Loading...
HomeMy WebLinkAbout20190319_Coastal Hazards Analysis Report 02-14-19WILLIAM SIMPSON & ASSOCIATES, INC. CONSULTING STRUCTURAL ENGINEERS 23 ORCHARD, SUITE 250 PH. (949) 206-9929 LAKE FOREST, CA 92630 FAX (949) 206-9955 www.wsase.com e -mail:T mail@wsase.comT February 14, 2019 Ritner Group Inc. Ron Ritner, Architect 503 32nd Street, Suite 130 Newport Beach, CA 92663 COASTAL HAZARDS ANALYSIS REPORT The Pickup Family; Applicant 23 Harbor Island Rd City of Newport Beach, County of Orange, CA 92660 WSA Job #7168-2 Dear Mr. Ritner, Pursuant to your request, William Simpson & Associates, Inc., (WSA) is pleased to provide this report regarding Coastal Hazards Analysis for the proposed development at the subject site. The site is adjacent to the Pacific Ocean; thus it may be subject to Coastal Hazards such as, flooding, wave runup, and erosion. This study investigates the potential for the aforementioned hazards to impact the proposed development on the site over the next 75 years and addresses compliance with Coastal Hazards Analysis Report requirements and standards of NBMC Section 21.30.15.E.2. STATEMENT OF THE PREPARER’S QUALIFICATIONS Soha Mirzahosseinkashani, P.E., the preparer of the Coastal Hazards Analysis Report on this project, holding a Master of Science in Civil Engineering from University of California Irvine, and is a Licensed Civil Engineer by the State of California Certificate No. C82840. He is actively involved in the design and entitlement of waterfront developments such as custom homes, seawalls, piers, platforms, floating docks and marinas. All the above being said, Soha Mirzahosseinkashani, P.E. shall be considered a qualified preparer for the Coastal Hazards Analysis Report on this project. Requirements in Appendix A for Step 1: Establish the project sea level rise range for the proposed project’s planning horizon (life of project) using the current best available science. The State of California Sea-Level Rise Guidance 2018 update developed by the Ocean Protection Council in close coordination with Policy Advisory Committee with representation from PA2019-051 California Natural Resources Agency, the Governor’s Office of Planning and Research, and the California Energy Commission provides a bold, science-based methodology for state and local Governments to analyze and assess the risks associated with sea-level rise, and to incorporate Sea- Level Rise into their planning, permitting, and investment decisions, and it is considered the current best available science. As reflected in the clouded area of the enclosed Table 28, based upon direct interpolation of the data for High emissions 2090 & 2100 and Low Rick Aversion, over the project’s planning horizon of 75 years, the estimated Sea-Level Rise for year 2094 shall be 2.90’, which is the Sea- Level Rise for the proposed project. Based on the highest high tide of +7.38’MLLW (7.20’NAVD88) with 0.3 feet correction for the wave setup recorded in the project area, the above established Sea-Level Rise will account for bay water level of +10.40’NAVD88. Requirements in Appendix A for Step 2: Determine how physical impacts from sea level rise may constrain the project site, including erosion, structural and geologic stability, flooding, and inundation. According to the attached slab edge plan sheet A1.1, lowest finished floor elevation of the proposed development is at +13.20’ NAVD88 = +13.38’MLLW which is above the Base Flood Elevation established for the area. The highest high tide reached in Newport Beach of +7.38’ MLLW is approximately 6’ below finished floor of the proposed structure and will remain below it until after year of 2094. As we well know, majority of the public streets in Newport Bay area are currently at much lower elevations than the subject site and they will flood due to Sea Level Rise way before the development on this site becomes subject to flooding. INTRODUCTION The subject site is located at Newport Bay shoreline, as reflected on the following Photo. PA2019-051 FLOODING HAZARD The primary hazard due to flooding from the ocean waters for this site, like majority of the sites located adjacent to Pacific Ocean, would be due to long-term sea-level rise. The current water levels in Newport Bay are reflected on the enclosed Datums for Newport Bay Entrance. According to the enclosed Topographic Survey, the lowest Finished Surface at the subject site facing the beach is +13.20’ NAVD88 (North American Vertical Datum 1988). According the topographic survey and sheet S-2 for the Seawall Reinforcing, top of existing seawall is at +8.70’ NAVD88 and top of new seawall shall be at +9.82’ NAVD88 which equals +10.00’ M.L.L.W in compliance with the current City of Newport Beach Waterfront Project Guidelines and Standards. While sea levels have been rising for decades, higher rates of raise are forecast for the coming century because of climate change – see enclosed table 28. Increases can be attributed to warmer temperatures, which cause water to expand, as well more liquid mass caused by melting of ice caps. Current estimates of future sea level rise generally fall in the range of 3.2 & 6.7 ft for the year 2100. Global warming may impact flooding in other ways as well. Warmer water could intensify North Pacific storms, bringing greater wind and wave energy to shoreline in winter and higher intensity precipitation. To review the historical tides, Flow Simulations, LLC has obtained tide heights data form the NOAA (National Oceanic and Atmospheric Administration) Center for Operational Oceanographic Products and Services (CO-OPS) “Tides and Currents” website, http://co-ops.nos.noaa.gov/ (Data accessed April 2008). Year-long records of hourly tide predictions and measurements for Station ID: 9410660 (Los Angeles) have been accessed for 1982-2007. In addition, year-long records of hourly tide predictions have been accessed for 2008-2020. All tide heights have been saved in units of feet relative to MLLW and relative to GMT (Greenwich Mean Time). Los Angeles has been chosen because it is the nearest NOAA tide station with tidal gauge measurement data. A review of benchmark data for Los Angeles versus Newport Harbor shows that tide heights typically differ by less than an inch. For example, NOAA benchmarks data reports than the mean tide range at Newport Beach harbor is 3.76 ft versus 3.81 ft at Los Angeles, a difference of 0.05 ft or 0.6 inches. Hourly NTRs (Non-Tide Residuals) have