 2006 GPU EIR and could result May 2020 Page 67 Less Than Significant Substantial Impacts/No Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact d) Result in other emissions (such as those leading to odors) adversely affecting a X substantial number of people? e) Conflict with or obstruct implementation of the applicable air quality plan? X Comments: a) Conflict with or obstruct implementation of the applicable air quality plan? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. A consistency determination with an AQMP plays an important role in local agency project review by linking local planning and individual projects to the AQMP. It fulfills the CEQA goal of informing decision makers of the environmental efforts of the project under consideration early enough to ensure that air quality concerns are fully addressed. It also provides the local agency with ongoing information as to whether they are contributing to the clean air goals in an AQMP. The South Coast AQMD is the responsible in developing AQMPs for the SoCAB region. The current air quality plan for the SoCAB region is the 2016 AQMP, which was adopted March 2017 (SCAQMD 2017). Regional growth projections are used by South Coast AQMD to forecast future emission levels in the SoCAB. For southern California, these regional growth projections are provided by SCAG and are partially based on land use designations included in city/county general plans. Projects that are consistent with the local general plan are considered consistent with the air quality -related regional plan. Project Comparison to 2006 General Plan EIR As stated, AQMPs utilize regional growth projections that are based on the land use designations in the local general plans. Thus, the land uses assumed and the growth anticipated in the 2006 GPU EIR have been incorporated into the current 2016 AQMP. The proposed project would redesignate the project site from AO to MU -H2, which would expand the overall geographic area designated as MU -H2 in the Airport Area. Although the overall geographic area designated MU -H2 would be expanded in the Airport Area, the proposed project would not increase the overall development capacity in the MU -1-12 -designated areas as analyzed in the 2006 GPU EIR. Additionally,, the proposed project would reduce the amount of allowable nonresidential land uses both within the project site and Airport Area. Because the land uses allowed under the proposed project would be within the development capacity assumed in the 2006 GPU EIR, its implementation would not result in increasing growth and would be within the growth assumptions of the 2016 AQMP. Additionally, and as discussed in Section 5.3(b), below, the proposed project is not anticipated to result in a substantial increase in operation -phase emissions compared to what was previously analyzed in the 2006 GPU EIR and could result May 2020 Page 67 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis in a reduction in emissions. Therefore, the proposed project would be consistent with the 2016 AQMP and its implementation is not anticipated to result in new or increase the severity of impacts as it pertains to consistency with the AQMP when compared to the 2006 GPU EIR. Therefore, there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Compared to the 2014 LUE Amendment SEIR, the proposed project would result in less commercial space and the same number of residential dwelling units allowed for the project site. Thus, because the proposed project would include less commercial space, it would generate fewer emissions from area, mobile, and energy sources compared to the land uses assumed for the project site as considered in the 2014 LUE Amendment SEIR. Therefore, buildout of the proposed project is not anticipated to result in new impacts or increase the severity of impacts as it pertains to consistency with the AQMP compared to what was previously analyzed in the 2014 LUE Amendment SEIR. Overall, there are no changes or new significant information that would require preparation of an EIR. b) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non -attainment under an applicable federal or state ambient air quality standard? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. The SoCAB is designated nonattainment for 03 and PM2.5 under the California and National AAQS, nonattainment for lead (Los Angeles County only) under the National AAQS, and nonattainment for PMlo under the California AAQS (CARB 2017a). According to South Coast AQMD methodology, any project that does not exceed or can be mitigated to less than the daily threshold values would not add significantly to a cumulative impact (South Coast AQ)M 1993). The following describes changes in regional impacts from short- term construction activities and long-term operation of the proposed project. Project Comparison to 2006 General Plan EIR Regional Construction Impacts Construction activities would result in the generation of air pollutants. These emissions would primarily be 1) exhaust emissions from off-road diesel -powered construction equipment; 2) dust generated from demolition, site preparation, earthmoving, and other construction activities; 3) exhaust emissions from on -road vehicles; and 4) off -gas emissions of volatile organic compounds (VOCs) from application of asphalt, paints, and coatings. When compared to the land uses considered for the project site under the 2006 GPU EIR, the proposed project would accommodate similar types of land uses. While the proposed 2006 GPU EIR does not include residential uses on the project site, the project would not result in an increase in residential units within the Airport Area in comparison to the General Plan. Overall, it is anticipated that the required construction processes and activities needed to develop the land uses accommodated under both the proposed project and the 2006 GPU EIR would be similar. Page 68 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis The 2006 GPU EIR determined that construction activities would generate short-term emissions that would exceed the South Coast AQMD regional significance thresholds. Thus, construction activities associated with buildout of the proposed project would result in similar regional air quality impacts as identified in the 2006 GPU EIR. Therefore, buildout of the proposed project is not anticipated to result in a substantial increase in construction emissions compared to what was previously analyzed in the 2006 GPU EIR. Overall, there are no changes or new significant information that would require preparation of an EIR. Development of individual land uses accommodated under the proposed project would adhere to General Plan Policy NR 8.1 and regulatory measures (e.g., South Coast AQMD Rule 201, Rule 403, Rule 1113, Rule 1403, and California Air Resources Board Rule 2840), which would minimize construction -related regional air quality impacts. Regional Operational Impacts The proposed project would result in the land use redesignation of the project site from AO to MU -H2. However, though the overall geographic area designated MU -H2 would be expanded in the Airport Area, the proposed project would not increase the overall development capacity of the allowable uses in the MU -H2 - designated areas as analyzed in the 2006 GPU EIR. In addition, redesignation of the project site from AO to MU -H2 would generate slightly fewer average daily vehicle trips (ADT) -6,630 ADTs compared to 6,829 ADTs (see Table 1, Appendix B). The estimated 6,630 trips is also conservative since it assumes buildout of the maximum number of density bonus units for a total of 444 residential units. Because the proposed project would reduce allowable non-residential building square footage on the project site, and overall Airport Area and generate fewer vehicle trips, its implementation would reduce emissions from area, mobile, and energy sources compared to the land uses assumed in the 2006 GPU EIR. Therefore, buildout of the proposed project is not anticipated to result in an increase in operation -phase emissions compared to what was analyzed in the 2006 GPU EIR. Overall, there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Regional Construction Impacts The proposed project would result in similar land use types as the previously considered under the 2014 LUE Amendment SEIR, but would reduce the intensity of these uses (see Table 3). Thus, it is anticipated that the types of construction activities and construction processes associated with the land use development projects accommodated under the proposed project would be less than what was considered in the 2014 LUE Amendment SEIR. Similar to the 2014 LUE Amendment SEIR, development of individual land uses accommodated under the proposed project would adhere to General Plan Policy NR 8.1 and regulatory measures (e.g., South Coast AQMD Rule 201, Rule 403, Rule 1113, Rule 1403, and California Air Resources Board Rule 2840), which would contribute to minimizing construction -related regional air quality impacts. The 2014 LUE Amendment SEIR determined that construction activities would generate short-term emissions that would exceed the South Coast AQMD regional significance thresholds. Thus, construction activities associated with buildout of the proposed project would result in similar regional air quality impacts as identified May 2020 Page 69 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis in the 2014 LUE Amendment SEIR. Therefore, buildout of the proposed project is not anticipated to result in an increase in construction emissions compared to what was analyzed in the 2014 LUE Amendment SEIR. Overall, there are no changes or new significant information that would require preparation of an EIR. Regional Operational Impacts Buildout of the proposed project would result in less commercial space and the same number of residential dwelling units on-site. In comparison to the proposed project, however, the 329 residential units (plus up to 115 density bonus units) are already allocated for the Airport Area as within the MU -112 uses. Overall, similar to what was identified in the 2014 LUE Amendment SEIR, operation of the land uses accommodated under the proposed project could generate daily long-term emissions that exceed the South Coast AQMD long-term regional emissions thresholds. However, because the proposed project would include less commercial space, it would generate less emissions from area, mobile, and energy sources compared to the land uses assumed for the project site in the 2014 LUE Amendment SEIR. Therefore, buildout of the proposed project would decrease operation -phase emissions compared to what was analyzed in the 2014 LUE Amendment SEIR. There are no changes or new significant information that would require preparation of an EIR. c) Expose sensitive receptors to substantial pollutant concentrations? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. The following describes changes in localized impacts from short-term construction activities and long-term operation of the proposed project. Project Comparison to 2006 General Plan EIR Localized Construction Impacts Localized Significance Thresholds The localized significance thresholds (LSTs) are the amount of project -related emissions at which localized concentrations (ppm or µg/m3) would exceed the ambient air quality standards for criteria air pollutants for which the SoCAB is designated a nonattainment area (SCAQMD 2008). Per the LST methodology, information regarding specific development projects and the locations of receptors would be needed in order to quantify the levels of localized operation and construction -related impacts associated with future development projects. Due to the programmatic nature of the General Plan Update, it was not possible to calculate individual, project - related operation and construction emissions at this time. The LST analysis can only be conducted at a project level. Per South Coast AQMD methodology, quantification of LSTs was not applicable for this program -level environmental analysis. When compared to the land uses considered for the project site under the 2006 GPU EIR, the proposed project would result in a reduction in commercial square footage and an increase in residential dwelling units on the project site. The proposed project, however, would not increase residential units within the Airport Area (see Table 3 comments). Overall, the amount of development would require approximately equivalent construction activities as those anticipated in the 2006 GPU EIR. Additionally, the proposed project would not result in developing a new area because the project site was considered for development under the 2006 GPU EIR. Page 70 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Thus, it is not anticipated that development of the land uses accommodated under the proposed project would result in new or increase the severity of construction -related LST impacts compared to the land uses considered for the project site in the 2006 GPU EIR. Off -Site Health Risk Similar to the LST evaluation, construction health risk can only be conducted at a project level; therefore, quantification of construction -related health risk was found inapplicable for this program -level environmental analysis conducted for the General Plan update. The South Coast AQMD currently does not require health risk assessments to be conducted for short-term emissions from construction equipment. Emissions from construction equipment primarily consist of diesel particulate matter (DPM). The Office of Environmental Health Hazards Assessment (OEHHA) issued new guidance for the preparation of health risk assessments in March 2015 (OEHHA 2015). The OEHHA has developed a cancer risk factor and non -cancer chronic reference exposure level for DPM, but these levels are based on continuous exposure over a 30 -year time frame. No short-term acute exposure levels have been developed for DPM. It is not anticipated that any individual land use development projects accommodated under the proposed project would have a construction duration of 30 years or more, which would limit the exposure to on-site and off-site receptors. It is likely that construction of individual developments accommodated under the plans would be spread out incrementally over this period of time, which would also limit the exposure of on- and off-site receptors to elevated concentrations of DPM. Furthermore, improvements under the proposed project would not introduce new types of construction processes or activities compared to what was previously considered in the 2006 GPU EIR. Thus, it is not anticipated that construction of the land uses accommodated under the proposed project would result in new or increase the severity of construction -related health risk impacts compared to the land uses considered for the project site in the 2006 GPU EIR. Therefore, no changes or new information would require preparation of a subsequent EIR. Localized Operational Impacts Off -Site LSTs and Health Risks Because a quantified LST analysis can only be conducted at a project level it was not possible to calculate individual, project -related, operation emissions for the General Plan Update. Types of land uses that typically generate substantial quantities of criteria air pollutants and toxic air contaminants (TAC) include industrial (stationary sources) and warehousing (truck idling) land uses. The types of land uses planned for the proposed project include 297,572 square feet of office, commercial, and auto rental facilities and up to 444 residential dwelling units. Thus, the types of land uses proposed under the proposed project would not be expected to generate substantial quantities of criteria air pollutants and TACs. Development of the commercial land uses may result in stationary sources of TAC emissions—e.g., dry cleaners, restaurants with char -broilers, or buildings with emergency generators and boilers. However, these sources are not considered large emitters by South Coast AQMD. Furthermore, they are subject to South Coast AQMD's new source review through their permitting requirements and would be subject to further study and health risk assessment prior to the issuance of any necessary air quality permits under South Coast AQMD Rule 1401. The permitting process ensures that May 2020 Page 71 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis stationary source emissions would be below the South Coast AQMD significance thresholds of 10 in a million cancer risk and 1 for acute risk at the maximally exposed individual. When compared to the land uses considered for the project site under the 2006 GPU EIR, the proposed project would accommodate similar types of non-residential land uses and introduce residential uses. The proposed project would not result in developing a new area as the project site was considered for development under the 2006 GPU EIR. Thus, overall, it is not anticipated that development of the land uses accommodated under the proposed project would result in new or increased severity of operation -related localized air quality impacts compared to the land uses considered in the 2006 GPU EIR. CO Hotspot The 2006 GPU EIR conducted a carbon monoxide (CO) hotspot analysis to identify whether the General Plan would expose sensitive receptors to substantial pollutant concentrations. At that time, the SoCAB was designated nonattainment under the California AAQS and National AAQS for CO. With the turnover of older vehicles, introduction of cleaner fuels, and implementation of control technology on industrial facilities, CO concentrations in the SoCAB and the state have steadily declined. In 2007, the South Coast AQMD was designated in attainment for CO under both the California AAQS and National AAQS. As identified in South Coast AQMD's 2003 AQMP and the 1992 Federal Attainment Plan for Carbon Monoxide (1992 CO Plan), peak carbon monoxide concentrations in the SoCAB were a result of unusual meteorological and topographical conditions and not a result of congestion at a particular intersection (SCAQMD 1992; SCAQMD 2003). The 2006 GPU EIR identified less than significant impacts related to CO hotspots. Compared to the land uses for the project site analyzed in the 2006 GPU EIR, the proposed project would result in minor changes to peak hour vehicle trips -615 evening peak hour trips compared to 637 evening peak hour trips, and 660 morning peak hour trips compared to 548 for the 2006 GPU EIR uses (note that these estimates conservatively assume maximum bonus density units for the proposed project). Given the reduction in trips compared to the 2006 GPU EIR, CO hotspot impacts related to mobile -source emissions from implementation of the proposed project would be reduced compared to the 2006 GPU EIR and would be less than significant. Therefore, compared to what was previously analyzed in the 2006 GPU EIR, buildout of the proposed project is not anticipated to result in new significant impacts or impacts of greater severity pertaining to CO hotspots. Overall, there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Localized Construction Impacts: LSTs and Health Risks The land use types accommodated under the proposed project would be the same as the uses analyzed for the 2014 LUE Amendment SEIR for the project site, but the overall intensity of these uses would be reduced. Thus, for the same reasons in the discussion of construction LSTs and health risk in comparison to the 2006 GPU EIR, it is not anticipated that development of the land uses accommodated under the proposed project would result in new or increase the severity of construction -related LST and health risk impacts compared to the land uses considered for the project site in the 2014 LUE Amendment SEIR. Therefore, there are no changes or new significant information that would require preparation of an EIR. Page 72 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Localized Operational Impacts Off -Site LSTs and Health Risks The land uses accommodated under the proposed project would be less than the development capacity considered for the project site in the 2014 LUE Amendment SEIR. Thus, implementation of the proposed project is not anticipated to result in new or increase the severity of operation -related localized air quality impacts related to criteria air pollutants and TACs compared to the land uses considered in the 2014 LUE EIR. Therefore, there are no changes or new significant information that would require preparation of an EIR. On -Site LSTS and Heath Risks The 2014 LUE Amendment SEIR analyzed potential localized impacts related to siting sensitive land uses near sources of emissions. The proposed project proposes a similar amount and type of development in the same footprint as development anticipated on the site in the 2014 LUE SEIR. Therefore, the project would not alter the localized impacts related to siting sensitive land uses near sources of emissions. In general, residential, commercial, office, and institutional uses (such as the hospital land uses) do not use substantial quantities of TACs and typically do not exacerbate existing hazards. CO Hotspot The project as considered in the 2014 LUE Amendment SEIR was determined to result in less than significant CO hotpot impacts overall. Because the proposed project would result in similar land use types, but overall less development capacity compared to the 2014 LUE Amendment SEIR, its implementation would generate fewer peak hour trips. Thus, similar to the project considered in the 2014 LUE Amendment SEIR, the proposed project would not result in significant CO hotpot impacts, but would result in slightly less CO hotspot impacts when compared to the 2014 LUE Amendment SEIR. Therefore, compared to what was previously analyzed in the 2014 LUE Amendment SEIR, buildout of the proposed project is not anticipated to result in new significant impacts or impacts of greater severity as it pertains to CO hotspots. Overall, there are no changes or new significant information that would require preparation of an EIR. d) Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Nuisance odors from land uses in the SoCAB are regulated under South Coast AQMD Rule 402, Nuisance, which states: A person shall not discharge from any source whatsoever such quantities of air contaminants or other material which cause injury, detriment, nuisance, or annoyance to any considerable number of persons or to the public, or which endanger the comfort, repose, health or safety of any such persons or the public, or which cause, or have a natural tendency to cause, injury or damage to business or property. The provisions of this rule shall not apply to odors emanating from agricultural operations necessary for the growing of crops or the raising of fowl or animals. May 2020 Page 73 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis The type of facilities that are considered to have objectionable odors include wastewater treatments plants, chemical manufacturing, sanitary landfill, fiberglass manufacturing, transfer station, painting/coating operations (e.g., autobody shops), composting facility, food processing facility, petroleum refinery, feed lot/dairy, asphalt batch plant, and rendering plant. Project Comparison to 2006 General Plan EIR The types of land uses that would be accommodated under the proposed project would consist of office, commercial, auto rental facilities, and residential. These types of uses do not usually generate significant or highly objectionable odors. In addition, land uses accommodated under the proposed project would be subject to South Coast AQMD Rule 402, which would contribute to minimizing odor -related nuisances. In addition to operation -related generation of odors, emissions from construction equipment, such as diesel exhaust, and from volatile organic compounds from architectural coatings and paving activities, may generate odors. However, these odors would be temporary and intermittent, and are not expected to affect a substantial number of people. Thus, similar to the 2006 GPU EIR, implementation of the proposed project would result in less than significant odors impacts. Furthermore, compared to the land uses considered for the project site in the 2006 GPU EIR, the types of land uses accommodated under the proposed project would result in similar construction odors. It is not anticipated that the proposed project would introduce or require any new construction processes that would generate substantial odors compared with what was previously considered in the 2006 GPU EIR. Therefore, buildout of the proposed project is not anticipated to result in new significant impacts or impacts of greater severity pertaining to objectionable odors compared to the 2006 GPU EIR. Overall, there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The land uses accommodated under the proposed project would be within the development capacity considered for the project site as analyzed in the 2014 LUE Amendment SEIR. Thus, the odors impacts discussion provided above comparing the proposed project and the 2006 GPU EIR is applicable, and for the same reasons, implementation of the proposed project is not anticipated to result in new or increase the severity of odor - related impacts compared to the land uses in the 2014 LUE Amendment SEIR. Therefore, there are no changes or new significant information that would require preparation of an EIR. 5.3.3 Adopted Mitigation Measures Applicable to the Proposed Project No mitigation measures related to air quality were outlined in the 2006 GPU EIR. 5.3.4 Relevant General Plan Policies The General Plan includes several policies that would reduce air quality emissions associated with future development projects in the City: ■ NR 6.1 —Walkable Neighborhoods: Provide for walkable neighborhoods to reduce vehicle trips by siting amenities such as services, parks, and schools in close proximity to residential areas. Page 74 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis ■ NR 6.2 — Mixed -Use Development: Support mixed-use development consisting of commercial or office with residential uses in accordance with the Land Use Element that increases the opportunity for residents to live in proximity to jobs, services, and entertainment. ■ NR 6.3 — Vehicle -Trip Reduction Measures: Support measures to reduce vehicle -trip generation such as at -work day care facilities, and on-site automated banking machines. ■ NR 6.4 — Transportation Demand Management Ordinance: Implement the Transportation Demand Management (TDM) Ordinance, which promotes and encourages the use of alternative transportation modes, and provides those facilities such as bicycle lanes that support such alternate modes. ■ NR 6.5 — Local Transit Agency Collaboration: Collaborate with local transit agencies to: develop programs and educate employers about employee rideshare and transit; establish mass transit mechanisms for the reduction of work-related and non -work-related vehicle trips; promote mass transit ridership through careful planning of routes, headways, origins and destinations, and types of vehicles; and develop bus shelters, bicycle lanes, and other bicycle facilities. ■ NR 6.6 — Traffic Signal Synchronization: Encourage synchronization of traffic signals throughout the City and with adjoining cities and counties to allow free flow of traffic. ■ NR 6.7 — City Fleet Vehicles: Implement the program to replace existing vehicles in the City fleet with clean vehicles that are commercially available and will provide needed services. ■ NR 6.8 — Accessible Alternative Fuel Infrastructure: Support the development of alternative fuel infrastructure that is available and accessible to the public, and provide incentives for alternative fuel vehicles. ■ NR 6.9 — Education on Mobile Source Emission Reduction Techniques: Provide education to the public on mobile source emission reduction techniques such as using alternative modes of transportation. ■ NR 7.1 — Fuel Efficient Equipment: Support the use of fuel efficient heating equipment and other appliances. ■ NR 7.2 — Source Emission Reduction Best Management Practices: Require the use of Best Management Practices (BMP) to minimize pollution and to reduce source emissions. ■ NR 7.3 — Incentives for Air Pollution Reduction: Provide incentives to promote siting or to use clean air technologies and building materials (e.g., fuel cell technologies, renewable energy sources, UV coatings, hydrogen fuel). ■ NR 8.1— Management of Construction Activities to Reduce Air Pollution: Require developers to use and operate construction equipment, use building materials and paints, and control dust created by construction activities to minimize air pollutants. May 2020 Page 75 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis ■ NR 24.1 — Incentives for Energy Conservation: Develop incentives that encourage the use of energy conservation strategies by private and public developments. ■ NR 24.2 — Energy -Efficient Design Features: Promote energy-efficient design features. ■ NR 24.3 — Incentives for Green Building Program Implementation: Promote or provide incentives for "Green Building" programs that go beyond the requirements of Title 24 of the California Administrative Code and encourage energy efficient design elements as appropriate to achieve "green building" status. ■ NR 24.4 — Incentives for Provision of LEED Certified Buildings: Provide incentives for implementing Leadership in Environmental and Energy Design (LEED) certified building such as fee waivers, bonus densities, and/or awards recognition programs. Page 76 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.4 BIOLOGICAL RESOURCES 5.4.1 Summary of Impacts Identified in the Program EIRs 5.4.1.1 2006 GENERAL PLAN EIR The GPU EIR identifies City-wide biological resources, including habitat types; sensitive biological resources, including special status species; marine resources; and sensitive marine sources. Identified biological resources are mapped in the GPU EIR (Figure 4.3-1) and reproduced here as Figure 13, 2006 General Plan Biological Resources. The EIR also delineates Environmental Study Areas (ESAs), as shown on Figure 14, Environmental Study Areas (ESAs). As shown, there are no identified biological resources on the project site, and the project site is not within an ESA. The GPU would allow infill development throughout the City. A variety of plant and animal species are present within the GPU planning area, including, but are not limited to, California least tern (Sterna antillarum broivni), yellow warbler (Dendroica petechia bremsten), Belding's savannah sparrow (Passerculus sandwicbensis beldinga), golden eagle (Aquila cbrysaetos), light-footed clapper rail (Rallus longitrostris levipes), and western snowy plover (Cbaradrius alexandrinus nivosus). Numerous GPU -identified goals and policies would aid in protecting sensitive habitats and species. These policies provide protection to habitats containing candidate and special status plant and wildlife species and increase the level of protection of these plant and wildlife species within the City's regulatory framework. Compliance with federal and California Environmental Species Act and CEQA, and implementation of proposed GPU goals and policies would reduce potential impacts on sensitive plant and wildlife species to less than significant. Development under the proposed GPU could also result in the removal of mature trees that may serve as perching or nesting sites for migratory birds and raptors in both developed and undeveloped areas. Several federal and state regulations restrict activities that may result in the "take" (kill, harm, harass, etc.) of certain species, including active nests. During the project -level analysis of development proposed under the GPU, project -specific mitigation, such as preconstruction surveys, may be necessary to ensure that development under the GPU does not result in the "take" of such species as a result of vegetation removal. The General Plan includes policies restricting development within wetland areas and ESAs. The project site is not within a wetland area or ESA, and therefore these policies would not be directly applicable to the project site. The Orange County Central -Coastal Subregional Natural Community Conservation Plan/Habitat Conservation Plan (NCCP/HCP) is the applicable habitat conservation plan for the GPU planning area. In July of 1996, the City became a signatory agency in this plan. As a signatory agency, the City is responsible for enforcing mitigation measures and other policies identified in the NCCP/HCP Implementation Agreement for properties within the City limit that are part of the NCCP Subregional Plan. The 2006 GPU IS found that impacts resulting from the implementation of the GPU to this plan were less than significant. The 2006 GPU May 2020 Page 77 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis IS also found that the GPU would not conflict with any local policies or ordinances protecting biological resources. 5.4.1.2 2014 LUE AMENDMENT SEIR As explained in the 2014 LUE SEIR, the City of Newport Beach is nearly built out, and the 2014 LUE Amendment consists mainly of infill development and intensification and increases/reductions in allowable development capacity. The land use changes considered in the SEIR for the project at that time reflected consideration that the site was in an urban developed areas with a number of existing buildings, structures, and other hardscape improvements already in place. The City is known to have special -status and sensitive wildlife and plant species, and Newport Beach is also located along the coast where there are natural riparian areas, wetlands, and wildlife corridors that may be affected by intensification and infill development. However, any development under the 2014 LUE Amendment would only be concentrated in urbanized areas and would not involve habitat modifications on any candidate, sensitive, or special -status species identified to occur or have the potential to occur within the City of Newport Beach. The land use changes proposed would also preclude most sites containing riparian habitats or wetland from being developed, and do not include any undeveloped areas that may currently be used as wildlife corridors or nursery sites for native and migratory wildlife. Impacts were found to be less than significant. Furthermore, new developments would have to adhere to policies under the federal and California Environmental Species Acts, state regulations by the California Department of Fish and Wildlife that protect stream beds and nearby riparian communities, and state and federal laws and regulations that protect wetlands through the Corps Section 404 permitting process and the California Wetlands Conservation Policy. New development also needs to complete CEQA environmental reviews on a project- by -project basis. Additionally, the 2006 General Plan policies require site-specific biological studies and compliance with the Orange County Central -Coastal Subregional NCCP/HCP. Therefore, the IS for the 2014 LUE Amendment found that impacts to candidate, sensitive, or special status species; riparian habitats; and wildlife movement, corridors, and nursery sites would be less than significant. The IS found that there would be no impacts on wetlands. Furthermore, the City of Newport Beach has local policies and ordinances protecting biological resources within its neighborhoods. Council Policy G-1 (Retention or Removal of City Trees) and Chapter 7.26 (Protection of Natural Habitat for Migratory and Other Waterfowl) of the City's municipal code regulate new development to ensure local biological resources are preserved. Specifically, Council Policy G-1 acts as the City's tree preservation policy to enhance and maintain appropriate tree diversity in the City's urban forest. Chapter 7.26 of the municipal code protects the natural habitat of migratory waterfowl and other birds. The 2014 LUE Amendment would not conflict with any of these local policies or ordinances protecting biological resources, and there would be no impact. The LUE Amendment would also not change or contradict any policies within the Orange County Central -Coastal NCCP/HCP, and all future development would be required to comply with these policies. Page 78 PlaceWorks COSTA MESA Ll PIER PACIFIC OCEAN John Wayne Airport UPPER NEWPORT BAY t YFASHION ISLAND / PROJECT SITE IRVINE NEWPORT � � / I COAST CRYSTAL COVE STATE PARK CRYSTAL COVE STATE PARK NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Figure 13 - 2006 General Plan Biological Areas — — — — Project Boundary City Boundary _ Eelgrass Bed _ Giant Kelp Bed _ Historic Grunion Spawning Area 0 Upper Newport Bay Nature Preserve 0 Upper Newport Beach State Marine Park 0 County 0 1 Scale (Miles) Source: EIP Associates, 2006 PlaceWlorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Tbis page intentionally left blank. Page 80 PlaceWorks Source: General Plan, 2006 John Wayne Airport VN' NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Figure 14 - Environmental Study Areas — Project Boundary �� �❑ PROJECT SITE ❑ ,-, © Seminuik Slough Northstar Beach COSTA MESA ❑� ❑� © West Bay O Upper Newport Bay State Marine Park ❑ 0 and Upper Newport Bay Nature Preserve O UPPER © De Anza Bayside Marsh Peninsula NEWPORT IRVINE i�JO�O�Ju F7 BAY 0 San Diego Creek ❑�❑❑o��DO ElOQO�� /�� O Eastbluff Remnant ❑�� ❑�%❑ ❑ ❑❑ D O Big Canyon ❑OC%���� ��� O Newporter North ❑�❑�� ❑ �00�� ❑DD o9P"" L Buck Gully ❑ �� \❑� 000❑ ❑� o D D�j \ ❑❑Q r�ul 1 Morning Canyon ❑ �0�❑00�© o o ® Newport Beach Marine Life Refuge o ����❑�0�0 0 0 ; l o0 00 ® Castaways ❑''""" ���❑ ® © 0�0 Banning Ranch IAI FASHION OO Com❑ O ej x NEWPORT A, D AND O Newport Coast Los Trancos, Pelican Hill e DD o ,e..x o0❑ oo �QJ �� Ridge Park ® , ISLE A" O a�����i T �!`�'�__. �0❑ D❑ Irvine Coast Marine Life Refuge a "LaoA ISLAND ❑ ❑ 10 Giant Kelp Bed in Newport Harbor ��❑��m0❑ ✓ Entrance Channel " �� m❑D❑m O O Bonita Canyon Creek Watershed ��� n➢ mmm O�oO�Ommm ' ����. SJuin Reservoir PACIFIC OCEAN����� ®an oa q a� ® Arroyo Park ❑❑ ® Coyote Canyon NEWPORT ❑ 0 MacArthur and Bison ® MacArthur/San Miguel CRYSTAL COVE®' MacArthur/San Joaquin STATE PARK ® Spyglass Hill 0 Non -Coastal Buck Gully 0 1 Scale (Miles) PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Tbis page intentionally left blank. Page 82 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.4.2 Impacts Associated with the Proposed Project Would the proposed project: May 2020 Page 83 Less Than Significant Substantial Impacts/No Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local X or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the X California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? c) Have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, X coastal, etc.) through direct removal, filling, hydrological interruption, or other means? d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or X impede the use of native wildlife nursery sites? e) Conflict with any local policies or ordinances protecting biological resources, such as a X tree preservation policy or ordinance? f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other X approved local, regional, or state habitat conservation plan? May 2020 Page 83 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Comments: a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? No Impact. Project Comparison to 2006 General Plan EIR The project site is fully developed and there is no natural habitat on-site. As shown in Figures 13 and 14, the General Plan did not identify biological resources in the project area and did not designate the area as an Environmental Study Area. Vegetation is limited to ornamental species, including trees and bushes. In comparison to the General Plan, the proposed project would reduce nonresidential building square footage by approximately 60,000 square feet and introduce up to 444 residential units to the site. None of the project's land use changes—in comparison to the uses permitted in the General Plan—would affect the potential impact of biological resources on the site. There are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Development under the proposed project is reduced under the proposed project (see Table 3). The project site is fully developed, and biological resources are limited to ornamental vegetation. As with development under the LUE Amendment proposed land uses, the proposed project would not impact sensitive biological resources. There would be no new significant adverse impacts. b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? No Impact. Project Comparison to 2006 General Plan EIR Riparian habitats and sensitive natural communities can be found in the City, particularly along the coast and in the Upper and Lower Newport Bay. The project site is approximately 5.5 miles from the coast and 1.15 miles from Upper Newport Bay and would not impact these habitats. Thus, no impacts would occur, and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The proposed project, similar to development pursuant to the 2014 LUE Amendment in the Airport Area, would preclude sites containing riparian habitats. Thus, no impacts would occur. Page 84 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis c) Have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? No Impact. Project Comparison to 2006 General Plan EIR Areas within the GPU planning area containing wetland habitat include Upper Newport Bay, Lower Newport Bay (Newport Harbor), and the coast of Newport Beach between the Santa Ana River and the boundary between the City and unincorporated Orange County. Additionally, Banning Ranch contains federally restored wetlands. The project site is approximately 5.5 miles from the coast, 1.15 miles from Upper Newport Bay, and 5.4 miles from Banning Ranch. Thus, no impacts would occur, and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The proposed project, similar to development pursuant to the 2014 LUE Amendment in the Airport Area, would preclude sites containing wetlands from being developed. Thus, no impacts would occur. d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? No Impact. Project Comparison to 2006 General Plan EIR Banning Ranch is the only site in the City that provides wildlife with a significantly large, diverse area for foraging, shelter, and movement. The project site is approximately 5.4 miles from Banning Ranch. Furthermore, the proposed project would allow for development in an area that is currently almost fully built out and does not include any undeveloped areas that may currently be used as wildlife corridors or nursery sites for native and migratory wildlife. No habitat fragmentation would occur because there would be no disturbances of undeveloped areas under the proposed project; any new development would occur only within urbanized areas of the City. Migratory nongame native bird species are protected by the California Fish and Game Code, Sections 3503, 3503.5, and 3513, which prohibit the take of all birds and their active nests. The proposed project would comply with the California Fish and Game Code, which would ensure that if construction occurs during the avian breeding season, appropriate measures would be taken to avoid impacts to nesting birds. Compliance would involve preconstruction surveys. The surveys would be conducted no more than three days prior to construction activities. If an active bird nest is observed, the surveyor/biologist shall determine the appropriate buffer around the nest. Buffers are determined on species-specific requirements and nest location. No construction activity would occur within the buffer zone until the nest is vacated, juveniles have fledged, and May 2020 Page 85 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis there is no evidence of a second attempt at nesting. With mandatory compliance with California Fish and Game Code, impacts to nesting birds would be less than significant. Thus, no impacts would occur and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The proposed project, similar to development pursuant to the 2014 LUE Amendment in the Airport Area, does not include any undeveloped areas that may currently be used as wildlife corridors or nursery sites for native and migratory wildlife. Thus, no impacts would occur. e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? No Impact. Project Comparison to 2006 General Plan EIR The proposed project, similar to development pursuant to the 2006 GPU, would adhere to GPU policies, the Orange County Central -Coastal Subregional NCCP/HCP, the City's Council Policy G-1 (Retention or Removal of City Trees) and Chapter 7.26 (Protection of Natural Habitat for Migratory and Other Waterfowl) of the City's municipal code. The proposed project would not conflict with any of these local policies or ordinances protecting biological resources, and there would be no impact. Thus, there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The proposed project, similar to development pursuant to the 2014 LUE Amendment, would implement the GPU policies and adhere to the requirements of the Orange County Central -Coastal Subregional NCCP/HCP, the City's Council Policy G-1, and Chapter 7.26 of the City's municipal code. Thus, no impacts would occur. f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? No Impact. Project Comparison to 2006 General Plan EIR The proposed project, similar to development pursuant to the 2006 General Plan, would not change or contradict any policies within the Orange County Central -Coastal NCCP/HCP, and all future development would be required to comply with these policies. Thus, no impacts would occur, and there are no changes or new significant information that would require preparation of an EIR. Page 86 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Project Comparison to 2014 LUE Amendment SEIR The proposed project, similar to development pursuant to the 2014 LUE Amendment, would adhere to the policies of the Orange County Central -Coastal NCCP/HCP. Thus, no impacts would occur. 5.4.3 Mitigation Measures Identified in the Program EIR and Applicable to the Proposed Project There were no mitigation measures in the 2006 GPU EIR or the 2014 LUE Amendment SEIR. 5.4.4 Relevant General Plan Policies The 2006 General Plan includes the following goals and policies that are relevant to biological resources. Goal NR 10: Protection of sensitive and rare terrestrial and marine resources from urban development. ■ NR 10.2 - Orange County Natural Communities Conservation Plan: Comply with the policies contained within the Orange County Natural Communities Conservation Plan. ■ NR 10.5 - New Development Siting and Design Require: that the siting and design of new development, including landscaping and public access, protect sensitive or rare resources against any significant disruption of habitat values. ■ NR 10.7 - Use of Buffers: Maintain a buffer of sufficient size around significant or rare biological resources, if present, to ensure the protection of these resources. Require the use of native vegetation and prohibit invasive plant species within these buffer areas. ■ NR 10.8 - Exterior Lighting: Shield and direct exterior lighting away from significant or rare biological resources to minimize impacts to wildlife. May 2020 Page 87 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.5 CULTURAL RESOURCES 5.5.1 Summary of Impacts Identified in the Program EIRs 5.5.1.1 2006 GENERAL PLAN EIR Historic Resources The City of Newport Beach has 11 properties listed or designated eligible for listing on the National Register of Historic Resources (NRHP) or California Register of Historic Resources (CRHR), or otherwise listed as historic or potentially historic in the California Historic Resources Information System (CHRIS) maintained by the Office of Historic Preservation. The City has listed five additional properties in the City Register in recognition of their local historical or architectural significance. The locations of these resources are mapped on GPU EIR Figure 4.4-1, Historic Resources. None of these recognized resources is located within or proximate to the proposed project site. Archaeological Resources Archaeological resources were also analyzed in the 2006 GPU EIR, which concluded that impacts would be less than significant. Archaeological resources that are often culturally or religiously important to Native American groups would be protected; information resources would be maintained; grading and excavation activities where there is a potential to affect archaeological resources would be monitored by a qualified archaeologist; cultural organizations, including Native American groups, would be notified of all potentially adverse impacts; and all scientifically valuable archeological resources would be donated to responsible public or private institutions (per Goal HR 2 and NR 18 of the 2006 General Plan). The Newport Beach City Council also established "Archaeological Guidelines (K-5)" requiring the City to prepare and maintain sources of information regarding archaeological sites. Thus, impacts to archaeological resources would be less than significant. Excavation during construction activities consistent with the 2006 General Plan has the potential to disturb human burial grounds, including Native American burials, in underdeveloped areas of the City. Human burials have specific provisions for treatment in Section 5097 of the California Public Resources Code, which authorizes the Native American Heritage Commission to resolve any disputes related to the disposition of Native American burials. The California Health and Safety Code (Sections 7050.5, 7051, and 7054) also have provisions protecting human burial remains from disturbance, vandalism, or destruction. Therefore, compliance with these regulations would ensure impacts to human burial grounds remain less than significant. 5.5.1.2 2014 LUE AMENDMENT SEIR There are 23 previously recorded cultural resource studies with 16 recorded resources in the subareas proposed for land use change under the 2014 LUE Amendment. However, there are no new impacts to archaeological resources relative to the 2006 GPU EIR. The 2014 LUE Amendment would only change development capacities or land use designations on already developed properties, and no new undisturbed areas are included. Page 88 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis In case future developments in accordance with the 2014 LUE Amendment require additional ground - disturbing activities (e.g., deeper excavation) that may impact previously undisturbed grounds, the City of Newport Beach City Council has established "Archaeological Guidelines (K-5)" to ensure that if cultural resources are found, the developer would be required to preserve any significant archaeological resources and mitigate any impacts. Furthermore, various policies within the 2006 GPU under Goals HR 2 and NR 18 specify requirements to identify, protect, and preserve important archaeological resources. Thus, compliance with the City's "Archaeological Guidelines (K-5)" and policies in the 2006 GPU would ensure that impacts to archaeological resources remain less than significant. Furthermore, the IS for the 2014 LUE Amendment found that although soil -disturbing activities associated with development could result in the discovery of human remains, compliance with California Health and Safety Code Section 7050.5 and Public Resources Code Section 5097.98 would ensure that significant impacts to human remains would not occur. 5.5.2 Impacts Associated with the Proposed Project CEQA Guidelines Section 15064.5 provides direction on determining significance of impacts to archaeological and historical resources. Generally, a resource shall be considered "historically significant" if the resource meets the criteria for listing on the California Register of Historical Resources: ■ Is associated with events that have made a significant contribution to the broad patterns of California's history and cultural heritage; ■ Is associated the with lives of persons important in our past; ■ Embodies the distinctive characteristics of a type, period, region or method of construction, or represents the work of an important creative individual, or possesses high artistic values; or ■ Has yielded, or may be likely to yield, information important in prehistory or history. (PRC § 5024.1; 14 CCR § 4852) The fact that a resource is not listed in the California Register of Historical Resources, not determined to be eligible for listing, or not included in a local register of historical resources does not preclude a lead agency from determining that it may be a historical resource. According to Appendix G of the CEQA Guidelines, a project would normally have a significant effect on the environment if the project would: May 2020 Page 89 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Comments: a) Cause a substantial adverse change in the significance of a historical resource pursuant to S 15064.5? No Impact. Project Comparison to 2006 General Plan EIR The City of Newport Beach has properties listed or designated eligible for listing on the NRNP, the CRHR, and CHRIS. The City Register also recognizes properties of local historical or architectural significance that meet the definition of historical resources under Section 15064.5(a) of the CEQA Guidelines. In addition, the City's Historic Resource Inventory includes properties with cultural significance to the City. However, none of the recognized sites are within the proposed project site boundaries. Thus, no impacts would occur and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR There are 16 recorded resources in the subareas proposed for land use change under the 2014 LUE Amendment, and no new impacts to archaeological resources relative to the 2006 GPU EIR. None of these are located on the proposed site. Therefore, the proposed project, similar to development pursuant to the 2014 LUE Amendment, would have no impacts. b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to S 15064.5? Less than Significant/No Changes or New Information Requiring Preparation of an EIR. Page 90 PlaceWorks Less Than Significant Substantial Impacts/No Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact a) Cause a substantial adverse change in the significance of a historical resource X pursuant to § 15064.5? b) Cause a substantial adverse change in the significance of an archaeological resource X pursuant to § 15064.5? c) Disturb any human remains, including those interred outside of dedicated cemeteries? X Comments: a) Cause a substantial adverse change in the significance of a historical resource pursuant to S 15064.5? No Impact. Project Comparison to 2006 General Plan EIR The City of Newport Beach has properties listed or designated eligible for listing on the NRNP, the CRHR, and CHRIS. The City Register also recognizes properties of local historical or architectural significance that meet the definition of historical resources under Section 15064.5(a) of the CEQA Guidelines. In addition, the City's Historic Resource Inventory includes properties with cultural significance to the City. However, none of the recognized sites are within the proposed project site boundaries. Thus, no impacts would occur and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR There are 16 recorded resources in the subareas proposed for land use change under the 2014 LUE Amendment, and no new impacts to archaeological resources relative to the 2006 GPU EIR. None of these are located on the proposed site. Therefore, the proposed project, similar to development pursuant to the 2014 LUE Amendment, would have no impacts. b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to S 15064.5? Less than Significant/No Changes or New Information Requiring Preparation of an EIR. Page 90 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Project Comparison to 2006 General Plan EIR As with land uses permitted under the General Plan, the proposed project would involve redevelopment and land disturbance. It is anticipated that grading/earthwork impacts would be similar and have comparable potential impacts to any unknown, cultural resources. The proposed project, similar to development pursuant to the 2006 GPU, would adhere to applicable GPU policies listed under Section 5.5.4, Relevant General Plan Policies. The proposed project, similar to development pursuant to the 2006 GPU, would also comply with the City's "Archaeological Guidelines (K-5)." Thus, impacts would be less than significant and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The intensity of land development permitted under the proposed project would be reduced in comparison to land uses under the 2014 LUE Amendment for the project site. The potential for disturbing unknown archaeological resources, however, would be similar because the project would disturb the same amount of the site as contemplated in the 2014 LUE Amendment. The proposed project, similar to development pursuant to the 2014 LUE Amendment, would comply with the City's "Archaeological Guidelines (K-5)" and policies within the 2006 GPU. Impacts would be less than significant and there are no changes or new significant information that would require preparation of an EIR. c) Disturb any human remains, including those interred outside of dedicated cemeteries? No Impact. Project Comparison to 2006 General Plan EIR California Health and Safety Code Section 7050.5 requires that if human remains are discovered within the project site, disturbance of the site shall remain halted until the coroner has conducted an investigation into the circumstances, manner and cause of any death, and the recommendations concerning the treatment and disposition of the human remains have been made to the person responsible for the excavation, or to his or her authorized representative, in the manner provided in Section 5097.98 of the Public Resources Code. If the coroner determines that the remains are not subject to his or her authority and if the coroner recognizes or has reason to believe the human remains to be those of a Native American, he or she shall contact, by telephone within 24 hours, the Native American Heritage Commission. The proposed project, similar to development pursuant to the 2006 GPU, would comply with California Health and Safety Code Section 7050.5 and Public Resources Code Section 5097.98. Therefore, no impacts would occur, and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The proposed project, similar to development pursuant to the 2014 LUE Amendment, would comply with California Health and Safety Code Section 7050.5 and Public Resources Code Section 5097.98. Therefore, no May 2020 Page 91 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis impacts would occur. There are no changes or new significant information that would require preparation of an EIR. 5.5.3 Mitigation Measures Identified in the Program EIR and Applicable to the Proposed Project There were no mitigation measures in the 2006 GPU EIR or the 2014 LUE Amendment SEIR. 5.5.4 Relevant General Plan Policies The 2006 General Plan includes the following goals and policies that are relevant to cultural resources. Goal HR 2: Identification and protection of important archeological and paleontological resources within the City. HR 2.1 - New Development Activities: Require that, in accordance with CEQA, new development protect and preserve paleontological and archaeological resources from destruction and avoid and mitigate impacts to such resources. Through planning policies and permit conditions, ensure the preservation of significant archeological and paleontological resources and require that the impact caused by any development be mitigated in accordance with CEQA. HR 2.2 - Grading and Excavation Activities: Require a qualified paleontologist/archeologist to monitor all grading and/or excavation where there is a potential to affect cultural, archeological or paleontological resources. If these resources are found, the applicant shall implement the recommendations of the paleontologist/archeologist, subject to the approval of the City Planning Department. HR 2.3 - Cultural Organizations: Notify cultural organizations, including Native American organizations, of proposed developments that have the potential to adversely impact cultural resources. Allow representatives of such groups to monitor grading and/or excavation of development sites. HR 2.4 - Paleontological or Archaeological Materials: Require new development to donate scientifically valuable paleontological or archaeological materials to a responsible public or private institution with a suitable repository, located within Newport Beach, or Orange County, whenever possible. Goal NR 18: Protection and preservation of important paleontological and archaeological resources. NR 18.1 - New Development: Require new development to protect and preserve paleontological and archaeological resources from destruction, and avoid and minimize impacts to such resources in accordance with the requirements of CEQA. Through planning policies and permit conditions, ensure the preservation of significant archeological and paleontological resources and require that the impact caused by any development be mitigated in accordance with CEQA. NR 18.3 - Potential for New Development to Impact Resources: Notify cultural organizations, including Native American organizations, of proposed developments that have the potential to adversely Page 92 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis impact cultural resources. Allow qualified representatives of such groups to monitor grading and/or excavation of development sites. Require new development, where on site preservation and avoidance are not feasible, to donate scientifically valuable paleontological or archaeological materials to a responsible public or private institution with a suitable repository, located within Newport Beach or Orange County, whenever possible. May 2020 Page 93 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.6 ENERGY 5.6.1 Summary of Impacts Identified in the Program EIRs 5.6.1.1 2006 GENERAL PLAN EIR Impacts related to energy were not analyzed in the 2006 GPU EIR because they were not officially part of the CEQA Guidelines' Appendix G checklist until January 1, 2019, long after the certification date Quly 25, 2006) of the 2006 GPU EIR by the Newport Beach City Council. Therefore, the analysis of energy impacts is new in this Addendum. However, the 2006 GPU EIR did include an analysis of the impacts on other public services or utilities, which included electricity and natural gas. Specifically, the analysis was in Section 4.14, "Utilities and Service Systems." As concluded in the 2006 GPU EIR, impacts to electricity and natural gas services were found to be less than significant. The electricity and natural gas analysis in Section 4.14 did not respond to the specific questions in the new energy section, which are provided below; however, the analysis (as applicable) is carried through to this new energy section for context, discussion, and comparison purposes. 5.6.1.2 2014 LUE AMENDMENT SEIR Impacts related to energy were also not analyzed in the 2014 LUE Amendment SEIR, which was certified July 22, 2014. However, an analysis of the impacts on other public services or utilities, which included electricity and natural gas, was included in Section 5.12, "Utilities and Service Systems." Impacts to electricity and natural gas services were found to be less than significant. This analysis did not respond to the specific questions in the new energy section, but the analysis (as applicable) is carried through to this new energy section for context, discussion, and comparison purposes. 5.6.2 Impacts Associated with the Proposed Project Would the proposed project: Page 94 PlaceWorks Less Than Significant Substantial ImpactslNo Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact a) Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of X energy resources, during project construction or operation? b) Conflict with or obstruct a state or local plan for renewable energy or energy efficiency? X Page 94 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Comments: a) Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation? Less than Significant/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR Construction As with the development pursuant to the 2006 GPU, construction of the proposed project would consume energy in the short term through electricity use, construction vehicles and equipment fuel consumption, and bound energy in construction materials (e.g., asphalt, steel, concrete, pipes, lumber, glass). Electricity Construction would require the use of equipment for grading, hauling, and building activities. Electricity use during construction would vary during different phases of construction—most of the construction equipment during grading would be gas or diesel powered, and the later construction phases would require electricity - powered equipment for interior construction and architectural coatings. The use of electricity would be temporary and would fluctuate according to the phase of construction. Neither the development pursuant to the 2006 GPU nor the proposed project would result in wasteful or unnecessary electricity demands. Therefore, the proposed project would not result in a significant impact related to electricity use during the construction phase. Transportation Transportation energy use depends on the type and number of trips, vehicle miles traveled, fuel efficiency of vehicles, and travel mode. Transportation energy use during construction would come from the transport and use of construction equipment (off-road), delivery and haul trucks (on -road), and construction employee passenger vehicles (on -road). The majority of construction equipment during grading would be diesel powered. Construction contractors are required to minimize idling of construction equipment during construction, per California Code of Regulations Section 2485. This code requires that nonessential idling for all diesel -fueled commercial motor vehicles must not exceed five consecutive minutes at any location. Such practices would limit wasteful and unnecessary energy consumption. Furthermore, the use of fuel by on -road and off-road vehicles would be temporary and would fluctuate according to the phase of construction. Construction fuel use for the proposed project would cease upon completion of project construction. No unusual project characteristics would necessitate the use of construction equipment that would be less energy efficient than for development pursuant to the 2006 GPU. Therefore, it is expected that construction fuel consumption associated with the proposed project would not be any more inefficient, wasteful, or unnecessary than the energy required for development contemplated in the 2006 GPU. May 2020 Page 95 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Construction Materials Construction building materials may include recycled materials and products originating from nearby sources in order to reduce the costs of transportation. With increasing transportation costs and fuel prices, contractors and owners have a strong financial incentive to avoid wasteful, inefficient, and unnecessary consumption of energy during construction. The type of construction for the proposed project is conventional and would be similar to development pursuant to the 2006 GPU. Substantial reductions in energy inputs for construction materials can be achieved by building with recycled materials, which require much less energy to produce. The Newport Beach Municipal Code, Chapter 15.11, adopts the 2019 California Green Building Standards Code (CALGreen; Title 24, California Code of Regulations, Part 11). CALGreen Section 5.408, Construction Waste Reduction, Disposal, and Recycling, requires that at least 65 percent of the nonhazardous construction and demolition waste from nonresidential construction operations be recycled and/or salvaged for reuse. The incremental increase in the use of energy bound in construction materials, such as asphalt, steel, concrete, pipes, and manufactured or processed materials (e.g., lumber and gas), would not substantially increase demand for energy compared to overall local and regional demand for construction materials. It is reasonable to assume that production of building materials such as concrete, steel, etc. would employ reasonable energy conservation practices in the interest of minimizing the cost of doing business. Therefore, it is expected that energy consumption associated with construction materials for the proposed project would not be any more inefficient, wasteful, or unnecessary than development pursuant to the 2006 GPU. Operation Building Energy Use Operation of the proposed project would increase electricity use by 1.1 million kilowatt hours per year and natural gas use by 9.2 million kilo—British thermal units in comparison to permitted land uses for the site under the General Plan (see Tables 21 and 22 in Section 5.19, Utilities and Service Systems). However, total mid -electricity consumption2 in Southern California Edison Company's (SCE's) service area is forecast to increase by approximately 12,723 gigawatt hours between 2015 and 2027 (CEC 2016), and SCE forecasts that it will have sufficient electricity supplies to meet demands in its service area. The Southern California Gas Company's (SCGC's) residual supplies are forecast to remain constant at 3,775 million cubic feet (MMCF) per day from 2020 through 2035. Total natural gas consumption in SCGC's service area is forecast to decline slightly from 2,591 MMCF/day in 2019 to 2,313 MMCF/day in 2035 (CGEU 2018). SCGC forecasts that it will have sufficient natural gas supplies to meet gas demands. Additionally, the 2019 Building Energy Efficiency Standards, adopted on May 9, 2018, went into effect for new construction starting January 1, 2020. The 2019 standards focus on four key areas: 1) smart residential photovoltaic systems; 2) updated thermal envelope standards (preventing heat transfer from the interior to 2 The high electricity demand case incorporates relatively high economic/demographic growth, relatively low electricity rates, and relatively low committed efficiency program, self -generation, and climate change impacts. The low electricity demand case includes lower economic/demographic growth, higher assumed rates, and higher committed efficiency program and self -generation impacts. The mid case uses input assumptions at levels between the high and low cases. Page 96 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis exterior and vice versa); 3) residential and nonresidential ventilation requirements; 4) and nonresidential lighting requirements (CEC 2018). Under the 2019 standards, nonresidential buildings will be 30 percent more energy efficient than under the 2016 standards (CEC 2018). It should be noted that the electricity and natural gas demands shown in Tables 21 and 22 do not account for this 30 percent reduction in energy use and are therefore more conservative estimates. Furthermore, the proposed project would be in compliance with 2019 Energy Efficiency Standards as well as the 2019 CALGreen standards. All appliances would comply with the 2012 Appliance Efficiency Regulations. The proposed project would be consistent with the requirements of these energy-related regulations and would not result in wasteful or unnecessary electricity demands. Therefore, the proposed project, similar to development pursuant to the 2006 GPU, would not result in a significant impact related to energy for building use. Transportation Redesignation of the project site from AO (2006 General Plan) to MU -H2 is projected to generate fewer average daily vehicle trips 6,630 ADTs compared to 6,829 (see Appendix B, New ort Airport Village Trip - Making Assessment). As shown in Appendix B, Table 1, the estimated 6,630 ADT for the proposed project is the higher estimate of potential trips and includes development of all 115 possible density bonus units for a total of 444 residential units. Furthermore, fuel consumption in passenger vehicles and trucks is regulated by federal and state laws regarding average corporate fuel economy of vehicles. Additionally, one of the primary goals of the California Air Resources Board's (CARB) 2017 Scoping Plan is to provide clean transportation options for California residents. In January 2012, CARB approved the Advanced Clean Cars program for model years 2017 through 2025. The program combines the control of smog, soot, and global warming gases with requirements for greater numbers of zero -emission vehicles into a single package of standards. The proposed project, similar to development pursuant to the 2006 GPU, would be consistent with the requirements of these energy-related regulations and would not result in wasteful or unnecessary fuel demands. Therefore, the proposed project would not result in a significant impact related to transportation energy during the operational phase. Conclusion As substantiated above, the proposed project, as with development pursuant to the 2006 GPU, would not result in potentially significant environmental impacts due to wasteful, inefficient, or unnecessary consumption of energy resources during project construction or operation. Thus, impacts would be less than significant and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Construction Refer to the discussion of construction related energy impacts above. Given that the proposed project would result in the same amount of residential as anticipated in the 2014 LUE Amendment SEIR and reduced non- residential development compared to that anticipated in the 2014 LUE Amendment SEIR, it is expected that energy consumption associated with electricity, transportation, and construction materials for the proposed May 2020 Page 97 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis project would not be any more inefficient, wasteful, or unnecessary than development pursuant to the 2014 LUE Amendment. Operation Building Energy Use The land uses accommodated under the proposed project would be within and less than the development capacity considered for the project site as analyzed in the 2014 LUE Amendment. Therefore, the proposed project would result in a decrease in electricity and natural gas demand. Additionally, the proposed project would comply with the requirements of the 2019 Building Energy Efficiency Standards, and the 2019 CALGreen standards. All appliances would comply with the 2012 Appliance Efficiency Regulations. The proposed project would be consistent with the requirements of these energy-related regulations and would not result in wasteful or unnecessary electricity demands. Therefore, the proposed project, similar to development pursuant to the 2014 LUE Amendment, would not result in a significant impact related to energy for building use. Transportation Nonresidential building square footage would be reduced for proposed project relative to the LUE Amendment proposal for the project site. Both the proposed project and LUE Amendment uses would include up to 444 residential units. The proposed project, therefore, would generate fewer vehicle trips, resulting in reduced energy use. Furthermore, the proposed project would be in compliance with CARB's Scoping Plan and the Advanced Clean Cars program and would not result in wasteful or unnecessary fuel demands. Therefore, the proposed project would not result in a significant impact related to transportation energy during the operational phase. Conclusion As substantiated above, the proposed project would reduce development intensity in comparison with land uses under the proposed 2014 LUE Amendment and would not result in potentially significant environmental impacts due to wasteful, inefficient, or unnecessary consumption of energy resources during project construction or operation. Thus, impacts would be less than significant. b) Conflict with or obstruct a state or local plan for renewable energy or energy efficiency? Less than Significant/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR The California Renewables Portfolio Standard (RPS) was established in 2002 under SB 1078 and was amended in 2006 and 2011. The RPS program requires investor-owned utilities, electric service providers, and community choice aggregators to increase the use of eligible renewable energy resources to 33 percent of total procurement by 2020. Renewable energy sources include wind, small hydropower, solar, geothermal, biomass, and biogas. Page 98 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Executive Order S-14-08, signed in November 2008, expanded the state's RPS to 33 percent renewable power by 2020. This standard was adopted by the legislature in 2011 (SB X1-2). Senate Bill 350 (de Leon) was signed into law September 2015 and established tiered increases to renewable energy resources of 40 percent by 2024, 45 percent by 2027, and 50 percent by 2030. Senate Bill 350 also set a new goal to double the energy -efficiency savings in electricity and natural gas through energy -efficiency and -conservation measures. On September 10, 2018, Governor Brown signed Senate Bill 100, which raised California's RPS requirements to 60 percent by 2030, with interim targets, and 100 percent by 2045. The bill also established a state policy that eligible renewable energy resources and zero -carbon resources supply 100 percent of all retail sales of electricity to California end-use customers and 100 percent of electricity procured to serve all state agencies by December 31, 2045. Under SB 100 the state cannot increase carbon emissions elsewhere in the western grid or allow resource shuffling to achieve the 100 percent carbon -free electricity target. The project site is currently being serviced by SCE, which obtains electricity from conventional and renewable sources. In 2018, 36 percent of SCE's electricity was generated from eligible renewables; 6 percent from nuclear power; 4 percent from large hydroelectric generators; and 37 percent from unspecified sources (SCE 2019). SCE is scheduled to reach California's 2020 renewable energy as mandated. The net increase in power demand associated with the proposed project, similar to the projects pursuant to the 2006 GPU, is anticipated to be within the service capabilities of SCE and would not impede SCE's ability to implement California's renewable energy goals. Therefore, the proposed project would not obstruct a state or local plan for renewable energy. Thus, impacts would be less than significant and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Refer to the discussion above. It is expected that energy consumption associated with electricity, transportation, and construction materials for the proposed project would not be any more inefficient, wasteful, or unnecessary than development pursuant to the 2014 LUE Amendment. The power demand associated with the proposed project, similar to the projects pursuant to the 2014 LUE Amendment, is anticipated to be within the service capabilities of SCE and would not impede SCE's ability to implement California's renewable energy goals. Therefore, the proposed project would not obstruct a state or local plan for renewable energy. 5.6.3 Mitigation Measures Identified in the Program EIR and Applicable to the Proposed Project There were no mitigation measures in the 2006 GPU EIR or the 2014 LUE Amendment SEIR. 5.6.4 Relevant General Plan Policies The 2006 General Plan does not include any energy goals or policies that are relevant to the proposed project. May 2020 Page 99 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.7 GEOLOGY AND SOILS 5.7.1 Summary of Impacts Identified in the Program EIRs 5.7.1.1 2006 GENERAL PLAN EIR Seismic Hazards Newport Beach is exposed to risk from multiple earthquake fault zones. High risk fault zones include the Newport -Inglewood fault zone, Whittier fault zone, San Joaquin Hills fault zone, and Elysian Park fault zone. However, none of these faults are zoned under the guidelines of the Alquist-Priolo Earthquake Fault Zoning Act. Thus, there are no Alquist-Priolo fault zones within the vicinity of the City, and no impact would occur. The GPU would allow infill development throughout the City, consistent with existing land use patterns, intensities, and building types. The fault zones located within the City each have the potential to cause moderate to large earthquakes that would cause ground shaking. Policies contained in the GPU would ensure that adverse effects caused by seismic and geologic hazards, such as strong seismic ground shaking, are minimized. Additionally, the California Building Code (CBC) Chapter 33 includes building design standards for the construction of new buildings and/or structures and specific engineering design and construction measures to avoid the potential for adverse impacts. Site-specific geotechnical studies and hazards assessments would be required on a project -by -project basis to determine site-specific soil properties and potential for ground failure. Furthermore, compliance with standards in the CBC requires implementation of design measures to mitigate any potential ground failure hazards. Standards related to site-specific slope stability by the City's Building Code and those related to shoring and stabilization by the California Division of Occupational Safety and Health would ensure seismic -related ground failure would be less than significant. A considerable part of the City's mapped liquefiable areas (West Newport, Balboa Peninsula, the harbor islands and vicinity) are already built upon, mostly with residential and commercial development. A portion of the City's active oil field is also built on liquefiable soils. Furthermore, many of the areas in central and eastern Newport Beach have been identified as vulnerable to seismically induced slope failure due to steep terrain. However, proposed project is not within an area vulnerable to liquefaction or landslides (see Figure 4.5-2 of the 2016 GPU EIR). Compliance with the standards in the current CBC would also require an assessment of hazards related to landslides and liquefaction and the incorporation of design measures into structures to mitigate this hazard if development were considered feasible. The City has included policies in its Safety Element to achieve the goal of minimizing the risk of injury, loss of life, and property damage caused by earthquake hazards or geologic disturbances. Additionally, if any development on steep terrain were to occur upon implementation of the GPU, site-specific slope stability design would be required to ensure adherence to the standards in Appendix Chapter A33, Excavation and Grading, of the City Building Code, as well as to California Division of Occupational Safety and Health (Cal/OSHA) requirements for shoring and stabilization. After compliance with applicable regulations as well as policies in the GPU, impacts would be less than significant. Page 100 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Soil Erosion and Compressible Soils Much of the City is built out and topsoil erosion is not an issue because there is no exposed topsoil or any agricultural or biological production that would be affected. Soil erosion is a significant problem in Newport Beach because wave actions along the coast cause sediment and coastal bluff erosion. However, the project site is not near the coast. All demolition and construction activities within the City would be required to comply with CBC Chapter 70 standards, which would ensure implementation of appropriate measures during grading activities to reduce soil erosion. In addition, all new developments would be subject to regional and local regulations pertaining to construction activities. Specifically, development that is greater than five acres would be required to comply with the provisions of the General Construction Activity Stormwater Permit adopted by the State Water Resources Control Board (SWRCB), which would require the employment of best management practices (BMPs) to limit the extent of eroded materials from a construction site. All development that is between one and five acres would be required to comply with the provisions of the National Pollutant Discharge Elimination System (NPDES) Phase II regulations concerning the discharge of eroded materials and pollutants from construction sites. Compliance with policies in the GPU would further ensure that new development would not result in substantial soil erosion or loss of topsoil. Compliance with the NPDES permit would minimize effects from erosion and ensure consistency with the Regional Water Quality Control Board (RWQCB) Water Quality Control Plan. In view of these policies, implementation of the GPU would have a less than significant impact associated with soil erosion or topsoil. Furthermore, compressible soils underlie a significant part of the City. Under the added weight of fill embankments or buildings, these sediments will settle, causing distress to improvements. Also, some of the geologic units in the Newport Beach area, including both surficial soils and bedrock, have fine-grained components that are moderate to highly expansive. These materials may be present at the surface or exposed by grading activities. Man-made fills can also be expansive, depending on the soils used. An acceptable degree of soil stability is required by the Building Code and can be achieved for expansive or compressible material by the incorporation of soil treatment programs (replacement, grouting, compaction, drainage control, etc.) in the excavation and construction plans to address site-specific soil conditions. A site-specific evaluation of soil conditions is required by the City's Building Code and must contain recommendations for ground preparation and earthwork specific to the site that become an integral part of the construction design. As part of the construction permitting process, the City requires completed reports of soil conditions at specific construction sites to identify potentially unsuitable soil conditions, including liquefaction, subsidence, and collapse. Adherence to the City's codes and policies in the GPU would ensure the maximum practicable protection for users of buildings and infrastructure and associated trenches, slopes, and foundations, and impacts are less than significant. Paleontological Resources Paleontological resources were analyzed in the 2006 GPU EIR, which concluded that impacts would be less than significant. Grading and excavation activities where there is a potential to affect paleontological resources May 2020 Page 101 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis would be monitored by a qualified paleontologist, and all scientifically valuable paleontological resources would be donated to responsible public or private institutions (per Goal HR 2 and NR 18 of the 2006 General Plan). The Newport Beach City Council also established "Paleontological Guidelines (K-4)" requiring the City to prepare and maintain sources of information regarding paleontological sites. Thus, impacts to paleontological resources would be less than significant. 5.7.1.2 2014 LUE AMENDMENT SEIR The 2014 LUE Amendment EIR reflects the geotechnical and paleontological conditions and the regulatory requirements summarized above for the 2006 GPU. The 2014 LUE Amendment EIR did not find specific constraints relative to the Saunders property, which includes the project site, and concluded that compliance with regulatory requirements would reduce impacts to less than significant. 5.7.2 Impacts Associated with the Proposed Project Would the proposed project: Page 102 PlaceWorks Less Than Significant Substantial Impacts/No Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact a) Directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map, issued by the State Geologist for the area or based on other substantial X evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42. ii) Strong seismic ground shaking? X iii) Seismic -related ground failure, including liquefaction? X iv) Landslides? X b) Result in substantial soil erosion or the loss of topsoil? X Page 102 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Comments: a) Directly or indirectly cause substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning map, issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42. No Impact. Project Comparison to 2006 General Plan EIR As mentioned above, there are no Alquist-Priolo fault zones within the City of Newport Beach. Therefore, the proposed project, similar to development pursuant to the 2006 GPU, would have no impact. There are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Since there are no faults zoned under the guidelines of the Alquist-Priolo Earthquake Fault Zoning Act within or in the vicinity of the City of Newport Beach, the proposed project, similar to development pursuant to the 2014 LUE Amendment, would have no impact. May 2020 Page 103 Less Than Significant Substantial Impacts/No Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result X in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse? d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial direct or indirect X risks to life or property? e) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems X where sewers are not available for the disposal of waste water? f) Directly or indirectly destroy a unique paleontological resource or site or unique X geologic feature? Comments: a) Directly or indirectly cause substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning map, issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42. No Impact. Project Comparison to 2006 General Plan EIR As mentioned above, there are no Alquist-Priolo fault zones within the City of Newport Beach. Therefore, the proposed project, similar to development pursuant to the 2006 GPU, would have no impact. There are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Since there are no faults zoned under the guidelines of the Alquist-Priolo Earthquake Fault Zoning Act within or in the vicinity of the City of Newport Beach, the proposed project, similar to development pursuant to the 2014 LUE Amendment, would have no impact. May 2020 Page 103 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis ii) Strong seismic ground shaking? Less Than Significant/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR Relative to land uses under the General Plan, the proposed project would reduce potential noncommercial use (by approximately 60,000 square feet) and introduce up to 444 housing units on the project site. Seismic ground shaking caused by the Newport -Inglewood fault zone, Whittier fault zone, San Joaquin Hills fault zone, and Elysian Park fault zone could occur at the project site. All new development would implement the requirements of the 2019 CBC. Thus, similar to the 2006 GPU, seismic ground shaking impacts would be less than significant, and there are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Similar to development pursuant to the 2014 LUE Amendment, the proposed project would implement the requirements of the 2019 CBC, and seismic ground shaking impacts would be less than significant. There are no changes or new information requiring preparation of an EIR. iii) Seismic -related ground failure, including liquefaction? Less Than Significant/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR The proposed project is not within an area vulnerable to liquefaction or landslides. Thus, there are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The proposed project is not in an area susceptible to liquefaction or landslide, and no impacts would arise. There are no changes or new information requiring preparation of an EIR. iv) Landslides? No Impact. Project Comparison to 2006 General Plan EIR See response to Section 5.7.2 a(iii), above. The project site is not within a landslide zone, and no impacts would arise. Thus, there are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR See response to Section 5.7.2 a(iii), above. The project site is not within a landslide zone and no impacts would arise. Page 104 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis b) Result in substantial soil erosion or the loss of topsoil? Less than Significant/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR Since the City is mostly built out, topsoil erosion is not an issue, especially in developed areas like the project site. However, soil erosion is a concern in Newport Beach. The demolition and construction of the proposed project, similar to all development in Newport Beach, would comply with CBC Chapter 70 standards, which would ensure implementation of appropriate measures during grading activities to reduce soil erosion. In addition, the proposed project, similar to applicable development pursuant to the 2006 GPU, would implement the requirements of the General Construction Activity Stormwater Permit, the RWQCB Water Quality Control Plan, and the provision of the NPDES Phase II regulations. The 2006 GPU also includes policies that address soil erosion. Compliance with policies in the 2006 GPU and regulatory requirements would reduce impacts to less than significant. Thus, there are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Topsoil erosion is not an issue in the City. However, soil erosion is a concern in Newport Beach. Similar to development pursuant to the 2014 LUE Amendment, all demolition and construction activities associated with the proposed project would comply with applicable local, state, and federal laws. These include regulations in CBC Chapter 70, the SWRCB's General Construction Activity Stormwater Permit and related BMPs, the NPDES Phase II regulations, and the RWQCB Water Quality Control Plan. By complying with these regulations and the policies of the 2006 GPU, soil erosion impacts from new developments would be less than significant. c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction, or collapse. Less than Significant/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR Compressible soils underlie a significant part of the City, and some geologic units in the Newport Beach area are moderately to highly expansive. However, the proposed project, similar to development pursuant to the 2006 GPU, would comply with the requirements for expansive or compressible material in the 2019 CBC. Furthermore, the City Building Code requires a site-specific evaluation of soil conditions that must contain recommendations for ground preparation and earthwork specific to the site that become an integral part of the construction design. As part of the construction permitting process, the City also requires completed reports of soil conditions at specific construction sites to identify potentially unsuitable soil conditions, including liquefaction, subsidence, and collapse. Compliance with the CBC, the City's codes, and policies in the GPU would ensure impacts would be less than significant. Thus, there are no changes or new information requiring preparation of an EIR. May 2020 Page 105 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Project Comparison to 2014 LUE Amendment SEIR The proposed project, similar to development pursuant to the 2014 LUE Amendment, involves infill development that could potentially add weight of fill and foundation support that could decrease soil stability and lead to lateral spreading, subsidence, or collapse problems in the future. However, adherence to the City's codes, CBC standards, and GPU policies would ensure maximum protection against unstable soils, and these impacts would be less than significant. d) Be located on expansive soil, as defined in Table 19-1-B of the Uniform Building Code (1994), creating substantial risks to life or property? Less than Significant/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR See response to Section 5.7.2 c, above. Project Comparison to 2014 LUE Amendment SEIR See response to Section 5.7.2 c, above. e) Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater? No Impact. Project Comparison to 2006 General Plan EIR The City of Newport Beach is almost entirely built out with established utility services. Therefore, the proposed project, similar to development pursuant to the 2006 GPU, would not require the use of septic tanks and no impacts would arise. There are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The City of Newport Beach has established utility services throughout the City and does not use septic tanks. Thus, the proposed project, similar to development pursuant to the 2014 LUE Amendment, would have no impact on soils incapable of adequately supporting septic tanks or alternative wastewater disposal systems. There are no changes or new information requiring preparation of an EIR. f) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? Less than Significant/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR There are no known unique paleontological resources of unique geologic features on-site. The proposed project, similar to development pursuant to the 2006 GPU, would adhere to the GPU policies under Goals Page 106 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis HR 2 and NR 18 in case future development requires ground -disturbing activities that may impact previously undisturbed grounds. New development would: ■ Protect and preserve paleontological resources from destruction and avoid and mitigate impacts to such resources. Require a qualified paleontologist to monitor all grading and/or excavation where there is a potential to affect paleontological resources. If these resources are found, the applicant shall implement the recommendations of the paleontologist, subject to the approval of the City Planning Department. ■ Donate any scientifically valuable paleontological materials to a responsible public or private institution with a suitable repository, located within Newport Beach, or Orange County, whenever possible. Furthermore, the proposed project, similar to development pursuant to the 2006 GPU, would comply with the City's "Paleontological Guidelines (K-4)." Thus, impacts would be less than significant, and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The proposed project, similar to development pursuant to the 2014 LUE Amendment, would comply with the City's "Paleontological Guidelines (K-4)" and policies in the 2006 GPU. Thus, impacts would be less than significant. 5.7.3 Mitigation Measures Identified in the Program EIR and Applicable to the Proposed Project There were no mitigation measures in the 2006 GPU EIR or the 2014 LUE Amendment SEIR. 5.7.4 Relevant General Plan Policies The 2006 General Plan includes the following goals and policies that are relevant to geology and soils. Goal NR 3: Enhancement and protection of water quality of all natural water bodies, including coastal waters, creeks, bays, harbors, and wetlands. NR 3.5 - Storm Sewer System Permit: Require all development to comply with the regulations under the City's municipal separate storm sewer system permit under the National Pollutant Discharge Elimination System. ■ NR 3.10 - Water Quality Management Plan: Require new development applications to include a Water Quality Management Plan (WQMP) to minimize runoff from rainfall events during construction and post - construction. NR 3.11 - Best Management Practices: Implement and improve upon Best Management Practices (BMPs) for residences, businesses, development projects, and City operations. May 2020 Page 107 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis ■ NR 3.12 - Site Design and Source Control: Include site design and source control BMPs in all developments. When the combination of site design and source control BMPs are not sufficient to protect water quality as required by the National Pollutant Discharge Elimination System (NPDES), structural treatment BMPs will be implemented along with site design and source control measures. ■ NR 3.13 - Reduction of Infiltration: Include equivalent BMPs that do not require infiltration, where infiltration of runoff would exacerbate geologic hazards. ■ NR 3.16 - Street Drainage Systems: Require all street drainage systems and other physical improvements created by the City, or developers of new subdivisions, to be designed, constructed, and maintained to minimize adverse impacts on water quality. Investigate the possibility of treating or diverting street drainage to minimize impacts to water bodies. ■ NR 3.18 - Parking Lots and Rights -of -Way: Require that parking lots and public and private rights-of- way be maintained and cleaned frequently to remove debris and contaminated residue. ■ NR 3.21 - Impervious Surfaces: Require new development and public improvements to minimize the creation of and increases in impervious surfaces, especially directly connected impervious areas, to the maximum extent practicable. Require redevelopment to increase area of pervious surfaces, where feasible. Goal NR 4: Maintenance of water quality standards through compliance with the total maximum daily loads (TMDLs) standards. NR 4.4 - Erosion Minimization: Require grading/erosion control plans with structural BMPs that prevent or minimize erosion during and after construction for development on steep slopes, graded, or disturbed areas. Goal HR 2: Identification and protection of important archeological and paleontological resources within the City. HR 2.1 - New Development Activities: Require that, in accordance with CEQA, new development protect and preserve paleontological and archaeological resources from destruction and avoid and mitigate impacts to such resources. Through planning policies and permit conditions, ensure the preservation of significant archeological and paleontological resources and require that the impact caused by any development be mitigated in accordance with CEQA. HR 2.2 - Grading and Excavation Activities: Require a qualified paleontologist/archeologist to monitor all grading and/or excavation where there is a potential to affect cultural, archeological or paleontological resources. If these resources are found, the applicant shall implement the recommendations of the paleontologist/archeologist, subject to the approval of the City Planning Department. HR 2.4 - Paleontological or Archaeological Materials: Require new development to donate scientifically valuable paleontological or archaeological materials to a responsible public or private institution with a suitable repository, located within Newport Beach, or Orange County, whenever possible. Page 108 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Goal NR 18 Protection and preservation of important paleontological and archaeological resources. NR 18.1 - New Development: Require new development to protect and preserve paleontological and archaeological resources from destruction, and avoid and minimize impacts to such resources in accordance with the requirements of CEQA. Through planning policies and permit conditions, ensure the preservation of significant archeological and paleontological resources and require that the impact caused by any development be mitigated in accordance with CEQA. NR 18.3 - Potential for New Development to Impact Resources: Require new development, where on site preservation and avoidance are not feasible, to donate scientifically valuable paleontological or archaeological materials to a responsible public or private institution with a suitable repository, located within Newport Beach or Orange County, whenever possible. May 2020 Page 109 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.8 GREENHOUSE GAS EMISSIONS 5.8.1 Summary of Impacts Identified in the Previous EIRs 5.8.1.1 2006 GENERAL PLAN EIR The 2006 GPU EIR did not evaluate greenhouse gas (GHG) emissions impacts because it was prior to Senate Bill 97 (SB 97), which went into effect January 1, 2010. Thus, GHG was not included in the CEQA Guidelines Appendix G checklist, and the City did not have adopted thresholds at the time of preparation. 5.8.1.2 2014 LUE AMENDMENT SEIR GHG Emissions Impacts The 2014 LUE Amendment SEIR determined that the LUE Amendment would achieve South Coast AQMD's efficiency metric and would not conflict with plans adopted for the purpose of reducing GHG emissions. However, the SEIR concluded that additional statewide measures would be necessary to reduce GHG emissions to meet the long-term GHG reduction goals under Executive Order S-03-05, which identified a goal to reduce GHG emissions to 80 percent of 1990 levels by 2050. Because no additional statewide measures were available, GHG emissions impacts were determined to be significant and unavoidable. Consistency with Plans to Reduce GHG The 2014 LUE Amendment SEIR determined that the LUE Amendment was consistent with the California Air Resources Board (CARB) Scoping Plan and SCAG's Regional Transportation Plan/Sustainable Communities Strategy, and impacts were less than significant. 5.8.2 Impacts Associated with the Proposed Project Would the proposed project: Page 110 PlaceWorks Less Than Significant Substantial Impacts/No Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact a) Generate greenhouse gas emissions, either directly or indirectly, that may have a X significant impact on the environment? b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse X gases? Page 110 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Comments: a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Global climate change is not confined to a particular project area and is generally accepted as the consequence of global industrialization over the last 200 years. A typical project, even a very large one, does not generate enough greenhouse gas emissions on its own to influence global climate change significantly; hence, the issue of global climate change is by definition a cumulative environmental impact. Project Comparison to 2006 General Plan EIR The proposed project would redesignate the project site from AO to MU -H2 and allow a maximum of 297,572 square feet of office, retail, service, and auto rental facilities, along with 329 residential dwelling units with an additional 115 density bonus units. However, while the overall geographic area designated as MU -H2 would be expanded within the Airport Area, the proposed project would not increase the overall development capacity of the allowable uses in the MU -H2 designated areas as analyzed in the 2006 GPU EIR. Thus, the proposed land uses would be within the development capacity analyzed in the 2006 GPU EIR. In addition, redesignation of the project site from AO to MU -H2 as proposed would slightly reduce daily vehicle trip generation -6,630 ADTs compared to 6,829 ADTs (see Appendix B). Because the proposed project would reduce non-residential uses and generate slightly fewer vehicle trips, it would reduce area and mobile sources. As quantified in Section 5.19, water demand, wastewater generation and solid waste generation, and energy demand for the project site would increase relative to the 2006 General Plan due to the introduction of up to 444 units on the project site. Since the 329 units (444 units with maximum density bonus) allocation for the site, however, would be within the overall 2,200 maximum units for the Airport Area for the MU -142 designation, the number of units in the Airport Area would not be increased. Overall, therefore, GHG emissions would be reduced because of the reduction in non-residential development. Furthermore, as discussed in Section 5.3(b), it is anticipated that the construction activities under the proposed project and 2006 GPU EIR would be similar. Thus, construction - related emissions between the proposed project and 2006 GPU EIR would also be similar. Therefore, implementation of the proposed project is not anticipated to result in a substantial increase in GHG emissions compared to what was previously considered in the 2006 GPU EIR. Overall, there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Similar to potential impacts identified in the 2014 LUE Amendment SEIR, implementation of the proposed project would generate GHG emissions that exceed the South Coast AQMD GHG threshold. However, because the proposed project would reduce non-residential uses, it would also reduce emissions from area, mobile, and energy sources in addition to emissions associated with water demand, wastewater generation, solid waste generation, and construction activities when compared to the 2014 LUE Amendment SEIR permitted site land uses. Therefore, buildout of the proposed project is not anticipated to result in a substantial increase in operation -phase emissions compared to what was previously analyzed in the 2014 LUE Amendment SEIR. Overall, there are no changes or new significant information that would require preparation of an EIR. May 2020 Page 111 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Applicable plans adopted for the purpose of reducing GHG emissions include the CARB Scoping Plan and the SCAG's 2016-2040 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS). A consistency analysis with these plans is presented below. Project Comparison to 2006 General Plan EIR CARB's Scoping Plan In accordance with Assembly Bill 32 (AB 32) and Senate Bill 32 (SB 32), CARB's Scoping Plan outlines the State's strategy to achieve 1990 level emissions by year 2020 and a 40 percent reduction from 1990 emissions by year 2030 (CARB 2017a). The CARB Scoping Plan has been the primary tool to develop performance-based and efficiency -based CEQA criteria and GHG reduction targets for climate action planning efforts. Statewide strategies to reduce GHG emissions in the latest 2017 Climate Change Scoping Plan include implementing Senate Bill 350, which expands the Renewables Portfolio Standard to 50 percent by 2030 and doubles energy efficiency savings; expanding the Low Carbon Fuel Standard to 18 percent by 2030; implementing the Mobile Source Strategy to deploy zero -electric vehicle buses and trucks; implementation of the Sustainable Freight Action Plan; implementation of the Short -Lived Climate Pollutant Reduction Strategy, which reduces methane and hydrofluorocarbons 40 percent below 2013 levels by 2030 and black carbon emissions 50 percent below 2013 levels by 2030; continuing to implement Senate Bill 375; creation of a post - 2020 Cap -and -Trade Program; and development of an Integrated Natural and Working Lands Action Plan to secure California's land base as a net carbon sink. Statewide GHG emissions reduction measures that are being implemented as a result of the Scoping Plan would reduce the Proposed Revised Project's GHG emissions. The GHG emissions associated with the land uses accommodated under the 2006 GPU EIR would be reduced through compliance with statewide measures that have been adopted since AB 32 and SB 32 were adopted. Similarly, the land uses that would be accommodated under the proposed project would also be reduced through compliance with statewide measures that have been adopted since AB 32 and SB 32 were adopted. Thus, the proposed project would not conflict with the above statewide strategies identified to implement the CARB Scoping Plan. Therefore, there are no changes or new significant information that would require preparation of an EIR. SCAG's Regional Transportation Plan/Sustainable Communities Strategy The SCAG 2016-2040 RTP/SCS was adopted April 7, 2016 (SCAG 2016). It identifies that land use strategies that focus on new housing and job growth in areas served by high quality transit and other opportunity areas would be consistent with a land use development pattern that supports and complements the proposed transportation network. The overarching strategy in the 2016-2040 RTP/SCS is to plan for the southern California region to grow in more compact communities in existing urban areas; provide neighborhoods with efficient and plentiful public transit and abundant and safe opportunities to walk, bike, and pursue other forms Page 112 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis of active transportation; and preserve more of the region's remaining natural lands (SCAG 2016). The 2016- 2040 RTP/SCS contains transportation projects to help more efficiently distribute population, housing, and employment growth, as well as a forecast development that is generally consistent with regional -level general plan data. The projected regional development pattern, when integrated with the proposed regional transportation network identified in the 2016-2040 RTP/SCS, would reduce per capita vehicular travel -related GHG emissions and achieve the GHG reduction per capita targets for the SCAG region. The 2016-2040 RTP/SCS does not require that local general plans, specific plans, or zoning be consistent with the 2016-2040 RTP/SCS, but provides incentives for consistency for governments and developers. As stated, the 2016-2040 RTP/SCS utilizes regional -level growth data from local general plans. Because the proposed project would be within the development capacity considered under the 2006 GPU EIR (it would result in a net decrease in commercial square footage and no net chance in residential units since the proposed 444 residential units are within the anticipated 2,200 replacement units allocated to the Airport Area in the GPU), its implementation would not result in additional growth compared to the growth forecasted in the 2006 GPU EIR. Thus, implementation of the proposed project would not interfere with SCAG's ability to implement the regional strategies outlined in the RTP/SCS. Therefore, there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR CARB's Scoping Plan The Scoping Plan consistency discussion provided above comparing the proposed project and the 2006 GPU EIR is applicable. For the same reasons outlined in the aforementioned discussion, implementation of the proposed project is not anticipated to result in new or increase the severity of impacts as it pertains to consistency with the Scoping Plan when compared to the land uses considered for the project site in the 2014 LUE Amendment SEIR. Therefore, there are no changes or new significant information that would require preparation of a subsequent EIR. SCAG's Regional Transportation Plan/Sustainable Communities Strategy The SCAG 2016-2040 RTP/SCS consistency discussion provided above comparing the proposed project and the 2006 GPU EIR is applicable. For the same reasons outlined in the aforementioned discussion, implementation of the proposed project is not anticipated to result in new or increase the severity of impacts as it pertains to consistency with the SCAG 2016-2040 RTP/SCS when compared to the land uses considered for the project site in the 2014 LUE Amendment SEIR. Therefore, there are no changes or new significant information that would require preparation of an EIR. 5.8.3 Adopted Mitigation Measures Applicable to the Proposed Project No mitigation measures related to GHG emissions were outlined in the 2006 GPU EIR. May 2020 Page 113 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.8.4 Relevant General Plan Policies The 2006 General Plan includes several policies that would reduce GHG emissions associated with future development projects in the City, including: ■ NR 6.1— Walkable Neighborhoods: Provide for walkable neighborhoods to reduce vehicle trips by siting amenities such as services, parks, and schools in close proximity to residential areas. ■ NR 6.2 — Mixed -Use Development: Support mixed-use development consisting of commercial or office with residential uses in accordance with the Land Use Element that increases the opportunity for residents to live in proximity to jobs, services, and entertainment. ■ NR 6.3 — Vehicle -Trip Reduction Measures: Support measures to reduce vehicle -trip generation such as at -work day care facilities, and on-site automated banking machines. ■ NR 6.4 — Transportation Demand Management Ordinance: Implement the Transportation Demand Management (TDM) Ordinance, which promotes and encourages the use of alternative transportation modes, and provides those facilities such as bicycle lanes that support such alternate modes. ■ NR 6.5 — Local Transit Agency Collaboration: Collaborate with local transit agencies to: develop programs and educate employers about employee rideshare and transit; establish mass transit mechanisms for the reduction of work-related and non -work-related vehicle trips; promote mass transit ridership through careful planning of routes, headways, origins and destinations, and types of vehicles; and develop bus shelters, bicycle lanes, and other bicycle facilities. ■ NR 6.6 — Traffic Signal Synchronization: Encourage synchronization of traffic signals throughout the City and with adjoining cities and counties to allow free flow of traffic. ■ NR 6.7 — City Fleet Vehicles: Implement the program to replace existing vehicles in the City fleet with clean vehicles that are commercially available and will provide needed services. ■ NR 6.8 — Accessible Alternative Fuel Infrastructure: Support the development of alternative fuel infrastructure that is available and accessible to the public, and provide incentives for alternative fuel vehicles. ■ NR 6.9 — Education on Mobile Source Emission Reduction Techniques: Provide education to the public on mobile source emission reduction techniques such as using alternative modes of transportation. ■ NR 7.1 — Fuel Efficient Equipment: Support the use of fuel efficient heating equipment and other appliances. ■ NR 7.2 — Source Emission Reduction Best Management Practices: Require the use of Best Management Practices (BMP) to minimize pollution and to reduce source emissions. Page 114 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis ■ NR 7.3 — Incentives for Air Pollution Reduction: Provide incentives to promote siting or to use clean air technologies and building materials (e.g., fuel cell technologies, renewable energy sources, UV coatings, hydrogen fuel). ■ NR 8.1— Management of Construction Activities to Reduce Air Pollution: Require developers to use and operate construction equipment, use building materials and paints, and control dust created by construction activities to minimize air pollutants. ■ NR 24.1 — Incentives for Energy Conservation: Develop incentives that encourage the use of energy conservation strategies by private and public developments. ■ NR 24.2 — Energy -Efficient Design Features: Promote energy-efficient design features. ■ NR 24.3 — Incentives for Green Building Program Implementation: Promote or provide incentives for "Green Building" programs that go beyond the requirements of Title 24 of the California Administrative Code and encourage energy efficient design elements as appropriate to achieve "green building" status. ■ NR 24.4 — Incentives for Provision of LEED Certified Buildings: Provide incentives for implementing Leadership in Environmental and Energy Design (LEED) certified building such as fee waivers, bonus densities, and/or awards recognition programs. May 2020 Page 115 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.9 HAZARDS AND HAZARDOUS MATERIALS 5.9.1 Summary of Impacts Identified in the Program EIRs 5.9.1.1 2006 GENERAL PLAN EIR Hazardous Materials The 2006 GPU EIR found that implementation of the GPU could result in an increase in commercial development that could increase the overall routine transport, use, storage, and disposal of hazardous materials within the City. Construction activities associated with implementation of the GPU could result in the release of hazardous materials to the environment through reasonably foreseeable upset and accident conditions. Compliance with existing regulations and GPU policies would ensure that construction workers and the general public would not be exposed to any unusual or excessive risks related to hazardous materials during construction activities. Therefore, impacts associated with the exposure of construction workers and the public to hazardous materials during construction activities would be less than significant. Operation of future land uses that could be developed under the GPU could create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment. Compliance with Titles 8, 22, 26, and 49 of the California Code of Regulations, and their enabling legislation in Chapter 6.95 of the California Health and Safety Code, would ensure that this impact is less than significant by requiring compliance with applicable laws and regulations that would reduce the risk of hazardous materials use, transportation, and handling through the implementation of established safety practices, procedures, and reporting requirements. Implementation of the GPU could emit hazardous emissions or handle acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school. The California Pacific Charter School is located 0.25 mile southwest of the project site at 4101 Birch Street. Businesses that handle hazardous materials would be required to comply with Article 1 of the California Health and Safety Code and would prepare and implement a business emergency plan. Development would also implement the provisions of the City's Fire Code. With the implementation of these regulatory requirements impacts were found to be less than significant. Furthermore, the 2006 GPU EIR listed sites which were included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5; thus, implementation of the GPU could create a significant hazard to the public or the environment. The 2006 GPU EIR found that hazard impacts arising from existing hazardous materials sites would be less than significant after implementation of the GPU policies. Airport -Related Hazards Newport Beach borders the southeastern portion of John Wayne Airport QWA) and lies under the approach path for Long Beach Airport. The 2006 GPU EIR found that the potential growth and development that could occur through implementation of the GPU could place people at risk for an aviation hazard. The northern Page 116 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis inland portions of the City to the south just past Fashion Island are in the AELUP's height restriction zone for JWA. The AELUP referenced in the 2006 GPU EIR was dated December 19, 2002. Airport -related hazards were found to be less than significant after implementation of General Plan policies. 