HomeMy WebLinkAbout03_AT&T Small Cell SLC0007 Minor Use Permit and CDP_PA2019-150CITY OF NEWPORT BEACH
ZONING ADMINISTRATOR STAFF REPORT
September 10, 2020
Agenda Item No. 3
SUBJECT: AT&T Small Cell SLC0007 (PA2019-150)
Minor Use Permit No. UP2019-043
Coastal Development Permit No. CD2020-120
SITE LOCATION:
Public right-of-way, City streetlight number SLC0007, parkway south of
Ocean Boulevard at the intersection of Channel Road and Ocean
Boulevard
APPLICANT: New Cingular Wireless, LLC
CARRIER: AT&T Mobility
OWNER: City of Newport Beach
PLANNER: Patrick Achis, Assistant Planner
949-644-3237, pachis@newportbeachca.gov
LAND USE AND ZONING
• Public Right-of-Way (ROW)
PROJECT SUMMARY
A request for a minor use permit (MUP) and coastal development permit (CDP) to allow the
installation of a small cell wireless facility on a City-owned streetlight pole. Project
implementation will be fully contained within a parkway located south of Ocean Boulevard
at the intersection of Channel Road and Ocean Boulevard. The project includes the
following: (1) Removal and replacement of an existing City streetlight; (2) Installation of a
small cell wireless facility that consists of four remote radio units, a raycap disconnect, and
an omni-directional antenna within a 12-inch diameter screening shroud. This equipment
would be fixed to the top of the replaced streetlight pole for a maximum height of 33 feet, 9
inches; and (3) Establishment of support equipment below grade.
RECOMMENDATION
1) Conduct a public hearing;
2) Find this project exempt from the California Environmental Quality Act (CEQA)
pursuant to Sections 15302 and 15303 under Class 2 (Replacement or
Reconstruction) and Class 3 (New Construction or Conversion of Small Structures),
respectively, of the State CEQA Guidelines, California Code of Regulations, Title 14,
Division 6, Chapter 3, because it has no potential to have a significant effect on the
1
environment and the exceptions to the Class 3 exemption under Section 15300.2 do
not apply; and
3) Adopt Draft Zoning Administrator Resolution No. _ approving Minor Use Permit No.
UP2019-043 and Coastal Development Permit No. CD2020-120 (Attachment No. ZA
1).
BACKGROUND
Small Cell Wireless Facilities and the City
• Over the last several decades, with the invention of new technologies like
smartphones, tablets, and smartwatches, connectivity for wireless devices drove
telecommunications companies to deploy new equipment to allow for the
transmission of more data. Wireless data demand continues to grow, outpacing
the capacity of the existing telecommunications infrastructure.
• Small cell technology, like that proposed, is now being deployed across the country
as a new solution to resolve soaring data demand and make coverage more
reliable. In contrast to traditional macro wireless sites (i.e., cell towers), small cells
are able to advance a stronger signal over a small radius by the means of minimal
equipment on existing infrastructure. The result is limited visual intrusion and the
enhanced wireless network capacity which residents, businesses, and visitors
demand.
• The City of Newport Beach’s (“City”) regulatory review of wireless telecom siting is
limited by three federal laws: The Communications Act of 1934, the
Telecommunications Act of 1996 (“Telecommunications Act”) and a provision of
the Middle-Class Tax Relief and Job Creation Act of 2012 (“Spectrum Act”).
Together, these laws aim to facilitate and stimulate wireless infrastructure
development and restrict certain aspects of local authority in review and permitting
of wireless telecommunications facilities. On January 14, 2019, Federal
Communications Commission (FCC) Declaratory Ruling and Order FCC 18-133
(“Order”) became effective. This directive further removed barriers to wireless
infrastructure deployment and established accelerated timelines for processing
small wireless facility applications at the local level. It also limited the City’s rights
as a property owner, restricting the type and amount of fees the City can collect
for private use of public property.
• On February 12, 2019, the City Council authorized execution of a Master License
Agreement (“MLA”) (Contract No. C-8584-1) with New Cingular Wireless PCS,
LLC (“AT&T”). The Master License authorized non-exclusive use of City-owned
streetlights to install telecommunications equipment for small cell facilities, and
included approved designs, fee and rent assessment. AT&T is responsible for all
2
AT&T Small Cell SLC0007 (PA2019-150)
Zoning Administrator, September 10, 2020
Page 3
resultant construction, installation, maintenance, and repair of the small cell
facilities, including all related costs and expenses. Further, AT&T is responsible
for complying with all laws, statutes, ordinances, rules, and regulations that may
be required for their projects.
As the local regulatory agency, the City assesses wireless service facilities under
local permitting protocol and ensures sites adhere to responsible regulatory
practices, including safety, accessibility, environmental impact, land use, and
aesthetics. However, Section 332(c)(7)(B)(iv) of U.S. Code Title 47
Telecommunications) reads, “no state or local government may regulate wireless
telecommunication facilitates on the basis of the perceived health effects of radio
frequency (RF) emissions to the extent that the proposed facilities comply with
FCC regulations concerning emissions.” Submitted RF materials from the
Applicant demonstrate the proposal would conform with FCC Rules and
Regulations. Condition of Approval No. 25 requires the Applicant to comply with
all applicable provisions of U.S. Code Title 47 (Telecommunications) rules and
regulations, including those related to radio frequency emissions.
PROJECT SETTING AND DESCRIPTION
City of Newport Beach Streetlight No. SLC0007 is located on the Newport
Peninsula within a parkway south of the Channel Road and Ocean Boulevard
intersection. Abutting land uses are R-1 (Single-Unit Residential), except for a City-
owned, coastal view park to the east, known as West Jetty View Park.
Under the new FCC Order, wireless providers are not required to demonstrate a
significant coverage gap, a qualification previously required by local jurisdictions
in order to support an application. Pursuant to the Order, the City cannot “materially
[inhibit] the introduction of new services or the improvement of existing services.”
Moreover, pursuant to Section 332(c)(7)(B)(i)(II) of U.S. Code Title 47
(Telecommunications), the City may “not regulate the placement, construction or
modification of wireless service facilities in a manner that prohibits the provision of
personal wireless services.” Although not required, the Applicant produced a
coverage map for the project (Attachment No. ZA 4). This map indicates the
proposed facility would boost the supply of capacity and coverage in the vicinity.
Streetlight No. SLC0007 serves as a part of the City’s existing streetlight inventory.
AT&T proposes to: (1) Remove and replace an existing City streetlight; (2) install
a small cell wireless facility that consists of four remote radio units, a raycap
disconnect, and an omni-directional antenna within a 12-inch diameter screening
shroud. This equipment would be fixed to the top of the replaced streetlight pole for
a maximum height of 33 feet, 9 inches; and (3) Establish of support equipment below
grade. Please see the Applicant’s Project Description and Justification as
Attachment No. ZA 5.
3
AT&T Small Cell SLC0007 (PA2019-150)
Zoning Administrator, September 10, 2020
Page 4
For safety and circulation of the area during construction, Condition of Approval
No. 38 included within the draft resolution requires traffic control plans illustrating
compliance with the 2016 WATCHBook (temporary traffic control guidelines in
construction work areas) to be reviewed and approved by the Public Works
Department prior to the issuance of any building permit.
The replacement streetlight pole design is consistent with the size, shape, style,
and design of that existing, including the attached light arm and luminaire. Project
plans are available for reference as Attachment No. ZA 7. Figures 1 and 2 on the
next page depict the existing and proposed site conditions.
Remainder of This Page Intentionally Left Blank
4
AT&T Small Cell SLC0007 (PA2019-150)
Zoning Administrator, September 10, 2020
Page 5
Figure 1. Existing view from southeast corner of Channel Road street end.
Figure 2. Rendering of view from the southeast corner of the Channel Road street
end, showing the replaced streetlight pole, antenna, equipment shroud, and below-
grade equipment vaults.
