Loading...
HomeMy WebLinkAbout05_Cabin 3, LLC Residence CDP_PA2020-18303/13/2018 CITY OF NEWPORT BEACH ZONING ADMINISTRATOR STAFF REPORT October 15, 2020 Agenda Item No. 5 SUBJECT:Cabin 3, LLC Residence (PA2020-183) ƒCoastal Development Permit No. CD2020-117 SITE LOCATION:113 Grand Canal APPLICANT:R.A. Jeheber Residential Design, Inc. OWNER:Cabin 3, LLC PLANNER:David S. Lee, Associate Planner 949-644-3225, dlee@newportbeachca.gov LAND USE AND ZONING x General Plan:RT (Two Unit Residential) x Zoning District:R-BI (Two-Unit Residential, Balboa Island) x Coastal Land Use Category: RT-E (Two Unit Residential Detached) – (30.0-39.9 DU/AC) x Coastal Zoning District: R-BI (Two-Unit Residential, Balboa Island) PROJECT SUMMARY A request for a coastal development permit to allow the demolition of an existing single- family residence and the construction of a new 2,501-square-foot, single-family residence with a 399-square-foot, two-car attached garage. The proposed development also includes additional appurtenances such as walls, fences, patios, hardscape, drainage devices, and landscaping. RECOMMENDATION 1) Conduct a public hearing; 2) Find this project exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Division 6, Chapter 3, because it has no potential to have a significant effect on the environment; and 3) Adopt Draft Zoning Administrator Resolution No. _ approving Coastal Development Permit No. CD2020-117 (Attachment No. ZA 1). 1 Cabin 3, LLC Residence (PA2020-183) Zoning Administrator, October 15, 2020 Page 2 Tmplt: 04/03/18 DISCUSSION Land Use and Development Standards x The subject property is located in the R-BI Coastal Zoning District, which provides for one and two-unit residential development and is consistent with the City’s Coastal Land Use Plan, General Plan, and Zoning Code. A Coastal Development Permit is required as the property is not eligible for a waiver for de minimis development due to its location in the Coastal Commission Appeal Area. x The property currently consists of one legal lot developed with a single-family residence. The neighborhood is predominantly developed with two- and three- story, single-family residences and duplexes. The proposed project’s design, bulk, and scale are consistent with the existing and expected pattern of neighborhood development. x The proposed single-family dwelling and accessory structures conform to all applicable development standards, including floor area limit, setbacks, height, and off-street parking as evidenced by the project plans and illustrated in Table 1 below. Table 1 – Development Standards Development Standard Standard Proposed Setbacks (min.) Front (Grand Canal) 5 feet 7 feet Rear (Alley)5feet 5feet Sides 3 feet 3 feet Allowable Floor Area 2,900 sq. ft. 2,900 sq. ft. Parking (min.)2-car garage 2-car garage Height (max.)24 feet flat roof 29 feet sloped roof 24 feet flat roof 29 feet sloped roof Hazards x A Coastal Hazards Report was prepared by GeoSoils, Inc. on June 15, 2020. The project site is protected by a public boardwalk fronting the site along the Grand Canal and an existing City-owned bulkhead, which will remain in place. The report concludes that the highest high tide elevation (currently 7.7 feet NAVD 88) will not exceed 10.65 feet North American Vertical Datum of 1988 (NAVD 88) using the low-risk aversion projected sea level rise (2.9-foot increase) over the 75-year design life of the structure based on estimates for sea level rise provided by the State of California Sea-Level Rise Guidance 2018. The report states that the estimated sea level rise over the next 75 years, using the Medium-High Risk Aversion, is potentially 6 feet (up to 13.7 feet NAVD 88). The City-owned bulkhead is approximately 8.6 feet (NAVD 88) and it is recommended that the City increase the height of all public bulkheads on Balboa Island in the future. The report 2 Cabin 3, LLC Residence (PA2020-183) Zoning Administrator, October 15, 2020 Page 3 Tmplt: 04/03/18 concludes that if the proposed project is waterproofed and the City-owned bulkhead is raised, the project will not be adversely impacted by potential coastal hazards. x The finish floor elevation of the proposed dwelling is 9.0 feet (NAVD 88), which complies with the minimum 9.0-foot NAVD 88 elevation standard. Continuous waterproofing shall be extended around the perimeter of the dwelling that would protect against flooding up to an elevation of 10.65 feet (NAVD 88). Flood shields (sandbags and other methods) can be deployed across the openings to prevent flooding to the structure. x Pursuant to Newport Beach Municipal Code (NBMC) Section 21.30.030(C)(3)(i)(iv) (Bulkheads for nonresidential and residential waterfront development), the property owner will be required to enter into an agreement with the City waiving any potential right to protection to address situations in the future in which the development is threatened with damage or destruction by coastal hazards (e.g., waves, erosion, and sea level rise). The property owner will also be required to acknowledge any hazards present at the site and unconditionally waive any claim to damage or liability against the decision authority, consistent with NBMC Section 21.30.015(D)(3)(c) (Waterfront Development, Development Standards). Both requirements are included as conditions of approval that will need to be satisfied prior to the issuance of building permits for construction. x The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of a building permit. