HomeMy WebLinkAbout215 Riverside Aveneue Grading & Erosions ControlT/SLAB=16.50NOTE TO CONTRACTOR:CIVIL ENGINEER OF RECORD APPROVAL REQUIRED PRIOR TOBACKFILL OF ALL DRAIN PIPES, CONTACT CIVIL ENGINEER TOFIELD VERIFY LOCATION, SIZE, AND DEPTH OF DRAIN SYSTEM.SCOPE OF WORKCITY OF NEWPORT BEACH NOTESEASEMENT NOTES:DEVELOPMENT STATISTICSJOB NO.SHEET139 Avenida NavarroSan Clemente, CA 92672949.492.8586www.toalengineering.comCIVIL ENGINEERINGLAND SURVEYINGSTORMWATER QUALITYOFPLANS PREPARED BY:PREPARED FOR:ADAM L. TOALR.C.E. 59275DATE:APVD.DATER E V I S I O N S BY DATEAPPD.:DATE:DWG. NO.H. SCALE:V. SCALE:SURVEY DATE:CHD.:DRN.:STATE OF CALI
FOR
NIA
L ICE
N
S
ED LAND SURVEYORVIKTOR P.MEUMNo. 86821"=8'N/A7/20/182/7/19A.M.S.A.M.SA.L.T.1813113C-1LAIDLAW SCHULTZ ACHITECTS
POR. LOT D, TRACT 919
215 RIVERSIDE AVENUE, NEWPORT BEACH, CA
PRELIMINARY GRADING PLANPLANTER WALL STRUCTURAL DESIGN BY OTHERSUNDER SEPARATE PLAN & PERMITDETAILBIORETENTION PLANTER BOX
T/SLAB=16.50NOTE TO CONTRACTOR:CIVIL ENGINEER OF RECORD APPROVAL REQUIRED PRIOR TOBACKFILL OF ALL DRAIN PIPES, CONTACT CIVIL ENGINEER TOFIELD VERIFY LOCATION, SIZE, AND DEPTH OF DRAIN SYSTEM.SCOPE OF WORKCITY OF NEWPORT BEACH NOTESEASEMENT NOTES:DEVELOPMENT STATISTICSJOB NO.SHEET139 Avenida NavarroSan Clemente, CA 92672949.492.8586www.toalengineering.comCIVIL ENGINEERINGLAND SURVEYINGSTORMWATER QUALITYOFPLANS PREPARED BY:PREPARED FOR:ADAM L. TOALR.C.E. 59275DATE:APVD.DATER E V I S I O N S BY DATEAPPD.:DATE:DWG. NO.H. SCALE:V. SCALE:SURVEY DATE:CHD.:DRN.:STATE OF CALI
FOR
NIA
L ICE
N
S
ED LAND SURVEYORVIKTOR P.MEUMNo. 86821"=8'N/A7/20/182/7/19A.M.S.A.M.SA.L.T.1813123C-2LAIDLAW SCHULTZ ACHITECTS
POR. LOT D, TRACT 919
215 RIVERSIDE AVENUE, NEWPORT BEACH, CA
PRELIMINARY GRADING PLAN -
UPPER LEVEL
T/SLAB=16.50LEGENDNOTEYEAR-ROUND BMP REQUIREMENTSJOB NO.SHEET139 Avenida NavarroSan Clemente, CA 92672949.492.8586www.toalengineering.comCIVIL ENGINEERINGLAND SURVEYINGSTORMWATER QUALITYOFPLANS PREPARED BY:PREPARED FOR:ADAM L. TOALR.C.E. 59275DATE:APVD.DATER E V I S I O N S BY DATEAPPD.:DATE:DWG. NO.H. SCALE:V. SCALE:SURVEY DATE:CHD.:DRN.:STATE OF CALI
FOR
NIA
L ICE
N
S
ED LAND SURVEYORVIKTOR P.MEUMNo. 86821"=8'N/A7/20/182/7/19A.M.S.A.M.SA.L.T.1813133C-3LAIDLAW SCHULTZ ACHITECTS
POR. LOT D, TRACT 919
215 RIVERSIDE AVENUE, NEWPORT BEACH, CA
EROSION CONTROL PLAN