been obtained for years 1982-2007 by subtracting the predicted tide heights from the measured tide heights. Positive NTR corresponds to higher tides than predicted and negative NTR correspond to lower tides than predicted. To characterize the magnitude and frequency of historical NTRs during the winter season when maximum astronomical tides occur, hourly NTRs for the months of December, January and February have been compiled for each year between 1982/83 and 2006/07 and rank ordered. From this ranking the 98th percentile NTRs have been extracted; this corresponds to 2% exceedance probability. To further explore the association between NTR and strong El Nino conditions, the 98th percentile NTR for each winter (2% exceedance probability) has been plotted versus ONI (Oceanic Nino Index) as shown in the enclosed Figure 3.1 and positive correlation has been identified (R2 =0.72, p<0.05). The implication for coastal flooding is not only that the probability of coastal flooding, or flood risk, varies from year to year depending on climatic conditions in addition to astronomical factors, but that the stronger El Nino the greater the coastal flood risk. There are PA2019-051 important exceptions to this trend, however. Figure 3.1 shows two instances where NTR exceeded 0.5 ft even though ONI values have been between 0 and 1oC corresponding to El Nino neutral or weak El Nino conditions. On the other hand, Figure 3.1 also shows that 2% exceedance probability NTR values never exceeded 0.5 ft when ONI values have been less than zero (i.e., during La Nina conditions). This suggests that coastal flood risk is minimized during La Nina conditions. The enclosed Figure 3.2 shows the height of monthly maximum high tides through 2020 based on astronomical factors. There are two peaks per year corresponding to maximum high tides in summer and winter. The graph in Figure 3.2 also reflects the 4.4-year cycle reported by Zetler and Flick (1985) and Flick (1986). The Newport Beach Peninsula portion of the Pacific Institute California Flood Risk Map is shown herein as OE S Quadrangle. The dark blue colored areas show the areas where a 100-year sea level rise of 55 inches is added to the existing FEMA coastal flood elevation shown in light blue. Obviously, the entire Newport Bay area will be affected if sea level rises 55 inches by the year 2100. If the sea level rises in the next several decades as currently estimated, regional measures to mitigate the potential flooding hazard shall be taken. Since finished floor elevation of the proposed house will be at +13.20’ NAVD88, it will remain below the High Tide until after year of 2094. Thus, the proposed development shall not be a subject to Flooding over the economic life of the structure. WAVE RUNUP Wave runup is the uprush of water from wave action on a shore barrier intercepting Stillwater level. On steeply sloped shorelines, the rush of water up the surface of the natural beach, including dunes and bluffs, or the surface of a manmade structure, such as revetment or vertical wall can result in flood elevations higher than those of the crest of wind-driven waves. See wave Runup Sketch below. PA2019-051 Due to its location, this site is not a subject to typical ocean waves and the associated wave runup. Bay generated waves that may arrive at this site are very small wind waves and boat wakes. These types of waves are generally dampened by the moored vessels and dock systems located in front of the site and have no significant energy and runup effect. Tsunami type waves that approach from the ocean shoreline will likely not reach the site for several reasons. There is no significant near field source of a tsunami like the geologic conditions of some other places on Earth such as Japan, for example. A far field tsunami reaching the ocean shoreline will likely not reach the site because of the distance and developments between the shoreline and this site. A near or far field tsunami propagating into Newport Bay proper would likely cause a seiche or standing wave on the order of 1.3 feet traveling within the bay. Even at the highest anticipated tide in Newport Beach of +7.38’MLLW (+7.20’NAVD88) this shall not result in overtopping of the bulkhead/seawall. Due to its very frequent occurrence, 500 year recurrence interval tsunami should not be considered a significant impact over the life of the proposed structure that it is 75 years. EROSION HAZARD Erosion refers to the wearing or washing away of coastal lands. Beach erosion is a chronic problem along many open ocean shores of the United States. To meet the needs for comprehensive analysis of shoreline movement, the United States Geological Survey has conducted analysis of historical shoreline changes along open ocean sandy shores of the conterminous United States and has produced an Open-File Report 2006-1219 entitled “National Assessment of Shoreline Change Part 3: Historical Shoreline Change and Associated Coastal land Loss Along Sandy Shorelines of the California Coast”. The report looks at survey data of the following periods: 1800s, 1920s-1930s, and 1950s-1970s, whereas the lidar shoreline is from 1998-2002. The report looks at both long-term and short-term changes. According to the report, the average rate of long-term shoreline change for the State of California was 0.2±0.1 m/yr., and accretional trend. The average rate of short-term shoreline change for the state was erosional; with an average rate of -0.2±0.4 m/yr. The seawall location of this site is stabilized and not subject to significant long-term erosion. Review and analysis of historical aerial photographs and field measurements for seawall repairs in the area show no change in the position of the shoreline over the last several decades. The future shoreline changes over the next 75 years are assumed to be the same as in the previous several decades. However, there is a rapid rate of sea level rise predicted in the next 75 years. If that prediction holds true, the rapid sea level rise may accelerate shoreline erosion, but it shall not impact the structure on the subject lot over its economic life. PA2019-051 CONCLUSION In conclusion, flooding, wave runup and erosion will not significantly impact this property over the proposed life of the development. Once the existing seawall/bulkhead is repaired/reinforced in a manner like the one reflected on the enclosed drawing S-2, need for a new shoreline protective