5
AT&T Small Cell SLC0007 (PA2019-150)
Zoning Administrator, September 10, 2020
Page 6
CONSISTENCY ANALYSIS
Council Policy Manual
The project site is designated as Public Right-of-Way (ROW), which is property
held in trust by the City, and allows for the construction and maintenance of public
roads, crosswalks, pedestrian walkways, electric transmission lines, oil or gas
pipeline, water line, sanitary or storm sewer, or other similar uses. City Council
Policy L-23 (Siting of Wireless Telecommunications Equipment on City-Owned
Property) governs procedures and locations for siting wireless telecommunications
equipment in the ROW. Streetlights are eligible for telecom use, subject to
entitlements (such as this minor use permit request), yearly rent, and a license
agreement.
General Plan
General Plan Natural Resources Goal NR 21 and LCP Policy 4.4.4-1 recommends
“minimized visual impacts of signs and utilities.” The proposed design is consistent
with these requirements by introducing no new vertical obstructions in the ROW,
employing stealth elements like colorization (painting to match the streetlight pole),
and installing the associated equipment below grade. Conditions of Approval No.
21 and 22 prohibit advertising signage or identifying logos on any telecom facility
except for small identification, address, warning, and similar information plates.
Signage required by State or Federal regulations shall be allowed in its smallest
permissible size.
General Plan Land Use Policy LU 6.1.3 promotes “architecture and planning that
complements adjoining uses.” The proposed design adjoins residential uses and
aligns with LU 6.1.3 by copying the size, shape, style, and design of the existing
streetlight pole to decrease potential disruption of the visual environment. Adverse
impact to circulation, aesthetics, sounds, or odor are not anticipated from project
implementation.
General Plan Land Use Policy LU 4 calls for the “management of growth and
change to protect and enhance the livability of neighborhoods and achieve distinct
and economically vital business and employment districts, which are correlated
with supporting infrastructure and public services and sustain Newport Beach’s
natural setting.” The proposed small cell facility upholds the intent of LU 4 by
providing infrastructure to add system capacity for service gaps that may occur for
residents and visitors of the area in regular and high demand periods. It also
benefits the community by improving the existing coverage and capacity to
increase the voice and data system already in use by its customers. The facility is
designed to adapt to and accept future technologies, such as 5G, and will help
meet local demand and sustain the livability of the area.
6
AT&T Small Cell SLC0007 (PA2019-150)
Zoning Administrator, September 10, 2020
Page 7
Zoning Code, Local Coastal Program and Implementation Plan
Newport Beach Municipal Code (NBMC) Chapters 20.49 and 21.49 (Wireless
Telecommunication Facilities) outline State- and federally compliant
telecommunication facility development standards and details permit procedures
based on facility “Class.” Class of a wireless facility is characterized by its
installation type and location. Small cell facilities located on City-owned streetlights
in the ROW are a Class 3 specification (Public Right-of-Way Installations) and
require the Applicant to obtain a Minor Use Permit from the Zoning Administrator
(NBMC Section 20.49.060 [Permit Review Procedures]). NBMC Subsection
21.49.040(A) (Preferred Locations) prioritizes telecom facilities from most
preferred (1) to least preferred (4) as follows: (1) collocation of a new facility at an
existing facility; (2) Class 1 (Stealth/Screened); (3) Class 2 (Visible Antennas) and
Class 3 (Public Right-of-Way); and (4) Class 4 (Freestanding Structure). Although
lower on the listing of priority facilities, the proposed facility consists of one small
cell facility that is designed to not visually dominate the surrounding area and
instead to blend into the existing block.
The project is located within the Coastal Zone. Subsection 21.49.020(B) (Permit
and Agreement Required) of the NBMC requires a coastal development permit for
any wireless telecommunication facility unless said facility is exempted by
Subsection 21.49.020(C) (Exempt Facilities). In this case, the project does not
meet any of the prescribed exemptions; therefore, a coastal development permit
is required. The project was reviewed for consistency with the Public View
Protection regulations of Section 21.49.050(B) (Public View Protection) of the
NBMC. The site is located adjacent to a public view point and public view as
identified on the Coastal Land Use Plan Map 4-3 (Coastal Views).
NBMC Section 20.49.050 and 21.49.050 (General Development and Design
Standards) require projects to be visually compatible with surrounding structures.
In reviewing this application, the Zoning Administrator shall consider the proposed
facility’s use of color blending, equipment screening, and the limited size of the
equipment designed consistently with the aforementioned criteria. All
telecommunications equipment on top of the streetlight pole would be concealed
within a painted-to-match 12-inch diameter shroud. The proposed small cell facility
would rely on likeness with the streetlight pole through style, color, and material to
help disguise its presence. Engineering of the replacement streetlight pole
accommodates and withstands the weight of the small cell equipment and could
display a future City banner, if needed. Electrical and wiring components of the
telecommunications equipment are designed to be fully contained within the new
streetlight pole. The overall height of 33 feet, 9 inches from finished grade to the
top of the proposed facility complies with the maximum allowed. Equipment not
contained within the shroud on the streetlight pole would be out of sight, located
7
AT&T Small Cell SLC0007 (PA2019-150)
Zoning Administrator, September 10, 2020
Page 8
below the ground in the adjacent ROW. Condition of Approval No. 32 requires
approved design drawings from Southern California Edison (SCE) of the power
supply to the small cell facility before construction of the facility is to commence.
The existing development surrounding the subject parkway on Channel Road is
residential except for West Jetty View Park to the east and southeast, which is
zoned for parks and recreation. The zoning designations are R-1 (Single-Unit
Residential) and Parks and Recreation (PR) respectively. The height of the
replacement streetlight with proposed equipment will not exceed the height
limitation of 35 feet and is not anticipated to dominate the streetscape.
Photographic visual simulations of the facility, depicting the existing and proposed
conditions, have been prepared by the Applicant and are included as Attachment
No. ZA 6.
Analysis of Coastal Views and Access
The subject location is between the first public roadway paralleling the sea and the
sea and is adjacent to the viewshed of a public viewpoint at West Jetty View Park,
as identified on the Coastal Land Use Plan Map 4-3 (Coastal Views). Site
evaluation revealed that the proposed project is consistent with the surrounding
development context and will not affect the existing views afforded from West Jetty
View Park. NBMC Chapter 21.49.040 (Telecom Facility Preferences and
Prohibited Locations) allows new telecom facilities located on the sea and first
public road paralleling the sea when said facilities are on an existing utility tower.
The project scope involves the removal and replacement of an existing City
streetlight in the same location with the same luminaire height and it complies with
all applicable development standards. West Jetty Park is approximately 40 to 50
feet in width and improved with public benches and landscaping that orients and
frames views toward the Newport Bay and not over the subject site.
Consistent with Local Coastal Plan (LCP) Policies 4.4.1-1, 4.4.1-7, and 4.4.4-1,
design elements of the project help to minimize impacts to coastal resources and
protect the visual quality of the coastal zone. Within the surrounding residential
context, the replacement streetlight is consistent with the size, shape, style, and
design of the existing pole and other poles in the vicinity. The proposed
replacement streetlight and antenna structure will comply with the maximum
allowable height limit of 35 feet from existing finished grade. The location of the
existing streetlight pole would not change and, aside from the approximately 6-foot
height extension for the antenna shroud and minimum required signage, there are
no other detectable changes to the visual environment.
The streetlight is located within a parkway and separated from the adjacent
residence by approximately seven feet of landscaping and a concrete public
sidewalk. There are other City streetlights, street signs, and wayfinding signs
8
AT&T Small Cell SLC0007 (PA2019-150)
Zoning Administrator, September 10, 2020
Page 9
common to City streetscapes along Channel Road. Unlike other streetscapes, this
corridor on Channel Road is unique given that it contains one of the City ’s three
tsunami sirens. (See Figure 3 below for a visual of existing site conditions.)
Parkways on either side of Channel Road are landscaped with a series of mature
palm trees that vary in height and species. On the project side of Channel Road,
there are three parkways with a total of four mature palm trees averaging 45 feet
in height. While the existing streetlight pole is slightly staggered, it follows the
existing pattern of palm trees. In this way, the proposed project and associated
equipment is anticipated to coordinate well into the existing streetscape and
surrounding visual context of the environment.
Figure 3. View of existing conditions facing south on Channel Road, toward the beach
There will be no negative impacts on coastal views or coastal resources with the
project’s implementation. There will be no changes or obstructions to the
pedestrian right-of-way and access on Channel Road will be unaffected. As such,
the project will not affect the public’s ability to gain access to, use, and/or view the
coast and nearby recreational facilities.
