Loading...
HomeMy WebLinkAboutPA2019-029 Building PRR 2 PROJECT REVIEW REQUEST COMMUNITY DEVELOPMENT DEPARTMENT Planning Division Please Distribute to: Date: November 6, 2019 Building—Kennedy Public Works - Keely Please return PRR and Plans to Staff Planner David S. Lee, Assistant Planner 949-644-3225, dlee(aD-newportbeachca.gov Applicant: Brion Jeannette Architecture Contact: Katelynn Rodgers katelynn@bja-inc.com Project Name Shaoulian Residence Address: 110 & 106 Sonora Street PA2019-029 CD2019 # Demolition of a duplex and construction of a new duplex (3-story plus basement). The existing configuration has garage access from alley. The proposed design has removed parking from the alley and relocated a two-car garage, a single-car garage, and a car port that is accessed from Seashore Drive. REPORT REQUESTED BY. November 15, 2019 Zoning Administrator HEARING DATE: TDB Check all that apply: Notes: ❑ No comments on the project 1. One independent emergency escape and rescue opening shall as presented.❑ Application of Standard Code be provided from each basement and one from each room that requirements are not can be used for sleeping purposes per section R310.1 CRC. expected to alter the project Appears a total of four could be required to a yard, which is clear design. ❑ Recommended conditions of and unobstructed from grade to the sky. Not through a tunnel or approval are attached. connecting corridor. Secant shoring must surround the entire 4 Application of Standard Code requirements or the attached area, appears not to be at egress well. (Basement level includes conditions of approval will the main basement rooms and each media room and the, substantially impact or alter the design of the project. exercise room) ❑ I contacted the applicant on 2. Emergency escape and rescue opening from both exercise ❑ To schedule an appt. for rooms on the third floor must be clear and unobstructed from Code review grade to the sky, not onto decks, roofs or other architectural ❑ To discuss the following (see notes) appendages. Third floor level 3279 Nov 13, 2019 i g. re Ext. Date Please indicate the approximate time spent one ewing this project: Tmplt: 10/10/12