GEOTECHNICAL INVESTIGATION
FOR PROPOSED RESIDENTIAL RE-DEVELOPMENT
LOCATED AT
2104 EAST BALBOA BOULEVARD
NEWPORT BEACH, CALIFORNIA
Presented to :
HUDGINS DESIGN GROUP, Inc.
1107 South Coast Highway
Laguna Beach, CA 92651
Attention :
Scott Hudgins, AIA
Prepared by :
EGA CONSULTANTS, Inc.
375-C Monte Vista Avenue
Costa Mesa, California 92627
ph (949) 642-9309
fax (949) 642-1290
July 30, 2018
Project No. HD134.1
engineering
geotechnical
applications
375 -C Monte Vista Avenue • Costa Mesa, CA 92627 • (949) 642 -9309 • FAX (949) 642-1290
PA2019-033
engine ering
geotecbnica l
appli cations
consultants July 30, 2018
Project No. HD134.1
Site : Proposed SFR -2104 East Balboa Boulevard
Newport Beach . Cal ifo rni a
Executive Summary
Based on our geotechnical study of the site, our review of available reports and literature and our
experience, it is our opi nion that the proposed residential development is feasible from a geotechnical
standpoint. There appear to be no significant geotechnical constraints on-site that cannot be mitigated by
proper planning, design, and utilization of sound construction practices. The engineering properties of the
soil and native materials , and surface drainage offer favorable conditions for site re-development.
The following key elements are conclusions confirmed from this investigation :
A review of available geologic records indicates that no active faults cross the subject property.
The site is located in the seismically active Southern California area, and within 2 kilometers of the
Type B Newport-Inglewood Fault. As such, the proposed development shall be designed in
accordance with seismic considerations specified in the 2016 California Building Code (CBC) and
the City of Newport Beach requirements.
Foundation specifications herein include added provisions for potential liquefaction on-site per City
policy CBC 1803.11-12 .
SUMMARY OF RECOMMENDATIONS
Design Item
Foundations :
Footing Bearing Pressure :
Passive Lateral Resistence:
Perimeter Footi ng Widths:
Perimeter Footing Depths :
Coefficient of Friction :
Mat Slab (Optional):
Soil Expansion:
Soil Sulfate Content:
Building Pad Removals :
Sandy Soil Max . Density:
Building Slab:
Recommendations
1,750 psf -building, continuous ; 2,250 psf -columns
250 psf per foot
min . 15 inches with two No . 5 bars top and bottom
min . 24 inches below lowest adjacent grade
0.30
min . 18 inches with thickened edges(+ 6 inches)
with no . 5 bars@ 12" o.c. each way, top and bottom
Non-Expansive Beach Sands
Negligible
min . 2% ft . overexcavation, with 2% ft . envelope.
118.5 pcf@ 12.0 % Opt. Moisture
* Concrete slabs cast against properly compacted fill materials shall be a minimum of 5 inches
thick (actual) and reinforced with No. 4 rebar at 12 inches on center in both directions .
* Dowel all footings to slabs with No. 4 bars at 24 inches on center.
* Concrete building slabs shall be underlain by 2" clean sand, underlain by a min . 15 mil thick
moisture barrier, with all laps sealed, underlain by 4" of %-inch gravel (capillary break).
Seismic Values :
Site Class Definition (Table 1613.5.2)
Mapped Spectral Response Acceleration at 0 .2s Period, s.
Mapped Spectral Response Acceleration at 1s Period, S 1
Short Period Site Coefficient at 0.2 Period, Fa
Long Period Site Coefficient at 1s Period , Fv
Adjusted Spectral Response Acceleration at 0.2s Period , SMs
Adjusted Spectral Response Acceleration at 1 s Period, SM 1
Design Spectral Response Acceleration at 0 .2s Period, S05
Design Spectral Response Acceleration at 1 s Period, S01
D
1.721 g
0.633 g
1.00
1.50
1.721 g
0.949 g
1.148 g
0 .633 g
PGAm= 0.713 g
375-C Monte Vist a Av e nue• Costa Mesa , CA 9 2627 • (949) 642-9309 • FAX (949) 642-1290
PA2019-033
consultants
engineering
geotechnical
applications
HUDGINS DESIGN GROUP, Inc.
1107 South Coast Highway
Laguna Beach, CA 92651
July 30, 2018
Project No. HD134.1
Attention:
Subject:
Dear Scott ,
Scott Hudgins
GEOTECHNICAL INVESTIGATION
FOR PROPOSED RESIDENTIAL RE-DEVELOPMENT
LOCATED AT
2104 EAST BALBOA BOULEVARD
NEWPORT BEACH, CALIFORNIA
In accordance with your request and with the 2016 CBC , we have completed our
Geotechnical Investigation of the above referenced site. This investigation was
performed to determine the site soil conditions and to provide geotechnical parameters
for the proposed re-grading and construction at the subject site.
It is our understanding that the proposed re-development shall include the demolition of
the existing residence and the construction of a new residential dwelling with associated
improvements .
This report presents the results of the investigation (including Liquefaction
Computations) along with grading and foundation recommendations pertaining to the
proposed residential development.
This opportunity to be of service is appreciated. If you have any questions, please call .
Very truly yours,
EGA Consultants, Inc.
~-{_Gc.c-.. -
DAVID A. WORTHINGTON CEG 2124
Principal Engineering Geologist
Copies : (4) Addressee
375-C Mont e V ista Aven u e • Costa Me sa, CA 92627 • (949) 642 -9309 • F AX (949) 642 -12 90
PA2019-033
GEOTECHNICAL INVESTIGATION
July 30, 2018
Project No. HD134.1
FOR PROPOSED RESIDENTIAL RE-DEVELOPMENT
LOCATED AT
INTRODUCTION
2104 EAST BALBOA BOULEVARD
NEWPORT BEACH, CALIFORNIA
In response to your request and in accordance with the City of Newport Beach Building
Department requirements, we have completed a preliminary geotechnical investigation
at the subject site located at 2104 East Balboa Boulevard , in the City of Newport
Beach, State of California (see Site Location Map, Figure 1).
The purpose of our investigation was to evaluate the existing geotechnical conditions at
the subject site and provide recommendations and geotechnical parameters for site re-
development, earthwork, and foundation design for the proposed re-construction. We
were also requested to evaluate the potential for on-site geotechnical hazards. This
report presents the results of our findings, as well as our conclusions and
recommendations.
SCOPE OF STUDY
The scope of our investigation included the following tasks:
• Review of readily available published and unpublished reports ;
• Geologic reconnaissance and mapping;
• Excavation and sampling of two (2) exploratory borings (B-1 and B-2) to a
total depth of 12 feet below existing grade (b.g.);
• Two (2) Continuous Cone Penetration Test (CPT-1 and CPT-2) soundings
to a depth of 49 feet below grade (results of the CPT soundings are
included herein);
• Laboratory testing of representative samples obtained from the exploratory
borings;
• Engineering and geologic analysis including seismicity coefficients in
accordance with the 2016 California Building Code (CBC);
2
PA2019-033
• Seismic and Liquefaction analysis and settlement computations (in
accordance with California Geological Survey, SP 117 A);
• Preparation of this report presenting our findings, conclusions, and
recommendations.
GENERAL SITE CONDITIONS
The subject bayfront property is an approximate 35 ft. to 73 ft . wide by 261 ft. by 249 ft.
long rectangular wedge-shaped lot located at 2104 East Balboa Boulevard in the City of
Newport Beach, County of Orange, California (see Site Location Map, Figure 1). For
the purpose of clarity in this report, the lot is bound by East Balboa Boulevard to the
south, by similar single family dwellings to the east and west, and by a seawall and
channel waters of the Newport Beach Harbor to the north (see Plot Plan, Figure 2).
The lot is located near the eastern terminus of the Balboa Peninsular . The Pacific
Ocean shoreline is located approximately 1,700 feet to the southwest.
The lot is legally described as Lot 2 of Re-Subdivision 250 in the City of Newport
Beach, County of Orange, California (APN 048-240-36).
The subject property consists of a relatively flat, planar lot with no significant slopes on
or adjacent to the site.
Currently, the lot is occupied by a single family, two-story residence situated on a
graded level pad. A detached, one-story garage is located in the front portion of the of
the property and is accessed by a front driveway from E. Balboa Blvd . The residence is
supported on continuous perimeter footings with slab-on-grade floors.
The existing residence layout is shown herein as Figure 2, Plot Plan .
PROPOSED RESIDENTIAL RE-DEVELOPMENT
Based on our discussions with the project architect, Scott Hudgins, the proposed
residential development shall include the demolition of the existing structures, and the
construction of a new three-story residential dwelling in its place.
Additionally, it is our understanding that a basement is planned. However, the precise
limits of the basement footprint and depths were not made available at this time.
We assume that the proposed building will consist of wood-frame and masonry block
construction or building materials of similar type and load. The building foundations will
consist of a combination of isolated and continuous spread footings. Loads on the
footings are unknown, but are expected to be less than 2,250 and 1,750 pounds per
Proposed Residence
Soils Report -2104 East Balbo a Blvd., Newport Beach, CA
Project No. HD134.I
July 30, 2018 3
PA2019-033
square foot on the isolated and continuous footings, respectively. If actual loads
exceed these assumed values, we should be contacted to evaluate whether revisions of
this report are necessary. It is our understanding that the grade of the site is not
expected to vary significantly, with maximum regrades consisting of approximately 1 to
2 feet in the building areas.
Based on NAVD88, the site elevation is approximately 12 ft. above MSL. Based on the
preliminary plans, the proposed finish floor elevation shall be 9+ ft. above mean sea
level (MSL) to conform with City and United States FEMA flood elevation requirements.
Note: The precise determination, measuring, and documenting of the site elevations,
hub locations, property boundaries, etc ., is the responsibility of the project licensed land
surveyor.
SUBSURFACE EXPLORATION
Our subsurface exploration consisted of the excavation of two exploratory borings (B-1
and B-2) to a maximum depth of 12 feet below grade (b.g.) and two CPT probes (CPT-
1 to 35 ft. b.g . and CPT-2 to 49 ft. b.g. with continuous soil profile). Prior to drilling, the
underground detection and markup service (Underground Service Alert of Southern
California) was ordered and completed under DigAlert Confirmation No. A 181700037-
00A.
Representative bulk and relatively undisturbed soil samples were obtained for labora-
tory testing. Geologic/CPT logs of the soil boring/probes are included in Appendix A.
The borings were continuously logged by a registered geologist from our firm who
obtained soil samples for geotechnical laboratory analysis. The approximate locations
of the borings are shown on Figure 2, Plot Plan .
Geotechnical soil samples were obtained using a modified California sampler filled with
2 % inch diameter, 1-inch tall brass rings. Bulk samples were obtained by collecting
representative bore hole cuttings. Locations of geotechnical samples and other data
are presented on the boring logs in Appendix A.
The soils were visually classified according to the Unified Soil Classification System .
Classifications are shown on the boring logs included in Appendix A.
LABORATORY TESTING
Laboratory testing was performed on representative soil samples obtained during our
subsurface exploration. The following tests were performed:
Proposed Residence
Soils Report -2104 East Balboa Blvd., Newport Beach, CA
Project No . HD134 . l
July30,2018 4
PA2019-033
*
*
*
*
*
*
*
Dry Density and Moisture Content
(ASTM: D2216)
Wet Density (Submerged)
(ASTM: D2216)
Maximum Dry Density and Optimum Moisture Content
(ASTM: D1557)
Direct Shear
(ASTM D3080)
Sulfate Content
(CA 417, ACI 318-14)
Soil Classification
(ASTM D2487)
Sieve Analysis
(ASTM D442)
All laboratory testing was performed by our sub-contractor, G3Soi1Works, Inc., of Costa
Mesa, California.
Geotechnical test results are included in Appendix B, herein.
SOIL AND GEOLOGIC CONDITIONS
The site soil and geologic conditions are as follows:
Seepage and Groundwater
Seepage or surface water ponding was not noted on the subject site at the time
of our study. Groundwater was encountered in our test excavations at a depth
of approximately 12 feet b.g .. According to the Orange County Water District
(OCWD), there are no water wells located within the general vicinity of the
subject property.
The Pacific Ocean shoreline is approximately 1,700 feet southwest of the site.
The Newport Bay and seawall bulkhead is located north and adjacent to the
property (see Figure 2, Plot Plan).
Depths to groundwater are influenced by tidal fluctuations. A tidal chart during
the week of July 2, 2018, presented as Figure 4, herein.
Proposed Residence
Soils Report - 2 J 04 East Balboa Blvd ., Newport Beach , CA
Project No . HD134 . I
July30,2018 5
PA2019-033
Geo logic Sett ing
Regionally, the site is located within the western boundary of the Coastal Plain
of Orange County. The Coastal Plain lies within the southwest portion of the
Los Angeles Basin and consists of semi-consolidated marine and non-marine
deposits ranging in age from Miocene to recent. The western boundary of the
Coastal Plain, in which the site is located, is referred to as the Tustin Plain. It is
bound by the Santa Ana Mountains to the northeast and the San Joaquin Hills
to the southeast.
Based on available geologic maps the site is underlain by a thin mantle of
eolian)/hydraulic sands and/or engineered fill. The shallow soil layer is
underlain by Quaternary-age old paralic deposits (Qop) which are described as
medium dense to very dense, oxidized, fine to medium grained, moderately to
well-cemented sand and silty sand (see reference No. 2).
The old paralic deposits are underlain by massive bedrock of the Monterey
Formation (Tm). Roadside exposures of massive bedrock of the Monterey
Formation (Tm) are visible on the inland side of side of Pacific Coast Highway
less than 0.8 kilometer northeast of the site (Bayside Drive bluffs).
A Geologic Map is presented as Figure 3, herein (reference : Morton, D.M., and
Miller, F.K., 2006).
Based on the geologic map (Figure 3) correlation with the on-site CPT probes
advanced on July 2, 2018, bedrock of the Monterey Formation (Tm) was likely
encountered approximately 33 feet (CPT-1) to 42 feet (CPT-2) below grade .
Faulti ng
A review of available geologic records indicates that no active faults cross the
subject property (reference No. 2).
Se ism ic ity
The seismic hazards most likely to impact the subject site is ground shaking
following a large earthquake on the Newport-Inglewood (onshore), Palos
Verdes (offshore), Whittier-Elsinore, or Cucamonga . The fault distances,
probable magnitudes, and horizontal accelerations are listed as follows:
Proposed Residence
Soils Report -2104 East Balboa Blvd., Newport Beach, CA
Project No. HDJ34. I
July 30, 2018 6
PA2019-033
FAULT DISTANCE FROM MAXIMUM CREDIBLE MAXIMUM
(Seismic SUBJECT SITE EARTHQUAKE HORIZONTAL
Source Type) (KIiometers) MAGNITUDE ROCK
ACCELERATION
Newport-2 kilometers southwest 7.2 0.69 g's
Inglewood (B)
Palos Verdes 16 kilometers 7.1 0.38 g's
(B) southwest
Chino-Cental 40 kilometers northeast 6.7 0.14 g's
Avenue (B)
Elsinore (B) 37 kilometers northeast 6.8 0.16 g's
Cucamonga 50 kilometers north-7.0 0. 14 g's
(A) northeast
The maximum anticipated bedrock acceleration on the site is estimated to be
less than 0.69, based on a maximum probable earthquake on the Newport-
Inglewood Fault. The site is underlain by fill and estuarine sands. For design
purposes, two-thirds of the maximum anticipated bedrock acceleration may be
assumed for the repeatable ground acceleration. The effects of seismic
shaking can be mitigated by adhering to the 2016 California Building Code or
the standards of care established by the Structural Engineers Association of
California.
With respect to this hazard, the site is comparable to others in this general area
in similar geologic settings. The grading specifications and guidelines outlined
in Appendix C of the referenced report are in part, intended to mitigate seismic
shaking. These guidelines conform to the industry standard of care and from a
geotechnical standpoint, no additional measures are warranted.
Based on our review of the "Seismic Zone Map," published by the California
Department of Mines and Geology in conjunction with Special Publication 117,
there are no earthquake landslide zones on or adjacent to the site. The
proposed development shall be designed in accordance with seismic
considerations contained in the 2016 CBC and the City of Newport Beach
requirements .
Based on Chapter 16 of the 2016 CBC and on Maps of Known Active Near-
Source Zones in California and Adjacent Portions of Nevada (ASCE 7
Standard), the following parameters may be considered :
Proposed Residence
Soils Re port -2104 Eas t Balboa Blvd ., Newport Beach, CA
Project No. J--10134 . I
July 30, 2018 7
PA2019-033
2016 CBC Seismic Design Parameters
SITE ADDRESS 2104 E t B lb B I d N t B I CA as a oa ou evar , ewpo1 eac 1,
Site Latitude (Decimal Degrees) 33 .59934
Site Longitude(Decimal Degrees) -117.8847
Site Class Definition D
Mapped Spectral Response Acceleration at 0.2s Period, Ss 1.721 g
Mapped Spectral Response Acceleration at ls Period, S 1 0.633 g
Short Period Site Coefficient at 0.2 Period, Fa 1.00
Long Period Site Coefficient at ls Period, Fv 1.50
Adjusted Spectral Response Acceleration at 0.2s Period, SMs 1.721 g
Adjusted Spectral Response Acceleration at ls Period, SM, 0.949 g
Design Spectral Response Acceleration at 0.2s Period, Sos 1.148 g
Design Spectral Response Acceleration at ls Period S01 0.633 g
In accordance with the USGS Design Maps, and assuming Site Class "D", the
mean peak ground acceleration (PGAm) per USGS is 0.713 g . The stated
PGAm is based on a 2% probability of exceedance in a 50 year span (see
copies of the USGS Design Maps Detailed Report, Appendix D, herein).
O ther Geologic Hazards
Other geologic hazards such as landsliding, or expansive soils, do not appear to
be evident at the subject site .
FINDINGS
Subsurface Soils
As encountered in our test borings, the site is underlain by, fill and native
materials as follows:
Fill (Af}
Fill soils were encountered in each of the borings to a depth of
approximately 2% feet b.g. The fill soils consist generally of medium brown,
moist, loose to medium dense, silty fine to medium sand with trace shell
fragments. The expansion potential of the fill soils was judged to be very
low (E . I. = 0) when exposed to an increase in moisture content.
Proposed Residence
Soils Report -2104 East Balboa Blvd., Newport Beach, CA
Project No . HD134 .I
July 30, 2018 8
PA2019-033
Hydraul ic-Na t ive Sands (Qe). Paral ic Depos its (Qop ) and Bedrock (Tm )
Underlying the fill materials are hydraulic and native sands and silts/clays
as encountered in each of the test borings (B-1, B-2, CPT-1, and CPT-2).
The native sands consist generally of olive brown, moist to wet , medium
dense to dense, non-cemented, fine to medium-grained sand with shell
fragments. The native sands are underlain by eolian (Qe) and old paralic
(Qop) deposits, which are underlain by Monterey Formation (Tm) bedrock
consisting of medium dense to very dense, oxidized, fine to medium
grained, moderately to well-cemented sand and siltstone to the maximum
depths explored (49 ft. b.g.).
