HomeMy WebLinkAbout20190530_MinutesPage 1 of 6
NEWPORT BEACH ZONING ADMINISTRATOR MINUTES
100 CIVIC CENTER DRIVE, NEWPORT BEACH
CORONA DEL MAR CONFERENCE ROOM (BAY E-1ST FLOOR)
THURSDAY, MAY 30, 2019
REGULAR MEETING – 3:03 P.M.
I. CALL TO ORDER – The meeting was called to order at 3:02 p.m.
Staff Present: Patrick J. Alford, Zoning Administrator
Rosalinh Ung, Senior Planner
Chelsea Crager, Associate Planner
Liz Westmoreland, Assistant Planner
Patrick Achis, Planning Technician
Liane Schuller, Consultant Planner
II. REQUEST FOR CONTINUANCES
None.
III. APPROVAL OF MINUTES
ITEM NO. 1 MINUTES OF MAY 16, 2019
Action: Approved as amended
IV. PUBLIC HEARING ITEMS
ITEM NO. 2 Pedicini Residence Coastal Development Permit No. CD2019-009 (PA2019-024)
Site Location: 1520 East Ocean Front Council District 1
Liane Schuller, Consultant Planner, provided a brief project description stating that the Applicant is requesting
a coastal development permit to allow the demolition of an existing single-family residence and construction
of a new 2,449-square-foot, single-family residence with an attached 759-square-foot, three-car garage.
The proposed project complies with all applicable development standards including height, setbacks, and
floor area limits. No deviations are requested.
Applicant Justin Johnston of Brandon Architects, on behalf of John Pedicini, stated that he had reviewed the
draft resolution and agrees with all of the required conditions.
The Zoning Administrator opened the public hearing. Seeing that no one from the public wished to comment,
the public hearing was closed.
Action: Approved
ITEM NO. 3 Stack Residence Coastal Development Permit No. CD2018-110 (PA2018-284)
Site Location: 101 Shorecliff Road Council District 6
Chelsea Crager, Associate Planner, provided a brief project description stating that the project is a coastal
development permit to demolish an existing single-family residence and construct a 12,882-square-foot single-
family residence including an attached 762-square-foot 3-car garage. The proposed project complies with all
applicable development standards including Bluff Overlay standards and no deviations are requested. Staff
updated the draft resolution to include a condition of approval requiring that swimming pools shall be of double
wall construction with subdrains between the walls and leak detection devices or an equivalent method. One
comment was received via email from Mr. Jim Mosher, a member of the public, stating that the project complies
with density requirements and inquiring as to why the existing residence was being replaced.