Loading...
HomeMy WebLinkAboutPA2019-023_PRR 2 Fire Comments PROJECT REVIEW REQUEST COMMUNITY DEVELOPMENT DEPARTMENT Planning Division Please Distribute to: Date: April 23, 2019 Building/Dan Kennedy Life Safety Services/Susan Guzzetta Please return PRR and Plans to Staff Planner Public Works—Bri ne/Keely/Al mend ral o/Cooke Makana Nova, Associate Planner 949-644-3249, mnova(aD-newportbeachca.gov Applicant: Laidlaw Schultz Architects Contact: Jonathan Yee of Laidlaw Architects 949-645-9982 jyee@lsarchitects.com Project Name The Garden Office and Parking Structure Address: 215 Riverside Avenue PA2019-023 CD2019-003 A coastal development permit to demolish an existing restaurant/office building, and associated surface parking lot and the construction of a new 50-space two level parking structure and 2,921-square-foot office building. A modification permit is required to authorize 16 tandem parking spaces on the first and second floor levels. The project includes hardscape, drainage, and landscaping improvements. The proposed development complies with all applicable development standards including height, setbacks, and floor area limits. No deviations are requested. The project is proposed to provide valet off-site parking for employees to serve The Garden Shopping Center located directly to the south of the project site. Refer to PA2019-006 for 2902 West Coast Highway. . REPORT REQUESTED BY: May 7, 2019 ZONING ADMINISTRATOR HEARING DATE: TBD Check all that apply: Notes: ❑ No comments on the project as presented. ❑ Application of Standard Code requirements are not expected to alter the project design. Recommended conditions of approval are attached. ❑ Application of Standard Code requirements or the attached conditions of approval will substantially impact or alter the design of the project. ❑ I contacted the applicant on ❑ To schedule an appt. for Code review J ❑ To discuss the following (see notes) Signature Ext. Date Please indicate the approximate time spent on reviewing this project: Tmplt: 10/10/12 CITY OF NEWPORT BEACH FIRE DEPARTMENT SH Life Safety Services Division a 100 Civic Center Drive I P.O. Box 1769 I Newport Beach, CA 92658-8915 cqc/F0 X www.neWportbeachca.gov 949- 644-3200 Planning Project Review Conditions for Approval DATE: March 4, 2019 PROJECT LOCATION: 215 Riverside Ave Conditions: 1. Two exits ffem the upper-level will be requifed if the eeeupant load for the upper-level i-S ever-29 per-sons or-the eemmen path of egress tFavel distanee is 75 feet or greater-. Cali fe i dire Code (CFC) Seefi n 1006.3.2 2. Fire Sprinklers will be r-equir-ed as per-CFC— Seetion 903. 3. Fire access roads will be required as per CFC Section 503.1.1 and Newport Beach Fire Department Guideline C.01 and C.02. 4. An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities and buildings are hereafter constructed or moved into or within the jurisdiction. CFC Section 507.1 5. Fire flow shall be determined as per City of Newport Beach Guideline B.01. CFC Section 507.3. 6. Fire hydrants shall be provided and located within 400 feet of all portions of the building. CFC Section 507.5.1 7. Public Safety Radio Coverage will be required as per CFC Section 510.1 and City of Newport Beach Guideline D.05. 8. Standby power shall be provided for emergency responder radio coverage systems as required in Section 510.4.2.3. The standby power supply shall be capable of operating the emergency responder radio coverage system for a duration of not less than 24 hours. CFC Section 604.2.3.