Existing SLC0007 to be removed and
replaced in same location Existing tsunami warning system
West Jetty View Park
9
AT&T Small Cell SLC0007 (PA2019-150)
Zoning Administrator, September 10, 2020
Page 10
HEALTH AND SAFETY
Section 332(c)(7)(B)(iv) of U.S. Code Title 47 (Telecommunications) reads, “no
state or local government may regulate wireless telecommunication facilitates on
the basis of the perceived health effects of radio frequency (RF) emissions to the
extent that the proposed facilities comply with FCC regulations concerning
emissions.” Submitted RF materials from the Applicant demonstrate the proposal
would conform with FCC Rules and Regulations. Condition of Approval No. 25
requires the Applicant to comply with all applicable provisions of U.S. Code Title
47 rules and regulations, including those related to FCC Radio Frequency safety.
ALTERNATIVE SITES CONSIDERED
Site alternatives were identified and investigated by the Applicant as possible
alternate locations for this small cell facility; however, all sites were found by the
Applicant to be not viable (see Attachment No. ZA 3). Existing right-of-way
infrastructure options located off Channel Road in the interior streets of the
residential community consist of small upright luminaire poles, which stand slightly
taller than the height of a stop sign at 8 feet. These luminaire poles are not viable
alternative locations because of the design constraints, visual compatibility with
surrounding infrastructure, and the fact that the existing height would dramatically
increase by nearly 25 feet.
The Applicant studied City Streetlight Nos. SLC0005, SLC0006, SLC0008 as
Alternative Site No. 1, 2, 3. These alternative sites are all located in West Jetty
View Park. SLC0005 is located approximately 130 feet south of the proposed
streetlight, SLC0006 is located approximately 55 feet southeast, and SLC0008 is
approximately 110 feet northwest. Installation of the small cell in these locations
would require major trenching within the park lawn and landscape area. Alternative
sites 1, 2, and 3 would be in the direct viewshed of the identified protected public
viewpoint, resulting in an adverse visual impact to coastal views. It should be noted
that City staff was not supportive of locating the proposed facility on these
streetlights and agrees with the Applicant’s conclusion that these are not viable
sites. Staff’s review of the subject area did not identify any additional alternative
sites to be studied.
AT&T explored the alternative of constructing an entirely new streetlight pole in the
vicinity, but this was not possible for several reasons. The first being that NBMC
Sections 20.40.040 and 21.49.040 (Telecom Facility Preferences and Prohibited
Locations) prohibit new telecom facilities located on the sea and first public road
paralleling the sea, unless telecom facilities are on an existing utility tower; no new
utility infrastructure would be allowed in order to install the proposed facility. The
Public Works Department, General Plan Policy NR 21, and LCP Section 4.4.4-1
prohibit new vertical intrusions in the right-of-way. Thirdly, new vertical intrusions
10
AT&T Small Cell SLC0007 (PA2019-150)
Zoning Administrator, September 10, 2020
Page 11
within the AT&T’s target area are more visually disruptive to the existing
environment.
The Applicant’s analysis concluded that a more preferred location as defined by
NBMC Subsection 21.49.040(A) (Preferred Locations), such as a collocation or a
Class 1 or 2 facility, would not be technically feasible from a coverage or
construction perspective.
ENVIRONMENTAL REVIEW
This project is exempt from the California Environmental Quality Act (CEQA) pursuant to
Sections 15302 and 15303 under Class 2 (Replacement or Reconstruction) and Class 3
(New Construction or Conversion of Small Structures), respectively, of the CEQA
Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no
potential to have a significant effect on the environment. Class 2 consists of replacement
or reconstruction of existing structures and facilities where the new structure will be
located on the same site as the structure replaced and will have substantially the same
purpose and capacity as the structure replaced. Class 3 consists of construction and
location of limited numbers of new, small facilities or structures; installation of small new
equipment and facilities in small structures; and the conversion of existing small
structures from one use to another where only minor modifications are made in the
exterior of the structure.
In this case, the proposal includes the removal and replacement of an existing City
streetlight pole to install a small telecommunications wireless facility, including below-
grade accessory equipment.
The exceptions to the Class 3 categorical exemptions under Section 15300.2 are not
applicable. The project location does not impact an environmental resource of hazardous
or critical concern, does not result in cumulative impacts, does not have a significant effect
on the environment due to unusual circumstances, does not damage scenic resources
within a state scenic highway, is not a hazardous waste site, and is not identified as a
historical resource.
PUBLIC NOTICE
Notice of this application was published in the Daily Pilot, mailed to all owners of property
and residential occupants within 300 feet of the boundaries of the site (excluding
intervening rights-of-way and waterways) including the Applicant, and posted on the
subject streetlight pole at least 10 days before the scheduled hearing, consistent with the
provisions of the Municipal Code. Although not required, a courtesy notice was mailed to
residential occupants living within the aforementioned radius. Additionally, the item
appeared on the agenda for this meeting, which was posted at City Hall and on the City
website.
11
AT&T Small Cell SLC0007 (PA2019-150)
Zoning Administrator, September 10, 2020
Page 12
APPEAL PERIOD:
This action shall become final and effective 14 days following the date the Resolution is
adopted unless within such time an appeal or call for review is filed with the Community
Development Director in accordance with the provisions of Title 21 (Local Coastal
Implementation Plan) of the Newport Beach Municipal Code. Final action taken by the City
may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the
City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through
13120, and Section 30603 of the Coastal Act. For additional information on filing an appeal,
contact the Planning Division at 949-644-3200.
Prepared by:
BMZ/pda
Attachments: ZA 1 Draft Resolution
ZA 2 Vicinity Map
ZA 3 Alternative Locations Studied and Rejected
ZA 4 Coverage Maps
ZA 5 Applicant’s Project Description and Justification
ZA 6 Photographic Visual Simulations
ZA 7 Project Plans
12
Attachment No. ZA 1
Draft Resolution
13
RESOLUTION NO. ZA2020-###
A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE
CITY OF NEWPORT BEACH, CALIFORNIA, APPROVING MINOR
USE PERMIT NO. UP2019-043 AND COASTAL DEVELOPMENT
PERMIT NO. CD2020-120 FOR A SMALL CELL WIRELESS
FACILITY LOCATED WITHIN THE PUBLIC RIGHT-OF-WAY ON
CITY STREETLIGHT NUMBER SLC0007, WITHIN A PARKWAY,
SOUTH OF OCEAN BOULEVARD AT THE INTERSECTION OF
CHANNEL ROAD AND OCEAN BOULEVARD(PA2019-150)
THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS
FOLLOWS:
SECTION 1. STATEMENT OF FACTS.
1. An application was filed by New Cingular Wireless, LLC (“Applicant”), with respect to
City of Newport Beach Streetlight Number SLC0007, located within the public right-of-
way on City streetlight number SLC0007, with the parkway south of Ocean Boulevard
at the intersection of Channel Road and Ocean Boulevard.
2. The Applicant requests a minor use permit and coastal development permit to install small
cell wireless facility on a City-owned streetlight pole. Project implementation will be fully
contained within a parkway located south of Channel Road and Ocean Boulevard. The
project includes the following: (1) Removal and replacement of an existing City streetlight;
(2) Installation of a small cell wireless facility that consists of four (4) remote radio units, a
raycap disconnect, and an omni-directional antenna within a 12-inch diameter screening
shroud. This equipment would be fixed to the top of the replaced streetlight pole for a
maximum height of 33 feet, 9 inches; and (3) Establishment of support equipment below
grade.
3. The streetlight pole is located within the public right-of-way. The proposal is regulated
by City Council Policy L-23 (Siting of Wireless Telecommunications Equipment on City-
Owned Property), as well as Newport Beach Municipal Code (NBMC) Chapter 20.49
(Wireless Telecommunication Facilities).
4. The Project is located within the Coastal Zone. Subsection 21.49.020(B) (Permit and
Agreement Required) of the NBMC requires a coastal development permit for a wireless
telecommunication facility unless said facility is exempted by Subsection 21.49.020(C)
(Exempt Facilities). In this case, the Project does not meet any of the prescribed
exemptions; therefore, a coastal development permit is required.