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and the CBC prior to building permit issuance. Public Access x The project site is located on the Balboa Island between the nearest public road and the sea. Implementation Plan Section 21.30A.040 (Determination of Public Access/Recreation Impacts) requires that the provision of public access bear a reasonable relationship between the requirement and the project’s impact and be proportional to the impact. In this case, the project replaces an existing single-family residence with a new single-family residence. Therefore, the project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. Furthermore, the project is designed and sited so as not to block or impede existing public access opportunities. Vertical 3 Cabin 3, LLC Residence (PA2020-183) Zoning Administrator, October 15, 2020 Page 4 Tmplt: 04/03/18 access to the bay is available near the site on Marine Avenue and Grand Canal. The nearest lateral access is located on South Bay Front and South Bay Front Alley. x The project site is not located adjacent to a coastal view road, public viewpoint, public park, beach, or public accessway, as identified in the Coastal Land Use Plan. However, the Coastal Land Use Plan identifies the Park Avenue bridge that crosses the Grand Canal as a public view point. The subject property is located approximately 220 feet from the bridge. The proposed project will replace an existing single-family residence with a new single-family residence that complies with all applicable Local Coastal Program (LCP) development standards and maintains a building envelope consistent with the existing neighborhood pattern of development. An investigation of the project site and surrounding area did not identify any other public view opportunities. The project may be located within the viewshed of distant public viewing areas. Therefore, the project does not have the potential to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to public views. Water Quality x Pursuant to Municipal Code Section 21.35.050 (Water Quality and Hydrology Plan), due to the proximity of the development to the shoreline and the development containing more than 2,500 square feet of impervious surface area, a Water Quality Management Plan (WQMP) is required. As conditioned, a WQMP shall be submitted and reviewed by the City’s Engineer Geologist prior to building permit issuance. The WQMP shall include polluted runoff and hydrologic site characterization, a sizing standard for Best Management Practices (BMPs), use of a Low Impact Development approach to retain the design’s storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs. ENVIRONMENTAL REVIEW This project is exempt from the California Environmental Quality Act (CEQA) pursuant to Section 15303 under Class 3 (New Construction or Conversion of Small Structures) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential to have a significant effect on the environment. The Class 3 exemption includes the construction of limited numbers of new, small structures, including one single-family residence. The proposed project is a new single-family residence located in the R-1 Coastal Zoning District. There are no known exceptions listed in CEQA Guidelines Section 15300.2 that would invalidate the use of these exemptions. PUBLIC NOTICE Notice of this public hearing was published in the Daily Pilot, mailed to all owners and residential occupants of property within 300 feet of the boundaries of the site (excluding intervening rights-of-way and waterways), including the applicant, and posted on the 4 Cabin 3, LLC Residence (PA2020-183) Zoning Administrator, October 15, 2020 Page 5 Tmplt: 04/03/18 subject property at least 10 days before the scheduled hearing, consistent with the provisions of the Municipal Code. Additionally, the item appeared on the agenda for this meeting, which was posted at City Hall and on the City website. APPEAL PERIOD: This action shall become final and effective 14 days following the date the Resolution is adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 (Local Coastal Implementation Plan) of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. For additional information on filing an appeal, contact the Planning Division at 949-644-3200. Prepared by: ___________________________ David S. Lee, Associate Planner JM/dl Attachments: ZA 1 Draft Resolution ZA 2 Vicinity Map ZA 3 Project Plans 5 03/13/2018 Attachment No. ZA 1 Draft Resolution 6 RESOLUTION NO. ZA2020-### A RESOLUTION OF THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH APPROVING COASTAL DEVELOPMENT PERMIT NO. CD2020-117 FOR A NEW SINGLE- FAMILY RESIDENCE LOCATED AT 113 GRAND CANAL (PA2020-183) THE ZONING ADMINISTRATOR OF THE CITY OF NEWPORT BEACH HEREBY FINDS AS FOLLOWS: SECTION 1. STATEMENT OF FACTS. 