devise is not anticipated over the economic life of the proposed development to protect it from flooding, wave runup or erosion. If found not adequate for the actual sea level rise over the next 75 years, the bulkhead assembly allows to be increased in height per the enclosed STD-601-L without further seaward encroachment. If during this period the seawall displays any sign of distress that requires immediate attention, it should be repaired or replaced at the time accordingly, without seaward encroachment from its current location. The above conclusion was prepared based on the existing conditions, proposed drawings, current projection of future sea level rise, and within the inherent limitations of this study, in accordance with generally acceptable engineering principles and practices. We make no further warranty, either expressed or implied. William Simpson & Associates, Inc. appreciates the opportunity to work with you towards the successful completion of your project. Should you have any questions regarding this report, please give us a call. Respectfully submitted, Soha Mirzahosseinkashani, P.E. Masoud Jafari, S.E. Project Manager Principal Enclosures: Location Map Aerial View Topographic Survey Map Architectural Slab Edge Plan A1.1 Preliminary Grading Plan C-1 Table 28: Projected Sea-Level Rise (in feet) for Los Angeles Architectural Building Elevation A5.1 & A5.2 Datums for Newport Bay Entrance Figure 3.1 PA2019-051 Figure 3.2 Newport Beach OE S Quadrangle Detail For Raising Bulkheads STD-601-L Reinforcing Existing Sewall S-0 Thru S-2 PA2019-051 PA2019-051 "UL WILLIAM SIMPSON & ASSOCIATES, INC. ~ CONSUL TING STRUCTURAL ENGINEERS 23 HARBOR ISLAND RD NEWPORT BEACH, CA 92660 JOB . 7168-2 SHT. 23 ORCHARD , SUITE 250 LAKE FOREST , CA 92630 DES . SK P (949) 206-9929 f--------------------+------- F (949) 206-9955 DATE 02/14 /19 PROJECT SITE LOCATION MAP PA2019-051 UL WILLIAM SIMPSON & ASSOCIATES, INC. ~ CONSUL TING STRUCTURAL ENGINEERS 23 HARBOR ISLAND RD NEWPORT BEACH, CA 92660 JOB. 7168-2 SHT. 23 ORCHARD , SUITE 250 LAKE FOREST, CA 92630 DES. SK P (949) 206-9929 1--------------------+------- F (949) 206-9955 DATE 02 /14 /2019 AERIAL VIEW PA2019-051 5'-8"41'-91 2"23'-4"48'-9"38'-1112"7'-2"32'-01 2" 6" 41'-4"5'-8"92'-1"4'-4"9'-912"20'-0"19'-0"4'-0 9 16" 1'-5"9'-2"7'-2"1'-101 4"9'-2" 6"9'-3"10'-3"39'-0"2'-9"6"5'-1"1'-101 4"19'-6"9'-0"23'-4"4'-2"4'-512"92'-1"18'-10"8'-612"10'-4"19'-6"1'-11" 3'-8"8" 19'-11" 16'-3"3"3"9" 10"20'-712"4'-612"10'-3"612"4'-812"10"10"13'-5"1'-0" 4" 8"1'-0" 8" 16'-4"3'-2" 5'-31 2"13'-3" 4'-4"2'-2"1'-412"2'-4"5'-11"61 8"4'-0" Setback 4'-21 8" 3'-6 1 16"15'-0" Setback15'-0"11'-3"11'-3" Setback15'-0" Setback4'-0" Setback 4'-0" Setback 2'-9" 10"4'-1"41 2" 41 2"4'-1"1'-10" 6"4'-0 5 16" 4'-2 1 16" 4'-0" Setback 3'-2 1 16"10"41 2"4'-1"1'-10"13'-9"6"2'-0"6"6" 12'-4"10'-8"1012"3'-2"14'-1112"6"20'-3" 15'-3"4'-11"5'-21 2"51 2"6'-0"4'-812"6'-012"10'-9"21'-612"10"512"6" 6"SlopeConcrete Garage Slab,See StructuralConcreteCurb TypicalT.O. Curb13.70'ConcreteCurb TypicalT.O. Curb13.70'ElevatorPitT.O. Slab13.20'ConcreteSlab TypicalConcreteSlab TypicalConcreteSlab TypicalConcreteSlab Typical1'-31 2"6'-31 2"ConcreteSlab TypicalConcreteCurb TypicalT.O. Curb13.70'ConcreteCurb TypicalT.O. Curb13.70'6" 6"6"6"12'-1"T.O. Slab12.534'6"6"2'-0" 6"512"6"9"5'-612"9'-3"5'-812"10'-812"612"512"7'-2"6'-10"19'-4"ConcreteCurb TypicalT.O. Curb13.70'ConcreteCurb TypicalT.O. Curb13.70'6'-5"18'-11"412"17'-7"1'-7"6" 20'-6"4"6" 6"18'-1112"412"17'-7"1'-012"612"6"6"6"6"6"5"1"6"2'-2"6" 2'-6"16'-4"T.O. Slab-6"1'-2" 6" 6"Pool EquipmentClosetFD9'-01 2"3'-0"T.O. Slab13.20'ConcreteCurb TypicalT.O. Curb13.70'T.O. Slab13.20'T.O. Slab13.20'3'-8"2'-334"5'-2"2'-334"1'-112"10'-8"6"3'-2"6"6"10'-3"6"20'-0" Minimum ConcreteEncased Electrode13.00'GFF12.80'GFFSlab Edge PlanSCALE: 1/4" = 1'-0"SLAB EDGEPLANPLOT REFERENCE DATE: 02-18-19SHEET NUMBER:503 32ND STREET, SUITE 130TELEPHONE: (949) 999-3255NEWPORT BEACH, CA 92663FAX: (949) 999-3259STAMP:TELEPHONE:FAX:A1.1SHEET TITLE:‹RITNER GROUP, INC. 2019 expressly reserves allcommon law copyright and property rights in these plans.These plans are not to be reproduced, changed orcopied in any form or manner whatsoever, nor are theyto be assigned to any third party without first obtaining the express written permission and consent ofRITNER GROUP, INC.PROJECT DESIGNER:PROJECT CAD FILE:PROJECT NUMBER:DRAWN BY:PROJECT MANAGER:18001-PLN-FLOORO:\2018-PROJECTS\18001\CD\18001-PLN-FLOOR February 15, 2019 RRBW18001Lot 22, Tract 802CDP Submittal 02-18-19 PROJECT:BUILDING DEPARTMENT SUBMITTAL: -REVISIONS:1- -2- -SLOPETO DRAINSLOPE TO DRAIN 1/8" PERFOOT U.N.O.FINISH SLAB TO FINISH SLABDIMENSION NOTE: REFER TOCIVIL DRAWINGS FORADDITIONAL SLAB ELEVATIONINFORMATIONSLAB LEGEND1. THIS ARCHITECTURAL FOUNDATION PLAN IS FORDIMENSIONAL INFORMATION ONLY. THECONTRACTOR SHALL REFER TO THE STRUCTURAL FOUNDATION PLAN FOR ALL STRUCTURAL REQUIREMENTS. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT IF THERE IS ANY DISCREPANCY BETWEEN THE ARCHITECTURAL FOUNDATION PLAN AND THE STRUCTURALFOUNDATION PLAN.2. FOOTINGS SHALL BE EXAMINED AND CERTIFIED IN WRITING BY THE PROJECT SOIL / GEOLOGY ENGINEER PRIOR TO EMA INSPECTIONS AND PLACEMENT OF CONCRETE.3. VERIFY ALL INFORMATION REGARDING CONCRETE SLAB, FOUNDATION, AND RETAINING WALLS, WITH STRUCTURAL AND CIVIL ENGINEER'S DRAWINGS.SLAB NOTES4. REFER TO STRUCTURAL DRAWINGS FOR SHEAR WALLS AND HOLD DOWN LOCATIONS AND SIZES.5. DEPRESSED SLAB FOR MATERIAL THICKNESS REFERTO LEGEND.6. PROVIDE ELECTRICAL CONDUIT BELOW SLAB FOR FLOOROUTLETS, KITCHEN ISLAND OUTLETS AND APPLIANCES.VERIFY LOCATION WITH INTERIOR DESIGN DRAWINGS7. SURVEYOUR TO FILE A CORNER RECORD OF SURVEY WITH THE OFFICE OF COUNTY SURVEYOR. EVIDENCE OF FILING SHALL BE SUBMITTED TO BUILDING INSPECTOR PRIOR TO FOUNDATION INSPECTION.PA2019-051 8" W 8" SLOT 23TRACT NO. 802M.M. 24/7LOT 22CLLOT 24N52°44'03"W 50.15'N32°56'52"E 153.95'N32°56'56"E 157.71'N57°02'06"W 50.01'LOT 4LOT 5LOT 6NEWPORT BAY[BASIS OF BEARINGS] HARBOR ISLAND ROADGARAGEF.F.=13.32T/SLAB=_____SPA13 9 A v e n i d a N a v a r r oS a n C l e m e n t e , C A 9 2 6 7 29 4 9 . 4 9 2 . 