5.9.1.2 2014 LUE AMENDMENT SEIR Hazardous Materials The 2014 LUE Amendment consisted of changes to land use designations and increases and reductions in development capacities in certain subareas of the City. These changes in land use and allowable development did not involve any industrial uses that could result in the use of hazardous materials and/or the generation of hazardous materials that were not considered in the 2006 GPU EIR. Additionally, all new developments that would handle or use hazardous materials would be required to comply with regulations and standards established by the US Environmental Protection Agency (EPA) and by the State, County, and City. Specifically, any new business is required to submit a full hazardous materials disclosure report, including an inventory of hazardous materials used, generated, stored, handled, or emitted; emergency response plans; evacuation plan; and a training program for personnel. The Newport Beach Fire Department (NBFD) conducts yearly inspections of all businesses to ensure business plans are in order. Additionally, all businesses that handle or have on-site transportation of hazardous materials would be required to comply with the provisions of the City's Fire Code and the California Health and Safety Code, Article 1, Chapter 6.95 for a business emergency plan. By complying with federal, State, and City regulations, the 2014 LUE would result in a less than significant impact on the public or environment through the use, transport, or disposal of hazardous materials. Furthermore, compliance with South Coast Air Quality Management District (AQMD) Rules and Regulations (pertaining to asbestos); Code of Federal Regulations; California Code of Regulations, Title 8 Party 61, Subpart M Construction Safety Orders 1529 (pertaining to asbestos) and 1532.1 (pertaining to lead); and the US Department of Housing and Urban Development's (HUD) guidelines for lead exposure would ensure that construction workers and the general public are not exposed to any risks related to hazardous materials during demolition and construction activities. Cal/OSHA also has regulations concerning the use of hazardous materials, including requirements for safety training, exposure warnings, availability of safe equipment, and prepared emergency action/prevention plans. Existing contaminated sites would be required to be documented and remediated under the supervision of the State Department of Toxic Substance Control (DTSC) before construction activities could begin. Furthermore, any existing old underground storage tanks (USTs) that may be disturbed during construction activities would be managed under the guidance of Orange County Department of Environmental Health regulations, and if groundwater contamination is identified, remediation activities would be required by the Santa Ana RWQCB. By complying with federal, State, and City regulations, the 2014 LUE would result in a less than significant impact on the public or environment during the construction and demolition phases of proposed development. The NBFD Emergency Services Office published the City of Newport Beach Emergency Management Plan in 2004 and updates it every three years. The Emergency Management Plan guides responses to extraordinary emergency situations associated with natural disasters, technological incidents, and nuclear defense operations. The City Manager is also responsible for updating, revising, publishing, and distributing the plan, with assistance May 2020 Page 117 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis from NBFD. Updating the emergency management plan every three years to incorporate changes to the City, including potentially increased traffic conditions from the 2014 LUE Amendment, would reduce impacts associated with emergency response and evacuation in the City to less than significant. Furthermore, buildout of the 2014 LUE Amendment within the Airport Area was found to place 841 household residents, guests in 150 hotel rooms, and residents in congregate care in subareas with known hazardous materials releases on and next to those areas. However, upon implementation of regulatory requirements and standard conditions of approval, the impact was found to be less than significant. Airport -Related Hazards Subsequent to the adoption of the 2006 GPU, the 2008 AELUP was adopted on April 17, 2008, by the Airport Land Use Commission (ALUC). The 2008 AELUP included Safety Zones—discussed in the 2014 LUE Amendment EIR—that depict which land uses are acceptable and which are unacceptable in various portions of airport environs. Safety zones in the City range from Zone 1 to Zone 6; land use restrictions are greatest in Zone 1 and least restrictive in Zone 6. Most of the Airport Area is in Safety Zone 6 for the long runway (Runway 19R/1L) at JWA. However, some areas are within Safety Zone 3 for the short runway (Runway 19L/1R) (see Figure 12). Land use restrictions and compatibility for each zone are described in Table 4, Land Use Compatibility: Jobn Wayne Airport Safety Zones. Safety Zone 3 General Plan Policy LU 6.15.7, Overall Density and Housing Types, for mixed use districts (MU -H2) stipulates that residential units be developed at a minimum density of 30 units and a maximum of 50 units averaged over the total area of each residential village. The placement of high-density housing is not consistent with the land use compatibility standards for Safety Zone 3. For consistency with the AELUP safety zones, the residential units for the proposed project would not be within Safety Zone 3. Safety Zone 6 Restricted land uses in Safety Zone 6 consist of outdoor stadiums and similar uses with very high intensities— children's schools, large day care centers, hospitals, and nursing homes. Compatible land uses in the proposed MU -H2 zone include office; research and development; and similar uses that support the primary office and business park functions, such as retail and financial services, while allowing for the reuse of properties for the development of cohesive residential villages that are integrated with business park uses. Land uses permitted in the proposed MU -H2 zone would not conflict with prohibited land uses in Safety Zone 6. By abiding by the standards of the Safety Zones, impacts were found to be less than significant. FAR Part 77 Height Restrictions Compared to Maximum Permitted Building Heights The 2014 LUE does not propose changes to height limits under City of Newport Beach Planned Community regulations and Municipal Code Section 20.30.060(E). All existing height limits would remain. Page 118 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis The maximum permitted building heights in the Airport Area for subareas with proposed development capacity increases and/or changes in land use designations under the LUE Amendment are compared in Table 5. FAA height limitations and subareas are shown in Figure 15, FAA Part 77 Height Kestrictions — 2014 LUE Amendment Airport Area Change Areas. ladle 5 txisting iviaximum rerminea tsuiiaing neignts Location Existing Planned Community or Zoning' Subarea Maximum Permitted Height Saunders Properties2 AO - Airport Office and Supporting Uses All The height limit for nonresidential and mixed-use Significant structure with flat roofs is 300 feet. However, Impacts/No buildings and structures shall not penetrate Federal Substantial Substantial Aviation Regulation (FAR) Part 77, Obstruction— Changes or New Imaginary Surfaces, for John Wayne Airport unless Change in Showing New or Information approved by the Airport Land Use Commission Project Requiring Circum -stances (ALUC). Height limit ranges from 150 to 206 feet Requiring amsl. The Hangars Planned Community 11 - Newport Place All Six stories above ground level Issues Professional & Business Office - Site 9 EIR Revisions Effects Lyon Companies Planned Community 15 -Koll Center All 12 stories; must also comply with FAA height Office D Area restrictions UAP Companies Planned Community 15 -Koll Center All 12 stories; must also comply with FAA height 4699 Jamboree Road Office F Area disposal of hazardous materials? restrictions and 5190 Campus Drive Height limits for zoning districts, including District APF listed here, are set forth in Newport Beach Municipal Code Section 20.30.060(E). 2 The proposed project is located in this subarea. The entire Airport Area is within the Height Restriction Zone designated in the Airport Environs Land Use Plan for John Wayne Airport (see Figure 11). In most of the Airport Area the height limit is 206 feet above mean sea level (amsl). By abiding by the City of Newport Beach Planned Community regulations and the Height Restriction Zone in the Airport Environs Land Use Plan for John Wayne Airport, impacts were found to be less than significant. 5.9.2 Impacts Associated with the Proposed Project Would the project: May 2020 Page 779 Less Than Significant Impacts/No Substantial Substantial New Information Changes or New Change in Change in Showing New or Information Project Requiring Circum -stances Increased Requiring Major EIR Requiring Major Significant Preparation of Issues Revisions EIR Revisions Effects an EIR No Impact a) Create a significant hazard to the public or the environment through the routine transport, use, or X disposal of hazardous materials? May 2020 Page 779 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Comments: a) Create a significant hazard to the public or the environment through the routine transport, storage, production, use, or disposal of hazardous materials? Less than Significant/No Changes or New Information Requiring Preparation of an EIR. Page 120 PlaceWorks Less Than Significant Impacts/No Substantial Substantial New Information Changes or New Change in Change in Showing New or Information Project Requiring Circum -stances Increased Requiring Major EIR Requiring Major Significant Preparation of Issues Revisions EIR Revisions Effects an EIR No Impact b) Create a significant hazard to the public or the environment through reasonably foreseeable upset X and accident conditions involving the release of hazardous materials into the environment? c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste X within one-quarter mile of an existing or proposed school? d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code § 65962.5 and, as a result, would X it create a significant hazard to the public or the environment? e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, X would the project result in a safety hazard or excessive noise for people residing or working in the project area? f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency X evacuation plan? g) Expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death X involving wildland fires? Comments: a) Create a significant hazard to the public or the environment through the routine transport, storage, production, use, or disposal of hazardous materials? Less than Significant/No Changes or New Information Requiring Preparation of an EIR. Page 120 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Figure 15 -Height Restrictions per Federal Air Regulations Part 77 - 2014 LUE Amendment Airport Area Changes Q. .. r Qi / 4A - Saunders 001 / 48 - The Hangars Newport Beach Source: Orange County Airport Land Use Commission Airport Environs Land Use Plan for John Wayne Airport, 2008; PlaceWorks, 2014 Irvine �r fl Project Boundary City Boundary `eet AMSL Elevation Contours in feet above mean sea level (AMSL) Lyon Companies Airport Surfaces 0 Horizontal Surface - Elevation 206 Feet AMSL 0 Departure Surface - Slope 50:1 (Horizontal:Vertical) 0 D -UAP Companies Transitional Surface - Slope 7:1 (Horizontal:Vertical) 0 Conical Surface - Slope 20:1 (Horizontal:Vertical) 00 Runway - Elevation 54 Feet AMSL 0 2,400 Scale (Feet) PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Tbis page intentionally left blank. Page 122 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Project Comparison to the 2006 General Plan EIR The proposed project, similar to development pursuant to the 2006 GPU, would comply with regulations and standards established by the EPA, the State, Orange County, the City of Newport Beach, and NBFD. Furthermore, the proposed project, similar to development pursuant to the 2006 GPU, would implement the rules and regulations of the South Coast AQMD, HUD, Cal/OSHA, DTSC, the Orange County Department of Environmental Health, and the Santa Ana RWQCB. Compliance with regulatory requirements would ensure that the proposed project would not create a significant hazard to the public or the environment through the routine transport, storage, production, use, or disposal of hazardous materials. Thus, similar to the 2006 GPU, impacts would be less than significant and there are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR By complying with federal, State, and City regulations, the proposed project, similar to development pursuant to the 2014 LUE Amendment, would result in a less than significant impact on the public or environment through the use, transport, or disposal of hazardous materials. Therefore, there are no changes or new information requiring preparation of an EIR. b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? Less than Significant/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR The proposed project, similar to development pursuant to the 2006 GPU, would be subject to the City of Newport Beach Emergency Management Plan. The emergency management plan would reduce impacts associated with emergency response and evacuation in the City. Furthermore, the proposed project, similar to development pursuant to the 2006 GPU, would be constructed and operated with strict adherence to all emergency response plan requirements set forth by OC Environmental Health Department and the NBFD. The proposed project would also abide by the requirements of Title 22, Division 4.5, of the California Code of Regulations (CCR) and the California Fire Code (CCR Title 24 Part 9). Title 22 specifies the requirements for transporting shipments of hazardous waste, including manifesting, vehicle registration, and emergency accidental discharges during transportation. The California Fire Code sets requirements pertaining to fire safety and life safety, including for building materials and methods, fire protection systems in buildings, emergency access to buildings, and handling and storage of hazardous materials. Additionally, commercial business within the proposed project would prepare business plans that must include emergency response plans and procedures to be used in the event of a significant or threatened significant release of a hazardous material. With the implementation of the emergency management plan and regulatory requirements, impacts of the proposed project, similar to development pursuant to the 2006 GPU, would be less than significant. Therefore, there are no changes or new information requiring preparation of an EIR. May 2020 Page 123 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Project Comparison to 2014 LUE Amendment SEIR The proposed project, similar to development pursuant to the 2014 LUE Amendment, would be subject to the City of Newport Beach Emergency Management Plan and would implement emergency response requirements of the OC Environmental Health Department; the NBFD; Title 22, Division 4.5, of the CCR; and the California Fire Code. Impacts would be less than significant, and there are no changes or new information requiring preparation of an EIR. c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? Less than Significant/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR The California Pacific Charter School is located 0.25 mile southwest of the project site. As stated in the 2006 GPU EIR, all businesses that handle or have on-site transportation of hazardous materials would be required to comply with the provisions of the City's Fire Code and the California Health and Safety Code, Article 1, Chapter 6.95, for a business emergency plan. Therefore, compliance with City and State regulations would minimize the risks associated with exposure of sensitive receptors to hazardous materials and would result in a less than significant impact. There are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR As mentioned above, the California Pacific Charter School is within one-quarter mile of the project site. All businesses that handle or have on-site transportation of hazardous materials would be required to comply with the provisions of the City' Fire Code and the California Health and Safety Code, Article 1, Chapter 6.95 for a business emergency plan. Therefore, impacts would be less than significant, and there are no changes or new information requiring preparation of an EIR. d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code § 65962.5 and, as a result, would it create a significant hazard to the public or the environment? Less than Significant/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR The proposed project includes development in areas listed as hazardous materials sites on environmental databases. An updated data search was conducted for this Addendum as shown in Table 6. The table shows Page 124 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis areas on the project site listed on the GeoTracker3 and RCRAInf04 databases. The table also shows sites within 0.25 mile of the project site that are listed as hazardous materials sites. All hazardous materials sites listed in Table 6 are known to regulatory agencies. The permitted UST and small quantity generator (SQG) listings document the presence of hazardous materials on those sites, but do not document hazardous releases. There are three open cases for leaking USTs and one open cleanup program case within 0.25 mile of the proposed project. Of the three open leaking UST cases, site assessment has occurred on one; remediation has occurred on the second; and verification monitoring to assess adequacy of site remediation is ongoing on the third. Site assessment has occurred on the open cleanup program site. Regulatory requirements for hazardous issues related to the project site would be the same for 2006 General Plan uses as the currently proposed project. Preparation of a Phase I Environmental Site Assessment (Phase I ESA) would be required for each project considered for approval on the project site. Where recognized environmental conditions are identified by the Phase I ESA, a Phase II ESA would be required. Recognized environmental conditions are the presence or likely presence of hazardous materials or petroleum products under conditions indicating an existing or past release or a material threat of a release. A Phase II ESA consists of sampling and testing of soil, soil vapor, and/or groundwater from the site for hazardous materials and a health risk assessment for any hazardous materials identified. Where a Phase II ESA identified human health risks from hazardous materials over regulatory thresholds for the proposed land use, site cleanup for hazardous materials would be required before occupancy of any proposed development on-site. These requirements would reduce impacts to less than significant. The changes due to the proposed project do not change the conclusions in the 2006 GPU EIR and there are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Table 6 shows areas on the project site and within a 0.25 -mile radius that are listed on the GeoTracker and RCRAInfo databases. There have been no changes since the 2014 LUE Amendment EIR other than the closure of the leaking UST case at the Beacon Bay Auto Wash. Any development associated with the proposed project, similar to development pursuant to the 2014 LUE Amendment, would prepare a Phase I and/or Phase II ESA, as applicable, and impacts would be less than significant. 3 GeoTracker is the Water Boards' data management system for sites that impact, or have the potential to impact, water quality in California, with emphasis on groundwater. GeoTracker contains records for sites that require cleanup, such as Leaking Underground Storage Tank (LUST) Sites, Department of Defense Sites, and Cleanup Program Sites. GeoTracker also contains records for various unregulated projects as well as permitted facilities including: Irrigated Lands, Oil and Gas production, operating Permitted USTs, and Land Disposal Sites. 4 RCRAInfo is EPA's comprehensive information system, providing access to data supporting the Resource Conservation and Recovery Act (RCRA) of 1976 and the Hazardous and Solid Waste Amendments (HSWA) of 1984. May 2020 Page 125 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 6 GeoTracker and RCRA Info Sites Area Database Site Name and Address' Type of Site Map ID No. Onsite GeoTracker Texaco Leaking Underground Storage Tank 8 4678 Campus (LUST). Gasoline release affected groundwater other than drinking water Case closed. Alamo Rent A Car Permitted Underground Storage Tank 21 4361 Birch St (UST) National Car Rental Inc Permitted UST 20 4242 Campus Dr Avis Rent A Car Permitted UST 19 4201 Birch St RCRAInfo Orange County Business Journal SQG 5 4590 Macarthur Blvd Suite 100 Sutton Place Hotel SQG 6 4500 Macarthur Within 0.25 miles GeoTracker Hertz Rent A Car Permitted UST 34 4000 Campus Dr Edler Industries Permitted UST 39 2101 Dove St Edler Industries LUST. Release of Waste Oil / Motor / 36 2101 Dove St Hydraulic / Lubricating oil affected Soil. Case closed. Beacon Bay Auto Wash #08 LUST 40 4200 Birch Gasoline release affected groundwater other than drinking water Case closed. Permitted UST 41 Koll Center Newport #8 Permitted UST 22 4590 Macarthur Blvd Sheraton Hotel Newport Permitted UST 43 4545 Macarthur Blvd Reef Funds USA#1 Permitted UST 66 1301 Dove St Westerly Place LUST 69 1500 Quail St Diesel release affected soil Case closed. Permitted UST 65 American Air Center LUST 2 19461 S Airport Way Gasoline release affected drinking water Santa Ana aquifer Case closed. Orange County Fire Station 27 Permitted UST 19459 Airport S Santa Ana 3 Page 126 PlacefForks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 6 GeoTracker and RCRA Info Sites Area Database Site Name and Address' Type of Site Map ID No. Santa Ana Tower F.A.A. LUST 18990 Ike Jones Rd Heating Oil / Fuel Oil release affected Santa Ana drinking water aquifer Case open: site assessment. 4 Tallmantz Aviation LUST solvents release affected drinking 19711 S Airport Way water aquifer Santa Ana Case closed. 17 Martin Aviation Permitted UST 19331 Campus Dr Santa Ana 38 UCO Air Permitted UST 19461 Campus Dr Santa Ana 33 Pan Western Fuel Farm JWA Permitted UST 19711 Campus Dr Santa Ana 32 John Wayne Airport Cleanup Program site 3151 Airway Avenue Contaminants of concern: Aviation, Costa Mesa Diesel, Gasoline, MTBE / TBA / Other Fuel Oxygenates, Trichloroethylene (TCE), Waste Oil / Motor / Hydraulic / Lubricating oil. Case Open - Site Assessment 2009 31 Amr Combs Fuel Farm LUST 19301 Campus Dr Aviation fuel release affected Santa Ana Groundwater other than drinking water Case open, remediation 2010 59 Martin Aviation (Fuel Farm) LUST 19331 S Airport Way Kerosene release affected Santa Ana drinking water aquifer Case open: verification monitoring 58 RCRAInfo Execair Maintenance Inc SQG 19301 Campus Ste 255 Santa Ana 4 Sunbird Aviation SQG 19531 Campus Drive Suite 20 Santa Ana 4 Alaska Airlines Inc SQG 18601 Airport Wy Santa Ana 18 Newport Car Clinic SQG 4360 Campus Dr 37 Atlantic Aviation Center SQG 19711 Campus Drive Santa Ana 60 Sunny Fresh Cleaners SQG 4200 Campus Dr 60 Hertz Corp SQG 61 May 2020 Page 127 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 6 GeoTracker and RCRA Info Sites Area Database Site Name and Address' Type of Site Map ID No. 4000 Campus Dr SSO Medical Waste Management Transporter 3720 Campus Dr 61 Edler Industries SQG 2101 Dove St 35 Physician Care Walk In Medical SQG 4030 Birch St 107 63 Cosmos Sport Cars SQG 4001 Birch St 63 Jetronic Industries Inc - SQG Transchem Div 3767 Birch 62 Emerald Cleaners SQG 4341 MacArthur Blvd 44 Macarthur Square Cleaners SQG 1701 H Corinthian Way 42 Bacons Airport Photo Inc SQG 4251-B Martingale Wy 42 Sources: GeoTracker 2020, RCRAInfo 2020. Notes: UST — Underground Storage Tank LUST — Leaking Underground Storage Tank SQG - Small Quantity Generators e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? Less than Significant/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR The central portion of the proposed project, approximately 10 acres, is within Safety Zone 3 for the short runway (Runway 19L/1R) at JWA (see Figure 12, Airport Area Safety Zones). The rest of the property is within Safety Zone 6 for the long runway (Runway 19R/1L). Land use restrictions in Safety Zone 3 include limiting residential uses to very low densities. General Plan Policy LU 6.15.7 stipulates that for MU -H2, residential units should be developed at a minimum density of 30 units and a maximum of 50 units averaged over the total area of each residential village. The placement of high- density housing is not consistent with the land use compatibility standards for Safety Zone 3. For consistency with the AELUP safety zones, the residential units on the project site would be within Safety Zone 6. Furthermore, the project site is at an elevation of about 45 feet amsl. The FAA height restriction is at 206 feet amsl over approximately the eastern half of the project site (see Figure 11) and declines to 150 feet amsl at the southeast corner of at the intersection of Campus Drive and Dove Street. Pursuant to the AELUP land use Page 128 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis compatibility guidelines, buildings with more than three aboveground habitable floors are generally unacceptable in Safety Zone 3. Assuming that a three-story building would be 35 feet high, and given the elevation on-site of about 45 feet amsl, the top of such a building would be about 80 feet amsl. The lowest building height restriction is about 150 feet amsl; thus, within Safety Zone 3, the land use restriction in the safety zone is more restrictive than the FAA height restriction. With implementation of regulations specified in the AELUP, the proposed project, similar to development pursuant to the 2006 GPU, would have a less than significant impact. Thus, there are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR As with the proposed project, the LUE Amendment included introducing up to 444 residential units within Airport Safety Zone 6. Only nonresidential uses would be allowed within Safety Zone 3. As shown in Table 4, Land Use Compatibility Zones: Tobn Mayne Airport Safety Zones, residential uses are a compatible land use within Zone 6 pursuant to the AELUP. The proposed project, similar to development pursuant to the 2014 LUE Amendment, would abide by the safety regulations of the AELUP. Impacts would be less than significant, and there are no changes or new information requiring preparation of an EIR. f) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? Less than Significant/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR The proposed project involves changes in land use designations and would result in a decrease of approximately 60,000 square feet of nonresidential uses and would introduce up to 444 residential units to the project site. Since the residential units would be within the 2,200 housing units already allocated for the MU -1-12 area, it would not increase residential units within the overall Airport Area. As quantified in Section 5.17, Transportation/Traffic, the proposed project would result in nominal changes to traffic congestion (as demonstrated by the minimal changes in intersection levels of service). The City of Newport Beach Emergency Management Plan guides responses to extraordinary emergency situations associated with natural disasters, technological incidents, and nuclear defense operations. Updating the emergency management plan every three years to incorporate changes to the City, including potential changes in traffic conditions from the proposed project, would reduce impacts associated with emergency response and evacuation in the City to less than significant. Thus, there are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR As noted above, the City's Emergency Management Plan would reduce impacts associated with the proposed project and development pursuant to the 2014 LUE Amendment to less than significant. The project proposes May 2020 Page 129 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis no net increase in development compared to the 2014 LUE Amendment SEIR land uses. Thus, there are no changes or new information requiring preparation of an EIR. g) Expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires? No Impact/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR Refer to Section 5.20. There are no impacts and no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Refer to Section 5.20. There are no impacts and no changes or new significant information that would require preparation of an EIR. 5.9.3 Mitigation Measures Identified in the Program EIR and Applicable to the Proposed Project There were no mitigation measures in the 2006 GPU EIR or the 2014 LUE Amendment SEIR.. 5.9.4 Relevant General Plan Policies The 2006 General Plan includes the following goals and policies that are relevant to hazards and hazardous materials. Goal LU 6.15: A mixed-use community that provides jobs, residential, and supporting services in close proximity, with pedestrian -oriented amenities that facilitates walking and enhance livability. ■ LU 6.15.24- Airport Compatibility: Require that all development be constructed within the height limits and residential be located outside of areas exposed to the 65 dBA CNEL noise contour specified by the Airport Environs Land Use Plan (AELUP), unless the City Council makes appropriate findings for an override in accordance with applicable law. Goal S 7: Exposure of people and the environment to hazardous materials associated with methane gas extraction, oil operations, leaking underground storage tanks, and hazardous waste generators is minimized. ■ S 7.1 - Known Areas of Contamination: Require proponents of projects in known areas of contamination from oil operations or other uses to perform comprehensive soil and groundwater contamination assessments in accordance with American Society for Testing and Materials standards, and if contamination exceeds regulatory action levels, require the proponent to undertake remediation procedures prior to grading and development under the supervision of the County Environmental Health Page 130 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Division, County Department of Toxic Substances Control, or Regional Water Quality Control Board (depending upon the nature of any identified contamination). ■ S 7.4 - Implementation of Remediation Efforts: Minimize the potential risk of contamination to surface water and groundwater resources and implement remediation efforts to any resources adversely impacted by urban activities. ■ S 7.5 - Siting of Sensitive Uses: Develop and implement strict land use controls, performance standards, and structure design standards including development setbacks from sensitive uses such as schools, hospitals, day care facilities, elder care facilities, residential uses, and other sensitive uses that generate or use hazardous materials. ■ S 7.6 - Regulation of Companies Involved with Hazardous Materials: Require all users, producers, and transporters of hazardous materials and wastes to clearly identify the materials that they store, use, or transport, and to notify the appropriate City, County, State and Federal agencies in the event of a violation. May 2020 Page 131 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.10 HYDROLOGY 5.10.1 Summary of Impacts Identified in the Program EIRs 5.10.1.1 2006 GENERAL PLAN EIR The 2006 EIR found that development under the approved 2006 General Plan could increase pollutants in stormwater and wastewater, although water quality standards and waste discharge requirements would not be violated. The 2006 EIR also found that development under the 2006 General Plan could change the existing drainage pattern of the planning area and substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site or exceed the capacity of existing or planned stormwater drainage systems. However, implementation of the GPU policies and compliance with NPDES regulations, the City's municipal code, and California Department of Fish and Wildlife regulations would reduce the risk of flooding resulting from drainage alterations to less than significant. All new development in the city in areas that are subject to flood hazards would be required to comply with the flood damage prevention provisions of the City's municipal code, and impacts were less than significant. 5.10.1.2 2014 LUE AMENDMENT SEIR The 2014 LUE Amendment SEIR found that enforcement of water quality standards by the Santa Ana RWQCB's NPDES program, in addition to implementation of General Plan policies, would reduce water quality impacts to less than significant. Domestic water for the city is supplied by both groundwater and imported surface water sources. The operation of the proposed land uses under the 2014 LUE Amendment would not involve direct additions or withdrawals of groundwater or have the potential to lower the local groundwater table level or interfere with groundwater recharge. None of the proposed land use changes in accordance with the 2014 LUE Amendment had the potential to substantially alter existing drainage patterns, including the course of a stream or river. Site-specific drainage improvements and erosion control would be subject to regulatory requirements, General Plan policies, and review at the time of specific project approval. Because Newport Beach is largely built out, 2014 SEIR found that the increased development intensity in accordance with the 2014 LUE Amendment would only nominally increase the amount of runoff from impervious surfaces and did not have the potential to result in flooding on- or off-site. Moreover, compliance with General Plan policies and regulatory requirements rendered impacts less than significant. None of the subareas proposed for change under the 2014 LUE Amendment are within a 100 -year flood zone or a dam inundation area. The coastal city of Newport Beach overall is at risk of inundation by seiches and tsunamis, but the proposed LUE Amendment introduced a nominal increase of land use intensity in areas Page 132 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis potentially subject to these hazards, and these land uses would be subject to the same General Plan policies and flood hazard provisions in the City's municipal code. These impacts would be less than significant. 5.10.2 Impacts Associated with the Proposed Project Would the proposed project: May 2020 Page 133 Less Than Significant Substantial ImpactslNo Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact a) Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground X water quality? b) Substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project X may impede sustainable groundwater management of the basin? c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would: i) Result in a substantial erosion or siltation on- or off-site. X ii) Substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or X offsite. iii) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage X systems or provide substantial additional sources of polluted runoff. iv) Impede or redirect flood flows. X d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project X inundation? e) Conflict with or obstruct implementation of a water quality control plan or sustainable X groundwater management plan? May 2020 Page 133 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Comments: a) Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality? Less than Significant/No Changes or New Information Requiring Preparation of an EIR. Areas that disturb one or more acres of land surface are subject to the Construction General Permit, 99-08-DWQ adopted by the SWRCB. Preparation of a Stormwater Pollution Prevention Plan (SWPPP) is required for compliance with the NPDES General Construction Stormwater Activity Permit. Compliance with the permit would involve filing a Notice of Intent with the SWRCB and preparing and submitting a SWPPP prior to construction activities. The Construction General Permit requirements would need to be satisfied prior to beginning construction on any project located on a site greater than one acre. Furthermore, certain projects require the preparation of a water quality management plan (WQMP). Construction would also need to abide by the requirements of Chapter 14.36 of the City's municipal code. Under the provisions of this chapter, any discharge that would result in or contribute to degradation of water quality via stormwater runoff is prohibited. Contractors constructing new development or redevelopment projects are required to comply with provisions in the Orange County Drainage Area Management Plan (DAMP), including the implementation of appropriate BMPs to control stormwater runoff so as to prevent any deterioration of water quality that would impair subsequent or competing beneficial uses of the water. Project Comparison to 2006 General Plan EIR Construction of the proposed project, similar to construction associated with development under the 2006 GPU, would be subject to the Construction General Permit, the requirements of Chapter 14.36 of the City's municipal code, the Orange County DAMP, and the General Plan policies. Furthermore, operation of the proposed project, similar to development pursuant to the 2006 GPU, would comply with provisions in the DAMP, the NPDES permit, and GPU policies. Thus, impacts would be less than significant and there are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The proposed project, similar to development pursuant to the 2014 LUE Amendment, would implement state and local regulations and General Plan polices that would reduce impacts from the construction and operational phases to less than significant. There are no changes or new information requiring preparation of an EIR. b) Substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin? No Impact. Proposed Project Comparison to 2006 General Plan EIR The proposed project could create additional impervious surfaces; however, similar to the 2006 GPU, new development would be focused in areas that are currently developed and would not substantially decrease groundwater recharge. Page 134 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis As shown in Section 5.19.2 (d), the City's groundwater supply would be sufficient to meet the demand of the proposed project. Therefore, the proposed project, similar to development pursuant to the 2006 GPU, would not decrease groundwater supplies. Thus, there are no changes or new information requiring preparation of an EIR. Proposed Project Comparison to 2014 LUE Amendment SEIR The proposed project, similar to development pursuant to the 2014 LUE Amendment, would not involve direct additions or withdrawals of groundwater or have the potential to lower the local groundwater table level or interfere with groundwater recharge. c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would: i) Result in a substantial erosion or siltation on- or off-site. Less than Significant /No Changes or New Information Requiring Preparation of an EIR. Proposed Project Comparison to the 2006 General Plan EIR Refer to Section 5.10(a) above. Impacts would be less than significant and there are no changes or new information requiring preparation of an EIR. Proposed Project Comparison to the 2014 LUE Amendment SEIR Refer to Section 5.10(a) above. Impacts would be less than significant. ii) Substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site. Less than Significant /No Changes or New Information Requiring Preparation of an EIR. Proposed Project Comparison to 2006 General Plan EIR The proposed project site is currently developed and it is unlikely that redevelopment would increase the rate or amount of surface runoff so that it would result in flooding on- or off-site or exceed the capacity of existing or planned stormwater drainage systems. The proposed project, similar to applicable development pursuant to the 2006 GPU, would prepare a WQMP including measures to reduce the volume of runoff generated. Furthermore, compliance with Chapter 15.50 of the City's municipal code and NPDES regulations would also minimize flood hazards resulting from drainage alterations. Therefore, implementation of the General Plan policies and compliance with NPDES regulations and the City's municipal code would reduce the risk of flooding resulting from drainage alterations to less than significant. Thus, no changes or new information require preparation of an EIR. May 2020 Page 135 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Project Comparison to 2014 LUE Amendment SEIR The proposed project, similar to development pursuant to the 2014 LUE Amendment, would implement state and local regulations and General Plan policies that would reduce impacts from the construction and operational phases to less than significant. iii) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff. Less than Significant /No Changes or New Information Requiring Preparation of an EIR. Proposed Project Comparison to 2006 General Plan EIR Refer to Section 5.10.c(i) above. Impacts would be less than significant and there are no changes or new information requiring preparation of an EIR. Proposed Project Comparison to 2014 LUE Amendment SEIR Refer to Section 5.10.c(i) above. Impacts would be less than significant. iv) Impede or redirect flood flows. No Impact Proposed Project Comparison to 2006 General Plan EIR The proposed project is not within a 100 -year flood, a dam inundation area (Newport Beach 2014), or a tsunami inundation zone, or at risk of flooding from seiches (Newport Beach 2014). Moreover, project land uses, similar to development pursuant to the 2006 General Plan update, would be subject to the same General Plan policies and flood hazard provisions in the City's municipal code. There would be no impacts and no changes or new information requiring preparation of an EIR. Proposed Project Comparison to 2014 LUE Amendment SEIR The proposed project is not at a risk of flooding and, similar to development pursuant to the 2014 LUE Amendment, would implement state and local regulations and General Plan policies, and no impacts would arise. d) In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation? No Impact Proposed Project Comparison to 2006 General Plan EIR The proposed project is not within a 100 -year flood zone designated by FEMA or within a dam inundation area (Newport Beach 2014). Furthermore, the proposed project would not introduce land use intensity within areas potentially subject to tsunami or seiches (Newport Beach 2014). Moreover, these land uses, similar to Page 136 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis development pursuant to the 2006 General Plan update, would be subject to the same General Plan policies and flood hazard provisions in the City's municipal code. Therefore, there would be no impacts and no changes or new information requiring preparation of an EIR. Proposed Project Comparison to 2014 LUE Amendment SEIR The proposed project would not be exposed to flood hazard due to a 100 -year flood, dam inundation, tsunami, or seiches. Additionally, the proposed project, similar to development pursuant to the 2014 LUE Amendment, would be subject to the same General Plan policies and flood hazard provisions in the City's municipal code, and no impacts would arise. e) Conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan? Less than Significant/No Changes or New Information Requiring Preparation of an EIR. Proposed Project Comparison to 2006 General Plan EIR The City of Newport Beach is under the jurisdiction of the Santa Ana RWQCB. RWQCBs adopt a water quality control plan, or basin plan, that recognizes and reflects regional differences in existing water quality, the beneficial uses of the region's ground and surface waters, and local water quality conditions and problems. The Santa Ana River Basin Water Quality Control Plan is the plan adopted by the Santa Ana RWQCB. The water quality control plan is the basis for the RWQCB's regulatory programs and establishes water quality standards for the ground and surface waters of the region. The term "water quality standards," as used in the federal Clean Water Act, includes both the beneficial uses of specific water bodies and the levels of quality that must be met and maintained to protect those uses. The water quality control plan includes an implementation plan describing the actions by the RWQCB, and others that are necessary to achieve and maintain the water quality standards (Santa Ana RWQCB 2008). As indicated under Section 5.10 (a), the proposed project, similar to development pursuant to the 2006 General Plan update, would not violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality, and would therefore not conflict with the water quality control plan. The Orange County Water District (OCWD) is a special district formed to manage the Orange County Groundwater Basin, which supplies water to residents in north and central Orange County. OCWD adopted its first groundwater management plan in 1989. The latest update was completed in 2015. This plan sets basin management goals and objectives and describes how the basin is managed. Basin management goals are (1) to protect and enhance groundwater quality, (2) to protect and increase the sustainable yield of the basin in a cost- effective manner, and (3) to increase the efficiency of OCWD operations. (OCWD 2015). As indicated under Sections 5.10 (a) and (b), the proposed project, similar to development pursuant to the 2006 General Plan update, would not degrade groundwater quality, substantially decrease groundwater supplies, or interfere substantially with groundwater recharge. Thus, impacts would be less than significant, and there are no changes or new information on requiring preparation of an EIR. May 2020 Page 137 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Proposed Project in Comparison to 2014 LUE Amendment SEIR The proposed project, similar to development pursuant to the 2014 LUE Amendment, would not conflict with the Santa Ana RWQCB's Water Quality Plan or the OCWD's Groundwater Management Plan. Thus, impacts would be less than significant. 5.10.3 Mitigation Measures Identified in the Program EIR and Applicable to the Proposed Project There were no mitigation measures in the 2006 GPU EIR or the 2014 LUE Amendment SEIR. 5.10.4 Relevant General Plan Policies The 2006 General Plan includes the following goals and policies that are relevant to hydrology and water quality. Goal NR 3: Enhancement and protection of water quality of all natural water bodies, including coastal waters, creeks, bays, harbors, and wetlands. ■ NR 3.2 - Chemical Use Impacts: Support regulations limiting or banning the use insecticides, fertilizers, and other chemicals which are shown to be detrimental to water quality. ■ NR 3.4 - Ground Water Contamination: Suspend activities and implement appropriate health and safety procedures in the event that previously unknown groundwater contamination is encountered during construction. Where site contamination is identified, implement an appropriate remediation strategy that is approved by the City and the state agency with appropriate jurisdiction. ■ NR 3.5 - Storm Drain Sewer System Permit: Require all development to comply with the regulations under the City's municipal separate storm drain system permit under the National Pollutant Discharge Elimination System. ■ NR 3.6 - Natural Water Bodies: Require that development does not degrade natural water bodies. ■ NR 3.10 - Water Quality Management Plan: Require new development applications to include a Water Quality Management Plan (WQMP) to minimize runoff from rainfall events during construction and post - construction. ■ NR 3.11 - Best Management Practices: Implement and improve upon Best Management Practices (BMPs) for residences, businesses, development projects, and City operations. ■ NR 3.12 - Site Design and Source Control: Include site design and source control BMPs in all developments. When the combination of site design and source control BMPs are not sufficient to protect water quality as required by the National Pollutant Discharge Elimination System (NPDES), structural treatment BMPs will be implemented along with site design and source control measures. Page 138 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis ■ NR 3.13 - Reduction of Infiltration: Include equivalent BMPs that do not require infiltration, where infiltration of runoff would exacerbate geologic hazards. ■ NR 3.16 - Street Drainage Systems: Require all street drainage systems and other physical improvements created by the City, or developers of new subdivisions, to be designed, constructed, and maintained to minimize adverse impacts on water quality. Investigate the possibility of treating or diverting street drainage to minimize impacts to water bodies. ■ NR 3.17 - Siting of New Development: Require that development be located on the most suitable portion of the site and designed to ensure the protection and preservation of natural and sensitive site resources that provide important water quality benefits. ■ NR 3.18 - Parking Lots and Rights -of -Way: Require that parking lots and public and private rights-of- way be maintained and cleaned frequently to remove debris and contaminated residue. ■ NR 3.20 - Natural Drainage Systems: Require incorporation of natural drainage systems and stormwater detention facilities into new developments, where appropriate and feasible, to retain stormwater in order to increase groundwater recharge. ■ NR 3.21 - Impervious Surfaces: Require new development and public improvements to minimize the creation of and increases in impervious surfaces, especially directly connected impervious areas, to the maximum extent practicable. Require redevelopment to increase area of pervious surfaces, where feasible. Goal NR 4: Maintenance of water quality standards through compliance with the total maximum daily loads (TMDLs) standards NR 4.4 - Erosion Minimization: Require grading/erosion control plans with structural BMPs that prevent or minimize erosion during and after construction for development on steep slopes, graded, or disturbed areas. Goal NR 5: Sanitary Sewer Outflows—Minimal adverse effects to water quality from sanitary sewer outflows NR 5.2 - Waste Discharge Permits: Require waste discharge permits for all food preparation facilities that produce grease. May 2020 Page 139 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.11 LAND USE AND PLANNING 5.11.1 Summary of Impacts Identified in the Program EIRs 5.11.1.1 2006 GENERAL PLAN EIR The 2006 GPU EIR concluded that the General Plan update would not include any roadway extensions or other development features through currently developed areas; instead, it would allow limited infill development in select subareas in the City. Therefore, the 2006 GPU would not physically divide an established community and impacts were less than significant. The 2006 GPU EIR also analyzed land use incompatibility with regard to introducing new land uses and structures that could result in intensification of development in the city. Analyzing subareas of the City, the 2006 GPU EIR concluded that the majority of land use changes proposed would not result in incompatibilities or nuisances that rose to a level of significance. Impacts were less than significant. The 2006 GPU was found to be consistent with all applicable land use plans for the City. The General Plan Update was modified after preparation of the 2006 GPU Draft EIR to eliminate any potential residential development within the 65 dBA CNEL contour, and therefore was found to be consistent with John Wayne Airport AELUP. The City of Newport Beach is subject to policies within the Orange County Central and Coastal Natural Community Conservation Plan (NCCP). Future development was required to comply with policies within the plan, and therefore no impact occurred. 5.11.1.2 2014 LUE AMENDMENT SEIR The 2014 LUE Amendment primarily increased or decreased development capacity of certain areas of the city. However, it did not propose any extensions of roadways or other development features through areas that could physically divide an established community. Impacts were found to be less than significant. The 2014 LUE Amendment was found to be consistent with the CLUP, the 2012-2035 SCAG's Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS), the AELUP for JWA, the 2006 GPU policies, the University of California, Irvine Long Range Development Plan, and all Planned Community Development Plans. Page 140 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.11.2 Impacts Associated with the Proposed Project Would the project: Comments: a) Physically divide an established community? No Impact. Project Comparison to the 2006 General Plan EIR The City of Newport Beach is nearly built out, and the proposed project consists of infill and intensification of development on the project site. The proposed project would not include any roadway extensions or other development features through currently developed areas. Therefore, the proposed project, similar to development pursuant to the 2006 GPU, would not physically divide an established community and there would be no impacts. Thus, there are no changes or new significant information that would require preparation of an EIR. Proposed Project Comparison to the 2014 LUE Amendment SEIR Similar to development pursuant to the 2014 LUE Amendment, the proposed project would not introduce a physical barrier that would separate land uses that are not already separated. Vehicular and pedestrian connections and access for residential uses in the surrounding area would remain. Except for driveways accessing the project site, the proposed project would not physically change the neighborhood's street pattern or otherwise impede movement through the neighborhood. Therefore, there would be no impact. b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect? Proposed Project Comparison to the 2006 General Plan EIR Adopted land use regulations applicable to the proposed project include the AELUP for JWA, and the 2006 GPU policies. May 2020 Page 141 Less Than Significant Impacts/No Substantial Substantial New Information Changes or New Change in Change in Showing New or Information Project Circum -stances Increased Requiring Requiring Major Requiring Major Significant Preparation of Issues EIR Revisions EIR Revisions Effects an EIR No Impact a) Physically divide an established community? X b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an X environmental effect? Comments: a) Physically divide an established community? No Impact. Project Comparison to the 2006 General Plan EIR The City of Newport Beach is nearly built out, and the proposed project consists of infill and intensification of development on the project site. The proposed project would not include any roadway extensions or other development features through currently developed areas. Therefore, the proposed project, similar to development pursuant to the 2006 GPU, would not physically divide an established community and there would be no impacts. Thus, there are no changes or new significant information that would require preparation of an EIR. Proposed Project Comparison to the 2014 LUE Amendment SEIR Similar to development pursuant to the 2014 LUE Amendment, the proposed project would not introduce a physical barrier that would separate land uses that are not already separated. Vehicular and pedestrian connections and access for residential uses in the surrounding area would remain. Except for driveways accessing the project site, the proposed project would not physically change the neighborhood's street pattern or otherwise impede movement through the neighborhood. Therefore, there would be no impact. b) Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect? Proposed Project Comparison to the 2006 General Plan EIR Adopted land use regulations applicable to the proposed project include the AELUP for JWA, and the 2006 GPU policies. May 2020 Page 141 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis SCAG's RTP/SCS is a long-range visioning plan that balances future mobility and housing needs with economic, environmental, and public health goals. The proposed project is not considered a project of "regionwide significance" pursuant to the criteria in SCAG's Intergovernmental Review Procedures Handbook (November 1995) and Section 15206 of the CEQA Guidelines. Therefore, this section does not address the proposed project's consistency with SCAG's regional planning guidelines and policies. The proposed project is within the following JWA zones: ■ Clear Zone/Runway Protection Zones and Accident Potential Zones ■ Federal Aviation Regulation (FAR) Part 77 Obstruction Imaginary Surfaces and Notification Area ■ 65 dBA CNEL aircraft operation noise contours of JWA Potential project impacts associated with airport -related hazard impacts (Safety Zones and FAR Part 77) are addressed in Section 5.9, Ha.Zards and Ha.ZardousMaterials. Airport -related noise impacts are addressed in Section 5.13, Noise. By complying with the AELUP safety zone land use compatibility requirements, FAR Part 77 regulations, Policy N 3.2 of the General Plan, and CCR Title 21, the proposed project would be consistent with JW -Ns land use plan. Thus, impacts to airport -related hazards and noise are less than significant. A detailed analysis of the proposed project's consistency with the applicable goals and policies of the various elements of the City's 2006 GPU is provided in Table 7, General Plan Consistency Analysis. The analysis in the table concludes that the proposed project would be consistent with the applicable goals and policies of the City's 2006 GPU, and the proposed project would not result in significant land use impacts related to the General Plan's goals and policies. Table 7 Newport Beach General Plan Consistency Analysis Applicable Goals and Policies I Project Consistency Goal LU 1: A unique residential community with diverse coastal and upland neighborhoods, which values its colorful past, high quality of life, and community bonds, and balances the needs of residents, businesses, and visitors through the recognition that Newport Beach is primarily a residential community. LU 1.1. Unique Environment. Maintain and enhance the beneficial and unique character of the different neighborhoods, business districts, and harbor that together identify Newport Beach. Locate and design development to reflect Newport Beach's topography, architectural diversity, and view sheds. LU 1.4. Growth Management. Implement a conservative growth strategy that enhances the quality of life of residents and balances the needs of all constituencies with the preservation of open space and natural resources. Page 142 Consistent.. The PCDP enhances the distinct, urban character of the Airport Area by providing a means for replacing parking lots and small- scale commercial structures with attractive and functional mixed-use development, in line with the General Plan goal of transitioning the Airport Area to a mixed-use community. The Property is not in or near any of the City's areas featuring the harbor, unique topography, or view sheds. The proposed project would introduce a mix of land uses, including residential units to the Property consistent with the uses and urbanized character of the JWA area and the MU -1-12 designation. Consistent: The Newport Airport Village Development Plan allows the City to meet the demand for additional housing without developing open space or natural areas, and without densification of existing residential areas. The PCDP enhances the quality of life for the community by improving the aesthetics of the PC District in accordance with the Site Development Standards and Architectural Design Considerations contained in Sections III and IV, respectively. PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 7 Newport Beach General Plan Applicable Goals and Policies I Project Consistency LU 1.5. Economic Health. Encourage a local economy that Consistent. By developing a mix of residential and nonresidential provides adequate commercial, office, industrial, and marine- uses, the proposed project represents an investment in the economic oriented opportunities that provide employment and revenue to health of the City, including by adding residents to a mixed-use area support high-quality community services. that will help support other nearby commercial uses. Goal LU 2: A living, active, and diverse environment that complements all lifestyles and enhances neighborhoods, without compromising the valued resources that make Newport Beach unique. It contains a diversity of uses that support the needs of residents, sustain and enhance the economy, provide job opportunities, serve visitors that enjoy the City's diverse recreational amenities, and protect its important environmental setting, resources, and quality of life. LU 2.1. Resident -Serving Land Uses. Accommodate uses that Consistent. Consistent with housing needs demonstrated in the City's support the needs of Newport Beach's residents including housing element, the proposed project includes housing opportunities housing, retail, services, employment, recreation, education, in the form of 444 dwelling units, including 115 units reserved for culture, entertainment, civic engagement, and social and spiritual lower-income households. activity that are in balance with community natural resources and The project also would provide office, industrial, and commercial space open spaces. in a mixed-use setting.. LU 2.2. Sustainable and Complete Community. Emphasize the development of uses that enable Newport Beach to continue as a self-sustaining community and minimize the need for residents to travel outside of the community for retail, goods and services, and employment. Consistent. The project introduces 444 new residential units to the project site in an existing major employment center (the Airport Area, Irvine Business Complex, and surrounding areas), providing new opportunities for those working in the area to live near work. The project also provides office, industrial, and commercial space that will help to meet the needs of residents and employees. The introduction and subsequent integration of a mixed-use development into a well-established neighborhood of primarily commercial, retail, and office uses would provide a greater balance between housing, employment, and retail opportunities within the Airport Area. Potential employment opportunities for future residents of the proposed project that may arise in the surrounding area would be within walking/bicycle riding distance of the proposed homes. In addition, those who are currently employed in the area would be afforded a rental housing opportunity within walking/bicycle riding distance of their place of employment. LU 2.3. Range of Residential Choices. Provide opportunities Consistent. The PCDP allows for multi -family residential uses, for the development of residential units that respond to including affordable units, offering a variety of product types that can community and regional needs in terms of density, size, location, respond to market needs and diversify the City's housing stock. and cost. Implement goals, policies, programs, and objectives identified within the City's Housing Element. LU 2.4. Economic Development. Accommodate uses that maintain or enhance Newport Beach's fiscal health and account for market demands, while maintaining and improving the quality of life for current and future residents. LU 2.8. Adequate Infrastructure. Accommodate the types, densities, and mix of land uses that can be adequately supported by transportation and utility infrastructure (water, sewer, storm drainage, energy, and so on) and public services (schools, parks, libraries, seniors, youth, police, fire, and so on). Consistent. See response to Policy LU 1.5. The project applicant/developer would pay the City's development impact fees, which are designed to ensure that new development does not have a negative fiscal impact on the City, and the school district's development impact fee. Additionally, a public benefit fee will be paid to the City as specified in the development agreement. The Newport Airport Village Development Plan facilitates the retention of commercial uses in the Airport Area while allowing residential uses that would enhance the economic viability of retail, restaurants, and commercial services. Consistent. Because the proposed project involves redevelopment of existing urbanized parcels instead of developing on a greenfield (undeveloped) site, it would benefit from the efficiency of connecting to existing utility infrastructure and the existing street network. For more information about the provision of public services and utilities, see May 2020 Page 143 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 7 Newport Beach General Plan Consistency Analysis Applicable Goals and Policies I Proiect Consistencv Goal LU 3: A development pattern that retains and complements the City's residential neighborhoods, commercial and industrial districts, open spaces, and natural environment. LU 3.1. Neighborhoods, Districts, Corridors, and Open Consistent. The proposed project is a mixed use (residential and Spaces. Maintain Newport Beach's pattern of residential nonresidential) project that would be built in a mixed-use context of neighborhoods, business and employment districts, commercial commercial, industrial, and offices. Furthermore, consistent with long - centers, corridors, and harbor and ocean districts. range planning efforts implemented by the cities of Newport Beach and Irvine designed to change the areas around JWA to provide residential uses, the project provides 444 residential units. Therefore, the proposed project would maintain the overall land use pattern of the Airport Area. LU 3.2. Growth and Change. Enhance existing neighborhoods, Consistent. The proposed project would represent a substantial districts, and corridors, allowing for re -use and infill with uses that investment in an existing district (the JWA Airport Area) that is are complementary in type, form, scale, and character. Changes important to the City's economic health. The proposed housing units in use and/or density/intensity should be considered only in those would contribute toward Newport Beach accommodating its share of areas that are economically underperforming, are necessary to projected regional population growth. The proposed housing also accommodate Newport Beach's share of projected regional could reduce commuting distances and traffic by providing residences population growth, improve the relationship and reduce in an employment -rich area. For more information about the provision commuting distance between home and jobs, or enhance the of public services and infrastructure to the project site, see Sections values that distinguish Newport Beach as a special place to live 5.15, Public Services, 5.18 Transportation and Traffic, and 5.19, for its residents. The scale of growth and new development shall Utilities and Service Systems, of this Addendum. be coordinated with the provision of adequate infrastructure and The Newport Airport Village Development Plan facilitates reuse of public services, including standards for acceptable traffic level of existing underutilized properties and infill development that is service. complementary to recent development in the Airport Area. The Development Plan enhances the economic viability of local retail, restaurants, and commercial services by allowing for residential uses that increases the residential population in the area. LU 3.3. Opportunities for Change. Provide opportunities for Consistent. The premise of the proposed project is exactly what is improved development and enhanced environments for residents articulated by this policy—the project would redevelop and reuse a site in the following districts and corridors, as specified in Polices featuring underperforming commercial uses and would develop 6.3.1 through 6.22.7: residential uses in a cohesive design near existing jobs and services. John Wayne Airport Area: re -use of underperforming industrial and office properties and development of cohesive residential neighborhoods in proximity to jobs and services. LU 3.8 Project Entitlement Review with Airport Land Use Consistent. Development within Newport Airport Village will be Commission. Refer the adoption or amendment of the General subject to ALUC review. Plan, Zoning Code, specific plans, and Planned Community development plans for land within the John Wayne Airport planning area, as established in the JWA Airport Environs Land Use Plan (AELUP), to the Airport Land Use Commission (ALUC) for Orange County for review, as required by Section 21676 of the California Public Utilities Code. In addition, refer all development projects that include buildings with a height greater than 200 feet above ground level to the ALUC for review. Goal LU 4: Management of growth and change to protect and enhance the livability of neighborhoods and achieve distinct and economically vital business and employment districts, which are correlated with supporting infrastructure and public services and sustain Newport Beach's natural setting. LU 4.1. Land Use Diagram. Accommodate land use Consistent. Figure LU1 in the land use element shows that the Airport development consistent with the Land Use Plan. Figure LU1 Area is primarily intended for commercial and mixed uses. Figures depicts the general distribution of uses throughout the City and LU11 and LU22 show that adjacent parcels are designated MU -1-12. Figure LU2 through Figure LU15 depict specific use categories Page 144 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 7 Newport Beach General Plan Consistency Analysis Applicable Goals and Policies Project Consistent for each parcel within defined Statistical Areas. Table LU1 (Land The proposed project would extent the MU -1-12 designation and upon Use Plan Categories) specifies the primary land use categories, approval would be consistent with this policy. types of uses, and, for certain categories, the densities/intensities to be permitted. See page 3-11 of the City's General Plan for the full policy. Goal LU 5.1: Residential neighborhoods that are well-planned and designed contribute to the livability and quality of life of residents, respect the natural environmental setting, and sustain the qualities of place that differentiate Newport Beach as a special place in the Southern California region. LU 5.1.1. Compatible but Diverse Development. Establish Consistent. property development regulations for residential projects to The PCDP includes development standards and residential design create compatible and high-quality development that contributes guidelines to create a compatible and high-quality development that to neighborhood character. contributes to the emerging urban neighborhood character of the Airport Area. LU 5.1.2 Compatible Interfaces. Require that the height of Consistent. Newport Airport Village is not located near any lower - development in nonresidential and higher -density residential density residential areas, thus no compatibility conflicts would occur. areas transition as it nears lower -density residential areas to minimize conflicts at the interface between the different types of development. Goal LU 5.3: Districts where residents and businesses are intermixed that are designed and planned to ensure compatibility among the uses, that they are highly livable for residents, and are of high quality design reflecting the traditions of Newport Beach. LU 5.3.1 Mixed -Use Buildings. Require that mixed-use Consistent. Development will be required to comply with the buildings be designed to convey a high level of architectural and development and design standards in the PCDP. Conceptual landscape quality and ensure compatibility among their uses in renderings of the proposed project are shown in Figure 10. The consideration of the following principles: proposed buildings, landscaping, and other built elements have been • Design and incorporation of building materials and features designed to exhibit high quality design and complement the to avoid conflicts among uses, such as noise, vibration, surrounding urban context. As illustrated in the renderings, the project lighting, odors, and similar impacts would integrate the nonresidential uses with the residential uses • Visual and physical integration of residential and through a common design theme. For an additional evaluation of nonresidential uses visual and aesthetic impacts generated by the proposed project, see • Architectural treatment of building elevations and modulation Section 5.1, Aesthetics, of this Addendum. of their massing • Separate and well-defined entries for residential units and nonresidential businesses • Design of parking areas and facilities for architectural consistency and integration among uses • Incorporation of extensive landscape appropriate to its location; urbanized streetscapes, for example, would require less landscape along the street frontage but integrate landscape into interior courtvards and common open spaces. LU 5.3.2 Mixed -Use Building Location and Size of Consistent. Within mixed-use buildings, ground floor nonresidential Nonresidential Uses. Require that 100 percent of the ground floor use is promoted through the Architectural Design Considerations street frontage of mixed-use buildings be occupied by retail and provided in Section IV of the PCDP. other compatible nonresidential uses, unless specified otherwise by policies LU 6.1.1 through LU 6.20.6 for a district or corridor. LU 5.3.3 Parcels Integrating Residential and Nonresidential Uses. Require that properties developed with a mix of residential and nonresidential uses be designed to achieve high levels of architectural quality in accordance with policies LU 5.1.9 and LU 5.2.1 and planned to ensure compatibility among the uses and provide adequate circulation and parking. Residential uses should May 2020 Consistent. As shown in Figure 10, the nonresidential component would be compatible with the residential uses. Given the AELUP safety zones for the project site and land use compatibility criteria, the residential use (limited to safety zone 6) is necessarily separated from the nonresidential uses in safety zone 3. Nevertheless, the commercial uses are allowed in the mixed-use potion of the project site identified Page 145 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis IaDle i New ort Iseacn ueneral rlan toonsistenCy Anal sls Applicable Goals and Policies Project Consistency be seamlessly integrated with nonresidential uses through as Planning Area 1 in the PCDP. Future development would require architecture, pedestrian walkways, and landscape. They should not uses to be integrated through architecture, pedestrian walkways, and be completely isolated by walls or other design elements. landscaping. LU 5.3.4. Districts Integrating Residential and Nonresidential Consistent. As described above under Policy LU 3.1, the Airport Area Uses. Require that sufficient acreage be developed for an is increasingly home to residential uses that are intermingled with individual use located in a district containing a mix of residential nonresidential uses. The project would develop sufficient acreage for and nonresidential uses to prevent fragmentation and ensure mainly residential uses to prevent fragmentation and ensure the each use's viability, quality, and compatibility with adjoining uses. viability of the residential uses. In addition, the project proposes some • Common signage program for tenant identification and commercial uses that provide a connection to surrounding commercial wayfinding areas. The addition of residential uses in the area will help ensure the • Common streetscapes and lighting to promote pedestrian viability of the remaining, existing retail uses in the vicinity. LU 5.3.6 Parking Adequacy and Location. Require that Consistent. Required number of parking spaces and parking location adequate parking be provided and is conveniently located to guidelines for development within the PC District are addressed in the serve tenants and customers. Set open parking lots back from Site Development Standards and Architectural Design Considerations public streets and pedestrian ways and screen with buildings, provided in Sections III and IV, respectively, of PCDP. architectural walls, or dense landscaping. Goal LU 5.4: Office and business districts that exhibit a high quality image, are attractive, and provide quality working environments for employees. LU 5.4.1 Site Planning. Require that new and renovated office Consistent. The development of the Planned Community will result in and retail development projects be planned to exhibit a high- high quality, cohesive development based upon the PCDP regulations. quality and cohesive "campus environment," characterized by the Pedestrian and bicycle connections are required between the following: residential areas and non-residential areas, primary access to the • Location of buildings around common plazas, courtyards, residential buildings will face a public right-of-way or central courtyard, walkways, and open space and signs will be reviewed to ensure compatibility with the • Incorporation of extensive on-site landscaping that development. emphasizes special features such as entryways • Use of landscape and open spaces to break the visual continuity of surface parking lots • Common signage program for tenant identification and wayfinding • Common streetscapes and lighting to promote pedestrian activity • Readily observable site access, entrance drives and building entries and minimized conflict between service vehicles, private automobiles, and pedestrians LU 5.4.2 Development Form and Architecture. Require that Consistent. High quality, unified development, including mixed use, new development of business park, office, and supporting residential, office and retail uses, is addressed through the Site buildings be designed to convey a unified and high-quality Development Standards and Architectural Design Considerations character in consideration of the following principles: provided in Sections III and IV, respectively, of the PCDP. • Modulation of building mass, heights, and elevations and articulation of building • Avoidance of blank building walls that internalize uses with no outdoor orientation to public spaces • Minimize the mass and bulk of building facades abutting streets • Consistent architectural design vocabulary, articulation, materials, and color palette • Clear identification of entries through design elements • Integration of signage with the building's architectural style and character Page 146 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 7 Newport Beach General Plan Consistency Analysis Applicable Goals and Policies Project Consistency • Architectural treatment of parking structures consistent with their Primary commercial or office buildinq Goal LU 5.6: Neighborhoods, districts, and corridors containing a diversity of uses and buildings that are mutually compatible and enhance the quality of the City's environment. LU 5.6.1. Compatible Development. Require that buildings and Consistent. The vicinity surrounding the project site contains a variety properties be designed to ensure compatibility within and as of nonresidential land uses at a variety of building intensities and interfaces between neighborhoods, districts, and corridors. scales. Although the height of the proposed project would be greater than some of the surrounding commercial and office buildings, the Airport Area is a district in transition with new projects—like the proposed project—introducing more street -facing urban building typologies. The design and scale of the proposed project will contribute to the evolving urban neighborhood that is gradually developing in the Airport Area. It includes features such as landscaped setbacks, street trees, outdoor retail -adjacent dining and lounging space, articulated facades with balconies and windows, and varying colors and material. These outward -facing features will add visual interest and integrate the project site with neighborhood activity on surroundina streets and buildinas. LU 5.6.2. Form and Environment. Require that new and Consistent. The project's design is typical for multifamily and mixed - renovated buildings be designed to avoid the use of styles, use projects in the city and nearby jurisdictions and would not colors, and materials that unusually impact the design character unusually impact the design character or quality of the area. The and quality of their location such as abrupt changes in scale, project's proposed material and color palette would not raise local building form, architectural style, and the use of surface materials temperatures or result in glare. See response to Policy LU 5.6.1. See that raise local temperatures, result in glare and excessive additional analysis in Section 5.1, which analyzes the proposed illumination of adjoining properties and open spaces, or project's potential impacts related to aesthetics, light, and glare. adversely modify wind patterns. LU 5.6.3. Ambient Lighting. Require that outdoor lighting be located and designed to prevent spillover onto adjoining properties or significantly increase the overall ambient illumination of their location. Consistent. All project -related exterior lighting would be designed, arranged, directed, or shielded in such a manner as to contain direct illumination on-site, in accordance with the provisions of Subsection 20.30.070.A (General Outdoor Lighting Standards) of the City's zoning code, thereby preventing excess illumination and light spillover onto adjoining land uses and/or roadways. For additional analysis, see Impact 5.1-3 in Section 5.1. Goal LU 6.2: Residential neighborhoods that contain a diversity of housing types and supporting uses to meet the needs of Newport Beach's residents and are designed to sustain livability and a high quality of life. LU 6.2.1. Residential Supply. Accommodate a diversity of Consistent. See response to Policy LU 2.1. residential units that meets the needs of Newport Beach's population and fair share of regional needs in accordance with the Land Use Plan's designations, applicable density standards, design and development policies, and the adopted Housing Element. LU 6.2.3. Residential Affordability. Encourage the Consistent. As described under Policy LU 2.1, up to 35 percent of the development of residential units that are affordable for those project would be affordable units (115 units reserved for lower-income employed in the City. households). This would be consistent with the City's housing element. Goal LU 6.15: A mixed-use community that provides jobs, residential, and supporting services in close proximity, with pedestrian -oriented amenities that facilitate walking and enhance livability. LU 6.15.1. Land Use Districts and Neighborhoods. Provide for the development of distinct business park, commercial, and airport -serving districts and residential neighborhoods that are integrated to ensure a quality environment and compatible land uses. Consistent. High quality, integrated development, including mixed use, residential, office, and retail uses, is addressed through the Land Use and Development Regulations (Section II), Architectural Design Considerations (Section III), and Residential Design Guidelines (Section IV) sections of the PCDP provide a comprehensive set of standards and auidelines to imDlement this May 2020 Page 147 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis laale i Newport tseacn ueneral rlan toonsistenCy Anal sis Applicable Goals and Policies Project Consistency LU 6.15.2. Underperforming Land Uses. Promote the Consistent.. The PCDP facilitates the reuse of underperforming redevelopment of sites with underperforming retail uses located properties by allowing the addition of mixed-use and residential use. on parcels at the interior of large blocks for other uses, with retail Land Use and Development Regulations (Section II), Architectural clustered along major arterials (e.g., Bristol, Campus, MacArthur, Design Considerations (Section III), and Residential Design Guidelines and Jamboree), except where intended to serve and be (Section IV) provide a comprehensive set of standards and guidelines integrated with new residential development. to promote high-quality new development. LU 6.15.3. Airport Compatibility. Require that all development Consistent. The Project would be constructed in conformance with be constructed in conformance with the height restrictions set the FAA's height restrictions, and all residential development would be forth by Federal Aviation Administration (FAA), Federal Aviation located outside the 65 dBA CNEL noise contour and outside the Regulations (FAR) Part 77, and Caltrans Division of Aeronautics, boundaries of Safety Zone 3 where high density residential and that residential development be located outside of the 65 development is not allowed. The Applicant has received a dBA CNEL noise contour specified by the 1985 JWA Master determination of no hazard to aviation with development up to 85 feet Plan. in height from the FAA. LU 6.15.4 Priority Uses Consistent. Office and commercial uses would be compatible with Accommodate office, research and development, and similar residential uses in accordance with the Land Use and Development uses that support the primary office and business park functions Regulations (Section II) and Architectural Design Considerations such as retail and financial services, as prescribed for the "CO- (Section III) of the PCDP. Residential uses would support local retail, G" designation, while allowing for the re -use of properties for the restaurants, and services. The PCDP design and connectivity development of cohesive residential villages that are integrated requirements would integrate residential and non-residential uses and with business park uses. ensure adequate circulation and parking within the PC District. LU 6.15.5 Residential and Supporting Uses Consistent. The GPA and PCDP provides development capacity and Accommodate the development of a maximum of 2,200 multi- standards for mixed-use development. The proposed development family residential units, including work force housing, and mixed- limit is 329 dwelling units (plus up 115 density bonus when affordable use buildings that integrate residential with ground level office or housing is provided) and 297,572 square feet for commercial retail uses, along with supporting retail, grocery stores, and development. The Property is not located within the Conceptual parklands. Residential units may be developed only as the Development Plan Area depicted on Figure LU22, and therefore, any replacement of underlying permitted nonresidential uses. When a residential units allocated to the site are not any portion of the 550 infill development phase includes a mix of residential and units allocated to the Conceptual Development Plan Area As nonresidential uses or replaces existing industrial uses, the described in Chapter 3 of the Addendum, the Project's residential uses number of peak hour trips generated by cumulative development would replace some of the permitted underlying commercial of the site shall not exceed the number of trips that would result development capacity. Specifically, the 329 units would replace 60,926 from development of the underlying permitted nonresidential square feet of permitted retail commercial uses using the City - uses. However, a maximum of 550 units may be developed as approved Airport Area Residential and Mixed -Use Adjustment factors infill on surface parking lots or areas not used as occupiable prepared by the City Traffic Engineer to ensure that the number of buildings on properties within the Conceptual Development Plan peak hour trips generated by the redevelopment of the Property would Area depicted on Figure LU22 provided that the parking is not exceed the number of trips attributable to the existing permitted replaced on site. non-residential uses. Any density bonus units, up to 115 units in this case are above and beyond what the General Plan allocates in accordance with Chapter 20.32 (Density Bonus) of the Newport Beach Municipal Code and State law. Two (2) projects have been approved within the Airport Area to date. Uptown Newport was approved for 632 replacement units, 290 additive units, and with a density bonus of 322 units for a total of 1,244 residential units. Newport Crossings was approved for 259 replacement units and 91 density bonus units. Therefore, the total remaining number of replacement units is 759 units and the 329 units requested by the applicant would not exceed the remaining units to be allocated pursuant to this policy. If approved, 430 replacement dwelling units would be available for other MU -H2 (Mixed -Use Horizontal 2) designated properties in the Airport Area. Page 148 PlaceWorks Table 7 Newport Beach General Plan Goals and Policies LU 6.15.6. Size of Residential Villages. Allow development of mixed-use residential villages, each containing a minimum of 10 acres and centered on a neighborhood park and other amenities (as conceptually illustrated in Figure LU23). The first phase of residential development in each village shall encompass at least 5 gross acres of land, exclusive of existing rights-of-way. This acreage may include multiple parcels provided that they are contiguous or face one another across an existing street. At the discretion of the City, this acreage may also include part of a contiguous property in a different land use category, if the City finds that a sufficient portion of the contiguous property is used to provide functionally proximate parking, open space, or other amenity. The "Conceptual Development Plan" area shown on Figure LU22 shall be exempt from the 5 -acre minimum, but a conceptual development plan described in Policy LU 6.15.11 shall be required. LU 6.15.7. Overall Density and Housing Types. Require that residential units be developed at a minimum density of 30 units and maximum of 50 units per net acre averaged over the total area of each residential village. Net acreage shall be exclusive of existing and new rights-of-way, public pedestrian ways, and neighborhood parks. Within these densities, provide for the development of a mix of building types ranging from townhomes to high-rises to accommodate a variety of household types and incomes and to promote a diversity of building masses and scales. LU 6.15.8. First Phase Development Density. Require a residential density of 45 to 50 units per net acre, averaged over the first phase for each residential village. This shall be applied to 100 percent of properties in the first phase development area whether developed exclusively for residential or integrating service commercial horizontally on the site or vertically within a NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Consistent. The Property is 16.46 acres in total area and does not include a centered public park. The Property is not identified on Figure LU22 or Figure LU23. The first phase, Planning Area 1, allows residential and mixed-use development is 7.14 acres and would be developed in one phase. The remaining area would be developed in subsequent phases after existing commercial leases expire. The Applicant requests the City Council waive the park dedication requirement pursuant to Policy LU 6.15.13 and instead, pay the park in -lieu fee . If the City Council waives the dedication requirement, the proposed project is consistent with this policy. Consistent. The residential component of the Project is 329 units (without density bonus units) within the 16.46 -acre residential village and the density is about 20 du/ac and below the minimum 30 du/ac standard. If the density bonus units were included, the result would be about 27 du/ac. To comply, additional units would need to be included and required to be replacement units pursuant to Policy LU 6.15.5, meaning the additional units would come at the expense of underlying permitted non-residential uses. The 16.46 -acre Property is partially constrained by the JWA 65 dBA CNEL noise contour and all residential use is inconsistent in this high noise area. The Property is also partially constrained by JWA Safety Zones 3 that limits residential uses to very low densities if not deemed unacceptable because of noise. Planning Area 1 is 7.14 acres and the area outside both the 65 dBA CNEL noise contour and Safety Zone 3 where residential use would be allowed consistent with the Airport Environs Land Use Plan for JWA is further limited to 6.02 acres. To comply with the Policy LU 6.15.7, 493 units would need to be constructed on 6.02 acres resulting in a density of 81.9 du/ac units per acre without including potential density bonus units which would exceed the maximum allowable density. However, California Government Code Section 65915(e)(1) prohibits a City from applying a development standard that will have the effect of physically precluding the construction of a development for projects that propose a density bonus. Waiver of height standards, number of stories and setbacks to accommodate project amenities such as an interior courtyard, community plaza and high ceilings have been interpreted as physical constraints that warrant waiver under Section 65915(e)(1). Wollmer v. City of Berkeley, (2011)193 Cal. App. 4th 1329. With the waiver of LU 6.15.7 pursuant to Government Code §65915(e)(1), the 30-50 du/acre over the total area of each residential village would not be required. However, the Project would create a 46 du/acre development not including the density bonus units in Planning Area 1 which is within the density range of the Policy LU 6.15.7. Consistent. The PCDP is divided into two (2) planning areas. Planning Area 1 allows residential and mixed-use development and is 7.14 acres. Three hundred twenty-nine dwelling units constructed over 7.14 acres results in a density of 46 du/acre which is consistent with LU 6.15.8. Planning Area 2 allows commercial development only and is 9.32 acres. May 2020 Page 149 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis lapse i New ort tseacn ueneral rlan toonsistenCy Anal sis Applicable Goals and Policies Project Consistency mixed-use building. On individual sites, housing development may exceed or be below this density to encourage a mix of housing types, provided that the average density for the area encompassed by the first phase is achieved LU 6.15.9 Subsequent Phase Development Location and Consistent. The residential component of the PCDP in Planning Area Density 1 would be developed in one phase and checked for consistency with Subsequent phases of residential development shall abut the first this requirement. Planning Area 2 only includes non-residential phase or shall face the first phase across a street. The minimum development. Therefore, there would be no subsequent phases of density of residential development (including residential mixed- residential development. use development) shall be 30 units per net acre and shall not exceed the maximum of 50 units per net acre averaged over the development phase. LU 6.15.12. Development Agreements. A Development Consistent. The proposed project includes approval of a development Agreement shall be required for all projects that include infill agreement which will be implemented through the PCDP. residential units. The Development Agreement shall define the improvements and public benefits to be provided by the developer in exchange for the City's commitment for the number, density, and location of the housing units. LU 6.15.13 Neighborhood Parks Standards. To provide a Consistent. No park is proposed, and the Applicant asks the City focus and identity for the entire neighborhood and to serve the Council to waive the requirement. The Applicant believes the location daily recreational and commercial needs of the community within proximate to John Wayne Airport is inappropriate to serve the needs of easy walking distance of homes, require dedication and the area and they have agreed to pay an in -lieu fee consistent with this improvement of at least 8 percent of the gross land area policy. A significant portion of the Property is impacted by high noise (exclusive of existing rights-of-way) of the first phase levels and within JWA Safety Zone 3 and locating a park in such areas development in each neighborhood, or 1/2 acre, whichever is may not be appropriate or desirable. Additionally, predominant uses in greater, as a neighborhood park. This requirement may be Planning Area 2 are vehicle storage lots for car rental agencies waived by the City where it can be demonstrated that the operating with long-term leases. Air quality in the area and the limited development parcels are too small to feasibly accommodate the residential density planned for the Airport Area are also factors park or inappropriately located to serve the needs of local suggesting a new public park within the Property may not be desirable. residents, and when an in -lieu fee is paid to the City for the If the park dedication was required, the best potential location would acquisition and improvement of other properties as parklands to be within Planning Area 1 outside the 65 dBA noise contour and JWA serve the Airport Area. Safety Zone 3 further reducing the available land for residential or mixed-use development. In this scenario, a 1 -acre dedication of 6.02 In every case, the neighborhood park shall be at least 8 percent acres of relatively unconstrained land is a significant percentage of the of the total Residential Village Area or one acre in area, area potentially available for residential use. If the dedication were whichever is greater, and shall have a minimum dimension of required in conjunction with the first phase density bonus 150 feet. Park acreage shall be exclusive of existing or new development, the cost of the dedication could render the density bonus rights-of-way, development sites, or setback areas. A financially infeasible. These or other potential factors could provide neighborhood park shall satisfy some or all of the requirements sufficient grounds for the City Council to waive the dedication of the Park Dedication Ordinance, as prescribed by the requirement. If the City Council chooses not to waive the parkland Recreation Element of the General Plan. dedication requirement, development of the future park would be required in accordance with this policy. With either outcome the City Council chooses, neighborhood park dedication or waiver, the Project is consistent with LU 6.15.13. LU 6.15.14 Location. Require that each neighborhood park is Consistent. No public park is proposed, and the Applicant askes the clearly public in character and is accessible to all residents of the City Council to waive the neighborhood park dedication requirement neighborhood. Each park shall be surrounded by public streets pursuant to Policy 6.15.13 and, instead, pay an in -lieu fee. If the City on at least two sides (preferably with on -street parking to serve Council acts to waive the park dedication, this policy would not apply. the park), and shall be linked to residential uses in its respective If the City Council chooses not to waive the parkland dedication, neighborhood by streets or pedestrian ways. development of the future park would be posted as a public park in accordance with this policy. Page 150 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis hale i Newport Iseacn ueneral rlan toonsistenCy Anal sls Applicable Goals and Policies Project Consistent LU 6.15.15. Aircraft Notification. Require that all neighborhood Consistent. The proposed project would comply with notification parks be posted with a notification to users regarding proximity to requirements related to aircraft overflight and noise if parks are John Wayne Airport and aircraft overflight and noise. developed. LU 6.15.16 On -Site Recreation and Open Space Standards. Consistent. Section II of the PCDP requires 75 square feet of Require developers of multi -family residential developments on common open space per dwelling unit in a future residential or mixed - parcels 8 acres or larger to provide on-site recreational use project and it exceeds the minimum standard. Separate from the amenities. For these developments, 44 square feet of on-site City's park dedication and/or in -lieu requirement under the General recreational amenities shall be provided for each dwelling unit in Plan, Chapter 19.52 (Park Dedications and Fees) of the NBMC also addition to the requirements under the City's Park Dedication require park dedication and/or in -lieu fees in accordance with Ordinance and in accordance with the Parks and Recreation California Government Code Section 66477 et seq. also referred to as Element of the General Plan. On-site recreational amenities can the Quimby Act. However, Chapter 19.52 only applies to subdivisions consist of public urban plazas or squares where there is the or condominiums. While the Applicant plans the construction of capability for recreation and outdoor activity. These recreational apartments that would not generate a park dedication requirement, amenities may also include swimming pools, exercise facilities, condominium development would be allowed by the PCDP. Should a tennis courts, and basketball courts. Where there is insufficient condominium project be proposed, it would be subject to NBMC land to provide on-site recreational amenities, the developer shall Chapter 19.52. Should a future residential development include be required to pay cash in -lieu that would be used to develop or publicly accessible open space that meets the policy criteria, the upgrade nearby recreation facilities to offset user demand as Applicant could request a credit toward parkland dedication defined in the City's Park Dedication Fee Ordinance. requirements (if any). Please refer to the discussion of Policy LU 6.15.13 for additional analysis regarding park dedication requirements. The acreage of on-site open space developed with residential projects may be credited against the parkland dedication requirements where it is accessible to the public during daylight hours, visible from public rights-of-way, and is of sufficient size to accommodate recreational use by the public. However, the credit for the provision of on-site open space shall not exceed 30 percent of the parkland dedication requirements. LU 6.15.17 Street and Pedestrian Grid. Create a pattern of Consistent: Any new streets and pedestrian ways in the PC District streets and pedestrian ways that breaks up large blocks, would be designed to break up large blocks, improve connections and improves connections between neighborhoods and community links between uses and be scaled to the residential component of the amenities, and is scaled to the predominantly residential PC District in Planning Area 1, as described in the Land Use and character of the neighborhoods. Development Regulations (Section ll) and Architectural Design Considerations (Section III), of the PCDP. The City would confirm compliance during future Site Development Review process. LU 6.15.18 Walkable Streets. Retain the curb -to -curb dimension Consistent: A future applicant be required to retain the curb -to -curb of existing streets, but widen sidewalks to provide park strips and dimension of existing streets and would widen sidewalks to create park generous sidewalks by means of dedications or easements. strips and sidewalks in compliance with General Plan policy 6.15.18. Except where traffic loads preclude fewer lanes, add parallel The City would confirm compliance with this General Plan policy parking to calm traffic, buffer pedestrians, and provide short-term during Site Development Review. parking for visitors and shop customers. LU 6.15.21 Required Spaces for Primary Uses. Consider Consistent. Future development will be required to comply with City of revised parking requirements that reflect the mix of uses in the Newport Beach Municipal Code parking requirements, including neighborhoods and overall Airport Area, as well as the availability Section 20.32.040 of the Newport Beach Municipal Code for a density of on -street parking. bonus project. The City will confirm compliance with this General Plan policy during Site Development Review. LU 6.15.22 Building Massing. Require that high-rise structures Not Applicable. The PC District would include low- and mid -rise be surrounded with low- and mid -rise structures fronting public structures (85 feet maximum) in Planning Areas 1 and 2. No high-rise streets and pedestrian ways or other means to promote a more structures would be constructed in the PC District. Therefore, this pedestrian scale. General Plan policy does not apply to the PC District. LU 6.15.23. Sustainable Development Practices. Require that Consistent. The proposed project is a mixed-use development that, development achieves a high level of environmental because of compliance with modern state regulations related to energy May 2020 Page 151 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 7 Newport Beach General Plan Goals and Policies sustainability that reduces pollution and consumption of energy, efficiency and climate change, would be more energy efficient than the water, and natural resources. This may be accomplished through project site's existing commercial uses. For more information about the mix and density of uses, building location and design, this topic see Section 5.8, Greenhouse Gas Emissions. Future transportation modes, and other techniques. Among the development would comply with the CALGreen Code, including its strategies that should be considered are the integration of water conservation measures and City water conservation codes and residential with jobs -generating uses, use of alternative standards. transportation modes, maximized walkability, use of recycled currently experiencing a housing shortage. materials, capture and re -use of storm water on-site, water Consistent. All proposed affordable units will be made available to low conserving fixtures and landscapes, and architectural elements income households for a minimum period of 30 years. that reduce heat gain and loss. Goal H 2: A balanced residential community, comprised of a variety of housing types, designs, and opportunities for all social and economic segments. H 2.1. Encourage preservation of existing and provision of new Consistent. The proposed project would include affordable housing housing affordable to extremely low-, very low-, low-, and units in accordance with Chapter 20.32 of the Municipal Code. Upon moderate -income households. provision of affordable housing units, the project would be eligible for up to a 35 percent density bonus (up to 115 additional units) H 2.2. Encourage the housing development industry to respond Consistent. The proposed project would help meet existing housing to existing and future housing needs of the community and to the needs in Newport Beach and Orange County, which are jobs -rich and demand for housing as perceived by the industry. currently experiencing a housing shortage. Housing Program 2.2.4. All required affordable units shall have Consistent. All proposed affordable units will be made available to low restrictions to maintain their affordability for a minimum of 30 income households for a minimum period of 30 years. years. Housing Program 2.2.8. Implement Chapter 20.32 (Density Consistent. The project utilizes a density bonus and will consider Bonus) of the Zoning Code and educate interested developers requests for incentives/waivers consistent with the City's zoning code about the benefits of density bonuses and related incentives for and Government Code Section 65915. the development of housing that is affordable to very low-, low-, and moderate -income households and senior citizens. H 2.3. Approve, wherever feasible and appropriate, mixed Consistent. The proposed project is a mixed-use project with both residential and commercial use developments that improve the residential and commercial uses. balance between housing and jobs. Goal H 3: Housing opportunities for as many renter- and owner -occupied households as possible in response to the demand for housing in the City. H 3.1. Mitigate potential governmental constraints to housing Consistent. This policy addresses City strategy and not individual production and affordability by increasing the City of Newport development projects. Beach role in facilitating construction of affordable housing for all income groups. Housing Program 3.1.2. When a residential developer agrees to Consistent. The project utilizes a density bonus and requests construct housing for persons and families of very low-, low-, and incentives/waivers consistent with City's zoning code and Government moderate -income above mandated requirements, the City shall Code Section 65915. (1) grant a density bonus as required by state law and/or (2) provide additional incentives of equivalent financial value. H 3.2. Enable construction of new housing units sufficient to Consistent. The proposed project aids the City in its goal to provide meet City quantified goals by identifying adequate sites for their new housing opportunities by including 444 housing units. As construction. Development of new housing will not be allowed discussed in Section 5.13, Noise, a portion of the project site is within within the John Wayne Airport (JWA) 65 dB CNEL contour, no the airport's 65 dB CNEL, and the PCDP restricts housing within this larger than shown on the 1985 JWA Master Plan. zone. Goal H 4: Preservation and increased affordability of the City's housing stock for extremely low-, very low—, low-, and moderate - income households. H 4.1. Continue or undertake the following programs to mitigate Consistent. The housing programs listed under Policy H 4.1 in the potential loss of "at risk" units due to conversion to market -rate Housing Element are identified as being the responsibility of the City. units. These efforts utilize existinq Citv and local resources. Thev However, the proposed prosect would complv with all requirements Page 152 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 7 Newport Beach General Plan Consistency Analysis Applicable Goals and Policies Project Consistency include efforts to secure additional resources from public and enforced by the City, including restrictions regarding maintenance of private sectors should they become available. units as affordable. H 4.2. Improve energy efficiency of all housing unit types Consistent. As discussed in Section 5.8, Greenhouse Gas Emissions, (including mobile homes). and Section 5.6, Energy, the proposed project would be constructed to sufficient to protect water quality as required by the National adhere to the California Building Energy and Efficiency Standards and Pollutant Discharge Elimination System (NPDES), structural the California Green Building Standards Code (CALGreen). The 2016 treatment BMPs will be implemented along with site design and Building Energy Efficiency Standards and CALGreen were effective source control measures. starting on January 1, 2017, and the 2019 standards were effective NR 3.14. Runoff Reduction on Private Property. Retain runoff starting January 1, 2020. These standards achieve higher energy on private property to prevent the transport of pollutants into efficiency that most existing housing units. Goal NR 1. Minimized water consumption through conservation methods and other techniques. NR 1.1. Water Conservation in New Development. Enforce Consistent. Section 5.19, Utilities and Service Systems, discusses the water conservation measures that limit water usage, prohibit numerous water conservation requirements applicable to the proposed activities that waste water or cause runoff, and require the use of project, including those found in the Newport Beach Municipal Code. water—efficient landscaping and irrigation in conjunction with new The proposed project would comply with these regulations. construction projects. redevelopment to increase area of pervious surfaces, where NR 1.6. Services for Lower Income Households. New Consistent. The proposed project would include housing units developments which provide housing for lower income affordable to lower-income households. Furthermore, because the households that help meet regional needs shall have priority for project is in an existing developed urban area, it is already well served the provision of available and future resources or services, by water, sewer, and other services. including water and sewer supply and services. Goal NR 3: Enhancement and protection of water quality of all natural water bodies, including coastal waters, creeks, bays, harbors, and wetlands. NR 3.9. Water Quality Management Plan. Require new Consistent. All development under the proposed project would have development applications to include a Water Quality WQMPs in place and would implement post -construction BMPs to Management Plan (WQMP) to minimize runoff from rainfall maintain surface and groundwater quality. events during construction and post -construction. NR 3.11. Site Design and Source Control. Include site design Consistent. Section 5.10 includes analysis of the proposed project's and source control BMPs in all developments. When the drainage and stormwater runoff impacts. Development would involve combination of site design and source control BMPs are not implementation of low -impact development BMPs, site design BMPs, sufficient to protect water quality as required by the National and structural and nonstructural source control BMPs that would Pollutant Discharge Elimination System (NPDES), structural reduce the amount of runoff generated onsite and discharged off-site treatment BMPs will be implemented along with site design and as well as reduce the potential for pollutants to contaminate runoff. source control measures. NR 3.14. Runoff Reduction on Private Property. Retain runoff Consistent. See response to Policy NR 3.11, above. on private property to prevent the transport of pollutants into natural water bodies, to the maximum extent practicable. NR 3.20. Impervious Surfaces. Require new development and Consistent. The proposed project's site design BMPs would minimize public improvements to minimize the creation of and increases in impervious surfaces wherever possible, as discussed in Section 5.10. impervious surfaces, especially directly connected impervious areas, to the maximum extent practicable. Require redevelopment to increase area of pervious surfaces, where feasible. Goal NR 6: Reduced mobile source emissions. NR 6.1. Walkable Neighborhoods. Provide for walkable Consistent. The proposed project's context is Newport Beach's neighborhoods to reduce vehicle trips by siting amenities such as Airport Area, which features a variety of amenities (including services, parks, and schools in close proximity to residential restaurants, medical offices, and professional services) within walking areas. distance of the project site. NR 6.2. Mixed -Use Development. Support mixed-use Consistent. As discussed throughout this section, the proposed development consisting of commercial or office with residential project is mixed-use project that would add housing units in an uses in accordance with the Land Use Element that increases employment -rich area. May 2020 Page 153 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 7 Newport Beach General Plan Consistency Analysis Goals and Policies and entertainment. NR 6.3. Vehicle -Trip Reduction Measures. Support measures Consistent. The proposed project's introduction of residential uses in to reduce vehicle -trip generation such as at -work day care a largely nonresidential area with numerous services and amenities facilities, and on-site automated banking machines. nearby would reduce the need for off-site vehicle trips. See the response to Policy NR 6.1 for additional information. Goal NR 18: Protection and preservation of important paleontological and archaeological resources. NR 18.1. New Development. Require new development to Consistent. This topic is discussed in Section 5.5, Cultural protect and preserve paleontological and archaeological Resources. The proposed project would be required to comply with resources from destruction, and avoid and minimize impacts to regulatory requirements and GPU policies regarding monitoring and such resources in accordance with the requirements of CEQA. discovery of paleontological and archaeological resources, and would Through planning policies and permit conditions, ensure the reduce potential impacts to less than significant. preservation of significant archeological and paleontological resources and require that the impact caused by any and new residents of the community development be mitigated in accordance with CEQA. Consistent. The proposed project uses the City's density bonus NR 18.3. Potential for Development to Impact Resources. Consistent. This topic is discussed in Section 5.18, Tribal Cultural Notify cultural organizations, including Native American Resources. organizations, of proposed developments that have the potential to adversely impact cultural resources. Allow qualified representatives of such groups to monitor grading and/or excavation of development sites. Goal R 1. Provision of Facilities: Provision of adequate park and recreation facilities that meet the recreational needs of existing and new residents of the community R 1.4. Density Bonuses. Consider development of incentives Consistent. The proposed project uses the City's density bonus such as density bonuses for private commercial, office, and other incentives, as discussed in this table. developments to provide usable open space such as rooftop courts, pocket parks, public plazas, jogging trails, and pedestrian trails. R 1.12. Aircraft Overflight and Noise. Require that all public Consistent. The proposed park will be posted with the required parks located within the noise impact zones as defined in the notification to park users. This will be ensured through the City's 1985 JWA Master Plan for John Wayne Airport be posted with a development review and plan check process. notification to users regarding aircraft overflight and noise. 