5. A telephonic public hearing was held online on September 10, 2020, observing
restrictions due to the Declaration of a State Emergency and Proclamation of Local
Emergency related to COVID-19. A notice of time, place and purpose of the hearing was
14
Zoning Administrator Resolution No. ZA2020-###
Page 2 of 16
01-25-19
given in accordance with the NBMC. Evidence, both written and oral, was presented to,
and considered by, the Zoning Administrator at this hearing.
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION.
1. This project is exempt from the California Environmental Quality Act (CEQA) pursuant
to Sections 15302 and 15303 under Class 2 (Replacement or Reconstruction) and Class
3 (New Construction or Conversion of Small Structures), respectively, of the CEQA
Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no
potential to have a significant effect on the environment. Class 2 consists of replacement
or reconstruction of existing structures and facilities where the new structure will be
located on the same site as the structure replaced and will have substantially the same
purpose and capacity as the structure replaced. Class 3 consists of construction and
location of limited numbers of new, small facilities or structures; installation of small new
equipment and facilities in small structures; and the conversion of existing small
structures from one (1) use to another where only minor modifications are made in the
exterior of the structure.
2. In this case, the proposal includes the removal and replacement of an existing City
streetlight pole to install a small cell wireless facility, including below-grade accessory
equipment.
3. The exceptions to the Class 3 categorical exemption under Section 15300.2 are not
applicable. The project location does not impact an environmental resource of
hazardous or critical concern, does not result in cumulative impacts, does not have a
significant effect on the environment due to unusual circumstances, does not damage
scenic resources within a state scenic highway, is not a hazardous waste site, and is
not identified as a historical resource.
SECTION 3. REQUIRED FINDINGS.
Minor Use Permit
In accordance with NBMC Subsection 20.52.020(F) (Conditional Use Permits and Minor Use
Permits), the following findings and facts in support of such findings are set forth:
Finding:
A. The use is consistent with the General Plan and any applicable specific plan.
Facts in Support of Finding:
1. SLC0007 is designated as Public Right-of-Way (ROW), which is property held in trust
by the City, and allows for the construction and maintenance of public roads, crosswalks,
pedestrian walkways, electric transmission lines, oil or gas pipeline, water line, sanitary
or storm sewer, or other similar uses. City Council Policy L-23 (Siting of Wireless
Telecommunications Equipment on City-Owned Property) governs procedures and
15
Zoning Administrator Resolution No. ZA2020-###
Page 3 of 16
01-25-19
locations for siting wireless telecommunications equipment in the ROW. Streetlights are
eligible for telecom use, subject to entitlements (such as the subject request), yearly
rent, and a license agreement.
2. The City of Newport Beach General Plan (“General Plan”) Natural Resources Goal NR
21 recommends the “minimized visual impacts of signs and utilities.” The proposed
design is consistent with NR 21 by introducing no new vertical obstructions in the ROW,
employing stealth elements like colorization (painting to match the streetlight pole), and
installing the associated equipment below grade. Conditions of Approval No. 21 and 22
prohibit advertising signage or identifying logos on the small cell facility except for small
identification, address, warning, and similar information plates. Signage required by
State or Federal regulations shall be allowed in its smallest permissible size.
3. General Plan Land Use Policy LU 6.1.3 promotes “architecture and planning that
complements adjoining uses.” The proposed design adjoins residential uses and aligns
with LU 6.1.3 by copying the size, shape, style, and design of the existing streetlight
pole to decrease potential disruption of the visual environment. Adverse impact to
circulation, aesthetics, sounds, or odor are not anticipated from project implementation.
4. General Plan Land Use Policy LU 4 calls for the “management of growth and change to
protect and enhance the livability of neighborhoods and achieve distinct and
economically vital business and employment districts, which are correlated with
supporting infrastructure and public services and sustain Newport Beach’s natural
setting.” The proposed small cell facility upholds the intent of LU 4 by providing
infrastructure to add system capacity for service gaps that may occur for residents and
visitors of the area in regular and high demand periods. It also benefits the community
by improving the existing coverage and capacity to increase the voice and data system
already in use by its customers. The facility is designed to adapt to and accept future
technologies, such as 5G, and will help meet local demand and sustain the livability of
the area.
5. City streetlight Number SLC0007 is not located within a specific plan area
Finding:
B. The use is allowed within the applicable zoning district and complies with all other applicable
provisions of this Zoning Code and the Municipal Code.
Facts in Support of Finding:
1. See Fact in Support of Finding A.1, which is hereby incorporated by reference.
2. Wireless telecommunication facilities are regulated by NBMC Chapter 20.49 (Wireless
Telecommunication Facilities). Small cell equipment in the ROW assigns the project a
Class 3 specification (Public Right-of-Way Installations) and requires the Applicant to
16
Zoning Administrator Resolution No. ZA2020-###
Page 4 of 16
01-25-19
obtain a minor use permit from the Zoning Administrator (NBMC Section 20.49.060
[Permit Review Procedures]).
3. NBMC Subsection 20.49.040(A) (Preferred Locations) prioritizes telecom facilities from
most preferred (1) to least preferred (4) as follows: (1) collocation of a new facility at an
existing facility; (2) Class 1 (Stealth/Screened); (3) Class 2 (Visible Antennas) and Class
3 (Public Right-of-Way); and (4) Class 4 (Freestanding Structure). Although lower on
the listing of priority facilities, the proposed facility consists of one (1) small cell facility
that is designed to not visually dominate the surrounding area and instead to blend into
the existing block.
4. NBMC Section 20.49.050 (General Development and Design Standards) requires
projects to be visually compatible with surrounding structures. In reviewing this
application, the Zoning Administrator shall consider the proposed facility’s use of color
blending, equipment screening, and the limited size of the equipment designed
consistently with the aforementioned criteria. All telecommunications equipment on top
of the streetlight pole would be concealed within a painted-to-match 12-inch diameter
shroud. The proposed small cell facility would rely on likeness with the streetlight pole
through style, color, and material to help disguise its presence. Engineering of the
replacement streetlight pole accommodates and withstands the weight of the small cell
equipment and could display a future City banner, if needed. Electrical and wiring
components of the telecommunications equipment are designed to be fully contained
within the new streetlight pole. The overall height of 33 feet, 9 inches from finished grade
to the top of the proposed facility complies with the maximum allowed. Equipment not
contained within the shroud on the streetlight pole would be out of sight, located below
the ground in the adjacent ROW. Condition of Approval No. 33 requires approved design
drawings from Southern California Edison (SCE) of the power supply to the small cell
facility before construction of the facility is to commence.
5. The existing development surrounding the subject parkway on Channel Road is
residential with the exception of West Jetty View Park to the east/southeast which is
zoned for parks and recreation. The zoning designations are R-1 (Single-Unit
Residential) and Parks and Recreation (PR) respectively. The height of the replacement
streetlight with proposed equipment will not exceed the height limitation of 35 feet and
is not anticipated to dominate the streetscape.
6. The streetlight SLC0007 is located within a parkway and separated from the adjacent
residence by approximately seven feet of landscape and concrete public sidewalk.
There are other City streetlights, street signs, and wayfinding signs common to City
streetscapes adorning Channel Road. Unlike other streetscapes, this corridor on
Channel Place is unique insofar as it contains one of the City’s three tsunami sirens.
Parkways on either side of Channel Road enjoy a series of mature palm trees that vary
in height and species. On the project side of Channel Road, there are three parkways
with a total of four mature palm trees averaging 45 feet tall. While the existing streetlight
pole is slightly staggered, it follows the existing pattern of palm trees. In this way, the
subject streetlight’s location would serve to integrate the antenna shroud into the visual
17
Zoning Administrator Resolution No. ZA2020-###
Page 5 of 16
01-25-19
context of the environment. For the reasons listed above, the proposed streetlight and
associated equipment is anticipated to coordinate well into the existing streetscape.
7. Submitted materials from the Applicant demonstrate the proposal would conform with
Federal Communications Commission (FCC) Rules and Regulations regarding safety
and radio frequency (RF) emissions.
8. The Project will comply with applicable requirements of the NBMC with construction as
shown on the plans and implementation of the conditions of approval.