Based on the geologic map (Figure 3) correlation with the on-site CPT probe
advanced on July 2, 2018, bedrock of the Monterey Formation (Tm) was likely
encountered at depths ranging of approximately 33 to 42 feet below grade.
Based on the laboratory results dated July 2, 2018, the site maximum dry
density is 118.5 pct at an optimum moisture content of 12.0 % (per ASTM D
1557). The complete laboratory reports are presented in Appendix B, herein .
LIQUEFACTION ANALYSIS (Per SP117A)
Liquefaction of soils can be caused by strong vibratory motion in response to
earthquakes. Both research and historical data indicate that loose, granular
sandy soils are susceptible to liquefaction, while the stability of rock, gravels,
clays , and silts are not significantly affected by vibratory motion. Liquefaction
is generally known to occur only in saturated or near saturated granular soils.
The site is underlain by fill/estuarine sands, old paralic deposits, and bedrock of
the Monterey Formation.
It is our understanding that the current City policy, has assigned a seismic
settlement potential of one (1.0) inch in the upper ten feet. In the event
settlement values exceed these threshold values, then additional analysis
and/or additional mitigation is required.
The CPT testing was performed in accordance with the "Standard Test Method
for Performing Electronic Friction Cone and Piezocone Penetration Testing of
Soils," (ASTM 05778-12, Reference "j", herein). The seismically induced
settlement for the proposed structure was evaluated based on the "Soil
Liquefaction During Earthquakes" by I.M. Idriss and R.W. Boulanger, dated
September 8, 2008.
The analysis was provided by the two 12-feet deep 4 " diameter hand-auger
boring, and two 7" diameter CPT probes advanced on July 2, 2018. The
Proposed Residence
Soils Report -2104 East Balboa Blvd ., Newport Beach, CA
Project No. HD 134 .1
July 30, 2018 9
PA2019-033
exploratory boring and probe locations are shown in the Plot Plan, Figure 2,
herein.
The soil borings were continuously logged by a certified engineering geologist of
our firm .
The computations and results of our Liquefaction Analysis, based on CPT blow
counts of CPT-1 and CPT-2, are attached in Appendix E, herein. The
seismically induced settlement analysis was evaluated based on methods
published in the references Nos. "a" through "j" (see "Associated References",
herein). The liquefaction and seismic settlement calculations indicate seismic
settlement (includes dry and saturated sands) in the upper 10 feet is less than
1.0 inches, and hence shallow mitigation methods for liquefaction may be
implemented per City Code Policy (No. CBC 1803.5.11-2 last revised 7/3/2014).
Based on our liquefaction analysis, and in accordance with the City of Newport
Beach Policy No. CBC 1803.5.11-12 (NBMC, Chapter 15), we recommend the
following mitigative methods to minimize the effects of shallow liquefaction:
1. Tie all pad footings with grade beams .
2. All footings should be a minimum of 24 inches deep, below grade.
3. Continuous footings should be reinforced with two No. 5 rebar (two at the
top and two at the bottom).
4. Concrete slabs cast against properly compacted fill materials shall be a
minimum of 5 inches thick (actual) and reinforced with No. 4 rebar at 12
inches on center in both directions. The reinforcement shall be supported
on chairs to insure positioning of the reinforcement at mid-center in the
slab .
5. Dowel all footings to slabs with No. 4 bars at 24 inches on center.
6. Additionally, to further reduce the effects of the thin shallow zones of
potentially liquefiable soils, the upper building slabs shall include 15" w by
24" d interior grade beams ("cross beams") to be reinforced with two No. 5
rebars (two at the top and two at the bottom). The basement slabs shall be
mat slab design (see minimum specifications below).
The foundation specifications outlined above will act to decrease the potential
settlement due to liquefaction and/or seismically induced lateral deformation to
tolerable amounts . The above specifications eliminate the use of piles and
associated construction vibrations and groundwater displacement induced by
caisson drilling or pile-driving. If the above specifications are incorporated, the
proposed structure shall be stable and adequate for the intended uses and the
proposed construction will not adversely impact the subject or adjacent
properties.
Proposed Residence
Soils Report -2104 East Balboa Blvd., Newport Beach, CA
Project No. HD134. l
July30,2018 10
PA2019-033
Other Geolog ic Haza rd s
Other geologic hazards such as landsliding, or expansive soils, do not appear to
be evident at the subject site.
CONCLUSIONS
Based on our geotechnical study of the site, our review of available reports and
literature and our experience, it is our opinion that the proposed improvements at the
site are feasible from a geotechnical standpoint. There appear to be no significant
geotechnical constraints on-site that cannot be mitigated by proper planning, design,
and utilization of sound construction practices. The engineering properties of the soil
and native materials, and the surface drainage offer favorable conditions for site re-
development.
RECOMMENDATIONS
The following sections discuss the principle geotechnical concerns which should be
considered for proper site re-development.
Earthwork
Grading and earthwork should be performed in accordance with the following
recommendations and the General Earthwork and Grading Guidelines included
in Appendix C. It is our understanding that the majority of grading will be limited
to the re-grading of the building pad for the proposed construction . In general,
it is anticipated that the removal of the upper 2% feet within the building
footprint (slab-on-grade portion) will require removal and recompaction to
prepare the site for construction. Additionally, the bottom of the excavation
shall be scarified a minimum 6 inches. The removals should be accomplished
so that all fill and backfill existing as part of the previous site use and demolition
operations are removed.
Where feasible, the limits of the pad fill shall be defined by a three (3) feet
envelope encompassing the building footprint. Care should be taken to protect
the adjacent property improvements.
A minimum one foot thick fill blanket should be placed throughout the exterior
improvements (approaches, hardscape, etc.). The fill blanket will be achieved
by re-working (scarifying) the upper 12 inches of the existing grade.
Site Preparation
Prior to earthwork or construction operations, the site should be cleared of
Proposed Residence
Soils Report -2104 East Balboa Blvd., Newport Beach, CA
Project No . HD 134.1
July30,2018 11
PA2019-033
surface structures and subsurface obstructions and stripped of any vegetation
in the areas proposed for development. Removed vegetation and debris should
then be disposed of off-site. A minimum of 2% feet (+6 inches of scarification)
of the soils below existing grade will require removal and recompaction in the
areas to receive building pad fill. Following removal, the excavated surface
should be inspected by the soils engineer or his designated representative prior
to the placement of any fill in footing trenches. Holes or pockets of
undocumented fill resulting from removal of buried obstructions discovered
during this inspection should be filled with suitable compacted fill.
So il Cement-for upper pad only
At the time of the writing of this report, the site plan showing the limits of at-
grade and/or basement slab footprints were not available for our review. For
the upper building pads (if applicable), due to in situ dry, cohesionless soils, we
recommend approximately three (3) pallets (40 bags dry mix, each weighing 94
pounds and approximately 1.33 cubic yards) of Portland cement be blended
into the newly-placed fill. The first application of the Portland Cement shall be
placed on the bottom of the scarified over-excavation(s). This remedial
specification may be eliminated or reduced if suitable import fills are trucked-in.
This remedial recommendation does not apply to basement excavation
bottoms, where soil cement is not warranted .
The on-site soils are suitable for reuse as compacted fill, provided they are free
of organic materials, debris, and materials larger than four (4) inches in
diameter. After removal of any loose, compressible soils, all areas to receive fill
and/or other surface improvements should be scarified to a minimum depth of 6
inches, brought to at least 2 percent over optimum moisture conditions and
compacted to at least 90 percent relative compaction (based on ASTM: D
1557). If necessary, import soils for near-surface fills should be predominately
granular, possess a very low expansion potential, and be approved by the
geotechnical engineer.
Lift thicknesses will be dependent on the size and type of equipment used. In
general, fill should be placed in uniform lifts not exceeding 6 inches. Placement
and compaction of fill should be in accordance with local grading ordinances
under the observation and testing of the geotechnical consultant. We
recommend that fill soils be placed at moisture contents at least 2 percent over
optimum (based on ASTM: D 1557).
We recommend that oversize materials (materials over 4 inches) should they be
Proposed Residence
Soils Report -2104 East Balboa Blvd., Newport Beach, CA
Project No. HD134 . I
July30,2018 12
PA2019-033
encountered, be stockpiled and removed from the site .
Trench Backfill
The on-site soils may be used as trench backfill provided they are screened of
rock sizes over 4 inches in dimension and organic matter. Trench backfill
should be compacted in uniform lifts (not exceeding 6 inches in compacted
thickness) by mechanical means to at least 90 percent relative compaction
(ASTM: D 1557).
Geotechnical Parameters
Note: At the time of the writing of this report, the site plan showing the limits of at-grade
and/or basement slab footprints were not available for our review.
The following Geotechnical parameters may used in the design of the proposed
structure (also, see "Liquefaction Analysis,, section, above):
Foundation Design
Structures on properly compacted fill may be supported by conventional,
continuous or isolated spread footings. All footings should be a minimum of 24
inches deep (measured in the field below lowest adjacent grade).
At this depth (24 inches) footings founded in fill materials may be designed for
an allowable bearing value of 1,750 and 2,250 psf (for dead-plus-live load) for
continuous wall and isolated spread footings, respectively. These values may
be increased by one-third for loads of short duration, including wind or seismic
forces.
Reinforcement requirements may be increased if recommended by the project
structural engineer. In no case should they be decreased from the previous
recommendations.
Mat Foundation Design -Basement
Due to anticipated high tide waters and cohesionless sands during construction,
a mat slab foundation system is recommended for the proposed basement.
Mat slabs founded in compacted fill or competent native materials may be
designed for an allowable bearing value of 2,250 psf (for dead-plus-live load).
These values may be increased by one-third for loads of short duration,
including wind or seismic forces. The actual design of the foundation and slabs
should be completed by the structural engineer. This is also and option for the
at-grade, upper pad structures.
Proposed Residence
Soils Report -2104 East Balboa Blvd., Newport Beach, CA
Project No. HDl34. I
July 30, 2018 13
PA2019-033
MIN . DESIGN ITEM
Mat foundations :
allowable bearing pressure:
passive lateral resistence:
mat slab thickness:
steel reinforcement:
coefficient of friction:
Modulus of Subgrade Reaction :
RECOMMENDATIONS
2,250 psf
250 psf per foot
min . 18 inches with thickened edges(+ 6 inches)
no. 5 bars @ 12" o.c. each way, top and bottom
0.30
ks = 90 lbs/in 3
The mat slab shall be directly underlain by a min. 2-inch thick layer of washed
sand, underlain by min. 15-mil Stego wrap (or equiv., lapped and sealed),
underlain by 4 inches of gravel (%-inch crushed rock), underlain by competent
native materials. The precise sequence, composition and thickness of "ballast",
"weight" or "waste" slabs shall be determined by the structural engineer.
Joints in walls and floors, and between the wall and floor, and
penetrations of the wall and floor shall be made watertight using suitable
methods and materials (e.g. bentonite "water stops'?.
Reinforcement requirements may be increased if recommended by the project
structural engineer. In no case should they be decreased from the previous
recommendations.
Cement Type for Concrete in Contact with On-Site Earth Materials
Concrete mix design should be based on sulfate testing with Section 1904.2 of
the 2016 CBC . Preliminary laboratory testing indicates the site soils possess
negligible sulfate exposure (0.0021 % by weight). Test Results are presented in
Appendix B.
ACI 318-14 BUILDING CODE -Table 19.3 .1.1
REQUIREMENTS FOR CONCRETE EXPOSED TO SULFATE-CONTAINING SOLUTIONS
Sulfate Water soluble Sulfate (S04) in Cement Type Maximum water-Minimumfc',
Exposure sulfate (S04 ) in soil water, ppm cementitious material normal-weight
[SO] percent by weight ratio, by weight, normal and light weight
weight concrete concrete, psi
~
Negligible 0.00 $ S04 < 0.10 0 $ S04 <150 -------
[S1]
Moderate 0.10 < S04 < 0.20 150 < S04 < 1500 11,IP(MS), 0 .50 4000
[S2) IS(MS),P(MS)
l(PM)(MS),
l(SM)(MS)
Severe 0.20 s S04 < 2.00 1500 < SQ4 < V 0.45 4500
[S3] 10,000
Very Severe S04 > 2 .00 S04 > 10,000 V plus 0.45 4500
[S4) pozzalan
As a conservative approach, we recommend cement with a minimum strength
f'c of 4,000 psi be used for concrete in contact with on-site earth materials
Proposed Residence
Soils Report -2104 East Balboa Blvd., Newport Beach , CA
Project No. HD 134 .1
July 30, 2018 14
PA2019-033
(does not apply to temporary shoring "soft" piles which may be reduced to a
min. 1,000 psi).
Settlement
Utilizing the design recommendations presented herein, we anticipate that the
majority of any post-grading settlement will occur during construction activities.
We estimate that the total settlement for the proposed structure will be on the
order of 1 inch . Differential settlement is not expected to exceed 1 inch in 30
feet. These settlement values are expected to be within tolerable limits for
properly designed and constructed foundations.
Lateral Load Resistance
Footings founded in fill materials may be designed for a passive lateral bearing
pressure of 250 pounds per square foot per foot of depth. A coefficient of
friction against sliding between concrete and soil of 0 .30 may be assumed.
Capillary Break Below Interior Slabs -Upper Building Pad Only
In accordance with the 2016 California Green Building Standards Code Section
4.505.2.1, we provide the following building specification for the subject site
(living area and garages slabs):
Concrete building slabs shall be directly underlain by a min. 2 inches of
clean/washed sand, underlain by a min.15 mil-thick moisture barrier (e.g.
"Stego Wrap"), with all laps sealed, underlain by 4 inches of% -inch gravel.
In no case shall we approve sand placed directly on top of the gravel layer.
The above specification meets or exceeds the Section 5.505.2.1 requirement.
Basement Shoring Installation Recommendations
The precise limits of the basement footprint and depths were not made
available at this time. At any rate, it is our understanding that the shoring
system will consist of steel "H" beam soldier piles and slurry-backfilled "soft"
piles. The soldier piles should not be driven or vibrated into place due to the
possible damage that could occur to nearby structures. It is expected that slight
to moderate caving may occur within the pre-drilled holes above the
groundwater elevations. Below the ground water table, moderate to severe
caving of the beach sand deposits is expected. To mitigate the potential for this
caving, the soldier pile excavations should be drilled using casing and may also
require a drilling slurry additive such as Slurry Pro CDP. The casing may be
advanced by drilling ahead of the casing and then "crowding down" the casing;
however, the drill auger should not be advanced more than 2 to 3 feet below the
Proposed Residence
Soils Report -2104 East Balboa Blvd., Newport Beach, CA
Project No. HDl34. l
July30,2018 15
PA2019-033
bottom of the casing as the hole is drilled . It is also recommended that special
drill augers ( i.e., an auger with an overcut tooth) be used that permit the
groundwater to flow relatively unrestricted past the augers as they are being
lifted so that suction is not created. This is expected to reduce the potential for
piping of the sands beneath the bottom of the casing as the auger is being
withdrawn. The addition of a drilling slurry additive is for the purpose of sealing
the sidewalls of the excavation and helping in balancing the differential
hydrostatic pressure between the slurry and the surrounding saturated soil.
Once a hard pile boring is advanced to its recommended depth, a steel soldier
pile should be place immediately within the boring and the boring then slurry-
backfilled.
The concrete and slurry should be placed into the soldier pile excavation from
the bottom up using a pump and tremie pipe. The bottom of the tremie pipe
should be kept at least 2 to 3 feet below the level of the rising concrete or slurry .
The concrete should be thoroughly vibrated to remove any entrapped air. The
soil and water mixture dispersed by the concrete and slurry should be pumped
into a suitable disposal container. After the concrete and slurry is poured, the
casing may be removed. In some difficult cases, the casing top should be
notched to allow for "spinning"; which may improve the extraction workability.
Shoring: Temporary Secant Wall System
The precise limits of the basement footprint and depths were not made
available at this time . At any rate, for the limits of the proposed basement for
the bayfront property, we recommend the installation of secant walls which will
provide the advantage of cutting-off groundwater and greatly reducing or
eliminating the need for de-watering. The secant walls would be constructed
prior to the basement excavation. Hard piles and soft piles would be interlocked
and each drilled to the target depths. The soft piles (non-reinforced) are drilled
first. The secant wall hard piles are then drilled and reinforced using soldier
beams . Tremie tubes shall be deployed for concrete placed below the water
table. The tremie application displaces groundwater without inducing a
hydraulic cone of depression. The secant walls and weighted ("suppression")
slab induces no influence to the water table and eliminates potential problems
with "draw-down". The secant wall system, weighted mat slab, soil
movement monitoring details and waterproofing shall be provided by the
design engineer(s).
We recommend the design engineer assume hydrostatic pressure up to 7.0 ft .
above MSL (NAVO 88).
We recommend cement with a minimum strength f'c of 1,000 psi be used for
the temporary concrete elements. We recommend an approximate 2% blend of
water resistant additive such as Xypex be used for the concrete pours.
Proposed Residence
Soils Report -2104 East Balboa Blvd., Newport Beach, CA
Project No. HD134. l
July30,2018 16
PA2019-033
The finalized shoring Plans should be provided by the design engineer and
reviewed by EGA Consultants. The geotechnical consultant should be present
during the excavation phases of the project to observe the soil conditions and
make additional recommendations if necessary.
Dewatering
Dewatering can be accomplished by installing a series of well-points and/or
sumps and pumps within the basement excavation. Dewatering through the
use of a number of electric submersible pumps surrounded in gravel filler and
filter fabric have been adequate at similar sites in the beachfront vicinity.
Pumped groundwater may require special treatment or clarification prior to
discharge back into the site strata, ocean or into the storm water system. This
should be determined by the design team and by governing regulatory agency.
A Dewatering Plan should be provided by the design engineer and reviewed by
EGA Consultants.
• Groundwater and saturated soils were encountered at 7 to 12 ft. below
existing grade. However, the historic high salt water level is at the ground
surface which can be expected due to storm surge. We recommend a min.
of 8 (eight) monitoring points installed by the Licensed Surveying company.
At least four of the monitoring points shall be established near each of the
side yard property lines on the drilled shoring piles. The settlement
monitoring points shall be monitored for horizontal and vertical movement
prior and subsequent to the completion of construction, and on a daily basis
during the grading and basement construction.
• Basement floor slabs below the water table are planned. We recommend
the following be incorporated into the Foundation Plan:
Basement Slabs
To counter against the effects of buoyancy, for the basement floors we
recommend a min. 30 inch thick weighted slab at the bottom of the basement
excavation. The weighted (aka "suppression", "waste", "ballast, aka
"buoyancy") slab shall be overlain by waterproofing (e.g. "Carlisle Waterproofing
Products") which extends up the wall faces, and then overlain by a min. 4-inch
"protection slab" and then overlain by a 18-inch structural mat slab. The
protection slab is crucial in preserving the underlying waterproofing from
puncture or damage during construction. The mat slab shall be reinforced with
a minimum No. 5 bar placed 12 inches on-center in both directions. Steel
reinforcement is not required for the protection slab or the waste slab.