5.11.3 Mitigation Measures Identified in the Program EIR and Applicable to the Proposed Project There were no mitigation measures in the 2006 GPU EIR or the 2014 LUE Amendment SEIR. 5.11.4 Relevant General Plan Policies Relevant 2006 General Plan goals and policies are reviewed in detail in Table 7, above. Applicable General Plan policies for specific environmental topics are listed in the topical analysis sections of this Addendum. Page 154 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.12 MINERAL RESOURCES 5.12.1 Summary of Impacts Identified in the Program EIR 5.12.1.1 2006 GENERAL PLAN EIR Based on the California Geological Survey, areas known as mineral resource zones (MRZs) are classified according to the presence or absence of mineral resources. All of Newport Beach is zoned either MRZ-1 or MRZ-3, areas with no significant mineral deposits and areas containing mineral deposits of undetermined significance, respectively. The City is required to evaluate potential impacts to mineral resource recovery areas designated MRZ-2, areas with significant mineral deposits; however, there are no areas zoned MRZ-2 in the city. Furthermore, most of the active oil wells are in the West Newport and Newport production areas. Generally, these areas overlap with the Banning Ranch subarea, with a smaller portion of the Newport Oil Field within the Balboa Peninsula subarea. Consequently, the EIR found that implementation of the 2006 GPU would not substantially alter the projected production or consumption of the city, county, or state and no impact occurred. 5.12.1.2 2014 LUE AMENDMENT SEIR There are no regional, state, or locally important mineral resource recovery sites in the city. Furthermore, the active oil fields are in the Banning Ranch subarea, with a smaller portion in the Balboa Peninsula subarea. The 2014 LUE Amendment did not affect any land uses in the northwest area of the City. Therefore, there were no impacts to mineral resources. 5.12.2 Impacts Associated with the Proposed Project Would the proposed project: May 2020 Page 155 Less Than Significant Substantial Impacts/No Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact a) Result in the loss of availability of a known mineral resource that would be a value to X the region and the residents of the state? b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific X plan or other land use plan? May 2020 Page 155 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Comments: a) Result in the loss of availability of a known mineral resource that would be a value to the region and the residents of the state? No Impact. Project Comparison to 2006 General Plan EIR All of Newport Beach is zoned either MRZ-1 or MRZ-3, and most active oil wells are in the Newport Oil Field and the West Newport Oil Field, in the northwest area of the city. Therefore, the proposed project, similar to development pursuant to the 2006 GPU, would have no impact to mineral resources, and there are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The proposed project, similar to development pursuant to the 2014 LUE Amendment, would not introduce new development into areas designated as MRZ-2. Furthermore, no development would affect active oil wells in the northwest area of the City. Therefore, the proposed project, similar to development pursuant to the 2014 LUE Amendment, would have no impact to potential mineral resources.. b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? No Impact. Project Comparison to 2006 General Plan EIR The City of Newport Beach 2006 GPU EIR states that there are no regional, state, or locally important mineral resource recovery sites in the city. Consequently, the proposed project, similar to development pursuant to the 2006 GPU, would have no impact on mineral resource recovery sites in the city, and there are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The proposed project, similar to development pursuant to the 2014 LUE Amendment, would not introduce development into areas with regional, state, or locally important mineral resources and no impacts would arise. 5.12.3 Mitigation Measures Identified in the Program EIR and Applicable to the Proposed Project There were no mitigation measures in the 2006 GPU EIR or the 2014 LUE Amendment SEIR. Page 156 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.12.4 Relevant General Plan Policies The 2006 General Plan does not include any mineral resources goals or policies that are relevant to the proposed project. May 2020 Page 157 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.13 NOISE 5.13.1 Summary of Impacts Identified in the Previous EIRs 5.13.1.1 2006 GENERAL PLAN EIR The 2006 GPU EIR concluded that regional growth would create noise that would affect new and existing receptors. Most of this noise would be produced by increased traffic on local roads. Many of the General Plan policies, especially those associated with Goal N-2, Transportation Noise, would reduce the impact. However, existing receptors would still be exposed to new noise levels in excess of standards, and this impact, even with the proposed General Plan policies, was found to be significant and unavoidable. The 2006 GPU EIR concluded that vibration impacts would potentially exceed the threshold of 72 VdB, if construction activities occurred within 150 feet of sensitive receptors (e.g., residences and schools). No feasible mitigation measures were identified, and this impact was found to be significant and unavoidable. Construction noise was determined to be less than significant. Construction noise would be exempt from the City code during limited hours of the day and days of the week, and construction noise would comply with Municipal Code standards. Impacts due to airport noise were also found to be less than significant. Receptors that would fall under the John Wayne Airport QWA) 60 dBA or 65 dBA CNEL noise contours would be required to be consistent with General Plan Policies N.3.1 and N.3.2. These policies ensure that new uses are compatible and achieve interior noise levels of 45 dBA CNEL or less for residential uses. 5.13.1.2 2014 LUE AMENDMENT SEIR The 2014 LUE Amendment SEIR concluded that stationary, nontransportation noise would be less than significant. This was based on the traffic noise increase of the LUE Amendment in comparison to the 2006 General Plan buildout on study roadway segments. The SEIR also found that although some roadway segments could experience noise increases due to traffic, no roadway segments would exceed the City's transportation noise thresholds, so the impact of transportation noise was found to be less than significant. Airport noise impacts from JWA were found to be less than significant with the application of Policy N 3.2 of the Noise Element and compliance with Title 21 of the California Code of Regulations, which ensure that new uses are compatible and residential uses achieve interior noise levels of 45 dBA CNEL or less. The 2014 LUE Amendment SEIR concluded that construction noise impacts would not substantially differ from the 2006 GPU EIR and would be less than significant. However, like the 2006 GPU EIR, construction vibration could not be mitigated in all cases and would remain significant and unavoidable. Page 158 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.13.2 Impacts Associated with the Proposed Project Would the proposed project result in: Comments: a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? Less Than Significant Impact/No Changes or New Information Preparation of an EIR. Project Comparison to 2006 General Plan EIR Traffic Noise Policy N 1.8 of the General Plan Noise Element requires the employment of noise mitigation measures for existing sensitive uses when a significant noise impact is identified for new development impacting existing sensitive uses, as presented in Table 8. May 2020 Page 159 Less Than Significant Substantial Impacts/No Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general X plan or noise ordinance, or applicable standards of other agencies? b) Generation of excessive groundborne vibration or groundborne noise levels? X c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public X use airport, would the project expose people residing or working in the project area to excessive noise levels? Comments: a) Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? Less Than Significant Impact/No Changes or New Information Preparation of an EIR. Project Comparison to 2006 General Plan EIR Traffic Noise Policy N 1.8 of the General Plan Noise Element requires the employment of noise mitigation measures for existing sensitive uses when a significant noise impact is identified for new development impacting existing sensitive uses, as presented in Table 8. May 2020 Page 159 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 8 City of Newport Beach Incremental Noise Impact Criteria for Noise -Sensitive Uses (dBACNEL) No Project Noise Exposure Allowable Noise Exposure Increment 55 3 60 2 65 1 70 1 75 0 Source: City of Newport Beach General Plan. The proposed project would not increase the overall development capacity of the allowable uses as analyzed in the 2006 GPU EIR. In addition, redesignation of the project site from AO to MU -H2 would generate 327 fewer daily trips (Urban Crossroads 2020). Because the proposed project would generate fewer vehicle trips, its implementation would result in less overall traffic noise. Therefore, buildout of the proposed project is not anticipated to result in a substantial increase in traffic noise compared to what was previously analyzed in the 2006 GPU EIR. Therefore, impacts would be less than significant and there are no changes or new significant information requiring the preparation of an EIR. Stationary Noise The proposed project would change the land use designation of the site from AO to MU -H2. The site is currently developed as office and commercial uses. Stationary noise sources associated with these uses include rooftop mechanical equipment such as HVAC equipment and truck loading and unloading. The land use re- designation would not introduce new types of noise sources that were not already anticipated under the existing land use designation. In general, stationary noise sources associated with the proposed residential uses are similar to or less than commercial uses. Stationary noise sources associated with residential uses include HVAC equipment, but would not require truck loading and unloading needed for retail uses. Future development would be subject to the City of Newport Beach exterior noise standards from the Municipal Code. Therefore, impacts would be less than significant and there are no changes or new significant information that would require preparation of an EIR. Construction Noise As discussed in Section 5.13.1, the 2006 GPU EIR concluded that construction noise would be less than significant. When compared to the land uses considered for the project site under the 2006 GPU EIR, the proposed project would accommodate land uses that would require similar construction processes and intensities. Though the proposed 2006 GPU EIR does not include residential uses for the proposed project area, overall it is anticipated that the required construction processes and activities needed to develop the land uses accommodated under both the proposed project and the 2006 GPU EIR would be similar. Certain land uses are particularly sensitive to noise and vibration. These uses include residential, schools, libraries, churches, nursing homes, hospitals, hotels, and open space/recreation areas where quiet environments Page 160 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis are necessary for enjoyment, public health, and safety. Commercial and industrial uses are generally not considered noise and vibration sensitive unless noise and vibration would interfere with normal operations and business activities. The closest sensitive receptor to the site is the Hyatt Regency John Wayne Airport Hotel, approximately 80 feet east of the project boundary. Potential construction noise related to this use would be similar to noise as addressed in the 2006 GPU EIR and would not represent a new impact. Construction noise would be subject to General Plan Policy N 4.6, which would require enforcement of the noise ordinance limits and hours in the City's municipal code. Because the project's construction noise levels would not substantially differ from the 2006 GPU EIR, construction noise impacts with implementation of the proposed project would be less than significant. Therefore, there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Traffic Noise Buildout of the proposed project would result in less commercial space and the same number of residential dwelling units compared to the 2014 LUE SEIR. Implementation of the proposed project is anticipated to result in a minimum of 3,899 fewer daily trips with density bonus units and an estimated 4,463 fewer daily trips without density bonus (Urban Crossroads 2020). Because the proposed project would generate fewer vehicle trips, its implementation would result in less overall traffic noise. Therefore, buildout of the proposed project is not anticipated to result in a substantial increase in traffic noise compared to what was previously analyzed in the 2014 LUE Amendment SEIR. Therefore, there are no changes or new significant information requiring the preparation of an EIR. Stationary Noise The 2014 LUE Amendment SEIR concluded that stationary, non -transportation noise would be less than significant. Buildout of the proposed project would result in less commercial space and the same number of residential dwelling units. The proposed project would not introduce new types of noise sources that were not already anticipated under the 2014 LUE Amendment SEIR. Because the proposed project would result in less commercial space, stationary noise impacts are anticipated to be less than what was previously analyzed. Future development would be subject to the City of Newport Beach exterior noise standards from the Municipal Code. Therefore, there are no changes or new significant information that would require preparation of an EIR. Construction Noise The proposed project would result in similar land use types and be within the land use amounts previously considered under the 2014 LUE Amendment SEIR. Buildout of the proposed project would result in less commercial space and the same number of residential units. Thus, it is anticipated that the types of construction activities and construction processes associated with the land use development projects accommodated under the proposed project would be similar to or less intensive than what was considered in the 2014 LUE May 2020 Page 161 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Amendment SEIR. Therefore, there are no changes or new significant information that would require the preparation of an EIR. b) Generation of excessive groundborne vibration or groundborne noise levels? Less Than Significant Impact/No Changes or New Information Preparation of an EIR. Project Comparison to 2006 General Plan EIR When compared to the land uses considered for the project site under the 2006 GPU EIR, the proposed project would accommodate similar types of land uses, although the 2006 GPU EIR does not include residential uses for the proposed project area. Nevertheless, it is anticipated that the required construction processes and activities needed to develop the land uses accommodated under both the proposed project and the 2006 GPU EIR would be similar. The GPU EIR states that construction -related vibration levels could be problematic if sensitive uses are located within about 100 feet of potential project construction sites. There are no sensitive receptors (residents, school children, hospitals) within 100 feet of the project site. Given the potential that other site may not be able to be adequately mitigated for construction -related vibration, this impact was concluded to be potentially significant in the GPU EIR. Vibration impacts for the Airport Village Planned Community would be anticipated to be less than the potential impacts anticipated overall for the GPU. Therefore, there are no changes or new significant information that would require the preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The proposed project would result in similar land use types and be within the land use amounts previously considered under the 2014 LUE Amendment SEIR. Buildout of the proposed project would result in less commercial space and the same number of residential dwelling units. Thus, it is anticipated that the types of construction activities and construction processes associated with the land use development projects accommodated under the proposed project would be similar to or less intensive than what was considered in the 2014 LUE Amendment SEIR. Therefore, there are no changes or new significant information that would require the preparation of an EIR. c) For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? Less Than Significant Impact/No Changes or New Information Preparation of an EIR. Project Comparison to 2006 General Plan EIR Policy N 3.2 of the Noise Element requires that residential development in the Airport Area be located outside of the 65 dBA CNEL noise contour, which can be no larger than shown in the 1985 JWA Airport Environs Land Use Plan (AELUP). In addition, it requires that residential developers notify prospective purchasers or tenants of aircraft overflight andnoise. The Airport Land Use Commission (ALUC) of Orange County adopted an AELUP, amended April 17, 2008, that included JWA. The AELUP is a land use compatibility plan that is intended to protect the public from Page 162 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis adverse effects of aircraft noise. The proposed project is within the "airport influence area" defined by the AELUP. In most instances, the airport influence area is designated by the ALUC as its planning area boundary for the airport, and the two terms can be considered synonymous. The aircraft noise contours that are used for planning purposes by the County of Orange and Airport Land Use Commission are found in the AELUP and derived from the 1985 Master Plan for JWA and the accompanying EIR 508. These noise contours are based on fleet mix and flight level assumptions developed in EIR 508. The AELUP identifies noise impact zones based on the airport noise contour projections: ■ Noise Impact Zone "P' is the high noise impact that would occur in areas within the 65 dBA CNEL noise contour. The ALUC does not support residential development within this zone. All residential units would be inconsistent in this area unless it can be shown that the interior 45 dBA CNEL noise level is not exceeded in interior areas with an accompanying avigation easement for noise. Commercial, industrial, and recreational uses may be acceptable in this zone providing that commercial and industrial structures are sufficiently sound attenuated to allow normal work activities. The 12 -hour Leq interior noise standards due to exterior noise are measured from 7 am to 7 pm (or another approved time period): • 45 dBA—private offices, church sanctuary, board room, conference room • 50 dBA—general office, reception, clerical • 55 dBA—bank lobby, retail store, restaurant • 65 dBA—manufacturing, kitchen, warehousing ■ Noise Impact Zone "2" is the moderate noise impact that would occur in areas within the 60 dBA CNEL noise contour. Even though residential units are not incompatible in this area, the ALUC strongly recommends that residential units be limited or excluded from this area unless sufficiently sound attenuated, that is, with a CNEL value not exceeding an interior level of 45 dBA. Since the 2006 GPU EIR was approved, the 2014 John Wayne Airport Settlement Agreement Amendment EIR was approved. This amendment approved an increase in the number of passengers per year in three phases. The EIR concluded that the CNEL noise increases due to Phases 1 and 2 would result in less than a 1 dBA CNEL increase, and that Phase 3 would result in noise level increases less than 1.5 dBA CNEL. These increases did not exceed FAA or County of Orange noise standards. Figure 16, 2008 AELUP JVA Noise Exposure at the Project Site, shows how airport noise and noise impact zones affect the project site. Consistent with General Plan Policy N 3.2, the project does not propose residential uses in Noise Impact Zone 1. That is, the proposed residential uses would be outside the AELUP 65 dBA CNEL noise contour. The proposed project includes residential uses in Noise Impact Zone 2, which is the area in the AELUP 60 dBA CNEL noise contour. Consistent with Title 21 of the California Code of Regulations, which requires an interior noise level of 45 dBA CNEL, and with 45 dBA CNEL interior noise requirement for any residential uses proposed in Noise Impact Zone 2, project -level design review will be required prior to the issuance of a building permit, which demonstrates to the City per General Plan Policy N 1.2 that all residential units of the proposed project will meet the 45 dBA CNEL interior noise level. May 2020 Page 163 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Office uses within the 65 dBA CNEL noise contour were already considered under the 2006 GPU EIR and would be "normally compatible" per General Plan land use compatibility standards and ALUC noise compatibility guidelines. Project -level design review prior to the issuance of a building permit demonstrates to the City, per General Plan Policy N 1.2, that the 12 -hour Leq interior noise level due to exterior noise measured from 7 am to 7 pm—or another approved time period—does not exceed 50 dBA. The noise contours associated with the settlement for Phases 1, 2, and 3 of the 2014 John Wayne Airport Settlement Agreement Amendment EIR show that the proposed residential development as part of the proposed project would remain outside the 65 CNEL contour. Therefore, there are no changes or new significant information that would require the preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The 2014 LUE Amendment SEIR concluded that with the application of Policy N 3.2 of the Noise Element and compliance with Title 21 of the California Code of Regulations, which ensure that new uses are compatible and achieve interior noise levels of 45 dBA CNEL or less for residential uses, airport noise impacts from JWA would be less than significant. Similar to the 2014 LUE Amendment SEIR, the project proposes residential uses within the Airport Area near the intersection of Birch Street and MacArthur Boulevard. Consistent with General Plan Policy N 3.2, the project does not propose residential uses within Noise Impact Zone 1, but outside the AELUP 65 dBA CNEL noise contour. The proposed project includes residential uses in Noise Impact Zone 2, within the AELUP 60 dBA CNEL noise contour. Consistent with Title 21 of the California Code of Regulations, which requires an interior noise level of 45 dBA, and with the 45 dBA CNEL interior noise requirement for residential uses in Noise Impact Zone 2, project -level design review will be required prior to the issuance of a building permit to demonstrate to the City, per General Plan Policy N 1.2, that all residential units of the proposed project will meet the 45 dBA CNEL interior noise level. Office uses as part of the proposed project were already considered under the 2006 GPU EIR and would be "normally compatible" per General Plan land use compatibility standards within the 65 dBA CNEL noise contour. Office uses are "normally consistent" with the ALUC noise compatibility guidelines within the 65 dBA CNEL noise contour and must demonstrate through project -level design review, prior to the issuance of a building permit, which demonstrates to the City per General Plan Policy N 1.2 that the 12 -hour Leq interior noise level due to exterior noise measured from 7 am to 7 pm, or other appropriate, approved time periods does not exceed 50 dBA. The noise contours associated with the settlement for Phases 1, 2, and 3 of the 2014 John Wayne Airport Settlement Agreement Amendment EIR show that the proposed residential development as part of the proposed project would remain outside the 65 CNEL contour. Therefore, there are no changes or new significant information that would require the preparation of an EIR. Page 164 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Figure 16 - 2008 AELUP JWA Noise Exposure at the Project Site t JOHN WAYNE AIRPORT ice- irpo (OA Q� Use /Res enti I Us i 65 dBA CNEL Contour QJ O 'i Airport (O !• Uses /Reside tia`I Accessory and Amenity U s Unincorporated Orange County v 60 dBA CNEL Contour ! Newport Beach Q m Q / Oo `esu thigh ilk Project Boundary Office -Airport (OA) Uses/Residential Accessory and Amenity Uses 65 dBA CNEL Contour 0 1,200 —••— City Boundary Office -Airport (OA) Uses/Residential Uses 60 dBA CNEL Contour Scale (Feet) Source: Airport Land Use Commission, 2008 PlaceVorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Tbis page intentionally left blank. Page 166 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.13.3 Adopted Mitigation Measures Applicable to the Proposed Project No mitigation measures related to noise and vibration were outlined in the 2006 GPU EIR. 5.13.4 Relevant General Plan Policies The General Plan includes several policies that would reduce noise associated with future development projects in the City. Noise Element Goal N 1: Noise Compatibility: Minimized land use conflicts between various noise sources and other human activities. ■ N 1.1 - Noise Compatibility of New Development: Require that all proposed projects are compatible with the noise environment through use of Table N2 of the Noise Element, and enforce the interior and exterior noise standards shown in Table N3 of the Noise Element. N 1.2 - Noise Exposure Verification for New Development: Applicants for proposed projects that require environmental review and are, located in areas projected to be exposed to a CNEL of 60 dBA and higher, as shown on Figure N4, Figure N5, and Figure N6 of the Noise Element may conduct afield survey, noise measurements or other modeling in a manner acceptable to the City to provide evidence that the depicted noise contours do not adequately account for local noise exposure circumstances due to such factors as, topography, variation in traffic speeds, and other applicable conditions. These findings shall be used to determine the level of exterior or interior, noise attenuation needed to attain an acceptable noise exposure level and the feasibility of such mitigation when other planning considerations are taken into account. N 1.4 - New Developments in Urban Areas: Require that applicants of residential portions of mixed- use projects and high density residential developments in urban areas (such as the Airport Area and Newport Center) demonstrate that the design of the structure will adequately isolate noise between adjacent uses and units (common floor/ceilings) in accordance with the California Building Code. ■ N 1.6 - Mixed Use Developments: Encourage new mixed-use developments to site loading areas, parking lots, driveways, trash enclosures, mechanical equipment, and other noise sources away from the residential portion of the development. N 1.7 - Commercial/Entertainment Uses: Limit hours and/or requires attenuation of commercial/ entertainment operations adjacent to residential and other noise sensitive uses in order to minimize excessive noise to these receptors. Goal N 2: Minimized motor vehicle traffic and boat noise impacts on sensitive noise receptors May 2020 Page 167 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis ■ N 2.1- New Development: Require that proposed noise -sensitive uses in areas of 60 dBA and greater, as determined the analyses stipulated by Policy N1.1, demonstrate that they meet interior and exterior noise levels. ■ N 2.2 - Design of Sensitive Land Uses: Require the use of walls, berms, and interior noise insulation, double paned windows, or other noise mitigation measures, as appropriate, in the design of new residential or other new noise sensitive land uses that are adjacent to major roads. Application of the Noise Standards in Table N3 of the Noise Element shall govern this requirement. ■ N 2.3 - Limiting Truck Deliveries: Limit the hours of truck deliveries to commercial uses abutting residential uses and other noise sensitive land uses to minimize excessive noise unless there is no feasible alternative. Any exemption shall require compliance with nighttime (10:00 PM. to 7:00 A.M.) noise standards. Goal N 3: Protection of Newport Beach residents from the adverse noise impacts of commercial air carrier operations at John Wayne Airport as provided in the City Council Airport Policy. ■ N 3.1- New Development: Ensure new development is compatible with the noise environment by using airport noise contours no larger than those contained in the 1985 JWA Master Plan, as guides to future planning and development decisions. ■ N 3.2 - Residential Development: Require that residential development in the Airport Area be located outside of the 65 dBA CNEL noise contour no larger than shown in the 1985 JWA Master Plan and require residential developers to notify prospective purchasers or tenants of aircraft overflight and noise. ■ N 3.3 - Avigation Easement: Consider requiting the dedication of avigation easements in favor of the County of Orange when noise sensitive uses are proposed in the JWA planning area, as established in the JWA Airport Environs Land Use Plan (AELUP). Goal N 4: Minimization of Nontransportation-Related Noise: Minimized nontransportation-related noise impacts on sensitive noise receptors. ■ N 4.1- Stationary Noise Sources: Enforce interior and exterior noise standards outlined in Table N3 of the Noise Element and in the Cites Municipal Code to ensure that sensitive noise receptors are not exposed to excessive noise levels from stationary noise sources, such as heating, ventilation, and air conditioning egwpment. ■ N 4.2 - New Uses: Require that new uses such as restaurants, bars, entertainment, parking facilities, and other commercial uses where large numbers of people may be present adjacent to sensitive noise receptors obtain a use permit that is based on compliance with the noise standards in Table N3 of the Noise Element and the City's Municipal Code. ■ N 4.3 - New Commercial Developments: Require that new commercial developments abutting residentially designated properties be designed to minimize noise impacts generated by loading areas, Page 168 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis parking lots, trash enclosures, mechanical equipment, and any other noise generating features specific to the development to the extent feasible. ■ N 4.6 - Maintenance or Construction Activities: Require the enforcement of the Noise Ordinance noise limits and limits hours of maintenance or construction activity in or adjacent to residential areas, including noise that results from in-home hobby or work related activities. Goal N 5: Minimized excessive construction -related noise. ■ N 5.1- Limiting Hours of Activity: Enforce the limits on hours of construction activity. Land Use Element Goal LU 5.3: Districts where residents and businesses are intermixed that are designed and planned to ensure compatibility among the uses, that they are highly livable for residents, and are of high quality design reflecting the traditions of Newport Beach. LU 5.3.1- Mixed -Use Buildings: Require that mixed-use buildings be designed to convey a high level of architectural and landscape quality and ensure compatibility among their uses in consideration of the following principles: • Design and incorporation of building materials and features to avoid conflicts among uses, such as noise, vibration, lighting, odors, and similar impacts • Visual and physical integration of residential and nonresidential uses • Architectural treatment of building elevations and modulation of their massing • Separate and well-defined entries for residential units and nonresidential businesses • Design of parking areas and facilities for architectural consistency and integration among uses • Incorporation of extensive landscape appropriate to its location; urbanized streetscapes, for example, would require less landscape along the street frontage but integrate landscape into interior courtyards and common open spaces. Goal LU 6.1: A diversity of governmental service, institutional, educational, cultural, social, religious, and medical facilities that are available for and enhance the quality of life for residents and are located and designed to complement Newport Beach's neighborhoods. LU 6.1.3: Architecture and Planning that Complements Adjoining Uses: Ensure that the City's public buildings, sites, and infrastructure are designed to be compatible in scale, mass, character, and architecture with the district or neighborhood in which they are located, following the design and development policies for private uses specified by this Plan. Design impacts on adjoining uses shall be carefully considered in development, addressing such issues as lighting spillover, noise, hours of operation, parking, local traffic impacts, and privacy. May 2020 Page 169 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Goal LU 6.2: Residential neighborhoods that contain a diversity of housing types and supporting uses to meet the needs of Newport Beach's residents and are designed to sustain livability and a high quality of life. LU 6.2.5: Neighborhood Supporting Uses: Allow for the integration of uses within residential neighborhoods that support and are complementary to their primary function as a living environment such as schools, parks, community meeting facilities, religious facilities, and comparable uses. These uses shall be designed to ensure compatibility with adjoining residential addressing such issues as noise, lighting, and parking. Goal LU 6.15: A mixed-use community that provides jobs, residential, and supporting services in close proximity, with pedestrian -oriented amenities that facilitate walking and enhance livability. LU 6.15.3 - Airport Compatibility: Require that all development be constructed in conformance with the height restrictions set forth by Federal Aviation Administration (FAA), Federal Aviation Regulations (FAR) Part 77, and Caltrans Division of Aeronautics, and that residential development be located outside of the 65 dBA CNEL noise contour specified by the 1985 JWA Master Plan. ■ LU 6.15.15 - Aircraft Notification: Require that all neighborhood parks be posted with a notification to users regarding proximity to John Wayne Airport and aircraft overflight and noise. Page 170 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.14 POPULATION AND HOUSING 5.14.1 Summary of Impacts Identified in the Program EIRs 5.14.1.1 2006 GENERAL PLAN EIR The 2006 GPU EIR projected that buildout of the 2006 GPU would add 31,131 residents and 14,215 residential units to the City—at buildout the population would be 103,753 and the number of residential units 54,394. In 2004, SCAG forecast that the city would have 94,167 residents and 43,100 residential units in regional projections. General Plan buildout added 8,192 more residents and 8,810 more households to the city in 2030 than the regional forecasts. Implementation of the General Plan was therefore concluded to result in a significant and unavoidable population growth impact. No mitigation measures were identified to reduce or eliminate this significant impact. The 2006 GPU primarily planned development 1) on the sparse developable land the City had left, 2) by intensifying current land uses, and 3) through the conversion of land uses of economically underperforming and obsolete development. Also, new development could take place on the vacant Banning Ranch area if it could not be retained for open space. No substantial demolition of residential uses was proposed under the 2006 GPU. Since the 2006 GPU did not propose uses that would displace substantial numbers of existing housing or people, the EIR found no impact. 5.14.1.2 2014 LUE AMENDMENT SEIR Population and Housing Buildout of the General Plan as amended by the 2014 LUE Amendment added up to 1,729 more residential units in the city. This total assumed that the maximum number of units was developed, including potential density bonus units. In comparison to the 2006 GPU EIR and based on the 2013 average household of 2.22 for the city, this resulted in an additional 3,838 persons and a total population of 106,197 at General Plan buildout. This population exceeded the 2035 SCAG population projection for the City of 90,030 by 16,167 persons (approximately 18 percent). This impact was found to be significant. Employment The General Plan LUE Amendment resulted in a net increase of 388 employees in comparison to buildout of the 2006 GPU Estimated employment at buildout of the General Plan as amended was 85,905. Table 9, Projected Job -Hou ing Ratio, compares the resultant jobs -housing balance between buildout of the 2006 GPU and the 2014 LUE Amendment. Implementation of the LUE Amendment would reduce the jobs -housing ratio by 0.07, from 1.83 to 1.76 (a 3.8 percent reduction). Since the City was jobs -rich, this reduction was considered a beneficial impact. May 2020 Page 171 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 9 Projected Jobs -Housing Ratio The 2014 LUE Amendment involved changes in land use designations and increasing or reducing development capacities within subareas of the city. The areas proposed for decreased development capacities were Westcliff Plaza, Newport Coast Center, Newport Coast Hotel, Bayside Center, Harbor View Center, The Bluffs, Gateway Park, and Newport Ridge. The majority of these areas are commercial shopping centers with reduced square footage or, in the case of Newport Coast Hotel, a reduction in allowable hotel rooms. The only residential use subarea with reduced allowable dwelling units was Newport Ridge. However, the reduction was in the allowable development capacity of existing dwelling units in Newport Ridge. Thus, the 2014 LUE Amendment was found not to displace any existing housing in the city or necessitate the need to construct replacement housing elsewhere, resulting in no impact. 5.14.2 Impacts Associated with the Proposed Project Would the proposed project: 2006 General Plan Buildout General Plan LUE Amendment Buildout Chane Percent Change Total Employees 85,517 85,905 388 0.04% Housing Units 46,601 48,330 1729 3.7% Jobs/Housing Ratio 1.84 1.78 -.0.06 -3.2% The 2014 LUE Amendment involved changes in land use designations and increasing or reducing development capacities within subareas of the city. The areas proposed for decreased development capacities were Westcliff Plaza, Newport Coast Center, Newport Coast Hotel, Bayside Center, Harbor View Center, The Bluffs, Gateway Park, and Newport Ridge. The majority of these areas are commercial shopping centers with reduced square footage or, in the case of Newport Coast Hotel, a reduction in allowable hotel rooms. The only residential use subarea with reduced allowable dwelling units was Newport Ridge. However, the reduction was in the allowable development capacity of existing dwelling units in Newport Ridge. Thus, the 2014 LUE Amendment was found not to displace any existing housing in the city or necessitate the need to construct replacement housing elsewhere, resulting in no impact. 5.14.2 Impacts Associated with the Proposed Project Would the proposed project: Page 172 PlaceWorks Less Than Significant Substantial Impacts/No Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact a) Induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, X through extension of roads or other infrastructure)? b) Displace substantial numbers of existing housing, necessitating the construction of X replacement housing elsewhere? Page 172 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Comments: a) Induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? No Impact. Project Comparison to 2006 General Plan EIR Population and Housing As detailed in Chapter 3, Project Description, buildout of the proposed project would result in up to 444 more residential units on the project site. This total assumes that the maximum number of units are developed, including the potential for density bonus units. Based on the 2019 average household of 2.27 for the city (Census Bureau 2019), this would result in an additional 1,008 persons on the project site. In comparison to the 2006 GPU, the proposed project adds this population to the project site but does not result in a net increase in population for the Airport Area. The proposed 329 units and up to 115 density bonus units would be introduced to the project site under the proposed MU -142 land use classification. A total of 2,200 units are allowed in the Airport Area, and the project would involve a redistribution of these future units, not a net increase. Therefore, the proposed project would not exceed the 2040 SCAG population projection for the city. Employment Implementation of the proposed project would result in a decrease of 61,000 square feet of nonresidential space in comparison to buildout of the 2006 General Plan. Using the employment density factor of one retail and service -use job per 617 square feet (Natelson 2001), the proposed project would result in a decrease of 98 jobs. Therefore, the proposed project would not induce population growth through job creation. Since the proposed project would not result in an increase in population compared to the 2006 GPU and would result in a decrease in the number of employees, there would not be substantial unplanned population growth. Therefore, there are no impacts and no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The 2014 LUE Amendment allocated 596,575 square feet of office uses and 444 dwelling units to the proposed project site. Under the LUE Amendment, the new residential units were additive to the 2,200 units allocated to the Airport Area under the General Plan. Since the proposed project would use a portion of the 2,200 units allocated to the MU -1-12 designated areas, it would not increase housing units. Therefore, in comparison to the LUE Amendment, the proposed project would reduce housing units by 444 units. Compared to the 2014 LUE Amendment, the proposed project would reduce nonresidential space. The proposed project would reduce impacts related to induced growth in comparison to the 2104 LUE Amendment for both housing and employment. May 2020 Page 173 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? No Impact. Project Comparison to 2006 General Plan EIR There was no housing on the site at the time the 2006 General Plan was adopted. As with existing conditions for the 2006 GPU EIR, there are no residential units currently on the project site, and project development would not displace any existing housing. Therefore, there are no impacts and no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The proposed project would be developed on a site with no current housing units. Therefore, there are no impacts and no changes or new significant information that would require preparation of an EIR. 5.14.3 Mitigation Measures Identified in the Program EIR and Applicable to the Proposed Project There were no mitigation measures in the 2006 GPU EIR or the 2014 LUE Amendment SEIR.. 5.14.4 Relevant General Plan Policies The City of Newport Beach's General Plan Housing Element was updated in 2013. This is in accordance with the state's requirement to update housing elements every five years in response to the Regional Housing Needs Assessment (RHNA). Goals and policies particularly relevant to the proposed project, including affordable housing and airport -area -related policies, are reproduced below. Housing Element (2013) ■ H 1.1- Support all reasonable efforts to preserve, maintain, and improve availability and quality of existing housing and residential neighborhoods, and ensure full utilization of existing City housing resources for as long into the future as physically and economically feasible. ■ H 2.1 - Encourage preservation of existing and provision of new housing affordable to extremely low-, very low-, low-, and moderate -income households. ■ H 2.2 - Encourage the housing development industry to respond to existing and future housing needs of the community and to the demand for housing as perceived by the industry. ■ H 3.1 - Mitigate potential governmental constraints to housing production and affordability by increasing the City of Newport Beach role in facilitating construction of affordable housing for all income groups. Page 174 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis ■ H 3.2 - Enable construction of new housing units sufficient to meet City quantified goals by identifying adequate sites for their construction. Development of new housing will not be allowed within the John Wayne Airport QWA) 65 dB CNEL contour, no larger than shown on the 1985 JWA Master Plan. May 2020 Page 175 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.15 PUBLIC SERVICES 5.15.1 Summary of Impacts Identified in the Program EIRs 5.15.1.1 2006 GENERAL PLAN EIR Fire Protection The Newport Beach Fire Department (NBFD) is responsible for reducing loss of life and property from fire, medical, and environmental emergencies. The GPU EIR noted that new Airport Area residential uses would increase demands for 24-hour medical service and than an increase in density by both infill and conversion of low rise properties to mid and high rise would necessitate the addition of a ladder truck company to the Santa Ana Heights fire station. To support the needs of future growth, the GPU included policies that ensure development would only occur with the provision of adequate infrastructure. Thus, fire staffing and facilities would expand commensurately to serve the needs of new development and maintain response times. The 2006 GPU EIR found that buildout of the GPU would have a less than significant impact on fire services. Police Protection Buildout of the 2006 GPU was determined to have a less than significant impact on police services. In order to maintain acceptable levels of service, the GPU includes policies to ensure adequate law enforcement is provided as the City experiences future development (Policy LU 2.8). Furthermore, to maintain the ratio of 1.7 officers per 1,000 residents (148 officers and 85,120 residents) at the time the 2006 GPU EIR was prepared, the Newport Beach Police Department (NBPD) would have had to provide an additional 53 officers upon GPU buildout. Maintaining NBPD's ratio of 0.60 nonsworn personnel per sworn officer would result in the addition of 32 nonsworn personnel. The addition of 85 police personnel would require NBPD to expand police facilities. However, since NBPD did not have near-term plans for expansion of police facilities, staff, or equipment inventory, it was speculative to determine whether a new substation would be considered. Furthermore, all new development would be subject to the City's project -specific environmental review under CEQA. Thus, impacts were determined to be less than significant. Schools The 2006 GPU EIR analyzed school capacity in Newport -Mesa Unified School District (NMUSD), Santa Ana Unified School District (SAUSD), and Laguna Beach Unified School District (LBUSD), comparing existing enrollment to projected enrollment at GPU buildout. At buildout, the student population in the City was estimated to increase by approximately 6,230 students, using the assumption that approximately. The Airport Area is served by the SAUSD. The GPU EIR projected that the Airport Area would experience an increase of 4,300 residential units and contribute approximately 1,883 students (of the total 6,230 students generated City- wide under GPU buildout). The GPU EIR also noted that anticipated growth within the Irvine Business Complex (IBC) would have the potential to cumulatively impact Airport Area schools. Page 176 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis The 2006 GPU included goals and policies to address capacity issues for NMUSD and SAUSD. Buildout would likely require construction of new school facilities; however, the EIR concluded that compliance with 2006 General Plan policies would reduce impacts to less than significant. Parks (Note that the following information is excerpted from the GPU EIR Section 4.12, Parks and Open Space. Inclusion of this analysis is included under Public Services in this Addendum for consistency with the updated CEQA Guidelines Appendix G checklist, as adopted December 2018.) The 2006 GPU EIR found that there was an existing deficit of approximately 38.8 acres of combined park and beach acreage citywide, with 7 of the 12 service areas experiencing the deficit. An increase in population in accordance with buildout of the GPU would potentially generate a higher demand on recreational facilities. The 2006 GPU includes goals and policies to address the potential increase in demand and accelerated deterioration of existing facilities. Goal R 2 requires the maintenance and preservation of existing parks and recreation facilities. More specifically, Policy R 2.1 promotes the City's Park Dedication Fee Ordinance, which requires new development to pay fees or dedicate land as parkland. Policy R 2.2 protects public parkland from nonrecreational uses, requiring in-kind replacement of any parkland lost through governmental action. Goal R 1 strives to provide adequate park and recreational facilities to existing and future residents of the City. Specifically, Policy R 1.1 requires future development to dedicate land or pay in -lieu fees to maintain a minimum of five acres of parkland per 1,000 residents, per Section 19.52.040 (Parkland Standard) of the City's municipal code. Policy R 1.4 requires park fees to be updated regularly for new residential developments, and Policy R 1.5 promotes development of incentives for private projects to provide usable open space to the public. High- density residential developments on parcels eight acres or larger are required to provide on-site recreational amenities per Policy R 1.3. Lastly, Policy R 1.10 provides additional park and recreational facilities that meet the needs as identified by direct feedback from residents, analysis of trends, and observation by City staff. The 2006 GPU EIR concludes that these goals and policies would ensure that increased demand from the larger population would not significantly accelerate the deterioration of existing recreational facilities, and new parks and facilities would be constructed to meet the needs of the growing population. Based on the 2006 GPU EIR, future development of parks and recreational facilities to meet the parkland ratio of five acres per 1,000 residents may adversely impact the existing environment. For example, lighted sports fields may cause light and glare impacts in communities, biological habitats may be impacted, or hydrology and drainage may be altered due to new park development. Nevertheless, significant new development would be subject to the City's environmental review process, which includes project -specific environmental review under CEQA. Thus, future provisions of new or improved parks and recreational facilities would not result in substantial adverse impacts and would be less than significant. May 2020 Page 177 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.15.1.2 2014 LUE AMENDMENT SEIR Fire Protection NBFD indicated that there were no deficiencies in the level of fire protection service provided to the city and that the proposed changes within the 2014 LUE Amendment were minor and incremental in scope relative to overall NBFD service demand levels. Therefore, increases to fire services were found to be less than significant. Police Protection In order to maintain the ratio of officers to residents at the buildout of the 2014 LUE Amendment, NBPD would have to provide an additional 5 sworn officers upon buildout. The 2014 LUE Amendment EIR found that NBPD did not have near-term plans for expansion of police facilities, staff, or equipment inventory. Though an increase in population and structures, whether residential or commercial, would require an increase in police presence, the department stated that the 2014 LUE Amendment would not have an adverse impact on its existing level of service. Furthermore, not knowing the exact types and locations of new structures makes it difficult to determine how much, if any, additional police facilities, personnel, or equipment would be needed. As development occurs, property and sales tax revenue would grow in rough proportions and provide more funding for the City's general funds, which would allocate funding to NBPD as necessary to ensure the department has enough facility space, personnel, and equipment to maintain a high-quality level of service for its residents. Schools The 2014 LUE Amendment EIR found that buildout would have no impact on SAUSD and LBUSD, and that NMUSD had enough capacity to accommodate the growth associated with the 2014 LUE Amendment buildout. Parks The 2014 LUE Amendment EIR found that the Airport Area does not have any existing parkland because there are currently no residential developments in the area. Within the Airport Area, the 2014 LUE Amendment would allow for the development of up to 329 dwelling units on Saunders Properties, 850 replacement units on Lyon Communities, and a land use designation for Congregate Care use on UAP Companies property. The future residents in the Airport Area would most likely use existing park facilities in the closest service areas— Santa Ana Heights, Eastbluff, and Big Canyon. Eastbluff and Big Canyon have substantial surpluses of 38.1 and 21.96 acres, respectively. In addition, future residential developments in the Airport Area would be required to comply with the same policies outlined in the 2006 GPU FIR to address potential park and recreation facilities, and Chapter 19.52 of the municipal code requires parkland dedication or payment of in -lieu fees for all new developments, which would ensure park and recreation facilities are simultaneously developed with residential dwelling units in the Airport Area. Furthermore, the new and/or revised land use policies proposed under the General Plan LUE Amendment ensured the availability and maintenance of City parkland. Thus, impacts on the demand of existing park and recreational facilities in Newport Beach were less than significant. Page 178 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Library Services The land use changes in the 2014 LUE Amendment allowed for increased development capacity in some areas of the city; these changes had the potential to affect library services to the general Newport Beach population if demands substantially increased. However, increased development in the City does not necessarily immediately equate to an increase in total volumes or square feet of library space, especially given the growing need for electronic resources rather than physical library collection items. Therefore, library service impacts due to the 2014 LUE Amendment were found to be less than significant. 5.15.2 Impacts Associated with the Proposed Project Would the project: Comments: a) Fire protection? Less than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR The proposed project would result in an increase of 444 dwelling units on the project site and a decrease of 61,000 square feet of nonresidential space. The 444 proposed project housing units, however, are well within the 4,300 units anticipated for the Airport Area in the General Plan Update. GPU Policy LU 3.2 would ensure that fire staffing and facilities would expand commensurately to serve the needs of new development and maintain current response times. Furthermore, the proposed project complies with all applicable federal, state, May 2020 Page 179 Less Than Significant Impacts/No Substantial Substantial New Information Changes or New Change in Change in Showing New or Information Project Requiring Circum -stances Increased Requiring Major EIR Requiring Major Significant Preparation of Issues Revisions EIR Revisions Effects an EIR No Impact Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, or the need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for any of the public services: a) Fire protection? X b) Police protection? X c) Schools? X d) Parks? X e) Other public facilities? X Comments: a) Fire protection? Less than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR The proposed project would result in an increase of 444 dwelling units on the project site and a decrease of 61,000 square feet of nonresidential space. The 444 proposed project housing units, however, are well within the 4,300 units anticipated for the Airport Area in the General Plan Update. GPU Policy LU 3.2 would ensure that fire staffing and facilities would expand commensurately to serve the needs of new development and maintain current response times. Furthermore, the proposed project complies with all applicable federal, state, May 2020 Page 179 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis and local regulations governing fire protection services, such as adequate fire and emergency access, fire flows, and number of fire hydrants. Therefore, impacts from the proposed project, similar to development pursuant to the 2006 GPU, would be less than significant, and there are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR As shown in Table 3, development under the 2014 LUE Amendment would increase residential units for the project site (and Airport Area) up to an additional 444 units and would also increase allowable nonresidential development for the project site (by approximately 238,000 square feet). Therefore, the proposed project would reduce potential fire protection service impacts compared to the 2014 LUE Amendment.. b) Police protection? Less than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR The proposed project would result in an increase of 444 dwelling units on the project site and a decrease of 61,000 square feet of nonresidential space. The number of residential units within the Airport Area as a whole, however, would not increase in comparison to the GPU. To maintain acceptable levels of service, the GPU included policies to ensure adequate law enforcement is provided as the City experiences development (Policy LU 2.8). Furthermore, property and sales tax revenue from the proposed project would provide more funding for the City's general funds, which would allocate funding to NBPD. Therefore, impacts from the proposed project, similar to development pursuant to the 2006 GPU, would be less than significant, and there are no changes or new information requiring preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR As shown in Table 3, development under the 2014 LUE Amendment would increase residential units for the project site (and Airport Area) up to an additional 444 units. The proposed units under the LUE Amendment were additive to the 4,300 units evaluated in the GPU EIR for the Airport Area. Nonresidential development for the project site was also contemplated to be greater under the 2014 LUE Amendment than under the proposed project. Therefore, the proposed project would reduce potential police protection services relative to the proposed site uses under the LUE Amendment. . c) Schools? Less than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR The proposed project is within the service area of SAUSD, which services the entire Airport Area (CSCD 2020). The proposed project would result in an increase of 444 dwelling units at the project site but would not increase the number of households within the Airport Area. Page 180 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 10 shows the estimated student generation (K-12) from an additional 444 dwelling units in accordance to the proposed project. Student generation rates are used by school districts to estimate the number of students generated by new development in order to determine whether or not existing school facilities would be adequate for future student enrollment. The estimates use student generation rates specific to SAUSD. Table 10 Projected Student Population in SAUSD Grade Level Student Generation Rate Estimated Buildout Generated Proposed Project Buildout Students K-5 0.194 86 444 DU 49 64 6-8 0.111 9-12 0.143 Project Total 177 Existing District Enrollment 51,482 Total District Enrollment + Project 51,659 Total District Capacity 62,672 Remaining Capacity 11,013 Source: CDE 2020; SAUSD 2018; SAUSD 2020a. According to Table 10, buildout of the proposed project would generate 177 more students. Using SAUSD's current capacity and enrollment, SAUSD would have enough capacity to accommodate 11,013 additional students beyond those generated from buildout of the proposed project. Also, the need for additional services is addressed through compliance with the school impact fee assessment. SB 50 (Chapter 407 of Statutes of 1998) set a state school facilities construction program that restricts a local jurisdiction's ability to condition a project on mitigation of school impacts in excess of fees in Education Code Section 17620. These fees are collected by school districts at the time building permits are issued for commercial, industrial, and residential projects. SAUSD charges $3.79 per square foot of residential development greater than 500 square feet, and $0.61 per square foot of commercial development. It would collect these fees from individual developers, pursuant to SB 50 (SAUSD 2020b). The State Legislature has declared that the payment of school impact fees constitutes full mitigation for the impacts of new development, per Government Code Section 65995. Furthermore, Chapter 19.48 (School Sites and Fees) of the City's municipal code may require, as a condition of approval, dedication of land within a subdivision development for the construction of elementary and high schools necessary to ensure that residents of the subdivision have adequate public school service. Thus, impacts from implementation of the proposed project on school services would be less than significant and no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Compared to the 2014 LUE Amendment, the proposed project would reduce nonresidential space and reduce the number of residential dwelling units allowed within the Airport Area (see Table 3). Therefore, the proposed May 2020 Page 181 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis project would reduce student generation in comparison to uses allowed under the LUE Amendment, and reduce potential impacts to the SAUSD.. d) Parks? Less than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR Refer to Section 5.16.2. Impacts would be less than significant, and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Compared to the 2014 LUE Amendment, the proposed project would reduce nonresidential space and reduce the number of residential dwelling units allowed within the Airport Area (see Table 3) Therefore, the proposed project would reduce potential impacts to park services relative to the LUE Amendment. e) Other public facilities? Less than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR As summarized in Table 3, the proposed project would reduce nonresidential development by approximately 60,000 square feet and would not increase the number of residential units within the Airport Area or city. It would introduce up to 444 residential units on the project site, but these units are already allocated in the 2,200 allowable units in MU -H2 designated areas in the Airport Area. The GPU EIR analyzed a total of 4,300 units within the Airport Area. The proposed project, therefore, would not increase the demand on other public facilities, including library services. It would not increase population in the city and would reduce nonresidential, airport/office land use. Residents of the proposed project would be served by the Newport Beach Public Library (NBPL); the nearest NBPL facility to the project site is the Crean Mariners Library at 1300 Irvine Avenue, approximately three miles southwest of the project site. The proposed project would pay a property excise tax per City municipal code Chapter 3.12, part of which is designated for libraries, and would generate additional tax revenues supporting the City's General Fund. Therefore, impacts on library facilities and services would be less than significant and no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR As shown in Table 3, development under the 2014 LUE Amendment increased residential units for the project site (and Airport Area) up to an additional 444 units. The proposed units under the LUE Amendment were additive to the 4,300 units evaluated in the GPU EIR for the Airport Area. Nonresidential development for the project site was also greater under the 2014 LUE Amendment in comparison to the proposed project. Therefore, the proposed project would reduce potential impacts to other public service, including library services, in comparison to proposed site uses under the LUE Amendment. Page 182 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.15.3 Mitigation Measures Identified in the Program EIR and Applicable to the Proposed Project There were no mitigation measures in the 2006 GPU EIR or the 2014 LUE Amendment SEIR.. 5.15.4 Relevant General Plan Policies The 2006 General Plan includes the following goals and policies that are relevant to public services. Goal LU 6.15: A mixed-use community that provides jobs, residential, and supporting services in close proximity, with pedestrian -oriented amenities that facilitates walking and enhance livability. ■ LU 6.15.15 - Aircraft Notification: Require that all neighborhood parks be posted with a notification to users regarding proximity to John Wayne Airport and aircraft overflight and noise. Goal R 1: Provision of Facilities—Provision of adequate park and recreation facilities that meet the recreational needs of existing and new residents of the community. R 1.4 - Density Bonuses: Consider development of incentives such as density bonuses for private commercial, office, and other developments to provide usable open space such as rooftop courts, pocket parks, public plazas, jogging trails, and pedestrian trails. R 1.12 - Aircraft Overflight and Noise: Require that all public parks located within the noise impact zones as defined in the 1985 JWA Master Plan for John Wayne Airport be posted with a notification to users regarding aircraft overflight and noise. May 2020 Page 183 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.16 RECREATION 5.16.1 Summary of Impacts Identified in the Program EIRs 5.16.1.1 2006 GENERAL PLAN EIR Although impacts related to physical deterioration of recreational facilities were considered less than significant for the majority of the city, there was a greater possibility for impacts in the Airport Area. At the time of the 2006 GPU, the Airport Area had no residential units and no park facilities. The 2006 GPU added up to 4,300 multifamily residential units to this area. Policy LU 6.15.15 of the 2006 GPU required residential developers to dedicate and develop a neighborhood park of at least 8 percent of gross land area, with a minimum size of one acre, in the first phase of development in each residential neighborhood or pay in -lieu fees when development is inappropriately located to serve the needs of the residents. This was in addition to the private recreational facilities required in Policy R 1.3. The recreational facilities provided by these policies was at the neighborhood level, and there was the potential for additional use and deterioration of existing sports fields at Bonita Creek and Bonita Canyon Sports Park. However, the policies under Goal R 2 helped ensure that existing parks and recreation facilities were maintained and preserved. Implementation of Policy R 2.1 would maintain existing facilities, thereby reducing impacts related to deterioration, by using funding from the City's Park Dedication Fee Ordinance to enhance existing parks and facilities such as Bonita Canyon Sports Park. With implementation of Policy R 2.1, impacts related to deterioration of parks and recreation facilities in the Airport Area were less than significant. Through the environmental review process, the future provision of new or physically altered parks or recreational facilities would not result in substantial adverse physical impacts and this impact was found to be less significant. 5.16.1.2 2014 LUE AMENDMENT SEIR The intensification of some land uses pursuant to the 2014 LUE Amendment could result in an increased demand for parks and recreational facilities. However, the increase in demand was determined not to result in an acceleration of deterioration of existing facilities. The 2014 LUE Amendment did not include changes to parks or recreational facilities that had the potential to have an adverse physical effect on the environment. The proposed increased development capacity included increases in dwelling units and hotel rooms, which would lead to an increase in visitors and overall population and related increase in park demands and consequently, the construction or expansion of recreational facilities that might have an adverse physical effect on the environment. However, as stated in the 2006 General Plan EIR, all significant new development of recreational facilities would be subject to the City's environmental review process, which includes project -specific environmental review under CEQA. Thus, the future provision of new or expanded parks or recreational facilities would result in a less than significant impact. Page 184 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.16.2 Impacts Associated with the Proposed Project Comments: a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities, such that substantial physical deterioration of the facility would occur or be accelerated? No Impact. Project Comparison to 2006 General Plan EIR Development of up to 329 residential units (444 with density bonus) would be within the number of units projected and analyzed for the Airport Area within the GPU EIR. Development would be required to comply with the 2006 GPU policies and Chapter 19.52 of the municipal code, which requires parkland dedication or payment of in -lieu fees. This would ensure park and recreation facilities are simultaneously developed with residential dwelling units. Thus, the proposed project would have no impact relative to the impacts as analyzed in the GPU EIR. Project Comparison to 2014 LUE Amendment SEIR The project proposes the same number of residential units as analyzed in the 2014 LUE SEIR. The proposed project, similar to development pursuant to the 2014 LUE Amendment, would implement Policies LU 6.15.15, R 1.1, R 1.2, and R 1.3 in addition to the requirements of Chapter 9.52 of the City's municipal code. Adherence to the 2006 GPU policies and the municipal code would ensure park and recreation facilities are simultaneously developed with residential dwelling units. Thus, impacts of the proposed project, similar to development pursuant to the 2014 LUE Amendment, would be less than significant. May 2020 Page 185 Less Than Significant Substantial Impacts/No Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that X substantial physical deterioration of the facility would occur or be accelerated? b) Does the project include recreational facilities or require the construction or expansion of recreational facilities which X might have an adverse physical effect on the environment? Comments: a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities, such that substantial physical deterioration of the facility would occur or be accelerated? No Impact. Project Comparison to 2006 General Plan EIR Development of up to 329 residential units (444 with density bonus) would be within the number of units projected and analyzed for the Airport Area within the GPU EIR. Development would be required to comply with the 2006 GPU policies and Chapter 19.52 of the municipal code, which requires parkland dedication or payment of in -lieu fees. This would ensure park and recreation facilities are simultaneously developed with residential dwelling units. Thus, the proposed project would have no impact relative to the impacts as analyzed in the GPU EIR. Project Comparison to 2014 LUE Amendment SEIR The project proposes the same number of residential units as analyzed in the 2014 LUE SEIR. The proposed project, similar to development pursuant to the 2014 LUE Amendment, would implement Policies LU 6.15.15, R 1.1, R 1.2, and R 1.3 in addition to the requirements of Chapter 9.52 of the City's municipal code. Adherence to the 2006 GPU policies and the municipal code would ensure park and recreation facilities are simultaneously developed with residential dwelling units. Thus, impacts of the proposed project, similar to development pursuant to the 2014 LUE Amendment, would be less than significant. May 2020 Page 185 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis b) Does the project include recreational facilities or require the construction or expansion of recreational facilities, which might have an adverse physical effect on the environment? No Impact. Project Comparison to the 2006 General Plan EIR The proposed project does not include development of any recreational facilities. It would also not result in the need for construction or expansion of recreational facilities relative to the GPU EIR. The proposed project would introduce up to 444 new residential units to the project site, but these units are already accommodated within the Airport Area under the GPU EIR analysis of up to 4,300 units. The proposed project, therefore, would not have the potential to require recreational facilities that could have an adverse physical effect on the environment. Thus, the future provision of new or expanded parks or recreational facilities associated with the proposed project, similar to development pursuant to the 2006 GPU, would result in no impact, and there are no changes or new information requiring preparation of an EIR. Project Comparison to the 2014 LUE Amendment SEIR The proposed project does not include development of any recreational facilities. It would reduce residential units by up to 444 units in comparison to the 2014 LUE Amendment (see Table 3), and therefore would not result in the need for construction or expansion of recreational facilities relative to the LUE Amendment. There would be no impacts. 5.16.3 Mitigation Measures Identified in the Program EIR and Applicable to the Proposed Project There were no mitigation measures in the 2006 GPU EIR or the 2014 LUE Amendment SEIR. 5.16.4 Relevant General Plan Policies The 2006 General Plan includes the following goals and policies that are relevant to recreation. Goal LU 6.15: A mixed-use community that provides jobs, residential, and supporting services in close proximity, with pedestrian -oriented amenities that facilitates walking and enhance livability. Goal R 1: Provision of Facilities—Provision of adequate park and recreation facilities that meet the recreational needs of existing and new residents of the community. ■ R 1.1 - Provision of Parkland: Require future development to dedicate land or pay in -lieu fees at a minimum of 5 acres of parkland per 1,000 persons. ■ R 1.3 - High -Density Residential Developments: Require developers of new high-density residential developments on parcels eight acres or larger, to provide on-site recreational amenities. For these developments, 44 square feet of on-site recreational amenities shall be provided for each dwelling unit in addition to the requirements under the City's Park Dedication Ordinance. On-site recreational amenities Page 186 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis can consist of public urban plazas or squares where there is the capability for recreation and outdoor activity. These recreational amenities can also include swimming pools, exercise facilities, tennis courts, and basketball courts. Where there is insufficient land to provide on-site recreational amenities, the developer shall be required to pay the City of Newport Beach cash in -lieu that would be used to develop or upgrade nearby recreation facilities to offset user demand as defined in the City's Park Dedication Fee Ordinance. The acreage of on-site open space developed with residential projects may be credited against the parkland dedication requirements where it is accessible to the public during daylight hours, visible from public rights- of-way, and is of sufficient size to accommodate recreational use by the public. However, the credit for the provision of on-site open space shall not exceed 30% of the parkland dedication requirement. May 2020 Page 187 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.17 TRANSPORTATION This section, in part, has been excerpted from the analysis in the following study prepared for this Addendum: ■ NezvportAirport Village Trip Making Assessment, Urban Crossroads, March 5, 2020 This report is included in its entirety as Appendix B to this Addendum. 5.17.1 Summary of Impacts Identified in the Program EIRs 5.17.1.1 2006 GENERAL PLAN EIR With respect to transportation/circulation impacts, the 2006 General Plan EIR concluded: ■ Implementation of the 2006 General Plan would contribute to a substantial impact at freeway ramps that exceeds thresholds and would result in operational deficiencies. This would be a significant and unavoidable impact. • Implementation of the 2006 General Plan would result in a substantial increase in the number of vehicle trips, volume -to -capacity ratio on roads, or congestion at intersections compared to existing conditions. With improvements proposed in the Circulation Element, growth related to buildout of the proposed 2006 General Plan alone would be reduced to less than significant levels. The improvements included in the City of Newport Beach Circulation Element are detailed in the GPU EIR. • The 2006 General Plan would not result in a substantial impact to CMP arterials in Newport Beach. Impacts related to CMP facilities would be less than significant. • Circulation improvements would be implemented, and no improvements would introduce new safety hazards at intersections or along roadway segments. Implementation of Circulation and Land Use policies in the 2006 General Plan would provide for increasing safety of roadways, balancing safety, quality of life, and efficiency in the design of circulation and access. Impacts would be less than significant. • The 2006 General Plan would provide adequate emergency access to the project area, and impacts would be less than significant. • The 2006 Circulation Element contained new policies to encourage alternatives modes of transportation, use of intelligent transportation systems, and the development of waterfront walkways. Intersection improvements would not affect implementation of these policies. The 2006 General Plan did not conflict with existing policies regarding alternative transportation, and impacts would be less than significant. Page 188 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.17.1.2 2014 LUE AMENDMENT SEIR Trip Generation and Intersection Performance The LUE Amendment altered, intensified, and redistributed land uses in certain subareas of the city, including major areas such as Newport Center/Fashion Island, Newport Coast, and the Airport Area near John Wayne Airport. The changes were projected to result in a citywide increase of 260 morning peak hour inbound trip ends, 521 morning peak hour outbound trip ends, 434 evening peak hour inbound trip ends, 324 evening peak hour outbound trip ends, and 8,221 daily trip ends. The Airport Area land use changes were described in the LUE Amendment EIR as follows: Airport Area: The Airport Area is another subarea proposed for considerable changes from the existing land use plan. The project proposes changes to four properties within the subarea: Saunders Properties, The Hangars, Lyon Communities, and UAP Companies. Currently, the four properties only consist of office buildings. The proposed project would allow for increased square footage for retail and office uses as well as residential units and hotel rooms. As with Newport Center/Fashion Island, the Airport Area would allow for denser infill development and an estimated additional 10,771 daily trips. Table 11, Project Trip Generation - LUE Amendment Airport Area Change Areas, shows the trip changes anticipated within the proposed change areas in the Airport Area (see Figure 6, Airport Area Proposed Changes, 2014 LUE Amendment). Table 11 Project Trip Generation - LUE Amendment Airport Area Change Areas Source: Urban Crossroads 2014. TSF = thousand square feet The General Plan LUE Amendment would result in the redistribution of peak hour directional traffic movements, which generally would not degrade roadway system performance in comparison to the 2006 General Plan. In summary, based on the intersection impact criteria described, there would be no significant impacts with the planned improvements at study -area intersections. May 2020 Page 189 AM PM In Out In Out Area Area Name Land Use Chane ADT Saunders Pro a p ty 329 du Apartment 239 220 211 221 4,651 238.077 TSF General Office The Hangars 11.8 TSF General Commercial 13 6 14 17 340 -10 TSF General Office 42 850 du Apartment (High -Rise) Lyon Homes 150 room Hotel 103 352 321 210 5,780 85 TSF General Commercial -250.176 TSF General Office UAP Companies trip neutral land uses 0 0 0 0 0 Citywide Total 355 578 546 448 10,771 Source: Urban Crossroads 2014. TSF = thousand square feet The General Plan LUE Amendment would result in the redistribution of peak hour directional traffic movements, which generally would not degrade roadway system performance in comparison to the 2006 General Plan. In summary, based on the intersection impact criteria described, there would be no significant impacts with the planned improvements at study -area intersections. May 2020 Page 189 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Congestion Management Program Intersections The Orange County Congestion Management Program (CMP) was established in 1991 to reduce traffic congestion and to provide a mechanism for coordinating land use and development decisions. Compliance with CMP requirements ensures a city's eligibility to compete for state gas tax funds for local transportation projects. For OCTA CMP intersections, the acceptable LOS is E. If the intersection would operate at unacceptable LOS and the project increases the volume -to -capacity (V/C) ratio by 0.03 or greater, mitigation is required to bring the intersection back to an acceptable level of service or to no -project conditions. CMP intersections in the vicinity of the LUE Amendment consist of: ■ I-405 Northbound Ramps/Jamboree Road ■ I-405 Southbound Ramps/Jamboree Road ■ MacArthur Boulevard/Jamboree Road ■ MacArthur Boulevard/Coast Highway • Newport Boulevard/Coast Highway Implementation of the LUE Amendment would not cause a CMP intersection to fall below LOS E and would not cause a cumulative increase of more than 0.03 in the V/C ratio at any CMP intersection with an established LOS standard worse than LOS E for any scenario. The LUE Amendment's contribution to trips at CMP intersections would be less than significant. Alternative Transportation Consistency Implementation of the LUE Amendment would have no impact on policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities. Development in accordance with the LUE Amendment would not result in changes to the circulation system and would not conflict with the design of pedestrian and bicycle facilities. Development of each site would have to comply with policies in the Land Use Element and Circulation Element related to alternative transportation. 5.17.2 Impacts Associated with the Proposed Project Would the project: Page 190 PlaceWorks Less Than Significant Substantial ImpactslNo Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact a) Conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and X pedestrian facilities? b) Conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b)? X Page 190 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Comments: a) Conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR Project Comparison to 2006 General Plan EIR The proposed project would comply with General Plan policies and ordinances, as well as regional programs addressing the circulation system. It would not impact transit, roadway, bicycle or pedestrian facilities. The Urban Crossroads study (in Appendix B) evaluated the project's potential impact on trip generation and intersection performance in comparison to development of the site under the 2006 General Plan land use designations. Table 12 summarizes allowed site uses for the project site that were evaluated using the Newport Beach Traffic Model (NBTM) for the 2006 General Plan traffic study in comparison to the proposed land uses for the project. Table 12 2006 General Plan U date Traffic Anal sis — Land Use Comparison to Proposed Project Less Than TAZ 1378 Total Studied 2006project Adjustment for smaller area: 62.7%1 Proposed Project Studied General Commercial Significant 91,476 171,191 107,336 Substantial General Office Impacts/No 198,198 370,913 Substantial Change in New Changes or 22,869 42,798 Change in Circum- Information New 0 0 Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible X uses (e.g., farm equipment)? d) Result in inadequate emergency access? X Comments: a) Conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR Project Comparison to 2006 General Plan EIR The proposed project would comply with General Plan policies and ordinances, as well as regional programs addressing the circulation system. It would not impact transit, roadway, bicycle or pedestrian facilities. The Urban Crossroads study (in Appendix B) evaluated the project's potential impact on trip generation and intersection performance in comparison to development of the site under the 2006 General Plan land use designations. Table 12 summarizes allowed site uses for the project site that were evaluated using the Newport Beach Traffic Model (NBTM) for the 2006 General Plan traffic study in comparison to the proposed land uses for the project. Table 12 2006 General Plan U date Traffic Anal sis — Land Use Comparison to Proposed Project TAZ 1377 TAZ 1378 Total Studied 2006project Adjustment for smaller area: 62.7%1 Proposed Project Studied General Commercial 79,715 91,476 171,191 107,336 46,4102 General Office 172,715 198,198 370,913 232,562 232,562 Industrial 19,929 22,869 42,798 26,834 18,6003 Apartments0 0 0 3294 (444 w/density bonus) 1 Proposed project area is 62.7% (16.46 acres) of TAZs 1377 and 1378 combined (26.24 acres). 2 60,926 sq. ft. converted into 329 dwelling units per Airport Area Conversion Rates (107,336 — 60,926 = 46,410). 3 Total floor area studied overestimated allowed capacity so industrial was reduced by 8,234. 4 Proposed project requests a GPA to allow 329 of the 1,650 replacement dwelling units already allowed by the general plan in the MU -H2 land use category. As shown, in comparison to the 2006 land uses analyzed for the project site, the proposed project reduces commercial and industrial building space and introduces up to 444 residential units. Table 13 compares the trip May 2020 Page 191 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis generation, including AM and PM peak hour trips and average daily trips (ADT) for the proposed project in comparison to the 2006 General Plan land uses for the site. Table 13 Project Site Trip Generation — 2006 GPA vs Proposed Pro NBTM I I AM Peak Hour PM Peak Hour Land Use Code I Quantity In Out Total In I Out I Total I Daily 2006 General Plan Update (Approved General Plan) Trip Generation Results General Commercial 10a 107.366 TSF 191 86 277 164 217 381 4,105 General Office 23a 232.562 TSF 195 60 255 91 151 242 2,577 Industrial 26 26.834 TSF 13 3 16 5 9 14 147 TOTAL 399 149 548 260 377 637 6,829 Proposed Project Trip Generation Results Apartment (High -Rise) 3c 329 DU 33 125 158 95 53 148 1,612 General Commercial 10a 46.41 TSF 83 37 120 71 94 165 1,775 General Office 23a 232.562 TSF 195 60 255 91 151 242 2,577 Industrial 26 18.6 TSF 9 2 11 3 6 9 102 TOTAL Density without Bonus 320 224 544 260 304 564 6,066 Apartment (High -Rise) I 3c 115 DU 12 44 56 33 18 51 564 TOTAL with Density Bonus 332 2681 600 2931 322 615 6,630 Difference without Density Bonus -79 75 -4 0 -73 -73 -763 Difference without Density Bonus 1 -67 119 521 33 -55 -22 -199 DU = dwelling unit TSF = thousand square feet As shown, in comparison to the 2006 GPU land uses for the project site, the proposed project would reduce daily trip generation even with full buildout of the 115 additional units under the density bonus (199 fewer daily trips than the GPU land uses). It would result in a decrease of 22 total PM peak hour trips, but increase total AM peak hour trips by 33. The projected inbound and outbound trip distribution for the proposed project is shown on Exhibits A and B, respectively, of the traffic report. The peak hour trip differences were applied to the trip distributions to develop AM and PM peak hour intersection volume changes. Exhibits showing the AM and PM peak trip difference with the proposed project (with and without the density bonus) are included in Appendix B, Exhibits C through E Intersection Capacity Utilization (ICU) changes due to the project were calculated. The performance changes at area intersections due to the proposed project are shown in Table 14. The analysis conservatively assumes that buildout of the proposed project includes all potential density bonus units (total 444 residential units). Page 192 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 14 Intersection Level of Service - 2006 GPU vs Proposed Project Intersection Approved GP Approved GP with Project DB AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour ICU LOS' ICU LOS' ICU LOS' ICU LOS' 9 MacArthur BI. & Campus Dr. 0.58 A 0.67 B 0.58 A 0.67 B 10 MacArthur BI. & Birch St. 0.53 A 0.65 B 0.54 A 0.65 B 11 Von Karman Av. & Campus Dr. 0.69 B 0.74 C 0.69 B 0.74 C 12 MacArthur BI. & Von Karman Av. 0.64 B 0.56 A 0.64 B 0.56 A 15 Campus Dr. & Bristol St. N. 0.51 A 0.75 C 0.51 A 0.75 C 16 Birch St. & Bristol St. N. 0.64 B 0.64 B 0.63 B 0.64 B 17 Campus Dr. & Bristol St. S. 0.81 D 0.59 A 0.81 D 0.59 A 18 Birch St. & Bristol St. S. 0.49 A 0.53 A 0.50 A 0.53 A 29 MacArthur BI. & Jamboree Rd.. 0.62 B 0.88 D 0.62 B 0.88 D 69 MacArthur BI. & 1-405 NB Ramps 0.68 B 0.67 B 0.68 B 0.67 B 70 MacArthur BI. & 1-405 SB Ramps 0.61 B 0.77 C 0.61 B 0.76 C 71 MacArthur BI. & Michelson Dr. 0.68 B 0.88 D 0.69 B 0.88 D LOS is a qualitative description of traffic flow based on such factors as speed, travel time, delay, and freedom to maneuver. Six levels are defined from LOS "A", representing completely free-flow conditions, to LOS "IF", representing breakdown in flow resulting in stop -and -go conditions. As shown, implementation of the proposed project would have a nominal effect on the performance of intersections surrounding the project site in comparison to the 2006 GPU land uses. The impact of the project would be less than significant, and no changes or new information require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The proposed project would comply with General Plan policies and ordinances as well as regional programs addressing the circulation system. It would not impact transit, roadway, bicycle, or pedestrian facilities given the net decrease in development compared to development anticipated in the 2014 LUE SEIR. The Urban Crossroads study in Appendix B evaluated the project's potential impact on trip generation and intersection performance in comparison to development of the site under the 2014 LUE Amendment. Table 15 summarizes allowed site uses for the project site that were evaluated using the Newport Beach Traffic Model (NBTM) for the 2014 LUE Amendment traffic study in comparison to the proposed land uses for the project. May 2020 Page 193 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis I aDle "l5 ZU14 L`Ut Amenament I raTTIC Analysis — Lana use uom arlSon to rro osea rro ect 444 DU TAZ 1377 TAZ 1378 Total Studied 2014 Adjustment for smaller project Proposed Project area: 62.7%1 Studied General Commercial 79,715 91,476 171,191 107,336 46,4102 General Office 243,262 347,115 590,377 370,166 232,5623 Industrial 19,929 22,869 42,798 26,834 18,6004 Apartments 297 147 444 N/A5 329 (444 w/density bonus) Proposed project area is 62.7% (16.46 acres) of TAZs 1377 and 1378 combined (26.24 acres). 2 60,926 sq. ft. converted into 329 dwelling units per Airport Area Conversion Rates (107,336 — 60,926 = 46,410). 3 2014 study included an increase of 238,077 square feet of office in TAZs 1377 and 1378. No increase in the allowed office development for the proposed project. 4 Total floor area studied in 2014 overestimated allowed capacity so industrial was reduced by 8,234 sq. ft. 5 All 444 dwelling units were planned to go into the same general area as the current proposed project. As shown, in comparison to the 2014 LUE Amendment land uses analyzed for the project site, the proposed project reduces commercial, office, and industrial uses on the project site and includes development of the same number of residential units. Table 16 compares the trip generation, including AM and PM peak hour trips, and ADT for the proposed project in comparison to the 2014 LUE Amendment uses for the project site. Table 16 Project Site Trip Generation - 2014 LUE Amendment vs Pro NBTM I AM Peak Hour PM Peak Hour Daily Land Use Code I Quantity' In Out I Total I In Out I Total 2014 LUE Amendment Trip Generation Results Apartment (High -Rise) 3c 444 DU 44 169 213 129 71 200 2,176 General Commercial 10a 107.336 TSF 191 86 277 164 217 381 4,105 General Office 23a 370.166 TSF 311 96 407 144 241 385 4,101 Industrial 26 26.834 TSF 13 3 16 5 9 14 147 TOTAL 1 5591 3541 9131 4421 5381 9801 10,529 Proposed Project Trip Generation Results Apartment (High -Rise) 3c 329 DU 33 125 158 95 53 148 1,612 General Commercial 10a 46.41 TSF 83 37 120 71 94 165 1,775 General Office 23a 232.562 TSF 195 60 255 91 151 242 2,577 Industrial 26 18.6 TSF 9 2 11 3 6 9 102 TOTAL Density without Bonus 320 224 544 260 304 564 6,066 Apartment (High -Rise) I 3c 115 DU 12 44 56 33 18 51 564 TOTAL with Density Bonus 332 2681 600 293 322 615 6,630 Difference without Density Bonus -239 -130 -369 -182 -234 -416 -4,463 Difference with Density Bonus 227 86 313 149 -216 -365 -3,899 DU = dwelling unit TSF = thousand square feet As shown, in comparison to the 2014 LUE Amendment land uses for the project site, the proposed project would reduce AM and PM peak hour trips and daily trip generation even with full buildout of the 115 additional units. It would decrease ADT by 3,899 trips, PM trips by 365, and AM peak trips by 313. Page 194 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis The traffic study evaluated the potential changes to intersection performance for the proposed project in comparison to the LUE Amendment. Table 17 shows the resulting ICU values and levels of service. Table 17 Intersection Level of Service - 2014 LUE Amendment vs Proposed Project Intersection LUE LUE Update with Project DB AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour ICU LOS' ICU LOS' ICU LOS' ICU LOS' 9 MacArthur BI. & Campus Dr. 0.62 B 0.70 B 0.62 B 0.70 B 10 MacArthur BI. & Birch St. 0.57 A 0.71 C 0.57 A 0.71 C 11 Von Karman AV. & Campus Dr. 0.66 B 0.74 C 0.66 B 0.73 C 12 MacArthur BI. & Von Karman Av. 0.62 B j 0.58 A 0.62 B 0.57 A 15 Campus Dr. & Bristol St. N. 0.50 A 0.73 C 0.50 A 0.73 C 16 Birch St. & Bristol St. N. 0.60 A 0.64 B 0.60 A 0.64 B 17 Campus Dr. & Bristol St. S. 0.79 C 0.59 A 0.79 C 0.59 A 18 Birch St. & Bristol St. S. 0.49 A 0.53 A 0.49 A 0.53 A 29 MacArthur BI. & Jamboree Rd.. 0.64 B 0.89 D 0.64 B 0.89 D 69 MacArthur BI. & 1-405 NB Ramps 0.69 B 0.66 B 0.69 B 0.66 B 70 MacArthur BI. & 1-405 SB Ramps 0.63 B 0.79 C 0.63 B 0.79 C 71 MacArthur BI. & Michelson Dr. 0.70 B 0.90 D 0.70 B 0.90 D LOS is a qualitative description of traffic flow based on such factors as speed, travel time, delay, and freedom to maneuver. Six levels are defined from LOS "A", representing completely free-flow conditions, to LOS T", representing breakdown in flow resulting in stop -and -go conditions. As shown, implementation of the proposed project would have a nominal effect on the performance of intersections surrounding the project site in comparison to the LUE Amendment land uses. The impact of the project would be less than significant, and no changes or new information require preparation of an EIR. b) Conflict or be inconsistent with CEQA Guidelines S 15064.3, subdivision (b)? No Impact. Project Comparison to 2006 General Plan EIR This Appendix G checklist question and the referenced CEQA Guidelines section were added to the CEQA Guidelines updates in 2018, and therefore were not addressed in the 2006 GPU EIR. The legislature found that with the adoption of the SB 375, the state had signaled its commitment to encourage land use and transportation planning decisions and investments that reduce vehicle miles traveled (VMT) and contribute to the reduction of greenhouse gas emissions, as required by the California Global Warming Solutions Act of 2006 (AB 32). Additionally, AB 1358 (Complete Streets Act) requires local governments to plan for a balanced, multimodal transportation network that meets the needs of all users. May 2020 Page 195 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis On September 27, 2013, SB 743 was signed into law and started a process that could fundamentally change transportation impact analysis as part of CEQA compliance. These changes include the elimination of auto delay, level of service (LOS), and similar measures of vehicular capacity or traffic congestion as a basis for determining significant environmental impacts. On January 20, 2016, OPR released revisions to its proposed CEQA guidelines for the implementation of SB 743, and final review and rulemaking for the new guidelines were completed in December 2018. OPR allows agencies an opt -in period to adopt the guidelines, and they become mandatory on July 1, 2020. In Citi.Zens for Positive Growth & Preservation a City of Sacramento (2019) 43 Cal.App.5th 609, 625-626, the Third District Court of Appeal refused to address the merits of a pending CEQA appeal involving the sufficiency of an EIR's LOS -based analysis of transportation -related impacts. The court found that this particular challenge was moot, in that, if the court were to find problems with the analysis and remand the matter back to the respondent city, the city would be under no obligation to undertake additional LOS -based analysis. After noting that section 15064.3 was "[t]he regulation was promulgated, in part, pursuant to section 21099 and certified by the Secretary of the Natural Resources Agency before being approved by the Office of Administrative Law on December 28, 2018," the court reasoned as follows: In mandamus proceedings like this one, "the law to be applied is that which is current at the time of judgment in the appellate court" [Citations.] Under section 21099, subdivision (b)(2), existing law is that "automobile delay, as described solely by level of service or similar measures of vehicular capacity or traffic congestion shall not be considered a significant impact on the environment" under CEQA, except for roadway capacity projects. Accordingly, the 2035 General Plan's impacts on LOS (i.e., automobile delay) cannot constitute a significant environmental impact, as Citizens argues, rendering Citizens's traffic impacts argument moot. In short, as of December 28, 2018, "automobile delay, as described solely by level of service or similar measures of vehicular capacity or traffic congestion shall not be considered a significant impact on the environment" under CEQA, except for roadway capacity projects. Thus, the former obligation under CEQA to address LOS in transportation analyses ceased to exist as of that date, except (at agencies' discretion) with respect to transportation projects. The City of Newport Beach has not implemented VMT metrics yet and currently uses the established LOS criteria. The guidelines are not yet mandatory. Therefore, no new significant impacts result from project modification or changed circumstances, and no revisions to the 2006 GPU EIR are necessary. No changes or new information would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The referenced section of the CEQA Guidelines and Appendix G checklist question were added in 2018, and therefore not addressed in the 2014 LUE Amendment SEIR. As described above, the City of Newport Beach has not implemented VMT metrics yet and currently uses the established LOS criteria. The guidelines are not yet mandatory. Therefore, no new significant impacts result from project modification or changed circumstances, and no revisions to the 2014 LUE SEIR are necessary. No changes or new information would require preparation of an EIR. Page 196 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis c) Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? No Impact. Project Comparison to 2006 General Plan EIR The project site is already developed, and the proposed development would be accessed from the existing arterials fronting the project site. The project would not introduce roadway hazards or incompatible uses. It would not increase transportation hazards in comparison to the 2006 GPU. Impacts would be less than significant. Project Comparison to 2014 LUE Amendment SEIR The proposed project site is already developed and the proposed development would be accessed from the existing arterials fronting the project site. The project would not introduce roadway hazards or incompatible uses. It would not increase transportation hazards in comparison to the 2014 LUE Amendment. Impacts would be less than significant. d) Result in inadequate emergency access? No Impact. Project Comparison to 2006 General Plan EIR The proposed project would not modify any public road or introduce features that would affect vehicular, pedestrian, or bicycle circulation in the vicinity of the site. In addition, project traffic would not result in substantial delays and congestion that would affect the circulation of emergency vehicles in the study area compared to the 2006 General Plan EIR because the project would reduce the total number of onsite trips. The proposed project would not result in new impacts in comparison to the 2006 GPU EIR. Project Comparison to 2014 LUE Amendment SEIR The proposed project would not result in inadequate emergency access and would not introduce impacts in comparison to the 2014 LUE Amendment. 5.17.3 Adopted Mitigation Measures Applicable to the Proposed Project There were no transportation/traffic mitigation measures in the 2006 GPU EIR or the 2014 LUE Amendment SEIR. 5.17.4 Relevant General Plan Policies The 2006 General Plan includes the following goals and policies from the Circulation Element that are relevant to transportation/traffic impacts of the proposed project. May 2020 Page 197 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Goal CE 1.1: An overall transportation system that facilitates the movement of people and goods within and through the City of Newport Beach and accommodates conservative growth within the City of Newport Beach, but is not expanded primarily to accommodate growth in the surrounding region. • CE 1.1.1 - Comprehensive Transportation System: Provide a diverse transportation system that provides mobility options for the community. • CE 1.1.2 - Integrated System of Multiple Modes: Provide an integrated transportation system that supports the land use plan set forth in the Land Use Element. • CE 1.1.3 - Levels of Service Related to Community Character: Establish level of service standards that reflect the character of the various unique districts and neighborhoods of Newport Beach. Goal CE 1.2: Reduced summertime visitor traffic impacts. • CE 1.2.4 - Public Transit: Support and encourage OCTA efforts to provide/fund summertime expanded bus service and/or local shuttle services to reduce visitor traffic. Goal CE 2.1: A roadway system that provides for the efficient movement of goods and people in the City of Newport Beach, while maintaining the community's character and its residents' quality of life. • CE 2.1.1- Level of Service Standards: Plan the arterial roadway system to accommodate projected traffic at the following level of service standards: a. Level of Service (LOS) "D" throughout the City, unless otherwise noted b. LOS "E" at any intersection in the Airport Area shared with Irvine c. LOS "E" at Coast Highway (E\V) and Dover Drive (NS) due to right-of-way Limitations d. LOS "E" at Marguerite Avenue (NS) and Coast Highway (EW) in the pedestrian oriented area of Corona del Mar e. LOS "B" at Goldenrod Avenue (NS) and Coast Highway (EW) in the pedestrian oriented area of in Corona del Mar • CE 2.1.2 - Street and Highway Network: Construct the circulation system described on the map entitled Newport Beach Circulation Element -Master Plan of Streets and Highways shown in Figure CE1 and Figure CE2 (cross-section). • CE 2.1.4 - Roadway Improvements: Pursue construction of intersection improvements shown on Figure CE3 or alternate improvements that achieve an acceptable level of service. Page 198 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis • CE 2.1.6 - Protection of Right -of -Way: Protect right-of-way for designated future streets and highways through all practicable means. Goal CE 2.3: Optimal roadway system operation. • CE 2.3.4 - Improvements to Reflect Changing Traffic Conditions: Based on the monitoring of traffic conditions, consider additional improvements in areas with operations issues, such as intersections with heavy turn volumes (e.g. additional turn lanes, traffic signal progression, etc.). Goal CE 5.1: Convenient trail systems that satisfy recreational desires and transportation needs. • CE 5.1.2 - Pedestrian Connectivity: Link residential areas, schools, parks, and commercial centers so that residents can travel within the community without driving. • CE 5.1.3 - Pedestrian Improvements in New Development Projects: Require new development projects to include safe and attractive sidewalks, walkways, and bike lanes in accordance with the Master Plan, and, if feasible, trails. • CE 5.1.4 - Linkages to Citywide Trail System and Neighborhoods: Require developers to construct links to the planned trail system, adjacent areas, and communities where appropriate. • CE 5.1.5 - Bikeway System: Cooperate with state, federal, county, and local agencies to coordinate bikeways and trails throughout the region. • CE 5.1.6 - Bicycle Supporting Facilities: Incorporate bicycle and pedestrian facilities in the design plans for new streets and highways and, where feasible, in the plans for improving existing roads. • CE 5.1.7 - Bicycle Safety: Provide for safety of bicyclists, equestrians, and pedestrians by adhering to current national standards and uniform practices. • CE 5.1.8 - Bicycle Conflicts with Vehicles and Pedestrians: Minimize conflict points among motorized traffic, pedestrians, and bicycle traffic. • CE 5.1.9 - Integrated Bicycle Improvements: Coordinate community bicycle and pedestrian facilities in a citywide network for continuity of travel. Goal CE 6.2: Reduced automobile travel through the use of travel demand management strategies. • CE 6.2.1 - Alternative Transportation Modes: Promote and encourage the use of alternative transportation modes, such as ridesharing, carpools, vanpools, public transit, bicycles, and walking; and provide facilities that support such alternate modes. May 2020 Page 199 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis • CE 6.2.2 Support Facilities for Alternative Modes: Require new development projects to provide facilities commensurate with development type and intensity to support alternative modes, such as preferential parking for carpools, bicycle lockers, showers, commuter information areas, rideshare vehicle loading areas, water transportation docks, and bus stop improvements. • CE 6.2.3 - Project Site Design Supporting Alternative Modes: Encourage increased use of public transportation by requiring project site designs that facilitate the use of public transportation and walking. Goal CE 8.1: Adequate funding for needed transportation infrastructure and operations. • CE 8.1.9 - Right -of -Way Dedication: Require the dedication of needed right-of-way in conjunction with approval of subdivision maps or other discretionary approvals. • CE 8.1.10 - Development Requirements: Require development to provide the needed roadway improvements adjacent to a site, commensurate with project impact and in accordance with the Master Plan of Streets and Highways. • CE 8.1.11 -joint Funding with Adjoining jurisdictions: Pursue joint funding of improvements in areas (such as the Airport Area) where traffic growth and/or needed improvements are demonstrably based upon traffic contributions or improvements that are a joint responsibility of Newport Beach and one or more adjacent jurisdictions/agencies. • CE 8.1.12 - Measure M Restrictions: Measure M sales tax revenues shall not be used to replace private developer funding that has been committed for any project or normal subdivision obligations. • CE 8.1.13 - Transportation Improvement or Special Assessment District: Establish a transportation improvement or special assessment district to fund improvements needed in the Airport Area. Page 200 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.18 TRIBAL CULTURAL RESOURCES The City of Newport Beach has a long cultural history and is known to have been home to Native American groups prior to settlement by Euro -Americans. Archaeological materials associated with occupation of the city are known to exist and have the potential to provide important scientific information regarding history and prehistory. Archaeological resources are often of cultural or religious importance to Native American groups, particularly if the resource includes human and/or animal burials. Consequently, ground -disturbing activities, particularly in areas that have not previously been developed with urban uses, have the potential to damage or destroy Native American resources that may be present on or below the ground surface. AB 52, which took effect July 1, 2015, requires analysis of tribal cultural resources (TCR) in CEQA documents. Tribal cultural resources are sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American tribe that are either included or eligible for inclusion in the California Register of Historic Resources or included in a local register of historical resources. Or the lead agency, supported by substantial evidence, chooses at its discretion to treat the resource as a tribal cultural resource. AB 52 requires consultation with tribes at an early stage to determine whether the project would have an adverse impact on TCRs. Consultation concludes when both parties have agreed on measures to mitigate or avoid a significant effect to a tribal cultural resource, or a party, after a reasonable effort in good faith, decides that mutual agreement cannot be reached. Consultation only applies to CEQA documents that require public circulation; however, the CEQA document must disclose significant impacts to TCRs and discuss feasible alternatives or mitigation that avoid or lessen the impact. Although this Addendum does not require public review and therefore does not require consultation with Native American tribes, impacts to TCRs are analyzed in this section for consistency with the updated CEQA Guidelines, adopted December 2018. 