Finding:
C. The design, location, size, and operating characteristics of the use are compatible with the
allowed uses in the vicinity.
Facts in Support of Finding:
1. City of Newport Beach Streetlight No. SLC0007 serves as a part of the City’s existing
streetlight inventory. The Applicant proposes to remove and replace SLC0007 with a
new streetlight in the same location while maintaining the existing luminaire heights of
27 feet, 11 inches. The telecommunications equipment will be installed on top of the
new streetlight pole resulting in an overall height of 33 feet, 9 inches. All supporting
equipment will be installed below-grade adjacent to the streetlight, within the public right-
of-way.
2. The replacement streetlight pole design is consistent with the size, shape, style, and
design of that existing, including the attached light arms and luminaire sensors. For
safety and circulation of the area during construction, Condition of Approval No. 37
requires traffic control plans illustrating compliance with the 2016 WATCHBook to be
reviewed and approved by the Public Works Department prior to the issuance of any
building permit.
3. The proposed telecom facility is anticipated to enhance coverage and capacity for
residents, visitors and businesses in the neighborhood by providing wireless access to
voice and data transmission services. The proposed telecom facility is not expected to
result in any material changes to the character of the local community.
4. Under FCC Orders, wireless providers are not required to demonstrate a significant
coverage gap, a qualification previously required by local jurisdictions in order to support
an application. Pursuant to the Order, the City cannot “materially [inhibit] the introduction
of new services or the improvement of existing services.” Moreover, pursuant to Section
332(c)(7)(B)(i)(II) of U.S. Code Title 47 (Telecommunications), the City may “not
regulate the placement, construction or modification of wireless service facilities in a
manner that prohibits the provision of personal wireless services.” Although not required,
the Applicant produced a coverage map for the project. This map indicates the proposed
facility would boost the supply of capacity and coverage in the vicinity.
18
Zoning Administrator Resolution No. ZA2020-###
Page 6 of 16
01-25-19
5. See Facts in Support of Finding B.4, B.6, and B.7, which are hereby incorporated by
reference.
6. The proposed facility will be unmanned, will have no impact on the circulation system,
and, designed and conditioned, will not generate noise, odor, smoke, or any other
adverse impacts to adjacent land uses.
Finding:
D. The site is physically suitable in terms of design, location, shape, size, operating
characteristics, and the provision of public and emergency vehicle (e.g., fire and medical)
access and public services and utilities.
Facts in Support of Finding:
1. Adequate public and emergency vehicle access, public services, and utilities are
provided to and around the subject site, and the proposed use will not change this.
2. The proposed facility will be unmanned and will have no permanent impact on the
circulation system and adjacent land uses due to its location in the parkway, outside of
existing vehicle or pedestrian circulation areas.
3. The Public Works Department and Utilities Department have reviewed the project
proposal and do not have any concerns regarding access, public services, or utilities
provided to the existing neighborhood and surrounding area.
Finding:
E. Operation of the use at the location proposed would not be detrimental to the harmonious
and orderly growth of the City, nor endanger, jeopardize, or otherwise constitute a hazard
to the public convenience, health, interest, safety, or general welfare of persons residing or
working in the neighborhood of the proposed use.
Facts in Support of Finding:
1. The proposed facility will only require periodic maintenance and will not generate any
type of significant adverse impacts to the environment, such as noise, odor, smoke, etc.
2. The proposed facility must and will comply with the applicable Federal and State rules,
regulations and standards thus, ensuring public health and safety.
3. See Facts in Support of Finding B.4, B.6, B.7, B.8, and B.9, which are hereby
incorporated by reference.
4. The proposed telecom facility will be effectively blended based upon the design and
location with the incorporation of the conditions of approval to the greatest extent
feasible. As a result, the proposed facility at this location is not expected to result in
19
Zoning Administrator Resolution No. ZA2020-###
Page 7 of 16
01-25-19
conditions that are materially detrimental to nearby property owners, residents, and
businesses, nor to public health or safety.
Wireless Telecommunications Facility
In accordance with NBMC Subsection 20.49.060(H)(1) (General Findings for Telecom
Facilities), the following additional findings and facts in support of such findings are set forth:
Finding:
F. The proposed telecom facility is visually compatible with the surrounding neighborhood.
Facts in Support of Finding:
1. See Facts in Support of Finding B.4 to B.7, which are hereby incorporated by reference.
2. There are other City streetlights, street signs, and wayfinding signs common to City
streetscapes along Channel Road. Unlike other streetscapes, this corridor on Channel
Road is unique given that it contains one of the City s three tsunami sirens. Parkways
on either side of Channel Road are landscaped with a series of mature palm trees that
vary in height and species. On the project side of Channel Road, there are three
parkways with a total of four mature palm trees averaging 45 feet in height. While the
existing streetlight pole is slightly staggered, it follows the existing pattern of palm trees.
In this way, the proposed project and associated equipment is anticipated to coordinate
well into the existing streetscape and surrounding visual context of the environment.
3. Alternative sites studied that are located farther from the residential district and/or West
Jetty View Park are not feasible to fulfill the coverage needs that installation at the
proposed site provides.
4. The proposed facility and below-grade accessory equipment meets the City’s design
parameters approved by the City’s Master License Agreement, which emphasizes
stealth techniques and best practices to not be materially detrimental to the surrounding
area.
Finding:
G. The proposed telecom facility complies with height, location and design standards, as
provided for in this chapter.
Facts in Support of Finding:
1. The 33-foot, 9-inch tall small cell facility would comply with the maximum height limit of
35 feet for telecom facilities installed on streetlights within the public right-of-way.
20
Zoning Administrator Resolution No. ZA2020-###
Page 8 of 16
01-25-19
2. See Facts in Support of Finding B in its entirety.
3. The application includes documentation indicating the need to provide and improve
coverage to the residential areas within the City of Newport Beach. Moreover, the
additional system capacity provided by the proposed facility will address service gaps
that occur during high demand periods, as well as service gaps that exist at all demand
periods to the surrounding area. The proposed small cell site will help AT&T to meet its
coverage objectives and improve coverage to nearby areas that are currently marginal.
Finding:
H. An alternative site(s) located further from a residential district, public park or public facility
cannot feasibly fulfill the coverage needs fulfilled by the installation at the proposed site.
Facts in Support of Finding:
1. See Facts in Support of Finding C.2 and C.4.
2. Three (3) alternative existing streetlights neighboring the project were identified and
investigated by the Applicant, but these sites were found not practicable.
3. AT&T studied City Streetlight No. SLC0005, SLC0006, SLC0008 as Alternative Site
Nos. 1, 2, 3. These alternative sites are all located in West Jetty View Park. SLC0005 is
located approximately 130 feet south of the proposed streetlight, SLC0006 is located
approximately 55 feet southeast, and SLC0008 is approximately 110 feet northwest.
Installation of the small cell in these locations would require major trenching within the
park lawn and landscape area. Alternative sites 1, 2, and 3 would be in the direct
viewshed of the identified protected public viewpoint, resulting in an adverse visual
impact to coastal views.
4. The Applicant studied City Streetlight Nos. SLC0005, SLC0006, SLC0008 as Alternative
Site No. 1, 2, 3. These alternative sites are all located in West Jetty View Park. SLC0005
is located approximately 130 feet south of the proposed streetlight, SLC0006 is located
approximately 55 feet southeast, and SLC0008 is approximately 110 feet northwest.
Installation of the small cell in these locations would require major trenching within the
park lawn and landscape area. Alternative sites 1, 2, and 3 would be in the direct
viewshed of the identified protected public viewpoint, resulting in an adverse visual
impact to coastal views. It should be noted that City staff was not supportive of locating
the proposed facility on these streetlights and agrees with the Applicant’s conclusion
that these are not viable sites. Staff s review of the subject area did not identify any
additional alternative sites to be studied.
5. Small cell facilities are low powered and must be located at the precise location selected
to serve the network traffic demands of the specific limited area. Small cell facilities use
an omnidirectional antenna that propagates in 360 degrees and function most efficiently
on an unobstructed, vertical, structure such as a streetlight or utility pole.
21
Zoning Administrator Resolution No. ZA2020-###
Page 9 of 16
01-25-19
Finding:
I. An alternative plan that would result in a higher preference facility class category for the
proposed facility is not available or reasonably feasible and desirable under the
circumstances.