1. An application was filed by R.A. Jeheber Residential Design, Inc., on behalf of Cabin 3, LLC with respect to the property located at 113 Grand Canal, and legally described as Lot 9 of Block 2 of Section 4 of Balboa Island, requesting approval of a Coastal Development Permit. 2. The applicant proposes the demolition of an existing single-family residence and the construction of a new 2,501-square-foot, single-family residence with a 399-square-foot attached garage. The proposed development also includes additional appurtenances such as walls, fences, patios, hardscape, drainage devices, and landscaping. 3. The subject property is located within the Two-Unit Residential, Balboa Island (R-BI) Zoning District and the General Plan Land Use Element category is Two Unit Residential (RT). 4. The subject property is located within the coastal zone. The Coastal Land Use Plan category is RT-E (Two Unit Residential Detached) – (30.0-39.9 DU/AC) and the Coastal Zoning District is Two-Unit Residential, Balboa Island (R-BI). 5. A public hearing was held online on October 15, 2020, observing restrictions due to the Declaration of a State Emergency and Proclamation of Local Emergency related to COVID-19. A notice of time, place, and purpose of the hearing was given in accordance with the Newport Beach Municipal Code (NBMC). Evidence, both written and oral, was presented to, and considered by, the Zoning Administrator at this hearing. SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITY ACT DETERMINATION. 1. This project is categorically exempt pursuant to Title 14 of the California Code of Regulations (Section 15303, Article 19 of Chapter 3, Guidelines for Implementation of the California Environmental Quality Act (CEQA) under Class 3 (New Construction or Conversion of Small Structures), because it has no potential to have a significant effect on the environment. 2. Class 3 exempts the construction of limited numbers of new, small structures, including one single-family residence. The proposed project is a new single-family residence located in the R-BI Coastal Zoning District. 7 Zoning Administrator Resolution No. ZA2020-### Page 2 of 8 01-03-17 SECTION 3. REQUIRED FINDINGS. In accordance with Section 21.52.015 (Findings and Decision) of the Newport Beach Municipal Code, the following findings and facts in support of such findings are set forth: Finding: A. Conforms to all applicable sections of the certified Local Coastal Program. Facts in Support of Finding: 1. The proposed development complies with applicable residential development standards including, but not limited to, floor area limitation, setbacks, height, and parking. a. The maximum floor area limitation is 2,900 square feet and the proposed floor area is 2,900 square feet. b. The proposed development complies with the required setbacks, which are 5 feet along the property line abutting Grand Canal, 5 feet along the property line abutting the alley, and 3 feet along each side property line. c. The highest guardrail/parapet is below 24 feet from established grade and the highest ridge is 29 feet from established grade. The proposed development complies with all height requirements. d. The proposed development provides a two-car garage, meeting the minimum garage requirement for a single-family residence. e. The proposed development complies with the minimum 9.0-foot North American Vertical Datum of 1988 (NAVD 88) top of slab elevation requirement for interior living areas of new structures. 2. The neighborhood is predominantly developed with two- and three-story single-family residences. The proposed design, bulk, and scale of the development is consistent with the existing neighborhood pattern of development and expected future development. 3. A Coastal Hazards Report was prepared by GeoSoils, Inc. on June 15, 2020. The project site is protected by a public boardwalk fronting the site along the Grand Canal and an existing City-owned bulkhead, which will remain in place. The report concludes that the highest high tide elevation (currently 7.7 feet NAVD 88) will not exceed 10.65 feet North American Vertical Datum of 1988 (NAVD 88) using the low-risk aversion projected sea level rise (2.9-foot increase) over the 75-year design life of the structure based on estimates for sea level rise provided by the State of California Sea-Level Rise Guidance 2018. The report states that the estimated sea level rise over the next 75 years, using the Medium-High Risk Aversion, is potentially 6 feet (up to 13.7 feet NAVD 88). The City-owned bulkhead is approximately 8.6 feet (NAVD 88) and it is recommended that the City increase the height of all public bulkheads on Balboa Island in the future. The 8 Zoning Administrator Resolution No. ZA2020-### Page 3 of 8 01-03-17 report concludes that if the proposed project is waterproofed and the City-owned bulkhead is raised, the project will not be adversely impacted by potential coastal hazards. 