5.18.1 Summary of Impacts Identified in the Program EIRs 5.18.1.1 2006 GENERAL PLAN EIR Impacts related to tribal cultural resources were not analyzed in the 2006 GPU EIR because this analysis was not required in environmental documents until AB 52 became effective in 2015, long after the 2006 GPU EIR was certified. 5.18.1.2 2014 LUE AMENDMENT SEIR Impacts related to tribal cultural resources were not analyzed in the 2014 LUE Amendment SEIR because this analysis was not required in environmental documents until AB 52 became effective in 2015, after the 2014 LUE Amendment SEIR was certified. However, Senate Bill (SB) 18, which went into effect on March 1, 2005, required local jurisdictions to provide opportunities for involvement of California Native Americans tribes in the land planning process during this time. The City did consult with applicable tribes, pursuant to SB 18, on the 2014 LUE Amendment. The May 2020 Page 201 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Cultural Resources section of the 2014 LUE Amendment SEIR included a Sacred Lands File search from the Native American Heritage Commission (NAHC). The NAHC recommended contact with 14 Native American tribes or individuals who might have additional knowledge of the religious and cultural significance of historic properties within or immediately adjacent to the study area. Upon implementation of GPU policies, the requests of the tribes, and regulatory requirements, impacts to Native American resources were found to be less than significant. 5.18.2 Impacts Associated with the Proposed Project Would the project: Comments: Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code § 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is: Page 202 PlaceWorks Less Than Significant Impacts/No Substantial Substantial New Information Changes or New Change in Change in Showing New or Information Project Requiring Circum -stances Increased Requiring Major EIR Requiring Major Significant Preparation of Issues Revisions EIR Revisions Effects an EIR No Impact Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code § 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is: a) Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in X Public Resources Code section 5020.1(k), or b) A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code § 5024.1. In applying the criteria set forth X in subdivision (c) of Public Resource Code § 5024. 1, the lead agency shall consider the significance of the resource to a California Native American tribe. Comments: Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code § 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is: Page 202 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis a) Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k)? Less than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR The proposed project would alter land uses and intensities on the project site. The entire site, however, is previously developed, and project implementation would not result in disturbing new areas. The proposed project, similar to development pursuant to the 2006 GPU, would adhere to the GPU policies under Goals HR 2 and NR 18 in case future development requires ground -disturbing activities that may impact previously undisturbed ground. Furthermore, the proposed project, similar to development pursuant to the 2006 GPU, would comply with the City's "Archaeological Guidelines (K-5)." Although soil -disturbing activities associated with development could result in the discovery of human remains, compliance with California Health and Safety Code Section 7050.5 and Public Resources Code Section 5097.98 would ensure that significant impacts to human remains would not occur. No impact would occur in comparison to the GPU EIR, which was assessed as less than significant, and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR On October 14, 2013, the NAHC replied that there were no known Native American cultural resources within the planned land use change areas within the LUE Amendment, including the proposed project site (Saunders Property). The proposed project, similar to development pursuant to the 2014 LUE Amendment, would be required to implement the requirements of the "Archaeological Guidelines (K-5)" and policies in the 2006 GPU under Goals HR 2 and NR 18. Therefore, there would be no impact to tribal cultural resources relative to the conclusions in the 2014 LUE Amendment SEIR. b) A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code § 5024.1. In applying the criteria set forth in subdivision (c) of Public Resource Code 5 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe? Less than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to the 2006 General Plan EIR See Impact 5.17.2 (a). Project Comparison to the 2014 LUE Amendment SEIR See Impact 5.17.2 (a). May 2020 Page 203 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.18.3 Mitigation Measures Identified in the Program EIR and Applicable to the Proposed Project Therc were no mitigation measures in the 2006 GPU EIR or the 2014 LUE Amendment SEIR. 5.18.4 Relevant General Plan Policies The 2006 General Plan includes the following goals and policies that are relevant to tribal cultural resources. Goal HR 2: Identification and protection of important archeological and paleontological resources within the City. HR 2.1 - New Development Activities: Require that, in accordance with CEQA, new development protect and preserve paleontological and archaeological resources from destruction and avoid and mitigate impacts to such resources. Through planning policies and permit conditions, ensure the preservation of significant archeological and paleontological resources and require that the impact caused by any development be mitigated in accordance with CEQA. HR 2.2 - Grading and Excavation Activities: Require a qualified paleontologist/archeologist to monitor all grading and/or excavation where there is a potential to affect cultural, archeological or paleontological resources. If these resources are found, the applicant shall implement the recommendations of the paleontologist/archeologist, subject to the approval of the City Planning Department. HR 2.3 - Cultural Organizations: Notify cultural organizations, including Native American organizations, of proposed developments that have the potential to adversely impact cultural resources. Allow representatives of such groups to monitor grading and/or excavation of development sites. HR 2.4 - Paleontological or Archaeological Materials: Require new development to donate scientifically valuable paleontological or archaeological materials to a responsible public or private institution with a suitable repository, located within Newport Beach, or Orange County, whenever possible. Goal NR 18: Protection and preservation of important paleontological and archaeological resources. NR 18.1 - New Development: Require new development to protect and preserve paleontological and archaeological resources from destruction, and avoid and minimize impacts to such resources in accordance with the requirements of CEQA. Through planning policies and permit conditions, ensure the preservation of significant archeological and paleontological resources and require that the impact caused by any development be mitigated in accordance with CEQA. NR 18.3 - Potential for New Development to Impact Resources: Notify cultural organizations, including Native American organizations, of proposed developments that have the potential to adversely impact cultural resources. Allow qualified representatives of such groups to monitor grading and/or excavation of development sites. Page 204 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Require new development, where on site preservation and avoidance are not feasible, to donate scientifically valuable paleontological or archaeological materials to a responsible public or private institution with a suitable repository, located within Newport Beach or Orange County, whenever possible. May 2020 Page 205 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.19 UTILITIES AND SERVICE SYSTEMS 5.19.1 Summary of Impacts Identified in the Previous EIRs 5.19.1.1 2006 GENERAL PLAN EIR Wastewater Treatment and Collection The 2006 GPU EIR concluded that the 2006 GPU would have no impact on wastewater treatment requirements of the Regional Water Quality Control Board (RWQCB) because the City requires National Pollutant Discharge Elimination System (NPDES) permits. The permits contain limits on allowable concentrations and mass discharge of pollutants from both point and nonpoint sources. Development in accordance with the 2006 GPU would be required to comply with all provisions of the NPDES program, as enforced by RWQCB. In addition, the City's municipal code mandates dwelling units and businesses to connect to the City's public sewer and prohibits the discharge of polluting substances into public sewers. Furthermore, the NPDES Phase I and Phase II requirements regulate discharge from construction sites. Policies in the 2006 GPU also specify minimal adverse effects to water quality from sanitary sewer outflows (Policies HB 7.6, NR 4.1, NR 5.1, NR 5.3, NR 5.4). Thus, no impact to the City's wastewater treatment quality would occur. Using the City's 1996 Master Plan of Sewer's wastewater generation factors, buildout of the 2006 GPU was estimated to produce an additional 4.12 million gallons per day (mgd) of wastewater. The additional 4.12 mgd of wastewater would be distributed between Orange County Sanitation District (OCSD) Reclamation Plants Nos. 1 and 2. Reclamation Plant No. 1 was found to have a capacity of 174 mgd and treated an average flow of 90 mgd, approximately 52 percent of its design capacity. Reclamation Plant No. 2 was found to have a capacity of 276 mgd and treated an average of 153 mgd, approximately 55 percent of its design capacity. The additional 4.12 mgd from buildout of the 2006 GPU was nominal compared to the capacities of the two plants. In addition, policies within the 2006 General Plan require adequate wastewater facilities and conveyance systems to be available to the City residents through renovations, installations, and improvements when needed. Thus, impacts were determined less than significant. Lastly, according to the 2006 EIR, the City served approximately 1,200 acre-feet per year (afy) of irrigation demand using potable recycled water. Policy NR 2.1 of the 2006 General Plan encourages the use of recycled water in the City by continuing to provide financial incentives, staff assistance, and training opportunities for customers, and expanding recycled water infrastructure and programs, when feasible. Future recycled water infrastructure developments, if necessary, would require further environmental review when project -level details are known. Thus, impacts associated with the construction of new recycled water conveyance systems within the City were considered less than significant. Water Supply and Distribution The City's surface water supply comes from the City, the Mesa Consolidated Water District (MCWD), and the Irvine Ranch Water District (IRWD), which source their imported water from the Municipal Water District of Orange County (MWDOC). In addition, all three service providers use groundwater and recycled water to supplement their supply. Development in accordance with the 2006 GPU would increase water demand within Page 206 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis the City; however, the 2006 EIR concluded that impacts to existing water supply and infrastructure would be less than significant. The 2006 General Plan buildout would increase the City's water demands by approximately 998 afy; however, MWDOC, the City's imported water supplier, indicated that its 2030 projected availability of imported water supply exceeds the 2030 projected regionwide demand for imported water supply by at least 155,000 acre-feet. Thus, MWDOC would be able to meet 100 percent of the City's imported water needs through 2030. Beyond 2030, additional water transfers, local projects, conservation efforts, and State Water Project improvements may be necessary to meet Newport Beach's future demand requirements. Groundwater supplies were also identified to meet demands through 2030. Various policies in the 2006 General Plan Natural Resource Element aimed to increase the use of recycled water, provide financial incentives for reduced water use, offer alternative water resources through advance water treatment processes, and implement water conservation measures. Furthermore, the 2006 General Plan buildout would increase water demand by 270 afy in the IRWD service area. The additional water demand, however, would not change IRWD's urban water management plan (UWMP) conclusions with respect to projected water supply reliability. IRWD identified surplus water supplies under normal, single dry year, and multiple dry year scenarios for both imported and groundwater supplies. The MCWD service area would experience an increase in water demand by approximately 58.6 afy. However, Mesa indicated that they had adequate water supply sources to supply the additional demand. In addition, any new development would be subject to site-specific evaluation of existingwater system's capacity to service the development. If improvements are required, developers are required to pay its share of costs of all or portions of the needed improvements. Environmental impacts associated with these improvements would be evaluated at a project -level. Policy LU 2.8 of the 2006 General Plan also directs the City to accommodate land uses that can be adequately supported by infrastructure, including water treatment and conveyance facilities. Thus, overall impacts to the three water suppliers were found to be less than significant. Storm Drainage Systems The 2006 GPU EIR found that development would have a less than significant impact on Newport Beach's storm drainage system capacity. Buildout would generally result in infill development or redevelopment, which would not substantially alter drainage patterns because these areas are already developed with existing uses and impervious surfaces. The City's Storm Drain Master Plan was completed in 2000 and addressed drainage deficiencies. However, no upgrades were proposed as necessary with implementation of the 2006 GPU. Several GPU policies addressed stormwater. Section 15.50.160 of the City's municipal code also regulates flood hazards resulting from drainage alterations. By complying with the General Plan policies and City's municipal code, impacts to existing drainage system capacities would be less than significant. Solid Waste The 2006 EIR found that impacts on existing solid waste facilities from project -generated solid waste were less than significant. Development of the 2006 GPU would result in an additional 21,659 tons per year of solid waste to be disposed of at the Frank R. Bowerman Sanitary Landfill, which represented approximately 0.68 May 2020 Page 207 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis percent of the amount of solid waste the landfill accepts annually. Given the landfill's 16 -year lifespan and remaining capacity of approximately 44.6 million tons at the time the 2006 EIR was prepared, the increase in solid waste generated from buildout of the 2006 GPU was considered less than significant. Other Utilities The projected electrical demand for buildout under the GPU was found to be within the SCE's 2016 load forecast. Though SCE's total system demand was expected to continue to increase annually, excluding any unforeseen problems, SCE's plans for new distribution resources would be adequate to serve all existing and new customer loads throughout the coming decade. However, to reduce any potential impacts associated with buildout of the proposed GPU, SCE recommended the use of energy efficient and high-performance design for nonresidential and residential building design and construction. SCGC also indicated the natural gas level of service provided to the City would not be impaired by buildout under the GPU. 5.19.1.2 2014 LUE AMENDMENT SEIR Wastewater Treatment and Collection The 2014 LUE Amendment would result in an additional 431,340 gallons per day (gpd) of wastewater in the City's service area when compared with the buildout of the 2006 GPU buildout. According to OCSD, the growth would not necessitate new or expanded treatment facilities. Furthermore, if development under the General Plan LUE Amendment required additional sewer flow connections to the OCSD sewer lines or pump stations, then OCSD design guidelines would apply. Additionally, a sewer connection fee would be required prior to issuance of building permits, pursuant to Chapter 14.24 of the City's municipal code (Leon 2013). Developers are also required to pay for infrastructure expansions or improvements, including sewer improvements, if their projects could have a significant adverse impact on existing conditions. Therefore, impacts to the sewer system were found to be less than significant. Water Supply and Distribution The 2014 LUE Amendment SEIR found that buildout under this amendment would increase water demand within the City's service area by an additional 422 afy when compared to the 2006 GPU buildout. According to the City's 2010 UWMP, the 2035 projected availability of imported water supply from MWDOC meets the 2035 projected imported water demand. Due to its active efforts in promoting water conservation and water use efficiency to residents, the City is projecting a flattening demand trend in the next 25 years despite a projected 11 percent population growth. Projects pursuant to the 2014 LUE Amendment would comply with the requirements of the City's municipal code Chapter 14.16, Water Conservation and Supply Level Regulations, and Chapter 14.17, Water -Efficient Landscaping; the policies of the 2006 GPU; and the requirements of the 20x2020 Water Conservation Plan.5 Therefore, the City's existing and future water supply could accommodate the increased water demand 5 The 20x2020 Water Conservation Plan was issued by the California Department of Water Resources in 2010 pursuant to the Water Conservation Act of 2009 (SBX7-7), and established a statewide water conservation target of 20 percent reduction in water use by 2020 compared to the State's 2005 baseline use. Page 208 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis associated with the 2014 LUE Amendment. Furthermore, IRWD's water system was found to be sufficient and operating at a high level of service. According to IRWD's 2010 UWMP, the water supply was 100 percent reliable and able to accommodate normal years, single dry years, and multiple dry -year events, if needed. IRWD's 2035 projected availability exceeds the projected water demands by at least 51,082 afy. IRWD also indicated that there is adequate existing and planned water supply to accommodate future development and its associated water demands. Lastly, the LUE Amendment proposed only one land use designation change within the MCWD at King's Liquor Store, 1526 Placentia Avenue. All subsequent developments on the property would be required to go through a project -level environmental review by the City to determine adequate water supply to future development. Therefore, impacts to water supply and delivery systems were found to be less than significant. Storm Drainage System Implementation of the LUE Amendment would allow for development in various subareas proposed for changes in land use designation and/or development capacities. Since the City of Newport Beach is almost entirely built out, development would occur only in areas with existing storm drainage infrastructure. The Orange County Drainage Area Management Plan requires new developments to create and implement a Water Quality Management Plan (WQMP), which would ensure pollutant discharges are reduced to the maximum extent practicable and do not exceed existing storm drainage capacities. Thus, any additional stormwater runoff expected at buildout of the LUE Amendment would not exceed existing storm drainage capacities, and impacts were found to be less than significant. Solid Waste The buildout of the General Plan LUE Amendment was estimated to generate an additional 66,615 pounds of solid waste per day (approximately 12,157 tons per year) when compared to the 2006 General Plan buildout. The two landfills accepting nearly all solid waste landfilled from Newport Beach—Frank R. Bowerman Landfill and Olinda Alpha Landfill—had residual capacities of 192,300,000 and 43,900,000 cubic yards and estimated closure dates of 2053 and 2021, respectively. For a more conservative approach, if all 66,615 pounds generated per day (approximately 33.3 tons per day) from the buildout of the LUE Amendment were sent to the Frank R. Bowerman Landfill, it would represent only 0.30 percent of its maximum daily permitted tonnage. If all 12,157 tons generated per year were sent to the Olinda Alpha Landfill, it would represent only 0.42 percent of its maximum daily permitted tonnage. Thus, both landfills, individually, would be able to take in the complete amount of solid waste generated, and impacts were found to be less than significant. Other Utilities Similar to the 2006 GPU EIR, implementation of the General Plan LUE Amendment was found not to increase energy demands to exceed forecast energy supplies through 2030. Development in accordance with the 2014 LUE Amendment resulted in a net increase for electricity demand of approximately 8,026,488 kilowatt hours (KWh) per year. SCE forecast that it would have adequate electricity to meet the expected growth in its service area through 2022. Using SCE's anticipated consumption in 2022 in a high -demand consumption scenario, electricity demand was expected to be 116,637 gigawatt hours (GWh). The increase in electricity demand from the 2014 LUE Amendment would be 0.006 percent of overall demand in SCE's service area. The increase in May 2020 Page 209 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis demand would be nominal from that expected from the 2006 General Plan buildout. Therefore, no additional electricity production facilities would be needed. Furthermore, implementation of the LUE Amendment would result in a net increase for natural gas demand of 380,043 KBTU per year, approximately 1,014 cubic feet per day, in comparison to the 2006 General Plan buildout. The increase in natural gas demand from the LUE Amendment would be less than 0.0001 percent of overall demand in SCGCs' service area. Thus, the increase in demand would be nominal from that expected from the 2006 GPU buildout, and no additional natural gas facilities would be needed. 5.19.2 Impacts Associated with the Proposed Project Would the proposed project: Page 210 PlaceWorks Less Than Significant Substantial Impacts/No Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact a) Require or result in the relocation or construction of new or expanded wastewater treatment the construction or X relocation of which could cause significant environmental effects? b) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project's projected X demand in addition to the provider's existing commitments? c) Require or result in the relocation or construction of new or expanded water facilities, the construction or relocation of X which could cause significant environmental effects? d) Have sufficient water supplies available to serve the project and reasonably foreseeable future development during X normal, dry, and multiple dry years? e) Require or result in the relocation or construction of new or expanded storm water drainage facilities, the construction or X relocation of which could cause significant environmental effects? Page 210 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Comments: a) Require or result in the relocation or construction of new or expanded wastewater treatment the construction or relocation of which could cause significant environmental effects? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR The proposed project would include the redesignation of the project site from AO to MU -142, thus expanding the overall geographic area designated as MU -H2 within the Airport Area. The proposed project would include up to 297,572 square feet of nonresidential uses and up to 444 residential units. For purposes of the traffic study and analyzing potential utility impacts, the following breakdown of the nonresidential uses was assumed: 232,562 square feet of office use, 46,410 square feet of commercial use, 18,600 square feet of industrial use. In comparison to the 2006 GPU, the proposed project reduces commercial square footage and adds units to the project site but does not result in a net increase in units for the Airport Area. Using the City's wastewater generation factors from the 2010 Sewer Master Plan, the proposed project would generate 123,560 gallons per day (gpd), as shown in Table 18. The net change in wastewater generation for the project site compared to what is allowed for the site under the 2006 GPU is also shown in Table 18. It should be noted that even though the 329 units were accommodated within the airport MU -1-12 area in the 2006 GPU, these units were considered to be new for purposes of this analysis to provide a conservative estimate of impacts. May 2020 Page 211 Less Than Significant Substantial Impacts/No Substantial Change in New Changes or Change in Circum- Information New Project stances Showing New Information Requiring Requiring or Increased Requiring Major EIR Major EIR Significant Preparation of Environmental Issues Revisions Revisions Effects an EIR No Impact f) Generate solid waste in excess of state or local standards, or in excess of the capacity of local infrastructure, or otherwise impair X the attainment of solid waste reduction goals? g) Comply with federal, state, and local management and reduction statutes and X regulations related to solid waste? h) Require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or X telecommunications facilities, the construction or relocation of which could cause significant environmental effects? Comments: a) Require or result in the relocation or construction of new or expanded wastewater treatment the construction or relocation of which could cause significant environmental effects? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR The proposed project would include the redesignation of the project site from AO to MU -142, thus expanding the overall geographic area designated as MU -H2 within the Airport Area. The proposed project would include up to 297,572 square feet of nonresidential uses and up to 444 residential units. For purposes of the traffic study and analyzing potential utility impacts, the following breakdown of the nonresidential uses was assumed: 232,562 square feet of office use, 46,410 square feet of commercial use, 18,600 square feet of industrial use. In comparison to the 2006 GPU, the proposed project reduces commercial square footage and adds units to the project site but does not result in a net increase in units for the Airport Area. Using the City's wastewater generation factors from the 2010 Sewer Master Plan, the proposed project would generate 123,560 gallons per day (gpd), as shown in Table 18. The net change in wastewater generation for the project site compared to what is allowed for the site under the 2006 GPU is also shown in Table 18. It should be noted that even though the 329 units were accommodated within the airport MU -1-12 area in the 2006 GPU, these units were considered to be new for purposes of this analysis to provide a conservative estimate of impacts. May 2020 Page 211 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 18 Net Increase in Wastewater Generation Source: Uty Or Newport [teach Jewer master Flan, August Zulu. 1 The 2010 Sewer Master Plan does not have a wastewater generation factor for Office land use; therefore, a conservative generation factor of 2,500 gpd/ac, currently used for Commercial, Industrial, Public Facilities, and Private Institutions, is used for Office. A single wastewater generation rate is used for the office, commercial, and industrial uses proposed for the project. ac — acres SF — square feet du — dwelling unit gpd — gallons per day Wastewater collected by the City would be treated at OCSD's two reclamation plants, with a small portion of wastewater treated at IRWD's treatment plant. Reclamation Plant No. 1 has a capacity of 208 mgd and an estimated average daily influent of 120 mgd. Reclamation Plant No. 2 has a capacity of 168 mgd and an estimated average daily influent of 65 mgd (C)CSD 2018). Collectively, the two plants have a residual capacity of 191 mgd. Given that the proposed project would generate an additional 103,060 gpd (0.10 mgd) of wastewater, this increase is nominal compared to the combined residual capacity of both treatment plants. Thus, existing wastewater treatment facilities would accommodate the project -generated wastewater and continue maintaining a substantial amount of remaining capacity for future wastewater treatment. Furthermore, if development under the proposed project requires new sewer flow connections through OCSD, all connections are required to comply with current OCSD design guidelines and pay a sewer connection fee. Thus, impacts would be less than significant and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The 2014 LUE Amendment allocated 596,575 square feet of office uses and 444 dwelling units to the proposed project site. Compared to the 2014 LUE Amendment, the proposed project would reduce nonresidential space and maintain the number of residential dwelling units allowed for the project site (although reduce overall residential uses within the Airport Area). The wastewater generation rate for office uses is equivalent to other non-residential uses (i.e., commercial and industrial) (see Table 18); therefore, the wastewater generation factor used for office in the 2014 LUE Amendment would be the same generation factor that would apply to the project's non-residential uses. Thus, the proposed project would generate less wastewater and would reduce wastewater -related impacts in comparison to the 2014 LUE Amendment. Page 212 PlaceWorks Projected Projected Wastewater Wastewater Generation Wastewater Generation Wastewater For the 2006 Total Buildout Generation For the Proposed Total Buildout Generation GPU Net Increase Land Use Proposed Project Factor Project (gpd) 2006 GPU Factor (gpd) (gpd) Residential - Single and 444 du 240 gpd/du 106,560 0 240 0 106,560 Multifamily gpd/du 6.8 ac 500 2,/ac' 8.2 ac 2,500 Office/commercial/industrial (297,572 SF) gpd 17,000 (358,572 SF) gpd/ace 20,500 (3,500) Total - 123,560 - - 20,500 1 103,060 Source: Uty Or Newport [teach Jewer master Flan, August Zulu. 1 The 2010 Sewer Master Plan does not have a wastewater generation factor for Office land use; therefore, a conservative generation factor of 2,500 gpd/ac, currently used for Commercial, Industrial, Public Facilities, and Private Institutions, is used for Office. A single wastewater generation rate is used for the office, commercial, and industrial uses proposed for the project. ac — acres SF — square feet du — dwelling unit gpd — gallons per day Wastewater collected by the City would be treated at OCSD's two reclamation plants, with a small portion of wastewater treated at IRWD's treatment plant. Reclamation Plant No. 1 has a capacity of 208 mgd and an estimated average daily influent of 120 mgd. Reclamation Plant No. 2 has a capacity of 168 mgd and an estimated average daily influent of 65 mgd (C)CSD 2018). Collectively, the two plants have a residual capacity of 191 mgd. Given that the proposed project would generate an additional 103,060 gpd (0.10 mgd) of wastewater, this increase is nominal compared to the combined residual capacity of both treatment plants. Thus, existing wastewater treatment facilities would accommodate the project -generated wastewater and continue maintaining a substantial amount of remaining capacity for future wastewater treatment. Furthermore, if development under the proposed project requires new sewer flow connections through OCSD, all connections are required to comply with current OCSD design guidelines and pay a sewer connection fee. Thus, impacts would be less than significant and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The 2014 LUE Amendment allocated 596,575 square feet of office uses and 444 dwelling units to the proposed project site. Compared to the 2014 LUE Amendment, the proposed project would reduce nonresidential space and maintain the number of residential dwelling units allowed for the project site (although reduce overall residential uses within the Airport Area). The wastewater generation rate for office uses is equivalent to other non-residential uses (i.e., commercial and industrial) (see Table 18); therefore, the wastewater generation factor used for office in the 2014 LUE Amendment would be the same generation factor that would apply to the project's non-residential uses. Thus, the proposed project would generate less wastewater and would reduce wastewater -related impacts in comparison to the 2014 LUE Amendment. Page 212 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis b) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project's projected demand in addition to the provider's existing commitments? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR As mentioned above, implementation of the proposed project would not result in an increase in wastewater that cannot be accommodated by OCSD's treatment plants. Furthermore, the City requires NPDES permits, which set limits on allowable concentrations in any wastewater discharge. The City's municipal code also requires dwelling units and commercial uses to connect to the City's public sewer network and prohibits certain polluting substances from being discharged into a public sewer. The proposed project, similar to development in accordance with the 2006 GPU, would be required to comply with all provisions of the NPDES program and the municipal code and would not exceed wastewater treatment requirements. Therefore, impacts would be less than significant and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Implementation of the proposed project would generate less wastewater than the buildout proposed for the project site under the 2014 LUE Amendment. Furthermore, both the proposed project and development pursuant to the 2014 LUE Amendment would need to comply with the requirements of the NPDES permit and the City's municipal code and would not exceed the wastewater treatment requirements of the RWQCB. Thus, impacts would be less than significant. c) Require or result in the relocation or construction of new or expanded water facilities, the construction or relocation of which could cause significant environmental effects? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR Buildout of the proposed project is estimated to generate a water demand of approximately 211,084 gpd, or 236 afy (see Table 19). Residential water demand calculations are based on 202 gallons per capita per day (gpcd), which is the City's target goal for year 2020 (Arcadis 2018). The number of persons expected to reside in each residential unit is 2.22 persons, which is the average cited by the Department of Finance for Newport Beach for 2019 (DOF 2020). Table 19 shows the net change in water demand for the project site compared to what is allowed for the site under the 2006 GPU. As shown, the net increase in water demand is 195,672 gpd (219 afy). It should be noted that even though the 329 units (or 444 units with density bonus) were accommodated within the airport MU - H2 area in the 2006 GPU, these units were assumed to be new for purposes of this analysis to provide a conservative approach. May 2020 Page 213 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Table 19 Net Increase in Water Demand Source: Arcadis, August 2019. SF — square feet du — dwelling unit ac -acres gpd — gallons per day gpcd — gallons per capita per day gpad — gallons per acre per day The proposed project is within the City of Newport Beach's water service area. According to the City's 2015 UWMP, the 2040 projected availability of water supply meets the 2040 projected water demand for its residents during normal years, single dry years, and multiple dry -year events. The 2040 projected water demand for normal years is 16,973 afy. The 195,672 gpd (219 acre-feet/year) net increase for the project site water demand equates to 1.3 percent of the total water demand for the City. Since the residential units for the project, however, are already allocated within the Airport Area, placing the units on the project site would not increase water demand relative to another location within the Airport Area. The net, citywide water demand for the project, therefore, would be due to the reduction in non-residential square footage, resulting in a decrease of 3,500 gpd (3.9 afy). Therefore, the City's existing and future water supply is able to accommodate the increased water demand associated with the proposed project. Additionally, if development of the proposed project requires improvements to the existing water system capacity, the developer would be required to pay their share of costs for all or portions of the needed improvements. Thus, overall impacts to the water supply are less than significant. Overall, buildout of the proposed project is not anticipated to result in new or increase the severity of impacts to the water service. Therefore impacts are less than significant and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Compared to the 2014 LUE Amendment SEIR, the proposed project would reduce nonresidential space and result in the same number of residential dwelling units allowed for the project site. Thus, the proposed project would reduce water demand, and impacts would be less than significant. Page 214 PlaceWorks Projected Water Projected Water Total Buildout Demand Demand Proposed Water For the Proposed Total Buildout Water Demand For the 2006 GPU Net Increase Land Use Project Demand Factor Project d 2006 GPU Factor d d Residential - 986 persons Single and (444 du) 202 gpcd 199,172 0 202 gpcd 0 199,172 Multifamily 5.3 ac 5.3 ac Office (232,562 SF) 1,757 gpad 9,312 (232,562 SF) 1,757 gpad 9,312 0 Commercial a 2,200 gpad 2,200 2.5 ac 2,200 gpad 5,500 (3,300) (46,1 SF) (107,336 SF) Industrial 0.4 ac 1,000 gpad 400 0.6 ac 1,000 gpad 600 (200) (18, SF) (26 834 SF) Total 211,084 15,412 195,672 Source: Arcadis, August 2019. SF — square feet du — dwelling unit ac -acres gpd — gallons per day gpcd — gallons per capita per day gpad — gallons per acre per day The proposed project is within the City of Newport Beach's water service area. According to the City's 2015 UWMP, the 2040 projected availability of water supply meets the 2040 projected water demand for its residents during normal years, single dry years, and multiple dry -year events. The 2040 projected water demand for normal years is 16,973 afy. The 195,672 gpd (219 acre-feet/year) net increase for the project site water demand equates to 1.3 percent of the total water demand for the City. Since the residential units for the project, however, are already allocated within the Airport Area, placing the units on the project site would not increase water demand relative to another location within the Airport Area. The net, citywide water demand for the project, therefore, would be due to the reduction in non-residential square footage, resulting in a decrease of 3,500 gpd (3.9 afy). Therefore, the City's existing and future water supply is able to accommodate the increased water demand associated with the proposed project. Additionally, if development of the proposed project requires improvements to the existing water system capacity, the developer would be required to pay their share of costs for all or portions of the needed improvements. Thus, overall impacts to the water supply are less than significant. Overall, buildout of the proposed project is not anticipated to result in new or increase the severity of impacts to the water service. Therefore impacts are less than significant and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Compared to the 2014 LUE Amendment SEIR, the proposed project would reduce nonresidential space and result in the same number of residential dwelling units allowed for the project site. Thus, the proposed project would reduce water demand, and impacts would be less than significant. Page 214 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis d) Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry, and multiple dry years? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR As detailed above, the proposed project would generate an increase in water demand of 55.6 afy for the project site, but a net 3.9 afy decrease in water demand compared to the city-wide 2006 GPU buildout. The City's 2015 UWMP found that water supplies are sufficient to meet the 2040 projected water demand for its residents during normal years, single dry years, and multiple dry -year events. Therefore, the City's existing and future water supply is able to accommodate the increased water demand associated with the proposed project. Impacts are less than significant, and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Implementation of the proposed project would require less water supply than the buildout proposed for the project site under the 2014 LUE Amendment. Since the City has sufficient water supply for the future water demand and can accommodate the 2014 LUE Amendment, water supplies would also be able to accommodate the proposed project and impacts would be less than significant. e) Require or result in the relocation or construction of new or expanded storm water drainage facilities, the construction or relocation of which could cause significant environmental effects? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR Development of the proposed project would alter the on-site drainage patterns with the development of the buildings, roadways, and associated site improvements. However, the proposed project, similar to other projects developed pursuant to the 2006 General Plan, would be required to implement a WQMP. The WQMP would reduce discharge of stormwater into urban runoff from the operational phase by managing site runoff volumes and flow rates through application of appropriate best management practices. BMWs would be designed in accordance with the NPDES requirements. Any drainage facilities would also be designed in accordance with Section 19.28.080 of the City's municipal code. Thus, stormwater runoff expected at buildout of the proposed project would not exceed existing storm drainage capacities. Impacts would be less than significant, and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR Both the implementation of projects pursuant to the 2014 LUE Amendment and the proposed project would implement WQMPs to manage post -construction runoff. The goal of the WQMP is to ensure that new development and significant redevelopment does not contribute to increased urban runoff flow rates and velocities to the maximum extent practicable. Furthermore, any new drainage facilities would be designed pursuant to the requirements of the City's municipal code, and impacts would be less than significant. May 2020 Page 215 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis f) Generate solid waste in excess of state or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR Buildout of the proposed project is estimated to generate approximately 26,740 pounds of solid waste per day, shown in Table 20, which also shows the net change in solid waste generation for the project site. Buildout of the proposed project is estimated to generate a net increase of approximately 4,119 pounds per day (2.05 tons/day) of solid waste compared to the 2006 GPU buildout. It should be noted that even though the 329 units (444 with density bonus) were accommodated within the airport MU -H2 area in the 2006 GPU, these units are considered new for purposes of this analysis for a conservative estimate of impacts. The Frank R. Bowerman Landfill and Olinda Alpha Landfill have residual capacities of 3,600 tons/day and 867 tons/day and estimated closure dates of 2053 and 2021, respectively (CalRecycle 2019c, 2019d). Thus, both landfills, individually, would be able to take in the complete amount of additional solid waste generated by the proposed project. Furthermore, the proposed project, similar to other projects developed pursuant to the 2006 General Plan, would comply with the California Green Building Standards, Assembly Bill (AB) 341, and AB 1826. The 2019 California Green Building Standards Code requires that at least 65 percent of the nonhazardous construction and demolition waste from nonresidential construction operations be recycled and/or salvaged for reuse. AB 341 mandates a statewide solid waste diversion rate of 75 percent by 2020. AB 1826 requires businesses to recycle their organic waste on and after April 1, 2016, depending on the amount of waste they generate per week. Therefore, impacts would be less than significant, and there are no changes or new significant information that would require preparation of an EIR. Table 20 Net Increase in Solid Waste Generation Source: CalRecyle 2019a. SF — square feet du — dwelling unit lbs - pounds Page 216 PlaceWorks Projected Solid Waste Projected Solid Generation Waste for the Generation Total Buildout Proposed For the 2006 Net Proposed Solid Waste Project Total Buildout Solid Waste GPU Increase Land Use Project Generation Factor (lbs/day) 2006 GPU Generation Factor (Ibslday) (lbs/day) Residential - Single 444 du 12.23 5,430 0 12.23 0 5,430 and Multifamily lbs/household/day lbs/household/day Office 232,562 SF 0.084 lbs/SF/day 19,535 232,562 SF 0.084 lbs/SF/day 19,535 0 Commercial 46,410 SF 0.013 lbs/SF/day 603 107,336 SF 0.013 lbs/SF/day 1,395 (792) Industrial 18,600 SF 0.063 lbs/SF/day 1,172 26,834 SF 0.063 lbs/SF/day 1,691 (519) Total - 1 1 26,740 1 - 22,621 4,119 Source: CalRecyle 2019a. SF — square feet du — dwelling unit lbs - pounds Page 216 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Project Comparison to 2014 LUE Amendment SEIR Implementation of the proposed project would generate less solid waste than the buildout proposed for the project site under the 2014 LUE Amendment. Since the Frank R. Bowerman Sanitary Landfill can accommodate the 2014 LUE Amendment, the landfill can also accommodate the proposed project. Additionally, the proposed project, similar to other projects developed pursuant to the 2014 LUE Amendment, would comply with the California Green Building Standards, AB 341, and AB 1826. Therefore, impacts would be less than significant, and there are no changes or new significant information that would require preparation of an EIR. g) Comply with federal, state, and local management and reduction statutes and regulations related to solid waste? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR AB 939, the Integrated Waste Management Act of 1989 (California Public Resources Code §§ 40000 et seq.) requires all local governments to develop source reduction, reuse, recycling, and composting programs to reduce tonnage of solid waste going to landfills. Cities must divert at least 50 percent of their solid waste generation into recycling. Compliance with AB 939 is measured for each jurisdiction, in part, as actual disposal amounts compared to target disposal amounts. Target disposal rates for the City are 9.6 pounds per day (ppd) per resident and 11.5 ppd per employee. Actual disposal rates in 2018 were 6.9 ppd per resident and 7.4 ppd per employee (CalRecycle 2019b). Thus, solid waste diversion in Newport Beach is consistent with AB 939 and the project's solid waste generation would be consistent with AB 939. AB 1327, the California Solid Waste Reuse and Recycling Access Act of 1991 (California Public Resources Code §§ 42900 et seq.) required the California Integrated Waste Management Board to develop a model ordinance requiring adequate areas for the collection and loading of recyclable materials in development projects. Local agencies were then required to adopt and enforce either the model ordinance or an ordinance of their own by September 1, 1993. The City's municipal code includes waste recycling requirements in conformance with AB 1327. Therefore, the project's solid waste generation would be consistent with AB 1327. Furthermore, the proposed project, similar to all projects pursuant to the 2006 GPU, is required to recycle construction waste in compliance with the 2019 California Green Building Code, store and collect recyclable materials in compliance with AB 341 and handle green waste in accordance with AB 1826. Overall, impacts would be less than significant and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR As mentioned above, the proposed project, similar to projects pursuant to the 2014 LUE Amendment, would be in compliance with federal, state, and local management and reduction statutes and regulations and impacts would be less than significant. May 2020 Page 217 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis h) Require or result in the relocation or construction of new or expanded electric power or natural gas facilities, the construction or relocation of which could cause significant environmental effects? Less Than Significant Impacts/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR Buildout of the proposed project is expected to use approximately 5.9 million kilowatt hours (kWhr) of electricity per year (see Table 21). When compared to the buildout allocated for the project site in the 2006 GPU, development on the project site would result in an increase of approximately 1.1 million kWhr per year in electricity use. It should be noted that even though the 329 units (444 units with density bonus) were accommodated within the airport MU -H2 area in the 2006 GPU, these units were considered new for purposes of this analysis to provide a conservative approach. Total mid -electricity consumption in SCE's service area is forecast to increase by approximately 12,723 GWh between 2015 and 2027. SCE forecasts that it will have sufficient electricity supplies to meet demands in its service area, and impacts would be less than significant (CEC 2018). Table 21 Annual Net Increase in Electricity Use — Project Site Source: CaIEEMod 2016. Climate Zone 8 was used for Newport Beach ZIP Code 92660. The electricity use factors for T24 Electricity, NT24 Electricity, and Lighting Electricity were summed up. Since the buildings would be new construction, nonhistorical factors were used. For the dwelling units, the factors for high-rise apartments were used. SF — square feet du — dwelling unit kWh — kilowatt hours For natural gas, the proposed project is estimated to use about 9.0 million kilo British Thermal Units (kBTU) annually (see Table 22). When compared to the buildout allocated for the project site in the 2006 GPU, the project site would generate about an additional 5.9 million kBTU annually. SCGC's residual supplies were forecast to remain constant at 3,775 MMCF/day from 2020 through 2035. Total natural gas consumption in SCGC's service area is forecast to decline slightly from 2,591 MMCF/day in 2019 Page 218 PlaceWorks Projected Electricity Use Projected for the Electricity Use Proposed For the 2006 Total Buildout Electricity Project Total Buildout GPU Net Increase Land Use Proposed Project Use Factor kWhr) ear 2006 GPU Electricity Use Factor kWhr) ear kWhr) ear Residential - Single and 444 du 4,230 kWhr/du 1,878,120 0 4,230 kWhr/du 0 1,878,120 Multifamily Office 232,562 SF 14.34 kWh r/S F 3,334,939 232,562 SF 14.34 kWhr/SF 3,334,939 0 Commercial 46,410 SF 11.72 kWhr/SF 543,925 107,336 SF 11.72 kWhr/SF 1,257,978 (714,053) Industrial 18,600 SF 8.62 kWhr/SF 160,332 26,834 SF 8.62 kWhr/SF 231,309 (70,977) Total - 5,917,316 - 4,824,226 1,093,090 Source: CaIEEMod 2016. Climate Zone 8 was used for Newport Beach ZIP Code 92660. The electricity use factors for T24 Electricity, NT24 Electricity, and Lighting Electricity were summed up. Since the buildings would be new construction, nonhistorical factors were used. For the dwelling units, the factors for high-rise apartments were used. SF — square feet du — dwelling unit kWh — kilowatt hours For natural gas, the proposed project is estimated to use about 9.0 million kilo British Thermal Units (kBTU) annually (see Table 22). When compared to the buildout allocated for the project site in the 2006 GPU, the project site would generate about an additional 5.9 million kBTU annually. SCGC's residual supplies were forecast to remain constant at 3,775 MMCF/day from 2020 through 2035. Total natural gas consumption in SCGC's service area is forecast to decline slightly from 2,591 MMCF/day in 2019 Page 218 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis to 2,313 MMCF/day in 2035. SCGC forecasts that it will have sufficient natural gas supplies to meet gas demands, and the proposed project would not require SCGC to obtain new or expanded gas supplies. Impacts would be less than significant (CGEU 2018). Table 22 Annual Net Increase in Natural Gas Use Source: CaIEEMod 2016. Climate Zone 8 was used for Newport Beach ZIP Code 92660. The electricity use factors for T24 Natural Gas, and NT24 Natural Gas were summed up. Since the buildings would be new construction, non -historical factors were used. For the dwelling units, the factors for high-rise apartments were used. For the office land use, factors for general office building were used. For industrial land use, factors for general light industrial were used. For commercial land use, factors for a strip mall were used. SF — square feet du — dwelling unit kBTU — kilo British thermal units Furthermore, the proposed project would comply with the requirements of the current California Building Energy and Efficiency Standards (Title 24, Part 6) and the California Green Building Standards Code (CALGreen). All new appliances would comply with the 2012 Appliance Efficiency Regulations (Title 20, CCR Sections 1601 through 1608). Therefore, impacts would be less than significant and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The land uses accommodated under the proposed project would be within and less than the development capacity considered for the project site as analyzed in the 2014 LUE Amendment. Therefore, the proposed project would not result in the relocation or construction of new or expanded electric power or natural gas facilities. Furthermore, the proposed project would comply with the electricity and natural gas efficiency requirements as mentioned above and impacts would be less than significant. There are no changes or new significant information that would require preparation of an EIR. 5.19.3 Adopted Mitigation Measures Applicable to the Proposed Project There were no mitigation measures in the 2006 GPU EIR or the 2014 LUE Amendment SEIR.. May 2020 Page 219 Projected Natural Gas Use Projected forthe Natural Gas Use Total Buildout Proposed For the 20067ke Proposed Natural Gas Use Project Total Buildout Natural Gas Use GPU Land Use Project Factor' kBTUI ear 2006 GPU Factor kBTUI ear Residential - Single and 444 du 14,046 kBTU/du 6,236,424 0 14,046 kBTU/du 0 6,236,424 Multifamily Office 232,562 SF 10 kBTU/SF 2,325,620 232,562 SF 10 kBTU/SF 2,325,620 0 Commercial 46,410 SF 2 kBTU/SF 92,820 107,336 SF 2 kBTU/SF 214,672 (121,852) Industrial 18,600 SF 21 kBTU/SF 390,600 26,834 SF 21 kBTU/SF 563,514 (172,914) Total 9,045,464 - 3,103,806 5,941,658 Source: CaIEEMod 2016. Climate Zone 8 was used for Newport Beach ZIP Code 92660. The electricity use factors for T24 Natural Gas, and NT24 Natural Gas were summed up. Since the buildings would be new construction, non -historical factors were used. For the dwelling units, the factors for high-rise apartments were used. For the office land use, factors for general office building were used. For industrial land use, factors for general light industrial were used. For commercial land use, factors for a strip mall were used. SF — square feet du — dwelling unit kBTU — kilo British thermal units Furthermore, the proposed project would comply with the requirements of the current California Building Energy and Efficiency Standards (Title 24, Part 6) and the California Green Building Standards Code (CALGreen). All new appliances would comply with the 2012 Appliance Efficiency Regulations (Title 20, CCR Sections 1601 through 1608). Therefore, impacts would be less than significant and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The land uses accommodated under the proposed project would be within and less than the development capacity considered for the project site as analyzed in the 2014 LUE Amendment. Therefore, the proposed project would not result in the relocation or construction of new or expanded electric power or natural gas facilities. Furthermore, the proposed project would comply with the electricity and natural gas efficiency requirements as mentioned above and impacts would be less than significant. There are no changes or new significant information that would require preparation of an EIR. 5.19.3 Adopted Mitigation Measures Applicable to the Proposed Project There were no mitigation measures in the 2006 GPU EIR or the 2014 LUE Amendment SEIR.. May 2020 Page 219 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.19.4 Relevant General Plan Policies The General Plan includes several policies that would reduce impacts to utilities and service systems associated with future development projects in the City, including: Goal HB 8: Enhancement and protection of water quality of all natural water bodies, including coastal waters, creeks, bays, harbors and wetlands. ■ HB 8.4 - Storm Drain Sewer System Permit: Require all development to comply with the regulations under the City's municipal separate storm sewer system permit under the National Pollutant Discharge Elimination System. ■ HB 8.9 - Water Quality Management Plan: Require new development applications to include a Water Quality Management Plan (WQMP) to minimize runoff from rainfall events during construction and post - construction. ■ HB 8.11 - Site Design and Source Control: Include site design and source control BMPs in all developments. When the combination of site design and source control BMPs are not sufficient to protect water quality as required by the National Pollutant Elimination System, structural treatment BMPs will be implemented along with site design and source control measures. ■ HB 8.14 - Runoff Reduction on Private Property: Retain runoff on private property to prevent the transport of pollutants into recreational waters, to the maximum extent practicable. ■ HB 8.20 - Impervious Surfaces: Require new development and public improvements to minimize the creation of and increases in impervious surfaces, especially directly connected impervious areas, to the maximum extent practicable. Require redevelopment to increase area of pervious surfaces, where feasible. Goal NR 1: Minimized water consumption through conservation methods and other techniques. ■ NR 1.1 - Water Conservation in New Development: Enforce water conservation measures that limit water usage, prohibit activities that waste water or cause runoff, and require the use of water—efficient landscaping and irrigation in conjunction with new construction projects. Page 220 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis 5.20 WILDFIRE 5.20.1 Summary of Impacts Identified in the Program EIRs 5.20.1.1 2006 GENERAL PLAN EIR Impacts related to wildfire were not analyzed in the 2006 GPU EIR because the requirement to analyze wildfire in CEQA documents did not become effective until January 1, 2019, after of the 2006 GPU EIR by the Newport Beach City Council Quly 25, 2006). However, the 2006 General Plan identified areas with high and moderate fire susceptibility (Figure S4, Wildfire Hazards). Nonetheless„ the analysis of wildfire impacts is new in this Addendum. 5.20.1.2 2014 LUE AMENDMENT SEIR The 2015 LUE Amendment SEIR did not analyze impacts related to wildfire. The requirement to analyze wildfire in environmental documents came into effect on January 1, 2019, after the SEIR certification date Quly 22, 2014). 5.20.2 Impacts Associated with the Proposed Project Would the project: May 2020 Page 221 Less Than Significant Impacts/No Substantial Substantial New Information Changes or New Change in Change in Showing New or Information Project Requiring Circum -stances Increased Requiring Major EIR Requiring Major Significant Preparation of Issues Revisions EIR Revisions Effects an EIR No Impact a) Substantially impair an adopted emergency response plan or emergency evacuation plan? X b) Due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to pollutant concentrations from a wildfire X or the uncontrolled spread of a wildfire? c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may X result in temporary or ongoing impacts to the environment? d) Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post -fire slope X instability, or drainage changes? May 2020 Page 221 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Comments: According to Appendix G of the CEQA Guidelines, a project would normally have a significant effect on the environment if located in or near state responsibility areas or lands classified as very high fire hazard severity zones. Wildland fire protection in California is the responsibility of the state, local, and federal governments. In state responsibility areas (SRA), the State of California has the primary financial responsibility for the prevention and suppression of wildland fires. SRAs cover over 31 million acres, for which the State Department of Forestry and Fire Protection (CAL FIRE) provides a basic level of wildland fire prevention and protection services. Fire protection for local responsibility areas (LRA) is typically provided by city fire departments, fire protection districts, counties, and by CAL FIRE under contract to local government (CAL FIRE 2012). CAL FIRE is mandated by California Public Resources Code Sections 4201 to 4204 and California Government Code Sections 51175 to 51189 to identify fire hazard severity zones (FHSZ) for all communities in California. Local governments accept CAL FIRE's determination or make other, local determinations. If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would the project: a) Substantially impair an adopted emergency response plan or emergency evacuation plan? No Impact. Project Comparison to 2006 General Plan EIR The City of Newport Beach is nearly built out, and the proposed project consists mainly of infill and intensification of development on the project site. New development would occur in urbanized and developed areas far from the City's eastern grassy hillsides and brush -covered areas, which are more susceptible to wildfire. The project site is not within areas designated as High or Moderate fire susceptibility per the 2006 General Plan (Figure S4, Wildfire Hazards). Therefore, there are no impacts and no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The project site is not in or near state responsibility areas or lands classified as a very high FHSZ. Therefore, there are no impacts. b) Due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire? No Impact Page 222 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Project Comparison to 2006 General Plan EIR The project site is not located in or near state responsibility areas or lands classified as very high FHSZ. Therefore, the proposed project would not exacerbate wildfire risks and thereby expose project occupants to pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire. No impacts would arise and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The project site is not within areas designated as High or Moderate fire susceptibility per the 2006 General Plan (Figure S4, Wildfire Hazards). Therefore, there are no impacts. c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment? No Impact. Project Comparison to 2006 General Plan EIR The project site is not located in or near state responsibility areas or lands classified as very high FHSZ. Therefore, the proposed project would not require the installation or maintenance of associated infrastructure that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment. No impacts would arise and there are no changes or new significant information that would require preparation of an EIR. Project Comparison to 2014 LUE Amendment SEIR The proposed project would not require the installation or maintenance of associated infrastructure that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment. Therefore, no impacts would arise. d) Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post -fire slope instability, or drainage changes? No Impact/No Changes or New Information Requiring Preparation of an EIR. Project Comparison to 2006 General Plan EIR The project site is not within areas designated as High or Moderate fire susceptibility per the 2006 General Plan (Figure S4, Wildfire Hazards). Therefore, the proposed project would not expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post -fire slope instability, or drainage changes. No impacts would arise and there are no changes or new significant information that would require preparation of an EIR. May 2020 Page 223 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 5. Environmental Analysis Project Comparison to the 2014 LUE Amendment SEIR As noted above, the proposed project would not expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post -fire slope instability, or drainage changes. Therefore, no impacts would arise. 5.20.3 Mitigation Measures Identified in the Program EIR and Applicable to the Proposed Project There were no mitigation measures in the 2006 GPU EIR or the 2014 LUE Amendment SEIR. 5.20.4 Relevant General Plan Policies The 2006 General Plan does not include any wildfire goals or policies that are relevant to the proposed project. Page 224 PlaceWorks 6. Summary This document is Addendum No. 3 to the previously — certified City of Newport Beach General Plan EIR and Addendum No. 1 to the previously certified General Plan Land Use Element Amendment Final Supplemental EIR, May 2014. As such, this Addendum analyzes the potential differences between the environmental impacts identified in each of the previous Program EIRs and the impacts anticipated for the proposed project (Airport Village PCDP). CEQA Guidelines Section 15168(a) states that a Program EIR is appropriate for a series of actions that can be characterized as one large project and are related either: 1. Geographically, 2. A logical part in the chain of contemplated actions, 3. In connection with issuance of rules, regulations, plans, or other general criteria to govern the conduct of a continuing program, or 4. As individual activities carried out under the same authorizing or statutory or regulatory authority and having generally similar environmental effects which can be mitigated in similar ways. CEQA Guidelines Section 15168(c) states that subsequent activities undertaken pursuant to a Program EIR must be examined in the light of the Program EIR to determine whether an additional environmental document must be prepared. Pursuant to CEQA Guidelines Section 15168(c)(4), Where the subsequent activities involve site specific operations, the agency should use a written checklist or similar device to document the evaluation of the site and the activity to determine whether the environmental effects of the operation were covered in the Program EIR." This EIR Addendum provides the environmental information necessary for the City to make an informed decision about the proposed project, as more fully described in Section 3, Project Description. The City has determined that an Addendum to the above -referenced Program EIRs is appropriate, rather than a Supplement or Subsequent EIR, based on the following: a. As demonstrated in Section 5, Environmental Analysis, the proposed project would not require major revisions to the previously -certified EIRs because the project would not result in any new significant impacts to the physical environment nor would it create substantial increases in the severity of the environmental impacts previously disclosed in the respective programmatic EIRs. May 2020 Page 225 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 6. Summary b. There have been no substantial changes in circumstances subsequent to the certification of the 2006 GPU EIR and 2014 LUE Amendment EIR that would require major EIR revisions. The topical analysis in Section 5 of this Addendum describes updated regulatory requirements and conditions that could affect the potential significance of impacts associated with the proposed project. Existing, surrounding land uses have been described. Moreover, the project -related land use changes in comparison to both previous Program EIRs (square footage by use and number of residential uses) have been quantified, and the analysis for these changes, quantified as applicable. The incremental environmental impact due to the project would not combine with other related projects to result in new significant cumulative impacts. c. There is no known new information of substantial importance that was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIRs that would result in increased significant impacts. Page 226 PlaceWorks 7. References AKM. August 2010. City of Newport Beach Sewer Master Plan. Arcadis. 2019, April 29. 2019 Water Master Plan. https://www.newportbeachca.gov/home/showdocument?id=64184. 2018, March. 2015 Amended Urban Water Management Plan. https://www.newportbeachca.gov/home/showdocument?id=58831. California Air Resources Board (CARB). 2017, December 19. Area Designations Maps/State and National. http://www.arb.ca.gov/desig/desig.htm. 2017a, November. California's 2017 Climate Change Scoping Plan: The Strategy for Achieving California's 2030 Greenhouse Gas Target. https://www.arb.ca.gov/cc/scopingplan/2030sp—pp—final.pdf. 2017b, November. Final 2017 Scoping Plan Update: The Strategy for Achieving California's 2030 GHG Target. https://www.arb.ca.gov/cc/scopingplan/scoping_plan_2017.pdf. California Department of Conservation (CDC). 2015. CGS Information Warehouse: Regulatory Maps. Earthquake Zones of Required Investigation Tustin Quadrangle. https://maps.conservation.ca.gov/cgs/informationwarehouse/. California Department of Education (EDU). 2020, March 17 (accessed). 2018-2019 Enrollment by Garda Santa Ana Unified Report. https: / /datal .cde.ca.gov/dataquest/dgcensus/EnrGrdLevels.aspx?cds=3066670&agglevel=district& year=2018-19. California Emissions Estimator Model (CalEEMod). 2016, September. Appendix D Default Data Tables. http: / /www agmd.gov/docs/default-source/caleemod/upgrades/2016.3/05_appendix-d2016-3- 1.pdf. California Department of Forestry and Fire Protection (CAL FIRE). 2012. Frequently Asked Questions. http://calfire.ca.gov/fireprevention/ fire_prevention_wildland_fags.php#modelO2. California Gas and Electric Utilities (CGEU). 2018. 2018 California Gas Report. https://www socalgas.com/regulatory/documents/cgr/2018_Cahfornia_Gas_Report.pdf. CalRecyle. 2019a. Estimated Solid Waste Generation Rates. https: / /www2.calrecycle.ca.gov/ WasteCharacterization/ General/Rates. May 2020 Page 227 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 7. References 2019b. Jurisdiction Review Report. https: / /www2. calrecycle. ca.gov/LGCentral/AnnualReporting/ReviewReports /PerCapitaDisposalTr ends. 2019c. SWIS Facility/Site Search. https://www2.calrecycle.ca.gov/swfacilities/directory. California Energy Commission (CEC). 2018. News Release: Energy Commission Adopts Standards Requiring Solar Systems for New Homes, First in Nation. http: / /www energy.ca.gov/releases/2018_releases/2018-05-09_building_standards_adopted_nr.html. 2016, December 5. California Energy Demand Updated Forecast, 2017-2027. https://eflhng.energy.ca.gov/getdocument.aspx?tn=214635. California School Campus Database (CSCD). 2020, March 17 (accessed). http: / /www.mapcollaborator.org/mapcollab_cscd/?base=map&y=33.72320&x=- 117.89566&z=12&layers=notes%2Cpolygons%2Cschoolboundaries%2Cdistricts_uni%2Cdistricts_e lem%2Cdistricts_sec%2Ccides&opacs =100%2C25%2C 100%2C 100%2C 100%2C 100%2C 100. Cogstone. 2014, February. Cultural Resources Assessment for the Newport Land Use Element. Department of Finance (DOF). 2020. E-5 Population and Housing Estimates for Cities, Counties, and the State, January 2011-2019, with 2010 Benchmark. http://www.dofca.gov/Forecasting/Demographics/Estimates/e-5/. Department of Toxic Substances Control (DTSC). 2020. EnviroStor. http://www.envirostor.dtsc.ca.gov/public/. Natelson Company, The. 2001, October 31. Employment Density Study Summary Report. http://www.scag.ca.gov/pdfs/Employment—Density—Study.pdf. Newport Beach, City of 2014. Natural Hazards Mitigation Plan. https://www.newportbeachca.gov/Home/ShowDocument?id=19735. Office of Environmental Health Hazard Assessment (OEHHA). 2015, February. Air Toxics Hot Spots Program Risk Assessment Guidelines. Guidance Manual for Preparation of Health Risk Assessments. http://oehha.ca.gov/air/hot_spots/2015/2015GuidanceManual.pdf. Orange County Sanitary District (OCSD). 2018, June 27. Proposed Budget Fiscal Years 2018-19 and 2019-20. https://www.ocsd.com/Home/ShowDocument?id=24974. Orange County Water District (OCWD). 2015, June 17. Orange County Water District Groundwater Management Plan. https://www.ocwd.com/what-we-do/groundwater-management/groundwater- management-plan/. Page 228 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 7. References Santa Ana Regional Water Quality Control Board (Santa Ana RWQCB). 2008. Water Quality Control Plan, Santa Ana River Basin. https: / /www waterboards. ca.gov/ santaana/water_is sues /programs /basin_plan/index.html. Santa Ana Unified School District (SAUSD). 2018. Facilities Master Plan. https://www.sausd.us/cms/lib/CA01000471 /Centricity/Domain/47/ 18- 0710%20SAUSD_Master%20Plan_FINAL%20-%20REDUCED.pdf 2020a. SAUSD Residential Development School Fee Justification Study. 2020b. SAUSD Developer Fees. https://www.sausd.us/page/1133. South Coast Air Quality Management District (South Coast AQMD). 1992. Federal Attainment Plan for Carbon Monoxide. 1993. California Environmental Quality Act Air Quality Handbook. 2003. Final 2003 Air Quality Management Plan. https://www.agmd.gov/home/air-quality/clean-air- plans/air-quality-mgt-plan/2003-aqmp. 2008, July. Final Localized Significance Threshold Methodology. 2017, March 4. Final 2016 Air Quality Management Plan. https://www.agmd.gov/docs/default- source/clean-air-plans/air-quality-management-plans/2016-air-quality-management-plan/ final-2016- agmp/ final20l 6agmp.pdf?sfvrsn= l 5. Southern California Association of Governments (SCAG). 2016, April 7. Final 2016-2040 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS): A Plan for Mobility, Accessibility, Sustainability, and a High Quality of Life. http://scagrtpscs.net/Pages/FINAL2016RTPSCS.aspx. Southern California Edison. 2019, July. 2018 Power Content Label. https://www sce.com/sites/default/files/inline-files/2018SCEPCL.pdf. US Census Bureau (Census Bureau). 2019, July 1. QuickFacts Newport Beach. https:/ /www census.gov/quickfacts/ fact/table/newportbeachcitycalifornia,US/PST045219. US Environmental Protection Agency (USEPA). 2020. EnviroMapper for EnviroFacts. http://www.epa.gov/emefdata/em4ef home. May 2020 Page 229 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH 7. References Tbis page intentionally left blank. Page 230 PlaceWorks NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Appendices Appendix A Newport Village Planned Community Development Plan May 2020 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Appendices Tbis page intentionally left blank. PlaceWorks NEWPORT AIRPORT VILLAGE PLANNED COMMUNITY DEVELOPMENT PLAN PC -60 Adopted XXXXXX, 2020 Ordinance No. XX -2020 TABLE OF CONTENTS SECTION PAGE I. INTRODUCTION AND PURPOSE............................................................................................... 1 A. Introduction......................................................................................................................... 1 B. Location................................................................................................................................1 C. Surrounding Area................................................................................................................. 3 D. Purpose and Objective......................................................................................................... 4 E. Relationship to Other Regulations....................................................................................... 4 II. LAND USE AND DEVELOPMENT REGULATIONS....................................................................... 5 A. Permitted Uses..................................................................................................................... 6 B. Prohibited Uses.................................................................................................................... 7 C. Existing Legal Nonconforming Uses and Structures............................................................ 7 D. Land Use Concept................................................................................................................ 7 E. Development Standards — Planning Area 1 (Mixed -Use Residential Area) ......................... 8 F. Development Standards — Planning Area 2 (Non -Residential Area) ................................. 12 G. Additional Development Standards................................................................................... 13 III. ARCHITECTURAL DESIGN CONSIDERATIONS......................................................................... 16 A. General Principles.............................................................................................................. 16 B. Mixed-Use..........................................................................................................................16 C. Residential Uses................................................................................................................. 16 D. Office/Commercial Uses.................................................................................................... 17 E. Conceptual Images to Guide Development....................................................................... 17 IV. RESIDENTIAL DESIGN GUIDELINES......................................................................................... 21 A. Architectural Variety.......................................................................................................... 21 B. Windows and Entries......................................................................................................... 21 C. Massing and articulation.................................................................................................... 21 V. PLAN ADMINISTRATION and implementation...................................................................... 22 A. Permit Review Procedures................................................................................................. 22 B. Parcel or Tract Maps.......................................................................................................... 22 C. Amendments to Planned Community Development Plan ................................................. 22 D. Administrative Responsibility............................................................................................ 22 E. Enforcement...................................................................................................................... 22 Newport Airport Village TABLE OF CONTENTS FIGURE PAGE Figure1 - Vicinity Map.................................................................................................................... 2 Figure2 - Airport Area.................................................................................................................... 2 Figure 3 - Newport Airport Village Planned Community................................................................ 3 Figure4 - Land Use Map................................................................................................................. 5 Figure 5 - Conceptual Development Plan..................................................................................... 10 Figure 6 - Mixed -Use Conceptual Images................................................................................... 188 Figure 7 - Multi -Unit Residential Conceptual Images................................................................... 19 Figure 8 - Office/Commercial Conceptual Images........................................................................ 20 Newport Airport Village NEWPORT AIRPORT VILLAGE PLANNED COMMUNITY DEVELOPMENT PLAN (PCDP) I. INTRODUCTION AND PURPOSE A. Introduction The Newport Airport Village Planned Community Development Plan (PCDP) (PC -60) is envisioned to be a horizontal mixed-use development on an approximately 16.46 -acre site that is located in the northern portion of the City, near Macarthur Blvd and Campus Drive. The City of Newport Beach Municipal Code (NBMC) allows a Planned Community Development Plan to address land use designations and regulations in Planned Communities. The PCDP serves as the controlling zoning ordinance for the site and is authorized and intended to implement the provisions of the Newport Beach General Plan. The maximum buildout of the PCDP would result in 329 residential dwelling units, exclusive of any density bonus as allowed pursuant to California Government Code Section 65915; and 297,572 square feet of office, retail, and commercial use. The Newport Airport Village Planned Community (PC) consists of approximately 16.46 acres and prior to the development pursuant to this PCDP, a variety of commercial services, including: retail, restaurants, offices, rental car agencies, and other similar uses were developed. The Newport Airport Village Design Guidelines (contained herein) provide a conceptual vision of the physical implementation of the project and have been drafted to assist the City and community to visualize the architectural theme and desired character of the development. The Design Guidelines also provides the visual and mental imagery of what the current property owner and City see for the future development of the PC. B. Location As shown in Figures 1 and 2, the PC District is generally located southeast of John Wayne Airport and within the "Airport Area" Sub -Area as defined by the Newport Beach General Plan. The Airport Area includes 360 acres in the northernmost portion of Newport Beach, bounded by Campus Drive to the west and north, Jamboree Road to the east, and Bristol Street to the south. The City of Irvine is located north and east of the Airport Area. The Airport Area is proximate to Interstate 405 and State Routes 55 and 73. The Airport Area initially was a light industrial and commercial office area of Newport Beach, but is gradually redeveloping into a mixed-use community integrating residential development with existing non-residential uses consistent with the 2006 Newport Beach General Plan. I. INTRODUCTION AND PURPOSE Newport Beach Figure I - Vicinity Map _p Figure 2 -Airport Area Newport Airport Village 2 I. INTRODUCTION AND PURPOSE More specifically, the PC is located west of MacArthur Boulevard, south of Campus Drive, north of Birch Street, and about 550 feet north of Dove Street, as shown in Figure 2. Sane C�CydNewport GlS '' Figure 3 - NenportAirbort Village Planned Community As also noted in Figure 3, the 65-dBA CNEL noise contour line for John Wayne Airport (JWA) transects the site. Areas east of (i.e., outside) the 65 dBA CNEL line are "Clearly Compatible" or "Normally Compatible" with multi -family residential and mixed-use development under General Plan Table N2 (Land Use Noise Compatibility Matrix). Areas west of (i.e., inside) the 65 dBA CNEL line are "Normally incompatible" or "Clearly incompatible" with multi -family residential and mixed-use development under General Plan Table N2. Under the Airport Environs Land Use Plan for John Wayne Airport (AELUP), this means that areas west of the 65 dBA CNEL line are deemed suitable for residential uses and other noise -sensitive uses if the interior noise standard of 45 dBA CNEL can be maintained with an accompanying dedication of a avigation easement for noise. Additionally, building heights west of the 65 dBA CNEL line are restricted for aviation safety. C. Surrounding Area John Wayne Airport, a commercial and general aviation airport that is owned and operated by the County of Orange, is located to the west and north of the site (across Newport Airport Village 3 I. INTRODUCTION AND PURPOSE Campus Dr). To the immediate northeast of the site, on the southwest corner of MacArthur Blvd and Campus Dr, is a five -story office building and a small multi -tenant commercial building. Across MacArthur Boulevard, on the northeast corner of MacArthur Blvd and Campus Dr, is a nine -story office building that contains professional and medical office uses; a five -story apartment building at the intersection of Douglas and Martin Court; and multiple hotels and restaurants along MacArthur Blvd. To the east (across Birch St) are several multi -story office buildings that range from three to fourteen stories, hotels, and retail and restaurant uses. Commercial services, including vehicle sales and repairs and a pharmacy; restaurants; and office uses, including medical offices occupy the properties to the south of the PC. D. Purpose and Objective The purpose of the PCDP is to establish appropriate zoning regulations that govern the land use and development of the PC in a manner that is consistent with the City of Newport Beach General Plan. Implementation of the PCDP will: — Provide a quality mixed-use development that includes residential and supporting commercial uses; as well as, commercial uses that support or benefit from the proximity to the airport. — Create two planning areas to guide the development of the PC District (see Figure 4). Planning Area 1 will include the residential and, potentially, a complimentary retail or service commercial component of the PC District. Planning Area 2 will consist exclusively of non-residential uses. — Provide new housing opportunities in response to increased demand for housing, reduction of vehicle trips, and an encouragement of an active lifestyle by increasing the opportunity for residents to live in proximity to jobs, services, and entertainment. Such housing will be proximate to, and interconnected with, commercial development through pedestrian walkways provided by future development within the PCDP. — Ensure all residential units are located outside the John Wayne Airport 65 dBA CNEL noise contour and Safety Zone 3. E. Relationship to Other Regulations Whenever the provisions of this PCDP conflict with the regulations of the NEMC, the regulations contained herein will prevail. The NBMC including the Zoning Code apply and shall also regulate this development whenever regulations are not provided within this PCDP. Unless otherwise defined herein, all words and phrases used in this PCDP shall have the same meaning and definition as used in the NBMC. Newport Airport Village 4 II. LAND USE AND DEVELOPMENT REGULATIONS II. LAND USE AND DEVELOPMENT REGULATIONS The PC is subdivided into two planning areas. Figure 4 shows the Land Use Map for the PC District with the 65 d6A CNEL noise contour separating the residential use area from the non-residential use area. r 1 �i ■ ■ i ■ �wr� John Wayne'Airpor# 41 , L �i ■' Planning Area 1 ► { f a 1Planning Area 2 �' as lyzor m. uO � 5 •` lob, ► Airport Village Land Use * �� Planning Area 1 - Mixed -Use Residential 7-14 acres Planning Area 2 - Commercial 9.32 acres G1% oo,� Figure 4 -Land Use Map Newport Airport Village 5 II. LAND USE AND DEVELOPMENT REGULATIONS A. Permitted Uses Table 1 lists the permitted uses for each planning area of the Planned Community. The uses identified within the table are not intended to be a comprehensive list, but rather major use categories. The Community Development Director may determine other uses not specifically listed herein are allowed or allowed pursuant to a MUP or CUP, provided they are consistent with the purpose of the planning areas, are compatible with surrounding uses, and are not listed as a prohibited use. Table 1 Permitted Uses Uses Planning Area 1 Planning Area 2 Additional Regulations Residential Multi -unit dwellings P - Live/work units P - Mixed-use development P - Accessory dwelling units P - NBMC 20.48.200 Home Occupations P - NBMC 20.48.110 Residential accessory uses and amenities P P Food, alcohol, entertainment Alcohol sales (off-site) MUP MUP NBMC 20.48.030 Alcohol Sales (on-site) CUP CUP NBMC 20.48.030 Bars, lounge, nightclub CUP CUP NBMC 20.48.030 & 20.48.090 Food service, no late hours MUP MUP NBMC 20.48.030 & 20.48.090 Food service, late hours CUP CUP NBMC 20.48.030 & 20.48.090 Office, retail, service Financial Institutions P P Offices, business & professional P P Offices, medical and dental P P Personal services, general P P Personal services, restricted MUP MUP Retail sales (less than 10,000 sq. ft.) P P Retail sales (greater than 10,000 sq. ft.) P P Other uses Uses not listed herein, but allowed in the OA zone A A Subject to applicable NBMC requirements Newport Airport Village 6 II. LAND USE AND DEVELOPMENT REGULATIONS Table 1 Continued P = Permitted Use CUP = Conditional Use Permit MUP = Minor Use Permit A = Allowed subject to permit requirements provided in Table 2-4 of NBMC Section 20.20.020(C) - = Not Permitted B. Prohibited Uses The following uses shall be expressly prohibited from the PCDP: 1. Any use not authorized by this PCDP unless the Community Development Director determines a particular use consistent with the purpose and intent of the PCDP, 2. Residential dwelling units within (i.e., west of) the 65 dBA CNEL (or above) noise contour from John Wayne Airport (residential accessory uses, and amenities are allowed), 3. Residential dwelling units within John Wayne Airport Safety Zone 3 (residential accessory uses, and amenities are allowed), 4. The following uses, if said structure within 250 feet of any residential dwelling unit: a. Handicraft Industry b. Industry, Small (less than 5,000 sq. ft.) C. Emergency Health Facilities/Urgent Care d. Ambulance Services e. Funeral Homes and Mortuaries f. Maintenance and Repair Services. C. Existing Legal Nonconforming Uses and Structures Existing legally established use and structures that no longer conform to the provisions of this PCDP shall be subject to NBMC Chapter 20.38. D. Land Use Concept Figure 5 depicts the conceptual development plan for Newport Airport Village Planned Community. Multi -story residential structures would be located nearthe north side of the site in Planning Area 1 and may have a retail/commercial component. Office, commercial and other non-residential buildings would be located south of the residential buildings in Planning Area 2. A landscaped esplanade with open space areas, pedestrian pathways with areas for passive seating, and bicycle facilities will be provided to create an efficient and safe pedestrian -friendly environment interconnecting the various land uses through - Newport Airport Village 7 II. LAND USE AND DEVELOPMENT REGULATIONS out the site with surrounding properties and public ways. Although the PC may not be developed exactly as depicted in the conceptual land use development map, it serves as a demonstration of what could be achieved through the application of the site development standards of this PCDP. E. Development Standards — Planning Area 1(Mixed-Use Residential Area) 1. Permitted Height of Residential or Mixed -Use Structures: No structure, nor any portion of any structure, architectural feature, elevator penthouse, or mechanical equipment shall exceed a height of 85 feet measured consistent with the Zoning Code. 2. Permitted Height of Nonresidential Structures: No structure, nor any portion of any structure, architectural feature, elevator penthouse, or mechanical equipment shall exceed a height of 37 feet measured consistent with the Zoning Code, unless a Site Development Review is approved pursuant to NBMC Section 20.52.080, in which case the maximum shall be 55 feet. 3. Setbacks: Minimum setbacks shall be as follows: a. Buildings, or portion thereof, that are under 20 feet in height shall be setback a minimum of 10 feet from any street property line and a minimum of 5 feet from any internal property line. b. Buildings, or portion thereof, that are 20 feet or greater in height shall be setback a minimum of 20 feet from any street property line and a minimum of 5 feet from any internal property line. 4. Residential Density: Densities shall be a minimum of 30 dwelling units per acre and a maximum of 50 dwelling units per acre, not including density bonus units. 5. Residential Development Limit: A maximum of 329 dwellings units shall be permitted, exclusive of any density bonus as allowed pursuant to California Government Code Section 65915. In addition, residential development (excluding density bonus units) shall be subject to the maximum development allocation for the Airport Area established by General Plan Land Use Policy 6.15.5, or any successor policy or development limit resulting from a future General Plan Update/Amendment, provided that such allocation does not result in a reduction of the 329 permitted dwelling units in Planning Area 1. 6. Floor Area Limit: Floor area for nonresidential uses shall not exceed 94,583 square feet. This floor area limit is based on the conversion of commercial development allowed by the general plan to residential dwelling units pursuant to General Plan Newport Airport Village 8 II. LAND USE AND DEVELOPMENT REGULATIONS Policy LU6.15.5. The 2006 General Plan allowed a 0.5 FAR (155,509 square feet) that is reduced by 60,926 square feet and converted to allow 329 dwelling units. 7. Common Open Space: All residential development shall incorporate common open space in the amount of 75 square feet per unit with minimum dimensions of 15 feet in any direction. At least half of the common open space shall consist of recreational amenities, including but not limited to the following: a. Swimming pools/spas and adjacent lounging decks b. Exercise facilities C. Tennis courts d. Basketball courts e. Clubhouse rooms f. Roof deck recreation areas g. Community gardens h. Barbecue and other active (e.g. bocce ball) or passive (e.g., reading) courtyards i. Other amenities as deemed appropriate by the Community Development Director Outdoor common areas or recreational areas shall be posted with an outdoor notification sign to users regarding the proximity to John Wayne Airport and presence of operating aircraft. Newport Airport Village 9 II. LAND USE AND DEVELOPMENT REGULATIONS Figure S - Conceptual Development Plan Newport Airport Village 10 II. LAND USE AND DEVELOPMENT REGULATIONS 8. Private Open Space: All residential development shall incorporate private open space in the amount of 5% of the gross floor area (minimum) for each unit with a minimum dimension of 6 feet in any direction. 9. Affordability Requirements: Residential development shall include affordable housing as follows: a minimum of 5% of units for very -low income households, or a minimum of 10% of units for low-income households, or a minimum 10% of units for moderate -income households within a common -interest development. The following requirements also apply: a. Affordable units shall be provided on-site. b. Affordable units shall be designed and distributed within the residential as follows: i. Number of Bedrooms. Affordable units shall reflect the range of numbers of bedrooms provided in the residential development project as a whole. ii. Comparable Quality and Facilities. Affordable units shall be comparable in the facilities provided (e.g., laundry, recreation, etc.) and in the quality of construction and exterior design to the market -rate units. iii. Size. Affordable units may be smaller and have different interior finishes and features than the market -rate units, and iv. Location. Affordable units shall be dispersed throughout the residential development, unless clustering is allowed by the review authority. C. An Affordable Housing Implementation Plan (AHIP) shall be prepared and submitted with any site development review application seeking approval of a residential development within the PC District. The AHIP shall clearly demonstrate how the proposed residential development project will meet the affordability requirements of this PCDP and any applicable provisions of the State Density Bonus Law and the Newport Beach Municipal Code. The AHIP shall specify eligible income categories, the amount of the requested density bonus, any concession/incentives requested, and any development standards waivers or modifications sought and justifications for said concessions/incentives or development standard relief. d. Density bonuses/incentives or development standard concessions shall be provided pursuant to NBMC Chapter 20.32 and Section 65915 et. seq of the California Government Code. 10. Sound Mitigation: The interior ambient noise level of all new residential dwelling units shall meet applicable standards of the City's Community Noise Ordinance (NEMC Section 10.26.030). An acoustical analysis report, prepared by an acoustical engineer, shall be submitted describing the acoustical design features of the structure that will satisfy the interior noise standard. The residential units shall be constructed, and noise attenuated in compliance with the report. Newport Airport Village 11 II. LAND USE AND DEVELOPMENT REGULATIONS 11. Residential Design: Unless otherwise deemed appropriate by the City's Review Authority all residential and mixed-use buildings shall be generally consistent with the residential design guidelines as set forth in Section IV of the PCDP. 12. Notification to owners and tenants: A written disclosure statement shall be prepared prior to sale, lease, or rental of a residential unit within the development. The disclosure statement shall indicate that the occupants will be living in an urban type of environment adjacent to an airport and that the noise, odor, and outdoor activity levels may be higher than a typical suburban residential area. The disclosure statement shall include a written description of the potential impacts to residents of both the existing environment (e.g., noise from planes, commercial activity on the site and vehicles streets) and potential nuisances based upon the allowed uses in the zoning district. Each and every buyer, lessee, or renter shall sign the statement acknowledging that they have received, read, and understand the disclosure statement. A covenant shall also be included within all deeds, leases or contracts conveying any interest in a residential unit within the development that requires: (1) the disclosure and notification requirement stated herein; (2) an acknowledgment by all grantees or lessees that the property is located within an urban type of environment and that the noise, odor, and outdoor activity levels may be higher than a typical suburban residential area; and (3) acknowledgment that the covenant is binding for the benefit and in favor of the City of Newport Beach. 13. Deed notification: A deed notification shall be recorded with the County Recorder's Office, the form and content of which shall be satisfactory to the City Attorney. The deed notification document shall state that the residential unit is located in a mixed-use development and that an owner may be subject to impacts, including inconvenience and discomfort, from lawful activities occurring in the project or zoning district (e.g., noise, lighting, odors, high pedestrian activity levels, etc.). 14. Park Dedications and Fees: All residential subdivisions shall comply with all park dedications and fees, as required in NBMC Chapter 19.52. F. Development Standards — Planning Area 2 (Non -Residential Area) In addition to the additional development standards listed in Section II(F) of this PCDP, the following standards apply to all development in Planning Area 2. 1. Permitted Height of Structures: No structure, nor any portion of any structure, architectural feature, elevator penthouse, or mechanical equipment shall exceed a height of 37 feet, unless a Site Development Review is approved pursuant to Newport Airport Village 12 II. LAND USE AND DEVELOPMENT REGULATIONS NBMC Section 20.52.080, in which the review authority may allow buildings or structures to exceed 37 feet to a maximum of 55 feet. 2. Setbacks: Minimum setbacks shall be 15 feet from any street property line and 5 feet from any internal property line. 3. Floor Area Ratio: Floor area ratio shall not exceed 0.5, except for warehouse uses, which are allowed a maximum floor area ratio of 0.75. 4. Lot Size and Dimensions: Newly created lots shall meet the minimum standards for lots provided in NBMC Section 20.20.030 for the OA (Office—Airport) Zoning District. G. Additional Development Standards In addition to the planning area specific development standards listed in Sections II(D) and II(E) of this PCDP, the following standards apply to all development within the Newport Airport Village Planned Community. 1. Maximum Intensity: The total area of all office, retail, and other commercial uses within the Newport Airport Village PC shall not exceed 297,572 square feet. 2. Parking and Circulation: Parking and on-site circulation shall comply with NBMC Chapter 20.40. All proposed development is required to be reviewed and approved by the Planning Division, Public Works Department, the City Traffic Engineer, Fire Department and Building Division. On-site circulation, including but not limited to, driveway location, sight distance, parking lot design, drive aisles, emergency vehicle access and access the disabled shall meet applicable codes, polices and design standards. All approved vehicle entry points to the PC District shall comply with applicable City of Newport Beach Public Works and Fire Department requirements regarding safe and convenient vehicular access. 3. Landscaping: A detailed landscape and irrigation plan shall be prepared by a licensed landscape architect and submitted with the Site Development Review application. Landscaping shall be designed, installed, and maintained in consistent with all requirements of NBMC Chapters 14.17 (Water Efficient Landscaping) and 20.36 (Landscaping Standards). Landscape shall also be maintained in a healthy, weed -free condition, free of litter and consistent with NBMC Section 20.30.130 (Traffic Safety Visibility Area). 4. Pedestrian and Bicycle Connection: All uses in the PC shall be interconnected through safe and efficient pedestrian and bicycle paths, including a pedestrian Newport Airport Village 13 II. LAND USE AND DEVELOPMENT REGULATIONS connection feature between the residential and non-residential components of the PC District. 5. Lighting: A detailed lighting plan with lighting fixtures and standard designs shall be submitted with the Site Development Review application and shall comply with NBMC Section 20.30.070. The lighting system shall be designed and maintained to conceal the light source and minimize light spillage and glare outside of the boundary of the PC District. A minimum average 0.5 foot-candle shall be provided on all driving or walking surface during the hours of operation and one hour thereafter. All lighting shall comply with NBMC Section 20.30.070. 6. Utilities: A Utilities Plan shall be submitted with the Site Development Review application. The final alignment and location of utilities shall be reviewed and approved by the Public Works Department. Adequate access for maintenance vehicles shall be provided. All utilities on private property shall be privately maintained and operated. 7. Air Conditioning Units: The use of individual through -window or through -wall air conditioning units any commercial or residential unit is prohibited. Signs: A comprehensive sign program with sign materials and lighting details shall be submitted with the Site Development Review application. All signage shall comply with the Chapter 20.42 of the Municipal Code. Should a future neighborhood public park be constructed in either Planning Area, the park shall be posted with a notification to users regarding the proximity to John Wayne Airport and aircraft overflight and noise. Outdoor common areas or recreational areas shall also be posted with an outdoor notification sign to users regarding the proximity to John Wayne Airport and presence of operating aircraft. 8. Fences, Hedges, & Walls: Fences, hedges, and walls shall be limited to the following heights, subject to the exceptions contained in NBMC Section 20.30.040: a. Street setback areas — 42 inches b. Interior setback areas — 6 feet C. Between residential uses and nonresidential uses and parking areas — 8 feet 9. Buffering and Screenin a. General Requirements: Mechanical equipment must be located so that the impact of noise on residential uses is minimized to the greatest extent feasible. Screening shall be maintained in good condition at all times. Landscaping used as screening shall provide a dense, year-round screen. Newport Airport Village 14 II. LAND USE AND DEVELOPMENT REGULATIONS b. Roof -mounted Mechanical Equipment and Appurtenances: Roof -mounted mechanical equipment and appurtenances may not be visible in any direction (360 degrees) from a public right-of-way or adjacent residential property, as may be seen from a point six feet above ground level. Methods of screening may include mechanical roof wells recessed below the roof line or by solid and permanent roof -mounted screens. Screening must be compatible with the architectural style, materials, and color of the building on which the equipment is located. Supports for window washing equipment are permitted and are not required to be screened from view. No setbacks are required for rooftop mechanical equipment or appurtenances. All roof - mounted mechanical equipment and appurtenances shall be at or below all applicable height limits. C. Ground -mounted Mechanical Equipment: Ground -mounted mechanical equipment shall be screened from public rights-of-way and/or public property as seen from a point six feet above ground level. Methods of screening may include fences, walls, solid hedges, or other similar methods. Chain link fencing is not permitted with or without slats is not allowed. d. Outdoor Storage: Where equipment, material, or merchandise is allowed to be stored outdoors, these items shall be screened from public view and adjacent residential areas using fences, walls, solid hedges, or other methods. Chain link fencing with or without slats is not allowed. e. Solid Waste Storage Areas: New development shall provide adequate, enclosed areas with solid roofs for collecting, storing, and loading solid waste and recyclable materials. The square footage provided for solid waste and recyclable materials storage must be in compliance with NBMC Section 20.30.120. Solid waste and recyclable materials storage areas must be adequate in distribution to serve the project and be screened from public rights-of-way and/or public property as seen from a point six feet above ground level. Screening may consist of solid masonry walls, metal gates, landscaping, or similar methods. Structures used for solid waste screening must be visually compatible with the surrounding structures and must be properly secured to prevent access by unauthorized persons, while allowing authorized persons access for disposal of materials. Newport Airport Village 15 III. ARCHITECTURAL DESIGN CONSIDERATIONS III. ARCHITECTURAL DESIGN CONSIDERATIONS A. General Principles The following general principles shall be considered when siting and designing new development within Newport Airport Village. 1. Development should be designed to convey a unified and high-quality character with use of consistent architectural design vocabulary, materials, and color palette. 2. Building elevations should employ architectural treatments, articulation and modulation of mass to avoid the appearance of monolithic box -like buildings. 3. High-quality doors, windows, moldings, and finishes should be used on elevations visible from streets and pedestrian paths. 4. Roof profiles should be articulated to reduce the appearance of large structures and provide visual interest. 5. Streetscape design and plant materials should reflect the street's location and nature. 6. Abundant use of landscape within interior courtyards, open spaces, and parking areas should be encouraged. 7. The design of parking areas and parking facilities should consider architectural consistency and physical integration with nearby buildings. 8. Open parking lots should be set back from public streets and screened using buildings, decorative walls, berms or dense landscaping. B. Mixed -Use The following principles shall be considered when siting and designing new mixed-use development. 1. Residential uses should be seamlessly integrated with nonresidential uses through pedestrian connections, landscape, and other physical connections. 2. Conflicts between different uses, such as noise, vibration, glare, odors, and similar impacts, should be minimized through careful siting, building design and incorporation of appropriate building materials. 3. Entries for residential units and nonresidential businesses should be separate and well-defined. C. Residential Uses The following principles shall be considered when new development includes residential use. Newport Airport Village 16 III. ARCHITECTURAL DESIGN CONSIDERATIONS 1. Private open space for each residential unit should be usable and functional. 2. Common residential open space should create opportunities for recreation and promote an attractive living environment. D. Office/Commercial Uses The following principles shall be considered when siting and designing new office or commercial development. 1. Building siting should be oriented around public spaces such as plazas, courtyards, walkways, and open spaces. 2. On-site landscaping should emphasize special features such as entryways. 3. Landscape and other amenities should be used to provide visual relief within surface parking lots. 4. A common signage program that reflects the architectural style and character of the development should be prepared to address tenant identification and wayfinding. 5. Common streetscape and lighting programs should be developed to promote pedestrian activity. 6. Site design should provide clear site access, entrance drives and building entries as well as minimize conflicts between service vehicles, private automobiles, and pedestrians. E. Conceptual Images to Guide Development The following images provide general direction to convey the desired quality for new development through architectural massing, detail, variety in building materials and integration of pedestrian -orientation. These images are meant to inspire designers and do not indicate the precise design of future development within Newport Airport Village. The images are grouped by land use type: mixed use, multi -unit residential buildings, and office/commercial development. Newport Airport Village 17 • � � II � I •il • iRl ��� ; � 1 I� IIS �, � � � a I � � I' *��r TV n a F.- *007 f a p Oa m 40 r■�r `��f�■E■L7 ;��ii [ ------------ III. ARCHITECTURAL DESIGN CONSIDERATIONS Figure 8 - Officel Commercial Conceptual Images Newport Airport Village 20 IV. RESIDENTIAL DESIGN GUIDELINES IV. RESIDENTIAL DESIGN GUIDELINES The Newport Airport Village Residential Design Guidelines are intended to set parameters for the design of residential buildings and ensure an appropriate aesthetic quality is provided on all residential buildings. All residential and mixed-use buildings within Newport Airport Village PC should be generally consistent with the guidelines contained in this section of the PCDP. A. Architectural Variety 1. Buildings should utilize more than a single -color on all facades. 2. Buildings should utilize more than a single finished material on all fagades. For the purpose of this requirement, windows are not considered a finished material. 3. Building should have more than one roof height. The change in roof height shall be at least 5 feet for buildings with a height under 30 feet tall and 10 feet for buildings with a height of 30 feet or more. 4. Buildings should not have blank fagades. For the purpose of these guidelines a blank fagade shall mean, any portion of the fagade that is above the ground level and does not have a window or balcony 15 feet in any direction. B. Windows and Entries 1. The primary pedestrian entry into the building should lead into a common lobby or corridor and shall face the street or a common open space. 2. Ground level dwelling units are encouraged to have an individual primary entry on the exterior fagade of the building. 