Facts in Support of Finding:
1. Fact in Support of finding C.4 is incorporated by reference.
2. The Applicant’s analysis concluded that a more preferred location as defined by NBMC
Subsections 20.49.040(A) (Preferred Locations), such as a collocation or a Class 1 or 2
facility, would not be technically feasible from an RF or construction perspective. The
analysis explained that small cell facilities are low powered and must be located at the
precise location selected to serve the network traffic demands of the specific limited
area. Further, this type of service cannot be accomplished with a traditional macro
collocation or building mounted site in the area.
Coastal Development Permit
In accordance with Subsection 21.52.015(F) (Coastal Development Permits, Findings and
Decision) of the NBMC, the following findings and facts in support of such findings are set forth:
Finding:
J. Conforms to all applicable sections of the certified Local Coastal Program.
Facts in Support of Finding:
1. The project is considered a Class 3 (Public Right-of-Way) installation. Section 21.49.040
(Telecom Facility Preferences and Prohibited Locations) of the NBMC lists Class 3
installations as third on the installation preference list. NBMC Chapter 21.49.040(B)
(Telecom Facility Preferences and Prohibited Locations) allows new telecom facilities
located on the sea and first public road paralleling the sea when said facilities are on an
existing utility tower.
2. See Fact in Support of Finding I.2.
3. The subject location is between the first public roadway paralleling the sea and the sea
and is adjacent to the viewshed of a public viewpoint at West Jetty View Park, as
identified on the Coastal Land Use Plan Map 4-3 (Coastal Views). Site evaluation
revealed that the proposed project is consistent with the surrounding development
context and will not affect the existing views afforded from West Jetty View Park. The
project scope involves the removal and replacement of an existing City streetlight in the
same location with the same luminaire height and it complies with all applicable
development standards. West Jetty Park is approximately 40 to 50 feet in width and
22
Zoning Administrator Resolution No. ZA2020-###
Page 10 of 16
01-25-19
improved with public benches and landscaping that orients and frames views toward the
Newport Bay and not over the subject site.
4. Consistent with Local Coastal Plan (LCP) Policies 4.4.1-1, 4.4.1-7, and 4.4.4-1, design
elements of the project help to minimize impacts to coastal resources and protect the
visual quality of the coastal zone. Within the surrounding residential context, the
replacement streetlight is consistent with the size, shape, style, and design of the
existing pole and other poles in the vicinity. The proposed replacement streetlight and
antenna structure will comply with the maximum allowable height limit of 35 feet from
existing finished grade. The location of the existing streetlight pole would not change
and, aside from the approximately 6-foot height extension for the antenna shroud and
minimum required signage, there are no other detectable changes to the visual
environment.
5. See Fact in Support of Finding F.2.
6. The proposed replacement streetlight and antenna structure will comply with the
maximum allowable height limit of 35 feet from existing finished grade.
7. There will be no changes or obstructions to the pedestrian right-of-way and access on
Channel Road will be unaffected. As such, the project will not affect the public’s ability
to gain access to, use, and/or view the coast and nearby recreational facilities.
Finding:
K. Conforms with the public access and public recreation policies of Chapter 3 of the
Coastal Act if the project is located between the nearest public road and the sea or
shoreline of any body of water located within the coastal zone .
Facts in Support of Finding:
1. Streetlight No. SLC0007 is located between the nearest public road and the sea or
shoreline. The project site is within an parkway on Channel Road. All equipment will be
either concealed within the replacement pole or vaulted below grade. Vertical access to the
beach is provided by way of street-ends in the area, including Channel Road. Lateral access
along the beach provided on the beach itself and along the Oceanfront Boardwalk. The
equipment will be below grade and will not impact any public way.
2. The project will allow the installation of a small cell facility that complies with all applicable
Local Coastal Program (LCP) development standards and maintains development
attributes consistent with the existing and anticipated future surrounding neighborhood
pattern of development. Therefore, the project does not have the potential to degrade public
views within the Coastal Zone.
23
Zoning Administrator Resolution No. ZA2020-###
Page 11 of 16
01-25-19
SECTION 4. DECISION.
NOW, THEREFORE, BE IT RESOLVED:
1. This project is exempt from the California Environmental Quality Act (CEQA) pursuant
to Sections 15302 and 15303 under Class 2 (Replacement or Reconstruction) and Class
3 (New Construction or Conversion of Small Structures), respectively, of the CEQA
Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no
potential to have a significant effect on the environment. The exceptions to the Class 3
exemption do not apply.
2. The Zoning Administrator of the City of Newport Beach hereby approves Minor Use
Permit No. UP2019-043 and Coastal Development Permit No. CD2020-120, subject to
the conditions set forth in “Exhibit A,” which is attached hereto and incorporated by
reference.
3. This action shall become final and effective 14 days following the date this Resolution
was adopted unless within such time an appeal or call for review is filed with the
Community Development Director in accordance with the provisions of Title 21 Local
Coastal Implementation Plan, of the Newport Beach Municipal Code. The project site is
not located within the appeal area of the coastal zone; therefore, final action by the City
may not be appealed to the California Coastal Commission.
PASSED, APPROVED, AND ADOPTED THIS 10TH DAY OF SEPTEMBER, 2020.
______________________
Jaime Murillo, Zoning Administrator
24
Zoning Administrator Resolution No. ZA2020-###
Page 12 of 16
01-25-19
EXHIBIT “A”
CONDITIONS OF APPROVAL
Planning Division
1. The development shall be in substantial conformance with the plans, including elevation
exhibits and visual simulations, stamped and dated with the date of this approval (except
as modified by applicable conditions of approval).
2. The project is subject to all applicable City ordinances, policies, and standards, unless
specifically waived or modified by the conditions of approval.
3. The Applicant shall comply with all federal, state, and local laws. Material violation of
any of those laws in connection with the use may be cause for revocation of this
approval.
4. The telecom facility approved by this permit shall comply with all applicable Federal and
State rules, regulations, and standards.
5. The replacement pole shall be reconstructed in the exact location of the existing
streetlight pole.
6. No construction activity, including staging and/or storage, shall not occur within West
Jetty View Park. To the greatest extent feasible, construction activities shall not block
the public sidewalk or access immediately adjacent to SLC0007.
7. The reconstructed streetlight pole design shall be consistent with the size (including
diameter), shape, style, and design of the existing streetlight pole to the greatest extent
feasible, including the attached light arm and luminaire. All mounted equipment shall be
painted to match the color and style of the replacement streetlight pole.
8. All accessory support equipment of this facility shall be installed underground.
9. All electrical and antenna wiring shall be fully encased within the reconstructed
streetlight pole.
10. The telecom facility approved by the use permit shall comply with any easements,
covenants, conditions, or restrictions on the underlying City-trust property upon which
the facility is located.
11. Anything not specifically approved by this permit is not permitted and must be addressed
in a separate and subsequent review.
12. Prior to building permit final, a Height Certification Inspection shall be required prior to
final of building permits. The small cell facility and base streetlight pole approved by this
permit shall not exceed a total of 33 feet, 9 inches (33’ 9”) in height from existing grade
25
Zoning Administrator Resolution No. ZA2020-###
Page 13 of 16
01-25-19
(maximum elevation of 46.45 feet based on the North American Vertical Datum of 1988
[NAVD88]).
13. Prior to building permit issuance, all contractors and subcontractors shall have a valid
City of Newport Beach business license.
14. The Applicant shall continually maintain the wireless telecom facility so that it retains its
original appearance at the time the building permit is finaled by the City of Newport
Beach.
15. On an annual basis, the Applicant shall conduct maintenance inspections of the wireless
telecom facility, including the small cell facility and below-grade equipment areas, and
make all necessary repairs. The Community Development Director may require
additional inspections and/or maintenance activities at his/her discretion.
16. The Applicant shall not prevent the City of Newport Beach from having adequate
spectrum capacity on the City's 800 MHz radio frequencies at any time.
17. The facility shall transmit at the approved frequency ranges established by the FCC.
The Applicant shall inform the City in writing of any proposed changes to the frequency
range in order to prevent interference with the City's Public Safety radio equipment.
