Loading...
HomeMy WebLinkAboutPA2019-023 PRR_PW Comments PROJECT REVIEW REQUEST COMMUNITY DEVELOPMENT DEPARTMENT Planning Division Please Distribute to: Date: February 26, 2019 Code Enforcement Building/Dan Kennedy Please return PRR and Plans to Staff Planner Life Safety Services/Susan Guzzetta Makana Nova, Associate Planner Public Works—Bri ne/Keely/Al mend ralo/Cooke 949-644-3249, mnova(ab-newportbeachca.gov Applicant: Laidlaw Schultz Architects Contact: Jonathan Yee of Laidlaw Architects 949-645-9982 jyee@lsarchitects.com Project Name The Garden Office and Parking Structure Address: 215 Riverside Avenue PA2019-023 CD2019-003 A coastal development permit to demolish an existing restaurant/office building, and associated surface parking lot and the construction of a new 49-space two level parking structure and 3,030-square-foot office building. The project includes hardscape, drainage, and landscaping improvements. The proposed development complies with all applicable development standards including height, setbacks, and floor area limits. No deviations are requested. The project is proposed to provide off-site parking to serve The Garden Shopping Center located directly to the south of the project site. REPORT REQUESTED BY: March 12, 2019 ZONING ADMINISTRATOR HEARING DATE: TBD Check all that apply: Notes: ❑ No comments on the project as presented. ❑ Application of Standard Code requirements are not expected to alter the project design. ❑ Recommended conditions of approval are attached. Application of Standard Code requirements or the attached conditions of approval will substantially impact or alter the design of the project. ❑ I contacted the applicant on ❑ To schedule an appt. for Code review S 7-1-..To discuss the following ae notes) Signature Ext. Date ce the approximate time spent on reviewing this project: l� _ /12 City of Newport Beach PUBLIC WORKS DEPARTMENT March 5, 2019 TO: PLANNING DIVISION FROM: David Keely Senior Civil Engineer SUBJECT: FINDINGS, CORRECTIONS, & CONDITIONS OF APPROVAL FOR PA2019-023, CD2019-003 215 Riverside Ave New Office Building CORRECTIONS AND COMMENTS: 1. Show existing and proposed utilities. Please be advised that new sewer laterals and clean outs will be necessary as part of this project. 2. Both the first and second level, parking layout results in a dead end parking situation. Remove the head in parking spaces at the end of the dead end. Provide a dedicated turn around space and minimum 5-foot drive aisle extension/hammerhead. Clarify where the walls or obstructions are located within the parking lots (see mark ups). Parking spaces adjacent to wall or other obstructions shall be 9 foot wide minimum (6-inches wider on the side of the obstruction). Provide a fully dimensioned parking layout. 3. The proposed driveway approaches shall be installed per City Standard. A minimum 4-foot wide accessible path shall be provided across the driveway approach. The proposed driveway shall be within the prolongation of the property lines. Show the driveway slopes. 4. The driveways shall be designed to accommodate adequate sight distance per City Standard STD-110-L. 5. The ramp slopes are not consistent between the architectural and civil drawings. Please clarify the ramp slopes. Provide slopes to the gutter flow line. 6. Clarify the proposed design of the driveway on Avon Street and the parking areas. The proposed design should not impact the potential to extend the City sidewalk along Avon Street. 7. The proposed private drainage improvement along the Avon Street right of way and within the park property shall be relocated to private property. 1 of 2 8. Ensure that the proposed parking structure is located entirely on private property 9. Clarify the extent of the proposed grading within the public right of way and within the park property. Civil plans appear to show the building located partially on the park property. 10. The proposed project plans to construct a wall and drainage devices within easement#2. Is this in compliance with said easement. 11. Please clarify the project description. The plans call out a commercial building and the planning description identifies an Office building. Will retail be planned for this location? 12. Will this lot be valet parked? Explain how this lot be used as part of the large project across Avon Street. 13. See mark ups. 14. Conditions of approval will be provided upon resubmittal. 2 of 2