3. Rain protection should be provided above all pedestrian entries through the use of awnings, porticos, arcades, or the like. 4. Exterior windows and doors should be inset a minimum 2-% inches from the adjoining wall. C. Massing and articulation 1. The first three floors of a building should have a plane -break to divide all street facing facades into segments no more than 30 feet wide. Plane -breaks shall have a minimum depth and width of 5 feet. 2. The fourth floor and above of a building should have a plane -break on all street facing facades. Plane -breaks shall have a minimum depth of 5 feet and be across 25% of the width of the building. Newport Airport Village 21 V. PLAN ADMINISTRATION AND IMPLEMENTATION V. PLAN ADMINISTRATION AND IMPLEMENTATION A. Permit Review Procedures Approval of the Site Development Review application by the City -designated Review Authority consistent with NBMC Chapter 20.52 shall be required prior to the issuance of a grading or building permit for the construction of any new structure within the boundaries of the PCDP. The application shall include all materials necessary to clearly determine consistency with this PCDP and applicable requirements of the Newport Beach Municipal Code. The applicant shall include a descriptive narrative supported by facts, exhibits, or diagrams that clearly show how a proposed development generally conforms to the PCDP design guidelines. B. Parcel or Tract Maps No parcel or tract map shall be recorded prior to the approval of the Site Development Review for the entire project or significant phase so that the responsibility for performance of, and payment for, maintenance are clear. C. Amendments to Planned Community Development Plan Applications for amendments to this Planned Community Development Plan shall follow the process identified in the NBMC Section 20.56.050(E). D. Administrative Responsibility All property within this PCDP shall be subject to NBMC Chapter 20.60 that prescribes the authority and responsibilities of the Newport Beach City Council, Planning Commission, Hearing Officer, Zoning Administrator, and Community Development Director (Planning Director) in the administration of this PCDP and the Zoning Code. E. Enforcement All property within this PCDP shall be subject to NBMC Chapter 20.68 that establishes provisions intended to ensure compliance with this PCDP and the Zoning Code. Newport Airport Village 22 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Appendices Appendix B Newport Village Trip Making Assessment May 2020 NEWPORT AIRPORT VILLAGE EIR ADDENDUM CITY OF NEWPORT BEACH Appendices Tbis page intentionally left blank. PlaceWorks OURBAN CROSSROADS April 23, 2020 Ms. JoAnn Hadfield PLACEWORKS 3 MacArthur Place, Suite 1100 Santa Ana, CA 92707 Ofc: 1001 Dove St. I Suite 260 1 Newport Beach, CA 92660 Main: 260 E. Baker St. I Suite 200 1 Costa Mesa, CA 92626 SUBJECT: NEWPORT AIRPORT VILLAGE TRIP -MAKING ASSESSMENT Dear Ms. JoAnn Hadfield: Urban Crossroads, Inc. is pleased to provide this assessment of Trip Generation, Distribution, and Intersection Volume Shifts for the proposed Newport Airport Village mixed-use (residential and office/commercial) Project located in the City of Newport Beach. The Project is located on the northwest corner of MacArthur Boulevard (NS) at Birch Street (EW) as shown on Exhibit A. Newport Beach Transportation Model (NBTM) Traffic Analysis Zones (TAZs) 1377 and 1378 encompass the Project, and also surrounding parcels, with extents to MacArthur Boulevard, Campus Drive, Birch Street, and Dove Street. It is our understanding that the residential portion of the Project includes up to 329 residential dwelling units plus 115 density bonus units with accessory uses (such as open space and parking). The non- residential portion of the Project includes 297,572 square feet of non-residential facilities. BACKGROUND LAND USE AND TRIP GENERATION Urban Crossroads, Inc. has compiled previous land use and trip generation information for the Project and related area from the transportation analysis documents prepared in support of the 2006 General Plan EIR and the 2014 Land Use Update EIR. The Newport Beach General Plan Land Use Element Amendment Traffic Impact Analysis (TIA) (Urban Crossroads, March 12, 2014) studied proposed city wide changes to land us element including a sub -area identified as "Saunders Properties". The Saunders Properties land use change studied increases of horizontal mixed-use land uses consisting of 329 Apartment dwelling units (plus 115 density bonus units) and 238,077 square feet of office. The result was a total of 4,651 additional daily trips. The Saunders Property area was 26.24 acres and included TAZs 1377 and 1378 in their entirety, including the proposed project site. Since the proposed project site area is 16.46 acres of the of 26.24 acres of the area studied in 2014, trip generation was calculated by using 62.7% (16.46 acres of 26.24 acres) of allowed land uses (0.5 FAR) in TAZs 1377 and 1378 plus the proposed increase of 62.7% of the additional 238,077 square feet of office studied in the 2014 Land Use Amendment. The 329 dwelling and 115 density bonus dwelling units were 12907-02 Letter - revised - 2020.04.23.docx Ms. JoAnn Hadfield PLACEWORKS April 23, 2020 Page 2 of 3 all included in the proposed project analysis as the location of those units contemplated in 2014 was within the proposed project area. Please refer to Table 1 for more information. The City of Newport Beach General Plan Transportation Study (Urban Crossroads, March 22, 2006) provides trip rate adjustment for specific types and locations of land uses, including vertical mixed-use developments. On page 3-4, the study indicates that in the Airport Area, the 20% high rise apartment reduction has been applied with no accompanying reduction for mixed use. Pursuant to the Airport Area Residential & Mixed -Use Adjustment Factors for Traffic Analysis in Newport Beach (City of Newport Beach, July 2009), the Airport Area land use conversion factor for commercial uses being demolished for conversion to residential is 5.40 DU/KSF. Similarly, a conversion factor of 2.29 DU/KSF would be used for office conversion to residential or 1.16 for industrial conversion to residential. PROJECT LAND USE AND TRIP GENERATION The 2006 General Plan Update (Approved General Plan) included 107,336 square feet of commercial uses, 232,562 square feet of office uses, and 26,834 square feet of industrial uses. The 2013 LUE amendment included 107,336 square feet of commercial uses, 26,834 square feet of industrial uses, 444 dwelling units, and 370,166 square feet of office uses on the Project site. The Project proposes to include a total of 297,572 square feet of non-residential uses (which is represented as 46,410 square feet of commercial, 232,562 square feet of office, and 18,600 square feet of industrial uses for purposes of this analysis). The Project proposes to convert 61,000 square feet to accommodate the 329 dwelling units, which is based upon the commercial conversion factor. An additional 35% of residential units (115 additional units) are proposed as density bonus units, for which a non-residential reduction is not proposed. The total residential on-site would therefore be 444 dwelling units. NBTM trip generation calculations for the site for General Plan conditions are shown in Table 2. The worksheets that calculate trips for individual land use categories are shown in Attachment 1. As shown on Table 2, the greatest directional Project increase (in comparison to approved land uses) without the density bonus is 75 vehicles in the outbound direction for the AM peak hour. With density bonus, the AM peak hour outbound direction Project increase is 119 trips. Table 3 presents a comparison of the Project to the Land Use Element scenario. PROJECT TRIP DISTRIBUTION AND TRAFFIC VOLUME CHANGES Exhibit A shows the anticipated outbound Project trip distribution pattern. The inbound trip distribution pattern is shown on Exhibit B. 12907-02 Letter - revised - 2020.04.23.docx LO► URBAN Ms. JoAnn Hadfield PLACEWORKS April 23, 2020 Page 3 of 3 The Project trip difference based upon NBTM rates is applied to these trip distribution patterns to develop AM and PM peak hour intersection volume changes. Exhibits C and D show the resulting AM and PM peak hour Project difference volumes without density bonus, respectively. Peak hour Project difference volumes with density bonus are shown on Exhibits E and F, respectively. PERFORMANCE REVIEW OF NEARBY INTERSECTIONS The Newport Beach General Plan Land Use Element Amendment Traffic Impact Analysis (TIA) includes two relevant attachments. The first attachment includes intersection analysis data for the approved General Plan (the 2006 Project). Attachment 2 of this letter provides Intersection Capacity Utilization (ICU) calculation sheets for General Plan buildout conditions at study area intersections. Intersection analysis worksheets with the previously proposed Citywide Land Use Element Amendment are provided in Attachment 3 of this letter. Because the density bonus units within the Newport Airport Village Project represent conservative "worst case" conditions, the potential traffic volume changes associated with this scenario have been applied to the background traffic volumes in Attachments 2 and 3. Intersection analysis worksheets for Newport Airport Village Project volume changes from approved General Plan conditions are included in Attachment 4. Attachment 5 includes study area intersection analysis worksheets for Newport Airport Village Project volume changes from the former Citywide Land Use Element Amendment. The results of these changes in ICU values associated with the Newport Airport Village Project are summarized in Table 4. As shown in Table 4, potentially impacted study area intersections continue to experience acceptable operations for long range future conditions with the Newport Airport Village Project. Respectfully submitted, URBAN CROSSROADS, INC. John Kain, AICP Principal 12907-02 Letter - revised - 2020.04.23.docx r Marlie Whiteman, P.E. Senior Associate LO► URBAN Newport Airport Village EXHIBIT A: PROJECT OUTBOUND TRIP DISTRIBUTION 12907 - 01 - study area. dwg URBAN CROSSROADS EXHIBIT B: PROJECT INBOUND TRIP DISTRIBUTION Newport Airport Village I- 12907 - 01 - study area. dwg URBAN CROSSROAnS EXHIBIT C: PROJECT AM PEAK HOUR INTERSECTION VOLUME DIFFERENCES WITHOUT DENSITY BONUS 9 MacArthur BI. (NS) / 10 MacArthur BI. (NS) / 11 Von Karman Av. (NS) / 12 MacArthur BI. (NS) / Campus Dr. (EW) Birch St. (EW) Campus Dr. (EW) Von Karman Av. (EW) 10 �12 —12 � vv f --,B `15-11}f 7ff' -4-41f �I}f' +11— •12 •11� •7— v N 15 Campus Dr. (NS) / 16 Birch St. (NS) / 17 Campus Dr. (NS) / 18 Birch St. (NS) / Bristol St. N (EW) Bristol St. N (EW) Bristol St. S (EW) Bristol St. S (EW) .or.- �--4 vl- �---4 4 n,v My i �•4 � i � � �► i �► 1 } •8-4 } -3-1 4— , 4- —29 29 Jamboree Rd. (NS) / 69 MacArthur BI. (NS) / MacArthur BI. (EW) 1-405 NB Ramps (EW) i 9 i ►f---5 I f f? f 7� . — ,4--* 70 MacArthur BI. (NS) / 71 MacArthur Bl. (NS) / 1-405 SB Ramps (EW) Michelson Dr. (EW) QQ 10 fT 'ff 12907 - 01 - study area. dwg Newport Airport Village LEGEND: Q = INTERSECTION ID •10 = VOLUME INCREASE ASSOCIATED WITH PROPOSED PROJECT WITHOUT DENSITY BONUS IN COMPARISON TO APPROVED PROJECT -10 = VOLUME DECREASE ASSOCIATED WITH THE PROPOSED PROJECT WITHOUT DENSITY BONUS IN COMPARISON TO APPROVED PROJECT URBAN CROSSROADS EXHIBIT D: PROJECT PM PEAK HOUR INTERSECTION VOLUME DIFFERENCES WITHOUT DENSITY BONUS 9 MacArthur BI. (NS) / 10 MacArthur BI. (NS) / 11 Von Karman Av. (NS) / 12 MacArthur BI. (NS) / Campus Dr. (EW) Birch St. (EW) Campus Dr. (EW) Von Karman Av. (EW) :;- I f f' 15 Campus Dr. (NS) / 16 Birch St. (NS) / 17 Campus Dr. (NS) / 18 Birch St. (NS) / Bristol St. N (EW) Bristol St. N (EW) Bristol St. S (EW) Bristol St. S (EW) .or. -4 M -T '1 f ' f f f f f -4- 29 Jamboree Rd. (NS) / 69 MacArthur BI. (NS) / MacArthur BI. (EW) 1-405 NB Ramps (EW) .7- 70 MacArthur BI. (NS) / 71 MacArthur Bl. (NS) / 1-405 SB Ramps (EW) Michelson Dr. (EW) OQ f� �7tI- 12907 - 01 - study area. dwg Newport Airport Village LEGEND: Q = INTERSECTION ID '10 = VOLUME INCREASE ASSOCIATED WITH PROPOSED PROJECT WITHOUT DENSITY BONUS IN COMPARISON TO APPROVED PROJECT -10 = VOLUME DECREASE ASSOCIATED WITH THE PROPOSED PROJECT WITHOUT DENSITY BONUS IN COMPARISON TO APPROVED PROJECT URBAN CROSSROADS EXHIBIT E: PROJECT AM PEAK HOUR INTERSECTION VOLUME DIFFERENCES WITH DENSITY BONUS 9 MacArthur BI. (NS) / 10 MacArthur BI. (NS) / 11 Von Karman Av. (NS) / 12 MacArthur BI. (NS) / Campus Dr. (EW) Birch St. (EW) Campus Dr. (EW) Von Karman Av. (EW) �10 �10 �7 ao — (nM • 4-# } f ' f f' ;;� '1 f ' � '1 f f' � •is� •Ism � � � 15 Campus Dr. (NS) / 16 Birch St. (NS) / 17 Campus Dr. (NS) / 18 Birch St. (NS) / Bristol St. N (EW) Bristol St. N (EW) Bristol St. S (EW) Bristol St. S (EW) c%jrj 4-3 10N �---3 1010 1010 i �•6 � i � 3 � �► i �► } f ,6- f f .4— 29 Jamboree Rd. (NS) / 69 MacArthur BI. (NS) / MacArthur BI. (EW) 1-405 NB Ramps (EW) i 9 N i ►f---3 70 MacArthur BI. (NS) / 71 MacArthur Bl. (NS) / 1-405 SB Ramps (EW) Michelson Dr. (EW) QQ QJ`' C ���8 ���►� 0\�L 12907 - 01 - study area. dwg Newport Airport Village LEGEND: Q = INTERSECTION ID •10 = VOLUME INCREASE ASSOCIATED WITH PROPOSED PROJECT WITH DENSITY BONUS IN COMPARISON TO APPROVED PROJECT -10 = VOLUME DECREASE ASSOCIATED WITH THE PROPOSED PROJECT WITH DENSITY BONUS IN COMPARISON TO APPROVED PROJECT URBAN CROSSROADS EXHIBIT F: PROJECT PM PEAK HOUR INTERSECTION VOLUME DIFFERENCES WITH DENSITY BONUS 9 MacArthur BI. (NS) / 10 MacArthur BI. (NS) / 11 Von Karman Av. (NS) / 12 MacArthur BI. (NS) / Campus Dr. (EW) Birch St. (EW) Campus Dr. (EW) Von Karman Av. (EW) �_ �_ 10�_ NN P 9- '1 } f .y- ' f :6- '1 I f f .yam Ln Ln 15 Campus Dr. (NS) / 16 Birch St. (NS) / 17 Campus Dr. (NS) / 18 Birch St. (NS) / Bristol St. N (EW) Bristol St. N (EW) Bristol St. S (EW) Bristol St. S (EW) 4.2 �--•2 3 � �► i �► �.2 11 f ' f +2� f �' .3-4 f f 29 Jamboree Rd. (NS) / 69 MacArthur BI. (NS) / MacArthur BI. (EW) 1-405 NB Ramps (EW) 3 i �► f -• N i �- f --*2 -3� 70 MacArthur BI. (NS) / 71 MacArthur Bl. (NS) / 1-405 SB Ramps (EW) Michelson Dr. (EW) QQ �. v .o eQ i �► f -*2 j i l- - f� �'ff 12907 - 01 - study area. dwg Newport Airport Village LEGEND: Q = INTERSECTION ID •10 = VOLUME INCREASE ASSOCIATED WITH PROPOSED PROJECT WITH DENSITY BONUS IN COMPARISON TO APPROVED PROJECT -10 = VOLUME DECREASE ASSOCIATED WITH THE PROPOSED PROJECT WITH DENSITY BONUS IN COMPARISON TO APPROVED PROJECT URBAN CROSSROADS TABLE 1: NEWPORT AIRPORT VILLAGE TRAFFIC LAND USE DATA 2014 Land Use Element - Land Uses Studied in NBTM ' Proposed project area is 62.7% (16.46 acres) of TAZs 1377 and 1378 combined (26.24 acres) z 60,926 sq. ft. converted into 329 dwelling units per Airport Area Conversion Rates (107,336-60,926 = 46,410) 32014 study included an increase of 238,077 square feet of office in TAZs 1377 and 1378. No increase in the allowed office development for the proposed project. °Total floor area studied in 2014 overestimated allowed capacity so industrial was reduced by 8,234 sq. ft. 'Tall 444 dwelling units were planned to go into the same general area as the current proposed project. 2006 General Plan Update - Land Uses Studied in NBTM TAZ 1377 TAZ 1378 Total Studied Adjustment Proposed (2014) for smaller Project (2006) project Studied area: 62.7%1 General 79,715 91,476 171,191 107,336 46,4102 Commercial General Office 243,262 347,115 590,377 370,166 232,5623 Industrial 19,929 22,869 42,798 26,834 18,6004 Apartments 297 147 444 N/A5 329 (444 w/density bonus) ' Proposed project area is 62.7% (16.46 acres) of TAZs 1377 and 1378 combined (26.24 acres) z 60,926 sq. ft. converted into 329 dwelling units per Airport Area Conversion Rates (107,336-60,926 = 46,410) 32014 study included an increase of 238,077 square feet of office in TAZs 1377 and 1378. No increase in the allowed office development for the proposed project. °Total floor area studied in 2014 overestimated allowed capacity so industrial was reduced by 8,234 sq. ft. 'Tall 444 dwelling units were planned to go into the same general area as the current proposed project. 2006 General Plan Update - Land Uses Studied in NBTM ' Proposed project area is 62.7% (16.46 acres) of TAZs 1377 and 1378 combined (26.24 acres) Z 60,926 sq. ft. Converted into 329 dwelling units per Airport Area Conversion Rates (107,336-60,926 = 46,410) 'Total floor area studied overestimated allowed capacity so industrial was reduced by 8,234 "Proposed project requests a GPA to allow 329 of the 1,650 replacement dwelling units already allowed by the general plan in the MU -1-12 land use category. 10 TAZ 1377 TAZ 1378 Total Adjustment Proposed Studied for smaller Project (2006) project area: Studied 62.7%1 General 79,715 91,476 171,191 107,336 46,4102 Commercial General Office 1721715 198,198 370,913 232,562 232,562 Industrial 19,929 22,869 42,798 26,834 18,6003 Apartments 0 0 0 3294 (444 w/density bonus) ' Proposed project area is 62.7% (16.46 acres) of TAZs 1377 and 1378 combined (26.24 acres) Z 60,926 sq. ft. Converted into 329 dwelling units per Airport Area Conversion Rates (107,336-60,926 = 46,410) 'Total floor area studied overestimated allowed capacity so industrial was reduced by 8,234 "Proposed project requests a GPA to allow 329 of the 1,650 replacement dwelling units already allowed by the general plan in the MU -1-12 land use category. 10 TABLE 2: NBTM TRIP GENERATION COMPARISON NBTM Trip Generation Rates NBTM AM Peak Hour PM Peak Hour In Out Total In Out Total Land Use Code Units Daily Apartment (High -Rise) 3c DU 0.10 0.38 0.48 0.29 0.16 0.45 4.90 General Commercial 10a TSF 1.78 0.80 2.58 1.53 2.02 3.55 38.24 General Office 23a TSF 0.84 0.26 1.10 0.39 0.65 1.04 11.08 Industrial 1 26 1TSF 0.48 0.13 1 0.61 1 0.18 1 0.33 1 0.51 1 5.48 2006 General Plan Update (Approved General Plan) Trip Generation Results NBTM AM Peak Hour PM Peak Hour In NBTM Total In In Out Total In Out Total Land Use Code Quantity' Daily General Commercial 10a 107.336 TSF 191 86 277 164 217 381 4,105 General Office 23a 232.562 TSF 195 60 255 91 151 242 2,577 Industrial 26 26.834 TSF 13 3 16 5 9 14 147 TOTAL 399 149 548 260 1 377 1 637 6,829 Proposed Project Trip Generation Results NBTM AM Peak Hour PM Peak Hour In I Out Total In Out Total Land Use Code Quantity' Daily Apartment (High -Rise) 3c 329 DU 33 125 158 95 53 148 1,612 General Commercial 10a 46.41 TSF 83 37 120 71 94 165 1,775 General Office 23a 232.562 TSF 195 60 255 91 151 242 2,577 Industrial 26 18.6 TSF 9 2 1 11 3 1 6 9 102 TOTAL without Density Bonus 320 224 544 260 304 564 6,066 Apartment (High -Rise) 3c 115 DU 12 44 56 33 18 51 564 TOTAL with Density Bonus 332 268 600 293 322 615 6,630 1 DU = Dwelling Unit, TSF = Thousand Square Feet Difference without Density Bonus -79 75 -4 0 -73 -73 -763 Difference with Density Bonus -67 119 52 33 -55 -22 -199 R:IUXRjobsL12600-130001129071Excel [Trip Gen.x1sxJNBTM-Rev(10200217) 11 TABLE 3: NBTM LAND USE ELEMENT (LUE) TRIP GENERATION COMPARISON NBTM Trip Generation Rates NBTM AM Peak Hour PM Peak Hour In Out Total In Out Total Land Use Code Units Daily Apartment (High -Rise) 3c DU 0.10 0.38 0.48 0.29 0.16 0.45 4.90 General Commercial 10a TSF 1.78 0.80 2.58 1.53 2.02 3.55 38.24 General Office 23a TSF 0.84 0.26 1.10 0.39 0.65 1.04 11.08 Industrial 1 26 1TSF 0.48 0.13 1 0.61 1 0.18 1 0.33 1 0.51 1 5.48 2014 LUE Update Trip Generation Results NBTM AM Peak Hour PM Peak Hour In Out Total In Out Total Land Use Code Quantity' Daily Apartment (High -Rise) 3c 444 DU 44 169 213 129 71 200 2,176 General Commercial 10a 107.336 TSF 191 86 277 164 217 381 4,105 General Office 23a 370.166 TSF 311 96 407 144 241 385 4,101 Industrial 1 26 126.834 TSF 13 3 1 16 1 5 1 9 1 14 147 TOTAL 559 1 354 1 913 1 442 1 538 1 980 1 10,529 Proposed Project Trip Generation Results NBTM AM Peak Hour PM Peak Hour In Out Total In Out Total Land Use Code Quantity' Daily Apartment (High -Rise) 3c 329 DU 33 125 158 95 53 148 1,612 General Commercial 10a 46.41 TSF 83 37 120 71 94 165 1,775 General Office 23a 232.562 TSF 195 60 255 91 151 242 2,577 Industrial 26 18.6 TSF 9 2 1 11 3 1 6 9 102 TOTAL without Density Bonus 320 224 544 260 304 564 6,066 Apartment (High -Rise) 3c 115 DU 12 44 56 33 18 51 564 TOTAL with Density Bonus 332 268 600 293 322 615 6,630 1 DU = Dwelling Unit, TSF = Thousand Square Feet Difference without Density Bonus -239 -130 -369 -182 -234 -416 -4,463 Difference with Density Bonus -227 -86 -313 -149 -216 -365 -3,899 R:�UXRjobsL12600-13000�12907�Excel�(Trip Gen.x1sx1LUE-Rev (20200227) 12 TABLE 4: INTERSECTION ANALYSIS SUMMARY Intersection Approved GP Approved GP with Project DB AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour ICU LOS ICU LOS ICU LOS ICU LOS 9 MacArthur BI. & Campus Dr. 0.58 A 0.67 B 0.58 A 0.67 B 10 MacArthur BI. & Birch St. 0.53 A 0.65 B 0.54 A 0.65 B 11 Von Karman Av. & Campus Dr. 0.69 B 0.74 C 0.69 B 0.74 C 12 MacArthur BI.& Von Karman Av. 0.64 B 0.56 A 0.64 B 0.56 A 15 Campus Dr. & Bristol St. N. 0.51 A 0.75 C 0.51 A 0.75 C 16 Birch St. & Bristol St. N. 0.64 B 0.64 B 0.63 B 0.64 B 17 Campus Dr. & Bristol St. S. 0.81 D 0.59 A 0.81 D 0.59 A 18 Birch St. & Bristol St. S. 0.49 A 0.53 A 0.50 A 0.53 A 29 MacArthur BI. & Jamboree Rd. 0.62 B 0.88 D 0.62 B 0.88 D 69 MacArthur BI. & 1-405 NB Ramps 0.68 B 0.67 B 0.68 B 0.67 B 70 MacArthur BI. & 1-405 SB Ramps 0.61 B 0.77 C 0.61 B 0.76 C 71 MacArthur BI. & Michelson Dr. 0.68 B 0.88 D 0.69 B 0.88 D Intersection LUE Update LUE Update with Project DB AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour ICU LOS ICU LOS ICU LOS ICU LOS 9 MacArthur BI. & Campus Dr. 0.62 B 0.70 B 0.62 B 0.70 B 10 MacArthur BI. & Birch St. 0.57 A 0.71 C 0.57 A 0.71 C 11 Von Karman Av. & Campus Dr. 0.66 B 0.74 C 0.66 B 0.73 C 12 MacArthur BI.& Von Karman Av. 0.62 B 0.58 A 0.62 B 0.57 A 15 Campus Dr. & Bristol St. N. 0.50 A 0.73 C 0.50 A 0.73 C 16 Birch St. & Bristol St. N. 0.60 A 0.64 B 0.60 A 0.64 B 17 Campus Dr. & Bristol St. S. 0.79 C 0.59 A 0.79 C 0.59 A 18 Birch St. & Bristol St. S. 0.49 A 0.53 A 0.49 A 0.53 A 29 MacArthur BI. & Jamboree Rd. 0.64 B 0.89 D 0.64 B 0.89 D 69 MacArthur BI. & 1-405 NB Ramps 0.69 B 0.66 B 0.69 B 0.66 B 70 MacArthur BI. & 1-405 SB Ramps 0.63 B 0.79 C 0.63 B 0.79 C 71 MacArthur BI. & Michelson Dr. 0.70 B 0.90 D 0.70 B 0.90 D R: �UXRjobsL12600-13000�12907�ExceA[ICU review.x1sxjSheet1 13 Attachment 1 14 Attachment 1, Item 1 Model Trip Generation for Approved General Plan NBTM Land Use Code NBTM Land Use Description Quantity Units In AM Peak Hour F Out Total Trips PM Peak Hour In Out Total Daily 1 a Res -Low (SFD)-Balboa 0 DU 0 0 0 0 0 0 0 1 b Res -Low (SFD) 0 DU 0 0 0 0 0 0 0 2a Res -Medium (SFA) -Balboa 0 DU 0 0 0 0 0 0 0 2b Res -Medium (SFA) 0 DU 0 0 0 0 0 0 0 3a Apartment -Balboa 0 DU 0 0 0 0 0 0 0 3b Apartment 0 DU 0 0 0 0 0 0 0 3c Apartment (High -Rise) 0 DU 0 0 0 0 0 0 0 3d Apartment (Res -over -Retail) 0 DU 0 0 0 0 0 0 0 3e Apartment (Mid -Rise Newport Center) 0 DU 0 0 0 0 0 0 0 4 Elderly Residential 0 DU 0 0 0 0 0 0 0 5a Mobile Home -Balboa 0 DU 0 0 0 0 0 0 0 5b Mobile Home 0 DU 0 0 0 0 0 0 0 6 Motel 0 ROOM 0 0 0 0 0 0 0 7 1 Hotel 0 ROOM 0 0 0 0 0 0 0 9 Regional Commercial 0 TSF 0 0 0 0 0 0 0 10a General Commercial 107.336 TSF 191 86 277 164 217 381 4105 10b Comm (Res -over -Retail) 0 TSF 0 0 0 0 0 0 0 11 Comm./Recreation 0 ACRE 0 0 0 0 0 0 0 13 Restaurant 0 TSF 0 0 0 0 0 0 0 15 Fast Food Restaurant 0 TSF 0 0 0 0 0 0 0 16 jAuto Dealer/Sales 0 TSF 0 0 0 0 0 0 0 17 Yacht Club 0 TSF 0 0 0 0 0 0 0 18 Health Club 0 TSF 0 0 0 0 0 0 0 19 Tennis Club 0 CRT 0 0 0 0 0 0 0 20 Marina 0 SLIP 0 0 0 0 0 0 0 21 Theater 0 SEAT 0 0 0 0 0 0 0 22 Newport Dunes 0 ACRE 0 0 0 0 0 0 0 23a General Office 232.562 TSF 195 60 255 91 151 242 2577 23b Office (>300K block Newport Center) 0 TSF 0 0 0 0 0 0 0 24 Medical/Government Office 0 TSF 0 0 0 0 0 0 0 25 R& D 0 TSF 0 0 0 0 0 0 0 26 1 Industrial 26.834 TSF 13 3 16 5 9 14 147 27 Mini-Storage/Warehouse 0 TSF 0 0 0 0 0 0 0 28 Pre-School/Day Care 0 TSF 0 0 0 0 0 0 0 29 Elementary/Private School 0 STU 0 0 0 0 0 0 0 30 Junior/High School 0 STU 0 0 0 0 0 0 0 31 Cultural/Learning Center 0 TSF 0 0 0 0 0 0 0 32 Library 0 TSF 0 0 0 0 0 0 0 33 Post Office 0 TSF 0 0 0 0 0 0 0 34 Hospital 0 BEDS 0 0 0 0 0 0 0 35 Nursing/Conv. Home 0 BEDS 0 0 0 0 0 0 0 36 Church 0 TSF 0 0 0 0 0 0 0 37 Youth Ctr/Service 0 TSF 0 0 0 0 0 0 0 38 Park 0 ACRE 0 0 0 0 0 0 0 39 Regional Park 0 ACRE 0 0 0 0 0 0 0 40 Golf Course 0 ACRE 0 0 0 0 0 0 0 41 Resort Golf Course 0 ACRE 0 0 0 0 0 0 0 Total 1 399 149 548 260 377 637 6829 \UXRjobs\_12600-13000\12907\Excel\[TG-Calculator.xlsx]TG-Approved 15 Attachment 1, Item 2 Model Trip Generation with Proposed Project NBTM Land Use Code NBTM Land Use Description Quantity Units In AM Peak Hour F Out Total Trips PM Peak Hour In Out Total Daily 1 a Res -Low (SFD)-Balboa 0 DU 0 0 0 0 0 0 0 1 b Res -Low (SFD) 0 DU 0 0 0 0 0 0 0 2a Res -Medium (SFA) -Balboa 0 DU 0 0 0 0 0 0 0 2b Res -Medium (SFA) 0 DU 0 0 0 0 0 0 0 3a Apartment -Balboa 0 DU 0 0 0 0 0 0 0 3b Apartment 0 DU 0 0 0 0 0 0 0 3c Apartment (High -Rise) 329 DU 33 125 158 95 53 148 1612 3d Apartment (Res -over -Retail) 0 DU 0 0 0 0 0 0 0 3e Apartment (Mid -Rise Newport Center) 0 DU 0 0 0 0 0 0 0 4 Elderly Residential 0 DU 0 0 0 0 0 0 0 5a Mobile Home -Balboa 0 DU 0 0 0 0 0 0 0 5b Mobile Home 0 DU 0 0 0 0 0 0 0 6 Motel 0 ROOM 0 0 0 0 0 0 0 7 1 Hotel 0 ROOM 0 0 0 0 0 0 0 9 Regional Commercial 0 TSF 0 0 0 0 0 0 0 10a General Commercial 46.41 TSF 83 37 120 71 94 165 1775 10b Comm (Res -over -Retail) 0 TSF 0 0 0 0 0 0 0 11 Comm./Recreation 0 ACRE 0 0 0 0 0 0 0 13 Restaurant 0 TSF 0 0 0 0 0 0 0 15 Fast Food Restaurant 0 TSF 0 0 0 0 0 0 0 16 JAuto Dealer/Sales 0 TSF 0 0 0 0 0 0 0 17 Yacht Club 0 TSF 0 0 0 0 0 0 0 18 Health Club 0 TSF 0 0 0 0 0 0 0 19 Tennis Club 0 CRT 0 0 0 0 0 0 0 20 Marina 0 SLIP 0 0 0 0 0 0 0 21 Theater 0 SEAT 0 0 0 0 0 0 0 22 Newport Dunes 0 ACRE 0 0 0 0 0 0 0 23a General Office 232.562 TSF 195 60 255 91 151 242 2577 23b Office (>300K block Newport Center) 0 TSF 0 0 0 0 0 0 0 24 Medical/Government Office 0 TSF 0 0 0 0 0 0 0 25 R& D 0 TSF 0 0 0 0 0 0 0 26 1 Industrial 18.6 TSF 9 2 11 3 6 9 102 27 Mini-Storage/Warehouse 0 TSF 0 0 0 0 0 0 0 28 Pre-School/Day Care 0 TSF 0 0 0 0 0 0 0 29 Elementary/Private School 0 STU 0 0 0 0 0 0 0 30 Junior/High School 0 STU 0 0 0 0 0 0 0 31 Cultural/Learning Center 0 TSF 0 0 0 0 0 0 0 32 Library 0 TSF 0 0 0 0 0 0 0 33 Post Office 0 TSF 0 0 0 0 0 0 0 34 Hospital 0 BEDS 0 0 0 0 0 0 0 35 Nursing/Conv. Home 0 BEDS 0 0 0 0 0 0 0 36 Church 0 TSF 0 0 0 0 0 0 0 37 Youth Ctr/Service 0 TSF 0 0 0 0 0 0 0 38 Park 0 ACRE 0 0 0 0 0 0 0 39 Regional Park 0 ACRE 0 0 0 0 0 0 0 40 Golf Course 0 ACRE 0 0 0 0 0 0 0 41 Resort Golf Course 0 ACRE 0 0 0 0 0 0 0 Total i 320 224 544 260 304 564 6066 \UXRjobs\_12600-13000\12907\Excel\[TG-Calculator.XISX]TG-Proposed In Attachment 1, Item 3 Model Trip Generation for Density Bonus Units NBTM Land Use Code NBTM Land Use Description Quantity Units In AM Peak Hour 7 Out Total Trips PM Peak Hour In Out Total Daily 1a Res -Low (SFD)-Balboa 0 DU 0 0 0 0 0 0 0 1 b Res -Low (SFD) 0 DU 0 0 0 0 0 0 0 2a Res -Medium (SFA) -Balboa 0 DU 0 0 0 0 0 0 0 2b Res -Medium (SFA) 0 DU 0 0 0 0 0 0 0 3a Apartment -Balboa 0 DU 0 0 0 0 0 0 0 3b Apartment 0 DU 0 0 0 0 0 0 0 3c Apartment (High -Rise) 115 DU 12 44 55 33 18 52 564 3d Apartment (Res -over -Retail) 0 DU 0 0 0 0 0 0 0 3e Apartment (Mid -Rise Newport Center) 0 DU 0 0 0 0 0 0 0 4 Elderly Residential 0 DU 0 0 0 0 0 0 0 5a Mobile Home -Balboa 0 DU 0 0 0 0 0 0 0 5b Mobile Home 0 DU 0 0 0 0 0 0 0 6 Motel 0 ROOM 0 0 0 0 0 0 0 7 Hotel 0 ROOM 0 0 0 0 0 0 0 9 Regional Commercial 0 TSF 0 0 0 0 0 0 0 10a General Commercial 0 TSF 0 0 0 0 0 0 0 10b Comm (Res -over -Retail) 0 TSF 0 0 0 0 0 0 0 11 Comm./Recreation 0 ACRE 0 0 0 0 0 0 0 13 Restaurant 0 TSF 0 0 0 0 0 0 0 15 Fast Food Restaurant 0 TSF 0 0 0 0 0 0 0 16 Auto Dealer/Sales 0 TSF 0 0 0 0 0 0 0 17 Yacht Club 0 TSF 0 0 0 0 0 0 0 18 Health Club 0 TSF 0 0 0 0 0 0 0 19 Tennis Club 0 CRT 0 0 0 0 0 0 0 20 Marina 0 SLIP 0 0 0 0 0 0 0 21 Theater 0 SEAT 0 0 0 0 0 0 0 22 Newport Dunes 0 ACRE 0 0 0 0 0 0 0 23a General Office 0 TSF 0 0 0 0 0 0 0 23b Office (>300K block Newport Center) 0 TSF 0 0 0 0 0 0 0 24 Medical/Government Office 0 TSF 0 0 0 0 0 0 0 25 R&D 0 TSF 0 0 0 0 0 0 0 26 Industrial 0 TSF 0 0 0 0 0 0 0 27 Mini-Storage/Warehouse 0 TSF 0 0 0 0 0 0 0 28 Pre-School/Day Care 0 TSF 0 0 0 0 0 0 0 29 Elementary/Private School 0 STU 0 0 0 0 0 0 0 30 Junior/High School 0 STU 0 0 0 0 0 0 0 31 Cultural/Learning Center 0 TSF 0 0 0 0 0 0 0 32 Library 0 TSF 0 0 0 0 0 0 0 33 Post Office 0 TSF 0 0 0 0 0 0 0 34 Hospital 0 BEDS 0 0 0 0 0 0 0 35 Nursing/Conv. Home 0 BEDS 0 0 0 0 0 0 0 36 Church 0 TSF 0 0 0 0 0 0 0 37 Youth Ctr/Service 0 TSF 0 0 1 0 0 0 0 0 38 Park 0 ACRE 0 0 0 0 0 0 0 39 Regional Park 0 ACRE 0 0 0 0 0 0 0 40 Golf Course 0 ACRE 0 0 0 0 0 0 0 41 Resort Golf Course 0 ACRE 0 0 0 0 0 0 0 Total 12 44 55 33 18 52 564 \UXRjobs\_12600-13000\12907\Excel\[TG-Calculator.xlsx]DB Res 17 Attachment 2 18 9 . MacArthur B1 at Campus Dr GP Baseline TOTAL CAPACITY UTILIZATION 10 . MacArthur Bl at Birch St GP Baseline 583 .669 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 220 .069 185 .058* NBT 4 6400 987 154* 1221 .191 NBR 1 1600 90 .056 46 .029 SBL 1 1600 193 .121* 143 .089 SBT 3.5 8000 925 .193 1106 .225* SBR 1.5 0 673 .210 697 EBL 2 3200 546 .171* 461 .144* EBT 3 4800 1057 .220 622 .130 EBR d 1600 128 .080 163 .102 WBL 2 3200 57 .018 83 .026 WBT 3 4800 638 .133* 1160 .242* WBR f 57 131 Right Turn Adjustment SBR 004* TOTAL CAPACITY UTILIZATION 10 . MacArthur Bl at Birch St GP Baseline 583 .669 TOTAL CAPACITY UTILIZATION 19 .533 .650 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 35 .022 142 .089* NBT 3 4800 878 .183* 854 .178 NBR 1 1600 81 .051 60 .038 SBL 1 1600 106 .C66* 114 .071 SBT 4 6400 726 .151 1138 .222* SBR 0 0 265 .166 280 EBL 1.5 190 314 EBT 1.5 4800 514 .165* 426 _161* EBR 0 87 34 WBL 1 1600 47 .029 108 .068 WBT 2 3200 380 .119* 569 .178* WBR f 162 202 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION 19 .533 .650 11 . Von Karman Av at Campus GP Baseline AM PK HOUR PM PK HOUR LANES CAPACITY AM PK HOUR PM PK HOUR NBL LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 39 .024 50 .031* NBT 2 3200 853 .292* 564 .223 NBR 0 0 82 .046* 148 .030 SBL 1 1600 93 .058* 224 .140 SBT 2 3200 641 .263 815 .370* SBR 0 0 201 .008* 368 .064 EBL 2 3200 274 .086* 234 .073* EBT 2 3200 526 .185 791 .272 EBR 0 0 66 .049 79 .207* WBL 1 1600 124 .078 78 .049 WBT 2 3200 703 .256* 745 .265* WBR 0 0 116 .289* 104 TOTAL CAPACITY UTILIZATION 12 . MacArthur Bl at Von Karman GP Baseline 692 .739 TOTAL CAPACITY UTILIZATION +7i .641 .559 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 44 .028 40 .025* NBT 3 4800 915 191* 806 .168 NBR 1 1600 768 .480 191 .119 SBL 1 1600 74 .046* 48 .030 SBT 3 4800 573 .119 1248 .260* SBR 1 1600 135 .084 68 .043 EBL 1 1600 13 .008* 103 .064 EBT 2 3200 89 .028 213 .067* EBR f 19 135 WBL 2 3200 157 .049 663 .207* WBT 1 1600 171 .107* 102 .064 WBR f 52 143 Right Turn Adjustment NBR .289* TOTAL CAPACITY UTILIZATION +7i .641 .559 15 . Campus Dr at Bristol St(N) GP Baseline TOTAL CAPACITY UTILIZATION 16 . Birch St at Bristol St(N) GP Baseline .507 .748 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 518 .162 488 .153* NBT 4 6400 2110 .330* 1036 .162 NBR 0 0 0 0 0 0 SBL 0 0 0 0 0 0 SBT 4 6400 547 .085 1317 .206* SBR 3 4800 229 .048 1191 .248 EBL a 0 0 0 0 0 EBT 0 0 0 0 0 0 EBR a 0 0 0 0 0 WBL 1 1600 283 .177* 303 .189 WBT 5 8000 1193 .168 2671 .347* WBR 0 0 150 376 104 194 Right Turn Adjustment E/W Split Phasing SBR 042* TOTAL CAPACITY UTILIZATION 16 . Birch St at Bristol St(N) GP Baseline .507 .748 TOTAL CAPACITY UTILIZATION 21 .636 .636 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 85 .027 164 .051* NBT 2 3200 1214 .379* 466 .146 NBR 0 0 0 0 SBL 0 0 0 0 SBT 1.5 6400 264 .083 562 .231* SBR 2.5 245 .077 918 EBL 0 0 0 0 EBT 0 0 0 0 EBR 0 0 0 0 WBL 1.5 376 578 WBT 3.5 8000 1300 .257* 2058 .354* WBR 0 376 194 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION 21 .636 .636 17 . Campus Dr at Bristol St(S) GP Baseline TOTAL CAPACITY UTILIZATION .811 .587 18 . Birch St at Bristol St(S) GP Baseline AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 5 8000 1362 .206* 1002 _157* NBR 0 0 287 309 .193 SBL 1 1600 171 .107* 258 .161* SBT 3 4800 658 .137 1361 .284 SBR 0 0 0 0 EBL 1.5 1272 518 .121 EBT 2.5 6400 1914 .498* 973 .233* EBR 2 3200 534 .167 569 .178 WBL 0 0 0 0 WBT 0 0 0 0 WBR 0 0 0 0 Right Turn Adjustment E/W Split Phasing NBR _036* Note: Assumes E/W Sp7it Phasing TOTAL CAPACITY UTILIZATION .811 .587 18 . Birch St at Bristol St(S) GP Baseline TOTAL CAPACITY UTILIZATION .494 .527 22 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 2.5 6400 538 .156* 438 .097 NBR 1.5 462 182 SBL 2 3200 170 .053* 17D .053 SBT 2 3200 470 .147 973 .304* SBR 0 0 0 0 EBL 1.5 752 194 .121 EBT 3.5 8000 1378 .285* 1315 .223* EBR 0 150 110 WBL 0 0 0 0 WBT 0 0 0 0 WBR 0 0 D 0 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION .494 .527 22 29 . MacArthur Bl at Jamboree Rd GP Baseline TOTAL CAPACITY UTILIZATION 30 . Jamboree Rd at Bristol St{N GP Baseline PM PK HOUR VOL V/C 380 .119* 492 .077 336 .210 210 .044 1445 .301* 517 415 .130* 1085 .170 127 .079 638 .133 1572 .328* 213 .133 .620 .878 AM PK HOUR PM PK LANES CAPACITY VOL V/C NBL 2 3200 345 .108* NBT 4 6400 1136 .178 NBR 1 1600 385 .241 SBL 3 4800 54 .011 SBT 3 4800 523 .109* SBR f 0 196 EBL 2 3200 536 .168* EBT 4 6400 1361 .213 EBR 1 1600 497 311 WBL 3 4800 440 .092 WBT 3 4800 1089 .227* WBR 1 1600 88 .055 Right Turn Adjustment 0 EBR .008* Note: Assumes Right -Turn Overlap for NBR TOTAL CAPACITY UTILIZATION 30 . Jamboree Rd at Bristol St{N GP Baseline PM PK HOUR VOL V/C 380 .119* 492 .077 336 .210 210 .044 1445 .301* 517 415 .130* 1085 .170 127 .079 638 .133 1572 .328* 213 .133 .620 .878 TOTAL CAPACITY UTILIZATION 23 .483 .666 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 743 .232 803 .251* NBT 2.5 6400 2320 .483* 1510 .377 NBR 1.5 690 .431 900 SBL 0 0 0 0 SBT 3.5 8000 1040 .203 1270 .265* SBR 1.5 587 1327 .415 EBL 0 0 0 0 EBT 0 0 0 0 EBR 0 0 0 0 WK 0 0 0 0 WBT 0 0 0 0 WBR 0 0 0 0 Right Turn Adjustment SBR .150* TOTAL CAPACITY UTILIZATION 23 .483 .666 69 . MacArthur Bl. at I-405 NB Ramps GP Baseline (IRVINE ISEC) AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 4 6800 2009 .30* 2177 .32* NBR 2 3400 358 .11 1115 33 SBL 2 3400 162 .05* 495 .15* SBT 4 6800 1431 .21 2042 .30 SBR 0 0 0 0 EBL 0 0 0 0 EBT 0 0 0 0 EBR 0 0 0 0 i WBL 2 3400 889 .26* 518 .15* WBT 0 0 0 0 WBR 2 3400 1091 .32 423 .12 Right Turn Adjustment WBR 02* Clearance Interval .05* .05* TOTAL CAPACITY UTILIZATION 68 .67 71 . MacArthur B1. at Michelson Dr. GP Baseline (IRVINE ISEC) # AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C I 1 I NBL 1 1700 254 .15 212 .12 NBT 4 6800 1319 .19* 1759 .26* J NBR 1 1700 300 .18 119 .07 SBL 2 3400 973 .29* 619 .18* SBT 4 6800 1590 .24 1520 .23 SBR 0 0 14 12 EBL 2 3400 347 .10* 385 .11 EBT 1 1700 78 .05 112 .07* EBR 1 1700 86 .05 134 .08 WBL 2 3400 95 .03 517 .15* WBT 1 1700 92 .05* 107 .06 WBR 1 1700 264 ,16 776 .46 � I Right Turn Adjustment WBR 17* Clearance Interval .05* .05* Note: Assumes Right -Turn Overlap for WBR � TOTAL CAPACITY UTILIZATION 68 -88 24 70 . MacArthur B1. at I.405 SB Ramps GP Baseline (IRVINE ISEC) AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 4 6800 1499 .22* 2690 .43* NBR 1 1700 432 .25 676 .4C SBL 2 3400 160 .05* 477 .14* SBT 4 6800 1692 .25 1719 .25 SBR 1 1700 475 .28 384 .23 I EBL 0 0 0 0 LBT 0 0 0 0 EBR 0 0 0 0 WBL 2 3400 994 .29* 507 .15* WBT 1 1700 138 .0B 157 .09 WBR f 809 369 Clearance Interval .05* .05* Note: Assumes Right -Turn Overlap for NBR j TOTAL CAPACITY UTILIZATION .61 .77 72 . Von Karman Av. at Barranca Pkwy. GP Baseline (IRVINE ISEC) AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3400 183 .05* 319 .09 NBT 2 3400 576 ,17 1445 .43* N8R d 1700 152 .09 377 .22 SBL 2 3400 285 .08 441 .13* SBT 2 3400 1131 .33* 661 .19 SBR 2 3400 347 .10 388 .11 EBL 2 3400 224 .07* 507 .15 EBT 3 5100 552 -11 1193 .23* EBR 1 1700 235 .14 200 .12 WBL 2 3410 544 .16 159 .05* WBT 4 6800 1480 .22* 833 .12 WBR 1 1700 510 .30 408 .24 Right Turn Adjustment WBR .01* Clearance Interval .05* 05* Note. Assumes Right -Turn Overlap for SBR TOTAL CAPACITY UTILIZATION .72 .90 Attachment 3 25 9 . MacArthur Bl at Campus Dr GP Project TOTAL CAPACITY UTILIZATION 10 . MacArthur Bl at Birch St GP Project .624 699 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 245 .077 189 .059* NBT 4 6400 1072 .168* 1268 .198 NBR 1 1600 83 .052 47 .029 SBL 1 1600 170 .106* 157 .098 SBT 3.5 8000 849 .177 1283 .254* SBR 1.5 0 718 .224 752 EBL 2 3200 610 .209* 482 .151* EBT 3 4800 1106 .230 646 .135 EBR d 1600 139 .087 180 .113 WBL 2 3200 42 .013 87 .027 WBT 3 4800 547 .114* 1129 .235* WBR f 47 130 Right Turn Adjustment SBR .027* TOTAL CAPACITY UTILIZATION 10 . MacArthur Bl at Birch St GP Project .624 699 TOTAL CAPACITY UTILIZATION 570 .710 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 34 .021 151 .094* NBT 3 4800 911 .190* 872 .182 NBR 1 1600 67 .042 63 .039 SBL 1 1600 85 .053* 136 .085 SBT 4 6400 687 .143 1249 .248* SBR 0 0 255 .159 336 EBL 1.5 261 338 EBT 1.5 4800 567 .196* 472 .176* EBR 0 112 34 WBL 1 1600 51 .032 107 067 WBT 2 3200 420 .131* 613 .192* WBR f 188 210 Note: Assumes E/W Sp1lt Phasing TOTAL CAPACITY UTILIZATION 570 .710 11 . Von Karman Av at Campus GP Project AM PK HOUR PM PK HOUR LANES CAPACITY AM PK HOUR PM PK HOUR NBL LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 47 .029 50 .031* NBT 2 3200 885 .308* 567 .226 NBR 0 0 101 .040* 155 .031 SBL 1 1600 91 .057* 216 .135 SBT 2 3200 724 _288 845 .369* SBR 0 0 196 .014* 335 .064 EBL 2 3200 263 .082* 228 .071 EBT 2 3200 597 .214 809 .280* EBR 0 0 87 .056 87 .210* WBL 1 1600 120 .075 88 .055* WBT 2 3200 586 .209* 735 .262 WBR 0 0 82 .270* 104 TOTAL CAPACITY UTILIZATION 12 . MacArthur B1 at Von Karman GP Project .656 735 TOTAL CAPACITY UTILIZATION 27 623 ,575 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 46 .029 51 .032* NBT 3 4800 906 .189* 833 .174 NBR 1 1600 735 .459 201 .126 SBL 1 1600 64 .040* 49 .031 SBT 3 4800 601 .125 1282 .267* SBR 1 1600 128 .080 84 .053 EBL 1 1600 23 .014* 102 .064 EBT 2 3200 151 .047 212 .066* EBR f 40 137 WBL 2 3200 179 .056 672 .210* WBT 1 1600 176 .110* 125 .018 WBR f 51 141 Right Turn Adjustment NBR .270* TOTAL CAPACITY UTILIZATION 27 623 ,575 15 . Campus Or at Bristol St(N) GP Project TOTAL CAPACITY UTILIZATION 16 . Birch St at Bristol St(N) GP Project .499 .727 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 546 .171 467 .146* NBT 4 6400 2042 .319* 1060 .166 NBR 0 0 0 0 0 0 SBL 0 0 0 0 0 0 SBT 4 6400 552 .086 1269 .198* SBR 3 4800 244 .051 1141 .238 EBL 0 0 0 0 0 0 EBT 0 0 0 0 0 0 EBR 0 0 0 0 0 0 WBL 1 1600 288 .180* 301 .188 WBT 5 8000 1281 .179 2632 .343* WBR 0 0 148 353 110 195 Right Turn Adjustment E/W Split Phasing SBR .040* TOTAL CAPACITY UTILIZATION 16 . Birch St at Bristol St(N) GP Project .499 .727 TOTAL CAPACITY UTILIZATION 28 602 .636 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 84 .026 174 .054* NBT 2 3200 1111 347* 496 .155 NBR 0 0 0 0 SBL 0 0 0 0 SBT 1.5 6400 315 .098 560 .225* SBR 2.5 314 .098 880 EBL 0 0 0 0 EBT 0 0 0 0 EBR 0 0 0 0 WBL 1.5 357 602 WBT 3.5 8000 1326 .255* 2062 .357* WBR 0 353 195 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION 28 602 .636 17 . Carpus Dr at Bristol St(S) GP Project TOTAL CAPACITY UTILIZATION 18 . Birch St at Bristol St(S) GP Project .789 .586 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 5 8000 1386 .210* 988 .154* NBR, 0 0 295 303 .189 SBL 1 1600 170 .106* 255 .159* SBT 3 4800 669 .139 1314 .274 SBR 0 0 0 0 EBL 1.5 1204 532 .130 EBT 2.5 6400 1825 .473* 992 .238* EBR 2 3200 521 .163 566 .177 WBL 0 0 0 0 WBT 0 0 0 0 WBR 0 0 0 0 Right Turn Adjustment E/W Split Phasing NBR .035* Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION 18 . Birch St at Bristol St(S) GP Project .789 .586 TOTAL CAPACITY UTILIZATION 29 .489 .529 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 2.5 6400 524 .161* 462 .100 NBR 1.5 506 178 SBL 2 3200 170 .053* 177 .055 SBT 2 3200 501 .157 983 .307* SBR 0 0 0 0 EBL 1.5 666 208 .130 EBT 3.5 8000 1374 .275* 1315 .222* EBR 0 159 107 WBL 0 0 0 0 WBT 0 0 0 0 WBR 0 0 0 0 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION 29 .489 .529 29 . MacArthur B1 at Jamboree Rd GP Project TOTAL CAPACITY UTILIZATION 30 . Jamboree Rd at Bristol St(N GP Project PM PK HOUR VOL V/C 384 .120* 513 .080 352 .220 221 .046 1467 .306* 524 431 .135* 1138 .118 128 080 638 .133 1566 .326* 218 .136 .638 .887 AM PK HOUR PM PK LANES CAPACITY VOL V/C NK 2 3200 365 .114* NBT 4 6400 1093 .171 NBR 1 1600 400 .250 SBL 3 4800 59 .012 SBT 3 4800 548 .174* SBR f 0 216 EBL 2 3200 524 .164* EBT 4 6400 1434 .224 EBR 1 1600 505 .316 WBL 3 4800 450 .094 WBT 3 4800 1173 .244* WBR 1 1600 86 .054 Right Turn Adjustment EBR .002* Note: Assumes Right -Turn Overlap for NBR TOTAL CAPACITY UTILIZATION 30 . Jamboree Rd at Bristol St(N GP Project PM PK HOUR VOL V/C 384 .120* 513 .080 352 .220 221 .046 1467 .306* 524 431 .135* 1138 .118 128 080 638 .133 1566 .326* 218 .136 .638 .887 TOTAL CAPACITY UTILIZATION 30 .494 .672 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 730 .228 805 .252* NBT 2.5 6400 2370 .494* 1610 .392 NBR 1.5 690 .431 900 SBL 0 0 0 0 SBT 3.5 8000 1110 .218 1280 .267* SBR 1.5 630 1345 .420 EBL 0 0 0 0 EBT 0 0 0 0 EBR 0 0 0 0 WBL 0 0 0 0 WBT 0 0 0 0 WBR 0 0 0 0 Right Turn Adjustment SBR .153* TOTAL CAPACITY UTILIZATION 30 .494 .672 69 . MacArthur B1. at I.405 NB Ramps GP Project (IRVINE ISEC) AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C I J NBL 0 0 0 0 NBT 4 6800 2105 .31* 2183 .32* NBR 2 3400 392 .12 1206 .35 � I SBL 2 3400 159 .05* 479 .14* SBT 4 6800 1386 .20 2105 .31 SBR 0 0 0 0 EBL 0 0 0 0 J EBT 0 0 0 0 j EBR 0 0 0 0 I � WBL 2 3400 914 .27* 517 .15* J WBT 0 0 0 0 WBR 2 3400 1087 .32 428 .13 Right Turn Adjustment WBR .01* Clearance Interval .05* .05* TOTAL CAPACITY UTILIZATION .69 .66 71 . MacArthur B1. at Michelson Dr. GP Project (IRVINE ISEC) AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1700 275 .16 158 .09 NBT 4 6800 1427 .21* 1864 .27* NBR 1 1700 315 .19 122 .07 SBL 2 3400 1024 .30* 619 .18* SBT 4 6800 1631 .24 1626 _24 SBR 0 0 14 12 I EBL 2 3400 355 .10* 361 .11 EBT 1 1700 77 .05 83 .05* EBR 1 1700 85 .05 140 .08 WBL 2 3400 106 .03 550 .16* WBT 1 1700 69 .04* 91 .05 WBR 1 1700 263 .15 794 .47 I Right Turn Adjustment WBR .19* Clearance Interval 05* .05* Note: Assumes Right -Turn Overlap for WBR I TOTAL CAPACITY UTILIZATION .70 .90 31 70 . MacArthur B1. at I-405 SB Ramps GP Project (IRVINE ISEC) AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 a 0 NBT 4 6800 1628 .24* 2990 .44* j NBR 1 1700 447 .26 682 .40 I SBL 2 3400 156 .05* 468 .14* SBT 4 6800 1764 .26 1788 .26 SBR 1 1700 387 .23 387 .23 I EBL 0 0 0 0 J EBT 0 0 0 0 J EBR 0 0 0 0 I WBL 2 3400 987 .29* 535 .16* WBT 1 1700 148 .09 158 .09 WBR f 810 366 I Clearance Interval .05* .05* Note: Assumes Right -Turn Overlap for NBR + TOTAL CAPACITY UTILIZATION .63 .79 72 . Von Karman Av. at Barranca Pkwy. GP Project (IRVINE ISEC) AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3400 177 .05* 332 .10 NBT 2 3400 571 .17 1463 .43* NBR d 1700 164 .10 376 .22 SBL 2 3400 225 .07 428 .13* SBT 2 3400 1133 .33* 678 .20 SBR 2 3400 341 .10 388 .11 EBL 2 3400 223 .07* 506 I .15 EBT 3 5100 578 ,11 1183 .23* EBR 1 1700 231 .14 186 .11 WBL 2 3400 539 16 162 .05* WBT 4 6800 1483 .22* 839 12 WBR 1 1700 532 .31 393 .23 Clearance Interval .05* I .05* Note: Assumes Right -Turn Overlap for SBR TOTAL CAPACITY UTILIZATION .72 .89 Attachment 4 32 9 . MacArthur B1 at Campus Dr GP Baseline wDB AM PK HOUR PM PK HOUR LANES CAPACITY AM PK HOUR PM PK HOUR NBL LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 220 .069 185 .058* NBT 4 6400 987 .154* 1221 .191 NBR 1 1600 90 .056 46 .029 SBL 1 1600 193 .121* 143 .089 SBT 3.5 8000 925 .193 1106 .226* SBR 1.5 660 .206 703 EBL 2 3200 570 .178* 450 .141* EBT 3 4800 1074 .224 613 .128 EBR d 1600 128 .080 163 .102 WBL 2 3200 57 .018 83 .026 WBT 3 4800 628 .131* 1165 .243* WBR f E/W Split 57 131 TOTAL CAPACITY UTILIZATION 10 . MacArthur Bl at Birch St GP Baseline wDB .584 .668 TOTAL CAPACITY UTILIZATION 33 537 .651 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 24 .015 147 .092* NBT 3 4800 878 .183* 854 .178 NBR 1 1600 81 .051 60 .038 SBL 1 1600 106 .066* 114 .071 SBT 4 6400 726 .151 1138 .222* SBR 0 0 265 .166 280 EBL 1.5 190 314 EBT 1.5 4800 532 .172* 417 .158* EBR 0 105 25 WBL 1 1600 47 .029 108 .068 WBT 2 3200 370 .116* 574 .179* WBR f 162 202 Note: ASSLImes E/W Split Phasing TOTAL CAPACITY UTILIZATION 33 537 .651 11 . Von Karman Av at Campos GP Baseline wDB AM PK HOUR PM PK HOUR LANES CAPACITY VOL AM PK HOUR PM PK HOUR 1 LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 39 .024 50 .031* NBT 2 3200 859 .294* 561 .222 NBR 0 0 82 48 148 SBT SBL 1 1600 93 .058* 224 .140 SBT 2 3200 638 .293 817 .371* SBR 0 0 298 103 370 EBT EBL 2 3200 280 .088* 231 .072* EBT 2 3200 537 .188 785 .270 EBR 0 0 66 663 79 WBT WBL 1 1600 124 .078 78 .049 WBT 2 3200 696 .254* 748 .266* WBR 0 0 116 104 TOTAL CAPACITY UTILIZATION 12 . MacArthur B1 at Von Karman GP Baseline wDB .694 740 TOTAL CAPACITY UTILIZATION 34 .641 .557 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 44 .028 40 .025* NBT 3 4800 904 .188* 811 .169 NBR 1 1600 768 .480 191 .119 SBL 1 1600 74 .046* 48 .030 SBT 3 4800 591 .123 1239 .258* SBR 1 1600 135 .084 68 .043 EBL 1 1600 13 .008* 103 .064 EBT 2 3200 89 .028 213 .067* EBR f 19 135 WBL 2 3200 157 .049 663 .207* WBT 1 1600 171 .107* 102 .064 WBR f 52 143 Right Turn Adjustment NBR .292* TOTAL CAPACITY UTILIZATION 34 .641 .557 15 . Campus Dr at Bristol St(N) GP Baseline wDB TOTAL CAPACITY UTILIZATION .505 .747 16 . Birch St at Bristol St(N) GP Baseline wDB AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 518 .162 488 .153* NBT 4 6400 2100 .328* 1041 .163 NBR 0 0 0 0 0 0 SBL 0 0 0 0 0 0 SBT 4 6400 559 .087 1313 .205* SBR 3 4800 241 .050 1186 .247 EBL 0 0 0 0 0 0 EBT 0 0 0 0 0 0 EBR 0 0 0 0 0 0 WBL 1 1600 283 .177* 303 .189 WBT 5 8000 1199 .168 2668 .347* WBR 0 0 147 373 106 195 Right Turn Adjustment E/W Split Phasing SBR 042* TOTAL CAPACITY UTILIZATION .505 .747 16 . Birch St at Bristol St(N) GP Baseline wDB TOTAL CAPACITY UTILIZATION 35 .633 .635 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 85 .027 164 .051* NBT 2 3200 1207 .377* 469 .147 NBR 0 0 0 0 SBL 0 0 0 0 SBT 1.5 6400 276 .086 558 .230* SBR 2.5 251 .078 915 EBL 0 0 0 0 EBT 0 0 0 0 EBR 0 0 0 0 WBL 1.5 376 578 WBT 3.5 8000 1297 .256* 2060 .354* WBR 0 373 195 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION 35 .633 .635 17 . Campus Dr at Bristol St(S) GP Baseline wDB TOTAL CAPACITY UTILIZATION 813 .585 18 . Birch St at Bristol St(S) GP Baseline wDB AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 5 8000 1359 .206* 1006 .157* NBR 0 0 287 309 .193 SSL 1 1600 177 .111* 255 .159* SBT 3 4800 662 .138 1360 .283 SBR 0 0 0 0 EBL 1.5 1265 517 .124 EBT 2.5 6400 1910 .496* 974 .233* EBR 2 3200 534 .167 570 .178 WBL 0 0 0 0 WBT 0 0 0 0 WBR 0 0 0 0 Right Turn Adjustment E/W Split Phasing NBR .036* Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION 813 .585 18 . Birch St at Bristol St(S) GP Baseline wDB TOTAL CAPACITY UTILIZATION .496 .527 36 AM PK HOUR PM PK HOUR LAMES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 2.5 6400 535 .156* 439 .097 NBR 1.5 462 182 SBL 2 3200 176 .055* 167 .052 SBT 2 3200 476 .149 972 .304* SBR 0 0 0 0 ESL 1.5 748 198 .124 EBT 3.5 8000 1384 .285* 1317 .223* EBR 0 150 110 WBL 0 0 0 0 WBT 0 0 0 0 WBR 0 0 0 0 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION .496 .527 36 29 . MacArthur Bl at Jamboree Rd GP Baseline wDB TOTAL CAPACITY UTILIZATION .622 37 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 342 .107* 382 .119* NBT 4 6400 1136 .178 492 .077 NBR 1 1600 385 .241 336 .210 SBL 3 4800 54 .011 210 .044 SBT 3 4800 523 .109* 1445 .301* SBR f 196 517 EBL 2 3200 536 ,168* 415 .130* EBT 4 6400 1373 .215 1079 .169 EBR 1 1600 503 .314 124 .078 WBL 3 4800 440 .092 638 .133 WBT 3 4800 1080 .225* 1575 .328* WBR 1 1600 88 .055 213 .133 Right Turn Adjustment EBR .013* Note: Assumes Right -Turn Overlap for NBR TOTAL CAPACITY UTILIZATION .622 37 79 MacArthur Bl. at I-405 NB Ramps GP Baseline wDB(IRVINE ISEC) 3 3 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 .15 0 .12 NBT 4 6800 2015 .30* 2174 .32* NBR 2 3400 371 .11 1111 .33 SBL 2 3400 162 .05* 495 .15* SBT 4 6800 1429 .21 2045 .30 SBR 0 0 0 .25 0 .25 EBL 0 0 0 .10* 0 .11 EBT 0 0 0 .05 0 .07* EBR 0 0 0 .05 0 .08 WBL 2 3400 886 .26* 519 .15* WBT 0 0 0 .05* 0 .06 WBR 2 3400 1088 .32 423 .12 Right Turn Adjustment WBR .02* WBR .17* Clearance Interval f .05* 809 .05* TOTAL CAPACITY UTILIZATION .68 .67 82 MacArthur Bl. at Michelson Dr. GP Baseline wDB(IRVINE ISEC) 3 3 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1700 254 .15 212 .12 NBT 4 6800 1343 .20* 1749 .26* NBR 1 1700 300 .18 119 .07 SBL 2 3400 973 .29* 619 .18* SBT 4 6800 1577 .23 1528 .23 SBR 0 0 14 .25 12 .25 EBL 2 3400 347 .10* 385 .11 EBT 1 1700 78 .05 112 .07* EBR 1 1700 86 .05 134 .08 WBL 2 3400 95 .03 517 .15* WBT 1 1700 92 .05* 107 .06 WBR 1 1700 264 .16 776 .46 Right Turn Adjustment 138 .08 WBR .17* Clearance Interval f .05* 809 .05* Note: Assumes Right -Turn Overlap for WBR .05* 80 MacArthur Bl. at I-405 SB Ramps GP Baseline wDB(IRVINE ISEC) 3 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 4 6800 1518 .22* 2883 .42* NBR 1 1700 437 .26 673 .40 SBL 2 3400 160 .05* 477 .14* SBT 4 6800 1687 .25 1723 .25 SBR 1 1700 475 .28 384 .23 EBL 0 0 0 0 EBT 0 0 0 0 EBR 0 0 0 0 WBL 2 3400 986 .29* 511 .15* WBT 1 1700 138 .08 157 .09 WBR f 809 369 Clearance Interval .05* .05* Note: Assumes Right -Turn Overlap for NBR TOTAL CAPACITY UTILIZATION .61 76 TOTAL CAPACITY UTILIZATION .69 .88 Thursday, March 05, 2020 38 Page 1 Attachment 5 39 9 . MacArthur B1 at Campus Dr GP Project wDB TOTAL CAPACITY UTILIZATION 10 . MacArthur B1 at Birch St GP Project wDB .623 .697 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 245 .077 189 .059* NBT 4 6400 1072 .168* 1268 .198 NBR 1 1600 83 .052 47 .029 SBL 1 1600 170 .106* 157 .098 SBT 3.5 8000 849 .177 1283 .255* SBR 1.5 0 705 .220 758 EBL 2 3200 684 .214* 471 .147* EBT 3 4800 1123 .234 637 .133 EBR d 1600 139 .087 180 .113 WBL 2 3200 42 .013 87 .027 WBT 3 4800 537 .112* 1134 .236* WBR f 47 130 Right Turn Adjustment SBR .023* TOTAL CAPACITY UTILIZATION 10 . MacArthur B1 at Birch St GP Project wDB .623 .697 TOTAL CAPACITY UTILIZATION 40 .574 .711 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 23 .014 156 .098* NBT 3 4800 911 .190* 872 .182 NBR 1 1600 67 .042 63 .039 SBL 1 1600 85 .053* 136 .085 SBT 4 6400 687 .143 1249 .248* SBR 0 0 255 .159 336 EBL 1.5 261 338 EBT 1.5 4800 585 .203* 463 .172* EBR 0 130 25 WBL 1 1600 51 .032 107 .067 WBT 2 3200 410 .128* 618 .193* WBR f 188 210 Nate: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION 40 .574 .711 11 . Von Karman Av at Campus GP Project wDB AM PK HOUR PM PK HOUR LANES CAPACITY VOL AM PK HOUR PM PK HOUR 1 LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 47 .029 50 .031* NBT 2 3200 891 .310* 564 .225 NBR 0 0 101 49 155 SBT SBL 1 1600 88 .055* 216 .135 SBT 2 3200 721 .287 847 .370* SBR 0 0 196 102 337 EBT EBL 2 3200 269 .084 225 .070* EBT 2 3200 608 .217* 803 .278 EBR 0 0 87 672 87 WBT WBL 1 1600 120 .075* 88 .055 WBT 2 3200 579 .207 738 .263* WBR 0 0 82 104 TOTAL CAPACITY UTILIZATION 12 . MacArthur Bl at Von Karman GP Project wDB 657 734 TOTAL CAPACITY UTILIZATION 41 623 573 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1600 46 .029 51 .032* NBT 3 4800 895 .186* 838 .175 NBR 1 1600 735 .459 201 .126 SBL 1 1600 64 .040* 49 .031 SBT 3 4800 619 .129 1273 .265* SBR 1 1600 128 .080 84 .053 EBL 1 1600 23 .014* 102 .064 EBT 2 3200 151 .047 212 .066* EBR f 40 137 WBL 2 3200 179 .056 672 .210* WBT 1 1600 176 .110* 125 .078 WBR f 51 141 Right Turn Adjustment NBR .273* TOTAL CAPACITY UTILIZATION 41 623 573 15 . Campus Dr at Bristol St(N) GP Project wDB TOTAL CAPACITY UTILIZATION 16 . Birch St at Bristol St(N) GP Project wDB Im 726 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 546 .171 467 .146* NBT 4 6400 2032 .318* 1065 .166 NBR 0 0 0 0 0 0 SBL 0 0 0 0 0 0 SBT 4 6400 564 .088 1265 .198* SBR 3 4800 256 .053 1136 .237 EBL 0 0 0 0 0 0 EBT 0 0 0 0 0 0 EBR 0 0 0 0 0 0 WBL 1 1600 288 .180* 301 .188 WBT 5 8000 1287 .179 2629 .343* WBR 0 0 145 350 112 197 Right Turn Adjustment E/W Split Phasing SBR .039* TOTAL CAPACITY UTILIZATION 16 . Birch St at Bristol St(N) GP Project wDB Im 726 TOTAL CAPACITY UTILIZATION 42 599 .636 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 84 .026 174 .054* NBT 2 3200 1104 .345* 499 .156 NBR 0 0 0 0 SBL 0 0 0 0 SBT 1.5 6400 327 .102 556 .224* SBR 2.5 320 .100 877 EBL 0 0 0 0 EBT 0 0 0 0 EBR 0 0 0 0 WBL 1.5 357 602 WBT 3.5 8000 1323 .254* 2064 .358* WBR 0 350 197 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION 42 599 .636 17 . Campus Dr at Bristol St(S) GP Project wpB TOTAL CAPACITY UTILIZATION 18 . Birch St at Bristol St(S) GP Project wOB .791 -M. AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 5 8000 1383 .210* 990 .155* NBR 0 0 295 303 .189 SBL 1 1600 176 .110* 252 .158* SBT 3 4800 673 .140 1313 .274 SBR 0 0 0 0 EBL 1.5 1193 535 .131 EBT 2.5 6400 1821 .471* 994 .239* EBR 2 3200 521 .163 566 .177 WBL 0 0 0 0 WBT 0 0 0 0 WBR 0 0 0 0 Right Turn Adjustment E/W Split Phasing NBR .034* Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION 18 . Birch St at Bristol St(S) GP Project wOB .791 -M. TOTAL CAPACITY UTILIZATION 43 .490 .529 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 2.5 6400 521 .160* 464 .100 NBR 1.5 506 177 SBL 2 3200 176 .055* 174 .054 SBT 2 3200 507 .158 982 .307* SBR 0 0 0 0 EBL 1.5 663 210 .131 EBT 3.5 8000 1380 .275* 1312 .222* EBR 0 159 107 WBL 0 0 0 0 WBT 0 0 0 0 WBR 0 0 0 0 Note: Assumes E/W Split Phasing TOTAL CAPACITY UTILIZATION 43 .490 .529 29 . MacArthur B1 at Jamboree Rd GP Project wDB TOTAL CAPACITY UTILIZATION .640 44 02 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3200 362 .113* 386 .121* NBT 4 6400 1093 .171 513 .080 NBR 1 1600 400 .250 352 .220 SBL 3 4800 59 .012 221 .046 SBT 3 4800 548 .114* 1467 .306* SBR f 216 524 EBL 2 3200 524 .164* 431 .135* EBT 4 6400 1446 .226 1132 .177 EBR 1 1600 511 .319 125 .078 WBL 3 4800 450 .094 638 .133 WBT 3 4800 1164 .243* 1569 .327* WBR 1 1600 86 .054 218 .136 Right Turn Adjustment EBR .006* Note: Assumes Right -Turn Overlap for NBR TOTAL CAPACITY UTILIZATION .640 44 02 79 MacArthur Bl. at I-405 NB Ramps GP Project LUE wDB(IRVINE ISEC) 3 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 .16 0 .09 NBT 4 6800 2111 .31* 2178 .32* NBR 2 3400 405 .12 1202 .35 SBL 2 3400 159 .05* 479 .14* SBT 4 6800 1384 .20 2107 .31 SBR 0 0 0 .23 0 .23 EBL 0 0 0 .10* 0 .11 EBT 0 0 0 .05 0 .05* EBR 0 0 0 .05 0 .08 WBL 2 3400 911 .27* 519 .15* WBT 0 0 0 .04* 0 .05 WBR 2 3400 1087 .32 428 .13 Right Turn Adjustment WBR .01* WBR .19* Clearance Interval for NBR .05* .05* TOTAL CAPACITY UTILIZATION .69 .66 82 MacArthur Bl. at Michelson Dr. GP Project LUE wDB(IRVINE ISEC) 3 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1700 275 .16 158 .09 NBT 4 6800 1451 .21* 1853 .27* NBR 1 1700 315 .19 122 .07 SBL 2 3400 1024 .30* 619 .18* SBT 4 6800 1618 .24 1632 .24 SBR 0 0 14 .23 12 .23 EBL 2 3400 355 .10* 361 .11 EBT 1 1700 77 .05 83 .05* EBR 1 1700 85 .05 140 .08 WBL 2 3400 106 .03 550 .16* WBT 1 1700 69 .04* 91 .05 WBR 1 1700 263 .15 794 .47 Right Turn Adjustment .05* WBR .19* Clearance Interval for NBR .05* .05* Note: Assumes Right -Turn Overlap for WBR 80 MacArthur Bl. at I-405 SB Ramps GP Project LUE wDB(IRVINE ISEC) 3 AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 4 6800 1647 .24* 2981 .44* NBR 1 1700 452 .27 680 .40 SBL 2 3400 156 .05* 468 .14* SBT 4 6800 1759 .26 1792 .26 SBR 1 1700 387 .23 387 .23 EBL 0 0 0 0 EBT 0 0 0 0 EBR 0 0 0 0 WBL 2 3400 979 .29* 537 .16* WBT 1 1700 148 .09 158 .09 WBR f 810 366 Clearance Interval .05* .05* Note: Assumes Right -Turn Overlap for NBR TOTAL CAPACITY UTILIZATION .63 79 TOTAL CAPACITY UTILIZATION .70 .90 Thursday, March 05, 2020 45 Page 1 EXHIBIT "B" Addendum to the 2006 General Plan Update (SCH No. 2006011119) and the 2014 General Plan Land Use Element Update (SCH No. 2013101064) Environmental Impact Reports Available separately due to bulk at: www.newportbeachca.gov/cega Then look for the link for Newport Airport Village Addendum (PA2014-225) 14-38 Attachment B Ordinance No. 2020-22 14-39 ORDINANCE NO. 2020-22 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH, CALIFORNIA, APPROVING ZONING CODE AMENDMENT NO. CA2014-009 AND PLANNED COMMUNITY DEVELOPMENT PLAN NO. PC2020-002 ESTABLISHING THE NEWPORT AIRPORT VILLAGE PLANNED COMMUNITY DEVELOPMENT LOCATED AT 4341, 4361, AND 4501 BIRCH STREET; 4320, 4340, 4360, 4400, 4500, 4520, 4540, 4570, 4600 AND 4630 CAMPUS DRIVE; AND 4525, 4533, AND 4647 MACARTHUR BOULEVARD (PA2014-225) WHEREAS, Section 200 of the City of Newport Beach ("City") Charter vests the City Council with the authority to make and enforce all laws, rules and regulations with respect to municipal affairs subject only to the restrictions and limitations contained in the Charter and the State Constitution, and the power to exercise, or act pursuant to any and all rights, powers, and privileges, or procedures granted or prescribed by any law of the State of California; WHEREAS, an application was filed by Saunders Property Company ("Applicant") with respect to property located at 4341, 4361, and 4501 Birch Street; 4320, 4340, 4360, 4400, 4500, 4520, 4540, 4570, 4600 and 4630 Campus Drive; and 4525, 4533, and 4647 MacArthur Boulevard within the northerly portion of the Campus Tract, generally bounded by Birch Street, Campus Drive, MacArthur Boulevard and the extension of Corinthian Way, legally described on Exhibit A, which is attached hereto and incorporated herein by reference ("Property"); WHEREAS, the Property is designated AO (Airport Office and Supporting Uses) by the City of Newport Beach General Plan ("General Plan") Land Use Element and is located within the OA (Office -Airport) Zoning District; WHEREAS, the Applicant proposes a Planned Community Development Plan that would allow redevelopment of the 16.46 -acre Property with up to 329 residential dwelling units, exclusive of any density bonus as allowed pursuant to California Government Code Section 65915, and up to 297,572 square feet of office, retail, and commercial uses ("Project") which require the following approvals from the City of Newport Beach ("City"): • General Plan Amendment (GP2014-004) ("GPA") — A request to amend the General Plan Land Use Designation of the Property from AO (Airport Office and Supporting Uses) to MU -H2 (Mixed -Use Horizontal 2) and to amend Table LU2 (Anomaly Locations) to add Anomaly No. 86 to allow for the development of 329 dwelling units, exclusive of any permitted density bonus, and 297,572 square feet of commercial uses; ..E Ordinance No. 2020 - Page 2 of 6 • Zoning Code Amendment (CA2014-009) — A request to change the zoning designation of the Property from OA (Office -Airport) to PC -60 (Newport Airport Village Planned Community); • Planned Community Development Plan (PC2020-002) — A request to adopt the Newport Airport Village Planned Community Development Plan ("PCDP") which sets the development design and use standards for the Property; • Development Agreement (DA2014-003) ("Development Agreement") — A request for a development agreement between the Applicant and the City, which would provide vested rights to develop the Property, while also providing negotiated public benefits; and • Addendum to the 2006 General Plan Update and 2014 General Plan Land Use Element Amendment Environmental Impact Reports (ER2020-002) — Pursuant to the California Environmental Quality Act ("CEQA"), the Addendum to the 2006 General Plan Update Program Environmental Impact Report ("PEIR") and 2014 General Plan Land Use Element Supplemental Environmental Impact Report ("SEIR") will address reasonably foreseeable environmental impacts resulting from the Project; WHEREAS, the Project is not located in the coastal zone; therefore, amending the Local Coastal Program or a coastal development permit is not required; WHEREAS, a telephonic study session was held on April 23, 2020, in the Council Chambers located at 100 Civic Center Drive, Newport Beach, California, due to the Declaration of a State Emergency and Proclamation of Local Emergency related to COVID-19 to introduce the Project to the Planning Commission; WHEREAS, a telephonic public hearing was held by the Planning Commission on June 4, 2020, in the Council Chambers located at 100 Civic Center Drive, Newport Beach, California, due to the Declaration of a State Emergency and Proclamation of Local Emergency related to COVID-19. A notice of time, place and purpose of the public hearing was given in accordance with California Government Code Section 54950 et seq. ("Ralph M. Brown Act") and Chapter 20.62 (Public Hearings) of the Newport Beach Municipal Code ("NBMC"). Evidence, both written and oral, was presented to, and considered by, the Planning Commission at this public hearing; WHEREAS, at the hearing, the Planning Commission adopted Resolution No. PC2020-020 by a unanimous vote (6 ayes, 0 nays) recommending the City Council approve the Project; 14-41 Ordinance No. 2020 - Page 3 of 6 WHEREAS, due to the proposed amendments to the General Plan and the Property's zoning regulations, California Public Utilities Code Section 21676(b) requires the City to refer the Project to the Orange County Airport Land Use Commission ("ALUC") for a determination of the Project's consistency with the Airport Environs Land Use Plan ("AELUP") for the John Wayne Airport; WHEREAS, on July 16, 2020, the ALUC voted (6 ayes, 0 nays) finding the Project inconsistent with the AELUP; WHEREAS, telephonic public hearings were held by the City Council on September 8, 2020 and September 22, 2020, in the Council Chambers located at 100 Civic Center Drive, Newport Beach, California, due to the Declaration of a State Emergency and Proclamation of Local Emergency related to COVID-19. A notice of time, place and purpose of the public hearings were given in accordance with Public Utilities Code Section 21676(b), the Ralph M. Brown Act, and Chapters 15.45 (Development Agreements), 20.56 (Planning Community District Procedures) and 20.62 (Public Hearings) of the NBMC. Evidence, both written and oral, was presented to, and considered by, the City Council at these public hearings; WHEREAS, pursuant to California Public Utilities Code Sections 21676(b), the City Council adopted Resolution No. 2020-_, thereby finding the Project consistent with the purpose of the State Aeronautics Act and overriding the finding of inconsistency with the AELUP; WHEREAS, the PCDP meets the intent and purpose of Section 20.56.010 (Purpose) of the NBMC in that PC -60 provides for the classification and development of 16.46 acres developed land; WHEREAS, permitted and conditionally permitted uses have been classified, including residential, commercial, and airport supporting uses and development and use standards have been included in the PCDP to ensure future use of the Property does not impact the surrounding area; WHEREAS, in order to allow the diversification of uses, PC -60 provides two planning areas: Planning Area 1 allows residential and mixed-use development, while Planning Area 2 allows nonresidential development which will allow future development of PC -60 to be consistent with the goals and policies of the MU -H2 (Mixed -Use Horizontal 2) land use designation horizontal mixed-use standards; WHEREAS, to ensure the two planning areas relate to each other and can be integrated, the PCDP requires internal pedestrian and bicycle connection; and 14-42 Ordinance No. 2020 - Page 4 of 6 WHEREAS, future development of the Property affected by the proposed amendments will be consistent with the goals and policies of the Land Use Element of the General Plan along with the purpose and intent of PC -60. NOW THEREFORE, the City Council of the City of Newport Beach ordains as follows: Section 1: The City Council has considered the recommendation of the Planning Commission and has determined that modifications to the Project made by the City Council, if any, are not major changes that require referral back to the Planning Commission for consideration and recommendation. Section 2: The City Council hereby approves Zoning Code Amendment No. CA2014-009 to rezone the Property from OA (Office -Airport) to PC -60 (Newport Airport Village Planned Community) as depicted in Exhibit B, which is attached hereto and incorporated herein by reference. Section 3: The City Council hereby approves the Planned Community Development Plan No. PC2020-002 (Newport Airport Village Planned Community Development Plan) as depicted in Exhibit C, which is attached hereto and incorporated herein by reference, thereby establishing the permitted uses, development standards, and design guidelines for the Property. Section 4: The recitals provided in this ordinance are true and correct and are incorporated into the substantive portion of this ordinance. Section 5: If any section, subsection, sentence, clause or phrase of this ordinance is for any reason held to be invalid or unconstitutional, such decision shall not affect the validity or constitutionality of the remaining portions of this ordinance. The City Council hereby declares that it would have passed this ordinance and each section, subsection, sentence, clause or phrase hereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses or phrases be declared invalid or unconstitutional. 14-43 Ordinance No. 2020 - Page 5 of 6 Section 6: Environmental Impact Report Addendum No. ER2020-02 was prepared for the Project in compliance with California Public Resources Code Section 21000 et seq. ("CEQA"), CEQA Guidelines as set forth in California Code of Regulations, Title 14, Division 6, Chapter 3, and City Council Policy K-3. On the basis of the entire environmental review record, the Project will not result in any new significant impacts that were not previously analyzed in the PEIR for the General Plan 2006 Update (SCH No. 2006011119) or the SEIR for the 2014 update to the Land Use Element of the General Plan (SCH No. 2013101064). The potential impacts associated with this Project would either be the same or less than those described in either the PEIR or SEIR that have been appropriately mitigated. In addition, there are no substantial changes to the circumstances under which the Project would be undertaken that would result in new or more severe environmental impacts than previously addressed in either the PEIR or SEIR, nor has any new information regarding the potential for new or more severe significant environmental impacts been identified. In accordance with Section 15164 of the CEQA Guidelines, the City Council adopted Resolution No. 2020-_, thereby adopting an addendum to the previously adopted PEIR and SEIR. Resolution No. 2020-_, including all findings contained therein, is hereby incorporated by reference. Section 7: Except as expressly modified in this ordinance, all other sections, subsections, terms, clauses and phrases set forth in the NBMC shall remain unchanged and shall be in full force and effect. Section 8: The Mayor shall sign and the City Clerk shall attest to the passage of this ordinance. The City Clerk shall cause the ordinance, or a summary thereof, to be published pursuant to City Charter Section 414. This ordinance shall be effective thirty (30) calendar days after its adoption. 14-44 Ordinance No. 2020 - Page 6 of 6 This ordinance was introduced at a regular meeting of the City Council of the City of Newport Beach held on the 8th day of September, 2020, and adopted on the 22nd day of September, 2020, by the following vote, to -wit: AYES: NAYS: ABSENT: WILL O'NEILL, MAYOR ATTEST: LEILANI I. BROWN, CITY CLERK APPROVED AS TO FORM: CITY TTORNEY'S OFFICE AARON C. HARP, CITY AIFORNEY Attachments: Exhibit A - Legal Description Exhibit B - Zoning Map Exhibit C - Newport Airport Village Planned Community Development Plan PC -60 14-45 EXHIBIT "A" Legal Description 14-46 ADDRESS APN LEGAL DESCRIPTION 4361 Birch Street, 427-121-23 THE LAND REFERRED TO HEREIN BELOW IS SITUATED Newport Beach NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CA CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: LOTS 7, 8, 9 AND 10 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190, PAGES 11, 12 AND 13 OF MISCELLANEOUS MAPS, RECORDS OF ORANGE COUNTY, CALIFORNIA. SAID LAND IS ALSO SHOWN AS PARCEL 1 ON LOT LINE ADJUSTMENT 93-5, RECORDED DECEMBER 8, 1993 AS INSTRUMENT NO. 93-0854901, OFFICIAL RECORDS. EXCEPTING THEREFROM ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE GRANT DEED RECORDED APRIL 9, 1993 AS INSTRUMENT NO. 93-0237996 OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE GRANT DEED RECORDED APRIL 9, 1993 AS INSTRUMENT NO. 93-0237996, OFFICIAL RECORDS. 4540 Campus 427-111-03 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA PARCEL 1: LOT 18 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 11 THROUGH 13, INCLUSIVE 14-47 ADDRESS APN LEGAL DESCRIPTION OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPT ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED JUNE 30, 1992 AS INSTRUMENT NO. 92-440215 OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE, AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED JUNE 30, 1992 AS INSTRUMENT NO. 92-440215 OF OFFICIAL RECORDS. PARCEL 2: AN EASEMENT FOR DRIVEWAY PURPOSES OVER THE WESTERLY 12 FEET OF THE NORTHERLY 60 FEET OF LOT 17 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190, PAGES 11 THROUGH 13, INCLUSIVE OF MISCELLANEOUS MAPS, RECORDS OF ORANGE COUNTY, CALIFORNIA, AS SET FORTH IN THAT CERTAIN DECLARATION OF ACCESS EASEMENT, RECORDED JUNE 30, 1992 AS INSTRUMENT NO. 92-440213 OF OFFICIAL RECORDS, UPON THE TERMS AND CONDITIONS AS THEREIN PROVIDED 4340 Campus 427-121-07 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: ADDRESS APN LEGAL DESCRIPTION Newport Beach, LOT 29 OF TRACT NO. 3201, IN THE CITY OF NEWPORT BEACH, CA COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 130, PAGES 25 TO 30 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, ANY OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED BY THE IRVINE COMPANY IN DEED RECORDED FEBRUARY 4, 1994 AS INSTRUMENT NO. 94-0085581 OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS AS RESERVED IN THE DEED RECORDED FEBRUARY 4, 1994 AS INSTRUMENT NO. 94- 0085581 OF OFFICIAL RECORDS 4400 Campus 427-121-09 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA LOT 31 OF TRACT NO. 3201, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 130, PAGE(S) 25 THROUGH 30, INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, ANY OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE 14-49 ADDRESS APN LEGAL DESCRIPTION FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED BY THE IRVINE COMPANY IN DEED RECORDED DECEMBER 20, 1991 AS INSTRUMENT NO. 91-702340, OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS AS RESERVED IN THE DEED RECORDED DECEMBER 20, 1991 AS INSTRUMENT NO. 91- 702340, OF OFFICIAL RECORDS 4570 Campus 427-111-04 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA PARCEL 1: LOT 17 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 11 THROUGH 13, INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAND COUNTY. EXCEPTING THEREFROM ALL MINERALS, OIL, GAS, PETROLEUM, OTHER HYDROCARBON SUBSTANCES AND ALL UNDERGROUND WATER IN OR UNDER OR WHICH MAY BE PRODUCED FROM SAID LAND WHICH UNDERLIES A PLANE PARALLEL TO AND 500 FEET FROM THE PRESENT SURFACE OF SAID LAND FOR THE PURPOSE OF PROSPECTING FOR, THE EXPLORATION, DEVELOPMENT, PRODUCTION, EXTRACTION AND TAKING OF SAID MINERALS, OIL, GAS, PETROLEUM, OTHER HYDROCARBON SUBSTANCES AND WATER FROM SAID LAND BY MEANS OF MINES, WELLS, DERRICKS, OTHER EQUIPMENT FROM SURFACE LOCATIONS ON ADJOINING OR NEIGHBORING LAND OR LYING OUTSIDE OF THE ABOVE DESCRIBED LAND, IT BEING UNDERSTOOD THAT THE OWNER OF SUCH MINERALS, OIL GAS, 14-50 ADDRESS APN LEGAL DESCRIPTION PETROLEUM, OTHER HYDROCARBON SUBSTANCES AND WATER AS SET FORTH ABOVE, SHALL HAVE NO RIGHT TO ENTER UPON THE SAID LAND OR ANY PORTION THEREOF ABOVE SAID PLANE PARALLEL TO AND 500 FEET BELOW THE PRESENT SURFACE OF TI EE SAID LAND FOR ANY PURPOSE WHATSOEVER. AS RESERVED BY THE IRVINE COMPANY, A MICHIGAN CORPORATION IN THE DEED RECORDED FEBRUARY 19, 1993 AS INSTRUMENT NO. 93-107963 OF OFFICIAL RECORDS. PARCEL 2: NON-EXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "DECLARATION OF ACCESS EASEMENTS (MACARTHUR/CAMPUS)" DATED JANUARY 30, 1992 AND RECORDED FEBRUARY 20, 1992 AS INSTRUMENT NO. 92-101692 AS AMENDED AND RESTATED IN AN INSTRUMENT RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247260, BOTH OF OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. PARCEL 3: NON-EXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "DECLARATION OF ACCESS EASEMENT. DATED JUNE 17, 1992, AND RECORDED JUNE 30, 1992 AS INSTRUMENT NO. 92- 440213 OF OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. 4341 Birch Street 427-121-14 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Newport Beach CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, CA STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: LOT 6 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190, PAGES 11, 12 AND 13 OF MISCELLANEOUS MAPS, RECORDS OF SAID ORANGE COUNTY. EXCEPT ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED DECEMBER 31, 1991 AS INSTRUMENT NO. 91- 720058 OF OFFICIAL RECORDS. ALSO EXCEPT ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND 14-51 ADDRESS APN LEGAL DESCRIPTION OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED DECEMBER 31, 1991 AS INSTRUMENT NO. 91-720058 OF OFFICIAL RECORDS. APN: 427-121-14 4500 and 4520 427-111-01, THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Campus Drive 427-111-02 CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach, and 427- STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA 121-10 PARCEL 1 IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP FILED IN BOOK 60, PAGE 22 OF PARCEL MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. 4600 Campus 427-111-05 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA PARCEL 1: LOT 16 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 11 TO 13 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM, ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM AND OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE ON THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED BY THE IRVINE COMPANY, RECORDED FEBRUARY 19, 1993 AS INSTRUMENT NO. 93- 107971, OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR AND OWNED OR USED BY GRANTOR IN 14-52 ADDRESS APN LEGAL DESCRIPTION CONNECTION WITH OR WITH RESPECT TO THE LAND TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED BY THE IRVINE COMPANY, RECORDED FEBRUARY 19, 1993 AS INSTRUMENT NO. 93-107971, OFFICIAL RECORDS. PARCEL 2: NONEXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "AMENDED AND RESTATED OR ACCESS EASEMENTS (MACARTHUR/CAMPUS)", DATED MARCH 25, 1992, RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247260, IN THE OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. 4360 Campus 427-121-08 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA LOT 30 OF TRACT NO. 3201, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 130, PAGES 25, 26, 27, 28, 29 AND 30 OF MISCELLANEOUS MAPS, RECORDS OF ORANGE COUNTY CALIFORNIA. EXCEPT ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED MARCH 15, 1994 AS INSTRUMENT NO. 94-0179376, OFFICIAL RECORDS. ALSO EXCEPT ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR 14-53 ADDRESS APN LEGAL DESCRIPTION OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED MARCH 15, 1994 AS INSTRUMENT NO. 94-0179376, OFFICIAL RECORDS. 4501 Birch Street 427-111-10 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Newport Beach, CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, CA STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: PARCEL 1: LOT 12 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190. PAGES 11 TO 13 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPT ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR. ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED JANUARY 10, 1992 AS INSTRUMENT NO. 92- 015047, OFFICIAL RECORDS. ALSO EXCEPT ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED FROM THE 14-54 ADDRESS APN LEGAL DESCRIPTION IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED JANUARY 10, 1992 AS INSTRUMENT NO. 92-015047, OFFICIAL RECORDS. PARCEL 2: A NON-EXCLUSIVE EASEMENT FOR INGRESS AND EGRESS OVER THAT PORTION OF LOT 13 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 11 TO 13 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY, DESCRIBED AS FOLLOWS: BEGINNING AT THE MOST SOUTHERLY CORNER OF SAID LOT; THENCE NORTH 290 52'01" WEST 327.33 FEET TO THE MOST WESTERLY CORNER OF SAID LOT; THENCE NORTH 52'01'58" EAST 24.24 FEET ALONG THE NORTHWESTERLY LINE OF SAID LOT TO THE NORTHWESTERLY PROLONGATION OF A LINE PARALLEL WITH AND NORTHEASTERLY 24.00 FEET FROM THE SOUTHWESTERLY LINE OF SAID LOT; THENCE SOUTH 290 52' 10" EAST 331.81 FEET ALONG SAID PROLONGATION, SAID PARALLEL LINE AND THE SOUTHERLY PROLONGATION THEREOF TO A POINT ON A CURVE IN THE SOUTHERLY LINE OF SAID LOT, SAID CURVE BEING CONCAVE SOUTHERLY, HAVING A RADIUS OF 272.00 FEET, A RADIAL TO SAID POINT BEARS NORTH 240 48' 17" WEST; THENCE WESTERLY 24.03 FEET ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 50 03'44" OF THE POINT OF BEGINNING. 4630 Campus 427-111-06 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA PARCEL 1: LOT 15 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 11 TO 13 OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM, ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN GEOTHERMAL STEAM, ANY OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT HOWEVER, THE RIGHT TO DRILL MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OF THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED BY THE IRVINE COMPANY 14-55 ADDRESS APN LEGAL DESCRIPTION RECORDED FEBRUARY 19, 1993 AS INSTRUMENT NO. 93- 107967, OFFICIAL RECORDS. PARCEL 2: NONEXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "AM ENDED AND RESTATED DECLARATION OF ACCESS EASEMENTS (MACARTHUR/CAMPUS) DATED MARCH 25, 1992 RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247260, IN THE OFFICE RECORDS OF ORANGE COUNTY, CALIFORNIA. PARCEL 3: NONEXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED " RECIPROCAL EASEMENT AGREEMENT AND CONSENT" DATED OCTOBER 14, 1999 RECORDED NOVEMBER 19, 1999 AS INSTRUMENT NO. 19990805278, AND AMENDED BY THE CERTAIN DOCUMENT ENTITLED "WAIVER AND AMENDMENT TO RECIPROCAL EASEMENT AGREEMENT" DATED AUGUST 24, 2015 RECORDED AUGUST 28, 2015 AS INSTRUMENT NO. 2015000446662 IN THE OFFICE RECORDS OF ORANGE COUNTY, CALIFORNIA. 4525, 4533 and 427-111-09 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE 4647 MacArthur CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Boulevard STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS.- OLLOWS:Newport NewportBeach, PARCEL 1: CA LOT 13 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190, PAGE(S) 11 TO 13 INCLUSIVE, OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFORE AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION RECORDED APRIL 16, 1992. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE 14-56 ADDRESS APN LEGAL DESCRIPTION LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL, BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION RECORDED APRIL 16, 1992. PARCEL 2: NON-EXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "DECLARATION OF ACCESS EASEMENTS (MACARTHUR/CAMPUS)" DATED JANUARY 30, 1992 AND RECORDED FEBRUARY 20, 1992 AS INSTRUMENT NO. 92-101692, OFFICIAL RECORDS AND AMENDED BY DOCUMENT RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247260, OFFICIAL RECORDS, IN THE OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. PARCEL 3: NON-EXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "DECLARATION OF ACCESS EASEMENTS (BIRCH/MACARTHUR)" DATED JANUARY 30, 1992 AND RECORDED FEBRUARY 20, 1992 AS INSTRUMENT NO. 92- 101691 OFFICIAL RECORDS AND AMENDED BY DOCUMENT RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247259 OFFICIAL RECORDS IN THE OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. 4320 Campus 427-121-06 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA LOT 28 OF TRACT NO. 3201, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 130, PAGES 25 THROUGH 30, INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, ANY OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED BY THE IRVINE COMPANY, A MICHIGAN 14-57 ADDRESS APN LEGAL DESCRIPTION CORPORATION, BY DEED RECORDED MAY 6, 1994 AS INSTRUMENT NO. 94-317183 OF OFFICIAL RECORDS. 14-58 EXHIBIT "B" Zoning Map 14-59 EXHIBIT "C" Newport Airport Village Planned Community Development Plan PC -60 14-60 NEWPORT AIRPORT VILLAGE PLANNED COMMUNITY DEVELOPMENT PLAN PC -60 Adopted XXXXXX, 2020 Ordinance No. XX -2020 14-61 TABLE OF CONTENTS SECTION PAGE I. INTRODUCTION AND PURPOSE............................................................................................... 1 A. Introduction......................................................................................................................... 1 B. Location................................................................................................................................1 C. Surrounding Area.................................................................................................................3 D. Purpose and Objective......................................................................................................... 4 E. Relationship to Other Regulations....................................................................................... 4 II. LAND USE AND DEVELOPMENT REGULATIONS....................................................................... 5 A. Permitted Uses..................................................................................................................... 6 B. Prohibited Uses.................................................................................................................... 7 C. Existing Legal Nonconforming Uses and Structures............................................................ 7 D. Land Use Concept................................................................................................................ 7 E. Development Standards — Planning Area 1 (Mixed -Use Residential Area) ......................... 8 F. Development Standards — Planning Area 2 (Non -Residential Area) ................................. 12 G. Additional Development Standards................................................................................... 13 III. ARCHITECTURAL DESIGN CONSIDERATIONS......................................................................... 16 A. General Principles.............................................................................................................. 16 B. Mixed-Use..........................................................................................................................16 C. Residential Uses................................................................................................................. 16 D. Office/Commercial Uses.................................................................................................... 17 E. Conceptual Images to Guide Development....................................................................... 17 IV. RESIDENTIAL DESIGN GUIDELINES......................................................................................... 21 A. Architectural Variety.......................................................................................................... 21 B. Windows and Entries......................................................................................................... 21 C. Massing and articulation.................................................................................................... 21 V. PLAN ADMINISTRATION and implementation...................................................................... 22 A. Permit Review Procedures................................................................................................. 22 B. Parcel or Tract Maps.......................................................................................................... 22 C. Amendments to Planned Community Development Plan ................................................. 22 D. Administrative Responsibility............................................................................................ 22 E. Enforcement...................................................................................................................... 22 Newport Airport Village 14-62 TABLE OF CONTENTS FIGURE PAGE Figure1- Vicinity Map.................................................................................................................... 2 Figure2 - Airport Area.................................................................................................................... 2 Figure 3 - Newport Airport Village Planned Community................................................................ 3 Figure4 - Land Use Map................................................................................................................. 5 Figure 5 - Conceptual Development Plan..................................................................................... 10 Figure 6 - Mixed -Use Conceptual Images................................................................................... 188 Figure 7 - Multi -Unit Residential Conceptual Images................................................................... 19 Figure 8 - Office/Commercial Conceptual Images........................................................................ 20 Newport Airport Village 14-63 NEWPORT AIRPORT VILLAGE PLANNED COMMUNITY DEVELOPMENT PLAN (PCDP) I. INTRODUCTION AND PURPOSE A. Introduction The Newport Airport Village Planned Community Development Plan (PCDP) (PC -60) is envisioned to be a horizontal mixed-use development on an approximately 16.46 -acre site that is located in the northern portion of the City, near Macarthur Blvd and Campus Drive. The City of Newport Beach Municipal Code (NBMC) allows a Planned Community Development Plan to address land use designations and regulations in Planned Communities. The PCDP serves as the controlling zoning ordinance for the site and is authorized and intended to implementthe provisions ofthe Newport Beach General Plan. The maximum buildout of the PCDP would result in 329 residential dwelling units, exclusive of any density bonus as allowed pursuant to California Government Code Section 65915; and 297,572 square feet of office, retail, and commercial use. The Newport Airport Village Planned Community (PC) consists of approximately 16.46 acres and prior to the development pursuant to this PCDP, a variety of commercial services, including: retail, restaurants, offices, rental car agencies, and other similar uses were developed. The Newport Airport Village Design Guidelines (contained herein) provide a conceptual vision of the physical implementation of the project and have been drafted to assist the City and community to visualize the architectural theme and desired character of the development. The Design Guidelines also provides the visual and mental imagery of what the current property owner and City see for the future development of the PC. B. Location As shown in Figures 1 and 2, the PC District is generally located southeast of John Wayne Airport and within the "Airport Area" Sub -Area as defined by the Newport Beach General Plan. The Airport Area includes 360 acres in the northernmost portion of Newport Beach, bounded by Campus Drive to the west and north, Jamboree Road to the east, and Bristol Street to the south. The City of Irvine is located north and east of the Airport Area. The Airport Area is proximate to Interstate 405 and State Routes 55 and 73. The Airport Area initially was a light industrial and commercial office area of Newport Beach, but is gradually redeveloping into a mixed-use community integrating residential development with existing non-residential uses consistent with the 2006 Newport Beach General Plan. 14-64 I. INTRODUCTION AND PURPOSE I',pre 1 - T 'icirritJ tllap i A[RP 9TAREA / n ' I Figure 2 - Air,6od Area Newport Airport Village 2 14-65 1. INTRODUCTION AND PURPOSE More specifically, the PC is located west of MacArthur Boulevard, south of Campus Drive, north of Birch Street, and about 550 feet north of Dove Street, as shown in Figure 2. f r rvrrH rr'Mw , K Figure 3 - \+ewpo lAiiport T Aage P(anued Communiy a r— Legend As also noted in Figure 3, the 65-dBA CNEL noise contour line for John Wayne Airport (JWA) transects the site. Areas east of (i.e., outside) the 65 dBA CNEL line are "Clearly Compatible" or "Normally Compatible" with multi -family residential and mixed-use development under General Plan Table N2 (Land Use Noise Compatibility Matrix). Areas west of (i.e., inside) the 65 dBA CNEL line are "Normally incompatible" or "Clearly incompatible" with multi -family residential and mixed-use development under General Plan Table N2. Under the Airport Environs Land Use Plan for John Wayne Airport (AELUP), this means that areas west of the 65 dBA CNEL line are deemed suitable for residential uses and other noise -sensitive uses if the interior noise standard of 45 dBA CNEL can be maintained with an accompanying dedication of a avigation easement for noise. Additionally, building heights west of the 65 dBA CNEL line are restricted for aviation safety. C. Surrounding Area John Wayne Airport, a commercial and general aviation airport that is owned and operated by the County of Orange, is located to the west and north of the site (across Newport Airport Village 3 14-66 4� a r— Legend As also noted in Figure 3, the 65-dBA CNEL noise contour line for John Wayne Airport (JWA) transects the site. Areas east of (i.e., outside) the 65 dBA CNEL line are "Clearly Compatible" or "Normally Compatible" with multi -family residential and mixed-use development under General Plan Table N2 (Land Use Noise Compatibility Matrix). Areas west of (i.e., inside) the 65 dBA CNEL line are "Normally incompatible" or "Clearly incompatible" with multi -family residential and mixed-use development under General Plan Table N2. Under the Airport Environs Land Use Plan for John Wayne Airport (AELUP), this means that areas west of the 65 dBA CNEL line are deemed suitable for residential uses and other noise -sensitive uses if the interior noise standard of 45 dBA CNEL can be maintained with an accompanying dedication of a avigation easement for noise. Additionally, building heights west of the 65 dBA CNEL line are restricted for aviation safety. C. Surrounding Area John Wayne Airport, a commercial and general aviation airport that is owned and operated by the County of Orange, is located to the west and north of the site (across Newport Airport Village 3 14-66 I. INTRODUCTION AND PURPOSE Campus Dr). To the immediate northeast of the site, on the southwest corner of MacArthur Blvd and Campus Dr, is a five -story office building and a small multi -tenant commercial building. Across MacArthur Boulevard, on the northeast corner of MacArthur Blvd and Campus Dr, is a nine -story office building that contains professional and medical office uses; a five -story apartment building at the intersection of Douglas and Martin Court; and multiple hotels and restaurants along MacArthur Blvd. To the east (across Birch St) are several multi -story office buildings that range from three to fourteen stories, hotels, and retail and restaurant uses. Commercial services, including vehicle sales and repairs and a pharmacy; restaurants; and office uses, including medical offices occupy the properties to the south of the PC. D. Purpose and Objective The purpose of the PCDP is to establish appropriate zoning regulations that govern the land use and development of the PC in a manner that is consistent with the City of Newport Beach General Plan. Implementation of the PCDP will: — Provide a quality mixed-use development that includes residential and supporting commercial uses; as well as, commercial uses that support or benefit from the proximity to the airport. — Create two planning areas to guide the development of the PC District (see Figure 4). Planning Area 1 will include the residential and, potentially, a complimentary retail or service commercial component of the PC District. Planning Area 2 will consist exclusively of non-residential uses. — Provide new housing opportunities in response to increased demand for housing, reduction of vehicle trips, and an encouragement of an active lifestyle by increasing the opportunity for residents to live in proximity to jobs, services, and entertainment. Such housing will be proximate to, and interconnected with, commercial development through pedestrian walkways provided by future development within the PCDP. — Ensure all residential units are located outside the John Wayne Airport 65 dBA CNEL noise contour and Safety Zone 3. E. Relationship to Other Regulations Whenever the provisions of this PCDP conflict with the regulations of the NBMC, the regulations contained herein will prevail. The NBMC including the Zoning Code apply and shall also regulate this development whenever regulations are not provided within this PCDP. Unless otherwise defined herein, all words and phrases used in this PCDP shall have the same meaning and definition as used in the NBMC. Newport Airport Village 4 14-67 11. LAND USE AND DEVELOPMENT REGULATIONS II. LAND USE AND DEVELOPMENT REGULATIONS The PC is subdivided into two planning areas. Figure 4 shows the Land Use Map for the PC District with the 65 deA CNEL noise contour separating the residential use area from the non-residential use area. John Wayng/Airport co ff a z ,. N OOP �4 TO b'1 7 Punning Area 1 I 'k, A r �qY Airport Village Land Use Planning Area 1 - Mixed -Use Residential 7.14 acres oy ar nn�ea, CI5 {1Nlilm Planning Area 2 - Commercial 9.32 acres MOY OE1. 2020 _Fgrire d - Kurd U;e 11ap Newport Airport Village 5 14-68 II. LAND USE AND DEVELOPMENT REGULATIONS A. Permitted Uses Table 1 lists the permitted uses for each planning area of the Planned Community. The uses identified within the table are not intended to be a comprehensive list, but rather major use categories. The Community Development Director may determine other uses not specifically listed herein are allowed or allowed pursuant to a MUP or CUP, provided they are consistent with the purpose of the planning areas, are compatible with surrounding uses, and are not listed as a prohibited use. Table 1 Permitted Uses Uses Planning Area 1 Planning Area 2 Additional Regulations Residential Multi -unit dwellings P - Live/work units P - Mixed-use development P - Accessory dwelling units P - NBMC 20.48.200 Home Occupations P - NBMC 20.48.110 Residential accessory uses and amenities P P Food, alcohol, entertainment Alcohol sales (off-site) MUP MUP NBMC 20.48.030 Alcohol Sales (on-site) CUP CUP NBMC 20.48.030 Bars, lounge, nightclub CUP CUP NBMC 20.48.030 & 20.48.090 Food service, no late hours MUP MUP NBMC 20.48.030 & 20.48.090 Food service, late hours CUP CUP NBMC 20.48.030 & 20.48.090 Office, retail, service Financial Institutions P P Offices, business & professional P P Offices, medical and dental P P Personal services, general P P Personal services, restricted MUP MUP Retail sales (less than 10,000 sq. ft.) P P Retail sales (greater than 10,000 sq. ft.) P P Other uses Uses not listed herein, but allowed in the OA zone A A Subject to applicable NBMC requirements Newport Airport Village 14-69 II. LAND USE AND DEVELOPMENT REGULATIONS Table 1 Continued P = Permitted Use CUP = Conditional Use Permit MUP = Minor Use Permit A = Allowed subject to permit requirements provided in Table 2-4 of NEMC Section 20.20.020(C) - = Not Permitted B. Prohibited Uses The following uses shall be expressly prohibited from the PCDP: 1. Any use not authorized by this PCDP unless the Community Development Director determines a particular use consistent with the purpose and intent of the PCDP, 2. Residential dwelling units within (i.e., west of) the 65 dBA CNEL (or above) noise contour from John Wayne Airport (residential accessory uses, and amenities are allowed), 3. Residential dwelling units within John Wayne Airport Safety Zone 3 (residential accessory uses, and amenities are allowed), 4. The following uses, if said structure within 250 feet of any residential dwelling unit: a. Handicraft Industry b. Industry, Small (less than 5,000 sq. ft.) C. Emergency Health Facilities/Urgent Care d. Ambulance Services e. Funeral Homes and Mortuaries f. Maintenance and Repair Services. C. Existing Legal Nonconforming Uses and Structures Existing legally established use and structures that no longer conform to the provisions of this PCDP shall be subject to NBMC Chapter 20.38. D. Land Use Concept Figure 5 depicts the conceptual development plan for Newport Airport Village Planned Community. Multi -story residential structures would be located nearthe north side of the site in Planning Area 1 and may have a retail/commercial component. Office, commercial and other non-residential buildings would be located south of the residential buildings in Planning Area 2. A landscaped esplanade with open space areas, pedestrian pathways with areas for passive seating, and bicycle facilities will be provided to create an efficient and safe pedestrian -friendly environment interconnecting the various land uses through - Newport Airport Village i7 14-70 II. LAND USE AND DEVELOPMENT REGULATIONS out the site with surrounding properties and public ways. Although the PC may not be developed exactly as depicted in the conceptual land use development map, it serves as a demonstration of what could be achieved through the application of the site development standards of this PCDP. E. Development Standards — Planning Area 1(Mixed-Use Residential Area) 1. Permitted Height of Residential or Mixed -Use Structures: No structure, nor any portion of any structure, architectural feature, elevator penthouse, or mechanical equipment shall exceed a height of 85 feet measured consistent with the Zoning Code. 2. Permitted Height of Nonresidential Structures: No structure, nor any portion of any structure, architectural feature, elevator penthouse, or mechanical equipment shall exceed a height of 37 feet measured consistent with the Zoning Code, unless a Site Development Review is approved pursuant to NBMC Section 20.52.080, in which case the maximum shall be 55 feet. 3. Setbacks: Minimum setbacks shall be as follows: a. Buildings, or portion thereof, that are under 20 feet in height shall be setback a minimum of 10 feet from any street property line and a minimum of 5 feet from any internal property line. b. Buildings, or portion thereof, that are 20 feet or greater in height shall be setback a minimum of 20 feet from any street property line and a minimum of 5 feet from any internal property line. 4. Residential Density: Densities shall be a minimum of 30 dwelling units per acre and a maximum of 50 dwelling units per acre, not including density bonus units. 5. Residential Development Limit: A maximum of 329 dwellings units shall be permitted, exclusive of any density bonus as allowed pursuant to California Government Code Section 65915. In addition, residential development (excluding density bonus units) shall be subject to the maximum development allocation for the Airport Area established by General Plan Land Use Policy 6.15.5, or any successor policy or development limit resulting from a future General Plan Update/Amendment, provided that such allocation does not result in a reduction of the 329 permitted dwelling units in Planning Area 1. 6. Floor Area Limit: Floor area for nonresidential uses shall not exceed 94,583 square feet. This floor area limit is based on the conversion of commercial development allowed by the general plan to residential dwelling units pursuant to General Plan Newport Airport Village 8 14-71 II. LAND USE AND DEVELOPMENT REGULATIONS Policy LU6.15.5. The 2006 General Plan allowed a 0.5 FAR (155,509 square feet) that is reduced by 60,926 square feet and converted to allow 329 dwelling units. 7. Common Open Space: All residential development shall incorporate common open space in the amount of 75 square feet per unit with minimum dimensions of 15 feet in any direction. At least half of the common open space shall consist of recreational amenities, including but not limited to the following: a. Swimming pools/spas and adjacent lounging decks b. Exercise facilities C. Tennis courts d. Basketball courts e. Clubhouse rooms f. Roof deck recreation areas g. Community gardens h. Barbecue and other active (e.g. bocce ball) or passive (e.g., reading) courtyards i. Other amenities as deemed appropriate by the Community Development Director Outdoor common areas or recreational areas shall be posted with an outdoor notification sign to users regarding the proximity to John Wayne Airport and presence of operating aircraft. Newport Airport Village J 14-72 (A z O a c� W Q: r z W a 0 W W v Z Q W V) D O z E NEWPORT AIRPORT VILLAGE Conceptual Land Use MapF ``� EXISTING `@ - - 01fICE1F7Gt211 Ft. north Land Use Summary: '_ m Retail/Commercial Ez9' f 2 & 3 Storl Office e Z" � £�' cu 4 Story Residential over Parking ® (Existing) Enterprise OfficelFacility x (Future) Retail/Commercial Out Parcel 1511k 0 14-73 U. LAND USE AND DEVELOPMENT REGULATIONS 8. Private Open Space: All residential development shall incorporate private open space in the amount of 5% of the gross floor area (minimum) for each unit with a minimum dimension of 6 feet in any direction. 9. Affordability Requirements: Residential development shall include affordable housing as follows: a minimum of 5% of units for very -low income households, or a minimum of 10% of units for low-income households, or a minimum 10% of units for moderate -income households within a common -interest development. The following requirements also apply: a. Affordable units shall be provided on-site. b. Affordable units shall be designed and distributed within the residential as follows: i. Number of Bedrooms. Affordable units shall reflect the range of numbers of bedrooms provided in the residential development project as a whole. ii. Comparable Quality and Facilities. Affordable units shall be comparable in the facilities provided (e.g., laundry, recreation, etc.) and in the quality of construction and exterior design to the market -rate units. iii. Size. Affordable units may be smaller and have different interior finishes and features than the market -rate units, and iv. Location. Affordable units shall be dispersed throughout the residential development, unless clustering is allowed by the review authority. C. An Affordable Housing Implementation Plan (AHIP) shall be prepared and submitted with any site development review application seeking approval of a residential development within the PC District. The AHIP shall clearly demonstrate how the proposed residential development project will meet the affordability requirements of this PCDP and any applicable provisions of the State Density Bonus Law and the Newport Beach Municipal Code. The AHIP shall specify eligible income categories, the amount of the requested density bonus, any concession/incentives requested, and any development standards waivers or modifications sought and justifications for said concessions/incentives or development standard relief. d. Density bonuses/incentives or development standard concessions shall be provided pursuant to NBMC Chapter 20.32 and Section 65915 et. seq of the California Government Code. 10. Sound Mitigation: The interior ambient noise level of all new residential dwelling units shall meet applicable standards of the City's Community Noise Ordinance (NBMC Section 10.26.030). An acoustical analysis report, prepared by an acoustical engineer, shall be submitted describing the acoustical design features of the structure that will satisfy the interior noise standard. The residential units shall be constructed, and noise attenuated in compliance with the report. Newport Airport Village 11 14-74 II. LAND USE AND DEVELOPMENT REGULATIONS 11. Residential Design: Unless otherwise deemed appropriate by the City's Review Authority all residential and mixed-use buildings shall be generally consistent with the residential design guidelines as set forth in Section IV of the PCDP. 12. Notification to owners and tenants: A written disclosure statement shall be prepared prior to sale, lease, or rental of a residential unit within the development. The disclosure statement shall indicate that the occupants will be living in an urban type of environment adjacent to an airport and that the noise, odor, and outdoor activity levels may be higherthan a typical suburban residential area. The disclosure statement shall include a written description of the potential impacts to residents of both the existing environment (e.g., noise from planes, commercial activity on the site and vehicles streets) and potential nuisances based upon the allowed uses in the zoning district. Each and every buyer, lessee, or renter shall sign the statement acknowledging that they have received, read, and understand the disclosure statement. A covenant shall also be included within all deeds, leases or contracts conveying any interest in a residential unit within the development that requires: (1) the disclosure and notification requirement stated herein; (2) an acknowledgment by all grantees or lessees that the property is located within an urban type of environment and that the noise, odor, and outdoor activity levels may be higher than a typical suburban residential area; and (3) acknowledgment that the covenant is binding for the benefit and in favor of the City of Newport Beach. 13. Deed notification: A deed notification shall be recorded with the County Recorder's Office, the form and content of which shall be satisfactory to the City Attorney. The deed notification document shall state that the residential unit is located in a mixed-use development and that an owner may be subject to impacts, including inconvenience and discomfort, from lawful activities occurring in the project or zoning district (e.g., noise, lighting, odors, high pedestrian activity levels, etc.). 14. Park Dedications and Fees: All residential subdivisions shall comply with all park dedications and fees, as required in NBMC Chapter 19.52. F. Development Standards — Planning Area 2 (Non -Residential Area) In addition to the additional development standards listed in Section II(F) of this PCDP, the following standards apply to all development in Planning Area 2. 1. Permitted Height of Structures: No structure, nor any portion of any structure, architectural feature, elevator penthouse, or mechanical equipment shall exceed a height of 37 feet, unless a Site Development Review is approved pursuant to Newport Airport Village 12 14-75 II. LAND USE AND DEVELOPMENT REGULATIONS NBMC Section 20.52.080, in which the review authority may allow buildings or structures to exceed 37 feet to a maximum of 54 feet. 2. Setbacks: Minimum setbacks shall be 15 feet from any street property line and 5 feet from any internal property line. 3. Floor Area Ratio: Floor area ratio shall not exceed 0.5, except for warehouse uses, which are allowed a maximum floor area ratio of 0.75. 4. Lot Size and Dimensions: Newly created lots shall meet the minimum standards for lots provided in NBMC Section 20.20.030 for the OA (Office—Airport) Zoning District. G. Additional Development Standards In addition to the planning area specific development standards listed in Sections II(D) and II(E) of this PCDP, the following standards apply to all development within the Newport Airport Village Planned Community. 1. Maximum Intensity: The total area of all office, retail, and other commercial uses within the Newport Airport Village PC shall not exceed 297,572 square feet. 2. Parking and Circulation: Parking and on-site circulation shall comply with NBMC Chapter 20.40. All proposed development is required to be reviewed and approved by the Planning Division, Public Works Department, the City Traffic Engineer, Fire Department and Building Division. On-site circulation, including but not limited to, driveway location, sight distance, parking lot design, drive aisles, emergency vehicle access and access the disabled shall meet applicable codes, polices and design standards. All approved vehicle entry points to the PC District shall comply with applicable City of Newport Beach Public Works and Fire Department requirements regarding safe and convenient vehicular access. 3. Landscaping: A detailed landscape and irrigation plan shall be prepared by a licensed landscape architect and submitted with the Site Development Review application. Landscaping shall be designed, installed, and maintained in consistent with all requirements of NBMC Chapters 14.17 (Water Efficient Landscaping) and 20.36 (Landscaping Standards). Landscape shall also be maintained in a healthy, weed -free condition, free of litter and consistent with NBMC Section 20.30.130 (Traffic Safety Visibility Area). 4. Pedestrian and Bicycle Connection: All uses in the PC shall be interconnected through safe and efficient pedestrian and bicycle paths, including a pedestrian Newport Airport Village 13 14-76 II. LAND USE AND DEVELOPMENT REGULATIONS connection feature between the residential and non-residential components of the PC District. 5. Lighting: A detailed lighting plan with lighting fixtures and standard designs shall be submitted with the Site Development Review application and shall comply with NBMC Section 20.30.070. The lighting system shall be designed and maintained to conceal the light source and minimize light spillage and glare outside of the boundary of the PC District. A minimum average 0.5 foot-candle shall be provided on all driving or walking surface during the hours of operation and one hour thereafter. All lighting shall comply with NBMC Section 20.30.070. 6. Utilities: A Utilities Plan shall be submitted with the Site Development Review application. The final alignment and location of utilities shall be reviewed and approved by the Public Works Department. Adequate access for maintenance vehicles shall be provided. All utilities on private property shall be privately maintained and operated. 7. Air Conditioning Units: The use of individual through -window or through -wall air conditioning units any commercial or residential unit is prohibited. Signs: A comprehensive sign program with sign materials and lighting details shall be submitted with the Site Development Review application. All signage shall comply with the Chapter 20.42 of the Municipal Code. Should a future neighborhood public park be constructed in either Planning Area, the park shall be posted with a notification to users regarding the proximity to John Wayne Airport and aircraft overflight and noise. Outdoor common areas or recreational areas shall also be posted with an outdoor notification sign to users regarding the proximity to John Wayne Airport and presence of operating aircraft. 8. Fences. Hedges, & Walls: Fences, hedges, and walls shall be limited to the following heights, subject to the exceptions contained in NBMC Section 20.30.040: a. Street setback areas — 42 inches b. Interior setback areas — 6 feet C. Between residential uses and nonresidential uses and parking areas— 8 feet 9. Buffering and Screening a. General Requirements: Mechanical equipment must be located so that the impact of noise on residential uses is minimized to the greatest extent feasible. Screening shall be maintained in good condition at all times. Landscaping used as screening shall provide a dense, year-round screen. Newport Airport Village 14 14-77 II. LAND USE AND DEVELOPMENT REGULATIONS b. Roof -mounted Mechanical Equipment and Appurtenances: Roof -mounted mechanical equipment and appurtenances may not be visible in any direction (360 degrees) from a public right-of-way or adjacent residential property, as may be seen from a point six feet above ground level. Methods of screening may include mechanical roof wells recessed below the roof line or by solid and permanent roof -mounted screens. Screening must be compatible with the architectural style, materials, and color of the building on which the equipment is located. Supports for window washing equipment are permitted and are not required to be screened from view. No setbacks are required for rooftop mechanical equipment or appurtenances. All roof - mounted mechanical equipment and appurtenances shall be at or below all applicable height limits. C. Ground -mounted Mechanical Equipment: Ground -mounted mechanical equipment shall be screened from public rights-of-way and/or public property as seen from a point six feet above ground level. Methods of screening may include fences, walls, solid hedges, or other similar methods. Chain link fencing is not permitted with or without slats is not allowed. d. Outdoor Storage: Where equipment, material, or merchandise is allowed to be stored outdoors, these items shall be screened from public view and adjacent residential areas using fences, walls, solid hedges, or other methods. Chain link fencing with or without slats is not allowed. e. Solid Waste Storage Areas: New development shall provide adequate, enclosed areas with solid roofs for collecting, storing, and loading solid waste and recyclable materials. The square footage provided for solid waste and recyclable materials storage must be in compliance with NBMC Section 20.30.120. Solid waste and recyclable materials storage areas must be adequate in distribution to serve the project and be screened from public rights-of-way and/or public property as seen from a point six feet above ground level. Screening may consist of solid masonry walls, metal gates, landscaping, or similar methods. Structures used for solid waste screening must be visually compatible with the surrounding structures and must be properly secured to prevent access by unauthorized persons, while allowing authorized persons access for disposal of materials. Newport Airport Village 15 14-78 III. ARCHITECTURAL DESIGN CONSIDERATIONS III. ARCHITECTURAL DESIGN CONSIDERATIONS A. General Principles The following general principles shall be considered when siting and designing new development within Newport Airport Village. 1. Development should be designed to convey a unified and high-quality character with use of consistent architectural design vocabulary, materials, and color palette. 2. Building elevations should employ architectural treatments, articulation and modulation of mass to avoid the appearance of monolithic box -like buildings. 3. High-quality doors, windows, moldings, and finishes should be used on elevations visible from streets and pedestrian paths. 4. Roof profiles should be articulated to reduce the appearance of large structures and provide visual interest. 5. Streetscape design and plant materials should reflect the street's location and nature. 6. Abundant use of landscape within interior courtyards, open spaces, and parking areas should be encouraged. 7. The design of parking areas and parking facilities should consider architectural consistency and physical integration with nearby buildings. 8. Open parking lots should be set back from public streets and screened using buildings, decorative walls, berms or dense landscaping. B. Mixed -Use The following principles shall be considered when siting and designing new mixed-use development. 1. Residential uses should be seamlessly integrated with nonresidential uses through pedestrian connections, landscape, and other physical connections. 2. Conflicts between different uses, such as noise, vibration, glare, odors, and similar impacts, should be minimized through careful siting, building design and incorporation of appropriate building materials. 3. Entries for residential units and nonresidential businesses should be separate and well-defined. C. Residential Uses The following principles shall be considered when new development includes residential use. Newport Airport Village 16 14-79 III. ARCHITECTURAL DESIGN CONSIDERATIONS 1. Private open space for each residential unit should be usable and functional. 2. Common residential open space should create opportunities for recreation and promote an attractive living environment. D. Office/Commercial Uses The following principles shall be considered when siting and designing new office or commercial development. 1. Building siting should be oriented around public spaces such as plazas, courtyards, walkways, and open spaces. 2. On-site landscaping should emphasize special features such as entryways. 3. Landscape and other amenities should be used to provide visual relief within surface parking lots. 4. A common signage program that reflects the architectural style and character of the development should be prepared to address tenant identification and wayfinding. 5. Common streetscape and lighting programs should be developed to promote pedestrian activity. 6. Site design should provide clear site access, entrance drives and building entries as well as minimize conflicts between service vehicles, private automobiles, and pedestrians. E. Conceptual Images to Guide Development The following images provide general direction to convey the desired quality for new development through architectural massing, detail, variety in building materials and integration of pedestrian -orientation. These images are meant to inspire designers and do not indicate the precise design of future development within Newport Airport Village. The images are grouped by land use type: mixed use, multi -unit residential buildings, and office/commercial development. Newport Airport Village 17 III. ARCHITECTURAL DESIGN CONSIDERATIONS r - I Figure G - Mixed -Use Conceplua! Images Newport Airport Village 18 14-81 111. ARCHITECTURAL DESIGN CONSIDERATIONS Ik Tulle 8 - O fcel Commen-tal Cnin:eplrcrrl Lunges Newport Airport Village 20 14-83 1 Tulle 8 - O fcel Commen-tal Cnin:eplrcrrl Lunges Newport Airport Village 20 14-83 IV. RESIDENTIAL DESIGN GUIDELINES IV. RESIDENTIAL DESIGN GUIDELINES The Newport Airport Village Residential Design Guidelines are intended to set parameters for the design of residential buildings and ensure an appropriate aesthetic quality is provided on all residential buildings. All residential and mixed-use buildings within Newport Airport Village PC should be generally consistent with the guidelines contained in this section of the PCDP. A. Architectural Variety 1. Buildings should utilize more than a single -color on all fagades. 