18. The telecommunications facility shall at no time interfere with the frequencies used by
the City of Newport Beach for public safety. “Comprehensive advanced planning and
frequency coordination” engineering measures shall prevent interference, especially in
the choice of frequencies and radio ancillary hardware. This is encouraged in the "Best
Practices Guide" published by the Association of Public-Safety Communications
Officials-International, Inc. ("APCO"), and as endorsed by the FCC.
19. Should interference with the City's Public Safety radio equipment occur, use of the
telecom facility authorized by this permit may be suspended until the radio frequency
interference is corrected and verification of the compliance is reported.
20. The Applicant shall provide a "single point of contact" for the carrier in its Engineering
and Maintenance Departments that is monitored 24 hours per day to ensure continuity
on all interference issues, and to which interference problems may be reported. The
name, telephone number, fax number, and email address of that person shall be
provided to the Community Development Department and Newport Beach Police
Department's Support Services Commander prior to activation of the facility. If the point
of contact changes, the City shall be immediately alerted and updated.
21. No advertising signage or identifying logos shall be displayed on the telecom facility
except for small identification, address, warning, and similar information plates. A detail
of the information plates depicting the language on the plate shall be included in the
plans submitted for issuance of building permits.
26
Zoning Administrator Resolution No. ZA2020-###
Page 14 of 16
01-25-19
22. Appropriate information warning signs or plates shall be posted on the base streetlight
pole of the transmitting antenna. In addition, contact information (e.g., a telephone
number) shall be provided on the warning signs or plates. The location of the information
warning signs or plates shall be depicted on the plans submitted for construction permits.
Signage required by State or federal regulations shall be allowed in its smallest
permissible size.
23. Prior to the final of building permits, the Applicant shall schedule an evening inspection
by the Code Enforcement Division to confirm compliance with lighting. The telecom
facility shall be lighted to the extent deemed necessary by the Newport Beach Police
and Utilities Departments for security lighting and consistency with other streetlights in
the area.
24. The Applicant shall maintain the telecom facility in a manner consistent with this
approval.
25. The Applicant shall ensure that its telecom facility complies with the most current
regulatory, operations standards, and radio frequency emissions standards adopted by
the FCC. The Applicant shall be responsible for obtaining and maintaining the most
current information from the FCC regarding allowable radio frequency emissions and all
other applicable regulations and standards. This information shall be made available by
the Applicant upon request of the Community Development Director.
26. The facility shall comply with all applicable provisions of U.S. Code Title 47
(Telecommunications) rules and regulations, including those related to FCC Radio
Frequency safety.
27. Prior to final of building permits, the Applicant shall schedule an inspection by the
Planning Division to ensure materials and colors match existing architecture as
illustrated in the approved photographic simulations and in conformance with NBMC
Sections 20.49.050 and 21.49.050.
28. Any operator who intends to abandon or discontinue use of a telecom facility must notify
the Planning Division by certified mail no less than thirty (30) days prior to such action.
The operator shall have ninety (90) days from the date of abandonment or
discontinuance to reactivate use of the facility, or remove the telecom facility and restore
the site.
29. The City reserves the right and jurisdiction to review and modify any permit approved
pursuant to NBMC Chapters 20.49 and 21.49, including the conditions of approval,
based on changed circumstances. The operator shall notify the Planning Division of any
proposal to change the height or size of the facility; increase the size, shape, or number
of antennas; change the facility's color or materials or location on the site; or increase
the signal output above the maximum permissible exposure ("MPE") limits imposed by
the radio frequency emissions guidelines of the FCC. Any changed circumstance shall
require the operator to apply for a review of the modification, and possible amendment
to the use permit, prior to implementing any change.
27
Zoning Administrator Resolution No. ZA2020-###
Page 15 of 16
01-25-19
30. Minor Use Permit No. UP2019-043 and Costal Development Permit No. CD2020-120
shall expire unless exercised within 24 months from the date of approval as specified in
Sections 20.54.060 and 21.54.060 (Time Limits and Extensions) of the NBMC unless
an extension is otherwise granted.
31. Construction activities shall comply with NBMC Section 10.28.040, which restricts hours
of noise-generating construction activities that produce noise to between the hours of 7
a.m. and 6:30 p.m., Monday through Friday. Noise-generating construction activities are
not allowed on Saturdays, Sundays or holidays.
32. This approval may be modified or revoked by the Zoning Administrator if determined
that the proposed uses or conditions under which it is being operated or maintained is
detrimental to the public health, welfare or materially injurious to property or
improvements in the vicinity or if the property is operated or maintained so as to
constitute a public nuisance.
33. A copy of the Resolution, including conditions of approval Exhibit “A,” and approved
drawings from Southern California Edison (SCE) for the power supply and design, shall
be incorporated into the Building Division and field sets of plans prior to issuance of the
building permits.
34. The Applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA).
In compliance with the MBTA, grading, brush removal, building demolition, tree
trimming, and similar construction activities shall occur between August 16 and January
31, outside of the peak nesting period. If such activities must occur inside the peak
nesting season from February 1 to August 15, compliance with the following is required
to prevent the taking of Native Birds pursuant to MBTA:
A. The construction area shall be inspected for active nests. If birds are observed flying
from a nest or sitting on a nest, it can be assumed that the nest is active. Construction
activity within 300 feet of an active nest shall be delayed until the nest is no longer
active. Continue to observe the nest until the chicks have left the nest and activity is no
longer observed. When the nest is no longer active, construction activity can continue
in the nest area.
B. It is a violation of state and federal law to kill or harm a native bird. To ensure
compliance, consider hiring a biologist to assist with the survey for nesting birds, and
to determine when it is safe to commence construction activities. If an active nest is
found, one or two short follow-up surveys will be necessary to check on the nest and
determine when the nest is no longer active.
35. The Applicant shall promptly notify the City if the landscaped parkway of the subject
streetlight pole is negatively affected or otherwise damaged by project implementation.
36. To the fullest extent permitted by law, Applicant shall indemnify, defend and hold
harmless City, its City Council, its boards and commissions, officials, officers,
28
Zoning Administrator Resolution No. ZA2020-###
Page 16 of 16
01-25-19
employees, and agents from and against any and all claims, demands, obligations,
damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities,
costs and expenses (including without limitation, attorney’s fees, disbursements and
court costs) of every kind and nature whatsoever which may arise from or in any manner
relate (directly or indirectly) to City’s approval of AT&T Small Cell SLC0007, including,
but not limited to, Minor Use Permit No. UP2019-043 and Coastal Development Permit
No. CD2020-120 (PA2019-150). This indemnification shall include, but not be limited to,
damages awarded against the City, if any, costs of suit, attorneys' fees, and other
expenses incurred in connection with such claim, action, causes of action, suit or
proceeding whether incurred by Applicant, City, and/or the parties initiating or bringing
such proceeding. The Applicant shall indemnify the City for all of City's costs, attorneys'
fees, and damages which City incurs in enforcing the indemnification provisions set forth
in this condition. The Applicant shall pay to the City upon demand any amount owed to
the City pursuant to the indemnification requirements prescribed in this condition.
Public Works Department
37. Prior to the issuance of a building permit, an encroachment permit shall be required.
38. Prior to the issuance of a building permit, traffic control plans illustrating compliance with
the 2016 WATCHBook requirements shall be reviewed and approved by the Public
Works Department before their implementation. Large construction vehicles shall not be
permitted to travel narrow streets as determined by the Public Works Department.
Disruption caused by construction work along roadways and by movement of
construction vehicles shall be minimized by proper use of traffic control equipment and
flagman.
29
Attachment No. ZA 2
Vicinity Map
30
VICINITY MAP
Minor Use Permit No. UP2019-043
Coastal Development Permit No. CD2020-120
(PA2019-150)
Public right-of-way, City streetlight number SLC0007,
parkway south of Ocean Boulevard at the intersection
of Channel Road and Ocean Boulevard
Subject
Streetlight
31
Attachment No. ZA 3
Alternative Locations Studied and Rejected
32
33
34
35
36
37
38
39
40
41
Attachment No. ZA 4
Coverage Maps
42
43
44
45
Attachment No. ZA 5
Applicant s Project Description and Justification
46
Exhibit B
New Cingular Wireless PCS, LLC d/b/a AT&T Mobility
AT&T Site ID: HBNPB_047 and FA#14807376
In the Public Right-of-Way SLC0007 Newport Beach
Project Narrative
New Cingular Wireless PCS, LLC d/b/a AT&T Mobility (“AT&T”) is proposing to install new small cell wireless
telecommunications facility to serve residents and businesses in this portion of the community. Small cells
are low-power, low-profile wireless communications facilities that improve signal quality and capacity within
AT&T’s existing wireless network. The proposed small cell facility will help AT&T provide and improve critical
wireless services in this area.