We recommend a min. 4,000 psi concrete pour. The mat slab shall be
designed by the project structural engineer.
Proposed Residence
Soils Report -2104 East Balboa Blvd ., Newport Beach, CA
Project No. HDl34.1
July 30, 2018 1 7
PA2019-033
The presence of the weighted suppression and mat slabs; as well as the other
foundation specifications outlined herein will act to decrease the potential settlement
due to liquefaction and/or seismically induced lateral deformation to tolerable amounts.
Generally, a moderate risk for the potential effects of liquefaction, seismic events,
tsunamis and/or lateral spreading is assumed by the client. Some cosmetic damage to
structures may be unavoidable during large earthquakes. The proposed structure,
should however, be designed to resist structural collapse and thereby provide
reasonable protection from serious injury, catastrophic property damage and loss of life.
To provide mitigation for the potential effects of liquefaction, seismic events, tsunamis
and/or lateral spreading we recommend (1) the structure shall be placed either on a
compacted fill mat or competent native materials; (2) all footings shall be a minimum 24
inches below adjacent grade; (3) foundations shall be continuous and tied together with
grade beams; (4) foundations shall be reinforced with four #5 bars, two top and two
bottom; (5) the 4,000 psi concrete min. 18 inch thick mat foundation slab placed above
a minimum 6 inch thick protection slab placed over a 30 inch thick waste slab; (6)
footings shall be doweled into slabs with #4 bars at 24 inches on-center; and (7) asphalt
rubberized waterproofing of all basement walls and basement floor.
Basement Retaining Walls and Shoring Parameters
The structural engineer should consider wether some portions of the secant
walls should be designed for permanent structures (e.g. landscaped elements,
exterior retaining walls/stairways). After the secant walls are constructed, the
basement walls will be designed as permanent structures. In the construction
sequence, the shoring is provided first, then the construction of the basement
retaining walls . The following equivalent fluid pressures may be used in the
design of the site basement walls and shoring assuming embedment in
competent native soils.
These EFP values assume groundwater at the tidal high elevation equal to 7.0
ft. above MSL (NAVO 88) and include hydrostatic loads below the elevation of
7.0 ft above MSL:
Active Pressures
At-Rest Pressures
Passive Pressures
Coefficient of Friction
70 pct
80 pcf
200 pcf
0 .30
For the EFP values above 7.0 ft. elevation (NAVO 88) we recommend the
following (vadose zone):
Active Pressures
At-Rest Pressures
Proposed Residence
Soils Report -2104 East Balboa Blvd., Newport Beach, CA
Project No . HD 134.1
July 30, 2018
40 pct
55 pct
18
PA2019-033
Retaining wall footings founded in competent native soils may be designed for
an allowable bearing value of 2,500 pounds per square foot for dead-plus-live
load. Sliding friction and passive resistance may be combined without reduction
in calculating the total lateral resistance. Passive pressures may be assumed
to become constant at a value of 5 times the above values below a depth of 10
feet.
The limits and depths of the basement footprints were not available for our review.
However, for bidding purposes, assume shoring secant hard piles shall extend a
minimum 35 ft. below current ground level.
Soldier Pile Installation Observations
All soldier pile drilling and installation should be observed by the project
geotechnical consultant to verify that they are cast against the anticipated
geotechnical conditions, that pile excavations are properly prepared, that proper
dimensions are achieved, and that proper installation procedures are followed.
Waterproofing
Basement wall and slabs shall be waterproofed in accordance with section 1805
of the 2016 CBC. Permanent waterproofing of the basement slab and
basement walls is required. Basement walls and basement floors shall be
designed to withstand anticipated hydrostatic pressure with the water level at
the current ground surface level. Waterproofing shall consist of rubberized
asphalt, polymer-modified asphalt, butyl rubber, or other approved materials
capable of bridging non-structural cracks (e .g . "Carlisle Waterproofing
Products"). Special materials may be required due to the corrosive effects of
seawater. Joint in the membrane shall be lapped and sealed in an approved
manner. Protection board shall be used to protect the membrane during and
after backfilling. Joints and protrusions in walls and floors, and between the
wall and floor, and penetrations of the wall and floor shall be made watertight
using suitable methods and materials (e.g. bentonite "Water Stops").
The contractors shall strictly follow the manufacturer's recommendations for the
for surface preparation and use of water-proofing products. A third-party
waterproofing expert shall be retained to inspect and verify the
waterproofing installation.
Seismic Loads
In accordance with Section 1803.5.12 of the 2016 CBC, for design purposes, a
seismic earth pressure of 23 pct (equivalent fluid pressure) may be used for the
basement wall design. This pressure is additional to the static earth pressures
and should be considered as an inverted triangular pressure distribution, with
Proposed Residence
Soils Report -2104 East Balboa Blvd ., Newport Beach, CA
Project No. HDl34.I
July30,2018 19
PA2019-033
the maximum pressure occurring at the top of the wall (reference: Mononobe-
Okabe equation and PEEP Report dated October, 2008).
Exteri o r Sla b s-on -g rade {Ha rdsca pe)
Concrete slabs cast against properly compacted fill materials shall be a
minimum of 4 inches thick (actual) and reinforced with No. 3 rebar at 18 inches
on center in both directions. The reinforcement shall be supported on chairs to
insure positioning of the reinforcement at mid-center in the slab.
Control joints should be provided at a maximum spacing of 8 feet on center in
two directions for slabs and at 6 feet on center for sidewalks . Control joints are
intended to direct cracking.
Expansion or felt joints should be used at the interface of exterior slabs on
grade and any fixed structures to permit relative movement.
Some slab cracking due to shrinkage should be anticipated . The potential for
the slab cracking may be reduced by careful control of water/cement ratios.
The contractor should take appropriate curing precautions during the pouring of
concrete in hot weather to minimize cracking of slabs.
S urfac e Dra inage
Surface drainage shall be controlled at all times. Positive surface drainage
should be provided to direct surface water away from structures and toward the
street or suitable drainage facilities. Ponding of water should be avoided
adjacent to the structures . Recommended minimum gradient is 2 percent for
unpaved areas and one percent for concrete/paved areas . Roof gutter
discharge should be directed away from the building areas through solid PVC
pipes to suitable discharge points. Area drains should be provided for planter
areas and drainage shall be directed away from the top of slopes.
PRE-CONSTRUCTION MEETING
It is recommended that no clearing of the site or any grading operation be perfo rmed without
the presence of a representative of this office . An on site pre-grading meeting should be
arranged between the soils engineer and the grading contractor prior to any construction.
GEOTECHNICAL OBSERVATION AND TESTING DURING CONSTRUCTION
We recommend that a qualified geotechnical consultant be retained to provide geotechnical
engineering services, including geotechnical observation/testing, during the construction phase
of the project. This is to verify the compliance with the design, specifications and or
recommendations, and to allow design changes in the event that subsurface conditions differ
from those anticipated .
Proposed Residence
Soils Report -2104 East Balboa Blvd., Newport Beach, CA
Project No . HD134. l
July 30, 2018 20
PA2019-033
Geotechnical observations/testing should be performed at the following stages :
• During ANY grading operations, including excavation, removal, filling,
compaction, and backfilling, etc .
• After excavations for footings (or thickened edges) and/or grade beams verify the
adequacy of underlying materials .
• After pre-soaking of new slab sub-grade earth materials and placement of capillary
break, plastic membrane, prior to pouring concrete .
• After excavations for and/or drilling for soldier piles/caissons , if any to verify
the adequacy of underlying materials.
• After excavation for retaining wall footings to verify the adequacy of
underlying earth materials.
• During/after installation of water proofing for retaining walls, if any prior to
installation of sub-drain/backfilling .
• During/after installation of retaining wall sub-drain, prior to backfilling.
• During compaction of retaining wall backfill materials to verify proper
compaction.
• During backfill of drainage and utility line trenches, to verify proper
compaction .
• When/if any unusual geotechnical conditions are encountered.
• Placement of waterproofing at cold joints and penetrations (e.g. bentonitic
"Water Stops").
Please schedule an inspection with the geotechnical consultant prior to the pouring of
ALL interior and exterior slabs (includes waste and protection slabs).
LIMITATIONS
The geotechnical services described herein have been conducted in a manner consistent with the level of
care and skill ordinarily exercised by members of the geotechnical engineering profession practicing
contemporaneously under similar conditions in the subject locality. Under no circumstance is any
warranty, expressed or implied, made in connection with the providing of services described herein . Data,
interpretations, and recommendations presented herein are based solely on information available to this
office at the time work was performed. EGA Consultants will not be responsible for other parties'
interpretations or use of the information developed in this report .
The interpolated subsurface conditions should be checked in the field during construction by a
representative of EGA Consultants. We recommend that all foundation excavations and grading
operations be observed by a representative of th is firm to ensure that construction is performed in
accordance with the specifications outlined in this report.
We do not direct the contractor's operations, and we cannot be responsible for the safety of others. The
contractor should notify the owner if he considers any of the recommended actions presented herein to be
unsafe.
Proposed Residence
Soils Report -2104 East Balboa Blvd., Newport Beach, CA
Project No. HDl34.I
July30,2018 2 1
PA2019-033
Associated References re: Liquefaction Analysis
a. "Special Publication 117 A: Guidelines for Evaluating and Mitigating Seismic Hazards in
California," by the California Department of Conservation, California Geological Survey, dated
March 13, 1997; Revised September 11, 2008.
b. "Recommended Procedures for Implementation of DMG Special Publication 117 Guidelines for
Analyzing and Mitigating Liquefaction Hazards in California," by G.R. Martin and M. Lew,
University of Southern California Earthquake Center dated March, 1999.
c. "Soil Liquefaction During Earthquakes" by I.M. Idriss and R.W. Boulanger, dated September 8,
2008.
d. "Soils and Foundations, 81h Edition," by Cheng Liu and Jack B. Evett, dated August 4, 2013.
e. "Evaluation of Settlement in Sands due to Earthquake Shaking" by Kahaji Tokimatsu and H
Bolton Seed, Dated August 1987.
f. "Guidelines for Estimation of Shear Wave Velocity Profiles" By Bernard R. Wair, Jason T. Jong,
Thomas Shantz Pacific Earthquake Engineering Research Center, Dated December, 2012.
g. "Subsurface Exploration Using the Standard Penetration Test and the Cone Penetrometer Test,"
by J. David Rogers, Environmental & Engineering Geoscience, pp. 161-179, dated May, 2006.
h. "Handbook of Geotechnical Investigation and Design Tables" By Burt G. Look, Dated 2007.
I. "Use of SPT Blow Counts to Estimate Shear Strength Properties of Soils: Energy Balance
Approach," by Hiroshan Hettiarachi and Timothy Brown, Journal of Geotechnical and
Geoenvironmental Engineering, ASCE, pp. 830-834, dated June, 2009.
j . "Standard Test Method for Performing Electronic Friction Cone and Piezocone Penetration
Testing of Soils," (ASTM D5778-12), dated 2012.
REFERENCES
1. "USGS Topographic Map, 7.5 minute Quadrangle, Newport Beach OE S, California
Quadrangle," dated 2015.
2 . "Geologic Map of the San Bernardino and Santa Ana 30' X 60' Quadrangles, California," Version
1.0, compiled by Douglas M. Morton and Fred K. Miller, dated 2006.
3. "Maximum Credible Rock Acceleration from Earthquakes in California," by Roger W.
Reensfelder, dated 1974.
4 . Maps of Known Active Fault Near-Source Zones in California and Adjacent Portions of Nevada,"
prepared by California Department of Conservation Division of Mines and Geology, published by
International Conference of Building Officials, dated February, 1998.
5. "Guide for Concrete Floor and Slab Construction," by American Concrete Institute, ACI 302.1 R-
04, dated 2004.
6. "California Building Code, California Code of Regulations, Title 24, Part 2," by California Building
Standards Commission, 2016.
7. "Seismic Hazard Zone Report for the Newport Beach 7.5-Minute Quadrangles, Orange County,
California," by the California Department of Conservation, 1997.
8. "2015 International Building Code," by the International Code Council, dated June 5, 2014.
9. "Geologic Map of California, Santa Ana Sheet," Compilation by Thomas H. Rogers, 1965, fifth
printing 1985.
Proposed Residence
Soils Report -2104 East Balboa Blvd., Newport Beach, CA
Project No. HD134. l
July 30, 2018 22
PA2019-033
BALBOA YACHT Cll/8 •
SANTA CA !ALINA . -·---------NF:11/P(}/ff-tJ,4'{.::.:.. HAllBOfl NASTEH
--------.. CQ4ST GIJARD ....
1 PLAZA DEL NORTE CIR
2 PLAZA DEL SUR
3 SERRANO AV
4 GRANADA AV
---........... ........ BAYSIDE
DRIVE
BEACH
...... ,, ~
'',~
' \
' \
\ --.. .... \
\
\
\
\
' \
' \
'
IFIC OCEAN
OBTAINED FROM "THE THOMAS GUIDE"
THOMAS BROS. MAPS, ORANGE COUNTY
RAND MCNALLY & COMPANY, DATED 2008
JETTY
VIEW
PARK
EGA SITE LOCATION MAP
Consultants 2104 E BALBOA BLVD
engineering geotechnical applications NEWPORT BEACH, CALIFORNIA
' ' I
I
I
I
I
' I
' ' I
' ' ' ' ' ' ' '
CORONA DEL "'4/l
STATE BEACH I
' I
~
Project No: HD134.1
Date: JULY 2018
Figure No: 1
PA2019-033
\"T'\
o:> »
~ \ o:> -0 ~\ »
\ o:>
~
0
LEGEND
~ GEOTECHNICAL BORINGS
By EGA Consultants, Inc., on June 20, 2018.
-0 CONE PENETRATION TESTS
Advanced by Kehoe Testing and Engineering
on July 2, 2018.
CPT-:~
r j CPT-1 EXISTING POOL ~ -0 EXISTING
GARAGE r p:
B-2 $-
P.L
161'_.
EXISTING
RESIDENCE
249'
Refe ence "T r h' s opograp 1c urvey, II b T IE . y oa ngineenng, Inc., d ated 7 2/2018. I
EGA PLOT PLAN
Consultants 2104 E BALBOA BLVD
engineering gcotechnical applications NEWPORT BEACH, CALIFORNIA
-·-·-·, ---------i. I
8-1
m
X
vi
--l
z
G')
'"ti ~
0
:t>
:ti m
:t>
I
I
I
I
I
-·-·-,---·-·-·
Project No:
Date:
Figure No:
p _L.
HD134.1
JULY 2018
2
< n,
~ a
~
-I :;li
i;
~
OJ a
~
---,,-
II •
-, ~
1ml I X
_ I~
~(G') I
10 p
I
I ·-
vi ~
! r-r-
PA2019-033
• • • • • • • • • • • • ..
l'.::,,::B~::::'.,/J Eolian deposits (l_at~ Holocen~)-Active or recently active
.,· .,.: • .,. • 1 :. sand dune deposits, unconsolidated.
l\i. B-~·'.:i, ·:, Marine deposits (late Holocene)-Active or recently active
/·,.-: --~--·=.:) ·. beach deposits; sand, unconsolidated .
1.-\:_\·f :-.:.;.:;_:;J Estuarine deposits (late Holocene)-Sand, silt, and clay;
_,;,.-,.,: ----~-~::·.,. unconsolidated, contains variable amounts of organic
matter.
Qop4 I Old paralic deposits, Unit 4 (late to middle Pleistocene)-
~---· Silt, sand and cobbles resting on 34 -37 m Stuart Mesa
terrace . Age about 200,000-300,000years .
I Old paralic deposits, Unit 3 (late to middle Pleistocene)-
~Qop--3~-Silt, sand and cobbles resting on 45-46 m Guy Fleming
terrace . Age about 320,000-340,000 years.
Qomfa I Old paralic deposits, Unit 2 (late to middle Pleistocene)-
~---'· Silt, sand and cobbles resting on 55 m Parry Grove terrace .
Age about 413,000 years.
Sources:
Qopt Old paralic deposits, Unit 1 (late to middle
._ __ _. Pleistocene)-Silt, sand and cobbles resting on 61 -63 m
Golf Course terrace . Age about 450,000 years .
Qop3-e I Old paralic deposits, Units 3-6, undivided (late to middle
~---'· Pleistocene)-Silt, sand and cobbles on 45-55 m terraces .
Qop1 Old paralic deposits (late to middle Pleistocene) overlain
by alluvial fan deposits-Old paralic deposits capped by
sandy alluvial-fan deposits.
Capistrano Formation (early Pliocene and Miocene)-
Marine sandstone. Siltstone facies-Siltstone and
mudstone; white to pale gray, massive to crudely bedded,
friable.
Tm I Monterey Formation (Miocene)-Marine siltstone and
.___ __ _,_ sandstone; siliceous and diatomaceous .
Morton, D.M., and Miller, F.K. Preliminary Geologic map of the San Bernardino and Santa Ana 30' x 60' quadrangles, California . U.S . Geological
Survey . Published 2006. 1:100,000 scale.
EGA
Consultants
engineering geotechnical applications
GEOLOGIC MAP
2104 E BALBOA BLVD
NEWPORT BEACH, CALIFORNIA
Project No : HD134 .1
Date: JULY 2018
Figure No : 3
PA2019-033
Balboa Pier, Newport Beach, California Tide Chart
Requested time: 2018-07-02 Mon 12:00 AM PDT
)7-01 Sun
:21 PM PDT
07-02 Mon
6:54 AH PDT
Balboa Pier, Ne>oport Beach, California
07--02 Mon 07-02 Hon 07-03 Tue 07-03 Tue
1:41 PM PDT 6:19 PM PDT 12:00 AH PDT 7:32 AH PDT
07-03 Tue 07-03 Tue
2:28 PM PDT 7:25 PM PDT
7 ft ------------------------------------
6 ft.---------------~--~~~----~--~-------5f-i-.------------~--------~---------------
f~
a f't.
~ f't.
f
.o f-t;
-1 rt.