2. Buildings should utilize more than a single finished material on all fagades. For the purpose of this requirement, windows are not considered a finished material. 3. Building should have more than one roof height. The change in roof height shall be at least 5 feet for buildings with a height under 30 feet tall and 10 feet for buildings with a height of 30 feet or more. 4. Buildings should not have blank fagades. For the purpose of these guidelines a blank fagade shall mean, any portion of the fagade that is above the ground level and does not have a window or balcony 15 feet in any direction. B. Windows and Entries I. The primary pedestrian entry into the building should lead into a common lobby or corridor and shall face the street or a common open space. 2. Ground level dwelling units are encouraged to have an individual primary entry on the exterior facade of the building. 3. Rain protection should be provided above all pedestrian entries through the use of awnings, porticos, arcades, or the like. 4. Exterior windows and doors should be inset a minimum 2-% inches from the adjoining wall. C. Massing and articulation I. The first three floors of a building should have a plane -break to divide all street facing facades into segments no more than 30 feet wide. Plane -breaks shall have a minimum depth and width of 5 feet. 2. The fourth floor and above of a building should have a plane -break on all street facing facades. Plane -breaks shall have a minimum depth of 5 feet and be across 25% of the width of the building. Newport Airport Village 21 V. PLAN ADMINISTRATION AND IMPLEMENTATION V. PLAN ADMINISTRATION AND IMPLEMENTATION A. Permit Review Procedures Approval of the Site Development Review application by the City -designated Review Authority consistent with NBMC Chapter 20.52 shall be required prior to the issuance of a grading or building permit for the construction of any new structure within the boundaries of the PCDP. The application shall include all materials necessary to clearly determine consistency with this PCDP and applicable requirements of the Newport Beach Municipal Code. The applicant shall include a descriptive narrative supported by facts, exhibits, or diagrams that clearly show how a proposed development generally conforms to the PCDP design guidelines. B. Parcel or Tract Maps No parcel or tract map shall be recorded prior to the approval of the Site Development Review for the entire project or significant phase so that the responsibility for performance of, and payment for, maintenance are clear. C. Amendments to Planned Community Development Plan Applications for amendments to this Planned Community Development Plan shall follow the process identified in the NBMC Section 20.56.050(E). D. Administrative Responsibility All property within this PCDP shall be subject to NBMC Chapter 20.60 that prescribes the authority and responsibilities of the Newport Beach City Council, Planning Commission, Hearing Officer, Zoning Administrator, and Community Development Director (Planning Director) in the administration of this PCDP and the Zoning Code. E. Enforcement All property within this PCDP shall be subject to NBMC Chapter 20.68 that establishes provisions intended to ensure compliance with this PCDP and the Zoning Code. Newport Airport Village 22 14-85 Attachment C Ordinance No. 2020-23 ORDINANCE NO. 2020-23 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF NEWPORT BEACH, CALIFORNIA, APPROVING DEVELOPMENT AGREEMENT NO. DA2014-003 FOR THE NEWPORT AIRPORT VILLAGE PLANNED COMMUNITY DEVELOPMENT FOR THE PROPERTY LOCATED AT 4341, 4361, AND 4501 BIRCH STREET; 4320, 4340, 4360, 4400, 4500, 4520, 4540, 4570, 4600 AND 4630 CAMPUS DRIVE; AND 4525, 4533, AND 4647 MACARTHUR BOULEVARD (PA2014-225) WHEREAS, Section 200 of the City of Newport Beach ("City") Charter vests the City Council with the authority to make and enforce all laws, rules and regulations with respect to municipal affairs subject only to the restrictions and limitations contained in the Charter and the State Constitution, and the power to exercise, or act pursuant to any and all rights, powers, and privileges, or procedures granted or prescribed by any law of the State of California; WHEREAS, an application was filed by Saunders Property Company ("Applicant") with respect to property located at 4341, 4361, and 4501 Birch Street; 4320, 4340, 4360, 4400, 4500, 4520, 4540, 4570, 4600 and 4630 Campus Drive; and 4525, 4533, and 4647 MacArthur Boulevard within the northerly portion of the Campus Tract, generally bounded by Birch Street, Campus Drive, MacArthur Boulevard and the extension of Corinthian Way, legally described on Exhibit A, which is attached hereto and incorporated herein by reference ("Property"); WHEREAS, the Property is designated AO (Airport Office and Supporting Uses) by the City of Newport Beach General Plan ("General Plan") Land Use Element and is located within the OA (Office -Airport) Zoning District; WHEREAS, the Applicant proposes a Planned Community Development Plan that would allow redevelopment of the 16.46 -acre Property with up to 329 residential dwelling units, exclusive of any density bonus as allowed pursuant to California Government Code Section 65915, and up to 297,572 square feet of office, retail, and commercial uses ("Project") which require the following approvals from the City: • General Plan Amendment (GP2014-004) ("GPA") — A request to amend the General Plan Land Use Designation of the Property from AO (Airport Office and Supporting Uses) to MU -H2 (Mixed -Use Horizontal 2) and to amend Table LU2 (Anomaly Locations) to add Anomaly No. 86 to allow for the development of 329 dwelling units, exclusive of any permitted density bonus, and 297,572 square feet of commercial uses; 14-87 Ordinance No. 2020 - Page 2 of 6 • Zoning Code Amendment (CA2014-009) — A request to change the zoning designation of the Property from OA (Office -Airport) to PC -60 (Newport Airport Village Planned Community); • Planned Community Development Plan (PC2020-002) — A request to adopt the Newport Airport Village Planned Community Development Plan ("PCDP") which sets the development design and use standards for the Property; • Development Agreement (DA2014-003) ("Development Agreement") — A request for a development agreement between the Applicant and the City, which would provide vested rights to develop the Property, while also providing negotiated public benefits; and • Addendum to the 2006 General Plan Update and 2014 General Plan Land Use Element Amendment Environmental Impact Reports (ER2020-002) — Pursuant to the California Environmental Quality Act ("CEQA"), the Addendum to the 2006 General Plan Update Program Environmental Impact Report ("PEIR") and 2014 General Plan Land Use Element Supplemental Environmental Impact Report ("SEIR") will address reasonably foreseeable environmental impacts resulting from the Project; WHEREAS, the Project is not located in the coastal zone; therefore, amending the Local Coastal Program or a coastal development permit is not required; WHEREAS, a telephonic study session was held on April 23, 2020, in the Council Chambers located at 100 Civic Center Drive, Newport Beach, California due to the Declaration of a State Emergency and Proclamation of Local Emergency related to COVID-19 to introduce the Project to the Planning Commission, WHEREAS, a telephonic public hearing was held by the Planning Commission on June 4, 2020, in the Council Chambers located at 100 Civic Center Drive, Newport Beach, California, due to the Declaration of a State Emergency and Proclamation of Local Emergency related to COVID-19. A notice of time, place and purpose of the public hearing was given in accordance with California Government Code Section 54950 et seq. ("Ralph M. Brown Act") and Chapter 20.62 (Public Hearings) of the Newport Beach Municipal Code ("NBMC"). Evidence, both written and oral, was presented to, and considered by, the Planning Commission at this public hearing; WHEREAS, at the hearing, the Planning Commission adopted Resolution No. PC2020-020 by a unanimous vote (6 ayes, 0 nays) recommending the City Council approve the Project; -:: Ordinance No. 2020 - Page 3 of 6 WHEREAS, due to the proposed amendments to the General Plan and the Property's zoning regulations, California Public Utilities Code Section 21676(b) requires the City to refer the Project to the Orange County Airport Land Use Commission ("ALUC") for a determination of the Project's consistency with the Airport Environs Land Use Plan ("AELUP") for the John Wayne Airport; WHEREAS, on July 16, 2020, the ALUC voted (6 ayes, 0 nays) finding the Project inconsistent with the AELUP; WHEREAS, telephonic public hearings were held by the City Council on September 8, 2020 and September 22, 2020, in the Council Chambers located at 100 Civic Center Drive, Newport Beach, California, due to the Declaration of a State Emergency and Proclamation of Local Emergency related to COVID-19. A notice of time, place and purpose of the public hearings were given in accordance with California Public Utilities Code Section 21676(b), the Ralph M. Brown Act, and Chapters 15.45 (Development Agreements), 20.56 (Planning Community District Procedures) and 20.62 (Public Hearings) of the NEMC. Evidence, both written and oral, was presented to, and considered by, the City Council at these public hearings; WHEREAS, pursuant to California Public Utilities Code Sections 21676(b), the City Council adopted Resolution No. 2020-_, thereby finding the Project consistent with the purpose of the State Aeronautics Act and overriding the finding of inconsistency with the AELUP; WHEREAS, Development Agreement No. DA2014-003 is required by Chapter 15.45 (Development Agreements) of the NBMC in that the Project would add more than 50 dwelling units within Statistical Area L4 (Airport Area), WHEREAS, Section 15.45.040 (Contents) of the NBMC requires inclusion of the permitted uses of the property, density or intensity of uses, maximum height and size of proposed buildings and any reservation or dedication of land required into a development agreement; WHEREAS, Section 15.45.040 (Contents) of the NBMC permits inclusion of additional provisions into the development agreement, including but not limited to, conditions, terms, restrictions and requirements for subsequent discretionary actions as well as specifying when construction commence; WHEREAS, Development Agreement No. DA2014-003 satisfies the mandatory elements of Section 15.45.040 (Contents) of the NBMC in providing for the development of 329 dwelling units, exclusive of any permitted density bonus and 297,572 square feet of nonresidential floor area and specifies provides for the dedication of parkland or an in - lieu fee; ITC Ordinance No. 2020 - Page 4 of 6 WHEREAS, Development Agreement No. DA2014-003 further satisfies other mandatory elements of Section 15.45.040 (Contents) of the NBMC in the definition of Development Plan which incorporates all land use approvals required for the Project; WHEREAS, Development Agreement No. DA2014-003 also provides other non- mandatory elements, including a term of 15 years for completion of the residential portion and 20 years for completion of the commercial portion of the Project along with providing public benefits that are appropriate to support conveying the vested development rights consistent with the General Plan, NBMC, and Government Code Sections 65864 et seq.; and WHEREAS, the public benefits include the payment of a $1,000,000 public safety fee to provide new emergency response services or Fire Department equipment to serve the Airport Area and $6,000,000 public benefit fee to be used by the City Council as it deems appropriate. NOW THEREFORE, the City Council of the City of Newport Beach ordains as follows: Section 1: The City Council has considered the recommendation of the Planning Commission and has determined that modifications to the Project made by the City Council, if any, are not major changes that require referral back to the Planning Commission for consideration and recommendation. Section 2: The City Council hereby approves Development Agreement No. DA2014-003, as depicted in Exhibit B, which is attached hereto and incorporated herein by reference. Section 3: The recitals provided in this ordinance are true and correct and are incorporated into the substantive portion of this ordinance. Section 4: If any section, subsection, sentence, clause or phrase of this ordinance is for any reason held to be invalid or unconstitutional, such decision shall not affect the validity or constitutionality of the remaining portions of this ordinance. The City Council hereby declares that it would have passed this ordinance and each section, subsection, sentence, clause or phrase hereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses or phrases be declared invalid or unconstitutional. 14-90 Ordinance No. 2020 - Page 5 of 6 Section 5: Environmental Impact Report Addendum No. ER2020-02 was prepared for the Project in compliance with California Public Resources Code Section 21000 et seq. ("CEQA"), CEQA Guidelines as set forth in California Code of Regulations, Title 14, Division 6, Chapter 3, and City Council Policy K-3. On the basis of the entire environmental record, the Project will not result in any new significant impacts that were not previously analyzed in the PEIR for the General Plan 2006 Update (SCH No. 2006011119) or the SEIR for the 2014 update to the Land Use Element of the General Plan (SCH No. 2013101064). The potential impacts associated with this Project would either be the same or less than those described in either the PEIR or SEIR that have been appropriately mitigated. In addition, there are no substantial changes to the circumstances under which the Project would be undertaken that would result in new or more severe environmental impacts than previously addressed in either the PEIR or SEIR, nor has any new information regarding the potential for new or more severe significant environmental impacts been identified. In accordance with Section 15164 of the CEQA Guidelines, the City Council adopted Resolution No. 2020-_, thereby adopting an addendum to the previously adopted PEIR and SEIR. Resolution No. 2020-_, including all findings contained therein, is hereby incorporated by reference. Section 6: Except as expressly modified in this ordinance, all other sections, subsections, terms, clauses and phrases set forth in the NBMC shall remain unchanged and shall be in full force and effect. Section 7: The Mayor shall sign and the City Clerk shall attest to the passage of this ordinance. The City Clerk shall cause the ordinance, or a summary thereof, to be published pursuant to City Charter Section 414. This ordinance shall be effective thirty (30) calendar days after its adoption. 14-91 Ordinance No. 2020 - Page 6 of 6 This ordinance was introduced at a regular meeting of the City Council of the City of Newport Beach held on the 8t" day of September, 2020, and adopted on the 22nd day of September, 2020, by the following vote, to -wit: AYES: NAYS: ABSENT: WILL O'NEILL, MAYOR ATTEST: LEILANI 1. BROWN, CITY CLERK APPROVED AS TO FORM: CITY TTORNEY'S O_ FFICE C AARON C. HARP, CITY ATTORNEY Attachments: Exhibit A - Legal Description Exhibit B - Development Agreement 14-92 EXHIBIT "N' Legal Description 14-93 ADDRESS APN LEGAL DESCRIPTION 4361 Birch Street, 427-121-23 THE LAND REFERRED TO HEREIN BELOW IS SITUATED Newport Beach NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CA CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: LOTS 7, 8, 9 AND 10 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190, PAGES 11, 12 AND 13 OF MISCELLANEOUS MAPS, RECORDS OF ORANGE COUNTY, CALIFORNIA. SAID LAND IS ALSO SHOWN AS PARCEL 1 ON LOT LINE ADJUSTMENT 93-5, RECORDED DECEMBER 8, 1993 AS INSTRUMENT NO. 93-0854901, OFFICIAL RECORDS. EXCEPTING THEREFROM ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE GRANT DEED RECORDED APRIL 9, 1993 AS INSTRUMENT NO. 93-0237996 OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE GRANT DEED RECORDED APRIL 9, 1993 AS INSTRUMENT NO. 93-0237996, OFFICIAL RECORDS. 4540 Campus 427-111-03 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA PARCEL 1: LOT 18 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 11 THROUGH 13, INCLUSIVE 14-94 ADDRESS APN LEGAL DESCRIPTION OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPT ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED JUNE 30, 1992 AS INSTRUMENT NO. 92-440215 OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE, AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED JUNE 30, 1992 AS INSTRUMENT NO. 92-440215 OF OFFICIAL RECORDS. PARCEL 2: AN EASEMENT FOR DRIVEWAY PURPOSES OVER THE WESTERLY 12 FEET OF THE NORTHERLY 60 FEET OF LOT 17 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190, PAGES 11 THROUGH 13, INCLUSIVE OF MISCELLANEOUS MAPS, RECORDS OF ORANGE COUNTY, CALIFORNIA, AS SET FORTH IN THAT CERTAIN DECLARATION OF ACCESS EASEMENT, RECORDED JUNE 30, 1992 AS INSTRUMENT NO. 92-440213 OF OFFICIAL RECORDS, UPON THE TERMS AND CONDITIONS AS THEREIN PROVIDED 4340 Campus 427-121-07 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: 14-95 ADDRESS APN LEGAL DESCRIPTION Newport Beach, LOT 29 OF TRACT NO. 3201, IN THE CITY OF NEWPORT BEACH, CA COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 130, PAGES 25 TO 30 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, ANY OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED BY THE IRVINE COMPANY IN DEED RECORDED FEBRUARY 4, 1994 AS INSTRUMENT NO. 94-0085581 OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS AS RESERVED IN THE DEED RECORDED FEBRUARY 4, 1994 AS INSTRUMENT NO. 94- 0085581 OF OFFICIAL RECORDS 4400 Campus 427-121-09 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA LOT 31 OF TRACT NO. 3201, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 130, PAGE(S) 25 THROUGH 30, INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, ANY OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE 14-96 ADDRESS APN LEGAL DESCRIPTION FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED BY THE IRVINE COMPANY IN DEED RECORDED DECEMBER 20, 1991 AS INSTRUMENT NO. 91-702340, OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS AS RESERVED IN THE DEED RECORDED DECEMBER 20, 1991 AS INSTRUMENT NO. 91- 702340, OF OFFICIAL RECORDS 4570 Campus 427-111-04 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA PARCEL 1: LOT 17 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 11 THROUGH 13, INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAND COUNTY. EXCEPTING THEREFROM ALL MINERALS, OIL, GAS, PETROLEUM, OTHER HYDROCARBON SUBSTANCES AND ALL UNDERGROUND WATER IN OR UNDER OR WHICH MAY BE PRODUCED FROM SAID LAND WHICH UNDERLIES A PLANE PARALLEL TO AND 500 FEET FROM THE PRESENT SURFACE OF SAID LAND FOR THE PURPOSE OF PROSPECTING FOR, THE EXPLORATION, DEVELOPMENT, PRODUCTION, EXTRACTION AND TAKING OF SAID MINERALS, OIL, GAS, PETROLEUM, OTHER HYDROCARBON SUBSTANCES AND WATER FROM SAID LAND BY MEANS OF MINES, WELLS, DERRICKS, OTHER EQUIPMENT FROM SURFACE LOCATIONS ON ADJOINING OR NEIGHBORING LAND OR LYING OUTSIDE OF THE ABOVE DESCRIBED LAND, IT BEING UNDERSTOOD THAT THE OWNER OF SUCH MINERALS, OIL GAS, 14-97 ADDRESS APN LEGAL DESCRIPTION PETROLEUM, OTHER HYDROCARBON SUBSTANCES AND WATER AS SET FORTH ABOVE, SHALL HAVE NO RIGHT TO ENTER UPON THE SAID LAND OR ANY PORTION THEREOF ABOVE SAID PLANE PARALLEL TO AND 500 FEET BELOW THE PRESENT SURFACE OF TI EE SAID LAND FOR ANY PURPOSE WHATSOEVER. AS RESERVED BY THE IRVINE COMPANY, A MICHIGAN CORPORATION IN THE DEED RECORDED FEBRUARY 19, 1993 AS INSTRUMENT NO. 93-107963 OF OFFICIAL RECORDS. PARCEL 2: NON-EXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "DECLARATION OF ACCESS EASEMENTS (MACARTHUR/CAMPUS)" DATED JANUARY 30, 1992 AND RECORDED FEBRUARY 20, 1992 AS INSTRUMENT NO. 92-101692 AS AMENDED AND RESTATED IN AN INSTRUMENT RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247260, BOTH OF OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. PARCEL 3: NON-EXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "DECLARATION OF ACCESS EASEMENT. DATED JUNE 17, 1992, AND RECORDED JUNE 30, 1992 AS INSTRUMENT NO. 92- 440213 OF OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. 4341 Birch Street 427-121-14 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Newport Beach CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, CA STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: LOT 6 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190, PAGES 11, 12 AND 13 OF MISCELLANEOUS MAPS, RECORDS OF SAID ORANGE COUNTY. EXCEPT ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED DECEMBER 31, 1991 AS INSTRUMENT NO. 91- 720058 OF OFFICIAL RECORDS. ALSO EXCEPT ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND ADDRESS APN LEGAL DESCRIPTION OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED DECEMBER 31, 1991 AS INSTRUMENT NO. 91-720058 OF OFFICIAL RECORDS. APN: 427-121-14 4500 and 4520 427-111-01, THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Campus Drive 427-111-02 CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach, and 427- STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA 121-10 PARCEL 1 IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP FILED IN BOOK 60, PAGE 22 OF PARCEL MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. 4600 Campus 427-111-05 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA PARCEL 1: LOT 16 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 11 TO 13 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM, ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM AND OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE ON THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED BY THE IRVINE COMPANY, RECORDED FEBRUARY 19, 1993 AS INSTRUMENT NO. 93- 107971, OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR AND OWNED OR USED BY GRANTOR IN 14-99 ADDRESS APN LEGAL DESCRIPTION CONNECTION WITH OR WITH RESPECT TO THE LAND TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED BY THE IRVINE COMPANY, RECORDED FEBRUARY 19, 1993 AS INSTRUMENT NO. 93-107971, OFFICIAL RECORDS. PARCEL 2: NONEXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "AMENDED AND RESTATED OR ACCESS EASEMENTS (MACARTH U R/CAM PUS)", DATED MARCH 25, 1992, RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247260, IN THE OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. 4360 Campus 427-121-08 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA LOT 30 OF TRACT NO. 3201, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 130, PAGES 25, 26, 27, 28, 29 AND 30 OF MISCELLANEOUS MAPS, RECORDS OF ORANGE COUNTY CALIFORNIA. EXCEPT ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED MARCH 15, 1994 AS INSTRUMENT NO. 94-0179376, OFFICIAL RECORDS. ALSO EXCEPT ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR 14-100 ADDRESS APN LEGAL DESCRIPTION OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED MARCH 15, 1994 AS INSTRUMENT NO. 94-0179376, OFFICIAL RECORDS. 4501 Birch Street 427-111-10 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Newport Beach, CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, CA STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: PARCEL 1: LOT 12 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190. PAGES 11 TO 13 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPT ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR. ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED JANUARY 10, 1992 AS INSTRUMENT NO. 92- 015047, OFFICIAL RECORDS. ALSO EXCEPT ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED FROM THE 14-101 ADDRESS APN LEGAL DESCRIPTION IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED JANUARY 10, 1992 AS INSTRUMENT NO. 92-015047, OFFICIAL RECORDS. PARCEL 2: A NON-EXCLUSIVE EASEMENT FOR INGRESS AND EGRESS OVER THAT PORTION OF LOT 13 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 11 TO 13 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY, DESCRIBED AS FOLLOWS: BEGINNING AT THE MOST SOUTHERLY CORNER OF SAID LOT; THENCE NORTH 290 52'01" WEST 327.33 FEET TO THE MOST WESTERLY CORNER OF SAID LOT; THENCE NORTH 52° 01'58" EAST 24.24 FEET ALONG THE NORTHWESTERLY LINE OF SAID LOT TO THE NORTHWESTERLY PROLONGATION OF A LINE PARALLEL WITH AND NORTHEASTERLY 24.00 FEET FROM THE SOUTHWESTERLY LINE OF SAID LOT; THENCE SOUTH 290 52' 10" EAST 331.81 FEET ALONG SAID PROLONGATION, SAID PARALLEL LINE AND THE SOUTHERLY PROLONGATION THEREOF TO A POINT ON A CURVE IN THE SOUTHERLY LINE OF SAID LOT, SAID CURVE BEING CONCAVE SOUTHERLY, HAVING A RADIUS OF 272.00 FEET, A RADIAL TO SAID POINT BEARS NORTH 240 48' 17" WEST; THENCE WESTERLY 24.03 FEET ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 50 03'44" OF THE POINT OF BEGINNING. 4630 Campus 427-111-06 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA PARCEL 1: LOT 15 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 11 TO 13 OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM, ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN GEOTHERMAL STEAM, ANY OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT HOWEVER, THE RIGHT TO DRILL MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OF THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED BY THE IRVINE COMPANY 14-102 ADDRESS APN LEGAL DESCRIPTION RECORDED FEBRUARY 19, 1993 AS INSTRUMENT NO. 93- 107967, OFFICIAL RECORDS. PARCEL 2: NONEXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "AM ENDED AND RESTATED DECLARATION OF ACCESS EASEMENTS (MACARTHUR/CAMPUS) DATED MARCH 25, 1992 RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247260, IN THE OFFICE RECORDS OF ORANGE COUNTY, CALIFORNIA. PARCEL 3: NONEXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED " RECIPROCAL EASEMENT AGREEMENT AND CONSENT' DATED OCTOBER 14, 1999 RECORDED NOVEMBER 19, 1999 AS INSTRUMENT NO. 19990805278, AND AMENDED BY THE CERTAIN DOCUMENT ENTITLED "WAIVER AND AMENDMENT TO RECIPROCAL EASEMENT AGREEMENT' DATED AUGUST 24, 2015 RECORDED AUGUST 28, 2015 AS INSTRUMENT NO. 2015000446662 IN THE OFFICE RECORDS OF ORANGE COUNTY, CALIFORNIA. 4525, 4533 and 427-111-09 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE 4647 MacArthur CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Boulevard STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: Newport Beach, PARCEL 1: CA LOT 13 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190, PAGE(S) 11 TO 13 INCLUSIVE, OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFORE AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION RECORDED APRIL 16, 1992. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE 14-103 ADDRESS APN LEGAL DESCRIPTION LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL, BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION RECORDED APRIL 16, 1992. PARCEL 2: NON-EXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "DECLARATION OF ACCESS EASEMENTS (MACARTHUR/CAMPUS)" DATED JANUARY 30, 1992 AND RECORDED FEBRUARY 20, 1992 AS INSTRUMENT NO. 92-101692, OFFICIAL RECORDS AND AMENDED BY DOCUMENT RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247260, OFFICIAL RECORDS, IN THE OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. PARCEL 3: NON-EXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "DECLARATION OF ACCESS EASEMENTS (BIRCH/MACARTHUR)" DATED JANUARY 30, 1992 AND RECORDED FEBRUARY 20, 1992 AS INSTRUMENT NO. 92- 101691 OFFICIAL RECORDS AND AMENDED BY DOCUMENT RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247259 OFFICIAL RECORDS IN THE OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. 4320 Campus 427-121-06 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Drive CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, Newport Beach, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: CA LOT 28 OF TRACT NO. 3201, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 130, PAGES 25 THROUGH 30, INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, ANY OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED BY THE IRVINE COMPANY, A MICHIGAN 14-104 ADDRESS APN LEGAL DESCRIPTION CORPORATION, BY DEED RECORDED MAY 6, 1994 AS INSTRUMENT NO. 94-317183 OF OFFICIAL RECORDS. 14-105 EXHIBIT "B" Development Agreement 14-106 RECORDING REQUESTED BY AND WHEN RECORDED RETURN TO: City of Newport Beach 100 Civic Center Drive Newport Beach, CA 92660 Attn: City Clerk (Space Above This Line Is for Recorder's Use Only) This Agreement is recorded at the request and for the benefit of the City of Newport Beach and is exempt from the payment of a recording fee pursuant to Government Code §§ 6103 and 27383. DEVELOPMENT AGREEMENT between CITY OF NEWPORT BEACH and JRSM, LLC concerning NEWPORT AIRPORT VILLAGE 4341, 4361 BIRCH STREET, AND 4501 BIRCH STREET 4320, 4340, 4360, 4400, 4540, 4500, 4520, 4570, 4600, AND 4630 CAMPUS DRIVE 4525, 4533 AND 4647 MACARTHUR BOULEVARD 14-107 Page left intentionally blank 14-108 DEVELOPMENT AGREEMENT (Pursuant to Newport Beach Municipal Code Chapter 15.45 and California Government Code Sections 65864-65869.5) This DEVELOPMENT AGREEMENT ("Agreement" or "Development Agreement") is dated for reference purposes as of the _ day of , 2020 ("Agreement Date"), and is being entered into by and between the CITY OF NEWPORT BEACH ("Ciff") a California municipal corporation and charter city, organized and existing under and by virtue of its Charter and the Constitution, and the laws of the State of California, and JRSM, LLC, a California limited liability company ("Developer"). City and Developer are sometimes collectively referred to in this Agreement as the "Parties" and individually as a "Party." RECITALS A. Developer is fee simple owner of that certain real property located in the City of Newport Beach, County of Orange, State of California commonly referred to as 4341, 4361, and 4501 Birch Street, 4320, 4340, 4360, 4400, 4540, 4500, 4520, 4570, 4600, and 4630 Campus Drive, and 4525, 4533 and 4647 MacArthur Boulevard ("Property) and therefore is authorized to enter into this Agreement pursuant to Government Code Section 65865 and Newport Beach Municipal Code Chapter 15.45. The Property is more particularly described in the legal description attached hereto as Exhibit A and is depicted on the site map attached hereto as Exhibit B. B. To encourage investment in, and commitment to, comprehensive planning and public facilities financing, strengthen the public planning process and encourage private implementation of the local general plan, provide certainty in the approval of projects to avoid waste of time and resources, and reduce the economic costs of development by providing assurance to property owners that they may proceed with projects consistent with existing land use policies, rules, and regulations, the California Legislature adopted California Government Code Sections 65864-65869.5 ("Development Agreement Statute") authorizing cities and counties to enter into development agreements with persons or entities having a legal or equitable interest in real property located within their jurisdiction. C. On March 13, 2007, the City Council adopted Ordinance No. 2007-6, entitled "Ordinance Amending Chapter 15.45 of City of Newport Beach Municipal Code Regarding Development Agreements" ("Development Agreement Ordinance"). This Agreement is consistent with the Development Agreement Ordinance. D. As detailed in Section 4 of this Agreement and the Development Plans (as defined herein), and in consideration of the significant benefits outlined in this Agreement, Developer has agreed to pay a total Public Benefit Fee (as defined herein) in the sum of Six Million Dollars and 00/100 ($6,000,000). Developer shall pay the Public Benefit Fee to the City as provided in Article 3 of this Agreement. E. This Agreement is consistent with the City of Newport Beach General Plan, including, without limitation, the Property's proposed "MU -H2" (Mixed -Use Horizontal 2) General Plan designation that is being adopted and approved by the City Council concurrently 1 14-109 with its approval of this Agreement to establish appropriate standards to regulate land use and development of the Property consistent with the General Plan. G. In recognition of the significant public benefits that this Agreement provides, the City Council has found that this Agreement: (i) is consistent with the City of Newport Beach General Plan as of the date of this Agreement; (ii) is in the best interests of the health, safety, and general welfare of City, its residents, and the public; (iii) is entered into pursuant to, and constitutes a present exercise of, the City's police power; (iv) is consistent and has been approved consistent with the Project's Addendum to the Program Environmental Impact Report (SCH# 2006011119) ("PEIR") that was certified by the City Council on July 25, 2006 for the 2006 General Plan Update and Supplemental Environmental Impact Report (SCH# 2013101064) ("SEIR") that was certified by the City Council on July 22, 2014 for the 2014 Land Use Element Update, all of which analyze the environmental effects of the proposed development of the Project on the Property, and all of the findings, conditions of approval and mitigation measures related thereto; and (v) is consistent and has been approved consistent with provisions of California Government Code Section 65867 and City of Newport Beach Municipal Code Chapter 15.45. H. On June 4, 2020, City's Planning Commission held a public hearing on this Agreement, made findings and determinations with respect to this Agreement, and recommended to the City Council that the City Council approve this Agreement. I. On , 2020, the City Council also held a public hearing on this Agreement and considered the Planning Commission's recommendations and the testimony and information submitted by City staff, Developer, and members of the public. On , 2020, consistent with applicable provisions of the Development Agreement Statute and Development Agreement Ordinance, the City Council adopted Ordinance No. 2020- _ ("Adopting Ordinance"), finding this Agreement consistent with the City of Newport Beach General Plan and approving and adopting this Agreement. AGREEMENT NOW, THEREFORE, City and Developer agree as follows: 1. Definitions. In addition to any terms defined elsewhere in this Agreement, the following terms when used in this Agreement shall have the meanings set forth below: "Action" shall have the meaning ascribed in Section 8.10 of this Agreement. "Adopting Ordinance" shall mean City Council Ordinance No. 2020-_ approving and adopting this Agreement. "Agreement" shall mean this Development Agreement, as the same may be amended from time to time. "Agreement Date" shall mean the date first written above, which date is the date the City Council adopted the Adopting Ordinance. 2 14-110 "CEOA" shall mean the California Environmental Quality Act (California Public Resources Code sections 21000-21177) and the implementing regulations promulgated thereunder by the Secretary for Resources (California Code of Regulations, Title 14, Division 6, Chapter 3, Section 15000 et seq.), as the same may be amended from time to time. "Ci" shall mean the City of Newport Beach, a California municipal corporation and charter city, and any successor or assignee of the rights and obligations of the City of Newport Beach hereunder. "City Council" shall mean the governing body of City. "City's Affiliated Parties" shall have the meaning ascribed in Section 10.1 of this Agreement. "Claim" shall have the meaning ascribed in Section 10.1 of this Agreement. "CPI Index" shall mean the Consumer Price Index published from time to time by the United States Department of Labor for all urban consumers (all items) for the smallest geographic area that includes the City or, if such index is discontinued, such other similar index as may be publicly available that is selected by City in its reasonable discretion. "Cure Period" shall have the meaning ascribed in Section 8.1 of this Agreement. "Default" shall have the meaning ascribed to that term in Section 8.1 of this Agreement. "Develop" or "Development" shall mean to improve or the improvement of the Property for the purpose of completing the structures, improvements, and facilities comprising the Project, including but not limited to: grading; the construction of infrastructure and public facilities related to the Project, whether located within or outside the Property; the construction of all of the private improvements and facilities comprising the Project; the preservation or restoration, as required of natural and man-made or altered open space areas; and the installation of landscaping. The terms "Develop" and "Development," as used herein, do not include the maintenance, repair, reconstruction, replacement, or redevelopment of any structure, improvement, or facility after the initial construction and completion thereof. "Developer" shall mean JRSM, LLC and any successor or assignee to all or any portion of its right, title, and/or interest in and to ownership of all or a portion of the Property and/or the Project. "Development Agreement Ordinance" shall mean Chapter 15.45 of the City of Newport Beach Municipal Code. "Development Agreement Statute" shall mean California Government Code Sections 65864-65869.5, inclusive. "Development Exactions" shall mean any requirement of City in connection with or pursuant to any ordinance, resolution, rule, or official policy for the dedication of land, the construction or installation of any public improvement or facility, or the payment of any fee or ki 14-111 charge in order to lessen, offset, mitigate, or compensate for the impacts of Development of the Project on the environment or other public interests. "Development Plan" shall mean all of the land use entitlements, approvals and permits approved by the City for the Project on or before the Agreement Date, as the same may be amended from time to time consistent with this Agreement. Such land use entitlements, approvals and permits include, without limitation, the following: (1) the Development rights as provided under this Agreement; (2) General Plan Amendment No. GP2014-004 to change the General Plan Land Use Designation of the project area from Airport Office and Supporting Uses (AO) to Mixed Use Horizontal 2 (MU -H2) and to amend Table LU2 (Anomaly Locations) to add the project area as an anomaly to allow for the development of 329 dwelling units, exclusive of any permitted density bonus and 297,572 square feet of nonresidential floor area; (3) Planned Community Development Plan Amendment No. PC2020-002 to adopt the Newport Airport Village Planned Community Development Plan (PCDP). The PCDP sets the development, design and land use standards for the project area; (4) Zoning Code Amendment CA2014-009 to change the zoning district of the project area from OA (Office Airport) to PC -60 (Newport Airport Village Planned Community); (5) Development Agreement No. DA2014-003 which would provide vested rights to develop the planned community, while also providing public benefits should the Project be approved; (6) a density bonus in accordance with the California Government Code Section 65915 et. seq. (7) the Addendum to PEIR (SCH No. 2006011119) and SEIR (SCH No. 2013101064) ER2020-002 (SCH#2016021023); and (8) all conditions of approval and all mitigation measure approved for the Project on or before the Agreement Date. "Development Regulations" shall mean the following regulations as they are in effect as of the Effective Date and to the extent they govern or regulate the development of the Property, but excluding any amendment or modification to the Development Regulations adopted, approved, or imposed after the Effective Date that affects the Development of the Property, unless such amendment or modification is expressly authorized by this Agreement or is agreed to by Developer in writing: the General Plan; the Development Plan; and, to the extent not expressly superseded by the Development Plan or this Agreement (see Section 4.3 in particular), all other land use and subdivision regulations governing the permitted uses, density and intensity of use, design, and improvement, procedures for obtaining required City permits and approvals for development, and similar matters that may apply to the Development of the Project on the Property during the Term of this Agreement that are set forth in Title 15 of the Municipal Code (buildings and construction), Title 19 of the Municipal Code (subdivisions and inclusionary housing), and Title 20 of the Municipal Code (planning, zoning and density bonus), but specifically excluding all other sections of the Municipal Code, including without limitation Title 5 of the Municipal Code (business licenses and regulations). Notwithstanding the foregoing, the term "Development Regulations," as used herein, does not include any City ordinance, resolution, code, rule, regulation or official policy governing any of the following: (i) the conduct of businesses, professions, and occupations; (ii) taxes and assessments; (iii) the control and abatement of nuisances; (iv) the granting of encroachment permits and the conveyance of rights and interests which provide for the use of or the entry upon public property; or (v) the exercise of the power of eminent domain. "Effective Date" shall mean the latest of all of the following occurring: (i) the date that is thirty (30) calendar days after the Agreement Date; (ii) if a referendum concerning the Adopting Ordinance, the Development Plan, or any of the Development Regulations approved on or before �lr 14-112 the Agreement Date is timely qualified for the ballot and a referendum election is held concerning the Adopting Ordinance or any of such Development Regulations, the date on which the referendum is certified resulting in upholding and approving the Adopting Ordinance and the Development Regulations; or (iii) if a lawsuit is timely filed challenging the validity or legality of the Adopting Ordinance, this Agreement, the Development Plan, and/or any of the Development Regulations approved on or before the Agreement Date, the date on which said challenge is finally resolved in favor of the validity or legality of the Adopting Ordinance, this Agreement, the Development Plan, and/or the applicable Development Regulations, whether such finality is achieved by a final non -appealable judgment, voluntary or involuntary dismissal (and the passage of any time required to appeal an involuntary dismissal), or binding written settlement agreement. Promptly after the Effective Date occurs, the Parties agree to cooperate in causing an appropriate instrument to be executed and recorded against the Property memorializing the Effective Date. "Environmental Laws" means all federal, state, regional, county, municipal, and local laws, statutes, ordinances, rules, and regulations which are in effect as of the Agreement Date, and all federal, state, regional, county, municipal, and local laws, statutes, rules, ordinances, rules, and regulations which may hereafter be enacted and which apply to the Property or any part thereof, pertaining to the use, generation, storage, disposal, release, treatment, or removal of any Hazardous Substances, including without limitation the following: the Comprehensive Environmental Response Compensation and Liability Act of 1980, 42 U.S.C. Sections 9601, et seq., as amended ("CERCLA"); the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act of 1976, 42 U.S.C. Sections 6901, et SeMc ., as amended ("RCRA"); the Emergency Planning and Community Right to Know Act of 1986, 42 U.S.C. Sections 11001 et sea., as amended; the Hazardous Materials Transportation Act, 49 U.S.C. Section 1801, et seg., as amended; the Clean Air Act, 42 U.S.C. Sections 7401 et sea., as amended; the Clean Water Act, 33 U.S.C. Section 1251, et SeMc ., as amended; the Toxic Substances Control Act, 15 U.S.C. Sections 2601 et seq., as amended; the Federal Insecticide, Fungicide and Rodenticide Act, 7 U.S.C. Sections 136 et sea., as amended; the Federal Safe Drinking Water Act, 42 U.S.C. Sections 300f et seq., as amended; the Federal Radon and Indoor Air Quality Research Act, 42 U.S.C. Sections 7401 et sea., as amended; the Occupational Safety and Health Act, 29 U.S.C. Sections 651 et sea., as amended; and California Health and Safety Code Section 25100, et M. "General Plan" shall mean City's 2006 General Plan adopted by the City Council on July 25, 2006, by Resolution No. 2006-76, and any amendments to the 2006 General Plan that became effective before the Effective Date. The term "General Plan" shall exclude any amendments that became effective after the Effective Date unless such amendment is expressly authorized by this Agreement, or is specifically agreed to by Developer. The Land Use Plan of the Land Use Element of the General Plan was approved by City voters in a general election on November 7, 2006. "Hazardous Substances" means any toxic substance or waste, pollutant, hazardous substance or waste, contaminant, special waste, industrial substance or waste, petroleum or petroleum -derived substance or waste, or any toxic or hazardous constituent or additive to or breakdown component from any such substance or waste, including without limitation any substance, waste, or material regulated under or defined as "hazardous" or "toxic" under any Environmental Law. 5 14-113 "Mortgage" shall mean a mortgage, deed of trust, sale and leaseback arrangement, or any other form of conveyance in which the Property, or a part or interest in the Property, is pledged as security and contracted for in good faith and for fair value. "Mortaaee" shall mean the holder of a beneficial interest under a Mortgage or any successor or assignee of the Mortgagee. "Notice of Default" shall have the meaning ascribed in Section 8.1 of this Agreement. 46p4m" or "Parties" shall mean either City or Developer or both, as determined by the context. "Project" shall mean all on-site and off-site improvements, as provided in this Agreement and the Development Regulations, as the same may be modified or amended from time to time consistent with this Agreement and applicable law. "Pro e " is located at 4341, 4361, and 4501 Birch Street, 4320, 4340, 4360, 4400, 4500, 4520, 4540, 4570, 4600, and 4630 Campus Drive, and 4525, 4533 and 4647 MacArthur Boulevard in the City, as described in Exhibit A and depicted on Exhibit B. "Public Benefit Fee" shall have the meaning ascribed in Section 3.1 of this Agreement. "Subsequent Development Approvals" shall mean all discretionary development and building approvals that Developer is required to obtain to Develop the Project on and with respect to the Property after the Agreement Date consistent with the Development Regulations and this Agreement. "Term" shall have the meaning ascribed in Section 2.4 of this Agreement. "Termination Date" shall have the meaning ascribed in Section 2.4 of this Agreement. "Transfer" shall have the meaning ascribed in Section 11 of this Agreement. 2. General Provisions. 2.1 Plan Consistency, Zoning Implementation This Agreement and the Development Regulations applicable to the Property will cause City's zoning and other land use regulations for the Property to be consistent with the General Plan. 2.2 Binding Effect of Agreement. The Property is hereby made subject to this Agreement. Development of the Property is hereby authorized and shall be carried out in accordance with the terms of this Agreement. 2.3 Developer Representations and Warranties Regarding Ownership of the Property and Related Matters Pertaining to this Agreement 0 14-114 Developer and each person executing this Agreement on behalf of Developer hereby represents and warrants to City as follows: (i) that Developer is the fee simple owner to the Property; (ii) if Developer or any co-owner comprising Developer is a legal entity that such entity is duly formed and existing and is authorized to do business in the State of California; (iii) if Developer or any co-owner comprising Developer is a natural person that such natural person has the legal right and capacity to execute this Agreement; (iv) that all actions required to be taken by all persons and entities comprising Developer to enter into this Agreement have been taken and that Developer has the legal authority to enter into this Agreement; (v) that Developer's entering into and performing its obligations set forth in this Agreement will not result in a violation of any obligation, contractual or otherwise, that Developer or any person or entity comprising Developer has to any third party; and (vi) that neither Developer nor any co- owner comprising Developer is currently the subject of any voluntary or involuntary bankruptcy or insolvency petition; and (vii) that Developer has no actual knowledge of any pending or threatened claims of any person or entity affecting the validity of any of the representations and warranties set forth in clauses (i) -(vi), inclusive or affecting Developer's authority or ability to enter into or perform any of its obligations set forth in this Agreement. 2.4 Term. The term of this Agreement ("Term") shall commence on the Effective Date and shall terminate on the "Termination Date." Notwithstanding any other provision set forth in this Agreement to the contrary, if any Party reasonably determines that the Effective Date of this Agreement will not occur because, for example, (i) the Adopting Ordinance or any of the Development Regulations approved on or before the Agreement Date for the Project has/have been disapproved by City's voters at a referendum election or (ii) a final non -appealable judgment is entered in a judicial action challenging the validity or legality of the Adopting Ordinance, this Agreement, and/or any of the Development Regulations for the Project approved on or before the Agreement Date such that this Agreement and/or any of such Development Regulations is/are invalid and unenforceable in whole or in such a substantial part that the judgment substantially impairs such Party's rights or substantially increases its obligations or risks hereunder or thereunder, then such Party, in its sole and absolute discretion, shall have the right to terminate this Agreement upon delivery of a written notice of termination to the other Party, in which event neither Party shall have any further rights or obligations hereunder except that Developer's indemnity obligations set forth in Article 10 shall remain in full force and effect and shall be enforceable, and the Development Regulations applicable to the Project and the Property only (but not those general Development Regulations applicable to other properties in the City) shall be repealed by the City after delivery of said notice of termination except for the Development Regulations that have been disapproved by City's voters at a referendum election and, therefore, never took effect. The Termination Date shall be the earliest of the following dates: (i) the fifteenth (15th) anniversary of the Effective Date for the residential portion and the twentieth (20th) anniversary for the non-residential portion; (ii) such earlier date that this Agreement may be terminated in accordance with Articles 5, and 7, and/or Section 8.3 of this Agreement and/or Sections 65865.1 and/or 65868 of the Development Agreement Statute; or (iii) completion of the Project in accordance with the terms of this Agreement, including Developer's complete satisfaction, performance, and payment, as applicable, of all Development Exactions, the issuance of all 7 14-115 required final occupancy permits, and acceptance by City or applicable public agency(ies) or private entity(ies) of all required offers of dedication. Notwithstanding any other provision set forth in this Agreement to the contrary, the provisions set forth in Article 10 and Section 14.11 (as well as any other Developer obligations set forth in this Agreement that are expressly survive the Termination Date of this Agreement. 3. Public Benefits. 3.1 Public Benefit Fee. written to survive the Termination Date) shall As consideration for City's approval and performance of its obligations set forth in this Agreement, Developer shall pay to City a fee in the amount of Six Million Dollars and 00/100 ($6,000,000), which shall be in addition to any other fee or charge to which the Property and the Project would otherwise be subject. The Developer shall pay Two Million Dollars and 00/100 ($2,000,000) of the Public Benefit Fee to the City within thirty (30) days of the Effective Date of the Agreement; Two Million Dollars and 00/100 ($2,000,000) of the Public Benefit Fee at the time the City issues the Project's first building permit; and Two Million Dollars and 00/100 ($2,000,000) of the Public Benefit Fee to the City at the time of issuance of the first certificate of occupancy or temporary occupancy permit. Should the Developer fail to pay the Public Benefit Fee at the times provided above, the Developer shall be in default of the Agreement, as further described in Article 8 of this Agreement. The amount of the Public Benefit Fee shall be increased based upon percentage increases in the CPI Index. The first CPI adjustment to the Public Benefit Fee shall occur on the third anniversary of the City Council's adoption of the Adopting Ordinance (the first "Adjustment Date") and subsequent CPI adjustments shall occur on each anniversary of the first Adjustment Date thereafter until expiration of the Term of this Agreement (each, an "Adjustment Date"). The amount of the CPI adjustment on the first Adjustment Date shall be the percentage increase in the CPI Index between the second anniversary of the City Council's adoption of the Adopting Ordinance and the third anniversary of the City Council's adoption of the Adopting Ordinance. The amount of the CPI adjustment on each subsequent Adjustment Date shall be the percentage increase between said Adjustment Date and the immediately preceding Adjustment Date. The amount of the percentage increase in the CPI Index on the applicable Adjustment Dates shall in each instance be calculated based on the then most recently available CPI Index figures such that, for example, if the first Adjustment Date occurs on September 1, 2020, and the most recently available CPI Index figure on that date is the CPI Index for July 2020 (2 months prior to the first Adjustment Date), the percentage increase in the CPI Index on the first Adjustment Date shall be calculated by comparing the CPI Index for July 2019 with the CPI Index for July 2020. In no event, however, shall application of the CPI Index on any Adjustment Date reduce the amount of the Public Benefit Fee (or unpaid portion thereof) below the amount in effect prior to that Adjustment Date. Notwithstanding any other provision set forth in this Agreement to the contrary, during the Term of this Agreement City shall not increase the Public Benefit Fee except pursuant to the CPI Index as stated in this Section 3.1. 14-116 The City has not designated a specific project or purpose for the Public Benefit Fee. Developer acknowledges by its approval and execution of this Agreement that it is voluntarily agreeing to pay the Public Benefit Fee and the fees identified in Section 3.2 below, that its obligation to pay the Public Benefit Fee or the fees in Section 3.2 is an essential term of this Agreement and is not severable from City's obligations and Developer's vested rights to be acquired hereunder, and that Developer expressly waives any constitutional, statutory, or common law right it might have in the absence of this Agreement to protest or challenge the payment of the Public Benefits identified in this Section 3.1 on any ground whatsoever, including without limitation pursuant to the Fifth and Fourteenth Amendments to the United States Constitution, California Constitution Article I Section 19, the Mitigation Fee Act (California Government Code Section 66000 et seq. ), or otherwise. In addition to any other remedy set forth in this Agreement for Developer's default, if Developer shall fail to timely pay any portion of the Public Benefits identified in this Section 3.1 when due, City shall have the right to withhold issuance of any further building permits, occupancy permits, or other development or building permits for the Project. 3. 1.1 Public Benefit Fee Allocation. The City Council retains sole and absolute discretion to determine how the Public Benefit Fee shall be allocated and no final decisions have been made as of the Agreement Date. 3.2 Other Public Benefits. In addition to the Public Benefit Fee, the direct and indirect benefits City expects to receive pursuant to this Development Agreement are as follows: 3.2.1 Park Land. The park land dedication requirement for the Project pursuant to the City General Plan Land Use Policy 6.5.13 is one (1) acre. City acknowledges that Developer's performance of its obligations as set forth in this section satisfies all of Developer's General Plan, Quimby Act and Municipal Code Chapter 19.52 obligations governing park land dedication and fees. City acknowledges that Developer shall be eligible to receive credit against the payment of fees or dedication of land consistent with the General Plan. As of the Effective Date, the established fair market value for one (1) acre of land used in assessing in -lieu of park dedication fees equals Two Million Five Hundred Thousand Dollars and 00/100 ($2,500,000). Developer fees and credit shall be based on the established Two Million Five Hundred Thousand Dollars and 00/100 ($2,500,000) per acre. In lieu of dedicating land, the Developer shall pay one-half of the park dedication fee at the time the first building permit(s) is issued for any residential unit and the second -half to be paid at the time the first building permit(s) is issued for the non- residential portion of the Project. 3.2.2 Public Safety Fee. Developer shall pay a public safety fee in the amount of One Million Dollars and 00/100 ($1,000,000) to be used, at City's discretion, to fund the cost of staffing, services and equipment as necessary for fire related public safety purposes. The fee shall be paid at the time the first building permit is issued. 3.3 Reserved. z 14-117 4. Development of Project. 4.1 Applicable Regulations; Developer's Vested Rights and City's Reservation of Discretion With Respect to Subsequent Development Approvals. Other than as expressly set forth in this Agreement, during the Term of this Agreement, (i) Developer shall have the vested right to Develop the Project on and with respect to the Property in accordance with the terms of the Development Regulations and this Agreement and (ii) City shall not prohibit or prevent development of the Property on grounds inconsistent with the Development Regulations or this Agreement. Notwithstanding the foregoing, nothing herein is intended to limit or restrict the City's discretion with respect to (i) those review and approval requirements contained in the Development Regulations, (ii) the exercise of any discretionary authority City retains under the Development Regulations, (iii) the approval, conditional approval, or denial of any Subsequent Development Approvals that are required for Development of the Project as of the Effective Date, or (iv) any environmental approvals that may be required under CEQA or any other federal or state law or regulation in conjunction with any Subsequent Development Approvals that may be required for the Project, and in this regard, as to future actions in connection with the Subsequent Development Approvals, the City reserves its full discretion to the same extent that it would have such discretion in the absence of this Agreement. In addition, it is understood and agreed that nothing in this Agreement is intended to vest Developer's rights with respect to any laws, regulations, rules, or official policies of any other (i.e., non -City) governmental agency or public utility company with jurisdiction over the Property or the Project; or any applicable federal or state laws, regulations, rules, or official policies that may be inconsistent with this Agreement and that override or supersede the provisions set forth in this Agreement, and regardless of whether such overriding or superseding laws, regulations, rules, or official policies are adopted or applied to the Property or the Project prior or subsequent to the Agreement Date. Developer has expended and will continue to expend substantial amounts of time and money planning and preparing for Development of the Project. Developer represents, and City acknowledges, that Developer would not make these expenditures without this Agreement, and that Developer is and will be making these expenditures in reasonable reliance upon its vested rights to Develop the Project as set forth in this Agreement. Developer may apply to City for permits or approvals necessary to modify or amend the Development specified in the Development Regulations, without amending this Agreement, provided that the request does not propose an increase in the maximum density, intensity, height, or size of proposed structures, or a change in use that generates more peak hour traffic or more daily traffic and, in addition, Developer may apply to City for approval of minor amendments to the existing tentative tract map, if any, or associated conditions of approval, consistent with City of Newport Beach Municipal Code Section 19.12.090. This Agreement does not constitute a promise or commitment by City to approve any such permit or approval, or to approve the same with or without any particular requirements or conditions, and City's discretion with respect to such matters shall be the same as it would be in the absence of this Agreement. 4.2 No Conflicting Enactments. 10 14-118 Except to the extent City reserves its discretion as expressly set forth in this Agreement, during the Term of this Agreement City shall not apply to the Project or the Property any ordinance, policy, rule, regulation, or other measure relating to Development of the Project that is enacted or becomes effective after the Effective Date to the extent it conflicts with this Agreement or Developer consents in writing. This Section 4.2 shall not restrict City's ability to enact an ordinance, policy, rule, regulation, or other measure applicable to the Project pursuant to California Government Code Section 65866 consistent with the procedures specified in Section 4.3 of this Agreement. In Pardee Construction Co. v. City of Camarillo (1984) 37 Cal.3d 465, the California Supreme Court held that a construction company was not exempt from a city's growth control ordinance even though the city and construction company had entered into a consent judgment (tantamount to a contract under California law) establishing the company's vested rights to develop its property consistent with the zoning. The California Supreme Court reached this result because the consent judgment failed to address the timing of development. The Parties intend to avoid the result of the Pardee case by acknowledging and providing in this Agreement that Developer shall have the vested right to Develop the Project on and with respect to the Property at the rate, timing, and sequencing that Developer deems appropriate within the exercise of Developer's sole subjective business judgment, provided that such Development occurs in accordance with this Agreement and the Development Regulations, notwithstanding adoption by City's electorate of an initiative to the contrary after the Effective Date. No City moratorium or other similar limitation relating to the rate, timing, or sequencing of the Development of all or any part of the Project and whether enacted by initiative or another method, affecting subdivision maps, building permits, occupancy certificates, or other entitlement to use, shall apply to the Project to the extent such moratorium or other similar limitation restricts Developer's vested rights in this Agreement or otherwise conflicts with the express provisions of this Agreement. 4.3 Reservations of Authority. Notwithstanding any other provision set forth in this Agreement to the contrary, the laws, rules, regulations, and official policies set forth in this Section 4.3 shall apply to and govern the Development of the Project on and with respect to the Property. 4.3.1 Procedural Regulations. Unless otherwise specified in this Agreement, procedural regulations relating to hearing bodies, petitions, applications, notices, findings, records, hearings, reports, recommendations, appeals, and any other matter of procedure shall apply to the Property, provided that such procedural regulations are adopted and applied City- wide or to all other properties similarly situated in City. 4.3.2 Processing and Permit Fees. City shall have the right to charge, and Developer shall be required to pay, all applicable processing and permit fees to cover the reasonable cost to City of processing and reviewing applications and plans for any required Subsequent Development Approvals, building permits, excavation and grading permits, encroachment permits, and the like, for performing necessary studies and reports in connection therewith, inspecting the work constructed or installed by or on behalf of Developer, and monitoring compliance with any requirements applicable to Development of the Project, all at the rates in effect at the time fees are due. 11 14-119 4.3.3 Consistent Future City Regulations. City ordinances, resolutions, regulations, and official policies governing Development which do not conflict with the Development Regulations, or with respect to such regulations that do conflict, where Developer has consented in writing to the regulations, shall apply to the Property. 4.3.4 Development Exactions Applicable to Property. During the Term of this Agreement, Developer shall be required to satisfy and pay all Development Exactions at the time performance or payment is due to the same extent and in the same amount(s) that would apply to Developer and the Project in the absence of this Agreement. City shall not alter, increase, or modify said Development Exaction in a manner that is inconsistent with this Agreement, the Project's conditions of approval, or the Development Regulations without Developer's prior written consent or as may be otherwise required pursuant to overriding federal or state laws or regulations (Section 4.3.5 below). In addition, nothing in this Agreement is intended or shall be deemed to vest Developer against the obligation to pay any of the following (which are not included within the definition of "Development Exactions") in the full amount that would apply in the absence of this Agreement: (i) City's normal fees for processing, environmental assessment and review, tentative tract and parcel map review, plan checking, site review and approval, administrative review, building permit, grading permit, inspection, and similar fees imposed to recover City's costs associated with processing, reviewing, and inspecting project applications, plans, and specifications, including CEQA review; (ii) fees and charges levied by any other public agency, utility, district, or joint powers authority, regardless of whether City collects those fees and charges; or (iii) community facility district special taxes or special district assessments or similar assessments, business license fees, bonds or other security required for public improvements, transient occupancy taxes, sales taxes, property taxes, sewer lateral connection fees, water service connection fees, new water meter fees, and the Property Development Tax payable under Section 3.12 of City's Municipal Code. 4.3.5 Overriding Federal and State Laws and Regulations Federal and state laws and regulations that override Developer's vested rights set forth in this Agreement shall apply to the Property, together with any City ordinances, resolutions, regulations, and official policies that are necessary to enable City to comply with the provisions of any such overriding federal or state laws and regulations, provided that (i) Developer does not waive its right to challenge or contest the validity of any such purportedly overriding federal, state, or City law or regulation; and (ii) upon the discovery of any such overriding federal, state, or City law or regulation that prevents or precludes compliance with any provision of this Agreement, City or Developer shall provide to the other Party a written notice identifying the federal, state, or City law or regulation, together with a copy of the law or regulation and a brief written statement of the conflict(s) between that law or regulation and the provisions of this Agreement. Promptly thereafter, City and Developer shall meet and confer in good faith in a reasonable attempt to determine whether a modification or suspension of this Agreement, in whole or in part, is necessary to comply with such overriding federal, state, or City law or regulation. In such negotiations, City and Developer agree to preserve the terms of this Agreement and the rights of Developer as derived from this Agreement to the maximum feasible extent while resolving the conflict. City agrees to cooperate with Developer at no cost to City in resolving the conflict in a manner which minimizes any financial impact of the conflict upon Developer. City also agrees to process in a prompt manner Developer's proposed changes to the Project and any of the Development Regulations as may be necessary to comply with such overriding federal, state, or 12 14-120 City law or regulation; provided, however, that the approval of such changes by City shall be subject to the discretion of City, consistent with this Agreement. 4.3.6 Public Health and Safety. Any City ordinance, resolution, rule, regulation, program, or official policy that is necessary to protect persons on the Property or in the immediate vicinity from conditions dangerous to their health or safety, as reasonably determined by City, shall apply to the Property, even though the application of the ordinance, resolution, rule regulation, program, or official policy would result in the impairment of Developer's vested rights under this Agreement. 4.3.7 Uniform Building Standards. Existing and future building and building - related standards set forth in the building standard codes adopted and amended by City from time -to -time, including building, plumbing, mechanical, electrical, housing, swimming pool, and fire codes, and any modifications and amendments thereof shall all apply to the Project and the Property to the same extent that the same would apply in the absence of this Agreement. 4.3.8 Public Works Improvements. To the extent Developer constructs or installs any public improvements, works, or facilities, the City standards in effect for such public improvements, works, or facilities at the time of City's issuance of a permit, license, or other authorization for construction or installation of same shall apply. 4.3.9 No Guarantee or Reservation of Utility Capacity. Notwithstanding any other provision set forth in this Agreement to the contrary, nothing in this Agreement is intended or shall be interpreted to require City to guarantee or reserve to or for the benefit of Developer or the Property any utility capacity, service, or facilities that may be needed to serve the Project, whether domestic or reclaimed water service, sanitary sewer transmission or wastewater treatment capacity, downstream drainage capacity, or otherwise, and City shall have the right to limit or restrict Development of the Project if and to the extent that City reasonably determines that inadequate utility capacity exists to adequately serve the Project at the time Development is scheduled to commence. Notwithstanding the foregoing, City covenants to provide utility services to the Project on a non-discriminatory basis (i.e., on the same terms and conditions that City undertakes to provide such services to other similarly situated new developments in the City of Newport Beach as and when service connections are provided and service commences). 4.4 Tentative Subdivision Maps. City agrees that Developer may file and process new and existing vesting tentative maps for the Property consistent with California Government Code sections 66498.1-66498.9 and City of Newport Beach Municipal Code Chapter 19.20. Developer agrees that filing and issuance of a new subdivision map may trigger additional development impact fees. Pursuant to the applicable provision of the California Subdivision Map Act (California Government Code section 66452.6(a)), the life of any tentative subdivision map approved for the Property, whether designated a "vesting tentative map" or otherwise, shall be extended for the Term of this Agreement. 5. Amendment or Cancellation of Agreement This Agreement may be amended or canceled in whole or in part only by mutual written and executed consent of the Parties in compliance with California Government Code Section 13 14-121 65868 and Newport Beach Municipal Code Section 15.45.070 or by unilateral termination by City in the event of an uncured default of Developer. 6. Enforcement. Unless amended or canceled pursuant to California Government Code Section 65868, Newport Beach Municipal Code Section 15.45.070, or modified or suspended pursuant to Newport Beach Municipal Code Chapter 15.45 or California Government Code Section 65869.5, and except as otherwise provided in subdivision (b) of Section 65865.3, this Agreement shall be enforceable by either Party despite any change in any applicable general or specific plan, zoning, subdivision, or building regulation or other applicable ordinance or regulation adopted by City (including by City's electorate) that purports to apply to any or all of the Property. 7. Annual Review of Developer's Compliance With Agreement. 7.1 General. City shall review this Agreement once during every twelve (12) month period following the Effective Date for compliance with the terms of this Agreement as provided in Government Code section 65865.1. Developer (including any successor to the owner executing this Agreement on or before the date of the Adopting Ordinance) shall pay City a reasonable fee in an amount City may reasonably establish from time -to -time to cover the actual and necessary costs for the annual review. City's failure to timely provide or conduct an annual review shall not constitute a Default hereunder by City. 7.2 Developer Obligation to Demonstrate Good Faith Compliance During each annual review by City, Developer is required to demonstrate good faith compliance with the terms of the Agreement. Developer agrees to furnish such evidence of good faith compliance as City, in the reasonable exercise of its discretion, may require, thirty (30) calendar days prior to each anniversary of the Effective Date during the Term. 7.3 Procedure. The Zoning Administrator shall conduct a duly noticed hearing and shall determine, on the basis of substantial evidence, whether or not Developer has, for the period under review, complied with the terms of this Agreement. If the Zoning Administrator finds that Developer has so complied, the annual review shall be concluded. If the Zoning Administrator finds, on the basis of substantial evidence, that Developer has not so complied, written notice shall be sent to Developer by first class mail of the Zoning Administrator's finding of non-compliance, and Developer shall be given at least ten (10) calendar days to cure any noncompliance that relates to the payment of money and thirty (30) calendar days to cure any other type of noncompliance. If a cure not relating to the payment of money cannot be completed within thirty (30) calendar days for reasons which are beyond the control of Developer, Developer must commence the cure within such thirty (30) calendar days and diligently pursue such cure to completion. If Developer fails to cure such noncompliance within the time(s) set forth above, such failure shall be considered to be a Default and City shall be entitled to exercise the remedies set forth in Article 8 below. 14 14-122 7.4 Annual Review a Non -Exclusive Means for Determining and Requiring Cure of Developer's Default. The annual review procedures set forth in this Article 7 shall not be the exclusive means for City to identify a Default by Developer or limit City's rights or remedies for any such Default. 8. Events of Default. 8.1 General Provisions. In the event of any material default, breach, or violation of the terms of this Agreement ("Default"), the Parry alleging a Default shall deliver a written notice (each, a "Notice of Default') to the defaulting Party. The Notice of Default shall specify the nature of the alleged Default and a reasonable manner and sufficient period of time (twenty (20) calendar days if the Default relates to the failure to timely make a monetary payment due hereunder and not less than thirty (30) calendar days in the event of non -monetary Defaults) in which the Default must be cured ("Cure Period"). During the Cure Period, the Party charged shall not be considered in Default for the purposes of termination of this Agreement or institution of legal proceedings. If the alleged Default is cured within the Cure Period, then the Default thereafter shall be deemed not to exist. If a non -monetary Default cannot be cured during the Cure Period with the exercise of commercially reasonable diligence, the defaulting Party must promptly commence to cure as quickly as possible, and in no event later than thirty (30) calendar days after it receives the Notice of Default, and thereafter diligently pursue said cure to completion. Notwithstanding the foregoing, the City is not required to give Developer notice of default and may immediately pursue remedies for a Developer Default that result in an immediate threat to public health, safety or welfare. 8.2 Default by Developer. If Developer is alleged to have committed Default and it disputes the claimed Default, it may make a written request for an appeal hearing before the City Council within ten (10) calendar days of receiving the Notice of Default, and a public hearing shall be scheduled at the next available City Council meeting to consider Developer's appeal of the Notice of Default. Failure to appeal a Notice of Default to the City Council within the ten (10) calendar day period shall waive any right to a hearing on the claimed Default. If Developer's appeal of the Notice of Default is timely and in good faith but after a public hearing of Developer's appeal the City Council concludes that Developer is in Default as alleged in the Notice of Default, the accrual date for commencement of the thirty (30) calendar day Cure Period provided in Section 8.1 shall be extended until the City Council's denial of Developer's appeal is communicated to Developer in writing. 8.3 City's Option to Terminate Agreement. In the event of an alleged Developer Default, City may not terminate this Agreement without first delivering a written Notice of Default and providing Developer with the opportunity to cure the Default within the Cure Period, as provided in Section 8.1, and complying with Section 8.2 if Developer timely appeals any Notice of Default. A termination of this Agreement by City shall be valid only if good cause exists and is supported by evidence presented to the 15 14-123 City Council at or in connection with a duly noticed public hearing to establish the existence of a Default. The validity of any termination may be judicially challenged by Developer. Any such judicial challenge must be brought within sixty (60) calendar days of service on Developer, by first class mail, postage prepaid, of written notice of termination by City or a written notice of City's determination of an appeal of the Notice of Default as provided in Section 8.2. 8.4 Default by City. If Developer alleges a City Default and alleges that the City has not cured the Default within the Cure Period, Developer may pursue any legal or equitable remedy available to it, including, without limitation, an action for a writ of mandamus, injunctive relief, or specific performance of City's obligations set forth in this Agreement. Upon a City Default, any resulting delays in Developer's performance hereunder shall neither be a Developer Default nor constitute grounds for termination or cancellation of this Agreement by City and shall, at Developer's option (and provided Developer delivers written notice to City within thirty (30) calendar days of the commencement of the alleged City Default), extend the Term for a period equal to the length of the delay. 8.5 Waiver. Failure or delay by any Party in delivering a Notice of Default shall not waive that Party's right to deliver a future Notice of Default of the same or any other Default. 8.6 Specific Performance Remedy. Due to the size, nature, and scope of the Project, it will not be practical or possible to restore the Property to its pre-existing condition once implementation of this Agreement has begun. After such implementation, both Developer and City may be foreclosed from other choices they may have had to plan for the development of the Property, to utilize the Property or provide for other benefits and alternatives. Developer and City have invested significant time and resources and performed extensive planning and processing of the Project in agreeing to the terms of this Agreement and will be investing even more significant time and resources in implementing the Project in reliance upon the terms of this Agreement. It is not possible to determine the sum of money which would adequately compensate Developer or City for such efforts. For the above reasons, except as set forth in Section 8.7, City and Developer agree that damages would not be an adequate remedy if either City or Developer fails to carry out its obligations under this Agreement. Therefore, except as set forth in Section 8.7, specific performance of this Agreement is necessary to compensate Developer if City fails to carry out its obligations under this Agreement or to compensate City if Developer falls to carry out its obligations under this Agreement. 8.7 Monetary es. The Parties agree that monetary damages shall not be an available remedy for any Party for a Default hereunder by the other Party; provided, however, that (i) nothing in this Section 8.7 is intended or shall be interpreted to limit or restrict City's right to recover the Public Benefit Fees due from Developer as set forth herein; and (ii) nothing in this Section 8.7 is intended or shall be interpreted to limit or restrict Developer's indemnity obligations set forth in Article 10 or the right of the prevailing Party in any Action to recover its litigation expenses, as set forth in 16 14-124 Section 8. 10. In no event shall damages be awarded against the City upon an event of default or upon termination of this Agreement. Developer expressly agrees that the City, any City agencies and their respective elected and appointed councils, boards, commissions, officers, agents, employees, volunteers and representatives (collectively, for purposes of this Section 8.7, "City") shall not be liable for any monetary damage for a Default by the City or any claims against City arising out of this Agreement. Developer hereby expressly waives any such monetary damages against the City. The sole and exclusive judicial remedy for Developer in the event of a Default by the City shall be an action in mandamus, specific performance, or other injunctive or declaratory relief. 8.8 Additional Ci Remedy for Developer's Default In the event of any Default by Developer, in addition to any other remedies which may be available to City, whether legal or equitable, City shall be entitled to receive and retain any Development Exactions applicable to the Project or the Property, including any fees, grants, dedications, or improvements to public property which it may have received prior to Developer's Default without recourse from Developer or its successors or assigns. 8.9 No Personal Liability of City Officials Employees or Agents No City official, employee, or agent shall have any personal liability hereunder for a Default by City of any of its obligations set forth in this Agreement. 8.10 No Recovery of Legal Expenses by Prevailing Pgiy in Any Action In any judicial proceeding, arbitration, or mediation (collectively, an "Action") between the Parties that seeks to enforce the provisions of this Agreement or arises out of this Agreement, the prevailing Party shall not recover any of its costs and expenses, regardless of whether they would be recoverable under California Code of Civil Procedure section 1033.5 or California Civil Code section 1717 in the absence of this Agreement. These costs and expenses include, but are not limited to, court costs, expert witness fees, attorneys' fees, City staff costs (including overhead), and costs of investigation and preparation before initiation of the Action. 9. Force Majeure. No Party shall be deemed to be in Default where failure or delay in performance of any of its obligations under this Agreement is caused, through no fault of the Party whose performance is prevented or delayed, by floods, earthquakes, other acts of God, fires, wars, riots or similar hostilities, strikes or other labor difficulties, state or federal regulations, or court actions. Except as specified above, nonperformance shall not be excused because of the act or omission of a third person. In no event shall the occurrence of an event of force majeure operate to extend the Term of this Agreement. In addition, in no event shall the time for performance of a monetary obligation, including without limitation Developer's obligation to pay Public Benefit Fees, be extended pursuant to this Section. 10. Indemnity Obligations of Developer 10.1 Indemnity Arising From Acts or Omissions of Developer. 17 14-125 Except to the extent caused by the intentional misconduct or gross negligent acts, errors or omissions of City or one (1) or more of City's officials, employees, agents, attorneys, and contractors (collectively, the "City's Affiliated Parties"), Developer shall indemnify, defend, and hold harmless City and City's Affiliated Parties from and against all suits, claims, liabilities, losses, damages, penalties, obligations, and expenses (including but not limited to reasonable attorneys' fees and costs) (collectively, a "Claim") that may arise, directly or indirectly, from the acts, omissions, or operations of Developer or Developer's agents, contractors, subcontractors, agents, or employees in the course of Development of the Project or any other activities of Developer relating to the Property or Project, or pursuant to this Agreement. City shall be entitled to retain separate counsel to represent City against the Claim and the City's reasonable defense costs for its separate counsel shall be included in Developer's indemnity obligation, provided that such counsel shall reasonably cooperate with Developer in an effort to minimize the total litigation expenses incurred by Developer. In the event either City or Developer recovers any attorney's fees, expert witness fees, costs, interest, or other amounts from the party or parties asserting the Claim, Developer shall be entitled to retain the same (provided it has fully performed its indemnity obligations hereunder). The indemnity provisions in this Section 10.1 shall commence on the Agreement Date, regardless of whether the Effective Date occurs, and shall survive the Termination Date. 10.2 Third Party Litigation. In addition to its indemnity obligations set forth in Section 10.1, Developer shall indemnify, defend, and hold harmless City and City's Affiliated Parties from and against any Claim against City or City's Affiliated Parties seeking to attack, set aside, void, or annul the approval of this Agreement, the Adopting Ordinance, any of the Development Regulations for the Project (including without limitation any actions taken pursuant to CEQA with respect thereto), any Subsequent Development Approval, or the approval of any permit granted pursuant to this Agreement (including without limitation any actions taken pursuant to CEQA with respect thereto). Said indemnity obligation shall include payment of reasonable attorney's fees, expert witness fees, City staff costs (including overhead), and court costs. City shall promptly notify Developer of any such Claim and City shall cooperate with Developer in the defense of such Claim. Developer shall not be responsible to indemnify, defend, and hold City harmless from such Claim until Developer is so notified and if City fails to cooperate in the defense of a Claim Developer shall not be responsible to defend, indemnify, and hold harmless City during the period that City so fails to cooperate or for any losses attributable thereto. City shall be entitled to retain separate counsel to represent City against the Claim and the City's reasonable defense costs for its separate counsel shall be included in Developer's indemnity obligation, provided that such counsel shall reasonably cooperate with Developer in an effort to minimize the total litigation expenses incurred by Developer. In the event either City or Developer recovers any attorney's fees, expert witness fees, costs, interest, or other amounts from the party or parties asserting the Claim, Developer shall be entitled to retain the same (provided it has fully performed its indemnity obligations hereunder). No settlement of any Claim against City or City's Affiliated Parties shall be executed without the written consent of both the City and Developer. The indemnity provisions in this Section 10.2 shall commence on the Agreement Date, regardless of whether the Effective Date occurs, and shall survive the Termination Date. 10.3 Environmental Indemnity. 18 14-126 In addition to its indemnity obligations set forth in Section 10.1, from and after the Effective Date Developer shall indemnify, defend, and hold harmless City and City's Affiliated Parties from and against any and all Claims for personal injury or death, property damage, economic loss, statutory penalties or fines, and damages of any kind or nature whatsoever, including without limitation reasonable attorney's fees, expert witness fees, and costs, based upon or arising from any of the following: (i) the actual or alleged presence of any Hazardous Substance on or under any of the Property in violation of any applicable Environmental Law; (ii) the actual or alleged migration of any Hazardous Substance from the Property through the soils or groundwater to a location or locations off of the Property; and (iii) the storage, handling, transport, or disposal of any Hazardous Substance on, to, or from the Property and any other area disturbed, graded, or developed by Developer in connection with Developer's Development of the Project. The indemnity provisions in this Section 10.3 shall commence on the Effective Date occurs, and shall survive the Termination Date. 11. Assignment. Developer shall have the right to sell, transfer, or assign (hereinafter, collectively, a "Transfer") Developer's interest in or fee title to the Property, in whole or in part, to a "Permitted Transferee" (which successor, as of the effective date of the Transfer, shall become the "Developer" under this Agreement) at any time from the Agreement Date until the Termination Date; provided, however, that no such Transfer shall violate the provisions of the Subdivision Map Act (Government Code Section 66410 et seg.) or City's local subdivision ordinance and any such transfer shall include the assignment and assumption of Developer's rights, duties, and obligations set forth in or arising under this Agreement as to the Property or the portion thereof so Transferred and shall be made in strict compliance with the following conditions precedent: (i) no transfer or assignment of any of Developer's rights or interest under this Agreement shall be made unless made together with the Transfer of all or a part of Developer's interest in the Property; and (ii) prior to the effective date of any proposed Transfer, Developer (as transferor) shall notify City, in writing, of such proposed Transfer and deliver to City a written assignment and assumption, executed in recordable form by the transferring and successor Developer and in a form subject to the reasonable approval of the City Attorney of City (or designee), pursuant to which the transferring Developer assigns to the successor Developer and the successor Developer assumes from the transferring Developer all of the rights and obligations of the transferring Developer with respect to the Property and this Agreement, or interest in the Property, or portion thereof to be so Transferred, including in the case of a partial Transfer the obligation to perform such obligations that must be performed outside of the Property so Transferred that are a condition precedent to the successor Developer's right to develop the portion of the Property so Transferred. Any Permitted Transferee shall have all of the same rights, benefits, duties, obligations, and liabilities of Developer under this Agreement with respect to the portion of, or interest in, the Property sold, transferred, and assigned to such Permitted Transferee; provided, however, that in the event of a Transfer of less than all of the Property, or interest in the Property, no such Permitted Transferee shall have the right to enter into an amendment of this Agreement that jeopardizes or impairs the rights or increases the obligations of the Developer with respect to the balance of the Property, without Developer's written consent. Notwithstanding any Transfer, the transferring Developer shall continue to be jointly and severally liable to City, together with the successor Developer, to perform all of the transferred 19 14-127 obligations set forth in or arising under this Agreement unless there is full satisfaction of all of the following conditions, in which event the transferring Developer shall be automatically released from any and all obligations with respect to the portion of the Property so Transferred: (i) the transferring Developer no longer has a legal or equitable interest in the portion of the Property so Transferred other than as a beneficiary under a deed of trust; (ii) the transferring Developer is not then in Default under this Agreement and no condition exists that with the passage of time or the giving of notice, or both, would constitute a Default hereunder; (iii) the transferring Developer has provided City with the notice and the fully executed written and recordable assignment and assumption agreement required as set forth in the first paragraph of this Section 11; and (iv) the successor Developer either (A) provides City with substitute security equivalent to any security previously provided by the transferring Developer to City to secure performance of the successor Developer's obligations hereunder with respect to the Property, or interest in the Property, or the portion of the Property so Transferred, as determined in the City's sole discretion, or (B) if the transferred obligation in question is not a secured obligation, the successor Developer either provides security reasonably satisfactory to City or otherwise demonstrates to City's reasonable satisfaction, as determined in the City's sole discretion, that the successor Developer has the financial resources or commitments available to perform the transferred obligation at the time and in the manner required under this Agreement and the Development Regulations for the Project. Any determination by the City in regards to the second paragraph of Section 11, subpart (iv) (A), (B), shall be documented in writing. 12. Mortgagee Rights. 12.1 Encumbrances on Property. The Parties agree that this Agreement shall not prevent or limit Developer in any manner from encumbering the Property, any part of the Property, or any improvements on the Property with any Mortgage securing financing with respect to the construction, development, use, or operation of the Project. 12.2 Mortgagee Protection. This Agreement shall be superior and senior to the lien of any Mortgage. Nevertheless, no breach of this Agreement shall defeat, render invalid, diminish, or impair the lien of any Mortgage made in good faith and for value. Any acquisition or acceptance of title or any right or interest in the Property or part of the Property by a Mortgagee (whether due to foreclosure, trustee's sale, deed in lieu of foreclosure, lease termination, or otherwise) shall be subject to all of the terms and conditions of this Agreement. Any Mortgagee who takes title to the Property or any part of the Property shall be entitled to the benefits arising under this Agreement. 12.3 Mortgagee Not Obligated. Notwithstanding the provisions of this Section 12.3, a Mortgagee will not have any obligation or duty under the terms of this Agreement to perform the obligations of Developer or other affirmative covenants of Developer, or to guarantee this performance except that: (i) the Mortgagee shall have no right to develop the Project under the Development Regulations without fully complying with the terms of this Agreement; and (ii) to the extent that any covenant to be C 14-128 performed by Developer is a condition to the performance of a covenant by City, that performance shall continue to be a condition precedent to City's performance. 12.4 Notice of Default to Mortgagee: Right of Mortgagee to Cure Each Mortgagee shall, upon written request to City, be entitled to receive written notice from City of: (i) the results of the periodic review of compliance specified in Article 7 of this Agreement, and (ii) any default by Developer of its obligations set forth in this Agreement. Each Mortgagee shall have a further right, but not an obligation, to cure the Default within thirty (30) calendar days after receiving a Notice of Default with respect to a monetary Default and within sixty (60) calendar days after receiving a Notice of Default with respect to a non -monetary Default. If the Mortgagee can only remedy or cure a non -monetary Default by obtaining possession of the Property, then the Mortgagee shall have the right to seek to obtain possession with diligence and continuity through a receiver or otherwise, and to remedy or cure the non -monetary Default within sixty (60) calendar days after obtaining possession and, except in case of emergency or to protect the public health or safety, City may not exercise any of its judicial remedies set forth in this Agreement to terminate or substantially alter the rights of the Mortgagee until expiration of the sixty (60) calendar day period. In the case of a non -monetary Default that cannot with diligence be remedied or cured within sixty (60) calendar days, the Mortgagee shall have additional time as is reasonably necessary to remedy or cure the Default, provided the Mortgagee promptly commences to cure the non -monetary Default within sixty (60) calendar days and diligently prosecutes the cure to completion. 13. Bankruptcy. The obligations of this Agreement shall not be dischargeable in bankruptcy. 14. Miscellaneous Terms. 14.1 Reserved 14.2 Notices. Any notice or demand that shall be required or permitted by law or any provision of this Agreement shall be in writing. If the notice or demand will be served upon a Party, it either shall be personally delivered to the Party; deposited in the United States mail, certified, return receipt requested, and postage prepaid; or delivered by a reliable courier service that provides a receipt showing date and time of delivery with courier charges prepaid. The notice or demand shall be addressed as follows: TO CITY: City of Newport Beach 100 Civic Center Drive Newport Beach, California 92660 Attn: City Manager With a copy to: City Attorney City of Newport Beach 100 Civic Center Drive Newport Beach, California 92660 21 14-129 TO DEVELOPER: JRSM, LLC 4040 MacArthur Boulevard, Suite 300 Newport Beach, CA 92660 With a copy to: Sean Matsler, Esq. Cox, Castle & Nicholson LLP 3121 Michelson Drive, Ste. 200 Irvine, CA 92612 Any Party may change the address stated in this Section 14.2 by delivering notice to the other Parties in the manner provided in this Section 14.2, and thereafter notices to such Party or Parties shall be addressed and submitted to the new address. Notices delivered in accordance with this Agreement shall be deemed to be delivered upon the earlier of: (i) the date received, or (ii) three (3) business days after deposit in the mail as provided above. 14.3 Proiect as Private Undertaking. The Development of the Project is a private undertaking. Neither the Developer nor the City is acting as the agent of the other in any respect, and each is an independent contracting entity with respect to the terms, covenants, and conditions set forth in this Agreement. This Agreement forms no partnership, joint venture, or other association of any kind. The only relationship between the Parties is that of a government entity regulating the Development of private property by the owner of the property. 14.4 Cooperation. Each Party shall cooperate with and provide reasonable assistance to the other Party to the extent consistent with and necessary to implement this Agreement. Upon the request of a Party at any time, the other Party shall promptly execute, with acknowledgement or affidavit if reasonably required, and file or record the required instruments and writings and take any actions as may be reasonably necessary to implement this Agreement or to evidence or consummate the transactions contemplated by this Agreement. 14.5 Estoppel Certificates. At any time, any Party may deliver written notice to the other Party requesting that Party certify in writing that, to the best of its knowledge: (i) this Agreement is in full force and effect and is binding on the Party; (ii) this Agreement has not been amended or modified either orally or in writing or, if this Agreement has been amended, the Party providing the certification shall identify the amendments or modifications; and (iii) the requesting Party is not in Default in the performance of its obligations under this Agreement and no event or situation has occurred that with the passage of time or the giving of Notice or both would constitute a Default or, if such is not the case, then the other Party shall describe the nature and amount of the actual or prospective Default. Such estoppel certificates may be relied upon only by the Parties, their respective successors and assigns, and, in the event of an estoppel certificate issued by City, a Mortgagee of Developer, including a Permitted Transferee, and its actual or prospective 22 14-130 Mortgagee. City shall be entitled to payment/reimbursement for its actual and reasonable costs of investigation and preparation of an estoppel certificate prior to issuing the same. The Party requested to furnish an estoppel certificate shall execute and return the certificate within thirty (30) calendar days following receipt (assuming, in the case of an estoppel certificate to be issued by City, Developer has paid City the cost thereof, as provided above). 14.6 Rules of Construction. The singular includes the plural; the masculine and neuter include the feminine; "shall" is mandatory; and "may" is permissive. 14.7 Time Is of the Essence. Time is of the essence regarding each provision of this Agreement as to which time is an element. 14.8 Waiver. The failure by a Party to insist upon the strict performance of any of the provisions of this Agreement by the other Party, and failure by a Party to exercise its rights upon a Default by the other Party, shall not constitute a waiver of that Party's right to demand strict compliance by the other Party in the future. 14.9 Counterparts. This Agreement may be executed in two (2) or more counterparts, each of which shall be identical and may be introduced in evidence or used for any other purpose without any other counterpart, but all of which shall together constitute one (1) and the same agreement. 14.10 Entire Agreement. This Agreement constitutes the entire agreement between the Parties and supersedes all prior agreements and understandings, both written and oral, between the Parties with respect to the subject matter addressed in this Agreement. 14.11 Severability. The Parties intend that each and every obligation of the Parties is interdependent and interrelated with the other, and if any provision of this Agreement or the application of the provision to any Party or circumstances shall be held invalid or unenforceable to any extent, it is the intention of the Parties that the remainder of this Agreement or the application of the provision to persons or circumstances shall be rendered invalid or unenforceable. The Parties intend that no Party shall receive any of the benefits of the Agreement without the full performance by such Party of all of its obligations provided for under this Agreement. Without limiting the generality of the foregoing, the Parties intend that Developer shall not receive any of the benefits of this Agreement if any of Developer's obligations are rendered void or unenforceable as the result of any third party litigation, and City shall be free to exercise its legislative discretion to amend or repeal the Development Regulations applicable to the Property 23 14-131 and Developer shall cooperate as required, despite this Agreement, should third party litigation result in the nonperformance of Developer's obligations under this Agreement. The provisions of this Section 14.11 shall apply regardless of whether the Effective Date occurs and after the Termination Date. 14.12 Construction. This Agreement has been drafted after extensive negotiation and revision. Both City and Developer are sophisticated parties who were represented by independent counsel throughout the negotiations or City and Developer had the opportunity to be so represented and voluntarily chose to not be so represented. City and Developer each agree and acknowledge that the terms of this Agreement are fair and reasonable, taking into account their respective purposes, terms, and conditions. This Agreement shall therefore be construed as a whole consistent with its fair meaning, and no principle or presumption of contract construction or interpretation shall be used to construe the whole or any part of this Agreement in favor of or against any Party. 14.13 Successors and Assigns; Constructive Notice and Acceptance The burdens of this Agreement shall be binding upon, and the benefits of this Agreement shall inure to, all successors in interest to the Parties to this Agreement. Except for those provisions relating to indemnity in Section 10, all other provisions of this Agreement shall, from and after the Effective Date hereof, be enforceable as equitable servitudes and constitute covenants running with the land. Subject to occurrence of the Effective Date, each covenant to do or refrain from doing some act hereunder with regard to Development of the Property: (i) is for the benefit of and is a burden upon every portion of the Property; (ii) runs with the Property and each portion thereof; and (iii) is binding upon each Party and each successor in interest during its ownership of the Property or any portion thereof. Every person or entity who now or later owns or acquires any right, title, or interest in any part of the Project or the Property is and shall be conclusively deemed to have consented and agreed to every provision of this Agreement. This Section 14.13 applies regardless of whether the instrument by which such person or entity acquires the interest refers to or acknowledges this Agreement and regardless of whether such person or entity has expressly entered into an assignment and assumption agreement as provided for in Article 11. 14.14 No Third Party Beneficiaries. The only Parties to this Agreement are City and Developer. This Agreement does not involve any third party beneficiaries, and it is not intended and shall not be construed to benefit or be enforceable by any other person or entity. 14.15 Applicable Law and Venue. This Agreement shall be construed and enforced consistent with the laws of the State of California, without regard to conflicts of law principles. Any action at law or in equity arising under this Agreement or brought by any Party for the purpose of enforcing, construing, or determining the validity of any provision of this Agreement shall be filed and tried in the Superior Court of the County of Orange, State of California, or the United States District Court for the Central District of California. The Parties waive all provisions of law providing for the removal or change of venue to any other court. 24 14-132 14.16 Section Headings. All section headings and subheadings are inserted for convenience only and shall not affect construction or interpretation of this Agreement. 14.17 Incorporation of Recitals and Exhibits. All of the Recitals are incorporated into this Agreement by this reference. Exhibits A through B are attached to this Agreement and incorporated by this reference as follows: EXHIBIT DESIGNATION DESCRIPTION A Legal Description of Property B Site Map 14.18 Recordation. The City Clerk of City shall record this Agreement and any amendment, modification, or cancellation of this Agreement in the Office of the County Recorder of the County of Orange within the period required by California Government Code section 65868.5 and City of Newport Beach Municipal Code section 15.45.090. The date of recordation of this Agreement shall not modify or amend the Effective Date or the Termination Date. [SIGNATURE PAGE FOLLOWS] 25 14-133 SIGNATURE PAGE TO DEVELOPMENT AGREEMENT ATTEST: Leilani I. Brown, City Clerk APPROVED AS TO FORM: Aaron C. Harp, City Attorney Sean Matsler, Attorney for Developer "DEVELOPER" JRSM, LLC, a California limited liability company By: _ Name: Title: By: _ Name: Title: "CITY" 26 CITY OF NEWPORT BEACH, a municipal corporation and charter city Will O'Neill, Mayor 14-134 ACKNOWLEDGEMENTS A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. STATE OF CALIFORNIA COUNTY OF On , before me, (here insert name and title of the officer) personally appeared who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature (Seal) A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. STATE OF CALIFORNIA COUNTY OF On I , before me, (here insert name and title of the officer) personally appeared who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature (Seal) -27- 14-135 EXHIBIT A LEGAL DESCRIPTION OF PROPERTY ADDRESS APN LEGAL DESCRIPTION 4361 Birch Street, 427-121-23 THE LAND REFERRED TO HEREIN BELOW IS SITUATED NEWPORT Newport Beach CA BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: LOTS 7, 8,9 AND 10 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190, PAGES ll, 12 AND 13 OF MISCELLANEOUS MAPS, RECORDS OF ORANGE COUNTY, CALIFORNIA. SAID LAND IS ALSO SHOWN AS PARCEL 1 ON LOT LINE ADJUSTMENT 93-5, RECORDED DECEMBER 8, 1993 AS INSTRUMENT NO. 93-0854901, OFFICIAL RECORDS. EXCEPTING THEREFROM ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE GRANT DEED RECORDED APRIL 9, 1993 AS INSTRUMENT NO. 93-0237996 OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY 14-136 ADDRESS APN LEGAL DESCRIPTION RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE GRANT DEED RECORDED APRIL 9, 1993 AS INSTRUMENT NO. 93-0237996, OFFICIAL RECORDS. 4540 Campus Drive 427-111-03 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Newport Beach, CA CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: PARCEL 1: LOT 18 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES I1 THROUGH 13, INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPT ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED JUNE 30, 1992 AS INSTRUMENT NO. 92- 440215 OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE, AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED 14-137 ADDRESS APN LEGAL DESCRIPTION JUNE 30, 1992 AS INSTRUMENT NO. 92-440215 OF OFFICIAL RECORDS. PARCEL 2: AN EASEMENT FOR DRIVEWAY PURPOSES OVER THE WESTERLY 12 FEET OF THE NORTHERLY 60 FEET OF LOT 17 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190, PAGES 11 THROUGH 13, INCLUSIVE OF MISCELLANEOUS MAPS, RECORDS OF ORANGE COUNTY, CALIFORNIA, AS SET FORTH IN THAT CERTAIN DECLARATION OF ACCESS EASEMENT, RECORDED JUNE 30, 1992 AS INSTRUMENT NO. 92-440213 OF OFFICIAL RECORDS, UPON THE TERMS AND CONDITIONS AS THEREIN PROVIDED 4340 Campus Drive 427-121-07 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Newport Beach, CA CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: LOT 29 OF TRACT NO. 3201, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 130, PAGES 25 TO 30 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, ANY OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED BY THE IRVINE COMPANY IN DEED RECORDED FEBRUARY 4, 1994 AS INSTRUMENT NO. 94-0085581 OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL REMOVE AND STORE THE 14-138 ADDRESS APN LEGAL DESCRIPTION SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS AS RESERVED IN THE DEED RECORDED FEBRUARY 4, 1994 AS INSTRUMENT NO. 94-0085581 OF OFFICIAL RECORDS 4400 Campus Drive 427-121-09 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Newport Beach, CA CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: LOT 31 OF TRACT NO. 3201, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 130, PAGE(S) 25 THROUGH 30, INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, ANY OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED BY THE IRVINE COMPANY IN DEED RECORDED DECEMBER 20, 1991 AS INSTRUMENT NO. 91-702340, OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, 14-139 ADDRESS APN LEGAL DESCRIPTION STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS AS RESERVED IN THE DEED RECORDED DECEMBER 20, 1991 AS INSTRUMENT NO. 91-702340, OF OFFICIAL RECORDS 4570 Campus Drive 427-111-04 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Newport Beach, CA CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: PARCEL 1: LOT 17 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 11 THROUGH 13, INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAND COUNTY. EXCEPTING THEREFROM ALL MINERALS, OIL, GAS, PETROLEUM, OTHER HYDROCARBON SUBSTANCES AND ALL UNDERGROUND WATER IN OR UNDER OR WHICH MAY BE PRODUCED FROM SAID LAND WHICH UNDERLIES A PLANE PARALLEL TO AND 500 FEET FROM THE PRESENT SURFACE OF SAID LAND FOR THE PURPOSE OF PROSPECTING FOR, THE EXPLORATION, DEVELOPMENT, PRODUCTION, EXTRACTION AND TAKING OF SAID MINERALS, OIL, GAS, PETROLEUM, OTHER HYDROCARBON SUBSTANCES AND WATER FROM SAID LAND BY MEANS OF MINES, WELLS, DERRICKS, OTHER EQUIPMENT FROM SURFACE LOCATIONS ON ADJOINING OR NEIGHBORING LAND OR LYING OUTSIDE OF THE ABOVE DESCRIBED LAND, IT BEING UNDERSTOOD THAT THE OWNER OF SUCH MINERALS, OIL GAS, PETROLEUM, OTHER HYDROCARBON SUBSTANCES AND WATER AS SET FORTH ABOVE, SHALL HAVE NO RIGHT TO ENTER UPON THE SAID LAND OR ANY PORTION THEREOF ABOVE SAID PLANE PARALLEL TO AND 500 FEET BELOW THE PRESENT SURFACE OF TI EE SAID LAND FOR ANY PURPOSE WHATSOEVER. AS RESERVED BY THE IRVINE COMPANY, A MICHIGAN CORPORATION IN THE DEED RECORDED FEBRUARY 19, 1993 AS INSTRUMENT NO. 93-107963 OF OFFICIAL RECORDS. PARCEL 2: NON-EXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "DECLARATION OF ACCESS EASEMENTS (MACARTHUR/CAMPUS)" DATED JANUARY 30, 1992 AND RECORDED FEBRUARY 20, 1992 AS INSTRUMENT NO. 92-101692 AS AMENDED AND RESTATED IN AN INSTRUMENT RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247260, BOTH OF OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. PARCEL 3: NON-EXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN 14-140 ADDRESS APN LEGAL DESCRIPTION INSTRUMENT ENTITLED "DECLARATION OF ACCESS EASEMENT. DATED JUNE 17, 1992, AND RECORDED JUNE 30, 1992 AS INSTRUMENT NO. 92- 440213 OF OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. 4341 Birch Street 427-121-14 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Newport Beach CA CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: LOT 6 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190, PAGES 11, 12 AND 13 OF MISCELLANEOUS MAPS, RECORDS OF SAID ORANGE COUNTY. EXCEPT ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED DECEMBER 31, 1991 AS INSTRUMENT NO. 91-720058 OF OFFICIAL RECORDS. ALSO EXCEPT ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED DECEMBER 31, 1991 AS INSTRUMENT NO. 91-720058 OF OFFICIAL RECORDS. APN: 427-121-14 14-141 ADDRESS APN LEGAL DESCRIPTION 4500 and 4520 427-111-01, THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Campus Drive 427-111-02 CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE Newport Beach, CA and OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: 427-121-10 PARCEL 1 IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP FILED IN BOOK 60, PAGE 22 OF PARCEL MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. 