September 8, 2020
Agenda Item No. 6
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: David A. Webb, Public Works Director - 949-644-3311,
dawebb@newportbeachca.gov
PREPARED BY: Patrick Arciniega, Senior Civil Engineer
parciniega@newportbeachca.gov
PHONE: 949-644-3347
TITLE: West Coast Highway Median Landscaping Phase 2 — Notice of
Completion for Contract No. 7189-2 (18L11)
ABSTRACT:
On November 19, 2019, City Council awarded Contract No. 7189-2 for the West Coast
Highway Median Landscaping Phase 2 project to KASA Construction, Inc. The work is
now complete and staff requests City Council acceptance and close out of the contract.
RECOMMENDATION:
a) Accept the completed work and authorize the City Clerk to file a Notice of Completion
for the project;
b) Authorize the City Clerk to release the Labor and Materials Bond 65 days after the
Notice of Completion has been recorded in accordance with applicable portions of
Civil Code; and
c) Release Faithful Performance Bond one year after acceptance by the City Council.
FUNDING REQUIREMENTS:
Funds for the construction contract were expended from the following Capital
Improvement budget accounts:
Account Description Account Number Amount
Neighborhood Enhancement 53601-980000-18L11 $ 1,076,475.03
Gas Tax 12101-980000-18L11 $ 27,250.17
Parks, Damage to Property 0108031-851014 $ 44,505.14
Total: $ 1,148,230.34
6-1
DISCUSSION:
West Coast Highway Median Landscaping Phase 2 —
Notice of Completion for Contract No. 7189-2 (181_11)
September 8, 2020
Page 2
Overall Contract Cost/Time Summary
Awarded
Final Cost at
Contingency
Actual
% Due to
% Due to
Contract Amount
Completion
Allowance
Contract
Directed
Unforeseen
Change
Change
Change
$975,375.50
$1,148,230.34
20%
17.7%
1.7%
16%
Allowed Contract Time +
97
Actual Time
0
Approved Extensions (days) =
Under (-) or Over (+)
This construction contract focused on the second and third of four proposed landscaping
phases on West Coast Highway, extending from the City Oil Field entrance on the western
end to Newport Boulevard on the eastern end.
The work necessary to complete this contract consisted of clearing and grubbing,
removing embossed concrete paving, installing artificial boulders, plants and trees,
landscape establishment and maintenance, irrigation improvements and a staining
restoration treatment for the existing colored/stamped concrete located within the
medians.
The contracted work has now been completed to the satisfaction of the Public Works
Department. A summary of the construction cost is as follows:
Original Bid Amount: $975,350.50
Actual Cost of Bid Items Constructed: $861,907.00
Total Change Orders: $286,323.34
Final Contract Cost: $1,148,230.34
The contract originally estimated 36,495 square feet of old concrete highway pavement
removals that exists underneath the Coast Highway medians. During construction, the
contractor did not encounter concrete pavement to remove, but did however have to
export more unsuitable soil than estimated for the project. The additional soil export cost
totaled $96,723.91, which was largely offset by savings for non-existent concrete
pavement removal.
In addition, change orders for subgrade amendments and drainage improvements totaled
$61,425.49. Due to unexpected Caltrans emergency drainage work within the same area
of West Coast Highway, there were also change orders for cost of delay and revised
traffic control plan totaling $42,763.00. Further change order work included additional
irrigation improvements, replacement palms, artificial boulders and a price adjustment for
the imported topsoil bid item, all of which totaled $40,905.80. Lastly, there were two car
accidents during the course of the project, which required change orders to address the
necessary repairs. The cost of the two accident repairs totaled $44,505.14 and were
billed to the responsible party identified in the accident reports. With the completion of
the project, the final contract cost is approximately 17.7 percent above the original bid
amount.
6-2
West Coast Highway Median Landscaping Phase 2 —
Notice of Completion for Contract No. 7189-2 (181-11)
September 8, 2020
Page 3
A summary of the project schedule is as follows:
Estimated Start of Construction per Annual Baseline Schedule January 6, 2020
Actual Start of Construction Per Notice to Proceed February 10, 2020
Extended Contract Completion Date Inclusive of Extra Work June 26, 2020
Actual Substantial Construction Completion Date June 30, 2020
The project was substantially complete on June 30, 2020 with all landscaping
improvements completed to the satisfaction of the Public Works Department. The
required 90 day landscape maintenance period will end on September 28, 2020.
ENVIRONMENTAL REVIEW:
On November 19, 2019, City Council found this project exempt from the California
Environmental Quality Act (CEQA) pursuant to Section 15301(c) (minor alterations of
existing facility involving negligible or no expansion of capacity) of the CEQA Guidelines,
because this project has no potential to have a significant effect on the environment
NOTICING:
The agenda item has been noticed according to the Brown Act (72 hours in advance of
the meeting at which the City Council considers the item).
ATTACHMENT:
Attachment A — Location Map
6-3
- LIMITS OF WORK
WEST COAST HIGHWAY MEDIAN
LANDSCAPING -PHASE 2
LOCATION MAP
ATTACHMENT A
C
'm
CITY OF NEWPORT BEACH
PUBLIC WORKS DEPARTMENT
C-7189-2 I 11/19/19