4. The finish floor elevation of the proposed dwelling is 9.0 feet (NAVD 88), which complies with the minimum 9.0-foot NAVD 88 elevation standard. Continuous waterproofing shall be extended around the perimeter of the dwelling that would protect against flooding up to an elevation of 10.65 feet (NAVD 88). Flood shields (sandbags and other methods) can be deployed across the openings to prevent flooding to the structure. 5. Pursuant to Municipal Code Section 21.35.050 (Water Quality and Hydrology Plan), due to the proximity of the development to the shoreline and the development containing more than 2,500 square feet of impervious surface area, a Water Quality Management Plan (WQMP) is required. As conditioned, a WQMP shall be submitted and reviewed by the City’s Engineer Geologist prior to building permit issuance. The WQMP shall include polluted runoff and hydrologic site characterization, a sizing standard for Best Management Practices (BMPs), use of a Low Impact Development approach to retain the design’s storm runoff volume on site, and documentation of the expected effectiveness of the proposed BMPs. 6. The property is located in an area known for the potential of seismic activity and liquefaction. All projects are required to comply with the California Building Code (CBC) and Building Division standards and policies. Geotechnical investigations specifically addressing liquefaction are required to be reviewed and approved prior to the issuance of building permits. Permit issuance is also contingent on the inclusion of design mitigation identified in the investigations. Construction plans are reviewed for compliance with approved investigations and the CBC prior to building permit issuance. 7. The project site is not located adjacent to a coastal view road, public viewpoint, public park, beach, or public accessway, as identified in the Coastal Land Use Plan. However, the Coastal Land Use Plan identifies the Park Avenue bridge that crosses the Grand Canal as a public view point. The subject property is located approximately 220 feet from the bridge. The proposed project will replace an existing single-family residence with a new single- family residence that complies with all applicable Local Coastal Program (LCP) development standards and maintains a building envelope consistent with the existing neighborhood pattern of development. An investigation of the project site and surrounding area did not identify any other public view opportunities. The project may be located within the viewshed of distant public viewing areas. Therefore, the project does not have the potential to degrade the visual quality of the Coastal Zone or result in significant adverse impacts to public views. Finding: B. Conforms with the public access and public recreation policies of Chapter 3 of the Coastal Act if the project is located between the nearest public road and the sea or shoreline of any body of water located within the coastal zone. 9 Zoning Administrator Resolution No. ZA2020-### Page 4 of 8 01-03-17 Facts in Support of Finding: 1. The project site is located on the Balboa Island between the nearest public road and the sea. Implementation Plan Section 21.30A.040 (Determination of Public Access/Recreation Impacts) requires that the provision of public access bear a reasonable relationship between the requirement and the project’s impact and be proportional to the impact. In this case, the project replaces an existing single-family residence with a new single-family residence. Therefore, the project does not involve a change in land use, density or intensity that will result in increased demand on public access and recreation opportunities. Furthermore, the project is designed and sited so as not to block or impede existing public access opportunities. 2. Vertical access to the bay is available near the site on Marine Avenue and Grand Canal. The nearest lateral access is located on South Bay Front and South Bay Front Alley. SECTION 4. DECISION. NOW, THEREFORE, BE IT RESOLVED: 1. The Zoning Administrator of the City of Newport Beach hereby approves Coastal Development Permit No. CD2020-117, subject to the conditions set forth in Exhibit “A,” which is attached hereto and incorporated by reference. 