Balboa Pier, Newport Beach, California
33.Gooo· N, 117.9000· w
2018-07-02 Mon 5 :45 AM PDT Sunrise
2018-07-02 Mon 6 :54 AM PDT 0.1 feet Low Tide
2018-07-02 Mon 1:41 PM PDT 3.6 feet High Tide
2018-07-02 Mon 6:19 PM PDT 2.7 feet Low Tide
2018-07-02 Mon 8 :05 PM PDT Sunset SivsA.\n'\
. 2018-07-03 Tue 12 :00 AM PDT 4.6 feet High Tide
2018-07 -03 Tue 5:46 AM PDT Sunrise to,-(lllf'•"I bodp),C',1,...,,~
2018-07-03 Tue 7:32 AM PDT 0.4 feet Low Tide
2018-07 -03 Tue 2:28 PM PDT 3 .7 feet High Tide
2018-07-03 Tue 7:25 PM PDT 2.8 feet Low Tide
2018-07 -03 Tue 8 :05 PM PDT Sunset
2018-07-04 Wed 12:46 AM PDT 4.2 feet High Tide
2018-07 -04 Wed 5:46 AM PDT Sunrise
2018-07-04 Wed 8:13 AM PDT 0.7 feet Low Tide
2018-07-04 Wed 3:15 PM PDT 3.9 feet High Tide
2018-07-04 Wed 8:05 PM PDT Sunset
2018-07-04 Wed 8 :51 PM PDT 2 .7 feet Low Tide
2018-07-05 Thu 1:49 AM PDT 3 .7 feet High Tide
2018-07-05 Thu 5 :46 AM PDT Sunrise
2018-07 -05 Thu 8 :57 AM PDT 1.0 feet Low Tide
2018-07-05 Thu 4 :01 PM PDT 4.2 feet High Tide
2018-07-05 Thu 8:05 PM PDT Sunset
2018 -07 -05 Thu 10 :24 PM PDT 2.3 feet Low Tide
2018 -07-06 Fri 12 :52 AM PDT Last Quarter
TIDE CHART
J-4 ...,lll'O'l U.flffl.
EGA
Consultants
engineering geotechnical applications
2104 E BALBOA BLVD
NEWPORT BEACH, CALIFORNIA
Cou"t.rnl\.
Project No:
Date:
Figure No :
HD134 .1
JULY 2018
4
PA2019-033
APPENDIX A
GEOLOGIC LOGS
and
CPT Data Report by Kehoe Drilling & Testing
(B-1, B-2, CPT-1 and CPT-2)
PA2019-033
UNIF IED SOIL CLASSIFICATION SYSTEM
ASTM D-2457
UNIFIED SOIL CLASSIFICATION AND SYMBOL CHART
COARSE-GRAINED SOILS
(more than 50% of material is larger than No_ 200 sieve size.)
GRAVELS
More than 50%
or coarse
fraction larger
than No. 4
sieve s ize
SANDS
50% or more
or coarse
rac 10n sma er
than No. 4
sieve size
Clean Gravels (Less than 5% nnes )
I :.~ r.:.·, GW Well-graded gravels, gravel-sand
11,I.', mixtures, little or no fines
~.-i
.::::: .•.•.• -:-:•:
~
H
,;,'
•' . .
GP Poorly-graded gravels, gravel-sand
mixtures, little or no fines
----·-·--·-··-_., ____ --·--------.. Gravels with fines lMore tha n 12% fines) ··-
GM Silty gravels , gravel-sand-silt mixtures
GC Clayey gravels, gravel-sand-clay
mixtures
Clean Sands {Less than 5% fines)
Well-graded sands, gravelly sands, SW little or no fines
SP Poorly graded sands, gravelly sands,
little or no fines
Sands with fines (More thari 12.% nnesl
SM SIity sands, sand-sill mixtures
SC Clayey sands , sand-clay mixtures
FINE-GRAIN E D SOILS
(50% or more of material is smaller than No. 200 sieve size.)
SILTS
AND
CLAYS
Liquid limit
less than
50%
SILTS
AND
CLAYS
Liquid limit
50%
or greater
HIGHLY
ORGANIC
SOILS
Cohesionless
Sands and Silts
Very loose
Loose
Medium dense
Dense
Very dense
ML
CL
OL
MH
PT
Inorganic silts and very Hne sands, rock
flour, silty of clayey fine sands or clayey
silts with slight plasticity
Inorganic clays of low to medium
plasticity, gravelly clays, sandy clays ,
silty clays, lean clays
Organic silts and organic silty clays of
low plasticity
Inorganic silts, micaceous or
diatomaceous fine sandy or silty soils,
elastlc silts
Inorganic clays of high plasticity, rat
clays
Organic clays of medium to high
plasticity, organic sills
Peat and other highly organic soils
RELATIVE DENSITY
Blows/ft• Blows/ft ...
0-4 0-30
4-10 30-60
10-30 80-200
30-50 200-400
Over SO Over400
LABORATORY CLASSIFICATION CRITERIA
D50 D30
GW C0 = --greater than 4 : Cc = ---between 1 and 3
D10 010 xD6o
GP Nol meeting all gradation requirements for GW
GM Atterberg limits below 'A" Above 'A" line with P.I. between line or P.I. less than 4
4 and 7 are borderline cases
GC Alterberg limits above 'A" requiring use of dual symbols
line with P.1. greater than 7
Da o D30
Cu = --greater than 4: Cc = ---between 1 and 3
SW D10 D1o ~Doo
SP Not meeting all gradation requirements for GW
SM Atterberg llmlts below 'A" Limits plotting in shaded zone
line or P.1. less than 4 with P.I. between 4 and 7 are
Atlerberg limits above "A" borderline cases requiring use
SC line with P.I. greater than 7 of dual symbols .
Determine percentages of sand and gravel from grain -size curve . Depending
on percentage or fines (fraction smaller than No _ 200 sieve size),
coarse-grained soils are classified as follows:
Less than 5 percent .................................... GW, GP, SW. SP
More than 12 percent ................. _ ................ GM , GC , SM . S C
5 to 12 percent ................... Borderline cases requ iring dual symbols
PLASTICITY CHART
60
l 50 ~
)( 40 w
Q
l: 30
~ 20 ~ UJ
:5 10
a..
.,v
CH /
/
' A LINE :
I/P1 = 0)3(LL-20l
CL .,v MH ,OH
/ /
····· Cl.+MI. / ..... .• ML&10L
O O 10 20 30 40 50 60 70 80 90 100
LIQUID LIMIT (LL) (%)
CONSISTENCY
Cohesive Soils Blows/ft* Blows/ft ..
Ver-t soft 0-4 0-4
Soft 2-4 4-11
Firm 4-8 11-50
St iff 8-16 50-110
Ver{ stiff 16-32 110-220
Hard Over32 Over 220
• Blows/foot for a 140-po und hammer falling 30 inches to drive a 2-inch O.D., 1-3/8 inch I.D. Split Spoon sampler
(Standard Penetration Test).
** Blows/foot for a 36-pound hammer falling 24 inches to drive a 3.25 O .D., 2.411.D. Sampler (Hand Sampling). Blow
count convergence to standard penetration test was done in accordance with Fig. 1 .24 of Foundation Engineering
Handbook by H.Y. Fang, Von Nostr and Re i nhold, 1991.
PA2019-033
--~ ---
LOG OF EXPLORATORY BORING Sheet 1 of 1
Job Number: HD134 .1 Boring No: 8-1
Project: 2104 E Balboa Blvd, Newport Beach, CA Boring Location : See Figure 2
Hudgins Design Group
Date Started : 6/20/2018 Rig: Mob. 4" augers
Date Completed : 6/20/2018 Grnd Elev. +/-12 ft . NAVD88
Sample ~ '13 Direct
Type 0 X a. Shear
Ql C: '13 Q) ;i, ~ .ThlnWall cg] 2 .5" Ring a. 'O
Q) Q) ~ t E "iii 1/)
lL a. 'O Tube Sample C C -~ ~ C Q) II)
.E: ~ 0 0 0 0 a. 0 C .c ::, .:.:: 12J Bulk OJ standard Split static Water ~ 'iii -& 0:: a. 'ci ~ 3 ¥'. ~ C E 0 w
Q) 1/) 00 Sample Spoon Sample Table ::, (lJ ::, :r: "O :ii ~ a. E I-0 C 0 X -~ 0 :J 0 w
~ ~ c:nn ncc:r.RIPTl ()N
I FILL: Medium brown, silty fine to medium sand with Op t.%
1 SM rootlets and shell fragments, damp to moist, loose 118.5 30 245 12.0%
>( to medium dense. Sulf
At 2.5 ft.: Becomes med brown and gray fine to SM 9 .9 115 .7 21 ppm z med . grained silty sand, moist, med dense to dense.
5 -At 5 ft .: Medium to olive brown, fine silty 14.6 %<200 z sand with trace shell fragments, moist , med dense. 13.4 336
z At 6 ft .: Becomes moist, dense.
At 8 ft .: Same, moist to wet, dense. 24.1
SM ~ At 9 ft .: Saturated, more dense.
10 -z At 1 Oft.: Groundwater encountered, dense. 26 .1
Total Depth : 12 ft.
Groundwater at 10 ft.
15 -No caving
Backfilled and Compacted 6/20/2018
20 -
25 -
30 -
35 -
40
I EGA Consultants II F:~1~ I
PA2019-033
LOG OF EXPLORATORY BORING Sheet 1 of 1
Job Number: HD134.1 Boring No: B-2
Project: 2104 E Balboa Blvd, Newport Beach, CA Boring Location: See Figure 2
Hudgins Design Group
Date Started: 7/2/2018 Rig: Mob . 4" augers
Date Completed : 7/2/2018 Grnd Elev . +/-12 ft. NAVD88
Sample ~ u Direct
Type a. Shear c' 'u X (/)
al (l) ~ .ThinWall ~2.S"Ring a. "O I-
<I) 2 ~ E <I) (/)
LL a. "O Tube Sample C C -UJ ~ <I) 0 C ~ <I) I-£ -e <I) 0 . a.
-"' u C ·;;; -e-Cl'. .c :::, [2J Bulk [I] Standard Split Static Water <I) a. ·5 .i :i g ~ 0 C E u UJ
<I) (/) []J Sample Spoon Samp le Table ~ co :::, J: "O c!" i E I-0 C
:J ·o 0 -~ 0
::?
c:n11 n~C:r'QIPTt()N ::?
I FILL: Medium brown, silty fine to medium sand with Opl .%
1 SM rootlets and shell fragments, damp to moist, loose 23.5 95.3 118.5 30 245 12.0%
X to medium dense. Sult ,____
ML At 2 .5 ft .: Becomes clayey silt with trace fine sand, 21 ppm z olive brown, moist, soft to firm. 15 .7
5 -At 4 ft.: More clayey silt, with trace sand and %<200 z occasional shell fragments, mor firm. 3.7 33 e
SM z At 5 ft.: Returns to silty sand, dry to damp, dense.
At 8 ft.: Same, dry to damp, dense. 5.8
SM sz z At 10 ft.: Becomes moist to saturated, more dense.
10 -At 10 ft.: Groundwater encountered, dense. 23.9
Total Depth : 11 ft.
Groundwater at 10 ft.
15 -No Caving
Backfilled and Compacted 6/20/2018
20 -
25 -
• 30 -
35 -
40
I EGA Consultants II ·:~; I
PA2019-033
K~
Kehoe Testing and Engineering
714-901-7270
rich@kehoetesting.com
www.kehoetesting.com
Project: EGA Consultants, LLC
Location: 2104 E. Balboa Blvd Newport Beach, CA
Cone resistance qt Sleeve friction Pore pressure u
~ .....
£
0..
Q)
0
D a a
2 2 2
4 4 4
6 6 6
8 8 a
10 10 10
12 12 12
14 14 14
16 16 16
18 18 18
20 20 20
22 ,-... 22 ,-... 22 ..... ..... ..... .....
24 24 24
£ £
26 0.. 26 0.. 26
Q) Q)
28 0 28 0 28
30 30 30
32 32 32
34 34 34
36 36 36
38 38 38 -
40 40 40
42 42 42
44 44 44
46 46 46
48 48 48
so 50 50
a 100 200 300 400 500 a o.s l l.S 2 2 .5 3 -10 -s a s 10
Tip resistance (tsf) Frie tion (tsf) Pressure (psi)
CPeT-IT v.2.1.1.6 -CPTU data presentation & interpretation software -Report created on : 7/9/2018, 4:35:30 PM
Project file: C:\EGANewport7-18\Plot Data\Plots .cpt
15
Friction ratio
0
2
4
6
8
10
12
14
16
18
20
~ 22 .....
24
£
0.. 26
Q)
0 28
30
32
34
36
38
40
42
44
46
48
50
20 a 1 2 3 4 6 7
Rf(%)
0
2
4
6
a
10
12
14
16
18
20
~ 22 .....
24
£
0.. 26
Q)
0 28
30
32
34
36
38
40
42
44
46
48
50
8 a
CPT-1
Total depth: 34.72 ft, Date: 7/2/2018
Cone Type: Vertek
Soil Behaviour Type
Clay
Sand & silty sand
Sand
Sand &·silty sard
2 4 6 8 10 12 1'4 16 18
SBT (Robertson, 2010)
0
PA2019-033
C PT-//
2/0¥ e-: dAt.84"1 $~VP/ NB, e~
In situ data
Depth qc (tsf) fs (tsf) SBTn Ksbt (f't/s) Cv (f't2/s) SPTN60 Constrained D (OA ) Friction No (ft) (blows/feet Mod. (tsf) r 0 angle (0 )
1 1 131.68 0.31 7 1.86E-02 2.72E+03 18 716.49 100 46
2 2 107.87 0.52 7 4.43E-03 6.87E+02 17 760.67 100 46
3 3 172.51 0.52 7 1.46E-02 2.91E+03 25 980.79 100 47
4 4 168.75 0.52 7 1.20E-02 2.43E+03 · 25 994.04 100 46
5 5 133 .35 0.52 7 5.21E-03 9 .69E+02 21 912.65 100 45
6 6 159 .36 0.52 7 8.22E-03 1.68E+03 24 1004.33 100 46
7 7 156.54 0.42 7 9.66E-03 1.89E+03 23 957.96 98 45
8 8 99 .94 0.21 7 5.05E-03 7.08E+02 16 687.35 81 42
9 9 101.29 0.31 7 3.12E-03 4.83E+02 17 760.17 82 43
10 10 173.45 0.52 7 8.12E-03 1.81E+03 26 1095 .39 99 45
11 11 165.31 0 .52 7 6.62E-03 1.46E+03 25 1083.67 96 45
12 12 129.49 0.42 7 3.86E-03 7.36E+02 21 935 .73 87 43
13 13 151 0.52 7 4.48E-03 9.70E+02 24 1062.4 92 44
14 14 125 .73 0.31 7 4 .55E-03 8.17E+02 20 882 .03 83 43
15 15 128.45 0.21 7 6.95E-03 1.18E+03 20 834.56 81 42
16 16 131.89 0.21 7 7.24E-03 1.26E+03 20 850.62 81 43
17 17 158.94 0.31 7 8.53E-03 1.73E+03 24 995 .42 87 44
18 18 181.18 0.52 7 6.82E-03 1.64E+03 28 1181.54 94 45
19 19 165.83 0.42 7 6.58E-03 1.46E+03 26 1088.53 89 44
20 20 145.26 0.31 7 5.78E-03 1.15E+03 23 976 .15 83 43
21 21 133.04 0.31 7 4.20E-03 8 .11E+02 21 947.15 80 42
22 22 140.98 0.31 7 4.92E-03 9 .79E+02 22 975.27 81 43
23 23 167.92 0.31 7 8.47E-03 1.82E+03 25 1053.16 86 43
24 24 168.86 0 .31 7 8.40E-03 1.82E+03 25 1060.7 86 43
25 25 179.09 0.42 7 7.25E-03 1.71E+03 27 1155.48 89 44
26 26 155.81 0.21 7 8.84E-03 1.75E+03 23 969.66 81 43
27 27 150.58 0.21 7 7.77E-03 1.52E+03 23 959.48 80 42
28 28 116.33 0.21 7 3.37E-03 5 .92E+02 19 862.32 72 41
29 29 159.15 0.21 7 8.88E-03 1.79E+03 24 989.93 81 43
30 30 134.5 0 .21 7 5.09E-03 9 .61E+02 21 925.07 76 42
31 31 139.31 0.31 7 3.74E-03 7.72E+02 23 1013.34 78 42
32 32 203.74 0.52 7 7.24E-03 1.94E+03 31 1315.06 91 44
33 33 317 .04 1.25 7 8.68E-03 3 .50E+03 48 1979.85 100 47
34 34 318.82 0 7 0.00E+OO 0.00E+OO 0 457.57 100 53
PA2019-033
Project: EGA Consultants, LLC
Kehoe Testing and Engineering
714-901-7270
rich@kehoetesting.com
www.kehoetesting.com
Location: 2104 E. Balboa Blvd Newport Beach, CA
Cone resistance qt
0
Sleeve friction Pore pressure u
a
2 2
4 4
6 6
8 B
10 10 10
12 12 12
14 14 14
16 16 16
18 18 18
20 20 20
,..... 22 ,..... 22 ..... ..... .... .... ,-.. 22 ..... .... .__, 24 24 24
£ £
Q. 26 Q. 26
Qj Qj
0 28 0 28
fj
Q. 26
Qj
0 28
30 30 30
32 32 32
34 34 34
36 36 36
38 38 38
40 40 40
42 42 42
44 44 44
46 46 46
48 48 48
50 50 50
100 200 300 400 500 o 0 ,5 1 .5 2 2 .5 3 -10 ·5 o 5 10
Tip resistance (tsf) Frie tion (tsf) Pressure (psi)
CPeT·IT v.2.1.1.6 • CPTU data presentation & interpretation software -Report created on : 7/9/2018, 4:35 :58 PM
Project file: C:\EGANewport7·18\Plot Data\Plots .cpt
15
CPT-2
Total depth: 48.82 ft, Date: 7/2/2018
Cone Type: Vertek
Friction ratio Soil Behaviour Type
0 0
Clay
2 2 rm ~i sand i It s sandy sill
4 4 I Sim sandy SI
6 6 Clay
e e 8~~ i ~ii~ gl~
10 10
12 12 Sand & silty sand
14 14
16 16 Sand
18 18
Sand & sil~ sand
Sand & sil sand
20 20 -22 ..-.. 22 ..... ..... .... ....
24 24
..c fi .....