8 5 8 6w w w . t o a l e n g i n e e r i n g . c o mC I V I L E N G I N E E R I N GL A N D S U R V E Y I N GSTORMWATER QUALITYNOTE TO CONTRACTOR:CIVIL ENGINEER OF RECORD APPROVAL REQUIRED PRIOR TOBACKFILL OF ALL DRAIN PIPES, CONTACT CIVIL ENGINEER TOFIELD VERIFY LOCATION, SIZE, AND DEPTH OF DRAIN SYSTEM.TOPOGRAPHIC SURVEY BY:APEX LAND SURVEYING INC.HUNTINGTON BEACH, CA 92646TEL: (714) 488-5006SCOPE OF WORKCITY OF NEWPORT BEACH NOTESDETAILBOTTOMLESS TRENCH DRAINCONSTRUCTION NOTESKEYNOTESPA2019-051 Probabilistic Projections (in feet) (based on Kopp et al. 2014) H++ scenario (Sweet et al. 2017) *Single scenario MEDIAN LIKELY RANGE 1-IN-20 CHANCE 1-IN-200 CHANCE 50% probability sea-level rise meets or exceeds… 66% probability sea-level rise is between… 5% probability sea-level rise meets or exceeds… 0.5% probability sea-level rise meets or exceeds… Low Risk Aversion Medium - High Risk Aversion Extreme Risk Aversion High emissions 2030 0.3 0.2 - 0.5 0.6 0.7 1.0 2040 0.5 0.4 - 0.7 0.9 1.2 1.7 2050 0.7 0.5 - 1.0 1.2 1.8 2.6 Low emissions 2060 0.8 0.5 - 1.1 1.4 2.2 High emissions 2060 1.0 0.7 - 1.3 1.7 2.5 3.7 Low emissions 2070 0.9 0.6 - 1.3 1.8 2.9 High emissions 2070 1.2 0.8 - 1.7 2.2 3.3 5.0 Low emissions 2080 1.0 0.6 - 1.6 2.1 3.6 High emissions 2080 1.5 1.0 - 2.2 2.8 4.3 6.4 Low emissions 2090 1.2 0.7 - 1.8 2.5 4.5 High emissions 2090 1.8 1.2 - 2.7 3.4 5.3 8.0 Low emissions 2100 1.3 0.7 - 2.1 3.0 5.4 High emissions 2100 2.2 1.3 - 3.2 4.1 6.7 9.9 Low emissions 2110* 1.4 0.9 - 2.2 3.1 6.0 High emissions 2110* 2.3 1.6 - 3.3 4.3 7.1 11.5 Low emissions 2120 1.5 0.9 - 2.5 3.6 7.1 High emissions 2120 2.7 1.8 - 3.8 5.0 8.3 13.8 Low emissions 2130 1.7 0.9 - 2.8 4.0 8.1 High emissions 2130 3.0 2.0 - 4.3 5.7 9.7 16.1 Low emissions 2140 1.8 0.9 - 3.0 4.5 9.2 High emissions 2140 3.3 2.2 - 4.9 6.5 11.1 18.7 Low emissions 2150 1.9 0.9 - 3.3 5.1 10.6 High emissions 2150 3.7 2.4 - 5.4 7.3 12.7 21.5 STATE OF CALIFORNIA SEA-LEVEL RISE GUIDANCE APPENDIX 3: SEA-LEVEL RISE PROJECTIONS FOR ALL 12 TIDE GAUGES | 72 TABLE 28: Projected Sea-Level Rise (in feet) for Los Angeles Probabilistic projections for the height of sea-level rise shown below, along with the H++ scenario (depicted in blue in the far right column), as seen in the Rising Seas Report. The H++ projection is a single scenario and does not have an associated likelihood of occurrence as do the probabilistic projections. Probabilistic projections are with respect to a baseline of the year 2000, or more specifically the average relative sea level over 1991 - 2009. High emissions represents RCP 8.5; low emissions represents RCP 2.6. Recommended projections for use in low, medium-high and extreme risk aversion decisions are outlined in blue boxes below. *Most of the available climate model experiments do not extend beyond 2100. The resulting reduction in model availability causes a small dip in projections between 2100 and 2110, as well as a shift in uncertainty estimates (see Kopp et al. 2014). Use of 2110 projections should be done with caution and with acknowledgement of increased uncertainty around these projections. PA2019-051 T.O.SHTGEL.23.93'KitchenT.O SlabEL.13.20'CEILING 33.26'12.84 FS12.42 NG9'-6"GarageT.O SlabEL.12.70'KitchenT.O SlabEL.13.20'7'-21 4" 9'-4"8'-11 2"HDR EL.31.12'TPL EL.22.70'HDR EL.21.325'12.93 FSANGEL.12.63'29'-0"Maximum Building HeightEL.41.63'TPL EL.34.60'10'-8"126.5126.15EL.41.63'KitchenT.O SlabEL.13.20'CEILING 33.26'9'-4"8'-11 2" 29'-0"HDR EL.21.325'9'-6"HDR EL.31.12'7'-21 4"KitchenT.O SlabEL.13.20'T.O.SHTGEL.23.93'GarageT.O SlabEL.12.70'TPL EL.22.70'TPL EL.34.60'10'-8"EL.12.63'EL.41.63'Maximum Building HeightLeft Side ElevationSCALE: 1/4" = 1'-0"BUILDINGELEVATIONSPLOT REFERENCE DATE: 06-01-18SHEET NUMBER:503 32ND STREET, SUITE 130TELEPHONE: (949) 999-3255NEWPORT BEACH, CA 92663FAX: (949) 999-3259STAMP:TELEPHONE:FAX:A5.1SHEET TITLE:‹RITNER GROUP, INC. 2018 expressly reserves allcommon law copyright and property rights in these plans.These plans are not to be reproduced, changed orcopied in any form or manner whatsoever, nor are theyto be assigned to any third party without first obtaining the express written permission and consent ofRITNER GROUP, INC.PROJECT DESIGNER:PROJECT CAD FILE:PROJECT NUMBER:DRAWN BY:PROJECT MANAGER:18001-PLN-ELEVO:\2018-PROJECTS\18001\CD\18001-PLN-ELEV June 1, 2018 RRBW18001Lot 22, Tract 802Progress Set 06-01-18 PROJECT:BUILDING DEPARTMENT SUBMITTAL: -REVISIONS:1- -2- -SCALE: 1/4" = 1'-0"ELEVATION NOTESROOFING MATERIAL:EXTERIOR FINISH: PAINTED CEDAR SHINGLESBRICK VENEER: 2" THICK CUT BRICK VENEER PER C.B.C.REQUIREMENTSBUILDING PAPER: PROVIDE A MINIMUM OF TWO LAYERS OFGRADE "D" PAPER OVER ALL WOOD BASEDSHEATHING. AND UNDER ALL GROUT BASEMASONRY VENEERS. C.B.C. SECTION 1402.1FIRE-RETARDANT-TREATED WOOD SHINGLESBY: FSR TREATMENT, INC ESR-1410No. 1 GRADE WESTERN RED CEDAR SHINGLESCOMPLYING WITH IBC SECTION 1508.9.6 ANDSECTION 4.1 OF THE ESR-1410 REPORT, OVERSOLID SHEATHING COVERED WITH ONE LAYER OF1/4 " THICK DENS-DECK ROOF BOARDMANUFACTURED BY GEORGIA PACIFIC CORP.BUILT-UP ROOF (CLASS "A")MODIFIED BITUMEN ROOFING OVEREXTERIOR GRADE ROOF SHEATHING1/4":12" MINIMUM SLOPE U.N.O.DOORS / WINDOWS: WOOD WINDOWS AND DOORSBY: "WOODWORKS ETC., INC."SEMI-TRANSPARENT STAINCOLOR:(3) COATSVAPOR BARRIER: PROVIDE VAPOR BARRIER AROUND ALL WALLPENETRETIONS INCLUDING DOORS, WINDOWSAND VETS PER DETAILS.GUTTERS /DOWNSPOUTS:5" DIAMETER HALF ROUND COPPER GUTTEREAVES,RAFTER TAILS,& BEAMS STAIN:SEMI-TRANSPARENT STAINCOLOR:(3) COATSGARAGE DOORS& GATES:SEMI-TRANSPARENT STAINCOLOR:(3) COATSDOORS / WINDOWS: STEEL WINDOWS AND DOORSBY:"STEELWORKS ETC., INC."FACTORY FINISHCOLOR:CHIMNEYTERMINATION:CHIMNEY SHALL EXTEND AT LEAST 2'-0" HIGHERTHAN ANY PORTION OF THE BUILDING WITHIN10'-0", BUT SHALL NOT BE LESS THAN 3'-0" ABOVETHE HIGHEST POINT WHERE THE CHIMNEYPASSES THROUGH THE ROOF.ADDRESS:ADDRESSES SHALL BE PLAINLY VISIBLE ANDLEGIBLE FROM THE STREET FRONTING THEPROPERTY. ADDRESS NUMBERS SHALL BE 4INCHES IN HEIGHT, 1/2" MINIMUM STROKE WIDTHAND OF CONTRASTING COLOR TO THEIRBACKGROUND. R319.1 CRC.1WOOD SHINGLE ROOF2GUTTER / DOWNSPOUT34WOOD TRIM5WOOD CORBEL6789WOOD COLUMN10ELEVATION KEY NOTES111213141516WOOD POSTBUILT-UP WOOD FACIAWOOD BRACKET1718METAL ROOFWOOD RAFTER TAILSBOXED WOOD BEAMWOOD SHINGLESTHIN BRICK WALL VENEERFULL BRICK FACINGMETAL GUARDRAIL - REFER TO DETAILMETAL HANDRAIL- REFER TO DETAILSTAIR - REFER TO DETAIL1920212223WOOD ENTRY DOORWOOD GARAGE DOORWOOD SHUTTER242526WOOD DOOR / WINDOWSTEEL DOOR / WINDOWPLANTER WALL - REFER TO LANDSCAPE PLANS27DECORATIVE LIGHT FIXTUREBUILDING ADDRESSFLATWORK - REFER TO LANDSCAPE PLANSTHE MINIMUM REQUIRED TOP OF SLAB ELEVATION FORINTERIOR LIVING AREAS OF ALL NEW STRUCTURESSHALL BE AT LEAST 9.00 (NAVD 88). THE HEIGHT OF APRINCIPAL STRUCTURE SHALL BE MEASURED FROM THEMINIMUM REQUIRED TOP