2. This action shall become final and effective 14 days following the date this Resolution was adopted unless within such time an appeal or call for review is filed with the Community Development Director in accordance with the provisions of Title 21 Local Coastal Implementation Plan, of the Newport Beach Municipal Code. Final action taken by the City may be appealed to the Coastal Commission in compliance with Section 21.64.035 (Appeal to the Coastal Commission) of the City’s certified LCP and Title 14 California Code of Regulations, Sections 13111 through 13120, and Section 30603 of the Coastal Act. PASSED, APPROVED, AND ADOPTED THIS 15 TH DAY OF OCTOBER, 2020. _____________________________ Jaime Murillo, Zoning Administrator 10 Zoning Administrator Resolution No. ZA2020-### Page 5 of 8 01-03-17 EXHIBIT “A” CONDITIONS OF APPROVAL 1. The development shall be in substantial conformance with the approved site plan, floor plans, and building elevations stamped and dated with the date of this approval (except as modified by applicable conditions of approval). 2. Revisions to the approved plans may require an amendment to this Coastal Development Permit or the processing of a new Coastal Development Permit. 3. Coastal Development Permit No. CD2020-117 shall expire unless exercised within 24 months from the date of approval as specified in Section 21.54.060 (Time Limits and Extensions) of the Newport Beach Municipal Code, unless an extension is otherwise granted. 4. Prior to the issuance of a Certificate of Occupancy, an agreement in a form approved by the City Attorney between the property owner and the City shall be executed and recorded waiving rights to the construction of future shoreline protection devices including the repair and maintenance, enhancement, reinforcement, or any other activity affecting the bulkhead, that results in any encroachment seaward of the authorized footprint of the bulkhead or other shoreline protective device. The agreement shall be binding against the property owners and successors and assigns. 5. Prior to the issuance of a building permit, the property owner shall submit a notarized signed letter acknowledging all hazards present at the site, assuming the risk of injury or damage from such hazards, unconditionally waiving any claims of damage against the City from such hazards, and to indemnify and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of development. 6. No demolition or construction materials, equipment debris, or waste, shall be placed or stored in a location that would enter sensitive habitat, receiving waters, or a storm drain or result in impacts to environmentally sensitive habitat areas, streams, the beach, wetlands or their buffers. 7. This approval does not authorize any new or existing improvements (including landscaping) on State tidelands, public beaches, or the public right-of-way. 8. All proposed accessory structures located within setback areas shall comply with applicable height limits consistent with Zoning Code Section 20.30.040 (Fences, Hedges, Walls, and Retaining Walls). 11 Zoning Administrator Resolution No. ZA2020-### Page 6 of 8 01-03-17 9. Continuous waterproofing shall be extended around the perimeter of the dwelling that would protect against flooding up to an elevation of 10.65 feet (NAVD 88). Flood shields (sandbags and other methods) can be deployed across the openings to prevent flooding to the structure. 10. The discharge of any hazardous materials into storm sewer systems or receiving waters shall be prohibited. Machinery and equipment shall be maintained and washed in confined areas specifically designed to control runoff. A designated fueling and vehicle maintenance area with appropriate berms and protection to prevent spillage shall be provided as far away from storm drain systems or receiving waters as possible. 11. Debris from demolition shall be removed from work areas each day and removed from the project site within 24 hours of the completion of the project. Stock-piles and construction materials shall be covered, enclosed on all sites, not stored in contact with the soil, and located as far away as possible from drain inlets and any waterway. 12. Trash and debris shall be disposed in proper trash and recycling receptacles at the end of each construction day. Solid waste, including excess concrete, shall be disposed in adequate disposal facilities at a legal disposal site or recycled at a recycling facility. 13. Prior to issuance of building permits, the final WQHP/WQMP shall be reviewed and approved by the Building Division. Implementation shall be in compliance with the WQHP/WQMP and any changes could require separate review and approval by the Building Division. 14. Prior to the issuance of building permits, the applicant shall submit a final drainage and grading plan. The plan shall be subject to the review and approval by the Building Division. 15. Prior to the issuance of building permits, the applicant shall submit a final landscape and irrigation plan. These plans shall incorporate drought tolerant plantings, non-invasive plant species and water efficient irrigation design. The plans shall be approved by the Planning Division. 