Q. 26 0. 26
Qj Qj
0 28 0 28
30 30
32 32
34 34 Sand &:silty sand
36 36
38 38
40 40
42 42
44 44
46 46
48 48
50 50
20 o 1 2 3 4 5 6 7 8 o 2 4 6 B 10 12 14 16 18
Rf(%) SBT (Robertson, 2010)
0
PA2019-033
C/JT-2 ( ~ /-F2)
'2-l"tf c~ t?A~~A '1L-//4 ///4 c,,4
In situ data
No Depth qc (tsf) fs (tsf) SBTn Ksbt (ft/s) Cv (ft2/s) SPT N60 Constrained Dr (%) Friction
(ft) (blows/feet Mod. (tsf) angle (0 )
1 1 121.76 0.63 7 6.llE-03 1.01E+03 19 810.2 100 48
2 2 135.55 1.04 6 2.63E-03 5.64E+02 23 1050.21 100 48
3 3 38.64 1.25 8 2.82E-05 3.89E+OO 10 676.16 97 47
4 4 27.05 1.04 8 1.06E-05 1.23E+OO 8 567 .02 81 45
5 5 18.48 0.73 8 5.08E-06 2.66E-01 6 257 .21 67 44
6 6 15.25 0.52 5 4.26E-06 1.84E-01 5 211.64 58 42
7 7 27.36 0.31 6 5.83E-05 5.01E+OO 7 421.28 60 39
8 8 99.41 0.31 7 3.18E-03 4.82E+02 16 744.15 83 43
9 9 99 0.31 7 2.91E-03 4.46E+02 16 753.02 82 43
10 10 70.28 0.21 6 1.51E-03 1.85E+02 12 601.59 71 41
11 11 102.34 0.42 6 1.91E-03 3.28E+02 18 839.65 82 43
12 12 197.79 0.84 7 5.63E-03 1.53E+03 31 1335.37 100 46
13 13 167.29 0.63 7 4.83E-03 1.14E+03 26 1161.37 96 45
14 14 128.97 0.52 6 2.53E-03 5.19E+02 22 1005.95 87 43
15 15 151.11 0.42 7 5.57E-03 1.16E+03 24 1022.11 89 44
16 16 221.7 0.52 7 1.42E-02 3.67E+03 32 1266.34 100 46
17 17 207.08 0.63 7 8.51E-03 2.25E+03 31 1297.55 100 45
18 18 237.26 0.84 7 8.52E-03 2.58E+03 36 1486.33 100 46
19 19 247.6 0.94 7 7.89E-03 2.53E+03 37 1573.42 100 46
20 20 203.95 0.73 7 5.85E-03 1.63E+03 32 1367.92 98 45
21 21 164.06 0.52 7 4.42E-03 1.04E+03 26 1157.62 89 44
22 22 175 .75 0.31 7 9.98E-03 2.18E+03 26 1070.14 88 44
23 23 134.61 0.42 7 2.86E-03 5.99E+02 22 1027.49 81 42
24 24 119 .88 0.31 6 2.69E-03 5.08E+02 20 925.11 76 42
25 25 125 0.31 7 3.0lE-03 5.80E+02 21 945.61 77 42
26 26 121.87 0.42 6 1.85E-03 3.80E+02 21 1006.68 77 42
27 27 119.36 0.42 6 1.67E-03 3.42E+02 21 1004.54 76 42
28 28 125.42 0.42 6 1.93E-03 4 .05E+02 22 1028.23 77 42
29 29 135.96 0.42 6 2.49E-03 5.41E+02 23 1064.28 78 42
30 30 157.58 0 .52 7 3 .00E-03 7 .29E+02 26 1193 .1 83 43
31 31 167.19 0.52 7 3.61E-03 9.02E+02 27 1223.72 85 43
32 32 143.38 0.42 6 2.78E-03 6.24E+02 24 1100.25 79 42
33 33 139.72 0.42 6 2.48E-03 5.53E+02 24 1094 .85 78 42
34 34 88.03 0.31 6 6.88E-04 1.22E+02 17 869.91 64 39
35 35 151.52 0.31 7 4.48E-03 9.74E+02 24 1066.89 79 42
36 36 176.48 0.31 7 7.39E-03 1.71E+03 27 1135 .11 83 43
37 37 81.35 0.21 6 7 ,85E-04 1.26E+02 15 785.17 60 38
38 38 100 .04 0 .21 6 1.56E-03 2.71E+02 18 853.37 65 40
39 39 78.01 0.21 6 6.47E-04 1.03E+02 15 780.17 59 38
40 40 103.49 0.21 6 1.67E-03 2.97E+02 18 871.7 65 40
41 41 110.38 0.21 6 2.03E-03 3.72E+02 19 897.12 67 40
PA2019-033
C./1T-2-O'f J?7~)
,?/O"f' $"' (lk4J/I ~lV/)1 ,vi/'/' c,,4-
42 42 125.83 0.63 6 7.59E-04 1.89E+02 24 1222.16 73 41
43 43 247.39 1.57 6 1.84E-03 7.68E+02 43 2045.06 99 45
44 44 299.08 1.57 7 3.78E-03 1.67E+03 48 2171.35 100 46
45 45 223.89 1.78 6 9.33E-04 3.98E+02 41 2093.04 95 45
46 46 206.35 1.57 6 8.63E-04 3.44E+02 38 1956.38 91 44
47 47 205,93 1.46 6 9.68E-04 3.77E+02 38 1912.98 90 44
48 48 199.04 0 0 0.00E+OO O.OOE+OO 0 285.65 0 0
PA2019-033
APPENDIX B
LABORATORY RESULTS
PA2019-033
GEOLOGY· GEOTECH · GROUNDWATER
EGA Consultants
375-C Monte Vista Avenue
Costa Mesa, California 92627
Attention:
Subject:
Mr. David Worthington, C.E.G .
Laboratory Test Results
2104 East Balboa Boulevard
Newport Beach, California
Dear Mr . Worthington :
July 2, 2018
Project No. 114-504-10
G3Soi1Works, Inc. performed the requested laboratory tests on soil specimens delivered to our
office for the subject project. The results of these tests are included as an attachment to this
report.
We appreciate the opportunity of providing our services to you on this project. Should you have
any questions, please contact the undersigned.
Sincerely ,
G3Soi1Works, Inc.
Attachment: Laboratory Test Results
350 Fischer Ave. Front • Costa Mesa, CA 92626 • P: 714 668 5600 • www.G3Soi1Works.com
PA2019-033
EGA Consultants
Laboratory Test Results
2104 East Balboa Boulevard
Newport Beach, California
LABORATORY TEST RESULTS
July 2 , 2018
Project No. 114-504-10
Page 2 of 4
Summarized below are the results of requested laboratory testing on samples submitted to our
office.
Dry Density and Moisture Content
Tabulated below are the requested results of field dry density and moisture contents of
undisturbed soils samples retained in 2.42 -inch inside diameter by one-inch height rings.
Moisture only results were obtained from small bulk samples.
Sample Dry Density, Moisture Content,
Identification pcf %
8-1 @2.5' 115.7 9.9
B-1@ 4.0 ' * 14.3
B-1 @6.0' * 13.4
8-1@ 8.0' * 24 .1
B-1 @ 10.0' * 26 .1
B-2 @2.5' 95.3 23.5
8-2 @4.0' * 15.7
8-2@6.0' * 3.7
B-2 @8.0' * 5.8
8-2@ 10.0' * 23.9
Notes : (*) Denotes small bulk sample for moisture content testing only.
Soil Classification
Requested soil samples were classified using ASTM D2487 as a guideline and are based on
visual and textural methods only. These classifications are shown below:
Sample Identification Soil Description Group Symbol
8 -1 @ 0-3' Silty fine to medium sand with shell SM fragments -medium brown, rootlets,
B-2 @2.5' Clayey silt with trace fine sand -ML olive brown, micaceous
350 Fischer Ave . Front • Costa Mesa, CA 92626 • P: 714 668 5600 • www.G3Soi1Works.com
PA2019-033
EGA Consultants
Laboratory Test Results
2104 East Balboa Boulevard
Newport Beach , California
Maximum Dry Density and Optimum Mois t ure Content
July 2, 2018
Project No. 114-504-10
Page 3 of 4
Maximum dry density and optimum moisture content test was performed in accordance with
ASTM: D 1557. The results are shown below:
Sample Identification Maximum Dry Density Optimum Moisture
(pcf) Content(%)
B-2@ 0-3' 118.5 12 .0
Sulfate Content
A selected bulk sample was tested for soluble sulfate content in accordance with Hach
procedure . The test result is shown below:
Sample Identification Water Soluble Sulfate in Soll Sulfate Exposure Class
(Percentage by weight (%)) (ACI 318-14, Table 19.3.1.1)
B-1 @ 0-3 ' 0.0021 so
We t Density
A composite of samples identified as B-1 @ 4.0, 6.0 and 8.0 feet was remolded to the dry
density obtained from B-1 @ 2 .5 feet. This soil specimen was then soaked and reweighed and
the resulting wet density of this sample was determined to be 120.0 pcf.
Direct Shear
The results of direct shear testing (ASTM D3080) are plotted on Figure S-1. Soil specimens
were soaked in a confined state and sheared under varied loads ranging from 1.0 ksf to 4.0 ksf
with a direct shear machine set at a controlled rate of strain of 0.005 inch per minute.
350 Fischer Ave. Front • Costa Mesa, CA 92626 • P: 714 668 5600 • www.G3Soi1Works.com
PA2019-033
EGA Consultants
Laboratory Test Results
2104 East Balboa Boulevard
Newport Beach, California
Sieve Analysis
July 2, 2018
Project No. 114-504-10
Page 4 of 4
Particle size analysis was performed in accordance with ASTM 0442. The test results are
presented below:
Sample ID B-1 @0-3'
Sieve Size Percent Passing
3/4" 100
1/2" 98.4
3/8" 98.4
No. 4 96.6
No. 8 95.4
No.16 92.8
No. 30 83.6
No. 50 62.7
No. 100 46.4
No. 200 33.6
350 Fischer Ave. Front • Costa Mesa, CA 92626 • P: 714 668 5600 • www.G3Soi1Works .com
PA2019-033
4,000
3,750
3,500
3 ,250
3,000
2,750
LL 2,500
en
Q_
en· 2,250
en
UJ
O:'.'. 2,000 I-en
O:'.'.
<( 1,750
UJ
I en 1,500
1,250
1,000
750
500
250
0
......... . :. ~·.:. ,:,,:,<•
·:· -:• ~. ... ,., ,.
,;.;.:,,;,.:,,-i•i•i•
•!•:O•:••:•-!·\·f ·i ·i•
. ~ ·~ ·:· ·:· -:• ! . : . : '~ .
. ~. ~ ·:· •:• -:· ~. ! • t ': • ·····--·········· . . . . . . . . . .. .. ... -· ......... . ......... ...................... . : -~ .: .. : . .:. : . : . : . ~ .
. ;,;.; .. ;,•:•\•i ;.;.
'l ·~ •:-·:· -:· ~·:. ! . : .
. ! ·~ ·;, -:· -:· ~. ~.:.: . .................... ......... ....... -.......... . . . . . . . . . . . , . ., ................. . . . . . . . . . ' . . . , '•' ,,, ......... ' .
• J ,},: .. :,,:,,.,.;,j ,
· l ·i •:• ,:, ,:, ~-1 · 1 · l •
. ! ·~ ·~ •:• -:• -:•:. t.'. . . . . . . . . . .. . ·• .................. . . .. . . . . . . . ..................... .. . . . . ' ... ................. ······ . . . . . . ' ..
• • •• ... '•' '-' ~• I • I 'f •
•i•i-•:,.; •. ; • .;,;,,,j ,
·J •:••:••:••:-•:•!•i •j•
. ! ·:-·:• ·:· ·:· ~. ! . ! '! . ....... ,.,;,,,, ..... . . . . . . ' .. ........ --........ .
•I••• 0 o O 0 . . . . . . . . . ..................... . . . . . . . . . . ,.,, ......... , ...... . . . . ' .... . . ,., .............. ,.,.,.
·i·:-;,,:,,:,,:,t,J•)•
• , -~ ·:· ";• ·:· ~-: • t. ~.
. : •:, ·:· -;· -:· ~. t.:.:.
•• •• ... -· .......... t . . . , .... . ....... _ .. , ....... . . . . " .... . .. .. . ,., .......... ' .. . . . . . . . . .
.. ... .. . ... . ... . ... . ... .·~ ..
.;.;.:..; .. ;.!·1 ·1 ·1·
·~·~·~·:·~·~·:·l·?· ... , ... , .. ,., ....... . . . . . . . .. . . : -~ ·:-·:· :· :·:.:.:.
DIRECT SHEAR TEST
Undisturbed
...... -:,,:,
,•,,•,
..... ..... ., .,. .. ,. . ,., .. :. -~ •:--:-
... ,'I,. •• ~.
,:, •:• .;. \•i•j ·i·i ,; . •!• \•
~:• •:· ·:· \•~·I · f • :, •;' • •:• ,: •
·:-·:· .· ~' !· 1 ·: ·~ -~ • ~-,.
·~ ,:· ~· ~· !': ·~·~ ·:-.. -:· ~· ....................... ...... . . . . . . . . . . ' ... -. ..................... .
o • 'o I IO o • o ' ................... , ......... . . . . . . . . . . . . ................... , ......... , .
. .;.:,.: .. ; .
. •j,•:••:-•:• . '~ -~ -:· ·:· . . , ........ .
............... . ,.,•,,; ... ,,.
..... ' ... ......................
o O o O I 4 ' o < •\•o •o•,,,.,,,,,-..••• . ; . ~.; .; -~ ,:, .: . .: . ' .
. ~.!.I-~ -~ •:· ,;, ,: . <.
o ! o ! 0 ~ •:-•~ ,;, •:• ~ 0 ! I ., ................ , .. . ......... .......... -......... . . . . . . . . ' . .......... -...... . . . . . . . . . .
•••••••• ,,1 .. ,,,.,. •••
• 0 o o O O o' I
,{,,,j ,:,,:,,: .. ;,.;,i ,
•!•!•i O:·<·•:•,:•{•\•
•I ' I •',',,•, ,•, •'• ., • f ' ......... . , ... ' ...... ,•, ..• ,. , , . . . ' .... . .................... . ' ...... . ............. -· ... . . .. . . . . . . . ....... , .............. . . . . . . . . ' . ·······;•,•,•-., ..... -:--:--:·\·l-i ·i-i-:-,,:,,:. . i.; ·i ,:. -:-.; .. ; . '··i .; •} ,;, ,:, ~-, .
. . . . . . . . . ... -............... .. . . . . . ' .. .. .................... . . . .. . . . . . .................... , ..... . . . . . . . . . .............. , ... , ....
.; .. :,.; .. :,\•f •i •i -:. ,:,,:,•:••>{·!·!<·•:• ... . • . .;, ,.,. i., .•. , I• o •' o •' o ....... ,,;,1,,,, ....... . :.. .:.;. ;, ;, : .: .: .: ..... ' ... . . .. . . . .. . . .............. , ...... ... . . . . .. . . . . ....................... ,:,,:,-:.,.-,.j .;.:,.:,
,:.,;,,;,,.;•l•l•l •:•
·=-·:· ~· !· !·: ·: ·~ ·~ ........ ,;., ........ .. . . . . . . . . . ..................... . . . . . . . . . . ~ ... -........... . ......... ....................... . . . . . . . . .
. . . . . . . . .
. ·:· !' :•: ·: ·: ·:·;--:· ..................... .. :.:.:.;.t .;.;.: .. : .. . . . . . . . . . ....•. , ... ,.,,., ......
. ;. \• '. i .; -~ ,:, ,;, ~.
·<·(·!·l·l<··:••:•·=· . ·:· ~· ~.:.? ·:" ·:" ·:· -:· .... ,., ..... , ...... .;, ....... ' . ................... -. ......... . . . . . . . . . ......................
• .:. :. ~, l, i.:. .:. .;. .: .
, .. :,,,,.J,}·i-:•,:••!•
••:•<•!·l·i·,·=·-:•-:•
.. :, ~· ~. ! • ! ., ·:" ,: .. :·
. -:• ~-~. ! • ! ·:-·:-·:" ";· ·-· ....... , ......... . ........ ' . ·-· ................ . . . . \ .... . ........ ,.,, .. ;-,•-.• .........
. . . . . . . . . ' ....... . ·-................... '~-................ . . . . . . . . . . . . . . . . ..................... ..................... . . . . . . . . . . . . . ' . . . . . ... . ,. ... . . . . . . . ... ... . ........ -........... ,,.
•' •' o I • 0 • •' • • '' o •' ,.,. •,o •,• \, t 1 o •• 0 • .. 1 4' • •,I \ 0 I O O I f I I •,•,• •,t
,:.,: •. ;,,:,\•l·i ·>•:• ,,;,.;,\,1,;.; .• :,,:,,:,
,: .. ;.,:.,;. H•!•)•:· • ,;,.:,1-1 ,1,;--:,.;.,;.
·;' ·:· ·:· ~· ~· ! • t ·~ ·~ ........... , ..... , ... . . . ' .... . ... .... ~-.......... .. . . . . . . .
' ·:· ~· ~.:. ! . ~ -~ ·:· ·:· ,,.,, ................. . . . . ' .... . . ";' .. : . : -: . : ·: ·:· :·
... ' ..... ..................... . ....... . ··········-·"· ... . ......... ........ ,.,-....... . ......... • , ••• , •• •;,Y.,, •• , ... ......... •\'I 'l '; •; •,••,•\'I'
··>l ·i<·<··: .. :•{•(• . ,.,., ............. ,., .
• o o • '0 o o I .............. ,,., .. . . ....... . . ................... .
'' o '• • 'o I . ....... . .......... ., ......... .
• ~. j • ; • ~ .;. ..:, .;. ~' ; • .;.;.;..; .. :--:--:•\·i·
• <· l ·• •i <· ·=· ,:, .:, ~. •''••I ,\,\,•,~, I ,'• . ....... . ., ................ ;., . . ....... . .................... . . . . . . . . . . .................. . . . ' ..... . . ......... , ........... . . ....... .
, j. I , I ,I,.,,,,, ,,. ,I, I ~ . . . . . . . . . . : . : . : ·: ·:-·;· -:· ~· : . ....................... . . . . . . .. . ...... ·-·--· ...... . . . . . . . . . . ............. , ........ . . ;.;.;.;,;.; .. ;.;.;.
.;.;,;.;.: .. : .. ;.,:.;;-
•\• i•i •}-:• ,;.,:, ·> {•
. . . . . . . . . . , .................. . . . . . . . . . . . ................... . . . . . . . . . . ..... ,.,., .......... . . \.:.: .; .~ .:,. .;. ~.;.
•\•Iii·},:,,:,,:,,:,,.
. ·>I· I ·l ,:, •:• •:• ,:, ~.
. ~. ! • : ·} . :· -:• ·:· ~ ' ~. ,, ............... ,,,,, . ....... . . .................. .
. . . . . ' .. . . .................. . . '.' .... . • o ', •; '•' '•' ~ • <o' Io '•
• ;.;.:,.; •. ;,'\,;,i ,;,
· I ,:. -:, •:• ·> ~ • {·I• I·
• ? • ~ -~ •:• ·:· ~-:.:. t • . ............ , ...... . . . . . . . . -.
1 , ••••••• "''''''''' . ' ...... . ..................... . . . . ' ... . . . '. •; ,,, .......... .
.;.;,:,,: .. ;,.;.i ·i•i·
,1,:,,:,,:,,:,,:,{•!·!·
. : ·~ -~ ,;, •:• ~-! • : • ! . ............. ,,,,,, ... . . . . . . . . . . : . ~ '~ ·;· ·:·:.:. : . : . ......................
o a ' 0 •''I 0 . ................ , .. . . : . ~ .~ .: .. :. ~. : . : . : .
·; · i ,;. ,;. ,:, .; • ~ , I • i •
.........
• • ' ••• 4,0 -· ~-•••••• . . . . . . . . . .... .. ... "' ....... . . ....... . . ,,,,; ............. . . ....... ' . .... , ............ ,.
,;.;.;.: .. :-,!·i·I·;· ·!·: .. ; .. :,,;.,:,,.;,;.
.,.,.,., •.. ,,.1 .1 .1 • . ....... . . ~ . : ·:-•;• -:· ~. ~ ' : . : . .....................
o • o o I• o •'
. .. ............. .,.,, .... ,.
