Loading...
HomeMy WebLinkAbout20190603_WQMP Checklist 7 4�twpo CITY OF NEWPORT BEACH 0 \1 COMMUNITY DEVELOPMENT DEPARTMENT v BUILDING DIVISION 100 Civic Center Drive, Newport Beach, CA 92660 LX�OR� www.newportbeachca.gov 1 (949) 644-3200 CONCEPTUAL WATER QUALITY MANAGEMENT PLAN (pWQMP) PLAN REVIEW CHECKLIST Project Address: 215 RIVERSIDE AVENUE Plan Check No.: PA2019-023 Date of Report: FEBRUARY.7,2019 Report Prepared By: TOAL ENGINEERING, INC. Plan Check Engineer: Sergio Gutierrez sgutierrez@newportbeachca.gov Phone: 949-644-3213 X 1 st Review: 6/3/19 2nd Review: 3rd Review: • Make the following corrections to the report. • Return this correction sheet and check prints with corrected Water Quality Management Plan. • Submit a response sheet indicating how each correction was resolved. • A"Conceptual"and "Final"WQMP is required for"Priority" projects. For Conceptual WQMP, provide tentative LID and Hydromodification BMP's at the earliest planning phase for early review and approval: http://www.newportbeachca.gov/home/showdocument?id=21687 • LID BMP's shall follow the following hierarchy of BMP's: infiltration, evapotranspiration, harvest/re- use, and biotreatment. • For"Non-Priority" projects, prepare a Water Quality Management Plan (WQMP)following City's template: http://www.newportbeachca.gov/home/showdocument?id=10747 • On the cover page identify the report as a"Priority" or"Non-Priority" project report. • For Model WQMP: http://www.newportbeachca..gov/home/showdocument?id=10750 • For design see Technical Guidance Document: hftp://www.newportbeachca.gov/home/showdocument?id=l 0749 • For Total Maximum Daily Loads and 301(d) list: www.waterboards.ca.gov/rwgcb8/waterissues/progress/tmdl 1 Correction Lists\waterQualityMgmtPlanRevChecklist 05/31/2019 D Prior to approval of the WQMP Report, attend to the following: TITLE PAGE • Registered Civil Engineer's signature and stamp OWNER'S CERTIFICATION • A signed certification statement, in which the project owner acknowledges and accepts the provisions of the WQMP, follows the title page SECTION I, DISCRETIONARY PERMIT(S) AND WATER QUALITY CONDITIONS • verbatim., the Water Quality Gonditians, including condition requiring preparation of WQMP, if applicable SECTION II, PROJECT DESCRIPTION 11.1—PROJECT DESCRIPTION mC code Awurate4y describe where facilities will be located, what activities will be conducted and where on file site,'kinds of materials and products that will be used,haw and where materials will be received and stored, and what kinds of wastes will be generated-, • describe delivery areas and loading docks(specify location and design and if below grade and types of materials expected to be stored ., D4�scr%be outdoor materials storage areas (describe and depict, locations(s), specify types) of materials expected to be stored);. • Di scribe any activities associated with equ pment or vehicle maintenance and repair, including washing or cleaning:. Indicates number of service bays'or number of fueling islands/fuel pumps, if applicable 11.2-POLLUTANTS �.. ratify the, potential stormwater or urban runoff pollutants reasonably,expected to be associated'' with the project "Heavy Metals" may be associated with this project, Parking Garage Lit plutant of concern 11.3-HYDROLOGY cuss Hydrologic Conditions of Concern- The Hydrologic conditions of this project will be ig,br canfi altered from existing condition lease provide,computations. Y 9 P P P SECTION IV, BEST MANAGEMENT PRACTICES (BMP) IV. 1 -PROJECT PERFORMANCE CRITERIA • Hydromodification control performance criteria. Provide some Hydrologic source control. See item IV.2 IV.2- SITE DESIGN AND DRAINAGE PLAN • Site design BMP's o Minimize impervious areas o rnr�e natural irifiltration o 'CDiscnnoct impervious areas o Protect existing vegetation and sensitive areas 2 Correction Lists\waterQ ualityMgmtPlan RevCheckl ist 05/31/2019 4 o Re-vegetate disturbed areas o BMP's incorporated to the MEP o List of BMP's for each DMA IV.3-LID BMP SELECTION AND PROJECT CONFORMANCE ANALYSIS • List hydrologic source controls • Infiltration BMP's. Infiltration NOT feasible due to Geological and Geotechnical Seismic Hazard.' • Evapotranspiration, and rainwater harvesting BMP's • Biotreatment BMP's • Hydromodification control BMP's SECTION VI, SITE PLAN AND DRAINAGE PLAN • Has an 11" by 17" plot plan been included? Please provide WQMP PLAN • Do all figures, maps, plot plans, etc. have a legend, including a north arrow and scale? • Are all facilities labeled for the intended function? • Are all areas of outdoor activity labeled? • Are all structural BMPs indicated? • Is drainage flow information, including general surface flow lines, concrete or other surface ditches or channels, as well as storm drain facilities such as catch basins and underground storm drain pipes depicted? • Depict where and how on-site drainage ties into the off-site drainage • Provide the following minimum information: o Project Location o Site boundary o Landscape, hardscape, and paved areas o Suitability/feasibility constraints o Drainage connections and discharge points 3 Correction Lists\WaterQualityMgmtPlanRevChecklist 05/31/2019