OF SLAB ELEVATION.NOTE:ALL PRIVATE IMPROVEMENTS IN THE SOUTH BAY FRONTRIGHT -OF WAY REQUIRE AN ENCROACHMENTAGREEMENT WITH THE PUBLIC WORKS DEPARTMENTPER COUNCIL POLICY L-6FOUNDATION: THE TOP ELEVATION OF THE CONCRETEPERIMETER WALL OF THE FOUNDATION SHALL BESET AT A MINIMUM ELEVATION OF 9.5 FEETNAVD88 TO ACCOMMODATE A POTENTIAL RISE INSEA LEVEL.SEA LEVEL RISE: ADAPTATION MEASURES TO MINIMIZE HAZARDSOF LIFE AND PROPERTY FROM POTENTIALFLOODING FROM SEA LEVEL RISE TO INCLUDEFLOOD PROOFING THE FIRST FLOOR AND SANDBAG BARRIERS LOCATED AT THE DOORLOCATIONS.BUILT-UP "CLASS A" ROOFFront ElevationPA2019-051 TPL EL.22.70'HDR EL.31.12'9'-6"12.68 FS9'-4"8'-11 2" 29'-0"EL.41.63'T.O. SHTGEL.23.93'CEILING 33.26'KitchenT.O SlabEL.13.20'KitchenT.O SlabEL.13.20'HDR EL.21.325'7'-21 4"TPL EL.34.60'10'-8"Maximum Building Height12126.15KitchenT.O SlabEL.13.20'HDR EL.31.12'8'-11 2"6.5EL.41.63'T.O.SHTGEL.23.93'9'-6"TPL EL.22.70'HDR EL.21.325'7'-21 4" 29'-0" 9'-4"KitchenT.O SlabEL.13.20'CEILING 33.26'TPL EL.34.60'10'-8"Maximum Building HeightRight Side ElevationSCALE: 1/4" = 1'-0"BUILDINGELEVATIONSPLOT REFERENCE DATE: 06-01-18SHEET NUMBER:503 32ND STREET, SUITE 130TELEPHONE: (949) 999-3255NEWPORT BEACH, CA 92663FAX: (949) 999-3259STAMP:TELEPHONE:FAX:A5.2SHEET TITLE:‹RITNER GROUP, INC. 2018 expressly reserves allcommon law copyright and property rights in these plans.These plans are not to be reproduced, changed orcopied in any form or manner whatsoever, nor are theyto be assigned to any third party without first obtaining the express written permission and consent ofRITNER GROUP, INC.PROJECT DESIGNER:PROJECT CAD FILE:PROJECT NUMBER:DRAWN BY:PROJECT MANAGER:18001-PLN-ELEVO:\2018-PROJECTS\18001\CD\18001-PLN-ELEV June 1, 2018 RRBW18001Lot 22, Tract 802Progress Set 06-01-18 PROJECT:BUILDING DEPARTMENT SUBMITTAL: -REVISIONS:1- -2- -SCALE: 1/4" = 1'-0"ELEVATION NOTESROOFING MATERIAL:EXTERIOR FINISH: PAINTED CEDAR SHINGLESBRICK VENEER: 2" THICK CUT BRICK VENEER PER C.B.C.REQUIREMENTSBUILDING PAPER: PROVIDE A MINIMUM OF TWO LAYERS OFGRADE "D" PAPER OVER ALL WOOD BASEDSHEATHING. AND UNDER ALL GROUT BASEMASONRY VENEERS. C.B.C. SECTION 1402.1FIRE-RETARDANT-TREATED WOOD SHINGLESBY: FSR TREATMENT, INC ESR-1410No. 1 GRADE WESTERN RED CEDAR SHINGLESCOMPLYING WITH IBC SECTION 1508.9.6 ANDSECTION 4.1 OF THE ESR-1410 REPORT, OVERSOLID SHEATHING COVERED WITH ONE LAYER OF1/4 " THICK DENS-DECK ROOF BOARDMANUFACTURED BY GEORGIA PACIFIC CORP.BUILT-UP ROOF (CLASS "A")MODIFIED BITUMEN ROOFING OVEREXTERIOR GRADE ROOF SHEATHING1/4":12" MINIMUM SLOPE U.N.O.DOORS / WINDOWS: WOOD WINDOWS AND DOORSBY: "WOODWORKS ETC., INC."SEMI-TRANSPARENT STAINCOLOR:(3) COATSVAPOR BARRIER: PROVIDE VAPOR BARRIER AROUND ALL WALLPENETRETIONS INCLUDING DOORS, WINDOWSAND VETS PER DETAILS.GUTTERS /DOWNSPOUTS:5" DIAMETER HALF ROUND COPPER GUTTEREAVES,RAFTER TAILS,& BEAMS STAIN:SEMI-TRANSPARENT STAINCOLOR:(3) COATSGARAGE DOORS& GATES:SEMI-TRANSPARENT STAINCOLOR:(3) COATSDOORS / WINDOWS: STEEL WINDOWS AND DOORSBY:"STEELWORKS ETC., INC."FACTORY FINISHCOLOR:CHIMNEYTERMINATION:CHIMNEY SHALL EXTEND AT LEAST 2'-0" HIGHERTHAN ANY PORTION OF THE BUILDING WITHIN10'-0", BUT SHALL NOT BE LESS THAN 3'-0" ABOVETHE HIGHEST POINT WHERE THE CHIMNEYPASSES THROUGH THE ROOF.ADDRESS:ADDRESSES SHALL BE PLAINLY VISIBLE ANDLEGIBLE FROM THE STREET FRONTING THEPROPERTY. ADDRESS NUMBERS SHALL BE 4INCHES IN HEIGHT, 1/2" MINIMUM STROKE WIDTHAND OF CONTRASTING COLOR TO THEIRBACKGROUND. R319.1 CRC.1WOOD SHINGLE ROOF2GUTTER / DOWNSPOUT34WOOD TRIM5WOOD CORBEL6789WOOD COLUMN10ELEVATION KEY NOTES111213141516WOOD POSTBUILT-UP WOOD FACIAWOOD BRACKET1718METAL ROOFWOOD RAFTER TAILSBOXED WOOD BEAMWOOD SHINGLESTHIN BRICK WALL VENEERFULL BRICK FACINGMETAL GUARDRAIL - REFER TO DETAILMETAL HANDRAIL- REFER TO DETAILSTAIR - REFER TO DETAIL1920212223WOOD ENTRY DOORWOOD GARAGE DOORWOOD SHUTTER242526WOOD DOOR / WINDOWSTEEL DOOR / WINDOWPLANTER WALL - REFER TO LANDSCAPE PLANS27DECORATIVE LIGHT FIXTUREBUILDING ADDRESSFLATWORK - REFER TO LANDSCAPE PLANSTHE MINIMUM REQUIRED TOP OF SLAB ELEVATION FORINTERIOR LIVING AREAS OF ALL NEW STRUCTURESSHALL BE AT LEAST 9.00 (NAVD 88). THE HEIGHT OF APRINCIPAL STRUCTURE SHALL BE MEASURED FROM THEMINIMUM REQUIRED TOP OF SLAB ELEVATION.NOTE:ALL PRIVATE IMPROVEMENTS IN THE SOUTH BAY FRONTRIGHT -OF WAY REQUIRE AN ENCROACHMENTAGREEMENT WITH THE PUBLIC WORKS DEPARTMENTPER COUNCIL POLICY L-6FOUNDATION: THE TOP ELEVATION OF THE CONCRETEPERIMETER WALL OF THE FOUNDATION SHALL BESET AT A MINIMUM ELEVATION OF 9.5 FEETNAVD88 TO ACCOMMODATE A POTENTIAL RISE INSEA LEVEL.SEA LEVEL RISE: ADAPTATION MEASURES TO MINIMIZE HAZARDSOF LIFE AND PROPERTY FROM POTENTIALFLOODING FROM SEA LEVEL RISE TO INCLUDEFLOOD PROOFING THE FIRST FLOOR AND SANDBAG BARRIERS LOCATED AT THE DOORLOCATIONS.BUILT-UP "CLASS A" ROOFRear ElevationPA2019-051 PA2019-051 PA2019-051 PA2019-051 --"' ~ ~ :0 "' ..0 e a. 8 1 - C: .§ 0.5 - "' 8 X UJ ~ N .c 1 0- 0: 1-z _Q ,'f I C: "' 7 -0.5 ~ 0 ll) D Los Angeles, 1982/83-2006/07 0 0 0 0 R2=0.72, p<0.05 - - - -1 '---~~~~-'''--~~~~..1'~~~~~-1.......'~~~~-'''--~~~~...1.'~~~~------' -3 -2 -1 0 1 2 3 Oceanic Nino Index (ONI) ror Dec-Jan-Feb ("C) Figure 3. I. A plot of 2o/o exceectance probability NTR versus ONI shows significant correlation (R2=0.72, p<0.05), but note that NTR exceeding 0.5 ft have also occurred during weak El Nino and El Nino neutral winters (O<ONI<l ). PA2019-051 ~ I - ' 6 - 5.5 '-----''---'--• __ ,....._. _ _J_' __ _.. _ __,,.___ ...... __ ...... ---'''----'-'--"---'--'---' 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Figure 3.2. Monthly maximum high tides for Los Angeles between 2008 and 2020. There are two peaks per year corresponding to maximum high tides in summer and winter. Note also the 4.4 year cycle reported by Zetler and Flick (1985) and Flick (1986). Newport BeachNewport Beach Costa MesaCosta MesaCosta MesaCosta MesaHuntington BeachHuntington Beach ¬«1 ¬«55 ¬«1 ¬«55 117°52’30"W 117°52’30"W 117°55’0"W 117°55’0"W 117°57’30"W 117°57’30"W 118°0’0"W 118°0’0"W 33°37’30"N 33°37’30"N 33°35’0"N 33°35’0"N 33°32’30"N 33°32’30"N 33°30’0"N 33°30’0"N 407000mE 407000mE 08 08 09 09 410 410 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 419000mE 419000mE3707000mN 3707000mN08 08 09 09 3710 3710 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 3720 37203721000mN3721000mN This information is being made available for informational purposes only. Users of this information agree by their use to hold blameless the State of