AT&T estimates that since introduction of the iPhone in 2007, mobile data usage has increased 470,000% on
its network. AT&T forecasts its customers’ growing demand for mobile data services to continue. Customer
needs require AT&T to design and maintain its network to provide and improve wireless signal quality and to
increase data rates sufficient to stream video. Areas that do not meet this minimal standard, or where
wireless service is otherwise compromised, represent service issues that must be addressed.
Specifically, this proposed small cell facility will help improve AT&T’s wireless services by offloading network
traffic carried by existing macro facilities in the area. In addition, faster data rates allow customers to get on
and off the network quickly, which produces more efficient use of AT&T’s limited spectrum. By placing the
small cell facility in areas where AT&T’s existing wireless telecommunications facilities are constrained and
where AT&T experiences especially high network traffic, AT&T can address the existing and forecasted
demand and support 5G speeds in the near future.
Improving signal quality and Increasing data speed is critical to providing the mobile experience customers
demand and to manage the unprecedented increase in mobile data usage on AT&T’s network. The Center for
Disease Control and Prevention (CDC) tracks the rates at which American households are shifting from
landlines to wireless telecommunications. According to the CDC’s latest Wireless Substitution Report, more
than 70 percent of Americans rely exclusively or primarily on wireless communications in their homes.1 In
addition, the FCC estimates that 70 percent of all 911 calls are made from wireless devices.2 And with AT&T’s
selection by FirstNet as the wireless service provider to build and manage the nationwide first responder
wireless network, each new or modified facility will help strengthen first responder communications.
AT&T selected the proposed facility as the best available means to address its service objectives in this
portion of the city. The overall site location and design will comply with applicable code provisions, General
Plan, and other published siting guidelines. The proposed small cell facility will be located in the public right-
of-way, where AT&T has a right to place its equipment pursuant to Section 7901 of the California Public
Utilities Code. The proposed node is a Pico cell site and will provide 4G services to the surrounding area. The
project will involve the placement of a small antenna and associated small cell equipment on a replacement
streetlight. For this small cell, AT&T proposes to install a 10-inch diameter omni-directional antenna and
radios at the top of a replacement streetlight, fully concealed within a 12-inch diameter shroud. The
concealment will be painted to match the final color of the aggregate concrete light pole. The facility will not
obstruct pedestrian or vehicular traffic. It will not adversely affect the surrounding properties and will have a
minimal physical and aesthetic footprint in this area. In addition, the proposed facility fully complies with
1 See Wireless Substitution: Early Release of Estimates From the National Health Interview Survey, January-June 2018 , available
at http://www.cdc.gov/nchs/data/nhis/earlyrelease/wireless201812.pdf.
2 See 911 Wireless Services, available at https://www.fcc.gov/consumers/guides/911-wireless-services.
PA2019-150
47
Exhibit B
Page 2 of 3
applicable design criteria. Therefore, the City can easily make the necessary findings for approval for this
small cell facility.
The project scope will consist of the following:
Removal and replacement of a streetlight.
Installation of a single omni-directional antenna.
Installation of four remote radio units and raycap disconnect switch within a shroud.
Installation of below grade power and fiber handholds.
Project Code Compliance
The subject project complies with the City of Newport Beach’s Wireless Telecommunications Facilities
Ordinance in the Public Right-of-Way, Chapter 21.49 in the following ways:
1. The proposed wireless facility is a small cell installation to be installed on a replaced streetlight in the
public right-of-way to match the existing pole.
2. The project is allowed subject to the city’s approval of a Minor Use Permit. The proposed installation
will not interfere with the use of the existing right-of-way.
3. The proposed facility is a low powered antenna designed to work in conjunction with other small cell
sites in the area and to off-load capacity from an existing macro facility. The installation will comply
with applicable regulations of the Federal Communications Commission as demonstrated in the
enclosed FCC Local Official Guide to RF – Appendix A.
4. The replacement streetlight is consistent with the size, shape, style, and design of the existing pole,
including the attached light arm.
5. The replacement streetlight, placed within the public right-of-way, does not exceed thirty-five (35)
feet in height above the finished grade.
6. No above ground mounted equipment is proposed, and the support equipment is proposed to be
placed in underground handholes.
7. All transmission equipment, including remote radio units and the raycap disconnect switch, are fully
concealed within the base of the mono pole.
8. Signage displayed on the wireless facility will be in the smallest permissible size. There will be no
advertising signage.
9. The applicant will conform to all City of Newport Beach requirements.
Conformance with FCC Regulations
The proposed low powered antenna installation attached to the utility pole is considered categorical
excluded by the FCC based on the analysis included in the FCC Optional Checklist for Determination of the
Local Official’s Guide to RF (attached). Installation that are categorically excluded are considered to meet or
exceed the FCC standards for RF Emissions.
Construction, Maintenance and Monitoring
Construction of the proposed project will take approximately 30-days. All construction will be done in a
manner that minimizes impact to residents and/or businesses in the area. Existing underground or overhead
power and fiber connections will be used with minimal trenching. Directional boring will be used when
deemed appropriate for each specific location.
Maintenance of the subject facility is minimal. The telecom operator will be responsible for maintenance of
the telecom facility including, but not limited to, any missing, discolored or damaged screening, all graffiti
removed promptly, and the facility kept clean and free of litter. Monitoring is typically done from AT&T’s
PA2019-150
48
Exhibit B
Page 3 of 3
switching offices. If needed, a site visit to change any radio equipment will be coordinated with the city
through the appropriate process.
Site Preferred Location and Alternative Analysis
Per the Newport Beach Municipal Code (NBMC) section 20.49.050 General Development and Design
Standards, installations in the public right-of-way (Class 3) are the third preferred location for telecom
facilities in the City. Collocation onto existing street infrastructure is the most preferred alternative design.
AT&T is committed to providing wireless telecommunications services and faster data rates throughout the
City of Newport Beach and is doing so by installing the least intrusive technology, with the least intrusive
design at the least intrusive locations in the service coverage gap. Rather than construct traditional tower
facilities in or near residential neighborhoods, AT&T is choosing to deploy very small facilities, called “small
cells,” that can be installed on utility infrastructure in the public right-of-way.
A small cell is a low-powered cell site, which, when grouped with other small cells, can provide coverage in
areas where traditional macro wireless facilities are discouraged. Although the signal from each small cell
antenna covers a shorter range than a conventional tower site, small cells can be effective tools to help close
significant gaps in service coverage with a minimal environmental and aesthetic footprint. Node HBNPB_047
will help AT&T close a significant gap in service coverage in this area of the City by the least intrusive means.
The proposed Node is located near the terminus of Channel Road between E. Ocean Boulevard and E.
Oceanfront. The area is comprised of single-family residential homes and West Jetty View Park. AT&T
proposes to use existing street infrastructure for installation of its telecommunication “small cell” facility.
No viable alternative locations options exist near this proposed location. The existing right-of-way
infrastructure consist of small upright luminaire poles which are not viable locations. The other surrounding
light poles in the area are within the existing park and appear to be too short to meet AT&T’s design criteria.
Another alternative light pole is located approximately 130 feet south of the proposed node; however, it
appears to be within private property.
Node HBNPB_047 is the best available means to help AT&T provide and improve critical wireless services in
the surrounding areas, adding low-power, low-profile equipment to utility infrastructure in the public right-
of-way. The antenna and equipment will be nicely concealed above the replaced streetlight pole.
PA2019-150
49
Attachment No. ZA 6
Photographic Visual Simulations
50
51
52
53
Attachment No. ZA 7
Project Plans
54
55
56
57
58
59
60
61
62
63
64