4600 Campus Drive 427-111-05 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Newport Beach, CA CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: PARCEL l: LOT 16 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES II TO 13 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM, ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM AND OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE ON THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED BY THE IRVINE COMPANY, RECORDED FEBRUARY 19, 1993 AS INSTRUMENT NO. 93-107971, OF OFFICIAL RECORDS. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL PERCOLATING, PRESCRIPTIVE, ADJUDICATED, 14-142 ADDRESS APN LEGAL DESCRIPTION STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED BY THE IRVINE COMPANY, RECORDED FEBRUARY 19, 1993 AS INSTRUMENT NO. 93-10797 1, OFFICIAL RECORDS. PARCEL 2: NONEXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "AMENDED AND RESTATED OR ACCESS EASEMENTS (MACARTHUR/CAMPUS)", DATED MARCH 25, 1992, RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247260, IN THE OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. 4360 Campus Drive 427-121-08 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Newport Beach, CA CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: LOT 30 OF TRACT NO. 3201, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 130, PAGES 25, 26, 27, 28, 29 AND 30 OF MISCELLANEOUS MAPS, RECORDS OF ORANGE COUNTY CALIFORNIA. EXCEPT ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED MARCH 15, 1994 AS INSTRUMENT NO. 94-0179376, OFFICIAL RECORDS. ALSO EXCEPT ANY AND ALL WATER., RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY 14-143 ADDRESS APN LEGAL DESCRIPTION OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED MARCH 15, 1994 AS INSTRUMENT NO. 94-0179376, OFFICIAL RECORDS. 4501 Birch Street 427-111-10 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Newport Beach, CA CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: PARCEL l: LOT 12 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190. PAGES 11 TO 13 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPT ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR. ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED JANUARY 10, 1992 AS INSTRUMENT NO. 92-015047, OFFICIAL RECORDS. ALSO EXCEPT ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER, RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, 14-144 ADDRESS APN LEGAL DESCRIPTION LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL; BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION, RECORDED JANUARY 10, 1992 AS INSTRUMENT NO. 92-015047, OFFICIAL RECORDS. PARCEL 2: A NON-EXCLUSIVE EASEMENT FOR INGRESS AND EGRESS OVER THAT PORTION OF LOT 13 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 1 I TO 13 INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY, DESCRIBED AS FOLLOWS: BEGINNING AT THE MOST SOUTHERLY CORNER OF SAID LOT; THENCE NORTH 290 52' 01" WEST 327.33 FEET TO THE MOST WESTERLY CORNER OF SAID LOT; THENCE NORTH 52° 01' 58" EAST 24.24 FEET ALONG THE NORTHWESTERLY LINE OF SAID LOT TO THE NORTHWESTERLY PROLONGATION OF A LINE PARALLEL WITH AND NORTHEASTERLY 24.00 FEET FROM THE SOUTHWESTERLY LINE OF SAID LOT; THENCE SOUTH 29° 52' 10" EAST 331.81 FEET ALONG SAID PROLONGATION, SAID PARALLEL LINE AND THE SOUTHERLY PROLONGATION THEREOF TO A POINT ON A CURVE IN THE SOUTHERLY LINE OF SAID LOT, SAID CURVE BEING CONCAVE SOUTHERLY, HAVING A RADIUS OF 272.00 FEET, A RADIAL TO SAID POINT BEARS NORTH 24° 48' 17" WEST; THENCE WESTERLY 24.03 FEET ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 50 03' 44" OF THE POINT OF BEGINNING. 4630 Campus Drive 427-111-06 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Newport Beach, CA CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: PARCEL 1: LOT 15 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 190, PAGES 11 TO 13 OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM, ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN GEOTHERMAL STEAM, ANY OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND INCLUDING THE 14-145 ADDRESS APN LEGAL DESCRIPTION RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT HOWEVER, THE RIGHT TO DRILL MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OF THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED BY THE IRVINE COMPANY RECORDED FEBRUARY 19, 1993 AS INSTRUMENT NO. 93-107967, OFFICIAL RECORDS. PARCEL 2: NONEXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "AM ENDED AND RESTATED DECLARATION OF ACCESS EASEMENTS (MACARTHUR/CAMPUS) DATED MARCH 25, 1992 RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247260, IN THE OFFICE RECORDS OF ORANGE COUNTY, CALIFORNIA. PARCEL 3: NONEXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED " RECIPROCAL EASEMENT AGREEMENT AND CONSENT" DATED OCTOBER 14, 1999 RECORDED NOVEMBER 19, 1999 AS INSTRUMENT NO. 19990805278, AND AMENDED BY THE CERTAIN DOCUMENT ENTITLED "WAIVER AND AMENDMENT TO RECIPROCAL EASEMENT AGREEMENT" DATED AUGUST 24, 2015 RECORDED AUGUST 28, 2015 AS INSTRUMENT NO. 2015000446662 IN THE OFFICE RECORDS OF ORANGE COUNTY, CALIFORNIA. 4525, 4533 and 427-111-09 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE 4647 MacArthur CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE Boulevard OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: Newport Beach, CA PARCEL 1: LOT 13 OF TRACT NO. 5169, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 190, PAGE(S) I1 TO 13 INCLUSIVE, OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFORE AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE 14-146 ADDRESS APN LEGAL DESCRIPTION RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED IN THE DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION RECORDED APRIL 16, 1992. ALSO EXCEPTING THEREFROM ANY AND ALL WATER, RIGHTS OR INTERESTS THEREIN, NO MATTER HOW ACQUIRED BY GRANTOR, AND OWNED OR USED BY GRANTOR IN CONNECTION WITH OR WITH RESPECT TO THE LAND, TOGETHER WITH THE RIGHT AND POWER TO EXPLORE, DRILL, REDRILL, REMOVE AND STORE THE SAME FROM THE LAND OR TO DIVERT OR OTHERWISE UTILIZE SUCH WATER RIGHTS OR INTERESTS ON ANY OTHER PROPERTY OWNED OR LEASED BY GRANTOR, WHETHER SUCH WATER RIGHTS SHALL BE RIPARIAN, OVERLYING, APPROPRIATIVE, LITTORAL, PERCOLATING, PRESCRIPTIVE, ADJUDICATED, STATUTORY OR CONTRACTUAL, BUT WITHOUT, HOWEVER, ANY RIGHT TO ENTER UPON THE SURFACE OF THE LAND IN THE EXERCISE OF SUCH RIGHTS, AS RESERVED IN DEED FROM THE IRVINE COMPANY, A MICHIGAN CORPORATION RECORDED APRIL 16, 1992. PARCEL 2: NON-EXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "DECLARATION OF ACCESS EASEMENTS (MACARTHUR/CAMPUS)" DATED JANUARY 30, 1992 AND RECORDED FEBRUARY 20, 1992 AS INSTRUMENT NO. 92-101692, OFFICIAL RECORDS AND AMENDED BY DOCUMENT RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247260, OFFICIAL RECORDS, IN THE OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. PARCEL 3: NON-EXCLUSIVE EASEMENTS AS SET FORTH IN THAT CERTAIN INSTRUMENT ENTITLED "DECLARATION OF ACCESS EASEMENTS (BIRCH/MACARTHUR)" DATED JANUARY 30, 1992 AND RECORDED FEBRUARY 20, 1992 AS INSTRUMENT NO. 92-101691 OFFICIAL RECORDS AND AMENDED BY DOCUMENT RECORDED APRIL 16, 1992 AS INSTRUMENT NO. 92-247259 OFFICIAL RECORDS IN THE OFFICIAL RECORDS OF ORANGE COUNTY, CALIFORNIA. 4320 Campus Drive 427-121-06 THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE Newport Beach, CA CITY OF NEWPORT BEACH IN THE COUNTY OF ORANGE, STATE 14-147 ADDRESS APN LEGAL DESCRIPTION OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: LOT 28 OF TRACT NO. 3201, IN THE CITY OF NEWPORT BEACH, COUNTY OF ORANGE, STATE OF CALIFORNIA, AS SHOWN ON A MAP RECORDED IN BOOK 130, PAGES 25 THROUGH 30, INCLUSIVE OF MISCELLANEOUS MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY. EXCEPTING THEREFROM ANY AND ALL OIL, OIL RIGHTS, MINERALS, MINERAL RIGHTS, NATURAL GAS RIGHTS, AND OTHER HYDROCARBONS BY WHATSOEVER NAME KNOWN, GEOTHERMAL STEAM, ANY OTHER MATERIAL RESOURCES AND ALL PRODUCTS DERIVED FROM ANY OF THE FOREGOING, THAT MAY BE WITHIN OR UNDER THE LAND, TOGETHER WITH THE PERPETUAL RIGHT OF DRILLING, MINING, EXPLORING AND OPERATING THEREFOR AND STORING IN AND REMOVING THE SAME FROM THE LAND OR ANY OTHER LAND, INCLUDING THE RIGHT TO WHIPSTOCK OR DIRECTIONALLY DRILL AND MINE FROM LANDS OTHER THAN THOSE CONVEYED HEREBY, OIL OR GAS WELLS, TUNNELS AND SHAFTS INTO, THROUGH OR ACROSS THE SUBSURFACE OF THE LAND, AND TO BOTTOM SUCH WHIPSTOCKED OR DIRECTIONALLY DRILLED WELLS, TUNNELS AND SHAFTS UNDER AND BENEATH OR BEYOND THE EXTERIOR LIMITS THEREOF, AND TO REDRILL, RETUNNEL, EQUIP, MAINTAIN, REPAIR, DEEPEN AND OPERATE ANY SUCH WELLS OR MINES; WITHOUT, HOWEVER, THE RIGHT TO DRILL, MINE, STORE, EXPLORE AND OPERATE THROUGH THE SURFACE OR THE UPPER 500 FEET OF THE SUBSURFACE OF THE LAND, AS RESERVED BY THE IRVINE COMPANY, A MICHIGAN CORPORATION, BY DEED RECORDED MAY 6, 1994 AS INSTRUMENT NO. 94-317183 OF OFFICIAL RECORDS. 14-148 EXHIBIT B SITE MAP 14-149 lyl s� � -r�;m •.4t � � ,�.�-� e Leg t� end r.. r Nv { Project Area ', r► ' ® 65 JWACNEL JWA Safety Zones City Boundary Site Map - Newport Airport Village IN E. AI 1. ! �F\' (DA2014-003) Gry of P4s btt 61-h (PA2014-225) GIS 0 f Max :9,2o.a rAM 1 .11, 192" 1- .Mwxxe 14-150 04- � 4• .� �+ MOW J r lyl s� � -r�;m •.4t � � ,�.�-� e Leg t� end r.. r Nv { Project Area ', r► ' ® 65 JWACNEL JWA Safety Zones City Boundary Site Map - Newport Airport Village IN E. AI 1. ! �F\' (DA2014-003) Gry of P4s btt 61-h (PA2014-225) GIS 0 f Max :9,2o.a rAM 1 .11, 192" 1- .Mwxxe 14-150 Attachment D Planning Commission Staff Report, Dated June 4, 2020 14-151 Q4�11 PQCITY OF NEWPORT BEACH rPLANNING COMMISSION STAFF REPORT June 4, 2020 R�P Agenda Item No. 4 SUBJECT: Newport Airport Village (PA2014-225) • General Plan Amendment (GP2014-004) • Zoning Code Amendment (CA2014-009) • Planned Community Developmnet Plan (PC2020-002) • Development Agreement (DA2014-003) • Addendum No. 3 to the 2006 General Plan Update PEIR and Addendum No. 1 to the 2014 Land Use Element Amendment SEIR (ER2020-002) SITE Northerly portion of the Campus Tract, generally bounded by Birch LOCATION: Street, Campus Drive, MacArthur Boulevard and the extension of Corinthian Way APPLICANT: Saunders Property Company c/o Starpointe Ventures OWNER: Saunders Property Company PLANNER: Gregg Ramirez, Principal Planner 949-644-3219, gramirez@newportbeachca.gov PROJECT SUMMARY The applicant requests legislative approvals consisting of a General Plan Amendment (GPA), Zoning Code Amendment to approve the Newport Airport Village Planned Community Development Plan (PCDP), and a Development Agreement (DA) for a 16.46 - acre project area within the Campus Tract, adjacent to the John Wayne Airport (JWA). Ultimately up to 444 dwelling units (329 base units and 115 density bonus units) and 297,572 square feet of retail, office, and airport supporting uses would be accommodated at the project site. The GPA would change the land use category of the site from AO (Airport Office) to MU - H2 (Mixed Use Horizontal 2). No development capacity increase above what the General Plan currently allows for the Airport Area is proposed. The PCDP would establish permitted uses, development standards, and design guidelines for the future redevelopment of the project area with mixed-use and commercial development. The applicant requests a development agreement that would provide rights to develop the PCDP and public benefits consisting of the payment of substantial fees not otherwise required. No specific development project is included in this application. Future development projects would go through the City's existing Site Development Review process prior to building permit issuance. Minor development might be approvable at the staff level and more significant projects will require a public hearing with either the Zoning Administrator or Planning Commission depending upon the size of the project. 14-152 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 2 The City has prepared an addendum to two previously certified Environmental Impact Reports in accordance with the California Environmental Quality Act to serve as the environmental analysis for this project. RECOMMENDATION 1) Conduct a public hearing; 2) Find that potential environmental impacts have been previously mitigated through the implementation of the policies of the General Plan as evaluated in Program Environmental Impact Report (PEIR) for the 2006 General Plan Update (SCH No. 2006011119) and the Supplemental Environmental Impact Report (SEIR) for the 2014 Land Use Element Amendment (SCH No. 2013101064); therefore, in accordance with Section 15164 of the California Environmental Quality Act (CEQA) Guidelines, an addendum to the previously adopted PEIR and SEIR is the appropriate environmental documentation for the Project; 3) Adopt Resolution No. PC2020-020 (Attachment No. PC 1) recommending the City Council adoption of Environmental Impact Report Addendum No. ER2020-002 and approval of General Plan Amendment No. GP2014-004 (including a waiver of the neighborhood park dedication requirement pursuant to General Plan Policy LU 6.15.13), Zoning Code Amendment No. CA2014-009, Planned Community Development Plan No. PC2020-002 (including a waiver of the density standards of General Plan Policy LU 6.15.7 pursuant to Government Code §65915(e)(1), and Development Agreement No. DA2014-003 for the Newport Airport Village Planned Community Project, located at 4341, 4361, and 4501 Birch Street; 4320, 4340, 4360, 4400, 4500, 4520, 4540, 4570, 4600 and 4630 Campus Drive; and 4525, 4533, and 4647 MacArthur Boulevard (PA2014-225). INTRODUCTION Proiect Settin The 16.46 -acre project site is generally located southeast of John Wayne Airport and is west of MacArthur Boulevard, south of Campus Drive, north of Birch Street, and about 550 feet north of Dove Street (Figure 1). The John Wayne Airport 65 -dB Community Noise Equivalent Level (CNEL) noise contour transects the site, running from north to south and approximately half of the project area is located within the 65-dBA CNEL contour (Figure 2). Portions of the project area are also within the John Wayne Airport Safety Zone 3. The project site is currently developed with a variety of commercial uses, including retail, restaurants, rental vehicle facilities and office buildings. 14-153 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 3 The project area is within the Airport Area of the City and currently has a General Plan Land Use Plan Category of Airport Office (AO). Additionally, the project area is zoned OA (Office Airport) that allows uses consistent with the Land Use Plan Category. Figure 1 - Vicinity Map John Wayne Airport (JWA), a commercial and general aviation airport, is owned and operated by the County of Orange and is located to the west and north of the site (across Campus Dr.). To the immediate northeast of the site, on the southwest corner of MacArthur Blvd. and Campus Dr., is a five -story office building and a small multi -tenant retail commercial building. Across MacArthur Blvd. is a nine -story office building that contains professional and medical office uses; a five -story apartment building at the intersection of Douglas and Martin Court; and multiple hotels and restaurants along 14-154 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 4 MacArthur Blvd. To the east (across Birch St) are several multi -story office buildings that range from three to fourteen stories, hotels, and retail and restaurant uses. Commercial services, including vehicle sales and repairs and a pharmacy; restaurants; and office uses, including medical offices occupy the properties to the south of the proposed planned community. Souce: � fN�porc GlS ' Project Description Figure 2 - Project Boundaries l7 r Legend P part Airport Village PI n dCammunity Saunders Property Company c/o Starpointe Ventures ("Applicant") seeks approval of the following applications: • General Plan Amendment (GP2014-004) — A request to change the General Plan Land Use Designation of the project area from Airport Office (AO) to Mixed Use Horizontal 2 (MU -H2) and to amend Table LU2 (Anomaly Locations) to add the project area as an anomaly to allow for the development of 329 dwelling units, exclusive of any permitted density bonus, and 297,572 square feet of nonresidential floor area; 14-155 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 5 • Zoning Code Amendment (CA2014-009) — A request to change the zoning district of the project area from OA (Office Airport) to PC (Newport Airport Village Planned Community); • Planned Community Development Plan (PC2020-002) — A request to adopt the Newport Airport Village Planned Community Development Plan (PCDP). The PCDP sets the development, design and land use standards for the project area; • Development Agreement (DA2014-003) — A request for a Development Agreement between the Applicant and the City, which would provide vested rights to develop the planned community, while also providing negotiated public benefits; and • Addendum to the 2006 General Plan Update and the 2014 Land Use Element Amendment Environmental Impact Reports (ER2020-002) — Pursuant to the California Environmental Quality Act (CEQA), the addendum will address reasonably foreseeable environmental impacts resulting from the legislative amendment requests. As noted, this Applicant's request does not include any project specific development project or plans, but rather is for legislative approvals only. Should the applications be approved by the City Council, future development would be required to comply with the development and use standards set forth in the PCDP. Background A similar, but more intensive project, was previously considered as part of the 2014 Land Use Element Update. Unlike the current proposal that limits development to the existing allocated units under the General Plan and allowed nonresidential intensity, the 2014 proposal would have increased the density in the Airport Area by 329 dwelling units and 238,077 sq. ft. of nonresidential uses in the larger 26.4 -acre Campus Tract. Although the City Council approved the 2014 Land Use Element Update, it failed to obtain voter approval as required by Charter Section 423. The SEIR for that amendment was certified and the outcome of the vote did not nullify its certification. Additionally, the City Council did not rescind its certification of the SEIR, and therefore, it remains a certified resource. On April 23, 2020, the Planning Commission held a study session to become familiar with the proposed project. The Applicant presented the project and staff discussed the process and summarized the requested applications. Through this process, the public was also provided an opportunity to participate and comment. Aside from general questions and discussion, the Commission discussed parkland dedication requirements, how the project can help meet the City's Regional Housing Needs Assessment (RHNA) obligations, and the future phasing of construction of residential and non-residential uses. The study session focused on how the project would measure up to the JWA Airport Environs Land 14-156 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 6 Use Plan (AELUP) and future Airport Land Use Commission (ALUC) review. No action was taken by the Planning Commission during or at the conclusion of the study session. DISCUSSION General Plan Amendment The proposal would amend the General Plan Land Use Category from Airport Office (AO) to Mixed Use Horizontal 2 (MU -H2). The existing land use plan categories described below are shown in Figure 3. The AO land use plan category is described on page 3-13 of the General Plan Land Use Element as: "[t]he AO designation is intended to provide for the development of properties adjoining the John Wayne Airport for uses that support or benefit from airport operations. These may include professional offices, aviation retail, automobile rental, sales, and service, hotels, and ancillary retail, restaurant, and service uses." The AO category provides for a, "floor area to land area ratio of 0.5, except for warehousing which may be develoaed at a floor area to land ratio of 0.75." Figure 3 — Existing Land Use Map (Excerpt Land Use Element Figure LU11) 14-157 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 7 The MU -H2 land use plan category is described on page 3-14 of the General Plan: "[tJhe MU -H2 designation applies to properties located in the Airport Area. It provides for a horizontal intermixing of uses that may include regional commercial office, multi -family residential, vertical mixed-use buildings, industrial, hotel rooms, and ancillary neighborhood commercial uses." It also provides that, "[rlesidential: maximum of 2,200 units as replacement of existing office, retail, and/or industrial uses at a maximum density of 50 units per adjusted gross acre, of which a maximum of 550 units may be developed as infill. Nonresidential Uses: as defined by Table LU2 [Anomaly Locations]." The revised land use designation would be consistent with the properties to the east of the project area, which are across Birch Street, between Corinthian Way and MacArthur Boulevard (Figure 4). Figure 4 - Proposed Land Use Map Airport Area Dwelling Units The MU -H2 designation and General Plan Policy LU 6.15.5 (Residential and Supporting Uses) allows a maximum of 2,200 residential units of which 1,650 units may be developed as replacement of existing office, retail, and/or industrial uses. The remaining 550 units are classified as additive units, meaning they are not required to replace other units and they may be constructed as "in -fill" units to existing commercial or office development within the Conceptual Development Plan Area (CDPA) of the Airport Area as illustrated in Figure LU22 of the General Plan Land Use Element (Attachment No. PC 2). Any eligible 14-158 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 8 density bonus allowed by Government Code §65915 (Density Bonus Law) and Newport Beach Municipal Code (NBMC) Chapter 20.32 (Density Bonus) are not included in the 2,200 -unit allowance or the 50 dwelling units per acre standard. As indicated, the proposed amendment will not increase the existing nonresidential floor area currently allowed or the 2,200 dwelling unit limit. Land Use Element Policy LU 6.15.5 Residential and Supporting Uses Accommodate the development of a maximum of 2,200 multi -family residential units, including work force housing, and mixed-use buildings that integrate residential with ground level office or retail uses, along with supporting retail, grocery stores, and parklands. Residential units may be developed only as the replacement of underlying permitted nonresidential uses. When a development phase includes a mix of residential and nonresidential uses or replaces existing industrial uses, the number of peak hour trips generated by cumulative development of the site shall not exceed the number of trips that would result from development of the underlying permitted nonresidential uses. However, a maximum of 550 units may be developed as infill on surface parking lots or areas not used as occupiable buildings on properties within the Conceptual Development Plan Area depicted on Figure LU22 provided that the parking is replaced on site. The City applies conversion factors to determine consistency with the trip neutral requirement of this policy as established by the Airport Area Residential and Mixed -Use Adjustment Factors document created by the City's Traffic Engineer. The existing site is allowed 358,498 square feet of commercial square footage. The applicant has requested a total of 329 replacement dwelling units that requires the conversion of 60,926 square feet of commercial floor area (5.4 du/s per 1,000 square feet) to be consistent with LU 6.15.5. Density bonus units do not count towards the capacity limits of the General Plan since State Housing Law excludes these types of dwelling units from maximum allowable densities under the General Plan. In considering the Newport Airport Village project, in conjunction with the other approved and pending projects within the MU -H2 land use designation, there would be 430 remaining units available for other properties with the MU -H2 land use plan category designation (see Table 1 below). The approval of the proposed amendment would specifically allocate 329 units of the remaining units available to a portion of the project site, and they could not be developed at some other site designated MU -H2. Residential units in the Airport Area have been slow to develop over the last 13 years since the opportunity was first introduced with the comprehensive update of the General Plan in 2006. A variety of factors contribute to this circumstance but the principal one is the existing land value. The property owner believes the value of the land, along with other factors, contributes to create a viable housing opportunity site. Given the approaching high RHNA allocation, the City may need this housing opportunity site to comply with the State mandate. 14-159 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 9 Table 1 — Airport Area Residential Units Anomaly Locations Residential Development Allocation Base Units Statistical Density Bonus Units Project Totals With Density Bonus Replacement Units Additive Units Total Units General Plan Development Limit (MU -H2) 1650 550 2,200 Additional Information Approved Projects Nonresidential 86 Uptown Newport 632 290 1 922 322 1 1,244 Newport Crossings 259 0 259 91 350 Projects Under Review The Koll Center Residences 260 260 52 312 Proposed Newport Airport Village 329 0 329 115 444 Remaining Development Allocation 430 0 430 Airport Office Floor Area Limits Currently the Airport Office (AO) land use designation allows a floor area ratio (FAR) of 0.5 which results in 358,498 square feet for the project site. Due to the conversion of nonresidential floor area to dwelling units, the existing 0.5 FAR over the project site would no longer be permissible. To reflect the reduction of floor area due to the conversion allocated to the project site, the GPA would add Anomaly No. 86 to Table LU2 (Anomaly Locations) of the General Plan. Table LU2 Anomaly Locations Anomaly Statistical Land Use Development Number Area Designation Limit (soDevelopment Limit (Other) Additional Information Nonresidential 86 L4 MU -H2 development 329 dwelling units 297,572 General Plan Consistency The proposed applications are legislative acts. Neither the NBMC nor State planning law specify findings that need to be adopted to approve the requested General Plan Amendment. Nevertheless, the project is consistent with the General Plan since "[t]he MU -H2 designation applies to properties located in the Airport Area. It provides for a horizontal intermixing of uses that may include regional commercial office, multifamily residential, vertical mixed-use buildings, industrial, hotel rooms, and ancillary neighborhood commercial uses." The allowed uses of the MU -H2 land use category are broad enough to allow for the existing uses of the AO category while allowing residential or mixed-use development at the density described. The proposed PCDP regulations 14-160 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 10 would provide for a combination of residential development, airport supporting uses, and a variety of commercial land uses consistent with the MU -H2 designation. The draft Planning Commission resolution (Attachment No. PC 1) includes an analysis of relevant Airport Area polices. Furthermore, the EIR Addendum includes a comprehensive analysis of all relevant General Plan polices. The analysis shows the requested amendments are consistent with all applicable General Plan polices. However, two warrant additional discussion as they require a policy waiver to achieve consistency. General Plan Policv Waiver - LU 6.15.13 Neiahborhood Parks Standards General Plan Policy LU 6.15.13 is specific to the Airport Area. The policy is intended to ensure that adequate neighborhood parks are developed to serve new residential villages. The policy itself allows the City to waive the dedication requirement under certain circumstances and the applicant requests the requirement be waived. LU 6.15.13 Neighborhood Parks Standards. To provide a focus and identity for the entire neighborhood and to serve the daily recreational and commercial needs of the community within easy walking distance of homes, require dedication and improvement of at least 8 percent of the gross land area (exclusive of existing rights-of-way) of the first phase development in each neighborhood, or % acre, whichever is greater, as a neighborhood park. This requirement may be waived by the City where it can be demonstrated that the development parcels are too small to feasibly accommodate the park or inappropriately located to serve the needs of local residents, and when an in -lieu fee is paid to the City for the acquisition and improvement of other properties as parklands to serve the Airport Area. In every case, the neighborhood park shall be at least 8 percent of the total Residential Village Area or one acre in area, whichever is greater, and shall have a minimum dimension of 150 feet. Park acreage shall be exclusive of existing or new rights-of-way, development sites, or setback areas. A neighborhood park shall satisfy some or all of the requirements of the Park Dedication Ordinance, as prescribed by the Recreation Element of the General Plan. The Applicant believes it would be inappropriate to locate a neighborhood park within the project site due to its proximity to John Wayne Airport. Pursuant to the policy, the Applicant has agreed to pay an in -lieu park fee of $2,500,000. The value was established by City Council Resolution No. 2007-30. A significant portion of the project site is impacted by high noise levels within JWA Safety Zone 3 and locating a park in such areas may not be appropriate or desirable. Additionally, predominant uses in Planning Area 2 (see Figure 6) are vehicle storage lots for car rental agencies operating with long-term leases. Air quality in the area and the limited residential density planned for the Airport Area are also factors suggesting a new public park within the proposed project site may not be desirable. If the park dedication 14-161 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 11 was required, the best potential location would be within Planning Area 1, outside the 65- dBA CNEL noise contour and JWA Safety Zone 3 further reducing the available land for residential or mixed-use development. In this scenario, a 1 -acre dedication of 6.02 acres of relatively unconstrained land is a significant percentage of the area potentially available for residential use. If the dedication were required in conjunction with the first phase density bonus development, the cost of the dedication could render the density bonus project financially infeasible. These or other potential factors could provide sufficient grounds for the City Council to waive the dedication requirement. If the City Council chooses not to waive the parkland dedication requirement, development of the future park would be required in accordance with this policy. With either choice, neighborhood park dedication or waiver, the proposed project is consistent with this policy. Staff believes the reasons cited above compelling to waive the dedication requirement. The recommended actions for project approval include a recommendation to the City Council to waive the policy. General Plan Policy Waiver - LU 6.15.7. Overall Density and Housing Types LU 6.15.7. Overall Density and Housing Types. Require that residential units be developed at a minimum density of 30 units and maximum of 50 units per net acre averaged over the total area of each residential village. Net acreage shall be exclusive of existing and new rights-of-way, public pedestrian ways, and neighborhood parks. Within these densities, provide for the development of a mix of building types ranging from townhomes to high-rises to accommodate a variety of household types and incomes and to promote a diversity of building masses and scales. The residential component of the project is 329 units (excluding density bonus units) within the 16.46 -acre residential village, and the density is about 20 dwelling units per acre (du/ac) and below the minimum 30 du/ac standard. If the density bonus units were included, the result would be about 27 du/ac. To comply, additional units would need to be included and required to be replacement units pursuant to Policy LU 6.15.5, meaning the additional units would come at the expense of underlying permitted nonresidential uses. The 16.46 -acre property is partially constrained by the JWA 65-dBA CNEL noise contour and all residential use is inconsistent in this high noise area. The property is also partially constrained by JWA Safety Zone 3 that limits residential uses to very low densities if not deemed unacceptable because of noise. Planning Area 1 is 7.14 acres and the area outside both the 65 dBA CNEL noise contour and Safety Zone 3 where residential use would be allowed consistent with the AELUP is further limited to 6.02 acres. To comply with Policy LU 6.15.7, 493 units would need to be constructed on 6.02 acres resulting in a density of 81.9 du/ac without including potential density bonus units which would exceed the maximum allowable density. However, California Government Code Section 65915(e)(1) prohibits a city from applying a development standard that will have the effect of physically precluding the construction of a development for projects that propose a density bonus. The waiver of height 14-162 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 12 standards, number of stories and setbacks to accommodate project amenities such as an interior courtyard, community plaza and high ceilings have been interpreted as physical constraints that warrant a waiver pursuant to Government Code §65915(e)(1) in Wollmer v. City of Berkeley, (2011) 193 Cal. App. 4th 1329. Staff believes the application of the density standards of Policy LU 6.15.7 would have precluded the proposed density bonus units of the project given the constraints, and therefore, it must be waived if the project is approved. It should be noted that the project would create an opportunity for housing (including affordable housing) that would be approximately 46 du/acre, not including the density bonus units in Planning Area 1, which is within the density range of the Policy LU 6.15.7. The requirement to waive this policy in no way diminishes the City's discretion to deny the proposed project. Housing Element and Regional Housing Needs Assessment (RHNA) If the proposed land use element is approved, corresponding changes to the Housing Element would be authorized. Corresponding maps, figures and tables would be updated. Most notably, PCDP Planning Area No. 1 would be added to the City's Housing Site Inventory. Credit would be given for the project towards the City's upcoming RHNA allocation for the next housing element cycle (2021-2029) due to the fact that project meets all criteria as a viable housing opportunity site pursuant to State Housing Element Law. Credit might not be given if construction occurs prior to the next housing element cycle. Zoning Code Amendment The Applicant requests the project site be rezoned from OA (Office Airport) to PC (Planned Community - Newport Airport Village Planned Community) to implement the proposed MU -H2 land use plan category (the GPA). This rezone would allow for the adoption of the Planned Community Development Plan (PCDP), which sets the development standards and land use regulations for the project area. The purpose of the PC district as provided in NBMC §20.56.10 is to: 1) Provide for the classification and development of land as coordinated, comprehensive projects in order to take advantage of the superior environment resulting from large-scale community planning, 2) Allow diversification of uses as they relate to each other in a physical and environmental arrangement while ensuring substantial compliance with the spirit, intent, and provisions of this Zoning Code, and 3) Include various types of uses, consistent with the General Plan through the adoption of a development plan and text materials that identify land use relationships and associated development standards. 14-163 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 13 NBMC §20.56.020(A) requires that a PC district contain at least 10 acres of improved land unless the City Council waives the minimum acreage requirement. At 16.46 acres, the Newport Airport Village PC District will not require such a waiver. NBMC §20.56.030 requires a PCDP to contain land use regulations and NBMC §20.56.040 requires a PCDP include property development standards. The proposed PCDP includes these provisions as summarized below. NBMC §20.56.050 outlines the procedure to adopt a PCDP and it provides for the contents of the PCDP itself. In summary, staff believes the proposed PCDP meets these Code requirements and recommends the Planning Commission concur by adopting a recommendation to the City Council that it be adopted by ordinance. Figure 5 below depicts the proposed Zoning Map. Z ZO U r' PC Jam' r'lf J� 1 `1 r� � G �. F- r I r r c 0 r apLF lyI NrH/gN rr �¢ WAY OA p 4 PC -15 PC -1 1 73 v)nLpVAIN Figure 5 - Proposed Zoning Map 14-164 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 14 Planned Community Development Plan The draft Newport Airport Village PCDP is within Exhibit E of Attachment No. PC 1. The PCDP is divided into the following sections: Introduction and Purpose — Introduces the project, site, and surrounding area. II. Land Use and Development Regulations — Creates the permitted uses and development standards. III. Architectural Design Considerations — Provides principles and concepts to guide the site layout and architectural design of buildings. IV. Residential Design Guidelines — Establishes specific architectural standards that residential developments will need to comply with. V. Plan Administration and Implementation — Sets the process to review development and amending the PCDP. Site Development Review is required for the development of new buildings. To achieve a mixed-use environment, Newport Airport Village PC District is divided into two planning areas (see Figure 5). Planning Area 1 would accommodate all of the dwelling units, plus up to 94,583 square feet of nonresidential (food service, retail, offices, and personal services) uses. It is important to note that all dwelling units would be required to be located outside of John Wayne Airport's 65-dBA CNEL zone and Safety Zone 3 as shown in Figure 6. Planning Area 2 is limited to nonresidential uses with an FAR of 0.5. This would include food services, bars/nightclubs, retail sales, offices, personal services, and most uses permitted or conditionally permitted within the Office Airport (OA) zone. A summary of the proposed development standards is contained in Table 2. 14-165 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 15 John Wayn Airport 411 Planning Areal r � t f Y Planning Area 2: r• 1 00, 1 one 2 1 ZU I - m m � t 1 M I Figure 6 — Planning Areas Table 2 — Development Standards Development Standard Planning Area 1 Planning Area 2 Housing Density 30 units/acre minimum N/A 46 units/acre maximum Building Height 85' (residential and mixed-use) 37', an increase to 55' is 37' (nonresidential) allowed with approval of a Site Development Permit Setbacks Buildings under 20' in height 15' from street property line 10' from street property line 5' from internal property line 5' from internal property line Buildings 20' or greater in height 20' from street property line 5' from internal property line Floor Area 94,583 square feet 0.5 Floor Area Ratio (202,989 square feet) Open Space Private - 5% gross floor area/unit N/A Common - 75 square feet/unit 14-166 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 16 Traffic Analysis To assess any potential traffic issues, a traffic analysis was prepared by Urban Crossroads for use in the CEQA analysis based on the Newport Beach Traffic Model (NBTM). As noted previously, the proposed project includes less development than studied in the 2014 Land Use Element Amendment Traffic Impact Analysis and consequently the project results in fewer peak hour and average daily trips (ADT) for the project site. When compared to the land uses currently allowed on the site by the current General Plan, the proposed development without the density bonus results in 4 fewer AM peak hour trips, 73 fewer PM peak hour trips and 763 fewer average daily trips (ADT). With the density bonus, proposed development results in an increase of 52 AM peak hour trips, a decrease of 22 PM peak hour trips and a decrease of 199 ADT. As a result of these trip generation changes, the analysis did not identify any intersection or other traffic -related impacts that would be created by the proposed project. Charter Section 423 (AKA Greenliaht Initiative City Council Policy A-18 requires that proposed GPAs be reviewed to determine if a vote of the electorate would be required pursuant to City Charter Section 423. If a GPA (separately or cumulatively with other GPAs within the previous 10 years within the same Statistical Area of the General Plan) generates more than 100 peak hour trips (a.m. or p.m.), adds 40,000 square feet of nonresidential floor area, or adds more than 100 dwelling units in a statistical area, a vote of the electorate would be required if the City Council approves the GPA. The property is located in Statistical Area L4. The proposed General Plan Amendment would only change the land use designation of the site and not increase nonresidential floor area or residential units. The 329 dwelling units requested are already provided in the MU -H2 land use plan category and Policy LU 6.15.6. The 2,200 -dwelling -unit allocation to the MU -H2 is not changing and the Amendment does not increase the amount of floor area proposed. Consequently, there is no increase in a.m. or p.m. peak hour traffic trips. As a result, the Amendment is not classified as a major amendment requiring a vote of the electorate should the City Council choose to approve the requested General Plan Amendment. Airport Noise Being adjacent to the airport, there is a concern about noise affecting future residents. General Plan Policy, the Airport Environs Land Use Plan for John Wayne Airport (AELUP) and the propose PCDP will not permit residential units in areas subject to noise at 65 dBA CNEL or greater. The PCDP further requires that residential construction comply with NBMC Section 10.26.030, which requires the interior ambient noise level of the dwelling units does not exceed 45 dBA between 7:00 a.m. and 10:00 p.m., 40 dBA between 10:00 14-167 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 17 p.m. and 7:00 a.m. Additionally, should a neighborhood park be required, notification to future residents and the public by posting signs in outdoor open areas and recreation areas, is mandated by the draft PCDP. Residential use is considered "conditionally consistent" with the airport by the AELUP provided interior noise mitigation and exterior notice as described is provided. As a result, the proposed project is compatible with the airport and consistent with the adopted AELUP. Airport Land Use Commission (ALUC) Since the proposed project includes General Plan and Zoning Amendments and a PCDP, review for consistency with the Airport Environs Land Use Plan for John Wayne Airport (AELUP) is required by Section 21676(b) of the Public Utilities Code. The amendments will be forwarded to the ALUC for their review and a determination of consistency with the AELUP prior to the City Council consideration. Should the ALUC find the project consistent with the AELUP, the project can proceed to the City Council without further delay. If the ALUC finds the project inconsistent with the AELUP, which is their prerogative despite the fact that the amendments appear to be consistent with the adopted AELUP, the City Council would have to initiate a process to override the ALUC determination by a two-thirds vote of the City Council, should the Council choose to approve the project. As indicated, staff believes the proposed project is consistent with the requirements and standards in the AELUP. Residential units would be located outside the 65 dBA CNEL noise contour line established by the AELUP, and the use would be "conditionally consistent" provided interior noise mitigation is provided and exterior notice of the proximity to operating aircraft is provided. These two conditions are mandated by the PCDP. The project site does include areas within JWA Safety Zones 3 and 6. Safety Zone 3 precludes high density residential, and the PCDP does not permit residential units within this zone. Commercial development allowed by the PCDP is permitted to be within Safety Zone 3. The remainder of the site is within Safety Zone 6, which is less restrictive than Safety Zone 3 and allows all residential uses and commercial development. Refer to Figure 6 to see the boundaries of 65 dBA CNEL and Safety Zone 3. Additionally, the Applicant has received a Determination of No Hazard to Air Navigation from the Federal Aviation Administration for 85 feet above ground level (AGL), which is the proposed PCDP height limit for residential and mixed-use buildings. In summary, staff believes the proposed amendments are consistent with the adopted AELUP given the provisions of the PCDP, and as a result, staff supports a recommendation to adopt the amendments. Fiscal Analysis The City's consultant, Applied Development Economics, Inc., has prepared an independent fiscal impact analysis (Attachment No. PC 3) based on the City's Fiscal Impact Model in accordance with General Plan Implementation Programs 12.1 and 12.2. These programs require the preparation of a net fiscal analysis based upon an updated 14-168 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 18 model for significant development projects and General Plan Amendments. The City's fiscal impact model is designed to calculate the average cost of public services required by new development, on the assumption that new development affects City services in the same way that existing development does. The model concluded that the net impact of the growth in land uses at build -out of the General Plan compared to existing land uses in 2006 when the General Plan was last comprehensively updated, would result in a net positive fiscal impact for the General fund of $21.7 million per year. The analysis prepared for the proposed Newport Airport Village concludes that allowed land uses on the site generate $153,364 while the proposed project would result in an annual cost of $466,523 for a total of $619,887 annually. Since the proposed project includes 329 units of the 1,650 replacement dwelling units already allowed in the MU -H2 land use designation, the net fiscal change is no different than that predicted in 2006. In other words, the City planned for this change by adopting the MU -H2 land use plan category and project approval "locates" a portion of that change to the project site and avoids it at a different MU -H2 site. Develoament Aareement Pursuant to NBMC Section 15.45.020(A)(2)(a), a Development Agreement is required whenever a General Plan Amendment or Zoning Code Amendment is proposed that will result in the development of 50 or more dwelling units. The intent of the Development Agreement is to provide the property owner/developer a vested development right, while providing some public benefit to the community. In this case, the property owner/developer would have a vested right to develop 444 dwelling units (329 base units and up to 115 density bonus units) and 297,572 square feet of commercial floor area, provided the proposed development complies with the development regulations and design guidelines set forth in the PCDP. The vested right to develop is for 15 years for the residential portion of the project and 20 years for the nonresidential portion of the project. In consideration of the vested development right, the property owner/developer will pay the following in addition to standard impact fees: • Public Benefit Fee: $6,000,000 in three installments • General Pan Policy Waiver In -Lieu Park Fee: $2,500,000 • Public Safety Fee: $1,000,000 for Fire Life Safety staffing, services, or equipment The proposed Development Agreement (Exhibit F of Attachment No. PC 1) includes all the mandatory elements for consideration and public benefits that are appropriate to support conveying the vested development rights consistent with the General Plan, NBMC, and Government Code Sections 65864 et seq. 14-169 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 19 Environmental Review On July 25, 2006, the City Council certified a Program Environmental Impact Report (PEIR) for the General Plan 2006 Update (SCH No. 2006011119). The PEIR analyzed the potential impacts of a citywide land use plan, and goals and policies for 10 General Plan elements. The PEIR designated the project area as Airport Office and Supporting Uses (AO). The designation would allow up to 358,498 square feet of office based on the allowable 0.5 floor area ratio (FAR). The AO land use designation is intended to allow uses that support or benefit from operations of the adjoining John Wayne Airport. These may include professional offices; aviation; retail; automobile rental, sales, and service; hotels and ancillary retail, restaurant, and service uses. This designation specifies an FAR of 0.5, except for warehousing, which may be developed at an FAR of 0.75. Two previous addendums to the PEIR, which are unrelated to the project area, have been previously approved. On July 22, 2014, the City Council certified a Supplemental EIR (SEIR) for the 2014 update to the Land Use Element of the General Plan (SCH No. 2013101064). The SEIR focused on a General Plan Land Use Element Amendment proposing both reduced and increased development capacities in various areas of the City. The SEIR evaluated the designation of the project site as Mixed Use -Horizontal 2 (MU -H2). The SEIR assessed the potential development of 238,077 square feet of office space and 329 additional dwelling units for the project site as an increase to what the General Plan would allow. As a result of failing to obtain voter approval, as required by Charter Section 423, the General Plan Land Use Element Amendment was not implemented. The result of the vote did not nullify the certification of the SEIR and the City Council has not rescinded its certification of the SEIR. As a result of the proposed project changes from the analysis that was conducted in 2014, an Addendum to the PEIR and SEIR was prepared (Exhibit B of Attachment No. PC 1). The Addendum analyzed the following environmental topics: Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Energy, Geology and Soils, Greenhouse Gas Emissions, Hazards and Hazardous Materials, Hydrology, Land Use and Planning, Mineral Resources, Noise, Population and Housing, Public Services, Recreation, Transportation, Tribal Cultural Resources and Utilities and Service Systems. This Addendum also includes analysis of new topical sections that were not included in the previous EIRs; specifically, it includes a new energy section and a new wildfire section. These topics were included in the Addendum because the State CEQA checklist was updated to include them subsequent to both the PEIR and SEIR certifications. This proposed Newport Airport Village PCDP would result in the same or reduced development scope than what was analyzed in the PEIR and SEIR. Based on the environmental analysis conducted, any potential impact has already been appropriately addressed through the PEIR and SEIR. 14-170 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 20 Pursuant to Section 15162 of the CEQA Guidelines, when an EIR has been certified for a project, no subsequent EIR shall be required unless the City determines, on the basis of substantial evidence in the light of the whole record, one or more of the following: 1. Substantial changes are proposed in the project which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; 2. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or 3. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete, shows any of the following: a. The project will have one or more significant effects not discussed in the previous EIR; b. Significant effects previously examined will be substantially more severe than shown in the previous EIR; c. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or d. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative. On the basis of the entire environmental review record, the project will not result in any new significant impacts that were not previously analyzed in the PER or the SEIR. All potential impacts would either be the same or less than those described in either the PER or SEIR and have been appropriately mitigated. In addition, there are no substantial changes to the circumstances under which the project would be undertaken that would result in new or more severe environmental impacts than previously addressed in either the PER or SEIR, nor has any new information regarding the potential for new or more severe significant environmental impacts been identified. In accordance with Section 15164 of the CEQA Guidelines, an addendum to the previously adopted PER and SEIR is the appropriate environmental documentation for the project. 14-171 Newport Airport Village (PA2014-225) Planning Commission, June 4, 2020 Page 21 Alternatives The Planning Commission has the discretion to recommend changes to the proposed project to address areas of concern or to improve the proposed plan. The Commission can also recommend the City Council not waive the neighborhood park dedication policy. Lastly, the Commission can recommend denial if it believes the proposed plan introduces incompatible uses to the area that cannot be adequately mitigated or if consistency with the MU -H2 and/or other applicable Airport Area policies are not in evidence. 011M = 0IIOTM Notice of this hearing was published in the Daily Pilot, mailed to all owners of property within 300 feet of the boundaries of the site (excluding intervening rights-of-way and waterways), including the applicant and an email select alert was sent to email subscribers of the Planning Division's notification list. Notification is consistent with applicable provisions of the NBMC Additionally, the item appeared on the agenda for this meeting, which was posted at City Hall and on the City website. Prepared by: Gregg R mirez Principal Planner ATTACHMENTS PC 1 Draft Resolution Submitted by: Jim Campbell Deputy Community Development Director Exhibit A — Legal Descriptions Exhibit B — Addendum to EIRs Exhibit C — General Plan Amendment Exhibit D — Zoning Code Amendment Exhibit E — Planned Community Development Plan Exhibit F — Development Agreement PC 2 Figure LU22 of the General Plan Land Use Element PC 3 Fiscal Analysis 14-172 Attachment E PC -60 (Newport Airport Village Planned Community Development Plan) 14-173 NEWPORT AIRPORT VILLAGE PLANNED COMMUNITY DEVELOPMENT PLAN PC -60 Adopted XXXXXX, 2020 Ordinance No. XX -2020 14-174 TABLE OF CONTENTS SECTION PAGE I. INTRODUCTION AND PURPOSE............................................................................................... 1 A. Introduction......................................................................................................................... 1 B. Location................................................................................................................................1 C. Surrounding Area................................................................................................................. 3 D. Purpose and Objective......................................................................................................... 4 E. Relationship to Other Regulations....................................................................................... 4 II. LAND USE AND DEVELOPMENT REGULATIONS....................................................................... 5 A. Permitted Uses..................................................................................................................... 6 B. Prohibited Uses.................................................................................................................... 7 C. Existing Legal Nonconforming Uses and Structures............................................................ 7 D. Land Use Concept................................................................................................................ 7 E. Development Standards — Planning Area 1 (Mixed -Use Residential Area) ......................... 8 F. Development Standards — Planning Area 2 (Non -Residential Area) ................................. 12 G. Additional Development Standards................................................................................... 13 III. ARCHITECTURAL DESIGN CONSIDERATIONS......................................................................... 16 A. General Principles.............................................................................................................. 16 B. Mixed-Use..........................................................................................................................16 C. Residential Uses................................................................................................................. 16 D. Office/Commercial Uses.................................................................................................... 17 E. Conceptual Images to Guide Development....................................................................... 17 IV. RESIDENTIAL DESIGN GUIDELINES......................................................................................... 21 A. Architectural Variety.......................................................................................................... 21 B. Windows and Entries......................................................................................................... 21 C. Massing and articulation.................................................................................................... 21 V. PLAN ADMINISTRATION and implementation...................................................................... 22 A. Permit Review Procedures................................................................................................. 22 B. Parcel or Tract Maps.......................................................................................................... 22 C. Amendments to Planned Community Development Plan ................................................. 22 D. Administrative Responsibility............................................................................................ 22 E. Enforcement...................................................................................................................... 22 Newport Airport Village 14-175 TABLE OF CONTENTS FIGURE PAGE Figure1 - Vicinity Map.................................................................................................................... 2 Figure2 - Airport Area.................................................................................................................... 2 Figure 3 - Newport Airport Village Planned Community................................................................ 3 Figure4 - Land Use Map................................................................................................................. 5 Figure 5 - Conceptual Development Plan..................................................................................... 10 Figure 6 - Mixed -Use Conceptual Images................................................................................... 188 Figure 7 - Multi -Unit Residential Conceptual Images................................................................... 19 Figure 8 - Office/Commercial Conceptual Images........................................................................ 20 Newport Airport Village 14-176 NEWPORT AIRPORT VILLAGE PLANNED COMMUNITY DEVELOPMENT PLAN (PCDP) I. INTRODUCTION AND PURPOSE A. Introduction The Newport Airport Village Planned Community Development Plan (PCDP) (PC -60) is envisioned to be a horizontal mixed-use development on an approximately 16.46 -acre site that is located in the northern portion of the City, near Macarthur Blvd and Campus Drive. The City of Newport Beach Municipal Code (NBMC) allows a Planned Community Development Plan to address land use designations and regulations in Planned Communities. The PCDP serves as the controlling zoning ordinance for the site and is authorized and intended to implement the provisions of the Newport Beach General Plan. The maximum buildout of the PCDP would result in 329 residential dwelling units, exclusive of any density bonus as allowed pursuant to California Government Code Section 65915; and 297,572 square feet of office, retail, and commercial use. The Newport Airport Village Planned Community (PC) consists of approximately 16.46 acres and prior to the development pursuant to this PCDP, a variety of commercial services, including: retail, restaurants, offices, rental car agencies, and other similar uses were developed. The Newport Airport Village Design Guidelines (contained herein) provide a conceptual vision of the physical implementation of the project and have been drafted to assist the City and community to visualize the architectural theme and desired character of the development. The Design Guidelines also provides the visual and mental imagery of what the current property owner and City see for the future development of the PC. B. Location As shown in Figures 1 and 2, the PC District is generally located southeast of John Wayne Airport and within the "Airport Area" Sub -Area as defined by the Newport Beach General Plan. The Airport Area includes 360 acres in the northernmost portion of Newport Beach, bounded by Campus Drive to the west and north, Jamboree Road to the east, and Bristol Street to the south. The City of Irvine is located north and east of the Airport Area. The Airport Area is proximate to Interstate 405 and State Routes 55 and 73. The Airport Area initially was a light industrial and commercial office area of Newport Beach, but is gradually redeveloping into a mixed-use community integrating residential development with existing non-residential uses consistent with the 2006 Newport Beach General Plan. 14-177 I. INTRODUCTION AND PURPOSE II.4M1,..I...Mr �� 1 s •�ynx A �5 1 1 , Figure 9 - Vicinity Map Figure 2 - Airport Area Newport Airport Village 2 14-178 I. INTRODUCTION AND PURPOSE More specifically, the PC is located west of MacArthur Boulevard, south of Campus Drive, north of Birch Street, and about 550 feet north of Dove Street, as shown in Figure 2. I f, J ' l4� f i .w.. [h arXnw+US Figure 3 - NenportAirport Village Planned Community As also noted in Figure 3, the 65-dBA CNEL noise contour line for John Wayne Airport (JWA) transects the site. Areas east of (i.e., outside) the 65 dBA CNEL line are "Clearly Compatible" or "Normally Compatible" with multi -family residential and mixed-use development under General Plan Table N2 (Land Use Noise Compatibility Matrix). Areas west of (i.e., inside) the 65 dBA CNEL line are "Normally incompatible" or "Clearly incompatible" with multi -family residential and mixed-use development under General Plan Table N2. Under the Airport Environs Land Use Plan for John Wayne Airport (AELUP), this means that areas west of the 65 dBA CNEL line are deemed suitable for residential uses and other noise -sensitive uses if the interior noise standard of 45 dBA CNEL can be maintained with an accompanying dedication of a avigation easement for noise. Additionally, building heights west of the 65 dBA CNEL line are restricted for aviation safety. C. Surrounding Area John Wayne Airport, a commercial and general aviation airport that is owned and operated by the County of Orange, is located to the west and north of the site (across Newport Airport Village 3 14-179 I. INTRODUCTION AND PURPOSE Campus Dr). To the immediate northeast of the site, on the southwest corner of MacArthur Blvd and Campus Dr, is a five -story office building and a small multi -tenant commercial building. Across MacArthur Boulevard, on the northeast corner of MacArthur Blvd and Campus Dr, is a nine -story office building that contains professional and medical office uses; a five -story apartment building at the intersection of Douglas and Martin Court; and multiple hotels and restaurants along MacArthur Blvd. To the east (across Birch St) are several multi -story office buildings that range from three to fourteen stories, hotels, and retail and restaurant uses. Commercial services, including vehicle sales and repairs and a pharmacy; restaurants; and office uses, including medical offices occupy the properties to the south of the PC. D. Purpose and Objective The purpose of the PCDP is to establish appropriate zoning regulations that govern the land use and development of the PC in a manner that is consistent with the City of Newport Beach General Plan. Implementation of the PCDP will: — Provide a quality mixed-use development that includes residential and supporting commercial uses; as well as, commercial uses that support or benefit from the proximity to the airport. — Create two planning areas to guide the development of the PC District (see Figure 4). Planning Area 1 will include the residential and, potentially, a complimentary retail or service commercial component of the PC District. Planning Area 2 will consist exclusively of non-residential uses. — Provide new housing opportunities in response to increased demand for housing, reduction of vehicle trips, and an encouragement of an active lifestyle by increasing the opportunity for residents to live in proximity to jobs, services, and entertainment. Such housing will be proximate to, and interconnected with, commercial development through pedestrian walkways provided by future development within the PCDP. — Ensure all residential units are located outside the John Wayne Airport 65 dBA CNEL noise contour and Safety Zone 3. E. Relationship to Other Regulations Whenever the provisions of this PCDP conflict with the regulations of the NBMC, the regulations contained herein will prevail. The NBMC including the Zoning Code apply and shall also regulate this development whenever regulations are not provided within this PCDP. Unless otherwise defined herein, all words and phrases used in this PCDP shall have the same meaning and definition as used in the NBMC. Newport Airport Village 4 14-180 II. LAND USE AND DEVELOPMENT REGULATIONS II. LAND USE AND DEVELOPMENT REGULATIONS The PC is subdivided into two planning areas. Figure 4 shows the Land Use Map for the PC District with the 65 dBA CNEL noise contour separating the residential use area from the non-residential use area. John Way�Airport S 2 1y f fx S M x I V x r xxf Planninn Areal r � x x J/,Planning Area 2+' , / 1' 'F + nt �r � I ly 7 r�Airport Village Land Use Planning Area n - Mixed -Use Residential 7.14 acres... 4d one.o. Punning Area 2 - Commercial 9.32 acres ~Mmm Figure 4 - Land Use Map Newport Airport Village 5 14-181 II. LAND USE AND DEVELOPMENT REGULATIONS A. Permitted Uses Table 1 lists the permitted uses for each planning area of the Planned Community. The uses identified within the table are not intended to be a comprehensive list, but rather major use categories. The Community Development Director may determine other uses not specifically listed herein are allowed or allowed pursuant to a MUP or CUP, provided they are consistent with the purpose of the planning areas, are compatible with surrounding uses, and are not listed as a prohibited use. Table 1 Permitted Uses Uses Planning Area 1 Planning Area 2 Additional Regulations Residential Multi -unit dwellings P - Live/work units P - Mixed-use development P - Accessory dwelling units P - NBMC 20.48.200 Home Occupations P - NBMC 20.48.110 Residential accessory uses and amenities P P Food, alcohol, entertainment Alcohol sales (off-site) MUP MUP NBMC 20.48.030 Alcohol Sales (on-site) CUP CUP NBMC 20.48.030 Bars, lounge, nightclub CUP CUP NBMC 20.48.030 & 20.48.090 Food service, no late hours MUP MUP NBMC 20.48.030 & 20.48.090 Food service, late hours CUP CUP NBMC 20.48.030 & 20.48.090 Office, retail, service Financial Institutions P P Offices, business & professional P P Offices, medical and dental P P Personal services, general P P Personal services, restricted MUP MUP Retail sales (less than 10,000 sq. ft.) P P Retail sales (greater than 10,000 sq. ft.) P P Other uses Uses not listed herein, but allowed in the OA zone A A Subject to applicable NBMC requirements Newport Airport Village 6 14-182 II. LAND USE AND DEVELOPMENT REGULATIONS Table 1 Continued P = Permitted Use CUP = Conditional Use Permit MUP = Minor Use Permit A = Allowed subject to permit requirements provided in Table 2-4 of NBMC Section 20.20.020(C) - = Not Permitted B. Prohibited Uses The following uses shall be expressly prohibited from the PCDP: 1. Any use not authorized by this PCDP unless the Community Development Director determines a particular use consistent with the purpose and intent of the PCDP, 2. Residential dwelling units within (i.e., west of) the 65 dBA CNEL (or above) noise contour from John Wayne Airport (residential accessory uses, and amenities are allowed), 3. Residential dwelling units within John Wayne Airport Safety Zone 3 (residential accessory uses, and amenities are allowed), 4. The following uses, if said structure within 250 feet of any residential dwelling unit: a. Handicraft Industry b. Industry, Small (less than 5,000 sq. ft.) C. Emergency Health Facilities/Urgent Care d. Ambulance Services e. Funeral Homes and Mortuaries f. Maintenance and Repair Services. C. Existing Legal Nonconforming Uses and Structures Existing legally established use and structures that no longer conform to the provisions of this PCDP shall be subject to NBMC Chapter 20.38. D. Land Use Concept Figure 5 depicts the conceptual development plan for Newport Airport Village Planned Community. Multi -story residential structures would be located near the north side of the site in Planning Area 1 and may have a retail/commercial component. Office, commercial and other non-residential buildings would be located south of the residential buildings in Planning Area 2. A landscaped esplanade with open space areas, pedestrian pathways with areas for passive seating, and bicycle facilities will be provided to create an efficient and safe pedestrian -friendly environment interconnecting the various land uses through - Newport Airport Village 7 14-183 II. LAND USE AND DEVELOPMENT REGULATIONS out the site with surrounding properties and public ways. Although the PC may not be developed exactly as depicted in the conceptual land use development map, it serves as a demonstration of what could be achieved through the application of the site development standards of this PCDP. E. Development Standards — Planning Area 1(Mixed-Use Residential Area) 1. Permitted Height of Residential or Mixed -Use Structures: No structure, nor any portion of any structure, architectural feature, elevator penthouse, or mechanical equipment shall exceed a height of 85 feet measured consistent with the Zoning Code. 2. Permitted Height of Nonresidential Structures: No structure, nor any portion of any structure, architectural feature, elevator penthouse, or mechanical equipment shall exceed a height of 37 feet measured consistent with the Zoning Code, unless a Site Development Review is approved pursuant to NBMC Section 20.52.080, in which case the maximum shall be 55 feet. 3. Setbacks: Minimum setbacks shall be as follows: a. Buildings, or portion thereof, that are under 20 feet in height shall be setback a minimum of 10 feet from any street property line and a minimum of 5 feet from any internal property line. b. Buildings, or portion thereof, that are 20 feet or greater in height shall be setback a minimum of 20 feet from any street property line and a minimum of 5 feet from any internal property line. 4. Residential Density: Densities shall be a minimum of 30 dwelling units per acre and a maximum of 50 dwelling units per acre, not including density bonus units. 5. Residential Development Limit: A maximum of 329 dwellings units shall be permitted, exclusive of any density bonus as allowed pursuant to California Government Code Section 65915. In addition, residential development (excluding density bonus units) shall be subject to the maximum development allocation for the Airport Area established by General Plan Land Use Policy 6.15.5, or any successor policy or development limit resulting from a future General Plan Update/Amendment, provided that such allocation does not result in a reduction of the 329 permitted dwelling units in Planning Area 1. 6. Floor Area Limit: Floor area for nonresidential uses shall not exceed 94,583 square feet. This floor area limit is based on the conversion of commercial development allowed by the general plan to residential dwelling units pursuant to General Plan Newport Airport Village 8 14-184 II. LAND USE AND DEVELOPMENT REGULATIONS Policy LU6.15.5. The 2006 General Plan allowed a 0.5 FAR (155,509 square feet) that is reduced by 60,926 square feet and converted to allow 329 dwelling units. 7. Common Open Space: All residential development shall incorporate common open space in the amount of 75 square feet per unit with minimum dimensions of 15 feet in any direction. At least half of the common open space shall consist of recreational amenities, including but not limited to the following: a. Swimming pools/spas and adjacent lounging decks b. Exercise facilities C. Tennis courts d. Basketball courts e. Clubhouse rooms f. Roof deck recreation areas g. Community gardens h. Barbecue and other active (e.g. bocce ball) or passive (e.g., reading) courtyards i. Other amenities as deemed appropriate by the Community Development Director Outdoor common areas or recreational areas shall be posted with an outdoor notification sign to users regarding the proximity to John Wayne Airport and presence of operating aircraft. Newport Airport Village 9 14-185 II. LAND USE AND DEVELOPMENT REGULATIONS Figure S - Conceptual Development Plan Newport Airport Village 10 14-186 II. LAND USE AND DEVELOPMENT REGULATIONS 8. Private Open Space: All residential development shall incorporate private open space in the amount of 5% of the gross floor area (minimum) for each unit with a minimum dimension of 6 feet in any direction. 9. Affordability Requirements: Residential development shall include affordable housing as follows: a minimum of 5% of units for very -low income households, or a minimum of 10% of units for low-income households, or a minimum 10% of units for moderate -income households within a common -interest development. The following requirements also apply: a. Affordable units shall be provided on-site. b. Affordable units shall be designed and distributed within the residential as follows: i. Number of Bedrooms. Affordable units shall reflect the range of numbers of bedrooms provided in the residential development project as a whole. ii. Comparable Quality and Facilities. Affordable units shall be comparable in the facilities provided (e.g., laundry, recreation, etc.) and in the quality of construction and exterior design to the market -rate units. iii. Size. Affordable units may be smaller and have different interior finishes and features than the market -rate units, and iv. Location. Affordable units shall be dispersed throughout the residential development, unless clustering is allowed by the review authority. C. An Affordable Housing Implementation Plan (AHIP) shall be prepared and submitted with any site development review application seeking approval of a residential development within the PC District. The AHIP shall clearly demonstrate how the proposed residential development project will meet the affordability requirements of this PCDP and any applicable provisions of the State Density Bonus Law and the Newport Beach Municipal Code. The AHIP shall specify eligible income categories, the amount of the requested density bonus, any concession/incentives requested, and any development standards waivers or modifications sought and justifications for said concessions/incentives or development standard relief. d. Density bonuses/incentives or development standard concessions shall be provided pursuant to NBMC Chapter 20.32 and Section 65915 et. seq of the California Government Code. 10. Sound Mitigation: The interior ambient noise level of all new residential dwelling units shall meet applicable standards of the City's Community Noise Ordinance (NEMC Section 10.26.030). An acoustical analysis report, prepared by an acoustical engineer, shall be submitted describing the acoustical design features of the structure that will satisfy the interior noise standard. The residential units shall be constructed, and noise attenuated in compliance with the report. Newport Airport Village 11 14-187 II. LAND USE AND DEVELOPMENT REGULATIONS 11. Residential Design: Unless otherwise deemed appropriate by the City's Review Authority all residential and mixed-use buildings shall be generally consistent with the residential design guidelines as set forth in Section IV of the PCDP. 12. Notification to owners and tenants: A written disclosure statement shall be prepared prior to sale, lease, or rental of a residential unit within the development. The disclosure statement shall indicate that the occupants will be living in an urban type of environment adjacent to an airport and that the noise, odor, and outdoor activity levels may be higher than a typical suburban residential area. The disclosure statement shall include a written description of the potential impacts to residents of both the existing environment (e.g., noise from planes, commercial activity on the site and vehicles streets) and potential nuisances based upon the allowed uses in the zoning district. Each and every buyer, lessee, or renter shall sign the statement acknowledging that they have received, read, and understand the disclosure statement. A covenant shall also be included within all deeds, leases or contracts conveying any interest in a residential unit within the development that requires: (1) the disclosure and notification requirement stated herein; (2) an acknowledgment by all grantees or lessees that the property is located within an urban type of environment and that the noise, odor, and outdoor activity levels may be higher than a typical suburban residential area; and (3) acknowledgment that the covenant is binding for the benefit and in favor of the City of Newport Beach. 13. Deed notification: A deed notification shall be recorded with the County Recorder's Office, the form and content of which shall be satisfactory to the City Attorney. The deed notification document shall state that the residential unit is located in a mixed-use development and that an owner may be subject to impacts, including inconvenience and discomfort, from lawful activities occurring in the project or zoning district (e.g., noise, lighting, odors, high pedestrian activity levels, etc.). 14. Park Dedications and Fees: All residential subdivisions shall comply with all park dedications and fees, as required in NBMC Chapter 19.52. F. Development Standards — Planning Area 2 (Non -Residential Area) In addition to the additional development standards listed in Section II(F) of this PCDP, the following standards apply to all development in Planning Area 2. 1. Permitted Height of Structures: No structure, nor any portion of any structure, architectural feature, elevator penthouse, or mechanical equipment shall exceed a height of 37 feet, unless a Site Development Review is approved pursuant to Newport Airport Village 12 14-188 II. LAND USE AND DEVELOPMENT REGULATIONS NBMC Section 20.52.080, in which the review authority may allow buildings or structures to exceed 37 feet to a maximum of 54 feet. 2. Setbacks: Minimum setbacks shall be 15 feet from any street property line and 5 feet from any internal property line. 3. Floor Area Ratio: Floor area ratio shall not exceed 0.5, except for warehouse uses, which are allowed a maximum floor area ratio of 0.75. 4. Lot Size and Dimensions: Newly created lots shall meet the minimum standards for lots provided in NBMC Section 20.20.030 for the OA (Office—Airport) Zoning District. G. Additional Development Standards In addition to the planning area specific development standards listed in Sections II(D) and II(E) of this PCDP, the following standards apply to all development within the Newport Airport Village Planned Community. 1. Maximum Intensity: The total area of all office, retail, and other commercial uses within the Newport Airport Village PC shall not exceed 297,572 square feet. 2. Parking and Circulation: Parking and on-site circulation shall comply with NBMC Chapter 20.40. All proposed development is required to be reviewed and approved by the Planning Division, Public Works Department, the City Traffic Engineer, Fire Department and Building Division. On-site circulation, including but not limited to, driveway location, sight distance, parking lot design, drive aisles, emergency vehicle access and access the disabled shall meet applicable codes, polices and design standards. All approved vehicle entry points to the PC District shall comply with applicable City of Newport Beach Public Works and Fire Department requirements regarding safe and convenient vehicular access. 3. Landscaping: A detailed landscape and irrigation plan shall be prepared by a licensed landscape architect and submitted with the Site Development Review application. Landscaping shall be designed, installed, and maintained in consistent with all requirements of NBMC Chapters 14.17 (Water Efficient Landscaping) and 20.36 (Landscaping Standards). Landscape shall also be maintained in a healthy, weed -free condition, free of litter and consistent with NBMC Section 20.30.130 (Traffic Safety Visibility Area). 4. Pedestrian and Bicycle Connection: All uses in the PC shall be interconnected through safe and efficient pedestrian and bicycle paths, including a pedestrian Newport Airport Village 13 14-189 II. LAND USE AND DEVELOPMENT REGULATIONS connection feature between the residential and non-residential components of the PC District. 5. Lighting: A detailed lighting plan with lighting fixtures and standard designs shall be submitted with the Site Development Review application and shall comply with NBMC Section 20.30.070. The lighting system shall be designed and maintained to conceal the light source and minimize light spillage and glare outside of the boundary of the PC District. A minimum average 0.5 foot-candle shall be provided on all driving or walking surface during the hours of operation and one hour thereafter. All lighting shall comply with NBMC Section 20.30.070. 6. Utilities: A Utilities Plan shall be submitted with the Site Development Review application. The final alignment and location of utilities shall be reviewed and approved by the Public Works Department. Adequate access for maintenance vehicles shall be provided. All utilities on private property shall be privately maintained and operated. 7. Air Conditioning Units: The use of individual through -window or through -wall air conditioning units any commercial or residential unit is prohibited. Signs: A comprehensive sign program with sign materials and lighting details shall be submitted with the Site Development Review application. All signage shall comply with the Chapter 20.42 of the Municipal Code. Should a future neighborhood public park be constructed in either Planning Area, the park shall be posted with a notification to users regarding the proximity to John Wayne Airport and aircraft overflight and noise. Outdoor common areas or recreational areas shall also be posted with an outdoor notification sign to users regarding the proximity to John Wayne Airport and presence of operating aircraft. 8. Fences, Hedges, & Walls: Fences, hedges, and walls shall be limited to the following heights, subject to the exceptions contained in NBMC Section 20.30.040: a. Street setback areas — 42 inches b. Interior setback areas — 6 feet C. Between residential uses and nonresidential uses and parking areas — 8 feet 9. Buffering and Screenin a. General Requirements: Mechanical equipment must be located so that the impact of noise on residential uses is minimized to the greatest extent feasible. Screening shall be maintained in good condition at all times. Landscaping used as screening shall provide a dense, year-round screen. Newport Airport Village 14 14-190 II. LAND USE AND DEVELOPMENT REGULATIONS b. Roof -mounted Mechanical Equipment and Appurtenances: Roof -mounted mechanical equipment and appurtenances may not be visible in any direction (360 degrees) from a public right-of-way or adjacent residential property, as may be seen from a point six feet above ground level. Methods of screening may include mechanical roof wells recessed below the roof line or by solid and permanent roof -mounted screens. Screening must be compatible with the architectural style, materials, and color of the building on which the equipment is located. Supports for window washing equipment are permitted and are not required to be screened from view. No setbacks are required for rooftop mechanical equipment or appurtenances. All roof - mounted mechanical equipment and appurtenances shall be at or below all applicable height limits. C. Ground -mounted Mechanical Equipment: Ground -mounted mechanical equipment shall be screened from public rights-of-way and/or public property as seen from a point six feet above ground level. Methods of screening may include fences, walls, solid hedges, or other similar methods. Chain link fencing is not permitted with or without slats is not allowed. d. Outdoor Storage: Where equipment, material, or merchandise is allowed to be stored outdoors, these items shall be screened from public view and adjacent residential areas using fences, walls, solid hedges, or other methods. Chain link fencing with or without slats is not allowed. e. Solid Waste Storage Areas: New development shall provide adequate, enclosed areas with solid roofs for collecting, storing, and loading solid waste and recyclable materials. The square footage provided for solid waste and recyclable materials storage must be in compliance with NBMC Section 20.30.120. Solid waste and recyclable materials storage areas must be adequate in distribution to serve the project and be screened from public rights-of-way and/or public property as seen from a point six feet above ground level. Screening may consist of solid masonry walls, metal gates, landscaping, or similar methods. Structures used for solid waste screening must be visually compatible with the surrounding structures and must be properly secured to prevent access by unauthorized persons, while allowing authorized persons access for disposal of materials. Newport Airport Village 15 14-191 III. ARCHITECTURAL DESIGN CONSIDERATIONS III. ARCHITECTURAL DESIGN CONSIDERATIONS A. General Principles The following general principles shall be considered when siting and designing new development within Newport Airport Village. 1. Development should be designed to convey a unified and high-quality character with use of consistent architectural design vocabulary, materials, and color palette. 2. Building elevations should employ architectural treatments, articulation and modulation of mass to avoid the appearance of monolithic box -like buildings. 3. High-quality doors, windows, moldings, and finishes should be used on elevations visible from streets and pedestrian paths. 4. Roof profiles should be articulated to reduce the appearance of large structures and provide visual interest. 5. Streetscape design and plant materials should reflect the street's location and nature. 6. Abundant use of landscape within interior courtyards, open spaces, and parking areas should be encouraged. 7. The design of parking areas and parking facilities should consider architectural consistency and physical integration with nearby buildings. 8. Open parking lots should be set back from public streets and screened using buildings, decorative walls, berms or dense landscaping. B. Mixed -Use The following principles shall be considered when siting and designing new mixed-use development. 1. Residential uses should be seamlessly integrated with nonresidential uses through pedestrian connections, landscape, and other physical connections. 2. Conflicts between different uses, such as noise, vibration, glare, odors, and similar impacts, should be minimized through careful siting, building design and incorporation of appropriate building materials. 3. Entries for residential units and nonresidential businesses should be separate and well-defined. C. Residential Uses The following principles shall be considered when new development includes residential use. Newport Airport Village 16 14-192 III. ARCHITECTURAL DESIGN CONSIDERATIONS 1. Private open space for each residential unit should be usable and functional. 2. Common residential open space should create opportunities for recreation and promote an attractive living environment. D. Office/Commercial Uses The following principles shall be considered when siting and designing new office or commercial development. 1. Building siting should be oriented around public spaces such as plazas, courtyards, walkways, and open spaces. 2. On-site landscaping should emphasize special features such as entryways. 3. Landscape and other amenities should be used to provide visual relief within surface parking lots. 4. A common signage program that reflects the architectural style and character of the development should be prepared to address tenant identification and wayfinding. 5. Common streetscape and lighting programs should be developed to promote pedestrian activity. 6. Site design should provide clear site access, entrance drives and building entries as well as minimize conflicts between service vehicles, private automobiles, and pedestrians. E. Conceptual Images to Guide Development The following images provide general direction to convey the desired quality for new development through architectural massing, detail, variety in building materials and integration of pedestrian -orientation. These images are meant to inspire designers and do not indicate the precise design of future development within Newport Airport Village. The images are grouped by land use type: mixed use, multi -unit residential buildings, and office/commercial development. Newport Airport Village 17 14-193 SOM a_ VI . � r — � �-�' T F i �' �ti•�i r #IMP I� 'l n ■■■.�■Ell r --. � ■ ,i, � I ,211 i �.�i y■ �, 1� f ��� w� �..�.:. r■■, �����■■•rte � �� III. ARCHITECTURAL DESIGN CONSIDERATIONS Figure 8 - Oficel Commercial Conceptual Images Newport Airport Village 20 14-196 IV. RESIDENTIAL DESIGN GUIDELINES IV. RESIDENTIAL DESIGN GUIDELINES The Newport Airport Village Residential Design Guidelines are intended to set parameters for the design of residential buildings and ensure an appropriate aesthetic quality is provided on all residential buildings. All residential and mixed-use buildings within Newport Airport Village PC should be generally consistent with the guidelines contained in this section of the PCDP. A. Architectural Variety 1. Buildings should utilize more than a single -color on all fagades. 2. Buildings should utilize more than a single finished material on all fagades. For the purpose of this requirement, windows are not considered a finished material. 3. Building should have more than one roof height. The change in roof height shall be at least 5 feet for buildings with a height under 30 feet tall and 10 feet for buildings with a height of 30 feet or more. 4. Buildings should not have blank fagades. For the purpose of these guidelines a blank fagade shall mean, any portion of the fagade that is above the ground level and does not have a window or balcony 15 feet in any direction. B. Windows and Entries 1. The primary pedestrian entry into the building should lead into a common lobby or corridor and shall face the street or a common open space. 2. Ground level dwelling units are encouraged to have an individual primary entry on the exterior facade of the building. 3. Rain protection should be provided above all pedestrian entries through the use of awnings, porticos, arcades, or the like. 4. Exterior windows and doors should be inset a minimum 2-% inches from the adjoining wall. C. Massing and articulation 1. The first three floors of a building should have a plane -break to divide all street facing facades into segments no more than 30 feet wide. Plane -breaks shall have a minimum depth and width of 5 feet. 2. The fourth floor and above of a building should have a plane -break on all street facing facades. Plane -breaks shall have a minimum depth of 5 feet and be across 25% of the width of the building. Newport Airport Village 21 14-197 V. PLAN ADMINISTRATION AND IMPLEMENTATION V. PLAN ADMINISTRATION AND IMPLEMENTATION A. Permit Review Procedures Approval of the Site Development Review application by the City -designated Review Authority consistent with NBMC Chapter 20.52 shall be required prior to the issuance of a grading or building permit for the construction of any new structure within the boundaries of the PCDP. The application shall include all materials necessary to clearly determine consistency with this PCDP and applicable requirements of the Newport Beach Municipal Code. The applicant shall include a descriptive narrative supported by facts, exhibits, or diagrams that clearly show how a proposed development generally conforms to the PCDP design guidelines. B. Parcel or Tract Maps No parcel or tract map shall be recorded prior to the approval of the Site Development Review for the entire project or significant phase so that the responsibility for performance of, and payment for, maintenance are clear. C. Amendments to Planned Community Development Plan Applications for amendments to this Planned Community Development Plan shall follow the process identified in the NBMC Section 20.56.050(E). D. Administrative Responsibility All property within this PCDP shall be subject to NBMC Chapter 20.60 that prescribes the authority and responsibilities of the Newport Beach City Council, Planning Commission, Hearing Officer, Zoning Administrator, and Community Development Director (Planning Director) in the administration of this PCDP and the Zoning Code. E. Enforcement All property within this PCDP shall be subject to NBMC Chapter 20.68 that establishes provisions intended to ensure compliance with this PCDP and the Zoning Code. Newport Airport Village 22 14-198 Attachment F Fiscal Impact Analysis 14-199 MEMO TO: Gregg Ramirez, Principal Planner City of Newport Beach FROM: Doug Svensson, AICP DATE: May 8, 2020 SUBJECT: Fiscal Analysis for Newport Airport Village Project INTRODUCTION The fiscal analysis uses the Newport Beach Fiscal Impact Model to help calculate revenue and cost impacts of the proposed project. This model was initially developed in support of the General Plan Update, which was adopted in 2006.1 The model has been updated to reflect Fiscal Year 2019-2020 costs and revenues from the Newport Beach City Budget. The fiscal impact model calculates public service impacts for specific land uses that support the residential population, the employment base and the visitor population in Newport Beach. It also calculates the public revenues that each type of land use typically generates for the City, including property taxes, sales taxes and other taxes as well as a variety of user charges and fees. The fiscal impact model is designed to calculate the average cost of public services required by new development, on the assumption that new development affects City services in approximately the same way that existing development does. The model nets out certain costs that are unlikely to change with expansion of City government, such as the number of City Department Directors and Division managers, as well as the City Council and City Clerk expenditures, but otherwise assumes that City administrative support and overhead tends to increase as City government activities grow to provide services to an expanding population and employment base. Over the long term, this is clearly the dynamic that local governments experience. In the short term, development projects may have lower or higher cost impacts depending on the existing capacity of City services to accommodate more 1 A technical description of the fiscal impact model may be found in: Applied Development Economics, Fiscal Impact Analysis and Model, Newport Beach General Plan Update, January 2004. 3527 Mt. Diablo Blvd. #248, Lafayette, CA 94549 ■ Tel 925.934.8712 www.adeusa.com 14-200 development, and the level of expenditure needed to expand services incrementally if existing capacity is not available. PROJECT DESCRIPTION The proposed project would convert 61,000 sq. ft. of retail commercial development potential to 444 residential units, of which 37 would be affordable to very low income households. The project is part of a 16.46 acre site in the Airport Area located on Birch Street, Campus Drive and MacArthur Blvd. Under the current General Plan, 329 of the proposed dwelling units are already included as part of a pool of 1,650 units that may be exchanged for the conversion of non-residential floor area to dwelling units. In order to calculate the fiscal effects of the proposed changes, it is necessary to estimate certain socio-economic characteristics of the land uses, including population and employment, assessed value and taxable sales. 2019 Census data indicates that the average household size in the City of Newport Beach is 2.27 persons. With 444 units planned, the total population in the project is estimated at 1,008 persons. The assessed value for the project has been derived from a review of multi -family property sales in 2019-2020 in Newport Beach, in combination with a review of Zillow rent indexes for Newport Beach over the past year. Overall rent levels in Newport Beach have increased about 6% in the past year, after several years of increases in the 2%/yr. range. For this analysis, we have estimated the property values using an income capitalization approach. The resulting property values range from $565 per sq. ft. to $740 per sq. ft. as shown in Table 1. The assessed values for affordable units are discounted from market rates based on the difference between affordable and market rate rents. The total residential assessed value in the project is estimated at $239.2 million, for an average of $538,700 per unit, including the affordable units. This approach assumes that the affordable units remain in private ownership and are counted in the tax rolls. If the units are sold to a tax-exempt non-profit or governmental organization, the total project assessed value would be reduced by $11.1 million. The analysis uses the rent levels by unit type to estimate household income and taxable retail spending, as shown in Table 2. We assume that rent comprises 30 percent of household income. We then use a retail demand model to calculate the portion of income normally spent on taxable retail sales. We have assumed for purposes of these calculations that households would spend two-thirds of their annual retail budget in Newport Beach, and the remaining one-third would be spent at retail centers in other cities or on out-of-town trips. The City receives sales tax at the rate of one percent of taxable sales. For the 61,000 sq. ft. retail commercial center, the analysis assumes 80 percent of the building space would be occupied by retail or restaurant uses and 20 percent by service commercial businesses, which may include personal care salons, repair services, fitness centers or insurance and retail estate offices. This is typical of the commercial mix in Newport Beach overall. The building space is valued at $300 per sq. ft. based on a review of similar property records and the space is estimated to generate $535 per sq. ft. in taxable sales. Applied Development Economics I Page 2 14-201 Source: ADE, Inc., based on property transactions downloaded from CoreLogic ListSource, the Zillow Rent Index for Newport Beach, and multi -family capitalization rates for Orange County provided in CBRE North America Cap Rate Survey, Second Half 2019. ESTIMATED ESTIMATED ASSESSED THE TABLE VALUES NEWPORTIN AIRPORTVILLAGE FOR THE RESIDENTIAL PROJECT UNITS INCOME @30% UNIT TYPE SIZE MKT RATE NO.OF UNITS AN/SQ.FT. AFFORDABLE NO.OF UNITS AN/SQ.FT. TOTAL UNITS TOTAL ASSESSED VALUE Studio 600 33 $650 3 $400 36 $13,590,000 1 Bdrm 750 227 $740 21 $400 248 $132,370,000 2 Bdrm 1,075 147 $565 13 $290 160 $93,238,333 Total 407 37 444 $239,198,333 Source: ADE, Inc., based on property transactions downloaded from CoreLogic ListSource, the Zillow Rent Index for Newport Beach, and multi -family capitalization rates for Orange County provided in CBRE North America Cap Rate Survey, Second Half 2019. ESTIMATED TABLE HOUSEHOLD INCOME MARKET RATE AFFORDABLE UNIT TYPE RENT LEVELS INCOME @30% SALES TAX RENT INCOME LEVELS @30% SALES TAX Studio $1,830 $73,189 $5,178 $1,121 $44,850 $288 1 Bdrm $2,366 $94,643 $46,129 $1,281 $51,250 $2,271 2 Bdrm $2,818 $112,733 $35,449 $1,441 $57,650 $1,648 Total 1 $86,757 $4,207 Source: ADE, Inc. FISCAL IMPACTS The analysis, summarized in Table 3 below, estimates the current fiscal impact of the General Plan permitted retail commercial center and compares it to the projected fiscal impact of the proposed Newport Airport Village Project. The proposed project generates much more property tax, but less than one-third of the sales tax of the planned commercial use on the site. Overall, though, the proposed residential project generates nearly double the total revenues that could be expected from the planned commercial center, at $799,500 compared to $444,300. Applied Development Economics I Page 3 14-202 PROJECTED FISCAL IMPACT OF THE NEWPORT TABLE AIRPORT VILLAGE PROJECT COMPARED TO THE PLANNED RETAIL COMMERCIAL CENTER Annual Revenues/Costs Planned Newport Budget Category Commercial Airport Village Difference REVENUES GENERAL FUND Property Tax $32,025 $418,597 $386,572 Property Tax in lieu of Sales Tax $3,232 $42,245 $39,013 Sales Tax $326,527 $90,964 ($235,563) Transient Occupancy Tax $0 $0 $0 Franchise Fees $7,191 $20,528 $13,338 Business Licenses $12,072 $7,815 ($4,258) Other Intergovernmental $2,197 $10,032 $7,835 Charges for Service $19,428 $88,703 $69,276 Fines, Penalties, and Forfeitures $4,144 $18,920 $14,776 Licenses and Permits $577 $2,636 $2,059 Use of Property $13,906 $63,493 $49,587 Other Revenue $1,080 $4,931 $3,851 Interest Income $1,843 $3,355 $1,512 SUBTOTAL GENERAL FUND $424,223 $772,220 $347,997 GAS TAX $327 $27,028 $26,701 MEASURE M $19,763 $264 $19,498 SUBTOTAL OTHER FUNDS $20,090 $27,292 $7,202 TOTAL REVENUE $444,313 $799,513 $355,200 EXPENDITURES GENERAL FUND General Government $19,048 $103,953 $84,905 Police $101,551 $331,432 $229,882 Fire $52,852 $269,117 $216,265 Public Works $50,355 $229,909 $179,554 Community Development $3,336 $15,231 $11,895 Community Services $0 $289,978 $289,978 CIP Streets $27,056 $6,500 ($20,556) Other CIP Projects $2,564 $11,704 $9,141 SUBTOTAL GENERAL FLINM 256,760 $1,257,825 $1,001,065 GAS TAX $14,240 $3,421 ($10,819) MEASURE M $19,949 $4,789 ($15,160) SUBTOTAL OTHER FUNDS $34,189 $8,210 ($25,979) TOTAL EXPENDITURES $290,949 $1,266,035 $975,086 NET COST /REVENUE $153,364 ($466,523) ($619,887 Source: ADE, Inc. Note: Totals may not add due to rounding. However, the proposed project would likely require a much higher level of services. The 2014 Land Use Element Amendment Supplemental EIR indicates that the proposed project would not create adverse impacts on City services. However, the level of service needed for residential development is typically higher than for retail commercial development. Therefore, the fiscal analysis assumes there would need to be an increase in City staff costs for most City services. Based on City service level standards as reflected in the fiscal model, police protection costs for the residential population are about three times that of the planned retail use, while fire protection and emergency services would be more than five times higher. In addition, the residential project would require parks and recreation, library and senior services provided by the City Recreation and Senior Services Department, which are Applied Development Economics I Page 4 14-203 generally not used by retail uses. The retail center does produce higher costs for streets maintenance, reflected in the Streets CIP, the gas tax and Measure M, based on assumptions in the fiscal model about relative traffic generation between residential and retail uses. Overall, City costs are about four times higher for the proposed residential project than for the planned retail use. The proposed project would generate an annual net fiscal cost to the City of about $466,500, as compared to the estimated fiscal surplus from the planned commercial of $153,400. CONCLUSION The proposed residential use of the site would require a higher level of City services than the commercial retail center and would produce a negative annual cost/revenue balance of $619,887 based upon the model. However, the General Plan contemplated the conversion of non-residential space to 1,650 dwelling units in the Airport Area. With some of this conversion capacity utilized on this site, an equivalent 61,000 sq. ft. of commercial development capacity would remain in place at other locations in the area. Overall, the 2006 General Plan increased development potential for commercial and lodging uses substantially, in addition to the new residential units it would permit. The net impact of the growth in land uses at buildout of the General Plan compared to existing land uses in 2006 when the plan was adopted, would result in a positive fiscal impact for the General Fund of $21.7 million per year.z Therefore, the incremental change requested in this project application would not significantly change the fiscal health of the City in relation to the overall fiscal benefit of the implementation of the General Plan citywide. Z Applied Development Economics, Fiscal Impact Analysis Land Use Element Amendment, April 4, 2014. p. 3. Applied Development Economics I Page 5 14-204 Attachment G Planning Commission Minute Excerpt, Dated June 4, 2020 14-205 DocuSign Envelope ID: A00069B4-09DF-4E5D-971B-827CE069F6A1 Planning Commission Minutes June 4, 2020 ITEM NO. 4. NEWPORT AIRPORT VILLAGE (PA2014-225) Site Location: 4525 MacArthur Boulevard Summary: The applications listed below would allow for the redevelopment of approximately 16.46 acres of the northerly portion of the Campus Tract to create a new mixed-use commercial and residential development. The site is located near at the corner of MacArthur Blvd. and Birch St. in the Airport Area of the City. The site is currently allowed a maximum development of 358,498 square feet of nonresidential uses by the General Plan and Zoning Code. If approved, the requested applications would reduce nonresidential uses to 297,572 square feet and accommodate up to 444 dwelling units on about a 7.14 -acre portion of the project site that is not subjected to excessive noise or within a JWA safety zone that would prohibit residential development. The applicant, requests approval of the following legislative applications from the City of Newport Beach: General Plan Amendment — To designate the site as an Anomaly on Table LU2 — Anomaly Locations of the Land Use Element to change the land use category from AO (Airport Office and Supporting uses) to MU -H2 (Mixed Use Horizontal). The proposed amendment includes no additional dwelling units beyond those currently allowed by the MU -142 land use category of the General Plan. The amendment would allow up to 329 base units that are already allowed by the General Plan and up to 115 additional dwelling units would be allowed pursuant to State density bonus law provided affordable housing units are constructed. • Zoning Code Amendment — To change the zoning district of the project site from OA (Office Airport) to PC (Newport Airport Village Planned Community). • Planned Community Development Plan — To adopt the Newport Airport Village Planned Community Development Plan (PCDP) that will include development and design regulations to allow for mixed-use development with residential dwelling units, office, retail and other commercial development and uses. • Development Agreement — Review of a proposed development agreement that would provide certain rights to develop the project consistent with the PCDP in exchange for negotiated public benefits. Recommended Action: 1. Conduct a public hearing; 2. Find that potential environmental impacts have been previously mitigated through the implementation of the policies of the General Plan as evaluated in Program Environmental Impact Report (PEIR) for the 2006 General Plan Update (SCH No. 2006011119) and the Supplemental Environmental Impact Report (SEIR) for the 2014 Land Use Element Amendment (SCH No. 2013101064); therefore, in accordance with Section 15164 of the California Environmental Quality Act (CEQA) Guidelines, an addendum to the previously adopted PEIR and SEIR is the appropriate environmental documentation for the Project; and 3. Adopt Resolution No. PC2020-020 recommending the City Council adoption of Environmental Impact Report Addendum No. ER2020-002 and approval of General Plan Amendment No. GP2014-004 (including a waiver of the neighborhood park dedication requirement pursuant to General Plan Policy LU 6.15.13), Zoning Code Amendment No. CA2014-009, Planned Community Development Plan No. PC2020-002 (including a waiver of the density standards of General Plan Policy LU 6.15.7 pursuant to Government Code §65915(e)(1), and Development Agreement No. DA2014-003 for the Newport Airport Village Planned Community Project, located at 4341, 4361, and 4501 Birch Street; 4320, 4340, 4360, 4400, 4500, 4520, 4540, 4570, 4600 and 4630 Campus Drive; and 4525, 4533, and 4647 MacArthur Boulevard (PA2014-225). Deputy Community Development Director Campbell reported the Planning Commission is not considering a proposed project but establishing the policy framework and regulations under which a future project would be 3of7 14-206 DocuSign Envelope ID: A00069B4-09DF-4E5D-971B-827CE069F6A1 Planning Commission Minutes June 4, 2020 developed at the project site. The project site is located in the Airport Area at the corner of MacArthur Boulevard and Campus Drive near John Wayne Airport. The site contains 16.46 acres and a variety of uses. The General Plan currently designates the site as Airport Office (AO). The General Plan amendment would redesignate the site as Mixed -Use Horizontal 2 (MU -H2), which allows residential uses. Charter Section 423, the Greenlight Initiative, does not require a vote of the electorate for the project because there will be no increases in square footage, housing units, or traffic beyond current General Plan provisions. The applicant seeks to rezone the site to Planned Community (PC). The applicant proposes a Development Agreement that provides vested rights to develop the project and public benefits for the community. Deputy Community Development Director Campbell further reported that the existing zoning allows a 0.5 floor area ratio (FAR) for commercial and office uses and a 0.75 FAR for warehouse uses. The current FAR would allow up to 358,000 square feet of office and commercial uses and vehicle rental facilities. PC zoning would allow commercial floor area up to 297,000 square feet and 329 dwelling units. Under the density bonus, the applicant could request up to a 35 -percent density bonus or 115 units for a total of 444 units. The Planned Community Development Plan (PCDP) provides development standards, design guidelines, and a future review process. Deputy Community Development Director Campbell further reported the MU -H2 designation is specific to the Airport Area and allows the uses existing on the site. The applicant proposes to convert 61,000 square feet of allowed uses to 329 dwelling units. The conversion of uses will be trip neutral. Density bonus units are not regulated by General Plan development limits. The General Plan amendment would add Anomaly Number 86 limiting the site to 297,572 square feet of nonresidential development and 329 dwelling units. Deputy Community Development Director Campbell further indicated the PCDP proposes housing in Planning Area 1 and redevelopment of nonresidential uses in Planning Area 2 over time. The building height limit for Planning Area 1 is 85 feet, and the Federal Aviation Administration (FAA) has indicated it will not be a threat to air navigation. The building height limit for Planning Area 2 is 37 feet, which is consistent with existing AO height regulations. The density bonus law reduces parking requirements and the parking requirements provided in the PCDP are consistent with the municipal code and state density bonus law requirements. Under the Site Development Review process provided for in the proposed PCDP, which is an existing zoning code application review process, the residential component and large office buildings would be presented to the Planning Commission for review and approval and smaller components would either require zoning administrator review or staff review. Deputy Community Development Director Campbell further stated the PCDP does not allow residential development within the 65 -dB CNEL noise contour or JWA Safety Zone 3. The Airport Land Use Commission (ALUC) reviews General Plan amendments, Code amendments, and height changes within the Airport Land Use Plan area. Parking and residential amenities would be allowed in areas within the 65 -dB CNEL noise contour or Safety Zone 3 but not units themselves. A conceptual land use map reflects the possible locations of residences, retail uses, parking, and nonresidential uses. Deputy Community Development Director Campbell further reported the applicant requests a waiver of Land Use (LU) Policy 6.15.7 regarding overall density and housing types. The 329 dwelling units plus 115 density bonus units do not comply with the density criteria of the policy. Based on constraints in the Airport Area, staff recommends waiving the policy because State law prohibits a city from applying a development standard that will physically preclude a density bonus project. LU Policy 6.15.13 requires developments in the AirportArea to provide parkland and allows the City to waive the requirement with the payment of an in -lieu fee. Locating a park outside the 65 -dB CNEL and Safety Zone 3 would reduce the number of dwelling units that could be constructed. The applicant proposes to pay an in -lieu fee, and staff recommends waiving the policy based on the constraints of the site and the location proximate to John Wayne Airport. Deputy Community Development Director Campbell indicated the Development Agreement provides a term of 15 years for residential development and 20 years for nonresidential development, a $6 million public benefit fee paid in three installments, an in -lieu fee of $2.5 million for a 1 -acre park, and a $1 million public safety fee. Deputy Community Development Director Campbell stated the City prepared an addendum to the 2006 General Plan Program Environmental Impact Report (PEIR) and 2014 Land Use Element Supplemental Environmental 4 of 7 14-207 DocuSign Envelope ID: A00069B4-09DF-4E5D-971B-827CE069F6A1 Planning Commission Minutes June 4, 2020 Impact Report (SEIR) and it identified no new impacts. Next steps include an ALUC public hearing in July and a subsequent City Council public hearing. In response to Chair Koetting's questions, Deputy Community Development Director Campbell advised that in 2007 the City Council established the value of parkland as $2.5 million per acre. Staff has negotiated the Development Agreement with the applicant, and the applicant has agreed to the terms provided in the draft attached to the staff report. In reply to Commissioner Klaustermeier's inquiries, Deputy Community Development Director Campbell indicated the payments required in the Development Agreement are in addition to statutory fees charged to a development project. The financial analysis found that servicing residential units costs the City more than servicing existing uses. Increased property taxes will largely fund those costs. The positive impact in the conclusion of the analysis comes from the build out of the General Plan causing revenues to increase more than costs. The cost to service residential projects will likely never exceed revenue because Development Agreement fees also offset costs. In answer to Vice Chair Weigand's queries, Deputy Community Development Director Campbell explained that the Regional Housing Needs Assessment (RHNA) is a planning target rather than a construction target. If the project is approved, it would be an opportunity site for the upcoming 2021-2029 Housing Element. The applicant proposes to construct 329 base units and with a 20% density bonus, and the density bonus requires 5% very low- income units, 10% low-income units, or 10% moderate -income units; these percentages are the minimum amount of affordable units that must be constructed. In response to Commissioner Ellmore's query, Deputy Community Development Director Campbell related that density bonus units will not be optional because the City will waive land use policies based on a density bonus project. As the approval is currently structured, a future project will have to contain an affordable component. In answer to Commissioner Kleiman's inquiries, Deputy Community Development Director Campbell explained that the park in -lieu payment will be deposited into a fund for the park service area; however, City Council policy allows the Council to allocate park in -lieu fees to a community -wide park. Balancing housing and environmental preservation is the general theme of residential development. New sites for housing may be proposed during public meetings for the Housing Element Update. In reply to Commissioner Rosene's questions, Deputy Community Development Director Campbell indicated when a residential project is proposed for the site, the Planning Commission will review it to ensure it complies with affordable housing requirements contained in the PCDP. Assistant City Attorney Summerhill advised that five General Plan amendments may be considered in a year. In response to Chair Koetting's queries, Deputy Community Development Director Campbell noted the ALUC has provided a letter that suggests locating residential units outside the 65 -dB CNEL and Safety Zone 3, but staff has not had any detailed discussions with the ALUC. Staff has not received any comments from the City of Irvine. John Wayne Airport submitted a letter expressing concern about traffic volumes, but staff felt traffic volumes would not result in specific impacts. Commissioner Rosene disclosed he visited the site and he had a conversation with the applicant's agent. Commissioners Kleiman, Klaustermeier, and Ellmore disclosed that they had communications with the applicant's consultant. Chair Koetting disclosed no ex parte communications. Vice Chair Weigand disclosed that he had conversations with the applicant's consultant and a member of the public. Chair Koetting opened the public hearing. Patrick Strader, applicant's representative, shared the history of the property owner's pursuit of a General Plan amendment. The constraints on the site make residential development difficult. The current project is the result of many consultations with staff and modifications of the project. In reply to Chair Koetting's inquiries, Mr. Strader advised that construction would not occur for several years. The owner of the small parcel in the area of the project site does not wish to be a part of the project. 