California, and its respective officers, employees, agents, contractors, and subcontractors for any liability associated with its use in any form. This work shall not be used to assess actual coastal hazards, insurance requirements, or property values and specifically shall not be used in lieu of Flood Insurance Studies and Flood Insurance Rate Maps issued by the Federal Emergency Management Agency (FEMA). Data Sources: US Geological Survey, Department of Commerce (DOC), National Oceanic and Atmospheric Administration (NOAA), National Ocean Service (NOS), Coastal ServicesCenter (CSC), Scripps Institution of Oceanography, Phillip WIlliams and Associates, Inc. (PWA), US Department of Agriculture (USDA), California Coastal Commission, and National Aeronautics and Space Administration (NASA). Imagery from ESRI and i-cubed. Created by the Pacific Institute, Oakland, California, 2009. California Flood Risk: Sea Level Rise 00.511.520.25 Miles 01230.5 Kilometers 1: 2: 3: 4: 5: 6: 7: 8: Seal Beach Newport Beach Tustin not printed Laguna Beach not printed not printed not printed867 1 2 3 54 §¨¦ £¤ ") ¬« Interstate US Highway State Highway County Highway Grid coordinates: UTM Zone 11N meters Adjoining Quadrangles: Map extents match USGS 7.5 minute topographic maps Project funded by the California Energy Commission’s Public Interest Energy Research Program, CalTrans, and the California Ocean Protection Council Newport Beach OE S Quadrangle NAD83 GCS degrees Coastal Zone Boundary Current Coastal Base Flood (approximate 100-year flood extent) Sea Level Rise Scenario Coastal Base Flood + 1.4 meters (55 inches) Landward Limit of Erosion High Hazard Zone in 2100 PA2019-051 PA2019-051 PA2019-051GENERAL REQ .. REIIENTS 1. CONSTRUCTION SHAU.BE IN CONFORMITY'MlH THE 20ISEDITION OF THE CALFCIRNIABIACIINGCODE(C8C)ANDAU.APPUCAIILELOCALANDSTATE 2. ~~,.:=IN~~TRACTOR SHALL EXAMINE lHE PRO.ECT SITE 4t SHAU.~AU.OIMENS10N_;LOCAT10NSaEL.EVAT10NSOf1HEEXIS11NG J. CONTRACTOR SHALL PROWIE BARRICADES AND PEDESlRIAN PROTECTION AS RtOJIREO 8Y STATE AND LOCAL COO(S. .. &=:r=~~~..:-~~~~,~~~ra:.~ at CONtCCllNGTOSE'IIER,PIPINOOR'MRING,ETC.,ANDRCPORTANYPROet.DIS TOlHEENGfrlEER. 5. CONTRACTOR SHALL FULLY PROTECT ALL AOJACOIT PROPERTIES BEFORE COMMENCING ANY WORK. 6. OMISSIONS OR CONFUCTSBET1IEDI VARIOUSD.EMDITSOF THEDRA .. GS. NOTES. ANO DETALS SHALL BE 8ROUGHT TO THE ATTENTION OF THE ENoatEER 7, =TR~..a>~°':.~':.i_~~~LEIS~CRESTNITOFJCe. 8. ~~,:t~0~AILS ON ORAWICS SHALL TN<E PRECEOENCE 01/ER 11-£SE 9. TYPICALDCT,tJLSSHO'M<ISHALLAPA.Y'IIHERENOSPCCIALDETAILISSHO'Mrl. 'ff£REA0£TAL.1'rPICALOOAL.SECTION,T'rl'ICALSECllON,0RANOlEIS SHO'M'trORONECONOlllON,ITSHAU.AI.SOAPPLYFCIRAU.UKEORSIMIL.AR COICll'IIONS LIPLESS NOlED OTIER'MSE. IO. =~=:i~~=~~c:s,OR~,:f'~;:~~S. 11. WRITTEN DIMENSIONS (NOT SCALED DIMENSIONS) SHALL BE USED. 12.TEMPORARYERECllONBRACINGANDSHORIHGSHAU.BEPRO\IIDEDASAEOJIRED ON AU. SlRUClURES, ADEQUATE TO PROWlC RJU. STRUClUFIAI. STAIIIJTY AND ~ClEl)~oGJ:r.ALLNOT8EREIIO'oUIUNTIL1HEEI.EMENTSME:FUI.LY 13.~~~ 19.AU.UT.M.SPECIF'ICATIONSNOTEOONTHEORA'MNGSSHAU.BEltACCORON<ICE 'MlHTHELATtSTISSUEOFTHEA.S.T.M. 20. OBSERVAllON l/lSITS TO THE PRo.ECTSITE BY TiiE ENGINEER SHALL NOTIIE COHSlROEO AS NIIY IN!ffCTION AS REQIMIED 8YOOOE. FOUNDATIONS I. ~ ~'e~I:~~ ~= ,:'-~~: ~DRA~:.ocao •nt 2. FOOTINGS SHALL 8EAR ON NAlURAI. UNOISTUA8EO u.llFORM EARflol QR ENOltCEREO 3. ~==~ S1EB. ANO NO CONCRE'IE SHAU. 8E Pl.ACED l<I ANY EXCAVATION PRIORTOAPPROVAL8YlHE8UILOINGOEPARTMENT. 4. THE TOP OF AU. EXCAVA1l0NS SHALL 8E PRO'IECTED AGAINST HEAVY~~ SOI..S REPORT PREPARED 8~ .•••..••• -••. G3SCll.WORl(S, INC. ADDRESS: ,_ ......................................................... -... 350 FISHER A'-£ FRONT COSTA MESA, CA 92827 PHONE NI.JlaR: ................................................. -............... (714) FAXHUM8ER: ............................................................ ... SOI..S REPORT DATE: ...................................... -............... OCTOEIER 2e, 2017 SOI..S REPORT PRo..ECTNUM8ER: ·-••····-·······-······1-1118 GRADING NDTBS I. THE ANTICIPATED TOTAL \IQJJME OF CUT ANO Fl.J. FOR SEAWALL CONSlRUCllON ON 11-tSPRO..ECTISMCWIE lHAN il!OCU81CYAROS. flolUS,GRADINGPOIMITIS REQUIREO-SEEITEM28ELQW. 2. ~,.:~N~~J;la~.=..RJi=1~s~.if.:1~~ GRADINGONflolESHCWIESl>EOFflolEIIULKHEAO. S0iECM.U048HQl.ltSPRIQRTOSTARTOF UPRESCNT:O'lltlER.GRAOMOCONTRACTOR, ~ ~~~f~u.GR:14:J::r:rr'~ SHAU. 8E INSPECTED .l APf'ROllm 8Y lHE TOPLACINGCONCAElE. 8. TEMP<RARYEROSIQH conRa..PLANSAREREQUIREDFROU OCTQ8ER 15 TO MAY 15. 9. :~l~ CONTRQL D£WXS SHALL 8E AVAILAEILE ON·SllE 8ET'IEEN OCTOEIER 15 ANO .• 11. LNIOSCAPl<IO PL.ANS SHALL BE SU8MITTEO FQR .-PPROVAL., WORK COMPLETED ANO A CERTFICA 'IE OF CONF'QRMAHCE RECEM'.O 8Y flolE CITY ~AOINO ENGINEER PRIOR TO a.o5UREOFPERMIT,UNl..ESSWAl',£08YTHECITYGRAlllNGENGINEER. 12.1EMP<RARYOESILT1NG8ASIHS.'M£NREOUIRE0,SHALL8El<ISTAI..LEDANO 13. ::.~~ ~!'~~R~~fl,l~p~C:i.TUM. STRUCTURAL GENERAL NOTES BACKFLLING • COMPACTION NOTH 1. AU.8ACICf1U.SHALLCONFORMTOflolESOILSENGINEER'SREPORTANO 2. :i~M=:-:-ACKFI.J. ANO ANY 01HER 8ACKFI.J. MUST 8E MECliANICAI..LY OOMPACTED • .ETTING ANO FLOODING SHALL NOT 8E PERMITTED. 3. WHERE WAL.LS ARE BACKF'IJ..ED ON ONE SIDE ONLY~_!°fl~_SH_?lf'.'G.~ ar: "' •flolflolEREOUIREMENTSOFTHEC8CAPPOIOIXSECT1QHJJ13. 5. Fl.1ERQ.01HSHAU.8EMIRAF114Ctl-SERIESNON1IO\etPOL'l'PROP'll.ENEGEOTEX11LE AS MANUFACTURED 8Y ""IC MIRAF1 COMPANY" ANO SHALL 8E MltUJM 2.0' 'CIE AND . USE HEAVY COMPACTION EQUIPMENT 'lllflollN 20 FEET OF THE 8Ul..lOtEAO. 9. ONSl1EEIROICENCOfCRElt.tACPAVINGMAY8EUSEOASFIU.PROIIIOEOIT DOES NOT EXCEED 8 INCHES IN Sl2E ,t; IS NOT STACKED, LAYERED QR Pl.ACED AIIO\£ El.£VA11DN +7.0" ,l IS APAt<MD BY THE GEOlEatNICAI. ENGINEER. CONCRETE 3. CONCRETE OROJT SHAU. HA'-£ flolE SAME OOMPRESSI\IE STRENG1H AS THE OTIO ~~AN:~A~~~l~M~~5Tl~E:CAAN~~· " . SUPERPI..AS1lCIZIHG AOMll(lURE MAY 8E ADDEO TO l<ICJEASE lHE Sl..lJMP TO MAXIMUM 7.!,INQ£S,. OROJTUNOERSTEELCOlUMH8ASEPL.ATESSHALL8E"RAPIO-CET"OR "Fl'-£ STAR OROJr QR Al'PRO'.m EQUAL REINFORCING STEEL AllllEDPERflolECONlRACTOR'SllETAI..S. 5. ........ CONCAE'TE CO\O FM REINFORCING STEEL SHALL 8E ASFOU..OWS, lH..ESS NOTED ·-A)CONCRETE8El.OWORAOEQRINCONTACT'IIITHS01L: 'IIIENCASTAGAINSTEARTHJ". 'IIHENFORMED2". ~l ~~ELDl~Is~Im.~QRFAt:£.1". o) CONCRETE SLAII ON ORADE: AEN'ORCINO S1EB. AT ctNlER OF SLA11. UtU:SS NO'IEO "AUNG SHALL BE IN ACCORDANCE 'llllflol C8C SECTION 1007. eE...-...1&GAUGE,B.AQ(ANNEAl.£D.CONFMt.1NGfOA.