•:• .;. ·=· '!• ......... ,,,:,
·····
., ..... .
,:,,;,,:, .........
·:"·:·;;·
.,
'I ' ,:, .~ •
,;,, ,:,,:•
._. .. '
•}•!•-:•\•l•i•i•}•:• .. ,.,.,.,., ............. ,. ,j .: .. :,.; .. ;.,:.i ,
,:, ,:, ,:, ~· ,: , ! . ! ,:, ,: ... ,:, ~. ! . I·:<·<·,;.,:, , <,
·~ •:· ·;• ~· ~-! •? ·~ ·:· • -:•!· !· !·! ·~-:· ·:--·:· ., ........... ,,,1, . ..... .
: ~ ~: ~: ~: ~: ; : ; : ~ : ~ : : ~: ~: ~: ; : 1 : ~ :~ :~ ~: ...................... ·-· .............. "'
,, ............... . ....... . .............. . -~ .: .. :. ; . : . : . : . ~ -~ .. .: . .;. : . ; . : . : -~ .:. .:. . .. '; . ~ . ~ .: .. :. : . ; . . . . . . . . . . . . . . . . . . . . . . . ' .. . . ........... , ..... ,.,,;,, ......... ,,;,.,,,,,,, .... ,.,,, ...... , .. .
,:, ,:, ,:, ,. ,. j ·i·i ,:, .. ·>·>\· ;,: ,:,,:, ,:~ .:, . {, . i .:, ,:. ,:, .;. ,:, ,:.
·:· ·:· -:• ~-!· ! . ~ ·~ •:· ... :, !· ~-! . ~ ·~ -~ •:• -:•
·!' ·:· ·:· !' ! . ! • ! • ~ ·~, . -:· ,:• ~.: • : ·~ ·: ·:· ,:, :: ~: ::: ;: :: ::: :~ ::: . :~: :: :: : :::~ :: ::: ~: ....... ' .. -...... . ... ... ... . . . . . . . . , ·~ .... ~· ..... ., •; ...... .
,; ,:, ,:, : 0 '0 : o ! 0 ~ I ~ I ',:, :, : < : 0 : ,; ,; o~ ,:,
:t :/: :i: ~:~::: ::~ :): : : /~:f: :: :~ :; :~: :(:
-~ •:• -:· !· ~.:. ! ·~ •:· '";• -:• ~· ! • : •: -~ •:• ~·
-~~:·?·~·~·:·-:·~·!·
••••••• , ..... 4 ........ .
• 0 I• 0 • 0 o o . :·: ·: ·: ·:-:· ·:: :· :· . ....... .-........... . . ....... . ......... .; .. , ....... . ......... ., ..... ,., ...... , .. .
.;;,1,J,,;.,;.,:,,:,>.,,,
·!·l·l·r ·:-·:··:+«· •(•:•:-~·:·:··:·~ t
.:.:.~.;.;.:.:.:.: .~.;.;,;,:.:.:.:..:. ~:.:.:.:.:. _,;.:, . . . . . . . . . . . . . . . . . . . . . ' ... . . ..................................... _ ...... . ........ .
:~:;: :i: i: ~: i: ;:t :t : j: i: ~:; :; :t:t :ti : . ;:: .; :t :f j:t i: i:
-:--:,,:,-:,,,1,l•i•!-·ttt !:tJg •i•i•i•i •:.•:,a0:•i ·\•
:~:1~:[if l:::1:i:~::~i:rtf J!:!JJ if J:li
......... ~ ............... . . .. , ................... ,,.,............ , ...................... .
• ; .; .;. .:. ~. ~.,. ;. ; •• ~ .: • .:. ,. ~.: , .~ '.:. ~. ;. j .: .~.~ .:., ,:,
·J ., .,.; .. :, \· i· •. , . ,;, .;. ·=· , ..•.•. ;.; '.; .. ;. \,J ,t,;,:, .; •. ; •
,1,;,: .. ;.,; .. :•!·l ·i· .,.;. · ,•!•l•H<· •·:•!•!·l•l ·,< .. :··>
TH Wi HH!I!H IfflJHH
IO• 0 0 0 0 o I . ......... , ...... , .. .
.;.1 .:.;.;.;.,:.;.; .
• ,. ; . t .;. -:-.:, ,;, t· ' •
I (' 1' f I~•!-,:,•:• (' ( o
• !• l • ! -~ -~ -:• ,:, ~. ! • . ......... , .. , .. ,; .. . . ....... .
,: .. ;.,:,,:.;:,1-;,; .. :, .. ;·\·i·i ·
<··:••:••:•i•l•J•; .. ) ••:•!•(•!• ......... ,.,.,,,., .... , .. , ... ,. . . . ' .... . ................... , ........ ' . -: -~ :-~· :-: . : -: ,: .. ·-·· .. ······· ·-........ . . . . . . . . '. .................... . . . . . . . . . . .,. .....•• ·l ·•·••,•> .... ,., •••
·J' ,:--:-\· ,.;.;.r ... ; .. :. , .. ,.,.
. . '
-~ ·~ ·: •:• -:· ~-~·: ·:' •:, ·:· ·:· ~· ~·! ·:·~ ·~ "-:· !~ !• :·
·:·~·~·:·-:· ~· ~·:·: · ":" ·:· -::· ~·!· t·;·~ •:,, . .,.,,, .... ....................... .................. .
. : . ~ .: .:. ,;, :. ! . : . : . ..:. .: . .:. ; ' : . : . : • : .: . ' .. .................. ..................... ......... , ....... , ... , ........ . . . . . . . . . . . . . . . . . '.
: i :; :; ::: ~: ~: {: i: i: :~ ::: :::~: i: ': ;:; ::-.. ; .. ;. \• J.
,;,) •i ,:, ,:, !• !•l •l • ,; ,; .. ;, <•i• I • I •l -:· .. :. !•!•I •
·! ., ·~ ·: .. :· -:· ~·:· ! . ·:-·:· ·:· ~-!· !·!·~ ·~ . i•,;, , •••
. : ·: ·~ ·:":· : . : . : . : . .................... . . . . . . . . . . .. ~ ....... '•' ~· ..... . . . . . . . . . . . ... ,;,,,,,.,.,,., ...
,J,;,:,,: .. ;.,:.,,,.j,
·!·:,,: .. :,,:,,:-{•!•!•
. : . ' •:· .:· ·:· ~·:. t. ! . ..... , ............. . . ....... . . ................... . .........
. ....... . . ................... .. . ....... . . ................ .. ......... .., .............. , ... . . ' ..... .
,,-o,o '•' \I •• I '• ,, '"
:1: / :(: ~: ~: ::; :\: :\:
,:, ·:· ·:· ~. ~. ! . : . ~ . :· . ........ ,., ....... .. . ....... . .................... . ...... '.
.;.:,,;,,:,
•)•:••!••:• ,, ......... . ............
,#,#,:...!, . ;.; .. : .. :.
. ,., ... ~ . . , ...... .,.,
,;,:-,:,,:,
•/•!••:••:•
. ~.:.: ·: ·: ·:· -:· .. : . . ........ ~-.......... .
o Io O • < o o o . ......... .,,. .......... .
• ~. I • i ';. , :, ,;, ,: • .; • ; '
•(•i •l•)<·•: .. :,,,i , ....... , ......... ,., .
• • • • 'T '''
• r' • • I ''° '~ •'• ,•, t •I o ....... '. ..................... . . .. . . . . . .. . ................... . . ....... . . ....... , ............ . ' ....... . .,.,.,,,.; ......... .
·i·i ·i ·i-:,-:,,!,.:,:,
• ~.: . ~ -~ ·!' ·:· ·:· -:· ~ • . ......................... . . . . . . . . . . . ................... .. . .. ' .... . ·········--.. ····· . ...... . . ..................... . . ....... .
o \0 I O t 'I ·~ •,o ,,o '0 \ • ,t,:,;.;,,:,,:,,:,,:•\ ..
. ~. I . l . :, ,:. -:· .:, .:, {. ., ... , ........... ,,,. .........
• o 'I• o 'o 0 . .................. . . ....... . . ...... ,., ......... . ......... ............. ,., ... , ...... , ...
·=· ,:, ,:. • (. i.;. i ·=~ ,:, ,:, \• '\.
,:,. •:• •:• • (·I • > • i .:, ,:, ,:, ~ · i •
. t . : . ~ -~ ·~ -!· ~-!· !· 0 ! I: •? ': •:-•:• -:• ~' ~ t . ................... .
0 500 1,000 1,500 2,000 2,500 3 ,000 3,500 4 ,000
NORMAL STRESS , PSF
2104 E . Balboa Boulevard, Newport Beach COHESION
FRICTION ANGLE
245 psf.
30.0 degrees
symbol boring depth (ft .) symbol boring depth (ft .)
FIGURE S-1
DIRECT SHEAR TEST • B-1 2.5
PN: 114-504-10 REPORT DATE : 7/2/2018
350 f'ischer Ave. Front
Costa Mesa. CA 92626
Phon e: (714) 668 5600
www.G3Soi1Works.com
FIG. S-1
PA2019-033
APPENDIX C
GENERAL EARTHWORKS AND GRADING GUIDELINES
PA2019-033
GENERAL EARTHWORK AND GRADING GUIDELINES
I. GENERAL
These guidelines present general procedures and requirements for grading and
earthwork including preparation of areas to be filled, placement of fill, installation of
subdrains, and excavations. The recommendations contained in the geotechnical
report are a part of the earthwork and grading specifications and should supersede the
provisions contained herein in the case of conflict. Evaluations performed by the
consultant during the course of grading may result in new recommendations which
could supersede these specifications or the recommendations of the geotechnical
report.
II. EARTHWORK OBSERVATION AND TESTING
Prior to commencement of grading, a qualified geotechnical consultant should be
employed for the purpose of observing earthwork procedures and testing the fills for
conformance with the recommendations of the geotechnical report and these
specifications. The consultant is to provide adequate testing and observation so that
he may determine that the work was accomplished as specified . It should be the
responsibility of the contractor to assist the consultant and keep him apprised of work
schedules and changes so that the consultant may schedule his personnel accordingly .
The contractor is to provide adequate equipment and methods to accomplish the work
in accordance with applicable grading codes or agency ordinances, and these
specifications. If in the opinion of the consultant, unsatisfactory conditions are resulting
in a quality of work !ess than required in these specifications, the consultant may reject
the work and recommend that construction be stopped until the conditions are rectified.
Maximum dry density tests used to determine the degree of compaction should be
Proposed Residence
Soils Report -2104 East Balboa Blvd., Newport Beach, CA
Project No. HD 134.1
July 30, 2018
PA2019-033
performed in accordance with the American Society for Testing and Materials Test
Method ASTM : D 1557.
Ill. PREPARATION OF AREAS TO BE FILLED
1. Clearing and Grubbing: All brush, vegetation, and debris should be removed and
otherwise disposed of.
2. Processing: The existing ground which is evaluated to be satisfactory for support
of fill should be scarified to a minimum depth of 6 inches. Existing ground which is
not satisfactory should be overexcavated as specified in the following section.
Scarification should continue until the soils are broken down and free of large clay
lumps or clods and until the working surface is reasonably uniform and free of
uneven features which would inhibit uniform compaction.
3. Overexcavation: Soft, dry, spongy, or otherwise unsuitable ground, extending to
such a depth that surface processing cannot adequately improve the condition,
should be over excavated down to firm ground, approved by the consultant.
4. Moisture Conditioning: Over excavated and processed soils should be watered,
dried-back, blended, and/or mixed, as necessary to attain a uniform moisture
content near optimum.
5. Recompaction: Over excavated and processed soils which have been properly
mixed and moisture-conditioned should be recompacted to a minimum relative
compaction of 90 percent.
6. Benching: Where fills are to be placed on ground with slopes steeper than 5: 1
(horizontal to vertical units), the ground should be benched. The lowest bench
should be a minimum of 15 feet wide, and at least 2 feet deep, expose firm
material, and be approved by the consultant. Other benches should be excavated
Proposed Residence
Soils Report - 2 I 04 East Balboa Blvd ., Newport Beach , CA
Project No. HDI34 . I
July30,2018 2
PA2019-033
in firm material for a minimum width of 4 feet. Ground sloping flatter than 5: 1
should be benched or otherwise over excavated when considered necessary by
the consultant.
7. Approval: All areas to receive fill, including processed areas, removal areas , and
toe-of-fill benches should be approved by the consultant prior to fill placement.
IV. FILL MATERIAL
V.
1. General: Material to be placed as fill should be free of organic matter and other
deleterious substances, and should be approved by the consultant. Soils of poor
gradation, expansion, or strength characteristics should be placed in areas
designated by the consultant or mixed with other soils until suitable to serve as
satisfactory fill material.
2. Oversize: Oversize material defined as rock, or other irreducible material with a
maximum dimension greater than 12 inches, should not be buried or placed in fill,
unless the location, materials, and disposal methods are specifically approved by
the consultant. Oversize disposal operations should be such that nesting of
oversize material does not occur, and such that the oversize material is completely
surrounded by compacted or densified fill. Oversize material should not be placed
within 10 feet vertically of finish grade or within the range of future utilities or
underground construction, unless specifically approved by the consultant.
3. Import: If importing of fill material is necessary for grading, the import material
should be approved by the geotechnical consultant.
FILL PLACEMENT AND COMPACTION
1. Fill Lifts: Approved fill material should be placed in areas prepared to receive fill in
near-horizontal layers not exceeding 6 inches in compacted thickness . The
Proposed Residence
Soils Report -2104 East Balboa Blvd ., Newport Beach, CA
Project No. HD 134 . l
July 30, 2018 3
PA2019-033
consultant may approve thicker lifts if testing indicates the grading procedures are
such that adequate compaction is being achieved with lifts of greater thickness.
Each layer shall be spread evenly and should be thoroughly mixed during
spreading to attain uniformity of material and moisture in each layer.
2. Fill Moisture: Fill layers at a moisture content less than optimum should be
watered and mixed, and wet fill layers should be aerated by scarification or
blended with drier material. Moisture-conditioning and mixing of fill layers should
continue until the fill material is at a uniform moisture content at or near optimum .
3. Compaction of Fill: After each layer has been evenly spread, moisture-
conditioned, and mixed, it should be uniformly compacted to not less than 90
percent of maximum dry density. Compaction equipment should be adequately
sized and either specifically designed for soil compaction or of proven reliability, to
efficiently achieve the specified degree of compaction .
4. Fill Slopes: Compacting of slopes should be accomplished, in addition to normal
compacting procedures, by backrolling of slopes with sheepsfoot rollers at
frequent increments of 2 to 3 feet in fill elevation gain, or by other methods
producing satisfactory results . At the completion of grading, the relative
compaction of the slope out to the slope face shall be at least 90 percent.
5. Compaction Testing: Field tests to check the fill moisture and degree of
compaction will be performed by the consultant. The location and frequency of
tests should be at the consultant's discretion. In general, the tests should be
taken at an interval not exceeding 2 feet in vertical rise and/or 1,000 cubic yards of
embankment.
VI. SUBDRAIN INSTALLATION
Subdrain systems, if required, should be installed in approved ground and should not
Proposed Residence
Soils Report -2104 East Balboa Blvd., Newport Beach, CA
Project No HDl34 . I
July 30, 2018 4
PA2019-033
be changed or modified without the approval of the consultant. The consultant,
however, may recommend and upon approval , d irect changes i n subdrain line, grade ,
or material.
VII. EXCAVATION
Excavations and cut slopes should be examined during grading. If directed by the
consultant, further excavation or overexcavation and refilling of cut areas should be
performed , and/or remedial grading of cut slopes performed . Where fill-over-cut
slopes are to be graded, unless otherwise approved, the cut portion of the slope should
be made and approved by the consultant prior to placement of materials for
construction of the fill portion of the slope.
Proposed Residence
Soils Report -2104 East Balboa Blvd .. Newport Beach, CA
Project No. HDl34.1
July 30 , 2018 5
PA2019-033
APPENDIX D
USGS Design Maps Detailed Report
PA2019-033
EUSGS Design Maps Summary Report
User-Specified Input
Report Title 2104 E Balboa Blvd, Newport Beach, CA
Fri July 27, 2018 18 :23 :11 UTC
Building Code Reference Document ASCE 7-10 Standard
(whi ch utilizes USGS hazard data available in 2008)
~ite Coordinates 33.59934°N, 117.8847°W
Site Soil Classification Site Class D -"Stiff Soil"
Risk Category I/II/Ill
USGS-Provided Output
5 5 = 1.721 g
51 = 0.633 g
5Ms = 1.721 g
SMl = 0.949 g
S05 = 1.148 g
501 = 0.633 g
For information on how the SS and S1 values above have been calculated from probabilistic (risk-targeted) and
deterministic ground motions In the direction of maximum horizontal response, please return to the application and
select the "2009 NEHRP" building code reference document.
MCER Response Spl"C'trum Destp kt'5ponse Spectrum
l ).J
i' t','7:!
~ 11J.,4'\
u.J:-
(IJ l t
Period, ·1· (lllt'C!)
For PGAMt TLI CRSI and CRI values, please ylew the detalled reQQ[!;.
Although this information is a product of the U.S . Geological Survey, we provide no warranty, ex pressed or Implied, as to the
accuracy of the data contain ed therein . This tool is not a substitute for technical subject-matter knowledge.
PA2019-033
liUSGS Design Maps Detailed Report
ASCE 7-10 Standard (33.59934°N, 117.8847°W)
Site Class D -"Stiff Soil", Risk Category I/II/III
Section 11.4.1 -Mapped Acceleration Parameters
Note: Ground motion values provided below are for the direction of maximum horizontal
spectral response acceleration. They have been converted from correspond i ng geometric
mean ground moti ons computed by the USGS by applying factors of 1.1 (to obtain 5 5 ) and
1.3 (to obtain 5 1 ). Maps in the 2010 ASCE-7 Standard are provided for Site Class B.
Adjustments for other Site Classes are made, as needed, in Section 11.4 .3.
From Figure 22-1 ci1 5 5 = 1.721 g
---------·--------
From flgure 22-2 c21 51 = 0.633 g
Section 11.4.2 -Site Class
The authority having jurisdiction (not the USGS), site-specific geotechnical data, and/or
the default has classified the site as Site Class D, based on the site soil properties in
accordance with Chapter 20 .
Table 20.3-1 Site Classification
Site Class v, ii or N0 h
A . Hard Rock >5,000 ft/s N/A --------------
B . Rock 2,500 to 5,000 ft/s N/A
-
Su
N/A ----
N/A
----------------·-------------------
C . Very dense soil and soft rock 1,200 to 2,500 ft/s
600 to 1,200 ft/s
>50 >2,000 psf
D. Stiff Soil 15 to 50 1,000 to 2,000 psf -----------
E. Soft clay soil
F. So il s requiring site response
analysis in accordance with Section
21.1
<600 ft/s <15 <1,000 psf
Any profile with more than 10 ft of soil having the
characteristics:
• Plasticity Index PI > 20,
• Moisture content w ~ 40%, and
• Undrained shear strength s" < 500 psf
See Section 20 .3 .1
For SI: lft/s = 0.3048 m/s llb/ft:2 = 0.0479 kN/m 2
PA2019-033
Section 11.4.3 -Site Coefficients and Risk-Targeted Maximum Considered Earthquake
(.M.C.5.a ) Spectral Response Acceleration Parameters
Table 11.4-1: Site Coefficient F.