5 of 7 14-208 DocuSign Envelope ID: A00069B4-09DF-4E5D-971B-827CE069F6A1 Planning Commission Minutes June 4, 2020 Jim Mosher was unclear whether parkland referenced in the Airport Area section of the Land Use Element is to be located in the Airport Area or the service area. No public comment period was provided for the environmental documents. He questioned whether a development project will need a vehicle miles traveled (VMT) analysis. In response to Vice Chair Weigand's questions, Mr. Strader indicated the property owner purchased the parcels at different times. A future development partner will be needed for the residential development of Planning Area 1. There are no plans to develop Planning Area 2 in the near future. In answer to Commissioner Ellmore's query, Sean Matsler, applicant representative, indicated the property owner has four leases with businesses on the site that extend to 2038, which is the reason the Development Agreement provides 20 years for nonresidential development. In reply to Commissioner Kleiman's inquiries, Mr. Strader explained that the price points and project scope for residential units will be similar to the Uptown Newport project. Mr. Matsler reported soil studies will be conducted as part of future applications for residential development. With no other speakers, Chair Koetting closed the public hearing. Motion made by Commissioner Kleiman and seconded by Commissioner Ellmore to approve the staff recommendation. AYES: Koetting, Weigand, Ellmore, Klaustermeier, Kleiman, Rosene NOES: ABSTAIN: ABSENT: Lowrey VIII. STAFF AND COMMISSIONER ITEMS ITEM NO. 5 MOTION FOR RECONSIDERATION None ITEM NO. 6 REPORT BY THE COMMUNITY DEVELOPMENT DIRECTOR OR REQUEST FOR MATTERS WHICH A PLANNING COMMISSION MEMBER WOULD LIKE PLACED ON A FUTURE AGENDA. Deputy Community Development Director Campbell reported that on May 26, 2020, the City Council adopted an Urgency Ordinance that allows the Community Development Director to issue emergency temporary use permits for use of public and private properly to allow businesses to expand to provide for physical distancing. Approximately 15 permits have been issued. He reviewed agenda items for the June and July Planning Commission meetings. In response to Chair Koetting's questions, Deputy Community Development Director Campbell indicated the Planning Commission reviewed the car wash project on Jamboree more than a year ago. He will include in the staff report information about the applicant's work with neighbors. In reply to Commissioner Kleiman's questions, Assistant City Attorney Summerhill advised that staff can schedule a comprehensive agenda item regarding the RHNA numbers in relation to the Greenlight Initiative. Deputy Community Development Director Campbell explained that Commission officer elections will occur in July. The City Council should fill vacant Planning Commission positions in the next week. ITEM NO. 7 REQUESTS FOR EXCUSED ABSENCES None X. ADJOURNMENT — 8:09 p.m. 6of7 14-209 Attachment H Planning Commission Resolution No. PC2020-20, excluding attachments 14-210 RESOLUTION NO. PC2020-020 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH, CALIFORNIA RECOMMENDING THE CITY COUNCIL ADOPTION OF ENVIRONMENTAL IMPACT REPORT ADDENDUM NO. ER2020-002 AND APPROVAL OF GENERAL PLAN AMENDMENT NO. GP2014-004, ZONING CODE AMENDMENT NO. CA2014-009, PLANNED COMMUNITY DEVELOPMENT PLAN NO. PC2020-002, AND DEVELOPMENT AGREEMENT NO. DA2014-003 FOR THE NEWPORT AIRPORT VILLAGE PLANNED COMMUNITY PROJECT LOCATED AT 4341, 4361, AND 4501 BIRCH STREET; 4320, 4340, 4360, 4400, 4500, 4520, 4540, 4570, 4600 AND 4630 CAMPUS DRIVE; AND 4525, 4533, AND 4647 MACARTHUR BOULEVARD (PA2014-225) THE PLANNING COMMISSION OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. An application was filed by Saunders Property Company ("Applicant"), with respect to property located at 4341, 4361, and 4501 Birch Street; 4320, 4340, 4360, 4400, 4500, 4520, 4540, 4570, 4600 and 4630 Campus Drive; and 4525, 4533, and 4647 MacArthur Boulevard within the northerly portion of the Campus Tract, generally bounded by Birch Street, Campus Drive, MacArthur Boulevard and the extension of Corinthian Way ("Property"). See Exhibit "A" for legal description. 2. The Applicant proposes a Planned Community Development Plan that would allow redevelopment of the 16.46 -acre Property with up to 329 residential dwelling units, exclusive of any density bonus as allowed pursuant to California Government Code Section 65915; and up to 297,572 square feet of office, retail, and commercial use ("Project"). 3. The Property is designated AO (Airport Office and Supporting Uses) by the City of Newport Beach General Plan ("General Plan") Land Use Element and is located within the OA (Office -Airport) Zoning District. 4. The Applicant, requests the following approvals from the City of Newport Beach ("City"): General Plan Amendment (GP2014-004) ("GPA") — A request to change amend the General Plan Land Use Designation of the Property from AO (Airport Office and Supporting Uses) to MU -H2 Mixed -Use Horizontal 2 and to amend Table LU2 (Anomaly Locations) to add Anomaly No. 86 to allow for the development of 329 dwelling units, exclusive of any permitted density bonus, and 297,572 square feet of commercial uses; 14-211 Planning Commission Resolution No. PC2020-020 Paae 2 of 24 • Zoning Code Amendment (CA2014-009) — A request to change the zoning district of the Property from OA (Office Airport) to PC -60 (Newport Airport Village Planned Community); • Planned Community Development Plan (PC2020-002) ("PCDP") — A request to adopt the Newport Airport Village Planned Community Development Plan ("PCDP"). The PCDP sets the development design and use standards for the Property; • Development Agreement (DA2014-003) ("DA") — A request for a Development Agreement between the Applicant and the City, which would provide vested rights to develop the planned community, while also providing negotiated public benefits; and • Addendum to the 2006 General Plan Update and the 2014 Land Use Element Amendment Environmental Impact Reports (ER2020-002) — Pursuant to the California Environmental Quality Act ("CEQA"), the addendum will address reasonably foreseeable environmental impacts resulting from the Project. 5. The Property is not located within the coastal zone; therefore, amending the Local Coastal Program or a coastal development permit is not required. 6. A study session was held on April 23, 2020, in the Council Chambers located at 100 Civic Center Drive, Newport Beach to introduce the Project to the Planning Commission. No action was taken at the study session. 7. The Planning Commission held a public hearing on June 4, 2020, in the Council Chambers at 100 Civic Center Drive, Newport Beach, California. A notice of time, place and purpose of the hearing was given in accordance with California Government Code Section 54950 et. seq. ("Ralph M. Brown Act") and Chapters 15.45 (Development Agreements) and 20.62 (Public Hearings) of the Newport Beach Municipal Code ("NBMC"). Evidence, both written and oral, was presented to, and considered by, the Planning Commission at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. On July 25, 2006, the City Council adopted Resolution No. 2006-75, thereby certifying the adequacy and completeness of the Environmental Impact Report ("EIR") for the General Plan 2006 Update (SCH No. 2006011119). The EIR was prepared in compliance with the CEQA set forth in the California Public Resources Code Section 21000 et seq. and its implementing State regulations set forth in the California Code of Regulations Title 14, Division 6, Chapter 3 ("CEQA Guidelines") and City Council Policy K-3. Additionally, in accordance with Section 15168(a) of the CEQA Guidelines, the City prepared the EIR as a Program Environmental Impact Report ("PEIR"). This PEIR analyzed the potential impacts of a citywide land use plan, and the goals and policies of 10 general plan elements. The General Plan designates the Property as AO (Airport Office and Supporting Uses). The designation would allow up to 358,498 square feet of office based on the allowable 14-212 Planning Commission Resolution No. PC2020-020 Paae 3 of 24 0.5 floor area ratio ("FAR"). The AO land use designation is intended to allow uses that support or benefit from operations of the adjoining John Wayne Airport. These may include professional offices; aviation; retail; automobile rental, sales, and service; hotels and ancillary retail, restaurant, and service uses. This designation specifies an FAR of 0.5, except for warehousing, which may be developed at an FAR of 0.75. 2. Additionally, the City Council adopted Resolution Nos. 2007-79 and 2012-62 on December 11, 2007 and July 24, 2012, respectively. These resolutions approved CEQA addendums 1 and 2 to the PEIR for the General Plan 2006 Update to analyze changes to the development intensities within the North Newport Center Planned Community (NNCPC) Development Plan. No analysis of the Property was included in these addendums. 3. On July 22, 2014, the City Council adopted Resolution 2014-65, thereby certifying the adequacy and completeness of a Supplemental EIR No. ER2014-002 (SEIR) as part of an update to the Land Use Element of the General Plan (SCH No. 2013101064). The SEIR was prepared in compliance with CEQA, CEQA Guidelines and City Council Policy K-3. The SEIR focused on a General Plan Land Use Element Amendment proposing both reduced and increased development capacities in various areas of the City. The amendment that was the focus of the SEIR designated the Property as MU -H2 (Mixed - Use Horizontal 2), among other changes to the General Plan Land Use Element. The SEIR analyzed the impacts of potential development of an additional 238,077 square feet of office space and 329 dwelling units at the Property in addition to the 358,498 commercial floor area allowed by the general plan prior to the amendment. The MU -H2 designation applies to properties located in the Airport Area. It provides for a horizontal intermixing of uses that may include regional commercial office, multifamily residential, vertical mixed- use building, industrial, hotel rooms, and ancillary neighborhood commercial uses. As a result of failing to obtain voter approval in the November 2014 general election, as required by Charter Section 423, the General Plan Land Use Element amendment was not approved or implemented; however, City Council Resolution No. 2014-65 certifying the SEIR remains valid and effective because it was not rescinded by the outcome of the vote or by action of the City Council. 4. Pursuant to Section 21166 of the California Public Resources Code and Section 15162 of the CEQA Guidelines, when an EIR has been certified for a project, no subsequent EIR is required unless the lead agency determines, on the basis of substantial evidence in the light of the whole record, one or more of the following: a. Substantial changes are proposed in the project which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; b. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or 14-213 Planning Commission Resolution No. PC2020-020 Paae 4 of 24 c. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete, shows any of the following: The project will have one or more significant effects not discussed in the previous EIR; ii. Significant effects previously examined will be substantially more severe than shown in the previous EIR; iii. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or iv. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative. 5. The Applicant is proposing to amend the General Plan Land Use Designation from Airport Office (AO) to Mixed Use Horizontal 2 (MU -H2) and to amend Table LU2 (Anomaly Locations) to add the Property as Anomaly No. 86; and rezone the Property from OA (Office Airport) to PC (Newport Airport Village Planned Community). This change will allow the construction of 329 dwelling units, exclusive of any permitted density bonus, and 297,572 square feet of commercial uses. The commercial floor area is a reduction from what the General Plan currently would allow for the Property. The dwelling units would come from the remaining portion of the 2200 units currently allocated to properties designated MU -H2 in the Airport Area by the General Plan Land Use Element and the units would not increase planned residential development in the area. Due to the similarity between the proposed project and the prior project considered in the PEIR and SEIR, an Addendum to the EIR was prepared pursuant to Section 15162 (Subsequent EIRs and Negative Declarations) and 15164 (Addendum to an EIR or Negative Declaration) of the CEQA Guidelines. 6. The following environmental topics were analyzed for the proposed Project: Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Energy, Geology and Soils, Greenhouse Gas Emissions, Hazards and Hazardous Materials, Hydrology, Land Use and Planning, Mineral Resources, Noise, Population and Housing, Public Services, recreation, Transportation, Tribal Cultural Resources and Utilities and Service Systems. The Addendum includes analysis of new topics that were not included in the previous EIRs; specifically, it includes a new energy section and a new wildfire section. These additional analyses are appropriate for inclusion in the Addendum, but none result in new or increased significant impacts that would require preparation of a subsequent EIR pursuant to Section 15162 of the CEQA Guidelines. 14-214 Planning Commission Resolution No. PC2020-020 Paae 5 of 24 7. On the basis of the entire environmental review record, the Project will not result in any new significant impacts that were not previously analyzed in the PEIR for the General Plan 2006 Update (SCH No. 2006011119) or the SEIR for the update to the Land Use Element of the General Plan (SCH No. 2013101064). The potential impacts associated with this Project would either be the same or less than those described in either the PEIR or SEIR that have been appropriately mitigated. In addition, there are no substantial changes to the circumstances under which the Project would be undertaken that would result in new or more severe environmental impacts than previously addressed in either the PEIR or SEIR, nor has any new information regarding the potential for new or more severe significant environmental impacts been identified. Therefore, in accordance with Section 15164 of the CEQA Guidelines, an addendum to the previously adopted PEIR and SEIR is the appropriate environmental document for the Project. In taking action to approve any of the requested applications for the proposed Project, the data presented in the PEIR and SEIR, as augmented by the Addendum for this Project, are considered as part of the record. 8. The Addendum to the PEIR and SEIR, is hereby recommended for adoption by the City Council given its analysis and conclusions. The Addendum to the PEIR and SEIR and all materials, which constitute the record upon which this decision was based, are on file with the Planning Division, City Hall, 100 Civic Center Drive, Newport Beach, California. 9. The Planning Commission finds that judicial challenges to the City's CEQA determinations and approvals of land use projects are costly and time consuming. In addition, project opponents often seek an award of attorneys' fees in such challenges. As project applicants are the primary beneficiaries of such approvals, it is appropriate that such applicants should bear the expense of defending against any such judicial challenge, and bear the responsibility for any costs, attorneys' fees, and damages which may be awarded to a successful challenger. SECTION 3. FINDINGS. L General Plan Amendment Amendments to the General Plan are a legislative act. Neither Title 20 (Planning and Zoning) of the Newport Beach Municipal Code, the Charter of the City of Newport Beach, nor California Government Code Section 65350 et seq. set forth any required findings for either approval or denial of amendments to the General Plan. Notwithstanding the foregoing, the proposed amendments are consistent with the General Plan for the reasons provided hereafter: The request is to amend the General Plan Land Use designation from AO (Airport Office and Supporting Services) to MU -H2 (Mixed -Use Horizontal 2). According to the General Plan, "The MU -H2 designation applies to properties located in the Airport Area. It provides for a horizontal intermixing of uses that may include regional commercial office, multifamily residential, vertical mixed-use buildings, industrial, hotel rooms, and ancillary neighborhood commercial uses." The PCDP would provide for a combination of residential development, airport supporting uses, and a variety of commercial land uses consistent with the description of the MU -H2 land use category. 14-215 Planning Commission Resolution No. PC2020-020 Paae 6 of 24 2. The GPA does not eliminate existing or future land uses to the overall detriment of the community given the site's size, location, and surrounding uses. Designating the Property to MU -H2 without the development capacity allows the Property to be developed with residential or mixed-use development consistent with other sites in the Airport Area. 3. The GPA is consistent with the following General Plan policies (additional policy analysis is included in the EIR Addendum attached hereto as Exhibit B): a. Land Use Element Policy LU 1.1 - Unique Environment: Maintain and enhance the beneficial and unique character of the different neighborhoods, business districts, and harbor that together identify Newport Beach. Locate and design development to reflect Newport Beach's topography, architectural diversity, and view sheds. The PCDP enhances the distinct, urban character of the Airport Area by providing a means for replacing parking lots and small-scale commercial structures with attractive and functional mixed-use development, in line with the General Plan goal of transitioning the Airport Area to a mixed-use community. The Property is not in or near any of the City's areas featuring the harbor, unique topography, or view sheds. The proposed project would introduce a mix of land uses, including residential units to the Property consistent with the uses and urbanized character of the JWA area and the MU -H2 designation. b. Land Use Element Policy LU 2.3 - Range of Residential Choices: Provide opportunities for the development of residential units that respond to community and regional needs in terms of density, size, location, and cost. Implement goals, policies, programs, and objectives identified within the City's Housing Element. c. LU 3.8 Project Entitlement Review with Airport Land Use Commission -. Refer the adoption or amendment of the General Plan, Zoning Code, specific plans, and Planned Community development plans for land within the John Wayne Airport planning area, as established in the JWA Airport Environs Land Use Plan (AELUP), to the Airport Land Use Commission (ALUC) for Orange County for review, as required by Section 21676 of the California Public Utilities Code. In addition, refer all development projects that include buildings with a height greater than 200 feet above ground level to the ALUC for review. The project is within the boundaries of the Airport Environs Land Use Plan (AELUP). The overseeing agency, ALUC, must review the proposed General Plan Amendment and PCDP pursuant to Government Code §65302.3 and Public Utilities Code §21676. The purpose of the review is to determine the project's consistency with the AELUP prior to the City Council taking action on the proposed project. The residential units would be limited to a 6.02 -acre portion of the 16.46 -acre project site that is subject to noise ranging between 60 dB CNEL and less than 65 dB CNEL and not located within JWA Safety Zone 3. All residential types are deemed "conditionally consistent" with nearby aircraft operations by AELUP provided sound attenuation is provided and notification of future residents and the public is posted. The PCDP 14-216 Planning Commission Resolution No. PC2020-020 Paae 7 of 24 includes regulations for sound attenuation and the posting of signs in outdoor common areas and a neighborhood park if developed. The residential portion of the project is located in JWA Safety Zone 6 and the AELUP allows residential uses in that zone. The PCDP does not introduce any new noise -sensitive uses that are inconsistent with AELUP Noise Impact Zones or compatibility qualities of the AELUP Safety Zones. Despite the project's consistency with the AELUP, the ALUC may find the project inconsistent and should they do so, approval of the project would require the Newport Beach City Council to override this determination with a two-thirds vote. The PCDP allows for multi -family residential uses, including affordable units, offering a variety of product types that can respond to market needs and diversify the City's housing stock. d. Land Use Element Policy LU 5.1.1 - Compatible but Diverse Development: Establish property development regulations for residential projects to create compatible and high-quality development that contributes to neighborhood character. The PCDP includes development standards and residential design guidelines to create a compatible and high-quality development that contributes to the emerging urban neighborhood character of the Airport Area. e. Land Use Element Policy LU 5.4.1 - Site Planning: Require that new and renovated office and retail development projects be planned to exhibit a high-quality and cohesive "campus environment, " characterized by the following: • Location of buildings around common plazas, courtyards, walkways, and open spaces, • Incorporation of extensive on-site landscaping that emphasizes special features such as entryways, • Use of landscape and open spaces to break the visual continuity of surface parking lots, • Common signage program for tenant identification and wayfinding, • Common streetscapes and lighting to promote pedestrian activity, • Readily observable site access, entrance drives and building entries and minimized conflict between service vehicles, private automobiles, and pedestrians. The development of the Planned Community will result in high quality, cohesive development based upon the PCDP regulations. Pedestrian and bicycle connections are required between the residential areas and non-residential areas, primary access to the residential buildings will face a public right-of-way or central courtyard, and signs will be reviewed to ensure compatibility with the development. f. LU 6.15.1. Land Use Districts and Neighborhoods. Provide for the development of distinct business park, commercial, and airport -serving districts and residential 14-217 Planning Commission Resolution No. PC2020-020 Paae 8 of 24 neighborhoods that are integrated to ensure a quality environment and compatible land uses. High quality, integrated development, including mixed use, residential, office, and retail uses, is addressed through the Land Use and Development Regulations (Section II), Architectural Design Considerations (Section III), and Residential Design Guidelines (Section IV) sections of the PCDP provide a comprehensive set of standards and guidelines to implement this policy. g. LU 6.15.2. Underperforming Land Uses. Promote the redevelopment of sites with underperforming retail uses located on parcels at the interior of large blocks for other uses, with retail clustered along major arterials (e.g., Bristol, Campus, MacArthur, and Jamboree), except where intended to serve and be integrated with new residential development. The PCDP facilitates the reuse of underperforming properties by allowing the addition of mixed-use and residential use. Land Use and Development Regulations (Section II), Architectural Design Considerations (Section III), and Residential Design Guidelines (Section IV) provide a comprehensive set of standards and guidelines to promote high-quality new development. h. LU 6.15.3. Airport Compatibility. Require that all development be constructed in conformance with the height restrictions set forth by Federal Aviation Administration (FAA), Federal Aviation Regulations (FAR) Part 77, and Caltrans Division of Aeronautics, and that residential development be located outside of the 65 dBA CNEL noise contour specified by the 1985 JWA Master Plan. The Project would be constructed in conformance with the FAA's height restrictions, and all residential development would be located outside the 65 dBA CNEL noise contour and outside the boundaries of Safety Zone 3 where high density residential development is not allowed. The Applicant has received a determination of no hazard to aviation with development up to 85 feet in height from the FAA. LU 6.15.4 Priority Uses. Accommodate office, research and development, and similar uses that support the primary office and business park functions such as retail and financial services, as prescribed for the "CO -G" designation, while allowing for the re -use of properties for the development of cohesive residential villages that are integrated with business park uses. Office and commercial uses would be compatible with residential uses in accordance with the Land Use and Development Regulations (Section II) and Architectural Design Considerations (Section III) of the PCDP. Residential uses would support local retail, restaurants, and services. The PCDP design and connectivity requirements would integrate residential and non-residential uses and ensure adequate circulation and parking within the PC District. 14-218 Planning Commission Resolution No. PC2020-020 Paae 9 of 24 j. LU 6.15.5 Residential and Supporting Uses. Accommodate the development of a maximum of 2,200 multi -family residential units, including work force housing, and mixed-use buildings that integrate residential with ground level office or retail uses, along with supporting retail, grocery stores, and parklands. Residential units may be developed only as the replacement of underlying permitted nonresidential uses. When a development phase includes a mix of residential and nonresidential uses or replaces existing industrial uses, the number of peak hour trips generated by cumulative development of the site shall not exceed the number of trips that would result from development of the underlying permitted nonresidential uses. However, a maximum of 550 units may be developed as infill on surface parking lots or areas not used as occupiable buildings on properties within the Conceptual Development Plan Area depicted on Figure LU22 provided that the parking is replaced on site. The GPA and PCDP provides development capacity and standards for mixed-use development. The proposed development limit is 329 dwelling units (plus up 115 density bonus when affordable housing is provided) and 297,572 square feet for commercial development. The Property is not located within the Conceptual Development Plan Area depicted on Figure LU22, and therefore, any residential units allocated to the site are not any portion of the 550 infill units allocated to the Conceptual Development Plan Area As described in Chapter 3 of the Addendum, the Project's residential uses would replace some of the permitted underlying commercial development capacity. Specifically, the 329 units would replace 60,926 square feet of permitted retail commercial uses using the City -approved Airport Area Residential and Mixed -Use Adjustment factors prepared by the City Traffic Engineer to ensure that the number of peak hour trips generated by the redevelopment of the Property would not exceed the number of trips attributable to the existing permitted non-residential uses. Any density bonus units, up to 115 units in this case are above and beyond what the General Plan allocates in accordance with Chapter 20.32 (Density Bonus) of the Newport Beach Municipal Code and State law. Two (2) projects have been approved within the Airport Area to date. Uptown Newport was approved for 632 replacement units, 290 additive units, and with a density bonus of 322 units for a total of 1,244 residential units. Newport Crossings was approved for 259 replacement units and 91 density bonus units. Therefore, the total remaining number of replacement units is 759 units and the 329 units requested by the applicant would not exceed the remaining units to be allocated pursuant to this policy. If approved, 430 replacement dwelling units would be available for other MU -H2 (Mixed -Use Horizontal 2) designated properties in the Airport Area. k. LU 6.15.6. Size of Residential Villages. Allow development of mixed-use residential villages, each containing a minimum of 10 acres and centered on a neighborhood park and other amenities (as conceptually illustrated in Figure LU23). The first phase of residential development in each village shall encompass at least 5 gross acres of land, exclusive of existing rights-of-way. This acreage may include multiple parcels provided that they are contiguous or face one another across an existing street. At the discretion of the City, this acreage may also include part of a contiguous property in a different land use category, if the City finds that a sufficient portion of the 14-219 Planning Commission Resolution No. PC2020-020 Paae 10 of 24 contiguous property is used to provide functionally proximate parking, open space, or other amenity. The "Conceptual Development Plan" area shown on Figure LU22 shall be exempt from the 5 -acre minimum, but a conceptual development plan described in Policy LU 6.15. 11 shall be required. The Property is 16.46 acres in total area and does not include a centered public park. The Property is not identified on Figure LU22 or Figure LU23. The first phase, Planning Area 1, allows residential and mixed-use development is 7.14 acres and would be developed in one phase. The remaining area would be developed in subsequent phases after existing commercial leases expire. The Applicant requests the City Council waive the park dedication requirement pursuant to Policy LU 6.15.13 and instead, pay the park in -lieu fee. If the City Council waives the dedication requirement, the proposed project is consistent with this policy. 1. LU 6.15.7. Overall Density and Housing Types. Require that residential units be developed at a minimum density of 30 units and maximum of 50 units per net acre averaged over the total area of each residential village. Net acreage shall be exclusive of existing and new rights-of-way, public pedestrian ways, and neighborhood parks. Within these densities, provide for the development of a mix of building types ranging from townhomes to high-rises to accommodate a variety of household types and incomes and to promote a diversity of building masses and scales. The residential component of the Project is 329 units (without density bonus units) within the 16.46 -acre residential village and the density is about 20 du/ac and below the minimum 30 du/ac standard. If the density bonus units were included, the result would be about 27 du/ac. To comply, additional units would need to be included and required to be replacement units pursuant to Policy LU 6.15.5, meaning the additional units would come at the expense of underlying permitted non-residential uses. The 16.46 -acre Property is partially constrained by the JWA 65 dBA CNEL noise contour and all residential use is inconsistent in this high noise area. The Property is also partially constrained by JWA Safety Zones 3 that limits residential uses to very low densities if not deemed unacceptable because of noise. Planning Area 1 is 7.14 acres and the area outside both the 65 dBA CNEL noise contour and Safety Zone 3 where residential use would be allowed consistent with the Airport Environs Land Use Plan for JWA is further limited to 6.02 acres. To comply with the Policy LU 6.15.7, 493 units would need to be constructed on 6.02 acres resulting in a density of 81.9 du/ac units per acre without including potential density bonus units which would exceed the maximum allowable density. However, California Government Code Section 65915(e)(1) prohibits a City from applying a development standard that will have the effect of physically precluding the construction of a development for projects that propose a density bonus. Waiver of height standards, number of stories and setbacks to accommodate project amenities such as an interior courtyard, community plaza and high ceilings have been interpreted as physical constraints that warrant waiver under Section 65915(e)(1). Wollmer v. City of Berkeley, (2011) 193 Cal. App. 4th 1329. With the waiver of LU 6.15.7 pursuant to Government Code §65915(e)(1), the 30-50 du/acre over the total area of each 14-220 Planning Commission Resolution No. PC2020-020 Paae 11 of 24 residential village would not be required. However, the Project would create a 46 du/acre development not including the density bonus units in Planning Area 1 which is within the density range of the Policy LU 6.15.7. m.LU 6.15.8. First Phase Development Density. Require a residential density of 45 to 50 units per net acre, averaged over the first phase for each residential village. This shall be applied to 100 percent of properties in the first phase development area whether developed exclusively for residential or integrating service commercial horizontally on the site or vertically within a mixed-use building. On individual sites, housing development may exceed or be below this density to encourage a mix of housing types, provided that the average density for the area encompassed by the first phase is achieved. The PCDP is divided into two (2) planning areas. Planning Area 1 allows residential and mixed-use development and is 7.14 acres. Three hundred twenty-nine dwelling units constructed over 7.14 acres results in a density of 46 du/acre which is consistent with LU 6.15.8. Planning Area 2 allows commercial development only and is 9.32 acres. n. LU 6.15.9 Subsequent Phase Development Location and Density. Subsequent phases of residential development shall abut the first phase or shall face the first phase across a street. The minimum density of residential development (including residential mixed-use development) shall be 30 units per net acre and shall not exceed the maximum of 50 units per net acre averaged over the development phase. The residential component of the PCDP in Planning Area 1 would be developed in one phase and checked for consistency with this requirement. Planning Area 2 only includes non-residential development. Therefore, there would be no subsequent phases of residential development. o. LU 6.15.12. Development Agreements. A Development Agreement shall be required for all projects that include infill residential units. The Development Agreement shall define the improvements and public benefits to be provided by the developer in exchange for the City's commitment for the number, density, and location of the housing units. The proposed project includes a development agreement which will be implemented through the PCDP. p. LU 6.15.13 Neighborhood Parks Standards. To provide a focus and identity for the entire neighborhood and to serve the daily recreational and commercial needs of the community within easy walking distance of homes, require dedication and improvement of at least 8 percent of the gross land area (exclusive of existing rights- of-way) of the first phase development in each neighborhood, or % acre, whichever is greater, as a neighborhood park. This requirement may be waived by the City where it can be demonstrated that the development parcels are too small to feasibly accommodate the park or inappropriately located to serve the needs of local 14-221 Planning Commission Resolution No. PC2020-020 Paae 12 of 24 residents, and when an in -lieu fee is paid to the City for the acquisition and improvement of other properties as parklands to serve the Airport Area. In every case, the neighborhood park shall be at least 8 percent of the total Residential Village Area or one acre in area, whichever is greater, and shall have a minimum dimension of 150 feet. Park acreage shall be exclusive of existing or new rights-of-way, development sites, or setback areas. A neighborhood park shall satisfy some or all of the requirements of the Park Dedication Ordinance, as prescribed by the Recreation Element of the General Plan. No park is proposed, and the Applicant asks the City Council to waive the requirement. The Applicant believes the location proximate to John Wayne Airport is inappropriate to serve the needs of the area and they have agreed to pay an in -lieu fee consistent with this policy. A significant portion of the Property is impacted by high noise levels and within JWA Safety Zone 3 and locating a park in such areas may not be appropriate or desirable. Additionally, predominant uses in Planning Area 2 are vehicle storage lots for car rental agencies operating with long-term leases. Air quality in the area and the limited residential density planned for the Airport Area are also factors suggesting a new public park within the Property may not be desirable. If the park dedication was required, the best potential location would be within Planning Area 1 outside the 65 dBA noise contour and JWA Safety Zone 3 further reducing the available land for residential or mixed-use development. In this scenario, a 1 -acre dedication of 6.02 acres of relatively unconstrained land is a significant percentage of the area potentially available for residential use. If the dedication were required in conjunction with the first phase density bonus development, the cost of the dedication could render the density bonus financially infeasible. These or other potential factors could provide sufficient grounds for the City Council to waive the dedication requirement. If the City Council chooses not to waive the parkland dedication requirement, development of the future park would be required in accordance with this policy. With either outcome the City Council chooses, neighborhood park dedication or waiver, the Project is consistent with LU 6.15.13. q. LU 6.15.14 Location. Require that each neighborhood park is clearly public in character and is accessible to all residents of the neighborhood. Each park shall be surrounded by public streets on at least two sides (preferably with on -street parking to serve the park), and shall be linked to residential uses in its respective neighborhood by streets or pedestrian ways. No public park is proposed, and the Applicant askes the City Council to waive the neighborhood park dedication requirement pursuant to Policy 6.15.13 and, instead, pay an in -lieu fee. If the City Council acts to waive the park dedication, this policy would not apply. If the City Council chooses not to waive the parkland dedication, development of the future park would be posted as a public park in accordance with this policy. 14-222 Planning Commission Resolution No. PC2020-020 Paae 13 of 24 r. LU 6.15.15. Aircraft Notification. Require that all neighborhood parks be posted with a notification to users regarding proximity to John Wayne Airport and aircraft overflight and noise. The Project would comply with notification requirements related to aircraft overflight and noise if parks are developed. s. LU 6.15.16 On -Site Recreation and Open Space Standards. Require developers of multi -family residential developments on parcels 8 acres or larger to provide on-site recreational amenities. For these developments, 44 square feet of on-site recreational amenities shall be provided for each dwelling unit in addition to the requirements under the City's Park Dedication Ordinance and in accordance with the Parks and Recreation Element of the General Plan. On-site recreational amenities can consist of public urban plazas or squares where there is the capability for recreation and outdoor activity. These recreational amenities may also include swimming pools, exercise facilities, tennis courts, and basketball courts. Where there is insufficient land to provide on-site recreational amenities, the developer shall be required to pay cash in -lieu that would be used to develop or upgrade nearby recreation facilities to offset user demand as defined in the City's Park Dedication Fee Ordinance. The acreage of on-site open space developed with residential projects may be credited against the parkland dedication requirements where it is accessible to the public during daylight hours, visible from public rights-of-way, and is of sufficient size to accommodate recreational use by the public. However, the credit for the provision of on-site open space shall not exceed 30 percent of the parkland dedication requirements. Section II of the PCDP requires 75 square feet of common open space per dwelling unit in a future residential or mixed-use project and it exceeds the minimum standard. Separate from the City's park dedication and/or in -lieu requirement under the General Plan, Chapter 19.52 (Park Dedications and Fees) of the NBMC also require park dedication and/or in -lieu fees in accordance with California Government Code Section 66477 et seq. also referred to as the Quimby Act. However, Chapter 19.52 only applies to subdivisions or condominiums. While the Applicant plans the construction of apartments that would not generate a park dedication requirement, condominium development would be allowed by the PCDP. Should a condominium project be proposed, it would be subject to NBMC Chapter 19.52. Should a future residential development include publicly accessible open space that meets the policy criteria, the Applicant could request a credit toward parkland dedication requirements (if any). Please refer to the discussion of Policy LU 6.15.13 for additional analysis regarding park dedication requirements. t. LU 6.15.17 Street and Pedestrian Grid. Create a pattern of streets and pedestrian ways that breaks up large blocks, improves connections between neighborhoods and community amenities, and is scaled to the predominantly residential character of the neighborhoods. 14-223 Planning Commission Resolution No. PC2020-020 Paae 14 of 24 Any new streets and pedestrian ways in the PC District would be designed to break up large blocks, improve connections and links between uses and be scaled to the residential component of the PC District in Planning Area 1, as described in the Land Use and Development Regulations (Section II) and Architectural Design Considerations (Section III), of the PCDP. The City would confirm compliance during future Site Development Review process. u. LU 6.15.21 Required Spaces for Primary Uses. Consider revised parking requirements that reflect the mix of uses in the neighborhoods and overall Airport Area, as well as the availability of on -street parking. Future development will be required to comply with City of Newport Beach Municipal Code parking requirements, including Section 20.32.040 of the Newport Beach Municipal Code for a density bonus project. The City will confirm compliance with these standards during Site Development Review. 4. City Council Policy A-18 requires that proposed GPAs be reviewed to determine if a vote of the electorate would be required pursuant to Section 423 of the City Charter. If a GPA (separately or cumulatively with other GPAs within the previous ten (10) years) generates more than one hundred (100) peak hour trips (a.m. or p.m.), adds forty thousand (40,000) square feet of nonresidential floor area, or adds more than one hundred (100) dwelling units in a statistical area, a vote of the electorate would be required if the City Council approves the GPA. a. The Property is located in Statistical Area L4. The GPA would change the land use designation only and not result in an increase in development. The 329 dwelling units requested are already included in the MU -H2 development capacity of 2,200 dwelling units and no increase in allowed floor area is proposed. Consequently, there is no increase in a.m. or p.m. peak hour trips pursuant to the Institute of Transportation Engineers ("ITE") trip rates included as Exhibit B of City Council Policy A-18. As a result, the amendment is not classified as a major amendment requiring a vote of the electorate should the City Council choose to approve the GPA. 5. Pursuant to California Government Code Section 65352.3 (SB18), a local government is required to contact the appropriate tribes identified by the Native American Heritage Commission ("NAHC") each time it considers a proposal to adopt or amend the General Plan. If requested by any tribe, the local government must consult for the purpose of preserving or mitigating impacts to cultural resources. The City received comments from the NAHC indicating that four (4) tribal contacts should be provided notice regarding the GPA. The tribal contacts were provided notice on April 29, 2020. California Government Code Section 65352.3 requires notification 90 days prior to Council action to allow tribal contacts to respond to the request to consult. The City was not contacted by any tribal contacts to date. SB 18 requires tribal consultation to be closed prior to the approval of the general plan amendment. Accordingly, consultation must be closed prior to City Council action on the GPA. 14-224 Planning Commission Resolution No. PC2020-020 Paae 15 of 24 H. Zoning Code Amendment and Planned Community Development Plan Amendments to Title 20 (Planning and Zoning) of the NBMC are legislative acts. Neither Chapters 20.66 (Amendments) and 20.56 (Planned Community Development District Procedures) of Title 20 (Planning and Zoning) of the Newport Beach Municipal Code, the Charter of the City of Newport Beach, nor Article 2 (Adoption of Regulations) of Chapter 4 (Zoning Regulations) of Division 1 (Planning and Zoning) of Title 7 (Planning and Land Use) of the California Government Code set forth any required findings for either approval or denial of amendments to the Municipal Code. Nevertheless, rezoning the Property to PC -60 is consistent with the purpose of Planned Community Districts as specified in NBMC Section 20.56.010 for the following reasons: PC -60 provides for the classification and development of 16.46 acres developed land. Permitted and conditionally permitted uses include residential, commercial, and airport supporting uses have been classified. Furthermore, development and use standards have been included in the PC to ensure future use of the Property does not impact the surrounding area. 2. In order to allow the diversification of uses, the PC -60 provides two planning areas; Planning Area 1 allows residential and mixed-use development, while Planning Area 2 allows nonresidential development. This allows future development of the PC to be consistent with the goals and policies of the MU -H2 land use designation horizontal mixed-use standards. To ensure the two planning areas relate to each other and can be integrated, the PC -60 requires internal pedestrian and bicycle connection. 3. The future development of the Property affected by the proposed amendments will be consistent with the goals and policies of the Land Use Element of the General Plan; and will be consistent with the purpose and intent of the PC -60 Development Plan. 111. Development Agreement Development Agreement No. DA2014-003 satisfies the requirements of Chapter 15.45 (Development Agreements) of the NBMC as provided hereafter: A development agreement is requested by the Applicant, as the Project would add more than 50 dwelling units within Statistical Area L4 (Airport Area). The development agreement includes all the mandatory elements including a term of 15 years for the residential portion of the proposed project and 20 years for the commercial portion and public benefits that are appropriate to support conveying the vested development rights consistent with the General Plan, NBMC, and Government Code Sections 65864 et seq. 2. Public benefits include the payment of a $1,000,000 public safety fee to satisfy any obligation the Project could have to provide new emergency response services or Fire Department equipment to serve the Airport Area whether a Community Facilities District is formed or not. The applicant has also agreed to pay a separate public benefit fee to be used by the City Council as it deems appropriate. 14-225 Planning Commission Resolution No. PC2020-020 Paae 16 of 24 SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: The Planning Commission of the City hereby recommends the City Council of the City adopt Environmental Impact Report Addendum No. ER2020-002 to the 2006 General Plan Update (SCH No. 2006011119) and the 2014 Land Use Element Amendment (SCH No. 2013101064) Environmental Impact Reports, as depicted in Exhibit "B." 2. The Planning Commission of the City hereby recommends the City Council of the City approve General Plan Amendment No. GP2014-004 as depicted in Exhibit "C," to change the Land Use Designation of the Property from AO (Airport Office and Supporting Uses) to MU -H2 (Mixed -Use Horizontal 2 and to amend Table LU2 (Anomaly Locations) to add a portion of the Property as an anomaly to allow for the development of 329 dwelling units, exclusive of any permitted density bonus. 3. The Planning Commission hereby recommends the granting of a waiver of the neighborhood park dedication requirement pursuant to General Plan Policy LU 6.15.13 as a public park within the project site would be inappropriately located due to the proximity with John Wayne Airport. 4. The Planning Commission of the City hereby recommends the City Council of the City approve Zoning Code Amendment No. CA2014-009, to rezone the Property from OA (Office Airport) to PC -60 (Newport Airport Village Planned Community), as depicted in Exhibit "D." 5. The Planning Commission of the City hereby recommends the City Council of the City approve Planned Community Development Plan No. PC2020-002 (Zoning) as depicted in Exhibit "E" to set the permitted uses, development standards, and design guidelines for the Property. 6. The Planning Commission hereby recommends the granting of a waiver of the density standards provided in General Plan Policy LU 6.15.7 pursuant to Government Code §65915(e)(1) as it would make a density bonus project infeasible. 7. The Planning Commission of the City hereby recommends the City Council of the City approve Development Agreement No. DA2014-003, as set forth in Exhibit "F." 14-226 Planning Commission Resolution No. PC2020-020 Page 17 of 24 PASSED, APPROVED, AND ADOPTED THIS 4th DAY OF JUNE, 2020. AYES: Ellmore, Klaustermeier, Kleiman, Koetting, Rosene, and Weigand NOES: ABSENT: Lowrey Pet((d Koettint, Chai Lee Lowrey, Secretary 14-227 Attachment I ALUC Staff Report, Dated July 16, 2020 14-211 AIRPORT LAND USE COMMISSION A7u, FOR ORANGE COUNTY 3160 Airway Avenue Costa Mesa, CA 92626 (949) 252-5170 Fax (949) 252-6012 AGENDA ITEM 2 July 16, 2020 TO: Commissioners. -Alternates FROM: Lea U. Choum, Executive Officer SUBJECT: Administrative Status Report The following attachments are for your review and information: • JWA Statistics for May 2020 • Notice of Intent from the City of Santa Ana to Overrule the Determination of Inconsk;tench for the Bowery Mixed -Use Development • Referral package confirmation letter for the City of Newport Beach - Newport Airport Village Project • Determination Letter for the Cite of Costa Mesa - One 111ctro West Mixed -Use Project Respectfull) submitted, Lea U. C}ioL1111 ExecutiVC Officer 14-212 Jonn Wayne Airport Yosts May 2UZU !�tatlshcs j John Wayne Airport, Orange County (SN... Page 1 of 2 2 D H r ?e` A Y H E A I R P O R T { R A N G E C • ,i ' June 23, 2020 John Wayne Airport Posts May 2020 Statistics SANTA ANA, Calif. - Airline passenger traffc at John Wayne Airport decreased in May 2020 as compared with May 2019. In May 2020, the Airport served 82,342 passengers a decrease of 91.3x€ when compared with the May 2019 passenger traffic count of 942.680 Commercial aircraft operations decreased 78 0% and commuter aircraft operations decreased 73.2% when compared with May 2019 levels. Total aircraft operations decreased in May 2020 as compared w.th the same month in 2019 1n May 2020 there were 17,352 total aircraft operations ;take -offs and landings) a 34 5% decrease compared to 26.509 total aircraft operations in May 2019 General aviation activity, which accounted for 88 75i. of the total aircraft operations during May 2020, decreased 14 5% when compared with May 2019 The top three a runes in May 2020 based on passenger count were Southwest Airlines (33 828J, American Ail nes 1; 6) and Alaska Airlines (8,798). https: www.ocair.com/newsroom/news `?nr--nr-2020-06-23&tr=no 7/812020 14-213 John Wayne Airport Posts May 2020 Statistics John Wayne Airport, Orange County (SN... Page 2 of 2 John Wayne Airport Monthly Airport Statistics May 2020 John Wayne Airpor, SNA) is owned by the County4vf Orange and i, operated as a self-supporting enterprise that rece»es:-.c general fund tax revenue. The Airport serves more than V0 mdGon passengers annual'y and rea-. hes more than 20 stop destinali :ns in The United States Ca..ada and Mex.co. Afore tnformatron can t;r foti'id at tike us on ,r falle.: us on _ and To receive John Wayne Airport news releases automatically go to ,:','r_tocair corn and click ;;..:., scr b_e. https: www.ocair.com/newsroom. news ?nr—nr-2020-06-23&tr=no 7 8.202014-214 May 2020 May 2019 •/ Change Year -To -Date 2020 Year -To -Date 2019 % Change Tota' passengers 82,342 942,680 -91.3% 2,016,528 4,374,150 -53.9% Enplaned passengers 4'.165 469,225 -91,2% 1,009 305 2,185,392 -53.8% Deplaned passengers 41.177 473,455 -91.3% 1,007,223 2,188,758 -54.0% Total Aircraft Operations 17,352 26.509 -34.51A 89,554 123,708 -27.6% General Aviation 15 392 18,000 -14.5% 65,258 83,771 -22,1% Commercial 1742 7,926 -78.0% 22,091 37,518 -41.1% Commuter' 134 500 -73.2% 1,940 2,059 -5.8% Military 84 83 1.2% 265 360 -26.4% Air Cargo Tons' 1.261 1 452 -13-2% 7,253 7 742 -6.3% International Statistics (included ,n totals above) May 2020 May 2019 % Change Year -To -Date 2020 Year -To -Date 2019 % Change Total Passengers 0 19.663 -100.0% 17,246 81,554 -789% Enplaned passengers 0 10.014 -100.0% 8,703 41,306 -78 j% Deplaned passengers 0 9 649 -100-0% 8,543 40,248 -78,8% Total Aircraft Operations I 0 186 -100.0% 172 825 -792% Aircraft used for regularly scheduled air service configured with not more than seventy (70) seats, and operating at weights not more than ninety thousand (90 000) pounds All -Cargo Carriers 1,205 tons Passenger Carriers (incidental belly cargo;: 56 tons (Current cargo tonnage figures in this report are for Aprit 2020) Includes all Canada and Mexico Commercial passengers and operations John Wayne Airpor, SNA) is owned by the County4vf Orange and i, operated as a self-supporting enterprise that rece»es:-.c general fund tax revenue. The Airport serves more than V0 mdGon passengers annual'y and rea-. hes more than 20 stop destinali :ns in The United States Ca..ada and Mex.co. Afore tnformatron can t;r foti'id at tike us on ,r falle.: us on _ and To receive John Wayne Airport news releases automatically go to ,:','r_tocair corn and click ;;..:., scr b_e. https: www.ocair.com/newsroom. news ?nr—nr-2020-06-23&tr=no 7 8.202014-214 MAYOR Miguel A. Pulldo MAYOR PRO TEM Juan Viltegas COUNCILMEMBERS Phil Bacerra Nelida Mendoza David Penaloza Vicente Sarmiento J o -se Solorio June 30, 2020 CITY OF SANTA ANA Planning and Building Agency 20 Civic Center Raza • P O Sox 1988 Santa Ana. California 92702 WvAV.santa-ana.orq/pba Lea U. Choum, Executive Officer Orange County Airport Land Use Commission 3160 Airway Avenue Costa Mesa, CA 92626 CITY MANAGER Kristine Ridge CITY ATTORNEY Sonia R. Carvalho CLERK OF THE COUNCIL Da sy Gomez via email of lchoum@ocair.com RE: NOTICE OF INTENT TO OVERRULE THE DETERMINATION OF INCONSISTENCY FOR THE BOWERY MIXED-USE DEVELOPMENT PROJECT PROPOSED AT 2300, 2310 AND 2320 SOUTH REDHILL AVENUE The purpose of this letter is to inform you of the City of Santa Ana's intention to recommend that the Santa Ana City Council adopt the attached findings to overrule the May 21, 2020 Airport Land Use Commission's (ALUC) determination of inconsistency for The Bowery Mixed -Use Development project proposed at 2300, 2310 and 2320 South Redhill Avenue The project consists of a mixed-use commercial and residential community that would contain up to 1,100 residential units, 80,000 square feet of leasable commercial area, landscaping, onsite amenities for the public and the community's residents, and parking. On June 16, 2020, the Santa Ana City Council met and (1) approved the issuance of a Notice of Intent to overrule and (2) determined to give notice to the ALUC of its decision to overrule as required by California Public Utilities Code (PUC) Section 21676(b). Pursuant to PUC Section 21676, the City hereby respectfully gives proper notice of its intention to overrule and submitted the attached findings (attached hereto as Exhibit A) for review. PUC Section 21676(b) requires that a public agency making a decision to overrule shall give notice to the California Department of Transportation (Caltrans), Aeronautics Division, and the ALUC at least 45 days prior to the final decision to overrule. After this notification, the ALUC and Caltrans have 30 days from the receipt of this notice to provide advisory comments to the City. SANTA ANA CITY COUNCIL bl.guc A Pvkm lean negas Vr:arle iarmremo '3aaq Penalo2 lase safo� Ph) Bacerra Ne da 1,%ncon AUyor 4%vy r Pro FSM N3 d 'r 1.1d I ward Z .vara 'Nara l bard 6 'r70e. �iCCd- I-anaar[ii�!�IeaTS.�Si_n_[a3na.4_rq '.Sarmienl aswla-43.ar7 gQanalaFaSsama-ana.ora nta an air q�jS�R�.FL5j�j3-dnd 9r_q nn �oTa h)san -dna-dra 14-215 City of Santa Ana Notice of Intent to Overrule & Findings June 30, 2020 Page 2 of 2 This letter shall commence the 45 -day notification period, with the City looking forward to receiving comments within 30 days hereof. The Bowery Mixed -Use Development project has been tentatively scheduled for its City Council public hearing on Tuesday, August 18, 2020. Thank you for your prompt attention on this matter. Should you have any questions regarding this notice and/or on the proposed project, please feel free to contact me by phone at (714) 667-2713 or by email at VFregoso@a santa-ana.org, Sincerely, Vince Fregoso ,A(CP/ Planning M97ger C: Minh Thai, Executive Director of Planning & Building Agency Lisa Storck, Assistant City Attorney Ali Pezeshkpour, Senior Planner Jerry Guevara, Assistant Planner I Exhibit A: Draft Resolution with Supporti . - Findings to Overrule ALUC's Determination 14-216 RESOLUTION NO.2020-xx A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA ANA OVERRULING THE ORANGE COUNTY AIRPORT LAND USE COMMISSION'S DETERMINATION OF INCONSISTENCY FOR THE BOWERY MIXED-USE DEVELOPMENT PROJECT LOCATED 2300, 2310 AND 2320 SOUTH REDHILL WITH THE AIRPORT ENVIRONS LAND USE PLAN FOR JOHN WAYNE AIRPORT, INCLUDING SUPPORTIVE FINDING BE IT RESOLVED BY THE CITY CO FOLLOWS: A Section 1. The City Council of and declares as follows: WHEREAS, Article 5 of 10 Section 65300) of the Governm comprehensive, long-term general WHEREAS, Element of the Gell to di Proif Ana, to develop T -M 14.69 -acre site ("Project Site"); TY OF SANTA ANA AS finds, determines 7 {commencing with prepare and adopt mt of the City; and a fia adopted the Land Use from time to time; and Arrimus Capital ("Applicant"), seeks and Residential Project (`'proposed 2320 South Redhill Avenue in Santa Inicpresenting Arrimus Capital ("Applicant"), seeks Use evelopment Project ("proposed Project"), on a nd 2320 South Redhill Avenue in Santa Ana, California WHEREAS, the eject as currently proposed entails, among other things, (1) demolition of the existing three (3) structures on the Project Site; (2) redevelopment of the Project Site with a commercial and residential mixed-use development consisting of up to 60,000 square feet leasable commercial area, 1,100 residential units, 2,600 onsite parking spaces, and onsite landscaping and amenities; (3) approval of General Plan Amendment (GPA) No. 2020-02, which would change the Project Site's existing land use designation of Professional & Administration Office (PAO) to District Center (DC); and (4) approval of Amendment Application (AA) No. 2020-01, which would change the zoning of the Project Site from Light Industrial (M-1) to Specific Development No. 96 (SD -96) designation; and Resolution No. 2020-xx Page 9 of 13 14-217 WHEREAS, the requested General Plan Amendment would change the General Plan land use designation of the property from Professional and Administrative Office (PAO) to District Center (DC) and to update text portions of the Citys Land Use Element to reflect this change in order to allow for development of the mixed-use commercial and residential Project; and WHEREAS, California Public Utilities Code (PUC) Section 21676(b) requires the City of Santa Ana to refer projects requiring a general pian amendment or a zone change to the Orange County Airport Land Use Commission (ALUC) for consistency with the 2008 John Wayne Airport (JWA) Environs Lanid M Plan (AELUP); and WHEREAS, the ALUC is charged with guidelines for compatible development in the of the County of Orange. PUC Section 216 the AELUP as: (1) "... to promote the . airport noise standards adopted pursuan of new noise and safety problems" and welfare by ensuring the orderly expansion measures that minimize the pu exposun within areas around public airp , e E devoted to incompatible uses;" an WHEREAS, Inconsistent with t pursuant to AES sections empower in the vicini f e airports 'tam UK U state, •Cion, trans -F and of an AELUP, establishing rport within the jurisdiction \-revent al purpose of he California the creation , safety, and ofland use afety hazards sets forth goals and o Section 21669 e ` .. to omtect these areas are not already and 1 proposed project to be AL C's findings were made and Section 216749(a). These cies in ensuring compatible land uses that the land in the vicinity of those as," and "to coordinate planning at the e for the orderly development of air the public, health, safety and welfare," WHE , pursuari G . PUC—Section 21676(b), the City may, after a public hearing, propos verr lie commission by a two-thirds vote of its governing body if it makes specificfWC, gs t the proposed action is consistent with the purposes of Article 3.5 Airport Commission of the PUC. At least 45 days prior to the decision to overrule ththe local agency governing body shall provide the ALUC and the State Division of Aeronautics a copy of the proposed decision and findings. The commission and the Division of Aeronautics may provide comments to the local agency governing body within 30 days of receiving the proposed decision and findings. If the ALUC and State Division of Aeronautics comments are not available within this time limit, the local agency governing body may act without them. Should comments be received, the City Council must include the comments from the ALUC in the public record of any final decision to overrule the ALUC. This decision shall be determined at a public hearing to make the specific findings that the proposed overruling is consistent with the purposes stated in PUC Section 21670. Resolution No. 2020-xx Page 2 of 13 14-218 WHEREAS, on June 16, 2020, the City Council of the City of Santa Ana adopted a resolution (Resolution No. 2020-051) authorizing the Planning Division to initiate the preparation and drafting of findings and determination overruling the Orange County ALUC's determination of inconsistency associated with the proposed Bowery Mixed - Use Development and to provide notice in accordance with PUC Section 21676(b) to the ALUC and the State Division of Aeronautics; and WHEREAS, on June 29, 2020, the Planning Division of the City of Santa Ana provided a Notice of Intent to overrule the Orange County ALUC`s determination that the Bowery Mixed -Use Development project is inconsistent with the AELUP of JWA and findings to the ALUC and the State Division of Aeronautii and WHEREAS, all correspondences received baWALUC and State Division of Aeronautics have been included in the public rec WHEREAS, on August 6, 2020, the , gave pu -notice of a City Council public hearing for consideration of over ALUC's deter tion on the proposed Bowery Mixed -Use Development project dvertising in the ge County Register, a newspaper of general circulation, by m to o rs of pr and residents within 500 feet of the Project, and osting a n o and WHEREAS, August 18, 2, • , City Cou onducted a duly noticed public hearing to consider the Environ me -1 Repo ) No. 2020-01, General Plan Amendment No. 2020-02, Ament tion 020-01, and the ALUC overruling determinate. ,' . consiste-� actio t w - earing members of the public were afford - p `1 ity to c adtions. Section 2. _City Concil of t City of Santa Ana made the following findings: A. Ar% -City o An require` R ide findings supporting the overrule of Orange C AL determin ion as required in the California PUC Setign 21676(b ed oxime following Findings of Fact and the associated sui,sfarttial evidenc _ the pc record, the proposed action by the City on the Boviery ' ed -Use elopment Project at 2300, 2310 and 2320 Red Hill Avenue related ning change and General Plan Amendment are consistent he oses of the State Aeronautics Act as stated in PUC Section 21&70. B. The proposed Project provides for the orderly development of JWA, and its surrounding area and promotes the overall goals and objectives of the State noise standards by avoiding new noise and safety problems, and protecting the public health, safety and welfare through the adoption of land use measures that minimize the public's exposure to excessive noise and safety hazards to the extent that this area is not already devoted to incompatible uses. This Project would not add any new residential or commercial noise impacts to the JWA 65 dBA Community Noise Equivalent Level (CNEL) noise area. Resolution No. 2020-xx Page 3 of 13 14-219 C. It is in the public interest to: provide for the orderly development of each public use airport in this state and the area surrounding these airports so as to promote the overall goals and objectives of the California airport noise standards adopted pursuant to PUC Section 21669 and to prevent the creation of new noise and safety problems. D. To provide for the orderly development of JWA and the area surrounding the airport, the ALUC adopted the 2008 AELUP on April 17, 2008. The AELUP guides development proposals to provide for orderly development of the airport and the area surrounding the airport through impleMentation of the standards in Section 2.1 (aircraft noise, safety comp zones, building height restrictions). E. The ALUC is required to use the Handbook (Handbook) that wa4effe Transportation, Division of Aeron been updated to incorporate the the operation and environmental F=ina l Environmental Impa epart (EIF of Supervisors on June 2 for the (GAIP). F. On May 21, 20 t t__ develop ment AELUP. Th _- C AELUP issu f airci the proposed pct G. The t is cor State AMFA@ut1cs evidence: a. Lack of City oM. JC for' report ange,j with S cam- n 21674. TWmia rt Land Use Planning d by theI.M.) rnia Department of altrans) in 20 he AELUP has not c nor has it upda : 'nformation about f JW reflecte s most recent INy the Oran aunty Board —f Aviation Improvement Program rese the Bowery Mixed -Use e of nsistency with the JWA my 2 0, finds that with regard to eights, safety zones and heliports, that I General Plan Amendment are each ch stated criteria of the AELUP, the Mmission find the proposed ...Bowery AELUP for JWA per AELUP Sections with We AELUP of JWA and with the purposes of the sed on the following Findings of Fact and substantial of inconsistency by the ALUC. b. There was no evidence presented by or to the ALUC at its hearing on May 21, 2020, to support if finding of inconsistency, nor was there a request to provide supplemental information. The ALUC staff made a presentation at the Commission hearing based on the staff report. The only addition made by the ALUC staff to the staff report published with the meeting agenda was their acknowledgment of the City's letter on May 20, 2020 stating that the Final EIR for the Project would reinstate a mitigation measure requiring "Notice of Airport in Vicinity," to be included in all lease/rental agreements and post outdoor signage infonning the Resolution No. 2020-xx Page 4 of 13 14-220 public of the presence of operating aircraft, which demonstrates further compliance with the AELUP and to minimize potential future noise complaints. C. Noise. The residential and commercial land uses under the proposed Project are consistent with the aircraft noise standards of the AELUP. 1. Project is located outside of the JWA 60 to 65 dBA CNEL aircraft noise contours. Aircraft noise analysis was completed in the Project's EIR and presented at the ALUC hearing. The JWA GAIP EIR also contains noise analysis de strafing that the Project is outside of the 60 dBA CNEL not our. This noise analysis is based on one year's worth aft operations in all runway operating configurations wit xisting aircraft fleet mixes and future fleet forecasts.A& anal y eludes the time of day of all operations and incl is penal r evening (7 pm to 10 pm) and night (10 p.s am) aircraft o ons of five and ten decibels per opera Residential land - s are normally consistent in areas imp by a' iftaft noise u 60 dBA CNEL and comm e ' I land use dBA CNEL gown in the AELUP Tab ese are t e noise stands s used by the FAA and the Californi identify compatible land uses near airports. ii. ct is Iod- d o the VIWA single -event aircraft se co .-._ rs. Thee air oise analysis completed as of the GAIP included analysis of single event aircraft n Thi lysis in ed single event noise contours for the nois _ j akin gular use of JWA. The Project veto cons r 0 ed analysis and information at the T heamg showi 'e Project site is located outside of the .= JVqW dB--�' le event noise contours for all aircraft making regul5fte of irport. iii. The prod - includes mitigation measure notifying future residents. e Fin IR for the Project revised on May 22, 2020 includes a Yarneasure requiring "Notice of Airport in Vicinity," to be in all lease/rental agreements and post outdoor signage inhe public of the presence of operating aircraft, which demonstrates further compliance with the AELUP and to minimize potential future noise complaints. d. Safety. The residential and commercial land uses under the proposed project are consistent with the safety standards of the AELUP, Project is not in any of the AELUP safety zones. The project is located more than a mile from the outer edge of AELUP Zone 6, Traffic Pattern Zone as depicted in Appendix D. Further, AELUP Appendix D states the "Basic Resolution No. 2020-xx Page 5 of 13 14-221 Compatibility Qualities" of Zone 6 as "Allow residential uses" and "Allow most nonresidential uses." Project is not in the JWA runway protection zones (RPZ). The Project is located nearly two miles from the outer edge of the nearest JWA RPZ. ii. The FAA's Determinations of No Hazard to Air Navigation for The Bowery Mixed Use development structures are the only source of authoritative, aviation safety findings regarding the project. The FAA conducted an aeronautical st 49 U.S.C. §44718 and 14 CFR Part 77) and issued Its Dete sons on March 5, 2020 that structures associated with the ct "do not exceed standards and would not be a hazard . ation" and that "[b]ased on this evaluation, marking ting vt necessary for aviation safety." The FAA's Det tions esta that the Project would be neither an obstru or a hazard to a - vigation. iii. In this case it is imp t to establisRMbat entity has authority ov the use o over the p . Ct site. "The United Stat rnment h clusive sovereign y of airspace of the United - .9 U.S.C. 103(aK1)). r to use tl " ns and I 401{ JnN, - ding a d id be FA inistrator is responsible us 'Mf the navigable airspace and jegulations on the flight of ns on sa a altitudes) for Navigating, aircraft; protecting individuals and sing the navigable airspace efficiently; Rtween aircraft, between aircraft and between aircraft -+.,d airborne objects" erona itical studies for the Bowe,y Mixed Use project .e the definitive standard for assessing compliance aviation safety laws and regulations (49 U.S.C. § s federal authority is recognized in State law (Cal. vi. The City of Santa Ana has the local police powers to control land use on the site (Cal. Const., art. KI 11, § 7). This constitutional authority is acknowledged in State law (Cal. PUC §21670 and §21676) and the ALUC process (AELUP §4.11) allowing for overrule of an ALUC finding of inconsistency. vii. The other entities that have processed or commented on this project have aviation safety duties and responsibilities related to this matter. Each of these entities relies on or ultimately defers to Resolution No. 2020-xx Page 6 of 13 14-222 the FAA's authoritative aviation safety role in airspace determinations. viii. The AELUP for JWA, Section 2.1.3 Building Height Restrictions states, "In adopting criteria for building height restrictions in the vicinities of airports, the Commission considered only one standard and that was Federal Aviation Regulations Part 77 ([14 CFR] Part 77) entitled, Objects Affecting Navigable Airspace. "These regulations are the only definitive standard available [emphasis added] and the standard most generally used." ix. Section 2.1.3 also recognizes F/ CFR Part 77 surfaces as the the `imaginary surfaces,' th TM Part 77.23 standards alo LVI studies, [emphasis ad the Commission, in , er 'obstruction."' This s • n considers and recogni analyzing pr • ct impact o navigational ing, it aids or pubii t paths also considers s,the " nautical studies beyond 14 La rd f0 r review, "in addition to ion will use all of the FAR ie ; Its of FAA aeronautical eemed necessary by n a structure is an sta Z Commission the siAuthority" for Mor aeronautic - perations, or nterference with navigational- other stu to determi goes on to e F_ s of studies prdF67q-jWQ _t a find* of er th he F ` the rocedures. The Commission 'ty" for reporting the results s he Commission will not Stu, I s conducted by parties ktcertifies and adopts such Sec*r efere to FAA Advisory Circular 150(5190- �, A�I I Zon �,- *Waite to Limit Height of Objects Around 4 martsMCommis• = Revie N, This FAA Advisory Circular profs AMCiu • guidance for establishing zoning regulations alond%th spe guidance on a "variance" process for potential ©bstrucsduct. At ction 3.b., "The Federal Aviation Administration (FAA) s aeronautical studies on obstructions which &aminWeir effect on such factors as: aircraft operational electronic and procedural requirements; and, airport ha tandards. if an aeronautical study shows that an abs ction, when evaluated against these factors, has no substantial adverse effect upon the safe and efficient use of navigable airspace, then the obstruction is considered not to be a hazard to air navigation [emphasis added]." xi. CalTrans Division of Aeronautics — Caltrans publishes the California Airport Land Use Planning Handbook ("Handbook") in accordance with State Law with the purpose to, " provide information to ALUCs, their staffs, airport proprietors, cities, counties, consultants, and the public; to identify the requirements Resolution No. 2020-xx Page 7 of 13 14-223 and procedures for preparing effective compatibility planning documents; and define exemptions where applicable (Caltrans, 2411).' The Handbook provides specific guidance for assessing potential airspace obstructions in Section 4.5 Airspace Protection. xii. JWA — The FAA requires airport sponsors like Orange County to accept specific grant assurances when they accept federal funding. Hazard Removal and Mitigation and Compatible Land Use are two of these assurances (49 U.S.C. § 47107(a)(9) and (10)). For hazard removal, the Airport relies on the FAA's aeronautical study to meet its req ent. For compatible land use, the Airport relies on coardi with the surrounding cities and the ALUC. The following specific assurances: xiii. Hazard Removal and Mi ' It ke appropriate action to assure that such ter _- airspace required to protect instrument and vi operations to airport (including established minimum t altitudes) will bel equately cleared and protected by rem to " * g, relocmarking, or lighting or a . erwise miti ing airport wards and by preventing t . Iishmant ation of future airport hazards. Compatible La re sem_ ,able, in Y per takemupriate action, to the extent Ifto-tion w =s ing laws, to restrict the WmmedM vicinity of the airport to ipatib tin normal airport operations, f of aircraft. In addition, if the project is am implementation, it will not cause or I use, within its jurisdiction, that wi! respect to the airport, of the nois(- ;ures upc i which Federal funds have entia ''=and commercial land uses under the proposed ent with the height standards of the AELUP. sed buildings associated with the Project would not ex a sloping, three-dimensional 100:1 (one percent sloping surra a from the nearest runway over 3,200 feet in actual length) FAA notification surface to require the Filing of FAA Form 7460-1. This fact is stated in the ALUC staff report and was repeated at the ALUC hearing on the Project. Despite this fact, the Project proponent fled with the FAA and received a Determination of No Hazard to Air Navigation on March 5, 2020. ii. The Project does not exceed the sloping, three-dimensional 50:1 FAA precision instrument Approach Surface to JWA Runway 20R. This fact is stated in the ALUC staff report and was repeated at Resolutior No, 2020-xx Page 8 of 13 14-224 the ALUC hearing on the Project. Despite this fact, the Project proponent filed with the FAA and received a Determination of No Hazard to Air Navigation on March 5, 2020. Overflight. "Close to the JWA approach centerline" as identified by the ALUC is neither an FAA nor an AELUP standard. The FAA is the only authoritative source of aviation safety data and the FAA does not have a "close to the JWA approach centerline" standard. The FAA's Aeronautical Study of the Project and Determinations of No Hazard Air Navigation issued on March 5, 2020 are the only autho ' source of airspace impact information as stated in the AE The AELUP clearly standards around aii measures of these g Section 2.1. The Prol, standards. Two-dimen ht I nothing to in -- one day of arr flims an .' sof aircr y ti toy } _ � duced se iv. proxm dimer Apra from - - the JV noise - single difn its Mort land use planning Oise, sa efyMand height. Objective ards are clew entified in AELUP consistent with e f these objective ks -(listunassocia ed aircraft do act ots. The ALUC provided cks, f departure flight tracks ude that were purported broponeff epared three-dimensional models of the Soe ht t information to depict actual overflight aled model of the Project. These three - m DwA at some residents and users of the IW likely b gWe to see aircraft flying past the property tlon �. Aircraft noise information from the AELUP, I and from the Project EIR demonstrate that the t wo - d be less than 60 dBA CNEL and less than noise standards identified in the JWA GAIP EIR. V. � Y_ ise contours used to objectively measure noise impact Ell ssume flight tracks and actual operating conditions for a full ar including future operations. One day of arrival flight tracks and one day of departure flight tracks are simple anecdotes and not substantive evidence. vi. The project is located outside of the JWA single event noise exposure areas documented in the JWA General Aviation Improvement Program EIR certified on June 25, 2019. The project developer presented this information to the ALUC Commission at its hearing on May 21, 2020. Resolution No. 2020-xx Page 9 of 13 14-225 vii. ALUC Commissioners Monin and Murphy asked for but did not receive evidence of general aviation aircraft using Runway 2R120L would "be turning right in front of the site." In fact, the GA aircraft pattern and voluntary noise abatement procedures for Runway 2R120L operate within one to two miles from the end of the runway north of the airport and on a 15 -degree offset from the extended runway centerline to avoid airspace conflicts with aircraft arriving Runway 20R. This location places GA aircraft south of Barranca Parkway and aligned with the Tustin Legacy property southeast of the Project site. These regular GA aircraft flight tracks are substantiated in the presentation byjWA staff on April S, 2019 at a Town Hall meeting about the G - g. Heliports. Heliports are not a part h. Zone Change and Genera change, and General Plan AELUP aircraft noise, safdq ' consistent with the larger planrt approach centerlines not an F The proposed zone with the objective ind are therefore hese to the JWA lent are cans height standar ole ALUC. 4La F C stand i. ALUC offersntladonMl overflights of new residents would be dist ed . noyed. the contrary, the ALUC de_ o strates th -he is to ,ft outside of the 60 dBA �x4ise Ionto • As Re.Proji t would not add any new y-_ .� . idenfiaf• r com Oise acts to the JWA 65 dBA 0munit.-oise Eq gent Level (CNEL noise area. Flig qday rrivals and one day of departures are t unrq and: uil ccounted for in the one year of RW. ighff- ed to m Mag re- CNEL noise impacts associated with Flight tks for c e day of arrivals and one day of departures are not uniqa and are fully accounted for in the single -event noise ntour oduced for the JWA GAIP EIR. The Project is located Sal" hese single -event noise contours. iv. The A comments on the Project conflict with its own noise analysis contained in the GAIP EIR. The ALUC staff report states, "Because of the project location within the primary approach corridor and its proximity to JWA (2.25 miles), JWA stated it is not supportive of the proposed residential portion of the project." The objective analysis and conclusions of the JWA GAIP EIR find that the objective aircraft noise analysis demonstrate that the Project would be located outside of the 60 dBA CNEL noise contour and would have no impact on operations at JWA due to height. Resolution No. 2020-xx Page 10 or 13 14-226 V. The ALUC staff report states that, "per Section 1.2 of the AELUP for JWA, the purpose of the AELUP is to safeguard the general welfare of the inhabitants within the vicinity of the airport and to ensure the continued operations of the airport." The method by which the ALUC achieves this purpose is through the application of the objective standards contained in Section 2.1 of the AELUP. As demonstrated In the ALUC staff report and, in these Findings, the Project is consistent with each of the standards. As a result, the ALUC has met their duty under Section 1.2 by ensuring that the Project meets these standards. vi. The ALUC staff report states the AELUP for JWA and Commission to coordinate land use planning." The charge is through th contained in Section ALUC staff report an t with each of the standa duty under qgqtIon 2.1.4 a the Project fflese sty Section 3. CALIFORNIA ditionally, Section 2.1.4 of Section 21674 charge the level to ensure compatible tfid by the ALUC achieves this 511cation a objective standards the AELUP. emonstrated in the :se Findings, th 'act is consistent As ult, the A has met their ction 21674 nsuring that ENTAMMUALITY ACT: The City pact = pprt No. 2020-01; adopted SM }; Pfd adopted the Statement Section 4. IRM NIFQATION. A& Applicant shall indemnify, protect, defend ano.!AW he _ 'erg= of i fficials, officers, employees, agent dapartrndgf,4, au � Ized vo( d instrumentalities thereof, harmles from C7 and all d6'mands, la 9 writs of ni!! ndamus, and other and proceedlffg, (whether , egi�ltable, declaratory, administrative or adjudicatory in nature), a Iternative We r'��Qlution procedures (including, but not limited to arbitrations_ iations, an uch other procedures), judgments, orders, and decisions (collectively "A s"), bro 1 against the City and/or any of its officials, officers, employees, age depa nts, agencies, and instrumentalities thereof, that challenge, attack, o odify, set aside, void, or annul, any action of, or any permit or approval iss the City and/or any of its officials, officers, employees, agents, departments, a encies, and instrumentalities thereof (including actions approved by the voters of the City) for or concerning the project, whether such Actions are brought under the Ralph M. Brown Act, California Environmental Quality Act, the Planning and Zoning Law, the Subdivision Map Act, Code of Civil Procedure sections 1085 or 1094.5, or any other federal, state or local constitution, statute, law, ordinance, charter, rule, regulation, or any decision of a court of competent jurisdiction. It is expressly agreed that the City shall have the right to approve, which approval will not be unreasonably withheld, the legal counsel providing the City's defense, and that Applicant shall reimburse the City for any costs and expenses directly and necessarily incurred by the City in the course of the defense. City shall promptly notify the Resolution No, 2020-xx Page 11 of 13 14-227 Applicant of any Action brought and City shall cooperate with Applicant in the defense of the Action. Section 5. CITY COUNCIL_ ACTION: Based on the above evidence and Findings made, and the remainder of the record in this case, the City Council of the City of Santa Ana hereby resolves to overrule the Orange County ALUC's determination that the Bowery Mixed -Use Development Project is inconsistent with the Orange County AELUP. Section 6. EXECUTION OF RESOLUTION Resolution and the Clerk of the Council shall attest anjj AP Sol By: AY NC AB NOT PRESENT ADOPTED this day of -- I , 2020. Councilmembers e Mayor shall sign this fy to the adoption thereof. ulido Resolution No. 2020-xx Page 12 of 13 14-228 CERTIFICATE OF ATTESTATION AND ORIGINALITY I, DAISY GOMEZ, Clerk of the Council, do hereby attest to and certify the attached Resolution No. 2020-xx to be the original resolution adopted by the City Council of the City of Santa Ana on , 2020. Date - Clerk of the Council City of Santa Pte, Resolution No. 2020-xx Page 13 of 13 14-229 AIRPORT LAND CASE COMMISSION ORANGE COUNTY -`��,-- FOR ORANGE COUNTY 3160 Airway Avenue • Costa Mesa, California 92626.949.252.5170 fax: 949.252.6012 July 3, 2020 David Blumenthal, AICP Planning Consultant City of Newport Beach 100 Civic Center Drive Newport Beach, CA 92660 Subject: ALl✓C Referral Package Confirmation Dear Mr. Blumenthal: This is to confirm that Airport Land f'se Commission (ALIJC) staff has received the City of Newport Beach referral request for the Newport Airport Village project in the area bound by Campus Drive, MacArthur Boulevard and Birch Street. Your request for a review and consistency determination by the Commission is hereby accepted and deemed complete on July 3, 2020, and will be agendized for the next Commission meeting of July 16, 2020, unless otherwise noticed. Please note that consistent with the Governor's Order N 2720 issued on March 17, 2020, the meeting will be held with a teleconferencing option. We will provide call-in details when the agenda is posted. Your attendance at the meeting (in person or via teleconference) would be appreciat.d in case there are questions regarding this item. A copy of the meeting agenda and .taff report regarding your item will be provided to you pri, the Commission meeting. Please contact Julie Fitch at (949) 252-5284 or at jfitch@ocair.com you need additional information regarding the Commission's review of this project. Sincerely, Lea U. Choum U` Executive Officer 14-230 ORANGE I COUNTY !:Wk I IN.— July C July 9, 2020 AIRPORT LAND USE COMMISSION FOR ORANGE COUNTY 3160 Airway Avenue • Costa Mesa, California 92626 - 949.252.5170 fax: 949.252.6012 Barry Curtis. Director Economic and Development Ser% ices Cite of Costa Mesa 77 Fair Drive P.O. Box 1200 Costa Mesa. CA 92628 Subject: One Metro «'est Mixed -Use De-elopment at 1683 Sunflower A♦enue Dear Mr. CLII'tis: During the meeting held Oil ,Tulle 18. 2020. the Airport Land ['se Commission (Al ['C) For OI•an�gc County considered the subject project. l lie matter was dul) disCLISSC& moN ed, seconded and Carried unan11110LlS1\' h\ the Commission to find the City of Costa l\/leSa 5 proposed One Metro West Mixed -Use Dcvelc)pnlent Project and related General Plan Amendment and Zoning Code Change to be Consistent \\ith the CommiMlon's 21ir7701-i Lnvirouv Lowl ( 'tic Plum (.,11;LUP) Jor .Jnitrr II irvne 11i17301-1 Please contact Julie I- itch. land Use Manager at 1949) 2"52-5284 or via email at .11: itch rt.,ocair.com if you require additional information or haN e questions regardim:. this proceeding. Sincerely, Lea U. Choum Lxecutive Officer 14-231 Attachment J ALUC Letter of Determination 14-232 AIRPORT LAND USE COMMISSION ORANGE COUNTY FOR ORANGE COUNTY 3160 Airway Avenue • Costa Mesa, California 92626 - 949.252.5170 fax: 949.252.6012 July 21, 2020 David Blumenthal, AICP Planning Consultant City of Newport Beach 100 Civic Center Drive Newport Beach, CA 92660 Subject: ALUC Determination for Newport Airport Village Dear Mr. Blumenthal: During the public meeting held on July16, 2020, the Airport Land Use Commission (ALUC) for Orange County considered the subject project. The matter was duly discussed, and with a unanimous vote of 6-0, the Commission found the proposed General Plan Amendment, Zoning Code Amendment and proposed Newport Airport Village project located at 4320, 4340, 4360, 4400, 4500, 4520, 4540, 4570, 4600, and 4630 Campus Drive; 4525, 4533 and 4647 MacArthur Boulevard; and 4341, 4361,1 and 4501 Birch Street, to be Inconsistent with the Airporf Environs Land Use Plan (A EL UP) fol John Wayne Airport (JWA) per: • Section 2. 1.1 Aircraft Noise that the "aircraft noise emanating from airports may be incompatible with general welfare of the inhabitants within the vicinity of an airport." Section 2.1.2 Safety Compatibility Zones in which "the purpose of these zones is to support the continued use and operation of an airport by establishing compatibility and safety standards to promote air navigational safety and to reduce potential safety hazards for persons living, working or recreating near JWA." Section 2.1.3 Building Height Restrictions which states that "the results of an aeronautical study conducted by the FAA... will be utilized to help determine if a structure will have an adverse effect on the airport or on aeronautical operations." The Aeronautical study provided was for structures 124 feet AMSL, while the General Plan Amendment and Development Plan indicate the maximum height would be 129 feet AMSL, and • Section 2.1.4, and PUC Section 21674 which state that the Commission is charged by PUC Section 21674(a) "to assist local agencies in ensuring compatible land uses in the 14-233 vicinity of ...existing airports to the extent that the land in the vicinity of those airports is not already devoted to incompatible uses," and PUC Section 21674(b) "to coordinate planning at the state, regional and local levels so as to provide for the orderly development of air transportation, while at the same time protecting the public health, safety and welfare." Please contact Julie Fitch at ifitch@ocair.com or at (949) 252-5284 if you require additional information or have questions regarding this proceeding. Sincerely, � Lea U. Choum Executive Officer cc: ALUC 14-234 Attachment K Previous ALUC Consistent Findings 14-235 ALUC CONSISTENCY FINDINGS (in order of ALUC determination date) Map Key Project Number Location Description ALUC Finding Overrule Consistent - PA2006-159 Citywide Comprehensive General Plan Update N/A July 20, 2006 1 PA2006-079 1000 Bison Ave Construction of a new two-story, 31,722 sf educational Consistent N/A building and gymnasium December 20, 2007 Consistent - PA2009-034 Citywide Comprehensive Zoning Code Update N/A August 19, 2010 2 PA2007-213 4300 Von Karmen Ave GPA, PCDP, Parcel Map to accommodate development of a Consistent N/A new 11,960 sf commercial building. October 21, 2010 3 PA2008-164 4699 Jamborees Rd and GPA PCDP Parcel Map to accommodate redevelopment of � Consistent N/A 5190 Campus Dr p site with 46,000 sf commercial business plaza. October 21, 2010 Newport Place Planned Community Amendment - Text to allow residential developments that include: 1) a minimum of 30 percent of units affordable to lower-income households; Consistent 4 PA2011-215 West side of MacArthur BI and 2) densities between 30 du/ac and 50 du/ac consistent June 21, 2012 N/A with the MU -H2 General Plan land use designation and policies for the Airport Area. North Newport Center PCDP Amendment - Increase the 5 PA2012-020 900 Newport Center Dr residential development allocation from 430 dwelling units to Consistent N/A a total of 524 dwelling units (increase of 94 units) and July 19, 2012 allocating the units to the San Joaquin Plaza sub -area. Uptown Newport Project - Mixed use project with up to 1,244 Inconsistent 6 PA2011-134 4311-4321 Jamboree Rd Yes dwelling units and 11,500 square feet of retail. October 18, 2012 Consistent 7 PA2012-034 East of Tustin Ave Emerson Island Annexation N/A November 15, 2012 Consistent 8 PA2012-047 520 Newport Center Dr 20 story office building N/A November 15, 2012 14-236 Map Key Project Number Location Description ALUC Finding Overrule Consistent - PA2012-104 Citywide 2014-2021 Housing Element Update N/A September 19, 2013 Back Bay Landing Project - Legislative approval to allow mixed-use waterfront project. The Planned Community 9 PA2011-216 300 E Coast Hwy Development Plan would allow for the development of a new Consistent N/A enclosed dry stack boat storage facility for 135 boats, 43,500 January 16, 2014 square feet of visitor -serving retail and recreational marine facilities, and up to 49 attached residential units. Inconsistent - PA2013-098 Citywide General Plan Land Use Element Update Yes April 17, 2014 Consistent 10 PA2015-152 850 San Clemente Dr Museum House Project - 100 dwelling units N/A November 17, 2016 11 PA2015-210 101 Bayview PI Harbor Point Senior Living - 5,000 square foot convalescent Consistent N/A and congregate care facility with 120 beds. November 17, 2016 Vivante Senior Housing Project —184,309 -square foot, 6 -story 10 PA2018-185 850 San Clemente Dr combination senior housing development (90 residential Consistent N/A dwelling units, 126 beds) and memory care facility (9 units, 27 July 18, 2019 beds). Newport Airport Village Project — Mixed-use development to Between Campus Dr and allow the redevelopment of the 16.46 -acre property with up Inconsistent 12 PA2014-225 Birch St, at MacArthur BI to 444 dwelling units (329 base units and 115 density bonus July 16, 2020 Pending units) and 297,572 square feet of retail, office, and other airport supporting uses. 14-237 2 BAKER SI q¥ / � f *r J 71 4 ( 2 >` @ '� > § 66 o COST OEs& \ ' C4 � � 4P .� R D SI - � � 4, B I k ' 4; 7 � � t LO 10 � \ > � � IL, CA 61 t Index 0ConsistentPrq t 0 Inconsistent Projert 0 Project Site Attachment L ALUC Response to City's Notice of Intent 14-239 ORANGE COUNTY dZUK:; August 27, 2020 AIRPORT LAND USE COMMISSION FOR ORANGE COUNTY 3160 Airway Avenue • Costa Mesa, California 92626 - 949.252.5170 fax: 949.252.6012 David Blumenthal, AICP, Planning Consultant City of Newport Beach Community Development Department 100 Civic Center Drive Newport Beach, CA 92660 Subject: Newport Airport Village Project -- Response to Notice of Intent to Overrule the Airport Land 1 rse Commission for Orange County Dear Mr. Blumenthal: We are in receipt of the City of Newport Beach letter dated July 30, 2020, and City Council Resolution No. 2020-73 notifying the Airport Land Use Commission (ALUC) for Orange County of the City's intent to overrule the ALUC's inconsistency determination on the proposed Newport Airport Village project'. In accordance with Section 21676 of the Public I..'tilities Code, the ALUC submits the following comments addressing the proposed overrule findings for the above -referenced project. Please be advised that California Public Utilities Code Section 21678 states: "With respect to a publicly owned airport that a public agency does not operate, if the public agency pursuant to Section 21676, 21676.5, or 21677 overrules a commission's action or recommendation, the operator of the airport shall be immune from liability for damages to property or personal injury caused by or resulting directly or indirectly from the public agency's decision to overrule the commission's action or recommendation." Background _- On July 16, 2020, the ALUC for Orange County found the proposed Newport Airport Village project and the associated general plan amendment and zoning code amendment to be inconsistent with the Aiiporl Environs Land Use Plan (AELUP) for John Wayne Airporl (JWA) on a 6-0 vote. The inconsistent finding was based on AELUP Sections 2.1.1, 2.1.2, 2.1.3, and 2.1.4. ALUC for Orange County has the following comments regarding the findings and facts of support included in Resolution No. 2020-73. Response to "Fact in Support" 1. .1 and 2.2 Regarding Noise Standards: ' It appears the City is only addressing the inconsistency finding related to the "project" but not the associated inconsistency determinations made by ALUC regarding the General Plan and zoning code amendments. 14-240 Newport Airport Village Overrule Response August 27, 2020 Page 2 As noted in the City's discussion, the Community Noise Equivalent Level (CNEL) standards are set forth in the AELUP for JWA. As part of the review of the proposed project and its associated general plan and zoning code amendments, it was noted that the project site is within the JWA 65 dBA and 60 dBA CNEL noise contours. The developer is proposing to locate the residential portion of the mixed-use project within the 60 CNEL contour which is outside of, but adjacent to, the 65 CNEL contour. The Commission believes that the proposed residential units would be highly affected by airport noise due to the close proximity to the airport (1,500 feet from the main runway), and that the past and current land use designation of Airport Office is the appropriate designation for this site. The proposed General Plan land use designation change to Mixed -Use Horizontal, which includes residential, is not suitable and would subject the future residents to excessive noise. The ALUC has historically found residential uses in the vicinity of JWA to be inconsistent with the AELUPforJWA, and this proposal would allow up to 444 housing units (including low-income units), directly across the street from JWA. While ALUC found that the proposed General Plan amendment, zoning code amendment and mixed-use project is inconsistent with Section 2.1.1. of the AELUPforJWA, we support the city's inclusion of policies in the Planned Community Development Plan (PCDP) to provide sound attenuation in the residential units to not exceed 45 dBA during daytime hours and 40 dBA between 10:00 p.m. and 7:00 a.m. Response to "Fact in Support 1.2 and 2.3 Regarding Safety: The proposed property is located in Safety Zone 3 - Inner Turning Zone, and Safety Zone 6 - Traffic Pattern Zone. As stated in the ALUC staff report, the California Airport Land Use Planning Handbook policies for Safety Zone 3 are to avoid residential development and to limit commercial and other nonresidential uses to 100-150 people per acre on average, and no more than 300 to 450 people per single acre in urban areas. While the conceptual plans for proposed project did not include residential use in Zone 3, detailed development plans were not submitted, therefore we were not able to determine the number of people per acre. The Handbook states that noise and overflight should be considered in Safety Zone 6, and that residential densities be limited to that of the surrounding areas. Flight tracks for the property were included in the ALUC staff report and are attached to this letter. There are no residential uses surrounding the project site, as the area is almost exclusively office!commercial and hotel,'retail. Considering the proximately to JWA and the number of flights over the property, ALUC believes that the proposed General Plan amendment, zoning amendment and mixed- use project is inappropriate for this site. Response to Fact in Support 1.3 and 2.4 Regarding Height: At the time of the ALUC meeting, the only valid FAA "Determination of No Hazard" for the project site was for a structure height of 80 feet, while the proposed general plan designation would allow for a maximum height 85 feet. This was discussed at the ALUC meeting, and the applicant indicated that he was in the process of resubmitting various Form 7460-1's to the FAA. ALUC staff has learned that on July 28" and 29" of 2020, the FAA provided Newport Airport Village Overrule Response August 27, 2026 Page 3 "Determination of No Hazard" letters for structures on the site up to 85 feet in height (129' AMSL). Section 2.1.3. of the AELUP for JWA, however, states that a FAA Determination of No Hazard to Air Navigation does not automatically equate to a consistency determination by ALUC, and that the Commission may utilize criteria for protecting aircraft traffic patterns in consideration of health, welfare, or air safety. As part of the staff report, JWA Noise Office provided flight tracks for the property on two separate days in January (attached). As shown on the exhibits, on Sunday, January 19, 2020, there were 19 operations directly over the property with an average altitude of 398 feet AMSL. With a proposed maximum building height of 129 AMSL, these flights would be, on average, only 269 feet above the building with many of the flights closer. On Thursday, January 23, 2020, there were 40 flights directly over the property with an average altitude of 412 feet AMSL. It is the determination of ALUC that the proposed height of this project and its location in the general aviation flight path for John Wayne Airport, is inconsistent with the AELUP for JWA. While ALUC found that the proposed General Plan amendment, zoning code amendment and Newport Airport Village mixed-use project is inconsistent with Section 2.1.1. of the AELUP for JWA, we would support the city's inclusion of policies in the Planned Community Development Plan (PCDP) to provide sound attenuation in the residential units to not exceed 45 dBA during daytime hours and 40 dBA between 10:00 p.m. and 7:00 a.m. Summary By virtue of being clearly stated in AELUP for JWA Sections 1.2 "Purpose and Scope" and 2.0 "Planning Guidelines," every Commissioner understands the complex legal charge to protect public airports from encroachment by incompatible land use development, while simultaneously protecting the health, safety and welfare of citizens who work and live in the airport's environs. To this end, and as also statutorily required, our ALUC proceedings are benefited by several members "having expertise in aviation." Based upon careful consideration of all information provided, and input from ALUC members with expertise in aviation, the ALUC unanimously found the proposed Newport Beach General Plan amendment, zoning code amendment, and Newport Airport Village Mixed -Use project to be Inconsistent with the AELUP for JWA. Also, please be advised that California Business & Professions Code Section 11010 requires the following statement to be included on sale/lease disclosure documents for developments within an ALUC's "Airport Influence Area:" "NOTICE OF AIRPORT IN VICINITY This property is presently located in the vicinity of an airport, within what is known as an airport influence area. For that reason, the property may be subject to some of the annoyances or inconveniences associated with proximity to airport operations (For example: noise, vibration, or odors). Individual sensitivities to those annoyances can vary from person to person. You may wish to consider what airport annoyances, if any, are associated 14-242 Newport Airport Village Overrule Response August 27, 2020 Page 4 with the property before you complete your purchase and determine whether they are acceptable to you." We hope the fact that the City posted the Notice of Public Hearing for a Notice of Intent to Overrule ALUC prior to ALUC holding the meeting and making a finding of inconsistency does not mean that the City of Newport Beach will disregard these comments. We urge the City Council to take ALUC's concerns into consideration in its deliberations prior to deciding whether to overrule ALUC and approve the project entitlements. Thank you for the opportunity to provide these comments. Sincerely, Gerald A. Bresnaha Chairman Attachment: John Wayne Airport Flight Tracks for Newport Airport Village cc: Members of Airport Land Use Commission for Orange County Members of Newport Beach City Council Kevin Ryan, CaltranslDivision of Aeronautics 14-243 John Wayne Airport Flight Tracks Newport Airport Village Sunday, January 19, 2020 19 Operations I Avg. Altitude = 398 ft. MSL 14-244 Flight Tracks for Newport Airport Village* Sunday, January 19, 2020 (Standard Operations) Time Aircraft Type Altitude (Feet AMSL) 9:09:17 0172 613 9:40:08 P28A 295 10:55:52 C172 133 11:57:43 BE33 236 12:11:38 R22 313 12:28:54 P28A 414 12:29:45 EVSS 458 12:46:39 C210 190 13:22:07 C172 405 13:24:10 C172 391 14:21:37 C172 317 14:29:59 C172 260 14:33:46 EVSS 381 14:47:00 E300 737 14:49:36 C172 321 15:54:18 C152 391 16:30:51 EVSS 721 17:20:24 BL8 495 18:24:04 P28A 498 Avg. Alt. (ft) MSL 398 * Includes all flights directly over: 4320, 4340, 4360, 4400, 4500, 4520, 4570, 4600, and 4630 Campus Drive; 4525, 4533 and 4647 MacArthur Boulevard; and 4341, 4351, and 4501 Birch Street. 14-245 John Wayne Airport Flight Tracks Newport Airport Village Thursday, .January 23, 2020 40 Operations j Avg. Altitude = 412 ft. MSL 14-246 Flight Tracks for Newport Airport Village* Thursday, January 23, 2020 (Standard Operations) Time Aircraft Type Altitude (Feet AMSL) Time Aircraft Type Altitude (Feet AMSL) 7:18:22 C182 326 12:56:06 C172 267 9:14:39 M20P 415 13:00:43 C172 352 9:16:52 CRUZ 421 13:02:46 C172 289 9:30:55 R44 442 13:09:05 C172 324 9:48:24 C172 390 13:19:48 C182 437 10:01:44 0172 401 13:42:01 P28A 245 10:06:43 C172 392 14:04:24 C172 230 10:35:05 R44 414 14:06:04 C172 498 10:42:33 R44 401 14:14:54 C172 455 11:01:14 AS50 311 14:18:22 AL3 521 11:11:33 C172 405 15:16:14 C172 537 11:19:47 C120 189 15:33:24 E300 738 11:20:53 R44 536 15:33:49 RV6 478 11:45:22 E300 887 15:55:08 CH7B 402 11:49:01 EVSS 285 16:37:10 EVSS 61 11:58:29 C172 413 16:40:32 0150 401 12:19:00 C182 359 16:59:21 BL8 299 12:23:53 P28A 277 17:00:37 R22 439 12:35:16 HXA 420 17:13:13 R22 267 12:36:13 C172 367 17:27:37 SR22 1182 Avg. Alt. (ft) MSL 412 * Includes all flights directly over: 4320, 4340, 4360, 4400, 4500, 4520, 4570, 4600, and 4630 Campus Drive; 4525, 4533 and 4647 MacArthur Boulevard; and 4341, 4361, and 4501 Birch Street. 14-247 Attachment M Division of Aeronautics Response to City's Notice of Intent 14-248 STATE OF CALIFORNIA—CALIFORNIA STATE TRANSPORTATION AGENCY Gavin Newsom, Governor DEPARTMENT OF TRANSPORTATION DIVISION OF AERONAUTICS - M.S. #40 1 120 N STREET P. O. BOX 942874 SACRAMENTO, CA 94274-0001 PHONE (916) 654-4959 FAX (916) 653-9531 TTY 711 www.dot.ca.gov August 28, 2020 a Making Conservation a California Way of Life. Mr. David Blumenthal, AICP, Planning Consultant Electronically Sent City of Newport Beach Dblumenthal@newportbeachca.gov Community Development Department 100 Civic Center Drive Newport Beach, CA 92660-3267 Dear Mr. Blumenthal: The California Department of Transportation, Division of Aeronautics' (Division) goal is to assist cities, counties, and Airport Land Use Commissions (ALUC) in the development and implementation of policies that protect the safety and general welfare of the communities in which aeronautical activities take place. We encourage collaboration with our partners in the planning process and thank you for including us in the review of the Notice of Intent to Overrule the Orange County Airport Land Use Commission. On July 30, 2020, the Division received an email stating that the City Council of the City of Newport Beach (City) voted to adopt Resolution No. 2020-73, a Notice of Intent to Overrule the July 16, 2020, Determination of Inconsistency by the Orange County ALUC. The ALUC Determination states that the Newport Airport Village Project (Project) is inconsistent with the Airport Environs Land Use Plan (AELUP) for John Wayne Airport (SNA) based on potential noise and safety issues and proposed height standards for structures. The proposed project is located at 4341, 4361, and 4501 Birch Street; 4320, 4340, 4360, 4400, 4500, 4520, 4540, 4570, 4600 and 4630 Campus Drive; and 4525, 4533, and 4647 MacArthur Boulevard. These proposed locations are within the northerly portion of the Campus Tract, generally bounded by Birch Street, Campus Drive, MacArthur Boulevard and the extension of Corinthian Way. The proposed Project provides a Planned Community Development Plan that would allow redevelopment of the 16.46 -acre property with up to 329 residential dwelling units, exclusive of any density bonus as allowed pursuant to California Government Code section 65915 and up to 297,572 square feet of office, retail, and commercial use. The Division has reviewed the "Facts in Support" provided by the City and has determined the findings are insufficient to warrant this proposed overrule. Specifically, the findings are not consistent with the purposes of the statutes set forth in the "Provide a safe, sustainable, integrated, and efficient transportation system to enhance California's economy and livability" 14-249 Mr. David Blumenthal August 28, 2020 Page 2 California Public Utilities Code (PUC), section 21670. These findings do not provide substantial evidence that the proposed Project will meet the requirements of PUC, section 21670(a) (1) and (2). The Division commends the City for locating all residential uses for the proposed Project outside of Safety Compatibility Zone 3, and the 65 Community Noise Equivalent Level noise contour of the AELUP for the SNA. It must be noted that the only valid determination of no hazard to air navigation by the Federal Aviation Administration's (FAA) Aeronautical study No. 2020 -AWP -3998 -OE was for structures up to 124 feet Above Mean Sea Level (AMSL), while the proposed Project indicates that a maximum height would be 129 feet AMSL. This is incompatible with the AELUP for the SNA, the FAA Aeronautical study No 2020 -AWP -3998 -OE, and the California Airport Land Use Planning Handbook (Handbook). Although certain non-residential uses are allowed in Safety Zone 3, according to the Handbook, there are also limitations to the types of uses allowed. Additionally, there can only be a maximum average number of people allowed per gross acre and a maximum number of people allowed per single acre. According to State guidance found in the Handbook, the proposed Project is located within Safety Zones 3 and 6. Safety Zone 3 is the Inner Turning Zone and considered by the Handbook as having a moderate to high risk level for an aircraft accident. The Handbook states the following for Safety Zone 3: To prohibit the following uses: Major shopping centers, theaters, meeting halls and other assembly facilities, children's schools, large daycare centers, hospitals, nursing homes, stadiums, and group recreational uses. To avoid buildings with more than 3 aboveground habitable floors, and hazardous uses. The maximum non-residential intensities for all allowed uses should be limited to 150 people average per gross acre and a maximum of 450 people for any single gross acre. Safety Zone 6 is the Traffic Pattern Zone and considered by the Handbook as having a low risk level for an aircraft accident. Although residential uses are allowed in this zone, noise and overflight impacts should be considered where ambient noise levels are low. Additionally, the Handbook states to avoid outdoor stadiums and similar uses with very high intensities and to limit the following uses: "Provide a safe, sustainable, integrated, and efficient transportation system to enhance California's economy and livability" 14-250 Mr. David Blumenthal August 28, 2020 Page 3 children's schools, large day care centers, hospitals, and nursing homes, as well as processing and storage of bulk quantities of highly hazardous materials. Please note the PUC reference below, which mandates that local agencies shall be guided by the height, use, noise, safety, and density criteria as established in the Handbook: California Public Utilities Code, section 21674.7 (b), It is the intent of the Legislature to discourage incompatible land uses near existing airports. Therefore, prior to granting permits for the renovation or remodeling of an existing building, structure, or facility, and before the construction of a new building, it is the intent of the Legislature that local agencies shall be guided by the height, use, noise, safety, and density criteria that are compatible with airport operations, as established by this article, and referred to as the Airport Land Use Planning Handbook, published by the Division... Additionally, the Division understands and shares the ALUC's concern for potential safety and noise issues at this location due to continuous overflights associated with the commercial service airport's general aviation runway operations, particularly related to noise generated from a mix of multiengine, turbine - powered, business jet aircraft. Sincerely, Original signed by: KEVIN RYAN, Aviation Planner Office of Aviation Planning c: Lea Choum, Executive Officer, Orange County ALUC; LChoum@ocair.com Seimone Jurjis, Community Development Director, Newport Beach; sjurjis@newportbeachca.gov "Provide a safe, sustainable, integrated, and efficient transportation system to enhance California's economy and livability" 14-251