$.T.M. AS2. SHM.L 8E l'R£E OF RUST, GREASE OR OTHER MA'IERIALUKO.Y TO ANCHOR RODS l. ~~~E~~~~lU~c:io~~~,:Y5~·r:~Nl~1:c N (09) •lH OOUBl.E ~ PROTECTION. 2. ROO TENSIONING:AFTER BACKFUJNG .I! COMPACllNG TO TOP OF ANCHOR BEN.I. TENSION ROOS TO 1,000f. COMPLETE 8AO<f1U. .I! COMPACTION TO ROUGi GRADE .I! TENSION ROOS TO 5,000f. CONCRl!TI! Rl!PAIR AF1ER flolE ROIFORCINO OF flolE EXISTINO SEAWALL IS COMPI.ETEO IN OOMPUANCE 'lllflol lHE REOIJIICUENTS AS SHO'flN <»I THIS SET OF IIRA._.GS, IT IS REOOMMENOED flolAT lHE <>-..ER SHALL HIRE A COMPANY SPECWJZING .. STRUCTURAL PRES(RVATl<»ITOFIXflolEOJRRENTCRAO(S,WHERETHEYOCCUR,ATTHEE»STING CONCRETE WALL ABBRl!YIA TION8 A.8. .......... ANOiOR ltOLT ADDL •••.•••• AOOITIONAL A.F.F. • ...... ABOVE FINISH FlDOR ALT ............ ALTERNATE ARCHT •.••• ARO-IITEC'nJRAL BET •••••••••••• BE1llEEN BLDG •••••••••• BUUIING BU<G ........ BLOCKING BM ........... BEAM B.N ............ BDUNOARY NAILING BOT ......... BOnOM C ............. CHANNEL CANT ........ CAfHll£VER C.J ••••••••••••• CONSlRUCTION JOINT OR CEILING JOIST CLG ••••••••.•• CEILING CLR .......... a.EAR C.M.U •••••••• CCIICRTE MASCNRY UNT CCN.. ....... COUAIN CONC ...... CONCRETE CONN .... CONNECTION CONT • ••• CCIITINUDUS CONST CCIISTRUCTION CTR ........ CENTER DEil •••••••••• ODU8l.E LLV ........... LONG l£G VERTICAL LONGIT LONGIT\JOINAL LP ............ LOW POINT LT... LIGHT MAll ••••••• MATERIAL MAX .......... MAXIMUM M.B ........... MACH"'E BCN..T MECH ........ MECHANICAL MEZZ ........ MEZZANINE M.F.O. ...... METAL FRAMED OPENIN MIN ....... MINMUM MISC MISCEUANEIDUS Mll ........... METAL {N) .......... NEW N.I.C •••••••••• NOT IN CCtllRACT NO. .......... NUMEIER N.S ........... NELSON STUD OR NEAR SIDE N.T.S. ........ NOT TO SCALE O.C. ....... ON CENTER OF'F ........ OFFICE OPNG ....... OPENING OPP HO ..... OPPOSITE HANO PEN PENETRATION Pl ............. PLATE OR PR<PERTY LINE Pl.YVltl PLYWOOD CITY OF NEWPORT nt:ACII CO.\l.\ll.':'ill'\' DG\'1,L01'"1t:,,,,,-onAMTMt.,TI Blfll.01.~G 1)1\'ISION _, I 1'1<11._.,._.-.,,_,,,,.. __ .. _,o,,.,.-,ca,,,c~-(11.,_.. I TIC-llll-~'1•--Ml-~ ~c,..._~ ...... "'°"IOtOW,~ -• -o,c,-.---ri:i-•,,,.cm (11-----"'CI Cr ___ O,M-lllll~ _.,. ___ .._ ... Dt._ ..... ..-_i:,11 __ . s:~~°!P.~~ 0 OET .......... OETAIL DF •••••••••• DDUGl..AS FIR DIAG ......... DIAGCl<IAL PSF ••••••••••• PDUNOS PER SQUARE FOOT PSI ••••••••••• PDUNOS PER SQUARE .. CH OIAPH • OIAPl«AGM DIA ............ DIAMETER DIM ........... DIMENSION OP ......... DEEP OWGS ...... ORA'MNGS ~~.:·::···::·.WNG E.F. • ........ EACH FACE ELEC ......... ELECTRICAL ELEV ....... ELEVATION EMBED ..... EM8EDMENT, EMBEDOEO E.N. ... EDGE MAUNG EQ ............ EQUAL E.S. .......... EDGE Slot E.W. .......... EACH WAY EXIST... EXISTING EXP •. .• EXPANSION FON .••••.•• FDUNOATION F.f. ... FINISH FLOOR F.G. •••••••••• FINISH GRADE FIN •..•••..•• FINISH F.J. ........... fLDOR JOIST FlG ...... Fl.ANGE FlR •• FLOOR F.N ........... FIELD NAILING F.S. .......... FAR Slot n .... FEET OR FOOT F'TC ....... FOOTING GALV GALVANIZED GA ............ GAUGE GLB •• • •• GLU-LAM 8EAM GLP ........ GlU·LAMPU~ GYP BO G'IPSUM BOARD HOR .......... HEAOER HGR ........ HANGER HORIZ ••••••• HORIZONTAL H.P ........... HIQi POINT HT ••••• HEIGHT H.S. .......... HIGH STRENGTH HSS •••••••••• HCllOW STRUCTURAL SECTION HVAC •• ~~~~a!l~TION ,t IN ........... INCJt INFO •.•••• INF~ATION "' "'" JT •••••••••••• JOINT K.O. ......... KNOCK CUT L ............. AHGI..E LAT ........... LATERAL LOR ........... LEDGER LG •.••••.•••• LONG LU-I ........... LONG l£G HORIZONTAL ._. i ·······" ·------.ctNfERLINE .............. CIIAl«fER • ............. Pl.A1EORPROP£RTYUNE $ .............. S1EPINFOOT1NC P.T ............ PRESARVATIVE TREATED ,000 R8 •..••••.. ROOF BEAN REBAR ••••••• REINFORONG BAR REF .......... REFERENCE REINF ••••••••• REINFORCING RECD .••••.••• REOOIRED REV ............ REVISION RJ .............. ROOF JOIST SCH ........... SCHEDULE SECT ......... SECllON SHTG ••••••••• st£A1HING SHT ........... SHEET SIM ............ SIMILAR S.J. ............ SAWCUT JOINT SPA ........... SPACING SPECS ••••• SPECIFICATIO.. SQ •.••••.••••.• SQUARE STAGG ••••••• STAGGERED STO ........... STANOARO STIFf •.•••..• STIFFENER Sll.. STEEL S.S ............ SELECT STRUCT\JRAL STRUCT ••..• STRUCllRAL S'tM ........... SYMElRICAL T a B ••••••• TOP .I! BOTTOM T a G •• •• TONGUE .I! GROOVE T.8. •••••••••••• TOP OF BEAM T.F ............. TOP OF FOOTING TG .............. TAPERED GIRDER THK •..•••..•••. THICI< THRU .......... THROUGH T.L ............ TOP OF LEOGER T.N ............. TOP OF NAILER TOT •••••••••••• TOTAL T.P ............. TOP OF PAAAPET/PANEL TRANSF' ..... TRANSFER TRANSV ••••• TRANS',£RSE T.S. •••••••• TOP OF SI..AEI/STEEL T.W .••••.••••.• TOP OF WALL T'l'P ........... T'l'PICAL U.N.0 •••••••• UNLESS NOTED OflolERWISE VERT ......... VERTICAL. V.LF .......... VERIFY IN FIELD w ............... 'MOE Fl.ANGE W/ •••••••••••• WITH 'M> ............ WOOD W/0 .......... 'MTHDUT W.P ........... WORK POINT WT ............. \IIEIGHT w.w.F ••••••• YIELDED WIRE FABRIC X ............... EXTRA STRONG XX ••••••••••••• 0DUBl£ EXTRA STRO..G GENERAL SPECIAL INSPECTIONS I. :4&<=i~.r~~ <rs ~cx:ClJ~~~'tc:..i.~:Cft BY A QTY A) SITE CONCRETE WORK (COPING a ANCHOR BEN.I) : ........... NON-coNTINUOUS. 8) 1<1Sf'ECTSl-€ETPU FM LENOflol ,l OAMAOE: ............... NON-CONTIMJOUS. i =.:S:~sr·-~:~~:~:~~:~::::~~:~::::~=~:::~s F) Pl.ING lfSTALLATION :.-................................................... NON-CONTINUOUS. G) HEUCAL ANCliORS INSTALLATION IN ACCQROANCE •nt ---· -• --IOC ER-2~ ....................................... NON-CONTINUOUS. ~S REQIMIED FOR SEAWALL PANEL CONC'R£TE IF NOT CAST IUIIEDFM flolEl<ISTALLAllON OF i,ADHESIVIEOOIIO.SANO ":E~~WTEREDOO'UTY ~~~ .. p~~~~THEBUILOl<IGOO'ARTMENTON.Y, 4. SITEVISITSCOHDUC1EOBYflolEENGINEERAREMERELYFOR08SERVATION PURPOSE ON.Y AND 00 NOT CONSTllUlE AN INSPECTION. .. Jl-l$S2JHAll90RISLN«l.NE'M'ORT8EAOI.CA9ffl0 l'lll'•-nDC _____ cwar---TICllll:t,.«J-lll.iQl-'"ff-.C"--"l---1*1'-~--fOllll>ti:nllClrt-C11.r_,,.o,co.-llJC110iill...,.nc~-'°'au•-,;;.-' :=e.~~-::;..~ ~--" ... __... UNDERGROUND SERVICE ALERT ~-,=-~ .. -~··· TWO WORKING DAYS BEFORE YOU DIG -4216/4217ofN-Cod•---•DlgA1an--bo-l>rin•-IO_\e ... bo .... i<I.FClf!'OU' D1gA1anlden'.fflootlon-...i .)1111,!IQ.IOl,J(llt"IW __ tott ..... c~,u.--._,..~=-~.:i.. 01"1a-ll'IIJW:ID-t-~ 0 ... 0"""" .; .. _ ~ j _!l_-000 o ... O) '\..,...,.,:i, c~,~ } 1.,~:lt,'Jl.11,:' \ • ·r.ot~ '•·" q. \: ~ ,.,_ ......... " ~ ... ~ .... :;.. PIICMBCT -1rrrr... 