16. All landscape materials and irrigation systems shall be maintained in accordance with the approved landscape plan. All landscaped areas shall be maintained in a healthy and growing condition and shall receive regular pruning, fertilizing, mowing, and trimming. All landscaped areas shall be kept free of weeds and debris. All irrigation systems shall be kept operable, including adjustments, replacements, repairs, and cleaning as part of regular maintenance. 17. The applicant is responsible for compliance with the Migratory Bird Treaty Act (MBTA). In compliance with the MBTA, grading, brush removal, building demolition, tree trimming, and similar construction activities shall occur between August 16 and January 31, outside of the peak nesting period. If such activities must occur inside the peak nesting season from February 1 to August 15, compliance with the following is required to prevent the taking of Native Birds pursuant to MBTA: 12 Zoning Administrator Resolution No. ZA2020-### Page 7 of 8 01-03-17 A. The construction area shall be inspected for active nests. If birds are observed flying from a nest or sitting on a nest, it can be assumed that the nest is active. Construction activity within 300 feet of an active nest shall be delayed until the nest is no longer active. Continue to observe the nest until the chicks have left the nest and activity is no longer observed. When the nest is no longer active, construction activity can continue in the nest area. B. It is a violation of state and federal law to kill or harm a native bird. To ensure compliance, consider hiring a biologist to assist with the survey for nesting birds, and to determine when it is safe to commence construction activities. If an active nest is found, one or two short follow-up surveys will be necessary to check on the nest and determine when the nest is no longer active. 18. The project is subject to all applicable City ordinances, policies, and standards, unless specifically waived or modified by the conditions of approval. 19. The applicant shall comply with all federal, state, and local laws. Material violation of any of those laws in connection with the use may be cause for revocation of this Coastal Development Permit. 20. This Coastal Development Permit may be modified or revoked by the Zoning Administrator if determined that the proposed uses or conditions under which it is being operated or maintained is detrimental to the public health, welfare or materially injurious to property or improvements in the vicinity or if the property is operated or maintained so as to constitute a public nuisance. 21. Prior to issuance of the building permits, a copy of the Resolution, including conditions of approval Exhibit “A” shall be incorporated into the Building Division and field sets of plans. 22. Prior to the issuance of building permits, the applicant shall submit a final construction erosion control plan. The plan shall be subject to the review and approval by the Building Division. 23. Prior to the issuance of building permit, the applicant shall pay any unpaid administrative costs associated with the processing of this application to the Planning Division. 24. Should the property be sold or otherwise come under different ownership, any future owners or assignees shall be notified of the conditions of this approval by either the current business owner, property owner, or the leasing agent. 25. To the fullest extent permitted by law, applicant shall indemnify, defend and hold harmless City, its City Council, its boards and commissions, officials, officers, employees, and agents from and against any and all claims, demands, obligations, damages, actions, causes of action, suits, losses, judgments, fines, penalties, liabilities, costs and expenses (including without limitation, attorney’s fees, disbursements and court costs) of every kind and nature whatsoever which may arise from or in any manner relate (directly or indirectly) to City’s approval of Cabin 3, LLC Residence including, but not limited to, Coastal Development 13 Zoning Administrator Resolution No. ZA2020-### Page 8 of 8 01-03-17 Permit No. CD2020-117 (PA2020-183). This indemnification shall include, but not be limited to, damages awarded against the City, if any, costs of suit, attorneys' fees, and other expenses incurred in connection with such claim, action, causes of action, suit or proceeding whether incurred by applicant, City, and/or the parties initiating or bringing such proceeding. The applicant shall indemnify the City for all of City's costs, attorneys' fees, and damages which City incurs in enforcing the indemnification provisions set forth in this condition. The applicant shall pay to the City upon demand any amount owed to the City pursuant to the indemnification requirements prescribed in this condition. 14 03/13/2018 Attachment No. ZA 2 Vicinity Map 15 03/13/2018 VICINITY MAP Coastal Development Permit No. CD2020-117 PA2020-183 113 Grand Canal Subject Property 16 03/13/2018 Attachment No. ZA 3 Project Plans 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35