HomeMy WebLinkAboutPA2019-029 Building PRR 2 PROJECT REVIEW REQUEST
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
Please Distribute to: Date: November 6, 2019
Building—Kennedy
Public Works - Keely Please return PRR and Plans to Staff Planner
David S. Lee, Assistant Planner
949-644-3225, dlee(aD-newportbeachca.gov
Applicant: Brion Jeannette Architecture Contact: Katelynn Rodgers
katelynn@bja-inc.com
Project Name Shaoulian Residence
Address: 110 & 106 Sonora Street
PA2019-029 CD2019 #
Demolition of a duplex and construction of a new duplex (3-story plus basement). The existing
configuration has garage access from alley. The proposed design has removed parking from the alley
and relocated a two-car garage, a single-car garage, and a car port that is accessed from Seashore
Drive.
REPORT REQUESTED BY. November 15, 2019
Zoning Administrator HEARING DATE: TDB
Check all that apply: Notes:
❑ No comments on the project 1. One independent emergency escape and rescue opening shall
as presented.❑ Application of Standard Code be provided from each basement and one from each room that
requirements are not can be used for sleeping purposes per section R310.1 CRC.
expected to alter the project Appears a total of four could be required to a yard, which is clear
design.
❑ Recommended conditions of and unobstructed from grade to the sky. Not through a tunnel or
approval are attached. connecting corridor. Secant shoring must surround the entire
4 Application of Standard Code
requirements or the attached area, appears not to be at egress well. (Basement level includes
conditions of approval will the main basement rooms and each media room and the,
substantially impact or alter
the design of the project. exercise room)
❑ I contacted the applicant on 2. Emergency escape and rescue opening from both exercise
❑ To schedule an appt. for rooms on the third floor must be clear and unobstructed from
Code review grade to the sky, not onto decks, roofs or other architectural
❑ To discuss the following
(see notes) appendages. Third floor level
3279 Nov 13, 2019
i g. re Ext. Date
Please indicate the approximate time spent one ewing this project:
Tmplt: 10/10/12