'UH•-11)' .. LJM~~.d " .... ~ ·,,,,,",. ~~Iii,;~ l\·,'J.:i.,.., ,., Y\.y,1,1: \)/• •. !: l!-irl&ll''rj '!l.~1 VICINITY MAP .... 1,,,, .... ,i;; a.s.\:ou.11iti·IV ,t.Al/"'/1 SCOPE OF WORK, TO REINFORCE THE EXISTING SEAWALL/BUU<HEAD BY UTILIZING OYWIOAG TIE-BACKS CONNECTING THE EXISTING CONCRETE CCPING TO NEW CONTINUOOS CONCRETE OEADMEN. 2. COIISTRUCT A NEW APPROXIMATELY 12" TALL CAST-IN-PLACE REINFORCED COHCRETE STEM/RETAINING WALL OH TOP OF THE EXISTING COPING. NOTI! TO THI! BIDDl!RB, AF'TER THORDUGHL Y EXAMINING THE C0NSTRUC1l0N DOCUMENTS ANO THE SITE: 1. NOTIFY THE ARCJtlTECT N«J/OR THE ENGINEER IN WRITING, REGARDING ALL DISCREPANCIES REQUIRING CLARIFICATIO.., PRIOR TO THE "90 SUBMITTAL". 2. IF flolE ARO-IITECT ANO/OR THE ENGINEER IS NOT NOTIFIED, AS REQUIRED PER ITEM fl ABOVE. IT SHALL MEAN THAT THE CONTRACTOR HAS CONSIOERED AIJEQUATE CONTINGENCY IN HIS BIO TO COVER ALL COSTS TO COMPLY '111TH THE MOST STRINGENT CONDITIONS. 3. THE CONTRACTOR SHALL NOT BE ENTillED TO ANY ADOITIONAL COMPENSATION FOR ANY DISCREPANCY DISCOVERED AFTER flolE "CLOS£ <S THE BIO". I• f jii11 :l!li l!l!p ·1'"1 I, .. •Iii! l!!!I liiii 0 "' "' N °' C Q () z . c:i:: ... () ,-0C z -111 < a:ID u i 01-ma: ' a:o CA. e; :i:::11 i ..,.., 0 NZ -.:: !;; C ::, .. I: "I!! 0 z zC .. " ~3 .. " = .. .... C ~ "'= !ii~ h jll d ;i! ;J_ i ... ~ ilE t .. '"f g •= .!; ~ ..... = --Zl,i,,, ~u !Zffii~, •!l!h ~<ll-~!!· ~ .. ~~ i• ee ~g :S!~-~ ~ t,l!!c:a z ~ < ;.,i1il '::tfJ s AH ., ,0 ~ 0 I Cl) PA2019-051SITE PLAN 23 HARBOR ISLAND , , I I 1: I : \\. • 11 I ------i : \:-\ :;i: , , EXISTING BUILDING ----, -,--11 , 11 ~ ...; I I I -I ----,,-'~-j \: ~ I I --1..--II I I I .... ,1 : II I I• •ii ' --:u :•i ·,,: r--- --: :!, ·;:;1: "--_:-_-., I I•"' ;.. '', n I I \\-< ;j, :: : l :• PROPERTY -1: Ii: I ii '"'""~'\\, :~,: : 1\ : I --' I I I 4' I ---~\ \\ \ ".C:~"-'°'-;,~j·-::-:-::T i: r~:;-;=;_-=:;1t~~~?~~:~:""'.J \ \ ~ 9''M1N----e·-e· \ \ --\ \ ----1 ~---n~~~ AH I II I II I II I II I II I II I II I II I II I II I II I II \ II f II -tt \ 11 ~ \ \ \ ~ I II ~t~~0t<iA~:~ THE (E) CUT TIE-BACKS APPROXIMATELY 10'-0" O.C. : ~ t : ,,, ----1 ' -==~\ -----b--====== : : t--, .. ~ FOR BULKHEAD ELEVATION (E) aER/PCATI'ORM_/ 10'-0" , .. -----------------------,: PROPERTY LINE TYP f>--------GUARORAIL (OEF'ERR£0 SUBMITTAL) (N) AHatOR CONN TYP t i' ---0 --------0 --------0 1-------0 --------0 ---le__ ~~ =~ =N:~:~\:~ rn> ,---r--=i---r--=,---r---,-'f--1 I I I I I I I I I I I I I I I I I I I I I I I I I I : : : : : I I I I I I I -----(£) DREDGE UNE I I I I I I ,-'----'-+--'-\-----(E) CONC PANn TO REMAIN rn> ~~ " APPLY OCTAL @AT THE ENTIRE PERIMETER OF ANY EXCAVATED MATERIAL PILED UP AT THE PRO..ECT SITE IN COMPUAQNCE 'MTH llEM 6 UNOER "EROSIQ\I CONlRCt. NOTES" ON SHEET S-0. ,-z < u i '-i 0 -,:: C .. .,5 ~g I• f jii11 :l!li l!l!p ·1'"1 I, .. •Iii! l!!!I liiii 0 "' "' N °' C Q () z . c:i:: ... () 0C -111 a:ID 01-ma: a:o CA. :i:::11 ..,.., NZ : 15 .. " = ~ . .. .... C ~ "':I ... ~ !-= !ii,,; .. .. j<> ~ d ;i! 0. ... ~ iii: ~ t .. '"f Ii:! .!; ..... = --11.i:di! ! t:J HI ~!!)·hi, ~ ~ ~--r·ee ~g Q 1:S!~-~ ~ t,l!!c:a z ~ < ;.,i1il '::tfl s AH ., <O "' "-=-"" ;::. ... I Cl) BULKHEAD ELEVATION V PA2019-051$-,S COIT EA FACE 14 lES T'rP 2-15 EA WAY,: 1'-6" LCNG 0 EACH ANCHOR ROO NOTE : FORINFORMATION NOT SHOMt. SEE OETAILffi. DETAIL I N.T.S. HEAT SHRINK SLEEVE CENTERED O\,£R COUPLER (•) DELETE GROUT SLEEVE ON FIELD CUT TENDONS COUP! EB INSIAI I ADON PBOCEPllBE· 1. APPLY CORROSION .. HIBITING GREASE TO THE BARE ENOS OF THE BARS ANO THE INSIDE OF THE COUPLER. 2. C04NECT THE TWO BAR ENOS WITH THE COUPLER. EACH ENO SHAU. BE SCREV£D INTO THE COUl'l..ER HALF THE l£NGTH OF THE COUPLER. l. TORQUE BAR ENOS 4. ADO ANOTHER COA ANO WRAP WITH TW 5. CENTER HEAT SHR .. K HEAT UNTIL Sl..£E',I[ IS DCP COUPLER DETAIL L i-~~ / .ff ANCHOR PLATE 1,:aJS,,:&JS W/ANCHOR NUT BEHIND 2-f5 \'ERT a HORIZ BARS NOTE : FOR .. FORMATION NOT SHO'M,1, SEE DETAILS ffi a ffi. GROUT Sl.EE\IE (•) 2 LA'IERS OF Ma..DABLE DENSO TAPE OVER BAA£ BAA ANO COUPLER L___SPAC£ BETWEEN COUPLER Atl.) BAR TO BE COMl'l..ElEL Y FILLED WITH CORROSION .. H181TING GREASE PREPARATION EOR EIEI P CUT RAB$· 1. CUT CCRROSION PROTECTION AND THREAD BAR WITH AN ABRASIVE SAW (00 NOT USE A TORCH). 2.~mJ...~~g·~~{~GtTEDAtl.)CEMENT B b ~ (E) CONC PANELS TO REMAIN a BE PROTECTED----: 9 " 7 / ,,1-/ ,/,'~"''"'"""'''"" EXCAVATION FOR SEAWAU. REINFORCING. EXCAVATE AT SHOMt PRIOR TO THE BEGINMNG OF DIGGING FOR TIE-BACKS a OU.OMEN .. STAU.ATION 25':I:, SEE PLAN ~ • ~ ~ I'.~ .•. 1·.:.·.·. ~>) r,::_·:. 1,.:"'I ~ t" .-. ·.~ .__.. _______ LJ·J G I TYPICAL SECTION INSTAU. (N) FILTER Q.OTH AT PANEL JOINTS PER NOTES CN SliEET S-0 OR SEAL PANEL JOINTS AT BAYWARO FACE OF PANELS TO A\.00 SOL MIGRATICN R~j~J n GUARORAIL (OEFERREO SUBMITAU.)-j i f5 ADHESIVE TIES 0 16" 0.C. $" M .. Dl!EDOEDrn> T'rRCAL SCCTION SANDBAG VELOCITY R£DUC£R DETAIL II I VELOCITY REDUCER DETAIL I ,.,.s. N TllO ROltS OF SAHOBAGS 1HRff BAGS HIGH TO£ OF SLOP£ PROTECTION DETAIL = THIS DETAIL SHAU. APPLY AT THE ENTIRE PERIMETER OF ANY EXCAVATED 2-f4W4T (E)C04C COPING & PANEL -~---1 = CARE SHAU. BE EXEROSED BY THE CONlRACTOR NOT TO CUT ANY OF THE EXISTING REINFORCttG DURING THE CORE ORIWNG FOR THE d ,. MATERIAL PILED UP AT THE PRo..ECT SITE IN COMPLIANCE 'MTH ITEM 6 UNDER "EROSION W4TROL NOTES" ON SHEET S-0. .. STAU.ATION OF 1l£ CONNECTION SHO'M,1 ABOVE. ,,.s. BYO<L "DB¥ FOR (N) CONT W4C OEAlilAN T'rP SEE/B J ~GATED p-.,: 9£ATHING SHOP GROUTED F\U. LENGTH VIITH 1l£ Fa.I.OWING GROUT .. ~ ~~4 ~'"r"E Ill 4.$-5 GAL WATER 0.75 LBS. INTRUSION Al> LS =, IN CASE OF PROPOSED BUILDING FOOTINGS INTERFERE 'MTH 1l£ TIE-BACKS. DEEPEN FOOTINGS PER STRUCTURAL ENGINEER OF THE BUILDING REQIJIREMENTS AND PROVIDE SCHE0Ul£ 40 p-.,: Sl.EE\IES FOR MINIMUM 2" CLEAR DISTANCE AROUND TIE-SACKS. N.T.S. K ,-. z < u ii' ~ ' e; i 0 -,:: C .. I• f jii11 :l!li l!l!p ·1'"1 I, .. •Iii! l!!!I liiii 0 "' "' N °' C Q () z . c:i:: ... () !!l :l a:ID 01-ma: a:o CA. :i:::11 ..,111 NZ .,I!! 0 ~g ! ..... .... cl ~ "'= !ii~ ~ !i5 jli ~ d ;i! ... ~ ilE t .. '"f •= .!; """ = llii:di! 111! t:J HI ~!!ii U, ~~ ~ ~--r· ee r-1 -------,1-~I Q_JI 3~ ~ :~ ~~ Z ;c 111"' i 1il CORE DRILL (E) COPING FOR ANCHOR CONN. AFTER STRESSING, TREAT SURFACE 'MTH BONDING A~T ANO FLL 'MTH RAPID SET NON-SHRINK ORWT '::tfl s AH ., <O N 1'------------~----~-+------------~----~-+------------~----~-+------------~----~--+------------~~---~---1~ I Cl) R 8 TOE OF SLOPE PROTECTION N.T.S. T SECTION N.T.S. I u V