Site Class Mapped MCE R Spectral Response Acceleration Parameter at Short Period
55 s 0.25 S5 = 0.50 5 5 = 0.75 5 5 = 1.00 55 ~ 1.25
A 0 .8 0.8 0 .8 0.8 0 .8
B 1.0 1.0 1.0 1.0 1.0
C 1.2 1.2 1.1 1.0 1.0
D 1.6 1.4 1.2 1.1 1.0
E 2.5 1.7 1.2 0.9 0 .9
F See Section 11.4.7 of ASCE 7
Note: Use straight-l ine interpolation for intermed iate values of S5
For Site Class= D and S5 = 1.721 g, F0 = 1,000
Table 11.4-2: Site Coefficient Fv
Site Class Mapped MCE R Spectral Response Acceleration Parameter at 1-s Period
51 s 0.10 51 = 0.20 S1 = 0.30 S1 = 0.40 51 ~ 0 .50
A 0.8 0.8 0.8 0.8 0.8
B 1.0 1.0 1.0 1.0 1.0
C 1.7 1.6 1.5 1.4 1.3
D 2.4 2.0 1.8 1.6 1.5
E 3.5 3 .2 2.8 2.4 2.4
F See Section 11.4. 7 of ASCE 7
Note : Use straight-line interpolation for intermediate values of S1
For Site Class = D and S 1 = 0 .633 g, F. = 1.500
PA2019-033
Equation (11.4-1): SMs = F0 5 5 = 1.000 X 1. 721 = 1. 721 g
Equation (11.4-2): SM1 = FvSl = 1.500 X 0.633 = 0.949 g
Section 11.4.4 -Design Spectral Acceleration Parameters
Equation (11.4-3): 5 05 = % SMs = % X 1.721 = 1.148 g
Equation (11.4-4): 501 =%SM! = % X 0.949 = 0.633 g
Section 11.4.5 -Design Response Spectrum
From figure 22-12 c3 1 TL= 8 seconds
Figure 11.4-1: Design Response Spectrum
S1;s = I 1-18
'
T < TO : S0 "' 508 ( 0 .4 + 0.8 T /TO )
Tu:ST :STs : S1 ::: S08
TI< T :S TL : s.: S01 / T
T>TL : S1 =S01 TL (Tl
~ ... , .... ---------, ------ ----
I
T" = 0.110 T~ = H. I 1.000
l'mod, T fm,)
PA2019-033
Section 11.4.6 -Risk-Targeted Maximum Considered Earthquake (MCER) Response Spectrum
The MCER Response Spectrum is determined by multiplying the design response spectrum above by
i :
I
j
l
(II
1.5.
s,11 .. o.9 4" • -•· -.. ------., -.. -------
'
T,,,.0.110 1 fl()l)
l'ffmd, T (a«)
PA2019-033
Section 11.8.3 -Additional Geotechnical Investigation Report Requirements for Seismic
Design Categories D through F
From Figure 22-7 C4 J PGA = 0.713
Equation (11.8-1): PGAM = FPGAPGA = 1.000 x 0.713 = 0.713 g
------
Table 11 .8-1: Site Coefficient F PGA
Site Mapped MCE Geometric Mean Peak Ground Acceleration, PGA
Class
PGA S PGA = PGA = PGA = PGA 2!:
0.10 0.20 0.30 0.40 0.50
A 0.8 0.8 0.8 0.8 0.8
B 1.0 1.0 1.0 1.0 1.0
C 1.2 1.2 1.1 1.0 1.0
D 1.6 1.4 1.2 1.1 1.0
E 2.5 1.7 1.2 0.9 0 .9
F See Section 11.4.7 of ASCE 7
Note: Use straight-line interpolation for intermediate values of PGA
For Site Class= D and PGA = 0.713 g, FP<IA = 1.000
Section 21.2.1.1 -Method 1 (from Chapter 21 -Site-Specific Ground Motion Procedures for
Seismic Design)
From Figure 22-17 C5 l CRs = 0.894
From Figure 22-18 c~J CRl = 0.910
---------------------
PA2019-033
Section 11.6 -Seismic Design Category
Table 11.6-1 Seismic Des ign Category Based on Short Period Response Acceleratlon Parameter
RISK CATEGORY
VALUE OF 5 05
I or II III IV
5 05 < 0.167g A A A
0.167g S 5 05 < 0.33g B B C
0.33g S 5 05 < 0.50g C C D
O.SOg S 5 05 D D D
For Risk Category= I and S05 = 1.148 g, Seismic Design Category= D
Table 11.6-2 Seismic Design Category Based on 1-5 Period Response Acceleration Parameter
RISK CATEGORY
VALUE OF 5 01
I or II III IV
5 01 < 0.067g A A A
0.067g S 501 < 0.133g B B C
0.133g S SD1 < 0.20g C C D
0.20g s 501 D D D
For Risk Category = I and s01 = 0.633 g, Seismic Design Category = D
Note: When 5 1 is greater than or equal to 0. 75g, the Seismic Design Category is E for
buildings in Risk Categories I, II, and III, and F for those in Risk Category IV, irrespective
of the above.
Seismic Design Category = "the more severe design category in accordance with
Table 11.6-1 or 11.6-2" = D
Note: See Section 11.6 for alternative approaches to calculating Seismic Design Category .
References
1. Figure 22-1: https://earthquake.usgs.gov/hazards/designmaps/downloads/pdfs/2010_ASCE-7 _Figure_22-
1.pdf
2. Figure 22-2: https ://earthquake. usgs.gov/hazards/designmaps/downloads/pdfs/2010_ASCE-7 _Figure_22-
2 .pdf
3. Figure 22-12: https://earthquake. usgs .gov/hazards/designmaps/downloads/pdfs/20 lO_ASCE-7 _Figure_22-
12. pdf
4. Figure 22-7: https://earthquake. usgs.gov /hazards/designmaps/downloads/pdfs/2010_ASCE-7 _Figure_22-
7. pdf
5. Figure 22-17: https://earthquake.usgs.gov/hazards/designmaps/downloads/pdfs/2010_ASCE-7 _Figure_22-
17.pdf
6. Figure 22-18: https://earthquake.usgs.gov/hazards/designmaps/downloads/pdfs/2010_ASCE-7_Figure_22-
18.pdf
PA2019-033
APPENDIX E
LIQUEFACTION ANALYSES/SETTLEMENT COMPUTATIONS
PA2019-033
1011111 fatiLmmc;:
Peak Ground Acceleration: 0.713
Earthquake Magnitude: 7.2
Water Table Depth (m): 1.2192
Average y above water table (kN /m" 16
Average y below water table (kN/m' 18
Borehole diameter (mm): 34.925
Requires correction for Sample Liners (YES/NO):
Sample Depth
Number (m)
1 0.30
2 0.61
3 0.91
4 1.22
5 1.52
6 1.83
7 2.13
8 2.44
9 2.74
10 3.05
11 3.35
12 3.66
13 3.96
14 4.27
15 4 .57
16 4 .88
17 5.18
consultants
Measured Soil Type
(N) (USCS)
18 ML/CL
17 SM
25 SM
25 SM
21 SM
24 SM
23 SM
16 SM
17 SM
26 SM
25 SM
21 SM
24 SM
20 SM
20 SM
20 SM
24 SM
engineering
geolechnical
appli c ations
NO
Flag "Clay" Fines
"Unsaturated" Content
"Unreliable" (%)
so
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
Energy CE CB CR cs
Ratio
(ER)%
65 1.08 1 0.75 1
65 1.08 1 0.75 1
65 1.08 1 0.75 1
65 1.08 1 0.75 1
65 1.08 1 0.8 1
65 1.08 1 0.8 1
65 1.08 1 0.8 1
65 1.08 1 0.8 1
65 1.08 1 0.85 1
65 1.08 1 0.85 1
65 1.08 1 0.85 1
65 1.08 1 0.85 1
65 1.08 1 0.85 1
65 1.08 1 0.85 1
65 1.08 1 0.95 1
65 1.08 1 0.95 1
65 1.08 1 0.95 1
N60 ave
14.63 4.88
13.81 9.75
20.31 14.63
20.31 19.51
18.20 24.99
20.80 30.48
19.93 35.97
13.87 41.45
15.65 46.94
23.94 52.43
23.02 57.91
19.34 63.40
22.10 68.88
18.42 74.37
20.58 79.86
20.58 85.34
24.70 90.83
2104 E Balboa Blvd, Newport Beach, CA
HD134.1
July 2018
crVC' CN
4.88 1.70
9.75 1.70
14.63 1 .70
19.51 1.70
22.00 1 .70
24.50 1.70
27.00 1.70
29.49 1.70
31.99 1.70
34.49 1.70
36.98 1.66
39.48 1.60
41.97 1 .55
44.47 1.51
46.97 1.47
49.46 1.43
51.96 1.40
PLATE A
CPT-1 advanced to 34 .72 ft. on 7/2/18
Page 1
PA2019-033
18 5.49 28 SM 16 65 1.08 1 0.95 1 28.82
19 5.79 26 SM 16 65 1.08 1 0.95 1 26.76
20 6.10 23 SM 16 65 1.08 1 0.95 1 23.67
21 6.40 21 SM 16 65 1.08 1 0.95 1 21 .61
22 6.71 22 SM 16 65 1.08 1 0.95 1 22.64
23 7.01 25 SM 16 65 1.08 1 0.95 1 25.73
24 7.32 25 SM 16 65 1.08 1 0.95 1 25.73
25 7.62 27 SM 16 65 1.08 1 0.95 1 27.79
26 7.92 23 SM 16 65 1.08 1 0.95 1 23.67
27 8.23 23 SM 16 65 1.08 1 0.95 1 23.67
28 8.53 19 SM 16 65 1.08 1 1 1 20.58
29 8.84 24 SM 16 65 1.08 1 1 1 26.00
30 9 .14 21 SM 16 65 1.08 1 1 1 22.75
31 9.45 23 SM 16 65 1.08 1 1 1 24.92
32 9.75 31 SW 8 65 1.08 1 1 1 33.58
33 10.06 48 SM 16 65 1.08 1 1 1 52.00
34 10.36 0 SM Unreliable 16 65 1.08 1 1 1 0.00
Auger Diameter: 1.375 inches
Hammer Weight: n.a.
Drop: continuous push
CPT-1 advanced to 34.72 ft by Kehoe Testing and Engineering on July 2, 2018 (CPT Data Logs attached herein]
References:
Idriss, LM. and Boulanger, R.W. Soil Liquefaction During Earthquakes. Earthquake Engineering Research Institute. 8 September 2008.
Liu, C. and Evett, ~B. Soils and Foundations. 8th Edition . 4 August 2013.
Martin, G.R and Lew, M. Recommendations for Implementation ofDMGSpecia/ Publication 117. University of Southern California Earthquake Center. March 1999.
California Department of Conservation, CGS.. Special Publication 117A: Gu;delinesfor Evaluating and Mitigating Seismic Hazards in California. Rev 11 Sept. 2008.
consultants
engineering
geotechnical
applications
96.32
101.80
107.29
112.78
118.26
123.75
129.24
134.72
140.21
145.69
151.18
156.67
162.15
167.64
173.13
178.61
184.10
2104 E Balboa Blvd, Newport Beach, CA
HD134.l
July 2018
54.46 1.36
56.95 1.33
59.45 1.31
61.94 1.28
64.44 1.25
66.94 1.23
69.43 1.21
71.93 1.19
74.43 1.17
76.92 1.lS
79.42 1.13
81.91 1.11
84.41 1.10
86.91 1.08
89.40 1.06
91.90 1.05
94.40 1.04
PLATE A
CPT-1 advanced to 34.72 ft. on 7/2/18
Page 2
PA2019-033
(N1)60 LIN for
Fines
Content
24.86 5.61
23.48 3.58
34.53 3.58
34.53 3.58
30.94 3.58
35.36 3.58
33.89 3.58
23.57 3.58
26.61 3.58
40.70 3.58
38.11 3.58
30.98 3.58
34.34 3.58
27.80 3.58
30.23 3.58
29.46 3.58
34.49 3.58
consultants
(N1)60-CS Stress
reduction
coeff, rd
30.48 1.00
27.06 1.00
38.11 1.00
38.11 1.00
34.52 0.99
38.94 0.99
37.46 0.99
27.15 0.98
30.19 0.98
44.28 0.98
41.68 0.97
34.56 0.97
37.91 0.97
31.38 0.96
33.81 0.96
33.04 0.95
38.07 0.95
engineering
geotechnical
app/i ca Ii ons
CSR MSF for sand
0.47 1.08
0.46 1.08
0.46 1.08
0.46 1.08
0.52 1.08
0.57 1.08
0.61 1.08
0.64 1.08
0.67 1.08
0.69 1.08
0.71 1.08
0.72 1.08
0.73 1.08
0.75 1.08
0.75 1.08
0.76 1.08
0.77 1.08
Ko for sand CRR for M=7.5 CRR
& oVC'= 1 atm
1.10 0.52 0.61
1.10 0.35 0.41
1.10 2.00 2.00
1.10 2.00 2.00
1.10 1.00 1.20
1.10 2.00 2.00
1.10 1.97 2.00
1.10 0.35 0.42
1.10 0.50 0.59
1.10 2.00 2.00
1.10 2.00 2.00
1.10 1.01 1.21
1.10 2.00 2.00
1.10 0.59 0.70
1.10 0.88 1.04
1.10 0.76 0.91
1.10 2.00 2.00
2104 E Balboa Blvd, Newport Beach, CA
HD134.l
July 2018
Factor of Limiting shear
Safety strain ylim
1.32 0.04
0.89 0.07
2.00 0.01
2.00 O.Ql
2.00 0.02
2.00 0.01
2.00 O.Ql
0.65 0.07
0.89 0.05
2.00 0.00
2.00 0.01
1.67 0.02
2.00 0.01
0.94 0.04
1.38 0.03
1.19 0.03
2.00 0.01
PLATE A
CPT-1 advanced to 34.72 ft. on 7/2/18
Page 3
PA2019-033
39.31 3.58 42.88 0.95 0.78 1.08 1.10
35.69 3.58 39.27 0.94 0.78 1.08 1.10
30.90 3.58 34.48 0.94 0.78 1.08 1.10
27.64 3.58 31.22 0.93 0.79 1.08 1.10
28.39 3.58 31.97 0.93 0.79 1.08 1.10
31.66 3.58 35.23 0:92 0.79 1.08 1.10
31.08 3.58 34.66 0.92 0.79 1.08 1.10
32.98 3.58 36.56 0.91 0.79 1.08 1.10
27.62 3.58 31.20 0.91 0.79 1.08 1.07
27.17 3.58 30.74 0.90 0.79 1.08 1.06
23.25 3.58 26.83 0.90 0.79 1.08 1.04
28.92 3.58 32.49 0.89 0.79 1.08 1.05
24.93 3.58 28.50 0.89 0.79 1.08 1.03
26.90 3.58 30.48 0.88 0.79 1.08 1.03
35.75 0.37 36.12 0.88 0.79 1.08 1.03
54.60 3.58 58.18 0.87 0.79 1.08 1.03
0.00 3.58 3.58 0.87 0.79 1.08 1.00
References:
Jdriss, l.M. and Boulanger, RW. Soil liquefaction During Earthquakes. Earthquake Engineering Research Institute. 8 September 2008.
Liu. C. and Evett, J.B. Soils and Foundations, 8th Edition . 4 August 2013.
2.00 2.00
2.00 2.00
1.00 1.19
0.57 0.68
0.64 0.76
1.16 1.39
1.03 1.23
1.57 1.86
0.57 0.66
0.54 0.61
0.34 0.38
0.70 0.79
0.41 0.45
0.52 0.58
1.42 1.59
2.00 2.00
0.08
Martin, G.R and Lew, M. Recommendations for Implementation of DMG Special Publication I 17. University of Southern California Earthquake Center. March 1999.
California Department of Conservation, CGS. Special Publication 117A: Guidelines for Evaluating and Mitigating Seismic Hazards in California. Rev 11 Sept. 2008.
consultants
engineering
geolechnical
applications
2104 E Balboa Blvd, Newport Beach, CA
HD134.1
July 2018
2.00 0.00
2.00 0.01
1.52 0.02
0.87 0.04
0.97 0.04
1.75 0.02
1.55 0.02
2.00 0.02
0.83 0.04
0.77 0.04
0.48 0.07
1.00 0.03
0.57 0.06
0.73 0.04
2.00 0.02
2.00 0.00
? 0.50
PLATE A
CPT-1 advanced to 34.72 ft. on 7/2/18
Page 4
PA2019-033
Parameter Fa
-0.12
0.10
-0.66
-0.66
-0.40
-0.72
-0.61
0.10
-0.10
-1.13
-0.93
-0.40
-0.65
-0.18
-0.35
-0.30
-0.66
Maximum llHi (m)
shear strain
ymax
0.02
0.04
0.00
0.00
0.00
0.00
0.00
0.07
0.04
0.00
0.00
0.01
0.00
0 .04
a.oz
0.02
0.00
engineering
geolechnical
applications
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
consultants
llLDli (m)
0.01
0 .01
0.00
0.00
0.00
0.00
0.00
0 .02
0.01
0.00
0.00
0.00
0.00
0.01
0.01
0.01
0.00
Vertical llSi (m)
reconsoL
Strain £V
0.00 0.00
0.01 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.01 0.00
0.01 o.oo
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.01 0.00
0.00 0.00
0.00 0.00
0.00 0.00
llSi (ft)
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.01
0.01
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
llSi (inches)
0.04
0.12
0.00
0.00
0.00
0.00
0.00
0 .18
0.10
0.00
0.00
0.02
0.00
0.09
0.04
a.as
0.00
2104 E Balboa Blvd, Newport Beach, CA
HD134.1
July 2018
PLATE A
CPT-1 advanced to 34. 72 ft. on 7 /2/18
Page 5
PA2019-033
-1.02 0.00 0.30 0.00 0.00 0.00
-0.75 0.00 0.30 0.00 0.00 0.00
-0.40 0.01 0.30 0.00 0.00 0.00
-0.17 0.04 0.30 0.01 0.01 0.00
-0.22 0.04 0.30 0.01 0.01 0.00
-0.45 0.01 0.30 0.00 0.00 0.00
-0.41 0.01 0.30 0.00 0.00 0.00
-0.55 0.00 0.30 0.00 0.00 0.00
-0.17 0.04 0.30 0.01 0.01 0.00
-0.14 0.04 0.30 0.01 O.Dl 0.00
0.12 0.07 0.30 0.02 0.02 0.00
-0.26 0.03 0.30 0.01 0.01 0.00
0.01 0.06 0.30 0.02 0.01 0.00
-0.12 0.04 0.30 0.01 0.01 0.00
-0.52 0.00 0.30 0.00 0.00 0.00
-2.27 0.00 0.30 0.00 0.00 0.00
0.95 0.00 0.30 0.00 0.00 0.00
Total Settlement: 0.04!
References:
Idriss, J.M. and Boulanger, RW. Soil Liquefaction During Earthquakes. Earthquake Engineering Researdi. Institute~ 8 September 2008.
Liu, C. and Evett, J.B. Soils and Foundations, 8th Edition . 4 August 2013.
0.00 0.00
0.00 0.00
0.00 0.03
0.01 0.09
0.01 0.08
0.00 0.01
0.00 0.02
0.00 0.00
0.01 0.09
0.01 0.10
0.02 0.19
0,01 0.07
0,01 0.14
0.01 0.10
0.00 0.00
0.00 0.00
0.00 0.00
0.13, 1.551
Martin, G.R and Lew, M. Recommendations for Implementation of DMG Special Publication 117 . University of Southern California Earthquake Center. March 1999.
California Department of Conservation, CGS. Spec;af Publication 117A: Guidelines for Evaluating and Mitigating Seismic Hazards in California. Rev 11 Sept. 2008.
consultants
engineering
geotechnica/
applications
2104 E Balboa Blvd, Newport Beach, CA
HD134.l
July 2018
PLATE A
CPT-1 advanced to 34.72 ft. on 7/2/18
Page 6
PA2019-033
2104 E Balboa Blvd, Newport Beach, CA
HD134.l
July 2018
ln11111 faGm~t!ll:li:
Peak Ground Acceleration: 0.713
Earthquake Magnitude: 7.2
Water Table Depth (m): 1.2192
Average y above water table (kN/m' 16
Average y below water table (kN/m' 18
Borehole diameter (mm): 34.925
Requires correction for Sample Liners (YES/NO): NO
Sample Depth Measured Soil Type Flag "Clay" Fines Energy CE CB CR cs N60 o-VC crVC' CN
Number (m) (N) (USCS) "Unsaturated" Content Ratio
"Unreliable" (%) (ER)%
1 0.30 19 ML/CL Clay so 65 1.08 1 0.75 1 15.44 4.88 4.88 1.70
2 0.61 23 SM 16 65 1.08 1 0.75 1 18.69 9.75 9.75 1.70
3 0.91 10 ML/CL Clay 16 65 1.08 1 0.75 1 8.13 14.63 14.63 1.70
4 1.22 8 CL Clay so 65 1.08 1 0.75 1 6.50 19.51 19.51 1.70
5 1.52 6 CL Clay 50 65 1.08 1 0.8 1 5.20 24.99 22.00 1.70
6 1.83 5 CL Clay so 65 1.08 1 0.8 1 4.33 30.48 24.50 1.70
7 2.13 7 CL Clay so 65 1.08 1 0.8 1 6.07 35.97 27.00 1.70
8 2.44 16 CL Clay so 65 1.08 1 0.8 1 13.87 41.45 29.49 1.70
9 2.74 16 ML/CL Clay so 65 1.08 1 0.85 1 14.73 46.94 31.99 1.70
10 3.05 12 SM 16 65 1.08 1 0.85 1 11.05 52.43 34.49 1.70
11 3.35 18 SM 16 65 1.08 1 0.85 1 16.58 57.91 36.98 1.66
12 3.66 31 SM 16 65 1.08 1 0.85 1 28.55 63.40 39.48 1.60
13 3.96 26 SM 16 65 1.08 1 0.85 1 23.94 68.88 41.97 1.55
14 4.27 22 SM 16 65 1.08 1 0.85 1 20.26 74.37 44.47 1.51
15 4.57 24 SM 16 65 1.08 1 0.95 1 24.70 79.86 46.97 1.47
16 4.88 32 SW 8 65 1.08 1 0.95 1 32.93 85.34 49.46 1.43
17 5.18 31 SM 16 65 1.08 1 0.95 1 31.90 90.83 51.96 1.40
18 5.49 36 SM 16 65 1.08 1 0.95 1 37.05 96.32 54.46 1.36
19 5.79 37 SM 16 65 1.08 1 0.95 1 38.08 101.80 56.95 1.33
20 6.10 32 SM 16 65 1.08 1 0.95 1 32.93 107.29 59.45 1.31
21 6.40 26 SM 16 65 1.08 1 0.95 1 26.76 112.78 61.94 1.28
22 6.71 26 SM 16 65 1.08 1 0.95 1 26.76 118.26 64.44 1.25
23 7.01 22 SM 16 65 1.08 1 0.95 1 22.64 123.75 66.94 1.23
24 7.32 20 SM 16 65 1.08 1 0.95 1 20.58 129.24 69.43 1.21
25 7.62 21 SM 16 65 1.08 1 0.95 1 21.61 134.72 71.93 1.19
26 7.92 21 SM 16 65 1.08 1 0.95 1 21.61 140.21 74.43 1.17
27 8.23 21 SM 16 65 1.08 1 0.95 1 21.61 145.69 76.92 1.15
28 8.53 22 SM 16 65 1.08 1 1 1 23.83 151.18 79.42 1.13
29 8.84 23 SM 16 65 1.08 1 1 1 24.92 156.67 81.91 1.11
30 9.14 26 SM 16 65 1.08 1 1 1 28.17 162.15 84.41 1.10
31 9.45 27 SM 16 65 1.08 1 1 1 29.25 167.64 86.91 1.08
engineering
geolechnical
applications PLATE B
consultants CPT-2 advanced to 48.82 ft . on 7/2/18
Page 1
PA2019-033
32 9.75 24 SM 16 65 1.08 1 1 1 26.00
33 10.06 24 SM 16 65 1.08 1 1 1 26.00
34 10.36 17 SM 16 65 1.08 1 1 1 18.42
35 10.67 24 SM 16 65 1.08 1 1 1 26.00
36 10.97 27 SW 16 65 1.08 1 1 1 29.25
37 11.28 15 SM 16 65 1.08 1 1 1 16.25
38 11.58 18 SM 16 65 1.08 1 1 1 19.50
39 11.89 15 SM 16 65 1.08 1 1 1 16.25
40 12.19 18 SM 16 65 1.08 1 1 1 19.50
41 12.50 19 SM 16 65 1.08 1 1 1 20.58
42 12.80 24 SM 16 65 1.08 1 1 1 26.00
43 13.11 43 SM 16 65 1.08 1 1 1 46.58
44 13.41 48 SM 16 65 1.08 1 1 1 52.00
45 13.72 41 SM 16 65 1.08 1 1 1 44.42
46 14.02 38 SM 16 65 1.08 1 1 1 41.17
47 14.33 38 SM 16 65 1.08 1 1 1 41.17
48 14.63 0 SM Unreliable 16 65 1.08 1 1 1 0.00
Auger Diameter: 1.375 inches
Hammer Weight: n.a
Drop: continuous push
CPT-2 advanced to 48.82 ft by Kehoe Testing and Engineering on July 2, 2018 (CPT Data Logs attached herein)
References:
Idriss, J.M. and Boulanger, RW. Soil liquefaction During Earthquakes. Earthquake Engineering Research Institute. 8 September 2008.
Liu. C. and Evett, J.B. Soils and Foundations, 8th Edition . 4 August 2013.
Ma.rtin, G.R and Lew, M. Recommendations for Implementation of DMG Special Publication 117 , University of Southern California Earthquake Center. March 1999.
California Department of Conservation, CGS. Special Publication 117A: Guidelines for Evaluating and Mitigating Seismic Hazards in California. Rev 11 Sept. 2008.
I
EGA
consultants
engineering
geotechnical
applications
173.13
178.61
184.10
189.59
195.07
200.56
206.04
211.53
217.02
222.50
227.99
233.48
238.96
244.45
249.94
255.42
260.91
2104 E Balboa Blvd, Newport Beach, CA
HD134.l
July 2018
89.40 1.06
91.90 1.05
94.40 1.04
96.89 1.02
99.39 1.01
101.89 1.00
104.38 0.99
106.88 0.97
109.37 0.96
111.87 0.95
114.37 0.94
116.86 0.93
119.36 0.92
121.86 0.91
124.35 0.90
126.85 0.89
129.34 0.89
PLO.TE B
CPT-2 advanced to 48.82 ft. on 7/2/18
Page 2
PA2019-033
(N1)60 .6N for (N1)60-CS Stress CSR MSF for sand
Fines reduction
Content coeff, rd
n.a. n.a. n.a 1.00 0.47 1.08
31.77 3.58 35.34 1.00 0.46 1.08
n.a. n.a. n.a 1.00 0.46 1.08
n.a n.a. n.a 1.00 0.46 1.08
n.a. n.a. n.a 0.99 0.52 1.08
n.a. n.a. n.a 0.99 0.57 1.08
n.a. n.a. n.a 0.99 0.61 1.08
n.a n.a. n.a 0.98 0.64 1.08
n.a n.a. n.a 0.98 0.67 1.08
18.79 3.58 22.36 0.98 0.69 1.08
27.44 3.58 31.01 0.97 0.71 1.08
45.73 3.58 49.31 0.97 0.72 1.08
37.20 3.58 40.77 0.97 0.73 1.08
30.58 3.58 34.16 0.96 0.75 1.08
36.28 3.58 39.86 0.96 0.75 1.08
47.14 0.37 47.50 0.95 0.76 1.08
44.55 3.58 48.13 0.95 0.77 1.08
50.54 3.58 54.11 0.95 0.78 1.08
50.79 3.58 54.37 0.94 0.78 1.08
43.00 3.58 46.57 0.94 0.78 1.08
34.22 3.58 37.80 0.93 0.79 1.08
33.55 3.58 37.13 0.93 0.79 1.08
27.86 3.58 31.43 0.92 0.79 1.08
24.87 3.58 28.44 0.92 0.79 1.08
25.65 3.58 29.23 0.91 0.79 1.08
25.22 3.58 28.79 0.91 0.79 1.08
24.80 3.58 28.38 0.90 0.79 1.08
26.92 3.58 30.50 0.90 0.79 1.08
27.71 3.58 31.29 0.89 0.79 1.08
30.86 3.58 34.44 0.89 0.79 1.08
31.58 3.58 35.16 0.88 0.79 1.08
eng i neering
geotechnical
applications
consultants
Kcr for sand CRR for M=7.5 CRR
& crVC'= 1 atm
1.10 n.a. n.a.
1.10 1.19 1.42
1.10 n.a n.a.
1.10 n.a. n.a.
·1.10 n.a n.a.
1.10 n.a. n.a.
1.10 n.a. n.a.
1.10 n.a n.a
1.10 n.a. n.a.
1.10 0.24 0.28
1.10 0.56 0.66
1.10 2.00 2.00
1.10 2.00 2.00
1.10 0.94 1.11
1.10 2.00 2.00
1.10 2.00 2.00
1.10 2.00 2.00
1.10 2.00 2.00
1.10 2.00 2.00
1.10 2.00 2.00
1.10 2.00 2.00
1.10 1.81 2.00
1.09 0.59 0.70
1.07 0.40 0.47
1.07 0.44 0.51
1.06 0.42 0.48
1.05 0.40 0.45
1.05 0.52 0.59
1.05 0.58 0.65
1.05 0.99 1.12
1.04 1.15 1.29
2104 E Balboa Blvd, Newport Beach, CA
HD134.1
July 2018
Factor of Limiting shear
Safety strainylim
n.a. 0.00
2.00 0.02
n.a. 0.00
n.a 0.00
n.a. 0.00
n.a 0.00
n.a 0.00
n.a 0.00
n.a. 0.00
0.41 0.12
0.94 0.04
2.00 0.00
2.00 0.01
1.50 0.03
2.00 0.01
2.00 0.00
2.00 0.00
2.00 0.00
2.00 0.00
2.00 0.00
2.00 0.01
2.00 0.02
0.88 0.04
0.59 0.06
0.64 0.05
0.60 0.05
0.57 0.06
0.74 0.04
0.83 0.04
1.41 0.02
1.63 0.02
PLATE B
CPT-2 advanced to 48.82 ft. on 7/2/18
Page 3
PA2019-033
27.68 3.58 31.26 0.88 0.79 1.08 1.03
27.30 3.58 30.88 0.87 0.79 1.08 1.02
19.08 3.58 22.66 0.87 0.79 1.08 1.01
26.59 3.58 30.16 0.86 0.78 1.08 1.01
29.53 3.58 33.11 0.86 0.78 1.08 1.00
16.21 3.58 19.78 0.85 0.78 1.08 1.00
19.21 3.58 22.79 0.85 0.78 1.08 1.00
15.82 3.58 19.40 0.84 0.77 1.08 0.99
18.77 3.58 22.34 0.84 0.77 1.08 0.99
19.59 3.58 23.17 0.83 0.77 1.08 0.98
24.47 3.58 28.05 0.83 0.77 1.08 0.98
43.38 3.58 46.95 0.82 0.76 1.08 0.96
47.91 3.58 51.49 0.82 0.76 1.08 0.95
40.50 3.58 44.08 0.81 0.76 1.08 0.94
37.16 3.58 40.74 0.81 0.75 1.08 0.94
36.79 3.58 40.37 0.80 0.75 1.08 0.93
0.00 3.58 3.58 0.80 0.75 1.08 0.98
References:
Id riss, J.M. a.nd Boulanger, R.W~Soil Liquefaction During Earthquakes. Earthquake Engineering Research Institute. 8 September 2008.
Liu, C. and Evett. J.B. Soils and Foundations, 8th Edition . 4 August 2013.
0.58 0.64
0.55 0.60
0.24 0.27
0.50 0.54
0.77 0.84
0.20 0.22
0.25 0.26
0.20 0.21
0.24 0.26
0.25 0.27
0.39 0.41
2.00 2.00
2.00 2.00
2.00 2.00
2.00 2.00
2.00 2.00
0.08 ?
Martin, G.R and Lew, M. Recommendations for lmplement.oa·on of DMG Special Publication 117 . University of Southern California Earthquake Center. March 1999.
California Department o( Conservation, CGS. Special Publication 117A: Guidelines for Evaluating and Mitigating Seismic Hazards in California . Rev 11 SepL 2008.
consultants
engineering
geotechnical
applications
2104 E Balboa Blvd, Newport Beach, CA
HD134.1
July 2018
0.81 0.04
0.76 0.04
0.34 0.12
0.69 0.05
1.07 0.03
0.28 0.16
0.34 0.12
0.28 0.17
0.33 0.12
0.35 0.11
0.53 0.06
2.00 0.00
2.00 0.00
2.00 0.00
2.00 0.Dl
2.00 0.01
? 0.50
PLATE B
CPT-2 advanced to 48.82 ft. on 7/2/18
Page 4
PA2019-033
Parameter Fcr Maximum llHi (m) llLDli (m)
shear strain
ymax
0.00 0.00 0.30 0.00
-0.46 0.00 0.30 0.00
0.00 0.00 0.30 0.00
0.00 0.00 0.30 0.00
0.00 0.00 0.30 0.00
0.00 0.00 0.30 0.00
0.00 0.00 0.30 0.00
0.00 0.00 0.30 0.00
0.00 0.00 0.30 0.00
0.39 0.12 0.30 0.04
-0.16 0.04 0.30 0.01
-1.53 0.00 0.30 0.00
-0.86 0.00 0.30 0.00
-0.38 0.01 0.30 0.00
-0.79 0.00 0.30 0.00
-1.39 0.00 0.30 0.00
-1.44 0.00 0.30 0.00
-1.93 0.00 0.30 0.00
-1.95 0.00 0.30 0.00
-1.31 0.00 0.30 0.00
-0.64 0.00 0.30 0.00
-0.59 0.00 0.30 0.00
-0.19 0.04 0.30 0.01
0.01 0.06 0.30 0.02
-0.04 0.05 0.30 0.02
-0.01 0.05 0.30 0.02
0.02 0.06 0.30 0.02
-0.12 0.04 0.30 0.01
-0.18 0.04 0.30 0.01
-0.40 0.02 0.30 0.00
-0.45 0.01 0.30 0.00
engineer i ng
geotechnical
applications
consultants
Vertical llSi (m) llSi (ft)
reconsol
Strain EV
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.02 0.01 0.02
0.01 0.00 0.01
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.01 0.00 O.Ql
0.01 0.00 0.01
0.01 0.00 0.01
0.01 0.00 0.01
0.01 0.00 0.01
0.01 0.00 0.01
0.01 0.00 0.01
0.00 0.00 0.00
0.00 0.00 0.00
llSi (inches)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.25
0.09
0.00
0.00
0.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.09
0.14
0.13
0.14
0.15
0.10
0.09
0.03
0.02
2104 E Balboa Blvd, Newport Beach, CA
HD134.l
July 2018
PLATE B
CPT-2 advanced to 48.82 ft. on 7/2/18
Page 5
PA2019-033
-0.17 0.04 0.30 0.01 O.Ql 0.00
-0.15 0.04 0.30 0.01 0.01 0.00
0.37 0.12 0.30 0.04 0.02 0.01
-0.10 0.05 0.30 0.01 0.01 0.00
-0.30 0.03 0.30 0.01 0.01 0.00
0.53 0.16 0.30 0.05 0.02 0.01
0.36 0.12 0.30 0.04 0.02 0.01
0.55 0.17 0.30 0.05 0.02 0.01
0.39 0.12 0.30 0.04 0.02 0.01
0.34 0.11 0.3 0 0,03 0.02 0.01
0.04 0.06 0.30 0.02 0.01 0.00
-1.34 0.00 0.30 0.00 0.00 0.00
-1.71 0.00 0.30 0.00 0.00 0.00
-1.12 0.00 0.30 0.00 0.00 0.00
-0.86 0.00 0.30 0.00 0.00 0.00
-0.83 0.00 0.30 0.00 0.00 0.00
0.95 0.00 0.30 0.00 0.00 0.00
Total Settlement: 0.001
References:
Idri s s, I.M . and Boulanger, RW. Soi/ liquefaction During Earthquakes. Earthquake Engineering Research lnstirute. B September 2008.
Llu. C. and Evett, J.B. Soils and Foundadons, 8th Edition. 4 August 2013.
O.Ql 0.09
0.01 0.10
0.02 0.25
0.01 0.11
0.01 0.06
0.02 0.28
0.02 0.25
0.02 0.28
0.02 0.25
0.02 0.24
O.Ql 0.15
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.201 3.311
Martin , G.R and Lew, M. Recommendations for Implement.a don of DMG Special Publication 117 . University of Southern California E.lrthquake Center. March 199(3 ,
California Department of Conservation, CGS. Special Publication 117A: Guidelines for Evaluaa·ng and Mitigating Seismic Hazards in California . Rev 11 Sept. 200S.
consultants
engineering
geotechnica/
applications
2104 E Balboa Blvd, Newport Beach, CA
HD134.1
July 2018
PLATE B
CPT-2 advanced to 48.82 ft . on 7/2/18
Page 6